{{#Wiki_filter:Revision 1 U.S. NUCLEAR REGULATORY COMMISSION                                                                                                                     Au"ust 1975 REGULATORY GUIDE
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION  
OFFICE OF STANDARDS DEVELOPMENT
REGULATORY GUIDE  
                                                              REGULATORY GUIDE 1.14 REACTOR COOLANT PUMP FLYWHEEL INTEGRITY
OFFICE OF STANDARDS DEVELOPMENT  
REGULATORY GUIDE 1.14 REACTOR COOLANT PUMP FLYWHEEL INTEGRITY


==A. INTRODUCTION==
==A. INTRODUCTION==
conditions that would cause such overspeed. Methods of limiting potential pump overspeed are also under investi General Design Criterion 4, "Environmental and                             gation.
General Design Criterion 4, "Environmental and Missile Design Bases," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50,
"Licensing of Production and Utilization Facilities,"
requires that nuclear power plant structures, systems, and components important to safety be protected against the effects of missiles that might result from equipment failures. This guide describes a method acceptable to the NRC staff of implementing this requirement with regard to minimizing the potential for failures of the flywheels of reactor coolant pump motors in light-water-cooled power reactors.


Missile Design Bases," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50,                                      If the flywheel of the reactor coolant pump is
==B. DISCUSSION==
"Licensing of Production and Utilization Facilities,"                              conservatively designed and made from suitable mate requires that nuclear power plant structures, systems,                              rials with closely controlled quality, if adequate design and components important to safety be protected                                    review of new configurations is provided, and if ade against the effects of missiles that might result from                              quate inservice inspection is provided, the probability of equipment failures. This guide describes a method                                  a flywheel failure is sufficiently small that the conse acceptable to the NRC staff of implementing this                                    quences of failure need not be protected against.
The flywheels on reactor coolant pump motors provide inertia to ensure a slow decrease in coolant flow in order to prevent fuel damage as a result of a loss of power to the pump motors. During operation at normal speed, a flywheel has sufficient kinetic energy to produce high-energy missiles and excessive vibration of the reactor coolant pump assembly if the flywheel should fail. Overspeed of the pump rotor assembly during a transient increases both the potential for failure and the kinetic energ3T of the flywheel. The safety consequences could be significant because of possible damage to the reactor coolant system, the containment, or other equipment or systems important to safety.
 
Methods of predicting the loss-of-coolant accident (LOCA) overspeed conditions are under continuing investigation. The limit on predicted pump overspeed in the event of a LOCA should be less than the calculated critical speed for failure of the flywheel. The conserva tism inherent in the latter calculation, coupled with a realistic prediction of maximum rotational speed, is considered to provide adequate margin because of the low probability of occurrence of the specific LOCA
conditions that would cause such overspeed. Methods of limiting potential pump overspeed are also under investi gation.
 
If the flywheel of the reactor coolant pump is conservatively designed and made from suitable mate rials with closely controlled quality, if adequate design review of new configurations is provided, and if ade quate inservice inspection is provided, the probability of a flywheel failure is sufficiently small that the conse quences of failure need not be protected against.
 
Materials for pump flywheels should be manufac tured by processes that minimize flaws and result in adequate fracture toughness in both the transverse and longitudinal rolling directions. Materials produced by vacuum melting and degassing or the electroslag remelt ing process are known to have improved cleanliness and toughness. Plate material should be cross rolled to a ratio of at least I to 3, sufficient to achieve acceptable isotropy. Fracture toughness is achieved more readily in thinner plates, and fabrication of laminated flywheels by assembling them from several plates is acceptable.
 
As an example, past evaluations have shown that ASME SA-533-B Class 1 and SA-508 Classes 2 and 3 materials generally have suitable toughness for typical flywheel applications provided stress concentrations are kept within reasonable limits and the reference tempera ture RTNDT, determined in accordance with Article NB-2331(a) of Section HI of the ASME Code,' is at least 500C (900F) below the lowest temperature at which operating speed is achieved. For other materials that may be considered for flywheels, the strength and toughness properties should be evaluated and justified for this application.
 
'Copies may be obbtined from the American Society of Mechanical Engineers, United Engineering Center, 345 East
47th Street, New York, New York 10017.
 
USNRC REGULATORY GUIDES
Comments should be sent to the Secretary of the Commission, U.S. Nciler Regulatory Guides are issued to describe and make available to the public Regulatory Commission. Washongton. D.C. 2
, Attention: Dockeling end methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff In evalu- The guides are issued in the following ten broad divisions:
sting specific problems or postulated accidents. or to provide guidance to appli cents. Regulatory Guides are not substitutes for regulations, end compliance
1: Power Reactors S. Products with them is not required. Methods and solutions different from those set out in
2. Research end Test Reactors
7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to
3' Fuels and Materiasi Facilities
"8. Occupational Health the issuance or continuance of a permit or license by the Commission.
 
