{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303 | ||
-1257 February 16, 2017 Mr. Tom Simril Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745 | |||
-9635 | |||
SUBJECT: | |||
ERRATA FOR CATAWBA NUCLEAR STATION | |||
- NRC INTEGRATED INSPECTION REPORT 05000413/2016003 AND 05000414/2016003 AND EXERCISE OF ENFORCEMENT DISCRETION | |||
==Dear Mr. Simril:== | |||
The U.S. Nuclear Regulatory Commission (NRC) has identified an error in NRC Inspection Report 05000413/201600 3 and 05000414/201600 3, dated November 2, 2016 (ADAMS Accession No. ML16307A004). Specifically, the licensed operator requalification biennial sample (IP 71111.11) was not included in the report (Section 1R11.3 | |||
). As a result, the NRC has reissued the report in its entirety to correct this error. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading | |||
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding. | |||
" | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 | Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50 | ||
-413, 50-414 License Nos.: NPF | |||
-35, NPF-52 | |||
===Enclosure:=== | ===Enclosure:=== | ||
IR 05000413/2016003 and 05000414/2016003 | IR 05000413/2016003 and 05000414/2016003 | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplementa l Information cc w/encl: Distribution via ListServ | |||
ML16307A004). Specifically, the licensed operator requalification biennial sample (IP 71111.11) was not included in the report (Section 1R11.3) | |||
. As a result, the NRC has reissued the report in its entirety to correct this error. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading | |||
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding. | |||
" | |||
Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 | Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50 | ||
-413, 50-414 License Nos.: NPF | |||
-35, NPF-52 | |||
===Enclosure:=== | ===Enclosure:=== | ||
IR 05000413/2016003 and 05000414/2016003 | IR 05000413/2016003 and 05000414/2016003 | ||
===w/Attachment:=== | ===w/Attachment:=== | ||
Supplemental Information cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPII\RPB1\CatawbaErrarta\REPORTS\2016\2016003 ADAMS ACCESSION NUMBER: ML17047A549 SUNSI Review Complete By: Frank Ehrhardt ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: SUNSI review complete OFFICE RII: DRP RII: DRP NAME JWorosilo FEhrhardt SIGNATURE JGW1 FJE DATE 2/16/2017 2/16/2017 Letter to Tom Simril from Frank Ehrhardt dated February 16, 2017 | Supplemental Information cc w/encl: Distribution via ListServ DOCUMENT NAME: | ||
G:\DRPII\RPB1\CatawbaErrarta\REPORTS\2016\2016003 ADAMS ACCESSION NUMBER: | |||
ML17047A549 SUNSI Review Complete By: Frank Ehrhardt ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: SUNSI review complete OFFICE RII: DRP RII: DRP NAME JWorosilo FEhrhardt SIGNATURE JGW1 FJE DATE 2/16/2017 2/16/2017 Letter to Tom Simril from Frank Ehrhardt dated February 16, 2017 | |||
SUBJECT: ERRATA FOR CATAWBA NUCLEAR STATION - NRC INTEGRATED INSPECTION REPORT 05000413/2016003 AND 05000414/2016003 AND EXERCISE OF ENFORCEMENT DISCRETION DISTRIBUTION: M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Report No.: 05000413/2016003 and 05000414/2016003 Licensee: Duke Energy Carolinas, LLC Facility: Catawba Nuclear Station, Units 1 and 2 Location: York, SC 29745 Dates: July 1, 2016 through September 30, 2016 Inspectors: J. Austin, Senior Resident Inspector C. Scott, Resident Inspector M. Toth, Project Engineer J. Montgomery, Senior Reactor Inspector (Section 4OA3) R. Williams, Senior Reactor Inspector (Sections 1R07, 1R08) R. Kellner, Senior Health Physicist (Sections 2RS1, 2RS3) C. Dykes, Health Physicist (Sections 2RS2, 2RS4) J. Panfel, Health Physicist (Sections 2RS5, 4OA1) R. Baldwin, Senior Operations Engineer (Section 1R11) D. Bacon, Senior Operations Engineer (Section 1R11) J. Cruz, Senior Project Manager (Section 1R11) Approved by: Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects | SUBJECT: | ||
ERRATA FOR CATAWBA NUCLEAR STATION | |||
- NRC INTEGRATED INSPECTION REPORT 05000413/2016003 AND 05000414/2016003 AND EXERCISE OF ENFORCEMENT DISCRETION DISTRIBUTION | |||
: M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos.: | |||
50-413, 50-414 License Nos.: | |||
NPF-35, NPF-52 Report No.: | |||
05000413/2016003 and 05000414/2016003 Licensee: | |||
Duke Energy Carolinas, LLC Facility: | |||
Catawba Nuclear Station, Units 1 and 2 Location: | |||
York, SC 29745 Dates: July 1, 2016 through September 30, 2016 Inspectors: | |||
J. Austin, Senior Resident Inspector C. Scott, Resident Inspector M. Toth, Project Engineer J. Montgomery, Senior Reactor Inspector (Section 4OA3) | |||
R. Williams, Senior Reactor Inspector (Sections 1R07, 1R08) R. Kellner, Senior Health Physicist (Sections 2RS1, 2RS3) C. Dykes, Health Physicist (Sections 2RS2, 2RS4) J. Panfel, Health Physicist (Sections 2RS5, 4OA1) R. Baldwin, Senior Operations Engineer (Section 1R11) | |||
D. Bacon, Senior Operations Engineer (Section 1R11) | |||
J. Cruz, Senior Project Manager (Section 1R11) | |||
Approved by: | |||
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects | |||
=SUMMARY= | =SUMMARY= | ||
IR 05000413/ | IR 05000413/2016 003 and 05000414/2016 003, July 1, 2016 through September 30, 2016 | ||
; Catawba Nuclear Station, Units 1 and 2; Integrated Inspection Report The report covered a three-month period of inspection by the resident inspectors and regional inspectors | |||
. No findings were identified during this inspection period. | |||
Policy dated August 1, 2016. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 6. | The significance of inspection findings are indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process," (SDP) dated April 29, 2015. The cross-cutting aspects are determined using IMC 0310, "Aspects within the Cross-Cutting Areas" dated December 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy dated August 1, 2016 | ||
. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG | |||
-1649, "Reactor Oversight Process | |||
," Revision 6 | |||
. | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Summary of Plant Status | |||
===Summary of Plant Status=== | |||
Unit 1: Operated at or near 100 percent rated thermal power for the entire inspection period. | |||
Unit 2: Operated at or near 100 percent rated thermal power through September 9. On September 10 | |||
, the unit commenced refueling outage 2EOC21 and remained in the outage throughout the report period. | |||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
| Line 67: | Line 111: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Impending Adverse Weather Conditions=== | ===.1 Impending Adverse Weather Conditions=== | ||
The inspectors reviewed the licensee's preparations to protect risk-significant systems from tropical storm Hermine expected September 2-3, 2016. The inspectors evaluated the licensee's implementation of adverse weather preparation procedures and compensatory measures, including operator staffing, before the onset of the adverse weather conditions. The inspectors reviewed the licensee's plans to address the consequences that may result from the tropical storm. The inspectors verified that operator actions specified in the licensee's adverse weather procedure | |||
The inspectors reviewed the licensee's preparations to protect risk | |||
-significant systems from tropical storm Hermine expected September 2 | |||
-3, 2016. The inspectors evaluated the licensee's implementation of adverse weather preparation procedures and compensatory measures, including operator staffing, before the onset of the adverse weather conditions. | |||
The inspectors reviewed the licensee's plans to address the consequences that may result from the tropical storm. The inspectors verified that operator actions specified in the licensee's adverse weather procedure maintain ed readiness of essential systems. The inspectors verified that required surveillances were current, or were scheduled and completed, if practical, before the onset of anticipated adverse weather conditions. The inspectors also verified that the licensee implemented periodic equipment walkdowns or other measures to ensure that the condition of plant equipment met operability requirements. Documents reviewed are listed in the | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 77: | Line 127: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Partial Walkdown=== | ===.1 Partial Walkdown=== | ||
The inspectors selected the following three systems or trains to inspect: | The inspectors verified that critical portions of the selected systems were correctly aligned by performing partial walkdowns. The inspectors selected systems for assessment because they were a redundant or backup system or train, were important for mitigating risk for the current plant conditions, had been recently realigned, or were a single-train system. The inspectors determined the correct system lineup by reviewing plant procedures and drawings. Documents reviewed are listed in the | ||
. | |||
The inspectors selected the following three systems or trains to inspect: | |||
2A diesel generator (DG) with the 2B DG out of service (OOS) for planned maintenance 2B motor driven auxiliary feedwater ( | |||
CA) pump with the 2A CA pump OOS for service water to auxiliary feedwater flow measurement 1B containment spray ( | |||
NS) pump with the 1A NS pump OOS for maintenance | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 89: | Line 143: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Quarterly Inspection=== | ===.1 Quarterly Inspection=== | ||
Auxiliary building 594' Level, fire area 22 2A DG room, fire area 27 | The inspectors evaluated the adequacy of selected fire plans by comparing the fire plans to the defined hazards and defense | ||
-in-depth features specified in the fire protection program. In evaluating the fire plans, the inspectors assessed the following items: | |||
control of transient combustibles and ignition sources fire detection systems fire suppression systems manual firefighting equipment and capability passive fire protection features compensatory measures and fire watches issues related to fire protection contained in the licensee's corrective action program The inspectors toured the following five fire areas to assess material condition and operational status of fire protection equipment. Documents reviewed are listed in the | |||
. | |||
Auxiliary building 594' Level, fire area 22 2A DG room, fire area 27 Unit 1, Essential Switchgear Room level 577', fire area 15 Unit 1, Essential Switchgear Room level 560', fire area 8 Unit 1, Turbine Building 594' level, fire zone N | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 101: | Line 159: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Internal Flooding=== | ===.1 Internal Flooding=== | ||
The inspectors reviewed related flood analysis documents and walked down the area listed below containing risk-significant structures, systems, and components susceptible to flooding. The inspectors verified that plant design features and plant procedures for flood mitigation were consistent with design requirements and internal flooding analysis assumptions. The inspectors also assessed the condition of flood protection barriers and drain systems. In addition, the inspectors verified the licensee was identifying and properly addressing issues using the corrective action program. Documents | |||
The inspectors reviewed related flood analysis documents and walked down the area listed below containing risk | |||
-significant structures, systems, and components susceptible to flooding. The inspectors verified that plant design features and plant procedures for flood mitigation were consistent with design requirements and internal flooding analysis | |||
assumptions. The inspectors also assessed the condition of flood protection barriers and drain systems. In addition, the inspectors verified the licensee was identifying and properly addressing issues using the corrective action program. Documents review ed are listed in the | |||
. | |||
Unit 1, turbine building | Unit 1, turbine building | ||
| Line 109: | Line 172: | ||
{{a|1R07}} | {{a|1R07}} | ||
==1R07 Heat Sink Performance== | ==1R07 Heat Sink Performance== | ||
(71111.07T) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Triennial Review of Heat Sink Performance | Triennial Review of Heat Sink Performance The inspectors reviewed operability determinations, completed surveillances, vendor manual information, associated calculations, performance test results, and cooler inspection results associated with the service water pump upper bearing oil cooler (SWUBOC) and the auxiliary feedwater pump motor coolers (AFWPMC). These coolers were chosen based on their risk significance in the licensee's probabilistic safety analysis, their important safety | ||
-related mitigating system support functions and their relatively low margin. | |||
For the SWUBOC, the inspectors determined whether testing, inspection, maintenance, and monitoring of biotic fouling and macrofouling programs were adequate to ensure proper heat transfer. This was accomplished by determining whether the test method used was consistent with accepted industry practices, or equivalent; the test conditions were consistent with the selected methodology; the test acceptance criteria were consistent with the design basis values; and reviewing results of heat exchanger performance testing. The inspectors also determined whether the test results appropriately considered differences between testing conditions and design conditions, whether the frequency of testing based on trending of test results was sufficient to detect degradation prior to loss of heat removal capabilities below design basis values, and whether test results considered test instrument inaccuracies and differences. | |||
For the AFWPMC, the inspectors reviewed the methods and results of heat exchanger performance inspections. The inspectors determined whether the methods used to inspect and clean heat exchangers were consistent with as | |||
-found conditions identified and expected degradation trends and industry standards; the licensee's inspection and cleaning activities had established acceptance criteria consistent with industry standards; and the as | |||
-found results were recorded, evaluated, and appropriately dispositioned so that the as | |||
-left condition was acceptable. | |||
In addition, the inspectors determined whether the condition and operation of the SWPUBOC and the AFWPMC were consistent with design assumptions in heat transfer calculations, and as described in the final safety analysis report. This included determining whether the number of plugged tubes was within pre | |||
-established limits based on capacity and heat transfer assumptions. The inspectors determined whether the licensee evaluated the potential for water hammer and established adequate controls and operational limits to prevent heat exchanger degradation due to excessive flow induced vibration during operation. In addition, visual inspection records were reviewed to determine the structural integrity of the heat exchanger. For the AFWPMC, the inspectors determined whether the licensee's chemical treatment programs for corrosion control were consistent with industry norms, and implemented accordingly. | |||
The inspectors determined whether the performance of the safety-related ultimate heat sink, identified as the standby nuclear service water pond (SNSWP), and its subcomponents such as piping, intake screens, pumps, valves, etc., was appropriately evaluated by tests or other equivalent methods, to ensure availability and accessibility to the in-plant cooling water systems. The inspectors determined whether the licensee's inspection of the SNSWP was thorough and of sufficient depth to identify degradation of the shoreline protection or loss of structural integrity. This included determination whether vegetation present along the slopes was trimmed, maintained, and was not adversely impacted the embankment. In addition, the inspectors determined whether the licensee ensured sufficient reservoir capacity by trending and removing debris, or sediment buildup, in the SNSWP. | The inspectors determined whether the performance of the safety | ||
-related ultimate heat sink, identified as the standby nuclear service water pond (SNSWP), and its subcomponents such as piping, intake screens, pumps, valves, etc., was appropriately evaluated by tests or other equivalent methods, to ensure availability and accessibility to the in-plant cooling water systems. The inspectors determined whether the licensee's inspection of the SNSWP was thorough and of sufficient depth to identify degradation of the shoreline protection or loss of structural integrity. This included determination whether vegetation present along the slopes was trimmed, maintained, and was not adversely impacted the embankment. In addition, the inspectors determined whether the licensee ensured sufficient reservoir capacity by trending and removing debris, or sediment buildup, in the SNSWP. | |||
The inspectors reviewed the licensee's operation of the service water system and SNSWP. This included a review of licensee's procedures for a loss of the service water system or SNSWP; a verification that instrumentation, which is relied upon for decision making, was available and functional; and a review of design changes made to the service water system and the SNSWP. In addition, the inspectors determined whether macrofouling was adequately monitored, trended, and controlled by the licensee to prevent clogging. The inspectors determined whether the licensee's biocide treatments for biotic control were adequately conducted and whether the results were adequately monitored, trended, and evaluated. The inspectors also reviewed whether the licensee maintained adequate pH, calcium hardness, etc. | The inspectors reviewed the licensee's operation of the service water system and SNSWP. This included a review of licensee's procedures for a loss of the service water system or SNSWP; a verification that instrumentation, which is relied upon for decision making, was available and functional; and a review of design changes made to the service water system and the SNSWP. In addition, the inspectors determined whether macrofouling was adequately monitored, trended, and controlled by the licensee to prevent clogging. The inspectors determined whether the licensee's biocide treatments for biotic control were adequately conducted and whether the results were adequately monitored, trended, and evaluated. The inspectors also reviewed whether the licensee maintained adequate pH, calcium hardness, etc. | ||
The inspectors reviewed the licensee's performance testing of service water system and SNSWP results. This included a review of the licensee's performance test results for key components and service water flow balance test results. In addition, the inspectors compared the flow balance results to system configuration and flow assumptions during design basis accident conditions. The inspectors also determined whether the licensee ensured adequate isolation during design basis events, consistency between testing methodologies and design basis leakage rate assumptions, and proper performance of risk significant non-safety related functions. | The inspectors reviewed the licensee's performance testing of service water system and SNSWP results. This included a review of the licensee's performance test results for key components and service water flow balance test results. In addition, the inspectors compared the flow balance results to system configuration and flow assumptions during design basis accident conditions. The inspectors also determined whether the licensee ensured adequate isolation during design basis events, consistency between testing methodologies and design basis leakage rate assumptions, and proper performance of risk significant non | ||
-safety related functions. | |||
The inspectors performed a system walkdown of the service water systems to determine whether the licensee's assessment on structural integrity was adequate. In addition, the inspectors reviewed available licensee testing and inspections results, the licensee's disposition of any active through wall pipe leaks, and the history of through wall pipe leakage to identify any adverse trends since the last NRC inspection. For buried or inaccessible piping, the inspectors reviewed the licensee's pipe testing, inspection, or monitoring program to determine whether structural integrity was ensured and that any leakage or degradation was appropriately identified and dispositioned by the licensee | The inspectors performed a system walkdown of the service water systems to determine whether the licensee's assessment on structural integrity was adequate. In addition, the inspectors reviewed available licensee testing and inspections results, the licensee's disposition of any active through wall pipe leaks, and the history of through wall pipe leakage to identify any adverse trends since the last NRC inspection. For buried or inaccessible piping, the inspectors reviewed the licensee's pipe testing, inspection, or monitoring program to determine whether structural integrity was ensured and that any leakage or degradation was appropriately identified and dispositioned by the licensee. | ||
In addition, the inspectors | The inspectors performed a system walkdown of the service water intake structure to determine whether the licensee's assessment o f structural integrity and component functionality was adequate and that the licensee ensured proper functioning of traveling screens and strainers, and structural integrity of component mounts. In addition, the inspectors determined whether service water pump bay silt accumulation was monitored, trended, and maintained at an acceptable level by the licensee, and that water level instruments were functional and routinely monitored. The inspectors also determined whether the licensee's ability to ensure functionality during adverse weather conditions was adequate. | ||
In addition, the inspectors reviewed condition reports related to heat exchanger, cooler and heat sink performance issues to determine whether the licensee had an appropriate threshold for identifying issues and to evaluate the effectiveness of the corrective actions. The documents that were reviewed are included in the | |||
. | |||
These inspection activities constituted three heat sink inspection samples as defined in IP 71111.07-05. | These inspection activities constituted three heat sink inspection samples as defined in IP 71111.07-05. | ||
| Line 135: | Line 212: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Non-Destructive Examination Activities and Welding Activities | Non-Destructive Examination Activities and Welding Activities | ||
From September 19 through September 29, 2016, the inspectors conducted an onsite review of the implementation of the licensee's in | |||
-service inspection (ISI) program for monitoring degradation of the reactor coolant system boundary, risk | |||
-significant piping and component boundaries, and containment boundaries in Unit 2. | |||
The inspectors either directly observed or reviewed the following non | |||
-destructive examinations (NDEs) mandated by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code of Record: 1998 Edition with 2000 Addenda) to evaluate compliance with the ASME Code, Section XI and Section V requirements and, if any indications or defects were detected, to evaluate if they were dispositioned in accordance with the ASME Code or an NRC | |||
-approved alternative requirement. The inspectors also reviewed the qualifications of the NDE technicians performing the examinations to determine whether they were current and in compliance with the ASME Code requirements. | |||
Boric Acid Corrosion Control Inspection Activities | Ultrasonic Examination (UT) of weld 2NI106 | ||
-14, Pipe to tee weld, ASME Class 2 (observed) | |||
Liquid Penetrant Examination (PT) of weld 2492NW158 | |||
-10, Pipe to valve weld, ASME Class 2 (reviewed) | |||
PT of weld 2SM | |||
-005, Access hole plug weld, ASME Class 2 (observed) | |||
Magnetic Particle Examination (MT) of weld C2.C5.51.0002, Pipe to elbow weld, ASME Class 2 (reviewed) | |||
MT of weld C2.C5.51.0001, Elbow to pipe weld, ASME Class 2 (reviewed) | |||
Visual Examination (VT) of 2RPV | |||
-BMI-NOZZLES, ASME Class 1 (reviewed) | |||
VT of 2RPV | |||
-HEAD-SURFACE-MULTIPLE, ASME Class 1 (reviewed) | |||
The inspectors either directly observed or reviewed the following welding activities, qualification records, and associated documents in order to evaluate compliance with procedures and the ASME Code, Section XI and Section IX requirements. Specifically, the inspectors reviewed the work order, repair and replacement plan, weld data sheets, welding procedures, procedure qualification records, welder performance qualification records, and NDE reports. | |||
Weld 2492NW158 | |||
-10, Pipe to valve weld, ASME Class 2 (reviewed) | |||
Weld 2SM-005, Access hole plug weld, ASME Class 2 (observed) | |||
During non | |||
-destructive surface and volumetric examinations performed since the previous refueling outage, the licensee did not identify any relevant indications that were analytically evaluated and accepted for continued service | |||
; therefore, no NRC review was completed for this inspection procedure attribute. | |||
PWR Vessel Upper Head Penetration Inspection Activities The inspectors verified that for the Unit 2 vessel head, a bare metal visual (BMV) examination and a volumetric examination were not required during this outage, in accordance with the requirements of ASME Code Case N 1 and 10 CFR 50.55a(g)(6)(ii)(D). The inspectors reviewed the calculation of effective degradation years, the previous examination history, and reviewed the results of the VT | |||
-2 examination performed under the vessel head insulation to verify that the examinations were performed in accordance with the requirements of ASME Code, Section XI, Article IWA-2212 requirements and the frequency was consistent with the Code Case. | |||
The licensee did not identify any relevant indications that were accepted for continued service. Additionally, the licensee did not perform any welding repairs to the vessel head penetrations since the beginning of the last Unit 2 refueling outage; therefore, no NRC review was completed for these inspection procedure attributes. | |||
Boric Acid Corrosion Control Inspection Activities The inspectors reviewed the licensee's boric acid corrosion control (BACC) program activities to determine if the activities were implemented in accordance with the commitments made in response to NRC Generic Letter 88 | |||
-05, "Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants," and applicable industry guidance documents. Specifically, the inspectors performed an onsite records review of procedures and the results of the licensee's containment walkdown inspections performed during the current refueling outage. The inspectors also interviewed the BACC program owner, conducted an independent walkdown of containment to evaluate compliance with licensee's BACC program requirements, and verified that degraded or non-conforming conditions, such as boric acid leaks, were properly identified and corrected in accordance with the licensee's BACC and corrective action programs. | |||
The inspectors reviewed the following engineering evaluations, completed for evidence of boric acid leakage, to determine if the licensee properly applied applicable corrosion rates to the affected components; and properly assessed the effects of corrosion induced wastage on structural or pressure boundary integrity in accordance with the licensee procedures. | The inspectors reviewed the following engineering evaluations, completed for evidence of boric acid leakage, to determine if the licensee properly applied applicable corrosion rates to the affected components; and properly assessed the effects of corrosion induced wastage on structural or pressure boundary integrity in accordance with the licensee procedures. | ||
AR 01898992, Excessive / Active boron accumulation from 2-NI-VA-327 pipe AR 01931170, 0-WL-FE-9780 Active / Excessive boron leak from flange | AR 01898992, Excessive / Active boron accumulation from 2 | ||
-NI-VA-327 pipe AR 01931170, 0 | |||
-WL-FE-9780 Active / Excessive boron leak from flange AR 01940775, 1 | |||
-NM-PG-6100 Active / Excessive boron from threaded fitting AR 01950202, 2 | |||
-KF-FS-5150 Active boron leak from fitting 30 | |||
-40 dpm The inspectors reviewed the following condition reports and associated corrective actions related to evidence of boric acid leakage to evaluate if the corrective actions completed were consistent with the requirements of the ASME Code and 10 CFR Part 50, Appendix B, Criterion XVI. | |||
AR 02060953, 2B NC Pump main flange leak AR 02020057, 1 | |||
-NS-VA-1B Excessive/active boron, leak increase AR 02047391, 1 | |||
-FW-VA-45 Active Boron Leak Steam Generator Tube Inspection Activities The inspectors reviewed the eddy current (EC) examination activities performed in Unit 2 steam generators A | |||
, B, C, and D during this current refueling outage to verify compliance with the licensee's Technical Specifications, ASME BPVC Section XI, and Nuclear Energy Institute 97 | |||
-06, "Steam Generator Program Guidelines." | |||
The inspectors reviewed the scope of the EC examinations, and the implementation of scope expansion criteria, to verify these were consistent with the Electric Power Research Institute (EPRI) Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7. The inspectors reviewed documentation for a sample of EC data analysts, probes, and testers to verify that personnel and equipment were qualified to detect the applicable degradation mechanisms in accordance with the EPRI Examination Guidelines. This review included a sample of site | |||
-specific Examination Technique Specification Sheets (ETSSs) to verify that their qualification and site | |||
-specific implementation were consistent with Appendix H or I of the EPRI Examination Guidelines. The inspectors also reviewed a sample of EC data for steam generator tubes (B-R29C38, B | |||
-R25C42, B | |||
-R29C43, B | |||
-R32C33, C | |||
-R44C87, and D-R28C69), with a qualified data analyst, to confirm that data analysis and equipment configuration were performed in accordance with the applicable ETSSs and site | |||
-specific analysis guidelines. The inspectors verified that recordable indications were detected and size d | |||
in accordance with vendor procedures. | |||
The inspectors selected a sample of degradation mechanisms from the Unit 2 Degradation Assessment report (i.e. anti-vibration bar wear and stress corrosion cracking) and verified that their respective in | |||
-situ pressure testing criteria were determined in accordance with the EPRI Steam Generator Integrity Assessment Guidelines, Revision 3. Additionally, the inspectors reviewed EC indication reports to determine whether tubes with relevant indications were appropriately screened for in | |||
-situ pressure testing. The inspectors also compared the latest EC examination results with the last Condition Monitoring and Operational Assessment report for Unit 2 to assess the licensee's prediction capability for maximum tube degradation and number of tubes with indications. The inspectors verified that the licensee's evaluation was conservative and that current examination results were bound by the Operational Assessment projections. | |||
The inspectors assessed the latest EC examination results to verify that new degradation mechanisms, if any, were identified and evaluated before plant startup. The review of EC examination results included the disposition of potential loose part indications on the steam generator secondary side to verify that corrective actions for evaluating and retrieving loose parts were consistent with the EPRI Guidelines. The inspectors also reviewed a sample of primary | |||
-to-secondary leakage data for Unit 2 to confirm that operational leakage in each steam generator remained below the detection or action level threshold during the previous operating cycle. | |||
The inspectors | The inspectors' review included the implementation of tube repair criteria and repair methods to verify they were consistent with plant Technical Specifications and industry guidelines. The inspectors verified that the licensee had selected the appropriate tubes for plugging based on the required plugging criteria. The inspectors reviewed the tube plugging procedure and directly observed tube plugging activities for tubes A | ||
-R36C37 and B-R23C104, to determine if the licensee installed the tube plugs in accordance with the applicable procedures. | |||
