{{#Wiki_filter:1                                                -      -
{{#Wiki_filter:*l3ackup TSC,OSF-113  
4-97
*l3urcau of Rad Protection  
*l3ackup TSC,OSF- 113                       C. Warlow
*Control RPa-U/1 File Convy. 0OB-I Control Rn-U/I Shift Mgrs Station, 03  
_ 311 jTh                                                  EPIP/TEP Instruction Memo
*Control Rm-U/I Work Cony. OOB-1 Dauphin County EMA  
*l3urcau of Rad Protection
*l)ir. Work Mgmt., OSF-2 Dir. Conmmunications, SOB.  
*Control RPa-U/1 File Convy. 0OB-I Control Rn-U/I Shift Mgrs Station, 03 M. Vyenielo L. Ritter L. Ritter liz  Date      !,R_-___-_ -      _0      Verif:  ,_____          Box No.  -    O  "    66_,1  T'I      T_"r2
*Documnent Center, NOB-2  
*Control Rm-U/I Work Cony. OOB-1             L. Ritter                    Please update your file with the attached listed below, destroy tie superseded and post your Index Dauphin County EMA                           D. Fetterhoff                accordingly. Al;o, if Controlled Documents please sign the acknowledgment at the bottom of this memo and
*Documnent Control Desk lDositnetry, Serv. Bldg.  
*l)ir. Work Mgmt., OSF-2                     S. Epler                    return to Debbie Marshbank, Configuration Cntrl., Ro. 135, SOB Dir. Conmmunications, SOB.                   R. DeSantis
*EP - NDB, Tlrng. Bl3g. 112  
*Documnent Center, NOB-2                     S. Burkett                                                                                              Page                Delete
*EI1.ierg. Prep. Dept.  
*Documnent Control Desk Document Number                  Rev            10          Number Replae.        Entire    Page(s)  Level lDositnetry, Serv. Bldg.                     D. College
*ROF, Trng. Bldg.  
*EP - NDB, Tlrng. Bl3g. 112
*EP Drills, Ting. Bldg. #12
*EI1.ierg. Prep. Dept.
: 0SD, Thig. Bldg..
N. D. Brown D. Light ft                    T--              --IL      1 &i-_0_  - Loo-              __7            x
Environ. Affhirs-Lab, Interstate Drive Environ. Affairs-TMi, NOB-1 10 - 211.  
*ROF, Trng. Bldg.
*Instnrutor Nuclear IV, Trog. Bldg. #2 Logisitcal Support, Trng. Bldg... ;1 -7 "  
*EP Drills, Ting. Bldg. #12 R. Finicle N. D. Brown      E-    ii 0SD,Thig. Bldg..                         R. Finicle                                7--7                      7      M- -0                                                    -_
*NRC - Onsite, NOB-I  
Environ. Affhirs-Lab, Interstate Drive       D. Russ Environ. Affairs-TMi, NOB-1 10 -     211. W. Ressler              XI    ADDITIONAL DISTRIBUTION:
*NRC - Region I, (Chief EP Section)  
*Instnrutor Nuclear IV, Trog. Bldg. #2 Logisitcal Support, Trng. Bldg... ;1 -7 "
*PEMA - Bureau of Plans Persoannel/Vehicle Monitor Kit Tnig Ctr.  
R. Neff R. Finincle ra#L                              V P.c-
*Plant Maint. (Library,), Serv. Bldg.  
                                                                                                        ;a-OTLLk        Fs-d              IC            I 3H    -6 3117L EaP~IT1V1      NA"
*NRC - Onsite, NOB-I
*NRC - Region I, (Chief EP Section)
P. Sdr        M ESDt: A_ý-T
*PEMA - Bureau of Plans                     D. Fleck Persoannel/Vehicle Monitor Kit Tnig Ctr. T. Berstler
*Plant Maint. (Library,), Serv. Bldg.
*Porter Consultants, Ardmore RLM, Rad Field Ops.
*Porter Consultants, Ardmore RLM, Rad Field Ops.
N. Smith S. Porter T. Berstler Li  TeýAA        SLLPPtT Ref                        tt,                                    I Rad Con -RAC Locker, Rad Field Ops.
Rad Con -RAC Locker, Rad Field Ops.
Rad Con -Kit I PC. Rad Field Ops./O Rtd Con -Kit 2 P. Red Field Ops./O T. Berstler7tIC T. Berstler T. Berstler Li    EAF eommuj.,aC*                        _
Rad Con -Kit I PC. Rad Field Ops./O Rtd Con -Kit 2 P.
Ut                                    I Rad Con -Kit 3 4, ,(ad Field Opsi0           T. Berstler Rad Con-Kit 4 EOF Bldg Rad Field Ops.IO     T. l3erstlcr Red Con-Kit 5 FOF t31dg Rad Field Ops.       T. Berstler                  I herebFy acknowledge reeipt oft]u mn  emo and have complied with the instuctions. Signature and returned memo Rad Con-Simulator l.ockerRad Field Ops       T. Berstler7t/i              required ONLY if CONTROLLED.
Red Field Ops./O Rad Con -Kit 3 4,,(ad Field Opsi0 Rad Con-Kit 4 EOF Bldg Rad Field Ops.IO Red Con-Kit 5 FOF t31dg Rad Field Ops.
*Rad 1ngineers-U1, OO1                       M. Wherry                    Signature                                              Date
Rad Con-Simulator l.ockerRad Field Ops  
*Rad Instrument, Bldg. 159                   J. L. Eckroth Radwaste/Chemistry, OOB-I                   L. Ritter Secondary Chem Lab-, 0013-1                 L. Ritter              LI
*Rad 1ngineers-U1, OO1  
*Security Mgr., PC                           V. Handley Security U-I, PC                             R. Goodrich                  Info Copy    3    Stapled, 3 Hole Punch
*Rad Instrument, Bldg. 159 Radwaste/Chemistry, OOB-I Secondary Chem Lab-, 0013-1  
*Simulator Room/File Copy, Trtg.             D. Silar                'Li' Simulator Room/Shift Supvs Office, Tnrg     D. Silar                      Ctrl Copy _        Stapled, 3 Hole Punch
*Security Mgr., PC Security U-I, PC  
*Simulator Room/Working Copy, T'rg.
*Simulator Room/File Copy, Trtg.
*TSC - Unit 1, OSF-l 13
Simulator Room/Shift Supvs Office, Tnrg  
*Training Dept., 'I'ng D. Silar C. Warlow C. Flory 3II  Ctrl Copy &.*lipped            +/-7
*Simulator Room/Working Copy, T'rg.  
* o      .                            Memo Only Distribution:
*TSC - Unit 1, OSF-l 13  
Central File
*Training Dept., 'I'ng  
*OSC Rad Field Ops..                       "T.Berstler                  Plain Copy      _    Clipped (4entlPi          ""
*OSC Rad Field Ops..  
*Unit I Operations, OOB.:I                 L. Ritter
*Unit I Operations, OOB.:I  
*Vice President - TMI , OSF-2
*Vice President - TMI, OSF-2  
*Word Processing, OOB,No Stamp/Clip RECORDS MGMT P. J. Chevalier A. Houseal S. Zirninennan II KLI                                                                                                       ,40-11
*Word Processing, OOB,No Stamp/Clip RECORDS MGMT C. Warlow M. Vyenielo L. Ritter L. Ritter L. Ritter D. Fetterhoff S. Epler R. DeSantis S. Burkett D. College N. D. Brown D. Light R. Finicle N. D. Brown R. Finicle D. Russ W. Ressler R. Neff R. Finincle P. Sdr M
D. Fleck T. Berstler N. Smith S. Porter T. Berstler T. Berstler7tIC T. Berstler T. Berstler T. Berstler T. l3erstlcr T. Berstler T. Berstler7t/i M. Wherry J. L. Eckroth L. Ritter L. Ritter V. Handley R. Goodrich D. Silar D. Silar D. Silar C. Warlow C. Flory "T. Berstler L. Ritter P. J. Chevalier A. Houseal S. Zirninennan 4-97 1

_ 311 E-jTh liz ft ii XI Li Li LI
'Li' 3II II KLI EPIP/TEP Instruction Memo Date
!,R_-___-_ -
_0 Verif:
Box No. -
O 66_,1 T'I T_"r2 Please update your file with the attached listed below, destroy tie superseded and post your Index accordingly. Al;o, if Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie Marshbank, Configuration Cntrl., Ro. 135, SOB Page Delete Document Number Rev 10 Number Replae. Entire Page(s)
Level T--
--IL 1 &i - Loo- __7 x
-_0_
7--7 7
M- -0 ADDITIONAL DISTRIBUTION:
ra#L I C I 3H V
3117L EaP~
P.c-Fs-d
-6
;a-OTLLk ESDt: A_ý-T TeýAA SLLPPtT Ref EAF eommuj.,aC
* I herebFy acknowledge reeipt oft]u mn required ONLY if CONTROLLED.
Signature t t, I
Ut I
emo and have complied with the instuctions. Signature and returned memo Date Info Copy 3
Stapled, 3 Hole Punch Ctrl Copy _
Stapled, 3 Hole Punch Ctrl Copy &.*lipped
+/-7
* o Plain Copy Clipped (4entl Pi Memo Only Distribution:
Central File IT1V1 NA"
,40-11


FOR INFORMATION ONLY                                     I Number AmerGen                                                   TMI - Unit 1 Emergency Procedure                       EPIP-TMI-.07 itle                                                                                  Revision No.
FOR INFORMATION ONLY I Number AmerGen itle Activation of the RAC TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 11 Revision No.
Activation of the RAC                                                                                11 Applicability/Scope                                                 USAGE LEVEL       Effective Date All TMI RAC Emergency Response Personnel                                 2                 DEC       8 2000 This document is within QA plan scope       X   Yes   L_     No Safety Reviews Required                     X I Yes       _    No List of Effective Pages Page         Revision   Page           Revision           Page     Revision       Page           Revision 1              11 2              11 3              11 4              11 5              11 6              11 7              11 8              11 9              11 10              11 11             11 12              11 13              11 14              11 15              11 11 S16 17              11 18              11 19              11 20              11 Procedure Owner                 I1/s/ J. L. Whitehead                               12/05/00 Approver                        /s/ N. Brown                                       12/05/00 1
Applicability/Scope USAGE LEVEL Effective Date All TMI RAC Emergency Response Personnel 2
DEC 8 2000 This document is within QA plan scope X
Yes L_
No Safety Reviews Required X I Yes No List of Effective Pages Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 S16 17 18 19 20 Revision Page Revision Page Revision Page Revision 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 Procedure Owner Approver I1/s/ J. L. Whitehead
/s/ N. Brown 12/05/00 12/05/00 1


Number TMI- Unit 1 Emergency Procedure                       EPIP-TMI-.07 tie                                                                                     Revision No.
Number TMI-Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.
Activation of the RAC                                                                                 11 1.0   PURPOSE The purpose of this procedure is to provide guidelines for the Radiological Assessment Coordinator (RAC) to activate the radiological assessment function.
Activation of the RAC 11 1.0 PURPOSE The purpose of this procedure is to provide guidelines for the Radiological Assessment Coordinator (RAC) to activate the radiological assessment function.
2.0   APPLICABILITY/SCOPE This procedure is applicable to the TMI Radiological Assessment Coordinator and Radiological Support Personnel.
2.0 APPLICABILITY/SCOPE This procedure is applicable to the TMI Radiological Assessment Coordinator and Radiological Support Personnel.
3.0   DEFINITIONS None 4.0   RESPONSIBILITIES 4.1     The on-shift RAC is responsible for implementing Exhibit 1.
3.0 DEFINITIONS None 4.0 RESPONSIBILITIES 4.1 The on-shift RAC is responsible for implementing Exhibit 1.
4.2     The Initial Response Emergency Organization (IREO) (RAC) is responsible for implementing Exhibit 2.
4.2 The Initial Response Emergency Organization (IREO) (RAC) is responsible for implementing Exhibit 2.
4.3     Radiological Support Personnel are responsible for implementing Exhibits 3 through Exhibits 5.
4.3 Radiological Support Personnel are responsible for implementing Exhibits 3 through Exhibits 5.  
  .0   PROCEDURE 5.1     This procedure is to be initiated upon declaration of any Emergency Classification specified in the Emergency Plan or when directed by the Emergency Director.
.0 PROCEDURE 5.1 This procedure is to be initiated upon declaration of any Emergency Classification specified in the Emergency Plan or when directed by the Emergency Director.
5.2     Emergency Actions NOTE The steps in this section are based on the expected sequence of activation of the RAC. The actual sequence should be based on when qualified personnel arrive in the facility.
5.2 Emergency Actions NOTE The steps in this section are based on the expected sequence of activation of the RAC. The actual sequence should be based on when qualified personnel arrive in the facility.
A.         The on-shift RAC shall activate the radiological assessment function by reporting to the Control Room and performing the steps in the on-shift RAC checklist (Exhibit 1).
A.
The on-shift RAC shall activate the radiological assessment function by reporting to the Control Room and performing the steps in the on-shift RAC checklist (Exhibit 1).
2
2


Number TMI - Unit 1 Emergency Procedure                         EPIP-TMI-.07 itle                                                                                   Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 itle Revision No.
Activation of the RAC                                                                               11 B.       The IREO RAC shall relieve the on-shift RAC and direct the radiological assessment function by assigning appropriate personnel to assume those positions and perform the actions listed for those positions as follows (in the absence of appropriate personnel, the Radiological Assessment Coordinator shall assume these positions and perform the essential actions for those positions):
Activation of the RAC 11 B.
The IREO RAC shall relieve the on-shift RAC and direct the radiological assessment function by assigning appropriate personnel to assume those positions and perform the actions listed for those positions as follows (in the absence of appropriate personnel, the Radiological Assessment Coordinator shall assume these positions and perform the essential actions for those positions):
Radiological Assessment Coordinator (RAC):
Radiological Assessment Coordinator (RAC):
Report to Emergency Control Center and perform the RAC Checklist (Exhibit 2).
Report to Emergency Control Center and perform the RAC Checklist (Exhibit 2).
Line 82: Line 115:
RAC/OSC Communicator (RAC Support Staff):
RAC/OSC Communicator (RAC Support Staff):
Report to the Emergency Control Center and complete the RAC/OSC Communicator Checklist (Exhibit 5).
Report to the Emergency Control Center and complete the RAC/OSC Communicator Checklist (Exhibit 5).
5.3   Final Conditions 5.3.1     The radiological assessment function is operational with the desired positions manned and functional. Communications are established.
5.3 Final Conditions 5.3.1 The radiological assessment function is operational with the desired positions manned and functional. Communications are established.
5.4   Post Event Actions 5.4.1     An inventory of the RAC Area of the ECC is required to be performed by the end of the workday following the end of the event. The inventory is the responsibility of Rad Con Field Operations. Notify the Manager, Rad Con Field Ops. of the need to perform the inventory in accordance with Procedure TEP-ADM-1300.01, Maintaining Emergency Preparedness.
5.4 Post Event Actions 5.4.1 An inventory of the RAC Area of the ECC is required to be performed by the end of the workday following the end of the event. The inventory is the responsibility of Rad Con Field Operations. Notify the Manager, Rad Con Field Ops. of the need to perform the inventory in accordance with Procedure TEP-ADM-1300.01, Maintaining Emergency Preparedness.  


==6.0   REFERENCES==
==6.0 REFERENCES==
6.1 TMI Emergency Plan 6.2 TMI Emergency Plan Implementing Procedures 6.3 6610-PLN-4200.02, Emergency Dose Calculation Manual (EDCM) 3


6.1   TMI Emergency Plan 6.2   TMI Emergency Plan Implementing Procedures 6.3   6610-PLN-4200.02, Emergency Dose Calculation Manual (EDCM) 3
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 de Revision No.
Activation of the RAC 11 7.0 EXHIBITS Exhibit 1 - On-Shift RAC Checklist Exhibit 2 - IREO Duty Roster RAC Checklist Exhibit 3 - Radiological Engineering Support Checklist Exhibit 4 - Radiological Line Communicator Checklist Exhibit 5 - RAC/OSC Communicator Checklist 4


Number TMI - Unit 1 Emergency Procedure     EPIP-TMI-.07 de                                                                Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.
Activation of the RAC                                                          11 7.0  EXHIBITS Exhibit 1 - On-Shift RAC Checklist Exhibit 2 - IREO Duty Roster RAC Checklist Exhibit 3 - Radiological Engineering Support Checklist Exhibit 4 - Radiological Line Communicator Checklist Exhibit 5 - RAC/OSC Communicator Checklist 4
Activation of the RAC 11 EXHIBIT 1 Page 1 of 5 On-Shift RAC Checklist 1.0 The On-Shift RAC should perform the following until relieved by the IREO RAC or by a more senior qualified individual. This checklist need not be completed by the On-Shift RAC prior to turnover per Step 1.11.
 
Number TMI - Unit 1 Emergency Procedure                      EPIP-TMI-.07 tie                                                                                   Revision No.
Activation of the RAC                                                                               11 EXHIBIT 1                                   Page 1 of 5 On-Shift RAC Checklist 1.0   The On-Shift RAC should perform the following until relieved by the IREO RAC or by a more senior qualified individual. This checklist need not be completed by the On-Shift RAC prior to turnover per Step 1.11.
NOTE The bold underlined steps below are particularly important in the early stages of an emergency. They should be performed promptly and in an orderly manner.
NOTE The bold underlined steps below are particularly important in the early stages of an emergency. They should be performed promptly and in an orderly manner.
1.1     Energize the RAC Computer.
1.1 Energize the RAC Computer.
1.2     Start a log of activities performed.
1.2 Start a log of activities performed.
1.3     Call out additional resources if they are needed. If no additional resources are needed at this time, skip the step but reconsider it later as needs change.
1.3 Call out additional resources if they are needed. If no additional resources are needed at this time, skip the step but reconsider it later as needs change.
1.3.1     For the duty roster RAC, determine from the Emergency Director (ED) if the duty roster has been called out. If not, get the RAC's phone number from the ED and call him/her.
1.3.1 For the duty roster RAC, determine from the Emergency Director (ED) if the duty roster has been called out. If not, get the RAC's phone number from the ED and call him/her.
1.3.2     For call-out of additional R.C. Techs, obtain (or have someone obtain) phone numbers from the Rad Con Field Ops phone list and call (or have someone call) the needed techs.
1.3.2 For call-out of additional R.C. Techs, obtain (or have someone obtain) phone numbers from the Rad Con Field Ops phone list and call (or have someone call) the needed techs.
1.4     Determine release Pathway. Consult with the ED or his/her designee to determine the pathway of any radioactive releases from the plant.
1.4 Determine release Pathway. Consult with the ED or his/her designee to determine the pathway of any radioactive releases from the plant.
NOTE Refer to the Emergency Dose Assessment Users Manual section of the EDCM located in the RAC locker for guidance in performing dose projections.
NOTE Refer to the Emergency Dose Assessment Users Manual section of the EDCM located in the RAC locker for guidance in performing dose projections.
5
5


Number TMI - Unit 1 Emergency Procedure                         EPIP-TMI-.07 le                                                                                       Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.
Activation of the RAC                                                                                   11 EXHIBIT 1                                       Page 2 of 5 1.5   Obtain and validate the initial dose projection within 15 minutes.
Activation of the RAC 11 EXHIBIT 1 Page 2 of 5 1.5 Obtain and validate the initial dose projection within 15 minutes.
1.5.1     Select the RAC Spreadsheet icon from the desktop of the RAC Computer.
1.5.1 Select the RAC Spreadsheet icon from the desktop of the RAC Computer.
1.5.2     Go to the release pathway specified by the ED.
1.5.2 Go to the release pathway specified by the ED.
1.5.2.1     Select the Update Plant Data option to import PPM and Met Data.
1.5.2.1 Select the Update Plant Data option to import PPM and Met Data.
1.5.2.2     If the pathway is being monitored by an RMS monitor, use the RMS option for that pathway.
1.5.2.2 If the pathway is being monitored by an RMS monitor, use the RMS option for that pathway.
1.5.2.3     If the pathway is not being monitored by an RMS monitor, use the leak rate option for that pathway.
1.5.2.3 If the pathway is not being monitored by an RMS monitor, use the leak rate option for that pathway.
1.5.2.4     Verify that the PPM and Met Data is current (15 minutes old or less). If not, all data will need to be input manually.
1.5.2.4 Verify that the PPM and Met Data is current (15 minutes old or less). If not, all data will need to be input manually.
1.5.2.5     Enter data not available from the PPM as specified by the input sheet.
1.5.2.5 Enter data not available from the PPM as specified by the input sheet.
1.5.2.6     Edit any PPM or Met Data that is not believed to be accurate.
1.5.2.6 Edit any PPM or Met Data that is not believed to be accurate.
1.5.2.7     Print dose projection.
1.5.2.7 Print dose projection.
1.5.3     Validate the dose projection by performing the following checks:
1.5.3 Validate the dose projection by performing the following checks:
* Verify that the correct release pathway is being used.
Verify that the correct release pathway is being used.
* Verify that the monitor input data is accurate and appropriate (e.g. no calibrations in progress).
Verify that the monitor input data is accurate and appropriate (e.g. no calibrations in progress).
* Verify the release duration with the ED.
Verify the release duration with the ED.
* Verify that the dose projection results are consistent with other indications.
Verify that the dose projection results are consistent with other indications.
1.5.4     Use the Total Dose Option to verify no other pathways are contributing to the offsite dose.
1.5.4 Use the Total Dose Option to verify no other pathways are contributing to the offsite dose.
1.5.5     If power is lost to the RAC computer, request assistance from Operations in obtaining power. An extension cord is available in the RAC locker.
1.5.5 If power is lost to the RAC computer, request assistance from Operations in obtaining power. An extension cord is available in the RAC locker.
1.6   Review the dose proiection with the ED. Ensure the ED understands the nature of the dose projection (e.g. bounding calculation, contingency projection, "what-if', etc.) and the precision or uncertainty associated with the dose projection..
1.6 Review the dose proiection with the ED. Ensure the ED understands the nature of the dose projection (e.g. bounding calculation, contingency projection, "what-if', etc.) and the precision or uncertainty associated with the dose projection..
1.7   Review the Emergency Classification with the ED as it relates to current radiological parameters and evaluate the need to escalate to a higher classification.
1.7 Review the Emergency Classification with the ED as it relates to current radiological parameters and evaluate the need to escalate to a higher classification.
6
6


Number TMI - Unit 1 Emergency Procedure                           EPIP-TMI-.07 tie                                                                                       Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.
Activation of the RAC                                                                                   11 EXHIBIT 1                                         Page 3 of 5 1.8   Advise the ED on any of the following issues if they apply. Skip any that do not apply but reconsider them as the emergency conditions change.
Activation of the RAC 11 EXHIBIT 1 Page 3 of 5 1.8 Advise the ED on any of the following issues if they apply. Skip any that do not apply but reconsider them as the emergency conditions change.
* Protective Action Recommendations (PAR) (see the PAR logic diagram in procedure EPIP-TMI-.02, Emergency Direction, available from the ED).
Protective Action Recommendations (PAR) (see the PAR logic diagram in procedure EPIP-TMI-.02, Emergency Direction, available from the ED).
* On-site assembly and site evacuation of non-essential personnel (see the table at the end of this exhibit for guidance).
On-site assembly and site evacuation of non-essential personnel (see the table at the end of this exhibit for guidance).
NOTE The automated Emergency Report Form that is produced by ED automatically suggests assembly location and evacuation routes contained on the table in this exhibit.
NOTE The automated Emergency Report Form that is produced by ED automatically suggests assembly location and evacuation routes contained on the table in this exhibit.
* Contaminated and/or injured employees and any decontamination efforts.
Contaminated and/or injured employees and any decontamination efforts.
1.9   Consider dispatchinci a field monitoring team if the dose projection indicates the potential for abnormal radiological conditions off-site.
1.9 Consider dispatchinci a field monitoring team if the dose projection indicates the potential for abnormal radiological conditions off-site.
1.9.1     To activate field teams:
1.9.1 To activate field teams:
* Perform radio checks with the field team(s).
Perform radio checks with the field team(s).
* Assign and record field team designations (e.g. Alpha, Bravo, etc.)
Assign and record field team designations (e.g. Alpha, Bravo, etc.)
* Obtain and record names and SSN's for all field team members.
Obtain and record names and SSN's for all field team members.
* Obtain and record year-to-date TEDE for all field team members.
Obtain and record year-to-date TEDE for all field team members.
* Inform team members of the current wind direction and speed and display it on the EPZ map.
Inform team members of the current wind direction and speed and display it on the EPZ map.
1.9.2     Field monitoring team placement and direction: consider the following guidelines for placing and directing field team(s).
1.9.2 Field monitoring team placement and direction: consider the following guidelines for placing and directing field team(s).
A. "         For ground level releases (highest doses projected at site boundary)
A. "
* Place the first field team downwind at the site boundary.
For ground level releases (highest doses projected at site boundary)
* Place the second team (if dispatched) off-site, downwind and as near to the site as possible.
Place the first field team downwind at the site boundary.
Place the second team (if dispatched) off-site, downwind and as near to the site as possible.
7
7


Number TMI - Unit 1 Emergency Procedure                             EPIP-TMI-.07 itle                                                                                     Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 itle Revision No.
Activation of the RAC                                                                                 11 EXHIBIT I                                         Page 4 of 5 B.         For elevated releases (highest doses projected at some distance from the site)
Activation of the RAC 11 EXHIBIT I Page 4 of 5 B.
For elevated releases (highest doses projected at some distance from the site)
Place the first field team downwind at the location where the highest dose is projected.
Place the first field team downwind at the location where the highest dose is projected.
Place the second team (if dispatched) downwind nearer to the site than the first team (results from this team aid in determining if the plume touched down closer than projected).
Place the second team (if dispatched) downwind nearer to the site than the first team (results from this team aid in determining if the plume touched down closer than projected).
C.         Instruct the team(s) to scan across the plume and attempt to locate plume centerline.
C.
Instruct the team(s) to scan across the plume and attempt to locate plume centerline.
Provide a definite start point, direction of travel and an end point for scanning (e.g. "scan for plume centerline starting at NNE31, travel toward the Southeast passing through NE31 and continue to ENE31").
Provide a definite start point, direction of travel and an end point for scanning (e.g. "scan for plume centerline starting at NNE31, travel toward the Southeast passing through NE31 and continue to ENE31").
1.10 BRP call back: Within 45 minutes of event declaration notify the ECC Communications Coordinator whether the BRP has called back to the RAC.
1.10 BRP call back: Within 45 minutes of event declaration notify the ECC Communications Coordinator whether the BRP has called back to the RAC.
1.11 Provide a turnover to the IREO RAC upon arrival.
1.11 Provide a turnover to the IREO RAC upon arrival.
8
8


EPIP-TMI-.07 Revision 11 EXHIBIT I                                  Page 5 of 5 On-Shift RAC Checklist Guidelines for Selection of On-Site Emergency Assembly Area and Evacuation Route for Non-Essential Personnel Off-Site Remote On-Site Emergency                                           Gate To Be       Assembly Area To Wind Direction Assembly Area To               Route to Emergency           Used For Site     Be Used For Site (from)             Use                       Assembly Area             Evacuation           Evacuation 10 to 800     Warehouse 1           Personnel in the NOB, OSF,           North Gate         Training Center Protected Area and other locations near Unit 1 use most direct route to Warehouse 1.
EXHIBIT I On-Shift RAC Checklist EPIP-TMI-.07 Revision 11 Page 5 of 5 Guidelines for Selection of On-Site Emergency Assembly Area and Evacuation Route for Non-Essential Personnel Off-Site Remote On-Site Emergency Gate To Be Assembly Area To Wind Direction Assembly Area To Route to Emergency Used For Site Be Used For Site (from)
Use Assembly Area Evacuation Evacuation 10 to 800 Warehouse 1 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 use most direct route to Warehouse 1.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 travel by personal vehicle to Warehouse 1.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 travel by personal vehicle to Warehouse 1.
810 to 1700     Warehouse 3         Personnel in the NOB, OSF,           North Gate         Training Center Protected Area and other locations near Unit 1 walk to Warehouse 3 via the East side of the plant.
810 to 1700 Warehouse 3 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 walk to Warehouse 3 via the East side of the plant.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 use most direct route to Warehouse 3.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 use most direct route to Warehouse 3.
1710 to 2400     Warehouse 3           Personnel in the NOB, OSF,         South Gate         Training Center Protected Area and other locations near Unit 1 should go directly to their personal vehicles and drive to the parking lot south of the Unit 2 Admin Bldg and then walk to Warehouse 3.
1710 to 2400 Warehouse 3 Personnel in the NOB, OSF, South Gate Training Center Protected Area and other locations near Unit 1 should go directly to their personal vehicles and drive to the parking lot south of the Unit 2 Admin Bldg and then walk to Warehouse 3.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 should use the most direct route to Warehouse 3.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 should use the most direct route to Warehouse 3.
2410 to 3200     Warehouse I           All site personnel should take     North Gate       Training Center or the most direct route to                                     EOF Warehouse 1.                                             (see Note) 3210 to 3600     Warehouse 1           All site personnel should take     North Gate         Training Center the most direct route to Warehouse 1.
2410 to 3200 Warehouse I All site personnel should take North Gate Training Center or the most direct route to EOF Warehouse 1.
(see Note) 3210 to 3600 Warehouse 1 All site personnel should take North Gate Training Center the most direct route to Warehouse 1.
NOTE Use the Training Center as the Off-Site Remote Assembly Area unless the Dose Projection between the Exclusion Area Boundary and 1 mile is greater than 5 mREM/hr CDE or I mREM/hr TEDE.
NOTE Use the Training Center as the Off-Site Remote Assembly Area unless the Dose Projection between the Exclusion Area Boundary and 1 mile is greater than 5 mREM/hr CDE or I mREM/hr TEDE.
9
9


Number TMI - Unit 1 Emergency Procedure                           EPIP-TMI-.07 ile                                                                                       Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 ile Revision No.
Activation of the RAC                                                                                   11 EXHIBIT 2                                         Page 1 of 5 IREO Duty Roster RAC Checklist 1.0   The IREO RAC should perform the following upon reporting to the Emergency Control Center:
Activation of the RAC 11 EXHIBIT 2 Page 1 of 5 IREO Duty Roster RAC Checklist 1.0 The IREO RAC should perform the following upon reporting to the Emergency Control Center:
1.1   Obtain a turnover from the On-Shift RAC if staffed. If the on-shift RAC position was not staffed skip to Step 1.2.
1.1 Obtain a turnover from the On-Shift RAC if staffed. If the on-shift RAC position was not staffed skip to Step 1.2.
1.2   Review Exhibit 1 and ensure applicable steps have been implemented.
1.2 Review Exhibit 1 and ensure applicable steps have been implemented.
NOTE The following steps should be considered and, if needed, implemented.
NOTE The following steps should be considered and, if needed, implemented.
These steps need not be performed in the sequence listed and may be performed multiple times. The RAC should periodically review this checklist to ensure that necessary steps are being performed.
These steps need not be performed in the sequence listed and may be performed multiple times. The RAC should periodically review this checklist to ensure that necessary steps are being performed.
A.         Assign personnel to staff positions described in Exhibits 3 through 5.
A.
B.         Maintain a log of activities performed.
Assign personnel to staff positions described in Exhibits 3 through 5.
C.         Refer to the Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) for dose assessment guidance.
B.
D.         Review dose projections with the ED.
Maintain a log of activities performed.
C.
Refer to the Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) for dose assessment guidance.
D.
Review dose projections with the ED.
Ensure the ED understands the nature of the dose projection (e.g. bounding calculation, contingency projection, "what-if', etc.) and the precision or uncertainty associated with the dose projection.
Ensure the ED understands the nature of the dose projection (e.g. bounding calculation, contingency projection, "what-if', etc.) and the precision or uncertainty associated with the dose projection.
E.       Advise the ED on:
E.
Advise the ED on:
Protective Action Recommendations (PAR) (see the PAR logic diagram in procedure EPIP-TMI-.02, Emergency Direction, available from the ED)
Protective Action Recommendations (PAR) (see the PAR logic diagram in procedure EPIP-TMI-.02, Emergency Direction, available from the ED)
On-site assembly and site evacuation of non-essential personnel (see the table at the end of this exhibit for guidance).
On-site assembly and site evacuation of non-essential personnel (see the table at the end of this exhibit for guidance).
Line 183: Line 225:
On-site and Off-site 10
On-site and Off-site 10


Number TMI - Unit 1 Emergency Procedure                             EPIP-TMI-.07 le                                                                                           Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.
Activation of the RAC                                                                                     11 EXHIBIT 2                                         Page 2 of 5 NOTE Consideration should be given to locations on-site where personnel may remain. Examples are:
Activation of the RAC 11 EXHIBIT 2 Page 2 of 5 NOTE Consideration should be given to locations on-site where personnel may remain. Examples are:
                -      Security Posts
Security Posts Warehouses Communications Medical Employee doses and emergency dose extensions.
                -      Warehouses
Contaminated employees, decontamination efforts and any use of Thyroid Blocking agent.
                -      Communications
F.
                -      Medical
Emergency classifications: Recommend emergency classifications to the ED based on radiological conditions and Emergency Action Levels (EAL).
* Employee doses and emergency dose extensions.
G.
* Contaminated employees, decontamination efforts and any use of Thyroid Blocking agent.
Fuel damage assessment: Provide any necessary assistance to the TSC for the assessment of fuel damage and report results to the ED.
F.       Emergency classifications: Recommend emergency classifications to the ED based on radiological conditions and Emergency Action Levels (EAL).
G.       Fuel damage assessment: Provide any necessary assistance to the TSC for the assessment of fuel damage and report results to the ED.
NOTE While the RAC should provide assistance to the TSC in assessing the degree of core damage, the 'official' damage assessment values will be determined by the TSC.
NOTE While the RAC should provide assistance to the TSC in assessing the degree of core damage, the 'official' damage assessment values will be determined by the TSC.
H.       Primary to secondary leak rate determination: If a primary to secondary leak exists, use the Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) to assist in determining primary to secondary leak rate. Coordinate with the TSC in making this determination.
H.
Primary to secondary leak rate determination: If a primary to secondary leak exists, use the Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) to assist in determining primary to secondary leak rate. Coordinate with the TSC in making this determination.
NOTE While the RAC should provide assistance to the TSC in estimating the primary to secondary leak rate, the 'official' leak rate values will be determined by the TSC.
NOTE While the RAC should provide assistance to the TSC in estimating the primary to secondary leak rate, the 'official' leak rate values will be determined by the TSC.
I.       When the EACC is staffed turn over field monitoring teams to the EACC.
I.
J.       Dose projection/field readings comparison: use the following guidance for comparing field readings (field team or Reuter Stokes readings) and dose projections.
When the EACC is staffed turn over field monitoring teams to the EACC.
* If field readings are within a factor of 10 less than (and not more than) the corresponding projected value, a very good correlation exist between the two.
J.
* Field iodine sample results, after being converted to thyroid dose rate (CDE per hour), can be directly compared to projected thyroid dose rate.
Dose projection/field readings comparison: use the following guidance for comparing field readings (field team or Reuter Stokes readings) and dose projections.
If field readings are within a factor of 10 less than (and not more than) the corresponding projected value, a very good correlation exist between the two.
Field iodine sample results, after being converted to thyroid dose rate (CDE per hour), can be directly compared to projected thyroid dose rate.
11
11


Number TMI - Unit 1 Emergency Procedure                           EPIP-TMI-.07 revisori I'Ju Aie                                                                                      Revision N*o.
TMI - Unit 1 Emergency Procedure Aie Activation of the RAC Number EPIP-TMI-.07 revisori I'Ju 11 0
Activation of the RAC                                                                                    11 EXHIBIT 2                                         Page 3 of 5 0            Field team closed window dose rates and Reuter Stokes readings can be compared with DDE values in dose projections.
K.
Sample provide 0
EXHIBIT 2 Page 3 of 5 Field team closed window dose rates and Reuter Stokes readings can be compared with DDE values in dose projections.
There is no dose projection value that corresponds directly to field team open window readings. Open window readings that are higher than closed window readings indicate that the plume is at ground level at that location.
There is no dose projection value that corresponds directly to field team open window readings. Open window readings that are higher than closed window readings indicate that the plume is at ground level at that location.
K.        Sample s: Consider the need for special samples (e.g. MAP-5, CATPASS, RCS-PAS) to provide more precise source term data for dose projections.
s: Consider the need for special samples (e.g. MAP-5, CATPASS, RCS-PAS) to more precise source term data for dose projections.
0            Samples taken directly from the effluent pathway (e.g. condenser off-gas, MAP-5, etc) provide the most precise source term data.
Samples taken directly from the effluent pathway (e.g. condenser off-gas, MAP-5, etc) provide the most precise source term data.
A sample from the Reactor Building atmosphere (i.e. CATPASS) will improve the precision of source term data for releases from the Reactor Building but will likely be less precise than effluent samples.
A sample from the Reactor Building atmosphere (i.e. CATPASS) will improve the precision of source term data for releases from the Reactor Building but will likely be less precise than effluent samples.
RCS sample results are useful in determining the extent of fuel damage and can be used to improve the precision of the source term but to less an extent than effluent samples.
RCS sample results are useful in determining the extent of fuel damage and can be used to improve the precision of the source term but to less an extent than effluent samples.
NOTE The Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) provides guidance on which sample(s) to obtain under various conditions.
NOTE The Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) provides guidance on which sample(s) to obtain under various conditions.
L.         Communication with BRP: Establish communication with the Bureau of Radiological Protection (BRP) and provide TMI dose projections to them.
L.
M.         Communication with NRC: If the NRC requests continuous communication on the Health Physics Network (HPN), establish and maintain communication on the HPN with them and:
Communication with BRP: Establish communication with the Bureau of Radiological Protection (BRP) and provide TMI dose projections to them.
0           Assign an extra RAC staff member as soon as one is available or, 0          Request an additional communicator from the ED Assistant.
M.
N.        Coordinate all Radiological Controls activities on-site, including:
Communication with NRC: If the NRC requests continuous communication on the Health Physics Network (HPN), establish and maintain communication on the HPN with them and:
0 0
N.
Coordinate Assign an extra RAC staff member as soon as one is available or, Request an additional communicator from the ED Assistant.
all Radiological Controls activities on-site, including:
Access control to areas affected by the emergency.
Access control to areas affected by the emergency.
Personnel dose monitoring and control (including dose extensions).
Personnel dose monitoring and control (including dose extensions).
In-plant surveys and samples.
In-plant surveys and samples.
12
12 Revision N*o.


Number TMI- Unit 1 Emergency Procedure                         EPIP-TMI-.07 itle                                                                                 Revision No.
Number TMI-Unit 1 Emergency Procedure EPIP-TMI-.07 itle Revision No.
Activation of the RAC                                                               1 EXHIBIT 2                                       Page 4 of 5
Activation of the RAC 1
: 0. Thyroid Blocking: Implement the Thyroid Blocking procedure (EPIP-COM-.44) if it is anticipated that person(s) will be exposed to quantities of radioiodine sufficient to cause a thyroid dose of 25 REM (CDE) or greater.
EXHIBIT 2 Page 4 of 5
P. Interface with the Group Leader- Radiological and Environmental Controls (GL-R&EC) regarding:
: 0.
* Dose projections
Thyroid Blocking: Implement the Thyroid Blocking procedure (EPIP-COM-.44) if it is anticipated that person(s) will be exposed to quantities of radioiodine sufficient to cause a thyroid dose of 25 REM (CDE) or greater.
* In-plant and on-site conditions
P.
* Protective actions Q. Recommend source term reduction techniques appropriate to the release pathway (e.g. RB spray, raising OTSG levels, etc). See the Emergency Dose Assessment User's Manual in Ref 6.3 for specific information.
Interface with the Group Leader-Radiological and Environmental Controls (GL-R&EC) regarding:
R. Evaluate the need for eating and drinking restrictions in-plant.
Dose projections In-plant and on-site conditions Protective actions Q.
* If results of habitability monitoring allow, recommend that the E.D. lift restrictions, as needed.
Recommend source term reduction techniques appropriate to the release pathway (e.g. RB spray, raising OTSG levels, etc). See the Emergency Dose Assessment User's Manual in Ref 6.3 for specific information.
* Ensure habitability monitoring continues.
R.
S. Review radiological information in press releases. Specific examples of radiological information that should not be included in press releases are:
Evaluate the need for eating and drinking restrictions in-plant.
0           Dose projections 0           Protective action recommendations
If results of habitability monitoring allow, recommend that the E.D. lift restrictions, as needed.
* Technical terms
Ensure habitability monitoring continues.
* Acronyms and abbreviations T. Trend effluent release data, RMS, sample results, field team readings and dose projections.
S.
U. Establish a watch bill to cover the RAC and all staff positions on a 24 hour-per-day basis.
Review radiological information in press releases. Specific examples of radiological information that should not be included in press releases are:
0 Dose projections 0
Protective action recommendations Technical terms Acronyms and abbreviations T.
Trend effluent release data, RMS, sample results, field team readings and dose projections.
U.
Establish a watch bill to cover the RAC and all staff positions on a 24 hour-per-day basis.
13
13


EPIP-TMI-.07 Revision 11 EXHIBIT 2                                  Page 5 of 5 IREO Duty Roster RAC Checklist Guidelines for Selection of On-Site Emergency Assembly Area and Evacuation Route for Non-Essential Personnel Off-Site Remote On-Site Emergency                                           Gate To Be       Assembly Area To Wind Direction Assembly Area To               Route to Emergency           Used For Site     Be Used For Site (from)             Use                       Assembly Area             Evacuation           Evacuation 10 to 800     Warehouse 1           Personnel in the NOB, OSF,           North Gate       Training Center Protected Area and other locations near Unit 1 use most direct route to Warehouse 1.
EXHIBIT 2 IREO Duty Roster RAC Checklist EPIP-TMI-.07 Revision 11 Page 5 of 5 Guidelines for Selection of On-Site Emergency Assembly Area and Evacuation Route for Non-Essential Personnel Off-Site Remote On-Site Emergency Gate To Be Assembly Area To Wind Direction Assembly Area To Route to Emergency Used For Site Be Used For Site (from)
Use Assembly Area Evacuation Evacuation 10 to 800 Warehouse 1 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 use most direct route to Warehouse 1.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 travel by personal vehicle to Warehouse 1.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 travel by personal vehicle to Warehouse 1.
810 to 1700     Warehouse 3         Personnel in the NOB, OSF,           North Gate       Training Center Protected Area and other locations near Unit 1 walk to Warehouse 3 via the East side of the plant.
810 to 1700 Warehouse 3 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 walk to Warehouse 3 via the East side of the plant.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 use most direct route to Warehouse 3.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 use most direct route to Warehouse 3.
1710 to 2400     Warehouse 3         Personnel in the NOB, OSF,           South Gate       Training Center Protected Area and other locations near Unit 1 should go directly to their personal vehicles and drive to the parking lot south of the Unit 2 Admin Bldg and then walk to Warehouse 3.
1710 to 2400 Warehouse 3 Personnel in the NOB, OSF, South Gate Training Center Protected Area and other locations near Unit 1 should go directly to their personal vehicles and drive to the parking lot south of the Unit 2 Admin Bldg and then walk to Warehouse 3.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 should use the most direct route to Warehouse 3.
Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 should use the most direct route to Warehouse 3.
2410 to 3200     Warehouse I         All site personnel should take       North Gate       Training Center or the most direct route to                                     EOF Warehouse 1.                                             (see Note) 3210 to 3600   Warehouse 1           All site personnel should take     North Gate         Training Center the most direct route to Warehouse 1.
2410 to 3200 Warehouse I All site personnel should take North Gate Training Center or the most direct route to EOF Warehouse 1.
(see Note) 3210 to 3600 Warehouse 1 All site personnel should take North Gate Training Center the most direct route to Warehouse 1.
NOTE Use the Training Center as the Off-Site Remote Assembly Area unless the Dose Projection between the Exclusion Area Boundary and I mile is greater than 5 mREM/hr CDE or I mREM/hr TEDE.
NOTE Use the Training Center as the Off-Site Remote Assembly Area unless the Dose Projection between the Exclusion Area Boundary and I mile is greater than 5 mREM/hr CDE or I mREM/hr TEDE.
14
14


Number TMI - Unit 1 Emergency Procedure                         EPIP-TMI-.07 le                                                                                       Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.
Activation of the RAC                                                                                   11 EXHIBIT 3                                       Page 1 of 3 Radiological Engineering Support Engineer Checklist 1.0   Perform the following:
Activation of the RAC 11 EXHIBIT 3 Page 1 of 3 Radiological Engineering Support Engineer Checklist 1.0 Perform the following:
NOTE The following steps should be considered and, if needed, implemented.
NOTE The following steps should be considered and, if needed, implemented.
These steps need not be performed in the sequence listed and may be performed multiple times. The RESE should periodically review this checklist to ensure that necessary steps are being performed.
These steps need not be performed in the sequence listed and may be performed multiple times. The RESE should periodically review this checklist to ensure that necessary steps are being performed.
A. Start a log of activities performed.
A.
B. Perform dose projections using the RAC computer.
Start a log of activities performed.
* Refer to the Emergency Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) for guidance.
B.
* Validate dose projections. Perform the following checks in coordination with the RAC:
Perform dose projections using the RAC computer.
                        -            Verify that the correct release pathway is being used.
Refer to the Emergency Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) for guidance.
                        -            Verify that the monitor input data is accurate and appropriate (e.g. no calibrations in progress).
Validate dose projections. Perform the following checks in coordination with the RAC:
                        -            Verify the release duration.
Verify that the correct release pathway is being used.
                        -            Verify that the dose projection results are consistent with other indications.
Verify that the monitor input data is accurate and appropriate (e.g. no calibrations in progress).
                        -            Verify that the PPM and Met data are not more than 15 minutes old.
Verify the release duration.
* If power is lost to the RAC computer, request assistance from Operations in obtaining power. An extension cord is available in the RAC locker.
Verify that the dose projection results are consistent with other indications.
C. Determine and log the time of reactor shut down.
Verify that the PPM and Met data are not more than 15 minutes old.
D. Communicate with the GL-R&EC and the EACC.
If power is lost to the RAC computer, request assistance from Operations in obtaining power. An extension cord is available in the RAC locker.
E. Trend dose projections.
C.
F. Generate source term data: Edit input parameters and input sample results to refine the source term.
Determine and log the time of reactor shut down.
D.
Communicate with the GL-R&EC and the EACC.
E.
Trend dose projections.
F.
Generate source term data: Edit input parameters and input sample results to refine the source term.
15
15


Number TMI - Unit 1 Emergency Procedure                           EPIP-TMI-.07 le                                                                                       Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.
Activation of the RAC                                                                                 11 EXHIBIT 3                                       Page 2 of 3 G. Met. and forecast data: Obtain current meteorological data and weather forecast data (short and long term) from the EACC for:
Activation of the RAC 11 EXHIBIT 3 Page 2 of 3 G.
* Dose projections (e.g. "what if' projections)
Met. and forecast data: Obtain current meteorological data and weather forecast data (short and long term) from the EACC for:
* Plume tracking
Dose projections (e.g. "what if' projections)
* Site evacuation planning
Plume tracking Site evacuation planning Off-site protective action planning H.
* Off-site protective action planning H. Evaluate the following inputs to verify that dose projections reflect actual conditions:
Evaluate the following inputs to verify that dose projections reflect actual conditions:
* Plant conditions
Plant conditions RMS data RCS activity Spiking factors Meteorological data.
* RMS data
* RCS activity
* Spiking factors
* Meteorological data.
Confirm dose projections by comparing with field team readings and/or Reuter Stokes readings.
Confirm dose projections by comparing with field team readings and/or Reuter Stokes readings.
* If field readings are within a factor of 10 less than, and not more than, the corresponding projected value a very good correlation exits.
If field readings are within a factor of 10 less than, and not more than, the corresponding projected value a very good correlation exits.
0         Field iodine sample results, after being converted to thyroid dose rate (CDE per hour),
0 Field iodine sample results, after being converted to thyroid dose rate (CDE per hour),
should only be compared to projected thyroid dose rate.
should only be compared to projected thyroid dose rate.
* Field team closed window dose rates and Reuter Stokes readings can be compared with DDE values in dose projections.
Field team closed window dose rates and Reuter Stokes readings can be compared with DDE values in dose projections.
0         There is no dose projection value that corresponds directly to field team open window readings. Open window readings that are higher than closed window readings indicate that the plume is at ground level at that location.
0 There is no dose projection value that corresponds directly to field team open window readings. Open window readings that are higher than closed window readings indicate that the plume is at ground level at that location.
J. Discuss Protective Action Recommendations (PAR) and Protective Action Guidelines (PAG) with the RAC.
J.
Discuss Protective Action Recommendations (PAR) and Protective Action Guidelines (PAG) with the RAC.
The PAR logic diagram is contained in procedure EPIP-TMI-.02, Emergency Direction, available from the ED.
The PAR logic diagram is contained in procedure EPIP-TMI-.02, Emergency Direction, available from the ED.
K. Perform "what if" dose projections based on potential or anticipated:
K.
* Plant status changes
Perform "what if" dose projections based on potential or anticipated:
* Meteorological changes 16
Plant status changes Meteorological changes 16


Number TMI - Unit 1 Emergency Procedure                         EPIP-TMI-.07 le                                                                                 Revision No Activation of the RAC                                                                           11 EXHIBIT 3                                     Page 3 of 3 L. Coordinate with the TSC. Assist the RAC in coordinating with the TSC for:
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No Activation of the RAC 11 EXHIBIT 3 Page 3 of 3 L.
Coordinate with the TSC. Assist the RAC in coordinating with the TSC for:
Primary to secondary leak rate determination. Use the Emergency Dose Assessment User's Manual (Ref. 6.3) for guidance.
Primary to secondary leak rate determination. Use the Emergency Dose Assessment User's Manual (Ref. 6.3) for guidance.
Fuel damage class determination.
Fuel damage class determination.
Line 297: Line 357:
17
17


Number TMI - Unit 1 Emergency Procedure                         EPIP-TMI-.07 tie                                                                                     Revision No.
Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.
Activation of the RAC                                                                                 11 EXHIBIT 4                                       Page 1 of 1 Radiological Line Communicator Checklist 1.0   Perform the following:
Activation of the RAC 11 EXHIBIT 4 Page 1 of 1 Radiological Line Communicator Checklist 1.0 Perform the following:
NOTE The following steps should be considered and, if needed, implemented.
NOTE The following steps should be considered and, if needed, implemented.
These steps need not be performed in the sequence listed and may be performed multiple times. The Radiological Line Communicator should periodically review this checklist to ensure that necessary steps are being performed.
These steps need not be performed in the sequence listed and may be performed multiple times. The Radiological Line Communicator should periodically review this checklist to ensure that necessary steps are being performed.
A.     Maintain a log of information sent and received.
A.
B. Communicate with the following:
Maintain a log of information sent and received.
* Group Leader - Radiological and Environmental Controls (GL-R&EC) at the EOF
B.
* Bureau of Radiological Protection (BRP)
Communicate with the following:
* Nuclear Regulatory Commission (on the HPN line).
Group Leader - Radiological and Environmental Controls (GL-R&EC) at the EOF Bureau of Radiological Protection (BRP)
C. Provide a briefing on current plant status and recent changes to all persons on the Radiological Line.
Nuclear Regulatory Commission (on the HPN line).
D. Pass requests from the RAC for off-site support to the EOF. Examples are:
C.
* Rad Con Technicians from other plants.
Provide a briefing on current plant status and recent changes to all persons on the Radiological Line.
* Equipment (e.g., radiation monitors, etc.)
D.
* Whole Body Counting E. If the NRC requests continuous communication on the HPN, establish and maintain communication on the HPN with them and request the RAC:
Pass requests from the RAC for off-site support to the EOF. Examples are:
* Assign an extra RAC staff member to man the HPN as soon as one is available or,
Rad Con Technicians from other plants.
* Obtain an additional communicator for the HPN from the ED Assistant.
Equipment (e.g., radiation monitors, etc.)
Whole Body Counting E.
If the NRC requests continuous communication on the HPN, establish and maintain communication on the HPN with them and request the RAC:
Assign an extra RAC staff member to man the HPN as soon as one is available or, Obtain an additional communicator for the HPN from the ED Assistant.
18
18


Number TMI - Unit 1 Emergency Procedure                         EPIP-TMI-.07 le                                                                                      Revision No.
TMI - Unit 1 Emergency Procedure le Activation of the RAC Number EPIP-TMI-.07 Revision No.
Activation of the RAC                                                                                  11 EXHIBIT 5                                       Page 1 of 2 RAC/OSC Communicator Checklist 1.0   Perform the following:
11 EXHIBIT 5 RAC/OSC Communicator Checklist Page 1 of 2 1.0 Perform the following:
NOTE The following steps should be considered and, if needed, implemented.
A.
B.
C.
D.
E.
Communicate between RAC and OSC Communicate with the Remote Assembly Area Personnel Maintain a Log of activities performed Provide Event Update to Rad Con Personnel in OSC Collect information on contaminated/injured personnel F.
Handle requests for:
Activation of on/offsite field teams In-Plant Radiological data, (surveys - dose rates, contamination levels)
Medical emergency information Search and Rescue Information Repair Team Information Vehicle/Personnel Contamination Surveys for Site Evacuation.
G.
Interface for obtaining accident samples and sample results:
CATPASS: Containment Atmospheric Post Accident Sampling System MAP-5: Particulate and Radioiodine Sample System on effluent pathways a
RCS PASS: Reactor Coolant System Post Accident Sampling System Radiation Monitoring System (RMS) samples for particulate, radioiodine, noble gas and tritium 0
Other plant samples as required (OTSG, secondary) 19 NOTE The following steps should be considered and, if needed, implemented.
These steps need not be performed in the sequence listed and may be performed multiple times. The RAC/OSC Communicator should periodically review this checklist to ensure that necessary steps are being performed.
These steps need not be performed in the sequence listed and may be performed multiple times. The RAC/OSC Communicator should periodically review this checklist to ensure that necessary steps are being performed.
A. Communicate between RAC and OSC B. Communicate with the Remote Assembly Area Personnel C. Maintain a Log of activities performed D.      Provide Event Update to Rad Con Personnel in OSC E.      Collect information on contaminated/injured personnel F.      Handle requests for:
* Activation of on/offsite field teams
* In-Plant Radiological data, (surveys - dose rates, contamination levels)
* Medical emergency information
* Search and Rescue Information
* Repair Team Information
* Vehicle/Personnel Contamination Surveys for Site Evacuation.
G.      Interface for obtaining accident samples and sample results:
* CATPASS: Containment Atmospheric Post Accident Sampling System
* MAP-5: Particulate and Radioiodine Sample System on effluent pathways a          RCS PASS: Reactor Coolant System Post Accident Sampling System
* Radiation Monitoring System (RMS) samples for particulate, radioiodine, noble gas and tritium 0          Other plant samples as required (OTSG, secondary) 19


Number TMI - Unit 1 "aencv Procedure                     EPIP-TMI-.07 EXHIBIT 5                                   Page 2 of 2 H. Provide Guidance from RAC on in-plant radiological controls
TMI - Unit 1 "aencv Procedure Number EPIP-TMI-.07 EXHIBIT 5 Page 2 of 2 H.
* Keep OSC updated on events that may alter radiological conditions in the plant
Provide Guidance from RAC on in-plant radiological controls Keep OSC updated on events that may alter radiological conditions in the plant Radiation Controls - e.g., posting of Turbine Building Obtain data on:
* Radiation Controls - e.g., posting of Turbine Building Obtain data on:
Skin contaminations - levels and location of contamination Dose extensions - extension limits, purpose of extensions, personnel receiving extensions Personnel injuries - any radiological concerns J.
* Skin contaminations - levels and location of contamination
Provide priority from the RAC to the Chemistry Coordinator on accident samples and analysis.
* Dose extensions - extension limits, purpose of extensions, personnel receiving extensions
* Personnel injuries - any radiological concerns J. Provide priority from the RAC to the Chemistry Coordinator on accident samples and analysis.
20
20


FOR INFORMATION ONLY                                                   Number TMI   - Unit 1 Emergency Plan                             EP IP-TMI-.10 Implementing Document itle                                                                                              Revision No.
FOR INFORMATION ONLY Number TMI - Unit 1 Emergency Plan Implementing Document EP itle Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                               12 Applicability/Scope                                                           USAGE LEVEL           Effective Date TMI Division                                                                       2                     DEC       8 ZlOO This document is within QA plan scope I X I Yes [_                       No Safety Reviews Required                         lXi YesL-               No List of Effective Pages Page         Revision            Page          Revision          Page      Revision          Paqe            Revision 1               12                21              12 2               12                22              12 3               12                23              12 4               12                24              12 5               12                25              12 6               12 7               12 8               12 9               12 10             12 11             12 12              12 13             12 14             12 15             12
IP-TMI-.10 Onsite/Offsite Radiological/Environmental Monitoring 12 Applicability/Scope USAGE LEVEL Effective Date TMI Division 2
~           16             12 17             12 18             12 19             12 20             12 Procedure Owner                         /s/ J. L. Whitehead                                   12/05/00 II                                     II                                                     '1 Approver                                 Is/ N. Brown                                           12/05/00 JL                                                     J __________________________________________________
DEC 8 ZlOO This document is within QA plan scope I X I Yes [_
1
No Safety Reviews Required lXi YesL-No List of Effective Pages Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15  
~
16 17 18 19 20 Procedure Owner
/s/ J. L. Whitehead II II  
'1 Approver Is/ N. Brown 12/05/00 12/05/00 1
Revision Page Page 21 22 23 24 25 Revision 12 12 12 12 12 Paqe Revision Revision 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 JL J __________________________________________________


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.10 itle                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 itle Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                     12 1.0   PURPOSE The purpose of this procedure is to provide guidance to radiological and environmental monitoring teams for adequate onsite and offsite monitoring of radiation, contamination and airborne radioactivity levels, and environmental sample procurement, following the accidental release of radioactive materials to the environment. The procedure establishes monitoring team actions necessary to obtain data required to make valid radiological assessments.
Onsite/Offsite Radiological/Environmental Monitoring 12 1.0 PURPOSE The purpose of this procedure is to provide guidance to radiological and environmental monitoring teams for adequate onsite and offsite monitoring of radiation, contamination and airborne radioactivity levels, and environmental sample procurement, following the accidental release of radioactive materials to the environment. The procedure establishes monitoring team actions necessary to obtain data required to make valid radiological assessments.
2.0   APPLICABILITY/SCOPE All TMI Emergency Radiological and Environmental Monitoring Team Personnel.
2.0 APPLICABILITY/SCOPE All TMI Emergency Radiological and Environmental Monitoring Team Personnel.
3.0   DEFINITIONS 3.1     Derived Air Concentration (DAC) - The airborne concentration of radioactive material that if breathed by a worker for one hour, results in an estimated Internal Whole Body Dose (CEDE) of 2.5 mrem, or in the case of radioiodine, results in an estimated thyroid dose (CDE) of 25 mrem.
3.0 DEFINITIONS 3.1 Derived Air Concentration (DAC) - The airborne concentration of radioactive material that if breathed by a worker for one hour, results in an estimated Internal Whole Body Dose (CEDE) of 2.5 mrem, or in the case of radioiodine, results in an estimated thyroid dose (CDE) of 25 mrem.
3.2     External Whole Body Dose (DDE) - The whole body dose from sources external to the body.
3.2 External Whole Body Dose (DDE) - The whole body dose from sources external to the body.
Typically this is the dose recorded on a whole body TLD. Official term: Deep Dose Equivalent.
Typically this is the dose recorded on a whole body TLD. Official term: Deep Dose Equivalent.
3.3     Internal Whole Body Dose (CEDE) - The estimated risk-based dose to the whole body resulting from the intake of radioactive material. Official term: Committed Effective Dose Equivalent.
3.3 Internal Whole Body Dose (CEDE) - The estimated risk-based dose to the whole body resulting from the intake of radioactive material. Official term: Committed Effective Dose Equivalent.
3.4     Thyroid Dose (CDE(th)) - the dose to the Thyroid resulting from the intake of radioactive material.
3.4 Thyroid Dose (CDE(th)) - the dose to the Thyroid resulting from the intake of radioactive material.
Official term: Committed Dose Equivalent - thyroid.
Official term: Committed Dose Equivalent - thyroid.
3.5     Total Whole Body Dose (TEDE) - the sum of the External Whole Body Dose (DDE) and the Internal Whole Body Dose (CEDE).
3.5 Total Whole Body Dose (TEDE) - the sum of the External Whole Body Dose (DDE) and the Internal Whole Body Dose (CEDE).
4.0   RESPONSIBILITIES 4.1     The Radiological/Environmental Monitoring Teams are responsible for implementing this procedure.
4.0 RESPONSIBILITIES 4.1 The Radiological/Environmental Monitoring Teams are responsible for implementing this procedure.
5.0   PROCEDURE 5.1       Implementation Criteria 5.1.1     This procedure is to be initiated upon the direction of the Emergency Director, the Radiological Assessment Coordinator (RAC), the Environmental Assessment Coordinator (EAC), or their designee.
5.0 PROCEDURE 5.1 Implementation Criteria 5.1.1 This procedure is to be initiated upon the direction of the Emergency Director, the Radiological Assessment Coordinator (RAC), the Environmental Assessment Coordinator (EAC), or their designee.
2
2


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.10 tie                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                   12 5.2 Emergency Actions NOTE Team members utilize additional radiological precautions when approaching any of the following:
Onsite/Offsite Radiological/Environmental Monitoring 12 5.2 Emergency Actions NOTE Team members utilize additional radiological precautions when approaching any of the following:
: 1.       4 REM Year-to-Date Total Whole Body Dose (TEDE).
: 1.
: 2.       25 REM Thyroid Dose (CDE) during this event.
4 REM Year-to-Date Total Whole Body Dose (TEDE).
: 2.
25 REM Thyroid Dose (CDE) during this event.
Minimize time spent in the plume especially in areas projected (by the RAC/EACC) to have high airborne radioactivity. Utilize protection such as thyroid blocking agent and/or respirators if advised by the RAC or the Env. Assessment Command Center (EACC).
Minimize time spent in the plume especially in areas projected (by the RAC/EACC) to have high airborne radioactivity. Utilize protection such as thyroid blocking agent and/or respirators if advised by the RAC or the Env. Assessment Command Center (EACC).
INITIALS 5.2.1     Upon assignment as a monitoring team member, obtain emergency equipment and emergency vehicle.
INITIALS 5.2.1 Upon assignment as a monitoring team member, obtain emergency equipment and emergency vehicle.
5.2.1.1       Emergency Equipment consists of the following:
5.2.1.1 Emergency Equipment consists of the following:
                                      -            Emergency Equipment/Instrument Kit (suitcase).
Emergency Equipment/Instrument Kit (suitcase).
                                      -            Air Sampler.
Air Sampler.
                                      -            Portable Two Way Radio with spare battery.
Portable Two Way Radio with spare battery.
                                      -            Respirators for Team Members.
Respirators for Team Members.
5.2.2     Verify that the seal on the emergency kit was intact.
5.2.2 Verify that the seal on the emergency kit was intact.
5.2.2.1       If the emergency kit seal was broken, conduct a brief inventory of the major pieces of equipment.
5.2.2.1 If the emergency kit seal was broken, conduct a brief inventory of the major pieces of equipment.
NOTE There is no need to inventory a kit if its seal was intact.
NOTE There is no need to inventory a kit if its seal was intact.
5.2.3     Record the following information on Exhibit 6: 1) Name, 2) SSN, 3) Date, 4) Current Year-to-date Total Whole Body Dose (TEDE). Item 4 may be obtained from the Rem-on-Line System or may be transmitted via radio while the team is in transit to their first monitoring location.
5.2.3 Record the following information on Exhibit 6: 1) Name, 2) SSN, 3) Date, 4) Current Year-to-date Total Whole Body Dose (TEDE). Item 4 may be obtained from the Rem-on-Line System or may be transmitted via radio while the team is in transit to their first monitoring location.
5.2.4     Operationally check all radiation meters and portable air sampler (battery check, airflow check, visual inspection).
5.2.4 Operationally check all radiation meters and portable air sampler (battery check, airflow check, visual inspection).
A.           Obtain properly calibrated replacements for any meters or samplers found to be unsatisfactory.
A.
Obtain properly calibrated replacements for any meters or samplers found to be unsatisfactory.
3
3


Number TMI - Unit 1 Emergency Plan Implementina Document                         EPIP-TMI-.10
TMI - Unit 1 Emergency Plan Implementina Document
'itle                                                                                       Revision No.
'itle Onsite/Offsite Radiological/Environmental Monitoring B.
Onsite/Offsite Radiological/Environmental Monitoring                                                       12 INITIALS B.             Inform the RAC/EACC of equipment problems and, if needed, request assistance in obtaining replacements.
Number EPIP-TMI-.10 Revision No.
NOTE If personnel intend to take air samples in areas inaccessible to vehicles (e.g., Shelley Island), a battery powered air sampler should be obtained for this purpose. A portable generator and an ordinary air sampler can be used if a battery powered air sampler is not available. Check the fuel level in the portable generator and operationally test it by running it momentarily.
12 Inform the RAC/EACC of equipment problems and, if needed, request assistance in obtaining replacements.
5.2.5       Fill (or verify filled) the noble gas sampling devices (plastic bottles or marinelli beakers) with water prior to leaving the P.C. or EOF.
5.2.5 Fill (or verify filled) the noble gas sampling devices (plastic bottles or marinelli beakers) with water prior to leaving the P.C. or EOF.
5.2.6       Issue self reading dosimeters (SRPDs or ESRDs) to team members.
5.2.6 Issue self reading dosimeters (SRPDs or ESRDs) to team members.
5.2.7       Ensure each team member is wearing a TLD.
5.2.7 Ensure each team member is wearing a TLD.
A.             Team members responding from on-site should retain their TLD. Team members responding from the EOF should either retain their personal TLD (if available) or be issued a TLD from the supply of emergency TLDs at the EOF.
A.
B.             Use the individual dose log, Exhibit 6 to track each team member's dose.
Team members responding from on-site should retain their TLD. Team members responding from the EOF should either retain their personal TLD (if available) or be issued a TLD from the supply of emergency TLDs at the EOF.
C.             At a minimum, each team member shall enter his/her SRPD/ESRD reading and time when he/she begins monitoring activities and again when he/she returns from the field.
B.
D.             SRPD/ESRD readings may be entered on the individual exposure log more frequently if a team member so desires (eg., when entering and leaving the plume).
Use the individual dose log, Exhibit 6 to track each team member's dose.
4
C.
At a minimum, each team member shall enter his/her SRPD/ESRD reading and time when he/she begins monitoring activities and again when he/she returns from the field.
D.
SRPD/ESRD readings may be entered on the individual exposure log more frequently if a team member so desires (eg., when entering and leaving the plume).
4 INITIALS NOTE If personnel intend to take air samples in areas inaccessible to vehicles (e.g., Shelley Island), a battery powered air sampler should be obtained for this purpose. A portable generator and an ordinary air sampler can be used if a battery powered air sampler is not available. Check the fuel level in the portable generator and operationally test it by running it momentarily.