4. Environmental end Siting
9. Antitrust Review Comments and suggestions for improvements in these guides are encouraged
5. Materials and Plant Protection
10. General at all times, and guides will be revised. as appropriate, to accommodate com ments and to reflect new information or experience. However. comments on Copies of published guides may be obtained by written requeat indicating the this guide, if received within about two months after its issuance, will be par.
 
divisions desired to the U.S. Nuclear Regulatory Commission. Washington. D.C.
 
ticularly useful in evaluating the need for an early revision.


requirement with regard to minimizing the potential for failures of the flywheels of reactor coolant pump motors                                    Materials for pump flywheels should be manufac in light-water-cooled power reactors.                                               tured by processes that minimize flaws and result in adequate fracture toughness in both the transverse and
21, Attention: Director, Office of Standards Development.


==B. DISCUSSION==
Revision 1 Au"ust 1975
longitudinal rolling directions. Materials produced by vacuum melting and degassing or the electroslag remelt The flywheels on reactor coolant pump motors                                ing process are known to have improved cleanliness and provide inertia to ensure a slow decrease in coolant flow                          toughness. Plate material should be cross rolled to a ratio in order to prevent fuel damage as a result of a loss of                            of at least I to 3, sufficient to achieve acceptable power to the pump motors. During operation at normal                                isotropy. Fracture toughness is achieved more readily in speed, a flywheel has sufficient kinetic energy to                                  thinner plates, and fabrication of laminated flywheels by produce high-energy missiles and excessive vibration of                            assembling them from several plates is acceptable.


the reactor coolant pump assembly if the flywheel should fail. Overspeed of the pump rotor assembly                                          As an example, past evaluations have shown that during a transient increases both the potential for failure                        ASME SA-533-B Class 1 and SA-508 Classes 2 and 3 and the kinetic energ3T of the flywheel. The safety                                materials generally have suitable toughness for typical consequences could be significant because of possible                              flywheel applications provided stress concentrations are damage to the reactor coolant system, the containment,                             kept within reasonable limits and the reference tempera or other equipment or systems important to safety.                                  ture RTNDT, determined in accordance with Article NB-2331(a) of Section HI of the ASME Code,' is at Methods of predicting the loss-of-coolant accident                          least 50 0 C (900F) below the lowest temperature at (LOCA) overspeed conditions are under continuing                                    which operating speed is achieved. For other materials investigation. The limit on predicted pump overspeed in                            that may be considered for flywheels, the strength and the event of a LOCA should be less than the calculated                              toughness properties should be evaluated and justified critical speed for failure of the flywheel. The conserva                            for this application.
The non-ductile fracture analysis called for in regulatory position C.2.d should be based on appropriate conservative assumptions for stress level, flaw size, temperature, and fracture toughness at the location of interest. The non-ductile fracture criterion used to predict the critical fracture speed should be based on initial instability of the flaw as defined in ASTM E-399.


tism inherent in the latter calculation, coupled with a realistic prediction of maximum rotational speed, is                                 'Copies may be obbtined from the American Society of considered to provide adequate margin because of the                                  Mechanical Engineers, United Engineering Center, 345 East low probability of occurrence of the specific LOCA                                    47th Street, New York, New York 10017.
The justification for the stress analysis method used in the fracture analysis should describe the treatment of stresses arising from interference fits and thermal stresses when they are superimposed on the stresses caused by rotational forces. Justification for the flaw size estimate should consider it to be the maximum expected size of flaw that could conceivably escape detection, and should consider material thickness, method and frequency of nondestructive inspection, and analysis of flaw growth in fatigue if that is significant. The effect of cracks emanating from such structural discontinuities as key ways and bolt holes should be evaluated. Justification for the fracture toughness assumed for the material should describe the properties to be measured transverse to the rolling direction in the tests of each plate of material. The range of fracture toughness test tempera tures should include the lowest service temperature at which overspeed could occur. If not, the basis used for any extrapolation should be justified.


USNRC REGULATORY GUIDES                                        Comments should be sent to the Secretary of the Commission, U.S. Nciler Regulatory Guides are issued to describe and make available to the public            Regulatory Commission. Washongton.          D.C. 2   , Attention: Dockeling end methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff In evalu-        The guides  are issued in the following ten broad divisions:
In doing the fracture analysis described in regulatory position C.2.d, engineering judgment should be used to select for analysis only those locations that appear to have the most severe sets of conditions. Severity is a function of stress level, flaw size, and fracture toughness at the location of interest. Comparison of perhaps three or four cases in terms of KI/KIC, the ratio of the imposed stress intensity factor at some nominal speed to the material toughness, should locate to most severe sets of conditions. Evaluation of the critical speed for fracture, which may require techniques that go beyond linear elastic fracture mechanics, may then focus on one critical location.
sting specific problems or postulated accidents. or to provide guidance to appli cents. Regulatory Guides are not substitutes for regulations, end compliance          1:  Power Reactors                      S. Products with them is not required. Methods and solutions different from those set out in      2.  Research end Test Reactors          7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to   3'  Fuels and Materiasi Facilities      "8. Occupational Health the issuance or continuance of a permit or license by the Commission.                4.  Environmental end Siting            9. Antitrust Review Comments and suggestions for improvements in these guides are encouraged              5. Materials and Plant Protection      10. General at all times, and guides will be revised. as appropriate, to accommodate com ments and to reflect new information or experience. However. comments on              Copies of published guides may be obtained by written requeat indicating the this guide, if received within about two months after its issuance, will be par.      divisions desired to the U.S. Nuclear Regulatory Commission. Washington. D.C.


