{{#Wiki_filter:RCso                    U.S. NUCLEAR REGULATORY COMMISSION                                                               February 1996 REGULATORY GUIDE
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION
                                    OFFICE OF NUCLEAR REGULATORY RESEARCH
February 1996 RCso
                                                          REGULATORY GUIDE 1.162 (Draft was Issued as DG-1027)
                                                    FORMAT AND CONTENT OF REPORT
                          FOR THERMAL ANNEAUNG OF REACTOR PRESSURE VESSELS


==A. INTRODUCTION==
==A. INTRODUCTION==
pleteness of the information provided, would assist the NRC staff in locating specific information, and would The thermal annealing rule, § 50.66, "Require                               aid in shortening the time needed for the review ments for Thermal Annealing of the Reactor Pressure                               process.
The thermal annealing rule, § 50.66, "Require ments for Thermal Annealing of the Reactor Pressure Vessel," of 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facility," provides that:
For those light water nuclear power reactors where neutron radiation has reduced the frac ture toughness of the reactor vessel materials, a thermal annealing may be applied to the reactor vessel to recover the fracture tough ness of the material. The use of a thermal an nealing treatment is subject to the require ments in this section. A report describing the licensee's plan for conducting the thermal an nealing must be submitted in accordance with
§ 50.4 at least three years prior to the date at which the limiting fracture toughness criteria in § 50.61 or Appendix G to Part 50 would be exceeded.


Vessel," of 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facility," provides that:                                      This regulatory guide also describes alternative methods that are acceptable to the NRC for determin For those light water nuclear power reactors                                ing the recovery of fracture toughness after the thermal where neutron radiation has reduced the frac                                annealing and for estimating the degree of post ture toughness of the reactor vessel materials,                            annealing reembrittlement expected during subse a thermal annealing may be applied to the                                   quent plant operations; 10 CFR 50.66 requires these to reactor vessel to recover the fracture tough                                be reported.
This regulatory guide describes a format and con tent acceptable to the NRC staff for the Thermal An nealing Report to be submitted to the NRC for describ ing the licensee's plan for thermal annealing a reactor vessel. This guide also describes the Thermal Anneal ing Results Report that is required by 10 CFR 50.66 to be submitted after the thermal annealing. Use of this format by the applicant would help ensure the corn- USNRC REGULATORY GUIDES
Regulatory Guides are issued to describe and make avallable to the public such Information as methods acceptable to the NRC staff for Implement ing specific parts of the Commission's regulations, techniques used by the staff In evaluating specific problems or postulated accidents, and data needed by the NRC staff In its review of applications for permits and licenses. Regulatory guides are not substitutes for regulations. and com plianoe with them Is not required. Methods and solutions different from those set out In the guides will be acceptable If they provide a basis for the findings requisite to the Issuance or continuance of a permit or license by the Commission.


ness of the material. The use of a thermal an                                      This regulatory guide contains guidance on man nealing treatment is subject to the require                                datory information collections that are contained as re ments in this section. A report describing the                              quirements in 10 CFR Part 50 and that are subject to licensee's plan for conducting the thermal an                              the Paperwork Reduction Act of 1980 (44 U.S.C.
This guide was Issued after consideration of comments received from the public. Comments and suggestions for Improvements In these guides are encouraged at all times, and guides will be revised, as appropriate, to acconmmodate comments and to reflect new Information or experience.


nealing must be submitted in accordance with                                3501 et seq.). These requirements were approved by
pleteness of the information provided, would assist the NRC staff in locating specific information, and would aid in shortening the time needed for the review process.
      § 50.4 at least three years prior to the date at                          the Office of Management and Budget, approval num which the limiting fracture toughness criteria                            ber 3150-0011.


in § 50.61 or Appendix G to Part 50 would be exceeded.                                                                          The public reporting burden for this collection of information Is estimated to be an average of 6000
This regulatory guide also describes alternative methods that are acceptable to the NRC for determin ing the recovery of fracture toughness after the thermal annealing and for estimating the degree of post annealing reembrittlement expected during subse quent plant operations; 10 CFR 50.66 requires these to be reported.
      This regulatory guide describes a format and con                          hours per respondent, including the time for reviewing tent acceptable to the NRC staff for the Thermal An                              instructions, searching existing data sources, gathering nealing Report to be submitted to the NRC for describ                            and maintaining the data needed, and completing and ing the licensee's plan for thermal annealing a reactor                          reviewing the collection of information. Send com vessel. This guide also describes the Thermal Anneal                              ments regarding this burden estimate or any other ing Results Report that is required by 10 CFR 50.66 to                           aspect of this collection of information, including sug be submitted after the thermal annealing. Use of this                            gestions for reducing the burden, to the Information format by the applicant would help ensure the corn-                              and Records Management Branch (T-6 F 33), U.S.


USNRC REGULATORY GUIDES                                  Written comments may be submitted to the Rules Review and Directives Branch, DFIPS, ADM, U.S. Nuclear Regulatory Commission, Washing Regulatory Guides are issued to describe and make avallable to the public      ton, DC 20658-0001.
This regulatory guide contains guidance on man datory information collections that are contained as re quirements in 10 CFR Part 50 and that are subject to the Paperwork Reduction Act of 1980 (44 U.S.C.


such Information as methods acceptable to the NRC staff for Implement ing specific parts of the Commission's regulations, techniques used by          The guides are issued in the following ten broad divisions:
3501 et seq.). These requirements were approved by the Office of Management and Budget, approval num ber 3150-0011.
the staff In evaluating specific problems or postulated accidents, and          1. Power Reactors                    6. Products data needed by the NRC staff In its review of applications for permits and      2. Research and Test Reactors          7. Transportation licenses. Regulatory guides are not substitutes for regulations. and com        3. Fuels and Materials Facilities      8. Occupational Health plianoe with them Is not required. Methods and solutions different from        4. Environmental and Siting            9. Antitrust and Financial Review those set out In the guides will be acceptable If they provide a basis for the  5. Materials and Plant Protection    10. General findings requisite to the Issuance or continuance of a permit or license by the Commission.                                                                 Single copies of regulatory guides may be obtained free of charge by writ the Office of Administration, Attention: Distribution and Services tion, U.S. Nuclear Regulatory Commission. Washington, OC
This guide was Issued after consideration of comments received from the          20655-0001. or by fax at (301)415-2260.


public. Comments and suggestions for Improvements In these guides are          Issued guides may also be purchased from the National Technical Infor encouraged at all times, and guides will be revised, as appropriate, to          mation Service on a standing order basis. Details on this service may be acconmmodate comments and to reflect new Information or experience.            obtained by writing NTIS, 6285 Port Royal Road, Springfield, VA 22161.
The public reporting burden for this collection of information Is estimated to be an average of 6000
hours per respondent, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send com ments regarding this burden estimate or any other aspect of this collection of information, including sug gestions for reducing the burden, to the Information and Records Management Branch (T-6 F 33), U.S.


Nuclear Regulatory Commission, Washington, DC                  annealing" at a temperature of 650°F using the reactor
Written comments may be submitted to the Rules Review and Directives Branch, DFIPS, ADM, U.S. Nuclear Regulatory Commission, Washing ton, DC 20658-0001.
20555-000 1; and to the Desk Officer, Office of Infor           coolant pumps as the heat source. In addition, at least mation and Regulatory Affairs, NEOB-10202                       12 Russian-designed VVER-440 PWRs, which operate
 
  (3150-0011), Office of Management and Budget,                 at conditions similar to U.S. PWRs, have been an Washington, DC 20503.                                          nealed in Russia and Eastern Europe at temperatures of approximately 850*F, using dry air and radiant Is.
The guides are issued in the following ten broad divisions:
 
===1. Power Reactors ===
 
===6. Products ===
2. Research and Test Reactors
 
===7. Transportation ===
3. Fuels and Materials Facilities
 
===8. Occupational Health ===
4. Environmental and Siting
9. Antitrust and Financial Review
5. Materials and Plant Protection
10. General Single copies of regulatory guides may be obtained free of charge by writ the Office of Administration, Attention: Distribution and Services tion, U.S. Nuclear Regulatory Commission.
 
Washington, OC
20655-0001. or by fax at (301)415-2260.
 
Issued guides may also be purchased from the National Technical Infor mation Service on a standing order basis. Details on this service may be obtained by writing NTIS, 6285 Port Royal Road, Springfield, VA 22161.
 
REGULATORY GUIDE
OFFICE OF NUCLEAR REGULATORY RESEARCH
REGULATORY GUIDE 1.162 (Draft was Issued as DG-1027)
FORMAT AND CONTENT OF REPORT
FOR THERMAL ANNEAUNG OF REACTOR PRESSURE VESSELS
 
Nuclear Regulatory Commission, Washington, DC
20555-000 1; and to the Desk Officer, Office of Infor mation and Regulatory Affairs, NEOB-10202  
(3150-0011), Office of Management and Budget, Washington, DC 20503.


==B. DISCUSSION==
==B. DISCUSSION==
heaters as the heat source. Details of the thermal an nealing of the Novovoronezh Unit 3 have been re BACKGROUND                                                    ported (Ref. 3) by a U.S. delegation that witnessed the operation.
BACKGROUND
Criterion 31 of Appendix A, "General Design Cri teria for Nuclear Power Plants," to 10 CFR Part 50
requires that:
The reactor shall be designed with sufficient margin to assure that when stressed under op erating, maintenance, testing, and postulated accident conditions, (1) the boundary behave in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized.
 
A major concern in this regard is that the material properties of reactor vessels degrade progressively when exposed to neutron radiation during service, re sulting in a loss in fracture toughness and ductility. To maintain adequate toughness and preclude nonductile failure in the vessel, a number of mitigating actions are taken during the operating life of a reactor: periodic changes are made in the pressure-temperature (P-T)  
limits required to preclude nonductile fracture of the materials during startup and cooldown, limitations are placed on the reduction of Charpy upper-shelf energy to maintain an adequate margin of safety against duc tile fracture, and additional restrictions are placed on toughness properties by screening criteria imposed to avoid vessel failure from pressurized thermal shock.
 
If neutron radiation embritdement becomes so se vere that the required margins cannot be maintained,
10 CFR 50.61 and Appendix G to 10 CFR Part 50
permit the application of a thermal annealing treat ment to recover the toughness properties of the vessel materials, which would avoid premature retirement of the reactor pressure vessel. Thermal annealing, the heating of the reactor vessel beltline to a temperature well above the operating temperature of the reactor for an extended period of time sufficient to remove the microstructural changes caused by radiation, is the only known method for restoring toughness properties to materials degraded by neutron radiation. The re quirements for conducting thermal annealing and re starting the plant after annealing are set forth in
10 CFR 50.66.


Criterion 31 of Appendix A, "General Design Cri teria for Nuclear Power Plants," to 10 CFR Part 50            CURRENT STATE OF KNOWLEDGE ON
Although thermal annealing has not yet been applied to a U.S. commercial power reactor, it has been successfully applied to other reactors. Two reac tor vessels that have been successfully annealed are the Army's SM-1A in 1967 (Ref. 1), and the BR-3 in Mol, Belgium, in 1984 (Ref. 2). Both of these reactors operated at temperatures low enough to permit "wet annealing" at a temperature of 650°F using the reactor coolant pumps as the heat source. In addition, at least
requires that:                                                THERMAL ANNEALING
12 Russian-designed VVER-440 PWRs, which operate at conditions similar to U.S. PWRs, have been an nealed in Russia and Eastern Europe at temperatures of approximately 850*F, using dry air and radiant heaters as the heat source. Details of the thermal an nealing of the Novovoronezh Unit 3 have been re ported (Ref. 3) by a U.S. delegation that witnessed the operation.
      The reactor shall be designed with sufficient                  A significant amount of information has been re margin to assure that when stressed under op              ported in the literature on thermal annealing and on erating, maintenance, testing, and postulated            the effects of thermal annealing variables (e.g., tem accident conditions, (1) the boundary behave              perature, time, materials chemistry, fluence levels), on in a nonbrittle manner and (2) the probability            the recovery of toughness properties. Server (Ref. 4)
      of rapidly propagating fracture is minimized.             summarized the state of knowledge, as of 1985, for A major concern in this regard is that the material      in-place thermal annealing of commercial reactor pres properties of reactor vessels degrade progressively            sure vessels. He reviewed data on annealing recovery when exposed to neutron radiation during service, re          and reirradiation effects for high-copper welds and sulting in a loss in fracture toughness and ductility. To      concluded that significant recovery occurs for anneal maintain adequate toughness and preclude nonductile            ing at 850*F for both the transition temperature shift failure in the vessel, a number of mitigating actions are      (ARTNDT) and reduction in Charpy upper-shelf ener taken during the operating life of a reactor: periodic          gy. He also reviewed engineering studies and con changes are made in the pressure-temperature (P-T)            cluded that annealing of U.S. reactors at 850*F is fea limits required to preclude nonductile fracture of the         sible using existing commercial heat treating methods, materials during startup and cooldown, limitations are          but that plant-specific engineering problems would placed on the reduction of Charpy upper-shelf energy            need to be resolved. Server (Ref. 4) also performed a to maintain an adequate margin of safety against duc            thermal and structural analysis for a typical PWR vessel K1 tile fracture, and additional restrictions are placed on        annealed at 850 0 F, which predicted that vessel dimen toughness properties by screening criteria imposed to          sional stability would be maintained and that post avoid vessel failure from pressurized thermal shock.           anneal residual stresses would not be significant. How ever, Server's results indicated that excessive bending If neutron radiation embritdement becomes so se          of the attached piping from differential thermal expan vere that the required margins cannot be maintained,            sion of the vessel could be a problem that required
10 CFR 50.61 and Appendix G to 10 CFR Part 50                  careful temperature control.


permit the application of a thermal annealing treat ment to recover the toughness properties of the vessel              Mager and others (Refs. 5 and 6) reported on re materials, which would avoid premature retirement of            search to determine the extent of fracture toughness the reactor pressure vessel. Thermal annealing, the            recovery as a function of annealing time and tempera heating of the reactor vessel beltline to a temperature        ture for materials that are sensitive to neutron well above the operating temperature of the reactor for        embrittlement. They concluded that excellent recov an extended period of time sufficient to remove the            ery of all properties could be achieved by annealing at microstructural changes caused by radiation, is the            850*F for 168 hours, and that the reembrittlement af only known method for restoring toughness properties          ter annealing would follow the same trend as the pre to materials degraded by neutron radiation. The re            annealing embrittlement rate. These reports also de quirements for conducting thermal annealing and re            scribe a thermal annealing procedure developed for starting the plant after annealing are set forth in            field application.
CURRENT STATE OF KNOWLEDGE ON
THERMAL ANNEALING
A significant amount of information has been re ported in the literature on thermal annealing and on the effects of thermal annealing variables (e.g., tem perature, time, materials chemistry, fluence levels), on the recovery of toughness properties. Server (Ref. 4)
summarized the state of knowledge, as of 1985, for in-place thermal annealing of commercial reactor pres sure vessels. He reviewed data on annealing recovery and reirradiation effects for high-copper welds and concluded that significant recovery occurs for anneal ing at 850*F for both the transition temperature shift (ARTNDT) and reduction in Charpy upper-shelf ener gy. He also reviewed engineering studies and con cluded that annealing of U.S. reactors at 850*F is fea sible using existing commercial heat treating methods, but that plant-specific engineering problems would need to be resolved. Server (Ref. 4) also performed a thermal and structural analysis for a typical PWR vessel annealed at 850 0 F, which predicted that vessel dimen sional stability would be maintained and that post anneal residual stresses would not be significant. How ever, Server's results indicated that excessive bending of the attached piping from differential thermal expan sion of the vessel could be a problem that required careful temperature control.


10 CFR 50.66.                                                      Additional research that includes data on Although thermal annealing has not yet been              irradiation-anneal-reirradiation property trends for applied to a U.S. commercial power reactor, it has            reactor pressure vessel welds has been reported by been successfully applied to other reactors. Two reac          Hawthorne and Hiser (Ref. 7).
Mager and others (Refs. 5 and 6) reported on re search to determine the extent of fracture toughness recovery as a function of annealing time and tempera ture for materials that are sensitive to neutron embrittlement. They concluded that excellent recov ery of all properties could be achieved by annealing at
tor vessels that have been successfully annealed are the            More recently*, Eason et al. performed analyses of Army's SM-1A in 1967 (Ref. 1), and the BR-3 in                existing data on annealing of irradiated pressure vessel Mol, Belgium, in 1984 (Ref. 2). Both of these reactors        steels using both mechanistic and statistical consider operated at temperatures low enough to permit "wet            ations. Eason et al. also developed improved correla-
850*F for 168 hours, and that the reembrittlement af ter annealing would follow the same trend as the pre annealing embrittlement rate. These reports also de scribe a thermal annealing procedure developed for field application.
                                                        1.162-2


tion models for estimating Charpy upper-shelf energy              The thermal annealing rule, 10 CFR 50.66, per and transition temperature after radiation and anneal       mits the thermal annealing of reactor vessels to restore ing. This work is reported in NUREG/CR-6327 (Ref.           fracture toughness of the reactor vessel material that
Additional research that includes data on irradiation-anneal-reirradiation property trends for reactor pressure vessel welds has been reported by Hawthorne and Hiser (Ref. 7).
  8), and it provides the basis for equations for estimat      was reduced by neutron radiation. Section 50.66(a)
More recently*, Eason et al. performed analyses of existing data on annealing of irradiated pressure vessel steels using both mechanistic and statistical consider ations. Eason et al. also developed improved correla-
>* ing recovery of fracture toughness following annealing       requires that, prior to initiation of thermal annealing, a (Section 3.1.3 of this regulatory guide).                  Thermal Annealing Report be submitted to describe the licensee's plan for conducting the thermal anneal.
1.162-2 Is.


General guidance for inservice annealing may be        The report must be submitted at least 3 years prior to found in ASTM Standard E 509-86 (Ref. 9). ASTM              the date at which the limiting fracture toughness crite Standard E 509-86 contains general procedures for            ria in 10 CFR 50.61 or Appendix G to Part 50 would conducting an in-service thermal anneal of a reactor        be exceeded. This 3-year period is specified to provide vessel and for demonstrating the effectiveness and de        the NRC staff with sufficient time to review the thermal gree of recovery. ASTM Standard E 509-86 also pro            annealing program. Within 3 years of submittal of a vides direction for a post-anneal vessel radiation sur      licensee's Thermal Annealing Report and at least 30
K1
  veillance program.                                          days prior to the start of the thermal annealing,
                                                                10 CFR 50.66(a) requires the NRC staff to review the Thermal Annealing Report and place the results of its CURRENT REGULATORY REQUIREMENTS                              evaluation in its Public Document Room. In order to FOR FRACTURE TOUGHNESS OF VESSELS                            provide for public participation in the regulatory proc ess, 10 CFR 50.66(0 requires that the NRC hold a Fracture toughness requirements for light-water public meeting a minimum of 30 days before the li cooled reactor pressure vessels are addressed in sever censee starts to thermal anneal the reactor vessel. The al regulations. Appendix G, "Fracture Toughness Re licensee may. begin thermal annealing after the NRC
    quirements," to 10 CFR Part 50 provides the fracture has placed the results of its evaluation of the Thermal toughness requirements for vessels during normal op Annealing Report in the Public Document Room and eration and anticipated accident conditions. Appendix after the public meeting is held.


G also permits the use of thermal annealing to restore fracture toughness degraded by neutron radiation                 The Thermal Annealing Report is required by when embrittlement degrades mechanical properties to        10 CFR 50.66(b) to include (1) a Thermal Annealing such an extent that adequate margins of safety cannot        Operating Plan, (2) a Requalification Inspection and be demonstrated during operation. Appendix H,                Test Program, (3) a Fracture Toughness Recovery and
tion models for estimating Charpy upper-shelf energy and transition temperature after radiation and anneal ing. This work is reported in NUREG/CR-6327 (Ref.
    "Reactor Vessel Material Surveillance Program Re            "Reembrittlement Trend Assurance Program, and quirements," to 10 CFR Part 50 requires surveillance        (4) the Identification of Unreviewed Safety Questions programs to monitor irradiation embrittlement of reac        and Technical Specification Changes.


tor vessel beltline materials. The pressurized thermal The rule also provides three methods for deter shock (PTS) rule, 10 CFR 50.61, establishes screening mining the percent recovery. When surveillance speci-.
8), and it provides the basis for equations for estimat
    criteria for embrittlement beyond which the plant may mens are available from a credible surveillance pro not operate without further justification.
>*
ing recovery of fracture toughness following annealing (Section 3.1.3 of this regulatory guide).
General guidance for inservice annealing may be found in ASTM Standard E 509-86 (Ref. 9). ASTM
Standard E 509-86 contains general procedures for conducting an in-service thermal anneal of a reactor vessel and for demonstrating the effectiveness and de gree of recovery. ASTM Standard E 509-86 also pro vides direction for a post-anneal vessel radiation sur veillance program.


gram, the percent recovery for the reactor vessel is The application of these regulations in the late        required to be determined by using a test program that
CURRENT REGULATORY REQUIREMENTS
    1980s and early 1990s demonstrated a need for clarifi      applies the actual annealing conditions to the irra cation and improved guidance. The NRC review of the          diated surveillance specimens. If surveillance speci reactor pressure vessel integrity of the Yankee Nuclear      mens are not available, the applicant may elect to de Power Station highlighted the need for such changes          termine the percent recovery by testing materials and resulted in a detailed plan described in                removed from the reactor vessel beltline region. The SECY-91-333          (Ref. 10) and SECY-92-283              third method permits uses of a generic computational (Ref. 11).                                                  method if adequate justification is provided. Use of the procedure described in this regulatory guide in Sec To implement this plan, a proposed rule to amend      tion 3.1.3, "Computational Methods," is considered the regulations  was issued on October 4, 1994 (59 FR      appropriate justification for this application.
FOR FRACTURE TOUGHNESS OF VESSELS
Fracture toughness requirements for light-water cooled reactor pressure vessels are addressed in sever al regulations. Appendix G, "Fracture Toughness Re quirements," to 10 CFR Part 50 provides the fracture toughness requirements for vessels during normal op eration and anticipated accident conditions. Appendix G also permits the use of thermal annealing to restore fracture toughness degraded by neutron radiation when embrittlement degrades mechanical properties to such an extent that adequate margins of safety cannot be demonstrated during operation. Appendix H,
"Reactor Vessel Material Surveillance Program Re quirements," to 10 CFR Part 50 requires surveillance programs to monitor irradiation embrittlement of reac tor vessel beltline materials. The pressurized thermal shock (PTS) rule, 10 CFR 50.61, establishes screening criteria for embrittlement beyond which the plant may not operate without further justification.


50513).  This rule  was issued in final form on Decem ber  19, 1995  (60  FR 65456). The rule includes a new          Upon completion of the thermal annealing and the
The application of these regulations in the late
    § 50.66, "Requirements for Thermal Annealing of the         associated tests and analyses, the applicant must con firm in writing to the Director of the Office of Nuclear Reactor Pressure Vessel," which sets forth the NRC's requirements for annealing of reactor pressure vessels.      Reactor Regulation (NRR) that the thermal anneal was Also, changes were made to both Appendix G and the          performed in accordance with the Thermal Annealing PTS rule to reference the thermal annealing require          Operating Plan and the Requalification Inspection and ments in § 50.66, as an option for reducing embrittle      Test Program. Within 15 days of the licensee's written ment when the toughness requirements of those rules          confirmation that the thermal annealing was com cannot otherwise be met.                                    pleted in accordance with the Thermal Annealing
1980s and early 1990s demonstrated a need for clarifi cation and improved guidance. The NRC review of the reactor pressure vessel integrity of the Yankee Nuclear Power Station highlighted the need for such changes and resulted in a detailed plan described in SECY-91-333 (Ref.
                                                          1.162-3


Plan, and prior to restart, the NRC will (1) briefly doc        quirements for partial annealing are analogous to situa ument whether the thermal annealing was performed              tions in which the thermal annealing was completed;
10)  
in compliance with the licensee's Thermal Annealing            that is, when the partial annealing was otherwise per Operating Plan and the Requalification Inspection and          formed in compliance with the Thermal Annealing Op Test Program, placing the documentation in the NRC              erating Plan and relevant portions of the Requalifica Public Document Room, and (2) hold a public meeting            tion Inspection and Test Program, the licensee submits      K
and SECY-92-283 (Ref. 11)
to permit the licensee to explain the results of the reac      written confirmation of such compliance and may re tor vessel annealing to the NRC and the public, allow          start following, among other things, holding a public the NRC to discuss its inspection of the reactor vessel        meeting on the annealing. By contrast, if the partial annealing, and provide an opportunity for the public to        annealing was not performed in accordance with the comment to the NRC on the thermal annealing. The               Thermal Annealing Operating Plan and relevant licensee may restart its reactor after the meeting has          portions of the Requalification Inspection and Test been completed, unless the NRC orders otherwise.                Program, the licensee is required by 10 CFR
To implement this plan, a proposed rule to amend the regulations was issued on October 4, 1994 (59 FR
Within 45 days of the licensee's written confirmation          50.66(c) (3) (iii) to submit a summary of lack of com that the thermal annealing was completed in accor              pliance, submit a justification for subsequent opera dance with the Thermal Annealing Operating Plan and            tions, identify any changes to the facility that are attrib the Requalification Inspection and Test Program, the            utable to noncompliances that constitute unreviewed NRC staff will complete full documentation of the               safety questions, and identify changes to the technical NRC's inspection of the licensee's annealing process            specifications that are required for operation as a result and place the documentation in the NRC's Public Doc            of the noncompliances with the Thermal Annealing ument Room.                                                      Operating Plan and relevant portions of the Requalifi cation Inspection and Test Program. If unreviewed If the thermal annealing was completed but not            safety questions or changes to technical specifications performed in accordance with the Thermal Annealing              are identified as necessary for resumed operation, the Operating Plan and the Requalification Inspection and          licensee may restart only after the Director of NRR au Test Program, including the bounding conditions of              thorizes restart and the public meeting on the thermal the temperature and times, according to 10 CFR                  annealing is held.
50513). This rule was issued in final form on Decem ber 19, 1995 (60 FR 65456). The rule includes a new
§ 50.66, "Requirements for Thermal Annealing of the Reactor Pressure Vessel," which sets forth the NRC's requirements for annealing of reactor pressure vessels.


50.66(c) (2) the licensee must submit a summary of the lack of compliance and a justification for subsequent                According to 10 CFR 50.66(d), every licensee operations. The licensee must also identify any                who either completes a thermal annealing or termi changes to the facility that are attributable to the non        nates an annealing but elects to take full or partial compliances that constitute unreviewed safety ques tions and any changes to the technical specifications credit for the annealing must provide a Thermal An nealing Results Report detailing (1) the time and tem K
Also, changes were made to both Appendix G and the PTS rule to reference the thermal annealing require ments in § 50.66, as an option for reducing embrittle ment when the toughness requirements of those rules cannot otherwise be met.
that are required for operation as a result of the non          perature profiles of the actual thermal anneal, (2) the compliances. This identification does not relieve the          post-anneal RTNDT and Charpy upper-shelf energy licensee from complying with applicable requirements            values of the reactor material to be used in subsequent of the Commission's regulations and the operating li            operations, (3) the projected postanneal reembrittle cense; and if these requirements cannot be met as a            ment trends for both RTNDT and Charpy upper-shelf result of the annealing operation, the licensee must ob        energy, and (4) the projected values of RTpTS and tain the appropriate exemption per 10 CFR 50.12. If            Charpy upper-shelf energy at the end of the proposed unreviewed safety questions or changes to technical            period of operation addressed in the application. The specifications are not identified as necessary for re          report must be submitted within three months of com sumed operation, the licensee may restart after the            pleting the thermal anneal, unless an extension is au NRC staff places a summary of its inspection of the            thorized by the Director of NRR.


thermal annealing in the NRC Public Document Room                    C.   FORMAT AND CONTENT FOR THE
The thermal annealing rule, 10 CFR 50.66, per mits the thermal annealing of reactor vessels to restore fracture toughness of the reactor vessel material that was reduced by neutron radiation. Section 50.66(a)  
and the NRC holds a public meeting on the thermal annealing. On the other hand, if unreviewed safety                      THERMAL ANNEALING REPORT
requires that, prior to initiation of thermal annealing, a Thermal Annealing Report be submitted to describe the licensee's plan for conducting the thermal anneal.
questions or changes to technical specifications are                The format described here is acceptable to the identified as necessary for resumed operation, the li          NRC staff for the Thermal Annealing Report that is to censee may restart only after the Director of the Office      be submitted to the Director of NRR for annealing a of Nuclear Reactor Regulation authorizes restart, the          reactor vessel to restore fracture toughness of the reac summary of the NRC staff inspection is placed in the          tor vessel material. This format addresses the contents NRC Public Document Room, and a public meeting on              of the Thermal Annealing Operating Plan, the Requal the thermal annealing is held.                                ification Inspection and Test Program, the Fracture Toughness Recovery and Reembrittlement Trend As The thermal annealing rule also sets forth in            surance Program, and the Identification of Unre
10 CFR 50.66(c) (3) (i) the requirements that a licens        viewed Safety Questions and Technical Specifications ee must follow if the thermal annealing was terminated        Changes. It also describes acceptance criteria that the prior to completion. In general, the process and re-          staff will use in evaluating the applicant's proposed
                                                        1.162-4


programs for determining fracture toughness recovery            RTNDT and Charpy upper-shelf energy values, deter and establishing reembrittlement rates. This regulatory         mined by either analysis or testing.
The report must be submitted at least 3 years prior to the date at which the limiting fracture toughness crite ria in 10 CFR 50.61 or Appendix G to Part 50 would be exceeded. This 3-year period is specified to provide the NRC staff with sufficient time to review the thermal annealing program. Within 3 years of submittal of a licensee's Thermal Annealing Report and at least 30
days prior to the start of the thermal annealing,  
10 CFR 50.66(a) requires the NRC staff to review the Thermal Annealing Report and place the results of its evaluation in its Public Document Room. In order to provide for public participation in the regulatory proc ess, 10 CFR 50.66(0 requires that the NRC hold a public meeting a minimum of 30 days before the li censee starts to thermal anneal the reactor vessel. The licensee may. begin thermal annealing after the NRC
has placed the results of its evaluation of the Thermal Annealing Report in the Public Document Room and after the public meeting is held.


guide applies to thermal annealing procedures that use heaters (electric or gas) for heating the reactor vessel,       1.2   Description of the Reactor Pressure Vessel
The Thermal Annealing Report is required by
)   the "dry" anneal method. Use of the "wet" anneal method, which applies heat generated by the pump to This section of the report should provide a de tailed description of the reactor pressure vessel and heat the reactor coolant, will be reviewed separately,          identify those parts of the vessel to be annealed. It on a case-by-case basis.                                        should also include all vessel data used for determining the Thermal Annealing Operating Plan, the proposed
10 CFR 50.66(b) to include (1) a Thermal Annealing Operating Plan, (2) a Requalification Inspection and Test Program, (3) a Fracture Toughness Recovery and
    1. THERMAL ANNEALING OPERATING                                  inspections and tests, and the programs for recovery PLAN                                                      and reembrittlement.
"Reembrittlement Trend Assurance Program, and  
(4) the Identification of Unreviewed Safety Questions and Technical Specification Changes.