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.10 itle                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 itle Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                   12 E.           Keep the RAC/EACC informed of field monitoring team doses.
Onsite/Offsite Radiological/Environmental Monitoring 12 E.
* Advise the RAC/EACC if any team member's dose approaches:
Keep the RAC/EACC informed of field monitoring team doses.
                                                -            4 REM year-to-date total whole body dose (TEDE) or
Advise the RAC/EACC if any team member's dose approaches:
                                                -            25 REM thyroid dose (CDE) during this event.
4 REM year-to-date total whole body dose (TEDE) or 25 REM thyroid dose (CDE) during this event.
* Recommend that the RAC/EACC consider the need for team relief.
Recommend that the RAC/EACC consider the need for team relief.
NOTE Relief should be conducted in a low radiation area.
NOTE Relief should be conducted in a low radiation area.
* Recommend that the RAC/EACC consider authorizing the use of thyroid blocking agent if field monitoring team thyroid doses are projected to be 25 REM (CDE) or greater.
Recommend that the RAC/EACC consider authorizing the use of thyroid blocking agent if field monitoring team thyroid doses are projected to be 25 REM (CDE) or greater.
* If the RAC/EACC authorizes the use of thyroid blocking agent, complete a copy of Exhibit 9 for each field team member.
If the RAC/EACC authorizes the use of thyroid blocking agent, complete a copy of Exhibit 9 for each field team member.
* If the RAC/EACC advises the use of respirators, use extreme caution if operating a vehicle while wearing a respirator.
If the RAC/EACC advises the use of respirators, use extreme caution if operating a vehicle while wearing a respirator.
INITIALS 5.2.8     Ensure your survey meter is turned on.
INITIALS 5.2.8 Ensure your survey meter is turned on.
NOTE The survey meter should remain all times during the performance of monitoring team duties.
NOTE The survey meter should remain all times during the performance of monitoring team duties.
5.2.9     Perform radio check with the RAC/EACC (see Exhibit 10 for radio operating guidelines).
5.2.9 Perform radio check with the RAC/EACC (see Exhibit 10 for radio operating guidelines).
NOTE Radio transmission may affect accuracy of portable instrument response. Information should not be transmitted while taking readings.
5 NOTE Radio transmission may affect accuracy of portable instrument response. Information should not be transmitted while taking readings.
5


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.10 tie                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.  
'-Onsite/Offsite Radiological/Environmental Monitoring                                                   12 WARNING Utilize roof top strobe light and vehicle's 4-way flashers whenever you are stopped along the road or travelling significantly slower than the speed limit.
'-Onsite/Offsite Radiological/Environmental Monitoring 12 WARNING Utilize roof top strobe light and vehicle's 4-way flashers whenever you are stopped along the road or travelling significantly slower than the speed limit.
INITIALS 5.2.10     Proceed to the designated monitoring point or other location as directed by the RAC/EACC. (See map in emergency kit for specifically designated monitoring point locations.)
INITIALS 5.2.10 Proceed to the designated monitoring point or other location as directed by the RAC/EACC. (See map in emergency kit for specifically designated monitoring point locations.)
NOTE The following steps should be implemented as they are needed. These steps need not be performed in the sequence listed and may be performed multiple times. The Field Monitoring Team should periodically review these steps to ensure that necessary actions are being performed.
NOTE The following steps should be implemented as they are needed. These steps need not be performed in the sequence listed and may be performed multiple times. The Field Monitoring Team should periodically review these steps to ensure that necessary actions are being performed.
A.         As time permits, keep a log of your major activities or the Major Activities log, Exhibit 7.
A.
B.         Perform radiological surveys/sampling as directed by the RAC/EACC at designated monitoring locations.
As time permits, keep a log of your major activities or the Major Activities log, Exhibit 7.
* Use the appropriate exhibit for the type of survey/sample requested:
B.
Exhibit 1 Radiation Surveys (including plume centerline scans).
Perform radiological surveys/sampling as directed by the RAC/EACC at designated monitoring locations.
Exhibit 2 Radioiodine and Particulate Air Samples.
Use the appropriate exhibit for the type of survey/sample requested:
Exhibit 3 Noble Gas Air Samples.
Exhibit 1 Radiation Surveys (including plume centerline scans).
Exhibit 4 Contamination Surveys.
Exhibit 2 Radioiodine and Particulate Air Samples.
C.         If radio communications are lost, attempt to re-establish radio communications with the RAC/EACC. Move to higher ground if possible.
Exhibit 3 Noble Gas Air Samples.
Exhibit 4 Contamination Surveys.
C.
If radio communications are lost, attempt to re-establish radio communications with the RAC/EACC. Move to higher ground if possible.
NOTE If the portable radio displays "CC SCAN" this indicates that the radio is in a bad location or it is out of range.
NOTE If the portable radio displays "CC SCAN" this indicates that the radio is in a bad location or it is out of range.
If radio communications cannot be re-established drive to the nearest telephone and call the RAC or the EACC (as appropriate). A list of important phone numbers is contained in Exhibit 8.
If radio communications cannot be re-established drive to the nearest telephone and call the RAC or the EACC (as appropriate). A list of important phone numbers is contained in Exhibit 8.
D.         Minimize personnel exposures by moving out of areas of high radiation when counting samples, recording data or awaiting further instructions.
D.
E.         Ensure all team members keep track of their doses in Exhibit 6.
Minimize personnel exposures by moving out of areas of high radiation when counting samples, recording data or awaiting further instructions.
E.
Ensure all team members keep track of their doses in Exhibit 6.
6
6


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.10 Title                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 Title Revision No.  
-Onsite/Offsite       Radiological/Environmental Monitoring                                                 12 INITIALS F.           Maintain all completed exhibits for permanent records.
-Onsite/Offsite Radiological/Environmental Monitoring 12 INITIALS F.
G.           Return all completed forms to Rad Con Coordinator at the OSC or other location as directed by the RAC/EACC.
Maintain all completed exhibits for permanent records.
H.           Retain all samples for later counting and analysis.
G.
Return all completed forms to Rad Con Coordinator at the OSC or other location as directed by the RAC/EACC.
H.
Retain all samples for later counting and analysis.
NOTE Samples may be returned to the Rad Con Lab or designated collection point at a convenient time as directed by the RAC/EACC.
NOTE Samples may be returned to the Rad Con Lab or designated collection point at a convenient time as directed by the RAC/EACC.
1._         When the Environmental Assessment Command Center (EACC) is activated and takes control of monitoring teams, begin reporting offsite surveys to the EACC.
1._
J.           Upon relief or upon completion of monitoring duties, team members shall frisk themselves in a low background area and frisk the tires, seats, floor, and foot pedals.
When the Environmental Assessment Command Center (EACC) is activated and takes control of monitoring teams, begin reporting offsite surveys to the EACC.
J.
Upon relief or upon completion of monitoring duties, team members shall frisk themselves in a low background area and frisk the tires, seats, floor, and foot pedals.
If any of the above are found to be greater than 100 CPM above background, inform the RAC/EACC and ask for instructions.
If any of the above are found to be greater than 100 CPM above background, inform the RAC/EACC and ask for instructions.
Recommend to the RAC/EACC that the team be scheduled for a whole body count.
Recommend to the RAC/EACC that the team be scheduled for a whole body count.
K.           If requested by the RAC/EACC, initiate an RWP to cover the duties performed as a monitoring team at the completion of monitoring team activities (if not already done).
K.
5.3 Additional Actions for Environmental Monitoring Teams A.         Determine from the EACC the types of samples to be collected. The EACC shall also determine the location and frequency of collection.
If requested by the RAC/EACC, initiate an RWP to cover the duties performed as a monitoring team at the completion of monitoring team activities (if not already done).
B.         Collect and label all samples in accordance with environmental sampling procedures.
5.3 Additional Actions for Environmental Monitoring Teams A.
Determine from the EACC the types of samples to be collected. The EACC shall also determine the location and frequency of collection.
B.
Collect and label all samples in accordance with environmental sampling procedures.
NOTE Plastic disposable gloves shall be worn during the sample collection process.
NOTE Plastic disposable gloves shall be worn during the sample collection process.
C.         Return all samples to the EACC (or other location as specified by the EAC) for analysis and retention.
C.
Return all samples to the EACC (or other location as specified by the EAC) for analysis and retention.
7
7


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.10 le                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 le Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                 12 5.4   Final Conditions INITIALS A.         Radiological/Environmental monitoring has been completed and all samples submitted for analysis/retention as directed by the RAC/EACC.
Onsite/Offsite Radiological/Environmental Monitoring 12 5.4 Final Conditions INITIALS A.
B.         Field monitoring equipment has been returned to the location specified by the RAC/EACC.
Radiological/Environmental monitoring has been completed and all samples submitted for analysis/retention as directed by the RAC/EACC.
C.         If field team members have taken thyroid blocking agent, they should contact company designated medical personnel to determine how long they should continue to take it.
B.
Field monitoring equipment has been returned to the location specified by the RAC/EACC.
C.
If field team members have taken thyroid blocking agent, they should contact company designated medical personnel to determine how long they should continue to take it.  


==6.0     REFERENCES==
==6.0 REFERENCES==
6.1 6510-PLN-4520.01, Radiological/Environmental Monitoring Program Plan 7.0 EXHIBITS 7.1 Exhibit 1, Radiation Surveys 7.2 Exhibit 2, Radioiodine and Particulate Air Samples 7.3 Exhibit 3, Noble Gas Air Samples 7.4 Exhibit 4, Contamination Surveys 7.5 Exhibit 5, Radiation/Air/Smear Sample Log 7.6 Exhibit 6, Individual Dose Log 7.7 Exhibit 7, Major Activities Log 7.8 Exhibit 8, Important Telephone Numbers 7.9 Exhibit 9, Field Team Thyroid Blocking Agent Administration Form 7.10 Exhibit 10, Field Team Radio Operating Guidelines 8


6.1    6510-PLN-4520.01, Radiological/Environmental Monitoring Program Plan 7.0    EXHIBITS 7.1    Exhibit 1, Radiation Surveys 7.2    Exhibit 2, Radioiodine and Particulate Air Samples 7.3    Exhibit 3, Noble Gas Air Samples 7.4    Exhibit 4, Contamination Surveys 7.5    Exhibit 5, Radiation/Air/Smear Sample Log 7.6    Exhibit 6, Individual Dose Log 7.7    Exhibit 7, Major Activities Log 7.8    Exhibit 8, Important Telephone Numbers 7.9    Exhibit 9, Field Team Thyroid Blocking Agent Administration Form 7.10  Exhibit 10, Field Team Radio Operating Guidelines 8
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tle Revision No.
 
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT I Page 1 of 2 Radiation Surveys To perform radiation surveys:
Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.10 tle                                                                                           Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                       12 EXHIBIT I                                         Page 1 of 2 Radiation Surveys To perform radiation surveys:
NOTE Sections A & B below should be implemented as needed based on direction from the RAC/EACC. These sections can be repeated as needed.
NOTE Sections A & B below should be implemented as needed based on direction from the RAC/EACC. These sections can be repeated as needed.
A.     Plume centerline scans:
A.
: 1.     General Guidance:
Plume centerline scans:
* Scanning is most effective when the team slowly travels across the plume at approximately a 900 angle to the wind direction.
: 1.
* Scanning should be performed with a frisker or a survey instrument. If a survey instrument is used, the probe window should be open.
General Guidance:
* In inclement weather, the instrument probe should be covered with a surgeon's glove or plastic bag to keep it dry.
Scanning is most effective when the team slowly travels across the plume at approximately a 900 angle to the wind direction.
: 2.     Ask the RAC/EACC to specify a start and stop point for scanning. If the RAC/EACC provides no direction, consult the map and choose a route which runs as nearly perpendicular as possible to the expected plume direction.
Scanning should be performed with a frisker or a survey instrument. If a survey instrument is used, the probe window should be open.
: 3.     Proceed to the start point with the survey instrument/frisker turned on.
In inclement weather, the instrument probe should be covered with a surgeon's glove or plastic bag to keep it dry.
: 4.     Scan by driving slowly (- 15 m.p.h.) while holding the instrument probe outside the vehicle.
: 2.
: 5.     Locate the point where the instrument reading is highest.
Ask the RAC/EACC to specify a start and stop point for scanning. If the RAC/EACC provides no direction, consult the map and choose a route which runs as nearly perpendicular as possible to the expected plume direction.
5.1       Scan until the reading rises and then begins to decrease.
: 3.
5.2       Reverse direction and return to the location where the maximum reading was obtained.
Proceed to the start point with the survey instrument/frisker turned on.
5.3         If the maximum reading persists for a definite distance (i.e., a tenth mile or greater), find the approximate midpoint of that distance.
: 4.
: 6.     Report the plume centerline location and maximum reading to the RAC/EACC. When reporting the location, give any landmarks which may help fix your location on a map (e.g., intersections, public buildings, streams, etc.).
Scan by driving slowly (- 15 m.p.h.) while holding the instrument probe outside the vehicle.
: 7.       Perform a stationary survey as described below unless directed otherwise by the RAC/EACC.
: 5.
Locate the point where the instrument reading is highest.
5.1 Scan until the reading rises and then begins to decrease.
5.2 Reverse direction and return to the location where the maximum reading was obtained.
5.3 If the maximum reading persists for a definite distance (i.e., a tenth mile or greater), find the approximate midpoint of that distance.
: 6.
Report the plume centerline location and maximum reading to the RAC/EACC. When reporting the location, give any landmarks which may help fix your location on a map (e.g., intersections, public buildings, streams, etc.).
: 7.
Perform a stationary survey as described below unless directed otherwise by the RAC/EACC.
9
9


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.10 tie                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                 12 EXHIBIT I                                   Page 2 of 2 B. Stationary Surveys:
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT I Page 2 of 2 B.
: 1.     Ensure the probe window is closed and hold the instrument probe at waist level while standing outside the vehicle.
Stationary Surveys:
* In inclement weather, the instrument probe should be covered with a surgeon's glove or plastic bag to keep it dry.
: 1.
: 2.     Obtain a reading by observing the instrument's needle for several seconds.
Ensure the probe window is closed and hold the instrument probe at waist level while standing outside the vehicle.
* Mentally average the needle fluctuations to arrive at an average reading.
In inclement weather, the instrument probe should be covered with a surgeon's glove or plastic bag to keep it dry.
: 3.     Obtain 3 readings per Step 2 above over a five minute period unless directed otherwise by the RAC/EACC.
: 2.
: 4.     Record the following in Exhibit 5.
Obtain a reading by observing the instrument's needle for several seconds.
4.1       Record the 3 readings obtained per Step 3. If only 1 reading was taken, record it as "Reading 1".
Mentally average the needle fluctuations to arrive at an average reading.
4.2       If 3 readings were taken, average them and record the average.
: 3.
4.3       Record the date, time and location of the reading(s).
Obtain 3 readings per Step 2 above over a five minute period unless directed otherwise by the RAC/EACC.
: 5.       Obtain one reading with the probe window open.
: 4.
5.1       Record the reading (in mR/hr) in Exhibit 5.
Record the following in Exhibit 5.
: 6.       Report the location, time, average closed window reading and open window reading to the RAC/EACC.
4.1 Record the 3 readings obtained per Step 3. If only 1 reading was taken, record it as "Reading 1".
4.2 If 3 readings were taken, average them and record the average.
4.3 Record the date, time and location of the reading(s).
: 5.
Obtain one reading with the probe window open.
5.1 Record the reading (in mR/hr) in Exhibit 5.
: 6.
Report the location, time, average closed window reading and open window reading to the RAC/EACC.
10
10


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.10 tie                                                                                             Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                           12 EXHIBIT 2                                       Page 1 of 4 Radioiodine And Particulate Air Samples To perform air samples for Iodine and/or Particulate:
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 2 Page 1 of 4 Radioiodine And Particulate Air Samples To perform air samples for Iodine and/or Particulate:
NOTE If possible, load the air sampler with the Silver Zeolite cartridge and particulate filter prior to entering the plume.
NOTE If possible, load the air sampler with the Silver Zeolite cartridge and particulate filter prior to entering the plume.
: 1.     Unscrew the filter and cartridge holder rings from the air sampler head and install a new Silver Zeolite cartridge and particulate filter.
: 1.
1.1     Ensure that the arrow on the side of the Silver Zeolite cartridge points toward the air sampler.
Unscrew the filter and cartridge holder rings from the air sampler head and install a new Silver Zeolite cartridge and particulate filter.
1.2     Ensure that the particulate filter is installed such that the side of the filter which has a fibrous appearance is closest to the Silver Zeolite cartridge.
1.1 Ensure that the arrow on the side of the Silver Zeolite cartridge points toward the air sampler.
1.3     Reassemble the air sampler head.
1.2 Ensure that the particulate filter is installed such that the side of the filter which has a fibrous appearance is closest to the Silver Zeolite cartridge.
1.3 Reassemble the air sampler head.
NOTE The sampler flow rate, measure with both a particulate filter and a Silver Zeolite cartridge in place, is written on the air sampler's calibration sticker. The Silver Zeolite cartridge must be in place to ensure obtaining calibrated air flow rate even if an iodine sample has not been requested and the cartridge will not be analyzed in the field.
NOTE The sampler flow rate, measure with both a particulate filter and a Silver Zeolite cartridge in place, is written on the air sampler's calibration sticker. The Silver Zeolite cartridge must be in place to ensure obtaining calibrated air flow rate even if an iodine sample has not been requested and the cartridge will not be analyzed in the field.
: 2.     Ensure the following prerequisites and precautions are met:
: 2.
* The air sampler shall be placed outside the vehicle or in an open vehicle door or window.
Ensure the following prerequisites and precautions are met:
* Do not place the sampler on the ground or on known contaminated surfaces.
The air sampler shall be placed outside the vehicle or in an open vehicle door or window.
* Keep the sampler away from vehicle exhaust gases.
Do not place the sampler on the ground or on known contaminated surfaces.
* Protect the sampler from rain and snow.
Keep the sampler away from vehicle exhaust gases.
* All samples shall be labeled and saved for further analysis.
Protect the sampler from rain and snow.
* Do not point the air sampler inlet toward any object which may restrict sampler air flow.
All samples shall be labeled and saved for further analysis.
* Do not stand directly in front of the sampler inlet when the sampler is running or allow loose clothing to restrict airflow.
Do not point the air sampler inlet toward any object which may restrict sampler air flow.
Do not stand directly in front of the sampler inlet when the sampler is running or allow loose clothing to restrict airflow.
11
11


Number TMI - Unit 1 Emergency Plan Implementing Document                 EPIP-TMI-.10
TMI - Unit 1 Emergency Plan Implementing Document
'tie                                                                                               Revision No.
'tie Onsite/Offsite Radiological/Environmental Monitoring EXHIBIT 2 Number EPIP-TMI-.10 Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                             12 EXHIBIT 2                           Page 2 of 4
12 Page 2 of 4
: 3. Using the sampler's self timer (or a stopwatch or wristwatch if the sampler is not so equipped) draw a 300 liter (approximately) air sample.
: 3.
3.1       Use the table below and the sampler's posted flow rate to determine sampler run time. Sampler's with adjustable flow rate should be set to the highest flowrate possible not to exceed 50 Ipm (1.8 cfm) and run for approximate time according to the table below.
Using the sampler's self timer (or a stopwatch or wristwatch if the sampler is not so equipped) draw a 300 liter (approximately) air sample.
Posted or Set Flow Rate                                             Sampler Run Time
3.1 Use the table below and the sampler's posted flow rate to determine sampler run time. Sampler's with adjustable flow rate should be set to the highest flowrate possible not to exceed 50 Ipm (1.8 cfm) and run for approximate time according to the table below.
                > 19.< 21 ........................................................ 15 m inutes
Posted or Set Flow Rate Sampler Run Time
                &#x17d; 21 < 25 ........................................................ 13 m inutes
> 19.< 21........................................................
                >25 < 29 Ipm ................................................. 11 m inutes
15 m inutes  
                &#x17d; 29 < 32 Ipm ................................................. 10 m inutes
&#x17d; 21 < 25........................................................
_32 < 36 Ipm ................................................. 9 minutes
13 m inutes  
                > 36 < 40 Ipm ................................................. 8 minutes
>25 < 29 Ipm.................................................
                > 40 < 46 Ipm ................................................. 7 m inutes
11 m inutes  
_46 < 50 Ipm ................................................. 6 minutes NOTE The RAC/EACC or their designee may direct that sampler run time be shortened to reduce time spent in the plume or to reduce the "lead time" in obtaining sample results or lengthened to provide better sensitivity in low concentration areas.
&#x17d; 29 < 32 Ipm.................................................
: 4. Fill out an air sample label with date, time, your name, location, air sampler run time, and air sampler flow rate.
10 m inutes
4.1       Also record this data on Exhibit 5.
_32 < 36 Ipm.................................................
: 5. To evaluate the Silver Zeolite cartridge in the field, perform the following steps:
9 minutes  
5.1       Obtain a general area background count rate with the E140N/HP260 pancake probe at approximately waist level.
> 36 < 40 Ipm.................................................
5.1.1     If the background is more than 200 cpm move to a location where background is acceptable (i.e. < 200) and proceed with Step 5.2.
8 minutes  
5.1.2     If background is 200 cpm or less, go to Step 5.3.
> 40 < 46 Ipm.................................................
7 m inutes
_46 < 50 Ipm.................................................
6 minutes
: 4.
Fill out an air sample label with date, time, your name, location, air sampler run time, and air sampler flow rate.
4.1 Also record this data on Exhibit 5.
: 5.
To evaluate the Silver Zeolite cartridge in the field, perform the following steps:
5.1 Obtain a general area background count rate with the E140N/HP260 pancake probe at approximately waist level.
5.1.1 If the background is more than 200 cpm move to a location where background is acceptable (i.e. < 200) and proceed with Step 5.2.
5.1.2 If background is 200 cpm or less, go to Step 5.3.
NOTE If you cannot find an area where background is _ 200 cpm, ask the RAC/EACC for advice.
NOTE If you cannot find an area where background is _ 200 cpm, ask the RAC/EACC for advice.
5.2       At the low background area run the air sampler for approximately 3 seconds to flush the cartridge.
5.2 At the low background area run the air sampler for approximately 3 seconds to flush the cartridge.
12
12 NOTE The RAC/EACC or their designee may direct that sampler run time be shortened to reduce time spent in the plume or to reduce the "lead time" in obtaining sample results or lengthened to provide better sensitivity in low concentration areas.


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.10 le                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 le Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                     12 EXHIBIT 2                                   Page 3 of 4 5.3     Record the background count rate at the sample counting location on the sample label and on Exhibit 5.
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 2 Page 3 of 4 5.3 Record the background count rate at the sample counting location on the sample label and on Exhibit 5.
5.4     Remove the cartridge from the sampler head and place it in a ziplock bag.
5.4 Remove the cartridge from the sampler head and place it in a ziplock bag.
NOTE Surgeons gloves should be used if the cartridge must be handled and contamination is expected.
NOTE Surgeons gloves should be used if the cartridge must be handled and contamination is expected.
5.5     Count both sides of the Silver Zeolite cartridge through the ziplock bag.
5.5 Count both sides of the Silver Zeolite cartridge through the ziplock bag.
5.5.1       Record the higher count rate as "gross cpm" on the sample label and on Exhibit 5.
5.5.1 Record the higher count rate as "gross cpm" on the sample label and on Exhibit 5.
5.6     Subtract the background cpm from the gross cpm and record the result as "Net Cpm" on the sample label and on Exhibit 5.
5.6 Subtract the background cpm from the gross cpm and record the result as "Net Cpm" on the sample label and on Exhibit 5.
5.7     Place the sample label in the ziplock bag and retain the sample for later analysis.
5.7 Place the sample label in the ziplock bag and retain the sample for later analysis.
: 6. To evaluate a particulate filter in the field, perform the following steps:
: 6.
6.1     Obtain a general area background count rate with the E140N/HP-260 pancake probe at approximately waist level.
To evaluate a particulate filter in the field, perform the following steps:
6.2     If the background count rate is more than 200 cpm move to a location where background is acceptable (i.e. < 200 cpm).
6.1 Obtain a general area background count rate with the E140N/HP-260 pancake probe at approximately waist level.
NOTE If you cannot find an area where the background is _<200 cpm, ask the RAC/EACC for advice.
6.2 If the background count rate is more than 200 cpm move to a location where background is acceptable (i.e. < 200 cpm).
6.3     Unscrew the filter holder section of the sampler head from the silver zeolite cartridge holder section such that the particulate filter is held in place in the removed section.
NOTE If you cannot find an area where the background is _< 200 cpm, ask the RAC/EACC for advice.
6.4     Obtain a gross count rate on the particulate filter by holding the collection side of the filter holder against the HP-260 pancake probe.
6.3 Unscrew the filter holder section of the sampler head from the silver zeolite cartridge holder section such that the particulate filter is held in place in the removed section.
6.5     Record the count rate as gross CPM on the sample label and on Exhibit 5.
6.4 Obtain a gross count rate on the particulate filter by holding the collection side of the filter holder against the HP-260 pancake probe.
6.6     Unscrew the retainer ring from the filter holder and, using tweezers, remove the filter from the holder.
6.5 Record the count rate as gross CPM on the sample label and on Exhibit 5.
6.7     Place the filter in the coin envelope.
6.6 Unscrew the retainer ring from the filter holder and, using tweezers, remove the filter from the holder.
6.8     Place the coin envelope in a ziplock bag (if an iodine sample was taken, use the same ziplock bag).
6.7 Place the filter in the coin envelope.
6.8 Place the coin envelope in a ziplock bag (if an iodine sample was taken, use the same ziplock bag).
13
13


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.10 itle                                                                                         Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 itle Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                     12 EXHIBIT 2                                       Page 4 of 4 6.9   Reinstall the retainer ring onto the filter holder and re-count the filter holder without the particulate filter in place.
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 2 Page 4 of 4 6.9 Reinstall the retainer ring onto the filter holder and re-count the filter holder without the particulate filter in place.
6.9.1       Enter this count rate as Background CPM on the sample label and on Exhibit 5.
6.9.1 Enter this count rate as Background CPM on the sample label and on Exhibit 5.
6.10   Subtract Background CPM from Gross CPM and record the results as NET CPM on the sample label and on Exhibit 5.
6.10 Subtract Background CPM from Gross CPM and record the results as NET CPM on the sample label and on Exhibit 5.
6.11   Place the sample label in the ziplock bag and retain the sample for later analysis.
6.11 Place the sample label in the ziplock bag and retain the sample for later analysis.
6.12   Report the following information from the sample label to the RAC/EACC:
6.12 Report the following information from the sample label to the RAC/EACC:
* Location
Location Sample time Net cpm for both silver zeolite cartridge and particulate filter Run time Flow rate 14
* Sample time
* Net cpm for both silver zeolite cartridge and particulate filter
* Run time
* Flow rate 14


Number TMI - Unit 1 Emergency Plan Implementing Document                             EPIP-TMI-.10 tie                                                                                             Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                           12 EXHIBIT 3                                         Page 1 of 1 Noble Gas Air Samples To obtain noble gas air samples when directed by the RAC/EACC, proceed with Step 1 below:
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 3 Page 1 of 1 Noble Gas Air Samples To obtain noble gas air samples when directed by the RAC/EACC, proceed with Step 1 below:
: 1.     Fill (or obtain a prefilled) clean container (500 ml [0.5 liter] or larger bottle or marinelli beaker) with clean water (i.e., not affected by plant release) (this can be done before going into the field).
: 1.
Fill (or obtain a prefilled) clean container (500 ml [0.5 liter] or larger bottle or marinelli beaker) with clean water (i.e., not affected by plant release) (this can be done before going into the field).
NOTE Field monitoring kit contains water filled plastic bottles for noble gas sampling.
NOTE Field monitoring kit contains water filled plastic bottles for noble gas sampling.
: 2.     When a sample is needed:
: 2.
2.1       Stand well away from vehicles or other obstructions.
When a sample is needed:
2.2       Pour the water from the container.
2.1 Stand well away from vehicles or other obstructions.
2.3       Cap or close the container.
2.2 Pour the water from the container.
: 3.     Label the sample container with the date/time of collection, and location.
2.3 Cap or close the container.
: 3.
Label the sample container with the date/time of collection, and location.
Record the same information on Exhibit 5.
Record the same information on Exhibit 5.
15
15


Number TMI - Unit 1 Emergency Plan Implementing Document                     EPIP-TMI-.10 Ue                                                                                   Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 Ue Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                 12 EXHIBIT 4                                   Page 1 of 1 Contamination Surveys To perform contamination surveys (if directed by the RAC/EACC):
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 4 Page 1 of 1 Contamination Surveys To perform contamination surveys (if directed by the RAC/EACC):
: 1.     Obtain smears and coin envelopes from the emergency kit, label envelope with date, time and location.
: 1.
: 2.     Wipe the smear over a 100 cm2 area (4" x 4" area).
Obtain smears and coin envelopes from the emergency kit, label envelope with date, time and location.
: 3.     Count the background with the E140N w/HP-260 probe (or equiv.).
: 2.
: 4.     If background is greater than 200 cpm:
Wipe the smear over a 100 cm2 area (4" x 4" area).
4-1     Move to a location where background is _ 200 cpm.
: 3.
4.2     Re-count background and the smear.
Count the background with the E140N w/HP-260 probe (or equiv.).
: 4.
If background is greater than 200 cpm:
4-1 Move to a location where background is _ 200 cpm.
4.2 Re-count background and the smear.
NOTE If you cannot find an area where the background is _ 200 cpm, ask the RAC/EACC for advice.
NOTE If you cannot find an area where the background is _ 200 cpm, ask the RAC/EACC for advice.
Count the smear with the E140N w/HP-260 probe (or equiv.).
Count the smear with the E140N w/HP-260 probe (or equiv.).
: 6.     Enter gross cpm and Bkg. cpm in Exhibit 5.
: 6.
: 7.     Subtract Bkg. cpm from gross cpm to obtain net cpm.
Enter gross cpm and Bkg. cpm in Exhibit 5.
: 8.     Enter net cpm on Exhibit 5.
: 7.
: 9.     Report location, time and net cpm for each smear to the RAC/EACC.
Subtract Bkg. cpm from gross cpm to obtain net cpm.
: 10. Save smears in coin envelope for later analysis as directed by the RAC/EACC.
: 8.
Enter net cpm on Exhibit 5.
: 9.
Report location, time and net cpm for each smear to the RAC/EACC.
: 10.
Save smears in coin envelope for later analysis as directed by the RAC/EACC.
16
16


EPIP-TMI-.10 EXHIBIT 5                                  Revision 12 Page 1 of 1 Radiation/Air/Smear Sample Log                          Date_
EXHIBIT 5 Radiation/Air/Smear Sample Log EPIP-TMI-.10 Revision 12 Page 1 of 1 Date_
Note: Report only the data in the bold outlined boxes to the RAC/EACC Open Window
Note: Report only the data in the bold outlined boxes to the RAC/EACC Open Window
* Closed Window E520 (mR/hr) or Frisker (cpm)
* Closed Window E520 (mR/hr) or Frisker (cpm)
Location         Time     E520 (mR/hr)         Reading 1     Reading 2     Reading 3             Average Air Sampler Run           Flow Time     Sample Type       Gross CPM       Bkg CPM       Net CPM         Time           Rate Iodine Particulate Smear Noble Gas Open Window
Location Time E520 (mR/hr)
Reading 1 Reading 2 Reading 3 Average Air Sampler Run Flow Time Sample Type Gross CPM Bkg CPM Net CPM Time Rate Iodine Particulate Smear Noble Gas Open Window
* Closed Window E520 (mR/hr) or Frisker (cpm)
* Closed Window E520 (mR/hr) or Frisker (cpm)
Location         Time     E520 (mR/hr)         Reading I1     Reading 2::   Reading 3   1Average
Location Time E520 (mR/hr)
                -      i Air Sampler IIodine Run          Flow Time      Sample Type       Gross CPM       Bkg CPM       Net CPM         Time           Rate Pa rticu late Smear
Reading I1 Reading 2::
                -                          I                            U Noble Gas a -
Reading 3 1Average Sample Type Gross CPM Bkg CPM Net CPM Run Time Air Sampler Flow Rate IIodine Pa rticu late Smear Survey Meter Type_
Survey Meter Type_                                     Serial No.                   Cal. Due Air Sampler Type                                      Serial No.                   Cal. Due Counting Inst. Type                                    Serial No.                   Cal. Due Technician Under normal circumstances, open window readings taken with the E-520 are recorded in cpm, however, during emergencies the mR/hr scale shall be used to permit the RAC/EACC to more easily compare the relative magnitudes of open window and closed window readings.
Air Sampler Type Counting Inst. Type Technician Serial No.
17
Cal.
Serial No.
Cal.
Serial No.
Cal.
Under normal circumstances, open window readings taken with the E-520 are recorded in cpm, however, during emergencies the mR/hr scale shall be used to permit the RAC/EACC to more easily compare the relative magnitudes of open window and closed window readings.
17 i
Time

I U
Noble Gas a -

Due Due Due


EPIP-TMI-.10 Revision 12 EXHIBIT 6                                        Page 1 of 2 INDIVIDUAL DOSE LOG Date:
EXHIBIT 6 INDIVIDUAL DOSE LOG EPIP-TMI-.10 Revision 12 Page 1 of 2 Date:
NAME (PRINT)                         SOC. SEC. #         YTD TOTAL WHOLE BODY DOSE (TEDE) (A)
NAME (PRINT)
SOC. SEC. #
YTD TOTAL WHOLE BODY DOSE (TEDE) (A)
APPROX.
APPROX.
INTERNAL         APPROX.
INTERNAL APPROX.
ENDING   EXTERNAL       APPROX.     WHOLE BODY         TOTAL       TOTAL BEGINNING               SRPD/ESRD WHOLE BODY THYROID         (CEDE) FROM WHOLE BODY THYROID SRPD/ESRD               READING   DOSE (DDE)     DOSE (CDE) IODINE           DOSE (TEDE) DOSE (CDE)
ENDING EXTERNAL APPROX.
START TIME READING (B)   STOP TIME     (C)         (D)           (E)*         (F)*             (G)           (H)
WHOLE BODY TOTAL TOTAL BEGINNING SRPD/ESRD WHOLE BODY THYROID (CEDE) FROM WHOLE BODY THYROID SRPD/ESRD READING DOSE (DDE)
(Cl-B1)                                   (A+DI+Fl)         (El) 2                                                  (C2-B2)                                 (Gl+D2+F2)       (Hl+E2) 3                                                  (C3-B3)                                 (G2+D3+F3)       (H2+E3) 4                                                  (C4-B4)                                 (G3+D4+F4)       (H3+E4) 5                                                  (C5-B5)                                 (G4+D5+F5)       (H4+E5) 6                                                  (C6-B6)                                 (G5+D6+F6)       (H5+E6)
DOSE (CDE) IODINE DOSE (TEDE) DOSE (CDE)
NAME (PRINT)                         SOC. SEC. #       YTD TOTAL WHOLE BODY DOSE (TEDE) (A)
START TIME READING (B)
STOP TIME (C)
(D)
(E)*
(F)*
(G)
(H)
(Cl-B1)
(A+DI+Fl)
(El)
(C2-B2)
(Gl+D2+F2)
(Hl+E2)
(C3-B3)
(G2+D3+F3)
(H2+E3)
(C4-B4)
(G3+D4+F4)
(H3+E4)
(C5-B5)
(G4+D5+F5)
(H4+E5)
(C6-B6)
(G5+D6+F6)
(H5+E6)
NAME (PRINT)
SOC. SEC. #
YTD TOTAL WHOLE BODY DOSE (TEDE) (A)
APPROX.
APPROX.
INTERNAL         APPROX.         TOTAL ENDING   EXTERNAL       APPROX. WHOLE BODY       TOTAL           THYROID BEGINNING               SRPD/ESR WHOLE BODY THYROID           (CEDE) FROM       WHOLE BODY     DOSE START TIME SRPD/ESRD     STOP TIME D READING DOSE (DDE)     DOSE (CDE) IODINE             DOSE (TEDE)   (CDE)
INTERNAL APPROX.
READING (B)                 (C)         (D),           (E)*         (F)*               (G)         (H) 1                                                    (C1-B1)                                     (A+DI+F1)       (El) 2                                                  (C2-B2)                                     (Gl+D2+F2)     (HI+E2) 3                                                  (C3-B3)                                     (G2+D3+F3)     (H2+E3) 4                                                  (C4-B4)                                     (G3+D4+F4)     (H3+E4) 5                                                  (C5-B5)                                     (G4+D5+F5)     (H4+E5) 6                                                  (C6-B6)                                     (G5+D6+F6)     (H5+E6)
TOTAL ENDING EXTERNAL APPROX.
* See for estimation method next page 18
WHOLE BODY TOTAL THYROID BEGINNING SRPD/ESR WHOLE BODY THYROID (CEDE) FROM WHOLE BODY DOSE START TIME SRPD/ESRD STOP TIME D READING DOSE (DDE)
DOSE (CDE) IODINE DOSE (TEDE) (CDE)
READING (B)
(C)
(D),
(E)*
(F)*
(G)
(H)
(C1-B1)
(A+DI+F1)
(El)
(C2-B2)
(Gl+D2+F2)
(HI+E2)
(C3-B3)
(G2+D3+F3)
(H2+E3)
(C4-B4)
(G3+D4+F4)
(H3+E4)
(C5-B5)
(G4+D5+F5)
(H4+E5)
(C6-B6)
(G5+D6+F6)
(H5+E6)
* See for estimation method next page 18 2
3 4
5 6
1 2
3 4
5 6


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.10 tie                                                                                          Revision No.
TMI - Unit 1 Emergency Plan Implementing Document tie Onsite/Offsite Radiological/Environmental Monitoring EXHIBIT 6 Number EPIP-TMI-.10 Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                      12 EXHIBIT 6                                    Page 2 of 2 NOTE Notify the RAC/EACC when any team member approaches either of the following:
12 Page 2 of 2 A rough approximation of the iodine derived air concentration (DAC), thyroid dose (CDE) and internal whole body dose (CEDE) can be obtained using the following relationship:
4 REM Year-to-Date Total Whole Body Dose (TEDE).
25 REM Thyroid Dose (CDE) dudnnq this event.
A rough approximation of the iodine derived air concentration (DAC), thyroid dose (CDE) and internal whole body dose (CEDE) can be obtained using the following relationship:
Every 1000 net cpm on the silver zeolite cartridge equals roughly:
Every 1000 net cpm on the silver zeolite cartridge equals roughly:
20 DAC Iodine, 500 mREM/hr Thyroid Dose (CDE) and 15 mREM/hr Internal Whole Body Dose (CEDE)
20 DAC Iodine, 500 mREM/hr Thyroid Dose (CDE) and 15 mREM/hr Internal Whole Body Dose (CEDE)
For example: 5000 net cpm on the cartridge would roughly equal: 100 DAC Iodine, 2500 mREM/hr CDE and 75 mRERM/hr CEDE.
For example: 5000 net cpm on the cartridge would roughly equal: 100 DAC Iodine, 2500 mREM/hr CDE and 75 mRERM/hr CEDE.
19 NOTE Notify the RAC/EACC when any team member approaches either of the following:
4 REM Year-to-Date Total Whole Body Dose (TEDE).
25 REM Thyroid Dose (CDE) dudnnq this event.
NOTE
NOTE
: 1.       This information is intended for field team use only and not for making dose projections for the public.
: 1.
: 2.       The relationships shown above are valid only if the sampler run times specified in the sampling instructions are followed.
This information is intended for field team use only and not for making dose projections for the public.
: 3.       The relationships are based on conservative assumptions (e.g. all iodine is 1131 ) and will in most cases overestimate the field team's dose. More refined estimates can be obtained from the RAC or EACC.
: 2.
19
The relationships shown above are valid only if the sampler run times specified in the sampling instructions are followed.
: 3.
The relationships are based on conservative assumptions (e.g. all iodine is 1131 ) and will in most cases overestimate the field team's dose. More refined estimates can be obtained from the RAC or EACC.


Number TMI - Unit 1 Emergency Plan Implementing Document       EPIP-TMI-.10 Jie                                                           Revision No Onsite/Offsite Radiological/Environmental Monitoring                       12 EXHIBIT 7                 Page 1 of 1 Major Activities Log Date TIME           Major Activities/Remarks i
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 Jie Revision No Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 7 Page 1 of 1 Major Activities Log Date TIME Major Activities/Remarks 20 i
i 20
i


Number TMI - Unit 1 Emergency Plan Implementing Document                 EPIP-TMI-.1O tle                                                                                Revision No.
TMI - Unit 1 Emergency Plan Implementing Document tle Onsite/Offsite Radiological/Environmental Monitoring Number EPIP-TMI-.1O Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                              12 EXHIBIT 8                               Page 1 of 1 Important Telephone Numbers Location/Position                        Phone Number Control Room                      RAC                            948-8525 RAC                            944-0382 OPS Support Center    -          RCC/GR( CS       Cellular     948-8248 ext. 5444 948-8672 948-8833 Processing Center                Security                      948-8038 Warehouse 1                      Assembly Area                  948-8248 ext. 5500 Warehouse 2                      Assembly Area                  948-8248 ext. 5042 EACC                            EAC/Met-Dose                  540-4501 Coordinator EOF                              Group Leader R&EC              657-2097 Simulator (Drills Only) -        RAC                            948-2063 21
12 Control Room OPS Support Center -
Processing Center Warehouse 1 Warehouse 2 EACC EOF Simulator (Drills Only) -
Location/Position RAC RAC RCC/GR(
EXHIBIT 8 Important Telephone Numbers Phone Number 948-8525 944-0382 CS Cellular 948-8248 ext. 5444 Security Assembly Area Assembly Area EAC/Met-Dose Coordinator Group Leader R&EC RAC 948-8672 948-8833 948-8038 948-8248 ext. 5500 948-8248 ext. 5042 540-4501 657-2097 948-2063 21 Page 1 of 1


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.10 tie                                                                                         Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                       12 EXHIBIT 9                                 Page 1 of 2 Field Team Thyroid Blocking Agent Administration Form Instructions:
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 9 Page 1 of 2 Field Team Thyroid Blocking Agent Administration Form Instructions:
: 1.       Fill in the information below:
: 1.
Fill in the information below:
Field Team Member's Name:
Field Team Member's Name:
Last                                               First                 Middle Initial Social Security Number:
Last First Middle Initial Social Security Number:
Badge Number:
Badge Number:
Estimated Thyroid Dose (CDE):                 REM Name of the RAC/EACC who authorized use of thyroid blocking agent:
Estimated Thyroid Dose (CDE):
REM Name of the RAC/EACC who authorized use of thyroid blocking agent:
Date and time of authorization:
Date and time of authorization:
Read the Thyroid Blocking Agent Precautions (Page 2 of this exhibit).
Read the Thyroid Blocking Agent Precautions (Page 2 of this exhibit).
' 3.       Decide if you should and are willing to take Thyroid Blocking Agent.
: 3.
: 4.       Record your decision below and sign/date this form.
Decide if you should and are willing to take Thyroid Blocking Agent.
: 4.
Record your decision below and sign/date this form.
NOTE Although 10 CFR 20 allows up to 50 REM per year, EPA and FDA guidance recommend considering the use of thyroid blocking agent (KI) for acute exposures of 25 REM or greater (CDE) to the adult thyroid in order to maintain exposures As Low As Reasonably Achievable (ALARA).
NOTE Although 10 CFR 20 allows up to 50 REM per year, EPA and FDA guidance recommend considering the use of thyroid blocking agent (KI) for acute exposures of 25 REM or greater (CDE) to the adult thyroid in order to maintain exposures As Low As Reasonably Achievable (ALARA).
I verify that I have read and understand the information on the Thyroid Blocking Agent Precautions sheet and understand that taking thyroid blocking agent is voluntary.
I verify that I have read and understand the information on the Thyroid Blocking Agent Precautions sheet and understand that taking thyroid blocking agent is voluntary.
I also verify that I have no / have a (circle one) known allergy to iodine. If you have a known allergy to iodine you should not take thyroid blocking agent.
I also verify that I have no / have a (circle one) known allergy to iodine. If you have a known allergy to iodine you should not take thyroid blocking agent.
I accent / refuse (circle one) thyroid blocking agent.
I accent / refuse (circle one) thyroid blocking agent.
Signature of Team Member                                     Date
Signature of Team Member Date
: 5.       If you have decided to accept thyroid blocking agent:
: 5.
If you have decided to accept thyroid blocking agent:
Obtain thyroid blocking agent and drinking water from the field monitoring kit.
Obtain thyroid blocking agent and drinking water from the field monitoring kit.
Take the initial dose of one (1) tablet.
Take the initial dose of one (1) tablet.
Line 653: Line 869:
22
22


Number TMI - Unit I Emergency Plan Implementing Document                         EPIP-TMI-.10
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.10  
    .le                                                                                           Revision No.
.le Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                         12 EXHIBIT 9                                       Page 2 of 2 HOW POTASSIUM IODIDE WORKS Certain forms of iodine help your thyroid gland work right. Most people get the iodine they need from foods, like iodized salt or fish. The thyroid can "store" or hold only a certain amount of iodine.
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 9 Page 2 of 2 HOW POTASSIUM IODIDE WORKS Certain forms of iodine help your thyroid gland work right. Most people get the iodine they need from foods, like iodized salt or fish. The thyroid can "store" or hold only a certain amount of iodine.
In a radiation emergency, radioactive iodine may be released in the air. This material may be breathed or swallowed. It may enter the thyroid gland and damage it. The damage would probably not show itself for years.
In a radiation emergency, radioactive iodine may be released in the air. This material may be breathed or swallowed. It may enter the thyroid gland and damage it. The damage would probably not show itself for years.
Children are most likely to have thyroid damage.
Children are most likely to have thyroid damage.
If you take potassium.iodide, it will fill-up your thyroid gland with non-radioactive iodine. This reduces the chance that radioactive iodine will enter the thyroid gland.
If you take potassium.iodide, it will fill-up your thyroid gland with non-radioactive iodine. This reduces the chance that radioactive iodine will enter the thyroid gland.
WHO SHOULD NOT TAKE POTASSIUM IODIDE The only people who should not take potassium iodide are people who know they are allergic to iodide. You may take potassium iodide even if you are taking medicines for a thyroid problem (for example, a thyroid hormone or anti-thyroid drug). Pregnant and nursing women and babies and children may also take this drug.
WHO SHOULD NOT TAKE POTASSIUM IODIDE The only people who should not take potassium iodide are people who know they are allergic to iodide. You may take potassium iodide even if you are taking medicines for a thyroid problem (for example, a thyroid hormone or anti-thyroid drug). Pregnant and nursing women and babies and children may also take this drug.
HOW AND WHEN TO TAKE POTASSIUM IODIDE Potassium Iodide should be taken as soon as possible after proper authorization is received. You should take one
HOW AND WHEN TO TAKE POTASSIUM IODIDE Potassium Iodide should be taken as soon as possible after proper authorization is received. You should take one  
    )se every 24 hours. More will not help you because the thyroid can "hold" only limited amounts of iodine. Larger
)se every 24 hours. More will not help you because the thyroid can "hold" only limited amounts of iodine. Larger  
    ,)ses will increase the risk of side effects. You will probably be told not to take the drug for more than 10 days.
,)ses will increase the risk of side effects. You will probably be told not to take the drug for more than 10 days.  
>Contact company medical personnel to determine how long you should take potassium iodine.
>Contact company medical personnel to determine how long you should take potassium iodine.
SIDE EFFECTS Usually, side effects of potassium iodide happen when people take higher doses for a long time. You should be careful not to take more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low drug dose and the short time you will be taking the drug.
SIDE EFFECTS Usually, side effects of potassium iodide happen when people take higher doses for a long time. You should be careful not to take more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low drug dose and the short time you will be taking the drug.
Line 671: Line 887:
23
23


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.10 "itle                                                                                         Revision No.
TMI - Unit 1 Emergency Plan Number Implementing Document EPIP-TMI-.10 "itle Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                       12 EXHIBIT 10                                       Page 1 of 2 Field Team Radio Operating Guidelines NOTE The following sections provide guidance for operation of the field team portable radios. Individual sections can be implemented as needed.
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 10 Page 1 of 2 Field Team Radio Operating Guidelines NOTE The following sections provide guidance for operation of the field team portable radios. Individual sections can be implemented as needed.
To operate the portable radio:
To operate the portable radio:
A.       Turn on the portable radio by rotating the "power on-off/volume" knob clockwise. The radio will perform a "power up self test" and then display:
A.
Turn on the portable radio by rotating the "power on-off/volume" knob clockwise. The radio will perform a "power up self test" and then display:
Its unit number (e.g., "TMI P 1" is portable radio #1) and Either "EARS" or "CC SCAN" depending on whether the radio is receiving the system Control Channel signal (i.e., if "CC SCAN" appears, the radio is out of range or in a bad location).
Its unit number (e.g., "TMI P 1" is portable radio #1) and Either "EARS" or "CC SCAN" depending on whether the radio is receiving the system Control Channel signal (i.e., if "CC SCAN" appears, the radio is out of range or in a bad location).
B.       To transmit:
B.
To transmit:
Make sure that "EARS" is displayed on the front of the radio and then press the Push-To Talk (PTT) button (elongated button on the left side of the radio).
Make sure that "EARS" is displayed on the front of the radio and then press the Push-To Talk (PTT) button (elongated button on the left side of the radio).
* When the short medium pitch beep is heard, begin speaking.
When the short medium pitch beep is heard, begin speaking.
If a high pitch beep is heard when the PTT is pressed, the system is temporarily busy.
If a high pitch beep is heard when the PTT is pressed, the system is temporarily busy.
Don't release the PTT button - continue pressing it and wait for the short medium pitch peep before starting to speak. The delay should typically be not more than a few seconds.
Don't release the PTT button - continue pressing it and wait for the short medium pitch peep before starting to speak. The delay should typically be not more than a few seconds.
When speaking, hold the radio approximately 3 inches from the mouth and speak in a normal voice.
When speaking, hold the radio approximately 3 inches from the mouth and speak in a normal voice.
C.     Receiving:
C.
Receiving:
When a call is being received the calling station's identity is displayed in the upper line of the radio's display.
When a call is being received the calling station's identity is displayed in the upper line of the radio's display.
24
24


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.10 le                                                                                         Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 le Revision No.
Onsite/Offsite Radiological/Environmental Monitoring                                                     12 EXHIBIT 10                                     Page 2 of 2 D. System status beeps:
Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 10 Page 2 of 2 D.
System status beeps:
The radio will indicate system status by emitting any of several beeps:
The radio will indicate system status by emitting any of several beeps:
A short medium pitch beep indicates that the radio has begun to transmit and the user may begin speaking.
A short medium pitch beep indicates that the radio has begun to transmit and the user may begin speaking.
Line 693: Line 913:
If five short high pitch beeps are heard while transmitting, this indicates that the radio is approaching its 60 second transmission length limit. Unless the radio is un-keyed before the long low pitch beep is heard, the radio will stop transmitting and information will be missed. Long transmissions should be broken into several shorter transmissions to avoid this.
If five short high pitch beeps are heard while transmitting, this indicates that the radio is approaching its 60 second transmission length limit. Unless the radio is un-keyed before the long low pitch beep is heard, the radio will stop transmitting and information will be missed. Long transmissions should be broken into several shorter transmissions to avoid this.
A low pitch beep simultaneous with the appearance of a battery icon in the lower right corner of the display indicates that the battery voltage is low and the battery should be changed.
A low pitch beep simultaneous with the appearance of a battery icon in the lower right corner of the display indicates that the battery voltage is low and the battery should be changed.
E. To replace the battery pack:
E.
0         Turn the radio off.
To replace the battery pack:
* Depress the recessed button beside the belt clip on the rear of the radio and slide the battery toward the bottom of the radio.
0 Turn the radio off.
* Lift the battery up and away from the radio.
Depress the recessed button beside the belt clip on the rear of the radio and slide the battery toward the bottom of the radio.
0         To install a fresh battery pack: Align the tabs on the battery with the slots on the radio and slide the battery pack toward the top of the radio until it clicks.
Lift the battery up and away from the radio.
F. The channel selector knob and the buttons on the front panel of the radio serve no function and should not be manipulated.
0 To install a fresh battery pack: Align the tabs on the battery with the slots on the radio and slide the battery pack toward the top of the radio until it clicks.
F.
The channel selector knob and the buttons on the front panel of the radio serve no function and should not be manipulated.
25
25