Furthermore, the inspectors interviewed licensee staff and reviewed a sample of inspection results for the visual inspection conducted in the primary side bowl of Steam Generator D, to verify that potential areas of degradation based on site | |||
-specific operating experience were inspected, and appropriate corrective actions were taken to address degradation indications. | |||
Identification and Resolution of Problems | |||
The inspectors reviewed a sample of ISI | |||
-related issues entered into the corrective action program to determine if the licensee had appropriately described the scope of the problem and had initiated corrective actions. The review also included the licensee's consideration and assessment of operating experience events applicable to the plant. The inspectors performed this review to ensure compliance with 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," requirements. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 161: | Line 298: | ||
{{a|1R11}} | {{a|1R11}} | ||
==1R11 Licensed Operator Requalification Program and Licensed Operator Performance== | ==1R11 Licensed Operator Requalification Program and Licensed Operator Performance== | ||
(71111.11) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Resident Inspector Quarterly Review of Licensed Operator Requalification=== | ===.1 Resident Inspector Quarterly Review of Licensed Operator Requalification=== | ||
The inspectors assessed the following: | On August 11, 2016 | ||
, the inspectors observed an evaluated simulator scenario administered to an operating crew as part of the annual requalification operating test required by 10 CFR 55.59, "Requalification". The crew responded to an instrument malfunction, followed by an automatic trip without a scram, loss of A 4 kV vital bus and a safety injection signal. | |||
The inspectors assessed the following: | |||
licensed operator performance the ability of the licensee to administer the scenario and evaluate the operators the quality of the post | |||
-scenario critique simulator performance | |||
===.2 Resident Inspector Quarterly Review of Licensed Operator Performance in the Actual Plant/Main Control Room=== | ===.2 Resident Inspector Quarterly Review of Licensed Operator Performance in the Actual Plant/Main Control Room=== | ||
The inspectors observed licensed operator performance in the main control room on July 26, 2016 while responding to an increase in letdown pressure caused by an equipment issue. | The inspectors observed licensed operator performance in the main control room on July 26, 2016 while responding to an increase in letdown pressure caused by an equipment issue. | ||
The inspectors assessed the following: | The inspectors assessed the following: | ||
use of plant procedures control board manipulations communications between crew members use and interpretation of instruments, indications, and alarms use of human error prevention techniques documentation of activities management and supervision Documents reviewed are listed in the | |||
. | |||
===.3 Licensed Operator Requalification=== | ===.3 Licensed Operator Requalification=== | ||
The inspectors reviewed the facility operating history and associated documents in preparation for this inspection. During the week of August 8 - 12, 2016, the inspectors reviewed documentation, interviewed licensee personnel, and observed the administration of operating tests associated with the licensee's operator requalification program. Each of the activities performed by the inspectors was done to assess the effectiveness of the facility licensee in implementing requalification requirements identified in 10 CFR Part 55, "Operators' Licenses." The evaluations were also performed to determine if the licensee effectively implemented operator requalification guidelines established in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," and Inspection Procedure 71111.11, "Licensed Operator Requalification Program." The inspectors also evaluated the licensee's simulation facility for adequacy for use in operator licensing examinations using ANSI/ANS-3.5-1985, "American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination." The inspectors observed two crews during the performance of the operating tests. Documentation reviewed included written examinations, Job Performance Measures (JPMs), simulator scenarios, licensee procedures, on-shift records, simulator modification request records, simulator performance test records, operator feedback records, licensed operator qualification records, remediation plans, watchstanding records, and medical records. The records were inspected using the criteria listed in Inspection Procedure 71111.11. Documents reviewed during the inspection are documented in the Attachment. | |||
The inspectors reviewed the facility operating history and associated documents in preparation for this inspection. During the week of August 8 | |||
- 12, 2016, the inspectors reviewed documentation, interviewed licensee personnel, and observed the administration of operating tests associated with the licensee's operator requalification program. Each of the activities performed by the inspectors was done to assess the effectiveness of the facility licensee in implementing requalification requirements identified in 10 CFR Part 55, "Operators' Licenses." The evaluations were also performed to determine if the licensee effectively implemented operator requalification guidelines established in NUREG | |||
-1021, "Operator Licensing Examination Standards for Power Reactors," and Inspection Procedure 71111.11, "Licensed Operator Requalification Program." The inspectors also evaluated the licensee's simulation facility for adequacy for use in operator licensing examinations using ANSI/ANS | |||
-3.5-1985, "American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination." The inspectors observed two crews during the performance of the operating tests. Documentation reviewed included written examinations, Job Performance Measures (JPMs), simulator scenarios, licensee procedures, on | |||
-shift records, simulator modification request records | |||
, simulator performance test records, operator feedback records, licensed operator qualification records, remediation plans, watchstanding records, and medical records. The records were inspected using the criteria listed in Inspection Procedure 71111.11. Documents reviewed during the inspection are documented in the Attachment | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 184: | Line 336: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors assessed the licensee's treatment of the three issues listed below to verify the licensee appropriately addressed equipment problems within the scope of the maintenance rule (10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power | The inspectors assessed the licensee's treatment of the three issues listed below to verify the licensee appropriately addressed equipment problems within the scope of the maintenance rule (10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plant s"). The inspectors reviewed procedures and records to evaluate the licensee's identification, assessment, and characterization of the problems as well as their corrective actions for returning the equipment to a satisfactory condition. Documents reviewed are listed in the | ||
. | |||
CR 2054316: | |||
02054316-05: QCE 02054316 | |||
- Aux. switch: medium voltage CR 2033128, Unit 0, A controlled area chilled water chiller trip, Maintenance rule functional failure oil pump CR 2052366, Extended equalize charge required for battery SDSB1 safe shutdown facility (SSF) | |||
In addition, the inspectors performed a review of the licensee's Quality Assurance Program to ensure licensee was in compliance with their program requirements. | In addition, the inspectors performed a review of the licensee's Quality Assurance Program to ensure licensee was in compliance with their program requirements. | ||
| Line 196: | Line 352: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors reviewed the four maintenance activities listed below to verify that the licensee assessed and managed plant risk as required by 10 CFR 50.65(a)(4) and licensee procedures. The inspectors assessed the adequacy of the licensee's risk assessments and implementation of risk management actions. The inspectors also verified that the licensee was identifying and resolving problems with assessing and managing maintenance-related risk using the corrective action program. Additionally, for maintenance resulting from unforeseen situations, the inspectors assessed the effectiveness of the licensee's planning and control of emergent work activities. Documents reviewed are listed in the | The inspectors reviewed the four maintenance activities listed below to verify that the licensee assessed and managed plant risk as required by 10 CFR 50.65(a)(4) and licensee procedures. The inspectors assessed the adequacy of the licensee's risk assessments and implementation of risk management actions. The inspectors also verified that the licensee was identifying and resolving problems with assessing and managing maintenance | ||
-related risk using the corrective action program. Additionally, for maintenance resulting from unforeseen situations, the inspectors assessed the effectiveness of the licensee's planning and control of emergent work activities. Documents reviewed are listed in the | |||
. | |||
Protected equipment plan for SSF DG control panel electrical maintenance | Protected equipment plan for SSF DG control panel electrical maintenance Yellow risk condition for 2A DG preventive maintenance Yellow risk condition for maintenance on 1A2 component cooling water pump Yellow risk condition while inspecting 1A DG connecting rod inspection | ||
====b. Findings==== | ====b. Findings==== | ||
| Line 206: | Line 362: | ||
{{a|1R15}} | {{a|1R15}} | ||
==1R15 Operability Determinations and Functionality Assessments== | ==1R15 Operability Determinations and Functionality Assessments== | ||
{{IP sample|IP=IP 71111.15}} | {{IP sample|IP=IP 71111.15}} | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
===.1 Operability and Functionality Review=== | ===.1 Operability and Functionality Review=== | ||
The inspectors selected the six operability determinations or functionality evaluations listed below for review based on the risk-significance of the associated components and systems. The inspectors reviewed the technical adequacy of the determinations to ensure that technical specification operability was properly justified and the components or systems remained capable of performing their design functions. To verify whether components or systems were operable, the inspectors compared the operability and design criteria in the appropriate sections of the technical specification and updated final safety analysis report to the licensee's evaluations. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the | The inspectors selected the six operability determinations or functionality evaluations listed below for review based on the risk | ||
-significance of the associated components and systems. The inspectors reviewed the technical adequacy of the determinations to ensure that technical specification operability was properly justified and the components or systems remained capable of performing their design functions. To verify whether components or systems were operable, the inspectors compared the operability and design criteria in the appropriate sections of the technical specification and updated final safety analysis report to the licensee's evaluations. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the | |||
CR 2039992, 2SV-19 stroke time longer than usual (for "A" Train solenoid) | . | ||
CR 2039992, 2SV | |||
-19 stroke time longer than usual (for "A" Train solenoid) | |||
CR 2049828, Unit 1 and Unit 2 EPL and EPQ minimum voltage calculations need revision CR 2053485, centrifugal charging pump 1B thrust bearing oil sight glass leak CR 2059121, 1B DG starting air compressor not maintaining pressure CR 2056751, auxiliary feedwater (CA) flow transmitters do not meet loss of coolant accident (LOCA) accuracy requirements CR 2060673, 2A auxiliary feedwater pump will not stop | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 222: | Line 380: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors verified that the plant modification listed below did not affect the safety functions of important safety systems. The inspectors confirmed the modifications did not degrade the design bases, licensing bases, and performance capability of risk significant structures, systems and components | The inspectors verified that the plant modification listed below did not affect the safety functions of important safety systems. The inspectors confirmed the modifications did not degrade the design bases, licensing bases, and performance capability of risk significant structures, systems and components. | ||
Engineering change (EC) 110357, Motor Lubricant Replacement for SR pumps | The inspectors also verified modifications performed during plant configurations involving increased risk did not place the plant in an unsafe condition. Additionally, the inspectors evaluated whether system operability and availability, configuration control, post | ||
-installation test activities, and changes to documents, such as drawings, procedures, and operator training materials, complied with licensee standards and NRC requirements. In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with modifications. | |||
Documents reviewed are listed in the Attachment. | |||
Engineering change ( | |||
EC) 110357, Motor Lubricant Replacement for SR pumps | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 233: | Line 397: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors either observed post-maintenance testing or reviewed the test results for the maintenance activities listed below to verify the work performed was completed correctly and the test activities were adequate to verify system operability and functional capability. | The inspectors either observed post | ||
-maintenance testing or reviewed the test results for the maintenance activities listed below to verify the work performed was completed correctly and the test activities were adequate to verify system operability and functional capability. | |||
post maintenance test of the "E" instrument air compressor following the breaker trip on August 23, 2016 in-service valve test following repair of 1NW-110B, NW supply to 1KC424B on July 27, 2016 operability performance test of the 1B containment spray (NS) pump following preplanned maintenance on August 2, 2016 | post maintenance test of the "E" instrument air compressor following the breaker trip on August 23, 2016 in-service valve test following repair of 1NW-110B, NW supply to 1KC424B on July 27, 2016 operability performance test of the 1B containment spray (NS) pump following preplanned maintenance on August 2, 2016 operability performance test of the 1A train of auxiliary building ventilation following preventive maintenance on August 8, 2016 operability performance test of the 1A train of auxiliary building ventilation following replacement of the exhaust fan breaker on August 23, 2016 The inspectors evaluated these activities for the following: | ||
acceptance criteria were clear and demonstrated operational readiness effects of testing on the plant were adequately addressed test instrumentation was appropriate tests were performed in accordance with approved procedures equipment was returned to its operational status following testing test documentation was properly evaluated Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with post-maintenance testing. Documents reviewed are listed in the | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 244: | Line 411: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
For the Unit 2 refueling outage from September 9, 2016 through the remainder of the inspection period, the inspectors evaluated the following outage activities: | For the Unit 2 refueling outage from September 9, 2016 through the remainder of the inspection period, the inspectors evaluated the following outage activities: | ||
outage planning shutdown, cooldown and refueling reactor coolant system instrumentation and electrical power configuration reactivity and inventory control decay heat removal and spent fuel pool cooling system operation containment closure The inspectors verified that the licensee: | |||
considered risk in developing the outage schedule controlled plant configuration per administrative risk reduction methodologies developed work schedules to manage fatigue developed mitigation strategies for loss of key safety functions adhered to operating license and technical specification requirements The inspectors verified that safety | |||
-related and risk | |||
-significant structures, systems, and components not accessible during power operations were maintained in an operable condition. The inspectors also reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with outage activities. | |||
Documents reviewed are listed in the | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 255: | Line 429: | ||
The inspectors reviewed the four surveillance tests listed below and either observed the test or reviewed test results to verify testing adequately demonstrated equipment operability and met technical specification and current licensing basis. The inspectors evaluated the test activities to assess for preconditioning of equipment, procedure adherence, and equipment alignment following completion of the surveillance. | The inspectors reviewed the four surveillance tests listed below and either observed the test or reviewed test results to verify testing adequately demonstrated equipment operability and met technical specification and current licensing basis. The inspectors evaluated the test activities to assess for preconditioning of equipment, procedure adherence, and equipment alignment following completion of the surveillance. | ||
Additionally, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with surveillance testing. Documents reviewed are listed in the | Additionally, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with surveillance testing. Documents reviewed are listed in the | ||
. | |||
Routine Surveillance Tests PT/1/A/4350/002B, Emergency diesel generator (EDG) 1B five hour full load r un PT/2/A/4200/009, Engineered safety features actuation periodic test PT/1/A/4600/001, Rod control cluster assembly (RCCA) movement test In-Service Tests (IST) | |||
PT/1/A/4250/003C, Auxiliary feedwater motor driven pump 1A performance test | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 267: | Line 444: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors observed the emergency preparedness drill conducted on July 28, 2016. The inspectors observed licensee activities in the simulator and/or technical support center to evaluate implementation of the emergency plan, including event classification, notification, and protective action recommendations. The inspectors evaluated the licensee's performance against criteria established in the licensee's procedures. Additionally, the inspectors attended the post-exercise critique to assess the licensee's effectiveness in identifying emergency preparedness weaknesses and verified | The inspectors observed the emergency preparedness drill conducted on July 28, 2016 | ||
. The inspectors observed licensee activities in the simulator and/or technical support center to evaluate implementation of the emergency plan, including event classification, notification, and protective action recommendations. The inspectors evaluated the licensee's performance against criteria established in the licensee's procedures. Additionally, the inspectors attended the post | |||
-exercise critique to assess the licensee's effectiveness in identifying emergency preparedness weaknesses and verified th e identified weaknesses were entered in the corrective action program. Documents reviewed are listed in the | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 274: | Line 454: | ||
==RADIATION SAFETY== | ==RADIATION SAFETY== | ||
(RS) | (RS) | ||
{{a|2RS1}} | {{a|2RS1}} | ||
==2RS1 Radiological Hazard Assessment and Exposure Controls== | ==2RS1 Radiological Hazard Assessment and Exposure Controls== | ||
(71124.01) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Hazard Assessment and Instructions to Workers: During facility tours, the inspectors directly observed radiological postings and container labeling for areas established within the radiologically controlled area (RCA) of the Unit 2 (U2) reactor building, U2 turbine building, Unit 1 (U1) and U2 auxiliary buildings, independent spent fuel storage installation (ISFSI), and radioactive waste (radwaste) processing and storage locations. The inspectors independently measured radiation dose rates or directly observed conduct of licensee radiation surveys for selected RCA areas. The inspectors reviewed survey records for several plant areas including surveys for airborne radioactivity, gamma surveys with a range of dose rate gradients, surveys for alpha-emitters and other hard-to-detect radionuclides, and pre-job surveys for upcoming tasks. The inspectors also discussed changes to plant operations that could contribute to changing radiological conditions since the last inspection. The inspectors attended pre-job briefings and reviewed radiation work permit (RWP) details to assess communication of radiological control requirements and current radiological conditions to workers. Control of Radioactive Material: The inspectors observed surveys of material and personnel being released from the RCA using small article monitor, personnel contamination monitor, and portal monitor instruments. The inspectors discussed equipment sensitivity, alarm setpoints, and release program guidance with licensee staff. The inspectors also reviewed records of leak tests on selected sealed sources and discussed nationally tracked source transactions with licensee staff. Hazard Control: The inspectors evaluated access controls and barrier effectiveness for selected high radiation area (HRA), locked high radiation area (LHRA), and very high radiation area (VHRA) locations and discussed changes to procedural guidance for LHRA and VHRA controls with radiation protection (RP) supervisors. The inspectors reviewed implementation of controls for the storage of irradiated material within the spent fuel pool. Established radiological controls, including airborne controls and electronic dosimeter (ED) alarm setpoints, were evaluated for selected U2 refueling outage (2EOC21) tasks such as steam generator inspections, tasks completed in lower containment of U2, and tasks associated with lifting the reactor head. In addition, the inspectors reviewed licensee controls for areas where dose rates could change significantly as a result of plant shutdown and refueling operations. The inspectors also reviewed the use of personnel dosimetry including extremity dosimetry and multibadging in high dose rate gradients | Hazard Assessment and Instructions to Workers | ||
: During facility tours, the inspectors directly observed radiological postings and container labeling for areas established within the radiologically controlled area (RCA) of the Unit 2 (U2) reactor building, U2 turbine building, Unit 1 (U1) and U2 auxiliary buildings, independent spent fuel storage installation (ISFSI), and radioactive waste (radwaste) processing and storage locations. | |||
The inspectors independently measured radiation dose rates or directly observed conduct of licensee radiation surveys for selected RCA areas. The inspectors reviewed survey records for several plant areas including surveys for airborne radioactivity, gamma surveys with a range of dose rate gradients, surveys for alpha | |||
-emitters and other hard | |||
-to-detect radionuclides, and pre | |||
-job surveys for upcoming tasks. The inspectors also discussed changes to plant operations that could contribute to changing radiological conditions since the last inspection. The inspectors attended pre | |||
-job briefings and reviewed radiation work permit (RWP) details to assess communication of radiological control requirements and current radiological conditions to workers. | |||
Control of Radioactive Material: The inspectors observed surveys of material and personnel being released from the RCA using small article monitor, personnel contamination monitor, and portal monitor instruments. The inspectors discussed equipment sensitivity, alarm setpoints, and release program guidance with licensee staff. The inspectors also reviewed records of leak tests on selected sealed sources and discussed nationally tracked source transactions with licensee staff. | |||
Hazard Control | |||
: The inspectors evaluated access controls and barrier effectiveness for selected high radiation area (HRA), | |||
locked high radiation area (LHRA), and very high radiation area (VHRA) locations and discussed changes to procedural guidance for LHRA and VHRA controls with radiation protection (RP) supervisors. The inspectors reviewed implementation of controls for the storage of irradiated material within the spent fuel pool. Established radiological controls, including airborne controls and electronic dosimeter (ED) alarm setpoints, were evaluated for selected U2 refueling outage (2EOC21) tasks such as steam generator inspections, tasks completed in lower containment of U2, and tasks associated with lifting the reactor head. | |||
In addition, the inspectors reviewed licensee controls for areas where dose rates could change significantly as a result of plant shutdown and refueling operations. The inspectors also reviewed the use of personnel dosimetry including extremity dosimetry and multibadging in high dose rate gradients. | |||
Radiation Worker Performance and RP Technician Proficiency | |||
: Occupational workers' adherence to selected RWPs and RP technician proficiency in providing job coverage were evaluated through direct observations and interviews with licensee staff. Jobs observed included work on the refueling floor, lifting the reactor head, and steam generator tasks in high radiation and contaminated areas. The inspectors also evaluated worker responses to dose and dose rate alarms during selected work activities. | |||
Inspection Criteria: Radiation protection activities were evaluated against the requirements of Updated Final Safety Analysis Report (UFSAR) Section 12, Technical Specifications (TS) Section 5.0, 10 CFR Parts 19 and 20, and approved licensee procedures. Licensee programs for monitoring materials and personnel released from the RCA were evaluated against 10 CFR Part 20 and IE Circular 81-07, "Control of Radioactively Contaminated Material". Documents and records reviewed are listed in the Attachment. The inspectors completed the required seven samples specified in Inspection Procedure (IP) 71124.01. | Problem Identification and Resolution | ||
: The inspectors reviewed and assessed condition reports associated with radiological hazard assessment and control. The inspectors evaluated the licensee's ability to identify and resolve the issues in accordance with licensee procedures. The inspectors also reviewed recent self | |||
-assessment results. | |||
Inspection Criteria | |||
: Radiation protection activities were evaluated against the requirements of Updated Final Safety Analysis Report (UFSAR) Section 12, Technical Specifications (TS) Section 5.0, 10 CFR Parts 19 and 20, and approved licensee procedures. Licensee programs for monitoring materials and personnel released from the RCA were evaluated against 10 CFR Part 20 and IE Circular 81-07, "Control of Radioactively Contaminated Material". Documents and records reviewed are listed in the Attachment. | |||
The inspectors completed the required seven samples specified in Inspection Procedure (IP) 71124.01. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|2RS2}} | {{a|2RS2}} | ||
==2RS2 Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls== | ==2RS2 Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls== | ||
(71124.02) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Work Planning and Exposure Tracking: The inspectors reviewed work activities and their collective exposure estimates during the U2 refueling/maintenance outage (2EOC21) and the recently completed U1 refueling/maintenance outage (1EOC22). The inspectors reviewed ALARA planning packages for activities related to the following U2 high collective exposure tasks: primary side steam generator (S/G) work (diaphragm and nozzle dam installation and removal, eddy current testing, and tube plugging); secondary side S/G work (sludge lancing, foreign object search and retrieval (FOSAR), feed ring inspection); reactor head disassembly and reassembly; temporary shielding installation; and 2B reactor coolant pump motor removal and replacement. For the selected tasks, the inspectors reviewed established dose goals and discussed assumptions regarding the bases for the current estimates with responsible ALARA planners. The inspectors evaluated the incorporation of exposure reduction initiatives and operating experience, including historical post-job reviews, into RWP requirements. Day-to-day collective dose data for the selected tasks were compared with established dose estimates and evaluated against procedural criteria (work-in-progress review limits) for additional ALARA review. Where applicable, the inspectors discussed changes to established estimates with ALARA planners and evaluated them against work scope changes or unanticipated elevated dose rates. | Work Planning and Exposure Tracking | ||
: The inspectors reviewed work activities and their collective exposure estimates during the U2 refueling/maintenance outage (2EOC21) and the recently completed U1 refueling/maintenance outage (1EOC22). The inspectors reviewed ALARA planning packages for activities related to the following U2 high collective exposure tasks: | |||
primary side steam generator (S/G) work (diaphragm and nozzle dam installation and removal, eddy current testing, and tube plugging); secondary side S/G work (sludge lancing | |||
, foreign object search and retrieval (FOSAR), feed ring inspection); reactor head disassembly and reassembly; temporary shielding installation; and 2B reactor coolant pump motor removal and replacement. For the selected tasks, the inspectors reviewed established dose goals and discussed assumptions regarding the bases for the current estimates with responsible ALARA planners. The inspectors evaluated the incorporation of exposure reduction initiatives and operating experience, including historical post | |||
-job reviews, into RWP requirements. Day | |||
-to-day collective dose data for the selected tasks were compared with established dose estimates and evaluated against procedural criteria (work | |||
-in-progress review limits) for additional ALARA review. Where applicable, the inspectors discussed changes to established estimates with ALARA planners and evaluated them against work scope changes or unanticipated elevated dose rates. | |||
Source Term Reduction and Control: The inspectors reviewed the collective exposure three-year rolling average from (2013 - 2015). The inspectors evaluated historical crud burst/cleanup results and dose rate trends for reactor coolant system piping and compared them to current 2EOC21 data | Source Term Reduction and Control | ||
: The inspectors reviewed the collective exposure three-year rolling average from (2013 - 2015). The inspectors evaluated historical crud burst/cleanup results and dose rate trends for reactor coolant system piping and compared them to current 2EOC21 data. | |||
Inspection Criteria: ALARA program activities were evaluated against the requirements of UFSAR Section 12, TS Section 5.4, 10 CFR Part 20, and approved licensee procedures. Documents reviewed are listed in the | Source term reduction initiatives, including cobalt reduction and zinc injection, were reviewed and discussed with RP staff. The inspectors also reviewed temporary shielding packages for 2EOC21. Radiation Worker Performance | ||
: As part of Inspection Procedure (IP) 71124.01, the inspectors observed pre | |||
-job ALARA briefings and radiation worker performance for various HRA jobs in the auxiliary building and containment. While observing job tasks, the inspectors evaluated the use of remote technologies to reduce dose including teledosimetry and remote visual monitoring. | |||
Problem Identification and Resolution | |||
: The inspectors reviewed and discussed selected corrective action program documents associated with ALARA program implementation. The inspectors evaluated the licensee's ability to identify and resolve issues. The inspectors also reviewed recent self | |||
-assessment results. | |||
Inspection Criteria | |||
: ALARA program activities were evaluated against the requirements of UFSAR Section 12, TS Section 5.4, 10 CFR Part 20, and approved licensee procedures. Documents reviewed are listed in the | |||
