ML16207A574: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:STPEGS UFSAR 17.1-1 Revision 13 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN BASIS AND CONSTRUCTION This section is not used. | {{#Wiki_filter:STPEGS UFSAR 17.1-1 Revision 13 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN BASIS AND CONSTRUCTION This section is not used. | ||
STPEGS UFSAR 17.2-1 Revision 13 17.2 QUALITY ASSURANCE DURING THE OPERATION PHASE This section is not used. | STPEGS UFSAR 17.2-1 Revision 13 17.2 QUALITY ASSURANCE DURING THE OPERATION PHASE This section is not used.}} | ||
}} | |||
Revision as of 06:19, 19 May 2018
| ML16207A574 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/28/2016 |
| From: | South Texas |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16207A547 | List:
|
| References | |
| NOC-AE-16003371 | |
| Download: ML16207A574 (2) | |
Text
STPEGS UFSAR 17.1-1 Revision 13 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN BASIS AND CONSTRUCTION This section is not used.
STPEGS UFSAR 17.2-1 Revision 13 17.2 QUALITY ASSURANCE DURING THE OPERATION PHASE This section is not used.