FO         INFORMATION ONLY                               Number AmerGen                                                TMI - Unit 1 Emergency Plan Implementing Document                     EPIP-TMI-.27 Title                                                                               Revision No.
FO INFORMATION ONLY Number TMI - Unit 1 AmerGen Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.
Emergency Operations Facility                                                                       18 Applicability/Scope                                               USAGE LEVEL       Effective Date TMI Division                                                           I                 DEC       8 2000 This document is within QA plan scope     X   Yes           No Safety Reviews Required                   X   Yes           No List of Effective Pages Page           Revision    Page        Revision          Page      Revision      Page          Revision 1             18         21            18             41          18             61              18 2              18         22            18             42          18             62              18 3              18         23            18             43          18             63              18 4              18         24          18               44          18             64              18 5              18         25          18               45          18             65              18 6              18         26           18               46          18             66              18 7              18         27          18               47          18             67              18 8              18         28          18               48          18             68              18 9              18         29          18               49          18             69              18 10              18         30          18              50          18             70              18 11              18         31          18               51         18             71              18 12              18         32          18               52          18             72              18 13              18         33          18               53          18             73              18 14              18         34          18               54          18             74              18 15              18         35          18               55          18             75              18 16              18         36          18               56          18           76              18 18         37          18               57          18           77              18   S17 18             18         38          18               58          18           78              18 19              18         39          18               59          18           79              18 20              18         40          18               60          18           80              18 Procedure Owner                 /s/ N. Brown                                       12/05/00 Approver                         /s/ N. Brown                                       12/05/00 1
Emergency Operations Facility 18 Applicability/Scope USAGE LEVEL Effective Date TMI Division I
DEC 8 2000 This document is within QA plan scope X
Yes No Safety Reviews Required X
Yes No List of Effective Pages Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 S17 18 19 20 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Page 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Page 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Page 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Procedure Owner
/s/ N. Brown Approver  
/s/ N. Brown 12/05/00 12/05/00 1


FOR INFORMATION ONLY I Number TMI - Unit 1 Emergency Plan Implementing Document                 EPIP-TMI-.27 i
FOR INFORMATION ONLY I Number tie Emergency Operations Facility TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Revision No.
tie                                                            Revision No.
18 List of Effective Pages Revision Page 2
Emergency Operations Facility                                                18 List of Effective Pages Page  Revision   Page   Revision         Page Revision      Page         Revision 81    18 82    18 83    18 84    18 85    18 86    18 87    18 88    18 89    18 2
Revision Page Page 81 82 83 84 85 86 87 88 89 Revision 18 18 18 18 18 18 18 18 18 Page Revision i


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 tie                                                                                   Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.
Emergency Operations Facility                                                                         18 1.0   PURPOSE Provide guidelines for activation and operation of the Emergency Operations Facility (EOF).
Emergency Operations Facility 18 1.0 PURPOSE Provide guidelines for activation and operation of the Emergency Operations Facility (EOF).
2.0   APPLICABILITY/SCOPE This procedure shall apply to all TMI personnel assigned to the EOF during a Site Area Emergency, General Emergency or when EOF activation is required by the Emergency Director.
2.0 APPLICABILITY/SCOPE This procedure shall apply to all TMI personnel assigned to the EOF during a Site Area Emergency, General Emergency or when EOF activation is required by the Emergency Director.
3.0   DEFINITIONS None 4.0   RESPONSIBILITIES
3.0 DEFINITIONS None 4.0 RESPONSIBILITIES
: a.     Emergency Support Director- Exhibit 1,2, 3, 4, 5, 8 and 14
: a.
: b.     EOF Communications Coordinator - Exhibit 23 and 24
Emergency Support Director-Exhibit 1,2, 3, 4, 5, 8 and 14
: c.     Technical Support Representative - Exhibit 15 and 15A
: b.
: d.     Group Leader R & EC - Exhibit 17
EOF Communications Coordinator - Exhibit 23 and 24
: e.     Group Leader Adm. Support - Exhibit 6, 7, 7A, 20, 21 and 22
: c.
: f.     Public Information Rep. - Exhibit 12, 13 and 14
Technical Support Representative - Exhibit 15 and 15A
: g.     Environmental Assessment Coord. - Exhibit 18 0         Met/Dose Coordinator- Exhibit 18A and 18B
: d.
: h.     Emergency Support Director Asst. - Exhibit 10
Group Leader R & EC - Exhibit 17
: i.     Emergency Preparedness Rep. - Exhibit 9 and 9A 5.0   PROCEDURE
: e.
: a.     Personnel shall perform actions as specified in the appropriate exhibits as applicable for the level and severity of the emergency.
Group Leader Adm. Support - Exhibit 6, 7, 7A, 20, 21 and 22
: b.     Personnel shall respond to specific requests from the Emergency Response Organization management (e.g., ESD, Group Leaders, Coordinators)
: f.
Public Information Rep. - Exhibit 12, 13 and 14
: g.
Environmental Assessment Coord. - Exhibit 18 0
Met/Dose Coordinator-Exhibit 18A and 18B
: h.
Emergency Support Director Asst. - Exhibit 10
: i.
Emergency Preparedness Rep. - Exhibit 9 and 9A 5.0 PROCEDURE
: a.
Personnel shall perform actions as specified in the appropriate exhibits as applicable for the level and severity of the emergency.
: b.
Personnel shall respond to specific requests from the Emergency Response Organization management (e.g., ESD, Group Leaders, Coordinators)  


==6.0   REFERENCES==
==6.0 REFERENCES==
: a.     TMI Emergency Plan (AP 1092)
: a.
: b.     TMI Emergency Plan Implementing Documents 3
TMI Emergency Plan (AP 1092)
: b.
TMI Emergency Plan Implementing Documents 3


Number TMI - Unit I Emergency Plan Implementing Document                     EPIP-TMI-.27 le                                                                               Revision No.
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                   18 7.0 EXHIBITS 7.1   Exhibit 1, Emergency Support Director Checklist 7.2   Exhibit 2, Emergency Report Form - TMI 7.3   Exhibit 3, EAL descriptions for the Emergency Report Form 7.4   Exhibit 4, Emergency Director/Emergency Support Director Turnover Checklist 7.5   Exhibit 5, Emergency Support Director Emergency Briefing Sheet 7.6   Exhibit 6, EOF Access Control 7.7   Exhibit 7, TMI Access Authorization Checklist 7.7.1     Exhibit 7A, TMI Access Authorization 7.8   Exhibit 8, PAR Logic Diagram 7.9   Exhibit 9, Emergency Preparedness Representative Checklist 7.9.1     Exhibit 9A, Fitness For Duty instructions 7.10   Exhibit 10, Emergency Support Director Assistant Checklist 7.11   Exhibit 11, ESD Logkeeper Checklist 7.12   Exhibit 12, Public Information Representative - EOF Checklist 7.13   Exhibit 13, Press Release Guidance 7.14   Exhibit 14, Site Access For Media 7.15   Exhibit 15, Tech Support Representative Checklist 7.15.1     Exhibit 15A, Plant Process Computer Access Instructions 7.16   Exhibit 16, TMI / NRC Emergency Response Interface Criteria 7.17   Exhibit 17, Group Leader Radiological & Environmental Controls Checklist 7.18   Exhibit 18, Environmental Assessment Coordinator Checklist 7.18.1     Exhibit 18A, Met/Dose Coordinator Checklist 7.18.2     Exhibit 18B, Field Team Data Collection 7.19   Exhibit 19, RAC Line Communicator Checklist 7.20   Exhibit 20, Group Leader Admin Support Checklist 4
Emergency Operations Facility 18 7.0 EXHIBITS 7.1 Exhibit 1, Emergency Support Director Checklist 7.2 Exhibit 2, Emergency Report Form - TMI 7.3 Exhibit 3, EAL descriptions for the Emergency Report Form 7.4 Exhibit 4, Emergency Director/Emergency Support Director Turnover Checklist 7.5 Exhibit 5, Emergency Support Director Emergency Briefing Sheet 7.6 Exhibit 6, EOF Access Control 7.7 Exhibit 7, TMI Access Authorization Checklist 7.7.1 Exhibit 7A, TMI Access Authorization 7.8 Exhibit 8, PAR Logic Diagram 7.9 Exhibit 9, Emergency Preparedness Representative Checklist 7.9.1 Exhibit 9A, Fitness For Duty instructions 7.10 Exhibit 10, Emergency Support Director Assistant Checklist 7.11 Exhibit 11, ESD Logkeeper Checklist 7.12 Exhibit 12, Public Information Representative - EOF Checklist 7.13 Exhibit 13, Press Release Guidance 7.14 Exhibit 14, Site Access For Media 7.15 Exhibit 15, Tech Support Representative Checklist 7.15.1 Exhibit 15A, Plant Process Computer Access Instructions 7.16 Exhibit 16, TMI / NRC Emergency Response Interface Criteria 7.17 Exhibit 17, Group Leader Radiological & Environmental Controls Checklist 7.18 Exhibit 18, Environmental Assessment Coordinator Checklist 7.18.1 Exhibit 18A, Met/Dose Coordinator Checklist 7.18.2 Exhibit 18B, Field Team Data Collection 7.19 Exhibit 19, RAC Line Communicator Checklist 7.20 Exhibit 20, Group Leader Admin Support Checklist 4


Number TMI - Unit 1 Emergency Plan Implementing Document     EPIP-TMI-.27 le                                                                 Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                   18 7.21 Exhibit 21, Emergency Shift Schedule (Watch Bill) 7.22 Exhibit 22, EOF Setup for Monitoring and Decontamination 7.23 Exhibit 23, EOF Communications Coordinator Checklist 7.24 Exhibit 24, Offsite Notifications Checklist 5
Emergency Operations Facility 18 7.21 Exhibit 21, Emergency Shift Schedule (Watch Bill) 7.22 Exhibit 22, EOF Setup for Monitoring and Decontamination 7.23 Exhibit 23, EOF Communications Coordinator Checklist 7.24 Exhibit 24, Offsite Notifications Checklist 5


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 Itle                                                                                        Revision No.
Itle
"*'merqencv Operations Facility                                                                              18 EXHIBIT 1                                   Page 1 of 10 ESD Checklist I.     EOF ACTIVATION NOTE The following steps are presented in the sequence that is most likely to result in efficient activation of the EOF. Steps may be performed out of sequence as the situation requires. Steps that are not applicable for the present situation may be skipped but should be reconsidered as the situation changes.
"*'merqencv Operations Facility TMI - Unit 1 Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.
Initial 1.0     Activate the EOF NOTE The facility is considered activated when all portions of Step 1 are completed.
18 EXHIBIT 1 ESD Checklist Page 1 of 10 I.
: a.     Obtain a turnover from the Emergency Director (ED)
EOF ACTIVATION Initial 1.0 Activate the EOF NOTE The facility is considered activated when all portions of Step 1 are completed.
* Use the Emergency Director's Line, or altemate means
: a.
* Complete Exhibit 4 to document the turnover.
Obtain a turnover from the Emergency Director (ED)
: b.     Use the EOF intercom to brief personnel on plant conditions using Exhibit 5.
Use the Emergency Director's Line, or altemate means Complete Exhibit 4 to document the turnover.
* Include NRC and State representative(s), if available.
: b.
* Include State Representative(s), if available.
Use the EOF intercom to brief personnel on plant conditions using Exhibit 5.
: c.     Verify from the EP Rep. that the EOF response positions have been manned within one hour of notification.
Include NRC and State representative(s), if available.
: d. After the above steps have been completed, assume ESD responsibilities by performing the following:
Include State Representative(s), if available.
                  *_          Inform the Emergency Director (ED) that you have assumed the position of ESD and will take over responsibility for the following:
: c.
: a.           Approving and directing information releases to the media.
Verify from the EP Rep. that the EOF response positions have been manned within one hour of notification.
6
: d.
After the above steps have been completed, assume ESD responsibilities by performing the following:
Inform the Emergency Director (ED) that you have assumed the position of ESD and will take over responsibility for the following:
: a.
Approving and directing information releases to the media.
6 NOTE The following steps are presented in the sequence that is most likely to result in efficient activation of the EOF. Steps may be performed out of sequence as the situation requires. Steps that are not applicable for the present situation may be skipped but should be reconsidered as the situation changes.


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 tie                                                                                 Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.
Emergency Operations Facility                                                                     18.
Emergency Operations Facility
EXHIBIT I                                   Page 2 of 10
: 18.
: b.           Approving and, if possible, personally conveying appropriate Protective Action Recommendations to the Senior Official in the State EOC (Emergency Operations Center).
EXHIBIT I Page 2 of 10
: c.           Brief the NRC Site Team Leader and serve as the official point of contact for TMI for receiving NRC directives. This includes interfacing with the NRC regarding deviations from license conditions or technical specifications (10 CFR 50.54).
: b.
Approving and, if possible, personally conveying appropriate Protective Action Recommendations to the Senior Official in the State EOC (Emergency Operations Center).
: c.
Brief the NRC Site Team Leader and serve as the official point of contact for TMI for receiving NRC directives. This includes interfacing with the NRC regarding deviations from license conditions or technical specifications (10 CFR 50.54).
NOTE The ED will advise the ESD when such deviations are being planned and the technical organization will be used to the fullest extent possible.
NOTE The ED will advise the ESD when such deviations are being planned and the technical organization will be used to the fullest extent possible.
If the ED decides to transfer responsibility for "Approving and directing official notifications to offsite agencies", perform the following
If the ED decides to transfer responsibility for "Approving and directing official notifications to offsite agencies", perform the following
: a.           Log the decision in the ESD log
: a.
: b.           Direct the EOF Communications Coordinator to obtain a turnover from the communicator making notifications in the ECC.
Log the decision in the ESD log
_            Announce on the intercom that the EOF is operational 7
: b.
Direct the EOF Communications Coordinator to obtain a turnover from the communicator making notifications in the ECC.
Announce on the intercom that the EOF is operational 7


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27
TMI - Unit 1 Emergency Plan Implementing Document
'tie                                                                                    Revision No.
'tie Emergency Operations Facility Number EPIP-TMI-.27 Revision No.
Emergency Operations Facility                                                                        18 EXHIBIT 1                                     Page 3 of 10 II. EOF OPERATION NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps may be performed out of the sequence listed and that some steps will be performed concurrently.
18 EXHIBIT 1 Page 3 of 10 II.
EOF OPERATION
: a.
Personally, if possible, inform the Chief Nuclear Officer Status of the EOF Status of the Emergency
: b.
The ESD is responsible for authorizing personnel to work in site facilities (EOF, EACC, JIC) during an emergency if they are not Fit for Duty (FFD).
Fitness for Duty criteria are stated in Exhibit 9A.
: c.
ESD Conferences ESD conferences are periodically (Typically once per hour or as conditions change) held for information exchange
: a.
b.
The ESD Assistant is in charge of EOF activities during the ESD conference.
The ESD Assistant will interrupt the conference if a major plant change occurs.
ESD conference attendance should include the following:
a.
State Representatives BRP 6
b.
PEMA NRC 0
Site Team Leader Director Site Operations C.
Group Leader R & EC 8
NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps may be performed out of the sequence listed and that some steps will be performed concurrently.
Steps that are not applicable for the present situation may be skipped.
Steps that are not applicable for the present situation may be skipped.
Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
: a. Personally, if possible, inform the Chief Nuclear Officer
* Status of the EOF
* Status of the Emergency
: b. The ESD is responsible for authorizing personnel to work in site facilities (EOF, EACC, JIC) during an emergency ifthey are not Fit for Duty (FFD).
* Fitness for Duty criteria are stated in Exhibit 9A.
: c. ESD Conferences
* ESD conferences are periodically (Typically once per hour or as conditions change) held for information exchange
: a.            The ESD Assistant is in charge of EOF activities during the ESD conference.
: b.          The ESD Assistant will interrupt the conference if a major plant change occurs.
* ESD conference attendance should include the following:
: a.            State Representatives BRP 6            PEMA
: b.          NRC 0            Site Team Leader Director Site Operations C.          Group Leader R & EC 8


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.27 je                                                                                   Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 je Revision No.
Emergency Operations Facility                                                                     18 EXHIBIT 1                                       Page 4 of 10
Emergency Operations Facility 18 EXHIBIT 1 Page 4 of 10
: d.         Technical Support Representative
: d.
: e.         Public Information Representative - EOF
Technical Support Representative
: f.         Group Leader Admin Support
: e.
: g.         Emergency Preparedness Representative Suggested structure for the first conference
Public Information Representative - EOF
: a.         Get information from the lead personnel
: f.
* Obtain input from State Representative(s)
Group Leader Admin Support
* Obtain input from NRC
: g.
: b.         Summarize the status
Emergency Preparedness Representative Suggested structure for the first conference
: c.         Discuss the prognosis of where the plant is heading
: a.
: d.         Discuss mitigating activities underway, planned or needed
Get information from the lead personnel Obtain input from State Representative(s)
: e.         Discuss what can go wrong and the consequences
Obtain input from NRC
: f.         Potential PAR if General Emergency is declared.
: b.
: g.         This conference constitutes the briefing of the State Representative Conference Action Items
Summarize the status
: a.         Action Items shall be logged
: c.
: b.         Action Items shall be tracked
Discuss the prognosis of where the plant is heading
: c.         Action items are to be discussed at subsequent conferences until they are resolved.
: d.
Discuss mitigating activities underway, planned or needed
: e.
Discuss what can go wrong and the consequences
: f.
Potential PAR if General Emergency is declared.
: g.
This conference constitutes the briefing of the State Representative Conference Action Items
: a.
Action Items shall be logged
: b.
Action Items shall be tracked
: c.
Action items are to be discussed at subsequent conferences until they are resolved.
EOF Briefings
EOF Briefings
: a. EOF briefings are accomplished using the EOF intercom.
: a.
* Use Exhibit 5 to enhance briefing 9
EOF briefings are accomplished using the EOF intercom.
Use Exhibit 5 to enhance briefing 9


Number TMI - Unit 1 Emergency Plan Implementinc Document                   i EPIP-TMI-.27 le                                                                                      Revision No.
le Emerqency Operations Facility TMI - Unit 1 Emergency Plan Implementinc Document Number EPIP-TMI-.27 Revision No.
Emerqency Operations Facility                                                                          18 EXHIBIT 1                                     Page 5 of 10 ESD Press Release
18 EXHIBIT 1 Page 5 of 10 ESD Press Release
: a. Press Releases SHOULD be issued within one (1) hour from the time a plant event has occurred; therefore a TIMELY review is required.
: a.
* The ESD must approve Press Releases that are not boilerplate
Press Releases SHOULD be issued within one (1) hour from the time a plant event has occurred; therefore a TIMELY review is required.
: a.           The Press Release Guidance (Exhibit 13) should be followed.
The ESD must approve Press Releases that are not boilerplate
: b.           The Group Leader R & EC SHALL review and concur with the Press Release, before ESD approval.
: a.
: c.           The Technical Support Representative SHALL review and concur with the Press Release, before ESD approval.
The Press Release Guidance (Exhibit 13) should be followed.
: d.             The Security Coordinator SHALL review and concur with any Press Release containing SAFEGURADS INFORMATION, before ESD approval.
: b.
The Group Leader R & EC SHALL review and concur with the Press Release, before ESD approval.
: c.
The Technical Support Representative SHALL review and concur with the Press Release, before ESD approval.
: d.
The Security Coordinator SHALL review and concur with any Press Release containing SAFEGURADS INFORMATION, before ESD approval.
NOTE
NOTE
: 1.     Information Releases (e.g., Media Advisories, Emergency Reclassifications) which merely provide standard non-technical information need not have ED/ESD approval
: 1.
: 2.     DO NOT include the PAR in a Press Release.
Information Releases (e.g., Media Advisories, Emergency Reclassifications) which merely provide standard non-technical information need not have ED/ESD approval
: b.     If MEDIA access to the site is required, refer to Exhibit 14, "Site Access Policy for Media during Emergencies."
: 2.
DO NOT include the PAR in a Press Release.
: b.
If MEDIA access to the site is required, refer to Exhibit 14, "Site Access Policy for Media during Emergencies."
Onsite Protective Actions
Onsite Protective Actions
: a.     Determine the status of site accountability from the Group Leader Admin Support
: a.
* Emergency Director (ED) can supply this information if the Group Leader Admin position is not staffed.
Determine the status of site accountability from the Group Leader Admin Support Emergency Director (ED) can supply this information if the Group Leader Admin position is not staffed.
: b.     Determine if site evacuation has been ordered.
: b.
              *_      Ensure provisions are made for providing site employees with instructions for reporting to work for the next business day.
Determine if site evacuation has been ordered.
10
Ensure provisions are made for providing site employees with instructions for reporting to work for the next business day.
10 i


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
    'le                                                                                       Revision No.
'le Revision No.  
"*-~mergency Operations Facility                                                                           18 EXHIBIT I                                         Page 6 of 10
"*-~mergency Operations Facility 18 EXHIBIT I Page 6 of 10
: c. If any, of the TMI Emergency Response Facilities are downwind of a radioactive release.
: c.
_  _        Provide for their monitoring and protection
If any, of the TMI Emergency Response Facilities are downwind of a radioactive release.
* Evacuation orders, for the general public, do not apply to the RAA. This facility would be relocated, if needed, based on advice from the Group Leader R&EC.
Provide for their monitoring and protection Evacuation orders, for the general public, do not apply to the RAA. This facility would be relocated, if needed, based on advice from the Group Leader R&EC.
Changes to Emergency Classifications
Changes to Emergency Classifications
: a. Review EPIP-TMI-.01 to determine when a change in emergency classification is warranted.
: a.
* Discuss the change in Emergency Classification with the Emergency Director.
Review EPIP-TMI-.01 to determine when a change in emergency classification is warranted.
: b. If the "Approving and directing off-site notification to off-site agencies" responsibility has been transferred to the ESD, then proceed with this section, if NOT, go to step 7.0 NOTE The ESD may overrule the ED and direct that the ED declare a higher level of emergency.
Discuss the change in Emergency Classification with the Emergency Director.
* Immediately complete an Emergency Report Form.
: b.
If the "Approving and directing off-site notification to off-site agencies" responsibility has been transferred to the ESD, then proceed with this section, if NOT, go to step 7.0 NOTE The ESD may overrule the ED and direct that the ED declare a higher level of emergency.
Immediately complete an Emergency Report Form.
NOTE
NOTE
: a. The form may be completed by an ESD Assistant or EP Rep.
: a.
: b. Notifications SHOULD be started within 5 minutes of an event declaration (i.e., General Emergency) and SHALL be made within 15 minutes of the declaration.
The form may be completed by an ESD Assistant or EP Rep.
: a.           Complete page 1 and 2 of the Emergency Report Form-TMI (Refer to Exhibit 2, for a sample of the form).
: b.
: b.           Use Exhibit 3 for the EAL and Event description
Notifications SHOULD be started within 5 minutes of an event declaration (i.e., General Emergency) and SHALL be made within 15 minutes of the declaration.
* The Event description must contain the following information from Exhibit 3.
: a.
: a.             EAL number
Complete page 1 and 2 of the Emergency Report Form-TMI (Refer to Exhibit 2, for a sample of the form).
: b.             EAL title
: b.
: c.             Additionally, include information about the plant status (e.g., Power Operations, Hot Shutdown, etc.).
Use Exhibit 3 for the EAL and Event description The Event description must contain the following information from Exhibit 3.
: a.
EAL number
: b.
EAL title
: c.
Additionally, include information about the plant status (e.g., Power Operations, Hot Shutdown, etc.).
11
11


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 tie                                                                                   Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.
Emergency Operations Facility                                                                       18 EXHIBIT I                                   Page 7 of 10 0         Approve the Emergency Notification
Emergency Operations Facility 18 EXHIBIT I Page 7 of 10 0
* Direct the EOF Communications Coordinator to initiate off-site agency notification using the completed Page 1 of the Emergency Report Form-TMI.
Approve the Emergency Notification Direct the EOF Communications Coordinator to initiate off-site agency notification using the completed Page 1 of the Emergency Report Form-TMI.
* Inform the Emergency Director to make the appropriate plant page announcement.
Inform the Emergency Director to make the appropriate plant page announcement.
* Inform the State Representative(s)
Inform the State Representative(s)
: a.         Level of Emergency Declared
: a.
: b.         Basis for the declaration Offsite Protective Action Recommendations (PAR)
Level of Emergency Declared
: a.     At the SITE AREA EMERGENCY
: b.
* Convene an ESD conference
Basis for the declaration Offsite Protective Action Recommendations (PAR)
: a.         Refer to step 2.3 of this exhibit 0         Determine what could lead to a General Emergency by reviewing the EALs in EPIP-TMI-.01
: a.
* Review the PAR Logic Diagram (Exhibit 8) and determine the most likely PAR, in preparation for a GENERAL EMERGENCY declaration
At the SITE AREA EMERGENCY Convene an ESD conference
* Discuss the PAR with the following:
: a.
: a.         PEMA representative at the EOF
Refer to step 2.3 of this exhibit 0
: b.         BRP representative at the EOF
Determine what could lead to a General Emergency by reviewing the EALs in EPIP-TMI-.01 Review the PAR Logic Diagram (Exhibit 8) and determine the most likely PAR, in preparation for a GENERAL EMERGENCY declaration Discuss the PAR with the following:
: c.         NRC representative at the EOF
: a.
: d.         Emergency Director
PEMA representative at the EOF
: b.     At the GENERAL EMERGENCY
: b.
* If you have assumed the "Approving and directing official notifications to off-site agencies" then complete Step 6.0.
BRP representative at the EOF
: c.
NRC representative at the EOF
: d.
Emergency Director
: b.
At the GENERAL EMERGENCY If you have assumed the "Approving and directing official notifications to off-site agencies" then complete Step 6.0.
12
12


Number TMI - Unit 1 Emergency Plan Implementing Document                             EPIP-TMI-.27 tie                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.
Emergency Operations Facility                                                                           18 EXHIBIT 1                                         Page 8 of 10 Immediately convene an ESD conference to agree upon a PAR
Emergency Operations Facility 18 EXHIBIT 1 Page 8 of 10 Immediately convene an ESD conference to agree upon a PAR
: a.           If a likely PAR was developed earlier, quickly verify that it is still appropriate
: a.
: b.           If a likely PAR was NOT developed earlier, determine the PAR from Exhibit 8
If a likely PAR was developed earlier, quickly verify that it is still appropriate
: c.           Present the developed PAR to the following:
: b.
* PEMA representative at the EOF
If a likely PAR was NOT developed earlier, determine the PAR from Exhibit 8
* BRP representative at the EOF (This fulfils the obligation to notify the BRP)
: c.
Present the developed PAR to the following:
PEMA representative at the EOF BRP representative at the EOF (This fulfils the obligation to notify the BRP)
NRC representative at the EOF NOTE ESD SHALL communicate the PAR developed by the TMI emergency organization whether or not PEMA, BRP or NRC representatives at the EOF agree with the developed PAR.
NRC representative at the EOF NOTE ESD SHALL communicate the PAR developed by the TMI emergency organization whether or not PEMA, BRP or NRC representatives at the EOF agree with the developed PAR.
NOTE To the maximum extent possible, obtain agreement from the State and NRC on the PAR Whether or not the State and NRC agree SHALL NOT impact communication of the PAR recommendation.
NOTE To the maximum extent possible, obtain agreement from the State and NRC on the PAR Whether or not the State and NRC agree SHALL NOT impact communication of the PAR recommendation.
Personally provide TMI's PAR to the SENIOR OFFICAL at the STATE EOC (Emergency Operations Center) within 15 minutes of the General Emergency declaration by one of the following methods:
Personally provide TMI's PAR to the SENIOR OFFICAL at the STATE EOC (Emergency Operations Center) within 15 minutes of the General Emergency declaration by one of the following methods:
NOTE Verify that you are speaking to the SENIOR OFFICAL at the State EOC when providing the PAR.
NOTE Verify that you are speaking to the SENIOR OFFICAL at the State EOC when providing the PAR.
: a.           Pennsylvania Governor                   (717) 651-2148
: a.
: b.           State EOC                               (717) 651-2011
Pennsylvania Governor (717) 651-2148
: c.           PEMA                                   Notification Line (DLM-6), PEMA, Dial 37 NOTE If the ESD cannot make the call personally, he may designate someone else to convey the PAR.
: b.
State EOC (717) 651-2011
: c.
PEMA Notification Line (DLM-6), PEMA, Dial 37 NOTE If the ESD cannot make the call personally, he may designate someone else to convey the PAR.
Briefly inform the ED of the PAR decision, do not delay the PAR notification process.
Briefly inform the ED of the PAR decision, do not delay the PAR notification process.
Inform the ED of the Protective Actions implemented by the State.
Inform the ED of the Protective Actions implemented by the State.
13
13


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 e                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e
"E-mergency   Operations Facility                                                                       18 EXHIBIT 1                                   Page 9 of 10 NRC Interface
Revision No.  
: a. Review Exhibit 16, "TMI / NRC Emergency Response Interface".
"E-mergency Operations Facility 18 EXHIBIT 1 Page 9 of 10 NRC Interface
                *_          Ask the Senior NRC person who is the Site Team Leader and who is the Director Site Operations.
: a.
Review Exhibit 16, "TMI / NRC Emergency Response Interface".
Ask the Senior NRC person who is the Site Team Leader and who is the Director Site Operations.
NOTE ONLY the Director Site Operations is empowered to issue directives.
NOTE ONLY the Director Site Operations is empowered to issue directives.
                *_          Verify that the EP Representative has briefed the NRC on the following:
Verify that the EP Representative has briefed the NRC on the following:
: a.           Status of the event
: a.
: b.           Structure of the TMI organization
Status of the event
: c.           Any NRC directives are to be in writing to the ESD or in the absence of the ESD the ED.
: b.
                **          Verify that the EP Representative has introduced TMI personnel to their NRC counterparts in the EOF.
Structure of the TMI organization
: c.
Any NRC directives are to be in writing to the ESD or in the absence of the ESD the ED.
Verify that the EP Representative has introduced TMI personnel to their NRC counterparts in the EOF.
Long-Term Recovery
Long-Term Recovery
: a.     Discuss implementation of EPIP-TMI-.45, Classified Emergency Termination/Recovery
: a.
_          At an ESD conference
Discuss implementation of EPIP-TMI-.45, Classified Emergency Termination/Recovery At an ESD conference With the ED 14 NOTE If a GENERAL EMERGENCY is in effect, DO NOT de-escalate to a lower level of emergency. The only option is to go into Long-Term Recovery and this transition SHALL NOT occur until ALL Offsite protective measures have been completed and the State has been notified.
* With the ED NOTE If a GENERAL EMERGENCY is in effect, DO NOT de-escalate to a lower level of emergency. The only option is to go into Long-Term Recovery and this transition SHALL NOT occur until ALL Offsite protective measures have been completed and the State has been notified.
14


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
    -itle                                                                                   Revision No.
-itle Revision No.  
"--Emergency Operations Facility                                                                         18 EXHIBIT I                                     Page 10 of 10 Close Out / Deactivation
"--Emergency Operations Facility 18 EXHIBIT I Page 10 of 10 Close Out / Deactivation
: a.     Upon any of the following conditions:
: a.
Emergency Close Out Deactivation of the EOF Deactivation of the EACC
Upon any of the following conditions:
___      An inventory of the EOF is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Emergency Preparedness Manager, TMI. Notify the Emergency Preparedness Manager of the need to perform the inventory in accordance with TEP-ADM-1300.01, Maintaining Emergency Preparedness.
Emergency Close Out Deactivation of the EOF Deactivation of the EACC An inventory of the EOF is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Emergency Preparedness Manager, TMI. Notify the Emergency Preparedness Manager of the need to perform the inventory in accordance with TEP-ADM-1300.01, Maintaining Emergency Preparedness.
ii.       An inventory of the EACC is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Environmental Radioactivity Laboratory Manager. Notify the Environmental Radioactivity Laboratory Manager of the need to perform the inventory in accordance with TEP-ADM-1 300.01, Maintaining Emergency Preparedness.
ii.
NAME                                                 TIME                     hours DATE Emergency Support Director 15
An inventory of the EACC is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Environmental Radioactivity Laboratory Manager. Notify the Environmental Radioactivity Laboratory Manager of the need to perform the inventory in accordance with TEP-ADM-1 300.01, Maintaining Emergency Preparedness.
NAME TIME hours DATE Emergency Support Director 15


EPIP-TMI-.27 Revision 18 EXHIBIT 2                                                                Page 1 of 2 SEMERGENCY                                                       REPORT FORM - TMI                                   Part I of 4 (Pm"s Fwrnly and kWite Cearl$l                               G~ait Outlotfaication 4".4..t C- LEVEL I Onshift (Requh'd for lnusuat Event) c-.,   C LEVEL 2 Initial Response Emergency Organization & Onshiftl(Reuired fi Alert)
EPIP-TMI-.27 Revision 18 Page 1 of 2 EXHIBIT 2 SEMERGENCY REPORT FORM - TMI Part I of 4 (Pm"s Fwrnly and kWite Cearl$l G~ait Outlotfaication 4".4..t C-LEVEL I Onshift (Requh'd for lnusuat Event) c-., C LEVEL 2 Initial Response Emergency Organization & Onshift l(Reuired fi Alert)
C LEVEL 3 Emergency Support OrganizatIon & Initial Response Ernergsrnc o                     anizhaon & Onshift (Required for SAE &GE)
C LEVEL 3 Emergency Support OrganizatIon & Initial Response Ernergsrnc o anizhaon & Onshift (Required for SAE & GE)
Start Here for Notifications Read message - slowly - clearly.
Start Here for Notifications Read message - slowly - clearly.
*si=ci         C This is a drill. This Is a dril IL.                           E] This is NOT a drilL This is NOT a drlil.
*si=ci C This is a drill. This Is a dril Completed by Communicator This Is IL.
Completed by Communicator This Is                                                at TMI, my pIone number is (Select) 944 (s,.-It:)e C An Unusual Event has been declared                                   11 A Site Area Emergency has been declared C An Alert has been declared                                           17 A General Emergency has been declared C The event has been terminated at                                         _____            hours   on   ______
E] This is NOT a drilL This is NOT a drlil.
Emergency Cla**ifivation T-me (24 hotr cock)                 Emergency Clas                   tion Date (s.an1     This represenfts:       C An initial Classification Status           [E An escalation In Classification Status EC No change In Classification Status         17 A reduction in Classification Status
at TMI, my pIone number is (Select) 944 (s,.-It:)e C An Unusual Event has been declared 11 A Site Area Emergency has been declared C An Alert has been declared 17 A General Emergency has been declared C The event has been terminated at hours on Emergency Cla**ifivation T-me (24 hotr cock)
=I         :00       0 There is: I2 No abnormal radioactive 11 An abnormal radioactive airborne                             E1 An abnormal radioactive liquid release to the environment as a result of this emergency.
Emergency Clas tion Date (s.an1 This represenfts:
cv-t-n.c       tr-m   m mie rswus arouna me plant and SHELTER the 5 to 10 mile radius around the plant SHELTER the 10 mile radius around the plant (Use SHELTER ONLY option when It is clear that EVACUATION is NOT arrmnrintne Wind direction is from                                       and the wind speed is                                         miles per hour, 804c4       M This is a drill. This Is a drill.                                   1   This is NOT a drill. This Is NOT a drill.
C An initial Classification Status
Approved - ED)ESD
[E An escalation In Classification Status EC No change In Classification Status 17 A reduction in Classification Status  
-. '                    Ohsfl~butico: Grass - call OutNtiiation Yeflow - Cn*:     w~t . Fri   ,*-,,   C.L*   f l,..,   ..  .    ......
=I
0116Mbution; Green -Call OutNOtiftstkln; Yalow -Corrt2ct; White - ED         Pi k P1                   AGO139C  ilL-"'M 16
:00 0
There is:
I2 No abnormal radioactive 11 An abnormal radioactive airborne E1 An abnormal radioactive liquid release to the environment as a result of this emergency.
cv-t-n.c tr-m m mie rswus arouna me plant and SHELTER the 5 to 10 mile radius SHELTER the 10 mile radius around the plant (Use SHELTER ONLY option when It is clear that EVACUATION is NOT arrmnrintne around the plant Wind direction is from and the wind speed is miles per hour, 804c4 M This is a drill. This Is a drill.
1 This is NOT a drill. This Is NOT a drill.
Approved - ED)ESD Ohsfl~butico: Grass - call OutNtiiation Yeflow - Cn*:
w~t. Fri,*-,,
C.L*
f l,..,
AGO139C ilL-"'M 16 0116Mbution; Green -Call OutNOtiftstkln; Yalow -Corrt2ct; White - ED Pi k P1


EPIP-TMI-.27 Revision 18 EXHIBIT 2                                                     Page 2 of 2 AmerGen E*-:,o   E-n**=**
EPIP-TMI-.27 Revision 18 EXHIBIT 2 Page 2 of 2 AmerGen EMERGENCY REPORT FORM - TMI Part 2 of 4 E *-:,o E-n**=**
EMERGENCY REPORT FORM - TMI                                            Part 2 of 4 Contact (int   D]   LEVEL 1 Onshift
Contact (int D] LEVEL 1 Onshift  
-t,&#xfd;   U LEVEL 2 Initial Response Emergency Organization & Onshift
-t,&#xfd; U LEVEL 2 Initial Response Emergency Organization & Onshift
[E LEVEL 3 Emergency Support Organization & Initial Response Emergency Organization & Onshift Start Here for Contact Read Message - slowly - clearly.
[E LEVEL 3 Emergency Support Organization & Initial Response Emergency Organization & Onshift Start Here for Contact Read Message - slowly - clearly.
Li This is a drill. This is a drill.                     L[ This Is NOT a drill. This is NOT a drill.
Li This is a drill. This is a drill.
[] An Unusual Event has been declared                               0] A S;ite Area Emergency has been declared El An Alert has been declared                                       [] A General Emergency has been declared C1 The event has been terminated at                                                         hours on Efevgency Cflashsation Time                                       Enmif.ncy CtassfflcaionDate This represents:     C1 An initial Classification Status           Li An escalation In Classificaton Status Li No change in Classification Status         LI A reduction In Classification Status There Is: Li No abnormal radioactive 13 An abnormal radioactive airborne                       [C An abnormal radioactive liculd release to the environment as a result of this emergency.
L[ This Is NOT a drill. This is NOT a drill.
0 Thislsaldril. ThImla*Idflf*0             ..                        Thfis sNO       a drill. This Is NOT a drill.
[] An Unusual Event has been declared 0] A S;ite Area Emergency has been declared El An Alert has been declared
Approved - EDIESD DlhhlUIo.: Gregn - Call Outo   ication; Yellow -Contact, White - ED copy; Pint -Plant Page       AGD139 (12-99) 17
[] A General Emergency has been declared C1 The event has been terminated at hours on Efevgency Cflashsation Time Enmif.ncy Ctassfflcaion Date This represents:
C1 An initial Classification Status Li An escalation In Classificaton Status Li No change in Classification Status LI A reduction In Classification Status There Is:
Li No abnormal radioactive 13 An abnormal radioactive airborne
[C An abnormal radioactive liculd release to the environment as a result of this emergency.
0 Thislsaldril. ThImla*Idflf*0 Thfis sNO a drill. This Is NOT a drill.
Approved - EDIESD DlhhlUIo.: Gregn - Call Outo ication; Yellow -Contact, White - ED copy; Pint -Plant Page AGD139 (12-99) 17


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 1 of 9 EAL            BRIEF TITLE            EVENT DESCRITION Radiological Effluent        An Unusualevent is declared because an abnormalrelease of Limits Are Being              radiationfrom the power plant has or will exceed 60 minutes and Exceeded could lead to very low level radiationdose rates at or beyond the outer boundary of the plant site.
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 1 of 9 EVENT DESCRITION An Unusual event is declared because an abnormal release of radiation from the power plant has or will exceed 60 minutes and could lead to very low level radiation dose rates at or beyond the outer boundary of the plant site.
U1.2       Unexpected Radiation         An UnusualEvent is declaredbecause of abnormallyhigh Readings Inside the           radiationlevels measuredinside the power plant that indicates a Power Plant                   degradationin the control of radioactivematerial. No abnormal releasesto the environment are occurring.
U1.2 Unexpected Radiation An Unusual Event is declared because of abnormally high Readings Inside the radiation levels measured inside the power plant that indicates a Power Plant degradation in the control of radioactive material. No abnormal releases to the environment are occurring.
U1.3       Liquid Radioactive           An Unusual Event is declaredbecause a release of radioactive Release That Exceeds         liquidthat exceeds the limits of government regulationshas lasted Limits                       for 60 minutes or more. This event indicates a degradationin the ability to control the release of radioactivematerials to the river.
U1.3 Liquid Radioactive An Unusual Event is declared because a release of radioactive Release That Exceeds liquid that exceeds the limits of government regulations has lasted Limits for 60 minutes or more. This event indicates a degradation in the ability to control the release of radioactive materials to the river.
U1.4       Low Spent Fuel Pool           An UnusualEvent is declaredbecause of the uncontrolled Level                         leakage of waterfrom the Spent Fuel Pool. The leakage exceeds or is expected to exceed the ability to refill the pool. No abnormal releases of radioactivityto the environment are occurring.
U1.4 Low Spent Fuel Pool An Unusual Event is declared because of the uncontrolled Level leakage of water from the Spent Fuel Pool. The leakage exceeds or is expected to exceed the ability to refill the pool. No abnormal releases of radioactivity to the environment are occurring.
U1.5       Low Fuel Transfer Canal       An UnusualEvent is declaredbecause of the uncontrolled Level                         leakage of waterfrom the Fuel Transfer Canal. The leakage exceeds or is expected to exceed the ability to refill the canal. No abnormalreleases of radioactivityto the environment are occurring.
U1.5 Low Fuel Transfer Canal An Unusual Event is declared because of the uncontrolled Level leakage of water from the Fuel Transfer Canal. The leakage exceeds or is expected to exceed the ability to refill the canal. No abnormal releases of radioactivity to the environment are occurring.
U1.6      Fuel Clad Damage With         An UnusualEvent is declaredbecause of indicationsthat there Increased Radiation          has been damage to the metal tubes that hold the nuclearfuel pellets. Increasedradiationhas been detected in the water that flows through the nuclear reactor.No abnormalreleases of radioactivity to the environment are occurring.
Fuel Clad Damage With Increased Radiation An Unusual Event is declared because of indications that there has been damage to the metal tubes that hold the nuclear fuel pellets. Increased radiation has been detected in the water that flows through the nuclear reactor. No abnormal releases of radioactivity to the environment are occurring.
U2.1       Potential Loss or Loss of     An Unusual Event is declaredbecause of the: PotentialLoss of Containment                   Containment as a Fission ProductBarrier. - OR - Loss of Containment as a Fission ProductBarrier.
U2.1 Potential Loss or Loss of An Unusual Event is declared because of the: Potential Loss of Containment Containment as a Fission Product Barrier. - OR - Loss of Containment as a Fission Product Barrier.
U2.2       Reactor Coolant System         An Unusual Event is declaredbecause of.- an unidentifiedleak or Steam Generator           (location unknown) greaterthan or equal to 10 gallons a minute Leakage                     from the Reactor Coolant System. - OR - an unidentfied leak (location unknown) greaterthan or equal to 10 gallons a minute from the Steam Generatortubes. - OR - an identified leak (locationknown) greaterthan or equal to 25 gallons a minute from the Reactor Coolant System.
U2.2 Reactor Coolant System An Unusual Event is declared because of.- an unidentified leak or Steam Generator (location unknown) greater than or equal to 10 gallons a minute Leakage from the Reactor Coolant System. - OR - an unidentfied leak (location unknown) greater than or equal to 10 gallons a minute from the Steam Generator tubes. - OR - an identified leak (location known) greater than or equal to 25 gallons a minute from the Reactor Coolant System.
U3.1       A Risk of Station             An UnusualEvent is declaredbecause of the loss of all normal Blackout Exists - Backup     electricalpower sourcesfor to the powerplantfor more than Power Is Available,         fifteen minutes. Emergency backup power is available.
U3.1 A Risk of Station An Unusual Event is declared because of the loss of all normal Blackout Exists - Backup electrical power sources for to the power plant for more than Power Is Available, fifteen minutes. Emergency backup power is available.
U3.3       Loss of "A" or "B" Plant     An UnusualEvent is declaredbecause of the loss ofALL of the DC Electricity For More       DC (DirectCurrent)electricalpower supply for more thanfifteen than 15 Minutes during       minutes.
U3.3 Loss of "A" or "B" Plant An Unusual Event is declared because of the loss of ALL of the DC Electricity For More DC (Direct Current) electrical power supply for more than fifteen than 15 Minutes during minutes.
Cold Shutdown or Refueling Shutdown.
Cold Shutdown or Refueling Shutdown.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the
18 EAL BRIEF TITLE Radiological Effluent Limits Are Being Exceeded U1.6 Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the  
--MERGENCY REPORT FORM - TMI.
--MERGENCY REPORT FORM - TMI.
18


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                     Page 2 of 9 EAL              BRIEF TITLE           EVENT DESCRITION
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 2 of 9 BRIEF TITLE Unplanned Loss of Control Room Safety Indicators EVENT DESCRITION An Unusual Event is declared because of the unplanned loss of the majority of the control room's Safety Related Equipment alarms - or - indications. Although other non-alarming indications are available to the Control Room Operators, this situation requires increased surveillance of the safety related equipment and there is the risk that a degraded plant condition could zo undetected U4.1.1 Unplanned Loss of Onsite An Unusual Event is declared because of the unplanned loss of all or Offsite onsite communications capabilities. - OR - all offsite Communications.
$-*d4.1        Unplanned Loss of           An UnusualEvent is declared because of the unplannedloss of Control Room Safety          the majority of the controlroom's Safety Related Equipment Indicators alarms - or - indications. Although other non-alarming indicationsare available to the Control Room Operators,this situationrequires increasedsurveillance of the safety related equipment and there is the risk that a degradedplant condition could zo undetected U4.1.1     Unplanned Loss of Onsite An UnusualEvent is declaredbecause of the unplannedloss of all or Offsite                   onsite communications capabilities. - OR - all offsite Communications.               communications capabilities.
communications capabilities.
U4.2       Failure to Complete a       An UnusualEvent is declaredbecause the requiredtime limit to Plant Shutdown or           perform a plant shutdown - OR - a plant cooldown was exceeded Cooldown Within the           The Technical Specificationsare the power plant's operational Required Time Limit.         guidelines. A Limiting Conditionfor Operation (LCO)sets a specific time limit that allows continuedplant operationwhile actions are being taken to correct the problem. If the problem cannot be correctedand the plant cannotbe shut down or cooled down within the time limit, an UnusualEvent must be declared U5.1       High River Water Level.     An UnusualEvent is declaredbecauseflood waters are within a few feet of the top of the stone dike that surroundsthe power plant. Water is NOTflooding onto the plant site.
U4.2 Failure to Complete a An Unusual Event is declared because the required time limit to Plant Shutdown or perform a plant shutdown - OR - a plant cooldown was exceeded Cooldown Within the The Technical Specifications are the power plant's operational Required Time Limit.
    '15.2       High Wind Speeds Near         An UnusualEvent is declaredbecause of Sustained Winds Hurricane Force             greater than 70 mph recordedat TMI. These winds have the potential to damage PlantEquipment.
guidelines. A Limiting Condition for Operation (LCO) sets a specific time limit that allows continued plant operation while actions are being taken to correct the problem. If the problem cannot be corrected and the plant cannot be shut down or cooled down within the time limit, an Unusual Event must be declared U5.1 High River Water Level.
U5.3       Tornado Strikes               An UnusualEvent is declaredbecause of a report that a tornado Protected Area.               touched down inside the ProtectedArea of the power plant.
An Unusual Event is declared because flood waters are within a few feet of the top of the stone dike that surrounds the power plant. Water is NOTflooding onto the plant site.  
There is the potentialfor damage to structuresand equipment inside the ProtectedArea.
'15.2 High Wind Speeds Near An Unusual Event is declared because of Sustained Winds Hurricane Force greater than 70 mph recorded at TMI. These winds have the potential to damage Plant Equipment.
U5.4       Earthquake At Threshold       An UnusualEvent is declaredbecause of a minor earthquake Levels.                       detected at the power plant. An earthquake of this magnitude has the potentialto damage some equipment, but it is not expected to affect any safety systems. The occurrence of any detectable earthquakewarrants increasedmonitoringby the operators.
U5.3 Tornado Strikes An Unusual Event is declared because of a report that a tornado Protected Area.
U6.1       Fire In The Protected       An UnusualEvent is declaredbecause of afire in the Protected Area.                       Area of the power plant that our site Fire Brigade could not bring under control within 15 minutes of when the fire was confirmed.
touched down inside the Protected Area of the power plant.
Thisfire has the potentialto involve Safety RelatedEquipment if it spreads.
There is the potential for damage to structures and equipment inside the Protected Area.
U6.3       Flammable I Toxic Gas       An UnusualEvent is declaredbecause of the detection of That May Affect             flammable / toxic gas that could enter the power plant site. This Operation.                   gas could affect the safety andhealth ofplantpersonneland disruptnormal operationof the powerplant.
U5.4 Earthquake At Threshold An Unusual Event is declared because of a minor earthquake Levels.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
detected at the power plant. An earthquake of this magnitude has the potential to damage some equipment, but it is not expected to affect any safety systems. The occurrence of any detectable earthquake warrants increased monitoring by the operators.
19
U6.1 Fire In The Protected An Unusual Event is declared because of afire in the Protected Area.
Area of the power plant that our site Fire Brigade could not bring under control within 15 minutes of when the fire was confirmed.
This fire has the potential to involve Safety Related Equipment if it spreads.
U6.3 Flammable I Toxic Gas An Unusual Event is declared because of the detection of That May Affect flammable / toxic gas that could enter the power plant site. This Operation.
gas could affect the safety and health ofplant personnel and disrupt normal operation of the power plant.
19 EAL
$-*d4.1 Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 3 of 9 Unexpected Explosion In     An UnusualEvent is declaredbecause of an unexpected explosion The Protected Area.            that causeddamage inside the ProtectedArea of the power plant.
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 3 of 9 Unexpected Explosion In The Protected Area.
This explosion was NOT caused by a bomb. The damage could affect the operationof the plant.
An Unusual Event is declared because of an unexpected explosion that caused damage inside the Protected Area of the power plant.
U6.5       Steam Turbine Damage.         An UnusualEvent is declared because of damage to the steam turbine, includingpuncturingof the steel casingaround the turbine or damage to the generatorseals. The hazardof projectilesfrom the turbine andpuncturing of the casingaround it decreases the safety level of the plant andcould affect the safety and health ofplant personnel which affects the operation of the power plant.
This explosion was NOT caused by a bomb. The damage could affect the operation of the plant.
U6.6       Vehicle Crash In The         An UnusualEvent is declaredbecause of a vehicle (airplane, Protected Area.               train, helicopter, etc.) that accidentally crashedinside the ProtectedArea of the power plant. There is the potentialfor damage to structuresand equipment inside the ProtectedArea.
U6.5 Steam Turbine Damage.
U7.1       Confirmed Security           An UnusualEvent is declaredbecause of a confirmed security Event.                       event, which could potentially degrade the safety level of the powerplant. (This event involves: A bomb discovered inside the ProtectedArea The ProtectedArea includes major plant structureslike the turbine andservice buildings that areprotected by a securityfence and to which access is controlled.) - OR - A Hostile Force inside the Owner ControlledArea (The Owner ControlledArea includes the area between the perimeter chain linkfence and the ProtectedArea).
An Unusual Event is declared because of damage to the steam turbine, including puncturing of the steel casing around the turbine or damage to the generator seals. The hazard of projectiles from the turbine and puncturing of the casing around it decreases the safety level of the plant and could affect the safety and health ofplant personnel which affects the operation of the power plant.
Judgment of the Shift         An UnusualEvent is declaredby the Shift Manager/Emergency Manager / Emergency           Director. The Shift Manager/Emergency Directorhas the Director - Potential Degradation of Plant         flexibility to declare an event if conditions exist that indicate a Safety                       potential decrease in the safety level of the plant. These conditions may not be specifically addressedin an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager/Emergency Director.
U6.6 Vehicle Crash In The An Unusual Event is declared because of a vehicle (airplane, Protected Area.
train, helicopter, etc.) that accidentally crashed inside the Protected Area of the power plant. There is the potential for damage to structures and equipment inside the Protected Area.
U7.1 Confirmed Security An Unusual Event is declared because of a confirmed security Event.
event, which could potentially degrade the safety level of the power plant. (This event involves: A bomb discovered inside the Protected Area The Protected Area includes major plant structures like the turbine and service buildings that are protected by a security fence and to which access is controlled.) - OR - A Hostile Force inside the Owner Controlled Area (The Owner Controlled Area includes the area between the perimeter chain link fence and the Protected Area).
Judgment of the Shift An Unusual Event is declared by the Shift Manager /Emergency Manager / Emergency Director. The Shift Manager /Emergency Director has the Director - Potential Degradation of Plant flexibility to declare an event if conditions exist that indicate a Safety potential decrease in the safety level of the plant. These conditions may not be specifically addressed in an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager /Emergency Director.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
20
20


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 4 of 9 EAL            BRIEF TITLE           EVENT DESCRITION 1-41.1        Radiological Effluent          An Alert is declaredbecause an abnormal release of radiation Limits Are Being            from the power plant has or will exceed 15 minutes and could Significantly Exceeded.
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 4 of 9 BRIEF TITLE Radiological Effluent Limits Are Being Significantly Exceeded.
lead to low level radiationdose rate at or beyond the outerfence line of the plantsite.
EVENT DESCRITION An Alert is declared because an abnormal release of radiation from the power plant has or will exceed 15 minutes and could lead to low level radiation dose rate at or beyond the outer fence line of the plant site.
A1.2       Unexpected Radiation           An Alert is declaredbecause of abnormallyhigh radiationlevels Readings Inside the         measuredinside the power plant, which indicate a serious Power Plant that Affect the Safe Operation of the   degradationin the control of radioactivematerial.
A1.2 Unexpected Radiation An Alert is declared because of abnormally high radiation levels Readings Inside the measured inside the power plant, which indicate a serious Power Plant that Affect the Safe Operation of the degradation in the control of radioactive material.
Plant.
Plant.
A1.3       Liquid Radioactive             An Alert is declaredbecause a release of radioactive liquid that Release That Significantly significantly exceeds the limits of government regulationshas Exceeds Limits.             lastedfor 15 minutes or more.
A1.3 Liquid Radioactive An Alert is declared because a release of radioactive liquid that Release That Significantly significantly exceeds the limits of government regulations has Exceeds Limits.
A1.4       Low Spent Fuel Pool           An Alert is declaredbecause of the uncontrolledleakage of Level With Increased         waterfrom the Spent Fuel Poolwith higher than normal Radiation Levels,           radiationlevels in the spentfuel pool area of the plant. This condition indicatesa serious degradationin the controlof radioactivematerial.
lastedfor 15 minutes or more.
A1.5       Low Fuel Transfer Canal       An Alert is declaredbecause of the uncontrolledleakage of Level With Increased         waterfrom the Fuel Transfer Canalwith higher than normal Radiation Levels,             radiationlevels in the reactorbuilding. This condition indicates a seriousdegradationin the control of radioactivematerial.
A1.4 Low Spent Fuel Pool An Alert is declared because of the uncontrolled leakage of Level With Increased water from the Spent Fuel Pool with higher than normal Radiation Levels, radiation levels in the spent fuel pool area of the plant. This condition indicates a serious degradation in the control of radioactive material.
A2.1     Potential Loss or Loss of     An Alert is declaredbecause ONE FissionProductBarrier the Fuel Clad - OR - the     (other than Containment) has been impacteddue to the: Potential Reactor Coolant System.     Loss of the Fuel CladFissionProductBarrier- OR - the Reactor "CoolantSystem FissionProductBarrier. - OR - Loss of the Fuel CladFissionProductBarrier- OR - the Reactor Coolant System FissionProduct Barrier.
A1.5 Low Fuel Transfer Canal An Alert is declared because of the uncontrolled leakage of Level With Increased water from the Fuel Transfer Canal with higher than normal Radiation Levels, radiation levels in the reactor building. This condition indicates a serious degradation in the control of radioactive material.
A3.1     A Risk of Station             An Alert is declaredbecause of the loss of all normal electrical Blackout Exists - Limited   power sourcesfor the power plantfor more thanfifteen minutes.
A2.1 Potential Loss or Loss of An Alert is declared because ONE Fission Product Barrier the Fuel Clad - OR -the (other than Containment) has been impacted due to the: Potential Reactor Coolant System.
Backup Power Is               Only one of severalsources of emergency electricalpower Available.                   sources is available.
Loss of the Fuel Clad Fission Product Barrier - OR - the Reactor "Coolant System Fission Product Barrier. - OR - Loss of the Fuel Clad Fission Product Barrier - OR - the Reactor Coolant System Fission Product Barrier.
A3.2       Prolonged Station             An Alert is declaredbecause of the loss of all normal electrical Blackout - Greater than     power sources - AND - the loss of all emergency electricalpower 15 minutes - During Cold     sourcesfor more thanfifteen minutes (a prolongedStation Shutdown or Refueling Shutdown.                   Blackout) during Cold Shutdown or a Refueling Shutdown.
A3.1 A Risk of Station An Alert is declared because of the loss of all normal electrical Blackout Exists - Limited power sources for the power plant for more than fifteen minutes.
A4.1       Unplanned Loss of             An Alert is declaredbecause of the unplannedloss of the Control Room Safety         majority of the control room's Safety RelatedEquipment alarms Indicators With Transient or - indications. - AND - The loss of other non-alarming indications. - OR - A significant change in the power plant's status is in progress. This situationrequires increased surveillance of the safety relatedequipment in order to safely operate the power plant and there is the risk that a degraded plant condition could go undetected.
Backup Power Is Only one of several sources of emergency electrical power Available.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
sources is available.
21
A3.2 Prolonged Station An Alert is declared because of the loss of all normal electrical Blackout - Greater than power sources - AND - the loss of all emergency electrical power 15 minutes - During Cold sources for more than fifteen minutes (a prolonged Station Shutdown or Refueling Shutdown.
Blackout) during Cold Shutdown or a Refueling Shutdown.
A4.1 Unplanned Loss of An Alert is declared because of the unplanned loss of the Control Room Safety majority of the control room's Safety Related Equipment alarms Indicators With Transient or - indications. - AND - The loss of other non-alarming indications. - OR - A significant change in the power plant's status is in progress. This situation requires increased surveillance of the safety related equipment in order to safely operate the power plant and there is the risk that a degraded plant condition could go undetected.
21 EAL 1-41.1 Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 5 of 9 EAL              BRIEF TITLE           EVENT DECI.ODESCRITION EVEN Failure of the Reactor to         An Alert is declaredbecause the Reactor ProtectionSystem that Automatically Shutdown          is designed to automaticallyshut down (trip) the reactorfailed to AND - a Successful Manual Reactor Shutdown was do so. The ControlRoom Operatorshave manually shut down Accomplished.                    (tripped)the reactor,but the failure of the automaticsystem deszrades the safety level of the power plant.
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 5 of 9 BRIEF TITLE EVEN DECI.O Failure of the Reactor to Automatically Shutdown AND - a Successful Manual Reactor Shutdown was Accomplished.
A4.3     Loss of All Means of Decay       An Alert is declaredbecause the operatorsare unable to provide Heat Removal and the             sufficient cooling water to the reactorfollowing a plant Nuclear fuel is Predicted to     shutdown. This condition reduces the ability of the operatorsto be Uncovered.
EVENT DESCRITION An Alert is declared because the Reactor Protection System that is designed to automatically shut down (trip) the reactor failed to do so. The Control Room Operators have manually shut down (tripped) the reactor, but the failure of the automatic system deszrades the safety level of the power plant.
keep the nuclearfuel cool anddegrades the safety level of the power plant.
A4.3 Loss of All Means of Decay An Alert is declared because the operators are unable to provide Heat Removal and the sufficient cooling water to the reactor following a plant Nuclear fuel is Predicted to shutdown. This condition reduces the ability of the operators to be Uncovered.
A5.1     High River Water Level Near       An Alert is declaredbecause offlood waters that have the Flood Level.                     potentialtoflow over the top of the stone dike that surroundsthe power plant. Portionsof the plant site may be flooded This flood has the potentialto damage Safety Related Equipment.
keep the nuclear fuel cool and degrades the safety level of the power plant.
A5.2     High Wind Speeds Greater           An Alert is declared because of Sustained Winds greaterthan 80 Than Hurricane Force.           mph recordedat TMI. There is the potentialfor damage to Safety Related Equipment.
A5.1 High River Water Level Near An Alert is declared because offlood waters that have the Flood Level.
A5.3     Tornado Strikes Vital Area.       An Alert is declared because of a report that a tornado touched down and has damagedstructures and equipment inside the Vital Area of the power plant. This damage could affect Safety Related Equipment.
potential to flow over the top of the stone dike that surrounds the power plant. Portions of the plant site may be flooded This flood has the potential to damage Safety Related Equipment.
,15.4   Earthquake At Operating           An Alert is declared because of an earthquake at the power Design.                         plant. An earthquake of this magnitude has the potentialto damage some Safety RelatedEquipment that could affect the ability to protect the public's health andsafety. The power plant may be shut down andincreasedmonitoringwill be performed by the operators.
A5.2 High Wind Speeds Greater An Alert is declared because of Sustained Winds greater than 80 Than Hurricane Force.
A6.1     Fire Affecting Safety Related     An Alert is declaredbecause of afire that has affected one of the Equipment.                       Safety RelatedEquipment systems in the Vital Area. (The Vital Area includes structureswhere safety related equipment is located) - OR - Afire is in the ProtectedArea and requires localfire company assistance. The ProtectedArea includes majorplant structureslike the turbine andservice buildings that areprotected by a securityfence and to which access is controlled.
mph recorded at TMI. There is the potentialfor damage to Safety Related Equipment.
A6.2     Control Room Evacuation           An Alert is declaredbecause of the order to evacuate the Initiated.                       ControlRoom. The absence ofpersonnel in the control room can affect the safe operation of the power plant.
A5.3 Tornado Strikes Vital Area.
A6.3     Flammable / Toxic Gas             An Alert is declaredbecause of life threateningconcentrations Affects Plant Operation.         of flammable / toxic gas within the Vital Area of the power plant.
An Alert is declared because of a report that a tornado touched down and has damaged structures and equipment inside the Vital Area of the power plant. This damage could affect Safety Related Equipment.  
This presence can affect the safety ofplantpersonnel and the operation of Safety RelatedEquipment.Evacuationofplant personnelis possible.
,15.4 Earthquake At Operating An Alert is declared because of an earthquake at the power Design.
Enter the EAL number AND the Brief Title ( his is the bold information) in the Event Description area of the
plant. An earthquake of this magnitude has the potential to damage some Safety Related Equipment that could affect the ability to protect the public's health and safety. The power plant may be shut down and increased monitoring will be performed by the operators.
A6.1 Fire Affecting Safety Related An Alert is declared because of afire that has affected one of the Equipment.
Safety Related Equipment systems in the Vital Area. (The Vital Area includes structures where safety related equipment is located) - OR - Afire is in the Protected Area and requires localfire company assistance. The Protected Area includes major plant structures like the turbine and service buildings that are protected by a security fence and to which access is controlled.
A6.2 Control Room Evacuation An Alert is declared because of the order to evacuate the Initiated.
Control Room. The absence ofpersonnel in the control room can affect the safe operation of the power plant.
A6.3 Flammable / Toxic Gas An Alert is declared because of life threatening concentrations Affects Plant Operation.
of flammable / toxic gas within the Vital Area of the power plant.
This presence can affect the safety ofplant personnel and the operation of Safety Related Equipment. Evacuation ofplant personnel is possible.
Enter the EAL number AND the Brief Title (  
'MERGENCY REPORT FORM - TMI.
'MERGENCY REPORT FORM - TMI.
22
his is the bold information) in the Event Description area of the 22 EAL


