IR 05000461/2017201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:
[[Issue date::October 12, 2017]]
[[Issue date::October 12, 2017]]


Mr. Bryan Hanson, Senior Vice President and Chief Nuclear Officer Exelon Generation Company, LLC (CNO) Exelon Nuclear 4300 Winfield Road Warrenville, Illinios 60555
Mr. Bryan Hanson, Senior Vice President and  
 
Chief Nuclear Officer Exelon Generation Company, LLC (CNO) Exelon Nuclear  
 
4300 Winfield Road Warrenville, Illinios 60555


SUBJECT: CLINTON POWER STATION, UNIT 1- NRC SECURITY INSPECTION REPORT 05000461/2017201
SUBJECT: CLINTON POWER STATION, UNIT 1- NRC SECURITY INSPECTION REPORT 05000461/2017201
Line 32: Line 36:
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Clinton Power Station, Unit 1.
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Clinton Power Station, Unit 1.


If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Clinton Power Station, Unit 1. One cross-cutting aspect was assigned to a finding in the area of Human Performance, within the area of Work Management. Specifically, because the licensee failed to implement a process controlling and executing work activities such that nuclear safety is the overriding priority (H.5).
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Clinton Power Station, Unit 1. One cross-cutting aspect was assigned to a finding in the area of Human Performance, within the area of Work Management. Specifically, because the licensee failed to implement a process controlling and executing work activities such that nuclear safety is the overriding  
 
priority (H.5).


This letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding."
This letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding."
Line 39: Line 45:
"Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
"Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,/RA D. Johnson for/
Sincerely,/RA D. Johnson for/  
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-461 License No. NPF-62  
 
Robert C. Johnson, Chief  
 
Security Performance Evaluation Branch  
 
Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-461 License No. NPF-62  


Nonpublic  
Nonpublic  
Line 53: Line 64:
A. Siegmund, Clinton Power Station  
A. Siegmund, Clinton Power Station  


ML17278A501 17278A501Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/ RIII NSIR/DSO/SPEBNAME C. Roundtree J. Clark E. Byre K. Riemer C. Johnson SIGNATURE Via email DJohnson for DATE 5/10/17 10/10/17 10/9/17 10/12/17 1/12/17
ML17278A501 17278A501Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/
RIII NSIR/DSO/SPEBNAME C. Roundtree J. Clark E. Byre K. Riemer C. Johnson SIGNATURE Via email DJohnson for DATE 5/10/17 10/10/17 10/9/17 10/12/17 1/12/17
}}
}}

Revision as of 11:03, 29 June 2018

Clinton Nuclear Power Station, Unit 1 - NRC Security Inspection Report 05000461/2017201 - Cover Letter
ML17278A501
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/12/2017
From: Johnson R C
NRC/NSIR/DSO/ISB
To: Bryan Hanson
Exelon Generation Co
Roundtree C
References
IR 2017201
Download: ML17278A501 (3)


Text

October 12, 2017

Mr. Bryan Hanson, Senior Vice President and

Chief Nuclear Officer Exelon Generation Company, LLC (CNO) Exelon Nuclear

4300 Winfield Road Warrenville, Illinios 60555

SUBJECT: CLINTON POWER STATION, UNIT 1- NRC SECURITY INSPECTION REPORT 05000461/2017201

Dear Mr. Hanson:

On September 5, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Clinton Power Station, Unit 1. The NRC inspectors discussed results of this inspection with Mr. Ted Stoner, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed inspection report.

The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Clinton Power Station, Unit 1.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Clinton Power Station, Unit 1. One cross-cutting aspect was assigned to a finding in the area of Human Performance, within the area of Work Management. Specifically, because the licensee failed to implement a process controlling and executing work activities such that nuclear safety is the overriding

priority (H.5).

This letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding."

The enclosed report contains Safeguards Information (SGI) as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains SGI, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response

"Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA D. Johnson for/

Robert C. Johnson, Chief

Security Performance Evaluation Branch

Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-461 License No. NPF-62

Nonpublic

Enclosure:

Inspection Report 05000461/2017201

w/Attachments:

Supplemental Information cc w/

Enclosure:

A. Siegmund, Clinton Power Station

ML17278A501 17278A501Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/

RIII NSIR/DSO/SPEBNAME C. Roundtree J. Clark E. Byre K. Riemer C. Johnson SIGNATURE Via email DJohnson for DATE 5/10/17 10/10/17 10/9/17 10/12/17 1/12/17