ticularly useful in evaluating the need for an early revision.                       21,    Attention: Director, Office of Standards Development.
Excessive deformation during overspeed of the flywheel is of concern because damage could be caused by separation of the flywheel from the shaft. For the purpose of this guide, excessive deformation means any deformation such as an enlargement of the bore that could cause such separation directly or could cause an unbalance of the flywheel leading to structural failure or separation of the flywheel from the shaft. The calcula tion of deformation should employ elastic-plastic meth ods unless it can be shown that stresses remain within the elastic range.


The non-ductile fracture analysis called for in                  The desired results of the analyses described in regulatory position C.2.d should be based on appropriate        regulatory positions C.2.c, d, and e are quantitative conservative assumptions for stress level, flaw size,            estimates of the margins against fracture or excessive temperature, and fracture toughness at the location of          deformation during overspeed because such estimates, interest. The non-ductile fracture criterion used to            coupled with adequate provisions against overspeed, predict the critical fracture speed should be based on          provide the best basis for assurance that the probability initial instability of the flaw as defined in ASTM E-399.        of failure under normal and transient conditions is The justification for the stress analysis method used in        sufficiently small that the consequences of failure need the fracture analysis should describe the treatment of          not be protected against.
The geometry of the flywheel and pump motor design should facilitate preservice and inservice inspec tion of all high-stress regions (bore, keyway, and bolt hole regions) without the need for removal of the flywheel from its shaft and preferably without the need for removing the rotor from the motor assembly.


stresses arising from interference fits and thermal stresses when they are superimposed on the stresses caused by                           
The desired results of the analyses described in regulatory positions C.2.c, d, and e are quantitative estimates of the margins against fracture or excessive deformation during overspeed because such estimates, coupled with adequate provisions against overspeed, provide the best basis for assurance that the probability of failure under normal and transient conditions is sufficiently small that the consequences of failure need not be protected against.


==C. REGULATORY POSITION==
==C. REGULATORY POSITION==
rotational forces. Justification for the flaw size estimate should consider it to be the maximum expected size of            1. Material and Fabrication flaw that could conceivably escape detection, and should consider material thickness, method and frequency of                  a. The flywheel material should be of closely nondestructive inspection, and analysis of flaw growth in      controlled quality. Plates' should conform to ASTM A20
1. Material and Fabrication a.
fatigue if that is significant. The effect of cracks            and should be produced by the vacuum-melting and emanating from such structural discontinuities as key            degassing process or the electroslag remelting process.
 
The flywheel material should be of closely controlled quality. Plates' should conform to ASTM A20  
and should be produced by the vacuum-melting and degassing process or the electroslag remelting process.
 
Plate material should be cross-rolled to a ratio of at least
1 to 3.
 
b.
 
Fracture toughness and tensile properties of each plate of flywheel material should be checked by tests that yield results2 suitable to confirm the applica bility to that flywheel of the properties used in the fracture analyses called for in regulatory positions C.2.c, d, and e.
 
c.
 
All flame-cut surfaces should be removed by machining to a depth at least 12 mm (1/2 inch) below the flame-cut surface.
 
d.
 
Welding, including tack welding and repair welding, should not be permitted in the finished flywheel unless the welds are inspectable and considered as potential sources of flaws in the fracture analysis.


ways and bolt holes should be evaluated. Justification          Plate material should be cross-rolled to a ratio of at least for the fracture toughness assumed for the material              1 to 3.
2.


should describe the properties to be measured transverse to the rolling direction in the tests of each plate of                b. Fracture toughness and tensile properties of material. The range of fracture toughness test tempera          each plate of flywheel material should be checked by tures should include the lowest service temperature at          tests that yield results2 suitable to confirm the applica which overspeed could occur. If not, the basis used for          bility to that flywheel of the properties used in the any extrapolation should be justified.                          fracture analyses called for in regulatory positions C.2.c, d, and e.
Design a.


In doing the fracture analysis described in regulatory position C.2.d, engineering judgment should be used to                 c. All flame-cut surfaces should be removed by select for analysis only those locations that appear to          machining to a depth at least 12 mm (1/2 inch) below have the most severe sets of conditions. Severity is a          the flame-cut surface.
The flywheel assembly, including any speed limiting and antirotation devices, the shaft, and the bearings, should be designed to withstand normal condi tions, anticipated transients, the design basis loss-of coolant accident, and the Safe Shutdown Earthquake loads without loss of structural integrity.


function of stress level, flaw size, and fracture toughness at the location of interest. Comparison of perhaps three              d. Welding, including tack welding and repair or four cases in terms of KI/KIC, the ratio of the              welding, should not be permitted in the finished flywheel imposed stress intensity factor at some nominal speed to        unless the welds are inspectable and considered as the material toughness, should locate to most severe sets        potential sources of flaws in the fracture analysis.
b.