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 6 of 9 EAL             BRIEF TITLE           EVENT DESCRITION
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 6 of 9 EAL BRIEF TITLE EVENT DESCRITION  
-K6.4       Unexpected Explosion In       An Alert is declaredbecause of an unexpected explosion that The Vital Area.             caused damage inside the Vital Area of the powerplant. This explosion was NOT caused by a bomb. The damage could potentially affect the ability to protect the public's health and safety.
-K6.4 Unexpected Explosion In An Alert is declared because of an unexpected explosion that The Vital Area.
A6.6       Vehicle Crash In The Vital     An Alert is declaredbecause of a vehicle (airplane,train, Area.                       helicopter, etc.) that accidentally crashedinside the Vital Area of the power plant. The damage could affect Safety Related Equipment.
caused damage inside the Vital Area of the power plant. This explosion was NOT caused by a bomb. The damage could potentially affect the ability to protect the public's health and safety.
A7.1       Confirmed Security Event       An Alert is declaredbecause of a confirmed security event, Potentially Affecting       which degrades the safety level of the power plant. This event Safety Related               involves: A bomb discovered inside the Vital Area. The Vital Area Equipment.                   includes buildings where Safety Related Equipment is located.
A6.6 Vehicle Crash In The Vital An Alert is declared because of a vehicle (airplane, train, Area.
Damage to this equipment would reduce the ability to protect the public's health andsafety. - OR - A Hostile Force inside the ProtectedArea. The ProtectedArea includes majorplant structures like the turbine andservice buildings that areprotected by a securityfence and to which access is controlled A8.1       Judgment of the Shift         An Alert is declaredby the Shift Manager/Emergency Director.
helicopter, etc.) that accidentally crashed inside the Vital Area of the power plant. The damage could affect Safety Related Equipment.
Manager / Emergency           The Shift Manager/Emergency Directorhas the flexibility to Director - Actual Degradation of Plant         declare an event if conditions exist that indicate a potential Safety.                     substantialdecrease in the safety level of the plant. These conditions may not be specifically addressedin an emergency procedure. In this situation,the decision to declare an emergency relies on the judgment of the Shift Manager / Emergency Director.
A7.1 Confirmed Security Event An Alert is declared because of a confirmed security event, Potentially Affecting which degrades the safety level of the power plant. This event Safety Related involves: A bomb discovered inside the Vital Area. The Vital Area Equipment.
includes buildings where Safety Related Equipment is located.
Damage to this equipment would reduce the ability to protect the public's health and safety. - OR - A Hostile Force inside the Protected Area. The Protected Area includes major plant structures like the turbine and service buildings that are protected by a security fence and to which access is controlled A8.1 Judgment of the Shift An Alert is declared by the Shift Manager /Emergency Director.
Manager / Emergency The Shift Manager /Emergency Director has the flexibility to Director - Actual Degradation of Plant declare an event if conditions exist that indicate a potential Safety.
substantial decrease in the safety level of the plant. These conditions may not be specifically addressed in an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager / Emergency Director.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
23
23


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 7 of 9 EAL              BRIEF TITLE        EVENT DESCRITION i
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 7 of 9 EVENT DESCRITION A Site Area Emergency is declared because an abnormal release of radiation from the power plant could lead to significant doses of radiation at the boundary of the power plant.
High  Radiological  Doses    A Site Area Emergency is declared because an abnormalrelease at the Boundary of the      of radiationfrom the power plant could lead to significantdoses Power Plant of radiationat the boundary of the power plant.
S2.1 Potential Loss or Loss of A Site Area Emergency is declared because TWO of the Fission the Fuel Clad -AND -
S2.1       Potential Loss or Loss of     A Site Area Emergency is declaredbecause TWO of the Fission the Fuel Clad - AND -       ProductBarriershave been impacted due to the: Loss of the Fuel Potential Loss or Loss of   CladFissionProductBarrier- AND - the PotentialLoss of the the Reactor Coolant System                     Reactor Coolant System Fission ProductBarrier.- OR - Potential Loss of the Fuel CladFissionProductBarrier- AND - the PotentialLoss of the Reactor CoolantSystem Fission Product Barrier. - OR - PotentialLoss of the Fuel CladFissionProduct Barrier- OR - the PotentialLoss of the Reactor Coolant System FissionProductBarrier - AND - the Loss ofAny Other Fission ProductBarrier.
Product Barriers have been impacted due to the: Loss of the Fuel Potential Loss or Loss of Clad Fission Product Barrier - AND - the Potential Loss of the the Reactor Coolant System Reactor Coolant System Fission Product Barrier. - OR - Potential Loss of the Fuel Clad Fission Product Barrier - AND - the Potential Loss of the Reactor Coolant System Fission Product Barrier. - OR - Potential Loss of the Fuel Clad Fission Product Barrier - OR - the Potential Loss of the Reactor Coolant System Fission Product Barrier - AND - the Loss of Any Other Fission Product Barrier.
S3.1       Prolonged Station           A Site Area Emergency is declaredbecause of the loss of all Blackout - Greater than     normal electricalpower sourcesfor the power plantfor more 15 Minutes.                 thanfifteen minutes -AND - the loss of all emergency electrical power sourcesfor more thanfifteen minutes. This is called a Station Blackout.
S3.1 Prolonged Station A Site Area Emergency is declared because of the loss of all Blackout - Greater than normal electrical power sources for the power plant for more 15 Minutes.
S3.3       - Loss of All Plant DC     A Site Area Emergency is declaredbecause of the loss of all DC Electricity For More than   (DirectCurrent) electricalpowerfor more thanfifteen minutes.
than fifteen minutes -AND - the loss of all emergency electrical power sources for more than fifteen minutes. This is called a Station Blackout.
S3.3  
- Loss of All Plant DC A Site Area Emergency is declared because of the loss of all DC Electricity For More than (Direct Current) electrical powerfor more than fifteen minutes.
15 Minutes when the plant is not in Cold Shutdown or Refueling Shutdown.
15 Minutes when the plant is not in Cold Shutdown or Refueling Shutdown.
Unplanned Loss of All     A Site Area Emergency is declaredbecause of the unplannedloss Control Room Safety        of all Safety Related Equipment indicationsand alarms - AND - A Indicators With Transient significantchange in the power plant'sstatus is in progress. The control room staff is unable to adequately monitor the systems necessary to safely control the power plant and insureprotection of the public's health andsafety.
Unplanned Loss of All Control Room Safety Indicators With Transient A Site Area Emergency is declared because of the unplanned loss of all Safety Related Equipment indications and alarms - AND - A significant change in the power plant's status is in progress. The control room staff is unable to adequately monitor the systems necessary to safely control the power plant and insure protection of the public's health and safety.
S4.2         Failure of the Reactor to A Site Area Emergency is declared because the Reactor Automatically Shutdown     ProtectionSystem that is designed to automaticallyshut down
S4.2 Failure of the Reactor to A Site Area Emergency is declared because the Reactor Automatically Shutdown Protection System that is designed to automatically shut down  
            - AND - a Manual Reactor Shutdown could not be       (trip) the reactorfailed to do so AND the Control Room Accomplished.             Operatorswere unable to manually shut down (manually trip) the reactorfrom the controlroom. This condition reduces the ability of the operatorsto control the power plant andcreates conditions that could lead to damage of the nuclearfuel or the steel reactor vessel andassociatedpiping. This condition impacts the ability to protect the health andsafety of the public.
- AND - a Manual Reactor Shutdown could not be (trip) the reactor failed to do so AND the Control Room Accomplished.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
Operators were unable to manually shut down (manually trip) the reactor from the control room. This condition reduces the ability of the operators to control the power plant and creates conditions that could lead to damage of the nuclear fuel or the steel reactor vessel and associated piping. This condition impacts the ability to protect the health and safety of the public.
24
24 EAL BRIEF TITLE High Radiological Doses at the Boundary of the Power Plant Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
i


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 8 of 9 EAL            BRIEF TITLE           EVENT DESCRITION 4                           +
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 8 of 9 BRIEF TITLE 4  
4.3      Loss of All Means of         A Site Area Emergency is declaredbecause the operatorsare Decay Heat Removal            unable to provide sufficient coolingwater to the reactorfollowing AND - Indications that the Nuclear fuel is a plant shutdown - AND - the increasedheat has caused the Uncovered.                    water in the reactorto boil and uncover the fuel. This condition reduces the ability of the operatorsto keep the nuclearfuel cool, degrades the safety level of the power plant anddecreases the ability to protect the public's health and safety.
+
S4.4       Loss of Both Methods         A Site Area Emergency is declaredbecause of the loss of the Needed to Maintain the       ability to cool the reactorafter it is shut down. This condition Nuclear Reactor in Hot       reduces the ability of the operatorsto keep the nuclearfuel cool Shut Down.
Loss of All Means of Decay Heat Removal AND - Indications that the Nuclear fuel is Uncovered.
anddegrades the safety level of the power plant and the ability to protect the public's health andsafety.
EVENT DESCRITION A Site Area Emergency is declared because the operators are unable to provide sufficient cooling water to the reactor following a plant shutdown - AND - the increased heat has caused the water in the reactor to boil and uncover the fuel. This condition reduces the ability of the operators to keep the nuclear fuel cool, degrades the safety level of the power plant and decreases the ability to protect the public's health and safety.
S6.2       Control Room Evacuation       A Site Area Emergency is declaredbecause of the evacuation of Completed Without             the Control Room - AND - the inability to confirm effective Complete Plant Control       cooling of the nuclearfuel within 15 minutes. The absence of personnel in the controlroom and the lack of effective cooling of the nuclearfuel can affect the operationof Safety Related Equipment and the ability to protect the public's health and safety.
S4.4 Loss of Both Methods A Site Area Emergency is declared because of the loss of the Needed to Maintain the ability to cool the reactor after it is shut down. This condition Nuclear Reactor in Hot reduces the ability of the operators to keep the nuclear fuel cool Shut Down.
S7.1       Confirmed Security Event A Site Area Emergency is declaredbecause of a confirmed Affecting Safety Related     security event that degrades the safety level of the power plant Equipment.                   and the ability to protect the public'shealth and safety. This event involves: A bomb that has exploded inside the Vital Area.
and degrades the safety level of the power plant and the ability to protect the public's health and safety.
The Vital Area includes buildingswhere Safety Related Equipment is located. Damage to this equipment would reduce the ability to protect the public's health andsafety. - OR - A Hostile Force inside the Vital Area.
S6.2 Control Room Evacuation A Site Area Emergency is declared because of the evacuation of Completed Without the Control Room - AND - the inability to confirm effective Complete Plant Control cooling of the nuclear fuel within 15 minutes. The absence of personnel in the control room and the lack of effective cooling of the nuclear fuel can affect the operation of Safety Related Equipment and the ability to protect the public's health and safety.
$8.1       Judgment of the Shift         A Site Area Emergency is declaredby the Shift Manager/
S7.1 Confirmed Security Event A Site Area Emergency is declared because of a confirmed Affecting Safety Related security event that degrades the safety level of the power plant Equipment.
Manager / Emergency           Emergency Director. The Shift Manager/Emergency Director Director - Actual Failures   has theflexibility to declare an event if conditionsexist that of Safety Systems.           indicate the likely or actualmajorfailure ofplantfunctions needed to protect the public's health andsafety. These conditions may not be specifically addressedin an emergency procedure. In this situation,the decision to declare an emergency relies on the judgment of the Shift Manager/ Emergency Director.
and the ability to protect the public's health and safety. This event involves: A bomb that has exploded inside the Vital Area.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
The Vital Area includes buildings where Safety Related Equipment is located. Damage to this equipment would reduce the ability to protect the public's health and safety. - OR - A Hostile Force inside the Vital Area.  
25
$8.1 Judgment of the Shift A Site Area Emergency is declared by the Shift Manager /
Manager / Emergency Emergency Director. The Shift Manager /Emergency Director Director - Actual Failures has the flexibility to declare an event if conditions exist that of Safety Systems.
indicate the likely or actual major failure ofplant functions needed to protect the public's health and safety. These conditions may not be specifically addressed in an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager/ Emergency Director.
25 EAL Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
4.3


EPIP-TMI-.27 Revision 18 EXHIBIT 3                                   Page 9 of 9 EAL            BRIEF TITLE           EVENT DESCRITION High Radiological Doses       A GeneralEmergency is declaredbecause an abnormal release at the Boundary of the        of radiationfrom the powerplant that could lead to high doses of Power Plant that Exceed Protective Action radiationat the boundary of the powerplant. This condition may Guideline (PAG) Limits.      require thatprotective actions be implementedfor members of the public livingz around Three Mile Island G2.1       Loss of ANY TWO of the       A GeneralEmergency is declaredbecause TWO of the Fission Fission Product Barriers     ProductBarriershave been Lost and there is at least the
EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 9 of 9 BRIEF TITLE High Radiological Doses at the Boundary of the Power Plant that Exceed Protective Action Guideline (PAG) Limits.
          - AND - the Potential       PotentialLoss of the third barrier.
EVENT DESCRITION A General Emergency is declared because an abnormal release of radiation from the power plant that could lead to high doses of radiation at the boundary of the power plant. This condition may require that protective actions be implemented for members of the public livingz around Three Mile Island G2.1 Loss of ANY TWO of the A General Emergency is declared because TWO of the Fission Fission Product Barriers Product Barriers have been Lost and there is at least the  
- AND - the Potential Potential Loss of the third barrier.
Loss of the third.
Loss of the third.
G3.1       Prolonged Station             A GeneralEmergency is declaredbecause of the loss of all Blackout - Greater than 4     normal electricalpower sourcesfor the power plantfor more hours.                       thanfour hours - AND - the loss of all emergency electrical power sourcesfor more thanfour hours (aprolongedStation Blackout) - AND - the overheatingof the nuclearfuel.
G3.1 Prolonged Station A General Emergency is declared because of the loss of all Blackout - Greater than 4 normal electrical power sources for the power plant for more hours.
G4.2       Failure of the Reactor to   A GeneralEmergency is declared,because the Reactor Automatically Shutdown - ProtectionSystem that is designed to automaticallyshut down AND - a Manual Reactor       (trip) the reactorfailedto do so AND, the ControlRoom Shutdown could not be Accomplished - AND -         Operatorswere unable to manually shut down (manually trip) the Operators are Unable to       reactorfrom the control room AND, the operatorsare unable to Cool the Nuclear fuel         cool the nuclearfuel.
than four hours - AND - the loss of all emergency electrical power sources for more than four hours (a prolonged Station Blackout) - AND - the overheating of the nuclear fuel.
G7.1       Confirmed Security Event A GeneralEmergency is declaredbecause of a confirmed security Loss of Plant Control.       event thatprevents the operatorsfrom being able to place the power plant in Cold Shutdown. This condition seriously degrades the safety level of the powerplant and the ability to protect the public's health andsafety. This event involves: The loss of physical control of the ControlRoom. - OR - The loss of physical control of the Remote Shutdown ControlArea.
G4.2 Failure of the Reactor to A General Emergency is declared, because the Reactor Automatically Shutdown -
G8.1       Judgment of the Shift       A GeneralEmergency is declaredby the Shift Manager /
Protection System that is designed to automatically shut down AND - a Manual Reactor (trip) the reactorfailed to do so AND, the Control Room Shutdown could not be Accomplished - AND -
Manager / Emergency         Emergency Director. The Shift Manager/ Emergency Director Director - Safety System     has theflexibility to declare an event if conditions exist that could Failures and Potential Radioactive Release.         result in substantialfuel damage anda substantialuncontrolled radiationrelease. - OR - have resulted in substantialfuel I damage and a potentialuncontrolledradiationrelease.
Operators were unable to manually shut down (manually trip) the Operators are Unable to reactor from the control room AND, the operators are unable to Cool the Nuclear fuel cool the nuclear fuel.
Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.
G7.1 Confirmed Security Event A General Emergency is declared because of a confirmed security Loss of Plant Control.
26
event that prevents the operators from being able to place the power plant in Cold Shutdown. This condition seriously degrades the safety level of the power plant and the ability to protect the public's health and safety. This event involves: The loss of physical control of the Control Room. - OR - The loss of physical control of the Remote Shutdown Control Area.
G8.1 Judgment of the Shift A General Emergency is declared by the Shift Manager /
Manager / Emergency Emergency Director. The Shift Manager / Emergency Director Director - Safety System has the flexibility to declare an event if conditions exist that could Failures and Potential Radioactive Release.
result in substantial fuel damage and a substantial uncontrolled radiation release. - OR - have resulted in substantial fuel I damage and a potential uncontrolled radiation release.
26 EAL Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.


EPIP-TMI-.27 Revision 18 EXHIBIT 4                                     Page 1 of 5 EMERGENCY DIRECTOR / EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST NOTE
EXHIBIT 4 EMERGENCY DIRECTOR / EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST NOTE
: a. This form is to be used for ALL turnovers.
: a.
: b. In the ECC:
This form is to be used for ALL turnovers.
: b.
In the ECC:
The Emergency Director or the Emergency Director Assistant may complete this form.
The Emergency Director or the Emergency Director Assistant may complete this form.
In the EOF:
In the EOF:
The Emergency Support Director or the Emergency Support Director Assistant may complete this form.
The Emergency Support Director or the Emergency Support Director Assistant may complete this form.
: c. This checklist need not be filled out in the order it is arranged.
: c.
This checklist need not be filled out in the order it is arranged.
Sections that are not applicable can be skipped and marked "N/A".
Sections that are not applicable can be skipped and marked "N/A".
EVENT CLASSIFICATION                                                 NOTIFICATIONS COMPLETED Level of Emergency             Date       Time         15 minute           1 hour NRC           1 hour (Hours)     Notifications         Notification         ERDS COMPLETE               COMPLETE         ACTIVATED
EVENT CLASSIFICATION EPIP-TMI-.27 Revision 18 Page 1 of 5 NOTIFICATIONS COMPLETED Level of Emergency Date Time 15 minute 1 hour NRC 1 hour (Hours)
                                        -          -        YES       NO         YES       NO     YES       NO UNUSUAL EVENT ALERT ITE AREA EMERGENCY                                                                               +        4 4          4          4          4
Notifications Notification ERDS COMPLETE COMPLETE ACTIVATED YES NO YES NO YES NO UNUSUAL EVENT ALERT ITE AREA EMERGENCY
-<3ENERAL EMERGENCY (PAR required)
-<3ENERAL EMERGENCY (PAR required) 4 4
DDQ      DI          IMADMATIArU ACTION                                                   YES         NO Information given to the Duty Public Information Representative VERBALLY approved Press release DRAFT release in review PRESS release APPROVED EVENT DESCRIPTION (Include pre-event information, current information, EALs, and Actions taken/planned) 27
4 4
+
4 DDQ
DI

IMADMATIArU ACTION YES NO Information given to the Duty Public Information Representative VERBALLY approved Press release DRAFT release in review PRESS release APPROVED EVENT DESCRIPTION (Include pre-event information, current information, EALs, and Actions taken/planned) 27


EPIP-TMI-.27 Revision 18 EXHIBIT 4                             Page 2 of 5
EXHIBIT 4
                        ***INFORMATION REGARDING PARs. NOT FOR PUBLIC RELEASE ***
*** INFORMATION REGARDING PARs. NOT FOR PUBLIC RELEASE ***
PAR has been provided to the STATE YES (-4)     1                   1       NO(4)                         NIA       I If YES, PAR RECOMMENDED PROTECTIVE ACTION IMPLEMENTED BY THE STATE, IF KNOWN PLANT STATUS REACTOR STATUS POWER OPERATION o                 % POWER STEADY STATE 0               MANUAL SHUTDOWN @               %/min o       HOT STANDBY             0       HOT SHUTDOWN SHUTDOWN 0       REACTOR TRIP               ___  AUTOMATIC               ___ MANUAL
PAR has been provided to the STATE YES (-4) 1 1
      ,OOLDOWN
NO(4)
'-'        COOLDOWN @           _    F/hr via O       FORCED CIRC with __ PUMPS             0       NATURAL CIRC with   __  AT o        Other (Explain)
NIA I
COLD SHUTDOWN o     DHR'A'           0       DHR'B'           0     LPI 'A'       0     LPI 'B' 0      OTHER (SPE ELECTRICAL STATUS o3     System GRID o       Main Generator Emergency Diesels       0]       'A'   0    'B'     0     SBO 0]        'A'   0    'B' Battery 0       OTHER (Specify) 28
If YES, PAR RECOMMENDED PROTECTIVE ACTION IMPLEMENTED BY THE STATE, IF KNOWN PLANT STATUS REACTOR STATUS POWER OPERATION o  
% POWER STEADY STATE 0 MANUAL SHUTDOWN @
o HOT STANDBY 0
HOT SHUTDOWN
%/min SHUTDOWN 0
REACTOR TRIP AUTOMATIC MANUAL
,OOLDOWN COOLDOWN @
F/hr via O
FORCED CIRC with __
PUMPS o
Other (Explain) 0 NATURAL CIRC with AT COLD SHUTDOWN o
DHR'A' 0
OTHER (SPE 0
DHR'B' 0
LPI 'A' 0
LPI 'B' ELECTRICAL STATUS o3 System GRID o
Main Generator Emergency Diesels Battery 0
OTHER (Specify) 0]
0]
'A'  
'A' 0
0
'B'  
'B' 0
SBO 28 EPIP-TMI-.27 Revision 18 Page 2 of 5


EPIP-TMI-.27 Revision 18 EXHIBIT 4                        Page 3 of 5 FISSION PRODUCT BARRIER STATUS REACTOR COOLANT SYSTEM Leak rate                   Leak rate INTACT     POTENTIAL         (gpm),                     (gpm),
EPIP-TMI-.27 Revision 18 Page 3 of 5 EXHIBIT 4 FISSION PRODUCT BARRIER STATUS REACTOR COOLANT SYSTEM Leak rate Leak rate INTACT POTENTIAL (gpm),
Barrier               jj/       LOSS (4)   / If KNOWN     LOSS (4) /     If KNOWN RCS (NOT OTSG)                                         /                       /
(gpm),
OTSG 'A'                                               /                       /
Barrier jj/
OTSG 'B'                                               I                       /
LOSS (4)  
CONTAINMENT BUILDING Barrier                                     INTACT (4)       POTENTIAL LOSS (4)   LOSS (4)
/
If KNOWN LOSS (4)  
/
If KNOWN RCS (NOT OTSG)  
/  
/
OTSG 'A'  
/  
/
OTSG 'B' I  
/
CONTAINMENT BUILDING Barrier INTACT (4)
POTENTIAL LOSS (4)
LOSS (4)
Building Integrity Bypass RB (e.g., OTSG leak to atmos.)
Building Integrity Bypass RB (e.g., OTSG leak to atmos.)
FUEL CLAD INTEGRITY Barrier                                     INTACT(4)       POTENTIAL LOSS(/)     LOSS(4)
FUEL CLAD INTEGRITY Barrier INTACT(4)
Clad EMERGENCY SYSTEMS ACTUATED 0]      NONE 0]      EMERGENCY FEEDWATER (EFW) q1      HIGH PRESSURE INJECTION (HPI)
POTENTIAL LOSS(/)
J~    CORE FLOOD (CF)
LOSS(4)
LOW PRESSURE INJECTION (LPI) 0]      REACTOR BUILDING SPRAY (BS)
Clad EMERGENCY SYSTEMS ACTUATED NONE EMERGENCY FEEDWATER (EFW)
PROBLEMS AT UNIT 2 OPEN TECHNICAL ISSUES (Provide specific details, including priortV) 29
HIGH PRESSURE INJECTION (HPI)
CORE FLOOD (CF)
LOW PRESSURE INJECTION (LPI)
REACTOR BUILDING SPRAY (BS) 0]
0]
q1 J~
0]
PROBLEMS AT UNIT 2 29 OPEN TECHNICAL ISSUES (Provide specific details, including priortV)


EPIP-TMI-.27 Revision 18 EXHIBIT 4                                 Page 4 of 5 RADIOLOGICAL CONDITIONS Is an abnormal, unplanned or uncontrolled release (monitored or unmonitored) in progress or suspected?
EXHIBIT 4 RADIOLOGICAL CONDITIONS Is an abnormal, unplanned or uncontrolled release (monitored or unmonitored) in progress or suspected?
o       YES     0       NO     0     N/A If YES, specify the release pathway:
o YES 0
If YES, describe release type:
NO 0
"o       Airborne release       El     Liquid release           01   Unknown "o       Other (Specify)
N/A If YES, specify the release pathway:
Have Field Monitoring Teams (FMT) been dispatched? El           YES   01       NO Have abnormal ON SITE or OFF SITE radiological conditions been detected by:
If YES, describe release type:  
0       Reuter Stokes         El     Field Monitoring Team Details:
"o Airborne release El Liquid release 01 Unknown "o
Abnormal radiation levels IN PLANT:     El      YES    0        NO Details (Location):
Other (Specify)
HAZMAT A HAZARDOUS MATERIAL EVENT HAS OCCURRED (See 1203-44)                   0     YES     0       NO HAS ENVIRONMENT AFFAIRS BEEN INFORMED?                                 El     YES     0       NO HAS THE HAZARDOUS MATERIAL ENTERED THE RIVER?                           0     YES     0       NO DETAILS (Location, Chemical, actions taken, etc.)
Have Field Monitoring Teams (FMT) been dispatched?
30
El YES 01 NO Have abnormal ON SITE or OFF SITE radiological conditions been detected by:
0 Reuter Stokes El Field Monitoring Team Details:
Abnormal radiation levels IN PLANT:
Details (Location):
El YES 0
NO HAZMAT A HAZARDOUS MATERIAL EVENT HAS OCCURRED (See 1203-44) 0 YES 0
NO HAS ENVIRONMENT AFFAIRS BEEN INFORMED?
El YES 0
NO HAS THE HAZARDOUS MATERIAL ENTERED THE RIVER?
0 YES 0
NO DETAILS (Location, Chemical, actions taken, etc.)
30 EPIP-TMI-.27 Revision 18 Page 4 of 5


EPIP-TMI-.27 Revision 18 EXHIBIT 4                  Page 5 of 5 PERSONNEL STATUS PERSONNEL INJURED                       0l   YES  HOW MANY            El    NO INJURED & CONTAMINATED 0l             YES  HOW MANY            El    NO TRANSPORT OFFSITE               []   YES  HOW MANY            El    NO SPECIFY THE OFFSITE FACILITY PERSONNEL CONTAMINATED                 0     YES   HOW MANY           13    NO DETAILS:
EPIP-TMI-.27 Revision 18 Page 5 of 5 PERSONNEL STATUS PERSONNEL INJURED 0l INJURED & CONTAMINATED 0l TRANSPORT OFFSITE
IS ONSITE ACCOUNTABILITY REQUIRED?                               0  YES 0]    NO IF YES, IS IT COMPLETE?                                   0  YES El    NO IS NON-ESSENTIAL PERSONNEL MUSTER REQUESTED?                     0  YES 0]    NO IF YES, LOCATION; HAVE NON-ESSENTIAL PERSONNEL BEEN EVACUATED?                     OE YES ES    NO IF YES, LOCATION; OTHER ISSUES;
[]
'6ETAILS   (Security, 10CFR50.54(x), etc.)
SPECIFY THE OFFSITE FACILITY YES YES YES HOW MANY HOW MANY HOW MANY PERSONNEL CONTAMINATED DETAILS:
FORM COMPLETED BY                                           DATE         TIME (NAME) 31
0 YES HOW MANY 0
0 0
IS ONSITE ACCOUNTABILITY REQUIRED?
IF YES, IS IT COMPLETE?
IS NON-ESSENTIAL PERSONNEL MUSTER REQUESTED?
IF YES, LOCATION; HAVE NON-ESSENTIAL PERSONNEL BEEN EVACUATED?
IF YES, LOCATION; YES YES YES 13 NO 0]
El 0]
OE YES ES OTHER ISSUES;
'6ETAILS (Security, 10CFR50.54(x), etc.)
FORM COMPLETED BY DATE TIME (NAME) 31 EXHIBIT 4 El El El NO NO NO NO NO NO NO


Number TMI - Unit I Emergency Plan Implementing Document                           EPIP-TMI-.27 le                                                                                    Revision No.
le Emerqencv Operations Facility TMI - Unit I Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.
Emerqencv Operations Facility                                                                        18 EXHIBIT 5                                       Page 1 of 2 Emergency Support Director Briefing Sheet NOTE This checklist may be completed by the ESD Assistant or EP Representative.
18 EXHIBIT 5 Emergency Support Director Briefing Sheet Page 1 of 2 NOTE This checklist may be completed by the ESD Assistant or EP Representative.
NOTE This checklist may be filled out in any sequence. Items that do not apply to the present situation may be skipped and marked "N/A".
NOTE This checklist may be filled out in any sequence. Items that do not apply to the present situation may be skipped and marked "N/A".
1.0 Conduct a briefing periodically. (Hourly and after significant changes in plant conditions).
1.0 Conduct a briefing periodically. (Hourly and after significant changes in plant conditions).
Briefing Time
Briefing Time
: a. Emergency classification/emergency organization status
: a.
: b. Plant status (temperature, pressure, leak rate, equipment status etc.)
Emergency classification/emergency organization status b.
RCS Temp                           RCS Press                               RCP Status RB Sump                             RB Flood                                 BWST
Plant status (temperature, pressure, leak rate, equipment status etc.)
: c. Radiological conditions (specific release pathway, verify release duration, in plant radiological conditions, etc.)
RCS Temp RCS Press RCP Status RB Sump RB Flood BWST 32
32
: c.
Radiological conditions (specific release pathway, verify release duration, in plant radiological conditions, etc.)


Number TMI - Unit 1 Emergency Plan I              Implementing Document                           EPIP-TMI-.27 "itle                                                                               i tRevision NO.
TMI - Unit 1 Emergency Plan Implementing Document "itle  
'Emergency Operations Facility                                                                         18 EXHIBIT 5                                       Page 2 of 2
'Emergency Operations Facility EXHIBIT 5
: d. Work in progress (equipment problems, evolutions in progress, etc.)
: d.
Priorty jobs to mitigate event 1) 2)
Work in progress (equipment problems, evolutions in progress, etc.)
3) 4)
Priorty jobs to mitigate event
Other
: e.
: e. Personnel status (muster, accountability, evacuation, contamination, etc.)
: f.
: f. Security and offsite support (security conditions, required offsite support)
g.
: g. Mitigating activities, future plans 33
Number EPIP-TMI-.27 tRevision NO.
18 Page 2 of 2
: 1)
: 2)
: 3)
: 4)
Other Personnel status (muster, accountability, evacuation, contamination, etc.)
Security and offsite support (security conditions, required offsite support)
Mitigating activities, future plans 33 I
i


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
  -11e                                                                                         Revision No.
-11e Revision No.  
..*mergency Operations Facility                                                                             18 EXHIBIT 6                                     Page 1 of 2 EOF Access Control Checklist Initials 1.0 Upon arrival at the EOF, request Environmental Radioactivity Lab personnel to unlock the door and keep the Main Gate open.
..*mergency Operations Facility 18 EXHIBIT 6 Page 1 of 2 EOF Access Control Checklist Initials 1.0 Upon arrival at the EOF, request Environmental Radioactivity Lab personnel to unlock the door and keep the Main Gate open.  
          - 2.0 Ensure all entrances other than the main entrance are locked or have positive access control in order to maintain access control to the EOF.
- 2.0 Ensure all entrances other than the main entrance are locked or have positive access control in order to maintain access control to the EOF.  
          - 3.0 Activate the DADCO Door Monitor (located at the Main Entrance) by depressing the "Green" power button.
- 3.0 Activate the DADCO Door Monitor (located at the Main Entrance) by depressing the "Green" power button.
: a.         Locate door number (1) on the alarm panel and place this door in standby mode by depressing the "black" button one time.
: a.
Locate door number (1) on the alarm panel and place this door in standby mode by depressing the "black" button one time.
NOTE This will cause the indicator light to switch from solid green to amber.
NOTE This will cause the indicator light to switch from solid green to amber.
: b.         If an alarm is received on any other alarmed door, silence the alarm by depressing the silence button. This will terminate audible alarm.
: b.
: c.         Check status of door by depressing black button corresponding to the door one time. If door is open, the amber light will flash. If closed, amber light will remain solid.
If an alarm is received on any other alarmed door, silence the alarm by depressing the silence button. This will terminate audible alarm.
: d.         If door indicator light is flashing or is solid (amber), notify Group Lead Admin. Support or E.P. Rep. to verify status of door. Request a walkthrough be conducted to verify only authorized personnel are present in the facility.
: c.
: e.         If door is verified to be secure, reset door by depressing black button corresponding to door, to return indicator button to green secure mode.
Check status of door by depressing black button corresponding to the door one time. If door is open, the amber light will flash. If closed, amber light will remain solid.
_f.       If door is unsecure, and must remain open, positive access control shall be determined by Group Leader Admin Support or E.P. Rep.
: d.
If door indicator light is flashing or is solid (amber), notify Group Lead Admin. Support or E.P. Rep. to verify status of door. Request a walkthrough be conducted to verify only authorized personnel are present in the facility.
: e.
If door is verified to be secure, reset door by depressing black button corresponding to door, to return indicator button to green secure mode.
_f.
If door is unsecure, and must remain open, positive access control shall be determined by Group Leader Admin Support or E.P. Rep.
4.0 Obtain the EOF access list from the glass case located next to the name board and ensure all authorized personnel frisk, if necessary.
4.0 Obtain the EOF access list from the glass case located next to the name board and ensure all authorized personnel frisk, if necessary.
34
34


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 Revision No.
TMI - Unit 1 Emergency Plan Implementing Document Emergency Operations Facility EXHIBIT 6 Number EPIP-TMI-.27 Revision No.
Emergency Operations Facility                                                                      18 EXHIBIT 6                                    Page 2 of 2 NOTE Personnel requesting entry to the EOF, must produce a TMI company photo ID badge or be on the approved access list. All other personnel requesting entry must be authorized by the Group Leader Administrative Support, the Emergency Preparedness Representative or the Emergency Support Director.
18 Page 2 of 2 NOTE Steps a, b, and c, below, may be performed in any order and may be repeated if necessary. Any of these steps that are not needed can be skipped and marked "N/A".
NOTE Steps a, b, and c, below, may be performed in any order and may be repeated if necessary. Any of these steps that are not needed can be skipped and marked "N/A".
: a.
a. If unauthorized personnel attempt to gain access to the EOF, the individual assigned access control should contact Dauphin County Control by dialing 911 on an outside line and request assistance from the Susquehanna Township Police.
If unauthorized personnel attempt to gain access to the EOF, the individual assigned access control should contact Dauphin County Control by dialing 911 on an outside line and request assistance from the Susquehanna Township Police.
b. If a person frisking causes an alarm, direct the individual to remain at that location and notify Group Leader R&EC.
: b.
: c. If you are notified by an individual that they have consumed an alcoholic beverage within the past five (5) hours or believe an individual should be tested for Fitness for Duty requirements, notify the Emergency Preparedness Representative.
If a person frisking causes an alarm, direct the individual to remain at that location and notify Group Leader R&EC.
  - 5.0 Forward completed checklist to the Emergency Preparedness Representative.
: c.
NAME                                                          TIME                  DATE EOF Access Control 35
If you are notified by an individual that they have consumed an alcoholic beverage within the past five (5) hours or believe an individual should be tested for Fitness for Duty requirements, notify the Emergency Preparedness Representative.
5.0 Forward completed checklist to the Emergency Preparedness Representative.
EOF Access Control TIME DATE 35 NOTE Personnel requesting entry to the EOF, must produce a TMI company photo ID badge or be on the approved access list. All other personnel requesting entry must be authorized by the Group Leader Administrative Support, the Emergency Preparedness Representative or the Emergency Support Director.
NAME


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 "le                                                                                            Revision No.
TMI - Unit 1 Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.
&#xfd;--mergency Operations Facility                                                                                18 EXHIBIT 7                                       Page 1 of 2 TMI Access Authorization Checklist NAME:                                                                       COMPANY:
18 EXHIBIT 7 TMI Access Authorization Checklist Page 1 of 2 NAME:
SSN:                                                                       BADGE #:
COMPANY:
SSN:
BADGE #:
The criteria identified by this checklist shall be completed and verified prior to authorizing access of NRC personnel during emergency conditions. Deviation from these requirements shall only be permitted at the direction of the Emergency Director, Emergency Support Director or their designee.
The criteria identified by this checklist shall be completed and verified prior to authorizing access of NRC personnel during emergency conditions. Deviation from these requirements shall only be permitted at the direction of the Emergency Director, Emergency Support Director or their designee.
NOTE Complete only the applicable sections of this checklist, mark other sections "N/A" (e.g., mark Section A as N/A for non-NRC personnel).
NOTE Complete only the applicable sections of this checklist, mark other sections "N/A" (e.g., mark Section A as N/A for non-NRC personnel).
A.       NRC personnel shall be granted unfettered access upon verification of:
A.
_        The representative possesses "Q" or "L" clearance, has been authorized site access by the NRC Region I Office (King of Prussia, PA) or the NRC Headquarters (Rockville, MD) and appears on the current TMI Access Roster/5 SS Screen.
NRC personnel shall be granted unfettered access upon verification of:
_        The representative possesses a "Q" or "L" clearance, has been authorized access by Regional Office and/or Headquarters, but does not appear on the TMI Access Roster/5 SS terminal. In this case a letter of access authorization shall be forwarded (via telefax) to the Emergency Operations Facility.
The representative possesses "Q" or "L" clearance, has been authorized site access by the NRC Region I Office (King of Prussia, PA) or the NRC Headquarters (Rockville, MD) and appears on the current TMI Access Roster/5 SS Screen.
_        The representative does not possess a "Q" or "L" clearance and must have an escort for entry into the protected area.
The representative possesses a "Q" or "L" clearance, has been authorized access by Regional Office and/or Headquarters, but does not appear on the TMI Access Roster/5 SS terminal. In this case a letter of access authorization shall be forwarded (via telefax) to the Emergency Operations Facility.
The representative does not possess a "Q" or "L" clearance and must have an escort for entry into the protected area.
If Step 1 or 2 are complete check box 1 on Access Authorization Form, if only Step 3 is completed, check box 2 on Access Authorization Form.
If Step 1 or 2 are complete check box 1 on Access Authorization Form, if only Step 3 is completed, check box 2 on Access Authorization Form.
Verification Signature:
Verification Signature:
Group Leader Admin Support/Designee                                   Date All other personnel require Emergency Director, Emergency Support Director or designee authorization and if not fully qualified for unescorted access require a qualified site staff member as an escort.
Group Leader Admin Support/Designee All other personnel require Emergency Director, Emergency Support Director or designee authorization and if not fully qualified for unescorted access require a qualified site staff member as an escort.
NOTE Permission for site entry should be obtained through the ESD Assistant.
NOTE Permission for site entry should be obtained through the ESD Assistant.
B.       Rad Con (Non-RWP Access)
B.
_        Complete Temporary Issue Paperwork.
Rad Con (Non-RWP Access)
_        Issue TLD.
Complete Temporary Issue Paperwork.
Issue TLD.
Verification Signature:
Verification Signature:
Group Leader R&EC/Designee                                             Date 36
Group Leader R&EC/Designee "le
&#xfd;--mergency Operations Facility Date 36 Date


Number TMI - Unit I Emergency Plan Implementing Document                       EPIP-TMI-.27
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27  
  )e                                                                                     Revision No.
)e Revision No.
Emergency Operations Facility                                                                           18 EXHIBIT 7                                     Page 2 of 2 C.         Rad Con/Training (Escorted RWP Access - No Respirator Areas)
Emergency Operations Facility 18 EXHIBIT 7 Page 2 of 2 C.
_      Complete Step B.
Rad Con/Training (Escorted RWP Access - No Respirator Areas)
_      View G.E.T. Film.
Complete Step B.
View G.E.T. Film.
NOTE Both 1/2 inch and 3/4 inch format tapes are stored in the EOF cabinet.
NOTE Both 1/2 inch and 3/4 inch format tapes are stored in the EOF cabinet.
_      Practical Factor Performance not required.
Practical Factor Performance not required.
_      Whole Body Count (waived if no facilities available).
Whole Body Count (waived if no facilities available).
Check Box 3 of the Access Authorization Form Verification Signature:
Check Box 3 of the Access Authorization Form Verification Signature:
Group Leader R&EC/Designee                                       Date D.       Rad Con (Unescorted RWP Access - No respirator Areas)
Group Leader R&EC/Designee Date D.
* Ensure Steps B and C are complete.
Rad Con (Unescorted RWP Access - No respirator Areas)
_      Complete practical factors.
Ensure Steps B and C are complete.
Complete practical factors.
Individual granted unescorted RWP Access (No Respirator Areas).
Individual granted unescorted RWP Access (No Respirator Areas).
Check Box 4 of the Access Authorization Form.
Check Box 4 of the Access Authorization Form.
Verification Signature:
Verification Signature:
Group Leader R&EC/Designee                                             Date E.       Rad Con (Unescorted RWP Access with Respirator)
Group Leader R&EC/Designee Date E.
_      Ensure Steps B, C and D complete.
Rad Con (Unescorted RWP Access with Respirator)
Ensure Steps B, C and D complete.
Documentation provided by NRC of satisfactory completion of respiratory medical or receive GPU Nuclear medical.
Documentation provided by NRC of satisfactory completion of respiratory medical or receive GPU Nuclear medical.
_      Complete TMI Respirator Training.
Complete TMI Respirator Training.
_      Complete TMI Respirator Fit Test.
Complete TMI Respirator Fit Test.
Individual granted unescorted RWP Access to all areas.
Individual granted unescorted RWP Access to all areas.
Check Box 5 of the Access Authorization Form.
Check Box 5 of the Access Authorization Form.  
*rification Signature:
*rification Signature:
Group Leader R&EC/Designee                                             Date 37
Group Leader R&EC/Designee Date 37


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.27 Je                                                                                          Revision No.
TMI - Unit 1 Emergency Plan Implementing Document Je Emergency Operations Facility Number EPIP-TMI-.27 Revision No.
Emergency Operations Facility                                                                              18 EXHIBIT 7A                                       Page 1 of 1 NRC TMI Access Authorization NAME:                                                                         SSN:
18 EXHIBIT 7A NRC TMI Access Authorization NAME:
EJ 1.         Authorized unescorted TMI Site Access.
SSN:
: 1.
Authorized unescorted TMI Site Access.
Authorized by Signature:
: 2.
Authorized escorted TMI Site Access.
Authorized by Signature:
Authorized by Signature:
0D 2.         Authorized escorted TMI Site Access.
: 3.
Authorized non-respirator RWP Access with an escort.
Authorized by Signature:
Authorized by Signature:
0      3. Authorized non-respirator RWP Access with an escort.
: 4.
Authorized unescorted non-respirator RWP Access.
Authorized by Signature:
Authorized by Signature:
: 4. Authorized unescorted non-respirator RWP Access.
: 5.
DL            Authorized by Signature:
Authorized to wear the following respirator(s) and unescorted RWP Access.
: 5. Authorized to wear the following respirator(s) and unescorted RWP Access.
Respirator Type Size Respirator Type Size Authorized by Signature:
Respirator Type           _                            Size Respirator Type         _                            Size Authorized by Signature:
Security Badge #:
Security Badge #:                     Issued By:                                       Date:
Issued By:
Date:
NOTE It is the individual's responsibility to maintain a copy of this form with them at all times. Failure to keep a copy of this form can result in Site/RWP Access being denied.
NOTE It is the individual's responsibility to maintain a copy of this form with them at all times. Failure to keep a copy of this form can result in Site/RWP Access being denied.
38
38 Page 1 of 1 EJ 0D 0
DL


EPIP-TMI-.27 Revision 18 EXHIBIT 8                                     Page 1 of 1 TMI Par Logic Diagram SITE AREA EMERGENCY IS DECLARED Determine which initial PAR is appropriate if a GENERAL EMERGENCY is declared.
EPIP-TMI-.27 Revision 18 EXHIBIT 8 Page 1 of 1 TMI Par Logic Diagram I CONTINUE ASSESSMENT BASED ON ALL AVAILABLE PLANT DATA AND FIELD M
MONITORING INFORMATIONI 4,
I Expand EVACUATION recommendation to the 10 mile radius around the plant if VALID dose assessment/measurement information indicates that areas outside the 5 mile radius will exceed 1 REM TEDE or 5 REM CDE (Child Thyroid)
I 39 SITE AREA EMERGENCY IS DECLARED Determine which initial PAR is appropriate if a GENERAL EMERGENCY is declared.
(1) Evacuate the 5 mile radius around the plant and shelter the 5 to 10 mile radius around the plant OR (2) Shelter the 10 mile radius around the plant Continue assessment of all available Plant and Field Monitoring information.
(1) Evacuate the 5 mile radius around the plant and shelter the 5 to 10 mile radius around the plant OR (2) Shelter the 10 mile radius around the plant Continue assessment of all available Plant and Field Monitoring information.
GENERAL EMERGENCY IS DECLARED EVACUATE THE 5 MILE RADIUS AROUND THE PLANT AND SHELTER THE 5 TO 10 MILE RADIUS AROUND THE PLANT UNLESS IT IS KNOWN THAT SHELTERING OF THE 10 MILE RADIUS AROUND THE PLANT WILL OFFER GREATER PROTECTION.
GENERAL EMERGENCY IS DECLARED EVACUATE THE 5 MILE RADIUS AROUND THE PLANT AND SHELTER THE 5 TO 10 MILE RADIUS AROUND THE PLANT UNLESS IT IS KNOWN THAT SHELTERING OF THE 10 MILE RADIUS AROUND THE PLANT WILL OFFER GREATER PROTECTION.
(See NOTE below)
(See NOTE below)
I MONITORING INFORMATIONI CONTINUE ASSESSMENT BASED ON ALL AVAILABLE PLANT DATA AND FIELD M
NOTE The intent is to evacuate the 5 mile radius around the plant as an initial PAR. The decision to recommend sheltering rather than evacuation should be made ONLY when it is clear that the evacuation cannot be completed within the release time. For example, the release has already stopped, the release can be stopped simply by turning off a piece of equipment, or there is a deliberate venting of the Containment Building with more than one valve available for isolation.
4, VALID dose assessment/measurement information indicates that areas outside the 5 mile radius I Expand        will exceed recommendation EVACUATION        1 REM TEDE or 5toREM the CDE NOTE (Child 10 mile    Thyroid) radius  around the plant if        I The intent is to evacuate the 5 mile radius around the plant as an initial PAR. The decision to recommend sheltering rather than evacuation should be made ONLY when it is clear that the evacuation cannot be completed within the release time. For example, the release has already stopped, the release can be stopped simply by turning off a piece of equipment, or there is a deliberate venting of the Containment Building with more than one valve available for isolation.
SECURITY EVENT  
SECURITY EVENT
"* When EITHER the Control Room or the Remote Shutdown area is available the initial PAR should be to SHELTER the 10 mile radius around the plant.  
            "* When EITHER the Control Room or the Remote Shutdown area is available the initial PAR should be to SHELTER the 10 mile radius around the plant.
"* When BOTH the Control Room and the Remote Shutdown area are lost the initial PAR should be to EVACUATE the 5 mile radius and SHELTER the 5 to 10 mile radius around the plant.
            "* When BOTH the Control Room and the Remote Shutdown area are lost the initial PAR should be to EVACUATE the 5 mile radius and SHELTER the 5 to 10 mile radius around the plant.
39


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.27 le                                                                                             Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                                 18 EXHIBIT 9                                       Page 1 of 3 EP Representative Activation 1.0     Start log for your position in accordance with EPIP-TMI-.05.
Emergency Operations Facility 18 EXHIBIT 9 Page 1 of 3 EP Representative Activation 1.0 Start log for your position in accordance with EPIP-TMI-.05.
NOTE Steps a through c may be completed in any sequence. Steps that do not apply to the present situation may be skipped or marked "N/A".
NOTE Steps a through c may be completed in any sequence. Steps that do not apply to the present situation may be skipped or marked "N/A".
: a.       Establish Access Control in accordance with Exhibit 6, EOF Access Control Checklist until relieved by the Group Leader Admin Support.
: a.
Establish Access Control in accordance with Exhibit 6, EOF Access Control Checklist until relieved by the Group Leader Admin Support.
If an individual is not available to implement Exhibit 6, proceed as follows:
If an individual is not available to implement Exhibit 6, proceed as follows:
: i.           Insure the door is locked ii.           Display a sign stating "Ring doorbell for facility access".
: i.
: b.       Test ESO personnel who admit to having had a drink in the last five hours in accordance with Fitness for Duty requirements (Exhibit 9A).
Insure the door is locked ii.
: c.       Determine if the EOF is 1 hour (from the time displayed on the pager) staffed and ready to be "activated.
Display a sign stating "Ring doorbell for facility access".
: b.
Test ESO personnel who admit to having had a drink in the last five hours in accordance with Fitness for Duty requirements (Exhibit 9A).
: c.
Determine if the EOF is 1 hour (from the time displayed on the pager) staffed and ready to be "activated.
Ensure that personnel properly use the EOF Name Board and are wearing tags to identify the position they are filling.
Ensure that personnel properly use the EOF Name Board and are wearing tags to identify the position they are filling.
                          *Determine vacant positions by looking at remaining nametags
* Determine vacant positions by looking at remaining nametags
: a.           Ensure that vacant positions are provided to the EOF Communications Coordinator so that personnel can be contacted to fill the positions.
: a.
Ensure that vacant positions are provided to the EOF Communications Coordinator so that personnel can be contacted to fill the positions.
Obtain an activation status report from the following positions:
Obtain an activation status report from the following positions:
: a.           ESD Assistant
: a.
: b.           Group Leader - Rad and Env Controls
ESD Assistant
: c.           Technical Support Rep
: b.
: d.           Public Information Representative - EOF
Group Leader - Rad and Env Controls
: e.           EOF Communications Coordinator
: c.
: f.           RAC Line Communicator
Technical Support Rep
: g.           ESD Logkeeper
: d.
: h.           EAC 40
Public Information Representative - EOF
: e.
EOF Communications Coordinator
: f.
RAC Line Communicator
: g.
ESD Logkeeper
: h.
EAC 40


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 le                                                                                           Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                               18 EXHIBIT 9                                     Page 2 of 3
Emergency Operations Facility 18 EXHIBIT 9 Page 2 of 3
: d. When all of the above positions are activated, report to the ESD that the EOF is 1 hour staffed and ready to be activated.
: d.
2.0 EP Operational Checklist NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
When all of the above positions are activated, report to the ESD that the EOF is 1 hour staffed and ready to be activated.
: a. Determine status of the Emergency Response Facilities from the ED Assistant and report the results to the ESD Assistant.
2.0 EP Operational Checklist NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
: b. Inform the ESD that the EOF is fully staffed when the Group Leader Administrative Support and supporting staff have arrived.
: a.
: c. Advise the ESD and other Emergency Response Organization members on all Emergency Plan related matters.
Determine status of the Emergency Response Facilities from the ED Assistant and report the results to the ESD Assistant.
* Proper interface with the State and the NRC
: b.
* Proper Emergency Classification Level
Inform the ESD that the EOF is fully staffed when the Group Leader Administrative Support and supporting staff have arrived.
* Proper Protective Action Recommendation 0             Proper use of Emergency Plan Implementing Procedures
: c.
* Offsite notifications (if that responsibility has been transferred to the EOF)
Advise the ESD and other Emergency Response Organization members on all Emergency Plan related matters.
: d. Upon the arrival of the NRC and State personnel
Proper interface with the State and the NRC Proper Emergency Classification Level Proper Protective Action Recommendation 0
* Provide a briefing.
Proper use of Emergency Plan Implementing Procedures Offsite notifications (if that responsibility has been transferred to the EOF)
: i.           Status of the Event ii.         Structure of TMI organization iii.         Request directives in writing to the ESD NOTE Use completed Exhibit 4 and, if available, Exhibit 5 to enhance the briefings Introduce them to their counterparts.
: d.
Upon the arrival of the NRC and State personnel Provide a briefing.
: i.
Status of the Event ii.
Structure of TMI organization iii.
Request directives in writing to the ESD NOTE Use completed Exhibit 4 and, if available, Exhibit 5 to enhance the briefings Introduce them to their counterparts.
41
41


Number TMI - Unit 1 Emergency Plan Implementing Document                     EPIP-TMI-.27 tie                                                                             Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.
Emergency Operations Facility                                                                 18 EXHIBIT 9                                 Page 3 of 3 Act as the point of contact for the PEMA representative.
Emergency Operations Facility 18 EXHIBIT 9 Page 3 of 3 Act as the point of contact for the PEMA representative.
: e. Attend all ESD Conferences 0         Log all conference Action Items on conference room status board.
: e.
* Ensure that mitigating activities are discussed.
Attend all ESD Conferences 0
0         Lead the review of the PAR Logic Diagram.
Log all conference Action Items on conference room status board.
0         Ensure the State and the NRC are given an opportunity to ask questions.
Ensure that mitigating activities are discussed.
: f. Determine status of the State and Local Emergency Operations Centers from the PEMA representative and report the results to the ESD Assistant.
0 Lead the review of the PAR Logic Diagram.
: g. Ensure the TMI Emergency Responders Information Brochure (located in the EOF Emergency Supplies Cabinet) are made available to responding government agencies (e.g., NRC, PEMA),
0 Ensure the State and the NRC are given an opportunity to ask questions.
: f.
Determine status of the State and Local Emergency Operations Centers from the PEMA representative and report the results to the ESD Assistant.
: g.
Ensure the TMI Emergency Responders Information Brochure (located in the EOF Emergency Supplies Cabinet) are made available to responding government agencies (e.g., NRC, PEMA),
industry support groups (e.g., INPO), etc.
industry support groups (e.g., INPO), etc.
: h. If problems are encountered with the Emergency Telephones, contact the EOF Communications Coordinator.
: h.
: i. Upon close out of the drill/emergency:
If problems are encountered with the Emergency Telephones, contact the EOF Communications Coordinator.
* Collect all completed EOF logs and forms
: i.
* Collect all EACC logs and forms
Upon close out of the drill/emergency:
* Provide them to the Emergency Preparedness Department Name                                                                 Time             Date Emergency Preparedness Representative 42
Collect all completed EOF logs and forms Collect all EACC logs and forms Provide them to the Emergency Preparedness Department Name Time Date Emergency Preparedness Representative 42


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 tie                                                                                          Revision No.
TMI - Unit 1 Emergency Plan Implementing Document tie Emergency Operations Facility EXHIBIT 9A Number EPIP-TMI-.27 Revision No.
Emergency Operations Facility                                                                              18 EXHIBIT 9A                                    Page 1 of 3 Emergency Operations Facility Fitness for Duty Determination Instructions NOTE The fitness for duty rule applies to all TMI employees (including TMI contractors and vendors) granted unescorted access to the protected area or who are required by position or name to report to the EOF. These instructions address their evaluation for utilization in an emergency only.
18 Page 1 of 3 Emergency Operations Facility Fitness for Duty Determination Instructions ScoPe:
All "for cause" evaluations must be conducted by the Medical or Security Department.
ScoPe:
In accordance with I 000-ADM-2002.06, Fitness for Duty, individuals responding to an emergency who have consumed alcohol within the previous five hours but believe that they are fit for duty shall inform the Emergency Support Director and receive an evaluation. Contractor/vendor personnel shall be asked if they have consumed alcohol within the previous five hours. If the answer is yes, an evaluation shall be conducted.
In accordance with I 000-ADM-2002.06, Fitness for Duty, individuals responding to an emergency who have consumed alcohol within the previous five hours but believe that they are fit for duty shall inform the Emergency Support Director and receive an evaluation. Contractor/vendor personnel shall be asked if they have consumed alcohol within the previous five hours. If the answer is yes, an evaluation shall be conducted.
Instructions:
Instructions:  
"-he Emergency Support Director shall direct the Emergency Preparedness Representative to administer the breath icohol evaluation in accordance with Exhibit 9A.
"-he Emergency Support Director shall direct the Emergency Preparedness Representative to administer the breath icohol evaluation in accordance with Exhibit 9A.
NOTE Extra copies of ALCO Sensor III operational checklist are kept with the instrument.
NOTE Extra copies of ALCO Sensor III operational checklist are kept with the instrument.
Based on the results of the test, perform the following:
Based on the results of the test, perform the following:
: a.       BAC 0.01% or less Allow the individual to work in the facility.
: a.
: b.       BAC greater than 0.01% but less than 0.04%
BAC 0.01% or less Allow the individual to work in the facility.
: b.
BAC greater than 0.01% but less than 0.04%
Allow the individual to work in the facility. Re-test the individual approximately every thirty minutes to determine the maximum BAC. If the maximum BAC is equal to or greater than 0.04%, refer to Step 3. If less than 0.04%, no further action is required.
Allow the individual to work in the facility. Re-test the individual approximately every thirty minutes to determine the maximum BAC. If the maximum BAC is equal to or greater than 0.04%, refer to Step 3. If less than 0.04%, no further action is required.
43
43 NOTE The fitness for duty rule applies to all TMI employees (including TMI contractors and vendors) granted unescorted access to the protected area or who are required by position or name to report to the EOF. These instructions address their evaluation for utilization in an emergency only.
All "for cause" evaluations must be conducted by the Medical or Security Department.