The Thermal Annealing Operating Plan should in                  Information to be reported on each heat of materi clude sufficient information to permit an independent            al in the reactor vessel beltline region should include evaluation of all the elements that went into its devel          material compositions, including all elements relevant opment. The following sections provide guidance on              to irradiation behavior, mechanical properties, fabri the format and content acceptable to the NRC staff for          cation techniques, nondestructive test results, and the operating plan, the information that should be in          neutron fluence exposures. The initial RTNDT as spec cluded in the plan, the minimum level of detail for this        ified in Branch Technical Position MTEB-5-2 in information, and the necessary supporting data.                 NUREG-0800 (Ref. 12) and NB-2300 of the ASME
The rule also provides three methods for deter mining the percent recovery. When surveillance speci-. 
          In all cases, the information described in this guide     Boiler and Pressure Vessel Code (Ref. 13), along with may be referenced if it has been submitted previously          the initial Charpy upper-shelf energy as defined in in another document, including any updates to pre              ASTM Standard E 185 (Ref. 14), should be reported for each heat of material. Material heats of base metal vious submittals.
mens are available from a credible surveillance pro gram, the percent recovery for the reactor vessel is required to be determined by using a test program that applies the actual annealing conditions to the irra diated surveillance specimens. If surveillance speci mens are not available, the applicant may elect to de termine the percent recovery by testing materials removed from the reactor vessel beltline region. The third method permits uses of a generic computational method if adequate justification is provided. Use of the procedure described in this regulatory guide in Sec tion 3.1.3, "Computational Methods," is considered appropriate justification for this application.


and weld metal that will be used for measuring percent recovery and for subsequent surveillance purposes, if
Upon completion of the thermal annealing and the associated tests and analyses, the applicant must con firm in writing to the Director of the Office of Nuclear Reactor Regulation (NRR) that the thermal anneal was performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program. Within 15 days of the licensee's written confirmation that the thermal annealing was com pleted in accordance with the Thermal Annealing
    1.1   General Considerations any, should be identified.
1.162-3


This first section should present introductory and All reactor vessel dimensions should be reported, general information. It should identify the reactor and give the reasons that thermal annealing is being pro            including diameter, wall thickness, cladding thickness, nozzle dimensions, flange dimensions, and transition j posed, including any regulatory requirement being challenged by the loss in fracture toughness. The pro          section dimensions. The dimensions of the gaps be jected percent recovery from annealing and the pro              tween the vessel and other potentially affected compo nents such as adjacent concrete structures, internal jected rate of reembrittlement in subsequent reactor permanent structures, and insulation should also be re operations should be identified, as well as the expected remaining operating life after annealing. The projected        ported. Attachments to the reactor that could be af fected by the annealing operation and the expected annealing response and reirradiation response should be determined using the provisions of this guide in Sec        effects should be identified and described. Examples of such effects are:
Plan, and prior to restart, the NRC will (1) briefly doc ument whether the thermal annealing was performed in compliance with the licensee's Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, placing the documentation in the NRC
    tion 3, "Fracture Toughness Recovery and Reem brittlement Assurance Program." In using these provi            "* Changes in properties of the vessel insulation, sions, the projected recovery should be determined              "* Effects of thermal growth of the reactor on sliding using the annealing time and temperature proposed in support structures, the application.
Public Document Room, and (2) hold a public meeting to permit the licensee to explain the results of the reac tor vessel annealing to the NRC and the public, allow the NRC to discuss its inspection of the reactor vessel annealing, and provide an opportunity for the public to comment to the NRC on the thermal annealing. The licensee may restart its reactor after the meeting has been completed, unless the NRC orders otherwise.


Within 45 days of the licensee's written confirmation that the thermal annealing was completed in accor dance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, the NRC staff will complete full documentation of the NRC's inspection of the licensee's annealing process and place the documentation in the NRC's Public Doc ument Room.
If the thermal annealing was completed but not performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, including the bounding conditions of the temperature and times, according to 10 CFR
50.66(c) (2) the licensee must submit a summary of the lack of compliance and a justification for subsequent operations. The licensee must also identify any changes to the facility that are attributable to the non compliances that constitute unreviewed safety ques tions and any changes to the technical specifications that are required for operation as a result of the non compliances. This identification does not relieve the licensee from complying with applicable requirements of the Commission's regulations and the operating li cense; and if these requirements cannot be met as a result of the annealing operation, the licensee must ob tain the appropriate exemption per 10 CFR 50.12. If unreviewed safety questions or changes to technical specifications are not identified as necessary for re sumed operation, the licensee may restart after the NRC staff places a summary of its inspection of the thermal annealing in the NRC Public Document Room and the NRC holds a public meeting on the thermal annealing. On the other hand, if unreviewed safety questions or changes to technical specifications are identified as necessary for resumed operation, the li censee may restart only after the Director of the Office of Nuclear Reactor Regulation authorizes restart, the summary of the NRC staff inspection is placed in the NRC Public Document Room, and a public meeting on the thermal annealing is held.
The thermal annealing rule also sets forth in
10 CFR 50.66(c) (3) (i) the requirements that a licens ee must follow if the thermal annealing was terminated prior to completion. In general, the process and re- quirements for partial annealing are analogous to situa tions in which the thermal annealing was completed;
that is, when the partial annealing was otherwise per formed in compliance with the Thermal Annealing Op erating Plan and relevant portions of the Requalifica tion Inspection and Test Program, the licensee submits written confirmation of such compliance and may re start following, among other things, holding a public meeting on the annealing. By contrast, if the partial annealing was not performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program, the licensee is required by 10 CFR
50.66(c) (3) (iii) to submit a summary of lack of com pliance, submit a justification for subsequent opera tions, identify any changes to the facility that are attrib utable to noncompliances that constitute unreviewed safety questions, and identify changes to the technical specifications that are required for operation as a result of the noncompliances with the Thermal Annealing Operating Plan and relevant portions of the Requalifi cation Inspection and Test Program. If unreviewed safety questions or changes to technical specifications are identified as necessary for resumed operation, the licensee may restart only after the Director of NRR au thorizes restart and the public meeting on the thermal annealing is held.
According to 10 CFR 50.66(d), every licensee who either completes a thermal annealing or termi nates an annealing but elects to take full or partial credit for the annealing must provide a Thermal An nealing Results Report detailing (1) the time and tem perature profiles of the actual thermal anneal, (2) the post-anneal RTNDT and Charpy upper-shelf energy values of the reactor material to be used in subsequent operations, (3) the projected postanneal reembrittle ment trends for both RTNDT and Charpy upper-shelf energy, and (4) the projected values of RTpTS and Charpy upper-shelf energy at the end of the proposed period of operation addressed in the application. The report must be submitted within three months of com pleting the thermal anneal, unless an extension is au thorized by the Director of NRR.
C.
FORMAT AND CONTENT FOR THE
THERMAL ANNEALING REPORT
The format described here is acceptable to the NRC staff for the Thermal Annealing Report that is to be submitted to the Director of NRR for annealing a reactor vessel to restore fracture toughness of the reac tor vessel material. This format addresses the contents of the Thermal Annealing Operating Plan, the Requal ification Inspection and Test Program, the Fracture Toughness Recovery and Reembrittlement Trend As surance Program, and the Identification of Unre viewed Safety Questions and Technical Specifications Changes. It also describes acceptance criteria that the staff will use in evaluating the applicant's proposed
1.162-4 K
K
programs for determining fracture toughness recovery and establishing reembrittlement rates. This regulatory guide applies to thermal annealing procedures that use heaters (electric or gas) for heating the reactor vessel,
)
the "dry" anneal method. Use of the "wet" anneal method, which applies heat generated by the pump to heat the reactor coolant, will be reviewed separately, on a case-by-case basis.
1. THERMAL ANNEALING OPERATING
PLAN
The Thermal Annealing Operating Plan should in clude sufficient information to permit an independent evaluation of all the elements that went into its devel opment. The following sections provide guidance on the format and content acceptable to the NRC staff for the operating plan, the information that should be in cluded in the plan, the minimum level of detail for this information, and the necessary supporting data.
In all cases, the information described in this guide may be referenced if it has been submitted previously in another document, including any updates to pre vious submittals.
1.1 General Considerations This first section should present introductory and general information. It should identify the reactor and give the reasons that thermal annealing is being pro j
posed, including any regulatory requirement being challenged by the loss in fracture toughness. The pro jected percent recovery from annealing and the pro jected rate of reembrittlement in subsequent reactor operations should be identified, as well as the expected remaining operating life after annealing. The projected annealing response and reirradiation response should be determined using the provisions of this guide in Sec tion 3, "Fracture Toughness Recovery and Reem brittlement Assurance Program." In using these provi sions, the projected recovery should be determined using the annealing time and temperature proposed in the application.
The operating history of the reactor prior to an nealing should be described in this section, including the power-time-temperature history during power op erations to permit evaluation of temperature and flu ence conditions for the reactor vessel; these data may be either actual recorded data or data deduced from other plant information that is identified as such. The specific reactor vessel beitline temperatures during the reactor operation should be reported.
This section should describe the results of the on going surveillance program, including the number of specimens, initial values for the reference temperature
*>
(RTNDT) and Charpy upper-shelf energy, and all data on shifts of RTNDT and decrease of Charpy upper shelf energy. It should also provide the pre-annealing RTNDT and Charpy upper-shelf energy values, deter mined by either analysis or testing.
1.2 Description of the Reactor Pressure Vessel This section of the report should provide a de tailed description of the reactor pressure vessel and identify those parts of the vessel to be annealed. It should also include all vessel data used for determining the Thermal Annealing Operating Plan, the proposed inspections and tests, and the programs for recovery and reembrittlement.
Information to be reported on each heat of materi al in the reactor vessel beltline region should include material compositions, including all elements relevant to irradiation behavior, mechanical properties, fabri cation techniques, nondestructive test results, and neutron fluence exposures. The initial RTNDT as spec ified in Branch Technical Position MTEB-5-2 in NUREG-0800 (Ref. 12) and NB-2300 of the ASME
Boiler and Pressure Vessel Code (Ref. 13), along with the initial Charpy upper-shelf energy as defined in ASTM Standard E 185 (Ref. 14), should be reported for each heat of material. Material heats of base metal and weld metal that will be used for measuring percent recovery and for subsequent surveillance purposes, if any, should be identified.
All reactor vessel dimensions should be reported, including diameter, wall thickness, cladding thickness, nozzle dimensions, flange dimensions, and transition section dimensions. The dimensions of the gaps be tween the vessel and other potentially affected compo nents such as adjacent concrete structures, internal permanent structures, and insulation should also be re ported. Attachments to the reactor that could be af fected by the annealing operation and the expected effects should be identified and described. Examples of such effects are:
"* Changes in properties of the vessel insulation,
"* Effects of thermal growth of the reactor on sliding support structures,
"* Overheating of instrumentation and attachments.
"* Overheating of instrumentation and attachments.


The operating history of the reactor prior to an nealing should be described in this section, including          1.3   Equipment, Components, and Structures the power-time-temperature history during power op                      Affected by Thermal Annealing erations to permit evaluation of temperature and flu                  This section of the report should provide a de ence conditions for the reactor vessel; these data may          scription of all equipment, structures, and components be either actual recorded data or data deduced from            that could be affected by the annealing operation, other plant information that is identified as such. The        either thermally or mechanically, and the expected specific reactor vessel beitline temperatures during the        effects to the level necessary to assess the effects of reactor operation should be reported.                          annealing on the equipment, structures, and compo This section should describe the results of the on        nents. Examples of these effects include degradation going surveillance program, including the number of            of the biological shield because of loss in strength or specimens, initial values for the reference temperature        reduction in neutron and gamma absorption capacity
1.3 Equipment, Components, and Structures Affected by Thermal Annealing This section of the report should provide a de scription of all equipment, structures, and components that could be affected by the annealing operation, either thermally or mechanically, and the expected effects to the level necessary to assess the effects of annealing on the equipment, structures, and compo nents. Examples of these effects include degradation of the biological shield because of loss in strength or reduction in neutron and gamma absorption capacity and the effects of vessel growth and distortions on at tached piping. All significant thermal and mechanical loadings projected for each item should be identified,
*>  (RTNDT) and Charpy upper-shelf energy, and all data            and the effects of vessel growth and distortions on at on shifts of RTNDT and decrease of Charpy upper                tached piping. All significant thermal and mechanical shelf energy. It should also provide the pre-annealing          loadings projected for each item should be identified,
1.162-5
                                                              1.162-5


as well as actions proposed to avoid damage from these         result in unacceptable degradation of the fatigue life of loadings.                                                      these components.
as well as actions proposed to avoid damage from these loadings.


The biological shield should be described, includ             The parameters to be evaluated in the thermal and ing its dimensions, materials, irradiation exposures,         stress analyses should include the annealing tempera any unique features, and all cooling provisions to be         ture, hold time at the annealing temperature, heating and cooling rates, the effect of insulation around the K
The biological shield should be described, includ ing its dimensions, materials, irradiation exposures, any unique features, and all cooling provisions to be used for controlling temperatures. If the biological shield is a tank, any provision for circulating the tank coolant should be described. If the biological shield is a concrete structure, the properties of the concrete should be reported as well as the properties of other concrete structures exposed to higher than normal temperatures. The existing design temperature limita tions for the concrete should be described. If the de sign temperature limitations are to be exceeded during the thermal annealing operation, an acceptable maxi mum temperature for the concrete should be estab lished as addressed in Paragraph 1.4.
used for controlling temperatures. If the biological shield is a tank, any provision for circulating the tank       vessel Including the bottom head, the active heating coolant should be described. If the biological shield is a     length of the heating device, the physical constraints concrete structure, the properties of the concrete             on the vessel, structural characteristics of attached pip should be reported as well as the properties of other         ing assemblies, and any other restraints.


concrete structures exposed to higher than normal                  The thermal analysis should establish the tempera temperatures. The existing design temperature limita          ture profiles for the inside and outside surfaces of the tions for the concrete should be described. If the de          vessel wall during heatup, start and end of steady-state sign temperature limitations are to be exceeded during        conditions, and cooldown conditions. The effects of the thermal annealing operation, an acceptable maxi            localized high temperatures should be evaluated for mum temperature for the concrete should be estab              degradation of the concrete adjacent to the vessel, for lished as addressed in Paragraph 1.4.                          changes, if any, in thermal and mechanical properties The piping attached to the vessel should be de           of the reactor insulation and for detrimental effects, if scribed. This description should include material             any, on containment and the biological shield. Maxi types, dimensions, and restraints such as supports and         mum concrete temperatures should be based on exist snubbers. The design requirements with respect to             ing design limits or provisions of Section III, Division temperature and bending stress or strain limitations           2, of the ASME Boiler and Pressure Vessel Code should be identified for the piping. Further, any indi         (Ref. 15). If the design temperature limits or the cations of potential flaws found during inspections of         ASME Boiler and Pressure Vessel Code limits for the the piping should be described.                                adjacent concrete structure are projected to be ex ceeded during the annealing operation, an acceptable Any other equipment or instrumentation that              maximum temperature for the concrete must be estab could be affected by the thermal annealing should be            fished using appropriate test data. Test data on proper described. A description of the overall containment as          ties should address irradiated concrete of appropriate it relates to core removal and storage, as well as the          type and exposures to time-temperature conditions annealing of the vessel, should be included. Any spe          that bound the expected conditions of the concrete cial requirements should be described in detail. For            during annealing.
The piping attached to the vessel should be de scribed. This description should include material types, dimensions, and restraints such as supports and snubbers. The design requirements with respect to temperature and bending stress or strain limitations should be identified for the piping. Further, any indi cations of potential flaws found during inspections of the piping should be described.


example, storage of core internals may require a coffer dam approach to isolate the coolant from the heating                 The structural analysis should evaluate, for the equipment in the drained vessel, in which case the             complete annealing cycle, residual deformations, re modifications, the equipment, and the method for en           sidual stresses, elastic-plastic-creep effects (Ref. 16),
Any other equipment or instrumentation that could be affected by the thermal annealing should be described. A description of the overall containment as it relates to core removal and storage, as well as the annealing of the vessel, should be included. Any spe cial requirements should be described in detail. For example, storage of core internals may require a coffer dam approach to isolate the coolant from the heating equipment in the drained vessel, in which case the modifications, the equipment, and the method for en suring the integrity of the isolation seals should be detailed.
suring the integrity of the isolation seals should be         distortions, bending, piping displacements, effects of thermal gradients (axial, azimuthal, and through detailed.


wall), and restraints on the vessel, including nozzles and flange and attached piping. Any potential interfer
1.4 Thermal and Stress Analyses This section of the report should provide an evalu ation of the effects of mechanical and thermal stresses and temperatures on the vessel, containment, biologi cal shield, attached piping and appurtenances, and ad jacent equipment, components, and structures that demonstrates that the annealing operation will not be detrimental to reactor operation. This evaluation should include detailed thermal and structural analyses that establish appropriate time and temperature pro files, including the heatup and cooldown rates of the annealing operation, so that dimensional stability of the system will be maintained. The analyses should demonstrate that localized temperatures, thermal stress gradients, and subsequent residual stresses will not result in unacceptable dimensional changes or dis tortions in the vessel, attached piping, and appurte nances and that the thermal annealing cycle will not result in unacceptable degradation of the fatigue life of these components.
1.4   Thermal and Stress Analyses                             ence with other equipment, components, or supports This section of the report should provide an evalu       should be evaluated. This section should specify the ation of the effects of mechanical and thermal stresses       limiting parameters established by these analyses, in and temperatures on the vessel, containment, biologi           cluding maximum temperature, maximum stress, and cal shield, attached piping and appurtenances, and ad         limiting heatup and cooldown rates.


jacent equipment, components, and structures that demonstrates that the annealing operation will not be           1.5  Thermal Annealing Operating Conditions detrimental to reactor operation. This evaluation                    This section of the report should describe the pro should include detailed thermal and structural analyses       posed thermal annealing operating conditions, includ that establish appropriate time and temperature pro            ing bounding conditions of temperature and time, and files, including the heatup and cooldown rates of the         heatup and cooldown schedules. The annealing annealing operation, so that dimensional stability of          parameters should be selected to provide sufficient re the system will be maintained. The analyses should            covery of fracture toughness to satisfy the require demonstrate that localized temperatures, thermal              ments of 10 CFR 50.60 and 10 CFR 50.61, or any stress gradients, and subsequent residual stresses will        other objective identified in the application, for the not result in unacceptable dimensional changes or dis          proposed post-anneal period of operation. The anneal tortions in the vessel, attached piping, and appurte          ing parameters should be compatible with design stress    K
The parameters to be evaluated in the thermal and stress analyses should include the annealing tempera ture, hold time at the annealing temperature, heating and cooling rates, the effect of insulation around the vessel Including the bottom head, the active heating length of the heating device, the physical constraints on the vessel, structural characteristics of attached pip ing assemblies, and any other restraints.
nances and that the thermal annealing cycle will not          limits of the reactor and any other component or
                                                        1.162-6


structure expected to experience significant tempera         cent equipment, components, and structures. Instru ture or stress gradients during the annealing operation.      mentation should also be installed to determine the Limitations such as the physical constraints resulting        stress profiles in these items, including the effects of from attached piping, supports, snubbers, and other          thermal gradients in the axial, azimuthal, and through components and the thermal and mechanical stresses            thickness directions during all transient and steady generated in the vessel and piping during the annealing       state aspects of the annealing operation. The accuracy operation should also be considered.                          and reliability of the measurements should be demon strated. The stresses and strains caused by temperature This section should identify the proposed anneal        gradients may be established by analysis in combina ing temperature, time at temperature, heatup rate,            tion with on-line measurements of temperature or cooldown rate, and the limitations and permitted vari        displacements.
The thermal analysis should establish the tempera ture profiles for the inside and outside surfaces of the vessel wall during heatup, start and end of steady-state conditions, and cooldown conditions. The effects of localized high temperatures should be evaluated for degradation of the concrete adjacent to the vessel, for changes, if any, in thermal and mechanical properties of the reactor insulation and for detrimental effects, if any, on containment and the biological shield. Maxi mum concrete temperatures should be based on exist ing design limits or provisions of Section III, Division
2, of the ASME Boiler and Pressure Vessel Code (Ref. 15). If the design temperature limits or the ASME Boiler and Pressure Vessel Code limits for the adjacent concrete structure are projected to be ex ceeded during the annealing operation, an acceptable maximum temperature for the concrete must be estab fished using appropriate test data. Test data on proper ties should address irradiated concrete of appropriate type and exposures to time-temperature conditions that bound the expected conditions of the concrete during annealing.


ations in these conditions. The limitation on tempera ture variations should include axial, azimuthal, and               The annealing procedure should detail the opera through-wall gradients and the permissible tempera            tional steps to be taken during the annealing operation ture profiles in the vessel during heatup, cooldown,         and should include all quality assurance measures and steady-state heating. The bases used to establish        needed to ensure an effective annealing operation.
The structural analysis should evaluate, for the complete annealing cycle, residual deformations, re sidual stresses, elastic-plastic-creep effects (Ref. 16),
distortions, bending, piping displacements, effects of thermal gradients (axial, azimuthal, and through wall), and restraints on the vessel, including nozzles and flange and attached piping. Any potential interfer ence with other equipment, components, or supports should be evaluated. This section should specify the limiting parameters established by these analyses, in cluding maximum temperature, maximum stress, and limiting heatup and cooldown rates.


these annealing parameters should be described.               The annealing procedure should identify the controls that will be in place and how these will be applied and The time and temperature parameters identified          maintained throughout the annealing operation. The in the Thermal Annealing Operating Plan should be            annealing procedure should describe how the heat based on the thermal and stress analyses described in        treatment equipment will be installed and removed Section 1.4 and should represent the bounding times,          from the vessel; what procedures will be instituted to temperatures, and heatup and cooldown schedules for          control radioactive contamination before, during, and the thermal annealing operation that should not be vio        after the annealing operation; and how the vessel will lated during the annealing operation. If these bound          be drained and dried prior to annealing. The proce ing conditions for times and temperatures are violated        dures should detail the precautions to be taken to pre during the thermal annealing operation, the analysis          clude cooling water leakage into the vessel during the will no longer be valid and the annealing operation is        annealing operation; such leakage could result in a considered not in accordance with the Thermal An              steam explosion or a thermal shock to the vessel.
1.5 Thermal Annealing Operating Conditions This section of the report should describe the pro posed thermal annealing operating conditions, includ ing bounding conditions of temperature and time, and heatup and cooldown schedules.


nealing Operating Plan. In that case, the licensee should follow Section 5.2 of this regulatory guide.            1.7  Proposed Annealing Equipment This section of the report should provide a de
The annealing parameters should be selected to provide sufficient re covery of fracture toughness to satisfy the require ments of 10 CFR 50.60 and 10 CFR 50.61, or any other objective identified in the application, for the proposed post-anneal period of operation. The anneal ing parameters should be compatible with design stress limits of the reactor and any other component or
1.6    Description of Annealing Method,                      scription of the equipment to be used for the in-service Instrumentation, and Procedures annealing. It should describe the heating apparatus This section of the report should describe in detail    and the general plant layout to support the annealing the method selected for annealing the vessel as well as      operation; the controls and instrumentation, including the proposed instrumentation and procedures to be            redundant controls; and equipment for measuring and applied during the annealing operation. The annealing        recording the temperatures and temperature profiles.
1.162-6 K
K


operation should not degrade the reactor or other            This section should describe how the equipment will equipment, components, and structures to such an ex          operate, as well as what provisions will be made to pro tent that their ability to perform intended safety func      tect personnel from radiation exposure and to protect tions can no longer be maintained. The annealing op          instruments and equipment from temperature effects eration must be compatible with the original design          during the annealing operation.
structure expected to experience significant tempera ture or stress gradients during the annealing operation.


limits of the reactor system or the incompatibility The heating apparatus should be designed, pro should be described and justified. In such cases, addi vided with instrumentation, and controlled so that the tional design analysis may be required.
Limitations such as the physical constraints resulting from attached piping, supports, snubbers, and other components and the thermal and mechanical stresses generated in the vessel and piping during the annealing operation should also be considered.


entire section of the vessel to be annealed is effectively The annealing method should be determined              held at a uniform temperature, within the bounds es based on constraints from reactor design and accessi          tablished by the Thermal Annealing Operating Plan, bility to the reactor vessel to allow insertion of equip      throughout the annealing period. Redundancy in heat ment and instrumentation. Selection of the method            ing devices, controls, and instrumentation should be also should be based on the expected structural effects      discussed in the operating plan. The temperature con on the primary system that result from temperature            trol system should be able to control temperatures suf gradients in the pressure vessel.                            ficiently to avert adverse effects from thermal gradients during heatup, annealing, and cooldown operations.
This section should identify the proposed anneal ing temperature, time at temperature, heatup rate, cooldown rate, and the limitations and permitted vari ations in these conditions. The limitation on tempera ture variations should include axial, azimuthal, and through-wall gradients and the permissible tempera ture profiles in the vessel during heatup, cooldown, and steady-state heating. The bases used to establish these annealing parameters should be described.


The reactor vessel and adjacent equipment, com ponents, and structures should have instrumentation            1.8  ALARA Considerations that permits on-line measurement of temperatures at
The time and temperature parameters identified in the Thermal Annealing Operating Plan should be based on the thermal and stress analyses described in Section 1.4 and should represent the bounding times, temperatures, and heatup and cooldown schedules for the thermal annealing operation that should not be vio lated during the annealing operation. If these bound ing conditions for times and temperatures are violated during the thermal annealing operation, the analysis will no longer be valid and the annealing operation is considered not in accordance with the Thermal An nealing Operating Plan. In that case, the licensee should follow Section 5.2 of this regulatory guide.
"locationsthat are needed to assess the entire tempera            This section of the report should describe the steps ture profile of the reactor pressure vessel and the adja-    to be taken to minimize occupational exposure, in
                                                        1.162-7


accordance with the "as low as is reasonably achiev          plan (see Section 1.5 of this guide) are not exceeded.
1.6 Description of Annealing Method, Instrumentation, and Procedures This section of the report should describe in detail the method selected for annealing the vessel as well as the proposed instrumentation and procedures to be applied during the annealing operation. The annealing operation should not degrade the reactor or other equipment, components, and structures to such an ex tent that their ability to perform intended safety func tions can no longer be maintained. The annealing op eration must be compatible with the original design limits of the reactor system or the incompatibility should be described and justified. In such cases, addi tional design analysis may be required.


able" (ALARA) principle and the provisions of 10              Temperature measurements should be made at suffi CFR 20.1206. Special training of the personnel who            cient locations to establish temperature profiles for will actually perform the annealing operations should         both the inside and outside surfaces of the reactor ves be described. Equipment and procedures for monitor            sel. These measurements should be made for the en ing and control of airborne radioactive particles during      tire length of the vessel along axial directions where it K
The annealing method should be determined based on constraints from reactor design and accessi bility to the reactor vessel to allow insertion of equip ment and instrumentation. Selection of the method also should be based on the expected structural effects on the primary system that result from temperature gradients in the pressure vessel.
the operation should be identified. This section should        is physically possible, at a minimum of two different specifically address precautions to be taken to avoid          azimuthal locations (which should include the top and excessive exposure from radiation streaming when the          bottom positions of the heating zone), at locations reactor internals are being removed and stored, when          within the heating zone where there may be cold spots the reactor coolant is removed from the reactor, and          (e.g., at joints between the heaters), at locations on when the heating equipment is being moved into and            each nozzle, and on any other component that is ex out of the reactor vessel. It should also describe steps      pected to be significantly affected by the annealing taken to minimize occupational exposure from radio            treatment. Measurements should be made with suffi active waste processing, radioactive materials decon          cient frequency to identify any temperature excursions tamination, and radioactive waste shipment.                  that could lead to violating the established temperature limits. When appropriate, the measurement devices
1.9    Summary of the Thermal Annealing                      should be in physical contact with the component Operating Plan                                        when the temperature is being measured. The meas The Thermal Annealing Report should contain a            urement records should be retained for possible review summary of the Thermal Annealing Operating Plan              and inspection by the NRC, in accordance with the re that includes the highlights of each section, the key pa      quirements of 10 CFR 50.71(c), until the facility li rameters of annealing, and the major conclusions of          cense is terminated. The temperature measurements the plan. The projected percent recovery and the pro          should be monitored and compared to pre-established jected reembrittlement rate should be identified, as          tolerance bounds during heatup, steady-state opera well as the projected end-of-license values of RTNDT          tion, and cooldown to ensure that temperature and and Charpy upper-shelf energy after annealing.                stress limits have not been exceeded.