of conditions. Evaluation of the critical speed for fracture, which may require techniques that go beyond            2.    Design linear elastic fracture mechanics, may then focus on one critical location.                                                    a. The flywheel assembly, including any speed limiting and antirotation devices, the shaft, and the Excessive deformation during overspeed of the              bearings, should be designed to withstand normal condi flywheel is of concern because damage could be caused            tions, anticipated transients, the design basis loss-of by separation of the flywheel from the shaft. For the            coolant accident, and the Safe Shutdown Earthquake purpose of this guide, excessive deformation means any          loads without loss of structural integrity.
Design speed should be at least 125% of normal speed but not less than the speed that could be attained during a turbine overspeed transient. Normal speed is defined as the synchronous speed of the a.c. drive motor at 60 hertz.


deformation such as an enlargement of the bore that could cause such separation directly or could cause an                b. Design speed should be at least 125% of normal unbalance of the flywheel leading to structural failure or      speed but not less than the speed that could be attained separation of the flywheel from the shaft. The calcula          during a turbine overspeed transient. Normal speed is tion of deformation should employ elastic-plastic meth          defined as the synchronous speed of the a.c. drive motor ods unless it can be shown that stresses remain within          at 60 hertz.
c.


the elastic range.
An analysis should be conducted to predict the critical speed for ductile fracture of the flywheel. The methods and limits of paragraph F-1323.1(b) in Section III of the ASME Code are acceptabl


c. An analysis should be conducted to predict the The geometry of the flywheel and pump motor                critical speed for ductile fracture of the flywheel. The design should facilitate preservice and inservice inspec        methods and limits of paragraph F-1323.1(b) in Section tion of all high-stress regions (bore, keyway, and bolt          III of the ASME Code are acceptable. If another method hole regions) without the need for removal of the flywheel from its shaft and preferably without the need
====e. If another method ====
                                                                  2 for removing the rotor from the motor assembly.                    These results should be included as part of the'FSAR.
2These results should be included as part of the'FSAR.


1.14-2
1.14-2


is used, justification should be provided. The anal ,sis                     b. Inservice inspection should be performed for should be submitted to the NRC staff for evaluation.7                   each flywheel as follows:
is used, justification should be provided. The anal ,sis should be submitted to the NRC staff for evaluation.7 d.
      d. An analysis should be conducted to predict the
                                                                                    (1) An in-place ultrasonic volumetric examina critical speed for nonductile fracture of the flywheel.


tion of the areas of higher stress concentration at the Justification should be given for the stress analysis bore and: keyway at approximately 3-year intervals, method, the estimate of flaw size and location, which during the refueling or maintenance shutdown coin should take into account initial size and flaw growth in service, and the values of fracture toughness assumed for                ciding with the inservice inspection schedule as required the material. The analysis should be submitted to the                   by Section XI of the ASME Code.
An analysis should be conducted to predict the critical speed for nonductile fracture of the flywheel.


NRC staff for evaluation.3
Justification should be given for the stress analysis method, the estimate of flaw size and location, which should take into account initial size and flaw growth in service, and the values of fracture toughness assumed for the material. The analysis should be submitted to the NRC staff for evaluation.3 e.
                                                                                    (2) A surface examination of all exposed sur e. An analysis should be conducted to predict the faces and complete ultrasonic volumetric examination at critical speed for excessive 4 deformation of the fly wheel. The analysis should be submitted to the NRC                       approximately 10-year intervals, during the plant shut staff for evaluation.3                                                   down coinciding with the inservice inspection schedule as required by Section XI of the ASME Code.


f. The normal speed should be less than one-half of the lowest of the critical speeds calculated in
An analysis should be conducted to predict the critical speed for excessive4 deformation of the fly wheel. The analysis should be submitted to the NRC
                                                                                    (3) Examination procedures should be in regulatory positions C.2.c, d, and e above.
staff for evaluation.3 f.


accordance with the requirements of Subarticle IWA-2200 of Section XI of the ASME Code.
The normal speed should be less than one-half of the lowest of the critical speeds calculated in regulatory positions C.2.c, d, and e above.


g. The predicted LOCA overspeed should be less than the lowest of the critical speeds calculated in
g.
                                                                                    (4) Acceptance criteria should conform to the regulatory positions C.2.c., d, and e.


recommendations of regulatory position C.2.f.
The predicted LOCA overspeed should be less than the lowest of the critical speeds calculated in regulatory positions C.2.c., d, and e.


===3. Testing===
3.
                                                                                    (5) If the examination and evaluation indicate Each flywheel assembly should be spin tested at the                an increase in flaw size or growth rate greater than predicted for the service life of the flywheel, the results design speed of the flywheel.


of the examination and evaluation should be submitted,
Testing Each flywheel assembly should be spin tested at the design speed of the flywheel.
4. Inspection                                                            to the staff for evaluation.