Number TMI - Unit 1 Emergency Plan Implementinq Document                             EPIP-TMI-.27 le                                                                                          Revision No.
TMI - Unit 1 Emergency Plan Implementinq Document le Emerqencv Operations Facility EXHIBIT 9A Number EPIP-TMI-.27 Revision No.
Emerqencv Operations Facility                                                                              18 EXHIBIT 9A                                        Page 2 o f 3
18 Page 2 o f 3
: c. BAC equal to or greater than 0.04%
: c.
BAC equal to or greater than 0.04%
If determined that the individual's unique knowledge or skills are required, that individual shall only be permitted to work with the permission of the Site Director (or in his/her absence, his/her designee),
If determined that the individual's unique knowledge or skills are required, that individual shall only be permitted to work with the permission of the Site Director (or in his/her absence, his/her designee),
Emergency Support Director, Emergency Director or Office of the President only after satisfactory assurance that the individual is capable of performing his/her duties. Remind the Emergency Support Director that if this individual is needed to work, he/she must be escorted at all times. Arrangements should be made as soon as practicable for (for cause) testing in accordance with 1000-ADM-2002.06.
Emergency Support Director, Emergency Director or Office of the President only after satisfactory assurance that the individual is capable of performing his/her duties. Remind the Emergency Support Director that if this individual is needed to work, he/she must be escorted at all times. Arrangements should be made as soon as practicable for (for cause) testing in accordance with 1000-ADM-2002.06.
NOTE Individuals not "on call" who report to their facility and test equal to or greater than 0.04 percent BAC are not subject to disciplinary action.
NOTE Individuals not "on call" who report to their facility and test equal to or greater than 0.04 percent BAC are not subject to disciplinary action.
: d. Ensure the individual who tested equal to or greater than 0.04, if not needed, is not permitted to drive home.
: d.
Ensure the individual who tested equal to or greater than 0.04, if not needed, is not permitted to drive home.
Provide a place for the individual to rest or contact Group Leader - Admin Support to arrange for transportation.
Provide a place for the individual to rest or contact Group Leader - Admin Support to arrange for transportation.
: e. Be alert for any individual that exhibits aberrant behavior or the smell of alcohol. Test these individuals in accordance with this exhibit. If aberrant behavior cannot be attributed to a positive BAC reading, ask the Group Leader - Admin Support to contact the Security Department for further action.
: e.
Be alert for any individual that exhibits aberrant behavior or the smell of alcohol. Test these individuals in accordance with this exhibit. If aberrant behavior cannot be attributed to a positive BAC reading, ask the Group Leader - Admin Support to contact the Security Department for further action.
44
44


Number TMI - Unit 1 Emergency Plan ImplementinQ Document                 i EPIP-TMI-.27
,e Emerqency Operations Facility TMI - Unit 1 Emergency Plan ImplementinQ Document Number EPIP-TMI-.27 Revision No.
    ,e                                                                                          Revision No.
18 EXHIBIT 9A ALCO Sensor III Operational Checklist Sample TEST SUBJECT NAME:
Emerqency Operations Facility                                                                              18 EXHIBIT 9A                                     Page 3 of 3 ALCO Sensor III Operational Checklist Sample TEST SUBJECT NAME:                                                       DATE SOCIAL SECURITY NO:                                                      SERIA,L NO:
SOCIAL SECURITY NO:
TIME OF TEST:             TEST 1                                         TEST 2 TEST RESULT (BAC): TEST 1 0.                                     %      TEST. 2      0.                            %
TIME OF TEST:
OPERATOR NAME:                                                          SIGNA,TURE:
TEST 1 TEST RESULT (BAC): TEST 1
: 0.
OPERATOR NAME:
INSTRUCTIONS - check each box after completion of step.
INSTRUCTIONS - check each box after completion of step.
NOTE The fifteen minute observation pedod of the subject may be waived as long as a positive test result is not received. Should a positive test result be indicated, it shall be disregarded and the alcohol breath test started anew after at least a 15 minute observation period.
DATE SERIA TEST TEST.
SIGNA
,L NO:
Page 3 of 3 2
2
: 0.  
,TURE:
A weak battery is indicated by an "8.888" in the display window. Replace battery.
A weak battery is indicated by an "8.888" in the display window. Replace battery.
: 1. LI       Check temperature window on back of unit (should read 200 to 360 C).
: 1.
: 2. Li       Have the individual mount mouth piece on unit.
LI Check temperature window on back of unit (should read 200 to 360 C).
Li       Press "READ" button and hold for 10 seconds. Check to see if .000 is constant. If not, press "Set"
: 2.
-                button and recheck in one minute. If the display reads greater than .000, remove the instrument from service and forward to the Medical Department for repair and use another instrument for testing.
Li Have the individual mount mouth piece on unit.
: 4. Li       Press "SET" button.
Li Press "READ" button and hold for 10 seconds. Check to see if.000 is constant. If not, press "Set" button and recheck in one minute. If the display reads greater than.000, remove the instrument from service and forward to the Medical Department for repair and use another instrument for testing.
: 4.
Li Li
: 5.
Li Li
: 6.
Li Li
: 7.
Li
Li
: 5. Li        Instruct subject to take a deep breath and blow steadily through the tube until told to stop Li      (minimum of 4 seconds). (NO smoking within fifteen [15] minutes of test.)
: 8.
: 6. Li      Push "READ" button during third second that the subject is blowing. (Subject MUST continue Li      to blow for a minimum of one [1] second after the "READ" button is depressed.)
: 7. Li      Keep "READ" button depressed until reading stops climbing.
: 8. Li        Record reading and time of TEST 1/TEST 2. (NOTE: The two readings must agree within
                  +/-10% of the averages of the two measurements, if not, use another instrument).
: 9. Li        Press "SET" button to accelerate elimination of reading and electrically clean the cell surface.
Li
Li
: 10. Li       Wait a minimum of two minutes and a maximum of 10 minutes and repeat Steps 3 through 9.
: 9.
45
Li Li Press "SET" button.
Instruct subject to take a deep breath and blow steadily through the tube until told to stop (minimum of 4 seconds). (NO smoking within fifteen [15] minutes of test.)
Push "READ" button during third second that the subject is blowing. (Subject MUST continue to blow for a minimum of one [1] second after the "READ" button is depressed.)
Keep "READ" button depressed until reading stops climbing.
Record reading and time of TEST 1/TEST 2. (NOTE: The two readings must agree within
+/-10% of the averages of the two measurements, if not, use another instrument).
Press "SET" button to accelerate elimination of reading and electrically clean the cell surface.
: 10.
Li Wait a minimum of two minutes and a maximum of 10 minutes and repeat Steps 3 through 9.
45 NOTE The fifteen minute observation pedod of the subject may be waived as long as a positive test result is not received. Should a positive test result be indicated, it shall be disregarded and the alcohol breath test started anew after at least a 15 minute observation period.
i


Number TMI- Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 e                                                                                       Revision No.
Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e
Emergency Operations Facility                                                                           18 EXHIBIT 10                                   Page 1 of 2 Emergency Support Director Assistant Checklist I.     ACTIVATION INITIAL
Revision No.
: a. Upon arrival at the EOF, ensure that steps are being taken to expeditiously activate the EOF.
Emergency Operations Facility 18 EXHIBIT 10 Page 1 of 2 Emergency Support Director Assistant Checklist I.
* Assist the ESD in the completion of Exhibit 1.
ACTIVATION INITIAL
* Assist the ESD in the completion of Exhibit 4.
: a.
: b. Report your status as activated when requested by the Emergency Preparedness Representative.
Upon arrival at the EOF, ensure that steps are being taken to expeditiously activate the EOF.
I1. OPERATIONS NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
Assist the ESD in the completion of Exhibit 1.
: a. Refer to EPIP-TMI-.01, "Emergency Classification and Basis", whenever major plant changes have occurred to determine if a change in emergency classification is warranted.
Assist the ESD in the completion of Exhibit 4.
: b. If the ESD has assumed the responsibilities for "Approving and directing official notifications to off site agencies; then perform the following:
: b.
Report your status as activated when requested by the Emergency Preparedness Representative.
I1.
OPERATIONS NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
: a.
Refer to EPIP-TMI-.01, "Emergency Classification and Basis", whenever major plant changes have occurred to determine if a change in emergency classification is warranted.
: b.
If the ESD has assumed the responsibilities for "Approving and directing official notifications to off site agencies; then perform the following:
Inform the EOF Communications Coordinator that the ESD has assumed responsibility for off site notifications.
Inform the EOF Communications Coordinator that the ESD has assumed responsibility for off site notifications.
* Assist the ESD in filling out the Emergency Report Form - TMI.
Assist the ESD in filling out the Emergency Report Form - TMI.
: c. When the ESD leaves the main room of the EOF, assume the Person-In-Charge role until the ESD returns.
: c.
When the ESD leaves the main room of the EOF, assume the Person-In-Charge role until the ESD returns.
NOTE This does NOT include assuming the responsibilities that the ESD has assumed from the ED.
NOTE This does NOT include assuming the responsibilities that the ESD has assumed from the ED.
Interrupt ESD conferences to inform the ESD of major changes that occur in the plant.
Interrupt ESD conferences to inform the ESD of major changes that occur in the plant.
46
46


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.27 le                                                                                 Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                     18 EXHIBIT 10                                     Page 2 of 2
Emergency Operations Facility 18 EXHIBIT 10 Page 2 of 2
: d. Promptly process press releases received from the PI Rep - EOF for ESD review and approval.
: d.
: e. Assume the TMI, Point-Of-contact role for any inquiries from the following:
Promptly process press releases received from the PI Rep - EOF for ESD review and approval.
* NEI (Technical and Regulatory Division)
: e.
* EPRI
Assume the TMI, Point-Of-contact role for any inquiries from the following:
* ANI
NEI (Technical and Regulatory Division)
: f. Assist the ESD in the completion of Exhibit 5.
EPRI ANI
0         Insure each completed Exhibit 5 includes the Briefing Time.
: f.
: g. Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Assist the ESD in the completion of Exhibit 5.
Name                                                                 Time                 Date ESD Assistant 47
0 Insure each completed Exhibit 5 includes the Briefing Time.
: g.
Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Name Time Date ESD Assistant 47


Number TMI - Unit 1 Emergency Plan Implementing Document                     EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
    -tle                                                                               Revision No.
-tle Revision No.  
"-..mergency Operations Facility                                                                   18 EXHIBIT 11                                 Page 1 of 1 ESD Logkeeper
"-..mergency Operations Facility 18 EXHIBIT 11 Page 1 of 1 ESD Logkeeper
: 1. ACTIVATION
: 1.
: a. Activate the ESD Logkeeper Position
ACTIVATION
* Maintain the ESD Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
: a.
* Report your status as activated when asked by the Emergency Preparedness Representative.
Activate the ESD Logkeeper Position Maintain the ESD Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
I1. ESD LOGKEEPER OPERATIONAL CHECKLIST
Report your status as activated when asked by the Emergency Preparedness Representative.
: a. At ESD Conferences, insure that previously generated Action Items are addressed.
I1.
* Forward the completed checklist and all ESD logs to the Emergency Preparedness Representative at the end of the event.
ESD LOGKEEPER OPERATIONAL CHECKLIST
Name                                                           Time:               Date ESD Logkeeper 48
: a.
At ESD Conferences, insure that previously generated Action Items are addressed.
Forward the completed checklist and all ESD logs to the Emergency Preparedness Representative at the end of the event.
Name Time:
Date ESD Logkeeper 48


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 le                                                                                    Revision No.
le
_Emergency Operations Facility                                                                        18 EXHIBIT 12                                      Page 1 of 3 Public Information Representative - EOF ACTIVATION
_Emergency Operations Facility TMI - Unit 1 Emergency Plan Implementing Document EXHIBIT 12 Number EPIP-TMI-.27 Revision No.
: a. Contact the Duty PI REP to advise of your arrival at the EOF and to determine whom will be writing Press Releases and whom will be the Media Briefer.
18 Page 1 of 3 Public Information Representative - EOF ACTIVATION
_    b. Start a log of all telephone calls in accordance with EPIP-TMI-.05.
: a.
: c. Report your status as activated when asked by the Emergency Preparedness Representative.
Contact the Duty PI REP to advise of your arrival at the EOF and to determine whom will be writing Press Releases and whom will be the Media Briefer.
IL. OPERATION NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
: b.
: a. Gather information about the emergency and provide it to the Media Briefer and News Release Writer, as appropriate:
Start a log of all telephone calls in accordance with EPIP-TMI-.05.
a          Be especially attentive to any radiological situation, whether or not a radiation release is occurring. ANY release of radiation in the context of the emergency SHOULD be reported to the Press Release Writer and Media Briefer.
: c.
Use the "Plant Emergency Information Checklist" (Refer to Exhibit 1C of the TMI Emergency Communications Response Manual) to obtain plant information.
Report your status as activated when asked by the Emergency Preparedness Representative.
0          Develop Bullets of information (e.g., RCP 'A' has been restarted) from attending ESD Conferences and obtained outside the conference.
IL.
i)           Information not obtained directly from plant indications needs to have ESD Assistant review and ESD approval.
OPERATION Gather information about the emergency and provide it to the Media Briefer and News Release Writer, as appropriate:
ii)           ALL BULLETS must be reviewed and APPROVED by the ESD.
Be especially attentive to any radiological situation, whether or not a radiation release is occurring. ANY release of radiation in the context of the emergency SHOULD be reported to the Press Release Writer and Media Briefer.
iii)         Obtain ESD approval of bullets generated during an ESD conference before the ESD leaves the conference room.
Use the "Plant Emergency Information Checklist" (Refer to Exhibit 1 C of the TMI Emergency Communications Response Manual) to obtain plant information.
iv)           Fax the authorized information to the Media Briefer.
Develop Bullets of information (e.g., RCP 'A' has been restarted) from attending ESD Conferences and obtained outside the conference.
49
i)
Information not obtained directly from plant indications needs to have ESD Assistant review and ESD approval.
ii)
ALL BULLETS must be reviewed and APPROVED by the ESD.
iii)
Obtain ESD approval of bullets generated during an ESD conference before the ESD leaves the conference room.
iv)
Fax the authorized information to the Media Briefer.
49 NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
a.
a 0


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
  'le                                                                                     Revision No.
'le Revision No.  
"-Emergency Operations Facility                                                                         18 EXHIBIT 12                                     Page 2 of 3
"-Emergency Operations Facility 18 EXHIBIT 12 Page 2 of 3 Continually update the Media Briefer and the Press Release Writer using the Emergency Information Checklist.
* Continually update the Media Briefer and the Press Release Writer using the Emergency Information Checklist.
Keep in contact with the PI REP - ECC who is to route new information to the JIC as requested.
* Keep in contact with the PI REP - ECC who is to route new information to the JIC as requested.
NOTE You are also required to provide real-time information about plant conditions, without ESD approval, to the JIC staff in order to assist the Media Briefer's understanding of changing plant conditions.
NOTE You are also required to provide real-time information about plant conditions, without ESD approval, to the JIC staff in order to assist the Media Briefer's understanding of changing plant conditions.
Press Releases
Press Releases
: b. When DRAFT Press Releases are received review them for accuracy before submitting them to the ESD Assistant for processing and obtaining ESD APPROVAL. Refer to Exhibit 13, Press Release Guidance, to enhance your review.
: b.
* Depending on the change required either mark up the DRAFT and have the Press Release Writer make the corrections before the processing below:
When DRAFT Press Releases are received review them for accuracy before submitting them to the ESD Assistant for processing and obtaining ESD APPROVAL. Refer to Exhibit 13, Press Release Guidance, to enhance your review.
i)           Give it to the Group Leader R&EC for review and approval
Depending on the change required either mark up the DRAFT and have the Press Release Writer make the corrections before the processing below:
* Be persistent to get it reviewed and INITIALED PROMPTLY ii)         Give it to the Tec Support Rep for review and approval
i)
* Be persistent to get it reviewed and INITIALED PROMPTLY iii)         If required, have Security perform a review for SAFEGUARDS information
Give it to the Group Leader R&EC for review and approval
* Be persistent to get it reviewed and INITIALED PROMPTLY iv)           Give it to the ESD Assistant for submittal to the ESD for review and approval
* Be persistent to get it reviewed and INITIALED PROMPTLY ii)
* Be persistent to get it reviewed and SIGNED PROMPTLY
Give it to the Tec Support Rep for review and approval
* Press Releases announcing anything other that emergency level changes or Media advisories (e.g., JIC activated) must be approved by the Emergency Support Director.
* Be persistent to get it reviewed and INITIALED PROMPTLY iii)
* Fax or deliver if the JIC is at the EOF the initialed (APPROVED) DRAFT Press Release to the Press Release Writer to obtain a final Press Release.
If required, have Security perform a review for SAFEGUARDS information
i)           Call the Press Release Writer and provide the changes verbally to expedite the Press Release process.
* Be persistent to get it reviewed and INITIALED PROMPTLY iv)
* Maintain copies of the Press Releases.
Give it to the ESD Assistant for submittal to the ESD for review and approval
* Provide a copy of ALL APPROVED Press Releases to the ESD.
* Be persistent to get it reviewed and SIGNED PROMPTLY Press Releases announcing anything other that emergency level changes or Media advisories (e.g., JIC activated) must be approved by the Emergency Support Director.
Fax or deliver if the JIC is at the EOF the initialed (APPROVED) DRAFT Press Release to the Press Release Writer to obtain a final Press Release.
i)
Call the Press Release Writer and provide the changes verbally to expedite the Press Release process.
Maintain copies of the Press Releases.
Provide a copy of ALL APPROVED Press Releases to the ESD.
50
50


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 le                                                                               Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                   18 EXHIBIT 12                                     Page 3 of 3
Emergency Operations Facility 18 EXHIBIT 12 Page 3 of 3
: c. Ensure that emergency level changes and the criteria for those changes are IMMEDIATELY communicated to the Media Briefer.
: c.
Ensure that emergency level changes and the criteria for those changes are IMMEDIATELY communicated to the Media Briefer.
Obtain a copy of the completed Emergency Report Form-TMI, if developed at the EOF, and transmit to the Media Briefer at the JIC.
Obtain a copy of the completed Emergency Report Form-TMI, if developed at the EOF, and transmit to the Media Briefer at the JIC.
: d. Upon termination of the emergency forward all logs, forms, draft Press Releases, approved Press Releases, completed checklists and other pertinent documentation to the Emergency Preparedness Rep.
: d.
Name                                                         Time:                 Date P1 REP - EOF 51
Upon termination of the emergency forward all logs, forms, draft Press Releases, approved Press Releases, completed checklists and other pertinent documentation to the Emergency Preparedness Rep.
Name Time:
Date P1 REP - EOF 51


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 le                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                           18 EXHIBIT 13                                     Page 1 of 4 Press Release Guidance 1.0 Press releases should be issued as soon as possible, typically within one hour from the time that a major plant event has occurred. Press releases shall be written in accordance with the following guidelines:
Emergency Operations Facility 18 EXHIBIT 13 Page 1 of 4 Press Release Guidance 1.0 Press releases should be issued as soon as possible, typically within one hour from the time that a major plant event has occurred. Press releases shall be written in accordance with the following guidelines:
: a.       The following categories of information should be included in press releases.
: a.
0           Level of Emercqency This is simply identifying which of the four emergency levels was declared.
The following categories of information should be included in press releases.
a         Basis for Emergqency Declaration This should be a simplified description of the plant condition which produced the emergency declaration (e.g., a leak of radioactive water within a plant building).
0 Level of Emercqency This is simply identifying which of the four emergency levels was declared.
S         QOperations Status of the Plant A simple description of the plant status at the time of the emergency declaration (e.g., TMI was operating at 100% power, however, the plant is currently reducing power).
a Basis for Emergqency Declaration This should be a simplified description of the plant condition which produced the emergency declaration (e.g., a leak of radioactive water within a plant building).
a         Company/Government Interface This is intended to inform the public that TMI has notified and is working closely with government officials so that public confidence and company credibility can be increased, or maintained.
S QOperations Status of the Plant A simple description of the plant status at the time of the emergency declaration (e.g., TMI was operating at 100% power, however, the plant is currently reducing power).
* Corrective Actions This should be a non-technical description of what plant personnel are doing to correct the problem. It may include such language as "attempts are being made to stop the leak" or "plant personnel are investigating the cause of the leak."
a Company/Government Interface This is intended to inform the public that TMI has notified and is working closely with government officials so that public confidence and company credibility can be increased, or maintained.
Corrective Actions This should be a non-technical description of what plant personnel are doing to correct the problem. It may include such language as "attempts are being made to stop the leak" or "plant personnel are investigating the cause of the leak."
Off-site Impact A statement which simply assess what impact this event may have on the environment.
Off-site Impact A statement which simply assess what impact this event may have on the environment.
This is intended to provide factual information on off-site radiological conditions (e.g., a radioactive release is in progress, however, monitoring teams have not detected any radiation levels in excess of normal background).
This is intended to provide factual information on off-site radiological conditions (e.g., a radioactive release is in progress, however, monitoring teams have not detected any radiation levels in excess of normal background).
The initial press release should include all or part of the above information, however, at the very least, it should contain information from the parts above.
The initial press release should include all or part of the above information, however, at the very least, it should contain information from the parts above.
: b.       In addition, the following guidance should be used in issuing press releases:
: b.
In addition, the following guidance should be used in issuing press releases:
Speculation, Dose Projections and Protective Action Recommendations should not be included in press releases.
Speculation, Dose Projections and Protective Action Recommendations should not be included in press releases.
52
52


Number TMI - Unit 1 Emergency Plan ilementina Document                                   11-.27 Operations Facility                                                                     18 EXHIBIT 13                                     Page 2 of 4 Press Releases SHALL have the concurrence of the Emergency Support Director. Press Releases, should have engineering, radiological and as appropriate Safeguards review.
TMI - Unit 1 Emergency Plan ilementina Document Number 11-.27 Operations Facility 18 EXHIBIT 13 Page 2 of 4 Press Releases SHALL have the concurrence of the Emergency Support Director. Press Releases, should have engineering, radiological and as appropriate Safeguards review.
: a.           Exceptions to this are limited to releases that are media advisories or releases that only contain 'boiler plate' information (e.g., level of emergency without any specific details or that the Joint Information Center is now activated).
: a.
: i.           The ED/ESD should be made aware of these advisories.
Exceptions to this are limited to releases that are media advisories or releases that only contain 'boiler plate' information (e.g., level of emergency without any specific details or that the Joint Information Center is now activated).
: b.           Original initialed copies are retained for records.
: i.
* Press releases should be reviewed promptly to support timely (< 1 hour) issuance.
The ED/ESD should be made aware of these advisories.
* Press releases should avoid undefined technical terms and abbreviations (e.g., plant names, trip, etc.)
: b.
: a.           Press releases should be written to be as simple as possible.
Original initialed copies are retained for records.
: i.           Where possible, descriptions should be used instead of technical terms. For example, "back up power source" should be used in place of "diesel generators".
Press releases should be reviewed promptly to support timely (< 1 hour) issuance.
: b.           Additional list of Technical terms and alternate words.
Press releases should avoid undefined technical terms and abbreviations (e.g., plant names, trip, etc.)
Technical Terms                     Suggqested Descriptions Accountability                       The process of accounting for all plant personnel Auxiliary Building                   Building housing support equipment for the Reactor RMG22                               A monitor which detects radiation levels RMG23                               inside the Reactor Building Contaminated                         Has loose radioactive material on it, him, her.
: a.
Contamination                       Loose radioactive material Containment Building                 Building which houses the Reactor or Reactor Containment Building Cladding                             A metal tube containing the nuclear fuel Control Rod                         A device which when inserted in a reactor stops the generation of power Critical                             Sustained Chain Reaction 53
Press releases should be written to be as simple as possible.
: i.
Where possible, descriptions should be used instead of technical terms. For example, "back up power source" should be used in place of "diesel generators".
: b.
Additional list of Technical terms and alternate words.
Technical Terms Suggqested Descriptions Accountability The process of accounting for all plant personnel Auxiliary Building Building housing support equipment for the Reactor RMG22 A monitor which detects radiation levels RMG23 inside the Reactor Building Contaminated Has loose radioactive material on it, him, her.
Contamination Loose radioactive material Containment Building Building which houses the Reactor or Reactor Containment Building Cladding A metal tube containing the nuclear fuel Control Rod A device which when inserted in a reactor stops the generation of power Critical Sustained Chain Reaction 53


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 I -
TMI - Unit 1 Emergency Plan Implementing Document Emergency Operations Facility Number I
Revislon No.
EPIP-TMI-.27 Revislon No.
Emergency Operations Facility                                                                18 EXHIBIT 13                                   Page 3 of 4 Technical Terms                Suggested Descriptions Diesel Generator              Emergency Power Unit or Back Up Power Source Fission Products              Radioactive materials made from operating the Reactor Fission Products Barriers      Barriers designed to contain the radioactive materials made from operating the Reactor.
18 EXHIBIT 13 Technical Terms Diesel Generator Fission Products Fission Products Barriers Fuel Cladding Failure Fuel Pool Grid Hot Well Loss of Off Site Power Noble Gas Penetration Plume Poison PORV Primary System Protected Area Radionuclides Reactor Building Reactor Building Purge Reactor Trip Page 3 of 4 Suggested Descriptions Emergency Power Unit or Back Up Power Source Radioactive materials made from operating the Reactor Barriers designed to contain the radioactive materials made from operating the Reactor.
Damage to the metal tubes containing the Fuel Cladding Failure nuclear fuel.
Damage to the metal tubes containing the nuclear fuel.
Fuel Pool                      Underwater Storage Area for Nuclear Fuel Grid                            Electrical Distribution System Hot Well                      Tank that collects condensed steam Loss of Off Site Power        The plant has lost its connection to the Electrical Distribution system Noble Gas                      Radioactive Gas Penetration                    Opening through the wall Plume                          Radioactivity released in the air or water Poison                          A material which reduces power in the reactor PORV                            Pressure Relief Valve Primary System                  The system that circulates water through the Reactor to remove heat Protected Area                  Security Barrier around the plant Radionuclides                  Radioactive material Reactor Building                Building which houses the reactor or reactor containment building Reactor Building Purge          A means of exchanging air inside the Reactor Building with outside air Reactor Trip                    Automatic or Manual Shutdown of the Reactor 54
Underwater Storage Area for Nuclear Fuel Electrical Distribution System Tank that collects condensed steam The plant has lost its connection to the Electrical Distribution system Radioactive Gas Opening through the wall Radioactivity released in the air or water A material which reduces power in the reactor Pressure Relief Valve The system that circulates water through the Reactor to remove heat Security Barrier around the plant Radioactive material Building which houses the reactor or reactor containment building A means of exchanging air inside the Reactor Building with outside air Automatic or Manual Shutdown of the Reactor 54


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27
TMI - Unit 1 Emergency Plan Implementing Document
  'tie                                                                          Revision No.
"--mergency Operations Facility EXHIBIT 13 Technical Terms Reuter Stokes SCRAM Secondary System Steam Generator Subcritical Half Life Number EPIP-TMI-.27 Revision No.
"--mergency Operations Facility                                                              18 EXHIBIT 13                                  Page 4 of 4 Technical Terms                  Suggested Descriptions Reuter Stokes                    Off Site electronic Radiation Monitors SCRAM                            Immediate or Fast Shutdown of the Reactor Secondary System                Non Nuclear Steam System Steam Generator                  Heat Exchanger where steam is made Subcritical                      No self sustaining chain reaction Half Life                        Time it takes for half of the radioactive material to decay away 55
18 Page 4 of 4 Suggested Descriptions Off Site electronic Radiation Monitors Immediate or Fast Shutdown of the Reactor Non Nuclear Steam System Heat Exchanger where steam is made No self sustaining chain reaction Time it takes for half of the radioactive material to decay away 55
'tie


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 Revision No.
TMI - Unit 1 Emergency Plan Implementing Document
"'-e-mergency Operations Facility                                                                          18 EXHIBIT 14                                     Page 1 of 2 Site Access Policy for Media During Emergencies NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
"'-e-mergency Operations Facility Number EPIP-TMI-.27 Revision No.
1.0 Providing site access to media personnel during a plant emergency or in the recovery from a plant emergency is in the best interest of the company and the public. However, media access to the site must not impair the response to the emergency.
18 EXHIBIT 14 Site Access Policy for Media During Emergencies Page 1 of 2 1.0 Providing site access to media personnel during a plant emergency or in the recovery from a plant emergency is in the best interest of the company and the public. However, media access to the site must not impair the response to the emergency.
2.0   Responsibility for approving site access rests with the Emergency Support Director, or, if the EOF is not activated, with the Emergency Director. Refer to Section 5 of this exhibit for responsibilities.
2.0 Responsibility for approving site access rests with the Emergency Support Director, or, if the EOF is not activated, with the Emergency Director. Refer to Section 5 of this exhibit for responsibilities.
3.0   For purposes of media access to the site during an emergency, the same industrial safety and security standards and requirements that apply to non-essential employees will be applied to the media.
3.0 For purposes of media access to the site during an emergency, the same industrial safety and security standards and requirements that apply to non-essential employees will be applied to the media.
4.0   Communications Dept. Responsibilities
4.0 Communications Dept. Responsibilities
: a.       Requests for media access will be made to the ESD or ED by the Public Information Duty Representative or the Communications Emergency Team Leader.
: a.
: b.       Communications will provide the ED/ESD with the number of media to gain site access, areas to be accessed and length of time the media will be there. (Communications will decide the number of media gaining access based on conditions at the time of the emergency. An attempt will be made to gain access for, at a minimum, one representative each from radio, television and print media.)
Requests for media access will be made to the ESD or ED by the Public Information Duty Representative or the Communications Emergency Team Leader.
: c.       Communications will provide media transportation on and off site.
: b.
: d.       Communications will have each member of the media sign a Media Access Briefing Form, indicating they were bdefed about the risks as they were known at the time by Company Management.
Communications will provide the ED/ESD with the number of media to gain site access, areas to be accessed and length of time the media will be there. (Communications will decide the number of media gaining access based on conditions at the time of the emergency. An attempt will be made to gain access for, at a minimum, one representative each from radio, television and print media.)
: c.
Communications will provide media transportation on and off site.
: d.
Communications will have each member of the media sign a Media Access Briefing Form, indicating they were bdefed about the risks as they were known at the time by Company Management.
If media access does not involve entry into a posted radiologically controlled area:
If media access does not involve entry into a posted radiologically controlled area:
: a.           The Communications staff will conduct the sign in and badging of media at TMI.
a.
: i.           Communications will notify the Security Coordinator prior to proceeding with Site Access.
The Communications staff will conduct the sign in and badging of media at TMI.
: b.          Communications will supervise and escort the media while on site.
i.
C.          Communications will conduct a briefing explaining the radiological and industrial conditions and dsks on site.
: b.
56
C.
Communications will notify the Security Coordinator prior to proceeding with Site Access.
Communications will supervise and escort the media while on site.
Communications will conduct a briefing explaining the radiological and industrial conditions and dsks on site.
56 NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 fle                                                                                   Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 fle Revision No.
Emergency Operations Facility                                                                       18 EXHIBIT 14                                     Page 2 of 2 If media access involves entry into a posted radiologically controlled area:
Emergency Operations Facility 18 EXHIBIT 14 Page 2 of 2 If media access involves entry into a posted radiologically controlled area:
: a.           Media will be processed at the EOF, as appropriate, receiving dosimetry, training, bioassay, waivers and briefings based on established procedural requirements.
: a.
Media will be processed at the EOF, as appropriate, receiving dosimetry, training, bioassay, waivers and briefings based on established procedural requirements.
Communications will notify the Security Coordinator prior to proceeding with Site Access.
Communications will notify the Security Coordinator prior to proceeding with Site Access.
: b.           Communications in conjunction with Radiological Controls will supervise and escort the media while in posted radiologically controlled areas.
: b.
5.0   ED/ESD Responsibilities
Communications in conjunction with Radiological Controls will supervise and escort the media while in posted radiologically controlled areas.
: a. The ED/ESD will consult with the RAC/Group Leader R&EC, and media will be granted access if the projected dose will not exceed the 500 millirem annual limit including external and internal exposure.
5.0 ED/ESD Responsibilities
: a.
The ED/ESD will consult with the RAC/Group Leader R&EC, and media will be granted access if the projected dose will not exceed the 500 millirem annual limit including external and internal exposure.
For Security driven events, media access to the Site must also be approved by the Local Law Enforcement Agency/Security.
For Security driven events, media access to the Site must also be approved by the Local Law Enforcement Agency/Security.
: b. Approve media access to the site if requirements are met.
: b.
Approve media access to the site if requirements are met.
57
57


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 le                                                                                         Revision No.
TMI - Unit 1 Emergency Plan Implementing Document le Emergency Operations Facility EXHIBIT 15 Technical Support Rep Checklist
Emergency Operations Facility                                                                               18 EXHIBIT 15                                     Page 1 of 2 Technical Support Rep Checklist
: 1.
: 1.       ACTIVATION Initials 1.0     Activate the Tech Support Rep position.
ACTIVATION Initials 1.0 Activate the Tech Support Rep position.
: a.       Start the Technical Support Representative Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
Number EPIP-TMI-.27 Revision No.
: b.     Assign a communicator to communicate on the Technical Functions Line with the communicator in the Technical Support Center (TSC).
18 Page 1 of 2
: a.
Start the Technical Support Representative Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
: b.
Assign a communicator to communicate on the Technical Functions Line with the communicator in the Technical Support Center (TSC).
Instruct the communicator to log telephone conversations in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
Instruct the communicator to log telephone conversations in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
: c.     Verify that the CRT to the Plant Process computer is being activated in accordance with Exhibit 15A instructions.
: c.
: d.     Verify that the projection information System is activated.
Verify that the CRT to the Plant Process computer is being activated in accordance with Exhibit 15A instructions.
* Use instructions posted at the projection unit.
: d.
: e.       Report your status as activated when asked by the Emergency Preparedness Representative II.     Tech Support Rep Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
Verify that the projection information System is activated.
: a.       Contact the TSC to determine the following:
Use instructions posted at the projection unit.
* Operational status of the plant
: e.
* Mitigating activities
Report your status as activated when asked by the Emergency Preparedness Representative II.
: i.       Completed ii.       Underway iii.     Planned Release information
Tech Support Rep Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
: i.       Pathway ii.       Duration 58
: a.
Contact the TSC to determine the following:
Operational status of the plant Mitigating activities
: i.
Completed ii.
Underway iii.
Planned Release information
: i.
Pathway ii.
Duration 58


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 le                                                                                 Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.  
"*-mergency Operations Facility                                                                     18 EXHIBIT 15                                   Page 2 of 2
"*-mergency Operations Facility 18 EXHIBIT 15 Page 2 of 2
: b. Provide the ESD with a summary of the plant status, as obtained from the TSC.
: b.
: c. Act as the Point-of-Contact for the BRP Engineering Representative.
Provide the ESD with a summary of the plant status, as obtained from the TSC.
0         Keep the BRP Representative informed of plant status and mitigating activities.
: c.
: d. Attend ESD Conferences and be prepared to discuss technical issues
Act as the Point-of-Contact for the BRP Engineering Representative.
* Core Conditions
0 Keep the BRP Representative informed of plant status and mitigating activities.
* Barrier status
: d.
: i.           RCS ii.         Clad iii.         Containment
Attend ESD Conferences and be prepared to discuss technical issues Core Conditions Barrier status
* Mitigating activities
: i.
: i.           In progress ii.         Being evaluated
RCS ii.
* What could make the situation worse?
Clad iii.
: e. Commence Accident assessment functions by:
Containment Mitigating activities
* Monitoring plant parameters
: i.
* Conducting trend analysis of key parameters
In progress ii.
* Display information on Status Boards
Being evaluated What could make the situation worse?
: i.           Update information on a routine basis
: e.
: f. Review and concur on draft Press Releases
Commence Accident assessment functions by:
* Use Exhibit 13, if required.
Monitoring plant parameters Conducting trend analysis of key parameters Display information on Status Boards
* If Press Release is acceptable from a technical point of view, endorse it by initialing the document for ESD approval.
: i.
: g. If problems are encountered with communications equipment contact the EOF Communications Coordinator for resolution.
Update information on a routine basis
: h. Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
: f.
Name                                                         Time:                 Date Tech Support Rep.
Review and concur on draft Press Releases Use Exhibit 13, if required.
If Press Release is acceptable from a technical point of view, endorse it by initialing the document for ESD approval.
: g.
If problems are encountered with communications equipment contact the EOF Communications Coordinator for resolution.
: h.
Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Name Time:
Date Tech Support Rep.
59
59


Number TMI- Unit I Emergency Plan Implementing Document                       EPIP-TMI-.27
Number TMI-Unit I Emergency Plan Implementing Document EPIP-TMI-.27  
.le                                                                                   Revision No.
.le Revision No.
Emergency Operations Facility                                                                       18 EXHIBIT 15A                                 Page 1 of 2 EOF Plant Process Computer Access Instructions
Emergency Operations Facility 18 EXHIBIT 15A Page 1 of 2 EOF Plant Process Computer Access Instructions
: 1. To put computer on line, verify system is energized or energize by turning on the computer and monitor.
: 1.
: a.         If the computer and monitor are energized but there is nothing displayed on the monitor, adjust the contrast knob as needed.
To put computer on line, verify system is energized or energize by turning on the computer and monitor.
: a.
If the computer and monitor are energized but there is nothing displayed on the monitor, adjust the contrast knob as needed.
NOTE This is for the dedicated line access.
NOTE This is for the dedicated line access.
      - 2. Simultaneously press the following keys ("Shift" and "On Line/Off').
: 2.
: a.         This may not work on the first attempt - try again.
Simultaneously press the following keys ("Shift" and "On Line/Off').
: b.         If the system does not come on line, access the PPC using the modem instructions in Step 9.
: a.
: 3. If PPC access is granted, the words "Off Line" at the bottom right hand comer of the screen will disappear.
This may not work on the first attempt - try again.
_    4. Press the key marked "GROUP" or any other function key to access the PPC.
: b.
_    5. Enter the number of the area you wish to access, and press "Execute".
If the system does not come on line, access the PPC using the modem instructions in Step 9.
      - 6. From any menu screen, select the display number to be printed and then press the print button (other functions are per users guide).
: 3.
_    7. To automatically print the first 10 displays in the EOF area, push the EOF print button.
If PPC access is granted, the words "Off Line" at the bottom right hand comer of the screen will disappear.
: 8. To quit, 8.1       Clear the screen, press "cancel" twice.
: 4.
8.2       Simultaneously press the following keys ("Shift" and "On Line/Off Line").
Press the key marked "GROUP" or any other function key to access the PPC.
8.3       Reduce contrast to eliminate monitor display.
: 5.
Enter the number of the area you wish to access, and press "Execute".
: 6.
From any menu screen, select the display number to be printed and then press the print button (other functions are per users guide).
: 7.
To automatically print the first 10 displays in the EOF area, push the EOF print button.
: 8.
To quit, 8.1 Clear the screen, press "cancel" twice.
8.2 Simultaneously press the following keys ("Shift" and "On Line/Off Line").
8.3 Reduce contrast to eliminate monitor display.
60
60


Number TMI- Unit 1 Emergency Plan Implementing Document                   EPIP-TMI-.27 le                                                                               Revision No.
Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                   18 EXHIBIT 15A                               Page 2 of 2 Modem Access (Backup)
Emergency Operations Facility 18 EXHIBIT 15A Page 2 of 2 Modem Access (Backup)
: 9. If the direct access fails, proceed as follows:
: 9.
9.1         Press the "C" (cell) button.
If the direct access fails, proceed as follows:
9.2         Press the "Go" button.
9.1 Press the "C" (cell) button.
9.2 Press the "Go" button.
NOTE The modem will automatically dial the following two numbers:
NOTE The modem will automatically dial the following two numbers:
9-717-948-9114 9-717-948-9115 9.3         When the numbers are dialed and connected, proceed with Step 4.
9-717-948-9114 9-717-948-9115 9.3 When the numbers are dialed and connected, proceed with Step 4.
: 10. If PPC access is not successful or problems are encountered with the computer, call 9-717-948 8606 for assistance.
: 10.
: 11. To quit, proceed as follows:
If PPC access is not successful or problems are encountered with the computer, call 9-717-948 8606 for assistance.
11.1       On Aydin Keyboard press CANCEL twice.
: 11.
11.2       On Aydin Keyboard press and hold down the SHIFT key (either RIGHT or LEFT) and press the On/Off Line key or xmit page key.
To quit, proceed as follows:
11.1 On Aydin Keyboard press CANCEL twice.
11.2 On Aydin Keyboard press and hold down the SHIFT key (either RIGHT or LEFT) and press the On/Off Line key or xmit page key.
NOTE An OFFLINE message may briefly appear in the lower right hand corner.
NOTE An OFFLINE message may briefly appear in the lower right hand corner.
11.3       On modem press the following buttons.
11.3 On modem press the following buttons.
11.3.1       "DISC" 11.3.2       "GO", the modem will display "DISCONNECTED".
11.3.1 "DISC" 11.3.2 "GO", the modem will display "DISCONNECTED".
61
61


Number TMI - Unit 1 Emergency Plan Implementing Document                     EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
    'tlie                                                                                   Revision No.
'tlie Revision No.
4Emergency Operations Facility                                                                           18 EXHIBIT 16                               Page 1 of 5 TMI/NRC Emergency Response Interface Criteria This is a synopsis of the NRC emergency response process as it applies to TMI.
4Emergency Operations Facility 18 EXHIBIT 16 Page 1 of 5 TMI/NRC Emergency Response Interface Criteria This is a synopsis of the NRC emergency response process as it applies to TMI.
Upon arrival of the NRC, the ED/ESD should:
Upon arrival of the NRC, the ED/ESD should:
-          Verify who is the senior NRC person in charge
Verify who is the senior NRC person in charge Ask the senior NRC person to inform the ED/ESD when the position of Director Site Operations is assumed and whether the responsibility to issue directives is included.
-          Ask the senior NRC person to inform the ED/ESD when the position of Director Site Operations is assumed and whether the responsibility to issue directives is included.
Request that the NRC keep TMI Management informed of all substantive information exchanges between the NRC and the state.
-          Request that the NRC keep TMI Management informed of all substantive information exchanges between the NRC and the state.
Request the NRC provide all DIRECTIVES in writing.
-          Request the NRC provide all DIRECTIVES in writing.
In essence, directives from the NRC must come from the NRC Director (typically, the NRC Chairman) or from the NRC Director of Site Operations (typically, the NRC Regional Administrator). Such advice or directive can only be communicated to the Emergency Director (the Emergency Support Director once the EOF is activated). If a directive order is issued by the NRC Director or Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.
In essence, directives from the NRC must come from the NRC Director (typically, the NRC Chairman) or from the NRC Director of Site Operations (typically, the NRC Regional Administrator). Such advice or directive can only be communicated to the Emergency Director (the Emergency Support Director once the EOF is activated). If a directive order is issued by the NRC Director or Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.
rhile NRC advice may be challenged by the ED or ESD, directives must be complied with.
rhile NRC advice may be challenged by the ED or ESD, directives must be complied with.
With respect to protective action recommendations for the public, the NRC may either endorse the TMI's recommendation or opt to recommend a different one. The ED/ESD is encouraged to include the NRC and State representatives in the protective action recommendation discussions in order to arrive at a mutually agreeable recommendation. In the event that the NRC opts to recommend a different PAR, they will attempt to resolve their differences with the utility prior to recommendations to the State. Their recommendation, like the utility recommendation, will be considered by the State in the development of a Governor directive.
With respect to protective action recommendations for the public, the NRC may either endorse the TMI's recommendation or opt to recommend a different one. The ED/ESD is encouraged to include the NRC and State representatives in the protective action recommendation discussions in order to arrive at a mutually agreeable recommendation. In the event that the NRC opts to recommend a different PAR, they will attempt to resolve their differences with the utility prior to recommendations to the State. Their recommendation, like the utility recommendation, will be considered by the State in the development of a Governor directive.
SYNOPSIS - NRC EMERGENCY RESPONSE Revision 2 to NUREG 0728, supplemented by NUREG-0845 and NUREG-1471, describes the manner in which the NRC will respond to an incident and provides criteria for making preplanned response decisions. They provide procedural guidance, describe the functions related to NRC emergency response and define procedures for responding to the following NRC modes of operation.
SYNOPSIS - NRC EMERGENCY RESPONSE Revision 2 to NUREG 0728, supplemented by NUREG-0845 and NUREG-1471, describes the manner in which the NRC will respond to an incident and provides criteria for making preplanned response decisions. They provide procedural guidance, describe the functions related to NRC emergency response and define procedures for responding to the following NRC modes of operation.
: 1.         Normal Mode
: 1.
: 2.         Standby mode
Normal Mode
: 3.         Initial Activation
: 2.
: 4.         Expanded Activation
Standby mode
: 5.         Deactivation 62
: 3.
Initial Activation
: 4.
Expanded Activation
: 5.
Deactivation 62


Number TMI - Unit 1 Emergency Plan
TMI - Unit 1 Emergency Plan Number
"*Emergency Operations Facility                                                                           18 EXHIBIT 16                                 Page 2 of 5 Each mode defines the scope of NRC activities related to a particular level of emergency response in ascending order of degree of involvement to deactivation. The various modes are characterized as follows:
"*Emergency Operations Facility 18 EXHIBIT 16 Page 2 of 5 Each mode defines the scope of NRC activities related to a particular level of emergency response in ascending order of degree of involvement to deactivation. The various modes are characterized as follows:
: 1. Normal mode - Normal activities designed to maintain readiness.
: 1.
: 2. Standby mode - Regional Office activates the Incident Response Center (IRC) with an appropriate staff and NRC Headquarters Operations Center is staffed by a Standby Team.
Normal mode - Normal activities designed to maintain readiness.
: 3. Initial Activation - NRC Operations Center is staffed by a response team, the Regional IRC is fully activated and a Site Team is dispatched under the leadership of the Regional Administrator, normally designated as Director of Site Operations (DSO).
: 2.
: 4. Expanded Activation - Focus of NRC response operations is shifted to the site. DSO is designated primary spokesman for the NRC and may be empowered with directive authority by the Chairman of the Nuclear Regulatory Commission.
Standby mode - Regional Office activates the Incident Response Center (IRC) with an appropriate staff and NRC Headquarters Operations Center is staffed by a Standby Team.
: 5. Deactivation - Follow-up activities (e.g., reviews, investigation and recovery operations).
: 3.
The particular mode assumed by the NRC will be dependent upon Licensee event classification and "independent NRC perception of relative severity of uncertainty of accident conditions".
Initial Activation - NRC Operations Center is staffed by a response team, the Regional IRC is fully activated and a Site Team is dispatched under the leadership of the Regional Administrator, normally designated as Director of Site Operations (DSO).
  "IRC functions defined in NUREG 0728 which impact directly on the Licensee are:
: 4.
: 1. Evaluate Incident and Plant Status NRC personnel at the site, the Regional Office and the Headquarters will acquire the necessary data to develop and maintain a complete and accurate overview of the evolution and status of the event.
Expanded Activation - Focus of NRC response operations is shifted to the site. DSO is designated primary spokesman for the NRC and may be empowered with directive authority by the Chairman of the Nuclear Regulatory Commission.
: 5.
Deactivation - Follow-up activities (e.g., reviews, investigation and recovery operations).
The particular mode assumed by the NRC will be dependent upon Licensee event classification and "independent NRC perception of relative severity of uncertainty of accident conditions".  
"IRC functions defined in NUREG 0728 which impact directly on the Licensee are:
: 1.
Evaluate Incident and Plant Status NRC personnel at the site, the Regional Office and the Headquarters will acquire the necessary data to develop and maintain a complete and accurate overview of the evolution and status of the event.
This will involve data gathering via ERDS, ENS, HPN, and other FTS 2000 telephones as well as direct communications with the Licensee at the ERF's.
This will involve data gathering via ERDS, ENS, HPN, and other FTS 2000 telephones as well as direct communications with the Licensee at the ERF's.
: 2. Evaluate Licensee Actions NRC personnel will evaluate Licensee actions to mitigate the consequences of the incident and provide recommendations conceming protective actions for the public.
: 2.
: 3. Project Incident Consequences and Plant Status Based on information and evaluations discussed above, the NRC will develop an independent projection of the likely further course of events.
Evaluate Licensee Actions NRC personnel will evaluate Licensee actions to mitigate the consequences of the incident and provide recommendations conceming protective actions for the public.
: 3.
Project Incident Consequences and Plant Status Based on information and evaluations discussed above, the NRC will develop an independent projection of the likely further course of events.
63
63


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 dle                                                                                           Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 dle Revision No.
Emergency Operations Facility                                                                               18 EXHIBIT 16                                     Page 3 of 5
Emergency Operations Facility 18 EXHIBIT 16 Page 3 of 5
: 4.       Advise, Assist or Direct Licensee The NRC may offer advice or assistance to the Licensee during an emergency, or may respond to Licensee requests for advice of assistance. This may involve diagnosis of critical problems, development of proposed remedial courses of action, and proposals to implement additional precautionary measures. The NRC is also prepared to direct that certain actions be taken if, after thorough discussion with the Emergency Director (the Emergency Support Director once the EOF is activated) it is decided that such direction is required. In the event that such action is taken by the NRC Director or the NRC Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive. Directives will be communicated directly to the ED/ESD from the NRC Director (NRC Chairman) or from the NRC Director of Site Operations (DSO), typically the Regional Administrator, once appointed and empowered to do so.
: 4.
Advise, Assist or Direct Licensee The NRC may offer advice or assistance to the Licensee during an emergency, or may respond to Licensee requests for advice of assistance. This may involve diagnosis of critical problems, development of proposed remedial courses of action, and proposals to implement additional precautionary measures. The NRC is also prepared to direct that certain actions be taken if, after thorough discussion with the Emergency Director (the Emergency Support Director once the EOF is activated) it is decided that such direction is required. In the event that such action is taken by the NRC Director or the NRC Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive. Directives will be communicated directly to the ED/ESD from the NRC Director (NRC Chairman) or from the NRC Director of Site Operations (DSO), typically the Regional Administrator, once appointed and empowered to do so.
Several important concepts govern the NRC in providing advice, assistance, or direction. They are:
Several important concepts govern the NRC in providing advice, assistance, or direction. They are:
: a.         The Licensee is at all times responsible for mitigating the consequences of the incident.
: a.
: b.         Although the NRC could issue formal orders to the Licensee to take certain measures and to monitor implementation, ". . . licensee continues to make other key operational decisions and to operate and manage the facility...".
The Licensee is at all times responsible for mitigating the consequences of the incident.
: c.         The NRC must have a single voice when advising or directing the Licensee.
: b.
: d.         The ED/ESD has the option to accept or challenge NRC advice.
Although the NRC could issue formal orders to the Licensee to take certain measures and to monitor implementation, "... licensee continues to make other key operational decisions and to operate and manage the facility...".
: c.
The NRC must have a single voice when advising or directing the Licensee.
: d.
The ED/ESD has the option to accept or challenge NRC advice.
At no time will advice or direction come from both the Director and the DSO and the Licensee will always be kept apprised of who is empowered to exercise authority as the NRC spokesman. All other NRC personnel in contact with Licensee personnel are responsible to make clear that discussions should not be construed as advice or direction but rather as a sharing or gathering of information.
At no time will advice or direction come from both the Director and the DSO and the Licensee will always be kept apprised of who is empowered to exercise authority as the NRC spokesman. All other NRC personnel in contact with Licensee personnel are responsible to make clear that discussions should not be construed as advice or direction but rather as a sharing or gathering of information.
: 5.       Inform Public and Monitor Public Information During emergency situations, the NRC will formulate its own press releases based on information gathered from the Licensee and from NRC personnel. Procedures exist to ensure that press releases are approved by one person. That person may be the Regional Administrator, NRC Chairman, or DSO depending on the current NRC mode of operations. NRC draft press releases will normally be shared with the Licensee; however, this does not imply a request for approval by the Licensee. The intent is to identify issues needing clarification prior to release to avoid confusing or misleading the public.
: 5.
Inform Public and Monitor Public Information During emergency situations, the NRC will formulate its own press releases based on information gathered from the Licensee and from NRC personnel. Procedures exist to ensure that press releases are approved by one person. That person may be the Regional Administrator, NRC Chairman, or DSO depending on the current NRC mode of operations. NRC draft press releases will normally be shared with the Licensee; however, this does not imply a request for approval by the Licensee. The intent is to identify issues needing clarification prior to release to avoid confusing or misleading the public.
64
64


Number TMI - Unit I Emergency Plan Implementing Document                         EPIP-TMI-.27
Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27  
    -'tle                                                                                         Revision No.
-'tle Revision No.  
"--mergency Operations Facility                                                                                 18 EXHIBIT 16                                   Page 4 of 5
"--mergency Operations Facility 18 EXHIBIT 16 Page 4 of 5
: 6.     Recommend Protective Actions for the Public The NRC responsibility during an emergency, as during normal operations, is to ensure that protection of public health and safety is adequate. One aspect of this responsibility is to provide protective action recommendations or advice to offsite authorities. This may take the form of an NRC endorsement of a Licensee protective action recommendation or the NRC may opt to recommend additional protective actions. The NRC is not normally involved in the process of recommending protective actions, however they may get involved if a major problem is identified with the protective actions recommended by the licensee or protective actions undertaken by the state or local govemment. Additionally NRC involvement may be requested by state or local officials.
: 6.
: 7.       Review, Investigate and Document Response Actions The scope of this task is not preplanned by the NRC; however, it is apparent that this may require a great deal of interaction between the Licensee and the NRC after-the-fact.
Recommend Protective Actions for the Public The NRC responsibility during an emergency, as during normal operations, is to ensure that protection of public health and safety is adequate. One aspect of this responsibility is to provide protective action recommendations or advice to offsite authorities. This may take the form of an NRC endorsement of a Licensee protective action recommendation or the NRC may opt to recommend additional protective actions. The NRC is not normally involved in the process of recommending protective actions, however they may get involved if a major problem is identified with the protective actions recommended by the licensee or protective actions undertaken by the state or local govemment. Additionally NRC involvement may be requested by state or local officials.
SYNOPSIS - REGION I SUPPLEMENT The Region I Incident Response Supplement to NUREG 0845 restates many of the concepts of NUREG 0845 in greater detail as they apply specifically to Region I.
: 7.
      ,ction I - Concept of Operations delineates general duties and responsibilities and describes the NRC modes of
Review, Investigate and Document Response Actions The scope of this task is not preplanned by the NRC; however, it is apparent that this may require a great deal of interaction between the Licensee and the NRC after-the-fact.
.,_--jeration. Relative to the authority of the DSO, it states:
SYNOPSIS - REGION I SUPPLEMENT The Region I Incident Response Supplement to NUREG 0845 restates many of the concepts of NUREG 0845 in greater detail as they apply specifically to Region I.  
              "The Director of Site Operations (DSO) supervises/manages all NRC personnel and operations at the site, is the NRC spokesperson, represents the NRC in interactions with other agencies and carries out the authority delegated by the Director of the NRC Executive Team (Chairman).
,ction I - Concept of Operations delineates general duties and responsibilities and describes the NRC modes of  
.,_--jeration. Relative to the authority of the DSO, it states:  
"The Director of Site Operations (DSO) supervises/manages all NRC personnel and operations at the site, is the NRC spokesperson, represents the NRC in interactions with other agencies and carries out the authority delegated by the Director of the NRC Executive Team (Chairman).
Delegated authority will include one or more of the following:
Delegated authority will include one or more of the following:
(a) authority to recommend actions to the Licensee, (b) authority to direct the Licensee to take specified actions, and (c) authority to recommend actions offsite, including protective measures for the public.
(a) authority to recommend actions to the Licensee, (b) authority to direct the Licensee to take specified actions, and (c) authority to recommend actions offsite, including protective measures for the public.
Line 1,586: Line 2,210:
65
65


(                                                                                  (              EPIP-TMI-.27 Revision 18
(
(
EXHIBIT 16     Page 5 of 5 V*.F*J,.F.P ,l*   Dfsd boedeed born nd*c.ate Ibm~.1.d     Cudtks POr"n~ie. CtI"o positon conmllute the n**nm dnff necnay to p6Mom Vh. cdical NRC repons                           5'  Open~if ow) to functimon proaredV to desg(on       of a Clredar of SM. Opeatkwon (050).                                         Is
EXHIBIT 16 V*.F*J,.F.P,l*
                                                                            !L                I Loc*an of al positions Is dvWen by Oie SWW           '$nssea Emergency Resos Omwlalin. The fcM               Nsta with these Positm represat lieF       I bcalons.
Dfsd boedeed born nd*c.ate Ibm~.1.d Cudtks POr"n~ie. CtI"o positon conmllute the n**nm dnff necnay to p6Mom Vh. cdical NRC repons functimon proaredV to desg (on of a Clredar of SM. Opeatkwon (050).
Loc*an of al positions Is dvWen by Oie SWW  
'$nssea Emergency Resos Omwlalin. The fcM Nsta with these Positm represat lieF I bcalons.
Note 1: Either the PMCL Communicator or the PHN Communicator will be a critical position, not both.
Note 1: Either the PMCL Communicator or the PHN Communicator will be a critical position, not both.
Note 2: Either the ENS Communicator or the RSCL Communicator will be a critical position, not both.
Note 2: Either the ENS Communicator or the RSCL Communicator will be a critical position, not both.
Note 3: Safeguards/Security Assistant Coordinator is part of the Initial Site Team only in safeguards/security type events.
Note 3: Safeguards/Security Assistant Coordinator is part of the Initial Site Team only in safeguards/security type events.
5' Open~if ow) to Is
!L I
66
66
(
EPIP-TMI-.27 Revision 18 Page 5 of 5
(