. | |||
The inspectors completed the required five samples specified in IP 71124.02. | The inspectors completed the required five samples specified in IP 71124.02. | ||
| Line 307: | Line 531: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Engineering Controls: The inspectors reviewed the use of temporary and permanent engineering controls to mitigate airborne radioactivity during 2EOC21 outage tasks. The inspectors observed the use of portable air filtration units for work in contaminated areas of the RCA and reviewed filtration unit testing certificates. The inspectors evaluated the effectiveness of continuous air monitors to provide indication of increasing airborne levels and the placement of air samplers in work area "breathing zones," including accounting for alpha emitting nuclides inclusion in setpoint determination. Respiratory Protection Equipment: The inspectors reviewed the use of respiratory protection devices to limit the intake of radioactive material. This included review of devices used for routine tasks and devices stored for use in emergency situations. The inspectors reviewed ALARA evaluations for the use of respiratory protection for steam generator work and other tasks performed during 2EOC21. Selected self-contained breathing apparatus (SCBA) units and negative pressure respirators ( | Engineering Controls | ||
: The inspectors reviewed the use of temporary and permanent engineering controls to mitigate airborne radioactivity during 2EOC21 outage tasks. The inspectors observed the use of portable air filtration units for work in contaminated areas of the RCA and reviewed filtration unit testing certificates. The inspectors evaluated the effectiveness of continuous air monitors to provide indication of increasing airborne levels and the placement of air samplers in work area "breathing zones, | |||
" including accounting for alpha emitting nuclides inclusion in setpoint determination. | |||
Respiratory Protection Equipment | |||
: The inspectors reviewed the use of respiratory protection devices to limit the intake of radioactive material. This included review of devices used for routine tasks and devices stored for use in emergency situations. The inspectors reviewed ALARA evaluations for the use of respiratory protection for steam generator work and other tasks performed during 2EOC21. Selected self-contained breathing apparatus (SCBA) units and negative pressure respirators (NPR s) staged for routine and emergency use in the main control room and other locations were inspected for material condition, SCBA bottle air pressure, number of units, and number of spare masks and availability of air bottles. The inspectors reviewed maintenance records for selected SCBA units for the past two years and evaluated SCBA and NPR compliance with National Institute for Occupational Safety and Health certification requirements. The inspectors also reviewed records of air quality testing for supplied | |||
-air devices and SCBA bottles. | |||
The inspectors discussed training for various types of respiratory protection devices with licensee staff and interviewed radworkers and control room operators on use of the devices including SCBA bottle change | |||
-out and use of corrective lens inserts. The inspectors reviewed respirator qualification records (including medical qualifications) for several main control room operators and emergency responder personnel. In addition, inspectors evaluated qualifications for individuals responsible for testing and repairing SCBA vital components. | |||
Problem Identification and Resolution: The inspectors reviewed and discussed selected corrective action program documents associated with airborne controls and respiratory protection activities. The inspectors evaluated the licensee's ability to identify and resolve issues. The inspectors also reviewed recent self | |||
-assessment results. | |||
Inspection Criteria: Radiation protection program activities associated with airborne radioactivity monitoring and controls were evaluated against details and requirements documented in the UFSAR Chapters 3, 12 and 15; TS Sections 3.7, 5.5.11 and 5.5.16, 10 CFR Part 20; Regulatory Guide (RG) 8.15, "Acceptable Programs for Respiratory Protection" and approved licensee procedures. Documents reviewed are listed in the | Inspection Criteria | ||
: Radiation protection program activities associated with airborne radioactivity monitoring and controls were evaluated against details and requirements documented in the UFSAR Chapters 3, 12 and 15; TS Sections 3.7, 5.5.11 and 5.5.16 | |||
, 10 CFR Part 20; Regulatory Guide (RG) 8.15, "Acceptable Programs for Respiratory Protection" and approved licensee procedures. Documents reviewed are listed in the | |||
. The inspectors completed the required four samples specified in IP 71124.03. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|2RS4}} | {{a|2RS4}} | ||
==2RS4 Occupational Dose Assessment== | ==2RS4 Occupational Dose Assessment (71124.04== | ||
) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Source Term Characterization: The inspectors reviewed the plant radiation characterization (including gamma, beta, alpha, and neutron) being monitored verified the use of scaling factors to account for hard-to-detect radionuclides in internal dose assessments. External Dosimetry: The inspectors reviewed national voluntary accreditation program (NVLAP) certification data of the licensee's thermoluminescent dosimeter (TLD) processor for the years 2014 through 2017. The inspectors observed and evaluated onsite storage of TLDs. Comparisons between ED and TLD results, including correction factors, were reviewed and discussed. The inspectors also evaluated licensee procedures for unusual dosimetry occurrences. Electronic dosimeter alarm logs were reviewed as part of Inspection Procedure 71124.01 | Source Term Characterization | ||
: The inspectors reviewed the plant radiation characterization (including gamma, beta, alpha, and neutron) being monitored verified the use of scaling factors to account for hard | |||
-to-detect radionuclides in internal dose assessments. | |||
External Dosimetry | |||
: The inspectors reviewed national voluntary accreditation program (NVLAP) certification data of the licensee's thermoluminescent dosimeter (TLD) processor for the years 2014 through 2017. The inspectors observed and evaluated onsite storage of TLDs. Comparisons between ED and TLD results, including correction factors, were reviewed and discussed. The inspectors also evaluated licensee procedures for unusual dosimetry occurrences. Electronic dosimeter alarm logs were reviewed as part of Inspection Procedure 71124.01. | |||
Special Dosimetry Situations: The inspectors reviewed records for declared pregnant workers ( | Internal Dosimetry | ||
: The inspectors reviewed and discussed the in | |||
-vivo bioassay program with the licensee. Inspectors reviewed procedures that addressed methods for determining internal or external contamination, releasing contaminated individuals, and the assignment of dose. The inspectors evaluated the licensee's program for in | |||
-vivo and in-vitro monitoring including passive whole body monitoring and bioassay results for diving activities. The inspectors also reviewed contamination logs and evaluated events with the potential for internal dose. | |||
Special Dosimetry Situations | |||
: The inspectors reviewed records for declared pregnant workers (DPW s) from June 2014 through June 2016 and discussed guidance for monitoring and instructing DPWs. Inspectors reviewed the licensee's program for monitoring external dose in areas of expected dose rate gradients, including the use of multi-badging and extremity dosimetry. The inspectors evaluated the licensee's neutron dosimetry program including instrumentation used to perform neutron surveys. In addition, the inspectors reviewed the licensee's program for evaluation of shallow dose equivalent (SDE). The inspectors also reviewed contamination logs and evaluated events with the potential for SDE. | |||
Problem Identification and Resolution | |||
: The inspectors reviewed and discussed selected corrective action program documents associated with occupational dose assessment including self | |||
-assessments. The inspectors evaluated the licensee's ability to identify and resolve issues. | |||
Inspection Criteria | |||
: The licensee's occupational dose assessment activities were evaluated against the requirements of UFSAR Section 12; TS Section 5.4; 10 CFR Parts 19 and 20; and approved licensee procedures. Documents reviewed are listed in the Attachment | |||
. | |||
The inspectors completed the required five samples specified in IP 71124.04. | The inspectors completed the required five samples specified in IP 71124.04. | ||
| Line 328: | Line 586: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|2RS5}} | {{a|2RS5}} | ||
==2RS5 Radiation Monitoring Instrumentation== | ==2RS5 Radiation Monitoring Instrumentation (71124.05== | ||
) | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors reviewed the licensee's radiation monitoring instrumentation programs to verify the accuracy and operability of radiation monitoring instruments used to monitor areas, materials, and workers to ensure a radiologically safe work environment during normal operations and under postulated accident conditions | The inspectors reviewed the licensee's radiation monitoring instrumentation programs to verify the accuracy and operability of radiation monitoring instruments used to monitor areas, materials, and workers to ensure a radiologically safe work environment during normal operations and under postulated accident conditions. | ||
Walkdowns and Observations | |||
: During tours of the site areas, the inspectors observed installed radiation detection equipment including the following instrument types: area radiation monitors (ARMs), continuous air monitors (CAMs), personnel contamination monitors (PCMs), small article monitors (SAMs), and portal monitors (PMs). The inspectors observed the calibration status, physical location, material condition and compared technical specifications for this equipment with UFSAR requirements. In addition, the inspectors observed the calibration status and functional checks of selected in-service portable instruments and discussed the bases for established frequencies and source ranges with RP staff personnel. The inspectors reviewed periodic source check records for compliance with plant procedures and manufacturer's recommendation for selected instruments and observed the material condition of sources used. | |||
Calibration and Testing Program | |||
: The inspectors reviewed calibration data for selected ARMs, PCMs, PMs, SAMs, and laboratory instruments as well as the last calibration and methodology for the whole body counter. The inspectors reviewed calibration data, methodology used and the source certification for the containment high range monitor area steam line monitors, control room area monitor, and refueling bridge monitors. The current output values for the portable instrument calibrator and the instrument certifications used to develop them were reviewed by the inspectors. The inspectors reviewed the licensee's process for investigating instruments that are removed from service for calibration or response check failures and discussed specific instrument failures with plant staff. In addition, the inspectors reviewed 10 CFR 61 data to determine if sources used in the maintenance of the licensee's radiation detection instrumentation were representative of radiation hazards in the plant and scaled appropriately for "hard to detect" nuclides. | |||
Inspection Criteria: Operability and reliability of selected radiation detection instruments were reviewed against details documented in the following: 10 CFR Part 20; NUREG-0737, "Clarification of TMI Action Plan Requirements"; UFSAR Chapters 11 and 12, TS Sections 3.3 and 5.4, and applicable licensee procedures. Documents reviewed are listed in the Attachment. | Problem Identification and Resolution | ||
: The inspectors reviewed and discussed selected corrective action program documents associated with radiological instrumentation including licensee sponsored assessments. The inspectors evaluated the licensee's ability to identify and resolve issues | |||
. | |||
Inspection Criteria | |||
: Operability and reliability of selected radiation detection instruments were reviewed against details documented in the following: 10 CFR Part 20; NUREG | |||
-0737, "Clarification of TMI Action Plan Requirements"; UFSAR Chapters 11 and 12, TS Sections 3.3 and 5.4, and applicable licensee procedures. Documents reviewed are listed in the Attachment | |||
. | |||
The inspectors completed the required three samples specified in IP 71124.05. | The inspectors completed the required three samples specified in IP 71124.05. | ||
| Line 352: | Line 621: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors reviewed a sample of the performance indicator (PI) data, submitted by the licensee, for the Unit 1 and Unit 2 PIs listed below. The inspectors reviewed plant records compiled between July 2015 and June 2016 to verify the accuracy and completeness of the data reported for the station. The inspectors verified that the PI data complied with guidance contained in Nuclear Energy Institute 99-02, "Regulatory Assessment Performance Indicator Guideline," and licensee procedures. The inspectors verified the accuracy of reported data that were used to calculate the value of each PI. In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with PI data. Documents reviewed are listed in the | The inspectors reviewed a sample of the performance indicator (PI) data, submitted by the licensee, for the Unit 1 and Unit 2 PIs listed below. The inspectors reviewed plant records compiled between July 2015 and June 2016 to verify the accuracy and completeness of the data reported for the station. The inspectors verified that the PI data complied with guidance contained in Nuclear Energy Institute 99-02, "Regulatory Assessment Performance Indicator Guideline," and licensee procedures. The inspectors verified the accuracy of reported data that were used to calculate the value of each PI. | ||
In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with PI data. Documents reviewed are listed in the | |||
. | |||
===Cornerstone:=== | |||
Initiating Events unplanned power changes per 7000 critical hours | |||
===Cornerstone:=== | |||
Mitigating Systems residual heat removal system | |||
Documents reviewed are listed in the attachment. | ===Cornerstone:=== | ||
Occupational Radiation Safety occupational exposure control effectiveness The inspectors reviewed the occupational exposure control effectiveness PI results for the occupational radiation safety cornerstone from January 2015 through August 2016. | |||
For the assessment period, the inspectors reviewed electronic dosimeter alarm logs and condition reports related to controls for exposure significant areas. Documents reviewed are listed in the attachment | |||
. Cornerstone: Public Radiation Safety radiological control effluent release occurrences | |||
The inspectors reviewed the radiological control effluent release occurrences PI results for the public radiation safety cornerstone from January 2015 through August 2016. | |||
For the assessment period, the inspectors reviewed cumulative and projected doses to the public contained in liquid and gaseous release permits and condition reports related to radiological effluent technical specifications/ODCM issues. The inspectors also reviewed licensee procedural guidance for collecting and documenting PI data. | |||
Documents reviewed are listed in the attachment | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 362: | Line 651: | ||
{{IP sample|IP=IP 71152}} | {{IP sample|IP=IP 71152}} | ||
===.1 Routine Review=== | ===.1 Routine Review=== | ||
The inspectors reviewed problem identification | The inspectors screened items entered into the licensee's corrective action program to identify repetitive equipment failures or specific human performance issues for follow | ||
-up. | |||
The inspectors reviewed problem identification prog ram reports, attended screenin g meetings, or accessed the licensee's computerized corrective action database. | |||
===.2 Annual Followup of Selected Issues=== | ===.2 Annual Followup of Selected Issues=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors conducted a detailed review of the following two nuclear condition reports (NCRs): CR 2058838, Multiple failed barriers during maintenance task | The inspectors conducted a detailed review of the following two nuclear condition reports (NCRs): CR 2058838, Multiple failed barriers during maintenance task CR 2055501, Extended equalize required for safe shutdown facility battery SDSB2 The inspectors evaluated the following attributes of the licensee's actions: | ||
complete and accurate identification of the problem in a timely manner evaluation and disposition of operability and reportability issues consideration of extent of condition, generic implications, common cause, and previous occurrences classification and prioritization of the problem identification of root and contributing causes of the problem identification of any additional condition reports completion of corrective actions in a timely manner Documents reviewed are listed in the | |||
. | |||
====b. Findings and Observations==== | ====b. Findings and Observations==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA3}} | {{a|4OA3}} | ||
==4OA3 Event Followup== | ==4OA3 Event Followup== | ||
(Closed) Licensee Event Report (LER) 05000413/2014 | |||
(Closed) Licensee Event Report (LER) 05000413/2014 00, 01: Unanalyzed Condition Due to Deviations from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
On June 2, 2014, the licensee submitted an LER documenting the discovery of a condition of non-compliance with the site's fire protection program (FPP). These conditions could prevent operators from achieving and maintaining safe shutdown (SSD) of the plant, in the case of a postulated fire. The inspectors performed a detailed review of the information related to this LER. Inspectors reviewed documents, and discussed the issues with licensee personnel to gain an understanding of the issues. The inspectors assessed the licensee's compensatory measures and corrective actions to determine if they were adequate. LERs 05000413/2014 | On June 2, 2014, the licensee submitted an LER documenting the discovery of a condition of non | ||
-compliance with the site's fire protection program (FPP). These conditions could prevent operators from achieving and maintaining safe shutdown (SSD) of the plant, in the case of a postulated fire. | |||
The inspectors performed a detailed review of the information related to this LER. Inspectors reviewed documents, and discussed the issues with licensee personnel to gain an understanding of the issues. The inspectors assessed the licensee's compensatory measures and corrective actions to determine if they were adequate. | |||
LERs 05000413/2014 00, 01 are closed. | |||
====b. Findings==== | ====b. Findings==== | ||
Introduction | |||
: The licensee identified a non | |||
The licensee identified a non-compliance with Operating License Condition 2.C.(5), for Units 1 and 2, for the failure to protect one of the redundant trains of equipment needed to achieve post-fire SSD from fire damage. Specifically, the licensee failed to use one of the means described in Branch Technical Position (BTP) Chemical Engineering Branch (CMEB) 9.5-1, Item C.5.b.2 to ensure that one of the redundant trains of equipment necessary to achieve and maintain hot shutdown conditions was protected from fire damage. | -compliance with Operating License Condition 2.C.(5), for Units 1 and 2, for the failure to protect one of the redundant trains of equipment needed to achieve post | ||
-fire SSD from fire damage. Specifically, the licensee failed to use one of the means described in Branch Technical Position (BTP) Chemical Engineering Branch (CMEB) 9.5 | |||
-1, Item C.5.b.2 to ensure that one of the redundant trains of equipment necessary to achieve and maintain hot shutdown conditions was protected from fire damage. | |||
=====Description:===== | =====Description:===== | ||
On June 2, 2014, the licensee submitted LER 413/2014 | On June 2, 2014, the licensee submitted LER 413/2014 00 with Revision 01 submitted on December 1, 2014, which documented discovery of cable routing issues and postulated fire | ||
-induced circuit failures that could prevent operation or cause maloperation of equipment required to achieve SSD in the event of a fire. This condition was identified during the licensee's transition to National Fire Protection Association Standard 805 (NFPA 805). | |||
During the transition to NFPA 805, the licensee identified multiple instances of cables for equipment required to achieve SSD not meeting the separation requirements of the current licensing basis. The licensee determined that this condition existed for 22 fire areas (FAs) across both units. The licensee characterized these issues as variance(s) from deterministic requirements (VFDRs). The conditions identified in the LER are related to VFDRs that met the following criteria: 1) VFDRs that required a plant modification to meet the fire risk criteria of NFPA 805, or 2) VFDRs where a potential concern existed with respect to NRC Information Notice (IN) 92-18, "Potential for Loss of Remote Shutdown Capability During a Control Room Fire", dated February 28, 1992. | During the transition to NFPA 805, the licensee identified multiple instances of cables for equipment required to achieve SSD not meeting the separation requirements of the current licensing basis. The licensee determined that this condition existed for 22 fire areas (FAs) across both units. The licensee characterized these issues as variance(s) from deterministic requirements (VFDRs). The conditions identified in the LER are related to VFDRs that met the following criteria: 1) VFDRs that required a plant modification to meet the fire risk criteria of NFPA 805, or 2) VFDRs where a potential concern existed with respect to NRC Information Notice (IN) 92 | ||
-18, "Potential for Loss of Remote Shutdown Capability During a Control Room Fire", dated February 28, 1992. | |||
The licensee determined that the deficiencies existed because of latent design deficiencies in the cable routing and circuit design. This LER was applicable to Units 1 and 2. Upon discovery, the licensee entered this issue into their corrective action program as | The licensee determined that the deficiencies existed because of latent design deficiencies in the cable routing and circuit design. This LER was applicable to Units 1 and 2. Upon discovery, the licensee entered this issue into their corrective action program as PI P C-1401427, and implemented compensatory actions in the form of fire watches and/or control of transient combustible material for the affected FAs. | ||
=====Analysis.===== | =====Analysis.===== | ||
Failure to protect one redundant train of cables and equipment necessary to achieve post-fire SSD from fire damage was a performance deficiency. This finding was more than minor because it was associated with the reactor safety mitigating system cornerstone attribute of protection against external events (i.e., fire). Specifically, failure to protect safe shutdown cables and equipment from fire damage negatively affected the reactor safety mitigating systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Because this issue relates to fire protection and this non-compliance was identified as a part of the site's transition to NFPA 805, this issue is being dispositioned in accordance with Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)" of the NRC Enforcement Policy. | Failure to protect one redundant train of cables and equipment necessary to achieve post | ||
-fire SSD from fire damage was a performance deficiency. This finding was more than minor because it was associated with the reactor safety mitigating system cornerstone attribute of protection against external events (i.e., fire). Specifically, failure to protect safe shutdown cables and equipment from fire damage negatively affected the reactor safety mitigating systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Because this issue relates to fire protection and this non | |||
-compliance was identified as a part of the site's transition to NFPA 805, this issue is being dispositioned in accordance with Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)" of the NRC Enforcement Policy. | |||
In order to verify that this non-compliance was not associated with a finding of high safety significance (Red), inspectors reviewed qualitative and quantitative risk analyses performed by the licensee. These risk evaluations took ignition source and target information from the licensee's fire probabilistic risk assessment to demonstrate that the significance of the non-compliances were less-than--4/year). Inspectors determined that cables associated with some of the VFDRs were not located in the zone of influence (ZOI) of any credible ignition source. For cables that were located in the ZOI of a credible ignition source, inspectors were able to perform a calculation to determine the change in conditional core damage probability (CCDP), based on the postulated fire-affected equipment not being available. Based on these screenings, inspectors determined that the significance of this non-compliance was less-than-Red. A bounding risk assessment performed by a regional Senior Risk Analyst (SRA) increase due to this condition was less than 1E-4, and therefore less than RED. The inspectors determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance. | In order to verify that this non | ||
-compliance was not associated with a finding of high safety significance (Red), inspectors reviewed qualitative and quantitative risk analyses performed by the licensee. These risk evaluations took ignition source and target information from the licensee's fire probabilistic risk assessment to demonstrate that the significance of the non | |||
-compliances were less | |||
-than--4/year). Inspectors determined that cables associated with some of the VFDRs were not located in the zone of influence (ZOI) of any credible ignition source. For cables that were located in the ZOI of a credible ignition source, inspectors were able to perform a calculation to determine the change in conditional core damage probability (CCDP), based on the postulated fire | |||
-affected equipment not being available. Based on these screenings, inspectors determined that the significance of this non | |||
-compliance was less | |||
-than-Red. A bounding risk assessment performed by a regional Senior Risk Analyst (SRA) increase due to this condition was less than 1E | |||
-4, and therefore less than RED. | |||
The inspectors determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance. | |||
=====Enforcement.===== | =====Enforcement.===== | ||
Operating License Condition 2.C.(5), for Units 1 and 2, requires that the licensee implement and maintain in effect all provisions of the approved FPP as described in the UFSAR, as amended, for the facility and as approved in the SER through Supplement 5. BTP CMEB 9.5-1, which incorporated the guidance of Appendix A to BTP ASB 9.5-1 and the technical requirements of Appendix R to 10 CFR 50, established the regulatory and licensing requirements for the FPP at Catawba Nuclear Station (CNS). The CNS FPP was reviewed against and approved for conformance with BTP CMEB 9.5-1 in the SER through Supplement 5. BTP CMEB 9.5-1, Item C.5.b.1, requires that fire protection features be provided that are capable of limiting fire damage so that one train of systems necessary to achieve and maintain hot standby conditions from either the control room or emergency control station(s) is free from fire damage. | Operating License Condition 2.C.(5), for Units 1 and 2, requires that the licensee implement and maintain in effect all provisions of the approved FPP as described in the UFSAR, as amended, for the facility and as approved in the SER through Supplement 5. BTP CMEB 9.5 | ||
-1, which incorporated the guidance of Appendix A to BTP ASB 9.5 | |||
-1 and the technical requirements of Appendix R to 10 CFR 50, established the regulatory and licensing requirements for the FPP at Catawba Nuclear Station (CNS). The CNS FPP was reviewed against and approved for conformance with BTP CMEB 9.5 | |||
-1 in the SER through Supplement 5. BTP CMEB 9.5 | |||
-1, Item C.5.b.1, requires that fire protection features be provided that are capable of limiting fire damage so that one train of systems necessary to achieve and maintain hot standby conditions from either the control room or emergency control station(s) is free from fire damage. | |||
BTP CMEB 9.5- 1, Item C.5.b.2 requires one redundant train to be protected from fire damage by one of the following specified methods: | BTP CMEB 9.5 | ||
- 1, Item C.5.b.2 requires one redundant train to be protected from fire damage by one of the following specified methods: | |||
(a) separation of cables and equipment by a fire barrier having a 3 | |||
-hour rating, (b) separation of cables and equipment by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards and with fire detectors and an automatic fire suppression system in the fire area, or (c) enclosure of cables and equipment in a fire barrier having a 1 | |||
-hour rating and with fire detectors and an automatic fire suppression system in the fire area. | |||
Contrary to the above, the licensee failed to use one of the means described in BTP CMEB 9.5-1, Item C.5.b.2 to ensure that one of the redundant trains of equipment necessary to achieve and maintain hot shutdown conditions was protected from fire damage. Specifically, on April 2, 2014, the licensee identified the failure to protect equipment in accordance with the current licensing basis. The licensee determined that fire damage could prevent operation of, or cause maloperation of, components that were required to achieve and maintain SSD. This condition has existed since initial plant startup for Units 1 and 2. The licensee entered this issue into the corrective action program (PIP C-14-1427) and implemented compensatory measures in the form of fire watches and/or control of transient combustible material for the affected FAs | |||
. | |||
Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)" and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensee's transition to NFPA 805, it was entered into the licensee's corrective action program, immediate corrective action and compensatory measures were taken, it was not likely to have been previously identified by routine licensee efforts, it was not willful, and it was not associated with a finding of high safety significance (Red). | |||
{{a|4OA5}} | {{a|4OA5}} | ||
==4OA5 Other Activities== | ==4OA5 Other Activities== | ||
| Line 409: | Line 735: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors performed a walkdown of the onsite independent spent fuel storage installation (ISFSI). The inspectors reviewed changes made to the ISFSI programs and procedures, including associated 10 CFR 72.48, "Changes, Tests, and Experiments," screens and evaluations to verify that changes made were consistent with the license or certificate of compliance. The inspectors reviewed records to verify that the licensee recorded and maintained the location of each fuel assembly placed in the ISFSI. The inspectors also reviewed surveillance records to verify that daily surveillance requirements were performed as required by technical specifications. Documents reviewed are listed in the | The inspectors performed a walkdown of the onsite independent spent fuel storage installation (ISFSI). The inspectors reviewed changes made to the ISFSI programs and procedures | ||
, including associated 10 CFR 72.48, "Changes, Tests, and Experiments," | |||
screens and evaluations to verify that changes made were consistent with the license or certificate of compliance. The inspectors reviewed records to verify that the licensee recorded and maintained the location of each fuel assembly placed in the ISFSI. The inspectors also reviewed surveillance records to verify that daily surveillance requirements were performed as required by technical specifications. Documents reviewed are listed in the | |||
. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Meetings, Including Exit== | ==4OA6 Meetings, Including Exit== | ||
ATTACHMENT: | On October 24, 2016, the resident inspectors presented the inspection results to Mr. Tom Simril and other members of the licensee's staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report | ||
. | |||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