==D. IMPLEMENTATION==
4. Inspection a.
a. Following the spin test described in regulatory position C.3, each finished flywheel should receive a The purpose of this section is to provide informa check of critical dimensions and a nondestructive exam ination as follows:                                                      tion to applicants and licensees regarding the staff's plans for utilizing this regulatory guide.


Following the spin test described in regulatory position C.3, each finished flywheel should receive a check of critical dimensions and a nondestructive exam ination as follows:
(1) Areas of higher stress concentrations, e.g.
(1) Areas of higher stress concentrations, e.g.


Except in those cases in which the applicant bores, keyways, splines, and drilled holes, and surfaces adjacent to these areas on the finished flywheel should                   proposes an acceptable alternative method for com be examined for surface defects in accordance with                       plying with specified portions' of the Commission's paragraph NB-2545 or NB-2546 of Section III of the                       regulations, the positions of this guide will be used by ASME Code using the procedures of paragraph NB-2540.                     the NRC staff as follows.
bores, keyways, splines, and drilled holes, and surfaces adjacent to these areas on the finished flywheel should be examined for surface defects in accordance with paragraph NB-2545 or NB-2546 of Section III of the ASME Code using the procedures of paragraph NB-2540.
 
No linear indications more than 1.6 mm (1/16 inch)
long, other than laminations, should be permitted.
 
(2) Each finished flywheel should be subjected to a 100% volumetric examination by ultrasonic meth ods using procedures and acceptance criteria specified in paragraph NB-2530 (for plates) or paragraph NB-2540
(for forgings) of Section III of the ASME Code.
 
'The analyses outlined in regulatory positions C.2.c, d, and e should preferably be submitted in topical reports rather than on a case-by-case basis for those flywheel designs that will have multiple applications.
 
4 As defined in the Discussion.
 
b.
 
Inservice inspection should be performed for each flywheel as follows:
(1) An in-place ultrasonic volumetric examina tion of the areas of higher stress concentration at the bore and: keyway at approximately 3-year intervals, during the refueling or maintenance shutdown coin ciding with the inservice inspection schedule as required by Section XI of the ASME Code.
 
(2) A surface examination of all exposed sur faces and complete ultrasonic volumetric examination at approximately 10-year intervals, during the plant shut down coinciding with the inservice inspection schedule as required by Section XI of the ASME Code.
 
(3) Examination procedures should be in accordance with the requirements of Subarticle IWA-2200 of Section XI of the ASME Code.


No linear indications more than 1.6 mm (1/16 inch)
(4) Acceptance criteria should conform to the recommendations of regulatory position C.2.f.
long, other than laminations, should be permitted.                            1. The recommendations of regulatory positions C.A, C.2, C.3, and C.4.a will be used in evaluating submittals for construction permit applications docketed
            (2) Each finished flywheel should be subjected on or after January 1, 1976. If an applicant wishes to to a 100% volumetric examination by ultrasonic meth use the recommendations of regulatory positions C.1, ods using procedures and acceptance criteria specified in C.2, C.3, and C.4.a of this regulatory guide in developing paragraph NB-2530 (for plates) or paragraph NB-2540
                                                                          submittals for an application docketed before January 1, (for forgings) of Section III of the ASME Code.


(5) If the examination and evaluation indicate an increase in flaw size or growth rate greater than predicted for the service life of the flywheel, the results of the examination and evaluation should be submitted, to the staff for evaluation.
==D. IMPLEMENTATION==
The purpose of this section is to provide informa tion to applicants and licensees regarding the staff's plans for utilizing this regulatory guide.
Except in those cases in which the applicant proposes an acceptable alternative method for com plying with specified portions' of the Commission's regulations, the positions of this guide will be used by the NRC staff as follows.
1. The recommendations of regulatory positions C.A, C.2, C.3, and C.4.a will be used in evaluating submittals for construction permit applications docketed on or after January 1, 1976. If an applicant wishes to use the recommendations of regulatory positions C.1, C.2, C.3, and C.4.a of this regulatory guide in developing submittals for an application docketed before January 1,
1976, the pertinent portions of the application will be evaluated on the basis of this guide.
1976, the pertinent portions of the application will be evaluated on the basis of this guide.


'The analyses outlined in regulatory positions C.2.c, d, and e                  2. The recommendations of regulatory position should preferably be submitted in topical reports rather than on a case-by-case basis for those flywheel designs that will have      C.4.b will be used in evaluating procedures used in multiple applications.                                                  inservice inspections conducted on all plants after January 1, 1976. If a licensee wishes to use the
2.
  4 As defined in the Discussion.                                          recommendations of regulatory position C.
 
The recommendations of regulatory position C.4.b will be used in evaluating procedures used in inservice inspections conducted on all plants after January 1, 1976. If a licensee wishes to use the recommendations of regulatory position C.


===4. b of this===
===4. b of this===
                                                                    1.14-3
1.14-3
 
regulatory guide in performing the inspection before January 1, 1976, the pertinent portions of the inspec.
 
tid procedures will be evaluated on the bosb of this guide. Where requirements of Section X) are recom mended, examinations conducted during each 40-month inspection period should meet the code edition and all addenda that were in effect per paragraph (b) of 10 CFR
§ 50.55a 6 months prior to the inspection period. If a licensee wishes to use editions and addenda that subse UNITED STATES
NUCLEAR REGULATORY COMMISSON
WASHINGTON, 0. C.
 