Number TMI - Unit 1 Emergency Plan Imolementina Document
TMI - Unit 1 Emergency Plan Imolementina Document le Emergency Operations Facility 4
                                                                    -                        4 EPIP-TMI-.27 le                                                                                          Revision No.
Number EPIP-TMI-.27 Revision No.
Emergency Operations Facility                                                                              18 EXHIBIT 17 EXHIBIT 17                                   Page 1 of 4 Group Leader - Radiological and Environmental Controls Checklist ACTUATION Initials 1.0     Activate the Group Leader - Radiological and Environmental Controls position.
18 Page 1 of 4 EXHIBIT 17 EXHIBIT 17 Group Leader - Radiological and Environmental Controls Checklist ACTUATION Initials 1.0 Activate the Group Leader - Radiological and Environmental Controls position.
: a.       Start the Group Leader R & EC log in accordance with EPIP-TMI-.05, Communications and Record Keepin-q.
: a.
: b.       Turn on the Group Leader R & EC computer to access the Emergency Information Network (e.g., RAC information, or dose projections).
Start the Group Leader R & EC log in accordance with EPIP-TMI-.05, Communications and Record Keepin-q.
: c.       Contact the RAC to obtain a status of the situation.
: b.
Turn on the Group Leader R & EC computer to access the Emergency Information Network (e.g., RAC information, or dose projections).
: c.
Contact the RAC to obtain a status of the situation.
Use list below as a guide, it is not all-inclusive.
Use list below as a guide, it is not all-inclusive.
* Release path(s)
Release path(s)
* Release duration
Release duration In plant radiological conditions Samples requested
* In plant radiological conditions
: d.
* Samples requested
Contact the Environmental Assessment Coordinator (EAC) to obtain a status of the situation.
: d.       Contact the Environmental Assessment Coordinator (EAC) to obtain a status of the situation.
Use list below as a guide, it is not all-inclusive.
Use list below as a guide, it is not all-inclusive.
* Field team status
Field team status Weather forecast Reuter Stokes
* Weather forecast
: e.
* Reuter Stokes
Inform the Emergency Preparedness Representative that the Group Leader R & EC position is activated.
: e.       Inform the Emergency Preparedness Representative that the Group Leader R & EC position is activated.
II.
II.     OPERATION 2.0     Perform the following:
OPERATION 2.0 Perform the following:
NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
: a.
: a.      Review dose projection information 67
Review dose projection information 67 NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 e                                                                                       Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e
Emergency Operations Facility                                                                         18 EXHIBIT 17                                     Page 2 of 4
Revision No.
: b. Review field monitoring information
Emergency Operations Facility 18 EXHIBIT 17 Page 2 of 4
: c. Perform dose assessment
: b.
* Compare dose projections against field monitoring data.
Review field monitoring information
* Determine ifthe dose projections are accurate (i.e., Field monitoring team data within a factor of 10 and less than the dose projection).
: c.
* Compare dose projections and field monitoring team data to EPA PAG's.
Perform dose assessment Compare dose projections against field monitoring data.
* Review weather forecast data for impact on the dose assessment process.
Determine if the dose projections are accurate (i.e., Field monitoring team data within a factor of 10 and less than the dose projection).
: d. Keep the ESD informed on the following:
Compare dose projections and field monitoring team data to EPA PAG's.
* All radiological issues.
Review weather forecast data for impact on the dose assessment process.
* All environmental issues.
: d.
* All industrial health issues.
Keep the ESD informed on the following:
* All safety issues.
All radiological issues.
: e. IMMEDIATELY inform the ESD if, after thorough dose assessment, you conclude that EPA Protective Action Guidelines (PAG's) will be exceeded anywhere offsite including OUTSIDE the 10 mile EPZ.
All environmental issues.
: f. Report any telephone problems to the EOF Communications Coordinator.
All industrial health issues.
: g. Direct Access Control personnel to set up the EOF frisking station.
All safety issues.
* If appropriate, require personnel to frisk prior to entering the EOF.
: e.
* If personnel require decontamination, refer to procedure 661 0-ADM-4330.02, Personnel Contamination Monitoring and Decontamination.
IMMEDIATELY inform the ESD if, after thorough dose assessment, you conclude that EPA Protective Action Guidelines (PAG's) will be exceeded anywhere offsite including OUTSIDE the 10 mile EPZ.
: h. Review DRAFT press releases developed for ESD approval to insure accuracy in the radiological information.
: f.
Report any telephone problems to the EOF Communications Coordinator.
: g.
Direct Access Control personnel to set up the EOF frisking station.
If appropriate, require personnel to frisk prior to entering the EOF.
If personnel require decontamination, refer to procedure 661 0-ADM-4330.02, Personnel Contamination Monitoring and Decontamination.
: h.
Review DRAFT press releases developed for ESD approval to insure accuracy in the radiological information.
Use Exhibit 13 for guidance to ensure the releases do not contain the following:
Use Exhibit 13 for guidance to ensure the releases do not contain the following:
: a.           Technical jargon
: a.
: b.           Acronyms
Technical jargon
: c.             Dose Projections
: b.
: d.             Protective Action Recommendations
Acronyms
* Correct the press release, as required.
: c.
* Endorse the correct release for ESD approval by initialing.
Dose Projections
: d.
Protective Action Recommendations Correct the press release, as required.
Endorse the correct release for ESD approval by initialing.
68
68


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Revision No.  
"'-&#xfd;mergency Operations Facility                                                                       18 EXHIBIT 17                                     Page 3 of 4 Periodically brief the following on current radiological and environmental conditions.
"'-&#xfd;mergency Operations Facility 18 EXHIBIT 17 Page 3 of 4 Periodically brief the following on current radiological and environmental conditions.
* ESD
ESD NRC State representative (BRP)
* NRC
: a.
* State representative (BRP)
Notify the State (BRP representative) if valid offsite dose projections are > 25 REM thyroid dose.
: a.         Notify the State (BRP representative) if valid offsite dose projections are > 25 REM thyroid dose.
: b.
: b.         Inform the State (BRP representative) of any problems with the automated dose projection code.
Inform the State (BRP representative) of any problems with the automated dose projection code.
0             Insure the level of conservatism in the calculation is presented.
0 Insure the level of conservatism in the calculation is presented.
Consider the following if, the Training Center is used as the Near-Site JIC and / or the Remote Assembly Area (RAA)
Consider the following if, the Training Center is used as the Near-Site JIC and / or the Remote Assembly Area (RAA)
* Evacuation of these facilities should NOT occur prior to evacuation of the general public.
Evacuation of these facilities should NOT occur prior to evacuation of the general public.
* Evacuation orders, for the general public, do NOT automatically apply to the RAA.
Evacuation orders, for the general public, do NOT automatically apply to the RAA.
* Relocation of the RAA should be considered if, the projected dose at the facility reaches 4 REM (TEDE) or 40 REM (CDE).
Relocation of the RAA should be considered if, the projected dose at the facility reaches 4 REM (TEDE) or 40 REM (CDE).
0         If relocated, the RAA and the JIC should be re-established at the EOF.
0 If relocated, the RAA and the JIC should be re-established at the EOF.
0         If warranted, provide radiological protection instructions to the RAA Team Leaders.
0 If warranted, provide radiological protection instructions to the RAA Team Leaders.
: k. As necessary, assist the Access Center Coordinator in the completion of the TMI Access Authorization Checklist for NRC personnel requiring access to the site.
: k.
* If additional dosimetry issue support is needed, request the Group Leader - Admin Support call out a Radiological Support Technician.
As necessary, assist the Access Center Coordinator in the completion of the TMI Access Authorization Checklist for NRC personnel requiring access to the site.
Forward the following to the Emergency Preparedness Representative
If additional dosimetry issue support is needed, request the Group Leader - Admin Support call out a Radiological Support Technician.
* Completed Group Leader R & EC checklist
Forward the following to the Emergency Preparedness Representative Completed Group Leader R & EC checklist Completed Group Leader R & EC log 69
* Completed Group Leader R & EC log 69


Number TMI - Unit 1 Emergency Plan Implementing Document                           EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
  "-Ile                                                                                       Revision No.
"-Ile Revision No.  
"-Emergency Operations Facility                                                                             18 EXHIBIT 17                                     Page 4 of 4 2.1   Attend ESD conferences.
"-Emergency Operations Facility 18 EXHIBIT 17 Page 4 of 4 2.1 Attend ESD conferences.
: a.     Discuss dose assessment information
: a.
* Dose projections
Discuss dose assessment information Dose projections
: i.           Insure the level of conservatism in the calculation is presented.
: i.
* Field monitoring team results
Insure the level of conservatism in the calculation is presented.
* Sample results
Field monitoring team results Sample results
: b.     Provide information concerning Protective Action Recommendations (PAR)
: b.
* Appropriate PAR in accordance with Exhibit 8
Provide information concerning Protective Action Recommendations (PAR)
* When EPA PAG's are exceeded outside 5 mile radius
Appropriate PAR in accordance with Exhibit 8 When EPA PAG's are exceeded outside 5 mile radius When the EPA PAG's are exceeded outside 10 mile EPZ iL Dose projections covering the 10 to 30 mile radius can be found on the Emergency Information Network.
* When the EPA PAG's are exceeded outside 10 mile EPZ iL           Dose projections covering the 10 to 30 mile radius can be found on the Emergency Information Network.
ii.
ii.         Recommend protective actions outside the 10 mile EPZ as follows:
Recommend protective actions outside the 10 mile EPZ as follows:
: a.           Expand the evacuation area in 5 mile increments
: a.
: b.           Utilize a 360 degree approach
Expand the evacuation area in 5 mile increments
: c.           Expand the area such that EPA PAG's are not expected to be exceeded outside the recommended radius (e.g., If PAG's are expected to be reached at 17 mile radius, the PAR would include the 20 mile radius).
: b.
: c. Inform the NRC representative of any problems.with the automated dose projection code.
Utilize a 360 degree approach
* Insure the level of conservatism in the calculation is presented.
: c.
Name                                                               Time:                   Date Group Leader - Radiological & Environmental Controls 70
Expand the area such that EPA PAG's are not expected to be exceeded outside the recommended radius (e.g., If PAG's are expected to be reached at 17 mile radius, the PAR would include the 20 mile radius).
: c.
Inform the NRC representative of any problems.with the automated dose projection code.
Insure the level of conservatism in the calculation is presented.
Name Time:
Date 70 Group Leader - Radiological & Environmental Controls


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
    -;fle                                                                                       Revision No.
-;fle Revision No.  
",--&#xfd;mergency Operations Facility                                                                           18 EXHIBIT 18                                   Page 1 of 2 Environmental Assessment Coordinator Checklist 1.0     Activate the Environmental Assessment Coordinator Position.
",--&#xfd;mergency Operations Facility 18 EXHIBIT 18 Page 1 of 2 Environmental Assessment Coordinator Checklist 1.0 Activate the Environmental Assessment Coordinator Position.
_ a.     Start an EAC log in accordance with EPIP-TMI-.05, "Communications and Record Keeping.
: a.
_ b.     Ensure that the Met/Dose Coordinator position is activated.
Start an EAC log in accordance with EPIP-TMI-.05, "Communications and Record Keeping.
_ c.     Ensure the Emergency Information Network (EIN) Computer is activated.
: b.
: d.     Establish communications with the RAC.
Ensure that the Met/Dose Coordinator position is activated.
: e.     Report the EAC and Met/Dose Coordinator positions as activated when asked by the Emergency Preparedness Representative.
: c.
2.0     Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
Ensure the Emergency Information Network (EIN) Computer is activated.
: a.     Keep the Group Leader R & EC and the RAC informed on the status of the following:
: d.
* Field Team measurements
Establish communications with the RAC.
* Reuter Stokes readings
: e.
* Meteorological data
Report the EAC and Met/Dose Coordinator positions as activated when asked by the Emergency Preparedness Representative.
* Plume Travel NOTE The items listed under "a" above are met if EIN is active and displaying proper data.
2.0 Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
* Weather forecasts
: a.
* Environmental Monitoring sample results (if available)
Keep the Group Leader R & EC and the RAC informed on the status of the following:
* Other pertinent information 71
Field Team measurements Reuter Stokes readings Meteorological data Plume Travel NOTE The items listed under "a" above are met if EIN is active and displaying proper data.
Weather forecasts Environmental Monitoring sample results (if available)
Other pertinent information 71


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 e                                                                                   Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e
Emergency Operations Facility                                                                       18 EXHIBIT 18                                   Page 2 of 2
Revision No.
: b. Interpret field team data.
Emergency Operations Facility 18 EXHIBIT 18 Page 2 of 2
* Ensure field team data is entered in the EIN (Onsite/Offsite Teams).
: b.
* Compare field team data to projections.
Interpret field team data.
* Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.
Ensure field team data is entered in the EIN (Onsite/Offsite Teams).
: c. Evaluate Reuter Stokes information.
Compare field team data to projections.
* Compare Reuter Stoke information to field team data.
Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.
* Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.
: c.
: d. Ensure weather forecast information is provided to the Group Leader R & EC and to the RAC.
Evaluate Reuter Stokes information.
Compare Reuter Stoke information to field team data.
Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.
: d.
Ensure weather forecast information is provided to the Group Leader R & EC and to the RAC.
NOTE Be especially sensitive to changes in dispersion at dusk and dawn.
NOTE Be especially sensitive to changes in dispersion at dusk and dawn.
: e. If problems are encountered with the telephones, contact the EOF Communications Coordinator.
: e.
: f. As additional personnel are available assign them to the following positions, as needed to help fulfill EAC responsibilities.
If problems are encountered with the telephones, contact the EOF Communications Coordinator.
          *_          Field Team Coordinator
: f.
          *_          Dose Projection Computer Operator
As additional personnel are available assign them to the following positions, as needed to help fulfill EAC responsibilities.
          *_          Radio Communicator
Field Team Coordinator Dose Projection Computer Operator Radio Communicator RAC Communicator
          *_          RAC Communicator
: g.
: g. Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Name                                                           Time:                   Date Environmental Assessment Coordinator 72
Name Time:
Date 72 Environmental Assessment Coordinator


Number TMI - Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 le                                                                                         Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.
Emergency Operations Facility                                                                             18 EXHIBIT 18A                                   Page 1 of 3 Met/Dose Coordinator 1.0   Activate the Met/Dose Coordinator position.
Emergency Operations Facility 18 EXHIBIT 18A Page 1 of 3 Met/Dose Coordinator 1.0 Activate the Met/Dose Coordinator position.
_ a.       Start a log in accordance with EPIP-TMI-.05, "Communications and Record Keeping"
: a.
_ b.       Energize the following, if not already done.
Start a log in accordance with EPIP-TMI-.05, "Communications and Record Keeping"
* EACC Computers
: b.
* EACC Printers
Energize the following, if not already done.
* EACC radio
EACC Computers EACC Printers EACC radio
: i.         Perform radio check
: i.
_ c.       Deploy Field Monitoring Teams
Perform radio check
                *_        Make team assignments.
: c.
                *_        If EOF access control has been established, inform the access center coordinator that there will be more than one access area open while field monitoring teams are being dispatched.
Deploy Field Monitoring Teams Make team assignments.
S* teams to ensure that there is no unauthorized entry.
If EOF access control has been established, inform the access center coordinator that there will be more than one access area open while field monitoring teams are being dispatched.
Instruct the field monitoring
S*
: i.           Instruct the teams to secure the door upon their departure.
Instruct the field monitoring teams to ensure that there is no unauthorized entry.
ii.           Instruct them to inform you upon departure.
: i.
              *_          Instruct the team to perform field monitoring per EPIP-TMI-.10, "Onsite/Offsite Radiological/Environmental Monitoring".
Instruct the teams to secure the door upon their departure.
_ d.     Access the Emergency Information Network (EIN).
ii.
* If the LAN connection is unavailable the EIN data will not be available and functions of the Reuter/Stokes, Midas, and the meteorology will have to be obtained by alternate means.
Instruct them to inform you upon departure.
_ e.     Obtain present meteorological parameters.
Instruct the team to perform field monitoring per EPIP-TMI-.10, "Onsite/Offsite Radiological/Environmental Monitoring".
_ f.     Report to the EAC that the Met/Dose Coordinator position is activated.
: d.
Access the Emergency Information Network (EIN).
If the LAN connection is unavailable the EIN data will not be available and functions of the Reuter/Stokes, Midas, and the meteorology will have to be obtained by alternate means.
: e.
Obtain present meteorological parameters.
: f.
Report to the EAC that the Met/Dose Coordinator position is activated.
73
73


Number TMI - Unit I Emergency Plan Implementing Document                 I.
TMI - Unit I Emergency Plan Implementing Document le Emergency Operations Facility EPIP-TMI-.27 Revision No.
EPIP-TMI-.27 le                                                                                             EPIP-TMI-.27 Revision No.
18 EXHIBIT 18A 2.0 Operations NOTE The following steps are not presented in the exact sequence to be performed. It is likely that some steps will have to be of the sequence listed and that some steps will be performei concurrently. Steps that are not applicable for the present s be skipped. Other steps may need to be repeated. This exl referred to periodically to ensure that necessary actions are
Emergency Operations Facility                                                                            18 18 EXHIBIT 18A                                     Page 2 of 3 2.0 Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be erformed out of the sequence listed and that some steps will be performeid concurrently. Steps that are not applicable for the present s ituation may be skipped. Other steps may need to be repeated. This exlhibit should be referred to periodically to ensure that necessary actions are not missed.
: a.
: a.     Obtain a current weather forecast by any of the following means:
Obtain a current weather forecast by any of the following means:
From a meteorologist, if available
From a meteorologist, if available
: i.           Obtain a weather forecast if the meteorologist can provide one over the telephone.
: i.
ii.          Ask the meteorologist to report to the EACC.
ii.
* From National Weather Service information found on the LAN or the Internet.
Page 2 of 3 Obtain a weather forecast if the meteorologist can provide one over the telephone.
            -            From the National Weather Service directly using the telephone numbers found in EPIP-TMI-.06.
Ask the meteorologist to report to the EACC.
: b.     Direct the Field Monitoring Efforts When the EAC and MET/Dose Coordinator positions are activated and the field monitoring teams are operational, inform the RAC that the EACC is ready to assume responsibility for radiological and environmental monitoring.
From National Weather Service information found on the LAN or the Internet.
From the National Weather Service directly using the telephone numbers found in EPIP-TMI-.06.
: b.
Direct the Field Monitoring Efforts When the EAC and MET/Dose Coordinator positions are activated and the field monitoring teams are operational, inform the RAC that the EACC is ready to assume responsibility for radiological and environmental monitoring.
ii.
Request the RAC inform the ED assistant that the EACC is operational.
Request the RAC inform the ED assistant that the EACC is operational.
ii.
Provide the following message to Field Monitoring Teams.
Provide the following message to Field Monitoring Teams.
ATTENTION FIELD MONITORING PERSONNEL. THE ENVIRONMENTAL ASSESSMENT COMMAND CENTER IS ACTIVATED AND WILL ASSUME RESPONSIBILITY FOR ALL RADIOLOGICAL AND ENVIRONMENTAL MONITORING AS OF                 . ALL TEAMS RESPOND BY CONFIRMING THIS MESSAGE.
Use MIDAS plume plots and meteorological data to properly position the teams for monitoring duties while keeping their doses ALARA.
i.
Provide redundant tracking of field team accumulated doses, after field teams reports accumulate 500 mRem of thyroid dose.
74 Number I.
that they are erformed out d
ituation may hibit should be not missed.
ATTENTION FIELD MONITORING PERSONNEL. THE ENVIRONMENTAL ASSESSMENT COMMAND CENTER IS ACTIVATED AND WILL ASSUME RESPONSIBILITY FOR ALL RADIOLOGICAL AND ENVIRONMENTAL MONITORING AS OF  
. ALL TEAMS RESPOND BY CONFIRMING THIS MESSAGE.
(Time)
(Time)
Use MIDAS plume plots and meteorological data to properly position the teams for monitoring duties while keeping their doses ALARA.
EPIP-TMI-.27 18
: i.            Provide redundant tracking of field team accumulated doses, after field teams reports accumulate 500 mRem of thyroid dose.
74


Number TMI- Unit 1 Emergency Plan Implementing Document                       EPIP-TMI-.27 le                                                                                   Revision No.
Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.  
"-l~mergency Operations Facility                                                                     18 EXHIBIT 18A                                   Page 3 of 3
"-l~mergency Operations Facility 18 EXHIBIT 18A Page 3 of 3 Direct the Field Teams to perform monitoring activities such as but not limited to:
* Direct the Field Teams to perform monitoring activities such as but not limited to:
: i.
: i.           Scan to find plume center line ii.           Perform dose rate surveys iii.         Obtain air samples
Scan to find plume center line ii.
* Interpret field team data.
Perform dose rate surveys iii.
: i.           Ensure field team data is entered in the EIN.
Obtain air samples Interpret field team data.
ii.           Compare field team data to that projected by MIDAS and the RAC dose codes.
: i.
iii.           Report results of comparison to the EAC and, as appropriate, to the RAC.
Ensure field team data is entered in the EIN.
: c. Based on the forecast data meteorological parameters used by the dose projection system are reasonable.
ii.
: d. Edit the MIDAS plume plots as necessary.
Compare field team data to that projected by MIDAS and the RAC dose codes.
: e. Keep the EAC informed of changes in the meteorology.
iii.
* Verify that the meteorological information appears to be accurate (e.g., the data is not remaining exactly the same over an extended time [30 - 45 minutes], it seems consistent with forecast information).
Report results of comparison to the EAC and, as appropriate, to the RAC.
: f. Using weather forecasts, obtained in Step 2.1, relay the expected trend in dispersion factors and wind direction.
: c.
Based on the forecast data meteorological parameters used by the dose projection system are reasonable.
: d.
Edit the MIDAS plume plots as necessary.
: e.
Keep the EAC informed of changes in the meteorology.
Verify that the meteorological information appears to be accurate (e.g., the data is not remaining exactly the same over an extended time [30 - 45 minutes], it seems consistent with forecast information).
: f.
Using weather forecasts, obtained in Step 2.1, relay the expected trend in dispersion factors and wind direction.
NOTE Be especially sensitive to changes in dispersion at dusk and dawn.
NOTE Be especially sensitive to changes in dispersion at dusk and dawn.
: g. Enter data on the EIN
: g.
* As time permits, enter field team data (Onsite & Offsite)
Enter data on the EIN As time permits, enter field team data (Onsite & Offsite)
L             Field team data is collected using Exhibit 18B.
L Field team data is collected using Exhibit 18B.
* Evaluate the data for consistency.
Evaluate the data for consistency.
: h. Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
: h.
Name                                                             Time:                 Date Met/Dose Coordinator 75
Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.
Name Time:
Date Met/Dose Coordinator 75


Number TMI - Unit I Emergency Plan Implementing Document                     EPIP-TMI-.27 le                                                                            Revision No.
le
"'-&#xfd;mergency Operations Facility                                                                18 EXHIBIT 18B                                   Page 1 of 1 Field Team Designation:                                                             Date:
"'-&#xfd;mergency Operations Facility TMI - Unit I Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.
Open Window E520 Location           Time           (mR/hr)         Average Closed Window E520 (mR/hr) or Frisker (cpm)
18 Air Sampler Time Sample Type Net CPM Run Time Flow Time Iodine Particulate Smear 1
Air Sampler Time       Sample Type         Net CPM         Run Time             Flow Time Iodine Particulate Smear Noble Gas Field Team Designation:                                                             Date:
t Noble Gas 76 EXHIBIT 18B Page 1 of 1 Field Team Designation:
Location Open Window E520     1 Time           (mR/hr)         Average Closed Window E520 (mR/hr) or Frisker (cpm)
Date:
Air Sampler Time        Sample Type          Net CPM        Run Time              Flow Time Iodine Particulate Smear 1                      t Noble Gas 76
Open Window E520 Location Time (mR/hr)
Average Closed Window E520 (mR/hr) or Frisker (cpm)
Air Sampler Time Sample Type Net CPM Run Time Flow Time Iodine Particulate Smear Noble Gas Field Team Designation:
Date:
Open Window E520 1 Location Time (mR/hr)
Average Closed Window E520 (mR/hr) or Frisker (cpm)


Number TMI - Unit 1 Emergency Plan Implementing Document                     EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
  ;le                                                                                 Revision No.
;le Revision No.
Emergency Operations Facility                                                                     18 EXHIBIT 19                                 Page 1 of 1 RAC Line Communicator
Emergency Operations Facility 18 EXHIBIT 19 Page 1 of 1 RAC Line Communicator
: 1. ACTIVATION 1.0   Activate the RAC Line Communicator Position.
: 1.
: a.       Turn on the Group Leader Radiological and Environment Controls computer and access the Emergency Information Network, if not already completed.
ACTIVATION 1.0 Activate the RAC Line Communicator Position.
: b.       Establish communications with the RAC by manning the Radiological Line.
: a.
0         Dial "22" on the ML-8000 System.
Turn on the Group Leader Radiological and Environment Controls computer and access the Emergency Information Network, if not already completed.
: c.       Establish a Telephone Communications Logsheet in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
: b.
: d.       Report your status as activated when asked by the Emergency Preparedness Representative.
Establish communications with the RAC by manning the Radiological Line.
I1. RAC LINE COMMUNICATOR OPERATIONAL CHECKLIST 2.0   Assist the Group Leader Radiological and Environmental Controls as necessary.
0 Dial "22" on the ML-8000 System.
: a.       Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
: c.
Name                                                             Time:               Date RAC Line Communicator 77
Establish a Telephone Communications Logsheet in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
: d.
Report your status as activated when asked by the Emergency Preparedness Representative.
I1.
RAC LINE COMMUNICATOR OPERATIONAL CHECKLIST 2.0 Assist the Group Leader Radiological and Environmental Controls as necessary.
: a.
Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Name Time:
Date RAC Line Communicator 77


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 tie                                                                                         Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.
Emergency Operations Facility                                                                               18 EXHIBIT 20                                     Page 1 of 3 Group Leader Admin Support I.     ACTIVATION Initial 1.0     Activate the Group Leader Admin Support Function
Emergency Operations Facility 18 EXHIBIT 20 Page 1 of 3 Group Leader Admin Support I.
: a.       Begin the Group Leader - Administrative Support Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
ACTIVATION Initial 1.0 Activate the Group Leader Admin Support Function
: b.       Report your status as activated to the Emergency Preparedness Representative.
: a.
II. GROUP LEADER - ADMIN SUPPORT OPERATIONAL CHECKLIST NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
Begin the Group Leader - Administrative Support Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".
2.0     Implement EOF Access Control in accordance with Exhibit 6.
: b.
: a.       If an individual is not available to implement Exhibit 6, proceed as follows:
Report your status as activated to the Emergency Preparedness Representative.
* Insure the door is locked.
II.
* Display a sign stating "Ring doorbell for facility access".
GROUP LEADER - ADMIN SUPPORT OPERATIONAL CHECKLIST NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
2.1     Determine, as necessary, where the following services can be performed or obtained.
2.0 Implement EOF Access Control in accordance with Exhibit 6.
: a.         General Administration
: a.
* Word processing
If an individual is not available to implement Exhibit 6, proceed as follows:
* Typing pool
Insure the door is locked.
* Reproduction
Display a sign stating "Ring doorbell for facility access".
: b.         Transportation Helicopter services (Refer to EPIP-TMI-.06)
2.1 Determine, as necessary, where the following services can be performed or obtained.
* Vans
: a.
* Buses
General Administration Word processing Typing pool Reproduction
* Automobiles
: b.
* Shuttle service 78
Transportation Helicopter services (Refer to EPIP-TMI-.06)
Vans Buses Automobiles Shuttle service 78


Number TMI - Unit 1 Emergency Plan Implementing Document                             EPIP-TMI-.27 Fe                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Fe Revision No.
Emergency Operations Facility                                                                         18 EXHIBIT 20                                       Page 2 of 3
Emergency Operations Facility 18 EXHIBIT 20 Page 2 of 3
: c.     Personnel Administration and Accommodations Personnel processing i)           Registration ii)           Indoctrination iii)         Training iv)           Security badging
: c.
* Lodging
Personnel Administration and Accommodations Personnel processing i)
* Food
Registration ii)
: d.     Outside Plant Support
Indoctrination iii)
* Trailer setup
Training iv)
* Janitorial Service
Security badging Lodging Food
* Telephones
: d.
: e.     If problems are encountered with the telephones, contact the EOF Communications Coordinator.
Outside Plant Support Trailer setup Janitorial Service Telephones
: f.     Process personnel requiring site access by implementing Exhibit 7, "TMI Access Authorization".
: e.
* Ensure a Radiological Support Technician is called out to activate the dosimetry issue function at the EOF.
If problems are encountered with the telephones, contact the EOF Communications Coordinator.
: g.     Assume the duties as the TMI Point of Contact for INPO.
: f.
: h.     Using Exhibit 21, develop a watch-bill for the Emergency Support Organization that will support the emergency on a 24 hour / day basis.
Process personnel requiring site access by implementing Exhibit 7, "TMI Access Authorization".
Ensure a Radiological Support Technician is called out to activate the dosimetry issue function at the EOF.
: g.
Assume the duties as the TMI Point of Contact for INPO.
: h.
Using Exhibit 21, develop a watch-bill for the Emergency Support Organization that will support the emergency on a 24 hour / day basis.
Determine from the ESD when he wants the first shift change to occur.
Determine from the ESD when he wants the first shift change to occur.
The time should be far enough in the future to give backup duty roster members time enough to get some rest before filling the second shift.
The time should be far enough in the future to give backup duty roster members time enough to get some rest before filling the second shift.
Line 1,844: Line 2,540:
List the person in the first shift position on Exhibit 21.
List the person in the first shift position on Exhibit 21.
Determine alternate duty roster members.
Determine alternate duty roster members.
: i.           Identify backup duty roster members already at the EOF.
: i.
Identify backup duty roster members already at the EOF.
79
79


Number TMI- Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 de                                                                                     Revision No.
Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 de Revision No.
Emergency Operations Facility                                                                         18 EXHIBIT 20                                     Page 3 of 3 ii.           Using the Emergency Support Organization Duty Roster and telephone listings from the glass case next to the nametag bulletin board, call other duty roster members to determine their availability.
Emergency Operations Facility 18 EXHIBIT 20 Page 3 of 3 ii.
Using the Emergency Support Organization Duty Roster and telephone listings from the glass case next to the nametag bulletin board, call other duty roster members to determine their availability.
Fill in the second shift using the available backup duty roster members.
Fill in the second shift using the available backup duty roster members.
Pass out copies of each group's watch-bill to that group.
Pass out copies of each group's watch-bill to that group.
Have the ESD announce when the shift rotation will occur.
Have the ESD announce when the shift rotation will occur.
Call out additional personnel as required.
Call out additional personnel as required.
2.2 Contact the Emergency Director Assistant to obtain the status of Protected Area Accountability and Site Evacuation.
2.2 Contact the Emergency Director Assistant to obtain the status of Protected Area Accountability and Site Evacuation.
: a.         Inform the ESD of the status.
: a.
: b.         If informed by the Emergency Assembly Area Coordinator that the EOF will be used as the Remote Assembly Area.
Inform the ESD of the status.
* Prepare the EOF to receive site evacuees in accordance with Exhibit 22.
: b.
2.3 Attend ESD conferences and be prepared to discuss information concerning the following:
If informed by the Emergency Assembly Area Coordinator that the EOF will be used as the Remote Assembly Area.
* NRC Incident Response Team
Prepare the EOF to receive site evacuees in accordance with Exhibit 22.
* Status of Accountability
2.3 Attend ESD conferences and be prepared to discuss information concerning the following:
* Status of Site Evacuation i)           Monitoring status ii)         Decontamination status
NRC Incident Response Team Status of Accountability Status of Site Evacuation i)
* Other Agencies
Monitoring status ii)
* Logistical information 2.4 Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Decontamination status Other Agencies Logistical information 2.4 Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.
Name                                                           Time:                     Date Group Leader - Admin Support 80
Name Time:
Date Group Leader - Admin Support 80


Number TMI - Unit 1 Emergency Plan r                         Implementing Document                                EPIP-TMI-.27 e                                                                                                  Revision No.
e Emergency Operations Facility r
Emergency Operations Facility                                                                                        18 I
Number EPIP-TMI-.27 Revision No.
18 EXHIBIT 21                                           Page 1 of I Emergency Shift Schedule DATE:
18 EXHIBIT 21 Emergency Shift Schedule Start hours Start hours End hours End hours List duty roster positions for your group including phone talkers/communicators being used.
Position # -
Name -
Name Home Phone Number Work Phone Number Beeper Number Position # -
Name -
Name Home Phone Number Work Phone Number Beeper Number
)sition # -
Home Phone Number Work Phone Number Beeper Number Name -
t I. Name -
i I
t
+
Position # -
Name -
Name Home Phone Number Work Phone Number Beeper Number Position # -
Name -
Name Home Phone Number Work Phone Number Beeper Number Position # -
Name -
Name Home Phone Number Work Phone Number Beeper Number Position # -
Name -
Name Home Phone Number Work Phone Number Beeper Number U _______________________________
I _______________________________
81 DATE:
GROUP:
GROUP:
Shift I         Start          hours                  End                hours Shift 2         Start          hours                  End                hours List duty roster positions for your group including phone talkers/communicators being used.
Shift I Shift 2 Page 1 of I TMI - Unit 1 Emergency Plan Implementing Document I
Position # -                            Name -                                        Name Home Phone Number Work Phone Number Beeper Number Position # -                            Name -                                        Name Home Phone Number Work Phone Number Beeper Number
18
  )sition # -                            Name -                                        Name -
t                                            I.
Home Phone Number i                            I Work Phone Number t                                          +
Beeper Number Position # -                            Name -                                        Name Home Phone Number Work Phone Number Beeper Number Position # -                            Name -                                        Name Home Phone Number Work Phone Number Beeper Number Position # -                            Name -                                        Name Home Phone Number Work Phone Number Beeper Number Position # -                            Name -                                       Name Home Phone Number Work Phone Number Beeper Number U _______________________________          I _______________________________
81


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27 e                                                                                     Revision No.
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e
Emergency Operations Facility                                                                         18 EXHIBIT 22                                     Page 1 of 2 EOF Set Up for Personnel Monitoring and Decon NOTE These steps may be performed concurrently.
Revision No.
1.0   Obtain the signs from the decon locker and post them as follows (see Exhibit 9 of EPIP-TMI-.36):
Emergency Operations Facility 18 EXHIBIT 22 Page 1 of 2 EOF Set Up for Personnel Monitoring and Decon NOTE These steps may be performed concurrently.
* Post a magnetic "TMI Site Evacuees Enter Here" sign on the outside of the door to the sample storage area.
1.0 Obtain the signs from the decon locker and post them as follows (see Exhibit 9 of EPIP-TMI-.36):
* Post a "Clean Personnel Exit - No Entry" sign outside the small roll-up door to the sample storage area.
Post a magnetic "TMI Site Evacuees Enter Here" sign on the outside of the door to the sample storage area.
0       Post 2 "TMI Site Evacuees Use Garage Entrance" signs on orange safety cones and place them at the EOF gate.
Post a "Clean Personnel Exit - No Entry" sign outside the small roll-up door to the sample storage area.
* Post a magnetic "Clean Personnel Exit - No Entry" sign outside the door at the front of the EOF near the NRC Conference Room.
0 Post 2 "TMI Site Evacuees Use Garage Entrance" signs on orange safety cones and place them at the EOF gate.
0 Set up a frisking area in the sample storage areas as indicated on Exhibit 9 of EPIP-TMI-.36.
Post a magnetic "Clean Personnel Exit - No Entry" sign outside the door at the front of the EOF near the NRC Conference Room.
0 Set up a frisking area in the sample storage areas as indicated on Exhibit 9 of EPIP-TMI-.36.  
"1---,.0 Erect radiological barriers as shown on Exhibit 9 of EPIP-TMI-.36.
"1---,.0 Erect radiological barriers as shown on Exhibit 9 of EPIP-TMI-.36.
4.0   Take the following personnel decon supplies from the decon locker to the men's room.
4.0 Take the following personnel decon supplies from the decon locker to the men's room.
* Paper towels
Paper towels Waterless hand cleaner Wash basin Bath soap Shampoo Scrub Brushes Nail Clippers Barber scissors Nasal swabs Disposable PC's Masking tape Poly bags Frisker Step off pad Procedure 661 0-ADM-4330.02 82
* Waterless hand cleaner
* Wash basin
* Bath soap
* Shampoo
* Scrub Brushes
* Nail Clippers
* Barber scissors
* Nasal swabs
* Disposable PC's
* Masking tape
* Poly bags
* Frisker
* Step off pad
* Procedure 661 0-ADM-4330.02 82


7
7 EPIP-TMI-.27 Revision 18 EXHIBIT 22 Page 2 of 2 83
(                                      EPIP-TMI-.27 Revision 18 C
(
EXHIBIT 22 Page 2 of 2 RADIOLOGICAL BARRIER FRISKING AREAS UMITS,, DO NOT USE SOFF 83
RADIOLOGICAL BARRIER FRISKING AREAS SOFF UMITS,, DO NOT USE C


Number TMI - Unit 1 Emergency Plan Implementina Document
TMI - Unit 1 Emergency Plan Implementina Document 4
                                                              -                        4 EPIP-TMI-.27 Revision No.
Number EPIP-TMI-.27 Revision No.
Emergency Operations Facility                                                                          18 EXHIBIT 23                                   Page 1 of 2 EOF Communications Coordinator I. ACTIVATION 1.0 Activate the EOF Communications Coordinator position.
18 EXHIBIT 23 EOF Communications Coordinator Page 1 of 2 I.
: a.       Synchronize the EOF clock, Admin Room clock and the ESD conference room clock with the Control Room clock.
ACTIVATION 1.0 Activate the EOF Communications Coordinator position.
* Dial 8070 (2070 for drills) and ask the ED Assistant for the Control Room clock time.
: a.
: b.       Activate the Rayland Public Address System Depress the black power button.
Synchronize the EOF clock, Admin Room clock and the ESD conference room clock with the Control Room clock.
Dial 8070 (2070 for drills) and ask the ED Assistant for the Control Room clock time.
: b.
Activate the Rayland Public Address System Depress the black power button.
Ensure the red power indicator light is solid red.
Ensure the red power indicator light is solid red.
Test the PA system by depressing the red signal button located on the = microphone. An alert tone should be heard. (Note: If the red power light or PA test does not work, verify the unit is plugged in.)
Test the PA system by depressing the red signal button located on the = microphone. An alert tone should be heard. (Note: If the red power light or PA test does not work, verify the unit is plugged in.)
Gc.     Report your status as activated when asked by the Emergency Preparedness Representative.
Gc.
Report your status as activated when asked by the Emergency Preparedness Representative.
EOF Communications Coordinator Operational Checklist.
EOF Communications Coordinator Operational Checklist.
NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.
2.0 Maintain an EOF Status Board with the following information, as a minimum, using the overhead projector in the front of the room.
2.0 Maintain an EOF Status Board with the following information, as a minimum, using the overhead projector in the front of the room.
Time when EOF is activated Emergency Classification Level Major changes in plant status
* Time when EOF is activated
: a.
* Emergency Classification Level
Call in additional personnel if requested to do so by the Emergency Preparedness Representative.
* Major changes in plant status
: a.       Call in additional personnel if requested to do so by the Emergency Preparedness Representative.
Obtain the positions that need to be filled from the Emergency Preparedness Representative.
Obtain the positions that need to be filled from the Emergency Preparedness Representative.
Use the Emergency Support Organization Duty Roster and telephone listings from the notebook at the communications table.
Use the Emergency Support Organization Duty Roster and telephone listings from the notebook at the communications table.
84
84 Emergency Operations Facility NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.


Number TMI - Unit 1 Emergency Plan Implementing Document                         EPIP-TMI-.27
Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27  
    *le                                                                                 Revision No.
*le Revision No.  
'-l6mergency Operations Facility                                                                       18 EXHIBIT 23                                       Page 2 of 2
'-l6mergency Operations Facility 18 EXHIBIT 23 Page 2 of 2
: b. If the ESD informs you that he has assumed the responsibility for "approving and directing official notifications to off-site agencies", perform the following:
: b.
If the ESD informs you that he has assumed the responsibility for "approving and directing official notifications to off-site agencies", perform the following:
Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC) to receive a turnover.
Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC) to receive a turnover.
Use EPIP-TMI-.06, Additional Assistance and Notification to obtain phone numbers.
Use EPIP-TMI-.06, Additional Assistance and Notification to obtain phone numbers.
Make notifications to offsite agencies in accordance with Exhibit 24, Offsite Notifications, using the message designated and approved by the ESD.
Make notifications to offsite agencies in accordance with Exhibit 24, Offsite Notifications, using the message designated and approved by the ESD.
: c. Coordinate the procurement of outside resources (e.g., Technical assistance, manpower, equipment, etc.) with the Group Leader Admin Support.
: c.
Coordinate the procurement of outside resources (e.g., Technical assistance, manpower, equipment, etc.) with the Group Leader Admin Support.
If requested to procure an outside resource, contact the Group Leader Admin Support for assistance.
If requested to procure an outside resource, contact the Group Leader Admin Support for assistance.
: d. If problems are encountered with the Emergency Telephones Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC).
: d.
: i.           Use EPIP-TMI-.06, Additional Assistance and Notification, to obtain phone numbers.
If problems are encountered with the Emergency Telephones Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC).
* Provide the name of the telephone circuit and a brief description of the problem.
: i.
Use EPIP-TMI-.06, Additional Assistance and Notification, to obtain phone numbers.
Provide the name of the telephone circuit and a brief description of the problem.
2.1 Forward the completed checklist and any other documentation to the Emergency Preparedness Representative at the end of the event.
2.1 Forward the completed checklist and any other documentation to the Emergency Preparedness Representative at the end of the event.
Name                                                           Time:                   Date EOF Communications Coordinator 85
Name Time:
Date EOF Communications Coordinator 85


(
EXHIBIT 24 Off Site Notification Checklist EPIP-TMI-.27 Revision 18 Page 1 of 4 Initial in the box following the action for the level of emergency declared, unless a check is requested.
(                                                                                                                  EPIP-TMI-.27 Revision 18 EXHIBIT 24                                Page 1 of 4 Off Site Notification Checklist Initial in the box following the action for the level of emergency declared, unless a check is requested.
UNUSUAL SITE AREA GENERAL CLOSE OUT ACTION EVENT ALERT EMERGENCY EMERGENCY EMERGENCY Obtain an Emergency Report Form, Part 1 and 2, from the Emergency  
                  .....................................                            UNUSUAL                   SITE AREA   GENERAL       CLOSE OUT ACTION                                                                               EVENT           ALERT   EMERGENCY EMERGENCY     EMERGENCY Obtain an Emergency Report Form, Part 1 and 2, from the Emergency
-Support Director Perform 15 minute notifications Confirm Dial tone on Notification line Dial "91" As the agencies answer, state, "This is Three Mile Island Nuclear Station. Stand by for an emergency message."
-Support Director Perform 15 minute notifications                                                       --                        -
Ask if each agency is on the line.
Confirm Dial tone on Notification line Dial "91" As the agencies answer, state, "This is Three Mile Island Nuclear Station. Stand by for an emergency message."
PEMA PEMA PEMA PEMA PEMA
Ask if each agency is on the line.                                   PEMA             PEMA       PEMA       PEMA           PEMA
[PEMA, are you on the line? Dauphin County?, etc.]
[PEMA, are you on the line? Dauphin County?, etc.]                   Dauphin         Dauphin   Dauphin   Dauphin       Dauphin Check when on line                                         Cumberland       Cumberland Cumberland Cumberland     Cumberland Lancaster       Lancaster Lancaster Lancaster     Lancaster Lebanon         Lebanon   Lebanon   Lebanon       Lebanon York             York       York       York           York Cancel the ring tone by flashing the hook switch twice.
Dauphin Dauphin Dauphin Dauphin Dauphin Check when on line Cumberland Cumberland Cumberland Cumberland Cumberland Lancaster Lancaster Lancaster Lancaster Lancaster Lebanon Lebanon Lebanon Lebanon Lebanon York York York York York Cancel the ring tone by flashing the hook switch twice.
If one or more agencies do not answer promptly, get another person, such as the EP Representative, to perform a parallel notification using any telephone with an out side connection.
If one or more agencies do not answer promptly, get another person, such as the EP Representative, to perform a parallel notification using any telephone with an out side connection.
Direct this person to log the Name/Dispatcher Number of the person contacted and the Time the notification was completed.
Direct this person to log the Name/Dispatcher Number of the person contacted and the Time the notification was completed.
State, "Please stay on the line after the following message to provide a name or dispatcher number and to confirm receipt."_
State, "Please stay on the line after the following message to provide a name or dispatcher number and to confirm receipt."_
Read Emergency Report Form, Part I RECORD TIME Notification completed 86
Read Emergency Report Form, Part I RECORD TIME Notification completed 86
(
(


(EPIP-TMI-.27 EXHIBIT 24                             Revision 18 Page 2 of 4
(EPIP-TMI-.27 Revision 18 EXHIBIT 24 Page 2 of 4 87
(
(
                                                                          . .......U N US UA L           SIT E A REA G E N E RA L   C LO S E O UT ACT.....I....                                                               EVENT         ALERT EMERGENCY   EMERGENCY     EMERGENCY Request receipt confirmation.
....... U N U S U A L S IT E A R EA G E N E RA L C LO S E O U T ACT.....I....
EVENT ALERT EMERGENCY EMERGENCY EMERGENCY Request receipt confirmation.
(NAME or DISPATCHER number)
(NAME or DISPATCHER number)
PEMA Dauphin Cumberland Lancaster Lebanon York.
PEMA Dauphin Cumberland Lancaster Lebanon York.
Line 1,962: Line 2,675:
If not already notified in parallel by another person, Notify remaining agencies that did not receive the information by pre-set conference call.
If not already notified in parallel by another person, Notify remaining agencies that did not receive the information by pre-set conference call.
Log receipt confirmation by recording name/dispatcher number and time.
Log receipt confirmation by recording name/dispatcher number and time.
PEMA Time Dauphin Time Cumberland Time Lancaster Time Lebanon Time York .
PEMA Time Dauphin Time Cumberland Time Lancaster Time Lebanon Time York.
Time 87
Time


(                                                                            (
EXHIBIT 24 EPIP-TMI-.27 Revision 18 Page 3 of 4
(
(
UNUSUAL SITE AREA r"CRJar- at*_rklP/
(
I  GENERAL EBAMr"Dfr-KItV CLOSE MRr-I  Mr OUT CIKt--r" N 11P
EPIP-TMI-.27 Revision 18 EXHIBIT 24 Page 3 of 4 UNUSUAL
                                                                                      " IrKIT I-, 114GIiil t:[lllIMM1*,,Ot:llLl IMU.-UMIUIL Ill5PUGLtUl Call Wayne Schmidt                           Site Telephone 9-948-1165 Or     Ext. 8253 Home Telephone 9-687-8627 Read Emergency Report Form, Part 2 Record Time contacted If unable to contact the Senior Resident Inspector Call the Senior Resident Inspector pager by dialing 9-1-800-398-7853 After hearing three beeps, dial the call back number you want the inspector to call.
" IrKIT I-,
114GIiil t:[lll IMM1*,,Ot:llLl IMU.-UMIUIL Ill5PUGLtUl Call Wayne Schmidt Site Telephone 9-948-1165 Or Ext.
8253 Home Telephone 9-687-8627
(
SITE AREA I GENERAL CLOSE OUT r"CRJar-at*_rklP/
EBAMr"Dfr-KItV MRr-I Mr CIKt--r" N 11P Read Emergency Report Form, Part 2 Record Time contacted If unable to contact the Senior Resident Inspector Call the Senior Resident Inspector pager by dialing 9-1-800-398-7853 After hearing three beeps, dial the call back number you want the inspector to call.
When the inspector calls back, read Emergency Report Form, Part 2.
When the inspector calls back, read Emergency Report Form, Part 2.
If the Senior Resident Inspector does not call back within 15 minutes, page the Resident Inspector, by dialing 9-1-800-398-8135 After hearing three beeps, dial the call back number you want the inspector to call.
If the Senior Resident Inspector does not call back within 15 minutes, page the Resident Inspector, by dialing 9-1-800-398-8135 After hearing three beeps, dial the call back number you want the inspector to call.
When the inspector calls back, read Emergency Report Form, Part 2.
When the inspector calls back, read Emergency Report Form, Part 2.
If the Resident Inspector does not call back within 15 minutes, record the time as
If the Resident Inspector does not call back within 15 minutes, record the time as  
                                'NOT CONTACTED' Contact the York Haven Power Station Dial 9-848-7277 or 9-266-3654 Read Emergency Report Form, Part 2 Record the following for the person contacted Name Time 88
'NOT CONTACTED' Contact the York Haven Power Station Dial 9-848-7277 or 9-266-3654 Read Emergency Report Form, Part 2 Record the following for the person contacted Name Time 88


6 EPIP-TMI-.27 Revision 18
6 EPIP-TMI-.27 Revision 18 EXHIBIT 24 Page 4 of 4 UNUSUAL ALERT I SITE AREA I GENERAL FIVFNT
(
:F=MFRCrI.F=rY I:FMFRAPINr.Y CLOSE OUT PftAP ** ::nPrny Record the following for the person contacted Name Time Contact ANI at 1(860) 561-3433 Read Emergency Report Form, Part 2 Provide call back number (717)
EXHIBIT 24                           Page 4 of 4 UNUSUAL ALERT I SITE AREA     I GENERAL         CLOSE OUT FIVFNT         :F=MFRCrI.F=rY I:FMFRAPINr.Y   PftAP ** ::nPrny Record the following for the person contacted Name Time Contact ANI at 1(860) 561-3433 Read Emergency Report Form, Part 2 Provide call back number (717)
(Insert number)
(Insert number)
Point of Contact is Emergency Support Director Assistant Inform the Emergency Support Director Assistant when all contacts have I been completed.                                                       I EVENT TERMINATION notifications NRC Inspector, contacted above.
Point of Contact is Emergency Support Director Assistant Inform the Emergency Support Director Assistant when all contacts have I been completed.
I EVENT TERMINATION notifications NRC Inspector, contacted above.
Name Time York Haven Power Station, contacted above.
Name Time York Haven Power Station, contacted above.
Name Time System Dispatcher, contacted above.
Name Time System Dispatcher, contacted above.
Name Time Forward this CHECKLIST and ALL associated documentation to the Emergency Preparedness Representative 89}}
Name Time
(
Forward this CHECKLIST and ALL associated documentation to the Emergency Preparedness Representative 89}}

Latest revision as of 02:00, 17 January 2025

Revised Emergency Plan Implementing Procedures,Including Rev 11 to EPIP-TMI-.07, Rev 12 to EPIP-TMI-.10 and Rev 18 to EPIP-TMI-.27
ML003778685
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/08/2000
From: Brown N, Whitehead J
AmerGen Energy Co
To:
Office of Nuclear Reactor Regulation
References
-RFPFR
Download: ML003778685 (135)


Text

  • l3ackup TSC,OSF-113
  • l3urcau of Rad Protection
  • Control RPa-U/1 File Convy. 0OB-I Control Rn-U/I Shift Mgrs Station, 03
  • Control Rm-U/I Work Cony. OOB-1 Dauphin County EMA
  • l)ir. Work Mgmt., OSF-2 Dir. Conmmunications, SOB.
  • Documnent Center, NOB-2
  • Documnent Control Desk lDositnetry, Serv. Bldg.
  • EP - NDB, Tlrng. Bl3g. 112
  • EI1.ierg. Prep. Dept.
  • ROF, Trng. Bldg.
  • EP Drills, Ting. Bldg. #12
0SD, Thig. Bldg..

Environ. Affhirs-Lab, Interstate Drive Environ. Affairs-TMi, NOB-1 10 - 211.

  • Instnrutor Nuclear IV, Trog. Bldg. #2 Logisitcal Support, Trng. Bldg... ;1 -7 "
  • NRC - Onsite, NOB-I
  • NRC - Region I, (Chief EP Section)
  • PEMA - Bureau of Plans Persoannel/Vehicle Monitor Kit Tnig Ctr.
  • Plant Maint. (Library,), Serv. Bldg.
  • Porter Consultants, Ardmore RLM, Rad Field Ops.

Rad Con -RAC Locker, Rad Field Ops.

Rad Con -Kit I PC. Rad Field Ops./O Rtd Con -Kit 2 P.

Red Field Ops./O Rad Con -Kit 3 4,,(ad Field Opsi0 Rad Con-Kit 4 EOF Bldg Rad Field Ops.IO Red Con-Kit 5 FOF t31dg Rad Field Ops.

Rad Con-Simulator l.ockerRad Field Ops

  • Rad 1ngineers-U1, OO1
  • Rad Instrument, Bldg. 159 Radwaste/Chemistry, OOB-I Secondary Chem Lab-, 0013-1
  • Security Mgr., PC Security U-I, PC
  • Simulator Room/File Copy, Trtg.

Simulator Room/Shift Supvs Office, Tnrg

  • Simulator Room/Working Copy, T'rg.
  • TSC - Unit 1, OSF-l 13
  • Training Dept., 'I'ng
  • OSC Rad Field Ops..
  • Unit I Operations, OOB.:I
  • Vice President - TMI, OSF-2
  • Word Processing, OOB,No Stamp/Clip RECORDS MGMT C. Warlow M. Vyenielo L. Ritter L. Ritter L. Ritter D. Fetterhoff S. Epler R. DeSantis S. Burkett D. College N. D. Brown D. Light R. Finicle N. D. Brown R. Finicle D. Russ W. Ressler R. Neff R. Finincle P. Sdr M

D. Fleck T. Berstler N. Smith S. Porter T. Berstler T. Berstler7tIC T. Berstler T. Berstler T. Berstler T. l3erstlcr T. Berstler T. Berstler7t/i M. Wherry J. L. Eckroth L. Ritter L. Ritter V. Handley R. Goodrich D. Silar D. Silar D. Silar C. Warlow C. Flory "T. Berstler L. Ritter P. J. Chevalier A. Houseal S. Zirninennan 4-97 1



_ 311 E-jTh liz ft ii XI Li Li LI

'Li' 3II II KLI EPIP/TEP Instruction Memo Date

!,R_-___-_ -

_0 Verif:

Box No. -

O 66_,1 T'I T_"r2 Please update your file with the attached listed below, destroy tie superseded and post your Index accordingly. Al;o, if Controlled Documents please sign the acknowledgment at the bottom of this memo and return to Debbie Marshbank, Configuration Cntrl., Ro. 135, SOB Page Delete Document Number Rev 10 Number Replae. Entire Page(s)

Level T--

--IL 1 &i - Loo- __7 x

-_0_

7--7 7

M- -0 ADDITIONAL DISTRIBUTION:

ra#L I C I 3H V

3117L EaP~

P.c-Fs-d

-6

a-OTLLk ESDt
A_ý-T TeýAA SLLPPtT Ref EAF eommuj.,aC
  • I herebFy acknowledge reeipt oft]u mn required ONLY if CONTROLLED.

Signature t t, I

Ut I

emo and have complied with the instuctions. Signature and returned memo Date Info Copy 3

Stapled, 3 Hole Punch Ctrl Copy _

Stapled, 3 Hole Punch Ctrl Copy &.*lipped

+/-7

  • o Plain Copy Clipped (4entl Pi Memo Only Distribution:

Central File IT1V1 NA"

,40-11

FOR INFORMATION ONLY I Number AmerGen itle Activation of the RAC TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 11 Revision No.

Applicability/Scope USAGE LEVEL Effective Date All TMI RAC Emergency Response Personnel 2

DEC 8 2000 This document is within QA plan scope X

Yes L_

No Safety Reviews Required X I Yes No List of Effective Pages Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 S16 17 18 19 20 Revision Page Revision Page Revision Page Revision 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 Procedure Owner Approver I1/s/ J. L. Whitehead

/s/ N. Brown 12/05/00 12/05/00 1

Number TMI-Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.

Activation of the RAC 11 1.0 PURPOSE The purpose of this procedure is to provide guidelines for the Radiological Assessment Coordinator (RAC) to activate the radiological assessment function.

2.0 APPLICABILITY/SCOPE This procedure is applicable to the TMI Radiological Assessment Coordinator and Radiological Support Personnel.

3.0 DEFINITIONS None 4.0 RESPONSIBILITIES 4.1 The on-shift RAC is responsible for implementing Exhibit 1.

4.2 The Initial Response Emergency Organization (IREO) (RAC) is responsible for implementing Exhibit 2.

4.3 Radiological Support Personnel are responsible for implementing Exhibits 3 through Exhibits 5.

.0 PROCEDURE 5.1 This procedure is to be initiated upon declaration of any Emergency Classification specified in the Emergency Plan or when directed by the Emergency Director.

5.2 Emergency Actions NOTE The steps in this section are based on the expected sequence of activation of the RAC. The actual sequence should be based on when qualified personnel arrive in the facility.

A.

The on-shift RAC shall activate the radiological assessment function by reporting to the Control Room and performing the steps in the on-shift RAC checklist (Exhibit 1).

2

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 itle Revision No.

Activation of the RAC 11 B.

The IREO RAC shall relieve the on-shift RAC and direct the radiological assessment function by assigning appropriate personnel to assume those positions and perform the actions listed for those positions as follows (in the absence of appropriate personnel, the Radiological Assessment Coordinator shall assume these positions and perform the essential actions for those positions):

Radiological Assessment Coordinator (RAC):

Report to Emergency Control Center and perform the RAC Checklist (Exhibit 2).

Radiological Engineering Support:

Report to the Emergency Control Center and complete the Radiological Engineering Support Checklist (Exhibit 3).

Radiological Line Communicator (RAC Support Staff):

Report to the Emergency Control Center and complete the Radiological Line Communicator Checklist (Exhibit 4).

RAC/OSC Communicator (RAC Support Staff):

Report to the Emergency Control Center and complete the RAC/OSC Communicator Checklist (Exhibit 5).

5.3 Final Conditions 5.3.1 The radiological assessment function is operational with the desired positions manned and functional. Communications are established.

5.4 Post Event Actions 5.4.1 An inventory of the RAC Area of the ECC is required to be performed by the end of the workday following the end of the event. The inventory is the responsibility of Rad Con Field Operations. Notify the Manager, Rad Con Field Ops. of the need to perform the inventory in accordance with Procedure TEP-ADM-1300.01, Maintaining Emergency Preparedness.

6.0 REFERENCES

6.1 TMI Emergency Plan 6.2 TMI Emergency Plan Implementing Procedures 6.3 6610-PLN-4200.02, Emergency Dose Calculation Manual (EDCM) 3

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 de Revision No.