| Line 424: | Line 756: | ||
===Licensee Personnel=== | ===Licensee Personnel=== | ||
: [[contact::C. Abernathy]], Manager, Nuclear Site Services | : [[contact::C. Abernathy]], Manager, Nuclear Site Services | ||
: [[contact::S. Andrews]], Sr. Engineer Regulatory Affairs, | : [[contact::S. Andrews]], Sr. Engineer Regulatory Affairs, | ||
: [[contact::T. Arlow]], Emergency Planning Manager | : [[contact::T. Arlow]], Emergency Planning Manager | ||
: [[contact::C. Bigham]], Director Nuclear Organizational Effectiveness | : [[contact::C. Bigham]], Director Nuclear Organizational Effectiveness | ||
: [[contact::M. Carwile]], Chemistry Manager | : [[contact::M. Carwile]], Chemistry Manager | ||
: [[contact::C. Cauthen]], SG Inspection Program | : [[contact::C. Cauthen]], SG Inspection Program | ||
: [[contact::B. Cauthen]], Lead Engineer | : [[contact::B. Cauthen]], | ||
: [[contact::C. Curry]], Plant Manager | Lead Engineer | ||
: [[contact::C. Fletcher]], Regulatory Affairs Manager | : [[contact::C. Curry]], Plant Manager | ||
: [[contact::N. Flippin]], Work Management Manager | : [[contact::C. Fletcher]], Regulatory Affairs Manager | ||
: [[contact::B. Foster]], Operations Manager | : [[contact::N. Flippin]], Work Management Manager | ||
: [[contact::T. Jenkins]], Maintenance Manager | : [[contact::B. Foster]], Operations Manager | ||
: [[contact::A. Keller]], ISI Program Owner | : [[contact::T. Jenkins]], Maintenance Manager | ||
: [[contact::L. Keller]], General Manager Nuclear Engineering | : [[contact::A. Keller]], ISI Program Owner | ||
: [[contact::T. Koleva]], Boric Acid Program Owner | : [[contact::L. Keller]], General Manager Nuclear Engineering | ||
: [[contact::B. Leonard]], Training Manager | : [[contact::T. Koleva]], Boric Acid Program Owner | ||
: [[contact::T. Simril]], Site Vice-President | : [[contact::B. Leonard]], Training Manager | ||
: [[contact::J. Smith]], Radiation Protection Manager | : [[contact::T. Simril]], Site Vice | ||
: [[contact::S. West]], Director, Nuclear Plant Security | -President | ||
: [[contact::B. Weaver]], PRA Engineer | : [[contact::J. Smith]], Radiation Protection Manager | ||
: [[contact::C. Wilson]], Sr. Engineer Regulatory Affairs | : [[contact::S. West]], Director, Nuclear Plant Security | ||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED | : [[contact::B. Weaver]], PRA Engineer | ||
: [[contact::C. Wilson]], Sr. Engineer Regulatory Affairs | |||
==LIST OF ITEMS== | |||
OPENED, CLOSED, AND DISCUSSED | |||
===Closed=== | ===Closed=== | ||
: 413/2014-002-00 LER Unanalyzed Condition Due to Deviations from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition (Section 4OA3) | : 413/2014-002-00 LER Unanalyzed Condition Due to Deviations from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition (Section 4OA3) | ||
: 413/2014-002-01 LER Unanalyzed Condition Due to Deviations | |||
from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition (Section 4OA3) | |||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
==Section 1R04: Equipment Alignment== | ==Section 1R04: Equipment Alignment== | ||
: OP/2/A/6350/002, D/G Valve and Breaker Checklist OP/1/A/6200/007, Containment Spray System OP/2/A/6250/002, Auxiliary Feedwater Valve Check List | : OP/2/A/6350/002, D/G Valve and Breaker Checklist | ||
: OP/1/A/6200/007, Containment Spray System | |||
: Fire Protection Fire Brigade Response Strategies for Safety-Related Areas, Rev. 039 Fire Strategy Plan, Fire Area 22: 594' Aux. Building Fire Strategy Plan N: 594' Turbine Building Fire Strategy Plan, Fire Area 27: 2A D/G room Fire Strategy Plan, Fire Area 15: Unit 1 Essential Switchgear Room 577' Fire Strategy Plan, Fire Area 8: Unit 1 Essential Switchgear Room 560' PT/0/A/4400/001 P, Inspection of Portable Fire Extinguishers, Rev. 086 PT/0/A/4400/001 T, Visual Inspection of Fire Hose Stations and Fire Hose Equipment Houses, Rev. 005 | : OP/2/A/6250/002, Auxiliary Feedwater Valve Check List Section 1R05Q: | ||
: Fire Protection Fire Brigade Response Strategies for Safety | |||
-Related Areas, Rev. 039 | |||
: Fire Strategy Plan, Fire Area 22: 594' Aux. | |||
: Building Fire Strategy Plan N: 594' Turbine Building Fire Strategy Plan, Fire Area 27: 2A D/G room Fire Strategy Plan, Fire Area 15: Unit 1 Essential Switchgear Room 577' Fire Strategy Plan, Fire Area 8: Unit 1 Essential Switchgear Room | |||
: 560' PT/0/A/4400/001 P, Inspection of Portable Fire Extinguishers, Rev. 086 | |||
: PT/0/A/4400/001 T, Visual Inspection of Fire Hose Stations and Fire Hose Equipment Houses, Rev. 005 | |||
: WO 20078175 01, Monthly Inspection of Portable Fire Extinguishers, June 2016 | : WO 20078175 01, Monthly Inspection of Portable Fire Extinguishers, June 2016 | ||
: WO 20012734 01, Visual Inspection of Fire Hose Stations, January 2016 AR #02048934 | : WO 20012734 01, Visual Inspection of Fire Hose Stations, January 2016 | ||
: AR #02048934 | |||
==Section 1R06: Internal Flooding== | ==Section 1R06: Internal Flooding== | ||
: CR 2050606, Potential failure of circulation water expansion joints | : CR 2050606, Potential failure of circulation water expansion joints Section 1R07 | ||
: | : Heat Sink Performance | ||
: AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev. 003 MP/0/A/7150/098, Nuclear Service Water (RN) Pump, Motor Upper Bearing Oil and Motor Coolers Chemical Cleaning, Rev. | ===Procedures=== | ||
: AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev. | |||
: 003 MP/0/A/7150/098, Nuclear Service Water (RN) Pump, Motor Upper Bearing Oil and Motor Coolers Chemical Cleaning, Rev. | |||
: 2 OP/0/A/6400/006 M, Nuclear Service Water System Unwatering Procedure, Rev. | |||
: 070 PT/0/A/4400/008 A, RN Flow Balance Train A, Rev. | |||
: 063 PT/0/A/4400/008 B, RN Flow Balance Train B, Rev. | |||
: 057 PT/0/A/4400/024, SNSWP Temperature Monitoring, Rev. | |||
: 014 | |||
===Calculations=== | ===Calculations=== | ||
: CNC-1150.01-00-0001, SNSWP Thermal Analysis during One Unit LOCA and One Unit Shutdown, Rev. 019 | : CNC-1150.01-00-0001, SNSWP Thermal Analysis during One Unit LOCA and One Unit Shutdown, Rev. | ||
: CNC-1150.04-00-0009, Area and Volume of the | : 019 | ||
: CNC-1223.24-00-0011, Nuclear Service Water System Test Criteria, Rev. 037 | : CNC-1150.04-00-0009, Area and Volume of the Stb | ||
y. Nuclear Service Water Pond, Rev. | |||
: 2 | |||
: CNC-1223.24-00-0011, Nuclear Service Water System Test Criteria, Rev. | |||
: 037 | |||
===Drawings=== | ===Drawings=== | ||
: CN-1397-4, SNSW Pond Instrumentation Pier, Rev. 008 | : CN-1397-4, SNSW Pond Instrumentation Pier, Rev. | ||
: CN-1574-01.00, Flow Diagram of Nuclear Service Water System (RN), Rev. 056 | : 008 | ||
: CN-1574-01.01, Flow Diagram of Nuclear Service Water System (RN), Rev. 061 | : CN-1574-01.00, Flow Diagram of Nuclear Service Water System (RN), Rev. | ||
: CN-1574-01.02, Flow Diagram of Nuclear Service Water System (RN), Rev. 056 | : 056 | ||
: CN-1574-02.01, Flow Diagram of Nuclear Service Water System (RN), Rev. 058 | : CN-1574-01.01, Flow Diagram of Nuclear Service Water System (RN), Rev. | ||
: CNSF-1574-RN.01, Summary Flow Diagram Nuclear Service Water System (RN), Rev. 006 | : 061 | ||
: CN-1574-01.02, Flow Diagram of Nuclear Service Water System (RN), Rev. | |||
: 056 | |||
: CN-1574-02.01, Flow Diagram of Nuclear Service Water System (RN), Rev. | |||
: 058 | |||
: CNSF-1574-RN.01, Summary Flow Diagram Nuclear Service Water System (RN), Rev. | |||
: 006 | |||
: Corrective Action Documents | : Corrective Action Documents | ||
: AR 01554606, OEDB 60799 Subject: IER L2-12-27, Reactor Scram and Loss of Off-Site Power | : AR 01554606, OEDB 60799 Subject: IER L2 | ||
-12-27, Reactor Scram and Loss of Off | |||
-Site Power | |||
: AR 1516631, SNSWP local level indication at the end of the outfall pier | : AR 1516631, SNSWP local level indication at the end of the outfall pier | ||
: AR 1898305, No flow discharging from long leg discharge of either A or B PIP C-99-2777, Assessment | : AR 1898305, No flow discharging from long leg discharge of either A or B | ||
: PIP C-99-2777, Assessment SA | |||
-99-26(CN)(PA) | |||
===Other Documents=== | ===Other Documents=== | ||
: C-ENG-SA-15-07, Ultimate Heat Sink Inspection Readiness | : C-ENG-SA-15-07, Ultimate Heat Sink Inspection Readiness NCR 1961833 | ||
: CNS-1150.04-00-0001, Design Basis Specification for the Nuclear Service Water Structures, Rev. 007 | |||
: CNS-1150.04-00-0001, Design Basis Specification for the Nuclear Service Water Structures, | : CNS-157 4.RN-00-0001, Design Basis Specification for the Nuclear Service Water System (RN), Rev. | ||
: 063 Completed IP/0/A/3860/030, Level Transmitter and Switch Calibration, 03/10/16 | |||
: CNS-157 4.RN-00-0001, Design Basis Specification for the Nuclear Service Water System (RN), Rev. 063 Completed IP/0/A/3860/030, Level Transmitter and Switch Calibration, 03/10/16 Completed IP/1/B/3112/004, Calibration of Non-Safety Related RN Intake Structure Instrumentation - dated 03/10/16 Completed PT/0/A/4200/009 A, Auxiliary Safeguards Test Cabinet Periodic Test - dated 03/28/16 Completed PT/0/A/4200/009 A, Auxiliary Safeguards Test Cabinet Periodic Test - dated 06/20/16 Completed PT/0/A/4200/013 C, RN Shared Valves Inservice Test (QU) - dated 03/23/16 Completed PT/0/A/4200/013, RN Share Valves Inservice Test (QU) - dated 01/14/16 Completed PT/0/A/4200/013, RN Share Valves Inservice Test (QU) - dated 08/07/15 Completed PT/0/A/4200/013, RN Shared Valves Inservice Test (QU) - dated 04/14/16 PT/0/A/4400/008 A, RN Flow Balance Train A, Rev. 063 Service Water System Program Manual, Rev. 009 | : Completed IP/1/B/3112/004, Calibration of Non | ||
-Safety Related RN Intake Structure Instrumentation | |||
- dated 03/10/16 | |||
: Completed PT/0/A/4200/009 A, Auxiliary Safeguards Test Cabinet Periodic Test | |||
- dated 03/28/16 Completed PT/0/A/4200/009 A, Auxiliary Safeguards Test Cabinet Periodic Test | |||
- dated 06/20/16 Completed PT/0/A/4200/013 C, RN Shared Valves Inservice Test (QU) | |||
- dated 03/23/16 | |||
: Completed PT/0/A/4200/013, RN Share Valves Inservice Test (QU) | |||
- dated 01/14/16 | |||
: Completed PT/0/A/4200/013, RN Share Valves Inservice Test (QU) | |||
- dated 08/07/15 | |||
: Completed PT/0/A/4200/013, RN Shared Valves Inservice Test (QU) | |||
- dated 04/14/16 | |||
: PT/0/A/4400/008 A, RN Flow Balance Train A, Rev. | |||
: 063 Service Water System Program Manual, Rev. | |||
: 009 | |||
: WO 02123166, 1RN PU A: Clean Motor Coolers | : WO 02123166, 1RN PU A: Clean Motor Coolers | ||
: WO 02129129, 1RN PU B-Clean Motor Coolers | : WO 02129129, 1RN PU B | ||
: WO 02131687, 2RN PU B-Clean Motor Coolers | -Clean Motor Coolers | ||
: WO 02131687, 2RN PU B | |||
-Clean Motor Coolers | |||
==Section 1RO8: Inservice Inspection Activities Procedures 03-1275284, Field Procedure for Remote Rolled Plugging Utilizing Plugging Control Box, | ==Section 1RO8: Inservice Inspection Activities== | ||
: MRS-GEN-1214, Steam Generator Channel Head Video Inspection, Rev. | ===Procedures=== | ||
: NDEMAN-NDE-25, Magnetic Particle Examination, Rev. | : 03-1275284, Field Procedure for Remote Rolled Plugging Utilizing Plugging Control Box, Rev. 021 03-9203864, Steam Generator Channel Head Inspection per Nuclear Safety Advisory Letter (NSAL) 12 | ||
: NDEMAN-NDE-640, Ultrasonic Examination Using Longitudinal Wave and Shear Wave Straight Beam Techniques, Rev. 005 | -1, Rev. 002 54-ISI-400-021, Multi | ||
: NDE-ND-ALL- 7202, Visual Examination of PWR Reactor Pressure Vessel Upper Head Penetrations, Rev. 000 | -Frequency Eddy Current Examination of Tubing, Rev. | ||
: NDE-NE-ALL-6102, Utilization of | : 000 MP/0/A/7650/040, Inspection, Assessment, and Cleanup of Boric Acid on Plant Materials, Rev. 022 | ||
: MRS-GEN-1214, Steam Generator Channel Head Video Inspection, Rev. | |||
: NDE-NE-ALL-7203, Visual Examination of PWR Reactor Pressure Vessel Bottom Mounted Instrument Penetrations, Rev. 000 SM/0/A/8140/001, Welding of QA and Non QA Piping, Valves and Components, Rev. 037 | : 2 | ||
: NDEMAN-NDE-25, Magnetic Particle Examination, Rev. | |||
: 28 | |||
: NDEMAN-NDE-640, Ultrasonic Examination Using Longitudinal Wave and Shear Wave Straight Beam Techniques, Rev. | |||
: 005 | |||
: NDE-ND-ALL- 7202, Visual Examination of PWR Reactor Pressure Vessel Upper Head Penetrations, Rev. | |||
: 000 | |||
: NDE-NE-ALL-6102, Utilization of PDI | |||
-UT-2 Generic Procedure for the Ultrasonic Examination of Austenitic Pipe Welds, Rev. | |||
: 000 | |||
: NDE-NE-ALL-7203, Visual Examination of PWR Reactor Pressure Vessel Bottom Mounted Instrument Penetrations, Rev. 000 | |||
: SM/0/A/8140/001, Welding of QA and Non QA Piping, Valves and Components, Rev. | |||
: 037 | |||
===Calculations=== | ===Calculations=== | ||
: CNC-1201.01-00-0022, Determination of Periodic Inspection Requirements for the Reactor Vessel Head and Reactor Vessel Head Inspection Documentation, Rev. | : CNC-1201.01-00-0022, Determination of Periodic Inspection Requirements for the Reactor Vessel Head and Reactor Vessel Head Inspection Documentation, Rev. | ||
: 23 | |||
===Drawings=== | ===Drawings=== | ||
: CN-2492-NW.00-158, Containment Valve Injection Water System (NW), Rev. | : CN-2492-NW.00-158, Containment Valve Injection Water System (NW), Rev. | ||
: CN-2569-01.00, Flow Diagram of Containment Valve Injection Water System (NW), Rev. | : 2 | ||
: CN-2569-01.00, Flow Diagram of Containment Valve Injection Water System (NW), Rev. | |||
: 25 | |||
===Other Documents=== | ===Other Documents=== | ||
: AD-EG-PWR-1611, Boric Acid Corrosion Control Program - Implementation, Rev. 001 | : AD-EG-PWR-1611, Boric Acid Corrosion Control Program | ||
: AD-MN-ALL-0006, Fluid Leak Management, Rev. 000 Catawba Unit 2EOC21 Steam Generator Degradation Assessment, Rev. 001 Certificate of Compliance for UT Test Block 15-1890 Certificate of Conformity for UT Probe SN: SB1593, SB1542, | - Implementation, Rev. | ||
: 001 | |||
: AD-MN-ALL-0006, Fluid Leak Management, Rev. | |||
: CNS-SG-ANL-GL, Eddy Current Guidelines for Duke Energy's D5 Steam Generators, Rev. 001 D5-SG-Appendix H Qual, D5 Steam Generators Site Technique Validation for Catawba Nuclear Station Unit 2, Rev. 001 Instrument Certification for Thermometer SN | : 000 Catawba Unit 2EOC21 Steam Generator Degradation Assessment, Rev. | ||
: 24620999 | : 001 Certificate of Compliance for UT Test Block 15 | ||
: LTR-PL-16-42, Operability Assessment for Primary Side Loose Parts from Degraded Steam Generator Channel Head Cladding at Catawba Unit 2 Magnetic Particle Examination Report No.: | -1890 Certificate of Conformity for UT Probe SN: SB1593, SB1542, RTD 03 | ||
-786 Certification of Analysis for Ferromor ND 8 Yellow Lot# F | |||
: MT-16-178 NDE Qualification Certification for Examiners: | -21011 Certified Test Report for Ultragel II | ||
-12125 | |||
: CNS-SG-ANL-GL, Eddy Current Guidelines for Duke Energy's D5 Steam Generators, Rev. | |||
: 001 D5-SG-Appendix H Qual, D5 Steam Generators Site Technique Validation for Catawba Nuclear Station Unit 2, Rev. | |||
: 001 Instrument Certification for Thermometer SN: 24620999 | |||
: LTR-PL-16-42, Operability Assessment for Primary Side Loose Parts from Degraded Steam Generator Channel Head Cladding at Catawba Unit 2 | |||
: Magnetic Particle Examination Report No.: MT | |||
-16-177, | |||
: MT-16-178 NDE Qualification Certification for Examiners: MGW | |||
-4124, KCE | |||
-3815, MLO | |||
-2292, | |||
: 624655, | : 624655, | ||
: 625282, | : 625282, | ||
: 246199, | : 246199, MGH | ||
-4124, | |||
: TJW-1341 | : TJW-1341 | ||
: PD-EG-PWR-1611, Boric Acid Corrosion Control Program, Rev. 001 UT Calibration/Examination Report No.: | : PD-EG-PWR-1611, Boric Acid Corrosion Control Program, Rev. | ||
: | : 001 UT Calibration/Examination Report No.: U | ||
: T-16-1342 Visual Examination Record for Boric Acid Detection Report No.: VT | |||
: VT-16-1484 Weld Performance Qualification Test for welders: O2847, H5555 Welding Procedure Qualification Record No.: L-110D, L-138, L-148C Welding Procedure Specification Technical Sheet: GTOO0808-04 | -16-1364, | ||
: VT-16-1484 Weld Performance Qualification Test for welders: O2847, H5555 | |||
: Welding Procedure Qualification Record No.: L | |||
-110D, L-138, L-148C Welding Procedure Specification Technical Sheet: GTOO0808 | |||
-04 | |||
===Condition Reports=== | ===Condition Reports=== | ||
: AR 01898992, Excessive / Active boron accumulation from 2-NI-VA-327 pipe | : AR 01898992, Excessive / Active boron accumulation from 2 | ||
-NI-VA-327 pipe | |||
: AR 01901090, During fit-up inspection, QC noted minimum wall thickness violation | : AR 01901090, During fit-up inspection, QC noted minimum wall thickness violation | ||
: AR 01931170, 0-WL-FE-9780 Active / Excessive boron leak from flange | : AR 01931170, 0 | ||
: AR 01940775, 1-NM-PG-6100 Active / Excessive boron from threaded fitting | -WL-FE-9780 Active / Excessive boron leak from flange | ||
: AR 01950202, 2-KF-FS-5150 Active boron leak from fitting 30-40 dpm | : AR 01940775, 1 | ||
: AR 01985576, Boric Acid Corrosion Control Program - Implementation Procedure Effectiveness | -NM-PG-6100 Active / Excessive boron from threaded fitting | ||
: AR 02020057, 1-NS-VA-1B Excessive/active boron, leak increase | : AR 01950202, 2 | ||
: AR 02047391, 1-FW-VA-45 Active Boron Leak | -KF-FS-5150 Active boron leak from fitting 30 | ||
-40 dpm | |||
: AR 01985576, Boric Acid Corrosion Control Program | |||
- Implementation Procedure Effectiveness | |||
: AR 02020057 | |||
, 1-NS-VA-1B Excessive/active boron, leak increase | |||
: AR 02047391, 1 | |||
-FW-VA-45 Active Boron Leak | |||
: AR 02060612, Heavy corrosion and scaling on the lower head | : AR 02060612, Heavy corrosion and scaling on the lower head | ||
: AR 02060953, 2B NC Pump main flange leak | : AR 02060953, 2B NC Pump main flange leak | ||
: AR 02061334, Area of exam coverage limitation encountered during UT exam | : AR 02061334, Area of exam coverage limitation encountered during UT exam | ||
: AR 02062097, Potential misapplication of SR 3.0.2 and SR 3.0.3 | : AR 02062097, Potential misapplication of SR 3.0.2 and SR 3.0.3 | ||
: AR 02062162, Minimum wall thickness violation under | : AR 02062162, Minimum wall thickness violation under WO 20025151 | ||
: AR 02062576, ISI UT Exam Coverage Limitation | : AR 02062576, ISI UT Exam Coverage Limitation | ||
: AR 02062987, Steam Generator 2D primary channel head cladding | : AR 02062987, Steam Generator 2D primary channel head cladding | ||
: AR 02063362, Supports in U2 lower containment | : AR 02063362, Supports in U2 lower containment | ||
: AR 02063371, BAC walkdown in U2 containment | : AR 02063371, BAC walkdown in U2 containment | ||
: AR 02065690, Indentation in U2 reactor head next to outer O-ring groove | : AR 02065690, Indentation in U2 reactor head next to outer | ||
: O-ring groove | |||
===Work Orders=== | ===Work Orders=== | ||
(WO)/Work Requests (WR) | (WO)/Work Requests (WR) | ||
: WO 02129915, 1NS-01B Dry Boron at Valve Packing | : WO 02129915, 1NS | ||
-01B Dry Boron at Valve Packing | |||
: WO 02144333, 2NW-061B: Clean Valve and Internals Delete, Bonnet Seal Weld | : WO 02144333, 2NW-061B: Clean Valve and Internals Delete, Bonnet Seal Weld | ||
: WO 20001790, 2SM-005: Replace Gamma Plug | : WO 20001790, 2SM | ||
-005: Replace Gamma Plug | |||
==Section 1R11: Licensed Operator Requalification Records: License Reactivation Packages (5). | ==Section 1R11: Licensed Operator Requalification== | ||
: LORP Training Attendance records (9 (Shift B)). Medical Files (9). Remedial Training Records (7). Remedial Training Examinations (4). 2016 LOR Exam JPM Summary Sheets (15). Maintenance Hours (10 individuals) Feedback summaries (3) | : Records: License Reactivation Packages (5). | ||
: LORP Training Attendance records (9 (Shift B)). | |||
: Medical Files (9). Remedial Training Records (7). | |||
: Remedial Training Examinations (4). | |||
: 2016 LOR Exam JPM Summary Sheets (15). | |||
: Maintenance Hours (10 individuals) | |||
: Feedback summaries (3) | |||
: Written Examinations: | : Written Examinations: | ||
: LOR 2016 12 B1R, RO Exam, 7/22/16 | : LOR 2016 12 B1R, RO Exam, | ||
: 7/22/16 | |||
: LOR 2016 12 B1S, SRO Exam, 7/22/16 | : LOR 2016 12 B1S, SRO Exam, 7/22/16 | ||
: LOR 2016 12 | : LOR 2016 12 B | ||
: 2R, RO Exam, | |||
: 7/22/16 | |||
: LOR 2016 12 B2S, SRO Exam, 7/22/16 | : LOR 2016 12 B2S, SRO Exam, 7/22/16 | ||
: Procedures: Nuclear System Directive: 512, Maintenance of RO/SRO NRC Licenses, Revision 7, 06/05/14. | : Procedures: | ||
: Nuclear System Directive: 512, Maintenance of RO/SRO NRC Licenses, Revision 7, 06/05/14. | |||
: AD-TQ-ALL-0068, Licensed Operator Continuing Training Program. Revision 1, 05/03/2016. | : AD-TQ-ALL-0068, Licensed Operator Continuing Training Program. Revision 1, 05/03/2016. | ||
: AD-TQ-ALL-0410, Remediation and Reevaluation, Revision 2, 11/18/2015. | : AD-TQ-ALL-0410, Remediation and Reevaluation, Revision 2, 11/18/2015. | ||
| Line 563: | Line 993: | ||
: AD-TQ-ALL-0230, Licensed Operator Requalification Annual and Biennial Exam Development, Revision 4, 07/11/2016. | : AD-TQ-ALL-0230, Licensed Operator Requalification Annual and Biennial Exam Development, Revision 4, 07/11/2016. | ||
: AD-TQ-ALL-0425, Simulator Scenario Based Testing, Revision 1, 04/30/2015 | : AD-TQ-ALL-0425, Simulator Scenario Based Testing, Revision 1, 04/30/2015 | ||
: AD-TQ-ALL-0470, Trainee Evaluation and Examination Security, Revision 0, 06/01/2015. OTMP 3.2, Written Examination Development, Administration and Grading, Instructor Guide, Revision 20, 06/30/2016. OTMP 3.4, Active Simulator Exam Development Guide, Revision 20, 04/25/2016. OTMP 4.1, JPM Exam Preparation and Administration, Revision 14, 07/05/2016 OTMP 4.7, Operator Requalification Examination Security Procedure, Revision 10, 03/07/2016 OTMP 6.3, Licensed Operator Requalification Program. Revision 15, 05/05/2016 OTMP 7.0, Simulator Configuration Management, Revision 17, 08/29/15 Nuclear System Directive: 0805, Nuclear Station Unit Specific Training Simulators, Revision 4, 04/27/15 | : AD-TQ-ALL-0470, Trainee Evaluation and Examination Security, Revision 0, 06/01/2015. | ||
: Simulator Steady State Tests: 2015 Steady State Test, 12/17/15. | : OTMP 3.2, Written Examination Development, Administration and Grading, Instructor Guide, Revision 20, 06/30/2016. | ||
: Simulator Real Time Tests: 2016 Real Time Test, 06/10/2016. | : OTMP 3.4, Active Simulator Exam Development Guide, Revision 20, 04/25/2016. | ||
: Simulator Transient Tests: 2016 Transient Test 3 (SBLOCA), Revision for C1C23, 07/25/16. 2016 Transient Test | : OTMP 4.1, JPM Exam Preparation and Administration, Revision 14, 07/05/2016 | ||
: OTMP 4.7, Operator Requalification Examination Security Procedure, Revision 10, 03/07/2016 | |||
: OTMP 6.3, Licensed Operator Requalification Program. Revision 15, 05/05/2016 | |||
: OTMP 7.0, Simulator Configuration Management, Revision 17, 08/29/15 | |||
: Nuclear System Directive: 0805, Nuclear Station Unit Specific Training Simulators, Revision 4, 04/27/15 | |||
: Simulator Steady State Tests: | |||
: 2015 Steady State Test, 12/17/15. | |||
: Simulator Real Time Tests: | |||
: 2016 Real Time Test, 06/10/2016. | |||
: Simulator Transient Tests: | |||
: 2016 Transient Test 3 (SBLOCA), Revision for C1C23, 07/25/16. | |||
: 2016 Transient Test | |||
(Loss of all Feedwater), Revision for C1C23, 07/25/16. | |||
: 2016 Transient Test 12 (Steam Line Break), Revision for C1C23, 07/25/16. | |||
: 2016 Transient Test 15 (SBLOCA/ICC), Revision for C1C23, 07/25/16. | |||
: Simulator Problem Reports & Design Change Requests: | : Simulator Problem Reports & Design Change Requests: | ||
: RMS-075, Mod to install new OEMF89 in the YN system, 10/15/15 | : RMS-075, Mod to install new OEMF89 in the YN system, 10/15/15 | ||
: EQA-307, Turbine Lube Oil controller on | : EQA-307, Turbine Lube Oil controller on MC | ||
-3 will not control in automatic, 4/15/16 | |||
: CRF-040, Replace all Rod Step counters with new programmable counters, 5/10/16 | : CRF-040, Replace all Rod Step counters with new programmable counters, 5/10/16 | ||
: PCS-078, During CF/CA nozzle swaps the simulator responds more drastically than the plant and results in deviation alarms, 7/14/16 | : PCS-078, During CF/CA nozzle swaps the simulator responds more drastically than the plant and results in deviation alarms, 7/14/16 | ||
| Line 577: | Line 1,021: | ||
: SYS-251, Annunciator | : SYS-251, Annunciator | ||
: AD7-C1 needs reflash capability, 6/24/16 | : AD7-C1 needs reflash capability, 6/24/16 | ||
: Simulator Reports: 2015 Annual Simulator Report, 01/12/16. | : Simulator Reports: | ||
: 2015 Annual Simulator Report, 01/12/16. | |||
: JPM Packages: | : JPM Packages: | ||
: WL-001, Calculate Total RL Discharge Flow, Revision 01, 07/25/2016 | : WL-001, Calculate Total RL Discharge Flow, Revision 01, 07/25/2016 | ||
: RFY-004, Manual Initiation of 1B Diesel Generator Cardox | : RFY-004, Manual Initiation of 1B Diesel Generator Cardox CO | ||
: System, Revision 00, 12/15/03 | |||
: AD-014, 2A Train Hydrogen Igniters Operation from SSF, Revision 02, 08/23/2011 | : AD-014, 2A Train Hydrogen Igniters Operation from SSF, Revision 02, 08/23/2011 | ||
: EP1-123, Respond to Inadvertent Dilution While Shutdown. Revision 00, 07/25/2016 | : EP1-123, Respond to Inadvertent Dilution While Shutdown. Revision 00, 07/25/2016 | ||
| Line 598: | Line 1,044: | ||
==Section 1R13: Maintenance Risk Assessments and Emergent Work Control== | ==Section 1R13: Maintenance Risk Assessments and Emergent Work Control== | ||
: PRT-2-16-2ADGOOS-014: 2A DG OOS | : PRT-2-16-2ADGOOS-014: 2A DG OOS | ||
: PRT-0-16-SSF SG | : PRT-0-16-SSF SG WK 28 | ||
-0158 | |||
: PRT-1-16-1BNSOOS, 1A NS protected due to 1B NS tagged | : PRT-1-16-1BNSOOS, 1A NS protected due to 1B NS tagged | ||
==Section 1R15: Operability Evaluations== | ==Section 1R15: Operability Evaluations== | ||
: PT/2/A/4200/031, SV Valve Inservice Test (QU), March 30, 2016 PT/2/A/4200/031, SV Valve Inservice Test (QU), June 22, 2016 | : PT/2/A/4200/031, SV Valve Inservice Test (QU), March 30, 2016 | ||
: AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev. 003 NCR #02039992 | : PT/2/A/4200/031, SV Valve Inservice Test (QU), June 22, 2016 | ||
: IDO Template filled out for | : AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev. 003 | ||
: NCR #02039992 | |||
: IDO Template filled out for SV | |||
-19 Initial Operability Determination; June 23, 2016 | |||
: OMP 2-29, LCO Tracking, Rev. | |||
: 061 | |||
==Section 2RS1: Radiological Hazard Assessment and Exposure Controls Procedures, Guidance Documents and Manuals | ==Section 2RS1: Radiological Hazard Assessment and Exposure Controls== | ||
: AD-RP-ALL-2001, Taking, Counting, and Recording Surveys, Rev. 001 | : Procedures, Guidance Documents and Manuals | ||
: AD-RP-ALL-2009, Personnel Contamination Monitoring and Reporting, Rev. 002 | : AD-RP-ALL-2001, Taking, Counting, and Recording Surveys, Rev | ||
: AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas, | . 001 | ||
: AD-RP-ALL-2009, Personnel Contamination Monitoring and Reporting, Rev | |||
: AD-RP-ALL-3001, Control of Radioactive Material and Use of Radioactive Material Labels, | . 002 | ||
: AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas, Rev. 002 | |||
: AD-RP-ALL-3001, Control of Radioactive Material and Use of Radioactive Material Labels, Rev. 001 RA/2/1100/004, Unit 2 Required Surveys for Plant Transients, Rev | |||
. 013 RA/0/1700/003, Issuance and Return of Radioactive Sources, Rev | |||
. 001 | |||
: Records and Data | : Records and Data | ||
: AD-RP-ALL-2011, Radiation Protection Briefings Attachment 2, Rx Head Move, 9/14/2016 | : AD-RP-ALL-2011, Radiation Protection Briefings Attachment 2, Rx Head Move, 9/14/2016 | ||
: AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas: Attachment 1, 09/14/2016, 18:42. | : AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas: Attachment 1, 09/14/2016, 18:42. | ||
: AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas: Attachment 1, 09/14/2016, 11:55. | : AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas: Attachment 1, 09/14/2016, | ||
: AD-RP-ALL-2017 Rev 2, Attachment 9 <<LHRA or VHRA Key Log >>, 09/23/2016-09/28/2016 @ 8:30 | : 11:55. | ||
: Boundary TLD Dose Trending Report 03/01/2015 - 07/21/2016 Catawba Nuclear Site Semiannual Source Inventory and Leak Test, 06/02/2016 (in part) Catawba Nuclear Station- Unit 2 | : AD-RP-ALL-2017 Rev 2, Attachment 9 <<LHRA or VHRA Key Log >>, 09/23/2016 | ||
-09/28/2016 @ 8:30 | |||
: Gamma Spectrum | : Boundary TLD Dose Trending Report 03/01/2015 | ||
- 07/21/2016 | |||
: Catawba Nuclear Site Semiannual Source Inventory and Leak Test, 06/02/2016 (in part) | |||
: Catawba Nuclear Station | |||
- Unit 2 EOC | |||
-21 Refueling Outage Hi level Schedule 09/26/2016 | |||
- 09/29/2016 | |||
: Confirmation Form 2016 Annual Inventory Reconciliation | |||
[NSTS Sources], 01/13/2016 | |||
: Gamma Spectrum Analyse | |||
s: 12-Sep-16-220016, E/C thimble tube inspection B/Z | |||
: RWP 2108, 09/12/2016 12-Sep-16-220015, E/C Thimble Tube Inspect HEPA exhaust | : RWP 2108, 09/12/2016 12-Sep-16-220015, E/C Thimble Tube Inspect HEPA exhaust | ||
: RWP 2108, 09/12/2016 CN16091300020, U2 RX L/C Decon Seal Table | : RWP 2108, 09/12/2016 | ||
: RWP 2103, 09/13/2016 CN16091300062, U2 Rx L/C Retracting Incore Thimble Tubes | : CN16091300020, U2 RX L/C Decon Seal Table | ||
: RWP 2126, 09/13/2016 CN16091400017, U2 Rx UC Cavity Seal sand-box covers | : RWP 2103, 09/13/2016 | ||
: CN16091300062, U2 Rx L/C Retracting Incore Thimble Tubes | |||
: RWP 2126, 09/13/2016 | |||
: | : CN16091400017, U2 Rx UC Cavity Seal sand | ||
: | -box covers RWP 2405/9 | ||
: RWP 2101, 09/27/2016 CN16092700035, U-2 L/C PRT Platform Routine, 09/27/2016 CN16092700041, U2 L/C A/D CACFU Exhaust, 09/27/2016 CN16092600046, L/C 'A' C/L Nozdam Remov/RT Prep/Boundary, 9/26/2016 CN16092700049, U2 L/C "D" Platform Rtn, 9/27/2016 CN16092700026, U2 Rx L/C B/C SG Nozzle Dam Boundary | : CN16091400025, U2 Rx UC C/S Rtn RWP 2401/1 | ||
: CN16091400007, U2 Rx UC Shallow End Stud Hole Plugs RWP 2405 | |||
: CN16091400016, U2 Rx UC C/S Rtn RWP 2401 | |||
: CN16092700052, U2 RX L/C PRT Platform Rtn | |||
: RWP 2101, 09/27/2016 | |||
: CN16092700035, | |||
: U-2 L/C PRT Platform Routine, 09/27/2016 | |||
: CN16092700041, U2 L/C A/D CACFU Exhaust, 09/27/2016 | |||
: CN16092600046, L/C 'A' C/L Nozdam Remov/RT Prep/Boundary, 9/26/2016 | |||
: CN16092700049, U2 L/C "D" Platform Rtn, 9/27/2016 | |||
: CN16092700026, U2 Rx L/C B/C SG Nozzle Dam Boundary | |||
: RWP 2808, 9/27/2016 | : RWP 2808, 9/27/2016 | ||
: CNS-M-20150306-33, U2 Rx Bldg\U-2 Upper Cont., 3/6/2015 | : CNS-M-20150306-33, U2 Rx Bldg | ||
: CNS-M-20150306-34, U2 Rx Bldg\U-2 Upper Cont., 3/6/2015 | \U-2 Upper Cont., 3/6/2015 | ||
: CNS-M-20160404-2, Aux Bldg\543 Elevation room 222 A-B, 04/04/2016 Interstation Letter Subject: CNS Material Stored in Spent Fuel Pools-2015 VSDS Standard Survey Report(s): | : CNS-M-20150306-34, U2 Rx Bldg | ||
: CNS-M-20160911-18, U2 Rx Bldg\U-2 Lower Cont., 09/11/2016 | \U-2 Upper Cont., 3/6/2015 | ||
: CNS-M-20160911-24, U2 Rx Bldg\U-2 Lower Cont., 09/11/2016 | : CNS-M-20160404-2, Aux Bldg | ||
: CNS-M-20160913-15, U2 Rx Bldg\U-2 Lower Cont., 09/12/2016 | \543 Elevation room 222 A | ||
: CNS-M-20160913-20, U2 Rx | -B, 04/04/2016 | ||
: CNS-M-20160912-52, U2 Rx Bldg\U-2 Lower Cont., 09/12/2016 | : Interstation Letter Subject: CNS Material Stored in Spent Fuel Pools | ||
: CNS-M-20160914-1, U2 Rx Bldg\U-2 Lower Cont., 09/14/2016 | -2015 VSDS Standard Survey Report(s): | ||
: CNS-M-20160914-28, U2 Rx Bldg\U-2 Upper Cont., 09/14/2016 | : CNS-M-20160911-18, U2 Rx Bldg | ||
: CNS-M-20160914-30, U2 Rx Bldg\U-2 Upper Cont., 09/14/2016 | \U-2 Lower Cont., 09/11/2016 | ||
: CNS-M-20160127-7, ISFSI Yard, 01/27/2016 RA/2/1100/001, Unit 2 Outage Upper Containment Controls and Surveillance: Enclosure 5.28, 09/14/2016, 8:55-16:00. | : CNS-M-20160911-24, U2 Rx Bldg | ||
\U-2 Lower Cont., 09/11/2016 | |||
: CNS-M-20160913-15, U2 Rx Bldg | |||
\U-2 Lower Cont., 09/12/2016 | |||
: CNS-M-20160913-20, U2 Rx Bl dg\U-2 Lower Cont., 09/13/2016 | |||
: CNS-M-20160912-52, U2 Rx Bldg | |||
\U-2 Lower Cont., 09/12/2016 | |||
: CNS-M-20160914-1, U2 Rx Bldg | |||
\U-2 Lower Cont., 09/14/2016 | |||
: CNS-M-20160914-28, U2 Rx Bldg | |||
\U-2 Upper Cont., 09/14/2016 | |||
: CNS-M-20160914-30, U2 Rx Bldg | |||
\U-2 Upper Cont., 09/14/2016 | |||
: CNS-M-20160127-7, ISFSI Yard, 01/27/2016 | |||
: RA/2/1100/001, Unit 2 Outage Upper Containment Controls and Surveillance: Enclosure 5.28, 09/14/2016, 8:55 | |||
-16:00. | |||
: CAP Documents | : CAP Documents | ||
: AD-PI-ALL-0100, Corrective Action Program, Rev. 006 Action Requests (AR): | : AD-PI-ALL-0100, Corrective Action Program, Rev | ||
. 006 Action Requests (AR) | |||
: | |||
: 01538967, | : 01538967, | ||
: 01540206, | : 01540206, | ||
| Line 652: | Line 1,142: | ||
: 01897614, | : 01897614, | ||
: 01898359, | : 01898359, | ||
: 01901055 and 02065328 | : 01901055 | ||
and 02065328 | |||