20U
OFFICIAL ]MUSINE9S
PENALTY FOR PRIVATE USE. 630
quently become effective per paragraph (b) of § 50.55a for any portion of the inspection, the pertinent portions of the inspection procedures will be evaluated on the basis of those editions and addenda.


regulatory guide in performing the inspection before    quently become effective per paragraph (b) of § 50.55a January 1, 1976, the pertinent portions of the inspec.  for any portion of the inspection, the pertinent portions tid  procedures will be evaluated on the bosb of this  of the inspection procedures will be evaluated on the guide. Where requirements of Section X) are recom      basis of those editions and addenda.
3.


mended, examinations conducted during each 40-month inspection period should meet the code edition and all addenda that were in effect per paragraph (b) of 10 CFR      3. The recommendations of this guide will be used
The recommendations of this guide will be used in evaluating all topical reports on flywheel integrity after January 1, 1976.
  § 50.55a 6 months prior to the inspection period. If a in evaluating all topical reports on flywheel integrity licensee wishes to use editions and addenda that subse  after January 1, 1976.


UNITED STATES
POSTAGE AND FIES PAID  
NUCLEAR REGULATORY COMMISSON
UNITED STATES NUCLEAR  
      WASHINGTON, 0. C. 20U
REGULATORY COMMISSION}}
                                                                    POSTAGE AND FIES PAID
                                                                        UNITED STATES NUCLEAR
          OFFICIAL ]MUSINE9S                                            REGULATORY COMMISSION
    PENALTY FOR PRIVATE USE. 630}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 02:08, 17 January 2025

Reactor Coolant Pump Flywheel Integrity
ML003739936
Person / Time
Issue date: 08/31/1975
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.14, Rev 1
Download: ML003739936 (4)


U.S. NUCLEAR REGULATORY COMMISSION

REGULATORY GUIDE

OFFICE OF STANDARDS DEVELOPMENT

REGULATORY GUIDE 1.14 REACTOR COOLANT PUMP FLYWHEEL INTEGRITY

A. INTRODUCTION

General Design Criterion 4, "Environmental and Missile Design Bases," of Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50,

"Licensing of Production and Utilization Facilities,"

requires that nuclear power plant structures, systems, and components important to safety be protected against the effects of missiles that might result from equipment failures. This guide describes a method acceptable to the NRC staff of implementing this requirement with regard to minimizing the potential for failures of the flywheels of reactor coolant pump motors in light-water-cooled power reactors.

B. DISCUSSION

The flywheels on reactor coolant pump motors provide inertia to ensure a slow decrease in coolant flow in order to prevent fuel damage as a result of a loss of power to the pump motors. During operation at normal speed, a flywheel has sufficient kinetic energy to produce high-energy missiles and excessive vibration of the reactor coolant pump assembly if the flywheel should fail. Overspeed of the pump rotor assembly during a transient increases both the potential for failure and the kinetic energ3T of the flywheel. The safety consequences could be significant because of possible damage to the reactor coolant system, the containment, or other equipment or systems important to safety.

Methods of predicting the loss-of-coolant accident (LOCA) overspeed conditions are under continuing investigation. The limit on predicted pump overspeed in the event of a LOCA should be less than the calculated critical speed for failure of the flywheel. The conserva tism inherent in the latter calculation, coupled with a realistic prediction of maximum rotational speed, is considered to provide adequate margin because of the low probability of occurrence of the specific LOCA

conditions that would cause such overspeed. Methods of limiting potential pump overspeed are also under investi gation.

If the flywheel of the reactor coolant pump is conservatively designed and made from suitable mate rials with closely controlled quality, if adequate design review of new configurations is provided, and if ade quate inservice inspection is provided, the probability of a flywheel failure is sufficiently small that the conse quences of failure need not be protected against.

Materials for pump flywheels should be manufac tured by processes that minimize flaws and result in adequate fracture toughness in both the transverse and longitudinal rolling directions. Materials produced by vacuum melting and degassing or the electroslag remelt ing process are known to have improved cleanliness and toughness. Plate material should be cross rolled to a ratio of at least I to 3, sufficient to achieve acceptable isotropy. Fracture toughness is achieved more readily in thinner plates, and fabrication of laminated flywheels by assembling them from several plates is acceptable.

As an example, past evaluations have shown that ASME SA-533-B Class 1 and SA-508 Classes 2 and 3 materials generally have suitable toughness for typical flywheel applications provided stress concentrations are kept within reasonable limits and the reference tempera ture RTNDT, determined in accordance with Article NB-2331(a) of Section HI of the ASME Code,' is at least 500C (900F) below the lowest temperature at which operating speed is achieved. For other materials that may be considered for flywheels, the strength and toughness properties should be evaluated and justified for this application.