Stress limitations should be monitored by a proce
The reactor vessel and adjacent equipment, com ponents, and structures should have instrumentation that permits on-line measurement of temperatures at
2.  REQUALIFICATION INSPECTION AND                          dure established by the licensee that uses strain gauges TEST PROGRAM                                            or alternative methods, for example, deflection meas The inspection and test program to requalify the         urements or temperature measurements. Experimen            K
"locations that are needed to assess the entire tempera ture profile of the reactor pressure vessel and the adja- cent equipment, components, and structures. Instru mentation should also be installed to determine the stress profiles in these items, including the effects of thermal gradients in the axial, azimuthal, and through thickness directions during all transient and steady state aspects of the annealing operation. The accuracy and reliability of the measurements should be demon strated. The stresses and strains caused by temperature gradients may be established by analysis in combina tion with on-line measurements of temperature or displacements.
annealed reactor vessel should include the detailed            tal evidence of the validity of alternative methods monitoring, inspections, and tests proposed to demon          should be provided. Measurements should be made to strate that the limitations in the operating plan on tem      establish stress levels at the vessel locations of highest peratures, heat treatment times, temperature profiles,        stress, on the vessel nozzles, on the flange, and on and stresses have not been exceeded. The detailed              high-stress piping locations.


monitoring, inspections, and tests should also establish the thermal annealing time and temperature to be used                This section should describe the measurement in quantifying the fracture toughness recovery. The          type, the number of measurements to be made for program should also demonstrate that the annealing           each component, measurement sensitivity, measure operation has not degraded the reactor vessel, at            ment frequency, and recording method.
The annealing procedure should detail the opera tional steps to be taken during the annealing operation and should include all quality assurance measures needed to ensure an effective annealing operation.


tached piping or appurtenances, or the adjacent con crete structures to a degree that could affect the safe      2.2    Inspection Program operation of the reactor after annealing.
The annealing procedure should identify the controls that will be in place and how these will be applied and maintained throughout the annealing operation. The annealing procedure should describe how the heat treatment equipment will be installed and removed from the vessel; what procedures will be instituted to control radioactive contamination before, during, and after the annealing operation; and how the vessel will be drained and dried prior to annealing. The proce dures should detail the precautions to be taken to pre clude cooling water leakage into the vessel during the annealing operation; such leakage could result in a steam explosion or a thermal shock to the vessel.


This section should describe the inspection pro The program should identify the limiting parame gram proposed to affirm that the annealing operation ters established for the thermal annealing operation has not damaged the reactor vessel or related equip conditions, identify the physical measurements and ment, components, or structures. The inspection pro tests to be made to ensure that these conditions are not gram, as a minimum, should include a pre- and post exceeded, describe the instrumentation to be used for anneal visual examination of critical regions of the making these measurements and tests, and state the vessel, piping, and any other equipment, component, quality assurance provisions to be applied.
1.7 Proposed Annealing Equipment This section of the report should provide a de scription of the equipment to be used for the in-service annealing. It should describe the heating apparatus and the general plant layout to support the annealing operation; the controls and instrumentation, including redundant controls; and equipment for measuring and recording the temperatures and temperature profiles.


or structure that might be affected by the annealing operation. The inspection program should also de
This section should describe how the equipment will operate, as well as what provisions will be made to pro tect personnel from radiation exposure and to protect instruments and equipment from temperature effects during the annealing operation.
2.1    Monitoring the Annealing Process scribe a nondestructive examination program for the This section should identify the measurements,          reactor vessel beltline region that will ensure that the with their locations, that will be used to monitor the        vessel will continue to perform its safety function after annealing process and to make certain that the pro            the annealing operation. The description of the inspec posed annealing conditions evaluated in the operating        tion program should include acceptance criteria, type
                                                        1.162-8


and number of examinations, qualification require                  3.1.1 Vessel Surveillance Program Method ments, and reporting requirements.                                If the plant's surveillance program has resulted in
The heating apparatus should be designed, pro vided with instrumentation, and controlled so that the entire section of the vessel to be annealed is effectively held at a uniform temperature, within the bounds es tablished by the Thermal Annealing Operating Plan, throughout the annealing period. Redundancy in heat ing devices, controls, and instrumentation should be discussed in the operating plan. The temperature con trol system should be able to control temperatures suf ficiently to avert adverse effects from thermal gradients during heatup, annealing, and cooldown operations.
                                                                  "credible" data (as defined in the PTS rule, 10 CFR
  ) 2.3    Testing Program                                        50.6 1), and broken specimens from that program have been retained (as recommended in NRC Information This section should describe the testing program        Notice No. 90-52, "Retention of Broken Charpy that will be performed to demonstrate the effectiveness      Specimens," Reference 17), the thermal annealing of the annealing operation and to assure that the reac        rule (10 CFR 50.66) requires that broken specimens tor vessel, attached piping and appurtenances, and ad        from surveillance specimens and any remaining untest jacent concrete will continue to perform their intended      ed surveillance specimens be used to evaluate anneal safety function following the annealing operation. This      ing recovery on a material-specific basis. The broken program is expected to be unique to each plant and            specimens should be reconstituted (see Section 3.1.4 should be established by the applicant. The testing pro      of this guide) to form new, full-size specimens with the gram may, for example, test the effects on the vessel of      insert material being the only material from the original annealing, the integrity of the concrete, the operability    surveillance specimen. These reconstituted specimens, of instrumentation, and the post-anneal functioning of        and any untested specimens from the original speci affected components, equipment, and structures.              men complement, should be annealed at time and temperature conditions that are equal to or are bounded by the actual vessel annealing conditions.


3.   FRACTURE TOUGHNESS RECOVERY AND
1.8 ALARA Considerations This section of the report should describe the steps to be taken to minimize occupational exposure, in
        REEMBRITrLEMENT ASSURANCE                                    This method may be applied to broken specimens PROGRAM                                                  from a single capsule or multiple capsules from the sur The fracture toughness recovery and reembrittle          veillance program. Specimens from at least two cap ment assurance program should describe the methods            sules should be used, with the fluences of the two cap to be used for quantifying the percent recovery, the          sules spanning the peak fluence of the reactor pressure reembrittlement trend and for establishing the post          vessel beltline; this ensures that an interpolation of the anneal RTNDT and Charpy upper-shelf energy values.            annealing recovery is possible. If broken specimens These tasks are important for evaluation of the safety        from only a single capsule are used, the specific surveil margins of the reactor pressure vessel in subsequent          lance capsule chosen should be the one for which the operating periods. The methods outlined below pro            fluence most closely matches the peak fluence of the vide experimental and computational means for quan            reactor pressure vessel beltline.
1.162-7


tifying both the recovery of fracture toughness follow            As an alternative, materials test reactor (MTR) ir ing the thermal anneal and the reembrittlement rate          radiations of the vessel-specific limiting material may with subsequent plant operation.                             be used as a method for determining percent recovery on a material-specific basis (see Section 3.3 of this
accordance with the "as low as is reasonably achiev able" (ALARA) principle and the provisions of 10
    3.1    Fracture Toughness Recovery Program                    guide).
CFR 20.1206. Special training of the personnel who will actually perform the annealing operations should be described. Equipment and procedures for monitor ing and control of airborne radioactive particles during the operation should be identified. This section should specifically address precautions to be taken to avoid excessive exposure from radiation streaming when the reactor internals are being removed and stored, when the reactor coolant is removed from the reactor, and when the heating equipment is being moved into and out of the reactor vessel. It should also describe steps taken to minimize occupational exposure from radio active waste processing, radioactive materials decon tamination, and radioactive waste shipment.
        This section of the assurance program should de              Methods for testing the specimens and using the scribe the method planned to determine the percent            resultant data are discussed in Sections 3.1.5 and recovery, including any computations or tests. The            3.1.6 of this guide.


methods discussed below provide experimental and                  The assurance program should describe the plans computational means for determining the percent re            for using the surveillance results, including a descrip covery of ARTNDT, Rt, and the percent recovery of             tion of the procedure for generating post-anneal prop Charpy upper-shelf energy, RUSE.                              erties (e.g., reconstituted specimens or whole pre viously untested specimens) and the method for using As provided in the thermal annealing rule (10
1.9 Summary of the Thermal Annealing Operating Plan The Thermal Annealing Report should contain a summary of the Thermal Annealing Operating Plan that includes the highlights of each section, the key pa rameters of annealing, and the major conclusions of the plan. The projected percent recovery and the pro jected reembrittlement rate should be identified, as well as the projected end-of-license values of RTNDT
                                                                  the surveillance measurements of percent recovery to CFR 50.66), one of three methods may be used to evaluate the recovery in fracture toughness following        evaluate the percent recovery for the vessel material.
and Charpy upper-shelf energy after annealing.


the thermal annealing. One method requires the use of              3.1.2 Irradiated Vessel Material Method surveillance specimens from "credible" surveillance programs (as defined in the PTS rule, 10 CFR 50.61)                An alternative method for determining the per to develop material-specific data, if such specimens are      cent recovery uses the results of a verification test pro available. The most accurate, but difficult, second          gram employing materials removed from the beltline method uses material removed from the reactor pres            region of the reactor vessel. For this method, the sam sure vessel beltline to develop plant-specific data. The      ples removed from the vessel are used to evaluate the third method uses generic computations to estimate            as-irradiated or pre-anneal condition of the material
2. REQUALIFICATION INSPECTION AND
>  the recovery. These three methods are described be            and the post-anneal condition of the material. The low. Values of percent recovery (RUSE and RI) may            post-anneal condition is evaluated from specimens that not exceed 100 percent.                                      have been annealed at the time and temperature
TEST PROGRAM
                                                            1.162-9
The inspection and test program to requalify the annealed reactor vessel should include the detailed monitoring, inspections, and tests proposed to demon strate that the limitations in the operating plan on tem peratures, heat treatment times, temperature profiles, and stresses have not been exceeded. The detailed monitoring, inspections, and tests should also establish the thermal annealing time and temperature to be used in quantifying the fracture toughness recovery. The program should also demonstrate that the annealing operation has not degraded the reactor vessel, at tached piping or appurtenances, or the adjacent con crete structures to a degree that could affect the safe operation of the reactor after annealing.


conditions equal to or bounded by the reactor vessel          pliance with the applicable stress limits of Section III of annealing conditions.                                        the ASME Code must include consideration of the ef The number of samples to be removed from the              fects of fatigue and corrosion on the exposed base metal following removal of the samples, and the analy vessel depends on many factors, including the size of ses should consider any thermal and mechanical ef the samples, the reason for the annealing (determining fects on the surface and near-surface material remain both RTNDT and Charpy upper-shelf energy requires ing after removal of the sample.
The program should identify the limiting parame ters established for the thermal annealing operation conditions, identify the physical measurements and tests to be made to ensure that these conditions are not exceeded, describe the instrumentation to be used for making these measurements and tests, and state the quality assurance provisions to be applied.


more tests than determining only one of these quanti ties), the testing plans (specimen size and type), and              The assurance program should describe the meth the acceptability of removing the samples from the ves        od proposed to characterize the depression remaining sel. The samples removed from the vessel beltdine can        after sample removal to ensure that the condition of be used to fabricate full-size Charpy specimens, inserts      the remaining material is bounded by the assumptions for reconstitution into full-size Charpy specimens, or        in the analysis and is acceptable. Any proposed re sub-size Charpy specimens (see subsections 3.1.4.3            pairs, including weld repair, should be described in the and 3.1.6.4). Other test methods for irradiated vessel        Thermal Annealing Operating Plan.
2.1 Monitoring the Annealing Process This section should identify the measurements, with their locations, that will be used to monitor the annealing process and to make certain that the pro posed annealing conditions evaluated in the operating plan (see Section 1.5 of this guide) are not exceeded.


material may be used if appropriate justification is                3.1.2.2 Testing of Material Removed from the provided.                                                     Vessel Beltline. One impediment to the quantitative This method is plant-specific and, as described be      use of data from testing of material removed from the low, several criteria must be satisfied to demonstrate        vessel beltine in determining the percent recovery of the acceptability of this method for a specific applica      ARTNDT and Charpy upper-shelf energy is that this tion or plant.                                                material represents surface or near-surface properties of the material. In contrast, ASTM Standard E 185 The assurance program should provide a complete          (Ref. 14) requires the use of material from the 1/4T
Temperature measurements should be made at suffi cient locations to establish temperature profiles for both the inside and outside surfaces of the reactor ves sel. These measurements should be made for the en tire length of the vessel along axial directions where it is physically possible, at a minimum of two different azimuthal locations (which should include the top and bottom positions of the heating zone), at locations within the heating zone where there may be cold spots (e.g., at joints between the heaters), at locations on each nozzle, and on any other component that is ex pected to be significantly affected by the annealing treatment. Measurements should be made with suffi cient frequency to identify any temperature excursions that could lead to violating the established temperature limits. When appropriate, the measurement devices should be in physical contact with the component when the temperature is being measured. The meas urement records should be retained for possible review and inspection by the NRC, in accordance with the re quirements of 10 CFR 50.71(c), until the facility li cense is terminated. The temperature measurements should be monitored and compared to pre-established tolerance bounds during heatup, steady-state opera tion, and cooldown to ensure that temperature and stress limits have not been exceeded.
description of the plans for using samples removed            location of plate and forging products, and more than from the vessel beltline, including the method for re         0.5 in. from the surface of weld metals, to determine moving the samples; the number, size, and location of          ARTNDT and Charpy upper-shelf energy.


the samples; analyses to demonstrate acceptability of To permit a quantitative use of material removed the sample removal; the experimental plans for using from the vessel beltiine to determine the percent re the samples (size and number of specimens, test plans covery of ARTNDT and Charpy upper-shelf energy, and procedures, etc.); and the method for determin samples removed from the vessel beltline should be ing the percent of recovery of the vessel material from used to evaluate both the pre-anneal and the post the results of the tests from the samples.
Stress limitations should be monitored by a proce dure established by the licensee that uses strain gauges or alternative methods, for example, deflection meas urements or temperature measurements. Experimen tal evidence of the validity of alternative methods should be provided. Measurements should be made to establish stress levels at the vessel locations of highest stress, on the vessel nozzles, on the flange, and on high-stress piping locations.


anneal properties of the near-surface materia
This section should describe the measurement type, the number of measurements to be made for each component, measurement sensitivity, measure ment frequency, and recording method.


====l. Speci====
2.2 Inspection Program This section should describe the inspection pro gram proposed to affirm that the annealing operation has not damaged the reactor vessel or related equip ment, components, or structures. The inspection pro gram, as a minimum, should include a pre- and post anneal visual examination of critical regions of the vessel, piping, and any other equipment, component, or structure that might be affected by the annealing operation. The inspection program should also de scribe a nondestructive examination program for the reactor vessel beltline region that will ensure that the vessel will continue to perform its safety function after the annealing operation. The description of the inspec tion program should include acceptance criteria, type
      3.1.2.1 Acceptability of Removing Material              mens used to evaluate the post-anneal properties from the Vessel. The acceptability of the method used        should be annealed at time and temperature condi for removing samples from the vessel beltline is based        tions that equal or are bounded by the actual vessel on local and global considerations, both of which            annealing conditions. The resulting percent recovery should be addressed in the assurance program. The            of transition temperature at the 30 ft-lb level may be global considerations concern the impact on overall          used to determine the percent recovery for ARTNDT,
1.162-8 K
vessel integrity of the depression, hole, or surface dis      R1. The resulting percent recovery of the Charpy continuity remaining after removal of the sample, and        upper-shelf energy may be used to determine the Char they are addressed through analysis. The local consid        py upper-shelf energy, RUSE.
K


erations concern thermal and mechanical effects and                Samples removed from the vessel beltiine material surface quality effects on the surrounding material re        can be used to develop test specimens in several man maining after removal of the samples.                        ners. The samples can be used to fabricate fullsize The sample removal process should be described          Charpy specimens, inserts for reconstitution into full in the assurance program, including a description of          size Charpy specimens, sub-size Charpy specimens or the measures to ensure the identification and docu            other test specimens of the approved plan. Preparation mentation of the orientation of the sample relative to        and use of these various specimen types is described in the vessel.                                                  Section 3.14.
and number of examinations, qualification require ments, and reporting requirements.


The removal of samples from the vessel beltline              3.1.3 Computational Method will result in a depression or other surface discontinuity          The computational method uses generic equations in the vessel wall. As required in the thermal annealing     (Equations I and 2) to determine the percent recovery rule (10 CFR 50.66), it must be demonstrated that the        of Charpy upper-shelf energy (USE) and ARTNDT re resulting depressions satisfy the stress limits of the       spectively. Alternative computational methods may be applicable portions of the ASME Code Section III, re          used if appropriate justification is provided. When de gardless of the applicable section of the Code for the       termining the projected percent recovery for the an vessel design. The analyses used to demonstrate com-         nealing plan, the proposed lower-bound annealing
)
                                                      1.162-10
2.3 Testing Program This section should describe the testing program that will be performed to demonstrate the effectiveness of the annealing operation and to assure that the reac tor vessel, attached piping and appurtenances, and ad jacent concrete will continue to perform their intended safety function following the annealing operation. This program is expected to be unique to each plant and should be established by the applicant. The testing pro gram may, for example, test the effects on the vessel of annealing, the integrity of the concrete, the operability of instrumentation, and the post-anneal functioning of affected components, equipment, and structures.


time and temperature are used in Equations 1 and 2.              3.1.4 Specimen Handling and Preparation Procedures However, when computing the post-anneal percent recovery, the actual annealing time and the lower                3.1.4.1 Specimen Handling Procedures. For re bound of the range of actual annealing temperatures          constituting surveillance specimens or removing sam determined from the instrumentation (see Section 2.1        ples from the vessel beltine, the assurance program of this guide) should be used.                              should describe the methods to be used for marking and handling the test materials to ensure that the
3.
                                  9 RUSE = {[1-0.586 exp(-ta/15. )] x [0.570AUSEi +              orientation of the material relative to the vessel is un
                        4
          (0.120Ta-10 ) Cu+0.0389Ta-17.6]} x                ambiguous and traceable.


(100/AUSEji (Equation 1)          3.1.4.2 Specimen Orientation. The assurance program should address the orientation of the speci where                                                        mens to be tested. For testing materials from a "cred ible" surveillance program for the evaluation of per RUSE    = percent recovery of USE from              cent recovery of ARTNDT, it is preferable to test the annealing,                                post-anneal specimens in the same orientation as the AUSEi = (mean USE unirradiated - mean                original surveillance tests. In contrast, for evaluation of USE after irradiation),                  Charpy upper-shelf energy, it may be preferable to use ta      = time at annealing temperature in          specimens oriented in the transverse direction, the hours,                                    T-L orientation, according to ASTM Standard E 399 Ta        = annealing temperature in °F,              (Ref. 18).
FRACTURE TOUGHNESS RECOVERY AND
      Cu        = copper content of material in weight-percent.                                3.1.4.3 Reconstitution of Charpy Specimens.
REEMBRITrLEMENT ASSURANCE
PROGRAM
The fracture toughness recovery and reembrittle ment assurance program should describe the methods to be used for quantifying the percent recovery, the reembrittlement trend and for establishing the post anneal RTNDT and Charpy upper-shelf energy values.


Reconstitution of Charpy specimens is used to provide R== [0.5 + 0.5 tanh((aTa - a2)/95.7}1]* 100            new full-size Charpy specimens from the broken pieces (Equation 2)    of previously tested specimens and to conserve materi al. Several methods are available for welding end-tabs where                                                        onto the test material section, with the goal of each method to provide a structurally sound and testable Rt        = percent recovery of transition temperature from annealing,              specimen (i.e., the specimen does not fracture at the reconstitution welds) without overheating (possibly in Sal      = 1 + 0.0151 ln(ta)
These tasks are important for evaluation of the safety margins of the reactor pressure vessel in subsequent operating periods. The methods outlined below pro vide experimental and computational means for quan tifying both the recovery of fracture toughness follow ing the thermal anneal and the reembrittlement rate with subsequent plant operation.
                  0.424Cu( 3 .2 8 - 0.00306Ta)              ducing annealing) the test section.


a2        = 0.584(Ti + 637), for Ta k 800OF                The assurance program should describe the proce or a2    = 0.584T1 - 15.51n(O) + 833 for            dures to be used for the reconstitution process. The Ta < 750 0F                              procedures and criteria of ASTM Standard E 1253-88 where                                                        (Ref. 19), "Standard Guide for Reconstitution of Irra diated Charpy Specimens," are sufficient to demon flux rate, n/(cm2-s),                   strate an adequate reconstitution method. Other pro TC          temperature of irradiation.              posed methods should have appropriate justification.
3.1 Fracture Toughness Recovery Program This section of the assurance program should de scribe the method planned to determine the percent recovery, including any computations or tests. The methods discussed below provide experimental and computational means for determining the percent re covery of ARTNDT, Rt, and the percent recovery of Charpy upper-shelf energy, RUSE.


Cu.         copper content of material in weight percent with maximum                    3.1.5 Specimen Testing value of 0.3%.
As provided in the thermal annealing rule (10
                                                                  3.1.5.1 Test Procedures. The assurance pro The current Rt equation is not accurate between        gram should describe the procedures used for testing annealing temperatures of 750 and 800 0 F. Until a          the Charpy specimens, either full-size or sub-size. For complete equation is developed an extension of the ef      testing full-size Charpy specimens, either reconstituted fect of the flux term (a2) is assumed to a temperature      specimens or specimens fabricated from samples re of 775*F. Between 775 and 800&deg;F, a linear interpola        moved from the vessel beltline, testing should be per tion between Equation 2 evaluated at 775 &deg;F with the        formed using equipment and testing procedures similar flux term and Equation 2 evaluated at 8000 without          to those used to develop surveillance data, as outlined the flux term should be made.                              in ASTM Standards E 185-82 (Ref. 14) and E 23-88 Since plant operational characteristics do not re      (Ref. 20).
CFR 50.66), one of three methods may be used to evaluate the recovery in fracture toughness following the thermal annealing. One method requires the use of surveillance specimens from "credible" surveillance programs (as defined in the PTS rule, 10 CFR 50.61)
sult in a unique value of irradiation temperature                Testing of sub-size Charpy specimens should fol throughout a plant's lifetime, the method used for          low the general procedures and methods in ASTM
to develop material-specific data, if such specimens are available. The most accurate, but difficult, second method uses material removed from the reactor pres sure vessel beltline to develop plant-specific data. The third method uses generic computations to estimate
evaluating Ti should be described in the assurance          Standard E 23-88 (Ref. 20) for testing of full-size program.                                                    Charpy specimens. For testing sub-size Charpy speci Equations 1 and 2 are documented in Reference 8        mens, a description of the general test procedures and and represent mean values of the percent recovery of        the testing equipment should be provided in the assur RTNDT and USE.                                               ance program. In addition, a method for applying the
>
                                                      1.162-11
the recovery. These three methods are described be low. Values of percent recovery (RUSE and RI) may not exceed 100 percent.


results from the tests of the sub-size specimens should      reference temperature (RTNDT) and Charpy upper be described.                                                shelf energy are evaluated using Equations 3 and 4:
3.1.1 Vessel Surveillance Program Method If the plant's surveillance program has resulted in
        3. 1.S.2 Test Plan. The assurance program should RTNDT(A) = RTNDT            + ARTNDT x describe the test plan, including the number of speci
"credible" data (as defined in the PTS rule, 10 CFR
                                                                              (100 - W) / 100            (Equation 3)
50.6 1), and broken specimens from that program have been retained (as recommended in NRC Information Notice No. 90-52, "Retention of Broken Charpy Specimens," Reference 17), the thermal annealing rule (10 CFR 50.66) requires that broken specimens from surveillance specimens and any remaining untest ed surveillance specimens be used to evaluate anneal ing recovery on a material-specific basis. The broken specimens should be reconstituted (see Section 3.1.4 of this guide) to form new, full-size specimens with the insert material being the only material from the original surveillance specimen. These reconstituted specimens, and any untested specimens from the original speci men complement, should be annealed at time and temperature conditions that are equal to or are bounded by the actual vessel annealing conditions.
  mens to be tested and the method for selecting test temperatures. This description should include the                                                                    K
  steps taken to ensure that a reasonable measure of           CvUSE(A) = CvUSE(u) [I - D x recovery is achieved by the testing; the description                        (100 - RUSE)/100001        (Equation 4)
  should also include the proposed method for handling where uncertainty in the test results.


RTNDT(A)    = reference temperature, RTNDT,
This method may be applied to broken specimens from a single capsule or multiple capsules from the sur veillance program. Specimens from at least two cap sules should be used, with the fluences of the two cap sules spanning the peak fluence of the reactor pressure vessel beltline; this ensures that an interpolation of the annealing recovery is possible. If broken specimens from only a single capsule are used, the specific surveil lance capsule chosen should be the one for which the fluence most closely matches the peak fluence of the reactor pressure vessel beltline.
        Testing to evaluate percent recovery of ARTNDT                                of the material in the post should result in an unambiguous evaluation of the tem                              anneal condition in OF,
  perature at which the average Charpy energy versus                  RTNDT(U) = reference temperature, RTNDT,
  temperature curve achieves an energy level of 30 ft-lb.                            of the material in the It is preferable that the testing cover a broad range of                           preservice or unirradiated results based on the shear percentage (from near 0                                  condition in &deg;F,
  percent to greater than 95 percent) to permit a more                ARTNDT      = mean value of the transition complete assessment of the Charpy data trends for the                              temperature shift, or change material and to preclude false trends from data cluster                            in RTNDT, from irradiation ing around the 30 ft-lb level.                                                      (before annealing) in &deg;F,
      Testing to evaluate Charpy upper-shelf energy re              Rt          = percent recovery of ARTNDT
  covery should provide an unambiguous definition of                                from annealing, the Charpy upper-shelf energy for the material. All                CvUSE(A) = Charpy upper-shelf energy of tests used in evaluating the Charpy upper-shelf energy                            the material in the post should result in 100 percent shear.                                                anneal condition in ft-lb, CvUSE(u) = Charpy upper-shelf energy of the material in the preservice
      3.1.6 Quantification of Post-Anneal Initial or unirradiated condition in Properties ft-lb, Quantification of the post-anneal initial proper ties, RTNDT and Charpy upper-shelf energy, is depen D          = percent decrease in Charpy upper-shelf energy from K
dent on the method used to determine the percent re                                irradiation (before annealing),
covery by annealing.                                                                and RUSE        = percent recovery of Charpy
      3.1.6.1 Vessel Surveillance Program Method.


upper-shelf energy from The assurance program should describe the surveil                                  annealing.
As an alternative, materials test reactor (MTR) ir radiations of the vessel-specific limiting material may be used as a method for determining percent recovery on a material-specific basis (see Section 3.3 of this guide). 
Methods for testing the specimens and using the resultant data are discussed in Sections 3.1.5 and
3.1.6 of this guide.


lance results to be used in evaluating percent recovery, along with the proposed method to relate the observed              The values of RTNDT(A) and CvUSE(A), calcu percent recovery from the surveillance results to the        lated using Equations 3 and 4, respectively, should be percent recovery of the vessel material.                     used as the values of reference temperature (RTNDT)
The assurance program should describe the plans for using the surveillance results, including a descrip tion of the procedure for generating post-anneal prop erties (e.g., reconstituted specimens or whole pre viously untested specimens) and the method for using the surveillance measurements of percent recovery to evaluate the percent recovery for the vessel material.
                                                              and Charpy upper-shelf energy, respectively, at the ini One method for relating the observed recovery to       tiation of continued plant operation.


the vessel recovery is to compare the measured recov
3.1.2 Irradiated Vessel Material Method An alternative method for determining the per cent recovery uses the results of a verification test pro gram employing materials removed from the beltline region of the reactor vessel. For this method, the sam ples removed from the vessel are used to evaluate the as-irradiated or pre-anneal condition of the material and the post-anneal condition of the material. The post-anneal condition is evaluated from specimens that have been annealed at the time and temperature
                                                                  3.1.6.2 Irradiated Vessel Material Method.
1.162-9


ery from the test (or tests) of surveillance specimens to Since the Charpy data evaluated by this method repre the percent recovery from Equations 1 and 2 for the sent the surface or near-surface properties of the plate, surveillance capsule. The average ratio (or the ratio weld, or forging, the measured values cannot be used from a single capsule) between the measured recovery directly to represent the plate or forging 1/4T or weld from the surveillance capsules and that evaluated from bulk properties as called for by Regulatory Guide 1.99, Equations 1 and 2 for the surveillance capsule provides Revision 2 (Ref. 21). However, evaluations of the pre a material-specific adjustment for the generic equa anneal and the post-anneal properties of the sample tion. In this method, the vessel percent recovery would removed from the vessel beltline will provide sufficient be calculated by multiplying the percent recovery de data to evaluate the expected recovery at the plate or termined from Equations 1 and 2 for the vessel by the forging II4T level or the weld bulk properties.
conditions equal to or bounded by the reactor vessel annealing conditions.


average ratio adjustment. Values of Rt and RUSE de termined from surveillance data may not exceed 100.                The assurance program should describe the proce dures used to evaluate percent recovery for the vessel Once suitable values of Rt and RUSE have been          materials from the measurements resulting from this determined from the surveillance data, the post-anneal      method.
The number of samples to be removed from the vessel depends on many factors, including the size of the samples, the reason for the annealing (determining both RTNDT and Charpy upper-shelf energy requires more tests than determining only one of these quanti ties), the testing plans (specimen size and type), and the acceptability of removing the samples from the ves sel. The samples removed from the vessel beltdine can be used to fabricate full-size Charpy specimens, inserts for reconstitution into full-size Charpy specimens, or sub-size Charpy specimens (see subsections 3.1.4.3 and 3.1.6.4). Other test methods for irradiated vessel material may be used if appropriate justification is provided.


1.162-12
This method is plant-specific and, as described be low, several criteria must be satisfied to demonstrate the acceptability of this method for a specific applica tion or plant.