==Section 2RS2: ALARA== | ==Section 2RS2: ALARA== | ||
: Procedures, Guidance Documents, and Manuals | : Procedures, Guidance Documents, and Manuals | ||
: AD-RP-ALL-2000, Preparation and Management of Radiation Work Permits (RWP), Rev. 001 | : AD-RP-ALL-2000, Preparation and Management of Radiation Work Permits (RWP), Rev | ||
: AD-RP-ALL-2006, Radiation Protection Risk Management Process, Rev. 001 | . 001 | ||
: AD-RP-ALL-2019, TEDE ALARA Evaluations and DAC hour Tracking, Rev. 001 | : AD-RP-ALL-2006, Radiation Protection Risk Management Process, Rev | ||
: AD-RP-ALL-9000, ALARA Program, Rev. 004 | . 001 | ||
: AD-RP-ALL-9001, ALARA Planning, Rev. 001 | : AD-RP-ALL-2019, TEDE ALARA Evaluations and DAC hour Tracking, Rev | ||
: AD-RP-ALL-9002, Sentinel ALARA Management, Rev. 000 | . 001 | ||
: AD-RP-ALL-9006, Failed Fuel Action Plan, Rev. 000 | : AD-RP-ALL-9000, ALARA Program, Rev | ||
: AD-RP-ALL-9007, Radiation Protection Source Term Review, Rev. 000 | . 004 | ||
: CSD-CP-CNS-0001, Catawba Primary Chemistry Strategic Plan, Rev. 001 Duke Fleet ALARA Manual, Various Revisions depending on Section | : AD-RP-ALL-9001, ALARA Planning, Rev | ||
. 001 | |||
: AD-RP-ALL-5002, Attachment 4, | : AD-RP-ALL-9002, Sentinel ALARA Management, Rev | ||
: CFR 61 Review, Catawba Nuclear Station, Annual General Station Review, 3/1/2016 ALARA Critique, Plan # C-OL-15-10, Unit 2 Repair/Replace 2BB-012, 8/31/2015 ALARA Critique, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, 3/9/2016 ALARA In-Progress Review, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities; 35% exposure/39% work, 11/26/2015; 85% exposure/54% work, | . 000 | ||
: ALARA Long Range Plan 2015-2020 (2015 Update), Catawba Nuclear Station, 8/15/2015 ALARA Long Range Plan 2016-2021 (2016 Update), Catawba Nuclear Station, 4/28/2016 ALARA Plan (AP), Plan # C-OL-15-10, Unit 2 Repair/Replace 2BB-012, 8/27/2015 AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 0, 10/29/2015 AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 1, 12/3/2015 AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 2, 12/9/2015 AP, Plan # 2EOC21-16-01, Install/Remove Temporary Shielding During 2EOC21, Rev. 000, 8/10/2016 AP, Plan # C2EOC21-16-02, Reactor Head Activities, Rev. 000, 8/9/2016 AP, Plan # C2EOC21-16-04, Steam Generator Primary Side Activities, Rev. 000, 8/9/2016 AP, Plan # C2EOC21-16-05, Steam Generator Secondary Side Activities, Rev. 000, 8/9/2016 AP, Plan # C2EOC21-16-10, 2B NC Pump Motor Removal/Replacement, Rev. 000, 8/4/2016 Catawba Nuclear Station ALARA Committee Meeting Minutes [Including 2EOC21 Challenge Boards], January through June 2016 CNS Unit 1 EOC22 Refueling & Maintenance Outage Summary of Personnel Radiation Exposures [Outage ALARA Report], 3/18/2016 CNS Radiation Protection Daily Status Reports/Graphs [Dose Tracking by work group and site]: 9/14/2016; 9/28/2016; and 9/29/2016 CNS Unit 2 | : AD-RP-ALL-9006, Failed Fuel Action Plan, Rev | ||
. 000 | |||
: AD-RP-ALL-9007, Radiation Protection Source Term Review, Rev | |||
: | . 000 | ||
: CSD-CP-CNS-0001, Catawba Primary Chemistry Strategic Plan, Rev. 001 Duke Fleet ALARA Manual, Various Revisions depending on Section Records and Da ta | |||
: AD-RP-ALL-5002, Attachment 4, | |||
: CFR 61 Review | |||
, Catawba Nuclear Station | |||
, Annual General Station Review, 3/1/2016 | |||
: ALARA Critique, Plan # C-OL-15-10, Unit 2 Repair/Replace 2BB | |||
-012, 8/31/2015 | |||
: ALARA Critique, Plan # C1EOC22 | |||
-15-02, 1EOC22 Reactor Head Activities, 3/9/2016 | |||
: ALARA In-Progress Review | |||
, Plan # C1EOC22 | |||
-15-02, 1EOC22 Reactor Head Activities; 35% exposure/39% work, 11/26/2015; 85% exposure/ | |||
: 54% work, 1 | |||
: 2/3/2015; 100% exposure/ | |||
: 70% work, 12/ | |||
: 9/2015 ALARA In-Progress Review, Plan # C-OL-15-10, Unit 2 Repair/Replace 2BB | |||
-012, 73%, 8/31/2015 | |||
: ALARA In-Progress Review, Plan # C2EOC21 | |||
-16-02, Headwork Activities, | |||
: 24% exposure/ | |||
: 36% work, 9/15/2016 ALARA In-Progress Reviews, Plan # 2EOC21 | |||
-16-04, Steam Generator Primary Side Activities: | |||
: 21% exposure/ | |||
: 14% work, 9/20/2016; 50% exposure/ | |||
: 44% work, 9/24/2016 | |||
: ALARA In-Progress Review, Plan # C | |||
: 2EOC21-16-08, Steam Generator Nozzle Dam Activities | |||
, 58% exposure/43% work, 9 | |||
/20/2016 ALARA In-Progress Review | |||
s, Plan # C2EOC21 | |||
-16-10, 2B NC Pump Motor Removal/ | |||
: Replacement | |||
: 2% exposure/1.6% work, 9/12/2016; 22.7% exposure/18% work, 9/17/2016; 39.3% exposure/48% work, 9/20/2016; 53% exposure/58% work, 9/23/2016; 75.3% exposure/76% work, 9/23/2016 ALARA Long Range Plan 2014 | |||
-2018 (2014 Update), Catawba Nuclear Station, 2 | |||
/11/2014 | |||
: ALARA Long Range Plan 2015 | |||
-2020 (2015 | |||
: Update), Catawba Nuclear Station, | |||
: 8/15/2015 ALARA Long Range Plan 2016 | |||
-2021 (2016 Update), Catawba Nuclear Station, 4/28/2016 | |||
: ALARA Plan (AP), Plan # C | |||
-OL-15-10, Unit 2 Repair/Replace 2BB | |||
-012, 8/27/2015 | |||
: AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 0, 10/29/2015 | |||
: AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 1, 12/3/2015 | |||
: AP, Plan # C1EOC22 | |||
-15-02, 1EOC22 Reactor Head Activities, Rev | |||
: 2, 12/9/2015 AP, Plan # 2EOC21-16-01, Install/Remove Temporary Shielding During 2EOC21, Rev. 000, 8/10/2016 | |||
: AP, Plan # C2EOC21-16-02, Reactor Head Activities, Rev | |||
. 000, 8/9/2016 AP, Plan # C2EOC21 | |||
-16-04, Steam Generator Primary Side Activities, Rev | |||
. 000, 8/9/2016 | |||
: AP, Plan # C2EOC21-16-05, Steam Generator Secondary Side Activities, Rev | |||
. 000, 8/9/2016 | |||
: AP, Plan # C2EOC21 | |||
-16-10, 2B NC Pump Motor Removal/Replacement, Rev | |||
. 000, 8/4/2016 Catawba Nuclear Station ALARA Committee Meeting Minutes [Including 2EOC21 Challenge Boards], January through June 2016 | |||
: CNS Unit 1 EOC22 Refueling & Maintenance Outage Summary of Personnel Radiation Exposures | |||
[Outage ALARA Report], 3/18/2016 | |||
: CNS Radiation Protection Daily Status Reports/Graphs [Dose Tracking by work group and site]: 9/14/2016; 9/28/2016; and 9/29/2016 | |||
: CNS Unit 2 EOC | |||
-21 Refueling Outage High Level Schedule(s): 9/12/2016 | |||
-9/15/2016; 9/13 | |||
-2016-9/16/2016; 9/15/2015 | |||
-9/18/2016; and 9/26/2016 | |||
-9/29/2016 | |||
: Micro ALARA Plan, Unit 2 Dry Cask Storage for Cask 82, 6/16/2016 | |||
: Micro ALARA Plan, Unit 2 Dry Cask Storage for Cask 82 | |||
, Post Job Revi ew, 8/3/2016 | |||
: Radiation Work Permits (RWP): RWP #2125, Shielding Activities (Lower Containment and Annulus), Rev 22; RWP #2162, 2B NCP Motor Replacement, Rev 9; RWP # 2405, Reactor Head Activities (U/C), Rev 21; RWP #2453, RX Head Inspections Includes Shroud, Hanger, Insulation & Inspection (U/C), Rev 9; RWP #2806, S/G Remove/Install Man Ways and Diaphragms/Bowl Pumping, Rev 30; RWP #2808, S/G Install/Remove Nozzle Covers/Dams, Rev 27; RWP #2812, S/G Eddy Current Activities, Rev 43; RWP #2814, SIG Plugging Activities, Rev | |||
. 032 RWP List Report, Catawba Nuclear Station, RWP Status, 7/12/2016 | |||
: Spreadsheet, 2015 Annual ALARA Estimate | |||
(by Work Group), undated Spreadsheet, 2016 | |||
: Annual ALARA Estimate (by Work Group), undated | |||
: TEDE ALARA Evaluations: Unit 2 Reactor Cavity Deep End | |||
-Blind Flange Install (RWP 2415), 9/12/2016; Unit 2 Reactor Cavity | |||
-Head Flange Cleaning and Cavity Seals (RWP2405), 9/9/2016; Unit 2 Seal Table | |||
-Eddy Current Activities (RWP 2108), 8/25/2016; Unit 2 S/G Bowls-Nozzle Dams (RWP 2808), 9/1/2016; | |||
: Unit 2 S/G Platform | |||
-Platform Work (RWPs 2806, 2810, 2812, 2814, 2834, & 2839), 9/1/2016 | |||
: Temporary Shielding Request (TSR), TSR 16 | |||
-232, Pressurizer Surge Line for 2B RCP Motor Work, 8/10/2016; TSR | |||
: 16-235, PZR Curtain@593', 3/1/2016; | |||
: TSR 16-235B, PZR Curtain at 2NCMR B, 8/10/2016; | : TSR 16-235B, PZR Curtain at 2NCMR B, 8/10/2016; | ||
: TSR 16-291, 2B Cold Leg Pipe, 8/8/2016; | : TSR 16-291, 2B Cold Leg Pipe, 8/8/2016; | ||
: TSR 16-296, 2B Hot Leg, 8/10/2016; | : TSR 16-296, 2B Hot Leg, 8/10/2016; | ||
: TSR 16-296B, 2B Hot Leg RTD, 8/10/2016 VSDS Survey # | : TSR 16-296B, 2B Hot Leg | ||
: RTD, 8/10/2016 | |||
: CNS-M-20160912*6, U2 Rx Bldg\U2 L/C Surge line Pre Shield [TSR16-232], 9/12/2016 VSDS Survey # | : VSDS Survey # CNS | ||
-M-20150828-4, 2BB12 Job Coverage, 8/28/2015 | |||
: CNS-M-20160911-14, Pre Shielding for | : VSDS Survey # | ||
: CNS-M-20160912*6 | |||
: CNS-M-20160910-5, 2EOC21 Initial Entry [2B Loop], 9/10/2016 | , U2 Rx Bldg | ||
\U2 L/C Surge line Pre Shield [TSR16-232], 9/12/2016 | |||
: VSDS Survey # CNS | |||
-M-20160912*6, Post Shielding for TSR16-232, 9/13/2016 | |||
: VSDS Survey # | |||
: CNS-M-20160911-14, Pre Shielding for TSR 16 | |||
-235B, 9/11/2016 | |||
: VSDS Survey # | |||
: CNS-M-20160910-5, 2EOC21 Initial Entry [2B Loop], 9/10/2016 | |||
: VSDS Survey # | : VSDS Survey # | ||
: CNS-M-20160914-3, Post Shielding B Cold Leg for | : CNS-M-20160914-3, Post Shielding B Cold Leg for | ||
: TSR 16-291, 9/13/2016 | : TSR 16-291, 9/13/2016 | ||
: VSDS Survey # | : VSDS Survey # | ||
: CNS-M-20160913-13, Pre and Post Shielding survey of 2B Hot Leg, 9/13/2016 1EOC22 Crud Burst Cleanup Dose Rate Data, with Graph [including comparison to previous outages], 9/13/16 2EOC21 Crud Burst Cleanup Dose Rate Data, with Graph [and comparison to previous outages], 9/13/16 2015 DAW Site Composite Smear Sample for 10 | : CNS-M-20160912-47, Pre and Post Shielding survey of | ||
: 2B Hot Leg, 9/12/2016 | |||
: VSDS Survey # | |||
: CNS-M-20160913-13, Pre and Post Shielding survey of 2B Hot Leg, 9/13/2016 | |||
: 1EOC22 Crud Burst Cleanup Dose Rate Data, with Graph [including comparison to previous outages], 9/13/16 | |||
: 2EOC21 Crud Burst Cleanup Dose Rate Data, with Graph [and comparison to previous outages], 9/13/16 | |||
: 2015 DAW Site Composite Smear Sample for 10 | |||
: CFR 61, 8/28/2015 | : CFR 61, 8/28/2015 | ||
: Corrective Action Program (CAP) Documents | : Corrective Action Program (CAP) Documents | ||
: AD-PI-ALL-0100, Corrective Action Program, Rev. 006 Self-Assessment, Perform Annual Radiation Protection Program review (ALARA program portion) as required by 10 | : AD-PI-ALL-0100, Corrective Action Program, Rev | ||
: CFR 20.1101(c), 10/29/2015 Self-Assessment Report G-FRPS-SA-15-22, 2015 Catawba Nuclear Station Radiation Protection Source Term Review, 10/20/2015 Self-Assessment Report C-RPS-SA-14-18, Assessment of CNS Dose Delta PIPs, 10/29/2014 PIPs C-14-0684 (AR 01534122), C-14-10693 (AR 01897403), and C-14-10854 (AR 01897418) Action Requests (AR): | . 006 Self-Assessment, Perform Annual Radiation Protection Program review (ALARA program portion) as required by 10 | ||
: CFR 20.1101(c), 10/29/2015 | |||
: Self-Assessment Report G | |||
-FRPS-SA-15-22, 2015 Catawba Nuclear Station Radiation Protection Source Term Review, 10/20/2015 | |||
: Self-Assessment Report | |||
: C-RPS-SA-14-18, Assessment of CNS Dose Delta PIPs, 10/29/2014 | |||
: PIPs C-14-0684 (AR 01534122), C-14-10693 (AR 01897403), and C-14-10854 (AR 01897418 | |||
) Action Requests (AR) | |||
: | |||
: 01519038, | : 01519038, | ||
: 01535695, | : 01535695, | ||
| Line 702: | Line 1,297: | ||
: 01982820, and 02026974 | : 01982820, and 02026974 | ||
==Section 2RS3: In-Plant Airborne Radioactivity Control and Mitigation Procedures, Guidance Documents, and Manuals | ==Section 2RS3: == | ||
: AD-RP-ALL-2019, TEDE ALARA Evaluations and DAC Hour Tracking, Rev. 001 | : In | ||
: AD-RP-ALL-6002, Inspections of Self-Contained Breathing Apparatus (SCBA) and Associated Equipment, Rev. 000 HP/0/B/1000/006, Emergency Equipment Functional Check and Inventory, Rev. 061 PT/0/B/4600/032, Fire Brigade Equipment Inspection/Inventory, Rev. 012 PT/1/A/4450/001, Containment Purge Periodic Test, Rev. 029 PT/1/A/4450/001, Fuel Pool Area Filtered Exhaust Filter Train Performance Test, Rev. 026 PT/1/A/4450/009, Spent Fuel Ventilation System Train A Operability Test, Rev. 028 RA/0/1100/007, Use of Portable Ventilation Systems in Radiologically Controlled Areas, | -Plant Airborne Radioactivity Control and Mitigation Procedures, Guidance Documents, and Manuals | ||
: AD-RP-ALL-2019, TEDE ALARA Evaluations and DAC Hour Tracking, Rev | |||
. 001 | |||
: AD-RP-ALL-6002, Inspections of Self | |||
-Contained Breathing Apparatus (SCBA) and Associated Equipment, Rev | |||
. 000 HP/0/B/1000/006, Emergency Equipment Functional Check and Inventory, Rev | |||
. 061 PT/0/B/4600/032, Fire Brigade Equipment Inspection/Inventory, Rev | |||
. 012 PT/1/A/4450/001, Containment Purge Periodic Test, Rev | |||
. 029 PT/1/A/4450/001, Fuel Pool Area Filtered Exhaust Filter Train Performance Test, Rev. 026 PT/1/A/4450/009, Spent Fuel Ventilation System Train A Operability Test, Rev | |||
. 028 RA/0/1100/007, Use of Portable Ventilation Systems in Radiologically Controlled Areas, Rev. 000 RA/0/1600/001, Respiratory Protection Equipment Receipt, Cleaning, Storage and Documentation, Re | |||
v. 008 RA/0/1600/004, Recharging Self | |||
-Contained Breathing Apparatus, Rev | |||
. 002 | |||
: Records and Data EnRad Laboratories Central Calibration Facility Flow Test Calibration, | : Records and Data EnRad Laboratories Central Calibration Facility Flow Test Calibration, | ||
: ID 04530, 06/14/2016 EnRad Laboratories Central Calibration Facility Flow Test Calibration, | : ID 04530, 06/14/2016 | ||
: ID 04186, 12/14/2015 EnRad Laboratories Central Calibration Facility Flow Test Calibration, | : EnRad Laboratories Central Calibration Facility Flow Test Calibration, | ||
: ID 04210, 03/15/2016 EnRad Laboratories Central Calibration Facility Flow Test Calibration, | : ID 04186, 12/14/2015 | ||
: ID 04160, 03/15/2016 EnRad Laboratories Central Calibration Facility Flow Test Calibration, | : EnRad Laboratories Central Calibration Facility Flow Test Calibration, | ||
: ID 04339, 02/192016 MSA C.A.R.E Authorized Repair Center & Technician Certification, Exp. 10/30/2015 PT/2/A/4450/001, Containment Purge Filter Train Performance Test Rev 035, 02/24/2015 PT/0/A/4450/001, Control Room Area Outside Air Pressure Filter Trains Performance Test, 04/01/16 RA/0/1400/012, System | : ID 04210, 03/15/2016 | ||
: EnRad Laboratories Central Calibration Facility Flow Test Calibration, | |||
: ID 04160, 03/15/2016 | |||
: EnRad Laboratories Central Calibration Facility Flow Test Calibration, | |||
: ID 04339, 02/192016 | |||
: MSA C.A.R.E Authorized Repair Center & Technician Certification, Exp | |||
. 10/30/2015 | |||
: PT/2/A/4450/001, Containment Purge Filter Train Performance Test Rev 035, 02/24/2015 | |||
: PT/0/A/4450/001, Control Room Area Outside Air Pressure Filter Trains Performance Test, 04/01/16 RA/0/1400/012, System Inte grity Testing of Portable HEPA Units: Enclosure 5.2, Rev 1, 09/2/2016 | |||
: CAP Documents | : CAP Documents | ||
: AD-PI-ALL-0100, Corrective Action Program, Rev. 006 | : AD-PI-ALL-0100, Corrective Action Program, Rev | ||
. 006 | |||
: ARs: | : ARs: | ||
: 01534067, | : 01534067, | ||
| Line 720: | Line 1,335: | ||
: 01900248, and 02018036 | : 01900248, and 02018036 | ||
==Section 2RS4: Occupational Dose Assessment Procedures, Guidance Documents, and Manuals | ==Section 2RS4: Occupational Dose== | ||
: AD-RP-ALL-2009, Personnel Contamination, Monitoring and Reporting, Rev. 002 | : Assessment Procedures, Guidance Documents, and Manuals | ||
: AD-RP-ALL-2010, Skin Dose from Contamination, Rev. 000 | : AD-RP-ALL-2009, Personnel Contamination, Monitoring and Reporting, Rev | ||
: AD-RP-ALL-4001, RP Number Issue and Rad Worker Activation, Rev. 005 | . 002 | ||
: AD-RP-ALL-4005, Dose Management, Rev. 002 | : AD-RP-ALL-2010, Skin Dose from Contamination, Rev | ||
: AD-RP-ALL-4010, Internal Dose Assessment, Rev. 000 | . 000 | ||
: AD-RP-ALL-4011, In Vitro Bioassay, Rev. 000 | : AD-RP-ALL-4001, RP Number Issue and Rad Worker Activation, Rev | ||
: AD-RP-ALL-4013, Area TLD Monitoring Program, Rev. 000 | . 005 | ||
: AD-RP-ALL-7008, APEX INVIVO Whole Body Counter Operation, Quality Control Checks and Data Review, Rev. 000 | : AD-RP-ALL-4005, Dose Management, Rev | ||
: ENRAD-PROC-839, Calibration of Canberra | . 002 | ||
: AD-RP-ALL-4010, Internal Dose Assessment, Rev | |||
. 000 | |||
: AD-RP-ALL-4011, In Vitro Bioassay, Rev | |||
. 000 | |||
: AD-RP-ALL-4013, Area TLD Monitoring Program, Rev | |||
. 000 | |||
: AD-RP-ALL-7008, APEX INVIVO Whole Body Counter Operation, Quality Control Checks and Data Review, Rev | |||
. 000 | |||
: ENRAD-PROC-839, Calibration of Canberra GEM | |||
-5 Portal Monitor, Rev | |||
. 002 RD/0/B/7000/13 | |||
, Operation and Calibration of the IDCHF | |||
: Electronic Dosimeter Calibrator, | |||
: Rev. 009 | : Rev. 009 | ||
: TE-RP-ALL-4001, Declared Pregnant Worker, Rev. 001 | : TE-RP-ALL-4001, Declared Pregnant Worker, Rev | ||
: TE-RP-ALL-4003, Placement of Personnel Dosimetry for Non-Uniform Radiation Fields, | . 001 | ||
: TE-RP-ALL-4003, Placement of Personnel Dosimetry for Non-Uniform Radiation Fields | |||
, | |||
: Rev. 000 | : Rev. 000 | ||
: TE-RP-ALL-4004, Multiple Dosimetry, Rev. 003 | : TE-RP-ALL-4004, Multiple Dosimetry, Rev | ||
: Records and Data Apex-InVivo Whole Body Count Analysis Nuclide Libraries: Medical, CNS Routine, Fastscan Calibration, Eu-152, and Qalib. | . 003 | ||
: 9/15/16 Apex-InVivo Whole Body Count Analysis Results: Multiple counts for RP Badge # V604976, 4/30/14 Apex-InVivo Whole Body Counter Background and QA Parameter report 4/2/2016 through 9/27/2016, 9/7/2016 Catawba Nuclear Station - | : Records and Data Apex-InVivo Whole Body Count Analysis Nuclide Libraries: Medical, CNS Routine, Fastscan Calibration, Eu | ||
: TLD-ED Correlations for | -152, and Qalib. | ||
: List, Positive Whole Body Counts Since June 2014, undated Internal Dose Assessment, RP Badge # V604976, 6/1/14 Map, 2014 ISFSI Boundary TLD Locations, 8/26/2016 Memo Catawba | : 9/15/16 | ||
: Apex-InVivo Whole Body Count Analysis Results: Multiple counts for RP Badge # V604976, 4/30/14 Apex-InVivo Whole Body Counter Background and QA Parameter report 4/2/2016 through | |||
: CNS-M-20160127-7, Annual ISFSI Boundary Survey, 1/27/2016 | : 9/27/2016, 9/7/2016 | ||
: Catawba Nuclear Station | |||
- | |||
: TLD-ED Correlations for 1 | |||
st Semi-Annual 2016, 8/17/2016 | |||
: Catawba ISFSI Boundary TLD Dose Trending Report, 3/1/2015 through 7/21/2016, 7/21/2016 | |||
: CNS Alpha Radiation Characterization, 12/18/15 | |||
: CNS Radiation Protection Daily Status Reports: 9/14/2016 and 9/27/2016 | |||
: List, Positive Whole Body Counts Since June 2014, undated Internal Dose Assessment, RP Badge # V604976, 6/1/14 | |||
: Map, 2014 ISFSI Boundary TLD Locations, 8/26/2016 Memo Catawba GEM | |||
-5 Passive Whole Body Sensitivity, 1/28/2014 | |||
: NVLAP Proficiency Testing Report, Third Quarter 2014, 11/24/2014 | |||
: NVLAP Certificate of Accreditation to ISO/IEC 17025:2005: Effective dates 4/1/2014 through 3/31/2015; 4/1/2015 through 3/31/2106; and 4/1/2016 through 3/31/2017 | |||
: Personnel Contamination Event (PCE) Logsheet January 2014 through July 2016, 7/12/2016 | |||
: Report, CNS ISFSI Neutron to Gamma Ratio Characterization, undated Report, Determination of Quarterly and Annual Baseline and Investigation Level for Catawba Nuclear Station Radiological Environmental Monitoring Program TLD Locations, 4/9/15 | |||
: Report, Top 10 Doses [Highest Dose Individuals] Catawba Nuclear Station 1/1/2015 to 12/31/2015 | |||
: Report, Top 10 Doses [Highest Dose Individuals] Catawba Nuclear Station 1/1/201 | |||
to 9/13/2016 VSDS Survey # | |||
: CNS-M-20160127-7, Annual ISFSI Boundary Survey, 1/27/2016 | |||
: VSDS Survey # | : VSDS Survey # | ||
: CNS-M-20160531-1, Survey for placement of Cask 80 and ISFSI Boundary Survey, 5/31/2016 | : CNS-M-20160517-2, Survey for placement of Cask 79 | ||
on ISFSI Pad, 5/17/2016 | |||
: VSDS Survey # CNS | |||
-M-20160531-1, Survey for placement of Cask 80 | |||
and ISFSI Boundary Survey, 5/31/2016 | |||
: TE-RP-ALL-4001, Attachment 1, Pregnancy Exposure Agreement for four workers, various dates | : TE-RP-ALL-4001, Attachment 1, Pregnancy Exposure Agreement for four workers, various dates | ||
: TE-RP-All-4004, Attachment 2, Multipack Forms: Multipack ID#4135, 4/8/14; Multipack ID#4136, 4/8/14; and Multipack ID#4166, 11/4/14 Tritium In-Vitro Analysis Results (Urine), RP ID# 703831: Multiple samples 4/2/14 through 4/11/2014; Multiple samples 10/30/14 through 11/7/2014 Tritium In-Vitro Analysis Results (Urine), RP ID# 308115: Multiple samples 10/30/14 through 11/7/2014 Tritium In-Vitro Analysis Results (Urine), RP ID# 211096: Multiple samples 4/2/14 through 4/11/2014 | : TE-RP-All-4004, Attachment 2, Multipack Forms: Multipack ID#4135, 4/8/14; Multipack ID#4136, 4/8/14; and Multipack ID#4166, 11/4/14 | ||
: Tritium In | |||
-Vitro Analysis Results (Urine), RP ID# 703831: Multiple samples 4/2/14 through 4/11/2014; | |||
: Multiple samples | |||
: 10/30/14 through 11 | |||
/7/2014 Tritium In | |||
-Vitro Analysis Results (Urine), RP ID# | |||
: 308115: Multiple samples 10/30/14 through 11/7/2014 | |||
: Tritium In | |||
-Vitro Analysis Results (Urine), RP ID# | |||
: 211096: Multiple samples 4/2/14 through 4/11/2014 | |||
: CAP Documents | : CAP Documents | ||
: AD-PI-ALL-0100, Corrective Action Program, Rev.00 6 Self-Assessment G-DOS-SA-14-03, TLD Lab NVLAP Onsite Assessment, 10/23/ | : AD-PI-ALL-0100, Corrective Action Program, Rev.00 6 Self-Assessment G | ||
-DOS-SA-14-03, TLD Lab NVLAP Onsite Assessment, 10/23/20 | |||
: Self-Assessment G | |||
-DOS-SA-15-03, 1st and 2nd Quarter 2015 TLD Data Review, 11/15/2015 | |||
: Self-Assessment G | |||
-FRPS-SA-15-08, Catawba Internal Dosimetry Program Assessment | |||
, 1/27/2016 | |||
: Benchmark Report C | |||
-RPS-B-14-03, Effective Dose Equivalent for External Exposures (EDEX) Improvements | |||
, 12/30/2014 ARs: | |||
: 01538606, | : 01538606, | ||
: 01541479, | : 01541479, | ||
| Line 756: | Line 1,425: | ||
: 01995469, and 02028825 | : 01995469, and 02028825 | ||
==Section 2RS5: Radiation Monitoring Instrumentation Procedures, Guidance Documents, and Manuals | ==Section 2RS5: Radiation Monitoring Instrumentation== | ||
: AD-RP-ALL-705, Radiation Protection Portable Instrument Source Check, Rev. 000 | |||
: ENRAD-PROC-824, Calibration of | ===Procedures=== | ||
, Guidance Documents, and Manuals | |||
: SAM-11 Small Articles Monitor, Rev. 001 | : AD-RP-ALL-705, Radiation Protection Portable Instrument Source Check, Rev | ||
: ENRAD-PROC-831, Calibration of | . 000 | ||
: ENRAD-PROC-824, Calibration of SAM | |||
: ENRAD-PROC-841, Calibration of Ludlum Model 3 (MR/HR), Rev. 001 | -19, | ||
: ENRAD-PROC-835, Calibration of the MGPI Telepole, Rev. 007 | : SAM-11 Small Articles Monitor, Rev | ||
: ENRAD-PROC-839, Calibration of Canberra | . 001 | ||
: ENRAD-PROC-831, Calibration of AMS | |||
: ENRAD-PROC-842, Calibration of Ludlum Model 3 (CPM), Rev. 001 | -4, Rev. 002 | ||
: ENRAD-PROC-857, Calibration and Quality Assurance of Canberra Cronos-4 Small Article Monitor, Rev. 001 HP/0/B/1000/010, Determination of Radiation Monitor Setpoints, Rev. 064 IP/0/A/3314/004, Radiation Monitoring System | : ENRAD-PROC-841, Calibration of Ludlum Model 3 (MR/HR), Rev | ||
. 001 | |||
: Data and Records Calibration of the J.L. Shepherd Model 89 Shielded Calibration Range Irradiator, EnRad No. 1999, 8/14/14, 8/13/15, and 8/16/16 | : ENRAD-PROC-835, Calibration of the MGPI Telepole, Rev | ||
: EnRad Certificate of Calibration, | . 007 | ||
: ENRAD-PROC-839, Calibration of Canberra GEM | |||
: ID 01704, 08/11/2016 EnRad Certificate of Calibration, | -5 Portal Monitor, Rev | ||
. 002 | |||
: ID 11205, 03/16/2016 EnRad Certificate of Calibration, Cronos-4, EnRad | : ENRAD-PROC-842, Calibration of Ludlum Model 3 (CPM), Rev | ||
: ID 12245, 02/10/2016 EnRad Certificate of Calibration, | . 001 | ||
: ENRAD-PROC-857, Calibration and Quality Assurance of Canberra Cronos | |||
: ID 00391, 03/09/2016 EnRad Certificate of Calibration, Argos-5AB, EnRad | -4 Small Article Monitor, Rev | ||
: ID 12955, 02/22/2016 EnRad Certificate of Calibration, | . 001 HP/0/B/1000/010, Determination of Radiation Monitor Setpoints, Rev | ||
. 064 IP/0/A/3314/004, Radiation Monitoring System RP | |||
: ID 02800, 01/05/2016 EnRad Certificate of Calibration, Ludlum Model 19, EnRad | -2C High Range Process Channel Calibration, Rev. 039 and Rev | ||
: ID 03613, 06/08/2016 EnRad Certificate of Calibration, Telepole, EnRad | . 040 Position Paper | ||
: ID 02708, 10/22/2015 Quality Control and Calibration of Apex InVivo Whole Body Counting System, 9/21/15, 9/16/14, and 8/4/2016 Work Order (WO) | - Source Response Check Frequencies for Instruments Used for Contamination Monitoring at Radiologically Control Area and Restricted Area Exit Points, 06/16/2016 | ||
: 01987407-01, 2EMF-53B Containment High Range Monitor Calibration, 03/21/12 | : RA/0/1300/003, Calibration of Apex Gamma Spectroscopy System, Rev | ||
. 000 RA/0/1300/005, Quality Control Check of Count Room Equipment, R | |||
: WO 02037362-01, 2EMF-2 Reactor Building Refuel Bridge Area Monitor Calibration, 09/12/13 | ev. 003 RA/0/1400/006, Radiation Protection Fixed Instruments Response Check, Rev | ||
: WO 02034544-01, 2EMF-11 Area Steamline Monitor Calibration, 07/16/13 | . 028 RA/0/1400/014, Radiation Protection Portable Instruments Response Check, R | ||
: WO 02066403-01, 2EMF-12 Area Steamline Monitor Calibration, 01/17/14 | ev. 001 RA/0/1400/013, Operation of Irradiators, Rev | ||
: WO 02067315-01, 2EMF-10 Area Steamline Monitor Calibration, 02/17/16 | . 000 SRPMP 9-2, Interlaboratory Cross Check Program, Rev | ||
: WO 02072509-01, 2EMF-53A Containment High Range Monitor Calibration, 10/08/13 | . 000 | ||
: WO 02072510-01, 2EMF-53B Containment High Range Monitor Calibration, 10/08/13 | : Data and Records Calibration of the J.L. Shepherd Model 89 Shielded Calibration Range Irradiator, EnRad No. | ||
: WO 02096388-01, 2EMF-4 Area Fuel Bridge Monitor Calibration, 01/10/14 | : 1999, 8/14/14, 8/13/15, and 8/16/16 | ||
: WO 02133686-01, 2EMF-53A Erratic Readings and Trip 1 Lit, 06/06/14 | : EnRad Certificate of Calibration, AMS | ||
: WO 02155685-01, 2EMF-53A Containment High Range Monitor Calibration, 03/29/15 | -4, EnRad | ||
: WO 02155686-01, 2EMF-53A Containment High Range Monitor Calibration, 03/28/15 | : ID 01704, 08/11/2016 | ||
: WO 02188711-01, 2EMF-4 Area Fuel Bridge Monitor Calibration, 08/08/15 | : EnRad Certificate of Calibration, AMP | ||
: WO 02189993-01, 1EMF-12 Control Room Monitor Calibration, 03/17/16 | -100, EnRad | ||
: WO 02194318-01, 1EMF-53A Containment High Range Monitor Calibration, 11/29/15 | : ID 11205, 03/16/2016 | ||
: WO 02194319-01, 1EMF-53B Containment High Range Monitor Calibration, 11/29/15 1EMF-53A/B Computer Data Point Plots [Background with keep alive source] from 12/1/2015 to 9/23/2016 | : EnRad Certificate of Calibration, Cronos | ||
-4, EnRad | |||
: ID 12245, 02/10/2016 | |||
: EnRad Certificate of Calibration, RO | |||
-20, EnRad | |||
: ID 00391, 03/09/2016 | |||
: EnRad Certificate of Calibration, Argos | |||
-5AB, EnRad | |||
: ID 12955, 02/22/2016 EnRad Certificate of Calibration, GEM | |||
-5, EnRad | |||
: ID 02800, 01/05/2016 | |||
: EnRad Certificate of Calibration, Ludlum Model 19, EnRad | |||
: ID 03613, 06/08/2016 | |||
: EnRad Certificate of Calibration, Telepole, EnRad | |||
: ID 02708, 10/22/2015 | |||
: Quality Control and Calibration of Apex InVivo Whole Body Counting System, 9/21/15 | |||
, 9/16/14, and 8/4/2016 Work Order ( | |||
: WO) | |||
: 01987407-01, 2EMF-53B Containment High Range Monitor Calibration, 03/21/12 WO 02034633 | |||
-01, 2EMF-13 Area Steamline Monitor Calibration, 09/09/13 | |||
: WO 02037362 | |||
-01, 2EMF-2 Reactor Building Refuel Bridge Area Monitor Calibration, 09/12/13 | |||
: WO 02034544 | |||
-01, 2EMF-11 Area Steamline Monitor Calibration, 07/16/13 | |||
: WO 02066403 | |||
-01, 2EMF-12 Area Steamline Monitor Calibration, 01/17/14 | |||
: WO 02067315 | |||
-01, 2EMF-10 Area Steamline Monitor Calibration, 02/17/16 | |||
: WO 02072509 | |||
-01, 2EMF-53A Containment High Range Monitor Calibration, 10/08/13 | |||
: WO 02072510 | |||
-01, 2EMF-53B Containment High Range Monitor Calibration, 10/08/13 | |||
: WO 02096388 | |||
-01, 2EMF-4 Area Fuel Bridge Monitor Calibration, 01/10/14 | |||
: WO 02133686 | |||
-01, 2EMF-53A Erratic Readings and Trip 1 Lit, 06/06/14 | |||
: WO 02155685 | |||
-01, 2EMF-53A Containment High Range Monitor Calibration, 03/29/15 | |||
: WO 02155686 | |||
-01, 2EMF-53A Containment High Range Monitor Calibration, 03/28/15 | |||
: WO 02188711 | |||
-01, 2EMF-4 Area Fuel Bridge Monitor Calibration, 08/08/15 | |||
: WO 02189993 | |||
-01, 1EMF-12 Control Room Monitor Calibration, 03/17/16 | |||
: WO 02194318 | |||
-01, 1EMF-53A Containment High Range Monitor Calibration, 11/29/15 | |||
: WO 02194319 | |||
-01, 1EMF-53B Containment High Range Monitor Calibration, 11/29/15 | |||
: 1EMF-53A/B Computer Data Point Plots [Background with keep alive source] from 12/1/2015 to 9/23/2016 | |||
: Corrective Action Program (CAP) Documents | : Corrective Action Program (CAP) Documents | ||
: AD-PI-ALL-0100, Corrective Action Program, Rev. 006 G-FRPS-SA-15-22, 2015 Catawba Nuclear Station Radiation Protection Source Term Review ARs: | : AD-PI-ALL-0100, Corrective Action Program, Rev | ||
. 006 G-FRPS-SA-15-22, 2015 Catawba Nuclear Station Radiation Protection Source Term Review | |||
: ARs: | |||
: 01520531, | : 01520531, | ||
: 01521846, | : 01521846, | ||
| Line 817: | Line 1,536: | ||
: 02013189, | : 02013189, | ||
: 02041936, | : 02041936, | ||
: 02061912, and 02062253 | : 02061912, and | ||
: 02062253 | |||
: Section 4 | |||
: AD-PI-ALL-0100, Corrective Action Program, Rev. 006 | : OA1: | ||
: AD-RP-ALL-1101, Performance Indicators for the Occupational and Public Radiation Cornerstones, Rev. 000 | : Performance Indicator Verification | ||
: Records and Data Reviewed Dose Commitment Data Sheets, Dose Estimates for dates from January 2015 to July 2016 Monthly PI Reports, January 2015 - July 2016 Unexpected Dose Rate Alarms, CNS, (January 2015 - July 2016) | ===Procedures=== | ||
: Corrective Action Program (CAP) Documents ARs: | and Guidance Documents | ||
: AD-PI-ALL-0100, Corrective Action Program, Rev | |||
. 006 | |||
: AD-RP-ALL-1101, Performance Indicators for the Occupational and Public Radiation Cornerstones, Rev. | |||
: 000 | |||
: Records and Data Reviewed Dose Commitment Data Sheets, Dose Estimates for dates from January 2015 to July 2016 | |||
: Monthly PI Reports, January 2015 | |||
- July 2016 | |||
: Unexpected Dose Rate Alarms, CNS, (January 2015 | |||
- July 2016) | |||
: Corrective Action Program (CAP) Documents | |||
: ARs: | |||
: 01945732, | : 01945732, | ||
: 01945823, | : 01945823, | ||
| Line 830: | Line 1,560: | ||
: 01978081, | : 01978081, | ||
: 02062132 | : 02062132 | ||
: 4OA3 - Fire Protection LERs | : 4OA3 - Fire Protection LERs Calc | ||
: CNC-1535.00-00-0170, "PRA Input to CNS LER 413/2014 | |||
: CNC-1535.00-00-0170, "PRA Input to CNS | -002-00, Unanalyzed Condition Due to Deviations From Fire Protection Current Licensing Basis Identified During NFPA 805 | ||
: Transition", Rev. | |||
: 001 Calc | |||
: CNC-1435.00-00-0067, "NFPA 805 Transition - Fire Risk Evaluation (FRE)" Rev. 003 Calc | : CNC-1435.00-00-0067, "NFPA 805 Transition | ||
: CNC-1435.00-00-0044, "Fire Protection Nuclear Safety Capability Assessment". Rev. | - Fire Risk Evaluation (FRE)" Rev. | ||
: CNC-1535.00-00-0110, "CNS Fire PRA (FPRA) Scenario Development Report", Rev. | : 003 Calc | ||
: CNC-1205.19-00-0189, "Evaluation of MOV Pressure Boundaries and Operator Manual | : CNC-1435.00-00-0044, "Fire Protection Nuclear Safety Capability Assessment". Rev. | ||
: 2 Calc | |||
: CNC-1535.00-00-0110, "CNS Fire PRA (FPRA) Scenario Development Report", Rev. | |||
: 2 Calc | |||
: CNC-1205.19-00-0189, "Evaluation of MOV Pressure Boundaries and Operator Manual Actuation Capabilities for IN 92 | |||
-18 Hot Short Events", Rev. | |||
: 000 | |||
}} | }} | ||
Revision as of 22:34, 29 June 2018
| ML17047A552 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 02/16/2017 |
| From: | Ehrhardt F J NRC/RGN-II/DRP/RPB1 |
| To: | Simril T Duke Energy Corp |
| References | |
| IR 2016003 | |
| Download: ML17047A552 (44) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 February 16, 2017 Mr. Tom Simril Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745
-9635
SUBJECT:
ERRATA FOR CATAWBA NUCLEAR STATION
- NRC INTEGRATED INSPECTION REPORT 05000413/2016003 AND 05000414/2016003 AND EXERCISE OF ENFORCEMENT DISCRETION
Dear Mr. Simril:
The U.S. Nuclear Regulatory Commission (NRC) has identified an error in NRC Inspection Report 05000413/201600 3 and 05000414/201600 3, dated November 2, 2016 (ADAMS Accession No. ML16307A004). Specifically, the licensed operator requalification biennial sample (IP 71111.11) was not included in the report (Section 1R11.3
). As a result, the NRC has reissued the report in its entirety to correct this error.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.