'Copies may be obbtined from the American Society of Mechanical Engineers, United Engineering Center, 345 East

47th Street, New York, New York 10017.

USNRC REGULATORY GUIDES

Comments should be sent to the Secretary of the Commission, U.S. Nciler Regulatory Guides are issued to describe and make available to the public Regulatory Commission. Washongton. D.C. 2

, Attention: Dockeling end methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate techniques used by the staff In evalu- The guides are issued in the following ten broad divisions:

sting specific problems or postulated accidents. or to provide guidance to appli cents. Regulatory Guides are not substitutes for regulations, end compliance

1: Power Reactors S. Products with them is not required. Methods and solutions different from those set out in

2. Research end Test Reactors

7. Transportation the guides will be acceptable if they provide a basis for the findings requisite to

3' Fuels and Materiasi Facilities

"8. Occupational Health the issuance or continuance of a permit or license by the Commission.

4. Environmental end Siting

9. Antitrust Review Comments and suggestions for improvements in these guides are encouraged

5. Materials and Plant Protection

10. General at all times, and guides will be revised. as appropriate, to accommodate com ments and to reflect new information or experience. However. comments on Copies of published guides may be obtained by written requeat indicating the this guide, if received within about two months after its issuance, will be par.

divisions desired to the U.S. Nuclear Regulatory Commission. Washington. D.C.

ticularly useful in evaluating the need for an early revision.

21, Attention: Director, Office of Standards Development.

Revision 1 Au"ust 1975

The non-ductile fracture analysis called for in regulatory position C.2.d should be based on appropriate conservative assumptions for stress level, flaw size, temperature, and fracture toughness at the location of interest. The non-ductile fracture criterion used to predict the critical fracture speed should be based on initial instability of the flaw as defined in ASTM E-399.

The justification for the stress analysis method used in the fracture analysis should describe the treatment of stresses arising from interference fits and thermal stresses when they are superimposed on the stresses caused by rotational forces. Justification for the flaw size estimate should consider it to be the maximum expected size of flaw that could conceivably escape detection, and should consider material thickness, method and frequency of nondestructive inspection, and analysis of flaw growth in fatigue if that is significant. The effect of cracks emanating from such structural discontinuities as key ways and bolt holes should be evaluated. Justification for the fracture toughness assumed for the material should describe the properties to be measured transverse to the rolling direction in the tests of each plate of material. The range of fracture toughness test tempera tures should include the lowest service temperature at which overspeed could occur. If not, the basis used for any extrapolation should be justified.

In doing the fracture analysis described in regulatory position C.2.d, engineering judgment should be used to select for analysis only those locations that appear to have the most severe sets of conditions. Severity is a function of stress level, flaw size, and fracture toughness at the location of interest. Comparison of perhaps three or four cases in terms of KI/KIC, the ratio of the imposed stress intensity factor at some nominal speed to the material toughness, should locate to most severe sets of conditions. Evaluation of the critical speed for fracture, which may require techniques that go beyond linear elastic fracture mechanics, may then focus on one critical location.

Excessive deformation during overspeed of the flywheel is of concern because damage could be caused by separation of the flywheel from the shaft. For the purpose of this guide, excessive deformation means any deformation such as an enlargement of the bore that could cause such separation directly or could cause an unbalance of the flywheel leading to structural failure or separation of the flywheel from the shaft. The calcula tion of deformation should employ elastic-plastic meth ods unless it can be shown that stresses remain within the elastic range.

The geometry of the flywheel and pump motor design should facilitate preservice and inservice inspec tion of all high-stress regions (bore, keyway, and bolt hole regions) without the need for removal of the flywheel from its shaft and preferably without the need for removing the rotor from the motor assembly.

The desired results of the analyses described in regulatory positions C.2.c, d, and e are quantitative estimates of the margins against fracture or excessive deformation during overspeed because such estimates, coupled with adequate provisions against overspeed, provide the best basis for assurance that the probability of failure under normal and transient conditions is sufficiently small that the consequences of failure need not be protected against.

C. REGULATORY POSITION

1. Material and Fabrication a.

The flywheel material should be of closely controlled quality. Plates' should conform to ASTM A20

and should be produced by the vacuum-melting and degassing process or the electroslag remelting process.

Plate material should be cross-rolled to a ratio of at least

1 to 3.

b.

Fracture toughness and tensile properties of each plate of flywheel material should be checked by tests that yield results2 suitable to confirm the applica bility to that flywheel of the properties used in the fracture analyses called for in regulatory positions C.2.c, d, and e.

c.

All flame-cut surfaces should be removed by machining to a depth at least 12 mm (1/2 inch) below the flame-cut surface.

d.

Welding, including tack welding and repair welding, should not be permitted in the finished flywheel unless the welds are inspectable and considered as potential sources of flaws in the fracture analysis.

2.

Design a.

The flywheel assembly, including any speed limiting and antirotation devices, the shaft, and the bearings, should be designed to withstand normal condi tions, anticipated transients, the design basis loss-of coolant accident, and the Safe Shutdown Earthquake loads without loss of structural integrity.

b.

