ML20128K964: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20128K964 | |||
| issue date = 07/17/1985 | |||
| title = Summarizes Enforcement Conference Detailed in Insp Rept 50-278/85-22 on 850621.Major Areas Inspected:Possibility of Licensed Operator Asleep on 850610.No Enforcement Action Planned.Actions Required within 30 Days | |||
| author name = Murley T | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
| addressee name = Daltroff S | |||
| addressee affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC | |||
| docket = 05000278 | |||
| license number = | |||
| contact person = | |||
| document report number = EA-85-075, EA-85-75, NUDOCS 8507240253 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | |||
| page count = 2 | |||
}} | |||
See also: [[see also::IR 05000278/1985022]] | |||
=Text= | |||
{{#Wiki_filter:_ _. | |||
N | |||
* | |||
- | |||
- | |||
.. | |||
. | |||
,- | |||
d | |||
JUL 171985 | |||
- | |||
' | |||
e | |||
Docket No. 50-278 | |||
Licen'se No. DPR-56 | |||
EA 85-75 | |||
' Philadelphia Electric Company | |||
ATTN: | |||
Mr.-S. L.-Daltroff | |||
Vice President | |||
Electric Production | |||
2301 Market Street | |||
' Philadelphia, Pennsylvania <19101 | |||
Gentlemen: | |||
Subject: | |||
Enforcement Conference | |||
(Inspection 50-278/85-22) | |||
On June 21, 1985, an enforcement conference was conducted with you, members of | |||
your staff, one of your-licensed operators at Peach Bottom, and members of the | |||
NRC Regional and Headquarters staff to discuss events which occurred on June | |||
10, 1985 at Peach Bottom, Unit 3. | |||
On that day, an NRC inspector observed the | |||
licensed' reactor operator at the controls of Unit 3 with his eyes apparently | |||
- closed, thereby giving the appearance of being inattentive to his duties as a | |||
licensed reactor operator. These events are documented in NRC Inspection | |||
Report No. 50-278/85-22 dated June 18, 1985. | |||
At the enforcement conference, the operator maintained that he was not asleep | |||
and not inattentive to his duties, but only relaxing his eyes. However, he | |||
acknowledged that he exercised poor judgment in maintaining his appearance once | |||
he-was aware of the NRC inspector in the control room. During the enforcement | |||
conference, you described your investigation of these events, and your actions | |||
taken to prevent recurrence. We were impressed by the candor of the operator | |||
and your thorough investigation and initiation of corrective actions. Accordingly, | |||
;no enforcement action is planned against you or the licensed operator regarding | |||
these events. | |||
However, based upon conversations with my staff, I concur with your finding | |||
that a negative attitude toward the NRC by some of the licensed operators at | |||
Peach Bottom may have contributed to these events. Although you acknowledged | |||
the importance of your personnel maintaining a positive attitude in dealings | |||
__ ' - | |||
with the NRC, PEco apparently has not been totally successful in fostering such | |||
can attitude. We expect the actions that you described at the enforcement | |||
conference should improve this attitude. | |||
Please document these actions in a | |||
written response to Region I within 30 days of the date of this letter. | |||
8507240253 850717 | |||
PDR | |||
ADOCK 05000278. | |||
s | |||
PDR | |||
OFFICIAL RECORD COPY | |||
CP PKG PB 85/75 2 - 0005.1.0 | |||
07/15/85 | |||
' | |||
,s | |||
. | |||
- , _ - - | |||
. _ _ | |||
_ | |||
-- | |||
. | |||
* | |||
, | |||
-o | |||
Philadelphia Electric Company | |||
2 | |||
The response requested by this office is not subject to the clearance | |||
procedures of the Office of Management and Budget, as required by the Paperwork | |||
Reduction Act of 1980, PL 96-511. | |||
Sincerely, | |||
* | |||
Thomas E. Murley | |||
Regional Administrator | |||
cc: | |||
R. S. Fleischmann, Station Superintendent | |||
John S. Kemper, Vice President, Engineering and Research | |||
Troy B. Conner, Jr., Esquire | |||
A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic | |||
, | |||
Electric | |||
Eugene J. Bradley, Esquire, Assistant General Counsel-(Without Report) | |||
Raymond L. Hovis, Esquire | |||
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report) | |||
, | |||
Public Document Room (PDR) | |||
Local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
Commonwealth of Pennsylvania | |||
Distribution | |||
Docket 55-8685 (with concurrences) | |||
{ | |||
Section Chief, DRP | |||
JMTaylor, IE | |||
RVo11mer, IE | |||
JAAxelrad, IE | |||
TPoindexter, IE | |||
JLieberman, ELD | |||
- | |||
TMurley, RI | |||
Enforcement Coordinators | |||
RI RII, RIII, RIV, RV | |||
-> | |||
IE:ES File | |||
IE:EA File | |||
' | |||
hC- | |||
. | |||
% | |||
ES:Ri $ DRSS:RI | |||
:RI | |||
RI | |||
D:DRP:RI | |||
RC(k | |||
i | |||
DHolody | |||
DFlorek | |||
Collins | |||
o | |||
RStarostecki JGul 'i Mrez | |||
J | |||
1,pn | |||
6/g3/85 | |||
6/7.d85 | |||
6/ d'85 | |||
6/ | |||
85 | |||
6/1E/85 | |||
6s?,h/85 | |||
6/@/85 | |||
IE:ES | |||
SGI | |||
ELD | |||
ES:D | |||
IE:DD | |||
IE:D | |||
/lWurley | |||
JLieberman | |||
JAAxelrad | |||
RVo11mer | |||
JMTaylor | |||
j | |||
TPoindexter | |||
7/ /85 | |||
/85 | |||
7/ /5 | |||
7/ | |||
7/ /85 | |||
7/ | |||
8f; | |||
' | |||
0FFICIAL REC | |||
OPY | |||
CP P,G PB 85/75 2 - 0006.0.0 | |||
07j15/85 | |||
. | |||
da 's 9 p4~ f | |||
" | |||
7/7 | |||
sjy | |||
._ | |||
}} | |||
Latest revision as of 12:43, 25 May 2025
| ML20128K964 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/17/1985 |
| From: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| EA-85-075, EA-85-75, NUDOCS 8507240253 | |
| Download: ML20128K964 (2) | |
See also: IR 05000278/1985022
Text
_ _.