"
Sincerely,/RA/
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50
-413, 50-414 License Nos.: NPF
-35, NPF-52
Enclosure:
IR 05000413/2016003 and 05000414/2016003
w/Attachment:
Supplementa l Information cc w/encl: Distribution via ListServ
ML16307A004). Specifically, the licensed operator requalification biennial sample (IP 71111.11) was not included in the report (Section 1R11.3)
. As a result, the NRC has reissued the report in its entirety to correct this error.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding.
"
Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50
-413, 50-414 License Nos.: NPF
-35, NPF-52
Enclosure:
IR 05000413/2016003 and 05000414/2016003
w/Attachment:
Supplemental Information cc w/encl: Distribution via ListServ DOCUMENT NAME:
G:\DRPII\RPB1\CatawbaErrarta\REPORTS\2016\2016003 ADAMS ACCESSION NUMBER:
ML17047A549 SUNSI Review Complete By: Frank Ehrhardt ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: SUNSI review complete OFFICE RII: DRP RII: DRP NAME JWorosilo FEhrhardt SIGNATURE JGW1 FJE DATE 2/16/2017 2/16/2017 Letter to Tom Simril from Frank Ehrhardt dated February 16, 2017
SUBJECT:
ERRATA FOR CATAWBA NUCLEAR STATION
- NRC INTEGRATED INSPECTION REPORT 05000413/2016003 AND 05000414/2016003 AND EXERCISE OF ENFORCEMENT DISCRETION DISTRIBUTION
- M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCatawba Resource Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos.:
50-413, 50-414 License Nos.:
05000413/2016003 and 05000414/2016003 Licensee:
Duke Energy Carolinas, LLC Facility:
Catawba Nuclear Station, Units 1 and 2 Location:
York, SC 29745 Dates: July 1, 2016 through September 30, 2016 Inspectors:
J. Austin, Senior Resident Inspector C. Scott, Resident Inspector M. Toth, Project Engineer J. Montgomery, Senior Reactor Inspector (Section 4OA3)
R. Williams, Senior Reactor Inspector (Sections 1R07, 1R08) R. Kellner, Senior Health Physicist (Sections 2RS1, 2RS3) C. Dykes, Health Physicist (Sections 2RS2, 2RS4) J. Panfel, Health Physicist (Sections 2RS5, 4OA1) R. Baldwin, Senior Operations Engineer (Section 1R11)
D. Bacon, Senior Operations Engineer (Section 1R11)
J. Cruz, Senior Project Manager (Section 1R11)
Approved by:
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects
SUMMARY
IR 05000413/2016 003 and 05000414/2016 003, July 1, 2016 through September 30, 2016
- Catawba Nuclear Station, Units 1 and 2; Integrated Inspection Report The report covered a three-month period of inspection by the resident inspectors and regional inspectors
. No findings were identified during this inspection period.
The significance of inspection findings are indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process," (SDP) dated April 29, 2015. The cross-cutting aspects are determined using IMC 0310, "Aspects within the Cross-Cutting Areas" dated December 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy dated August 1, 2016
. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG
-1649, "Reactor Oversight Process
," Revision 6
.
REPORT DETAILS
Summary of Plant Status
Unit 1: Operated at or near 100 percent rated thermal power for the entire inspection period.
Unit 2: Operated at or near 100 percent rated thermal power through September 9. On September 10
, the unit commenced refueling outage 2EOC21 and remained in the outage throughout the report period.
REACTOR SAFETY
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
1R01 Adverse Weather Protection
a. Inspection Scope
.1 Impending Adverse Weather Conditions
The inspectors reviewed the licensee's preparations to protect risk
-significant systems from tropical storm Hermine expected September 2
-3, 2016. The inspectors evaluated the licensee's implementation of adverse weather preparation procedures and compensatory measures, including operator staffing, before the onset of the adverse weather conditions.
The inspectors reviewed the licensee's plans to address the consequences that may result from the tropical storm. The inspectors verified that operator actions specified in the licensee's adverse weather procedure maintain ed readiness of essential systems. The inspectors verified that required surveillances were current, or were scheduled and completed, if practical, before the onset of anticipated adverse weather conditions. The inspectors also verified that the licensee implemented periodic equipment walkdowns or other measures to ensure that the condition of plant equipment met operability requirements. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
1R04 Equipment Alignment
a. Inspection Scope
.1 Partial Walkdown
The inspectors verified that critical portions of the selected systems were correctly aligned by performing partial walkdowns. The inspectors selected systems for assessment because they were a redundant or backup system or train, were important for mitigating risk for the current plant conditions, had been recently realigned, or were a single-train system. The inspectors determined the correct system lineup by reviewing plant procedures and drawings. Documents reviewed are listed in the
.
The inspectors selected the following three systems or trains to inspect:
2A diesel generator (DG) with the 2B DG out of service (OOS) for planned maintenance 2B motor driven auxiliary feedwater (
CA) pump with the 2A CA pump OOS for service water to auxiliary feedwater flow measurement 1B containment spray (
NS) pump with the 1A NS pump OOS for maintenance
b. Findings
No findings were identified.
1R05 Fire Protection
a. Inspection Scope
.1 Quarterly Inspection
The inspectors evaluated the adequacy of selected fire plans by comparing the fire plans to the defined hazards and defense
-in-depth features specified in the fire protection program. In evaluating the fire plans, the inspectors assessed the following items:
control of transient combustibles and ignition sources fire detection systems fire suppression systems manual firefighting equipment and capability passive fire protection features compensatory measures and fire watches issues related to fire protection contained in the licensee's corrective action program The inspectors toured the following five fire areas to assess material condition and operational status of fire protection equipment. Documents reviewed are listed in the
.
Auxiliary building 594' Level, fire area 22 2A DG room, fire area 27 Unit 1, Essential Switchgear Room level 577', fire area 15 Unit 1, Essential Switchgear Room level 560', fire area 8 Unit 1, Turbine Building 594' level, fire zone N
b. Findings
No findings were identified.
1R06 Flood Protection Measures
a. Inspection Scope
.1 Internal Flooding
The inspectors reviewed related flood analysis documents and walked down the area listed below containing risk
-significant structures, systems, and components susceptible to flooding. The inspectors verified that plant design features and plant procedures for flood mitigation were consistent with design requirements and internal flooding analysis
assumptions. The inspectors also assessed the condition of flood protection barriers and drain systems. In addition, the inspectors verified the licensee was identifying and properly addressing issues using the corrective action program. Documents review ed are listed in the
.
Unit 1, turbine building
b. Findings
No findings were identified.
1R07 Heat Sink Performance
a. Inspection Scope
Triennial Review of Heat Sink Performance The inspectors reviewed operability determinations, completed surveillances, vendor manual information, associated calculations, performance test results, and cooler inspection results associated with the service water pump upper bearing oil cooler (SWUBOC) and the auxiliary feedwater pump motor coolers (AFWPMC). These coolers were chosen based on their risk significance in the licensee's probabilistic safety analysis, their important safety
-related mitigating system support functions and their relatively low margin.
For the SWUBOC, the inspectors determined whether testing, inspection, maintenance, and monitoring of biotic fouling and macrofouling programs were adequate to ensure proper heat transfer. This was accomplished by determining whether the test method used was consistent with accepted industry practices, or equivalent; the test conditions were consistent with the selected methodology; the test acceptance criteria were consistent with the design basis values; and reviewing results of heat exchanger performance testing. The inspectors also determined whether the test results appropriately considered differences between testing conditions and design conditions, whether the frequency of testing based on trending of test results was sufficient to detect degradation prior to loss of heat removal capabilities below design basis values, and whether test results considered test instrument inaccuracies and differences.
For the AFWPMC, the inspectors reviewed the methods and results of heat exchanger performance inspections. The inspectors determined whether the methods used to inspect and clean heat exchangers were consistent with as
-found conditions identified and expected degradation trends and industry standards; the licensee's inspection and cleaning activities had established acceptance criteria consistent with industry standards; and the as
-found results were recorded, evaluated, and appropriately dispositioned so that the as
-left condition was acceptable.
In addition, the inspectors determined whether the condition and operation of the SWPUBOC and the AFWPMC were consistent with design assumptions in heat transfer calculations, and as described in the final safety analysis report. This included determining whether the number of plugged tubes was within pre
-established limits based on capacity and heat transfer assumptions. The inspectors determined whether the licensee evaluated the potential for water hammer and established adequate controls and operational limits to prevent heat exchanger degradation due to excessive flow induced vibration during operation. In addition, visual inspection records were reviewed to determine the structural integrity of the heat exchanger. For the AFWPMC, the inspectors determined whether the licensee's chemical treatment programs for corrosion control were consistent with industry norms, and implemented accordingly.
The inspectors determined whether the performance of the safety
-related ultimate heat sink, identified as the standby nuclear service water pond (SNSWP), and its subcomponents such as piping, intake screens, pumps, valves, etc., was appropriately evaluated by tests or other equivalent methods, to ensure availability and accessibility to the in-plant cooling water systems. The inspectors determined whether the licensee's inspection of the SNSWP was thorough and of sufficient depth to identify degradation of the shoreline protection or loss of structural integrity. This included determination whether vegetation present along the slopes was trimmed, maintained, and was not adversely impacted the embankment. In addition, the inspectors determined whether the licensee ensured sufficient reservoir capacity by trending and removing debris, or sediment buildup, in the SNSWP.
The inspectors reviewed the licensee's operation of the service water system and SNSWP. This included a review of licensee's procedures for a loss of the service water system or SNSWP; a verification that instrumentation, which is relied upon for decision making, was available and functional; and a review of design changes made to the service water system and the SNSWP. In addition, the inspectors determined whether macrofouling was adequately monitored, trended, and controlled by the licensee to prevent clogging. The inspectors determined whether the licensee's biocide treatments for biotic control were adequately conducted and whether the results were adequately monitored, trended, and evaluated. The inspectors also reviewed whether the licensee maintained adequate pH, calcium hardness, etc.
The inspectors reviewed the licensee's performance testing of service water system and SNSWP results. This included a review of the licensee's performance test results for key components and service water flow balance test results. In addition, the inspectors compared the flow balance results to system configuration and flow assumptions during design basis accident conditions. The inspectors also determined whether the licensee ensured adequate isolation during design basis events, consistency between testing methodologies and design basis leakage rate assumptions, and proper performance of risk significant non
-safety related functions.
The inspectors performed a system walkdown of the service water systems to determine whether the licensee's assessment on structural integrity was adequate. In addition, the inspectors reviewed available licensee testing and inspections results, the licensee's disposition of any active through wall pipe leaks, and the history of through wall pipe leakage to identify any adverse trends since the last NRC inspection. For buried or inaccessible piping, the inspectors reviewed the licensee's pipe testing, inspection, or monitoring program to determine whether structural integrity was ensured and that any leakage or degradation was appropriately identified and dispositioned by the licensee.
The inspectors performed a system walkdown of the service water intake structure to determine whether the licensee's assessment o f structural integrity and component functionality was adequate and that the licensee ensured proper functioning of traveling screens and strainers, and structural integrity of component mounts. In addition, the inspectors determined whether service water pump bay silt accumulation was monitored, trended, and maintained at an acceptable level by the licensee, and that water level instruments were functional and routinely monitored. The inspectors also determined whether the licensee's ability to ensure functionality during adverse weather conditions was adequate.
In addition, the inspectors reviewed condition reports related to heat exchanger, cooler and heat sink performance issues to determine whether the licensee had an appropriate threshold for identifying issues and to evaluate the effectiveness of the corrective actions. The documents that were reviewed are included in the
.
These inspection activities constituted three heat sink inspection samples as defined in IP 71111.07-05.
b. Findings
No findings were identified.
1R08 In-service Inspection Activities
a. Inspection Scope
Non-Destructive Examination Activities and Welding Activities
From September 19 through September 29, 2016, the inspectors conducted an onsite review of the implementation of the licensee's in
-service inspection (ISI) program for monitoring degradation of the reactor coolant system boundary, risk
-significant piping and component boundaries, and containment boundaries in Unit 2.
The inspectors either directly observed or reviewed the following non
-destructive examinations (NDEs) mandated by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code of Record: 1998 Edition with 2000 Addenda) to evaluate compliance with the ASME Code,Section XI and Section V requirements and, if any indications or defects were detected, to evaluate if they were dispositioned in accordance with the ASME Code or an NRC
-approved alternative requirement. The inspectors also reviewed the qualifications of the NDE technicians performing the examinations to determine whether they were current and in compliance with the ASME Code requirements.
Ultrasonic Examination (UT) of weld 2NI106
-14, Pipe to tee weld, ASME Class 2 (observed)
Liquid Penetrant Examination (PT) of weld 2492NW158
-10, Pipe to valve weld, ASME Class 2 (reviewed)
-005, Access hole plug weld, ASME Class 2 (observed)
Magnetic Particle Examination (MT) of weld C2.C5.51.0002, Pipe to elbow weld, ASME Class 2 (reviewed)
MT of weld C2.C5.51.0001, Elbow to pipe weld, ASME Class 2 (reviewed)
Visual Examination (VT) of 2RPV
-BMI-NOZZLES, ASME Class 1 (reviewed)
VT of 2RPV
-HEAD-SURFACE-MULTIPLE, ASME Class 1 (reviewed)
The inspectors either directly observed or reviewed the following welding activities, qualification records, and associated documents in order to evaluate compliance with procedures and the ASME Code,Section XI and Section IX requirements. Specifically, the inspectors reviewed the work order, repair and replacement plan, weld data sheets, welding procedures, procedure qualification records, welder performance qualification records, and NDE reports.
Weld 2492NW158
-10, Pipe to valve weld, ASME Class 2 (reviewed)
Weld 2SM-005, Access hole plug weld, ASME Class 2 (observed)
During non
-destructive surface and volumetric examinations performed since the previous refueling outage, the licensee did not identify any relevant indications that were analytically evaluated and accepted for continued service
- therefore, no NRC review was completed for this inspection procedure attribute.
PWR Vessel Upper Head Penetration Inspection Activities The inspectors verified that for the Unit 2 vessel head, a bare metal visual (BMV) examination and a volumetric examination were not required during this outage, in accordance with the requirements of ASME Code Case N 1 and 10 CFR 50.55a(g)(6)(ii)(D). The inspectors reviewed the calculation of effective degradation years, the previous examination history, and reviewed the results of the VT
-2 examination performed under the vessel head insulation to verify that the examinations were performed in accordance with the requirements of ASME Code,Section XI, Article IWA-2212 requirements and the frequency was consistent with the Code Case.
The licensee did not identify any relevant indications that were accepted for continued service. Additionally, the licensee did not perform any welding repairs to the vessel head penetrations since the beginning of the last Unit 2 refueling outage; therefore, no NRC review was completed for these inspection procedure attributes.
Boric Acid Corrosion Control Inspection Activities The inspectors reviewed the licensee's boric acid corrosion control (BACC) program activities to determine if the activities were implemented in accordance with the commitments made in response to NRC Generic Letter 88
-05, "Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants," and applicable industry guidance documents. Specifically, the inspectors performed an onsite records review of procedures and the results of the licensee's containment walkdown inspections performed during the current refueling outage. The inspectors also interviewed the BACC program owner, conducted an independent walkdown of containment to evaluate compliance with licensee's BACC program requirements, and verified that degraded or non-conforming conditions, such as boric acid leaks, were properly identified and corrected in accordance with the licensee's BACC and corrective action programs.
The inspectors reviewed the following engineering evaluations, completed for evidence of boric acid leakage, to determine if the licensee properly applied applicable corrosion rates to the affected components; and properly assessed the effects of corrosion induced wastage on structural or pressure boundary integrity in accordance with the licensee procedures.
AR 01898992, Excessive / Active boron accumulation from 2
-NI-VA-327 pipe AR 01931170, 0
-WL-FE-9780 Active / Excessive boron leak from flange AR 01940775, 1
-NM-PG-6100 Active / Excessive boron from threaded fitting AR 01950202, 2
-KF-FS-5150 Active boron leak from fitting 30
-40 dpm The inspectors reviewed the following condition reports and associated corrective actions related to evidence of boric acid leakage to evaluate if the corrective actions completed were consistent with the requirements of the ASME Code and 10 CFR Part 50, Appendix B, Criterion XVI.
AR 02060953, 2B NC Pump main flange leak AR 02020057, 1
-NS-VA-1B Excessive/active boron, leak increase AR 02047391, 1
-FW-VA-45 Active Boron Leak Steam Generator Tube Inspection Activities The inspectors reviewed the eddy current (EC) examination activities performed in Unit 2 steam generators A
, B, C, and D during this current refueling outage to verify compliance with the licensee's Technical Specifications, ASME BPVC Section XI, and Nuclear Energy Institute 97
-06, "Steam Generator Program Guidelines."
The inspectors reviewed the scope of the EC examinations, and the implementation of scope expansion criteria, to verify these were consistent with the Electric Power Research Institute (EPRI) Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7. The inspectors reviewed documentation for a sample of EC data analysts, probes, and testers to verify that personnel and equipment were qualified to detect the applicable degradation mechanisms in accordance with the EPRI Examination Guidelines. This review included a sample of site
-specific Examination Technique Specification Sheets (ETSSs) to verify that their qualification and site
-specific implementation were consistent with Appendix H or I of the EPRI Examination Guidelines. The inspectors also reviewed a sample of EC data for steam generator tubes (B-R29C38, B
-R25C42, B
-R29C43, B
-R32C33, C
-R44C87, and D-R28C69), with a qualified data analyst, to confirm that data analysis and equipment configuration were performed in accordance with the applicable ETSSs and site
-specific analysis guidelines. The inspectors verified that recordable indications were detected and size d
in accordance with vendor procedures.
The inspectors selected a sample of degradation mechanisms from the Unit 2 Degradation Assessment report (i.e. anti-vibration bar wear and stress corrosion cracking) and verified that their respective in
-situ pressure testing criteria were determined in accordance with the EPRI Steam Generator Integrity Assessment Guidelines, Revision 3. Additionally, the inspectors reviewed EC indication reports to determine whether tubes with relevant indications were appropriately screened for in
-situ pressure testing. The inspectors also compared the latest EC examination results with the last Condition Monitoring and Operational Assessment report for Unit 2 to assess the licensee's prediction capability for maximum tube degradation and number of tubes with indications. The inspectors verified that the licensee's evaluation was conservative and that current examination results were bound by the Operational Assessment projections.
The inspectors assessed the latest EC examination results to verify that new degradation mechanisms, if any, were identified and evaluated before plant startup. The review of EC examination results included the disposition of potential loose part indications on the steam generator secondary side to verify that corrective actions for evaluating and retrieving loose parts were consistent with the EPRI Guidelines. The inspectors also reviewed a sample of primary
-to-secondary leakage data for Unit 2 to confirm that operational leakage in each steam generator remained below the detection or action level threshold during the previous operating cycle.
The inspectors' review included the implementation of tube repair criteria and repair methods to verify they were consistent with plant Technical Specifications and industry guidelines. The inspectors verified that the licensee had selected the appropriate tubes for plugging based on the required plugging criteria. The inspectors reviewed the tube plugging procedure and directly observed tube plugging activities for tubes A
-R36C37 and B-R23C104, to determine if the licensee installed the tube plugs in accordance with the applicable procedures.
Furthermore, the inspectors interviewed licensee staff and reviewed a sample of inspection results for the visual inspection conducted in the primary side bowl of Steam Generator D, to verify that potential areas of degradation based on site
-specific operating experience were inspected, and appropriate corrective actions were taken to address degradation indications.
Identification and Resolution of Problems
The inspectors reviewed a sample of ISI
-related issues entered into the corrective action program to determine if the licensee had appropriately described the scope of the problem and had initiated corrective actions. The review also included the licensee's consideration and assessment of operating experience events applicable to the plant. The inspectors performed this review to ensure compliance with 10 CFR Part 50, Appendix B, Criterion XVI, "Corrective Action," requirements.
b. Findings
No findings were identified.
1R11 Licensed Operator Requalification Program and Licensed Operator Performance
(71111.11)
a. Inspection Scope
.1 Resident Inspector Quarterly Review of Licensed Operator Requalification
On August 11, 2016
, the inspectors observed an evaluated simulator scenario administered to an operating crew as part of the annual requalification operating test required by 10 CFR 55.59, "Requalification". The crew responded to an instrument malfunction, followed by an automatic trip without a scram, loss of A 4 kV vital bus and a safety injection signal.
The inspectors assessed the following:
licensed operator performance the ability of the licensee to administer the scenario and evaluate the operators the quality of the post
-scenario critique simulator performance
.2 Resident Inspector Quarterly Review of Licensed Operator Performance in the Actual Plant/Main Control Room
The inspectors observed licensed operator performance in the main control room on July 26, 2016 while responding to an increase in letdown pressure caused by an equipment issue.
The inspectors assessed the following:
use of plant procedures control board manipulations communications between crew members use and interpretation of instruments, indications, and alarms use of human error prevention techniques documentation of activities management and supervision Documents reviewed are listed in the
.
.3 Licensed Operator Requalification
The inspectors reviewed the facility operating history and associated documents in preparation for this inspection. During the week of August 8
- 12, 2016, the inspectors reviewed documentation, interviewed licensee personnel, and observed the administration of operating tests associated with the licensee's operator requalification program. Each of the activities performed by the inspectors was done to assess the effectiveness of the facility licensee in implementing requalification requirements identified in 10 CFR Part 55, "Operators' Licenses." The evaluations were also performed to determine if the licensee effectively implemented operator requalification guidelines established in NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," and Inspection Procedure 71111.11, "Licensed Operator Requalification Program." The inspectors also evaluated the licensee's simulation facility for adequacy for use in operator licensing examinations using ANSI/ANS
-3.5-1985Property "ANSI code" (as page type) with input value "ANSI/ANS</br></br>-3.5-1985" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process., "American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination." The inspectors observed two crews during the performance of the operating tests. Documentation reviewed included written examinations, Job Performance Measures (JPMs), simulator scenarios, licensee procedures, on
-shift records, simulator modification request records
, simulator performance test records, operator feedback records, licensed operator qualification records, remediation plans, watchstanding records, and medical records. The records were inspected using the criteria listed in Inspection Procedure 71111.11. Documents reviewed during the inspection are documented in the Attachment
.
b. Findings
No findings were identified.
1R12 Maintenance Effectiveness
a. Inspection Scope
The inspectors assessed the licensee's treatment of the three issues listed below to verify the licensee appropriately addressed equipment problems within the scope of the maintenance rule (10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plant s"). The inspectors reviewed procedures and records to evaluate the licensee's identification, assessment, and characterization of the problems as well as their corrective actions for returning the equipment to a satisfactory condition. Documents reviewed are listed in the
.
CR 2054316:
02054316-05: QCE 02054316
- Aux. switch: medium voltage CR 2033128, Unit 0, A controlled area chilled water chiller trip, Maintenance rule functional failure oil pump CR 2052366, Extended equalize charge required for battery SDSB1 safe shutdown facility (SSF)
In addition, the inspectors performed a review of the licensee's Quality Assurance Program to ensure licensee was in compliance with their program requirements.
b. Findings
No findings were identified.
1R13 Maintenance Risk Assessments and Emergent Work Control
a. Inspection Scope
The inspectors reviewed the four maintenance activities listed below to verify that the licensee assessed and managed plant risk as required by 10 CFR 50.65(a)(4) and licensee procedures. The inspectors assessed the adequacy of the licensee's risk assessments and implementation of risk management actions. The inspectors also verified that the licensee was identifying and resolving problems with assessing and managing maintenance
-related risk using the corrective action program. Additionally, for maintenance resulting from unforeseen situations, the inspectors assessed the effectiveness of the licensee's planning and control of emergent work activities. Documents reviewed are listed in the
.
Protected equipment plan for SSF DG control panel electrical maintenance Yellow risk condition for 2A DG preventive maintenance Yellow risk condition for maintenance on 1A2 component cooling water pump Yellow risk condition while inspecting 1A DG connecting rod inspection
b. Findings
No findings were identified.
1R15 Operability Determinations and Functionality Assessments
a. Inspection Scope
.1 Operability and Functionality Review
The inspectors selected the six operability determinations or functionality evaluations listed below for review based on the risk
-significance of the associated components and systems. The inspectors reviewed the technical adequacy of the determinations to ensure that technical specification operability was properly justified and the components or systems remained capable of performing their design functions. To verify whether components or systems were operable, the inspectors compared the operability and design criteria in the appropriate sections of the technical specification and updated final safety analysis report to the licensee's evaluations. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled. Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with operability evaluations. Documents reviewed are listed in the
.
CR 2039992, 2SV
-19 stroke time longer than usual (for "A" Train solenoid)
CR 2049828, Unit 1 and Unit 2 EPL and EPQ minimum voltage calculations need revision CR 2053485, centrifugal charging pump 1B thrust bearing oil sight glass leak CR 2059121, 1B DG starting air compressor not maintaining pressure CR 2056751, auxiliary feedwater (CA) flow transmitters do not meet loss of coolant accident (LOCA) accuracy requirements CR 2060673, 2A auxiliary feedwater pump will not stop
b. Findings
No findings were identified.
1R18 Plant Modifications
a. Inspection Scope
The inspectors verified that the plant modification listed below did not affect the safety functions of important safety systems. The inspectors confirmed the modifications did not degrade the design bases, licensing bases, and performance capability of risk significant structures, systems and components.
The inspectors also verified modifications performed during plant configurations involving increased risk did not place the plant in an unsafe condition. Additionally, the inspectors evaluated whether system operability and availability, configuration control, post
-installation test activities, and changes to documents, such as drawings, procedures, and operator training materials, complied with licensee standards and NRC requirements. In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with modifications.
Documents reviewed are listed in the Attachment.
Engineering change (
EC) 110357, Motor Lubricant Replacement for SR pumps
b. Findings
No findings were identified.
1R19 Post-Maintenance Testing
a. Inspection Scope
The inspectors either observed post
-maintenance testing or reviewed the test results for the maintenance activities listed below to verify the work performed was completed correctly and the test activities were adequate to verify system operability and functional capability.
post maintenance test of the "E" instrument air compressor following the breaker trip on August 23, 2016 in-service valve test following repair of 1NW-110B, NW supply to 1KC424B on July 27, 2016 operability performance test of the 1B containment spray (NS) pump following preplanned maintenance on August 2, 2016 operability performance test of the 1A train of auxiliary building ventilation following preventive maintenance on August 8, 2016 operability performance test of the 1A train of auxiliary building ventilation following replacement of the exhaust fan breaker on August 23, 2016 The inspectors evaluated these activities for the following:
acceptance criteria were clear and demonstrated operational readiness effects of testing on the plant were adequately addressed test instrumentation was appropriate tests were performed in accordance with approved procedures equipment was returned to its operational status following testing test documentation was properly evaluated Additionally, the inspectors reviewed a sample of corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with post-maintenance testing. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
1R20 Refueling and Other Outage Activities
a. Inspection Scope
For the Unit 2 refueling outage from September 9, 2016 through the remainder of the inspection period, the inspectors evaluated the following outage activities:
outage planning shutdown, cooldown and refueling reactor coolant system instrumentation and electrical power configuration reactivity and inventory control decay heat removal and spent fuel pool cooling system operation containment closure The inspectors verified that the licensee:
considered risk in developing the outage schedule controlled plant configuration per administrative risk reduction methodologies developed work schedules to manage fatigue developed mitigation strategies for loss of key safety functions adhered to operating license and technical specification requirements The inspectors verified that safety
-related and risk
-significant structures, systems, and components not accessible during power operations were maintained in an operable condition. The inspectors also reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with outage activities.
Documents reviewed are listed in the
.
b. Findings
No findings were identified.
1R22 Surveillance Testing
a. Inspection Scope
The inspectors reviewed the four surveillance tests listed below and either observed the test or reviewed test results to verify testing adequately demonstrated equipment operability and met technical specification and current licensing basis. The inspectors evaluated the test activities to assess for preconditioning of equipment, procedure adherence, and equipment alignment following completion of the surveillance.
Additionally, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with surveillance testing. Documents reviewed are listed in the
.
Routine Surveillance Tests PT/1/A/4350/002B, Emergency diesel generator (EDG) 1B five hour full load r un PT/2/A/4200/009, Engineered safety features actuation periodic test PT/1/A/4600/001, Rod control cluster assembly (RCCA) movement test In-Service Tests (IST)
PT/1/A/4250/003C, Auxiliary feedwater motor driven pump 1A performance test
b. Findings
No findings were identified.
Cornerstone:
1EP6 Drill Evaluation
a. Inspection Scope
The inspectors observed the emergency preparedness drill conducted on July 28, 2016
. The inspectors observed licensee activities in the simulator and/or technical support center to evaluate implementation of the emergency plan, including event classification, notification, and protective action recommendations. The inspectors evaluated the licensee's performance against criteria established in the licensee's procedures. Additionally, the inspectors attended the post
-exercise critique to assess the licensee's effectiveness in identifying emergency preparedness weaknesses and verified th e identified weaknesses were entered in the corrective action program. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
RADIATION SAFETY
(RS)
2RS1 Radiological Hazard Assessment and Exposure Controls
(71124.01)
a. Inspection Scope
Hazard Assessment and Instructions to Workers
- During facility tours, the inspectors directly observed radiological postings and container labeling for areas established within the radiologically controlled area (RCA) of the Unit 2 (U2) reactor building, U2 turbine building, Unit 1 (U1) and U2 auxiliary buildings, independent spent fuel storage installation (ISFSI), and radioactive waste (radwaste) processing and storage locations.
The inspectors independently measured radiation dose rates or directly observed conduct of licensee radiation surveys for selected RCA areas. The inspectors reviewed survey records for several plant areas including surveys for airborne radioactivity, gamma surveys with a range of dose rate gradients, surveys for alpha
-emitters and other hard
-to-detect radionuclides, and pre
-job surveys for upcoming tasks. The inspectors also discussed changes to plant operations that could contribute to changing radiological conditions since the last inspection. The inspectors attended pre
-job briefings and reviewed radiation work permit (RWP) details to assess communication of radiological control requirements and current radiological conditions to workers.
Control of Radioactive Material: The inspectors observed surveys of material and personnel being released from the RCA using small article monitor, personnel contamination monitor, and portal monitor instruments. The inspectors discussed equipment sensitivity, alarm setpoints, and release program guidance with licensee staff. The inspectors also reviewed records of leak tests on selected sealed sources and discussed nationally tracked source transactions with licensee staff.
Hazard Control
- The inspectors evaluated access controls and barrier effectiveness for selected high radiation area (HRA),
locked high radiation area (LHRA), and very high radiation area (VHRA) locations and discussed changes to procedural guidance for LHRA and VHRA controls with radiation protection (RP) supervisors. The inspectors reviewed implementation of controls for the storage of irradiated material within the spent fuel pool. Established radiological controls, including airborne controls and electronic dosimeter (ED) alarm setpoints, were evaluated for selected U2 refueling outage (2EOC21) tasks such as steam generator inspections, tasks completed in lower containment of U2, and tasks associated with lifting the reactor head.