Design speed should be at least 125% of normal speed but not less than the speed that could be attained during a turbine overspeed transient. Normal speed is defined as the synchronous speed of the a.c. drive motor at 60 hertz.

c.

An analysis should be conducted to predict the critical speed for ductile fracture of the flywheel. The methods and limits of paragraph F-1323.1(b) in Section III of the ASME Code are acceptabl

e. If another method

2These results should be included as part of the'FSAR.

1.14-2

is used, justification should be provided. The anal ,sis should be submitted to the NRC staff for evaluation.7 d.

An analysis should be conducted to predict the critical speed for nonductile fracture of the flywheel.

Justification should be given for the stress analysis method, the estimate of flaw size and location, which should take into account initial size and flaw growth in service, and the values of fracture toughness assumed for the material. The analysis should be submitted to the NRC staff for evaluation.3 e.

An analysis should be conducted to predict the critical speed for excessive4 deformation of the fly wheel. The analysis should be submitted to the NRC

staff for evaluation.3 f.

The normal speed should be less than one-half of the lowest of the critical speeds calculated in regulatory positions C.2.c, d, and e above.

g.

The predicted LOCA overspeed should be less than the lowest of the critical speeds calculated in regulatory positions C.2.c., d, and e.

3.

Testing Each flywheel assembly should be spin tested at the design speed of the flywheel.

4. Inspection a.

Following the spin test described in regulatory position C.3, each finished flywheel should receive a check of critical dimensions and a nondestructive exam ination as follows:

(1) Areas of higher stress concentrations, e.g.

bores, keyways, splines, and drilled holes, and surfaces adjacent to these areas on the finished flywheel should be examined for surface defects in accordance with paragraph NB-2545 or NB-2546 of Section III of the ASME Code using the procedures of paragraph NB-2540.

No linear indications more than 1.6 mm (1/16 inch)

long, other than laminations, should be permitted.

(2) Each finished flywheel should be subjected to a 100% volumetric examination by ultrasonic meth ods using procedures and acceptance criteria specified in paragraph NB-2530 (for plates) or paragraph NB-2540

(for forgings) of Section III of the ASME Code.

'The analyses outlined in regulatory positions C.2.c, d, and e should preferably be submitted in topical reports rather than on a case-by-case basis for those flywheel designs that will have multiple applications.

4 As defined in the Discussion.

b.

Inservice inspection should be performed for each flywheel as follows:

(1) An in-place ultrasonic volumetric examina tion of the areas of higher stress concentration at the bore and: keyway at approximately 3-year intervals, during the refueling or maintenance shutdown coin ciding with the inservice inspection schedule as required by Section XI of the ASME Code.

(2) A surface examination of all exposed sur faces and complete ultrasonic volumetric examination at approximately 10-year intervals, during the plant shut down coinciding with the inservice inspection schedule as required by Section XI of the ASME Code.

(3) Examination procedures should be in accordance with the requirements of Subarticle IWA-2200 of Section XI of the ASME Code.

(4) Acceptance criteria should conform to the recommendations of regulatory position C.2.f.

(5) If the examination and evaluation indicate an increase in flaw size or growth rate greater than predicted for the service life of the flywheel, the results of the examination and evaluation should be submitted, to the staff for evaluation.

D. IMPLEMENTATION

The purpose of this section is to provide informa tion to applicants and licensees regarding the staff's plans for utilizing this regulatory guide.

Except in those cases in which the applicant proposes an acceptable alternative method for com plying with specified portions' of the Commission's regulations, the positions of this guide will be used by the NRC staff as follows.

1. The recommendations of regulatory positions C.A, C.2, C.3, and C.4.a will be used in evaluating submittals for construction permit applications docketed on or after January 1, 1976. If an applicant wishes to use the recommendations of regulatory positions C.1, C.2, C.3, and C.4.a of this regulatory guide in developing submittals for an application docketed before January 1,

1976, the pertinent portions of the application will be evaluated on the basis of this guide.

2.

The recommendations of regulatory position C.4.b will be used in evaluating procedures used in inservice inspections conducted on all plants after January 1, 1976. If a licensee wishes to use the recommendations of regulatory position C.

4. b of this

1.14-3

regulatory guide in performing the inspection before January 1, 1976, the pertinent portions of the inspec.

tid procedures will be evaluated on the bosb of this guide. Where requirements of Section X) are recom mended, examinations conducted during each 40-month inspection period should meet the code edition and all addenda that were in effect per paragraph (b) of 10 CFR

§ 50.55a 6 months prior to the inspection period. If a licensee wishes to use editions and addenda that subse UNITED STATES

NUCLEAR REGULATORY COMMISSON

WASHINGTON, 0. C.

20U

OFFICIAL ]MUSINE9S

PENALTY FOR PRIVATE USE. 630

quently become effective per paragraph (b) of § 50.55a for any portion of the inspection, the pertinent portions of the inspection procedures will be evaluated on the basis of those editions and addenda.

3.

The recommendations of this guide will be used in evaluating all topical reports on flywheel integrity after January 1, 1976.