If the samples removed from the vessel beltline are                          the 1/4T location of plate and from the peak flux location for the material, one pro                            forging, or the weld bulk cedure to evaluate the post-anneal properties from the                           properties in ft-lb, measured percent recovery uses the following                      D            = percent decrease in Charpy equations:                                                                        upper-shelf energy from irradi ation embrittlement, for the
The assurance program should provide a complete description of the plans for using samples removed from the vessel beltline, including the method for re moving the samples; the number, size, and location of the samples; analyses to demonstrate acceptability of the sample removal; the experimental plans for using the samples (size and number of specimens, test plans and procedures, etc.); and the method for determin ing the percent of recovery of the vessel material from the results of the tests from the samples.
                                                                                  1/4T location of plate and RTNDT(A) = RTNDT(U) + ARTNDT x [1 - (iTs 1 (Equation 5)                            forging, or the weld bulk TTSA) (RS / ATs)]
                                                                                  properties,
                                                                                = from the measured surface CvUSE(A) = CvUSE u (1 - D / 100)                                                  data, the Charpy upper-shelf (CvSA /CVS)                (Equation 6)                            energy for the pre-anneal condition in ft-lb, where                                                              CVSA        = from the measured surface data, the Charpy upper-shelf RTNDT(A)    = reference temperature,                                      energy for the post-anneal RTNDT, of the material in the                               condition in ft-lb.


post-anneal condition in *F,
3.1.2.1 Acceptability of Removing Material from the Vessel. The acceptability of the method used for removing samples from the vessel beltline is based on local and global considerations, both of which should be addressed in the assurance program. The global considerations concern the impact on overall vessel integrity of the depression, hole, or surface dis continuity remaining after removal of the sample, and they are addressed through analysis. The local consid erations concern thermal and mechanical effects and surface quality effects on the surrounding material re maining after removal of the samples.
      RTNDT(U) = reference temperature,                        The values of RTNDT(A) and CvUSE(A) calcu RTNDT, of the material in the         lated using Equations 5 and 6 should be used as the preservice or unirradiated            values of reference temperature (RTNDT) and Charpy condition in *F,                     uppershelf energy, respectively, at the initiation of ARTNDT      = mean value of the transition          continued plant operation.


temperature shift, or change in RTNDT, caused by                        If the samples removed from the vessel beitline do irradiation (before annealing)        not come from the vessel peak flux location, the vessel in -F,                                embrittlement and the annealing recovery will not be
The sample removal process should be described in the assurance program, including a description of the measures to ensure the identification and docu mentation of the orientation of the sample relative to the vessel.
      "iTs1        = from the measured surface              as great as that for the vessel peak flux location, and data, the transition tempera          Equations 5 and 6 should underestimate the percent ture at the 30 ft-lb energy          recovery of the vessel. In such cases, the assurance level for the pre-anneal              program should describe the procedures used to evalu condition in *F,                      ate percent recovery for the vessel materials from the
      "7SA        = from the measured surface            measurements resulting from this method.


data, the transition tempera                3.1.6.3 Computational Method. For the compu ture at the 30 ft-lb energy          tational method, the postanneal initial RTNDT and level for the post-anneal Charpy upper-shelf energy values for each beltiine ma condition in *F,                     terial should be evaluated using Equations 3 and 4, us RS=            the ratio of Rt from Equation ing the values of Rt and RUSE from Equations 2 and 1.
The removal of samples from the vessel beltline will result in a depression or other surface discontinuity in the vessel wall. As required in the thermal annealing rule (10 CFR 50.66), it must be demonstrated that the resulting depressions satisfy the stress limits of the applicable portions of the ASME Code Section III, re gardless of the applicable section of the Code for the vessel design. The analyses used to demonstrate com- pliance with the applicable stress limits of Section III of the ASME Code must include consideration of the ef fects of fatigue and corrosion on the exposed base metal following removal of the samples, and the analy ses should consider any thermal and mechanical ef fects on the surface and near-surface material remain ing after removal of the sample.


2 for the 1/4T location to Rt from Equation 2 for the                   The values of RTNDT(A) and CvUSE(A), calcu surface of the plate, forging or      lated using Equations 3 and 4, respectively, should be weld,                                used as the values of reference temperature (RTNDT)
The assurance program should describe the meth od proposed to characterize the depression remaining after sample removal to ensure that the condition of the remaining material is bounded by the assumptions in the analysis and is acceptable. Any proposed re pairs, including weld repair, should be described in the Thermal Annealing Operating Plan.
      ATs          = the mean value of the transi          and Charpy upper-shelf energy, respectively, at plant tion temperature shift (in *F)        restart.


at the surface of the plate, forging or weld, determined               3.1.6.4 Sub-size Charpy Specimens. Sub-size using the surface fluence and         Charpy specimens can provide very useful information the same calculational method         concerning the toughness of the material and the re used to evaluate ARTNDT for           covery of irradiation embrittlement by annealing. Data the 1/4T location,                   from sub-size Charpy specimens is not uniquely corre CvUSE(A) = Charpy upper-shelf energy of             lated to data from full-size Charpy specimens in an the material in the post-anneal      absolute sense, but quantities such as irradiation condition, for the 1/4T              embrittlement shift and annealing recovery can be eva location of plate and forging,        luated from sub-size specimen data. Although some or the weld bulk properties in        work has been under way in the United States In this ft-lb,                                area using several sub-size Charpy specimen designs, CvUSE(u) = Charpy upper-shelf energy of              there is no consensus in the U.S. technical community the material in the preservice        or the nuclear industry as to a preferred specimen de or unirradiated condition, for        sign or an appropriate correlation method.
3.1.2.2 Testing of Material Removed from the Vessel Beltline. One impediment to the quantitative use of data from testing of material removed from the vessel beltine in determining the percent recovery of ARTNDT and Charpy upper-shelf energy is that this material represents surface or near-surface properties of the material. In contrast, ASTM Standard E 185 (Ref. 14) requires the use of material from the 1/4T
location of plate and forging products, and more than
0.5 in. from the surface of weld metals, to determine ARTNDT and Charpy upper-shelf energy.
 
To permit a quantitative use of material removed from the vessel beltiine to determine the percent re covery of ARTNDT and Charpy upper-shelf energy, samples removed from the vessel beltline should be used to evaluate both the pre-anneal and the post anneal properties of the near-surface material. Speci mens used to evaluate the post-anneal properties should be annealed at time and temperature condi tions that equal or are bounded by the actual vessel annealing conditions. The resulting percent recovery of transition temperature at the 30 ft-lb level may be used to determine the percent recovery for ARTNDT,
R1. The resulting percent recovery of the Charpy upper-shelf energy may be used to determine the Char py upper-shelf energy, RUSE.
 
Samples removed from the vessel beltiine material can be used to develop test specimens in several man ners. The samples can be used to fabricate fullsize Charpy specimens, inserts for reconstitution into full size Charpy specimens, sub-size Charpy specimens or other test specimens of the approved plan. Preparation and use of these various specimen types is described in Section 3.14.
 
3.1.3 Computational Method The computational method uses generic equations (Equations I and 2) to determine the percent recovery of Charpy upper-shelf energy (USE) and ARTNDT re spectively. Alternative computational methods may be used if appropriate justification is provided. When de termining the projected percent recovery for the an nealing plan, the proposed lower-bound annealing
1.162-10
 
time and temperature are used in Equations 1 and 2.
 
However, when computing the post-anneal percent recovery, the actual annealing time and the lower bound of the range of actual annealing temperatures determined from the instrumentation (see Section 2.1 of this guide) should be used.
 
RUSE = {[1-0.586 exp(-ta/15. 9)] x [0.570AUSEi +
(0.120Ta-10 4) Cu+0.0389Ta-17.6]} x
(100/AUSEji (Equation 1)
where RUSE
= percent recovery of USE from annealing, AUSEi = (mean USE unirradiated - mean USE after irradiation),
ta
= time at annealing temperature in hours, Ta
= annealing temperature in &deg;F,
Cu
= copper content of material in weight-percent.
 
R=
= [0.5 + 0.5 tanh((aTa - a2)/95.7}1]* 100
(Equation 2)
where Rt
= percent recovery of transition temperature from annealing, Sal
= 1 + 0.0151 ln(ta)
0.424Cu( 3.28 - 0.00306Ta)
a2
= 0.584(Ti + 637), for Ta k 800OF
or a2
= 0.584T1 - 15.51n(O) + 833 for Ta < 750 0F
where TC
Cu.
 
flux rate, n/(cm2-s),
temperature of irradiation.
 
copper content of material in weight percent with maximum value of 0.3%.
The current Rt equation is not accurate between annealing temperatures of 750 and 800 0 F. Until a complete equation is developed an extension of the ef fect of the flux term (a2) is assumed to a temperature of 775*F. Between 775 and 800&deg;F, a linear interpola tion between Equation 2 evaluated at 775 &deg;F with the flux term and Equation 2 evaluated at 8000 without the flux term should be made.
 
Since plant operational characteristics do not re sult in a unique value of irradiation temperature throughout a plant's lifetime, the method used for evaluating Ti should be described in the assurance program.
 
Equations 1 and 2 are documented in Reference 8 and represent mean values of the percent recovery of RTNDT and USE.
 
3.1.4 Specimen Handling and Preparation Procedures
3.1.4.1 Specimen Handling Procedures. For re constituting surveillance specimens or removing sam ples from the vessel beltine, the assurance program should describe the methods to be used for marking and handling the test materials to ensure that the orientation of the material relative to the vessel is un ambiguous and traceable.
 
3.1.4.2 Specimen Orientation. The assurance program should address the orientation of the speci mens to be tested. For testing materials from a "cred ible" surveillance program for the evaluation of per cent recovery of ARTNDT, it is preferable to test the post-anneal specimens in the same orientation as the original surveillance tests. In contrast, for evaluation of Charpy upper-shelf energy, it may be preferable to use specimens oriented in the transverse direction, the T-L orientation, according to ASTM Standard E 399 (Ref. 18). 
3.1.4.3 Reconstitution of Charpy Specimens.
 
Reconstitution of Charpy specimens is used to provide new full-size Charpy specimens from the broken pieces of previously tested specimens and to conserve materi al. Several methods are available for welding end-tabs onto the test material section, with the goal of each method to provide a structurally sound and testable specimen (i.e., the specimen does not fracture at the reconstitution welds) without overheating (possibly in ducing annealing) the test section.
 
The assurance program should describe the proce dures to be used for the reconstitution process. The procedures and criteria of ASTM Standard E 1253-88 (Ref. 19), "Standard Guide for Reconstitution of Irra diated Charpy Specimens," are sufficient to demon strate an adequate reconstitution method. Other pro posed methods should have appropriate justification.
 
3.1.5 Specimen Testing
3.1.5.1 Test Procedures. The assurance pro gram should describe the procedures used for testing the Charpy specimens, either full-size or sub-size. For testing full-size Charpy specimens, either reconstituted specimens or specimens fabricated from samples re moved from the vessel beltline, testing should be per formed using equipment and testing procedures similar to those used to develop surveillance data, as outlined in ASTM Standards E 185-82 (Ref. 14) and E 23-88 (Ref. 20). 
Testing of sub-size Charpy specimens should fol low the general procedures and methods in ASTM
Standard E 23-88 (Ref. 20) for testing of full-size Charpy specimens. For testing sub-size Charpy speci mens, a description of the general test procedures and the testing equipment should be provided in the assur ance program. In addition, a method for applying the
1.162-11
 
results from the tests of the sub-size specimens should be described.
 
3. 1.S.2 Test Plan. The assurance program should describe the test plan, including the number of speci mens to be tested and the method for selecting test temperatures. This description should include the steps taken to ensure that a reasonable measure of recovery is achieved by the testing; the description should also include the proposed method for handling uncertainty in the test results.
 
Testing to evaluate percent recovery of ARTNDT
should result in an unambiguous evaluation of the tem perature at which the average Charpy energy versus temperature curve achieves an energy level of 30 ft-lb.
 
It is preferable that the testing cover a broad range of results based on the shear percentage (from near 0
percent to greater than 95 percent) to permit a more complete assessment of the Charpy data trends for the material and to preclude false trends from data cluster ing around the 30 ft-lb level.
 
Testing to evaluate Charpy upper-shelf energy re covery should provide an unambiguous definition of the Charpy upper-shelf energy for the material. All tests used in evaluating the Charpy upper-shelf energy should result in 100 percent shear.
 
3.1.6 Quantification of Post-Anneal Initial Properties Quantification of the post-anneal initial proper ties, RTNDT and Charpy upper-shelf energy, is depen dent on the method used to determine the percent re covery by annealing.
 
3.1.6.1 Vessel Surveillance Program Method.
 
The assurance program should describe the surveil lance results to be used in evaluating percent recovery, along with the proposed method to relate the observed percent recovery from the surveillance results to the percent recovery of the vessel material.
 
One method for relating the observed recovery to the vessel recovery is to compare the measured recov ery from the test (or tests) of surveillance specimens to the percent recovery from Equations 1 and 2 for the surveillance capsule. The average ratio (or the ratio from a single capsule) between the measured recovery from the surveillance capsules and that evaluated from Equations 1 and 2 for the surveillance capsule provides a material-specific adjustment for the generic equa tion. In this method, the vessel percent recovery would be calculated by multiplying the percent recovery de termined from Equations 1 and 2 for the vessel by the average ratio adjustment. Values of Rt and RUSE de termined from surveillance data may not exceed 100.
 
Once suitable values of Rt and RUSE have been determined from the surveillance data, the post-anneal reference temperature (RTNDT) and Charpy upper shelf energy are evaluated using Equations 3 and 4:
RTNDT(A) = RTNDT
+ ARTNDT x
(100 - W) / 100
(Equation 3)
CvUSE(A) = CvUSE(u) [I - D x
(100 - RUSE)/100001 (Equation 4)
where RTNDT(A)
= reference temperature, RTNDT,
of the material in the post anneal condition in OF,
RTNDT(U)
= reference temperature, RTNDT,
of the material in the preservice or unirradiated condition in &deg;F,
ARTNDT
= mean value of the transition temperature shift, or change in RTNDT, from irradiation (before annealing) in &deg;F,
Rt
= percent recovery of ARTNDT
from annealing, CvUSE(A)
= Charpy upper-shelf energy of the material in the post anneal condition in ft-lb, CvUSE(u)
= Charpy upper-shelf energy of the material in the preservice or unirradiated condition in ft-lb, D
= percent decrease in Charpy upper-shelf energy from irradiation (before annealing),
and RUSE
= percent recovery of Charpy upper-shelf energy from annealing.
 
The values of RTNDT(A) and CvUSE(A), calcu lated using Equations 3 and 4, respectively, should be used as the values of reference temperature (RTNDT)
and Charpy upper-shelf energy, respectively, at the ini tiation of continued plant operation.
 
3.1.6.2 Irradiated Vessel Material Method.
 
Since the Charpy data evaluated by this method repre sent the surface or near-surface properties of the plate, weld, or forging, the measured values cannot be used directly to represent the plate or forging 1/4T or weld bulk properties as called for by Regulatory Guide 1.99, Revision 2 (Ref. 21). However, evaluations of the pre anneal and the post-anneal properties of the sample removed from the vessel beltline will provide sufficient data to evaluate the expected recovery at the plate or forging II4T level or the weld bulk properties.
 
The assurance program should describe the proce dures used to evaluate percent recovery for the vessel materials from the measurements resulting from this method.
 
1.162-12 K
K
 
If the samples removed from the vessel beltline are from the peak flux location for the material, one pro cedure to evaluate the post-anneal properties from the measured percent recovery uses the following equations:
RTNDT(A) = RTNDT(U) + ARTNDT x [1 - (iTs 1 TTSA) (RS / ATs)]
(Equation 5)
CvUSE(A) = CvUSE u (1 - D / 100)
(CvSA /CVS)
(Equation 6)
where RTNDT(A)
= reference temperature, RTNDT, of the material in the post-anneal condition in *F,
RTNDT(U) = reference temperature, RTNDT, of the material in the preservice or unirradiated condition in *F,
ARTNDT
= mean value of the transition temperature shift, or change in RTNDT, caused by irradiation (before annealing)
in -F,
"iTs1 
= from the measured surface data, the transition tempera ture at the 30 ft-lb energy level for the pre-anneal condition in *F,
"7SA
= from the measured surface data, the transition tempera ture at the 30 ft-lb energy level for the post-anneal condition in *F,
RS=
the ratio of Rt from Equation
2 for the 1/4T location to Rt from Equation 2 for the surface of the plate, forging or weld, ATs
= the mean value of the transi tion temperature shift (in *F)
at the surface of the plate, forging or weld, determined using the surface fluence and the same calculational method used to evaluate ARTNDT for the 1/4T location, CvUSE(A)
= Charpy upper-shelf energy of the material in the post-anneal condition, for the 1/4T
location of plate and forging, or the weld bulk properties in ft-lb, CvUSE(u)
= Charpy upper-shelf energy of the material in the preservice or unirradiated condition, for D
CVSA
the 1/4T location of plate and forging, or the weld bulk properties in ft-lb,
= percent decrease in Charpy upper-shelf energy from irradi ation embrittlement, for the  
1/4T location of plate and forging, or the weld bulk properties,
= from the measured surface data, the Charpy upper-shelf energy for the pre-anneal condition in ft-lb,
= from the measured surface data, the Charpy upper-shelf energy for the post-anneal condition in ft-lb.
 
The values of RTNDT(A) and CvUSE(A) calcu lated using Equations 5 and 6 should be used as the values of reference temperature (RTNDT) and Charpy uppershelf energy, respectively, at the initiation of continued plant operation.
 
If the samples removed from the vessel beitline do not come from the vessel peak flux location, the vessel embrittlement and the annealing recovery will not be as great as that for the vessel peak flux location, and Equations 5 and 6 should underestimate the percent recovery of the vessel. In such cases, the assurance program should describe the procedures used to evalu ate percent recovery for the vessel materials from the measurements resulting from this method.
 
3.1.6.3 Computational Method. For the compu tational method, the postanneal initial RTNDT and Charpy upper-shelf energy values for each beltiine ma terial should be evaluated using Equations 3 and 4, us ing the values of Rt and RUSE from Equations 2 and 1.
 
The values of RTNDT(A) and CvUSE(A), calcu lated using Equations 3 and 4, respectively, should be used as the values of reference temperature (RTNDT)
and Charpy upper-shelf energy, respectively, at plant restart.
 
3.1.6.4 Sub-size Charpy Specimens. Sub-size Charpy specimens can provide very useful information concerning the toughness of the material and the re covery of irradiation embrittlement by annealing. Data from sub-size Charpy specimens is not uniquely corre lated to data from full-size Charpy specimens in an absolute sense, but quantities such as irradiation embrittlement shift and annealing recovery can be eva luated from sub-size specimen data. Although some work has been under way in the United States In this area using several sub-size Charpy specimen designs, there is no consensus in the U.S. technical community or the nuclear industry as to a preferred specimen de sign or an appropriate correlation method.


1.162-13
1.162-13


The assurance program should describe the over         where all test plan for the use of sub-size Charpy specimens,            RTNDT          = reference temperature, including test specimen design and test procedures. In                                 RTNDT, of the material in the addition, the assurance program should describe the                                   irradiated condition in OF,
The assurance program should describe the over all test plan for the use of sub-size Charpy specimens, including test specimen design and test procedures. In addition, the assurance program should describe the method proposed for quantitative use of the sub-size Charpy specimen data in evaluating percent recovery, including any experimental demonstration validating the method.
method proposed for quantitative use of the sub-size               RTNDT(U)        = reference temperature, Charpy specimen data in evaluating percent recovery,                                   RTNDT, of the material in the including any experimental demonstration validating                                   preservice or unirradiated the method.                                                                           condition in OF,
 
                                                                    ARTNDT          = mean value of the transition
3.2 Reembrittlement Trend Assurance Program As specified in the thermal annealing rule (10  
3.2     Reembrittlement Trend Assurance Program                                       temperature shift, or change As specified in the thermal annealing rule (10
CFR 50.66(b) (3) (ii) (B)), the reembrittlement trend of both RTNDT and Charpy upper-shelf energy is to be estimated to establish the projected embrittlement at the end of the proposed period of plant operation, and is to be monitored during post-anneal reactor opera tions to confirm these estimates, using a surveillance program that conforms to the intent of Appendix H of  
                                                                                      in RTNDT, from irradiation in CFR 50.66(b) (3) (ii) (B)), the reembrittlement trend OF, and M              = margin term in OF to account of both RTNDT and Charpy upper-shelf energy is to be estimated to establish the projected embrittlement at                                 for uncertainties in the values the end of the proposed period of plant operation, and                                of RTNDT(U), nickel and is to be monitored during post-anneal reactor opera                                   copper content, fluence and the calculational procedures, tions to confirm these estimates, using a surveillance program that conforms to the intent of Appendix H of                                   as determined from Equation 8.
10 CFR Part 50. An appropriate method for estimating the reembrittlement trend is using a "lateral shift"
method. For the "lateral shift" method, the reem brittlement trend is the same as the embrittlement trend used for the pre-anneal operating period, regard less of whether the embrittlement was determined using the procedures of the PTS Rule (10 CFR
50.61(c)) for embrittlement of RTNDT, or the proce dures of Revision 2 of Regulatory Guide 1.99 (Ref. 21)
for embrittlement of Charpy upper-shelf energy, or whether embrittlement was determined from "cred ible" surveillance data.
 
The assurance program should describe the pro gram to estimate reembrittlement trends prior to the development of "credible" data from the reembrittle ment surveillance program and should describe the surveillance program to be used for post-anneal plant operation.
 
3.2.1 Lateral Shift Method
3.2.1.1 Description of the Lateral Shift Meth od. As illustrated in Figure 1 for both RTNDT and Charpy upper-shelf energy, the lateral shift method re sults in a shift of the initial irradiation embrittlement curve along the fluence axis, using the post-anneal properties (ARTNDT and Charpy upper-shelf energy)
as the basis point. This method has been found to be conservative in bounding subsequent embrittlement.


10 CFR Part 50. An appropriate method for estimating the reembrittlement trend is using a "lateral shift"                                                      (Equation 8)
3.2.1.2 Reembrittlement of RTNDT. The reem brittlement of RTNDT is established using the same embrittlement trend as the pre-anneal operating peri od, with a lateral shift.
                                                                  M  -  2 Ja1 2 + a,2 method. For the "lateral shift" method, the reem brittlement trend is the same as the embrittlement           where trend used for the pre-anneal operating period, regard less of whether the embrittlement was determined                    al  = standard deviation of RTNDT(U) in OF,
using the procedures of the PTS Rule (10 CFR
50.61(c)) for embrittlement of RTNDT, or the proce                        =
                                                                        =a standard deviation of ARTNDT in OF.


dures of Revision 2 of Regulatory Guide 1.99 (Ref. 21)             From Revision 2 of Regulatory Guide 1.99 (Ref.
For the pre-anneal operating period, RTNDT is given by:
RTNDT = RTNDT(U) + ARTNDT + M
(Equation 7)
where RTNDT
= reference temperature, RTNDT, of the material in the irradiated condition in OF,
RTNDT(U)  
= reference temperature, RTNDT, of the material in the preservice or unirradiated condition in OF,
ARTNDT
= mean value of the transition temperature shift, or change in RTNDT, from irradiation in OF, and M
= margin term in OF to account for uncertainties in the values of RTNDT(U), nickel and copper content, fluence and the calculational procedures, as determined from Equation 8.


for embrittlement of Charpy upper-shelf energy, or            21), VA is 17&deg;F for base metals and aA is 28*F for whether embrittlement was determined from "cred              weld metals.
M - 2 Ja12 + a,2 (Equation 8)
where al
= standard deviation of RTNDT(U) in OF,  
=a
= standard deviation of ARTNDT in OF.


ible" surveillance data.
From Revision 2 of Regulatory Guide 1.99 (Ref.


Further, ARTNDT is given by:
21),  
      The assurance program should describe the pro gram to estimate reembrittlement trends prior to the              ARTNDT = (CF) (f)(0.28 - 0.10 log f)
VA is 17&deg;F for base metals and aA is 28*F for weld metals.
development of "credible" data from the reembrittle                                                        (Equation 9)
ment surveillance program and should describe the surveillance program to be used for post-anneal plant        where operation.


CF       chemistry factor (in OF) based on the nickel and copper content of the
Further, ARTNDT is given by:
      3.2.1 Lateral Shift Method material, or based upon results from
ARTNDT = (CF) (f)(0.28 - 0.10 log f)
      3.2.1.1 Description of the Lateral Shift Meth                          the surveillance program if the od. As illustrated in Figure 1 for both RTNDT and                          program is "credible" according to the Charpy upper-shelf energy, the lateral shift method re                      criteria in the PTS rule (10 CFR
(Equation 9)
sults in a shift of the initial irradiation embrittlement                  50.61), and curve along the fluence axis, using the post-anneal                f     = the best-estimate neutron fluence (in properties (ARTNDT and Charpy upper-shelf energy)                            units of 1019 n/cm 2 , E > 1 MeV), at as the basis point. This method has been found to be                        the clad-base metal interface on the conservative in bounding subsequent embrittlement.                          inside surface of the vessel.
where CF  
chemistry factor (in OF) based on the nickel and copper content of the material, or based upon results from the surveillance program if the program is "credible" according to the criteria in the PTS rule (10 CFR  
50.61), and f  
= the best-estimate neutron fluence (in units of 1019 n/cm 2, E > 1 MeV), at the clad-base metal interface on the inside surface of the vessel.


3.2.1.2 Reembrittlement of RTNDT. The reem                  For reembrittlement, the lateral shift is accom brittlement of RTNDT is established using the same          plished by determining the "transition recovery flu embrittlement trend as the pre-anneal operating peri        ence," ft, by solving for the fluence value that satisfies od, with a lateral shift.                                    Equation 10:
For reembrittlement, the lateral shift is accom plished by determining the "transition recovery flu ence," ft, by solving for the fluence value that satisfies Equation 10:  
      For the pre-anneal operating period, RTNDT is          RTNDT(A) - RTNDT(U) = (CF) (fl) (0.28 - 0.10 log ft)
RTNDT(A) - RTNDT(U) = (CF) (fl) (0.28 - 0.10 log ft)  
given by:                                                                                              (Equation 10)
(Equation 10)  
      RTNDT = RTNDT(U) + ARTNDT + M                          where RTNDT(A) is the reference temperature, K
where RTNDT(A)  
                                            (Equation 7)    RTNDT, of the material in the post-anneal condition.
is the reference temperature, RTNDT, of the material in the post-anneal condition.


1.162-14
1.162-14 K


LATERAL SHIFT METHOD
LATERAL SHIFT METHOD
      Fluence (n/cm2 , E > 1 MeV)
Fluence (n/cm2, E > 1 MeV)
  LATERAL SHIFT METHOD
LATERAL SHIFT METHOD
wI
Ruence (nIcr2, E > I MoV)
      Ruence (nIcr2, E > I MoV)
Figure 1
              Figure 1
1.162-15 wI
              1.162-15
 
For reembrittlement, the reference temperature (RTNDT) is evaluated by RTNDT = RTNDT(U) + ARTNDT + M
(Equation 11)
where ARTNDT
= the mean value of the shift in reference temperature caused by irradiation (as given below by Equation 12) in OF, and M
= margin term in OF to account for uncertainties in the values of RTNDT(U), nickel and copper content, fluence, and the calculational procedures, as given by Equation 13.
 
ARTNDT = (CF) (f + ft)[0.28 - 0.10 log (f + ft)]
(Equation 12)
where CF = the same chemistry factor (in OF)
used for the pre-anneal operating period, based on the nickel and copper content of the material or the results of the "credible"
surveillance program, f
f the increment of best-estimate neutron fluence (in units of 1019 n/cm2, E > 1 MeV), at the clad-base metal interface on the inside surface of the vessel, accumulated during plant operation subsequent to the annealing operation, and ft=
the "transition recovery fluence,"
evaluated from Equation 10.
 
M - 2 la_ + ao2 (Equation 13)
where rately model the various Charpy uppershelf energy de crease curves. Using the equations in Reference 21:
CvUSE = CvUSE(u) x [I - D/100]
(Equation 14)
for base metals:
D = (100 Cu + 9) (00.2368 for weld metals:
D = (100 Cu + 14) (f0.2368 the upper bound:
D = 42.39 (f)0.1502 where CvUSE
= Charpy upper-shelf energy of the material in the irradiated condition (before annealing)
in ft-lb, CvUSE(U)
= Charpy upper-shelf energy of the material in the preservice or unirradiated condition in ft-lb, D
= percent decrease in Charpy upper-shelf energy from irradiation (before annealing),
Cu
= copper content (weight-percent)
for the subject material, and f
= the best-estimate total neutron fluence (in units of 1019 n/cm 2, E > I MeV), at the clad-base metal interface on the inside surface of the vessel.
 
The value of D is the lesser of that from the appro priate equation for the material type and that from the upper bound equation. For "credible" surveillance data, guidance is given in Revision 2 of Regulatory Guide 1.99 (Ref. 21) for determining percent decrease in Charpy upper-shelf energy based on the surveillance results.
 