N
-
-
..
.
,-
d
JUL 171985
-
'
e
Docket No. 50-278
Licen'se No. DPR-56
EA 85-75
' Philadelphia Electric Company
ATTN:
Mr.-S. L.-Daltroff
Vice President
Electric Production
2301 Market Street
' Philadelphia, Pennsylvania <19101
Gentlemen:
Subject:
Enforcement Conference
(Inspection 50-278/85-22)
On June 21, 1985, an enforcement conference was conducted with you, members of
your staff, one of your-licensed operators at Peach Bottom, and members of the
NRC Regional and Headquarters staff to discuss events which occurred on June
10, 1985 at Peach Bottom, Unit 3.
On that day, an NRC inspector observed the
licensed' reactor operator at the controls of Unit 3 with his eyes apparently
- closed, thereby giving the appearance of being inattentive to his duties as a
licensed reactor operator. These events are documented in NRC Inspection
Report No. 50-278/85-22 dated June 18, 1985.
At the enforcement conference, the operator maintained that he was not asleep
and not inattentive to his duties, but only relaxing his eyes. However, he
acknowledged that he exercised poor judgment in maintaining his appearance once
he-was aware of the NRC inspector in the control room. During the enforcement
conference, you described your investigation of these events, and your actions
taken to prevent recurrence. We were impressed by the candor of the operator
and your thorough investigation and initiation of corrective actions. Accordingly,
- no enforcement action is planned against you or the licensed operator regarding
these events.
However, based upon conversations with my staff, I concur with your finding
that a negative attitude toward the NRC by some of the licensed operators at
Peach Bottom may have contributed to these events. Although you acknowledged
the importance of your personnel maintaining a positive attitude in dealings
__ ' -
with the NRC, PEco apparently has not been totally successful in fostering such
can attitude. We expect the actions that you described at the enforcement
conference should improve this attitude.
Please document these actions in a
written response to Region I within 30 days of the date of this letter.
8507240253 850717
ADOCK 05000278.
s
OFFICIAL RECORD COPY
CP PKG PB 85/75 2 - 0005.1.0
07/15/85
'
,s
.
- , _ - -
. _ _
_
--
.
,
-o
Philadelphia Electric Company
2
The response requested by this office is not subject to the clearance
procedures of the Office of Management and Budget, as required by the Paperwork
Reduction Act of 1980, PL 96-511.
Sincerely,
Thomas E. Murley
Regional Administrator
cc:
R. S. Fleischmann, Station Superintendent
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr., Esquire
A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic
,
Electric
Eugene J. Bradley, Esquire, Assistant General Counsel-(Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
,
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
Distribution
Docket 55-8685 (with concurrences)
{
Section Chief, DRP
JMTaylor, IE
RVo11mer, IE
JAAxelrad, IE
TPoindexter, IE
JLieberman, ELD
-
TMurley, RI
Enforcement Coordinators
RI RII, RIII, RIV, RV
->
IE:ES File
IE:EA File
'
hC-
.
%
ES:Ri $ DRSS:RI
- RI
RI
D:DRP:RI
RC(k
i
DHolody
DFlorek
Collins
o
RStarostecki JGul 'i Mrez
J
1,pn
6/g3/85
6/7.d85
6/ d'85
6/
85
6/1E/85
6s?,h/85
6/@/85
IE:ES
ELD
ES:D
IE:DD
IE:D
/lWurley
JLieberman
JAAxelrad
RVo11mer
JMTaylor
j
TPoindexter
7/ /85
/85
7/ /5
7/
7/ /85
7/
8f;
'
0FFICIAL REC
OPY
CP P,G PB 85/75 2 - 0006.0.0
07j15/85
.
da 's 9 p4~ f
"
7/7
sjy
._