IR 05000461/2017201: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 21: | Line 21: | ||
[[Issue date::October 12, 2017]] | [[Issue date::October 12, 2017]] | ||
Mr. Bryan Hanson, Senior Vice President and Chief Nuclear Officer Exelon Generation Company, LLC (CNO) Exelon Nuclear 4300 Winfield Road Warrenville, Illinios 60555 | Mr. Bryan Hanson, Senior Vice President and | ||
Chief Nuclear Officer Exelon Generation Company, LLC (CNO) Exelon Nuclear | |||
4300 Winfield Road Warrenville, Illinios 60555 | |||
SUBJECT: CLINTON POWER STATION, UNIT 1- NRC SECURITY INSPECTION REPORT 05000461/2017201 | SUBJECT: CLINTON POWER STATION, UNIT 1- NRC SECURITY INSPECTION REPORT 05000461/2017201 | ||
| Line 32: | Line 36: | ||
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Clinton Power Station, Unit 1. | If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Clinton Power Station, Unit 1. | ||
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Clinton Power Station, Unit 1. One cross-cutting aspect was assigned to a finding in the area of Human Performance, within the area of Work Management. Specifically, because the licensee failed to implement a process controlling and executing work activities such that nuclear safety is the overriding priority (H.5). | If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Clinton Power Station, Unit 1. One cross-cutting aspect was assigned to a finding in the area of Human Performance, within the area of Work Management. Specifically, because the licensee failed to implement a process controlling and executing work activities such that nuclear safety is the overriding | ||
priority (H.5). | |||
This letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding." | This letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding." | ||
| Line 39: | Line 45: | ||
"Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Sincerely,/RA D. Johnson for/ | Sincerely,/RA D. Johnson for/ | ||
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-461 License No. NPF-62 | |||
Robert C. Johnson, Chief | |||
Security Performance Evaluation Branch | |||
Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-461 License No. NPF-62 | |||
Nonpublic | Nonpublic | ||
| Line 53: | Line 64: | ||
A. Siegmund, Clinton Power Station | A. Siegmund, Clinton Power Station | ||
ML17278A501 17278A501Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/ RIII NSIR/DSO/SPEBNAME C. Roundtree J. Clark E. Byre K. Riemer C. Johnson SIGNATURE Via email DJohnson for DATE 5/10/17 10/10/17 10/9/17 10/12/17 1/12/17 | ML17278A501 17278A501Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/ | ||
RIII NSIR/DSO/SPEBNAME C. Roundtree J. Clark E. Byre K. Riemer C. Johnson SIGNATURE Via email DJohnson for DATE 5/10/17 10/10/17 10/9/17 10/12/17 1/12/17 | |||
}} | }} | ||
Revision as of 11:03, 29 June 2018
| ML17278A501 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/12/2017 |
| From: | Johnson R C NRC/NSIR/DSO/ISB |
| To: | Bryan Hanson Exelon Generation Co |
| Roundtree C | |
| References | |
| IR 2017201 | |
| Download: ML17278A501 (3) | |
Text
October 12, 2017
Mr. Bryan Hanson, Senior Vice President and
Chief Nuclear Officer Exelon Generation Company, LLC (CNO) Exelon Nuclear
4300 Winfield Road Warrenville, Illinios 60555
SUBJECT: CLINTON POWER STATION, UNIT 1- NRC SECURITY INSPECTION REPORT 05000461/2017201
Dear Mr. Hanson:
On September 5, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Clinton Power Station, Unit 1. The NRC inspectors discussed results of this inspection with Mr. Ted Stoner, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed inspection report.
The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Clinton Power Station, Unit 1.
If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Clinton Power Station, Unit 1. One cross-cutting aspect was assigned to a finding in the area of Human Performance, within the area of Work Management. Specifically, because the licensee failed to implement a process controlling and executing work activities such that nuclear safety is the overriding
priority (H.5).
This letter will be available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding."
The enclosed report contains Safeguards Information (SGI) as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosed report will not be made publicly available. If you choose to provide a response that contains SGI, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response
"Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,/RA D. Johnson for/
Robert C. Johnson, Chief
Security Performance Evaluation Branch
Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-461 License No. NPF-62
Nonpublic
Enclosure:
Inspection Report 05000461/2017201
w/Attachments:
Supplemental Information cc w/
Enclosure:
A. Siegmund, Clinton Power Station
ML17278A501 17278A501Entire Report: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only: SUNSI Review Complete By: Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE NSIR/DSO NSIR/DSO NSIR/DSO/