For reembrittlement, the lateral shift is accom plished by determining the "shelf recovery fluence,"
fs, from:
01
= standard deviation of RTNDT(U) in OF,
= standard deviation of ARTNDT in OF,
3.2.1.3 Reembrittlement of the Charpy Upper Shelf Energy. The reembrittlement of the Charpy upper-shelf energy is evaluated using the same embrittlement trend as the pre-anneal operating peri od, with a lateral shift. For the pre-anneal operating period, Revision 2 of Regulatory Guide 1.99 (Ref. 21)
gives upper-shelf energy decrease in a graphical form only. Merkle (Ref. 22) developed equations that accu- for base metals:
1 - (CvUSE(A)/CvUSE(u)) 14.223 for weld metals:
4.223 I 1- (CvUJSE(A)/CvUSE(u))
[
100 Cu + 14 ]
1.162-16 K
K`1


For reembrittlement, the reference temperature          rately model the various Charpy uppershelf energy de (RTNDT) is evaluated by                                      crease curves. Using the equations in Reference 21:
the upper bound:  
      RTNDT = RTNDT(U) + ARTNDT + M                                CvUSE = CvUSE(u) x [I - D/100]
1 -(CvUSE(A)/CvUSE(u)) I6.658 f'
                                          (Equation 11)                                                  (Equation 14)   K
"42.39 (Equation 15)  
                                                                  for base metals:
For both weld metal and base metal, the correct value of fs is the larger of the values from the appropri ate equation for the material type and the upper bound equation.
where                                                                D = (100 Cu + 9) (00.2368 ARTNDT      = the mean value of the shift in              for weld metals:
                      reference temperature caused                    D = (100 Cu + 14) (f0.2368 by irradiation (as given below by Equation 12) in OF, and                  the upper bound:
        M          = margin term in OF to account                    D = 42.39 (f)0.1502 for uncertainties in the values of RTNDT(U), nickel and               where copper content, fluence, and                  CvUSE          = Charpy upper-shelf energy of the calculational procedures,                                  the material in the irradiated as given by Equation 13.                                        condition (before annealing)
                                                                                      in ft-lb, ARTNDT = (CF) (f + ft)[0.28 - 0.10 log (f + ft)]                    CvUSE(U)      = Charpy upper-shelf energy of (Equation 12)                                the material in the preservice or unirradiated condition in where                                                                                  ft-lb, D              = percent decrease in Charpy CF = the same chemistry factor (in OF)                                          upper-shelf energy from used for the pre-anneal operating                                        irradiation (before annealing),
              period, based on the nickel and                        Cu            = copper content (weight-percent)
              copper content of the material or                                        for the subject material, and the results of the "credible"                          f              = the best-estimate total neutron surveillance program,                                                    fluence (in units of 1019 n/cm 2 ,
      f    f the increment of best-estimate                                          E > I MeV), at the clad-base neutron fluence (in units of 1019                                        metal interface on the inside n/cm 2 , E > 1 MeV), at the clad-base                                    surface of the vessel.


metal interface on the inside surface The value of D is the lesser of that from the appro of the vessel, accumulated during priate equation for the material type and that from the plant operation subsequent to the upper bound equation. For "credible" surveillance annealing operation, and data, guidance is given in Revision 2 of Regulatory ft=   the "transition recovery fluence,"
Reembrittlement of Charpy upper-shelf energy is evaluated from:
                                                            Guide 1.99 (Ref. 21) for determining percent decrease evaluated from Equation 10.
CvUSE = CvUSE~u) x [1 - D/100]
(Equation 16)
for base metals:
D = (100 Cu + 9) (f + fs) 0-2 3 6s for weld metals:
D = (100 Cu + 14) (f + fs) 0 "2 36 8 the upper bound:
D = 42.39 (f + fs)&deg;-15&deg;2 where CvUSE(u)
= Charpy upper-shelf energy of the material in the preservice
2 or unirradiated condition in ft-lb, Cu
= the copper content (weight percent) for the subject material, f
= the increment of best-estimate total neutron fluence (in units of 1019 n/cm 2, E > 1 MeV),
at the clad-base metal inter face on the inside surface of the vessel, accumulated during subsequent plant operation after the annealing operation, and fs=  
the "shelf recovery fluence,"  
evaluated from Equation 15.


in Charpy upper-shelf energy based on the surveillance results.
For "credible" surveillance data, the values of "9"
and "14" in Equations 15 and 16 are replaced by val ues that are based on the surveillance results.


M - 2 la_ + ao2                      (Equation 13)          For reembrittlement, the lateral shift is accom plished by determining the "shelf recovery fluence,"
3.2.2 Surveillance Method For the surveillance method, the reembrittlement trend is determined from the surveillance results of a program that conforms to the intent of Appendix H of
                                                            fs, from:
10 CFR Part 50, once the surveillance program and results from the program have met the credibility re quirements in the PTS rule (10 CFR 50.61).
where
3.3 Use of Materials Test Reactor (MTR)  
        01          = standard deviation of                     for base metals:
Irradiations If archival pieces of the limiting vessel material are available, materials test reactor (MTR) irradiations may be used to evaluate the recovery and reembrittle ment trends. Plans for using archival material should be described in the assurance program, including the traceability of the material to the vessel, the proposed experimental matrix, and the method proposed for us ing the results of the MTR irradiations.
                        RTNDT(U) in OF,
                      = standard deviation of ARTNDT in OF,
                                                                                1 - (CvUSE(A)/CvUSE(u))  14.223
    3.2.1.3 Reembrittlement of the Charpy Upper Shelf Energy. The reembrittlement of the Charpy upper-shelf energy is evaluated using the same for weld metals:
                                                                                  [
embrittlement trend as the pre-anneal operating peri
                                                                                                          ]
od, with a lateral shift. For the pre-anneal operating                                                        4.223 period, Revision 2 of Regulatory Guide 1.99 (Ref. 21)                          I1- (CvUJSE(A)/CvUSE(u))
                                                                                                                          K`1 gives upper-shelf energy decrease in a graphical form                                  100 Cu +14 only. Merkle (Ref. 22) developed equations that accu-
                                                      1.162-16


the upper bound:
4.
                  f'
                        (CvUSE(A)/CvUSE(u))
                    1 - "42.39 I6.658        3.3    Use of Materials Test Reactor (MTR)
                                                                          Irradiations If archival pieces of the limiting vessel material are available, materials test reactor (MTR) irradiations may be used to evaluate the recovery and reembrittle ment trends. Plans for using archival material should (Equation 15)    be described in the assurance program, including the traceability of the material to the vessel, the proposed For both weld metal and base metal, the correct            experimental matrix, and the method proposed for us value of fs is the larger of the values from the appropri        ing the results of the MTR irradiations.


ate equation for the material type and the upper bound equation.                                                        4.  IDENTIFICATION OF UNREVIEWED
IDENTIFICATION OF UNREVIEWED  
                                                                        SAFETY QUESTIONS AND TECHNICAL
SAFETY QUESTIONS AND TECHNICAL  
      Reembrittlement of Charpy upper-shelf energy is                  SPECIFICATION CHANGES
SPECIFICATION CHANGES  
  evaluated from:                                                      Any changes to the facility that are described in the updated final safety analysis report as unreviewed CvUSE = CvUSE~u) x [1 - D/100]                              safety questions and any changes to the technical spec (Equation 16)    ifications that are necessary to either conduct the ther mal annealing or operate the nuclear power reactor for base metals:                  0 236                    following the annealing should be identified in this sec D = (100 Cu + 9) (f + fs) - s                            tion. The section should demonstrate that the Com for weld metals:                                            mission's requirements are complied with and that D = (100 Cu + 14) (f        + fs) 0 "2 36 8              there is reasonable assurance of adequate protection to the public health and safety following the changes.
Any changes to the facility that are described in the updated final safety analysis report as unreviewed safety questions and any changes to the technical spec ifications that are necessary to either conduct the ther mal annealing or operate the nuclear power reactor following the annealing should be identified in this sec tion. The section should demonstrate that the Com mission's requirements are complied with and that there is reasonable assurance of adequate protection to the public health and safety following the changes.


the upper bound:                                            S. COMPLETION OR TERMINATION OF
S.
        D = 42.39 (f + fs)&deg;-15&deg;2 THERMAL ANNEAL
 
  where                                                            5.1   Annealing Completed, In Compliance CvUSE(u)      = Charpy upper-shelf energy of                  If the thermal annealing was completed in accor the material in the preservice          dance with the Thermal Annealing Operating Plan and
COMPLETION OR TERMINATION OF  
2                          or unirradiated condition in            the Requalification Inspection and Test Program, the ft-lb,                                  licensee must so confirm in writing to the Director, Of Cu            = the copper content (weight                fice of Nuclear Reactor Regulation (NRR). Within 15 percent) for the subject                days of the licensee's written confirmation that the material,                              thermal annealing was completed in accordance with f              = the increment of best-estimate            the Thermal Annealing Plan, and prior to restart, the total neutron fluence (in units        NRC will (1) briefly document whether the thermal an of 1019 n/cm 2 , E > 1 MeV),            nealing was performed in compliance with the licens at the clad-base metal inter            ee's Thermal Annealing Operating Plan and the Re face on the inside surface              qualification Inspection and Test Program, with the of the vessel, accumulated              documentation to be placed in the NRC Public Docu during subsequent plant                ment Room, and (2) hold a public meeting on the an operation after the annealing          nealing. The purposes for the public meeting are to operation, and                          (1) permit the licensee to explain the results of the fs=              the "shelf recovery fluence,"          reactor vessel annealing to the NRC and the public, evaluated from Equation 15.            (2) allow the NRC to discuss its inspection of the reac tor vessel annealing, and (3) provide an opportunity For "credible" surveillance data, the values of "9"        for the public to comment to the NRC on the thermal and "14" in Equations 15 and 16 are replaced by val              annealing. The licensee may restart its reactor after the ues that are based on the surveillance results.                  meeting has been completed, unless the NRC orders otherwise. Within 45 days of the licensee's written con
THERMAL ANNEAL  
      3.2.2 Surveillance Method                                  firmation that the thermal annealing was completed in For the surveillance method, the reembrittlement            accordance with the Thermal Annealing Operating trend is determined from the surveillance results of a          Plan and the Requalification Inspection and Test Pro program that conforms to the intent of Appendix H of            gram, the NRC staff will complete full documentation
5.1 Annealing Completed, In Compliance If the thermal annealing was completed in accor dance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, the licensee must so confirm in writing to the Director, Of fice of Nuclear Reactor Regulation (NRR). Within 15 days of the licensee's written confirmation that the thermal annealing was completed in accordance with the Thermal Annealing Plan, and prior to restart, the NRC will (1) briefly document whether the thermal an nealing was performed in compliance with the licens ee's Thermal Annealing Operating Plan and the Re qualification Inspection and Test Program, with the documentation to be placed in the NRC Public Docu ment Room, and (2) hold a public meeting on the an nealing. The purposes for the public meeting are to  
  10 CFR Part 50, once the surveillance program and                of the NRC's inspection of the licensee's annealing results from the program have met the credibility re            process and place the documentation in the NRC Pub quirements in the PTS rule (10 CFR 50.61).                      lic Document Room.
(1) permit the licensee to explain the results of the reactor vessel annealing to the NRC and the public,  
(2) allow the NRC to discuss its inspection of the reac tor vessel annealing, and (3) provide an opportunity for the public to comment to the NRC on the thermal annealing. The licensee may restart its reactor after the meeting has been completed, unless the NRC orders otherwise. Within 45 days of the licensee's written con firmation that the thermal annealing was completed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Pro gram, the NRC staff will complete full documentation of the NRC's inspection of the licensee's annealing process and place the documentation in the NRC Pub lic Document Room.


1.162-17
1.162-17


5.2   Annealing Completed, Not in Compliance                       5.3.2 Licensee Elects To Take Credit for any Recovery If the thermal annealing was completed but not If the partial annealing was otherwise performed in performed in accordance with the Thermal Annealing accordance with the Thermal Annealing Operating Operating Plan and the Requalification Inspection and Test Program, including the bounding conditions of the temperature and times, the licensee must submit a Plan and relevant portions of the Requalification In spection and Test Program and the licensee elects to     K
5.2 Annealing Completed, Not in Compliance If the thermal annealing was completed but not performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, including the bounding conditions of the temperature and times, the licensee must submit a summary of lack of compliance and a justification for subsequent operations. The licensee must also identify any changes to the facility that are attributable to the noncompliances that constitute unreviewed safety questions and any changes to the technical specifica tions that are required for operation as a result of the noncompliances. This identification does not relieve the licensee from complying with applicable require ments of the Commission's regulations and the operat ing license; and if these requirements cannot be met as a result of the annealing operation, the licensee must obtain the appropriate exemption per 10 CFR 50.12.
                                                              take full or partial credit for the partial annealing, the summary of lack of compliance and a justification for licensee must confirm in writing to the Director, NRR,
 
subsequent operations. The licensee must also identify that the partial annealing was otherwise performed in any changes to the facility that are attributable to the compliance with the Thermal Annealing Operating noncompliances that constitute unreviewed safety Plan and relevant portions of the Requlification In questions and any changes to the technical specifica spection and Test Program. The licensee may restart tions that are required for operation as a result of the its reactor after the NRC places a summary of its in noncompliances. This identification does not relieve spection of the thermal annealing in the NRC Public the licensee from complying with applicable require Document Room and the NRC holds a public meeting ments of the Commission's regulations and the operat on the thermal annealing.
If unreviewed safety questions or changes to technical specifications are not identified as necessary for re sumed operation, the licensee may restart after the NRC staff places a summary of its inspection of the thermal annealing in the NRC Public Document Room and the NRC holds a public meeting on the thermal annealing. On the other hand, if unreviewed safety questions or changes to technical specifications are identified as necessary for resumed operation, the li censee may restart only after the Director of NRR au thorizes restart, the summary of the NRC staff inspec tion is placed in the NRC Public Document Room, and a public meeting is held on the thermal annealing.
 
5.3 Termination Prior to Completion of Anneal If the thermal annealing was terminated prior to completion, the licensee should immediately notify the NRC of the premature termination of the thermal anneal.
 
5.3.1 Licensee Elects Not To Take Credit for any Recovery If the partial annealing was otherwise performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification In spection and Test Program, and the licensee does not elect to take credit for any recovery, the licensee need not submit the Thermal Annealing Results Report de scribed in Section 6 of this regulatory guide but instead must confirm in writing to the Director, NRR, that the partial annealing was otherwise performed in accor dance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program. The licensee may restart its reactor after the NRC places a summary of its inspection of the ther mal annealing in the Public Document Room and the NRC holds a public meeting on the thermal annealing.
 
5.3.2 Licensee Elects To Take Credit for any Recovery If the partial annealing was otherwise performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification In spection and Test Program and the licensee elects to take full or partial credit for the partial annealing, the licensee must confirm in writing to the Director, NRR,  
that the partial annealing was otherwise performed in compliance with the Thermal Annealing Operating Plan and relevant portions of the Requlification In spection and Test Program. The licensee may restart its reactor after the NRC places a summary of its in spection of the thermal annealing in the NRC Public Document Room and the NRC holds a public meeting on the thermal annealing.
 
5.3.3 Termination, Not in Compliance If the partial annealing was not performed in ac cordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program, the licensee is to submit a summary of lack of compliance with the Thermal Annealing Op erating Plan and the Requalification Inspection and Test Program and a justification for subsequent opera tion, to the Director of NRR. Any changes to the facil ity as described in the updated final safety analysis re port that are attributable to the noncompliances and constitute unreviewed safety questions, and any changes to the technical specifications that are re quired as a result of the noncompliances, must also be identified.
 
If no unreviewed safety questions or changes to technical specifications are identified, the licensee may restart its reactor after the NRC places a summary of its inspection of the thermal annealing in the Public Doc ument Room, and the NRC holds a public meeting on the thermal annealing.
 
If any unreviewed safety questions or changes to technical specifications are identified, the licensee may restart its reactor only after approval is obtained from the Director, Office of Nuclear Reactor Regulation, the summary of the NRC staff inspection is placed in the public document room, and a public meeting on the thermal annealing is held.
 
6. THERMAL ANNEALING RESULTS
REPORT
Every licensee who either completes a thermal an nealing or terminates an annealing but elects to take full or partial credit for the annealing must provide a report that includes the results of the annealing opera tion and verifies compliance with the approved plan.


ing license; and if these requirements cannot be met as a result of the annealing operation, the licensee must              5.3.3 Termination, Not in Compliance obtain the appropriate exemption per 10 CFR 50.12.                  If the partial annealing was not performed in ac If unreviewed safety questions or changes to technical        cordance with the Thermal Annealing Operating Plan specifications are not identified as necessary for re        and relevant portions of the Requalification Inspection sumed operation, the licensee may restart after the          and Test Program, the licensee is to submit a summary NRC staff places a summary of its inspection of the          of lack of compliance with the Thermal Annealing Op thermal annealing in the NRC Public Document Room            erating Plan and the Requalification Inspection and and the NRC holds a public meeting on the thermal             Test Program and a justification for subsequent opera annealing. On the other hand, if unreviewed safety            tion, to the Director of NRR. Any changes to the facil questions or changes to technical specifications are          ity as described in the updated final safety analysis re identified as necessary for resumed operation, the li        port that are attributable to the noncompliances and censee may restart only after the Director of NRR au          constitute unreviewed safety questions, and any thorizes restart, the summary of the NRC staff inspec        changes to the technical specifications that are re tion is placed in the NRC Public Document Room, and          quired as a result of the noncompliances, must also be a public meeting is held on the thermal annealing.            identified.
This report is to be submitted within three months of completing the thermal anneal, unless an extension is authorized by the Director, Office of Nuclear Reactor Regulation. This report should provide the following information:
1.162-18 K
K


If no unreviewed safety questions or changes to
(1) The time and temperature profiles of the ac tual thermal annealing,
5.3    Termination Prior to Completion of Anneal              technical specifications are identified, the licensee may restart its reactor after the NRC places a summary of its If the thermal annealing was terminated prior to        inspection of the thermal annealing in the Public Doc completion, the licensee should immediately notify the        ument Room, and the NRC holds a public meeting on NRC of the premature termination of the thermal              the thermal annealing.
(2) The post-anneal RTNDT and Charpy upper shelf energy values of the reactor vessel mate rials for use in subsequent reactor operation,  
(3) The projected post-anneal reembrittlement trends for both RTNDT and Charpy upper shelf energy, and  
(4) The projected values of RTpTS and Charpy upper-shelf energy at the end of the proposed period of operation addressed in the application.


anneal.                                                           If any unreviewed safety questions or changes to technical specifications are identified, the licensee may
6.1 Description of the Overall Process A detailed summary of the annealing operation, including an actual time-temperature history, should be provided. The summary should identify the location and method of attachment for the specific instrumentation, including all temperature measure ment devices applied to the vessel and other structures and components. A history of the times and tempera tures for each temperature measurement device should be included, showing the actual temperatures for the beginning of annealing, the heat-up period, the  
    5.3.1 Licensee Elects Not To Take Credit                restart its reactor only after approval is obtained from for any Recovery                                the Director, Office of Nuclear Reactor Regulation, the summary of the NRC staff inspection is placed in If the partial annealing was otherwise performed in    the public document room, and a public meeting on accordance with the Thermal Annealing Operating              the thermal annealing is held.
,
steady-state conditions, and the cool-down period.


Plan and relevant portions of the Requalification In spection and Test Program, and the licensee does not          6.   THERMAL ANNEALING RESULTS
Sufficient detail should be included to permit determi nation of the heat-up and cool-down rates and the vari ations in temperature measurements during the entire cycle. A summary of key measurements should be pro vided that shows that the proposed annealing condi tions, specifically the time and temperature parameters and stress allowables established in the application, were not exceeded. Additionally, a summary of the worker exposures incurred during the annealing proc ess should be included.
elect to take credit for any recovery, the licensee need          REPORT
not submit the Thermal Annealing Results Report de                Every licensee who either completes a thermal an scribed in Section 6 of this regulatory guide but instead    nealing or terminates an annealing but elects to take must confirm in writing to the Director, NRR, that the        full or partial credit for the annealing must provide a partial annealing was otherwise performed in accor          report that includes the results of the annealing opera dance with the Thermal Annealing Operating Plan and          tion and verifies compliance with the approved plan.


relevant portions of the Requalification Inspection and     This report is to be submitted within three months of Test Program. The licensee may restart its reactor after    completing the thermal anneal, unless an extension is the NRC places a summary of its inspection of the ther      authorized by the Director, Office of Nuclear Reactor mal annealing in the Public Document Room and the           Regulation. This report should provide the following        K
6.2 Evaluation of Requalificatlon Inspections and Tests The results and evaluations of any inspections and tests used to requalify the annealed reactor vessel, the attached piping or appurtenances, and the adjacent concrete structures should be reported. The Thermal Annealing Results Report should include the results of all inspections and tests to demonstrate that the an nealing operation has not caused degradation of the reactor vessel, the insulation, the attached piping or appurtenances, containment, and the adjacent con crete to a degree that could affect the safe operation of the reactor. The report should describe the evaluation and disposition of any indications detected during the post-anneal inspections.
NRC holds a public meeting on the thermal annealing.         information:
                                                      1.162-18


(1) The time and temperature profiles of the ac        6.3   Determination of Percent Recovery tual thermal annealing,                                  The method for determining the percent recovery of RTNDT and Charpy upper-shelf energy should be
6.3 Determination of Percent Recovery The method for determining the percent recovery of RTNDT and Charpy upper-shelf energy should be described. The actual time-temperature parameters of the vessel annealing operation should be used and re ported. If the percent recovery is determined from testing credible surveillance specimens or from testing materials removed from the beltline region of the reac tor vessel, and the testing was subsequent to the an nealing operation or was not reported in the Thermal Annealing Operating Plan, the results of these tests should be reported. In this case, the report should include the initial unirradiated properties, the as irradiated properties just prior to annealing, and the properties of the test specimens in the irradiated and annealed conditions. The report should provide sup porting evidence for the licensee's report that the an nealing conditions for the test specimens were equal to or bounded by the annealing conditions of the reactor vessel. If the percent recovery is determined by calcu lation, the evaluation of percent recovery should use the actual vessel lower-bound annealing time and tem perature. In all cases, the report should include the post-anneal RTNDT and Charpy upper-shelf energy values.
      (2)  The post-anneal RTNDT and Charpy upper            described. The actual time-temperature parameters of shelf energy values of the reactor vessel mate    the vessel annealing operation should be used and re rials for use in subsequent reactor operation,    ported. If the percent recovery is determined from testing credible surveillance specimens or from testing materials removed from the beltline region of the reac
      (3) The projected post-anneal reembrittlement          tor vessel, and the testing was subsequent to the an trends for both RTNDT and Charpy upper            nealing operation or was not reported in the Thermal shelf energy, and                                  Annealing Operating Plan, the results of these tests should be reported. In this case, the report should include the initial unirradiated properties, the as
      (4)  The projected values of RTpTS and Charpy irradiated properties just prior to annealing, and the upper-shelf energy at the end of the proposed period of operation addressed in the              properties of the test specimens in the irradiated and application.                                      annealed conditions. The report should provide sup porting evidence for the licensee's report that the an nealing conditions for the test specimens were equal to
  6.1    Description of the Overall Process                    or bounded by the annealing conditions of the reactor vessel. If the percent recovery is determined by calcu A detailed summary of the annealing operation,          lation, the evaluation of percent recovery should use including an actual time-temperature history, should        the actual vessel lower-bound annealing time and tem be provided. The summary should identify the location        perature. In all cases, the report should include the and method of attachment for the specific                    post-anneal RTNDT and Charpy upper-shelf energy instrumentation, including all temperature measure          values.


ment devices applied to the vessel and other structures and components. A history of the times and tempera tures for each temperature measurement device                6.4   Determination of Reembrittlement Trend should be included, showing the actual temperatures              The program for determining the reembrittlement for the beginning of annealing, the heat-up period, the      trend based on both the reference temperature and the
6.4 Determination of Reembrittlement Trend The program for determining the reembrittlement trend based on both the reference temperature and the Charpy upper-shelf energy should be described, in cluding the results of any analyses or tests that establish these reembrittlement trends. The program should specifically identify the post-anneal "starting" values of reference temperature and Charpy upper-shelf energy, as well as the projected embrittlement path of these values with increasing neutron fluence, including the basis for this projection. To the degree that this in formation is the same as the information in the Ther mal Annealing Operation Plan, the plan may be referenced.
, steady-state conditions, and the cool-down period.          Charpy upper-shelf energy should be described, in Sufficient detail should be included to permit determi      cluding the results of any analyses or tests that establish nation of the heat-up and cool-down rates and the vari      these reembrittlement trends. The program should ations in temperature measurements during the entire        specifically identify the post-anneal "starting" values of cycle. A summary of key measurements should be pro          reference temperature and Charpy upper-shelf energy, vided that shows that the proposed annealing condi          as well as the projected embrittlement path of these tions, specifically the time and temperature parameters      values with increasing neutron fluence, including the and stress allowables established in the application,        basis for this projection. To the degree that this in were not exceeded. Additionally, a summary of the            formation is the same as the information in the Ther worker exposures incurred during the annealing proc          mal Annealing Operation Plan, the plan may be ess should be included.                                      referenced.


6.2    Evaluation of Requalificatlon Inspections            6.5   Changes to Surveillance Program and Tests                                                  Changes to the surveillance program previously The results and evaluations of any inspections and      described in the Thermal Annealing Report (10 CFR
6.5 Changes to Surveillance Program Changes to the surveillance program previously described in the Thermal Annealing Report (10 CFR  
  tests used to requalify the annealed reactor vessel, the    50.66(b) (3) (ii) (B)) that are the result of the annealing attached piping or appurtenances, and the adjacent          operation should be described in detail. If no changes concrete structures should be reported. The Thermal          are necessary, the Thermal Annealing Results Report Annealing Results Report should include the results of      should so state.
50.66(b) (3) (ii) (B)) that are the result of the annealing operation should be described in detail. If no changes are necessary, the Thermal Annealing Results Report should so state.


all inspections and tests to demonstrate that the an nealing operation has not caused degradation of the          6.6   Allowable Operating Period reactor vessel, the insulation, the attached piping or appurtenances, containment, and the adjacent con                  Based on the degree of recovery and the projected crete to a degree that could affect the safe operation of    reembrittlement trend, an analysis should be provided the reactor. The report should describe the evaluation      to demonstrate the period of operation for which the and disposition of any indications detected during the      requirements of 10 CFR 50.60 and 10 CFR 50.61 will post-anneal inspections.                                    be satisfied.
6.6 Allowable Operating Period Based on the degree of recovery and the projected reembrittlement trend, an analysis should be provided to demonstrate the period of operation for which the requirements of 10 CFR 50.60 and 10 CFR 50.61 will be satisfied.


1.162-19
1.162-19


7. PUBLIC INFORMATION AND                                   7.2  Completion or Termination of Thermal PARTICIPATION                                                   Annealing Within 15 days after the NRC's receipt of the
7. PUBLIC INFORMATION AND  
7.1   Thermal Annealing Report                             licensee's written submittal on the completion or termination of thermal annealing as described in Sec Upon receipt of a Thermal Annealing Report, and         tion 5 of this regulatory guide, the NRC staff will place K
PARTICIPATION  
a minimum of 30 days before the licensee starts ther         in the NRC Public Document Room a summary of its mal annealing, the NRC will:                                 inspection of the licensee's thermal annealing, and the Commission will hold a public meeting on the anneal
7.1 Thermal Annealing Report Upon receipt of a Thermal Annealing Report, and a minimum of 30 days before the licensee starts ther mal annealing, the NRC will:  
      (1) Notify and solicit comments from local and State governments in the vicinity of the site where the       ing. The purposes of this public meeting are (1) for the licensee to explain to the NRC and the public the re thermal annealing will take place and any Indian Nation or other indigenous people that have treaty or         sults of the reactor pressure vessel annealing, (2) for statutory rights that could be affected by the thermal       the NRC to discuss its inspection of the reactor vessel annealing, and (3) for the NRC to receive public com annealing, ments on the annealing.
(1) Notify and solicit comments from local and State governments in the vicinity of the site where the thermal annealing will take place and any Indian Nation or other indigenous people that have treaty or statutory rights that could be affected by the thermal annealing,
(2) Publish a notice of a public meeting in the Fed eral Register and in a forum, such as local newspapers, which is readily accessible to individuals in the vicinity of the site, to solicit comments from the public, and  
(3) Hold a public meeting on the licensee's Ther mal Annealing Report.


(2) Publish a notice of a public meeting in the Fed eral Register and in a forum, such as local newspapers,       7.3   NRC Inspection Report which is readily accessible to individuals in the vicinity        Within 45 days of NRC's receipt of a licensee's of the site, to solicit comments from the public, and        submittals described in Section 5 of this regulatory guide, the NRC staff will fully document its inspection
7.2 Completion or Termination of Thermal Annealing Within 15 days after the NRC's receipt of the licensee's written submittal on the completion or termination of thermal annealing as described in Sec tion 5 of this regulatory guide, the NRC staff will place in the NRC Public Document Room a summary of its inspection of the licensee's thermal annealing, and the Commission will hold a public meeting on the anneal ing. The purposes of this public meeting are (1) for the licensee to explain to the NRC and the public the re sults of the reactor pressure vessel annealing, (2) for the NRC to discuss its inspection of the reactor vessel annealing, and (3) for the NRC to receive public com ments on the annealing.
    (3) Hold a public meeting on the licensee's Ther        of the licensee's annealing process and place this docu mal Annealing Report.                                        mentation in the NRC Public Document Room.
 
7.3 NRC Inspection Report Within 45 days of NRC's receipt of a licensee's submittals described in Section 5 of this regulatory guide, the NRC staff will fully document its inspection of the licensee's annealing process and place this docu mentation in the NRC Public Document Room.


1-.
1-.
                                                      1.162-20
1.162-20
K


REFERENCES
REFERENCES
                                                                              Vessel      Steels,"      NUREG/CR-6327                (MCS
1.
  1.     U. Potapovs, J. R. Hawthorne, and C. Z. Serpan, Jr., "Notch Ductility Properties of SM-1A Reac                         950302), May 1995.3 tor Pressure Vessel Following the In-Place                           American Society for Testing and Materials,
 
                                                                        9.
U. Potapovs, J. R. Hawthorne, and C. Z. Serpan, Jr., "Notch Ductility Properties of SM-1A Reac tor Pressure Vessel Following the In-Place Annealing Operation," Nuclear Applications, Vol. 5, No. 6, pp. 389-409, 1968.
 
2.


Annealing Operation," Nuclear Applications,                           "Recommended Guide for In-Service Annealing Vol. 5, No. 6, pp. 389-409, 1968.
A. Fabry et al., "Annealing of the BR-3 Reactor Pressure Vessel," in Proceedings of the Twelfth Water Reactor Safety Research Information Meeting, NUREG/CP-0058, Vol.


of Water-Cooled Nuclear Reactor Vessels,"
4, pp.
  2.    A. Fabry et al., "Annealing of the BR-3 Reactor                        ASTM E 509-86, Philadelphia, 1986.


Pressure Vessel," in Proceedings of the Twelfth                10. NRC, "Additional Requirements for Yankee Water Reactor Safety Research Information                              Rowe Pressure Vessel Issues," SECY-91-333, Meeting, NUREG/CP-0058,                Vol. 4, pp.
144-175, NRC, January 1985.1
3.