In addition, the inspectors reviewed licensee controls for areas where dose rates could change significantly as a result of plant shutdown and refueling operations. The inspectors also reviewed the use of personnel dosimetry including extremity dosimetry and multibadging in high dose rate gradients.
Radiation Worker Performance and RP Technician Proficiency
- Occupational workers' adherence to selected RWPs and RP technician proficiency in providing job coverage were evaluated through direct observations and interviews with licensee staff. Jobs observed included work on the refueling floor, lifting the reactor head, and steam generator tasks in high radiation and contaminated areas. The inspectors also evaluated worker responses to dose and dose rate alarms during selected work activities.
Problem Identification and Resolution
- The inspectors reviewed and assessed condition reports associated with radiological hazard assessment and control. The inspectors evaluated the licensee's ability to identify and resolve the issues in accordance with licensee procedures. The inspectors also reviewed recent self
-assessment results.
Inspection Criteria
- Radiation protection activities were evaluated against the requirements of Updated Final Safety Analysis Report (UFSAR) Section 12, Technical Specifications (TS) Section 5.0, 10 CFR Parts 19 and 20, and approved licensee procedures. Licensee programs for monitoring materials and personnel released from the RCA were evaluated against 10 CFR Part 20 and IE Circular 81-07, "Control of Radioactively Contaminated Material". Documents and records reviewed are listed in the Attachment.
The inspectors completed the required seven samples specified in Inspection Procedure (IP) 71124.01.
b. Findings
No findings were identified.
2RS2 Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls
(71124.02)
a. Inspection Scope
Work Planning and Exposure Tracking
- The inspectors reviewed work activities and their collective exposure estimates during the U2 refueling/maintenance outage (2EOC21) and the recently completed U1 refueling/maintenance outage (1EOC22). The inspectors reviewed ALARA planning packages for activities related to the following U2 high collective exposure tasks:
primary side steam generator (S/G) work (diaphragm and nozzle dam installation and removal, eddy current testing, and tube plugging); secondary side S/G work (sludge lancing
, foreign object search and retrieval (FOSAR), feed ring inspection); reactor head disassembly and reassembly; temporary shielding installation; and 2B reactor coolant pump motor removal and replacement. For the selected tasks, the inspectors reviewed established dose goals and discussed assumptions regarding the bases for the current estimates with responsible ALARA planners. The inspectors evaluated the incorporation of exposure reduction initiatives and operating experience, including historical post
-job reviews, into RWP requirements. Day
-to-day collective dose data for the selected tasks were compared with established dose estimates and evaluated against procedural criteria (work
-in-progress review limits) for additional ALARA review. Where applicable, the inspectors discussed changes to established estimates with ALARA planners and evaluated them against work scope changes or unanticipated elevated dose rates.
Source Term Reduction and Control
- The inspectors reviewed the collective exposure three-year rolling average from (2013 - 2015). The inspectors evaluated historical crud burst/cleanup results and dose rate trends for reactor coolant system piping and compared them to current 2EOC21 data.
Source term reduction initiatives, including cobalt reduction and zinc injection, were reviewed and discussed with RP staff. The inspectors also reviewed temporary shielding packages for 2EOC21. Radiation Worker Performance
- As part of Inspection Procedure (IP) 71124.01, the inspectors observed pre
-job ALARA briefings and radiation worker performance for various HRA jobs in the auxiliary building and containment. While observing job tasks, the inspectors evaluated the use of remote technologies to reduce dose including teledosimetry and remote visual monitoring.
Problem Identification and Resolution
- The inspectors reviewed and discussed selected corrective action program documents associated with ALARA program implementation. The inspectors evaluated the licensee's ability to identify and resolve issues. The inspectors also reviewed recent self
-assessment results.
Inspection Criteria
- ALARA program activities were evaluated against the requirements of UFSAR Section 12, TS Section 5.4, 10 CFR Part 20, and approved licensee procedures. Documents reviewed are listed in the
.
The inspectors completed the required five samples specified in IP 71124.02.
b. Findings
No findings were identified.
2RS3 In-Plant Airborne Radioactivity Control and Mitigation
a. Inspection Scope
Engineering Controls
- The inspectors reviewed the use of temporary and permanent engineering controls to mitigate airborne radioactivity during 2EOC21 outage tasks. The inspectors observed the use of portable air filtration units for work in contaminated areas of the RCA and reviewed filtration unit testing certificates. The inspectors evaluated the effectiveness of continuous air monitors to provide indication of increasing airborne levels and the placement of air samplers in work area "breathing zones,
" including accounting for alpha emitting nuclides inclusion in setpoint determination.
Respiratory Protection Equipment
- The inspectors reviewed the use of respiratory protection devices to limit the intake of radioactive material. This included review of devices used for routine tasks and devices stored for use in emergency situations. The inspectors reviewed ALARA evaluations for the use of respiratory protection for steam generator work and other tasks performed during 2EOC21. Selected self-contained breathing apparatus (SCBA) units and negative pressure respirators (NPR s) staged for routine and emergency use in the main control room and other locations were inspected for material condition, SCBA bottle air pressure, number of units, and number of spare masks and availability of air bottles. The inspectors reviewed maintenance records for selected SCBA units for the past two years and evaluated SCBA and NPR compliance with National Institute for Occupational Safety and Health certification requirements. The inspectors also reviewed records of air quality testing for supplied
-air devices and SCBA bottles.
The inspectors discussed training for various types of respiratory protection devices with licensee staff and interviewed radworkers and control room operators on use of the devices including SCBA bottle change
-out and use of corrective lens inserts. The inspectors reviewed respirator qualification records (including medical qualifications) for several main control room operators and emergency responder personnel. In addition, inspectors evaluated qualifications for individuals responsible for testing and repairing SCBA vital components.
Problem Identification and Resolution: The inspectors reviewed and discussed selected corrective action program documents associated with airborne controls and respiratory protection activities. The inspectors evaluated the licensee's ability to identify and resolve issues. The inspectors also reviewed recent self
-assessment results.
Inspection Criteria
- Radiation protection program activities associated with airborne radioactivity monitoring and controls were evaluated against details and requirements documented in the UFSAR Chapters 3, 12 and 15; TS Sections 3.7, 5.5.11 and 5.5.16
, 10 CFR Part 20; Regulatory Guide (RG) 8.15, "Acceptable Programs for Respiratory Protection" and approved licensee procedures. Documents reviewed are listed in the
. The inspectors completed the required four samples specified in IP 71124.03.
b. Findings
No findings were identified.
2RS4 Occupational Dose Assessment (71124.04
)
a. Inspection Scope
Source Term Characterization
- The inspectors reviewed the plant radiation characterization (including gamma, beta, alpha, and neutron) being monitored verified the use of scaling factors to account for hard
-to-detect radionuclides in internal dose assessments.
External Dosimetry
- The inspectors reviewed national voluntary accreditation program (NVLAP) certification data of the licensee's thermoluminescent dosimeter (TLD) processor for the years 2014 through 2017. The inspectors observed and evaluated onsite storage of TLDs. Comparisons between ED and TLD results, including correction factors, were reviewed and discussed. The inspectors also evaluated licensee procedures for unusual dosimetry occurrences. Electronic dosimeter alarm logs were reviewed as part of Inspection Procedure 71124.01.
Internal Dosimetry
- The inspectors reviewed and discussed the in
-vivo bioassay program with the licensee. Inspectors reviewed procedures that addressed methods for determining internal or external contamination, releasing contaminated individuals, and the assignment of dose. The inspectors evaluated the licensee's program for in
-vivo and in-vitro monitoring including passive whole body monitoring and bioassay results for diving activities. The inspectors also reviewed contamination logs and evaluated events with the potential for internal dose.
Special Dosimetry Situations
- The inspectors reviewed records for declared pregnant workers (DPW s) from June 2014 through June 2016 and discussed guidance for monitoring and instructing DPWs. Inspectors reviewed the licensee's program for monitoring external dose in areas of expected dose rate gradients, including the use of multi-badging and extremity dosimetry. The inspectors evaluated the licensee's neutron dosimetry program including instrumentation used to perform neutron surveys. In addition, the inspectors reviewed the licensee's program for evaluation of shallow dose equivalent (SDE). The inspectors also reviewed contamination logs and evaluated events with the potential for SDE.
Problem Identification and Resolution
- The inspectors reviewed and discussed selected corrective action program documents associated with occupational dose assessment including self
-assessments. The inspectors evaluated the licensee's ability to identify and resolve issues.
Inspection Criteria
- The licensee's occupational dose assessment activities were evaluated against the requirements of UFSAR Section 12; TS Section 5.4; 10 CFR Parts 19 and 20; and approved licensee procedures. Documents reviewed are listed in the Attachment
.
The inspectors completed the required five samples specified in IP 71124.04.
b. Findings
No findings were identified.
2RS5 Radiation Monitoring Instrumentation (71124.05
)
a. Inspection Scope
The inspectors reviewed the licensee's radiation monitoring instrumentation programs to verify the accuracy and operability of radiation monitoring instruments used to monitor areas, materials, and workers to ensure a radiologically safe work environment during normal operations and under postulated accident conditions.
Walkdowns and Observations
- During tours of the site areas, the inspectors observed installed radiation detection equipment including the following instrument types: area radiation monitors (ARMs), continuous air monitors (CAMs), personnel contamination monitors (PCMs), small article monitors (SAMs), and portal monitors (PMs). The inspectors observed the calibration status, physical location, material condition and compared technical specifications for this equipment with UFSAR requirements. In addition, the inspectors observed the calibration status and functional checks of selected in-service portable instruments and discussed the bases for established frequencies and source ranges with RP staff personnel. The inspectors reviewed periodic source check records for compliance with plant procedures and manufacturer's recommendation for selected instruments and observed the material condition of sources used.
Calibration and Testing Program
- The inspectors reviewed calibration data for selected ARMs, PCMs, PMs, SAMs, and laboratory instruments as well as the last calibration and methodology for the whole body counter. The inspectors reviewed calibration data, methodology used and the source certification for the containment high range monitor area steam line monitors, control room area monitor, and refueling bridge monitors. The current output values for the portable instrument calibrator and the instrument certifications used to develop them were reviewed by the inspectors. The inspectors reviewed the licensee's process for investigating instruments that are removed from service for calibration or response check failures and discussed specific instrument failures with plant staff. In addition, the inspectors reviewed 10 CFR 61 data to determine if sources used in the maintenance of the licensee's radiation detection instrumentation were representative of radiation hazards in the plant and scaled appropriately for "hard to detect" nuclides.
Problem Identification and Resolution
- The inspectors reviewed and discussed selected corrective action program documents associated with radiological instrumentation including licensee sponsored assessments. The inspectors evaluated the licensee's ability to identify and resolve issues
.
Inspection Criteria
- Operability and reliability of selected radiation detection instruments were reviewed against details documented in the following: 10 CFR Part 20; NUREG
-0737, "Clarification of TMI Action Plan Requirements"; UFSAR Chapters 11 and 12, TS Sections 3.3 and 5.4, and applicable licensee procedures. Documents reviewed are listed in the Attachment
.
The inspectors completed the required three samples specified in IP 71124.05.
b. Findings
No findings were identified.
OTHER ACTIVITIES
4OA1 Performance Indicator Verification
a. Inspection Scope
The inspectors reviewed a sample of the performance indicator (PI) data, submitted by the licensee, for the Unit 1 and Unit 2 PIs listed below. The inspectors reviewed plant records compiled between July 2015 and June 2016 to verify the accuracy and completeness of the data reported for the station. The inspectors verified that the PI data complied with guidance contained in Nuclear Energy Institute 99-02, "Regulatory Assessment Performance Indicator Guideline," and licensee procedures. The inspectors verified the accuracy of reported data that were used to calculate the value of each PI.
In addition, the inspectors reviewed a sample of related corrective action documents to verify the licensee was identifying and correcting any deficiencies associated with PI data. Documents reviewed are listed in the
.
Cornerstone:
Initiating Events unplanned power changes per 7000 critical hours
Cornerstone:
Mitigating Systems residual heat removal system
Cornerstone:
Occupational Radiation Safety occupational exposure control effectiveness The inspectors reviewed the occupational exposure control effectiveness PI results for the occupational radiation safety cornerstone from January 2015 through August 2016.
For the assessment period, the inspectors reviewed electronic dosimeter alarm logs and condition reports related to controls for exposure significant areas. Documents reviewed are listed in the attachment
. Cornerstone: Public Radiation Safety radiological control effluent release occurrences
The inspectors reviewed the radiological control effluent release occurrences PI results for the public radiation safety cornerstone from January 2015 through August 2016.
For the assessment period, the inspectors reviewed cumulative and projected doses to the public contained in liquid and gaseous release permits and condition reports related to radiological effluent technical specifications/ODCM issues. The inspectors also reviewed licensee procedural guidance for collecting and documenting PI data.
Documents reviewed are listed in the attachment
.
b. Findings
No findings were identified.
4OA2 Problem Identification and Resolution
.1 Routine Review
The inspectors screened items entered into the licensee's corrective action program to identify repetitive equipment failures or specific human performance issues for follow
-up.
The inspectors reviewed problem identification prog ram reports, attended screenin g meetings, or accessed the licensee's computerized corrective action database.
.2 Annual Followup of Selected Issues
a. Inspection Scope
The inspectors conducted a detailed review of the following two nuclear condition reports (NCRs): CR 2058838, Multiple failed barriers during maintenance task CR 2055501, Extended equalize required for safe shutdown facility battery SDSB2 The inspectors evaluated the following attributes of the licensee's actions:
complete and accurate identification of the problem in a timely manner evaluation and disposition of operability and reportability issues consideration of extent of condition, generic implications, common cause, and previous occurrences classification and prioritization of the problem identification of root and contributing causes of the problem identification of any additional condition reports completion of corrective actions in a timely manner Documents reviewed are listed in the
.
b. Findings and Observations
No findings were identified.
4OA3 Event Followup
(Closed) Licensee Event Report (LER) 05000413/2014 00, 01: Unanalyzed Condition Due to Deviations from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition
a. Inspection Scope
On June 2, 2014, the licensee submitted an LER documenting the discovery of a condition of non
-compliance with the site's fire protection program (FPP). These conditions could prevent operators from achieving and maintaining safe shutdown (SSD) of the plant, in the case of a postulated fire.
The inspectors performed a detailed review of the information related to this LER. Inspectors reviewed documents, and discussed the issues with licensee personnel to gain an understanding of the issues. The inspectors assessed the licensee's compensatory measures and corrective actions to determine if they were adequate.
LERs 05000413/2014 00, 01 are closed.
b. Findings
Introduction
- The licensee identified a non
-compliance with Operating License Condition 2.C.(5), for Units 1 and 2, for the failure to protect one of the redundant trains of equipment needed to achieve post
-fire SSD from fire damage. Specifically, the licensee failed to use one of the means described in Branch Technical Position (BTP) Chemical Engineering Branch (CMEB) 9.5
-1, Item C.5.b.2 to ensure that one of the redundant trains of equipment necessary to achieve and maintain hot shutdown conditions was protected from fire damage.
Description:
On June 2, 2014, the licensee submitted LER 413/2014 00 with Revision 01 submitted on December 1, 2014, which documented discovery of cable routing issues and postulated fire
-induced circuit failures that could prevent operation or cause maloperation of equipment required to achieve SSD in the event of a fire. This condition was identified during the licensee's transition to National Fire Protection Association Standard 805 (NFPA 805).
During the transition to NFPA 805, the licensee identified multiple instances of cables for equipment required to achieve SSD not meeting the separation requirements of the current licensing basis. The licensee determined that this condition existed for 22 fire areas (FAs) across both units. The licensee characterized these issues as variance(s) from deterministic requirements (VFDRs). The conditions identified in the LER are related to VFDRs that met the following criteria: 1) VFDRs that required a plant modification to meet the fire risk criteria of NFPA 805, or 2) VFDRs where a potential concern existed with respect to NRC Information Notice (IN) 92
-18, "Potential for Loss of Remote Shutdown Capability During a Control Room Fire", dated February 28, 1992.
The licensee determined that the deficiencies existed because of latent design deficiencies in the cable routing and circuit design. This LER was applicable to Units 1 and 2. Upon discovery, the licensee entered this issue into their corrective action program as PI P C-1401427, and implemented compensatory actions in the form of fire watches and/or control of transient combustible material for the affected FAs.
Analysis.
Failure to protect one redundant train of cables and equipment necessary to achieve post
-fire SSD from fire damage was a performance deficiency. This finding was more than minor because it was associated with the reactor safety mitigating system cornerstone attribute of protection against external events (i.e., fire). Specifically, failure to protect safe shutdown cables and equipment from fire damage negatively affected the reactor safety mitigating systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Because this issue relates to fire protection and this non
-compliance was identified as a part of the site's transition to NFPA 805, this issue is being dispositioned in accordance with Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)" of the NRC Enforcement Policy.
In order to verify that this non
-compliance was not associated with a finding of high safety significance (Red), inspectors reviewed qualitative and quantitative risk analyses performed by the licensee. These risk evaluations took ignition source and target information from the licensee's fire probabilistic risk assessment to demonstrate that the significance of the non
-compliances were less
-than--4/year). Inspectors determined that cables associated with some of the VFDRs were not located in the zone of influence (ZOI) of any credible ignition source. For cables that were located in the ZOI of a credible ignition source, inspectors were able to perform a calculation to determine the change in conditional core damage probability (CCDP), based on the postulated fire
-affected equipment not being available. Based on these screenings, inspectors determined that the significance of this non
-compliance was less
-than-Red. A bounding risk assessment performed by a regional Senior Risk Analyst (SRA) increase due to this condition was less than 1E
-4, and therefore less than RED.
The inspectors determined that no cross cutting aspect was applicable to this performance deficiency because this finding was not indicative of current licensee performance.
Enforcement.
Operating License Condition 2.C.(5), for Units 1 and 2, requires that the licensee implement and maintain in effect all provisions of the approved FPP as described in the UFSAR, as amended, for the facility and as approved in the SER through Supplement 5. BTP CMEB 9.5
-1, which incorporated the guidance of Appendix A to BTP ASB 9.5
-1 and the technical requirements of Appendix R to 10 CFR 50, established the regulatory and licensing requirements for the FPP at Catawba Nuclear Station (CNS). The CNS FPP was reviewed against and approved for conformance with BTP CMEB 9.5
-1 in the SER through Supplement 5. BTP CMEB 9.5
-1, Item C.5.b.1, requires that fire protection features be provided that are capable of limiting fire damage so that one train of systems necessary to achieve and maintain hot standby conditions from either the control room or emergency control station(s) is free from fire damage.
BTP CMEB 9.5
- 1, Item C.5.b.2 requires one redundant train to be protected from fire damage by one of the following specified methods:
(a) separation of cables and equipment by a fire barrier having a 3
-hour rating, (b) separation of cables and equipment by a horizontal distance of more than 20 feet with no intervening combustibles or fire hazards and with fire detectors and an automatic fire suppression system in the fire area, or (c) enclosure of cables and equipment in a fire barrier having a 1
-hour rating and with fire detectors and an automatic fire suppression system in the fire area.
Contrary to the above, the licensee failed to use one of the means described in BTP CMEB 9.5-1, Item C.5.b.2 to ensure that one of the redundant trains of equipment necessary to achieve and maintain hot shutdown conditions was protected from fire damage. Specifically, on April 2, 2014, the licensee identified the failure to protect equipment in accordance with the current licensing basis. The licensee determined that fire damage could prevent operation of, or cause maloperation of, components that were required to achieve and maintain SSD. This condition has existed since initial plant startup for Units 1 and 2. The licensee entered this issue into the corrective action program (PIP C-14-1427) and implemented compensatory measures in the form of fire watches and/or control of transient combustible material for the affected FAs
.
Because the licensee committed to adopt NFPA 805 and change their fire protection licensing bases to comply with 10 CFR 50.48(c), the NRC is exercising enforcement and reactor oversight process (ROP) discretion for this issue in accordance with the NRC Enforcement Policy, Section 9.1, "Enforcement Discretion for Certain Fire Protection Issues (10 CFR 50.48)" and Inspection Manual Chapter 0305. Specifically, this issue was identified and will be addressed during the licensee's transition to NFPA 805, it was entered into the licensee's corrective action program, immediate corrective action and compensatory measures were taken, it was not likely to have been previously identified by routine licensee efforts, it was not willful, and it was not associated with a finding of high safety significance (Red).
4OA5 Other Activities
.1 Operation of an Independent Spent Fuel Storage Installation (60855.1)
a. Inspection Scope
The inspectors performed a walkdown of the onsite independent spent fuel storage installation (ISFSI). The inspectors reviewed changes made to the ISFSI programs and procedures
, including associated 10 CFR 72.48, "Changes, Tests, and Experiments,"
screens and evaluations to verify that changes made were consistent with the license or certificate of compliance. The inspectors reviewed records to verify that the licensee recorded and maintained the location of each fuel assembly placed in the ISFSI. The inspectors also reviewed surveillance records to verify that daily surveillance requirements were performed as required by technical specifications. Documents reviewed are listed in the
.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
On October 24, 2016, the resident inspectors presented the inspection results to Mr. Tom Simril and other members of the licensee's staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report
.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- C. Abernathy, Manager, Nuclear Site Services
- S. Andrews, Sr. Engineer Regulatory Affairs,
- T. Arlow, Emergency Planning Manager
- C. Bigham, Director Nuclear Organizational Effectiveness
- M. Carwile, Chemistry Manager
- C. Cauthen, SG Inspection Program
Lead Engineer
- C. Curry, Plant Manager
- C. Fletcher, Regulatory Affairs Manager
- N. Flippin, Work Management Manager
- B. Foster, Operations Manager
- T. Jenkins, Maintenance Manager
- L. Keller, General Manager Nuclear Engineering
- T. Koleva, Boric Acid Program Owner
- B. Leonard, Training Manager
- T. Simril, Site Vice
-President
- J. Smith, Radiation Protection Manager
- S. West, Director, Nuclear Plant Security
- C. Wilson, Sr. Engineer Regulatory Affairs
LIST OF ITEMS
OPENED, CLOSED, AND DISCUSSED
Closed
- 413/2014-002-00 LER Unanalyzed Condition Due to Deviations from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition (Section 4OA3)
- 413/2014-002-01 LER Unanalyzed Condition Due to Deviations
from Fire Protection Current Licensing Basis Identified During NFPA 805 Transition (Section 4OA3)
LIST OF DOCUMENTS REVIEWED
Section 1R04: Equipment Alignment
- OP/2/A/6350/002, D/G Valve and Breaker Checklist
- OP/1/A/6200/007, Containment Spray System
- OP/2/A/6250/002, Auxiliary Feedwater Valve Check List Section 1R05Q:
- Fire Protection Fire Brigade Response Strategies for Safety
-Related Areas, Rev. 039
- Fire Strategy Plan, Fire Area 22: 594' Aux.
- Building Fire Strategy Plan N: 594' Turbine Building Fire Strategy Plan, Fire Area 27: 2A D/G room Fire Strategy Plan, Fire Area 15: Unit 1 Essential Switchgear Room 577' Fire Strategy Plan, Fire Area 8: Unit 1 Essential Switchgear Room
- 560' PT/0/A/4400/001 P, Inspection of Portable Fire Extinguishers, Rev. 086
- PT/0/A/4400/001 T, Visual Inspection of Fire Hose Stations and Fire Hose Equipment Houses, Rev. 005
- WO 20078175 01, Monthly Inspection of Portable Fire Extinguishers, June 2016
- WO 20012734 01, Visual Inspection of Fire Hose Stations, January 2016
- AR #02048934
Section 1R06: Internal Flooding
- CR 2050606, Potential failure of circulation water expansion joints Section 1R07
- Heat Sink Performance
Procedures
- AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev.
- 003 MP/0/A/7150/098, Nuclear Service Water (RN) Pump, Motor Upper Bearing Oil and Motor Coolers Chemical Cleaning, Rev.
- 2 OP/0/A/6400/006 M, Nuclear Service Water System Unwatering Procedure, Rev.
- 070 PT/0/A/4400/008 A, RN Flow Balance Train A, Rev.
- 063 PT/0/A/4400/008 B, RN Flow Balance Train B, Rev.
- 057 PT/0/A/4400/024, SNSWP Temperature Monitoring, Rev.
- 014
Calculations
- CNC-1150.01-00-0001, SNSWP Thermal Analysis during One Unit LOCA and One Unit Shutdown, Rev.
- 019
- CNC-1150.04-00-0009, Area and Volume of the Stb
y. Nuclear Service Water Pond, Rev.
- 2
- CNC-1223.24-00-0011, Nuclear Service Water System Test Criteria, Rev.
- 037
Drawings
- CN-1397-4, SNSW Pond Instrumentation Pier, Rev.
- 008
- CN-1574-01.00, Flow Diagram of Nuclear Service Water System (RN), Rev.
- 056
- CN-1574-01.01, Flow Diagram of Nuclear Service Water System (RN), Rev.
- 061
- CN-1574-01.02, Flow Diagram of Nuclear Service Water System (RN), Rev.
- 056
- CN-1574-02.01, Flow Diagram of Nuclear Service Water System (RN), Rev.
- 058
- CNSF-1574-RN.01, Summary Flow Diagram Nuclear Service Water System (RN), Rev.
- 006
- Corrective Action Documents
- AR 01554606, OEDB 60799 Subject: IER L2
-12-27, Reactor Scram and Loss of Off
-Site Power
- AR 1516631, SNSWP local level indication at the end of the outfall pier
- AR 1898305, No flow discharging from long leg discharge of either A or B
Other Documents
- C-ENG-SA-15-07, Ultimate Heat Sink Inspection Readiness NCR 1961833
- CNS-1150.04-00-0001, Design Basis Specification for the Nuclear Service Water Structures, Rev. 007
- CNS-157 4.RN-00-0001, Design Basis Specification for the Nuclear Service Water System (RN), Rev.
- 063 Completed IP/0/A/3860/030, Level Transmitter and Switch Calibration, 03/10/16
- Completed IP/1/B/3112/004, Calibration of Non
-Safety Related RN Intake Structure Instrumentation
- dated 03/10/16
- Completed PT/0/A/4200/009 A, Auxiliary Safeguards Test Cabinet Periodic Test
- dated 03/28/16 Completed PT/0/A/4200/009 A, Auxiliary Safeguards Test Cabinet Periodic Test
- dated 06/20/16 Completed PT/0/A/4200/013 C, RN Shared Valves Inservice Test (QU)
- dated 03/23/16
- Completed PT/0/A/4200/013, RN Share Valves Inservice Test (QU)
- dated 01/14/16
- Completed PT/0/A/4200/013, RN Share Valves Inservice Test (QU)
- dated 08/07/15
- Completed PT/0/A/4200/013, RN Shared Valves Inservice Test (QU)
- dated 04/14/16
- PT/0/A/4400/008 A, RN Flow Balance Train A, Rev.
- 063 Service Water System Program Manual, Rev.
- 009
- WO 02123166, 1RN PU A: Clean Motor Coolers
- WO 02129129, 1RN PU B
-Clean Motor Coolers
- WO 02131687, 2RN PU B
-Clean Motor Coolers
Section 1RO8: Inservice Inspection Activities
Procedures
- 03-1275284, Field Procedure for Remote Rolled Plugging Utilizing Plugging Control Box, Rev. 021 03-9203864, Steam Generator Channel Head Inspection per Nuclear Safety Advisory Letter (NSAL) 12
-1, Rev. 002 54-ISI-400-021, Multi
-Frequency Eddy Current Examination of Tubing, Rev.
- 000 MP/0/A/7650/040, Inspection, Assessment, and Cleanup of Boric Acid on Plant Materials, Rev. 022
- MRS-GEN-1214, Steam Generator Channel Head Video Inspection, Rev.
- 2
- NDEMAN-NDE-25, Magnetic Particle Examination, Rev.
- 28
- NDEMAN-NDE-640, Ultrasonic Examination Using Longitudinal Wave and Shear Wave Straight Beam Techniques, Rev.
- 005
- NDE-ND-ALL- 7202, Visual Examination of PWR Reactor Pressure Vessel Upper Head Penetrations, Rev.
- 000
- NDE-NE-ALL-6102, Utilization of PDI
-UT-2 Generic Procedure for the Ultrasonic Examination of Austenitic Pipe Welds, Rev.
- 000
- NDE-NE-ALL-7203, Visual Examination of PWR Reactor Pressure Vessel Bottom Mounted Instrument Penetrations, Rev. 000
- 037
Calculations
- CNC-1201.01-00-0022, Determination of Periodic Inspection Requirements for the Reactor Vessel Head and Reactor Vessel Head Inspection Documentation, Rev.
- 23
Drawings
- CN-2492-NW.00-158, Containment Valve Injection Water System (NW), Rev.
- 2
- CN-2569-01.00, Flow Diagram of Containment Valve Injection Water System (NW), Rev.
- 25
Other Documents
- AD-EG-PWR-1611, Boric Acid Corrosion Control Program
- Implementation, Rev.
- 001
- AD-MN-ALL-0006, Fluid Leak Management, Rev.
- 000 Catawba Unit 2EOC21 Steam Generator Degradation Assessment, Rev.
- 001 Certificate of Compliance for UT Test Block 15
-1890 Certificate of Conformity for UT Probe SN: SB1593, SB1542, RTD 03
-786 Certification of Analysis for Ferromor ND 8 Yellow Lot# F
-21011 Certified Test Report for Ultragel II
-12125
- CNS-SG-ANL-GL, Eddy Current Guidelines for Duke Energy's D5 Steam Generators, Rev.
- 001 D5-SG-Appendix H Qual, D5 Steam Generators Site Technique Validation for Catawba Nuclear Station Unit 2, Rev.
- 001 Instrument Certification for Thermometer SN: 24620999
- LTR-PL-16-42, Operability Assessment for Primary Side Loose Parts from Degraded Steam Generator Channel Head Cladding at Catawba Unit 2
- Magnetic Particle Examination Report No.: MT
-16-177,
- MT-16-178 NDE Qualification Certification for Examiners: MGW
-4124, KCE
-3815, MLO
-2292,
- 624655,
- 625282,
- 246199, MGH
-4124,
- TJW-1341
- PD-EG-PWR-1611, Boric Acid Corrosion Control Program, Rev.
- 001 UT Calibration/Examination Report No.: U
- T-16-1342 Visual Examination Record for Boric Acid Detection Report No.: VT
-16-1364,
- VT-16-1484 Weld Performance Qualification Test for welders: O2847, H5555
- Welding Procedure Qualification Record No.: L
-110D, L-138, L-148C Welding Procedure Specification Technical Sheet: GTOO0808
-04
Condition Reports
- AR 01898992, Excessive / Active boron accumulation from 2
-NI-VA-327 pipe
- AR 01901090, During fit-up inspection, QC noted minimum wall thickness violation
- AR 01931170, 0
-WL-FE-9780 Active / Excessive boron leak from flange
- AR 01940775, 1
-NM-PG-6100 Active / Excessive boron from threaded fitting
- AR 01950202, 2
-KF-FS-5150 Active boron leak from fitting 30
-40 dpm
- AR 01985576, Boric Acid Corrosion Control Program
- Implementation Procedure Effectiveness
, 1-NS-VA-1B Excessive/active boron, leak increase
- AR 02047391, 1
-FW-VA-45 Active Boron Leak
- AR 02060612, Heavy corrosion and scaling on the lower head
- AR 02060953, 2B NC Pump main flange leak
- AR 02061334, Area of exam coverage limitation encountered during UT exam
- AR 02062097, Potential misapplication of SR 3.0.2 and SR 3.0.3
- AR 02062162, Minimum wall thickness violation under WO 20025151
- AR 02062576, ISI UT Exam Coverage Limitation
- AR 02062987, Steam Generator 2D primary channel head cladding
- AR 02063362, Supports in U2 lower containment
- AR 02063371, BAC walkdown in U2 containment
- AR 02065690, Indentation in U2 reactor head next to outer
- O-ring groove
Work Orders
- WO 02129915, 1NS
-01B Dry Boron at Valve Packing
- WO 02144333, 2NW-061B: Clean Valve and Internals Delete, Bonnet Seal Weld
- WO 20001790, 2SM
-005: Replace Gamma Plug
Section 1R11: Licensed Operator Requalification
- Records: License Reactivation Packages (5).