Activation of the RAC 11 7.0 EXHIBITS Exhibit 1 - On-Shift RAC Checklist Exhibit 2 - IREO Duty Roster RAC Checklist Exhibit 3 - Radiological Engineering Support Checklist Exhibit 4 - Radiological Line Communicator Checklist Exhibit 5 - RAC/OSC Communicator Checklist 4

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.

Activation of the RAC 11 EXHIBIT 1 Page 1 of 5 On-Shift RAC Checklist 1.0 The On-Shift RAC should perform the following until relieved by the IREO RAC or by a more senior qualified individual. This checklist need not be completed by the On-Shift RAC prior to turnover per Step 1.11.

NOTE The bold underlined steps below are particularly important in the early stages of an emergency. They should be performed promptly and in an orderly manner.

1.1 Energize the RAC Computer.

1.2 Start a log of activities performed.

1.3 Call out additional resources if they are needed. If no additional resources are needed at this time, skip the step but reconsider it later as needs change.

1.3.1 For the duty roster RAC, determine from the Emergency Director (ED) if the duty roster has been called out. If not, get the RAC's phone number from the ED and call him/her.

1.3.2 For call-out of additional R.C. Techs, obtain (or have someone obtain) phone numbers from the Rad Con Field Ops phone list and call (or have someone call) the needed techs.

1.4 Determine release Pathway. Consult with the ED or his/her designee to determine the pathway of any radioactive releases from the plant.

NOTE Refer to the Emergency Dose Assessment Users Manual section of the EDCM located in the RAC locker for guidance in performing dose projections.

5

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.

Activation of the RAC 11 EXHIBIT 1 Page 2 of 5 1.5 Obtain and validate the initial dose projection within 15 minutes.

1.5.1 Select the RAC Spreadsheet icon from the desktop of the RAC Computer.

1.5.2 Go to the release pathway specified by the ED.

1.5.2.1 Select the Update Plant Data option to import PPM and Met Data.

1.5.2.2 If the pathway is being monitored by an RMS monitor, use the RMS option for that pathway.

1.5.2.3 If the pathway is not being monitored by an RMS monitor, use the leak rate option for that pathway.

1.5.2.4 Verify that the PPM and Met Data is current (15 minutes old or less). If not, all data will need to be input manually.

1.5.2.5 Enter data not available from the PPM as specified by the input sheet.

1.5.2.6 Edit any PPM or Met Data that is not believed to be accurate.

1.5.2.7 Print dose projection.

1.5.3 Validate the dose projection by performing the following checks:

Verify that the correct release pathway is being used.

Verify that the monitor input data is accurate and appropriate (e.g. no calibrations in progress).

Verify the release duration with the ED.

Verify that the dose projection results are consistent with other indications.

1.5.4 Use the Total Dose Option to verify no other pathways are contributing to the offsite dose.

1.5.5 If power is lost to the RAC computer, request assistance from Operations in obtaining power. An extension cord is available in the RAC locker.

1.6 Review the dose proiection with the ED. Ensure the ED understands the nature of the dose projection (e.g. bounding calculation, contingency projection, "what-if', etc.) and the precision or uncertainty associated with the dose projection..

1.7 Review the Emergency Classification with the ED as it relates to current radiological parameters and evaluate the need to escalate to a higher classification.

6

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.

Activation of the RAC 11 EXHIBIT 1 Page 3 of 5 1.8 Advise the ED on any of the following issues if they apply. Skip any that do not apply but reconsider them as the emergency conditions change.

Protective Action Recommendations (PAR) (see the PAR logic diagram in procedure EPIP-TMI-.02, Emergency Direction, available from the ED).

On-site assembly and site evacuation of non-essential personnel (see the table at the end of this exhibit for guidance).

NOTE The automated Emergency Report Form that is produced by ED automatically suggests assembly location and evacuation routes contained on the table in this exhibit.

Contaminated and/or injured employees and any decontamination efforts.

1.9 Consider dispatchinci a field monitoring team if the dose projection indicates the potential for abnormal radiological conditions off-site.

1.9.1 To activate field teams:

Perform radio checks with the field team(s).

Assign and record field team designations (e.g. Alpha, Bravo, etc.)

Obtain and record names and SSN's for all field team members.

Obtain and record year-to-date TEDE for all field team members.

Inform team members of the current wind direction and speed and display it on the EPZ map.

1.9.2 Field monitoring team placement and direction: consider the following guidelines for placing and directing field team(s).

A. "

For ground level releases (highest doses projected at site boundary)

Place the first field team downwind at the site boundary.

Place the second team (if dispatched) off-site, downwind and as near to the site as possible.

7

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 itle Revision No.

Activation of the RAC 11 EXHIBIT I Page 4 of 5 B.

For elevated releases (highest doses projected at some distance from the site)

Place the first field team downwind at the location where the highest dose is projected.

Place the second team (if dispatched) downwind nearer to the site than the first team (results from this team aid in determining if the plume touched down closer than projected).

C.

Instruct the team(s) to scan across the plume and attempt to locate plume centerline.

Provide a definite start point, direction of travel and an end point for scanning (e.g. "scan for plume centerline starting at NNE31, travel toward the Southeast passing through NE31 and continue to ENE31").

1.10 BRP call back: Within 45 minutes of event declaration notify the ECC Communications Coordinator whether the BRP has called back to the RAC.

1.11 Provide a turnover to the IREO RAC upon arrival.

8

EXHIBIT I On-Shift RAC Checklist EPIP-TMI-.07 Revision 11 Page 5 of 5 Guidelines for Selection of On-Site Emergency Assembly Area and Evacuation Route for Non-Essential Personnel Off-Site Remote On-Site Emergency Gate To Be Assembly Area To Wind Direction Assembly Area To Route to Emergency Used For Site Be Used For Site (from)

Use Assembly Area Evacuation Evacuation 10 to 800 Warehouse 1 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 use most direct route to Warehouse 1.

Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 travel by personal vehicle to Warehouse 1.

810 to 1700 Warehouse 3 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 walk to Warehouse 3 via the East side of the plant.

Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 use most direct route to Warehouse 3.

1710 to 2400 Warehouse 3 Personnel in the NOB, OSF, South Gate Training Center Protected Area and other locations near Unit 1 should go directly to their personal vehicles and drive to the parking lot south of the Unit 2 Admin Bldg and then walk to Warehouse 3.

Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 should use the most direct route to Warehouse 3.

2410 to 3200 Warehouse I All site personnel should take North Gate Training Center or the most direct route to EOF Warehouse 1.

(see Note) 3210 to 3600 Warehouse 1 All site personnel should take North Gate Training Center the most direct route to Warehouse 1.

NOTE Use the Training Center as the Off-Site Remote Assembly Area unless the Dose Projection between the Exclusion Area Boundary and 1 mile is greater than 5 mREM/hr CDE or I mREM/hr TEDE.

9

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 ile Revision No.

Activation of the RAC 11 EXHIBIT 2 Page 1 of 5 IREO Duty Roster RAC Checklist 1.0 The IREO RAC should perform the following upon reporting to the Emergency Control Center:

1.1 Obtain a turnover from the On-Shift RAC if staffed. If the on-shift RAC position was not staffed skip to Step 1.2.

1.2 Review Exhibit 1 and ensure applicable steps have been implemented.

NOTE The following steps should be considered and, if needed, implemented.

These steps need not be performed in the sequence listed and may be performed multiple times. The RAC should periodically review this checklist to ensure that necessary steps are being performed.

A.

Assign personnel to staff positions described in Exhibits 3 through 5.

B.

Maintain a log of activities performed.

C.

Refer to the Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) for dose assessment guidance.

D.

Review dose projections with the ED.

Ensure the ED understands the nature of the dose projection (e.g. bounding calculation, contingency projection, "what-if', etc.) and the precision or uncertainty associated with the dose projection.

E.

Advise the ED on:

Protective Action Recommendations (PAR) (see the PAR logic diagram in procedure EPIP-TMI-.02, Emergency Direction, available from the ED)

On-site assembly and site evacuation of non-essential personnel (see the table at the end of this exhibit for guidance).

Radiological conditions:

In-plant (including habitability concerns in emergency facilities),

On-site and Off-site 10

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.

Activation of the RAC 11 EXHIBIT 2 Page 2 of 5 NOTE Consideration should be given to locations on-site where personnel may remain. Examples are:

Security Posts Warehouses Communications Medical Employee doses and emergency dose extensions.

Contaminated employees, decontamination efforts and any use of Thyroid Blocking agent.

F.

Emergency classifications: Recommend emergency classifications to the ED based on radiological conditions and Emergency Action Levels (EAL).

G.

Fuel damage assessment: Provide any necessary assistance to the TSC for the assessment of fuel damage and report results to the ED.

NOTE While the RAC should provide assistance to the TSC in assessing the degree of core damage, the 'official' damage assessment values will be determined by the TSC.

H.

Primary to secondary leak rate determination: If a primary to secondary leak exists, use the Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) to assist in determining primary to secondary leak rate. Coordinate with the TSC in making this determination.

NOTE While the RAC should provide assistance to the TSC in estimating the primary to secondary leak rate, the 'official' leak rate values will be determined by the TSC.

I.

When the EACC is staffed turn over field monitoring teams to the EACC.

J.

Dose projection/field readings comparison: use the following guidance for comparing field readings (field team or Reuter Stokes readings) and dose projections.

If field readings are within a factor of 10 less than (and not more than) the corresponding projected value, a very good correlation exist between the two.

Field iodine sample results, after being converted to thyroid dose rate (CDE per hour), can be directly compared to projected thyroid dose rate.

11

TMI - Unit 1 Emergency Procedure Aie Activation of the RAC Number EPIP-TMI-.07 revisori I'Ju 11 0

K.

Sample provide 0

EXHIBIT 2 Page 3 of 5 Field team closed window dose rates and Reuter Stokes readings can be compared with DDE values in dose projections.

There is no dose projection value that corresponds directly to field team open window readings. Open window readings that are higher than closed window readings indicate that the plume is at ground level at that location.

s: Consider the need for special samples (e.g. MAP-5, CATPASS, RCS-PAS) to more precise source term data for dose projections.

Samples taken directly from the effluent pathway (e.g. condenser off-gas, MAP-5, etc) provide the most precise source term data.

A sample from the Reactor Building atmosphere (i.e. CATPASS) will improve the precision of source term data for releases from the Reactor Building but will likely be less precise than effluent samples.

RCS sample results are useful in determining the extent of fuel damage and can be used to improve the precision of the source term but to less an extent than effluent samples.

NOTE The Emer. Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) provides guidance on which sample(s) to obtain under various conditions.

L.

Communication with BRP: Establish communication with the Bureau of Radiological Protection (BRP) and provide TMI dose projections to them.

M.

Communication with NRC: If the NRC requests continuous communication on the Health Physics Network (HPN), establish and maintain communication on the HPN with them and:

0 0

N.

Coordinate Assign an extra RAC staff member as soon as one is available or, Request an additional communicator from the ED Assistant.

all Radiological Controls activities on-site, including:

Access control to areas affected by the emergency.

Personnel dose monitoring and control (including dose extensions).

In-plant surveys and samples.

12 Revision N*o.

Number TMI-Unit 1 Emergency Procedure EPIP-TMI-.07 itle Revision No.

Activation of the RAC 1

EXHIBIT 2 Page 4 of 5

0.

Thyroid Blocking: Implement the Thyroid Blocking procedure (EPIP-COM-.44) if it is anticipated that person(s) will be exposed to quantities of radioiodine sufficient to cause a thyroid dose of 25 REM (CDE) or greater.

P.

Interface with the Group Leader-Radiological and Environmental Controls (GL-R&EC) regarding:

Dose projections In-plant and on-site conditions Protective actions Q.

Recommend source term reduction techniques appropriate to the release pathway (e.g. RB spray, raising OTSG levels, etc). See the Emergency Dose Assessment User's Manual in Ref 6.3 for specific information.

R.

Evaluate the need for eating and drinking restrictions in-plant.

If results of habitability monitoring allow, recommend that the E.D. lift restrictions, as needed.

Ensure habitability monitoring continues.

S.

Review radiological information in press releases. Specific examples of radiological information that should not be included in press releases are:

0 Dose projections 0

Protective action recommendations Technical terms Acronyms and abbreviations T.

Trend effluent release data, RMS, sample results, field team readings and dose projections.

U.

Establish a watch bill to cover the RAC and all staff positions on a 24 hour-per-day basis.

13

EXHIBIT 2 IREO Duty Roster RAC Checklist EPIP-TMI-.07 Revision 11 Page 5 of 5 Guidelines for Selection of On-Site Emergency Assembly Area and Evacuation Route for Non-Essential Personnel Off-Site Remote On-Site Emergency Gate To Be Assembly Area To Wind Direction Assembly Area To Route to Emergency Used For Site Be Used For Site (from)

Use Assembly Area Evacuation Evacuation 10 to 800 Warehouse 1 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 use most direct route to Warehouse 1.

Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 travel by personal vehicle to Warehouse 1.

810 to 1700 Warehouse 3 Personnel in the NOB, OSF, North Gate Training Center Protected Area and other locations near Unit 1 walk to Warehouse 3 via the East side of the plant.

Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 use most direct route to Warehouse 3.

1710 to 2400 Warehouse 3 Personnel in the NOB, OSF, South Gate Training Center Protected Area and other locations near Unit 1 should go directly to their personal vehicles and drive to the parking lot south of the Unit 2 Admin Bldg and then walk to Warehouse 3.

Personnel in the Unit 2 Admin Bldg, Bldg 222, Transportation and other locations near Unit 2 should use the most direct route to Warehouse 3.

2410 to 3200 Warehouse I All site personnel should take North Gate Training Center or the most direct route to EOF Warehouse 1.

(see Note) 3210 to 3600 Warehouse 1 All site personnel should take North Gate Training Center the most direct route to Warehouse 1.

NOTE Use the Training Center as the Off-Site Remote Assembly Area unless the Dose Projection between the Exclusion Area Boundary and I mile is greater than 5 mREM/hr CDE or I mREM/hr TEDE.

14

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.

Activation of the RAC 11 EXHIBIT 3 Page 1 of 3 Radiological Engineering Support Engineer Checklist 1.0 Perform the following:

NOTE The following steps should be considered and, if needed, implemented.

These steps need not be performed in the sequence listed and may be performed multiple times. The RESE should periodically review this checklist to ensure that necessary steps are being performed.

A.

Start a log of activities performed.

B.

Perform dose projections using the RAC computer.

Refer to the Emergency Dose Assessment User's Manual contained in the EDCM (Ref. 6.3) for guidance.

Validate dose projections. Perform the following checks in coordination with the RAC:

Verify that the correct release pathway is being used.

Verify that the monitor input data is accurate and appropriate (e.g. no calibrations in progress).

Verify the release duration.

Verify that the dose projection results are consistent with other indications.

Verify that the PPM and Met data are not more than 15 minutes old.

If power is lost to the RAC computer, request assistance from Operations in obtaining power. An extension cord is available in the RAC locker.

C.

Determine and log the time of reactor shut down.

D.

Communicate with the GL-R&EC and the EACC.

E.

Trend dose projections.

F.

Generate source term data: Edit input parameters and input sample results to refine the source term.

15

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No.

Activation of the RAC 11 EXHIBIT 3 Page 2 of 3 G.

Met. and forecast data: Obtain current meteorological data and weather forecast data (short and long term) from the EACC for:

Dose projections (e.g. "what if' projections)

Plume tracking Site evacuation planning Off-site protective action planning H.

Evaluate the following inputs to verify that dose projections reflect actual conditions:

Plant conditions RMS data RCS activity Spiking factors Meteorological data.

Confirm dose projections by comparing with field team readings and/or Reuter Stokes readings.

If field readings are within a factor of 10 less than, and not more than, the corresponding projected value a very good correlation exits.

0 Field iodine sample results, after being converted to thyroid dose rate (CDE per hour),

should only be compared to projected thyroid dose rate.

Field team closed window dose rates and Reuter Stokes readings can be compared with DDE values in dose projections.

0 There is no dose projection value that corresponds directly to field team open window readings. Open window readings that are higher than closed window readings indicate that the plume is at ground level at that location.

J.

Discuss Protective Action Recommendations (PAR) and Protective Action Guidelines (PAG) with the RAC.

The PAR logic diagram is contained in procedure EPIP-TMI-.02, Emergency Direction, available from the ED.

K.

Perform "what if" dose projections based on potential or anticipated:

Plant status changes Meteorological changes 16

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 le Revision No Activation of the RAC 11 EXHIBIT 3 Page 3 of 3 L.

Coordinate with the TSC. Assist the RAC in coordinating with the TSC for:

Primary to secondary leak rate determination. Use the Emergency Dose Assessment User's Manual (Ref. 6.3) for guidance.

Fuel damage class determination.

The TSC will produce the "official" damage class value.

Provide input using the guidance in Emergency Dose Assessment User's Manual (Ref. 6.3).

Update dose projection system as appropriate.

17

Number TMI - Unit 1 Emergency Procedure EPIP-TMI-.07 tie Revision No.

Activation of the RAC 11 EXHIBIT 4 Page 1 of 1 Radiological Line Communicator Checklist 1.0 Perform the following:

NOTE The following steps should be considered and, if needed, implemented.

These steps need not be performed in the sequence listed and may be performed multiple times. The Radiological Line Communicator should periodically review this checklist to ensure that necessary steps are being performed.

A.

Maintain a log of information sent and received.

B.

Communicate with the following:

Group Leader - Radiological and Environmental Controls (GL-R&EC) at the EOF Bureau of Radiological Protection (BRP)

Nuclear Regulatory Commission (on the HPN line).

C.

Provide a briefing on current plant status and recent changes to all persons on the Radiological Line.

D.

Pass requests from the RAC for off-site support to the EOF. Examples are:

Rad Con Technicians from other plants.

Equipment (e.g., radiation monitors, etc.)

Whole Body Counting E.

If the NRC requests continuous communication on the HPN, establish and maintain communication on the HPN with them and request the RAC:

Assign an extra RAC staff member to man the HPN as soon as one is available or, Obtain an additional communicator for the HPN from the ED Assistant.

18

TMI - Unit 1 Emergency Procedure le Activation of the RAC Number EPIP-TMI-.07 Revision No.

11 EXHIBIT 5 RAC/OSC Communicator Checklist Page 1 of 2 1.0 Perform the following:

A.

B.

C.

D.

E.

Communicate between RAC and OSC Communicate with the Remote Assembly Area Personnel Maintain a Log of activities performed Provide Event Update to Rad Con Personnel in OSC Collect information on contaminated/injured personnel F.

Handle requests for:

Activation of on/offsite field teams In-Plant Radiological data, (surveys - dose rates, contamination levels)

Medical emergency information Search and Rescue Information Repair Team Information Vehicle/Personnel Contamination Surveys for Site Evacuation.

G.

Interface for obtaining accident samples and sample results:

CATPASS: Containment Atmospheric Post Accident Sampling System MAP-5: Particulate and Radioiodine Sample System on effluent pathways a

RCS PASS: Reactor Coolant System Post Accident Sampling System Radiation Monitoring System (RMS) samples for particulate, radioiodine, noble gas and tritium 0

Other plant samples as required (OTSG, secondary) 19 NOTE The following steps should be considered and, if needed, implemented.

These steps need not be performed in the sequence listed and may be performed multiple times. The RAC/OSC Communicator should periodically review this checklist to ensure that necessary steps are being performed.

TMI - Unit 1 "aencv Procedure Number EPIP-TMI-.07 EXHIBIT 5 Page 2 of 2 H.

Provide Guidance from RAC on in-plant radiological controls Keep OSC updated on events that may alter radiological conditions in the plant Radiation Controls - e.g., posting of Turbine Building Obtain data on:

Skin contaminations - levels and location of contamination Dose extensions - extension limits, purpose of extensions, personnel receiving extensions Personnel injuries - any radiological concerns J.

Provide priority from the RAC to the Chemistry Coordinator on accident samples and analysis.

20

FOR INFORMATION ONLY Number TMI - Unit 1 Emergency Plan Implementing Document EP itle Revision No.

IP-TMI-.10 Onsite/Offsite Radiological/Environmental Monitoring 12 Applicability/Scope USAGE LEVEL Effective Date TMI Division 2

DEC 8 ZlOO This document is within QA plan scope I X I Yes [_

No Safety Reviews Required lXi YesL-No List of Effective Pages Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15

~

16 17 18 19 20 Procedure Owner

/s/ J. L. Whitehead II II

'1 Approver Is/ N. Brown 12/05/00 12/05/00 1

Revision Page Page 21 22 23 24 25 Revision 12 12 12 12 12 Paqe Revision Revision 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 JL J __________________________________________________

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 itle Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 1.0 PURPOSE The purpose of this procedure is to provide guidance to radiological and environmental monitoring teams for adequate onsite and offsite monitoring of radiation, contamination and airborne radioactivity levels, and environmental sample procurement, following the accidental release of radioactive materials to the environment. The procedure establishes monitoring team actions necessary to obtain data required to make valid radiological assessments.

2.0 APPLICABILITY/SCOPE All TMI Emergency Radiological and Environmental Monitoring Team Personnel.

3.0 DEFINITIONS 3.1 Derived Air Concentration (DAC) - The airborne concentration of radioactive material that if breathed by a worker for one hour, results in an estimated Internal Whole Body Dose (CEDE) of 2.5 mrem, or in the case of radioiodine, results in an estimated thyroid dose (CDE) of 25 mrem.

3.2 External Whole Body Dose (DDE) - The whole body dose from sources external to the body.

Typically this is the dose recorded on a whole body TLD. Official term: Deep Dose Equivalent.

3.3 Internal Whole Body Dose (CEDE) - The estimated risk-based dose to the whole body resulting from the intake of radioactive material. Official term: Committed Effective Dose Equivalent.

3.4 Thyroid Dose (CDE(th)) - the dose to the Thyroid resulting from the intake of radioactive material.

Official term: Committed Dose Equivalent - thyroid.

3.5 Total Whole Body Dose (TEDE) - the sum of the External Whole Body Dose (DDE) and the Internal Whole Body Dose (CEDE).

4.0 RESPONSIBILITIES 4.1 The Radiological/Environmental Monitoring Teams are responsible for implementing this procedure.

5.0 PROCEDURE 5.1 Implementation Criteria 5.1.1 This procedure is to be initiated upon the direction of the Emergency Director, the Radiological Assessment Coordinator (RAC), the Environmental Assessment Coordinator (EAC), or their designee.

2

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 5.2 Emergency Actions NOTE Team members utilize additional radiological precautions when approaching any of the following:

1.

4 REM Year-to-Date Total Whole Body Dose (TEDE).

2.

25 REM Thyroid Dose (CDE) during this event.

Minimize time spent in the plume especially in areas projected (by the RAC/EACC) to have high airborne radioactivity. Utilize protection such as thyroid blocking agent and/or respirators if advised by the RAC or the Env. Assessment Command Center (EACC).

INITIALS 5.2.1 Upon assignment as a monitoring team member, obtain emergency equipment and emergency vehicle.

5.2.1.1 Emergency Equipment consists of the following:

Emergency Equipment/Instrument Kit (suitcase).

Air Sampler.

Portable Two Way Radio with spare battery.

Respirators for Team Members.

5.2.2 Verify that the seal on the emergency kit was intact.

5.2.2.1 If the emergency kit seal was broken, conduct a brief inventory of the major pieces of equipment.

NOTE There is no need to inventory a kit if its seal was intact.

5.2.3 Record the following information on Exhibit 6: 1) Name, 2) SSN, 3) Date, 4) Current Year-to-date Total Whole Body Dose (TEDE). Item 4 may be obtained from the Rem-on-Line System or may be transmitted via radio while the team is in transit to their first monitoring location.

5.2.4 Operationally check all radiation meters and portable air sampler (battery check, airflow check, visual inspection).

A.

Obtain properly calibrated replacements for any meters or samplers found to be unsatisfactory.

3

TMI - Unit 1 Emergency Plan Implementina Document

'itle Onsite/Offsite Radiological/Environmental Monitoring B.

Number EPIP-TMI-.10 Revision No.

12 Inform the RAC/EACC of equipment problems and, if needed, request assistance in obtaining replacements.

5.2.5 Fill (or verify filled) the noble gas sampling devices (plastic bottles or marinelli beakers) with water prior to leaving the P.C. or EOF.

5.2.6 Issue self reading dosimeters (SRPDs or ESRDs) to team members.

5.2.7 Ensure each team member is wearing a TLD.

A.

Team members responding from on-site should retain their TLD. Team members responding from the EOF should either retain their personal TLD (if available) or be issued a TLD from the supply of emergency TLDs at the EOF.

B.

Use the individual dose log, Exhibit 6 to track each team member's dose.

C.

At a minimum, each team member shall enter his/her SRPD/ESRD reading and time when he/she begins monitoring activities and again when he/she returns from the field.

D.

SRPD/ESRD readings may be entered on the individual exposure log more frequently if a team member so desires (eg., when entering and leaving the plume).

4 INITIALS NOTE If personnel intend to take air samples in areas inaccessible to vehicles (e.g., Shelley Island), a battery powered air sampler should be obtained for this purpose. A portable generator and an ordinary air sampler can be used if a battery powered air sampler is not available. Check the fuel level in the portable generator and operationally test it by running it momentarily.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 itle Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 E.

Keep the RAC/EACC informed of field monitoring team doses.

Advise the RAC/EACC if any team member's dose approaches:

4 REM year-to-date total whole body dose (TEDE) or 25 REM thyroid dose (CDE) during this event.

Recommend that the RAC/EACC consider the need for team relief.

NOTE Relief should be conducted in a low radiation area.

Recommend that the RAC/EACC consider authorizing the use of thyroid blocking agent if field monitoring team thyroid doses are projected to be 25 REM (CDE) or greater.

If the RAC/EACC authorizes the use of thyroid blocking agent, complete a copy of Exhibit 9 for each field team member.

If the RAC/EACC advises the use of respirators, use extreme caution if operating a vehicle while wearing a respirator.

INITIALS 5.2.8 Ensure your survey meter is turned on.

NOTE The survey meter should remain all times during the performance of monitoring team duties.

5.2.9 Perform radio check with the RAC/EACC (see Exhibit 10 for radio operating guidelines).

5 NOTE Radio transmission may affect accuracy of portable instrument response. Information should not be transmitted while taking readings.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.

'-Onsite/Offsite Radiological/Environmental Monitoring 12 WARNING Utilize roof top strobe light and vehicle's 4-way flashers whenever you are stopped along the road or travelling significantly slower than the speed limit.

INITIALS 5.2.10 Proceed to the designated monitoring point or other location as directed by the RAC/EACC. (See map in emergency kit for specifically designated monitoring point locations.)

NOTE The following steps should be implemented as they are needed. These steps need not be performed in the sequence listed and may be performed multiple times. The Field Monitoring Team should periodically review these steps to ensure that necessary actions are being performed.

A.

As time permits, keep a log of your major activities or the Major Activities log, Exhibit 7.

B.

Perform radiological surveys/sampling as directed by the RAC/EACC at designated monitoring locations.

Use the appropriate exhibit for the type of survey/sample requested:

Exhibit 1 Radiation Surveys (including plume centerline scans).

Exhibit 2 Radioiodine and Particulate Air Samples.

Exhibit 3 Noble Gas Air Samples.

Exhibit 4 Contamination Surveys.

C.

If radio communications are lost, attempt to re-establish radio communications with the RAC/EACC. Move to higher ground if possible.

NOTE If the portable radio displays "CC SCAN" this indicates that the radio is in a bad location or it is out of range.

If radio communications cannot be re-established drive to the nearest telephone and call the RAC or the EACC (as appropriate). A list of important phone numbers is contained in Exhibit 8.

D.

Minimize personnel exposures by moving out of areas of high radiation when counting samples, recording data or awaiting further instructions.

E.

Ensure all team members keep track of their doses in Exhibit 6.

6

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 Title Revision No.

-Onsite/Offsite Radiological/Environmental Monitoring 12 INITIALS F.

Maintain all completed exhibits for permanent records.

G.

Return all completed forms to Rad Con Coordinator at the OSC or other location as directed by the RAC/EACC.

H.

Retain all samples for later counting and analysis.

NOTE Samples may be returned to the Rad Con Lab or designated collection point at a convenient time as directed by the RAC/EACC.

1._

When the Environmental Assessment Command Center (EACC) is activated and takes control of monitoring teams, begin reporting offsite surveys to the EACC.

J.

Upon relief or upon completion of monitoring duties, team members shall frisk themselves in a low background area and frisk the tires, seats, floor, and foot pedals.

If any of the above are found to be greater than 100 CPM above background, inform the RAC/EACC and ask for instructions.

Recommend to the RAC/EACC that the team be scheduled for a whole body count.

K.

If requested by the RAC/EACC, initiate an RWP to cover the duties performed as a monitoring team at the completion of monitoring team activities (if not already done).

5.3 Additional Actions for Environmental Monitoring Teams A.

Determine from the EACC the types of samples to be collected. The EACC shall also determine the location and frequency of collection.

B.

Collect and label all samples in accordance with environmental sampling procedures.

NOTE Plastic disposable gloves shall be worn during the sample collection process.

C.

Return all samples to the EACC (or other location as specified by the EAC) for analysis and retention.

7

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 le Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 5.4 Final Conditions INITIALS A.

Radiological/Environmental monitoring has been completed and all samples submitted for analysis/retention as directed by the RAC/EACC.

B.

Field monitoring equipment has been returned to the location specified by the RAC/EACC.

C.

If field team members have taken thyroid blocking agent, they should contact company designated medical personnel to determine how long they should continue to take it.

6.0 REFERENCES

6.1 6510-PLN-4520.01, Radiological/Environmental Monitoring Program Plan 7.0 EXHIBITS 7.1 Exhibit 1, Radiation Surveys 7.2 Exhibit 2, Radioiodine and Particulate Air Samples 7.3 Exhibit 3, Noble Gas Air Samples 7.4 Exhibit 4, Contamination Surveys 7.5 Exhibit 5, Radiation/Air/Smear Sample Log 7.6 Exhibit 6, Individual Dose Log 7.7 Exhibit 7, Major Activities Log 7.8 Exhibit 8, Important Telephone Numbers 7.9 Exhibit 9, Field Team Thyroid Blocking Agent Administration Form 7.10 Exhibit 10, Field Team Radio Operating Guidelines 8

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tle Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT I Page 1 of 2 Radiation Surveys To perform radiation surveys:

NOTE Sections A & B below should be implemented as needed based on direction from the RAC/EACC. These sections can be repeated as needed.

A.

Plume centerline scans:

1.

General Guidance:

Scanning is most effective when the team slowly travels across the plume at approximately a 900 angle to the wind direction.

Scanning should be performed with a frisker or a survey instrument. If a survey instrument is used, the probe window should be open.

In inclement weather, the instrument probe should be covered with a surgeon's glove or plastic bag to keep it dry.

2.

Ask the RAC/EACC to specify a start and stop point for scanning. If the RAC/EACC provides no direction, consult the map and choose a route which runs as nearly perpendicular as possible to the expected plume direction.

3.

Proceed to the start point with the survey instrument/frisker turned on.

4.

Scan by driving slowly (- 15 m.p.h.) while holding the instrument probe outside the vehicle.

5.

Locate the point where the instrument reading is highest.

5.1 Scan until the reading rises and then begins to decrease.

5.2 Reverse direction and return to the location where the maximum reading was obtained.

5.3 If the maximum reading persists for a definite distance (i.e., a tenth mile or greater), find the approximate midpoint of that distance.

6.

Report the plume centerline location and maximum reading to the RAC/EACC. When reporting the location, give any landmarks which may help fix your location on a map (e.g., intersections, public buildings, streams, etc.).

7.

Perform a stationary survey as described below unless directed otherwise by the RAC/EACC.

9

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT I Page 2 of 2 B.

Stationary Surveys:

1.

Ensure the probe window is closed and hold the instrument probe at waist level while standing outside the vehicle.

In inclement weather, the instrument probe should be covered with a surgeon's glove or plastic bag to keep it dry.

2.

Obtain a reading by observing the instrument's needle for several seconds.

Mentally average the needle fluctuations to arrive at an average reading.

3.

Obtain 3 readings per Step 2 above over a five minute period unless directed otherwise by the RAC/EACC.

4.

Record the following in Exhibit 5.

4.1 Record the 3 readings obtained per Step 3. If only 1 reading was taken, record it as "Reading 1".

4.2 If 3 readings were taken, average them and record the average.

4.3 Record the date, time and location of the reading(s).

5.

Obtain one reading with the probe window open.

5.1 Record the reading (in mR/hr) in Exhibit 5.

6.

Report the location, time, average closed window reading and open window reading to the RAC/EACC.

10

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 2 Page 1 of 4 Radioiodine And Particulate Air Samples To perform air samples for Iodine and/or Particulate:

NOTE If possible, load the air sampler with the Silver Zeolite cartridge and particulate filter prior to entering the plume.

1.

Unscrew the filter and cartridge holder rings from the air sampler head and install a new Silver Zeolite cartridge and particulate filter.

1.1 Ensure that the arrow on the side of the Silver Zeolite cartridge points toward the air sampler.

1.2 Ensure that the particulate filter is installed such that the side of the filter which has a fibrous appearance is closest to the Silver Zeolite cartridge.

1.3 Reassemble the air sampler head.

NOTE The sampler flow rate, measure with both a particulate filter and a Silver Zeolite cartridge in place, is written on the air sampler's calibration sticker. The Silver Zeolite cartridge must be in place to ensure obtaining calibrated air flow rate even if an iodine sample has not been requested and the cartridge will not be analyzed in the field.

2.

Ensure the following prerequisites and precautions are met:

The air sampler shall be placed outside the vehicle or in an open vehicle door or window.

Do not place the sampler on the ground or on known contaminated surfaces.

Keep the sampler away from vehicle exhaust gases.

Protect the sampler from rain and snow.

All samples shall be labeled and saved for further analysis.

Do not point the air sampler inlet toward any object which may restrict sampler air flow.

Do not stand directly in front of the sampler inlet when the sampler is running or allow loose clothing to restrict airflow.

11

TMI - Unit 1 Emergency Plan Implementing Document

'tie Onsite/Offsite Radiological/Environmental Monitoring EXHIBIT 2 Number EPIP-TMI-.10 Revision No.

12 Page 2 of 4

3.

Using the sampler's self timer (or a stopwatch or wristwatch if the sampler is not so equipped) draw a 300 liter (approximately) air sample.

3.1 Use the table below and the sampler's posted flow rate to determine sampler run time. Sampler's with adjustable flow rate should be set to the highest flowrate possible not to exceed 50 Ipm (1.8 cfm) and run for approximate time according to the table below.

Posted or Set Flow Rate Sampler Run Time

> 19.< 21........................................................

15 m inutes

Ž 21 < 25........................................................

13 m inutes

>25 < 29 Ipm.................................................

11 m inutes

Ž 29 < 32 Ipm.................................................

10 m inutes

_32 < 36 Ipm.................................................

9 minutes

> 36 < 40 Ipm.................................................

8 minutes

> 40 < 46 Ipm.................................................

7 m inutes

_46 < 50 Ipm.................................................

6 minutes

4.

Fill out an air sample label with date, time, your name, location, air sampler run time, and air sampler flow rate.

4.1 Also record this data on Exhibit 5.

5.

To evaluate the Silver Zeolite cartridge in the field, perform the following steps:

5.1 Obtain a general area background count rate with the E140N/HP260 pancake probe at approximately waist level.

5.1.1 If the background is more than 200 cpm move to a location where background is acceptable (i.e. < 200) and proceed with Step 5.2.

5.1.2 If background is 200 cpm or less, go to Step 5.3.

NOTE If you cannot find an area where background is _ 200 cpm, ask the RAC/EACC for advice.

5.2 At the low background area run the air sampler for approximately 3 seconds to flush the cartridge.

12 NOTE The RAC/EACC or their designee may direct that sampler run time be shortened to reduce time spent in the plume or to reduce the "lead time" in obtaining sample results or lengthened to provide better sensitivity in low concentration areas.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 le Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 2 Page 3 of 4 5.3 Record the background count rate at the sample counting location on the sample label and on Exhibit 5.

5.4 Remove the cartridge from the sampler head and place it in a ziplock bag.

NOTE Surgeons gloves should be used if the cartridge must be handled and contamination is expected.

5.5 Count both sides of the Silver Zeolite cartridge through the ziplock bag.

5.5.1 Record the higher count rate as "gross cpm" on the sample label and on Exhibit 5.

5.6 Subtract the background cpm from the gross cpm and record the result as "Net Cpm" on the sample label and on Exhibit 5.

5.7 Place the sample label in the ziplock bag and retain the sample for later analysis.

6.

To evaluate a particulate filter in the field, perform the following steps:

6.1 Obtain a general area background count rate with the E140N/HP-260 pancake probe at approximately waist level.

6.2 If the background count rate is more than 200 cpm move to a location where background is acceptable (i.e. < 200 cpm).

NOTE If you cannot find an area where the background is _< 200 cpm, ask the RAC/EACC for advice.

6.3 Unscrew the filter holder section of the sampler head from the silver zeolite cartridge holder section such that the particulate filter is held in place in the removed section.

6.4 Obtain a gross count rate on the particulate filter by holding the collection side of the filter holder against the HP-260 pancake probe.

6.5 Record the count rate as gross CPM on the sample label and on Exhibit 5.

6.6 Unscrew the retainer ring from the filter holder and, using tweezers, remove the filter from the holder.

6.7 Place the filter in the coin envelope.

6.8 Place the coin envelope in a ziplock bag (if an iodine sample was taken, use the same ziplock bag).

13

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 itle Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 2 Page 4 of 4 6.9 Reinstall the retainer ring onto the filter holder and re-count the filter holder without the particulate filter in place.

6.9.1 Enter this count rate as Background CPM on the sample label and on Exhibit 5.

6.10 Subtract Background CPM from Gross CPM and record the results as NET CPM on the sample label and on Exhibit 5.

6.11 Place the sample label in the ziplock bag and retain the sample for later analysis.

6.12 Report the following information from the sample label to the RAC/EACC:

Location Sample time Net cpm for both silver zeolite cartridge and particulate filter Run time Flow rate 14

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 3 Page 1 of 1 Noble Gas Air Samples To obtain noble gas air samples when directed by the RAC/EACC, proceed with Step 1 below:

1.

Fill (or obtain a prefilled) clean container (500 ml [0.5 liter] or larger bottle or marinelli beaker) with clean water (i.e., not affected by plant release) (this can be done before going into the field).

NOTE Field monitoring kit contains water filled plastic bottles for noble gas sampling.

2.

When a sample is needed:

2.1 Stand well away from vehicles or other obstructions.

2.2 Pour the water from the container.

2.3 Cap or close the container.

3.

Label the sample container with the date/time of collection, and location.

Record the same information on Exhibit 5.

15

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 Ue Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 4 Page 1 of 1 Contamination Surveys To perform contamination surveys (if directed by the RAC/EACC):

1.

Obtain smears and coin envelopes from the emergency kit, label envelope with date, time and location.

2.

Wipe the smear over a 100 cm2 area (4" x 4" area).

3.

Count the background with the E140N w/HP-260 probe (or equiv.).

4.

If background is greater than 200 cpm:

4-1 Move to a location where background is _ 200 cpm.

4.2 Re-count background and the smear.

NOTE If you cannot find an area where the background is _ 200 cpm, ask the RAC/EACC for advice.

Count the smear with the E140N w/HP-260 probe (or equiv.).

6.

Enter gross cpm and Bkg. cpm in Exhibit 5.

7.

Subtract Bkg. cpm from gross cpm to obtain net cpm.

8.

Enter net cpm on Exhibit 5.

9.

Report location, time and net cpm for each smear to the RAC/EACC.

10.

Save smears in coin envelope for later analysis as directed by the RAC/EACC.

16

EXHIBIT 5 Radiation/Air/Smear Sample Log EPIP-TMI-.10 Revision 12 Page 1 of 1 Date_

Note: Report only the data in the bold outlined boxes to the RAC/EACC Open Window

  • Closed Window E520 (mR/hr) or Frisker (cpm)

Location Time E520 (mR/hr)

Reading 1 Reading 2 Reading 3 Average Air Sampler Run Flow Time Sample Type Gross CPM Bkg CPM Net CPM Time Rate Iodine Particulate Smear Noble Gas Open Window

  • Closed Window E520 (mR/hr) or Frisker (cpm)

Location Time E520 (mR/hr)

Reading I1 Reading 2::

Reading 3 1Average Sample Type Gross CPM Bkg CPM Net CPM Run Time Air Sampler Flow Rate IIodine Pa rticu late Smear Survey Meter Type_

Air Sampler Type Counting Inst. Type Technician Serial No.

Cal.

Serial No.

Cal.

Serial No.

Cal.

Under normal circumstances, open window readings taken with the E-520 are recorded in cpm, however, during emergencies the mR/hr scale shall be used to permit the RAC/EACC to more easily compare the relative magnitudes of open window and closed window readings.

17 i

Time



I U

Noble Gas a -



Due Due Due

EXHIBIT 6 INDIVIDUAL DOSE LOG EPIP-TMI-.10 Revision 12 Page 1 of 2 Date:

NAME (PRINT)

SOC. SEC. #

YTD TOTAL WHOLE BODY DOSE (TEDE) (A)

APPROX.

INTERNAL APPROX.

ENDING EXTERNAL APPROX.

WHOLE BODY TOTAL TOTAL BEGINNING SRPD/ESRD WHOLE BODY THYROID (CEDE) FROM WHOLE BODY THYROID SRPD/ESRD READING DOSE (DDE)

DOSE (CDE) IODINE DOSE (TEDE) DOSE (CDE)

START TIME READING (B)

STOP TIME (C)

(D)

(E)*

(F)*

(G)

(H)

(Cl-B1)

(A+DI+Fl)

(El)

(C2-B2)

(Gl+D2+F2)

(Hl+E2)

(C3-B3)

(G2+D3+F3)

(H2+E3)

(C4-B4)

(G3+D4+F4)

(H3+E4)

(C5-B5)

(G4+D5+F5)

(H4+E5)

(C6-B6)

(G5+D6+F6)

(H5+E6)

NAME (PRINT)

SOC. SEC. #

YTD TOTAL WHOLE BODY DOSE (TEDE) (A)

APPROX.

INTERNAL APPROX.

TOTAL ENDING EXTERNAL APPROX.

WHOLE BODY TOTAL THYROID BEGINNING SRPD/ESR WHOLE BODY THYROID (CEDE) FROM WHOLE BODY DOSE START TIME SRPD/ESRD STOP TIME D READING DOSE (DDE)

DOSE (CDE) IODINE DOSE (TEDE) (CDE)

READING (B)

(C)

(D),

(E)*

(F)*

(G)

(H)

(C1-B1)

(A+DI+F1)

(El)

(C2-B2)

(Gl+D2+F2)

(HI+E2)

(C3-B3)

(G2+D3+F3)

(H2+E3)

(C4-B4)

(G3+D4+F4)

(H3+E4)

(C5-B5)

(G4+D5+F5)

(H4+E5)

(C6-B6)

(G5+D6+F6)

(H5+E6)

  • See for estimation method next page 18 2

3 4

5 6

1 2

3 4

5 6

TMI - Unit 1 Emergency Plan Implementing Document tie Onsite/Offsite Radiological/Environmental Monitoring EXHIBIT 6 Number EPIP-TMI-.10 Revision No.

12 Page 2 of 2 A rough approximation of the iodine derived air concentration (DAC), thyroid dose (CDE) and internal whole body dose (CEDE) can be obtained using the following relationship:

Every 1000 net cpm on the silver zeolite cartridge equals roughly:

20 DAC Iodine, 500 mREM/hr Thyroid Dose (CDE) and 15 mREM/hr Internal Whole Body Dose (CEDE)

For example: 5000 net cpm on the cartridge would roughly equal: 100 DAC Iodine, 2500 mREM/hr CDE and 75 mRERM/hr CEDE.

19 NOTE Notify the RAC/EACC when any team member approaches either of the following:

4 REM Year-to-Date Total Whole Body Dose (TEDE).

25 REM Thyroid Dose (CDE) dudnnq this event.

NOTE

1.

This information is intended for field team use only and not for making dose projections for the public.

2.

The relationships shown above are valid only if the sampler run times specified in the sampling instructions are followed.

3.

The relationships are based on conservative assumptions (e.g. all iodine is 1131 ) and will in most cases overestimate the field team's dose. More refined estimates can be obtained from the RAC or EACC.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 Jie Revision No Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 7 Page 1 of 1 Major Activities Log Date TIME Major Activities/Remarks 20 i

i

TMI - Unit 1 Emergency Plan Implementing Document tle Onsite/Offsite Radiological/Environmental Monitoring Number EPIP-TMI-.1O Revision No.

12 Control Room OPS Support Center -

Processing Center Warehouse 1 Warehouse 2 EACC EOF Simulator (Drills Only) -

Location/Position RAC RAC RCC/GR(

EXHIBIT 8 Important Telephone Numbers Phone Number 948-8525 944-0382 CS Cellular 948-8248 ext. 5444 Security Assembly Area Assembly Area EAC/Met-Dose Coordinator Group Leader R&EC RAC 948-8672 948-8833 948-8038 948-8248 ext. 5500 948-8248 ext. 5042 540-4501 657-2097 948-2063 21 Page 1 of 1

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 tie Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 9 Page 1 of 2 Field Team Thyroid Blocking Agent Administration Form Instructions:

1.

Fill in the information below:

Field Team Member's Name:

Last First Middle Initial Social Security Number:

Badge Number:

Estimated Thyroid Dose (CDE):

REM Name of the RAC/EACC who authorized use of thyroid blocking agent:

Date and time of authorization:

Read the Thyroid Blocking Agent Precautions (Page 2 of this exhibit).

3.

Decide if you should and are willing to take Thyroid Blocking Agent.

4.

Record your decision below and sign/date this form.

NOTE Although 10 CFR 20 allows up to 50 REM per year, EPA and FDA guidance recommend considering the use of thyroid blocking agent (KI) for acute exposures of 25 REM or greater (CDE) to the adult thyroid in order to maintain exposures As Low As Reasonably Achievable (ALARA).

I verify that I have read and understand the information on the Thyroid Blocking Agent Precautions sheet and understand that taking thyroid blocking agent is voluntary.

I also verify that I have no / have a (circle one) known allergy to iodine. If you have a known allergy to iodine you should not take thyroid blocking agent.

I accent / refuse (circle one) thyroid blocking agent.

Signature of Team Member Date

5.

If you have decided to accept thyroid blocking agent:

Obtain thyroid blocking agent and drinking water from the field monitoring kit.

Take the initial dose of one (1) tablet.

Notify the RAC/EACC of this action.

22

Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.10

.le Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 9 Page 2 of 2 HOW POTASSIUM IODIDE WORKS Certain forms of iodine help your thyroid gland work right. Most people get the iodine they need from foods, like iodized salt or fish. The thyroid can "store" or hold only a certain amount of iodine.

In a radiation emergency, radioactive iodine may be released in the air. This material may be breathed or swallowed. It may enter the thyroid gland and damage it. The damage would probably not show itself for years.

Children are most likely to have thyroid damage.

If you take potassium.iodide, it will fill-up your thyroid gland with non-radioactive iodine. This reduces the chance that radioactive iodine will enter the thyroid gland.

WHO SHOULD NOT TAKE POTASSIUM IODIDE The only people who should not take potassium iodide are people who know they are allergic to iodide. You may take potassium iodide even if you are taking medicines for a thyroid problem (for example, a thyroid hormone or anti-thyroid drug). Pregnant and nursing women and babies and children may also take this drug.

HOW AND WHEN TO TAKE POTASSIUM IODIDE Potassium Iodide should be taken as soon as possible after proper authorization is received. You should take one

)se every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. More will not help you because the thyroid can "hold" only limited amounts of iodine. Larger

,)ses will increase the risk of side effects. You will probably be told not to take the drug for more than 10 days.

>Contact company medical personnel to determine how long you should take potassium iodine.

SIDE EFFECTS Usually, side effects of potassium iodide happen when people take higher doses for a long time. You should be careful not to take more than the recommended dose or take it for longer than you are told. Side effects are unlikely because of the low drug dose and the short time you will be taking the drug.

Possible side effects include skin rashes, swelling of the salivary glands, and "iodism" (metallic taste, burning mouth and throat, sore teeth and gums, symptoms of a head cold, and sometimes stomach upset and diarrhea).

A few people could have an allergic reaction with more serious symptoms. These could be fever and joint pains, or swelling of parts of the face and body at times severe shortness of breath requiring immediate medical attention.

Taking iodide may rarely cause overactivity of the thyroid gland, underactivity of the thyroid gland, or enlargement of the thyroid gland (goiter).

WHAT TO DO IF SIDE EFFECTS OCCUR If the side effects are severe or if you have an allergic reaction, stop taking potassium iodide and contact the medical department.

23

TMI - Unit 1 Emergency Plan Number Implementing Document EPIP-TMI-.10 "itle Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 10 Page 1 of 2 Field Team Radio Operating Guidelines NOTE The following sections provide guidance for operation of the field team portable radios. Individual sections can be implemented as needed.

To operate the portable radio:

A.

Turn on the portable radio by rotating the "power on-off/volume" knob clockwise. The radio will perform a "power up self test" and then display:

Its unit number (e.g., "TMI P 1" is portable radio #1) and Either "EARS" or "CC SCAN" depending on whether the radio is receiving the system Control Channel signal (i.e., if "CC SCAN" appears, the radio is out of range or in a bad location).

B.

To transmit:

Make sure that "EARS" is displayed on the front of the radio and then press the Push-To Talk (PTT) button (elongated button on the left side of the radio).

When the short medium pitch beep is heard, begin speaking.

If a high pitch beep is heard when the PTT is pressed, the system is temporarily busy.

Don't release the PTT button - continue pressing it and wait for the short medium pitch peep before starting to speak. The delay should typically be not more than a few seconds.

When speaking, hold the radio approximately 3 inches from the mouth and speak in a normal voice.

C.

Receiving:

When a call is being received the calling station's identity is displayed in the upper line of the radio's display.

24

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.10 le Revision No.

Onsite/Offsite Radiological/Environmental Monitoring 12 EXHIBIT 10 Page 2 of 2 D.

System status beeps:

The radio will indicate system status by emitting any of several beeps:

A short medium pitch beep indicates that the radio has begun to transmit and the user may begin speaking.

A high pitch beep indicates that all system channels are busy and the radio is waiting for the next available channel. The user should continue pressing the PTT button until a short medium pitch beep is heard and then begin speaking.

If five short high pitch beeps are heard while transmitting, this indicates that the radio is approaching its 60 second transmission length limit. Unless the radio is un-keyed before the long low pitch beep is heard, the radio will stop transmitting and information will be missed. Long transmissions should be broken into several shorter transmissions to avoid this.

A low pitch beep simultaneous with the appearance of a battery icon in the lower right corner of the display indicates that the battery voltage is low and the battery should be changed.

E.

To replace the battery pack:

0 Turn the radio off.

Depress the recessed button beside the belt clip on the rear of the radio and slide the battery toward the bottom of the radio.

Lift the battery up and away from the radio.

0 To install a fresh battery pack: Align the tabs on the battery with the slots on the radio and slide the battery pack toward the top of the radio until it clicks.

F.

The channel selector knob and the buttons on the front panel of the radio serve no function and should not be manipulated.

25

FO INFORMATION ONLY Number TMI - Unit 1 AmerGen Emergency Plan Implementing Document EPIP-TMI-.27 Title Revision No.

Emergency Operations Facility 18 Applicability/Scope USAGE LEVEL Effective Date TMI Division I

DEC 8 2000 This document is within QA plan scope X

Yes No Safety Reviews Required X

Yes No List of Effective Pages Page 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 S17 18 19 20 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Page 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Page 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Page 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 Revision 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Procedure Owner

/s/ N. Brown Approver

/s/ N. Brown 12/05/00 12/05/00 1

FOR INFORMATION ONLY I Number tie Emergency Operations Facility TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Revision No.

18 List of Effective Pages Revision Page 2

Revision Page Page 81 82 83 84 85 86 87 88 89 Revision 18 18 18 18 18 18 18 18 18 Page Revision i

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.

Emergency Operations Facility 18 1.0 PURPOSE Provide guidelines for activation and operation of the Emergency Operations Facility (EOF).

2.0 APPLICABILITY/SCOPE This procedure shall apply to all TMI personnel assigned to the EOF during a Site Area Emergency, General Emergency or when EOF activation is required by the Emergency Director.

3.0 DEFINITIONS None 4.0 RESPONSIBILITIES

a.

Emergency Support Director-Exhibit 1,2, 3, 4, 5, 8 and 14

b.

EOF Communications Coordinator - Exhibit 23 and 24

c.

Technical Support Representative - Exhibit 15 and 15A

d.

Group Leader R & EC - Exhibit 17

e.

Group Leader Adm. Support - Exhibit 6, 7, 7A, 20, 21 and 22

f.

Public Information Rep. - Exhibit 12, 13 and 14

g.

Environmental Assessment Coord. - Exhibit 18 0

Met/Dose Coordinator-Exhibit 18A and 18B

h.

Emergency Support Director Asst. - Exhibit 10

i.

Emergency Preparedness Rep. - Exhibit 9 and 9A 5.0 PROCEDURE

a.

Personnel shall perform actions as specified in the appropriate exhibits as applicable for the level and severity of the emergency.

b.

Personnel shall respond to specific requests from the Emergency Response Organization management (e.g., ESD, Group Leaders, Coordinators)

6.0 REFERENCES

a.

TMI Emergency Plan (AP 1092)

b.

TMI Emergency Plan Implementing Documents 3

Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 7.0 EXHIBITS 7.1 Exhibit 1, Emergency Support Director Checklist 7.2 Exhibit 2, Emergency Report Form - TMI 7.3 Exhibit 3, EAL descriptions for the Emergency Report Form 7.4 Exhibit 4, Emergency Director/Emergency Support Director Turnover Checklist 7.5 Exhibit 5, Emergency Support Director Emergency Briefing Sheet 7.6 Exhibit 6, EOF Access Control 7.7 Exhibit 7, TMI Access Authorization Checklist 7.7.1 Exhibit 7A, TMI Access Authorization 7.8 Exhibit 8, PAR Logic Diagram 7.9 Exhibit 9, Emergency Preparedness Representative Checklist 7.9.1 Exhibit 9A, Fitness For Duty instructions 7.10 Exhibit 10, Emergency Support Director Assistant Checklist 7.11 Exhibit 11, ESD Logkeeper Checklist 7.12 Exhibit 12, Public Information Representative - EOF Checklist 7.13 Exhibit 13, Press Release Guidance 7.14 Exhibit 14, Site Access For Media 7.15 Exhibit 15, Tech Support Representative Checklist 7.15.1 Exhibit 15A, Plant Process Computer Access Instructions 7.16 Exhibit 16, TMI / NRC Emergency Response Interface Criteria 7.17 Exhibit 17, Group Leader Radiological & Environmental Controls Checklist 7.18 Exhibit 18, Environmental Assessment Coordinator Checklist 7.18.1 Exhibit 18A, Met/Dose Coordinator Checklist 7.18.2 Exhibit 18B, Field Team Data Collection 7.19 Exhibit 19, RAC Line Communicator Checklist 7.20 Exhibit 20, Group Leader Admin Support Checklist 4

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 7.21 Exhibit 21, Emergency Shift Schedule (Watch Bill) 7.22 Exhibit 22, EOF Setup for Monitoring and Decontamination 7.23 Exhibit 23, EOF Communications Coordinator Checklist 7.24 Exhibit 24, Offsite Notifications Checklist 5

Itle

"*'merqencv Operations Facility TMI - Unit 1 Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 1 ESD Checklist Page 1 of 10 I.

EOF ACTIVATION Initial 1.0 Activate the EOF NOTE The facility is considered activated when all portions of Step 1 are completed.

a.

Obtain a turnover from the Emergency Director (ED)

Use the Emergency Director's Line, or altemate means Complete Exhibit 4 to document the turnover.

b.

Use the EOF intercom to brief personnel on plant conditions using Exhibit 5.

Include NRC and State representative(s), if available.

Include State Representative(s), if available.

c.

Verify from the EP Rep. that the EOF response positions have been manned within one hour of notification.

d.

After the above steps have been completed, assume ESD responsibilities by performing the following:

Inform the Emergency Director (ED) that you have assumed the position of ESD and will take over responsibility for the following:

a.

Approving and directing information releases to the media.

6 NOTE The following steps are presented in the sequence that is most likely to result in efficient activation of the EOF. Steps may be performed out of sequence as the situation requires. Steps that are not applicable for the present situation may be skipped but should be reconsidered as the situation changes.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.

Emergency Operations Facility

18.

EXHIBIT I Page 2 of 10

b.

Approving and, if possible, personally conveying appropriate Protective Action Recommendations to the Senior Official in the State EOC (Emergency Operations Center).

c.

Brief the NRC Site Team Leader and serve as the official point of contact for TMI for receiving NRC directives. This includes interfacing with the NRC regarding deviations from license conditions or technical specifications (10 CFR 50.54).

NOTE The ED will advise the ESD when such deviations are being planned and the technical organization will be used to the fullest extent possible.

If the ED decides to transfer responsibility for "Approving and directing official notifications to offsite agencies", perform the following

a.

Log the decision in the ESD log

b.

Direct the EOF Communications Coordinator to obtain a turnover from the communicator making notifications in the ECC.

Announce on the intercom that the EOF is operational 7

TMI - Unit 1 Emergency Plan Implementing Document

'tie Emergency Operations Facility Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 1 Page 3 of 10 II.

EOF OPERATION

a.

Personally, if possible, inform the Chief Nuclear Officer Status of the EOF Status of the Emergency

b.

The ESD is responsible for authorizing personnel to work in site facilities (EOF, EACC, JIC) during an emergency if they are not Fit for Duty (FFD).

Fitness for Duty criteria are stated in Exhibit 9A.

c.

ESD Conferences ESD conferences are periodically (Typically once per hour or as conditions change) held for information exchange

a.

b.

The ESD Assistant is in charge of EOF activities during the ESD conference.

The ESD Assistant will interrupt the conference if a major plant change occurs.

ESD conference attendance should include the following:

a.

State Representatives BRP 6

b.

PEMA NRC 0

Site Team Leader Director Site Operations C.

Group Leader R & EC 8

NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps may be performed out of the sequence listed and that some steps will be performed concurrently.

Steps that are not applicable for the present situation may be skipped.

Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 je Revision No.

Emergency Operations Facility 18 EXHIBIT 1 Page 4 of 10

d.

Technical Support Representative

e.

Public Information Representative - EOF

f.

Group Leader Admin Support

g.

Emergency Preparedness Representative Suggested structure for the first conference

a.

Get information from the lead personnel Obtain input from State Representative(s)

Obtain input from NRC

b.

Summarize the status

c.

Discuss the prognosis of where the plant is heading

d.

Discuss mitigating activities underway, planned or needed

e.

Discuss what can go wrong and the consequences

f.

Potential PAR if General Emergency is declared.

g.

This conference constitutes the briefing of the State Representative Conference Action Items

a.

Action Items shall be logged

b.

Action Items shall be tracked

c.

Action items are to be discussed at subsequent conferences until they are resolved.

EOF Briefings

a.

EOF briefings are accomplished using the EOF intercom.

Use Exhibit 5 to enhance briefing 9

le Emerqency Operations Facility TMI - Unit 1 Emergency Plan Implementinc Document Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 1 Page 5 of 10 ESD Press Release

a.

Press Releases SHOULD be issued within one (1) hour from the time a plant event has occurred; therefore a TIMELY review is required.

The ESD must approve Press Releases that are not boilerplate

a.