October 22, 1991.3
N. M. Cole and T. Friderichs, "Report on An nealing of the Novovoronezh Unit 3 Reactor Ves sel in the USSR,"  
          144-175, NRC, January 1985.1
NUREG/CR-5760 (MPR  
                                                                        11. NRC, "Action Plans To Implement the Lessons
Associates, Inc., MPR-1230), NRC, July 1991.
  3.    N. M. Cole and T. Friderichs, "Report on An                           Learned from the Yankee Rowe Reactor Vessel nealing of the Novovoronezh Unit 3 Reactor Ves                         Embrittlement Issue,"            SECY-92-283, Au sel in the USSR," NUREG/CR-5760 (MPR                                   gust 14, 1992.3 Associates, Inc., MPR-1230), NRC, July 1991.


12. NRC, "Standard Review Plan for the Review of
4.
  4.    W. L. Server, "In-Place Thermal Annealing of                          Safety Analysis Reports for Nuclear Power Nuclear Reactor Pressure Vessels," NUREG/                              Plants," NUREG-0800, June 1987.1 CR-4212 (EG&G Idaho, Inc., EGG-MS-6708),
        NRC, April 1985.                                                13. American Society of Mechanical Engineers,
                                                                                "Rules for Construction of Nuclear Power
  5.    T. R. Mager, "Feasibility of and Methodology for                      Plants," Section III, Division 1, Subsection NB,
        Thermal Annealing an Embrittled Reactor Ves                            of ASME Boiler and Pressure Vessel Code, New sel," EPRI NP-2712, Vol. 2, Electric Power                            York, 1993.


Research Institute, Palo Alto, CA, November
W. L. Server, "In-Place Thermal Annealing of Nuclear Reactor Pressure Vessels," NUREG/
          1982.2                                                          14. American Society for Testing and Materials,
CR-4212 (EG&G Idaho, Inc., EGG-MS-6708),
                                                                                "Standard Practice for Conducting Surveillance
NRC, April 1985.
  6.    T. R. Mager et al., "Thermal Annealing of an                          Tests for Light-Water Cooled Nuclear Power Embrittled Reactor Vessel, Feasibility and Meth                      Reactors," ASTM E 185-82, Philadelphia, odology," EPRI NP-6113-SD, Electric Power                            1982.


Research Institute, Palo Alto, CA, January
5.
          1989.2                                                          15. American Society of Mechanical Engineers,
                                                                                "Nuclear Power Plant Components," Section III,
  7.      J. R. Hawthorne and A. L. Hiser, "Investigations                      Division 2, of the ASME Boiler and Pressure of Irradiation-Anneal-Reirradiation (IAR) Prop                        Vessel Code, New York, 1993.


erties Trends of RPV Welds-Phase 2, Final Re port," NUREG/CR-5492 (Materials Engineering                    16. G. B. Reddy and D. J. Ayres, "High Associates, Inc., MEA-2088), NRC, January                            Temperature Elastic-Plastic and Creep Properties
T. R. Mager, "Feasibility of and Methodology for Thermal Annealing an Embrittled Reactor Ves sel," EPRI NP-2712, Vol. 2, Electric Power Research Institute, Palo Alto, CA, November
          1990.1                                                                for SA533 Grade B, Class 1 and SA508 Materi als," EPRI Report NP-2763, December 1982.2
1982.2
  8.      E. D. Eason et al., "Models for Embrittlement Recovery Due to Annealing of Reactor Pressure                  17. NRC Information Notice No. 90-52, "Retention of Broken Charpy Specimens," August 14,
6.
                                                                                1990.3
                                                                          18. American Society for Testing and Materials,
                                                                                "Standard Test Method for Plane-Strain Frac ture Toughness of Metallic Materials," ASTM E
                                                                                399-83, Philadelphia, 1983.


1Copies are available for inspection or copying for a fee from the      19. American Society for Testing and Materials, NRC Public Document Room at 2120 L Street NW., Washing ton, DC; the PDR's mailing address Is Mail Stop LL-6, Wash                  "Standard Guide for Reconstitution of Irradiated ington, DC 20555-0001; telephone (202)634-3273; fax                          Charpy Specimens," ASTM E 1253-88, Phila
T. R. Mager et al., "Thermal Annealing of an Embrittled Reactor Vessel, Feasibility and Meth odology," EPRI NP-6113-SD, Electric Power Research Institute, Palo Alto, CA, January
    (202)634-3343. Copies may be purchased at current rates                    delphia, 1988.
1989.2
7.


from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20402-9328 (telephone (202) 512-1800) or from the National Technical Information Service by writing            3 Coples are available for Inspection or copying for a fee from the NTIS at 5285 Port Royal Road, Springfield, VA 22161.                  NRC Public Document Room at 2120 L Street NW., Washing
J. R. Hawthorne and A. L. Hiser, "Investigations of Irradiation-Anneal-Reirradiation (IAR) Prop erties Trends of RPV Welds-Phase 2, Final Re port," NUREG/CR-5492 (Materials Engineering Associates, Inc., MEA-2088), NRC, January
> 2 Copies may be purchased from EPRI's Research Reports Cen              ton, DC. the PDR's mailing address is Mail Stop LL-6. Wash Ington, DC 20555-0001; telephone          (202)634-3273;      fax ter, P.O. Box 50490, Palo Alto, CA 94303 (telephone                    (202)634-3343.
1990.1
8.


E. D. Eason et al., "Models for Embrittlement Recovery Due to Annealing of Reactor Pressure
1Copies are available for inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washing ton, DC; the PDR's mailing address Is Mail Stop LL-6, Wash ington, DC
20555-0001; telephone (202)634-3273; fax
(202)634-3343. Copies may be purchased at current rates from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20402-9328 (telephone (202) 512-1800) or from the National Technical Information Service by writing NTIS at 5285 Port Royal Road, Springfield, VA 22161.
>
2Copies may be purchased from EPRI's Research Reports Cen ter, P.O. Box 50490, Palo Alto, CA
94303 (telephone
(415)965-4081).
(415)965-4081).
                                                                  1.162-21
Vessel Steels,"
NUREG/CR-6327 (MCS
950302), May 1995.3
9.
 
American Society for Testing and Materials,
"Recommended Guide for In-Service Annealing of Water-Cooled Nuclear Reactor Vessels,"
ASTM E 509-86, Philadelphia, 1986.
 
10. NRC, "Additional Requirements for Yankee Rowe Pressure Vessel Issues," SECY-91-333, October 22, 1991.3
11. NRC, "Action Plans To Implement the Lessons Learned from the Yankee Rowe Reactor Vessel Embrittlement Issue,"
SECY-92-283, Au gust 14, 1992.3
12. NRC, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants," NUREG-0800, June 1987.1
13. American Society of Mechanical Engineers,
"Rules for Construction of Nuclear Power Plants," Section III, Division 1, Subsection NB,
of ASME Boiler and Pressure Vessel Code, New York, 1993.
 
14. American Society for Testing and Materials,
"Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactors,"
ASTM
E
185-82, Philadelphia,
1982.
 
15. American Society of Mechanical Engineers,
"Nuclear Power Plant Components," Section III,
Division 2, of the ASME Boiler and Pressure Vessel Code, New York, 1993.
 
16. G.
 
B.
 
Reddy and D. J.
 
Ayres,
"High Temperature Elastic-Plastic and Creep Properties for SA533 Grade B, Class 1 and SA508 Materi als," EPRI Report NP-2763, December 1982.2
17. NRC Information Notice No. 90-52, "Retention of Broken Charpy Specimens,"
August 14,
1990.3
18. American Society for Testing and Materials,
"Standard Test Method for Plane-Strain Frac ture Toughness of Metallic Materials," ASTM E
399-83, Philadelphia, 1983.
 
19. American Society for Testing and Materials,
"Standard Guide for Reconstitution of Irradiated Charpy Specimens," ASTM E 1253-88, Phila delphia, 1988.
 
3Coples are available for Inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washing ton, DC. the PDR's mailing address is Mail Stop LL-6. Wash Ington, DC 20555-0001; telephone
(202)634-3273; fax
(202)634-3343.
 
1.162-21
 
20. American Society for Testing and Materials,
"Standard Test Methods for Notched Bar Impact Testing of Metallic Materials," ASTM E 23-88, Philadelphia, 1988.
 
21. U.S.


20. American Society for Testing and Materials,                           Materials," Regulatory Guide 1.99, Revision 2,
Nuclear Regulatory Commission,  
        "Standard Test Methods for Notched Bar Impact                        May 1988.4 Testing of Metallic Materials," ASTM E 23-88, Philadelphia, 1988.                                            22. R. D. Cheverton et al., "Review of Reactor Pres sure Vessel Evaluation Report for Yankee Rowe
"Radiation Embrittlement of Reactor Vessel Materials," Regulatory Guide 1.99, Revision 2, May 1988.4  
  21.  U.S.      Nuclear      Regulatory      Commission, Nuclear Power Station (YAEC No. 1735),"
22. R. D. Cheverton et al., "Review of Reactor Pres sure Vessel Evaluation Report for Yankee Rowe Nuclear Power Station (YAEC No. 1735),"  
                                                                            NUREG/CR-5799 (ORNL/TM-11982), NRC,
NUREG/CR-5799 (ORNL/TM-11982),  
                                                                                                                                    K
NRC,  
        "Radiation Embrittlement of Reactor Vessel                          March 1992.1
March 1992.1
4 Single copies of regulatory guides may be obtained free of charge by writing the Office of Administration, Attn: Distribution and Services Section, USNRC, Washington, DC 20555-0001, or by fax at (301)415-2260. Copies are also available for inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washington, DC; the PDR's mailing address is Mail       K
4Single copies of regulatory guides may be obtained free of charge by writing the Office of Administration, Attn: Distribution and Services Section, USNRC, Washington, DC 20555-0001, or by fax at (301)415-2260. Copies are also available for inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washington, DC; the PDR's mailing address is Mail Stop LL-6, Washington, DC 20555-0001; telephone (202)634-3273; fax (202)634-3343.
  Stop LL-6, Washington, DC 20555-0001; telephone (202)634-3273; fax (202)634-3343.


K
K
1.162-22
1.162-22


REGULATORY ANALYSIS
REGULATORY ANALYSIS
    A separate regulatory analysis was not prepared       the guide. A copy of the regulatory analysis is available for inspection and copying for a fee at the NRC Public for this regulatory guide. The regulatory analysis prepared for 10 CFR 50.66, "Requirements for Ther          Document Room, 2120 L Street NW, Washing mal Annealing of the Reactor Pressure Vessel," pro        ton, DC; the PDR's mailing address is Mail Stop LL-6,     Washington,     DC 20555-0001;         phone vides the regulatory basis for this guide and examines
A separate regulatory analysis was not prepared for this regulatory guide. The regulatory analysis prepared for 10 CFR 50.66, "Requirements for Ther mal Annealing of the Reactor Pressure Vessel," pro vides the regulatory basis for this guide and examines the costs and benefits of the rule as implemented by the guide. A copy of the regulatory analysis is available for inspection and copying for a fee at the NRC Public Document Room, 2120 L Street NW, Washing ton, DC; the PDR's mailing address is Mail Stop LL-6, Washington, DC  
                                                            (202)634-3273; fax (202)634-3343.
20555-0001;  
phone  
(202)634-3273; fax (202)634-3343.


the costs and benefits of the rule as implemented by
1.162-23
                                                    1.162-23


J                         ,1               -
J
        UNITED STATES
,1 UNITED STATES  
NUCLEAR REGULATORY COMMISSION             FIRST CLASS MAIL
NUCLEAR REGULATORY COMMISSION  
                                      POSTAGE AND FEES PAID
WASHINGTON, DC 20555-0001
  WASHINGTON, DC 20555-0001                  USNRC
-
                                          PERMIT NO. G-67 OFFICIAL BUSINESS
FIRST CLASS MAIL  
    PENALTY FOR PRIVATE USE, $300
POSTAGE AND FEES PAID  
                                  7}}
USNRC  
PERMIT NO. G-67 OFFICIAL BUSINESS  
PENALTY FOR PRIVATE USE, $300
7}}


{{RG-Nav}}
{{RG-Nav}}

Latest revision as of 02:07, 17 January 2025

(Draft Was Issued as DG-1027) Format and Content of Report for Thermal Annealing of Reactor Pressure Vessels
ML003740052
Person / Time
Issue date: 02/29/1996
From:
Office of Nuclear Regulatory Research
To:
References
RG-1.162
Download: ML003740052 (24)


U.S. NUCLEAR REGULATORY COMMISSION

February 1996 RCso

A. INTRODUCTION

The thermal annealing rule, § 50.66, "Require ments for Thermal Annealing of the Reactor Pressure Vessel," of 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facility," provides that:

For those light water nuclear power reactors where neutron radiation has reduced the frac ture toughness of the reactor vessel materials, a thermal annealing may be applied to the reactor vessel to recover the fracture tough ness of the material. The use of a thermal an nealing treatment is subject to the require ments in this section. A report describing the licensee's plan for conducting the thermal an nealing must be submitted in accordance with

§ 50.4 at least three years prior to the date at which the limiting fracture toughness criteria in § 50.61 or Appendix G to Part 50 would be exceeded.

This regulatory guide describes a format and con tent acceptable to the NRC staff for the Thermal An nealing Report to be submitted to the NRC for describ ing the licensee's plan for thermal annealing a reactor vessel. This guide also describes the Thermal Anneal ing Results Report that is required by 10 CFR 50.66 to be submitted after the thermal annealing. Use of this format by the applicant would help ensure the corn- USNRC REGULATORY GUIDES

Regulatory Guides are issued to describe and make avallable to the public such Information as methods acceptable to the NRC staff for Implement ing specific parts of the Commission's regulations, techniques used by the staff In evaluating specific problems or postulated accidents, and data needed by the NRC staff In its review of applications for permits and licenses. Regulatory guides are not substitutes for regulations. and com plianoe with them Is not required. Methods and solutions different from those set out In the guides will be acceptable If they provide a basis for the findings requisite to the Issuance or continuance of a permit or license by the Commission.

This guide was Issued after consideration of comments received from the public. Comments and suggestions for Improvements In these guides are encouraged at all times, and guides will be revised, as appropriate, to acconmmodate comments and to reflect new Information or experience.

pleteness of the information provided, would assist the NRC staff in locating specific information, and would aid in shortening the time needed for the review process.

This regulatory guide also describes alternative methods that are acceptable to the NRC for determin ing the recovery of fracture toughness after the thermal annealing and for estimating the degree of post annealing reembrittlement expected during subse quent plant operations; 10 CFR 50.66 requires these to be reported.

This regulatory guide contains guidance on man datory information collections that are contained as re quirements in 10 CFR Part 50 and that are subject to the Paperwork Reduction Act of 1980 (44 U.S.C.

3501 et seq.). These requirements were approved by the Office of Management and Budget, approval num ber 3150-0011.

The public reporting burden for this collection of information Is estimated to be an average of 6000

hours per respondent, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send com ments regarding this burden estimate or any other aspect of this collection of information, including sug gestions for reducing the burden, to the Information and Records Management Branch (T-6 F 33), U.S.

Written comments may be submitted to the Rules Review and Directives Branch, DFIPS, ADM, U.S. Nuclear Regulatory Commission, Washing ton, DC 20658-0001.

The guides are issued in the following ten broad divisions:

1. Power Reactors

6. Products

2. Research and Test Reactors

7. Transportation

3. Fuels and Materials Facilities

8. Occupational Health

4. Environmental and Siting

9. Antitrust and Financial Review

5. Materials and Plant Protection

10. General Single copies of regulatory guides may be obtained free of charge by writ the Office of Administration, Attention: Distribution and Services tion, U.S. Nuclear Regulatory Commission.

Washington, OC

20655-0001. or by fax at (301)415-2260.

Issued guides may also be purchased from the National Technical Infor mation Service on a standing order basis. Details on this service may be obtained by writing NTIS, 6285 Port Royal Road, Springfield, VA 22161.

REGULATORY GUIDE

OFFICE OF NUCLEAR REGULATORY RESEARCH

REGULATORY GUIDE 1.162 (Draft was Issued as DG-1027)

FORMAT AND CONTENT OF REPORT

FOR THERMAL ANNEAUNG OF REACTOR PRESSURE VESSELS

Nuclear Regulatory Commission, Washington, DC

20555-000 1; and to the Desk Officer, Office of Infor mation and Regulatory Affairs, NEOB-10202

(3150-0011), Office of Management and Budget, Washington, DC 20503.

B. DISCUSSION

BACKGROUND

Criterion 31 of Appendix A, "General Design Cri teria for Nuclear Power Plants," to 10 CFR Part 50

requires that:

The reactor shall be designed with sufficient margin to assure that when stressed under op erating, maintenance, testing, and postulated accident conditions, (1) the boundary behave in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized.

A major concern in this regard is that the material properties of reactor vessels degrade progressively when exposed to neutron radiation during service, re sulting in a loss in fracture toughness and ductility. To maintain adequate toughness and preclude nonductile failure in the vessel, a number of mitigating actions are taken during the operating life of a reactor: periodic changes are made in the pressure-temperature (P-T)

limits required to preclude nonductile fracture of the materials during startup and cooldown, limitations are placed on the reduction of Charpy upper-shelf energy to maintain an adequate margin of safety against duc tile fracture, and additional restrictions are placed on toughness properties by screening criteria imposed to avoid vessel failure from pressurized thermal shock.

If neutron radiation embritdement becomes so se vere that the required margins cannot be maintained,

10 CFR 50.61 and Appendix G to 10 CFR Part 50

permit the application of a thermal annealing treat ment to recover the toughness properties of the vessel materials, which would avoid premature retirement of the reactor pressure vessel. Thermal annealing, the heating of the reactor vessel beltline to a temperature well above the operating temperature of the reactor for an extended period of time sufficient to remove the microstructural changes caused by radiation, is the only known method for restoring toughness properties to materials degraded by neutron radiation. The re quirements for conducting thermal annealing and re starting the plant after annealing are set forth in

10 CFR 50.66.

Although thermal annealing has not yet been applied to a U.S. commercial power reactor, it has been successfully applied to other reactors. Two reac tor vessels that have been successfully annealed are the Army's SM-1A in 1967 (Ref. 1), and the BR-3 in Mol, Belgium, in 1984 (Ref. 2). Both of these reactors operated at temperatures low enough to permit "wet annealing" at a temperature of 650°F using the reactor coolant pumps as the heat source. In addition, at least

12 Russian-designed VVER-440 PWRs, which operate at conditions similar to U.S. PWRs, have been an nealed in Russia and Eastern Europe at temperatures of approximately 850*F, using dry air and radiant heaters as the heat source. Details of the thermal an nealing of the Novovoronezh Unit 3 have been re ported (Ref. 3) by a U.S. delegation that witnessed the operation.

CURRENT STATE OF KNOWLEDGE ON

THERMAL ANNEALING

A significant amount of information has been re ported in the literature on thermal annealing and on the effects of thermal annealing variables (e.g., tem perature, time, materials chemistry, fluence levels), on the recovery of toughness properties. Server (Ref. 4)

summarized the state of knowledge, as of 1985, for in-place thermal annealing of commercial reactor pres sure vessels. He reviewed data on annealing recovery and reirradiation effects for high-copper welds and concluded that significant recovery occurs for anneal ing at 850*F for both the transition temperature shift (ARTNDT) and reduction in Charpy upper-shelf ener gy. He also reviewed engineering studies and con cluded that annealing of U.S. reactors at 850*F is fea sible using existing commercial heat treating methods, but that plant-specific engineering problems would need to be resolved. Server (Ref. 4) also performed a thermal and structural analysis for a typical PWR vessel annealed at 850 0 F, which predicted that vessel dimen sional stability would be maintained and that post anneal residual stresses would not be significant. How ever, Server's results indicated that excessive bending of the attached piping from differential thermal expan sion of the vessel could be a problem that required careful temperature control.

Mager and others (Refs. 5 and 6) reported on re search to determine the extent of fracture toughness recovery as a function of annealing time and tempera ture for materials that are sensitive to neutron embrittlement. They concluded that excellent recov ery of all properties could be achieved by annealing at

850*F for 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br />, and that the reembrittlement af ter annealing would follow the same trend as the pre annealing embrittlement rate. These reports also de scribe a thermal annealing procedure developed for field application.

Additional research that includes data on irradiation-anneal-reirradiation property trends for reactor pressure vessel welds has been reported by Hawthorne and Hiser (Ref. 7).

More recently*, Eason et al. performed analyses of existing data on annealing of irradiated pressure vessel steels using both mechanistic and statistical consider ations. Eason et al. also developed improved correla-

1.162-2 Is.

K1

tion models for estimating Charpy upper-shelf energy and transition temperature after radiation and anneal ing. This work is reported in NUREG/CR-6327 (Ref.

8), and it provides the basis for equations for estimat

>*

ing recovery of fracture toughness following annealing (Section 3.1.3 of this regulatory guide).

General guidance for inservice annealing may be found in ASTM Standard E 509-86 (Ref. 9). ASTM

Standard E 509-86 contains general procedures for conducting an in-service thermal anneal of a reactor vessel and for demonstrating the effectiveness and de gree of recovery. ASTM Standard E 509-86 also pro vides direction for a post-anneal vessel radiation sur veillance program.

CURRENT REGULATORY REQUIREMENTS

FOR FRACTURE TOUGHNESS OF VESSELS

Fracture toughness requirements for light-water cooled reactor pressure vessels are addressed in sever al regulations. Appendix G, "Fracture Toughness Re quirements," to 10 CFR Part 50 provides the fracture toughness requirements for vessels during normal op eration and anticipated accident conditions. Appendix G also permits the use of thermal annealing to restore fracture toughness degraded by neutron radiation when embrittlement degrades mechanical properties to such an extent that adequate margins of safety cannot be demonstrated during operation. Appendix H,

"Reactor Vessel Material Surveillance Program Re quirements," to 10 CFR Part 50 requires surveillance programs to monitor irradiation embrittlement of reac tor vessel beltline materials. The pressurized thermal shock (PTS) rule, 10 CFR 50.61, establishes screening criteria for embrittlement beyond which the plant may not operate without further justification.

The application of these regulations in the late

1980s and early 1990s demonstrated a need for clarifi cation and improved guidance. The NRC review of the reactor pressure vessel integrity of the Yankee Nuclear Power Station highlighted the need for such changes and resulted in a detailed plan described in SECY-91-333 (Ref.

10)

and SECY-92-283 (Ref. 11).

To implement this plan, a proposed rule to amend the regulations was issued on October 4, 1994 (59 FR

50513). This rule was issued in final form on Decem ber 19, 1995 (60 FR 65456). The rule includes a new

§ 50.66, "Requirements for Thermal Annealing of the Reactor Pressure Vessel," which sets forth the NRC's requirements for annealing of reactor pressure vessels.

Also, changes were made to both Appendix G and the PTS rule to reference the thermal annealing require ments in § 50.66, as an option for reducing embrittle ment when the toughness requirements of those rules cannot otherwise be met.

The thermal annealing rule, 10 CFR 50.66, per mits the thermal annealing of reactor vessels to restore fracture toughness of the reactor vessel material that was reduced by neutron radiation. Section 50.66(a)

requires that, prior to initiation of thermal annealing, a Thermal Annealing Report be submitted to describe the licensee's plan for conducting the thermal anneal.

The report must be submitted at least 3 years prior to the date at which the limiting fracture toughness crite ria in 10 CFR 50.61 or Appendix G to Part 50 would be exceeded. This 3-year period is specified to provide the NRC staff with sufficient time to review the thermal annealing program. Within 3 years of submittal of a licensee's Thermal Annealing Report and at least 30

days prior to the start of the thermal annealing,

10 CFR 50.66(a) requires the NRC staff to review the Thermal Annealing Report and place the results of its evaluation in its Public Document Room. In order to provide for public participation in the regulatory proc ess, 10 CFR 50.66(0 requires that the NRC hold a public meeting a minimum of 30 days before the li censee starts to thermal anneal the reactor vessel. The licensee may. begin thermal annealing after the NRC

has placed the results of its evaluation of the Thermal Annealing Report in the Public Document Room and after the public meeting is held.

The Thermal Annealing Report is required by

10 CFR 50.66(b) to include (1) a Thermal Annealing Operating Plan, (2) a Requalification Inspection and Test Program, (3) a Fracture Toughness Recovery and

"Reembrittlement Trend Assurance Program, and

(4) the Identification of Unreviewed Safety Questions and Technical Specification Changes.

The rule also provides three methods for deter mining the percent recovery. When surveillance speci-.

mens are available from a credible surveillance pro gram, the percent recovery for the reactor vessel is required to be determined by using a test program that applies the actual annealing conditions to the irra diated surveillance specimens. If surveillance speci mens are not available, the applicant may elect to de termine the percent recovery by testing materials removed from the reactor vessel beltline region. The third method permits uses of a generic computational method if adequate justification is provided. Use of the procedure described in this regulatory guide in Sec tion 3.1.3, "Computational Methods," is considered appropriate justification for this application.

Upon completion of the thermal annealing and the associated tests and analyses, the applicant must con firm in writing to the Director of the Office of Nuclear Reactor Regulation (NRR) that the thermal anneal was performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program. Within 15 days of the licensee's written confirmation that the thermal annealing was com pleted in accordance with the Thermal Annealing

1.162-3

Plan, and prior to restart, the NRC will (1) briefly doc ument whether the thermal annealing was performed in compliance with the licensee's Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, placing the documentation in the NRC

Public Document Room, and (2) hold a public meeting to permit the licensee to explain the results of the reac tor vessel annealing to the NRC and the public, allow the NRC to discuss its inspection of the reactor vessel annealing, and provide an opportunity for the public to comment to the NRC on the thermal annealing. The licensee may restart its reactor after the meeting has been completed, unless the NRC orders otherwise.

Within 45 days of the licensee's written confirmation that the thermal annealing was completed in accor dance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, the NRC staff will complete full documentation of the NRC's inspection of the licensee's annealing process and place the documentation in the NRC's Public Doc ument Room.

If the thermal annealing was completed but not performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, including the bounding conditions of the temperature and times, according to 10 CFR

50.66(c) (2) the licensee must submit a summary of the lack of compliance and a justification for subsequent operations. The licensee must also identify any changes to the facility that are attributable to the non compliances that constitute unreviewed safety ques tions and any changes to the technical specifications that are required for operation as a result of the non compliances. This identification does not relieve the licensee from complying with applicable requirements of the Commission's regulations and the operating li cense; and if these requirements cannot be met as a result of the annealing operation, the licensee must ob tain the appropriate exemption per 10 CFR 50.12. If unreviewed safety questions or changes to technical specifications are not identified as necessary for re sumed operation, the licensee may restart after the NRC staff places a summary of its inspection of the thermal annealing in the NRC Public Document Room and the NRC holds a public meeting on the thermal annealing. On the other hand, if unreviewed safety questions or changes to technical specifications are identified as necessary for resumed operation, the li censee may restart only after the Director of the Office of Nuclear Reactor Regulation authorizes restart, the summary of the NRC staff inspection is placed in the NRC Public Document Room, and a public meeting on the thermal annealing is held.

The thermal annealing rule also sets forth in

10 CFR 50.66(c) (3) (i) the requirements that a licens ee must follow if the thermal annealing was terminated prior to completion. In general, the process and re- quirements for partial annealing are analogous to situa tions in which the thermal annealing was completed;

that is, when the partial annealing was otherwise per formed in compliance with the Thermal Annealing Op erating Plan and relevant portions of the Requalifica tion Inspection and Test Program, the licensee submits written confirmation of such compliance and may re start following, among other things, holding a public meeting on the annealing. By contrast, if the partial annealing was not performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program, the licensee is required by 10 CFR

50.66(c) (3) (iii) to submit a summary of lack of com pliance, submit a justification for subsequent opera tions, identify any changes to the facility that are attrib utable to noncompliances that constitute unreviewed safety questions, and identify changes to the technical specifications that are required for operation as a result of the noncompliances with the Thermal Annealing Operating Plan and relevant portions of the Requalifi cation Inspection and Test Program. If unreviewed safety questions or changes to technical specifications are identified as necessary for resumed operation, the licensee may restart only after the Director of NRR au thorizes restart and the public meeting on the thermal annealing is held.

According to 10 CFR 50.66(d), every licensee who either completes a thermal annealing or termi nates an annealing but elects to take full or partial credit for the annealing must provide a Thermal An nealing Results Report detailing (1) the time and tem perature profiles of the actual thermal anneal, (2) the post-anneal RTNDT and Charpy upper-shelf energy values of the reactor material to be used in subsequent operations, (3) the projected postanneal reembrittle ment trends for both RTNDT and Charpy upper-shelf energy, and (4) the projected values of RTpTS and Charpy upper-shelf energy at the end of the proposed period of operation addressed in the application. The report must be submitted within three months of com pleting the thermal anneal, unless an extension is au thorized by the Director of NRR.

C.

FORMAT AND CONTENT FOR THE

THERMAL ANNEALING REPORT

The format described here is acceptable to the NRC staff for the Thermal Annealing Report that is to be submitted to the Director of NRR for annealing a reactor vessel to restore fracture toughness of the reac tor vessel material. This format addresses the contents of the Thermal Annealing Operating Plan, the Requal ification Inspection and Test Program, the Fracture Toughness Recovery and Reembrittlement Trend As surance Program, and the Identification of Unre viewed Safety Questions and Technical Specifications Changes. It also describes acceptance criteria that the staff will use in evaluating the applicant's proposed

1.162-4 K

K

programs for determining fracture toughness recovery and establishing reembrittlement rates. This regulatory guide applies to thermal annealing procedures that use heaters (electric or gas) for heating the reactor vessel,

)

the "dry" anneal method. Use of the "wet" anneal method, which applies heat generated by the pump to heat the reactor coolant, will be reviewed separately, on a case-by-case basis.

1. THERMAL ANNEALING OPERATING

PLAN

The Thermal Annealing Operating Plan should in clude sufficient information to permit an independent evaluation of all the elements that went into its devel opment. The following sections provide guidance on the format and content acceptable to the NRC staff for the operating plan, the information that should be in cluded in the plan, the minimum level of detail for this information, and the necessary supporting data.

In all cases, the information described in this guide may be referenced if it has been submitted previously in another document, including any updates to pre vious submittals.