- LORP Training Attendance records (9 (Shift B)).
- Medical Files (9). Remedial Training Records (7).
- Remedial Training Examinations (4).
- Maintenance Hours (10 individuals)
- Feedback summaries (3)
- Written Examinations:
- 7/22/16
- LOR 2016 12 B
- 2R, RO Exam,
- 7/22/16
- Procedures:
- Nuclear System Directive: 512, Maintenance of RO/SRO NRC Licenses, Revision 7, 06/05/14.
- AD-TQ-ALL-0068, Licensed Operator Continuing Training Program. Revision 1, 05/03/2016.
- AD-TQ-ALL-0410, Remediation and Reevaluation, Revision 2, 11/18/2015.
- AD-TQ-ALL-0420, Conduct of Simulator Training and Evaluation, Revision 0, 04/27/2016.
- AD-TQ-ALL-0230, Licensed Operator Requalification Annual and Biennial Exam Development, Revision 4, 07/11/2016.
- AD-TQ-ALL-0425, Simulator Scenario Based Testing, Revision 1, 04/30/2015
- AD-TQ-ALL-0470, Trainee Evaluation and Examination Security, Revision 0, 06/01/2015.
- OTMP 3.2, Written Examination Development, Administration and Grading, Instructor Guide, Revision 20, 06/30/2016.
- OTMP 3.4, Active Simulator Exam Development Guide, Revision 20, 04/25/2016.
- OTMP 4.1, JPM Exam Preparation and Administration, Revision 14, 07/05/2016
- OTMP 4.7, Operator Requalification Examination Security Procedure, Revision 10, 03/07/2016
- OTMP 6.3, Licensed Operator Requalification Program. Revision 15, 05/05/2016
- OTMP 7.0, Simulator Configuration Management, Revision 17, 08/29/15
- Nuclear System Directive: 0805, Nuclear Station Unit Specific Training Simulators, Revision 4, 04/27/15
- Simulator Steady State Tests:
- 2015 Steady State Test, 12/17/15.
- Simulator Real Time Tests:
- 2016 Real Time Test, 06/10/2016.
- Simulator Transient Tests:
- 2016 Transient Test
(Loss of all Feedwater), Revision for C1C23, 07/25/16.
- 2016 Transient Test 12 (Steam Line Break), Revision for C1C23, 07/25/16.
- 2016 Transient Test 15 (SBLOCA/ICC), Revision for C1C23, 07/25/16.
- Simulator Problem Reports & Design Change Requests:
- RMS-075, Mod to install new OEMF89 in the YN system, 10/15/15
- EQA-307, Turbine Lube Oil controller on MC
-3 will not control in automatic, 4/15/16
- CRF-040, Replace all Rod Step counters with new programmable counters, 5/10/16
- PCS-078, During CF/CA nozzle swaps the simulator responds more drastically than the plant and results in deviation alarms, 7/14/16
- DSG-052, The main simulator DG panel synchroscope is inoperable, 3/30/16
- EQA-287, Replace the two recorders on the EMF panels, 3/31/16
- SYS-251, Annunciator
- AD7-C1 needs reflash capability, 6/24/16
- Simulator Reports:
- 2015 Annual Simulator Report, 01/12/16.
- JPM Packages:
- WL-001, Calculate Total RL Discharge Flow, Revision 01, 07/25/2016
- RFY-004, Manual Initiation of 1B Diesel Generator Cardox CO
- System, Revision 00, 12/15/03
- AD-014, 2A Train Hydrogen Igniters Operation from SSF, Revision 02, 08/23/2011
- EP1-123, Respond to Inadvertent Dilution While Shutdown. Revision 00, 07/25/2016
- CA-085, Realign CA suction Source, Revision 00, 04/08/2016
- VA-002, Calculate Unit Vent Flow, Revision 00, 07/02/2013
- IRE-103, Start M/G Set #1A, Revision 20, 02/03/2011
- EP-016, Shifting Main Transformer Auxiliaries, Revision 3, 07/24/14
- EP3-001, Isolate a Faulted Steam Generator, Revision 14, 08/11/2014
- CF-003, Ensure Proper Feedwater Isolation Following a Reactor Trip, Revision 00, 07
- Scenario Packages:
- ASE-12, LOR, Revision 27, 07/26/2016
- ASE-24, LOR, Revision 12, 07/26/2016
- ASE-25, LOR, Revision 26, 07/26/2016
- ASE-52, LOR, Revision 02, 07/26/2016
- ASE-55, LOR, Revision 01, 07/26/2016
Section 1R13: Maintenance Risk Assessments and Emergent Work Control
- PRT-0-16-SSF SG WK 28
-0158
- PRT-1-16-1BNSOOS, 1A NS protected due to 1B NS tagged
Section 1R15: Operability Evaluations
- PT/2/A/4200/031, SV Valve Inservice Test (QU), March 30, 2016
- PT/2/A/4200/031, SV Valve Inservice Test (QU), June 22, 2016
- AD-OP-ALL-0105, Operability Determinations and Functionality Assessments, Rev. 003
- NCR #02039992
- IDO Template filled out for SV
-19 Initial Operability Determination; June 23, 2016
- OMP 2-29, LCO Tracking, Rev.
- 061
Section 2RS1: Radiological Hazard Assessment and Exposure Controls
- Procedures, Guidance Documents and Manuals
- AD-RP-ALL-2001, Taking, Counting, and Recording Surveys, Rev
. 001
- AD-RP-ALL-2009, Personnel Contamination Monitoring and Reporting, Rev
. 002
- AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas, Rev. 002
- AD-RP-ALL-3001, Control of Radioactive Material and Use of Radioactive Material Labels, Rev. 001 RA/2/1100/004, Unit 2 Required Surveys for Plant Transients, Rev
. 013 RA/0/1700/003, Issuance and Return of Radioactive Sources, Rev
. 001
- Records and Data
- AD-RP-ALL-2011, Radiation Protection Briefings Attachment 2, Rx Head Move, 9/14/2016
- AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas: Attachment 1, 09/14/2016, 18:42.
- AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas: Attachment 1, 09/14/2016,
- 11:55.
- AD-RP-ALL-2017 Rev 2, Attachment 9 <<LHRA or VHRA Key Log >>, 09/23/2016
-09/28/2016 @ 8:30
- Boundary TLD Dose Trending Report 03/01/2015
- 07/21/2016
- Catawba Nuclear Site Semiannual Source Inventory and Leak Test, 06/02/2016 (in part)
- Catawba Nuclear Station
- Unit 2 EOC
-21 Refueling Outage Hi level Schedule 09/26/2016
- 09/29/2016
- Confirmation Form 2016 Annual Inventory Reconciliation
[NSTS Sources], 01/13/2016
- Gamma Spectrum Analyse
s: 12-Sep-16-220016, E/C thimble tube inspection B/Z
- RWP 2108, 09/12/2016
- CN16091300020, U2 RX L/C Decon Seal Table
- RWP 2103, 09/13/2016
- CN16091300062, U2 Rx L/C Retracting Incore Thimble Tubes
- RWP 2126, 09/13/2016
- CN16091400017, U2 Rx UC Cavity Seal sand
-box covers RWP 2405/9
- CN16092700052, U2 RX L/C PRT Platform Rtn
- RWP 2101, 09/27/2016
- CN16092700035,
- U-2 L/C PRT Platform Routine, 09/27/2016
- CN16092700041, U2 L/C A/D CACFU Exhaust, 09/27/2016
- CN16092600046, L/C 'A' C/L Nozdam Remov/RT Prep/Boundary, 9/26/2016
- CN16092700049, U2 L/C "D" Platform Rtn, 9/27/2016
- CN16092700026, U2 Rx L/C B/C SG Nozzle Dam Boundary
- RWP 2808, 9/27/2016
- CNS-M-20150306-33, U2 Rx Bldg
\U-2 Upper Cont., 3/6/2015
- CNS-M-20150306-34, U2 Rx Bldg
\U-2 Upper Cont., 3/6/2015
- CNS-M-20160404-2, Aux Bldg
\543 Elevation room 222 A
-B, 04/04/2016
- Interstation Letter Subject: CNS Material Stored in Spent Fuel Pools
-2015 VSDS Standard Survey Report(s):
- CNS-M-20160911-18, U2 Rx Bldg
\U-2 Lower Cont., 09/11/2016
- CNS-M-20160911-24, U2 Rx Bldg
\U-2 Lower Cont., 09/11/2016
- CNS-M-20160913-15, U2 Rx Bldg
\U-2 Lower Cont., 09/12/2016
- CNS-M-20160913-20, U2 Rx Bl dg\U-2 Lower Cont., 09/13/2016
- CNS-M-20160912-52, U2 Rx Bldg
\U-2 Lower Cont., 09/12/2016
- CNS-M-20160914-1, U2 Rx Bldg
\U-2 Lower Cont., 09/14/2016
- CNS-M-20160914-28, U2 Rx Bldg
\U-2 Upper Cont., 09/14/2016
- CNS-M-20160914-30, U2 Rx Bldg
\U-2 Upper Cont., 09/14/2016
- CNS-M-20160127-7, ISFSI Yard, 01/27/2016
- RA/2/1100/001, Unit 2 Outage Upper Containment Controls and Surveillance: Enclosure 5.28, 09/14/2016, 8:55
-16:00.
- CAP Documents
- AD-PI-ALL-0100, Corrective Action Program, Rev
. 006 Action Requests (AR)
- 01538967,
- 01540206,
- 01540302,
- 01897614,
- 01898359,
- 01901055
and 02065328
Section 2RS2: ALARA
- Procedures, Guidance Documents, and Manuals
- AD-RP-ALL-2000, Preparation and Management of Radiation Work Permits (RWP), Rev
. 001
- AD-RP-ALL-2006, Radiation Protection Risk Management Process, Rev
. 001
. 001
- AD-RP-ALL-9000, ALARA Program, Rev
. 004
- AD-RP-ALL-9001, ALARA Planning, Rev
. 001
- AD-RP-ALL-9002, Sentinel ALARA Management, Rev
. 000
- AD-RP-ALL-9006, Failed Fuel Action Plan, Rev
. 000
- AD-RP-ALL-9007, Radiation Protection Source Term Review, Rev
. 000
- CSD-CP-CNS-0001, Catawba Primary Chemistry Strategic Plan, Rev. 001 Duke Fleet ALARA Manual, Various Revisions depending on Section Records and Da ta
- AD-RP-ALL-5002, Attachment 4,
- CFR 61 Review
, Catawba Nuclear Station
, Annual General Station Review, 3/1/2016
- ALARA Critique, Plan # C-OL-15-10, Unit 2 Repair/Replace 2BB
-012, 8/31/2015
- ALARA Critique, Plan # C1EOC22
-15-02, 1EOC22 Reactor Head Activities, 3/9/2016
- ALARA In-Progress Review
, Plan # C1EOC22
-15-02, 1EOC22 Reactor Head Activities; 35% exposure/39% work, 11/26/2015; 85% exposure/
- 54% work, 1
- 2/3/2015; 100% exposure/
- 70% work, 12/
- 9/2015 ALARA In-Progress Review, Plan # C-OL-15-10, Unit 2 Repair/Replace 2BB
-012, 73%, 8/31/2015
- ALARA In-Progress Review, Plan # C2EOC21
-16-02, Headwork Activities,
- 24% exposure/
- 36% work, 9/15/2016 ALARA In-Progress Reviews, Plan # 2EOC21
-16-04, Steam Generator Primary Side Activities:
- 21% exposure/
- 14% work, 9/20/2016; 50% exposure/
- 44% work, 9/24/2016
- ALARA In-Progress Review, Plan # C
- 2EOC21-16-08, Steam Generator Nozzle Dam Activities
, 58% exposure/43% work, 9
/20/2016 ALARA In-Progress Review
s, Plan # C2EOC21
-16-10, 2B NC Pump Motor Removal/
- Replacement
- 2% exposure/1.6% work, 9/12/2016; 22.7% exposure/18% work, 9/17/2016; 39.3% exposure/48% work, 9/20/2016; 53% exposure/58% work, 9/23/2016; 75.3% exposure/76% work, 9/23/2016 ALARA Long Range Plan 2014
-2018 (2014 Update), Catawba Nuclear Station, 2
/11/2014
- ALARA Long Range Plan 2015
-2020 (2015
- Update), Catawba Nuclear Station,
- 8/15/2015 ALARA Long Range Plan 2016
-2021 (2016 Update), Catawba Nuclear Station, 4/28/2016
-OL-15-10, Unit 2 Repair/Replace 2BB
-012, 8/27/2015
- AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 0, 10/29/2015
- AP, Plan # C1EOC22-15-02, 1EOC22 Reactor Head Activities, Rev 1, 12/3/2015
- AP, Plan # C1EOC22
-15-02, 1EOC22 Reactor Head Activities, Rev
- 2, 12/9/2015 AP, Plan # 2EOC21-16-01, Install/Remove Temporary Shielding During 2EOC21, Rev. 000, 8/10/2016
- AP, Plan # C2EOC21-16-02, Reactor Head Activities, Rev
. 000, 8/9/2016 AP, Plan # C2EOC21
-16-04, Steam Generator Primary Side Activities, Rev
. 000, 8/9/2016
- AP, Plan # C2EOC21-16-05, Steam Generator Secondary Side Activities, Rev
. 000, 8/9/2016
- AP, Plan # C2EOC21
-16-10, 2B NC Pump Motor Removal/Replacement, Rev
. 000, 8/4/2016 Catawba Nuclear Station ALARA Committee Meeting Minutes [Including 2EOC21 Challenge Boards], January through June 2016
- CNS Unit 1 EOC22 Refueling & Maintenance Outage Summary of Personnel Radiation Exposures
[Outage ALARA Report], 3/18/2016
- CNS Radiation Protection Daily Status Reports/Graphs [Dose Tracking by work group and site]: 9/14/2016; 9/28/2016; and 9/29/2016
-21 Refueling Outage High Level Schedule(s): 9/12/2016
-9/15/2016; 9/13
-2016-9/16/2016; 9/15/2015
-9/18/2016; and 9/26/2016
-9/29/2016
- Micro ALARA Plan, Unit 2 Dry Cask Storage for Cask 82, 6/16/2016
- Micro ALARA Plan, Unit 2 Dry Cask Storage for Cask 82
, Post Job Revi ew, 8/3/2016
- Radiation Work Permits (RWP): RWP #2125, Shielding Activities (Lower Containment and Annulus), Rev 22; RWP #2162, 2B NCP Motor Replacement, Rev 9; RWP # 2405, Reactor Head Activities (U/C), Rev 21; RWP #2453, RX Head Inspections Includes Shroud, Hanger, Insulation & Inspection (U/C), Rev 9; RWP #2806, S/G Remove/Install Man Ways and Diaphragms/Bowl Pumping, Rev 30; RWP #2808, S/G Install/Remove Nozzle Covers/Dams, Rev 27; RWP #2812, S/G Eddy Current Activities, Rev 43; RWP #2814, SIG Plugging Activities, Rev
. 032 RWP List Report, Catawba Nuclear Station, RWP Status, 7/12/2016
- Spreadsheet, 2015 Annual ALARA Estimate
(by Work Group), undated Spreadsheet, 2016
- Annual ALARA Estimate (by Work Group), undated
-Blind Flange Install (RWP 2415), 9/12/2016; Unit 2 Reactor Cavity
-Head Flange Cleaning and Cavity Seals (RWP2405), 9/9/2016; Unit 2 Seal Table
-Eddy Current Activities (RWP 2108), 8/25/2016; Unit 2 S/G Bowls-Nozzle Dams (RWP 2808), 9/1/2016;
- Unit 2 S/G Platform
-Platform Work (RWPs 2806, 2810, 2812, 2814, 2834, & 2839), 9/1/2016
- Temporary Shielding Request (TSR), TSR 16
-232, Pressurizer Surge Line for 2B RCP Motor Work, 8/10/2016; TSR
- 16-235, PZR Curtain@593', 3/1/2016;
- TSR 16-235B, PZR Curtain at 2NCMR B, 8/10/2016;
- TSR 16-291, 2B Cold Leg Pipe, 8/8/2016;
- TSR 16-296, 2B Hot Leg, 8/10/2016;
- TSR 16-296B, 2B Hot Leg
- RTD, 8/10/2016
- VSDS Survey # CNS
-M-20150828-4, 2BB12 Job Coverage, 8/28/2015
- VSDS Survey #
- CNS-M-20160912*6
, U2 Rx Bldg
\U2 L/C Surge line Pre Shield [TSR16-232], 9/12/2016
- VSDS Survey # CNS
-M-20160912*6, Post Shielding for TSR16-232, 9/13/2016
- VSDS Survey #
- CNS-M-20160911-14, Pre Shielding for TSR 16
-235B, 9/11/2016
- VSDS Survey #
- CNS-M-20160910-5, 2EOC21 Initial Entry [2B Loop], 9/10/2016
- VSDS Survey #
- CNS-M-20160914-3, Post Shielding B Cold Leg for
- TSR 16-291, 9/13/2016
- VSDS Survey #
- CNS-M-20160912-47, Pre and Post Shielding survey of
- 2B Hot Leg, 9/12/2016
- VSDS Survey #
- CNS-M-20160913-13, Pre and Post Shielding survey of 2B Hot Leg, 9/13/2016
- 1EOC22 Crud Burst Cleanup Dose Rate Data, with Graph [including comparison to previous outages], 9/13/16
- 2EOC21 Crud Burst Cleanup Dose Rate Data, with Graph [and comparison to previous outages], 9/13/16
- 2015 DAW Site Composite Smear Sample for 10
- CFR 61, 8/28/2015
- Corrective Action Program (CAP) Documents
- AD-PI-ALL-0100, Corrective Action Program, Rev
. 006 Self-Assessment, Perform Annual Radiation Protection Program review (ALARA program portion) as required by 10
- CFR 20.1101(c), 10/29/2015
- Self-Assessment Report G
-FRPS-SA-15-22, 2015 Catawba Nuclear Station Radiation Protection Source Term Review, 10/20/2015
- Self-Assessment Report
- PIPs C-14-0684 (AR 01534122), C-14-10693 (AR 01897403), and C-14-10854 (AR 01897418
) Action Requests (AR)
- 01519038,
- 01535695,
- 01536851,
- 01538606,
- 01901022,
- 01901145,
- 01929101,
- 01961173,
- 01982820, and 02026974
Section 2RS3:
- In
-Plant Airborne Radioactivity Control and Mitigation Procedures, Guidance Documents, and Manuals
. 001
- AD-RP-ALL-6002, Inspections of Self
-Contained Breathing Apparatus (SCBA) and Associated Equipment, Rev
. 000 HP/0/B/1000/006, Emergency Equipment Functional Check and Inventory, Rev
. 061 PT/0/B/4600/032, Fire Brigade Equipment Inspection/Inventory, Rev
. 012 PT/1/A/4450/001, Containment Purge Periodic Test, Rev
. 029 PT/1/A/4450/001, Fuel Pool Area Filtered Exhaust Filter Train Performance Test, Rev. 026 PT/1/A/4450/009, Spent Fuel Ventilation System Train A Operability Test, Rev
. 028 RA/0/1100/007, Use of Portable Ventilation Systems in Radiologically Controlled Areas, Rev. 000 RA/0/1600/001, Respiratory Protection Equipment Receipt, Cleaning, Storage and Documentation, Re
v. 008 RA/0/1600/004, Recharging Self
-Contained Breathing Apparatus, Rev
. 002
- Records and Data EnRad Laboratories Central Calibration Facility Flow Test Calibration,
- ID 04530, 06/14/2016
- EnRad Laboratories Central Calibration Facility Flow Test Calibration,
- ID 04186, 12/14/2015
- EnRad Laboratories Central Calibration Facility Flow Test Calibration,
- ID 04210, 03/15/2016
- EnRad Laboratories Central Calibration Facility Flow Test Calibration,
- ID 04160, 03/15/2016
- EnRad Laboratories Central Calibration Facility Flow Test Calibration,
- ID 04339, 02/192016
- MSA C.A.R.E Authorized Repair Center & Technician Certification, Exp
. 10/30/2015
- PT/2/A/4450/001, Containment Purge Filter Train Performance Test Rev 035, 02/24/2015
- PT/0/A/4450/001, Control Room Area Outside Air Pressure Filter Trains Performance Test, 04/01/16 RA/0/1400/012, System Inte grity Testing of Portable HEPA Units: Enclosure 5.2, Rev 1, 09/2/2016
- CAP Documents
- AD-PI-ALL-0100, Corrective Action Program, Rev
. 006
- ARs:
- 01534067,
- 01537455,
- 01899485,
- 01900248, and 02018036
Section 2RS4: Occupational Dose
- Assessment Procedures, Guidance Documents, and Manuals
- AD-RP-ALL-2009, Personnel Contamination, Monitoring and Reporting, Rev
. 002
- AD-RP-ALL-2010, Skin Dose from Contamination, Rev
. 000
- AD-RP-ALL-4001, RP Number Issue and Rad Worker Activation, Rev
. 005
- AD-RP-ALL-4005, Dose Management, Rev
. 002
- AD-RP-ALL-4010, Internal Dose Assessment, Rev
. 000
- AD-RP-ALL-4011, In Vitro Bioassay, Rev
. 000
- AD-RP-ALL-4013, Area TLD Monitoring Program, Rev
. 000
- AD-RP-ALL-7008, APEX INVIVO Whole Body Counter Operation, Quality Control Checks and Data Review, Rev
. 000
- ENRAD-PROC-839, Calibration of Canberra GEM
-5 Portal Monitor, Rev
. 002 RD/0/B/7000/13
, Operation and Calibration of the IDCHF
- Electronic Dosimeter Calibrator,
- Rev. 009
- TE-RP-ALL-4001, Declared Pregnant Worker, Rev
. 001
- TE-RP-ALL-4003, Placement of Personnel Dosimetry for Non-Uniform Radiation Fields
,
- Rev. 000
- TE-RP-ALL-4004, Multiple Dosimetry, Rev
. 003
- Records and Data Apex-InVivo Whole Body Count Analysis Nuclide Libraries: Medical, CNS Routine, Fastscan Calibration, Eu
-152, and Qalib.
- 9/15/16
- Apex-InVivo Whole Body Count Analysis Results: Multiple counts for RP Badge # V604976, 4/30/14 Apex-InVivo Whole Body Counter Background and QA Parameter report 4/2/2016 through
- 9/27/2016, 9/7/2016
- Catawba Nuclear Station
-
- TLD-ED Correlations for 1
st Semi-Annual 2016, 8/17/2016
- CNS Alpha Radiation Characterization, 12/18/15
- CNS Radiation Protection Daily Status Reports: 9/14/2016 and 9/27/2016
- List, Positive Whole Body Counts Since June 2014, undated Internal Dose Assessment, RP Badge # V604976, 6/1/14
-5 Passive Whole Body Sensitivity, 1/28/2014
- NVLAP Proficiency Testing Report, Third Quarter 2014, 11/24/2014
- NVLAP Certificate of Accreditation to ISO/IEC 17025:2005: Effective dates 4/1/2014 through 3/31/2015; 4/1/2015 through 3/31/2106; and 4/1/2016 through 3/31/2017
- Personnel Contamination Event (PCE) Logsheet January 2014 through July 2016, 7/12/2016
- Report, CNS ISFSI Neutron to Gamma Ratio Characterization, undated Report, Determination of Quarterly and Annual Baseline and Investigation Level for Catawba Nuclear Station Radiological Environmental Monitoring Program TLD Locations, 4/9/15
- Report, Top 10 Doses [Highest Dose Individuals] Catawba Nuclear Station 1/1/2015 to 12/31/2015
- Report, Top 10 Doses [Highest Dose Individuals] Catawba Nuclear Station 1/1/201
to 9/13/2016 VSDS Survey #
- CNS-M-20160127-7, Annual ISFSI Boundary Survey, 1/27/2016
- VSDS Survey #
- CNS-M-20160517-2, Survey for placement of Cask 79
on ISFSI Pad, 5/17/2016
- VSDS Survey # CNS
-M-20160531-1, Survey for placement of Cask 80
and ISFSI Boundary Survey, 5/31/2016
- TE-RP-ALL-4001, Attachment 1, Pregnancy Exposure Agreement for four workers, various dates
- TE-RP-All-4004, Attachment 2, Multipack Forms: Multipack ID#4135, 4/8/14; Multipack ID#4136, 4/8/14; and Multipack ID#4166, 11/4/14
- Tritium In
-Vitro Analysis Results (Urine), RP ID# 703831: Multiple samples 4/2/14 through 4/11/2014;
- Multiple samples
- 10/30/14 through 11
/7/2014 Tritium In
-Vitro Analysis Results (Urine), RP ID#
- 308115: Multiple samples 10/30/14 through 11/7/2014
- Tritium In
-Vitro Analysis Results (Urine), RP ID#
- 211096: Multiple samples 4/2/14 through 4/11/2014
- CAP Documents
- AD-PI-ALL-0100, Corrective Action Program, Rev.00 6 Self-Assessment G
-DOS-SA-14-03, TLD Lab NVLAP Onsite Assessment, 10/23/20
- Self-Assessment G
-DOS-SA-15-03, 1st and 2nd Quarter 2015 TLD Data Review, 11/15/2015
- Self-Assessment G
-FRPS-SA-15-08, Catawba Internal Dosimetry Program Assessment
, 1/27/2016
- Benchmark Report C
-RPS-B-14-03, Effective Dose Equivalent for External Exposures (EDEX) Improvements
, 12/30/2014 ARs:
- 01538606,
- 01541479,
- 01901277,
- 01901336,
- 01983630,
- 01995469, and 02028825
Section 2RS5: Radiation Monitoring Instrumentation
Procedures
, Guidance Documents, and Manuals
- AD-RP-ALL-705, Radiation Protection Portable Instrument Source Check, Rev
. 000
- ENRAD-PROC-824, Calibration of SAM
-19,
- SAM-11 Small Articles Monitor, Rev
. 001
- ENRAD-PROC-831, Calibration of AMS
-4, Rev. 002
- ENRAD-PROC-841, Calibration of Ludlum Model 3 (MR/HR), Rev
. 001
- ENRAD-PROC-835, Calibration of the MGPI Telepole, Rev
. 007
- ENRAD-PROC-839, Calibration of Canberra GEM
-5 Portal Monitor, Rev
. 002
- ENRAD-PROC-842, Calibration of Ludlum Model 3 (CPM), Rev
. 001
- ENRAD-PROC-857, Calibration and Quality Assurance of Canberra Cronos
-4 Small Article Monitor, Rev
. 001 HP/0/B/1000/010, Determination of Radiation Monitor Setpoints, Rev
. 064 IP/0/A/3314/004, Radiation Monitoring System RP
-2C High Range Process Channel Calibration, Rev. 039 and Rev
. 040 Position Paper
- Source Response Check Frequencies for Instruments Used for Contamination Monitoring at Radiologically Control Area and Restricted Area Exit Points, 06/16/2016
- RA/0/1300/003, Calibration of Apex Gamma Spectroscopy System, Rev
. 000 RA/0/1300/005, Quality Control Check of Count Room Equipment, R
ev. 003 RA/0/1400/006, Radiation Protection Fixed Instruments Response Check, Rev
. 028 RA/0/1400/014, Radiation Protection Portable Instruments Response Check, R
ev. 001 RA/0/1400/013, Operation of Irradiators, Rev
. 000 SRPMP 9-2, Interlaboratory Cross Check Program, Rev
. 000
- Data and Records Calibration of the J.L. Shepherd Model 89 Shielded Calibration Range Irradiator, EnRad No.
- 1999, 8/14/14, 8/13/15, and 8/16/16
- EnRad Certificate of Calibration, AMS
-4, EnRad
- ID 01704, 08/11/2016
- EnRad Certificate of Calibration, AMP
-100, EnRad
- ID 11205, 03/16/2016
- EnRad Certificate of Calibration, Cronos
-4, EnRad
- ID 12245, 02/10/2016
- EnRad Certificate of Calibration, RO
-20, EnRad
- ID 00391, 03/09/2016
- EnRad Certificate of Calibration, Argos
-5AB, EnRad
- ID 12955, 02/22/2016 EnRad Certificate of Calibration, GEM
-5, EnRad
- ID 02800, 01/05/2016
- EnRad Certificate of Calibration, Ludlum Model 19, EnRad
- ID 03613, 06/08/2016
- EnRad Certificate of Calibration, Telepole, EnRad
- ID 02708, 10/22/2015
- Quality Control and Calibration of Apex InVivo Whole Body Counting System, 9/21/15
, 9/16/14, and 8/4/2016 Work Order (
- WO)
- 01987407-01, 2EMF-53B Containment High Range Monitor Calibration, 03/21/12 WO 02034633
-01, 2EMF-13 Area Steamline Monitor Calibration, 09/09/13
-01, 2EMF-2 Reactor Building Refuel Bridge Area Monitor Calibration, 09/12/13
-01, 2EMF-11 Area Steamline Monitor Calibration, 07/16/13
-01, 2EMF-12 Area Steamline Monitor Calibration, 01/17/14
-01, 2EMF-10 Area Steamline Monitor Calibration, 02/17/16
-01, 2EMF-53A Containment High Range Monitor Calibration, 10/08/13
-01, 2EMF-53B Containment High Range Monitor Calibration, 10/08/13
-01, 2EMF-4 Area Fuel Bridge Monitor Calibration, 01/10/14
-01, 2EMF-53A Erratic Readings and Trip 1 Lit, 06/06/14
-01, 2EMF-53A Containment High Range Monitor Calibration, 03/29/15
-01, 2EMF-53A Containment High Range Monitor Calibration, 03/28/15
-01, 2EMF-4 Area Fuel Bridge Monitor Calibration, 08/08/15
-01, 1EMF-12 Control Room Monitor Calibration, 03/17/16
-01, 1EMF-53A Containment High Range Monitor Calibration, 11/29/15
-01, 1EMF-53B Containment High Range Monitor Calibration, 11/29/15
- 1EMF-53A/B Computer Data Point Plots [Background with keep alive source] from 12/1/2015 to 9/23/2016
- Corrective Action Program (CAP) Documents
- AD-PI-ALL-0100, Corrective Action Program, Rev
. 006 G-FRPS-SA-15-22, 2015 Catawba Nuclear Station Radiation Protection Source Term Review
- ARs:
- 01520531,
- 01521846,
- 01522067,
- 01526565,
- 01531121,
- 01537239,
- 01538269,
- 01540316,
- 01897249,
- 01897749,
- 01932781,
- 01945732,
- 01995470,
- 02013189,
- 02041936,
- 02061912, and
- 02062253
- Section 4
- OA1:
- Performance Indicator Verification
Procedures
and Guidance Documents
- AD-PI-ALL-0100, Corrective Action Program, Rev
. 006
- AD-RP-ALL-1101, Performance Indicators for the Occupational and Public Radiation Cornerstones, Rev.
- 000
- Records and Data Reviewed Dose Commitment Data Sheets, Dose Estimates for dates from January 2015 to July 2016
- Monthly PI Reports, January 2015
- July 2016
- Unexpected Dose Rate Alarms, CNS, (January 2015
- July 2016)
- Corrective Action Program (CAP) Documents
- ARs:
- 01945732,
- 01945823,
- 01977533,
- 01977538,
- 01978081,
- 02062132
- 4OA3 - Fire Protection LERs Calc
- CNC-1535.00-00-0170, "PRA Input to CNS LER 413/2014
-002-00, Unanalyzed Condition Due to Deviations From Fire Protection Current Licensing Basis Identified During NFPA 805
- Transition", Rev.
- 001 Calc
- CNC-1435.00-00-0067, "NFPA 805 Transition
- Fire Risk Evaluation (FRE)" Rev.
- 003 Calc
- CNC-1435.00-00-0044, "Fire Protection Nuclear Safety Capability Assessment". Rev.
- 2 Calc
- 2 Calc
- CNC-1205.19-00-0189, "Evaluation of MOV Pressure Boundaries and Operator Manual Actuation Capabilities for IN 92
-18 Hot Short Events", Rev.
- 000