| finding integer = 01
| finding integer = 01
| quarter = 2018Q1
| quarter = 2018Q1
| IR section = NO CC AREA
| IR section = 4OA3
| finding type = NCV
| finding type = NCV
| significance =  
| significance = Severity level IV
| cornerstone = No Cornerstone
| cornerstone = No Cornerstone
| violation of = 10 CFR 50.73, 10 CFR 50.73(a)(1), Technical Specification
| violation of = 10 CFR 50.73, 10 CFR 50.73(a)(1), Technical Specification
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 4OA3
| Inspection procedure = IP 71153
| Inspector = 7115
| Inspector = A Patel, E Andrews, F Arner, J Furia, J Kulp, J Schoppy, D Pelton
| CCA = N/A for ROP
| CCA =  
| INPO aspect = IV
| INPO aspect =  
| description = The inspectors identified a non-cited, Severity IV violation of 10 CFR 50.73(a)(1) for a failure to submit a licensee event report (LER) within 60 days after the discovery of an event requiring a report.  Specifically, on October 9, 2017, Exelon determined that the No. 2 emergency diesel generator was inoperable for longer than the allowed outage time, which is reportable as a condition prohibited by technical specifications.  Exelon did not submit an LER for this event until January 3, 2018
| description = The inspectors identified a non-cited, Severity IV violation of 10 CFR 50.73(a)(1) for a failure to submit a licensee event report (LER) within 60 days after the discovery of an event requiring a report.  Specifically, on October 9, 2017, Exelon determined that the No. 2 emergency diesel generator was inoperable for longer than the allowed outage time, which is reportable as a condition prohibited by technical specifications.  Exelon did not submit an LER for this event until January 3, 2018
}}
}}

Latest revision as of 07:59, 30 May 2018

01
Site: Oyster Creek
Report IR 05000219/2018001 Section 4OA3
Date counted Mar 31, 2018 (2018Q1)
Type: TEV: Severity level IV
cornerstone No Cornerstone
Identified by: NRC identified
Inspection Procedure: IP 71153
Inspectors (proximate) A Patel
E Andrews
F Arner
J Furia
J Kulp
J Schoppy
D Pelton
Violation of: 10 CFR 50.73

10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation

Technical Specification
INPO aspect
'