1.1 General Considerations This first section should present introductory and general information. It should identify the reactor and give the reasons that thermal annealing is being pro j

posed, including any regulatory requirement being challenged by the loss in fracture toughness. The pro jected percent recovery from annealing and the pro jected rate of reembrittlement in subsequent reactor operations should be identified, as well as the expected remaining operating life after annealing. The projected annealing response and reirradiation response should be determined using the provisions of this guide in Sec tion 3, "Fracture Toughness Recovery and Reem brittlement Assurance Program." In using these provi sions, the projected recovery should be determined using the annealing time and temperature proposed in the application.

The operating history of the reactor prior to an nealing should be described in this section, including the power-time-temperature history during power op erations to permit evaluation of temperature and flu ence conditions for the reactor vessel; these data may be either actual recorded data or data deduced from other plant information that is identified as such. The specific reactor vessel beitline temperatures during the reactor operation should be reported.

This section should describe the results of the on going surveillance program, including the number of specimens, initial values for the reference temperature

  • >

(RTNDT) and Charpy upper-shelf energy, and all data on shifts of RTNDT and decrease of Charpy upper shelf energy. It should also provide the pre-annealing RTNDT and Charpy upper-shelf energy values, deter mined by either analysis or testing.

1.2 Description of the Reactor Pressure Vessel This section of the report should provide a de tailed description of the reactor pressure vessel and identify those parts of the vessel to be annealed. It should also include all vessel data used for determining the Thermal Annealing Operating Plan, the proposed inspections and tests, and the programs for recovery and reembrittlement.

Information to be reported on each heat of materi al in the reactor vessel beltline region should include material compositions, including all elements relevant to irradiation behavior, mechanical properties, fabri cation techniques, nondestructive test results, and neutron fluence exposures. The initial RTNDT as spec ified in Branch Technical Position MTEB-5-2 in NUREG-0800 (Ref. 12) and NB-2300 of the ASME

Boiler and Pressure Vessel Code (Ref. 13), along with the initial Charpy upper-shelf energy as defined in ASTM Standard E 185 (Ref. 14), should be reported for each heat of material. Material heats of base metal and weld metal that will be used for measuring percent recovery and for subsequent surveillance purposes, if any, should be identified.

All reactor vessel dimensions should be reported, including diameter, wall thickness, cladding thickness, nozzle dimensions, flange dimensions, and transition section dimensions. The dimensions of the gaps be tween the vessel and other potentially affected compo nents such as adjacent concrete structures, internal permanent structures, and insulation should also be re ported. Attachments to the reactor that could be af fected by the annealing operation and the expected effects should be identified and described. Examples of such effects are:

"* Changes in properties of the vessel insulation,

"* Effects of thermal growth of the reactor on sliding support structures,

"* Overheating of instrumentation and attachments.

1.3 Equipment, Components, and Structures Affected by Thermal Annealing This section of the report should provide a de scription of all equipment, structures, and components that could be affected by the annealing operation, either thermally or mechanically, and the expected effects to the level necessary to assess the effects of annealing on the equipment, structures, and compo nents. Examples of these effects include degradation of the biological shield because of loss in strength or reduction in neutron and gamma absorption capacity and the effects of vessel growth and distortions on at tached piping. All significant thermal and mechanical loadings projected for each item should be identified,

1.162-5

as well as actions proposed to avoid damage from these loadings.

The biological shield should be described, includ ing its dimensions, materials, irradiation exposures, any unique features, and all cooling provisions to be used for controlling temperatures. If the biological shield is a tank, any provision for circulating the tank coolant should be described. If the biological shield is a concrete structure, the properties of the concrete should be reported as well as the properties of other concrete structures exposed to higher than normal temperatures. The existing design temperature limita tions for the concrete should be described. If the de sign temperature limitations are to be exceeded during the thermal annealing operation, an acceptable maxi mum temperature for the concrete should be estab lished as addressed in Paragraph 1.4.

The piping attached to the vessel should be de scribed. This description should include material types, dimensions, and restraints such as supports and snubbers. The design requirements with respect to temperature and bending stress or strain limitations should be identified for the piping. Further, any indi cations of potential flaws found during inspections of the piping should be described.

Any other equipment or instrumentation that could be affected by the thermal annealing should be described. A description of the overall containment as it relates to core removal and storage, as well as the annealing of the vessel, should be included. Any spe cial requirements should be described in detail. For example, storage of core internals may require a coffer dam approach to isolate the coolant from the heating equipment in the drained vessel, in which case the modifications, the equipment, and the method for en suring the integrity of the isolation seals should be detailed.

1.4 Thermal and Stress Analyses This section of the report should provide an evalu ation of the effects of mechanical and thermal stresses and temperatures on the vessel, containment, biologi cal shield, attached piping and appurtenances, and ad jacent equipment, components, and structures that demonstrates that the annealing operation will not be detrimental to reactor operation. This evaluation should include detailed thermal and structural analyses that establish appropriate time and temperature pro files, including the heatup and cooldown rates of the annealing operation, so that dimensional stability of the system will be maintained. The analyses should demonstrate that localized temperatures, thermal stress gradients, and subsequent residual stresses will not result in unacceptable dimensional changes or dis tortions in the vessel, attached piping, and appurte nances and that the thermal annealing cycle will not result in unacceptable degradation of the fatigue life of these components.

The parameters to be evaluated in the thermal and stress analyses should include the annealing tempera ture, hold time at the annealing temperature, heating and cooling rates, the effect of insulation around the vessel Including the bottom head, the active heating length of the heating device, the physical constraints on the vessel, structural characteristics of attached pip ing assemblies, and any other restraints.

The thermal analysis should establish the tempera ture profiles for the inside and outside surfaces of the vessel wall during heatup, start and end of steady-state conditions, and cooldown conditions. The effects of localized high temperatures should be evaluated for degradation of the concrete adjacent to the vessel, for changes, if any, in thermal and mechanical properties of the reactor insulation and for detrimental effects, if any, on containment and the biological shield. Maxi mum concrete temperatures should be based on exist ing design limits or provisions of Section III, Division

2, of the ASME Boiler and Pressure Vessel Code (Ref. 15). If the design temperature limits or the ASME Boiler and Pressure Vessel Code limits for the adjacent concrete structure are projected to be ex ceeded during the annealing operation, an acceptable maximum temperature for the concrete must be estab fished using appropriate test data. Test data on proper ties should address irradiated concrete of appropriate type and exposures to time-temperature conditions that bound the expected conditions of the concrete during annealing.

The structural analysis should evaluate, for the complete annealing cycle, residual deformations, re sidual stresses, elastic-plastic-creep effects (Ref. 16),

distortions, bending, piping displacements, effects of thermal gradients (axial, azimuthal, and through wall), and restraints on the vessel, including nozzles and flange and attached piping. Any potential interfer ence with other equipment, components, or supports should be evaluated. This section should specify the limiting parameters established by these analyses, in cluding maximum temperature, maximum stress, and limiting heatup and cooldown rates.

1.5 Thermal Annealing Operating Conditions This section of the report should describe the pro posed thermal annealing operating conditions, includ ing bounding conditions of temperature and time, and heatup and cooldown schedules.

The annealing parameters should be selected to provide sufficient re covery of fracture toughness to satisfy the require ments of 10 CFR 50.60 and 10 CFR 50.61, or any other objective identified in the application, for the proposed post-anneal period of operation. The anneal ing parameters should be compatible with design stress limits of the reactor and any other component or

1.162-6 K

K

structure expected to experience significant tempera ture or stress gradients during the annealing operation.

Limitations such as the physical constraints resulting from attached piping, supports, snubbers, and other components and the thermal and mechanical stresses generated in the vessel and piping during the annealing operation should also be considered.

This section should identify the proposed anneal ing temperature, time at temperature, heatup rate, cooldown rate, and the limitations and permitted vari ations in these conditions. The limitation on tempera ture variations should include axial, azimuthal, and through-wall gradients and the permissible tempera ture profiles in the vessel during heatup, cooldown, and steady-state heating. The bases used to establish these annealing parameters should be described.

The time and temperature parameters identified in the Thermal Annealing Operating Plan should be based on the thermal and stress analyses described in Section 1.4 and should represent the bounding times, temperatures, and heatup and cooldown schedules for the thermal annealing operation that should not be vio lated during the annealing operation. If these bound ing conditions for times and temperatures are violated during the thermal annealing operation, the analysis will no longer be valid and the annealing operation is considered not in accordance with the Thermal An nealing Operating Plan. In that case, the licensee should follow Section 5.2 of this regulatory guide.

1.6 Description of Annealing Method, Instrumentation, and Procedures This section of the report should describe in detail the method selected for annealing the vessel as well as the proposed instrumentation and procedures to be applied during the annealing operation. The annealing operation should not degrade the reactor or other equipment, components, and structures to such an ex tent that their ability to perform intended safety func tions can no longer be maintained. The annealing op eration must be compatible with the original design limits of the reactor system or the incompatibility should be described and justified. In such cases, addi tional design analysis may be required.

The annealing method should be determined based on constraints from reactor design and accessi bility to the reactor vessel to allow insertion of equip ment and instrumentation. Selection of the method also should be based on the expected structural effects on the primary system that result from temperature gradients in the pressure vessel.

The reactor vessel and adjacent equipment, com ponents, and structures should have instrumentation that permits on-line measurement of temperatures at

"locations that are needed to assess the entire tempera ture profile of the reactor pressure vessel and the adja- cent equipment, components, and structures. Instru mentation should also be installed to determine the stress profiles in these items, including the effects of thermal gradients in the axial, azimuthal, and through thickness directions during all transient and steady state aspects of the annealing operation. The accuracy and reliability of the measurements should be demon strated. The stresses and strains caused by temperature gradients may be established by analysis in combina tion with on-line measurements of temperature or displacements.

The annealing procedure should detail the opera tional steps to be taken during the annealing operation and should include all quality assurance measures needed to ensure an effective annealing operation.

The annealing procedure should identify the controls that will be in place and how these will be applied and maintained throughout the annealing operation. The annealing procedure should describe how the heat treatment equipment will be installed and removed from the vessel; what procedures will be instituted to control radioactive contamination before, during, and after the annealing operation; and how the vessel will be drained and dried prior to annealing. The proce dures should detail the precautions to be taken to pre clude cooling water leakage into the vessel during the annealing operation; such leakage could result in a steam explosion or a thermal shock to the vessel.

1.7 Proposed Annealing Equipment This section of the report should provide a de scription of the equipment to be used for the in-service annealing. It should describe the heating apparatus and the general plant layout to support the annealing operation; the controls and instrumentation, including redundant controls; and equipment for measuring and recording the temperatures and temperature profiles.

This section should describe how the equipment will operate, as well as what provisions will be made to pro tect personnel from radiation exposure and to protect instruments and equipment from temperature effects during the annealing operation.

The heating apparatus should be designed, pro vided with instrumentation, and controlled so that the entire section of the vessel to be annealed is effectively held at a uniform temperature, within the bounds es tablished by the Thermal Annealing Operating Plan, throughout the annealing period. Redundancy in heat ing devices, controls, and instrumentation should be discussed in the operating plan. The temperature con trol system should be able to control temperatures suf ficiently to avert adverse effects from thermal gradients during heatup, annealing, and cooldown operations.

1.8 ALARA Considerations This section of the report should describe the steps to be taken to minimize occupational exposure, in

1.162-7

accordance with the "as low as is reasonably achiev able" (ALARA) principle and the provisions of 10

CFR 20.1206. Special training of the personnel who will actually perform the annealing operations should be described. Equipment and procedures for monitor ing and control of airborne radioactive particles during the operation should be identified. This section should specifically address precautions to be taken to avoid excessive exposure from radiation streaming when the reactor internals are being removed and stored, when the reactor coolant is removed from the reactor, and when the heating equipment is being moved into and out of the reactor vessel. It should also describe steps taken to minimize occupational exposure from radio active waste processing, radioactive materials decon tamination, and radioactive waste shipment.

1.9 Summary of the Thermal Annealing Operating Plan The Thermal Annealing Report should contain a summary of the Thermal Annealing Operating Plan that includes the highlights of each section, the key pa rameters of annealing, and the major conclusions of the plan. The projected percent recovery and the pro jected reembrittlement rate should be identified, as well as the projected end-of-license values of RTNDT

and Charpy upper-shelf energy after annealing.

2. REQUALIFICATION INSPECTION AND

TEST PROGRAM

The inspection and test program to requalify the annealed reactor vessel should include the detailed monitoring, inspections, and tests proposed to demon strate that the limitations in the operating plan on tem peratures, heat treatment times, temperature profiles, and stresses have not been exceeded. The detailed monitoring, inspections, and tests should also establish the thermal annealing time and temperature to be used in quantifying the fracture toughness recovery. The program should also demonstrate that the annealing operation has not degraded the reactor vessel, at tached piping or appurtenances, or the adjacent con crete structures to a degree that could affect the safe operation of the reactor after annealing.

The program should identify the limiting parame ters established for the thermal annealing operation conditions, identify the physical measurements and tests to be made to ensure that these conditions are not exceeded, describe the instrumentation to be used for making these measurements and tests, and state the quality assurance provisions to be applied.

2.1 Monitoring the Annealing Process This section should identify the measurements, with their locations, that will be used to monitor the annealing process and to make certain that the pro posed annealing conditions evaluated in the operating plan (see Section 1.5 of this guide) are not exceeded.

Temperature measurements should be made at suffi cient locations to establish temperature profiles for both the inside and outside surfaces of the reactor ves sel. These measurements should be made for the en tire length of the vessel along axial directions where it is physically possible, at a minimum of two different azimuthal locations (which should include the top and bottom positions of the heating zone), at locations within the heating zone where there may be cold spots (e.g., at joints between the heaters), at locations on each nozzle, and on any other component that is ex pected to be significantly affected by the annealing treatment. Measurements should be made with suffi cient frequency to identify any temperature excursions that could lead to violating the established temperature limits. When appropriate, the measurement devices should be in physical contact with the component when the temperature is being measured. The meas urement records should be retained for possible review and inspection by the NRC, in accordance with the re quirements of 10 CFR 50.71(c), until the facility li cense is terminated. The temperature measurements should be monitored and compared to pre-established tolerance bounds during heatup, steady-state opera tion, and cooldown to ensure that temperature and stress limits have not been exceeded.

Stress limitations should be monitored by a proce dure established by the licensee that uses strain gauges or alternative methods, for example, deflection meas urements or temperature measurements. Experimen tal evidence of the validity of alternative methods should be provided. Measurements should be made to establish stress levels at the vessel locations of highest stress, on the vessel nozzles, on the flange, and on high-stress piping locations.

This section should describe the measurement type, the number of measurements to be made for each component, measurement sensitivity, measure ment frequency, and recording method.

2.2 Inspection Program This section should describe the inspection pro gram proposed to affirm that the annealing operation has not damaged the reactor vessel or related equip ment, components, or structures. The inspection pro gram, as a minimum, should include a pre- and post anneal visual examination of critical regions of the vessel, piping, and any other equipment, component, or structure that might be affected by the annealing operation. The inspection program should also de scribe a nondestructive examination program for the reactor vessel beltline region that will ensure that the vessel will continue to perform its safety function after the annealing operation. The description of the inspec tion program should include acceptance criteria, type

1.162-8 K

K

and number of examinations, qualification require ments, and reporting requirements.

)

2.3 Testing Program This section should describe the testing program that will be performed to demonstrate the effectiveness of the annealing operation and to assure that the reac tor vessel, attached piping and appurtenances, and ad jacent concrete will continue to perform their intended safety function following the annealing operation. This program is expected to be unique to each plant and should be established by the applicant. The testing pro gram may, for example, test the effects on the vessel of annealing, the integrity of the concrete, the operability of instrumentation, and the post-anneal functioning of affected components, equipment, and structures.

3.

FRACTURE TOUGHNESS RECOVERY AND

REEMBRITrLEMENT ASSURANCE

PROGRAM

The fracture toughness recovery and reembrittle ment assurance program should describe the methods to be used for quantifying the percent recovery, the reembrittlement trend and for establishing the post anneal RTNDT and Charpy upper-shelf energy values.

These tasks are important for evaluation of the safety margins of the reactor pressure vessel in subsequent operating periods. The methods outlined below pro vide experimental and computational means for quan tifying both the recovery of fracture toughness follow ing the thermal anneal and the reembrittlement rate with subsequent plant operation.

3.1 Fracture Toughness Recovery Program This section of the assurance program should de scribe the method planned to determine the percent recovery, including any computations or tests. The methods discussed below provide experimental and computational means for determining the percent re covery of ARTNDT, Rt, and the percent recovery of Charpy upper-shelf energy, RUSE.

As provided in the thermal annealing rule (10

CFR 50.66), one of three methods may be used to evaluate the recovery in fracture toughness following the thermal annealing. One method requires the use of surveillance specimens from "credible" surveillance programs (as defined in the PTS rule, 10 CFR 50.61)

to develop material-specific data, if such specimens are available. The most accurate, but difficult, second method uses material removed from the reactor pres sure vessel beltline to develop plant-specific data. The third method uses generic computations to estimate

>

the recovery. These three methods are described be low. Values of percent recovery (RUSE and RI) may not exceed 100 percent.

3.1.1 Vessel Surveillance Program Method If the plant's surveillance program has resulted in

"credible" data (as defined in the PTS rule, 10 CFR

50.6 1), and broken specimens from that program have been retained (as recommended in NRC Information Notice No. 90-52, "Retention of Broken Charpy Specimens," Reference 17), the thermal annealing rule (10 CFR 50.66) requires that broken specimens from surveillance specimens and any remaining untest ed surveillance specimens be used to evaluate anneal ing recovery on a material-specific basis. The broken specimens should be reconstituted (see Section 3.1.4 of this guide) to form new, full-size specimens with the insert material being the only material from the original surveillance specimen. These reconstituted specimens, and any untested specimens from the original speci men complement, should be annealed at time and temperature conditions that are equal to or are bounded by the actual vessel annealing conditions.

This method may be applied to broken specimens from a single capsule or multiple capsules from the sur veillance program. Specimens from at least two cap sules should be used, with the fluences of the two cap sules spanning the peak fluence of the reactor pressure vessel beltline; this ensures that an interpolation of the annealing recovery is possible. If broken specimens from only a single capsule are used, the specific surveil lance capsule chosen should be the one for which the fluence most closely matches the peak fluence of the reactor pressure vessel beltline.

As an alternative, materials test reactor (MTR) ir radiations of the vessel-specific limiting material may be used as a method for determining percent recovery on a material-specific basis (see Section 3.3 of this guide).

Methods for testing the specimens and using the resultant data are discussed in Sections 3.1.5 and

3.1.6 of this guide.

The assurance program should describe the plans for using the surveillance results, including a descrip tion of the procedure for generating post-anneal prop erties (e.g., reconstituted specimens or whole pre viously untested specimens) and the method for using the surveillance measurements of percent recovery to evaluate the percent recovery for the vessel material.

3.1.2 Irradiated Vessel Material Method An alternative method for determining the per cent recovery uses the results of a verification test pro gram employing materials removed from the beltline region of the reactor vessel. For this method, the sam ples removed from the vessel are used to evaluate the as-irradiated or pre-anneal condition of the material and the post-anneal condition of the material. The post-anneal condition is evaluated from specimens that have been annealed at the time and temperature

1.162-9

conditions equal to or bounded by the reactor vessel annealing conditions.

The number of samples to be removed from the vessel depends on many factors, including the size of the samples, the reason for the annealing (determining both RTNDT and Charpy upper-shelf energy requires more tests than determining only one of these quanti ties), the testing plans (specimen size and type), and the acceptability of removing the samples from the ves sel. The samples removed from the vessel beltdine can be used to fabricate full-size Charpy specimens, inserts for reconstitution into full-size Charpy specimens, or sub-size Charpy specimens (see subsections 3.1.4.3 and 3.1.6.4). Other test methods for irradiated vessel material may be used if appropriate justification is provided.

This method is plant-specific and, as described be low, several criteria must be satisfied to demonstrate the acceptability of this method for a specific applica tion or plant.

The assurance program should provide a complete description of the plans for using samples removed from the vessel beltline, including the method for re moving the samples; the number, size, and location of the samples; analyses to demonstrate acceptability of the sample removal; the experimental plans for using the samples (size and number of specimens, test plans and procedures, etc.); and the method for determin ing the percent of recovery of the vessel material from the results of the tests from the samples.

3.1.2.1 Acceptability of Removing Material from the Vessel. The acceptability of the method used for removing samples from the vessel beltline is based on local and global considerations, both of which should be addressed in the assurance program. The global considerations concern the impact on overall vessel integrity of the depression, hole, or surface dis continuity remaining after removal of the sample, and they are addressed through analysis. The local consid erations concern thermal and mechanical effects and surface quality effects on the surrounding material re maining after removal of the samples.

The sample removal process should be described in the assurance program, including a description of the measures to ensure the identification and docu mentation of the orientation of the sample relative to the vessel.

The removal of samples from the vessel beltline will result in a depression or other surface discontinuity in the vessel wall. As required in the thermal annealing rule (10 CFR 50.66), it must be demonstrated that the resulting depressions satisfy the stress limits of the applicable portions of the ASME Code Section III, re gardless of the applicable section of the Code for the vessel design. The analyses used to demonstrate com- pliance with the applicable stress limits of Section III of the ASME Code must include consideration of the ef fects of fatigue and corrosion on the exposed base metal following removal of the samples, and the analy ses should consider any thermal and mechanical ef fects on the surface and near-surface material remain ing after removal of the sample.

The assurance program should describe the meth od proposed to characterize the depression remaining after sample removal to ensure that the condition of the remaining material is bounded by the assumptions in the analysis and is acceptable. Any proposed re pairs, including weld repair, should be described in the Thermal Annealing Operating Plan.

3.1.2.2 Testing of Material Removed from the Vessel Beltline. One impediment to the quantitative use of data from testing of material removed from the vessel beltine in determining the percent recovery of ARTNDT and Charpy upper-shelf energy is that this material represents surface or near-surface properties of the material. In contrast, ASTM Standard E 185 (Ref. 14) requires the use of material from the 1/4T

location of plate and forging products, and more than

0.5 in. from the surface of weld metals, to determine ARTNDT and Charpy upper-shelf energy.

To permit a quantitative use of material removed from the vessel beltiine to determine the percent re covery of ARTNDT and Charpy upper-shelf energy, samples removed from the vessel beltline should be used to evaluate both the pre-anneal and the post anneal properties of the near-surface material. Speci mens used to evaluate the post-anneal properties should be annealed at time and temperature condi tions that equal or are bounded by the actual vessel annealing conditions. The resulting percent recovery of transition temperature at the 30 ft-lb level may be used to determine the percent recovery for ARTNDT,

R1. The resulting percent recovery of the Charpy upper-shelf energy may be used to determine the Char py upper-shelf energy, RUSE.

Samples removed from the vessel beltiine material can be used to develop test specimens in several man ners. The samples can be used to fabricate fullsize Charpy specimens, inserts for reconstitution into full size Charpy specimens, sub-size Charpy specimens or other test specimens of the approved plan. Preparation and use of these various specimen types is described in Section 3.14.

3.1.3 Computational Method The computational method uses generic equations (Equations I and 2) to determine the percent recovery of Charpy upper-shelf energy (USE) and ARTNDT re spectively. Alternative computational methods may be used if appropriate justification is provided. When de termining the projected percent recovery for the an nealing plan, the proposed lower-bound annealing

1.162-10

time and temperature are used in Equations 1 and 2.

However, when computing the post-anneal percent recovery, the actual annealing time and the lower bound of the range of actual annealing temperatures determined from the instrumentation (see Section 2.1 of this guide) should be used.

RUSE = {[1-0.586 exp(-ta/15. 9)] x [0.570AUSEi +

(0.120Ta-10 4) Cu+0.0389Ta-17.6]} x

(100/AUSEji (Equation 1)

where RUSE

= percent recovery of USE from annealing, AUSEi = (mean USE unirradiated - mean USE after irradiation),

ta

= time at annealing temperature in hours, Ta

= annealing temperature in °F,

Cu

= copper content of material in weight-percent.

R=

= [0.5 + 0.5 tanh((aTa - a2)/95.7}1]* 100

(Equation 2)

where Rt

= percent recovery of transition temperature from annealing, Sal

= 1 + 0.0151 ln(ta)

0.424Cu( 3.28 - 0.00306Ta)

a2

= 0.584(Ti + 637), for Ta k 800OF

or a2

= 0.584T1 - 15.51n(O) + 833 for Ta < 750 0F

where TC

Cu.

flux rate, n/(cm2-s),

temperature of irradiation.

copper content of material in weight percent with maximum value of 0.3%.

The current Rt equation is not accurate between annealing temperatures of 750 and 800 0 F. Until a complete equation is developed an extension of the ef fect of the flux term (a2) is assumed to a temperature of 775*F. Between 775 and 800°F, a linear interpola tion between Equation 2 evaluated at 775 °F with the flux term and Equation 2 evaluated at 8000 without the flux term should be made.

Since plant operational characteristics do not re sult in a unique value of irradiation temperature throughout a plant's lifetime, the method used for evaluating Ti should be described in the assurance program.

Equations 1 and 2 are documented in Reference 8 and represent mean values of the percent recovery of RTNDT and USE.

3.1.4 Specimen Handling and Preparation Procedures

3.1.4.1 Specimen Handling Procedures. For re constituting surveillance specimens or removing sam ples from the vessel beltine, the assurance program should describe the methods to be used for marking and handling the test materials to ensure that the orientation of the material relative to the vessel is un ambiguous and traceable.

3.1.4.2 Specimen Orientation. The assurance program should address the orientation of the speci mens to be tested. For testing materials from a "cred ible" surveillance program for the evaluation of per cent recovery of ARTNDT, it is preferable to test the post-anneal specimens in the same orientation as the original surveillance tests. In contrast, for evaluation of Charpy upper-shelf energy, it may be preferable to use specimens oriented in the transverse direction, the T-L orientation, according to ASTM Standard E 399 (Ref. 18).

3.1.4.3 Reconstitution of Charpy Specimens.

Reconstitution of Charpy specimens is used to provide new full-size Charpy specimens from the broken pieces of previously tested specimens and to conserve materi al. Several methods are available for welding end-tabs onto the test material section, with the goal of each method to provide a structurally sound and testable specimen (i.e., the specimen does not fracture at the reconstitution welds) without overheating (possibly in ducing annealing) the test section.

The assurance program should describe the proce dures to be used for the reconstitution process. The procedures and criteria of ASTM Standard E 1253-88 (Ref. 19), "Standard Guide for Reconstitution of Irra diated Charpy Specimens," are sufficient to demon strate an adequate reconstitution method. Other pro posed methods should have appropriate justification.

3.1.5 Specimen Testing

3.1.5.1 Test Procedures. The assurance pro gram should describe the procedures used for testing the Charpy specimens, either full-size or sub-size. For testing full-size Charpy specimens, either reconstituted specimens or specimens fabricated from samples re moved from the vessel beltline, testing should be per formed using equipment and testing procedures similar to those used to develop surveillance data, as outlined in ASTM Standards E 185-82 (Ref. 14) and E 23-88 (Ref. 20).

Testing of sub-size Charpy specimens should fol low the general procedures and methods in ASTM

Standard E 23-88 (Ref. 20) for testing of full-size Charpy specimens. For testing sub-size Charpy speci mens, a description of the general test procedures and the testing equipment should be provided in the assur ance program. In addition, a method for applying the

1.162-11

results from the tests of the sub-size specimens should be described.

3. 1.S.2 Test Plan. The assurance program should describe the test plan, including the number of speci mens to be tested and the method for selecting test temperatures. This description should include the steps taken to ensure that a reasonable measure of recovery is achieved by the testing; the description should also include the proposed method for handling uncertainty in the test results.

Testing to evaluate percent recovery of ARTNDT

should result in an unambiguous evaluation of the tem perature at which the average Charpy energy versus temperature curve achieves an energy level of 30 ft-lb.

It is preferable that the testing cover a broad range of results based on the shear percentage (from near 0

percent to greater than 95 percent) to permit a more complete assessment of the Charpy data trends for the material and to preclude false trends from data cluster ing around the 30 ft-lb level.

Testing to evaluate Charpy upper-shelf energy re covery should provide an unambiguous definition of the Charpy upper-shelf energy for the material. All tests used in evaluating the Charpy upper-shelf energy should result in 100 percent shear.

3.1.6 Quantification of Post-Anneal Initial Properties Quantification of the post-anneal initial proper ties, RTNDT and Charpy upper-shelf energy, is depen dent on the method used to determine the percent re covery by annealing.

3.1.6.1 Vessel Surveillance Program Method.

The assurance program should describe the surveil lance results to be used in evaluating percent recovery, along with the proposed method to relate the observed percent recovery from the surveillance results to the percent recovery of the vessel material.

One method for relating the observed recovery to the vessel recovery is to compare the measured recov ery from the test (or tests) of surveillance specimens to the percent recovery from Equations 1 and 2 for the surveillance capsule. The average ratio (or the ratio from a single capsule) between the measured recovery from the surveillance capsules and that evaluated from Equations 1 and 2 for the surveillance capsule provides a material-specific adjustment for the generic equa tion. In this method, the vessel percent recovery would be calculated by multiplying the percent recovery de termined from Equations 1 and 2 for the vessel by the average ratio adjustment. Values of Rt and RUSE de termined from surveillance data may not exceed 100.

Once suitable values of Rt and RUSE have been determined from the surveillance data, the post-anneal reference temperature (RTNDT) and Charpy upper shelf energy are evaluated using Equations 3 and 4:

RTNDT(A) = RTNDT

+ ARTNDT x

(100 - W) / 100

(Equation 3)

CvUSE(A) = CvUSE(u) [I - D x

(100 - RUSE)/100001 (Equation 4)

where RTNDT(A)

= reference temperature, RTNDT,

of the material in the post anneal condition in OF,

RTNDT(U)

= reference temperature, RTNDT,

of the material in the preservice or unirradiated condition in °F,

ARTNDT

= mean value of the transition temperature shift, or change in RTNDT, from irradiation (before annealing) in °F,

Rt

= percent recovery of ARTNDT

from annealing, CvUSE(A)

= Charpy upper-shelf energy of the material in the post anneal condition in ft-lb, CvUSE(u)

= Charpy upper-shelf energy of the material in the preservice or unirradiated condition in ft-lb, D

= percent decrease in Charpy upper-shelf energy from irradiation (before annealing),

and RUSE

= percent recovery of Charpy upper-shelf energy from annealing.

The values of RTNDT(A) and CvUSE(A), calcu lated using Equations 3 and 4, respectively, should be used as the values of reference temperature (RTNDT)

and Charpy upper-shelf energy, respectively, at the ini tiation of continued plant operation.

3.1.6.2 Irradiated Vessel Material Method.

Since the Charpy data evaluated by this method repre sent the surface or near-surface properties of the plate, weld, or forging, the measured values cannot be used directly to represent the plate or forging 1/4T or weld bulk properties as called for by Regulatory Guide 1.99, Revision 2 (Ref. 21). However, evaluations of the pre anneal and the post-anneal properties of the sample removed from the vessel beltline will provide sufficient data to evaluate the expected recovery at the plate or forging II4T level or the weld bulk properties.

The assurance program should describe the proce dures used to evaluate percent recovery for the vessel materials from the measurements resulting from this method.

1.162-12 K

K

If the samples removed from the vessel beltline are from the peak flux location for the material, one pro cedure to evaluate the post-anneal properties from the measured percent recovery uses the following equations:

RTNDT(A) = RTNDT(U) + ARTNDT x [1 - (iTs 1 TTSA) (RS / ATs)]

(Equation 5)

CvUSE(A) = CvUSE u (1 - D / 100)

(CvSA /CVS)

(Equation 6)

where RTNDT(A)

= reference temperature, RTNDT, of the material in the post-anneal condition in *F,

RTNDT(U) = reference temperature, RTNDT, of the material in the preservice or unirradiated condition in *F,

ARTNDT

= mean value of the transition temperature shift, or change in RTNDT, caused by irradiation (before annealing)

in -F,

"iTs1

= from the measured surface data, the transition tempera ture at the 30 ft-lb energy level for the pre-anneal condition in *F,

"7SA

= from the measured surface data, the transition tempera ture at the 30 ft-lb energy level for the post-anneal condition in *F,

RS=

the ratio of Rt from Equation

2 for the 1/4T location to Rt from Equation 2 for the surface of the plate, forging or weld, ATs

= the mean value of the transi tion temperature shift (in *F)

at the surface of the plate, forging or weld, determined using the surface fluence and the same calculational method used to evaluate ARTNDT for the 1/4T location, CvUSE(A)

= Charpy upper-shelf energy of the material in the post-anneal condition, for the 1/4T

location of plate and forging, or the weld bulk properties in ft-lb, CvUSE(u)

= Charpy upper-shelf energy of the material in the preservice or unirradiated condition, for D

CVSA

the 1/4T location of plate and forging, or the weld bulk properties in ft-lb,

= percent decrease in Charpy upper-shelf energy from irradi ation embrittlement, for the

1/4T location of plate and forging, or the weld bulk properties,

= from the measured surface data, the Charpy upper-shelf energy for the pre-anneal condition in ft-lb,

= from the measured surface data, the Charpy upper-shelf energy for the post-anneal condition in ft-lb.

The values of RTNDT(A) and CvUSE(A) calcu lated using Equations 5 and 6 should be used as the values of reference temperature (RTNDT) and Charpy uppershelf energy, respectively, at the initiation of continued plant operation.

If the samples removed from the vessel beitline do not come from the vessel peak flux location, the vessel embrittlement and the annealing recovery will not be as great as that for the vessel peak flux location, and Equations 5 and 6 should underestimate the percent recovery of the vessel. In such cases, the assurance program should describe the procedures used to evalu ate percent recovery for the vessel materials from the measurements resulting from this method.

3.1.6.3 Computational Method. For the compu tational method, the postanneal initial RTNDT and Charpy upper-shelf energy values for each beltiine ma terial should be evaluated using Equations 3 and 4, us ing the values of Rt and RUSE from Equations 2 and 1.

The values of RTNDT(A) and CvUSE(A), calcu lated using Equations 3 and 4, respectively, should be used as the values of reference temperature (RTNDT)

and Charpy upper-shelf energy, respectively, at plant restart.

3.1.6.4 Sub-size Charpy Specimens. Sub-size Charpy specimens can provide very useful information concerning the toughness of the material and the re covery of irradiation embrittlement by annealing. Data from sub-size Charpy specimens is not uniquely corre lated to data from full-size Charpy specimens in an absolute sense, but quantities such as irradiation embrittlement shift and annealing recovery can be eva luated from sub-size specimen data. Although some work has been under way in the United States In this area using several sub-size Charpy specimen designs, there is no consensus in the U.S. technical community or the nuclear industry as to a preferred specimen de sign or an appropriate correlation method.

1.162-13

The assurance program should describe the over all test plan for the use of sub-size Charpy specimens, including test specimen design and test procedures. In addition, the assurance program should describe the method proposed for quantitative use of the sub-size Charpy specimen data in evaluating percent recovery, including any experimental demonstration validating the method.

3.2 Reembrittlement Trend Assurance Program As specified in the thermal annealing rule (10

CFR 50.66(b) (3) (ii) (B)), the reembrittlement trend of both RTNDT and Charpy upper-shelf energy is to be estimated to establish the projected embrittlement at the end of the proposed period of plant operation, and is to be monitored during post-anneal reactor opera tions to confirm these estimates, using a surveillance program that conforms to the intent of Appendix H of

10 CFR Part 50. An appropriate method for estimating the reembrittlement trend is using a "lateral shift"

method. For the "lateral shift" method, the reem brittlement trend is the same as the embrittlement trend used for the pre-anneal operating period, regard less of whether the embrittlement was determined using the procedures of the PTS Rule (10 CFR

50.61(c)) for embrittlement of RTNDT, or the proce dures of Revision 2 of Regulatory Guide 1.99 (Ref. 21)

for embrittlement of Charpy upper-shelf energy, or whether embrittlement was determined from "cred ible" surveillance data.

The assurance program should describe the pro gram to estimate reembrittlement trends prior to the development of "credible" data from the reembrittle ment surveillance program and should describe the surveillance program to be used for post-anneal plant operation.

3.2.1 Lateral Shift Method

3.2.1.1 Description of the Lateral Shift Meth od. As illustrated in Figure 1 for both RTNDT and Charpy upper-shelf energy, the lateral shift method re sults in a shift of the initial irradiation embrittlement curve along the fluence axis, using the post-anneal properties (ARTNDT and Charpy upper-shelf energy)

as the basis point. This method has been found to be conservative in bounding subsequent embrittlement.

3.2.1.2 Reembrittlement of RTNDT. The reem brittlement of RTNDT is established using the same embrittlement trend as the pre-anneal operating peri od, with a lateral shift.

For the pre-anneal operating period, RTNDT is given by:

RTNDT = RTNDT(U) + ARTNDT + M

(Equation 7)

where RTNDT

= reference temperature, RTNDT, of the material in the irradiated condition in OF,

RTNDT(U)

= reference temperature, RTNDT, of the material in the preservice or unirradiated condition in OF,

ARTNDT

= mean value of the transition temperature shift, or change in RTNDT, from irradiation in OF, and M

= margin term in OF to account for uncertainties in the values of RTNDT(U), nickel and copper content, fluence and the calculational procedures, as determined from Equation 8.

M - 2 Ja12 + a,2 (Equation 8)

where al

= standard deviation of RTNDT(U) in OF,

=a

= standard deviation of ARTNDT in OF.

From Revision 2 of Regulatory Guide 1.99 (Ref.

21),

VA is 17°F for base metals and aA is 28*F for weld metals.

Further, ARTNDT is given by:

ARTNDT = (CF) (f)(0.28 - 0.10 log f)

(Equation 9)

where CF

chemistry factor (in OF) based on the nickel and copper content of the material, or based upon results from the surveillance program if the program is "credible" according to the criteria in the PTS rule (10 CFR

50.61), and f

= the best-estimate neutron fluence (in units of 1019 n/cm 2, E > 1 MeV), at the clad-base metal interface on the inside surface of the vessel.

For reembrittlement, the lateral shift is accom plished by determining the "transition recovery flu ence," ft, by solving for the fluence value that satisfies Equation 10:

RTNDT(A) - RTNDT(U) = (CF) (fl) (0.28 - 0.10 log ft)

(Equation 10)

where RTNDT(A)

is the reference temperature, RTNDT, of the material in the post-anneal condition.

1.162-14 K

LATERAL SHIFT METHOD

Fluence (n/cm2, E > 1 MeV)

LATERAL SHIFT METHOD

Ruence (nIcr2, E > I MoV)

Figure 1

1.162-15 wI

For reembrittlement, the reference temperature (RTNDT) is evaluated by RTNDT = RTNDT(U) + ARTNDT + M

(Equation 11)

where ARTNDT

= the mean value of the shift in reference temperature caused by irradiation (as given below by Equation 12) in OF, and M

= margin term in OF to account for uncertainties in the values of RTNDT(U), nickel and copper content, fluence, and the calculational procedures, as given by Equation 13.

ARTNDT = (CF) (f + ft)[0.28 - 0.10 log (f + ft)]

(Equation 12)

where CF = the same chemistry factor (in OF)

used for the pre-anneal operating period, based on the nickel and copper content of the material or the results of the "credible"

surveillance program, f

f the increment of best-estimate neutron fluence (in units of 1019 n/cm2, E > 1 MeV), at the clad-base metal interface on the inside surface of the vessel, accumulated during plant operation subsequent to the annealing operation, and ft=

the "transition recovery fluence,"

evaluated from Equation 10.

M - 2 la_ + ao2 (Equation 13)

where rately model the various Charpy uppershelf energy de crease curves. Using the equations in Reference 21:

CvUSE = CvUSE(u) x [I - D/100]

(Equation 14)

for base metals:

D = (100 Cu + 9) (00.2368 for weld metals:

D = (100 Cu + 14) (f0.2368 the upper bound:

D = 42.39 (f)0.1502 where CvUSE

= Charpy upper-shelf energy of the material in the irradiated condition (before annealing)

in ft-lb, CvUSE(U)

= Charpy upper-shelf energy of the material in the preservice or unirradiated condition in ft-lb, D

= percent decrease in Charpy upper-shelf energy from irradiation (before annealing),

Cu

= copper content (weight-percent)

for the subject material, and f

= the best-estimate total neutron fluence (in units of 1019 n/cm 2, E > I MeV), at the clad-base metal interface on the inside surface of the vessel.

The value of D is the lesser of that from the appro priate equation for the material type and that from the upper bound equation. For "credible" surveillance data, guidance is given in Revision 2 of Regulatory Guide 1.99 (Ref. 21) for determining percent decrease in Charpy upper-shelf energy based on the surveillance results.

For reembrittlement, the lateral shift is accom plished by determining the "shelf recovery fluence,"

fs, from:

01

= standard deviation of RTNDT(U) in OF,

= standard deviation of ARTNDT in OF,

3.2.1.3 Reembrittlement of the Charpy Upper Shelf Energy. The reembrittlement of the Charpy upper-shelf energy is evaluated using the same embrittlement trend as the pre-anneal operating peri od, with a lateral shift. For the pre-anneal operating period, Revision 2 of Regulatory Guide 1.99 (Ref. 21)

gives upper-shelf energy decrease in a graphical form only. Merkle (Ref. 22) developed equations that accu- for base metals:

1 - (CvUSE(A)/CvUSE(u)) 14.223 for weld metals:

4.223 I 1- (CvUJSE(A)/CvUSE(u))

[

100 Cu + 14 ]

1.162-16 K

K`1

the upper bound:

1 -(CvUSE(A)/CvUSE(u)) I6.658 f'

"42.39 (Equation 15)

For both weld metal and base metal, the correct value of fs is the larger of the values from the appropri ate equation for the material type and the upper bound equation.

Reembrittlement of Charpy upper-shelf energy is evaluated from:

CvUSE = CvUSE~u) x [1 - D/100]

(Equation 16)

for base metals:

D = (100 Cu + 9) (f + fs) 0-2 3 6s for weld metals:

D = (100 Cu + 14) (f + fs) 0 "2 36 8 the upper bound:

D = 42.39 (f + fs)°-15°2 where CvUSE(u)

= Charpy upper-shelf energy of the material in the preservice

2 or unirradiated condition in ft-lb, Cu

= the copper content (weight percent) for the subject material, f

= the increment of best-estimate total neutron fluence (in units of 1019 n/cm 2, E > 1 MeV),

at the clad-base metal inter face on the inside surface of the vessel, accumulated during subsequent plant operation after the annealing operation, and fs=

the "shelf recovery fluence,"

evaluated from Equation 15.

For "credible" surveillance data, the values of "9"

and "14" in Equations 15 and 16 are replaced by val ues that are based on the surveillance results.

3.2.2 Surveillance Method For the surveillance method, the reembrittlement trend is determined from the surveillance results of a program that conforms to the intent of Appendix H of

10 CFR Part 50, once the surveillance program and results from the program have met the credibility re quirements in the PTS rule (10 CFR 50.61).

3.3 Use of Materials Test Reactor (MTR)

Irradiations If archival pieces of the limiting vessel material are available, materials test reactor (MTR) irradiations may be used to evaluate the recovery and reembrittle ment trends. Plans for using archival material should be described in the assurance program, including the traceability of the material to the vessel, the proposed experimental matrix, and the method proposed for us ing the results of the MTR irradiations.

4.

IDENTIFICATION OF UNREVIEWED

SAFETY QUESTIONS AND TECHNICAL

SPECIFICATION CHANGES

Any changes to the facility that are described in the updated final safety analysis report as unreviewed safety questions and any changes to the technical spec ifications that are necessary to either conduct the ther mal annealing or operate the nuclear power reactor following the annealing should be identified in this sec tion. The section should demonstrate that the Com mission's requirements are complied with and that there is reasonable assurance of adequate protection to the public health and safety following the changes.

S.

COMPLETION OR TERMINATION OF

THERMAL ANNEAL

5.1 Annealing Completed, In Compliance If the thermal annealing was completed in accor dance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, the licensee must so confirm in writing to the Director, Of fice of Nuclear Reactor Regulation (NRR). Within 15 days of the licensee's written confirmation that the thermal annealing was completed in accordance with the Thermal Annealing Plan, and prior to restart, the NRC will (1) briefly document whether the thermal an nealing was performed in compliance with the licens ee's Thermal Annealing Operating Plan and the Re qualification Inspection and Test Program, with the documentation to be placed in the NRC Public Docu ment Room, and (2) hold a public meeting on the an nealing. The purposes for the public meeting are to

(1) permit the licensee to explain the results of the reactor vessel annealing to the NRC and the public,

(2) allow the NRC to discuss its inspection of the reac tor vessel annealing, and (3) provide an opportunity for the public to comment to the NRC on the thermal annealing. The licensee may restart its reactor after the meeting has been completed, unless the NRC orders otherwise. Within 45 days of the licensee's written con firmation that the thermal annealing was completed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Pro gram, the NRC staff will complete full documentation of the NRC's inspection of the licensee's annealing process and place the documentation in the NRC Pub lic Document Room.

1.162-17

5.2 Annealing Completed, Not in Compliance If the thermal annealing was completed but not performed in accordance with the Thermal Annealing Operating Plan and the Requalification Inspection and Test Program, including the bounding conditions of the temperature and times, the licensee must submit a summary of lack of compliance and a justification for subsequent operations. The licensee must also identify any changes to the facility that are attributable to the noncompliances that constitute unreviewed safety questions and any changes to the technical specifica tions that are required for operation as a result of the noncompliances. This identification does not relieve the licensee from complying with applicable require ments of the Commission's regulations and the operat ing license; and if these requirements cannot be met as a result of the annealing operation, the licensee must obtain the appropriate exemption per 10 CFR 50.12.

If unreviewed safety questions or changes to technical specifications are not identified as necessary for re sumed operation, the licensee may restart after the NRC staff places a summary of its inspection of the thermal annealing in the NRC Public Document Room and the NRC holds a public meeting on the thermal annealing. On the other hand, if unreviewed safety questions or changes to technical specifications are identified as necessary for resumed operation, the li censee may restart only after the Director of NRR au thorizes restart, the summary of the NRC staff inspec tion is placed in the NRC Public Document Room, and a public meeting is held on the thermal annealing.

5.3 Termination Prior to Completion of Anneal If the thermal annealing was terminated prior to completion, the licensee should immediately notify the NRC of the premature termination of the thermal anneal.

5.3.1 Licensee Elects Not To Take Credit for any Recovery If the partial annealing was otherwise performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification In spection and Test Program, and the licensee does not elect to take credit for any recovery, the licensee need not submit the Thermal Annealing Results Report de scribed in Section 6 of this regulatory guide but instead must confirm in writing to the Director, NRR, that the partial annealing was otherwise performed in accor dance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program. The licensee may restart its reactor after the NRC places a summary of its inspection of the ther mal annealing in the Public Document Room and the NRC holds a public meeting on the thermal annealing.

5.3.2 Licensee Elects To Take Credit for any Recovery If the partial annealing was otherwise performed in accordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification In spection and Test Program and the licensee elects to take full or partial credit for the partial annealing, the licensee must confirm in writing to the Director, NRR,

that the partial annealing was otherwise performed in compliance with the Thermal Annealing Operating Plan and relevant portions of the Requlification In spection and Test Program. The licensee may restart its reactor after the NRC places a summary of its in spection of the thermal annealing in the NRC Public Document Room and the NRC holds a public meeting on the thermal annealing.

5.3.3 Termination, Not in Compliance If the partial annealing was not performed in ac cordance with the Thermal Annealing Operating Plan and relevant portions of the Requalification Inspection and Test Program, the licensee is to submit a summary of lack of compliance with the Thermal Annealing Op erating Plan and the Requalification Inspection and Test Program and a justification for subsequent opera tion, to the Director of NRR. Any changes to the facil ity as described in the updated final safety analysis re port that are attributable to the noncompliances and constitute unreviewed safety questions, and any changes to the technical specifications that are re quired as a result of the noncompliances, must also be identified.

If no unreviewed safety questions or changes to technical specifications are identified, the licensee may restart its reactor after the NRC places a summary of its inspection of the thermal annealing in the Public Doc ument Room, and the NRC holds a public meeting on the thermal annealing.

If any unreviewed safety questions or changes to technical specifications are identified, the licensee may restart its reactor only after approval is obtained from the Director, Office of Nuclear Reactor Regulation, the summary of the NRC staff inspection is placed in the public document room, and a public meeting on the thermal annealing is held.

6. THERMAL ANNEALING RESULTS

REPORT

Every licensee who either completes a thermal an nealing or terminates an annealing but elects to take full or partial credit for the annealing must provide a report that includes the results of the annealing opera tion and verifies compliance with the approved plan.

This report is to be submitted within three months of completing the thermal anneal, unless an extension is authorized by the Director, Office of Nuclear Reactor Regulation. This report should provide the following information:

1.162-18 K

K

(1) The time and temperature profiles of the ac tual thermal annealing,

(2) The post-anneal RTNDT and Charpy upper shelf energy values of the reactor vessel mate rials for use in subsequent reactor operation,

(3) The projected post-anneal reembrittlement trends for both RTNDT and Charpy upper shelf energy, and

(4) The projected values of RTpTS and Charpy upper-shelf energy at the end of the proposed period of operation addressed in the application.

6.1 Description of the Overall Process A detailed summary of the annealing operation, including an actual time-temperature history, should be provided. The summary should identify the location and method of attachment for the specific instrumentation, including all temperature measure ment devices applied to the vessel and other structures and components. A history of the times and tempera tures for each temperature measurement device should be included, showing the actual temperatures for the beginning of annealing, the heat-up period, the

,

steady-state conditions, and the cool-down period.

Sufficient detail should be included to permit determi nation of the heat-up and cool-down rates and the vari ations in temperature measurements during the entire cycle. A summary of key measurements should be pro vided that shows that the proposed annealing condi tions, specifically the time and temperature parameters and stress allowables established in the application, were not exceeded. Additionally, a summary of the worker exposures incurred during the annealing proc ess should be included.

6.2 Evaluation of Requalificatlon Inspections and Tests The results and evaluations of any inspections and tests used to requalify the annealed reactor vessel, the attached piping or appurtenances, and the adjacent concrete structures should be reported. The Thermal Annealing Results Report should include the results of all inspections and tests to demonstrate that the an nealing operation has not caused degradation of the reactor vessel, the insulation, the attached piping or appurtenances, containment, and the adjacent con crete to a degree that could affect the safe operation of the reactor. The report should describe the evaluation and disposition of any indications detected during the post-anneal inspections.

6.3 Determination of Percent Recovery The method for determining the percent recovery of RTNDT and Charpy upper-shelf energy should be described. The actual time-temperature parameters of the vessel annealing operation should be used and re ported. If the percent recovery is determined from testing credible surveillance specimens or from testing materials removed from the beltline region of the reac tor vessel, and the testing was subsequent to the an nealing operation or was not reported in the Thermal Annealing Operating Plan, the results of these tests should be reported. In this case, the report should include the initial unirradiated properties, the as irradiated properties just prior to annealing, and the properties of the test specimens in the irradiated and annealed conditions. The report should provide sup porting evidence for the licensee's report that the an nealing conditions for the test specimens were equal to or bounded by the annealing conditions of the reactor vessel. If the percent recovery is determined by calcu lation, the evaluation of percent recovery should use the actual vessel lower-bound annealing time and tem perature. In all cases, the report should include the post-anneal RTNDT and Charpy upper-shelf energy values.

6.4 Determination of Reembrittlement Trend The program for determining the reembrittlement trend based on both the reference temperature and the Charpy upper-shelf energy should be described, in cluding the results of any analyses or tests that establish these reembrittlement trends. The program should specifically identify the post-anneal "starting" values of reference temperature and Charpy upper-shelf energy, as well as the projected embrittlement path of these values with increasing neutron fluence, including the basis for this projection. To the degree that this in formation is the same as the information in the Ther mal Annealing Operation Plan, the plan may be referenced.

6.5 Changes to Surveillance Program Changes to the surveillance program previously described in the Thermal Annealing Report (10 CFR

50.66(b) (3) (ii) (B)) that are the result of the annealing operation should be described in detail. If no changes are necessary, the Thermal Annealing Results Report should so state.

6.6 Allowable Operating Period Based on the degree of recovery and the projected reembrittlement trend, an analysis should be provided to demonstrate the period of operation for which the requirements of 10 CFR 50.60 and 10 CFR 50.61 will be satisfied.

1.162-19

7. PUBLIC INFORMATION AND

PARTICIPATION

7.1 Thermal Annealing Report Upon receipt of a Thermal Annealing Report, and a minimum of 30 days before the licensee starts ther mal annealing, the NRC will:

(1) Notify and solicit comments from local and State governments in the vicinity of the site where the thermal annealing will take place and any Indian Nation or other indigenous people that have treaty or statutory rights that could be affected by the thermal annealing,

(2) Publish a notice of a public meeting in the Fed eral Register and in a forum, such as local newspapers, which is readily accessible to individuals in the vicinity of the site, to solicit comments from the public, and

(3) Hold a public meeting on the licensee's Ther mal Annealing Report.

7.2 Completion or Termination of Thermal Annealing Within 15 days after the NRC's receipt of the licensee's written submittal on the completion or termination of thermal annealing as described in Sec tion 5 of this regulatory guide, the NRC staff will place in the NRC Public Document Room a summary of its inspection of the licensee's thermal annealing, and the Commission will hold a public meeting on the anneal ing. The purposes of this public meeting are (1) for the licensee to explain to the NRC and the public the re sults of the reactor pressure vessel annealing, (2) for the NRC to discuss its inspection of the reactor vessel annealing, and (3) for the NRC to receive public com ments on the annealing.

7.3 NRC Inspection Report Within 45 days of NRC's receipt of a licensee's submittals described in Section 5 of this regulatory guide, the NRC staff will fully document its inspection of the licensee's annealing process and place this docu mentation in the NRC Public Document Room.

1-.

1.162-20

K

REFERENCES

1.

U. Potapovs, J. R. Hawthorne, and C. Z. Serpan, Jr., "Notch Ductility Properties of SM-1A Reac tor Pressure Vessel Following the In-Place Annealing Operation," Nuclear Applications, Vol. 5, No. 6, pp. 389-409, 1968.

2.

A. Fabry et al., "Annealing of the BR-3 Reactor Pressure Vessel," in Proceedings of the Twelfth Water Reactor Safety Research Information Meeting, NUREG/CP-0058, Vol.

4, pp.

144-175, NRC, January 1985.1

3.

N. M. Cole and T. Friderichs, "Report on An nealing of the Novovoronezh Unit 3 Reactor Ves sel in the USSR,"

NUREG/CR-5760 (MPR

Associates, Inc., MPR-1230), NRC, July 1991.

4.

W. L. Server, "In-Place Thermal Annealing of Nuclear Reactor Pressure Vessels," NUREG/

CR-4212 (EG&G Idaho, Inc., EGG-MS-6708),

NRC, April 1985.

5.

T. R. Mager, "Feasibility of and Methodology for Thermal Annealing an Embrittled Reactor Ves sel," EPRI NP-2712, Vol. 2, Electric Power Research Institute, Palo Alto, CA, November

1982.2

6.

T. R. Mager et al., "Thermal Annealing of an Embrittled Reactor Vessel, Feasibility and Meth odology," EPRI NP-6113-SD, Electric Power Research Institute, Palo Alto, CA, January

1989.2

7.

J. R. Hawthorne and A. L. Hiser, "Investigations of Irradiation-Anneal-Reirradiation (IAR) Prop erties Trends of RPV Welds-Phase 2, Final Re port," NUREG/CR-5492 (Materials Engineering Associates, Inc., MEA-2088), NRC, January

1990.1

8.

E. D. Eason et al., "Models for Embrittlement Recovery Due to Annealing of Reactor Pressure

1Copies are available for inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washing ton, DC; the PDR's mailing address Is Mail Stop LL-6, Wash ington, DC

20555-0001; telephone (202)634-3273; fax

(202)634-3343. Copies may be purchased at current rates from the U.S. Government Printing Office, P.O. Box 37082, Washington, DC 20402-9328 (telephone (202) 512-1800) or from the National Technical Information Service by writing NTIS at 5285 Port Royal Road, Springfield, VA 22161.

>

2Copies may be purchased from EPRI's Research Reports Cen ter, P.O. Box 50490, Palo Alto, CA

94303 (telephone

(415)965-4081).

Vessel Steels,"

NUREG/CR-6327 (MCS

950302), May 1995.3

9.

American Society for Testing and Materials,

"Recommended Guide for In-Service Annealing of Water-Cooled Nuclear Reactor Vessels,"

ASTM E 509-86, Philadelphia, 1986.

10. NRC, "Additional Requirements for Yankee Rowe Pressure Vessel Issues," SECY-91-333, October 22, 1991.3

11. NRC, "Action Plans To Implement the Lessons Learned from the Yankee Rowe Reactor Vessel Embrittlement Issue,"

SECY-92-283, Au gust 14, 1992.3

12. NRC, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants," NUREG-0800, June 1987.1

13. American Society of Mechanical Engineers,

"Rules for Construction of Nuclear Power Plants,"Section III, Division 1, Subsection NB,

of ASME Boiler and Pressure Vessel Code, New York, 1993.

14. American Society for Testing and Materials,

"Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactors,"

ASTM

E

185-82, Philadelphia,

1982.

15. American Society of Mechanical Engineers,

"Nuclear Power Plant Components,"Section III,

Division 2, of the ASME Boiler and Pressure Vessel Code, New York, 1993.

16. G.

B.

Reddy and D. J.

Ayres,

"High Temperature Elastic-Plastic and Creep Properties for SA533 Grade B, Class 1 and SA508 Materi als," EPRI Report NP-2763, December 1982.2

17. NRC Information Notice No. 90-52, "Retention of Broken Charpy Specimens,"

August 14,

1990.3

18. American Society for Testing and Materials,

"Standard Test Method for Plane-Strain Frac ture Toughness of Metallic Materials," ASTM E

399-83, Philadelphia, 1983.

19. American Society for Testing and Materials,

"Standard Guide for Reconstitution of Irradiated Charpy Specimens," ASTM E 1253-88, Phila delphia, 1988.

3Coples are available for Inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washing ton, DC. the PDR's mailing address is Mail Stop LL-6. Wash Ington, DC 20555-0001; telephone

(202)634-3273; fax

(202)634-3343.

1.162-21

20. American Society for Testing and Materials,

"Standard Test Methods for Notched Bar Impact Testing of Metallic Materials," ASTM E 23-88, Philadelphia, 1988.

21. U.S.

Nuclear Regulatory Commission,

"Radiation Embrittlement of Reactor Vessel Materials," Regulatory Guide 1.99, Revision 2, May 1988.4

22. R. D. Cheverton et al., "Review of Reactor Pres sure Vessel Evaluation Report for Yankee Rowe Nuclear Power Station (YAEC No. 1735),"

NUREG/CR-5799 (ORNL/TM-11982),

NRC,

March 1992.1

4Single copies of regulatory guides may be obtained free of charge by writing the Office of Administration, Attn: Distribution and Services Section, USNRC, Washington, DC 20555-0001, or by fax at (301)415-2260. Copies are also available for inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washington, DC; the PDR's mailing address is Mail Stop LL-6, Washington, DC 20555-0001; telephone (202)634-3273; fax (202)634-3343.

K

K

1.162-22

REGULATORY ANALYSIS

A separate regulatory analysis was not prepared for this regulatory guide. The regulatory analysis prepared for 10 CFR 50.66, "Requirements for Ther mal Annealing of the Reactor Pressure Vessel," pro vides the regulatory basis for this guide and examines the costs and benefits of the rule as implemented by the guide. A copy of the regulatory analysis is available for inspection and copying for a fee at the NRC Public Document Room, 2120 L Street NW, Washing ton, DC; the PDR's mailing address is Mail Stop LL-6, Washington, DC

20555-0001;

phone

(202)634-3273; fax (202)634-3343.

1.162-23

J

,1 UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, DC 20555-0001

-

FIRST CLASS MAIL

POSTAGE AND FEES PAID

USNRC

PERMIT NO. G-67 OFFICIAL BUSINESS

PENALTY FOR PRIVATE USE, $300

7