The Press Release Guidance (Exhibit 13) should be followed.

b.

The Group Leader R & EC SHALL review and concur with the Press Release, before ESD approval.

c.

The Technical Support Representative SHALL review and concur with the Press Release, before ESD approval.

d.

The Security Coordinator SHALL review and concur with any Press Release containing SAFEGURADS INFORMATION, before ESD approval.

NOTE

1.

Information Releases (e.g., Media Advisories, Emergency Reclassifications) which merely provide standard non-technical information need not have ED/ESD approval

2.

DO NOT include the PAR in a Press Release.

b.

If MEDIA access to the site is required, refer to Exhibit 14, "Site Access Policy for Media during Emergencies."

Onsite Protective Actions

a.

Determine the status of site accountability from the Group Leader Admin Support Emergency Director (ED) can supply this information if the Group Leader Admin position is not staffed.

b.

Determine if site evacuation has been ordered.

Ensure provisions are made for providing site employees with instructions for reporting to work for the next business day.

10 i

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

'le Revision No.

"*-~mergency Operations Facility 18 EXHIBIT I Page 6 of 10

c.

If any, of the TMI Emergency Response Facilities are downwind of a radioactive release.

Provide for their monitoring and protection Evacuation orders, for the general public, do not apply to the RAA. This facility would be relocated, if needed, based on advice from the Group Leader R&EC.

Changes to Emergency Classifications

a.

Review EPIP-TMI-.01 to determine when a change in emergency classification is warranted.

Discuss the change in Emergency Classification with the Emergency Director.

b.

If the "Approving and directing off-site notification to off-site agencies" responsibility has been transferred to the ESD, then proceed with this section, if NOT, go to step 7.0 NOTE The ESD may overrule the ED and direct that the ED declare a higher level of emergency.

Immediately complete an Emergency Report Form.

NOTE

a.

The form may be completed by an ESD Assistant or EP Rep.

b.

Notifications SHOULD be started within 5 minutes of an event declaration (i.e., General Emergency) and SHALL be made within 15 minutes of the declaration.

a.

Complete page 1 and 2 of the Emergency Report Form-TMI (Refer to Exhibit 2, for a sample of the form).

b.

Use Exhibit 3 for the EAL and Event description The Event description must contain the following information from Exhibit 3.

a.

EAL number

b.

EAL title

c.

Additionally, include information about the plant status (e.g., Power Operations, Hot Shutdown, etc.).

11

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.

Emergency Operations Facility 18 EXHIBIT I Page 7 of 10 0

Approve the Emergency Notification Direct the EOF Communications Coordinator to initiate off-site agency notification using the completed Page 1 of the Emergency Report Form-TMI.

Inform the Emergency Director to make the appropriate plant page announcement.

Inform the State Representative(s)

a.

Level of Emergency Declared

b.

Basis for the declaration Offsite Protective Action Recommendations (PAR)

a.

At the SITE AREA EMERGENCY Convene an ESD conference

a.

Refer to step 2.3 of this exhibit 0

Determine what could lead to a General Emergency by reviewing the EALs in EPIP-TMI-.01 Review the PAR Logic Diagram (Exhibit 8) and determine the most likely PAR, in preparation for a GENERAL EMERGENCY declaration Discuss the PAR with the following:

a.

PEMA representative at the EOF

b.

BRP representative at the EOF

c.

NRC representative at the EOF

d.

Emergency Director

b.

At the GENERAL EMERGENCY If you have assumed the "Approving and directing official notifications to off-site agencies" then complete Step 6.0.

12

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.

Emergency Operations Facility 18 EXHIBIT 1 Page 8 of 10 Immediately convene an ESD conference to agree upon a PAR

a.

If a likely PAR was developed earlier, quickly verify that it is still appropriate

b.

If a likely PAR was NOT developed earlier, determine the PAR from Exhibit 8

c.

Present the developed PAR to the following:

PEMA representative at the EOF BRP representative at the EOF (This fulfils the obligation to notify the BRP)

NRC representative at the EOF NOTE ESD SHALL communicate the PAR developed by the TMI emergency organization whether or not PEMA, BRP or NRC representatives at the EOF agree with the developed PAR.

NOTE To the maximum extent possible, obtain agreement from the State and NRC on the PAR Whether or not the State and NRC agree SHALL NOT impact communication of the PAR recommendation.

Personally provide TMI's PAR to the SENIOR OFFICAL at the STATE EOC (Emergency Operations Center) within 15 minutes of the General Emergency declaration by one of the following methods:

NOTE Verify that you are speaking to the SENIOR OFFICAL at the State EOC when providing the PAR.

a.

Pennsylvania Governor (717) 651-2148

b.

State EOC (717) 651-2011

c.

PEMA Notification Line (DLM-6), PEMA, Dial 37 NOTE If the ESD cannot make the call personally, he may designate someone else to convey the PAR.

Briefly inform the ED of the PAR decision, do not delay the PAR notification process.

Inform the ED of the Protective Actions implemented by the State.

13

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e

Revision No.

"E-mergency Operations Facility 18 EXHIBIT 1 Page 9 of 10 NRC Interface

a.

Review Exhibit 16, "TMI / NRC Emergency Response Interface".

Ask the Senior NRC person who is the Site Team Leader and who is the Director Site Operations.

NOTE ONLY the Director Site Operations is empowered to issue directives.

Verify that the EP Representative has briefed the NRC on the following:

a.

Status of the event

b.

Structure of the TMI organization

c.

Any NRC directives are to be in writing to the ESD or in the absence of the ESD the ED.

Verify that the EP Representative has introduced TMI personnel to their NRC counterparts in the EOF.

Long-Term Recovery

a.

Discuss implementation of EPIP-TMI-.45, Classified Emergency Termination/Recovery At an ESD conference With the ED 14 NOTE If a GENERAL EMERGENCY is in effect, DO NOT de-escalate to a lower level of emergency. The only option is to go into Long-Term Recovery and this transition SHALL NOT occur until ALL Offsite protective measures have been completed and the State has been notified.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

-itle Revision No.

"--Emergency Operations Facility 18 EXHIBIT I Page 10 of 10 Close Out / Deactivation

a.

Upon any of the following conditions:

Emergency Close Out Deactivation of the EOF Deactivation of the EACC An inventory of the EOF is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Emergency Preparedness Manager, TMI. Notify the Emergency Preparedness Manager of the need to perform the inventory in accordance with TEP-ADM-1300.01, Maintaining Emergency Preparedness.

ii.

An inventory of the EACC is required to be performed by the end of the working day following the end of the event. The inventory is the responsibility of the Environmental Radioactivity Laboratory Manager. Notify the Environmental Radioactivity Laboratory Manager of the need to perform the inventory in accordance with TEP-ADM-1 300.01, Maintaining Emergency Preparedness.

NAME TIME hours DATE Emergency Support Director 15

EPIP-TMI-.27 Revision 18 Page 1 of 2 EXHIBIT 2 SEMERGENCY REPORT FORM - TMI Part I of 4 (Pm"s Fwrnly and kWite Cearl$l G~ait Outlotfaication 4".4..t C-LEVEL I Onshift (Requh'd for lnusuat Event) c-., C LEVEL 2 Initial Response Emergency Organization & Onshift l(Reuired fi Alert)

C LEVEL 3 Emergency Support OrganizatIon & Initial Response Ernergsrnc o anizhaon & Onshift (Required for SAE & GE)

Start Here for Notifications Read message - slowly - clearly.

  • si=ci C This is a drill. This Is a dril Completed by Communicator This Is IL.

E] This is NOT a drilL This is NOT a drlil.

at TMI, my pIone number is (Select) 944 (s,.-It:)e C An Unusual Event has been declared 11 A Site Area Emergency has been declared C An Alert has been declared 17 A General Emergency has been declared C The event has been terminated at hours on Emergency Cla**ifivation T-me (24 hotr cock)

Emergency Clas tion Date (s.an1 This represenfts:

C An initial Classification Status

[E An escalation In Classification Status EC No change In Classification Status 17 A reduction in Classification Status

=I

00 0

There is:

I2 No abnormal radioactive 11 An abnormal radioactive airborne E1 An abnormal radioactive liquid release to the environment as a result of this emergency.

cv-t-n.c tr-m m mie rswus arouna me plant and SHELTER the 5 to 10 mile radius SHELTER the 10 mile radius around the plant (Use SHELTER ONLY option when It is clear that EVACUATION is NOT arrmnrintne around the plant Wind direction is from and the wind speed is miles per hour, 804c4 M This is a drill. This Is a drill.

1 This is NOT a drill. This Is NOT a drill.

Approved - ED)ESD Ohsfl~butico: Grass - call OutNtiiation Yeflow - Cn*:

w~t. Fri,*-,,

C.L*

f l,..,

AGO139C ilL-"'M 16 0116Mbution; Green -Call OutNOtiftstkln; Yalow -Corrt2ct; White - ED Pi k P1

EPIP-TMI-.27 Revision 18 EXHIBIT 2 Page 2 of 2 AmerGen EMERGENCY REPORT FORM - TMI Part 2 of 4 E *-:,o E-n**=**

Contact (int D] LEVEL 1 Onshift

-t,ý U LEVEL 2 Initial Response Emergency Organization & Onshift

[E LEVEL 3 Emergency Support Organization & Initial Response Emergency Organization & Onshift Start Here for Contact Read Message - slowly - clearly.

Li This is a drill. This is a drill.

L[ This Is NOT a drill. This is NOT a drill.

[] An Unusual Event has been declared 0] A S;ite Area Emergency has been declared El An Alert has been declared

[] A General Emergency has been declared C1 The event has been terminated at hours on Efevgency Cflashsation Time Enmif.ncy Ctassfflcaion Date This represents:

C1 An initial Classification Status Li An escalation In Classificaton Status Li No change in Classification Status LI A reduction In Classification Status There Is:

Li No abnormal radioactive 13 An abnormal radioactive airborne

[C An abnormal radioactive liculd release to the environment as a result of this emergency.

0 Thislsaldril. ThImla*Idflf*0 Thfis sNO a drill. This Is NOT a drill.

Approved - EDIESD DlhhlUIo.: Gregn - Call Outo ication; Yellow -Contact, White - ED copy; Pint -Plant Page AGD139 (12-99) 17

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 1 of 9 EVENT DESCRITION An Unusual event is declared because an abnormal release of radiation from the power plant has or will exceed 60 minutes and could lead to very low level radiation dose rates at or beyond the outer boundary of the plant site.

U1.2 Unexpected Radiation An Unusual Event is declared because of abnormally high Readings Inside the radiation levels measured inside the power plant that indicates a Power Plant degradation in the control of radioactive material. No abnormal releases to the environment are occurring.

U1.3 Liquid Radioactive An Unusual Event is declared because a release of radioactive Release That Exceeds liquid that exceeds the limits of government regulations has lasted Limits for 60 minutes or more. This event indicates a degradation in the ability to control the release of radioactive materials to the river.

U1.4 Low Spent Fuel Pool An Unusual Event is declared because of the uncontrolled Level leakage of water from the Spent Fuel Pool. The leakage exceeds or is expected to exceed the ability to refill the pool. No abnormal releases of radioactivity to the environment are occurring.

U1.5 Low Fuel Transfer Canal An Unusual Event is declared because of the uncontrolled Level leakage of water from the Fuel Transfer Canal. The leakage exceeds or is expected to exceed the ability to refill the canal. No abnormal releases of radioactivity to the environment are occurring.

Fuel Clad Damage With Increased Radiation An Unusual Event is declared because of indications that there has been damage to the metal tubes that hold the nuclear fuel pellets. Increased radiation has been detected in the water that flows through the nuclear reactor. No abnormal releases of radioactivity to the environment are occurring.

U2.1 Potential Loss or Loss of An Unusual Event is declared because of the: Potential Loss of Containment Containment as a Fission Product Barrier. - OR - Loss of Containment as a Fission Product Barrier.

U2.2 Reactor Coolant System An Unusual Event is declared because of.- an unidentified leak or Steam Generator (location unknown) greater than or equal to 10 gallons a minute Leakage from the Reactor Coolant System. - OR - an unidentfied leak (location unknown) greater than or equal to 10 gallons a minute from the Steam Generator tubes. - OR - an identified leak (location known) greater than or equal to 25 gallons a minute from the Reactor Coolant System.

U3.1 A Risk of Station An Unusual Event is declared because of the loss of all normal Blackout Exists - Backup electrical power sources for to the power plant for more than Power Is Available, fifteen minutes. Emergency backup power is available.

U3.3 Loss of "A" or "B" Plant An Unusual Event is declared because of the loss of ALL of the DC Electricity For More DC (Direct Current) electrical power supply for more than fifteen than 15 Minutes during minutes.

Cold Shutdown or Refueling Shutdown.

18 EAL BRIEF TITLE Radiological Effluent Limits Are Being Exceeded U1.6 Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the

--MERGENCY REPORT FORM - TMI.

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 2 of 9 BRIEF TITLE Unplanned Loss of Control Room Safety Indicators EVENT DESCRITION An Unusual Event is declared because of the unplanned loss of the majority of the control room's Safety Related Equipment alarms - or - indications. Although other non-alarming indications are available to the Control Room Operators, this situation requires increased surveillance of the safety related equipment and there is the risk that a degraded plant condition could zo undetected U4.1.1 Unplanned Loss of Onsite An Unusual Event is declared because of the unplanned loss of all or Offsite onsite communications capabilities. - OR - all offsite Communications.

communications capabilities.

U4.2 Failure to Complete a An Unusual Event is declared because the required time limit to Plant Shutdown or perform a plant shutdown - OR - a plant cooldown was exceeded Cooldown Within the The Technical Specifications are the power plant's operational Required Time Limit.

guidelines. A Limiting Condition for Operation (LCO) sets a specific time limit that allows continued plant operation while actions are being taken to correct the problem. If the problem cannot be corrected and the plant cannot be shut down or cooled down within the time limit, an Unusual Event must be declared U5.1 High River Water Level.

An Unusual Event is declared because flood waters are within a few feet of the top of the stone dike that surrounds the power plant. Water is NOTflooding onto the plant site.

'15.2 High Wind Speeds Near An Unusual Event is declared because of Sustained Winds Hurricane Force greater than 70 mph recorded at TMI. These winds have the potential to damage Plant Equipment.

U5.3 Tornado Strikes An Unusual Event is declared because of a report that a tornado Protected Area.

touched down inside the Protected Area of the power plant.

There is the potential for damage to structures and equipment inside the Protected Area.

U5.4 Earthquake At Threshold An Unusual Event is declared because of a minor earthquake Levels.

detected at the power plant. An earthquake of this magnitude has the potential to damage some equipment, but it is not expected to affect any safety systems. The occurrence of any detectable earthquake warrants increased monitoring by the operators.

U6.1 Fire In The Protected An Unusual Event is declared because of afire in the Protected Area.

Area of the power plant that our site Fire Brigade could not bring under control within 15 minutes of when the fire was confirmed.

This fire has the potential to involve Safety Related Equipment if it spreads.

U6.3 Flammable I Toxic Gas An Unusual Event is declared because of the detection of That May Affect flammable / toxic gas that could enter the power plant site. This Operation.

gas could affect the safety and health ofplant personnel and disrupt normal operation of the power plant.

19 EAL

$-*d4.1 Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 3 of 9 Unexpected Explosion In The Protected Area.

An Unusual Event is declared because of an unexpected explosion that caused damage inside the Protected Area of the power plant.

This explosion was NOT caused by a bomb. The damage could affect the operation of the plant.

U6.5 Steam Turbine Damage.

An Unusual Event is declared because of damage to the steam turbine, including puncturing of the steel casing around the turbine or damage to the generator seals. The hazard of projectiles from the turbine and puncturing of the casing around it decreases the safety level of the plant and could affect the safety and health ofplant personnel which affects the operation of the power plant.

U6.6 Vehicle Crash In The An Unusual Event is declared because of a vehicle (airplane, Protected Area.

train, helicopter, etc.) that accidentally crashed inside the Protected Area of the power plant. There is the potential for damage to structures and equipment inside the Protected Area.

U7.1 Confirmed Security An Unusual Event is declared because of a confirmed security Event.

event, which could potentially degrade the safety level of the power plant. (This event involves: A bomb discovered inside the Protected Area The Protected Area includes major plant structures like the turbine and service buildings that are protected by a security fence and to which access is controlled.) - OR - A Hostile Force inside the Owner Controlled Area (The Owner Controlled Area includes the area between the perimeter chain link fence and the Protected Area).

Judgment of the Shift An Unusual Event is declared by the Shift Manager /Emergency Manager / Emergency Director. The Shift Manager /Emergency Director has the Director - Potential Degradation of Plant flexibility to declare an event if conditions exist that indicate a Safety potential decrease in the safety level of the plant. These conditions may not be specifically addressed in an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager /Emergency Director.

Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

20

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 4 of 9 BRIEF TITLE Radiological Effluent Limits Are Being Significantly Exceeded.

EVENT DESCRITION An Alert is declared because an abnormal release of radiation from the power plant has or will exceed 15 minutes and could lead to low level radiation dose rate at or beyond the outer fence line of the plant site.

A1.2 Unexpected Radiation An Alert is declared because of abnormally high radiation levels Readings Inside the measured inside the power plant, which indicate a serious Power Plant that Affect the Safe Operation of the degradation in the control of radioactive material.

Plant.

A1.3 Liquid Radioactive An Alert is declared because a release of radioactive liquid that Release That Significantly significantly exceeds the limits of government regulations has Exceeds Limits.

lastedfor 15 minutes or more.

A1.4 Low Spent Fuel Pool An Alert is declared because of the uncontrolled leakage of Level With Increased water from the Spent Fuel Pool with higher than normal Radiation Levels, radiation levels in the spent fuel pool area of the plant. This condition indicates a serious degradation in the control of radioactive material.

A1.5 Low Fuel Transfer Canal An Alert is declared because of the uncontrolled leakage of Level With Increased water from the Fuel Transfer Canal with higher than normal Radiation Levels, radiation levels in the reactor building. This condition indicates a serious degradation in the control of radioactive material.

A2.1 Potential Loss or Loss of An Alert is declared because ONE Fission Product Barrier the Fuel Clad - OR -the (other than Containment) has been impacted due to the: Potential Reactor Coolant System.

Loss of the Fuel Clad Fission Product Barrier - OR - the Reactor "Coolant System Fission Product Barrier. - OR - Loss of the Fuel Clad Fission Product Barrier - OR - the Reactor Coolant System Fission Product Barrier.

A3.1 A Risk of Station An Alert is declared because of the loss of all normal electrical Blackout Exists - Limited power sources for the power plant for more than fifteen minutes.

Backup Power Is Only one of several sources of emergency electrical power Available.

sources is available.

A3.2 Prolonged Station An Alert is declared because of the loss of all normal electrical Blackout - Greater than power sources - AND - the loss of all emergency electrical power 15 minutes - During Cold sources for more than fifteen minutes (a prolonged Station Shutdown or Refueling Shutdown.

Blackout) during Cold Shutdown or a Refueling Shutdown.

A4.1 Unplanned Loss of An Alert is declared because of the unplanned loss of the Control Room Safety majority of the control room's Safety Related Equipment alarms Indicators With Transient or - indications. - AND - The loss of other non-alarming indications. - OR - A significant change in the power plant's status is in progress. This situation requires increased surveillance of the safety related equipment in order to safely operate the power plant and there is the risk that a degraded plant condition could go undetected.

21 EAL 1-41.1 Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 5 of 9 BRIEF TITLE EVEN DECI.O Failure of the Reactor to Automatically Shutdown AND - a Successful Manual Reactor Shutdown was Accomplished.

EVENT DESCRITION An Alert is declared because the Reactor Protection System that is designed to automatically shut down (trip) the reactor failed to do so. The Control Room Operators have manually shut down (tripped) the reactor, but the failure of the automatic system deszrades the safety level of the power plant.

A4.3 Loss of All Means of Decay An Alert is declared because the operators are unable to provide Heat Removal and the sufficient cooling water to the reactor following a plant Nuclear fuel is Predicted to shutdown. This condition reduces the ability of the operators to be Uncovered.

keep the nuclear fuel cool and degrades the safety level of the power plant.

A5.1 High River Water Level Near An Alert is declared because offlood waters that have the Flood Level.

potential to flow over the top of the stone dike that surrounds the power plant. Portions of the plant site may be flooded This flood has the potential to damage Safety Related Equipment.

A5.2 High Wind Speeds Greater An Alert is declared because of Sustained Winds greater than 80 Than Hurricane Force.

mph recorded at TMI. There is the potentialfor damage to Safety Related Equipment.

A5.3 Tornado Strikes Vital Area.

An Alert is declared because of a report that a tornado touched down and has damaged structures and equipment inside the Vital Area of the power plant. This damage could affect Safety Related Equipment.

,15.4 Earthquake At Operating An Alert is declared because of an earthquake at the power Design.

plant. An earthquake of this magnitude has the potential to damage some Safety Related Equipment that could affect the ability to protect the public's health and safety. The power plant may be shut down and increased monitoring will be performed by the operators.

A6.1 Fire Affecting Safety Related An Alert is declared because of afire that has affected one of the Equipment.

Safety Related Equipment systems in the Vital Area. (The Vital Area includes structures where safety related equipment is located) - OR - Afire is in the Protected Area and requires localfire company assistance. The Protected Area includes major plant structures like the turbine and service buildings that are protected by a security fence and to which access is controlled.

A6.2 Control Room Evacuation An Alert is declared because of the order to evacuate the Initiated.

Control Room. The absence ofpersonnel in the control room can affect the safe operation of the power plant.

A6.3 Flammable / Toxic Gas An Alert is declared because of life threatening concentrations Affects Plant Operation.

of flammable / toxic gas within the Vital Area of the power plant.

This presence can affect the safety ofplant personnel and the operation of Safety Related Equipment. Evacuation ofplant personnel is possible.

Enter the EAL number AND the Brief Title (

'MERGENCY REPORT FORM - TMI.

his is the bold information) in the Event Description area of the 22 EAL

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 6 of 9 EAL BRIEF TITLE EVENT DESCRITION

-K6.4 Unexpected Explosion In An Alert is declared because of an unexpected explosion that The Vital Area.

caused damage inside the Vital Area of the power plant. This explosion was NOT caused by a bomb. The damage could potentially affect the ability to protect the public's health and safety.

A6.6 Vehicle Crash In The Vital An Alert is declared because of a vehicle (airplane, train, Area.

helicopter, etc.) that accidentally crashed inside the Vital Area of the power plant. The damage could affect Safety Related Equipment.

A7.1 Confirmed Security Event An Alert is declared because of a confirmed security event, Potentially Affecting which degrades the safety level of the power plant. This event Safety Related involves: A bomb discovered inside the Vital Area. The Vital Area Equipment.

includes buildings where Safety Related Equipment is located.

Damage to this equipment would reduce the ability to protect the public's health and safety. - OR - A Hostile Force inside the Protected Area. The Protected Area includes major plant structures like the turbine and service buildings that are protected by a security fence and to which access is controlled A8.1 Judgment of the Shift An Alert is declared by the Shift Manager /Emergency Director.

Manager / Emergency The Shift Manager /Emergency Director has the flexibility to Director - Actual Degradation of Plant declare an event if conditions exist that indicate a potential Safety.

substantial decrease in the safety level of the plant. These conditions may not be specifically addressed in an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager / Emergency Director.

Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

23

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 7 of 9 EVENT DESCRITION A Site Area Emergency is declared because an abnormal release of radiation from the power plant could lead to significant doses of radiation at the boundary of the power plant.

S2.1 Potential Loss or Loss of A Site Area Emergency is declared because TWO of the Fission the Fuel Clad -AND -

Product Barriers have been impacted due to the: Loss of the Fuel Potential Loss or Loss of Clad Fission Product Barrier - AND - the Potential Loss of the the Reactor Coolant System Reactor Coolant System Fission Product Barrier. - OR - Potential Loss of the Fuel Clad Fission Product Barrier - AND - the Potential Loss of the Reactor Coolant System Fission Product Barrier. - OR - Potential Loss of the Fuel Clad Fission Product Barrier - OR - the Potential Loss of the Reactor Coolant System Fission Product Barrier - AND - the Loss of Any Other Fission Product Barrier.

S3.1 Prolonged Station A Site Area Emergency is declared because of the loss of all Blackout - Greater than normal electrical power sources for the power plant for more 15 Minutes.

than fifteen minutes -AND - the loss of all emergency electrical power sources for more than fifteen minutes. This is called a Station Blackout.

S3.3

- Loss of All Plant DC A Site Area Emergency is declared because of the loss of all DC Electricity For More than (Direct Current) electrical powerfor more than fifteen minutes.

15 Minutes when the plant is not in Cold Shutdown or Refueling Shutdown.

Unplanned Loss of All Control Room Safety Indicators With Transient A Site Area Emergency is declared because of the unplanned loss of all Safety Related Equipment indications and alarms - AND - A significant change in the power plant's status is in progress. The control room staff is unable to adequately monitor the systems necessary to safely control the power plant and insure protection of the public's health and safety.

S4.2 Failure of the Reactor to A Site Area Emergency is declared because the Reactor Automatically Shutdown Protection System that is designed to automatically shut down

- AND - a Manual Reactor Shutdown could not be (trip) the reactor failed to do so AND the Control Room Accomplished.

Operators were unable to manually shut down (manually trip) the reactor from the control room. This condition reduces the ability of the operators to control the power plant and creates conditions that could lead to damage of the nuclear fuel or the steel reactor vessel and associated piping. This condition impacts the ability to protect the health and safety of the public.

24 EAL BRIEF TITLE High Radiological Doses at the Boundary of the Power Plant Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

i

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 8 of 9 BRIEF TITLE 4

+

Loss of All Means of Decay Heat Removal AND - Indications that the Nuclear fuel is Uncovered.

EVENT DESCRITION A Site Area Emergency is declared because the operators are unable to provide sufficient cooling water to the reactor following a plant shutdown - AND - the increased heat has caused the water in the reactor to boil and uncover the fuel. This condition reduces the ability of the operators to keep the nuclear fuel cool, degrades the safety level of the power plant and decreases the ability to protect the public's health and safety.

S4.4 Loss of Both Methods A Site Area Emergency is declared because of the loss of the Needed to Maintain the ability to cool the reactor after it is shut down. This condition Nuclear Reactor in Hot reduces the ability of the operators to keep the nuclear fuel cool Shut Down.

and degrades the safety level of the power plant and the ability to protect the public's health and safety.

S6.2 Control Room Evacuation A Site Area Emergency is declared because of the evacuation of Completed Without the Control Room - AND - the inability to confirm effective Complete Plant Control cooling of the nuclear fuel within 15 minutes. The absence of personnel in the control room and the lack of effective cooling of the nuclear fuel can affect the operation of Safety Related Equipment and the ability to protect the public's health and safety.

S7.1 Confirmed Security Event A Site Area Emergency is declared because of a confirmed Affecting Safety Related security event that degrades the safety level of the power plant Equipment.

and the ability to protect the public's health and safety. This event involves: A bomb that has exploded inside the Vital Area.

The Vital Area includes buildings where Safety Related Equipment is located. Damage to this equipment would reduce the ability to protect the public's health and safety. - OR - A Hostile Force inside the Vital Area.

$8.1 Judgment of the Shift A Site Area Emergency is declared by the Shift Manager /

Manager / Emergency Emergency Director. The Shift Manager /Emergency Director Director - Actual Failures has the flexibility to declare an event if conditions exist that of Safety Systems.

indicate the likely or actual major failure ofplant functions needed to protect the public's health and safety. These conditions may not be specifically addressed in an emergency procedure. In this situation, the decision to declare an emergency relies on the judgment of the Shift Manager/ Emergency Director.

25 EAL Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

4.3

EPIP-TMI-.27 Revision 18 EXHIBIT 3 Page 9 of 9 BRIEF TITLE High Radiological Doses at the Boundary of the Power Plant that Exceed Protective Action Guideline (PAG) Limits.

EVENT DESCRITION A General Emergency is declared because an abnormal release of radiation from the power plant that could lead to high doses of radiation at the boundary of the power plant. This condition may require that protective actions be implemented for members of the public livingz around Three Mile Island G2.1 Loss of ANY TWO of the A General Emergency is declared because TWO of the Fission Fission Product Barriers Product Barriers have been Lost and there is at least the

- AND - the Potential Potential Loss of the third barrier.

Loss of the third.

G3.1 Prolonged Station A General Emergency is declared because of the loss of all Blackout - Greater than 4 normal electrical power sources for the power plant for more hours.

than four hours - AND - the loss of all emergency electrical power sources for more than four hours (a prolonged Station Blackout) - AND - the overheating of the nuclear fuel.

G4.2 Failure of the Reactor to A General Emergency is declared, because the Reactor Automatically Shutdown -

Protection System that is designed to automatically shut down AND - a Manual Reactor (trip) the reactorfailed to do so AND, the Control Room Shutdown could not be Accomplished - AND -

Operators were unable to manually shut down (manually trip) the Operators are Unable to reactor from the control room AND, the operators are unable to Cool the Nuclear fuel cool the nuclear fuel.

G7.1 Confirmed Security Event A General Emergency is declared because of a confirmed security Loss of Plant Control.

event that prevents the operators from being able to place the power plant in Cold Shutdown. This condition seriously degrades the safety level of the power plant and the ability to protect the public's health and safety. This event involves: The loss of physical control of the Control Room. - OR - The loss of physical control of the Remote Shutdown Control Area.

G8.1 Judgment of the Shift A General Emergency is declared by the Shift Manager /

Manager / Emergency Emergency Director. The Shift Manager / Emergency Director Director - Safety System has the flexibility to declare an event if conditions exist that could Failures and Potential Radioactive Release.

result in substantial fuel damage and a substantial uncontrolled radiation release. - OR - have resulted in substantial fuel I damage and a potential uncontrolled radiation release.

26 EAL Enter the EAL number AND the Brief Title (This is the bold information) in the Event Description area of the EMERGENCY REPORT FORM - TMI.

EXHIBIT 4 EMERGENCY DIRECTOR / EMERGENCY SUPPORT DIRECTOR TURNOVER CHECKLIST NOTE

a.

This form is to be used for ALL turnovers.

b.

In the ECC:

The Emergency Director or the Emergency Director Assistant may complete this form.

In the EOF:

The Emergency Support Director or the Emergency Support Director Assistant may complete this form.

c.

This checklist need not be filled out in the order it is arranged.

Sections that are not applicable can be skipped and marked "N/A".

EVENT CLASSIFICATION EPIP-TMI-.27 Revision 18 Page 1 of 5 NOTIFICATIONS COMPLETED Level of Emergency Date Time 15 minute 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> NRC 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (Hours)

Notifications Notification ERDS COMPLETE COMPLETE ACTIVATED YES NO YES NO YES NO UNUSUAL EVENT ALERT ITE AREA EMERGENCY

-<3ENERAL EMERGENCY (PAR required) 4 4

4 4

+

4 DDQ

DI



IMADMATIArU ACTION YES NO Information given to the Duty Public Information Representative VERBALLY approved Press release DRAFT release in review PRESS release APPROVED EVENT DESCRIPTION (Include pre-event information, current information, EALs, and Actions taken/planned) 27

EXHIBIT 4

      • INFORMATION REGARDING PARs. NOT FOR PUBLIC RELEASE ***

PAR has been provided to the STATE YES (-4) 1 1

NO(4)

NIA I

If YES, PAR RECOMMENDED PROTECTIVE ACTION IMPLEMENTED BY THE STATE, IF KNOWN PLANT STATUS REACTOR STATUS POWER OPERATION o

% POWER STEADY STATE 0 MANUAL SHUTDOWN @

o HOT STANDBY 0

HOT SHUTDOWN

%/min SHUTDOWN 0

REACTOR TRIP AUTOMATIC MANUAL

,OOLDOWN COOLDOWN @

F/hr via O

FORCED CIRC with __

PUMPS o

Other (Explain) 0 NATURAL CIRC with AT COLD SHUTDOWN o

DHR'A' 0

OTHER (SPE 0

DHR'B' 0

LPI 'A' 0

LPI 'B' ELECTRICAL STATUS o3 System GRID o

Main Generator Emergency Diesels Battery 0

OTHER (Specify) 0]

0]

'A'

'A' 0

0

'B'

'B' 0

SBO 28 EPIP-TMI-.27 Revision 18 Page 2 of 5

EPIP-TMI-.27 Revision 18 Page 3 of 5 EXHIBIT 4 FISSION PRODUCT BARRIER STATUS REACTOR COOLANT SYSTEM Leak rate Leak rate INTACT POTENTIAL (gpm),

(gpm),

Barrier jj/

LOSS (4)

/

If KNOWN LOSS (4)

/

If KNOWN RCS (NOT OTSG)

/

/

OTSG 'A'

/

/

OTSG 'B' I

/

CONTAINMENT BUILDING Barrier INTACT (4)

POTENTIAL LOSS (4)

LOSS (4)

Building Integrity Bypass RB (e.g., OTSG leak to atmos.)

FUEL CLAD INTEGRITY Barrier INTACT(4)

POTENTIAL LOSS(/)

LOSS(4)

Clad EMERGENCY SYSTEMS ACTUATED NONE EMERGENCY FEEDWATER (EFW)

HIGH PRESSURE INJECTION (HPI)

CORE FLOOD (CF)

LOW PRESSURE INJECTION (LPI)

REACTOR BUILDING SPRAY (BS) 0]

0]

q1 J~

0]

PROBLEMS AT UNIT 2 29 OPEN TECHNICAL ISSUES (Provide specific details, including priortV)

EXHIBIT 4 RADIOLOGICAL CONDITIONS Is an abnormal, unplanned or uncontrolled release (monitored or unmonitored) in progress or suspected?

o YES 0

NO 0

N/A If YES, specify the release pathway:

If YES, describe release type:

"o Airborne release El Liquid release 01 Unknown "o

Other (Specify)

Have Field Monitoring Teams (FMT) been dispatched?

El YES 01 NO Have abnormal ON SITE or OFF SITE radiological conditions been detected by:

0 Reuter Stokes El Field Monitoring Team Details:

Abnormal radiation levels IN PLANT:

Details (Location):

El YES 0

NO HAZMAT A HAZARDOUS MATERIAL EVENT HAS OCCURRED (See 1203-44) 0 YES 0

NO HAS ENVIRONMENT AFFAIRS BEEN INFORMED?

El YES 0

NO HAS THE HAZARDOUS MATERIAL ENTERED THE RIVER?

0 YES 0

NO DETAILS (Location, Chemical, actions taken, etc.)

30 EPIP-TMI-.27 Revision 18 Page 4 of 5

EPIP-TMI-.27 Revision 18 Page 5 of 5 PERSONNEL STATUS PERSONNEL INJURED 0l INJURED & CONTAMINATED 0l TRANSPORT OFFSITE

[]

SPECIFY THE OFFSITE FACILITY YES YES YES HOW MANY HOW MANY HOW MANY PERSONNEL CONTAMINATED DETAILS:

0 YES HOW MANY 0

0 0

IS ONSITE ACCOUNTABILITY REQUIRED?

IF YES, IS IT COMPLETE?

IS NON-ESSENTIAL PERSONNEL MUSTER REQUESTED?

IF YES, LOCATION; HAVE NON-ESSENTIAL PERSONNEL BEEN EVACUATED?

IF YES, LOCATION; YES YES YES 13 NO 0]

El 0]

OE YES ES OTHER ISSUES;

'6ETAILS (Security, 10CFR50.54(x), etc.)

FORM COMPLETED BY DATE TIME (NAME) 31 EXHIBIT 4 El El El NO NO NO NO NO NO NO

le Emerqencv Operations Facility TMI - Unit I Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 5 Emergency Support Director Briefing Sheet Page 1 of 2 NOTE This checklist may be completed by the ESD Assistant or EP Representative.

NOTE This checklist may be filled out in any sequence. Items that do not apply to the present situation may be skipped and marked "N/A".

1.0 Conduct a briefing periodically. (Hourly and after significant changes in plant conditions).

Briefing Time

a.

Emergency classification/emergency organization status b.

Plant status (temperature, pressure, leak rate, equipment status etc.)

RCS Temp RCS Press RCP Status RB Sump RB Flood BWST 32

c.

Radiological conditions (specific release pathway, verify release duration, in plant radiological conditions, etc.)

TMI - Unit 1 Emergency Plan Implementing Document "itle

'Emergency Operations Facility EXHIBIT 5

d.

Work in progress (equipment problems, evolutions in progress, etc.)

Priorty jobs to mitigate event

e.
f.

g.

Number EPIP-TMI-.27 tRevision NO.

18 Page 2 of 2

1)
2)
3)
4)

Other Personnel status (muster, accountability, evacuation, contamination, etc.)

Security and offsite support (security conditions, required offsite support)

Mitigating activities, future plans 33 I

i

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

-11e Revision No.

..*mergency Operations Facility 18 EXHIBIT 6 Page 1 of 2 EOF Access Control Checklist Initials 1.0 Upon arrival at the EOF, request Environmental Radioactivity Lab personnel to unlock the door and keep the Main Gate open.

- 2.0 Ensure all entrances other than the main entrance are locked or have positive access control in order to maintain access control to the EOF.

- 3.0 Activate the DADCO Door Monitor (located at the Main Entrance) by depressing the "Green" power button.

a.

Locate door number (1) on the alarm panel and place this door in standby mode by depressing the "black" button one time.

NOTE This will cause the indicator light to switch from solid green to amber.

b.

If an alarm is received on any other alarmed door, silence the alarm by depressing the silence button. This will terminate audible alarm.

c.

Check status of door by depressing black button corresponding to the door one time. If door is open, the amber light will flash. If closed, amber light will remain solid.

d.

If door indicator light is flashing or is solid (amber), notify Group Lead Admin. Support or E.P. Rep. to verify status of door. Request a walkthrough be conducted to verify only authorized personnel are present in the facility.

e.

If door is verified to be secure, reset door by depressing black button corresponding to door, to return indicator button to green secure mode.

_f.

If door is unsecure, and must remain open, positive access control shall be determined by Group Leader Admin Support or E.P. Rep.

4.0 Obtain the EOF access list from the glass case located next to the name board and ensure all authorized personnel frisk, if necessary.

34

TMI - Unit 1 Emergency Plan Implementing Document Emergency Operations Facility EXHIBIT 6 Number EPIP-TMI-.27 Revision No.

18 Page 2 of 2 NOTE Steps a, b, and c, below, may be performed in any order and may be repeated if necessary. Any of these steps that are not needed can be skipped and marked "N/A".

a.

If unauthorized personnel attempt to gain access to the EOF, the individual assigned access control should contact Dauphin County Control by dialing 911 on an outside line and request assistance from the Susquehanna Township Police.

b.

If a person frisking causes an alarm, direct the individual to remain at that location and notify Group Leader R&EC.

c.

If you are notified by an individual that they have consumed an alcoholic beverage within the past five (5) hours or believe an individual should be tested for Fitness for Duty requirements, notify the Emergency Preparedness Representative.

5.0 Forward completed checklist to the Emergency Preparedness Representative.

EOF Access Control TIME DATE 35 NOTE Personnel requesting entry to the EOF, must produce a TMI company photo ID badge or be on the approved access list. All other personnel requesting entry must be authorized by the Group Leader Administrative Support, the Emergency Preparedness Representative or the Emergency Support Director.

NAME

TMI - Unit 1 Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 7 TMI Access Authorization Checklist Page 1 of 2 NAME:

COMPANY:

SSN:

BADGE #:

The criteria identified by this checklist shall be completed and verified prior to authorizing access of NRC personnel during emergency conditions. Deviation from these requirements shall only be permitted at the direction of the Emergency Director, Emergency Support Director or their designee.

NOTE Complete only the applicable sections of this checklist, mark other sections "N/A" (e.g., mark Section A as N/A for non-NRC personnel).

A.

NRC personnel shall be granted unfettered access upon verification of:

The representative possesses "Q" or "L" clearance, has been authorized site access by the NRC Region I Office (King of Prussia, PA) or the NRC Headquarters (Rockville, MD) and appears on the current TMI Access Roster/5 SS Screen.

The representative possesses a "Q" or "L" clearance, has been authorized access by Regional Office and/or Headquarters, but does not appear on the TMI Access Roster/5 SS terminal. In this case a letter of access authorization shall be forwarded (via telefax) to the Emergency Operations Facility.

The representative does not possess a "Q" or "L" clearance and must have an escort for entry into the protected area.

If Step 1 or 2 are complete check box 1 on Access Authorization Form, if only Step 3 is completed, check box 2 on Access Authorization Form.

Verification Signature:

Group Leader Admin Support/Designee All other personnel require Emergency Director, Emergency Support Director or designee authorization and if not fully qualified for unescorted access require a qualified site staff member as an escort.

NOTE Permission for site entry should be obtained through the ESD Assistant.

B.

Rad Con (Non-RWP Access)

Complete Temporary Issue Paperwork.

Issue TLD.

Verification Signature:

Group Leader R&EC/Designee "le

ý--mergency Operations Facility Date 36 Date

Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27

)e Revision No.

Emergency Operations Facility 18 EXHIBIT 7 Page 2 of 2 C.

Rad Con/Training (Escorted RWP Access - No Respirator Areas)

Complete Step B.

View G.E.T. Film.

NOTE Both 1/2 inch and 3/4 inch format tapes are stored in the EOF cabinet.

Practical Factor Performance not required.

Whole Body Count (waived if no facilities available).

Check Box 3 of the Access Authorization Form Verification Signature:

Group Leader R&EC/Designee Date D.

Rad Con (Unescorted RWP Access - No respirator Areas)

Ensure Steps B and C are complete.

Complete practical factors.

Individual granted unescorted RWP Access (No Respirator Areas).

Check Box 4 of the Access Authorization Form.

Verification Signature:

Group Leader R&EC/Designee Date E.

Rad Con (Unescorted RWP Access with Respirator)

Ensure Steps B, C and D complete.

Documentation provided by NRC of satisfactory completion of respiratory medical or receive GPU Nuclear medical.

Complete TMI Respirator Training.

Complete TMI Respirator Fit Test.

Individual granted unescorted RWP Access to all areas.

Check Box 5 of the Access Authorization Form.

  • rification Signature:

Group Leader R&EC/Designee Date 37

TMI - Unit 1 Emergency Plan Implementing Document Je Emergency Operations Facility Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 7A NRC TMI Access Authorization NAME:

SSN:

1.

Authorized unescorted TMI Site Access.

Authorized by Signature:

2.

Authorized escorted TMI Site Access.

Authorized by Signature:

3.

Authorized non-respirator RWP Access with an escort.

Authorized by Signature:

4.

Authorized unescorted non-respirator RWP Access.

Authorized by Signature:

5.

Authorized to wear the following respirator(s) and unescorted RWP Access.

Respirator Type Size Respirator Type Size Authorized by Signature:

Security Badge #:

Issued By:

Date:

NOTE It is the individual's responsibility to maintain a copy of this form with them at all times. Failure to keep a copy of this form can result in Site/RWP Access being denied.

38 Page 1 of 1 EJ 0D 0

DL

EPIP-TMI-.27 Revision 18 EXHIBIT 8 Page 1 of 1 TMI Par Logic Diagram I CONTINUE ASSESSMENT BASED ON ALL AVAILABLE PLANT DATA AND FIELD M

MONITORING INFORMATIONI 4,

I Expand EVACUATION recommendation to the 10 mile radius around the plant if VALID dose assessment/measurement information indicates that areas outside the 5 mile radius will exceed 1 REM TEDE or 5 REM CDE (Child Thyroid)

I 39 SITE AREA EMERGENCY IS DECLARED Determine which initial PAR is appropriate if a GENERAL EMERGENCY is declared.

(1) Evacuate the 5 mile radius around the plant and shelter the 5 to 10 mile radius around the plant OR (2) Shelter the 10 mile radius around the plant Continue assessment of all available Plant and Field Monitoring information.

GENERAL EMERGENCY IS DECLARED EVACUATE THE 5 MILE RADIUS AROUND THE PLANT AND SHELTER THE 5 TO 10 MILE RADIUS AROUND THE PLANT UNLESS IT IS KNOWN THAT SHELTERING OF THE 10 MILE RADIUS AROUND THE PLANT WILL OFFER GREATER PROTECTION.

(See NOTE below)

NOTE The intent is to evacuate the 5 mile radius around the plant as an initial PAR. The decision to recommend sheltering rather than evacuation should be made ONLY when it is clear that the evacuation cannot be completed within the release time. For example, the release has already stopped, the release can be stopped simply by turning off a piece of equipment, or there is a deliberate venting of the Containment Building with more than one valve available for isolation.

SECURITY EVENT

"* When EITHER the Control Room or the Remote Shutdown area is available the initial PAR should be to SHELTER the 10 mile radius around the plant.

"* When BOTH the Control Room and the Remote Shutdown area are lost the initial PAR should be to EVACUATE the 5 mile radius and SHELTER the 5 to 10 mile radius around the plant.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 9 Page 1 of 3 EP Representative Activation 1.0 Start log for your position in accordance with EPIP-TMI-.05.

NOTE Steps a through c may be completed in any sequence. Steps that do not apply to the present situation may be skipped or marked "N/A".

a.

Establish Access Control in accordance with Exhibit 6, EOF Access Control Checklist until relieved by the Group Leader Admin Support.

If an individual is not available to implement Exhibit 6, proceed as follows:

i.

Insure the door is locked ii.

Display a sign stating "Ring doorbell for facility access".

b.

Test ESO personnel who admit to having had a drink in the last five hours in accordance with Fitness for Duty requirements (Exhibit 9A).

c.

Determine if the EOF is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> (from the time displayed on the pager) staffed and ready to be "activated.

Ensure that personnel properly use the EOF Name Board and are wearing tags to identify the position they are filling.

  • Determine vacant positions by looking at remaining nametags
a.

Ensure that vacant positions are provided to the EOF Communications Coordinator so that personnel can be contacted to fill the positions.

Obtain an activation status report from the following positions:

a.

ESD Assistant

b.

Group Leader - Rad and Env Controls

c.

Technical Support Rep

d.

Public Information Representative - EOF

e.

EOF Communications Coordinator

f.

RAC Line Communicator

g.

ESD Logkeeper

h.

EAC 40

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 9 Page 2 of 3

d.

When all of the above positions are activated, report to the ESD that the EOF is 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> staffed and ready to be activated.

2.0 EP Operational Checklist NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

a.

Determine status of the Emergency Response Facilities from the ED Assistant and report the results to the ESD Assistant.

b.

Inform the ESD that the EOF is fully staffed when the Group Leader Administrative Support and supporting staff have arrived.

c.

Advise the ESD and other Emergency Response Organization members on all Emergency Plan related matters.

Proper interface with the State and the NRC Proper Emergency Classification Level Proper Protective Action Recommendation 0

Proper use of Emergency Plan Implementing Procedures Offsite notifications (if that responsibility has been transferred to the EOF)

d.

Upon the arrival of the NRC and State personnel Provide a briefing.

i.

Status of the Event ii.

Structure of TMI organization iii.

Request directives in writing to the ESD NOTE Use completed Exhibit 4 and, if available, Exhibit 5 to enhance the briefings Introduce them to their counterparts.

41

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.

Emergency Operations Facility 18 EXHIBIT 9 Page 3 of 3 Act as the point of contact for the PEMA representative.

e.

Attend all ESD Conferences 0

Log all conference Action Items on conference room status board.

Ensure that mitigating activities are discussed.

0 Lead the review of the PAR Logic Diagram.

0 Ensure the State and the NRC are given an opportunity to ask questions.

f.

Determine status of the State and Local Emergency Operations Centers from the PEMA representative and report the results to the ESD Assistant.

g.

Ensure the TMI Emergency Responders Information Brochure (located in the EOF Emergency Supplies Cabinet) are made available to responding government agencies (e.g., NRC, PEMA),

industry support groups (e.g., INPO), etc.

h.

If problems are encountered with the Emergency Telephones, contact the EOF Communications Coordinator.

i.

Upon close out of the drill/emergency:

Collect all completed EOF logs and forms Collect all EACC logs and forms Provide them to the Emergency Preparedness Department Name Time Date Emergency Preparedness Representative 42

TMI - Unit 1 Emergency Plan Implementing Document tie Emergency Operations Facility EXHIBIT 9A Number EPIP-TMI-.27 Revision No.

18 Page 1 of 3 Emergency Operations Facility Fitness for Duty Determination Instructions ScoPe:

In accordance with I 000-ADM-2002.06, Fitness for Duty, individuals responding to an emergency who have consumed alcohol within the previous five hours but believe that they are fit for duty shall inform the Emergency Support Director and receive an evaluation. Contractor/vendor personnel shall be asked if they have consumed alcohol within the previous five hours. If the answer is yes, an evaluation shall be conducted.

Instructions:

"-he Emergency Support Director shall direct the Emergency Preparedness Representative to administer the breath icohol evaluation in accordance with Exhibit 9A.

NOTE Extra copies of ALCO Sensor III operational checklist are kept with the instrument.

Based on the results of the test, perform the following:

a.

BAC 0.01% or less Allow the individual to work in the facility.

b.

BAC greater than 0.01% but less than 0.04%

Allow the individual to work in the facility. Re-test the individual approximately every thirty minutes to determine the maximum BAC. If the maximum BAC is equal to or greater than 0.04%, refer to Step 3. If less than 0.04%, no further action is required.

43 NOTE The fitness for duty rule applies to all TMI employees (including TMI contractors and vendors) granted unescorted access to the protected area or who are required by position or name to report to the EOF. These instructions address their evaluation for utilization in an emergency only.

All "for cause" evaluations must be conducted by the Medical or Security Department.

TMI - Unit 1 Emergency Plan Implementinq Document le Emerqencv Operations Facility EXHIBIT 9A Number EPIP-TMI-.27 Revision No.

18 Page 2 o f 3

c.

BAC equal to or greater than 0.04%

If determined that the individual's unique knowledge or skills are required, that individual shall only be permitted to work with the permission of the Site Director (or in his/her absence, his/her designee),

Emergency Support Director, Emergency Director or Office of the President only after satisfactory assurance that the individual is capable of performing his/her duties. Remind the Emergency Support Director that if this individual is needed to work, he/she must be escorted at all times. Arrangements should be made as soon as practicable for (for cause) testing in accordance with 1000-ADM-2002.06.

NOTE Individuals not "on call" who report to their facility and test equal to or greater than 0.04 percent BAC are not subject to disciplinary action.

d.

Ensure the individual who tested equal to or greater than 0.04, if not needed, is not permitted to drive home.

Provide a place for the individual to rest or contact Group Leader - Admin Support to arrange for transportation.

e.

Be alert for any individual that exhibits aberrant behavior or the smell of alcohol. Test these individuals in accordance with this exhibit. If aberrant behavior cannot be attributed to a positive BAC reading, ask the Group Leader - Admin Support to contact the Security Department for further action.

44

,e Emerqency Operations Facility TMI - Unit 1 Emergency Plan ImplementinQ Document Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 9A ALCO Sensor III Operational Checklist Sample TEST SUBJECT NAME:

SOCIAL SECURITY NO:

TIME OF TEST:

TEST 1 TEST RESULT (BAC): TEST 1

0.

OPERATOR NAME:

INSTRUCTIONS - check each box after completion of step.

DATE SERIA TEST TEST.

SIGNA

,L NO:

Page 3 of 3 2

2

0.

,TURE:

A weak battery is indicated by an "8.888" in the display window. Replace battery.

1.

LI Check temperature window on back of unit (should read 200 to 360 C).

2.

Li Have the individual mount mouth piece on unit.

Li Press "READ" button and hold for 10 seconds. Check to see if.000 is constant. If not, press "Set" button and recheck in one minute. If the display reads greater than.000, remove the instrument from service and forward to the Medical Department for repair and use another instrument for testing.

4.

Li Li

5.

Li Li

6.

Li Li

7.

Li

8.

Li

9.

Li Li Press "SET" button.

Instruct subject to take a deep breath and blow steadily through the tube until told to stop (minimum of 4 seconds). (NO smoking within fifteen [15] minutes of test.)

Push "READ" button during third second that the subject is blowing. (Subject MUST continue to blow for a minimum of one [1] second after the "READ" button is depressed.)

Keep "READ" button depressed until reading stops climbing.

Record reading and time of TEST 1/TEST 2. (NOTE: The two readings must agree within

+/-10% of the averages of the two measurements, if not, use another instrument).

Press "SET" button to accelerate elimination of reading and electrically clean the cell surface.

10.

Li Wait a minimum of two minutes and a maximum of 10 minutes and repeat Steps 3 through 9.

45 NOTE The fifteen minute observation pedod of the subject may be waived as long as a positive test result is not received. Should a positive test result be indicated, it shall be disregarded and the alcohol breath test started anew after at least a 15 minute observation period.

i

Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e

Revision No.

Emergency Operations Facility 18 EXHIBIT 10 Page 1 of 2 Emergency Support Director Assistant Checklist I.

ACTIVATION INITIAL

a.

Upon arrival at the EOF, ensure that steps are being taken to expeditiously activate the EOF.

Assist the ESD in the completion of Exhibit 1.

Assist the ESD in the completion of Exhibit 4.

b.

Report your status as activated when requested by the Emergency Preparedness Representative.

I1.

OPERATIONS NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

a.

Refer to EPIP-TMI-.01, "Emergency Classification and Basis", whenever major plant changes have occurred to determine if a change in emergency classification is warranted.

b.

If the ESD has assumed the responsibilities for "Approving and directing official notifications to off site agencies; then perform the following:

Inform the EOF Communications Coordinator that the ESD has assumed responsibility for off site notifications.

Assist the ESD in filling out the Emergency Report Form - TMI.

c.

When the ESD leaves the main room of the EOF, assume the Person-In-Charge role until the ESD returns.

NOTE This does NOT include assuming the responsibilities that the ESD has assumed from the ED.

Interrupt ESD conferences to inform the ESD of major changes that occur in the plant.

46

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 10 Page 2 of 2

d.

Promptly process press releases received from the PI Rep - EOF for ESD review and approval.

e.

Assume the TMI, Point-Of-contact role for any inquiries from the following:

NEI (Technical and Regulatory Division)

EPRI ANI

f.

Assist the ESD in the completion of Exhibit 5.

0 Insure each completed Exhibit 5 includes the Briefing Time.

g.

Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.

Name Time Date ESD Assistant 47

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

-tle Revision No.

"-..mergency Operations Facility 18 EXHIBIT 11 Page 1 of 1 ESD Logkeeper

1.

ACTIVATION

a.

Activate the ESD Logkeeper Position Maintain the ESD Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".

Report your status as activated when asked by the Emergency Preparedness Representative.

I1.

ESD LOGKEEPER OPERATIONAL CHECKLIST

a.

At ESD Conferences, insure that previously generated Action Items are addressed.

Forward the completed checklist and all ESD logs to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date ESD Logkeeper 48

le

_Emergency Operations Facility TMI - Unit 1 Emergency Plan Implementing Document EXHIBIT 12 Number EPIP-TMI-.27 Revision No.

18 Page 1 of 3 Public Information Representative - EOF ACTIVATION

a.

Contact the Duty PI REP to advise of your arrival at the EOF and to determine whom will be writing Press Releases and whom will be the Media Briefer.

b.

Start a log of all telephone calls in accordance with EPIP-TMI-.05.

c.

Report your status as activated when asked by the Emergency Preparedness Representative.

IL.

OPERATION Gather information about the emergency and provide it to the Media Briefer and News Release Writer, as appropriate:

Be especially attentive to any radiological situation, whether or not a radiation release is occurring. ANY release of radiation in the context of the emergency SHOULD be reported to the Press Release Writer and Media Briefer.

Use the "Plant Emergency Information Checklist" (Refer to Exhibit 1 C of the TMI Emergency Communications Response Manual) to obtain plant information.

Develop Bullets of information (e.g., RCP 'A' has been restarted) from attending ESD Conferences and obtained outside the conference.

i)

Information not obtained directly from plant indications needs to have ESD Assistant review and ESD approval.

ii)

ALL BULLETS must be reviewed and APPROVED by the ESD.

iii)

Obtain ESD approval of bullets generated during an ESD conference before the ESD leaves the conference room.

iv)

Fax the authorized information to the Media Briefer.

49 NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

a.

a 0

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

'le Revision No.

"-Emergency Operations Facility 18 EXHIBIT 12 Page 2 of 3 Continually update the Media Briefer and the Press Release Writer using the Emergency Information Checklist.

Keep in contact with the PI REP - ECC who is to route new information to the JIC as requested.

NOTE You are also required to provide real-time information about plant conditions, without ESD approval, to the JIC staff in order to assist the Media Briefer's understanding of changing plant conditions.

Press Releases

b.

When DRAFT Press Releases are received review them for accuracy before submitting them to the ESD Assistant for processing and obtaining ESD APPROVAL. Refer to Exhibit 13, Press Release Guidance, to enhance your review.

Depending on the change required either mark up the DRAFT and have the Press Release Writer make the corrections before the processing below:

i)

Give it to the Group Leader R&EC for review and approval

  • Be persistent to get it reviewed and INITIALED PROMPTLY ii)

Give it to the Tec Support Rep for review and approval

  • Be persistent to get it reviewed and INITIALED PROMPTLY iii)

If required, have Security perform a review for SAFEGUARDS information

  • Be persistent to get it reviewed and INITIALED PROMPTLY iv)

Give it to the ESD Assistant for submittal to the ESD for review and approval

  • Be persistent to get it reviewed and SIGNED PROMPTLY Press Releases announcing anything other that emergency level changes or Media advisories (e.g., JIC activated) must be approved by the Emergency Support Director.

Fax or deliver if the JIC is at the EOF the initialed (APPROVED) DRAFT Press Release to the Press Release Writer to obtain a final Press Release.

i)

Call the Press Release Writer and provide the changes verbally to expedite the Press Release process.

Maintain copies of the Press Releases.

Provide a copy of ALL APPROVED Press Releases to the ESD.

50

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 12 Page 3 of 3

c.

Ensure that emergency level changes and the criteria for those changes are IMMEDIATELY communicated to the Media Briefer.

Obtain a copy of the completed Emergency Report Form-TMI, if developed at the EOF, and transmit to the Media Briefer at the JIC.

d.

Upon termination of the emergency forward all logs, forms, draft Press Releases, approved Press Releases, completed checklists and other pertinent documentation to the Emergency Preparedness Rep.

Name Time:

Date P1 REP - EOF 51

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 13 Page 1 of 4 Press Release Guidance 1.0 Press releases should be issued as soon as possible, typically within one hour from the time that a major plant event has occurred. Press releases shall be written in accordance with the following guidelines:

a.

The following categories of information should be included in press releases.

0 Level of Emercqency This is simply identifying which of the four emergency levels was declared.

a Basis for Emergqency Declaration This should be a simplified description of the plant condition which produced the emergency declaration (e.g., a leak of radioactive water within a plant building).

S QOperations Status of the Plant A simple description of the plant status at the time of the emergency declaration (e.g., TMI was operating at 100% power, however, the plant is currently reducing power).

a Company/Government Interface This is intended to inform the public that TMI has notified and is working closely with government officials so that public confidence and company credibility can be increased, or maintained.

Corrective Actions This should be a non-technical description of what plant personnel are doing to correct the problem. It may include such language as "attempts are being made to stop the leak" or "plant personnel are investigating the cause of the leak."

Off-site Impact A statement which simply assess what impact this event may have on the environment.

This is intended to provide factual information on off-site radiological conditions (e.g., a radioactive release is in progress, however, monitoring teams have not detected any radiation levels in excess of normal background).

The initial press release should include all or part of the above information, however, at the very least, it should contain information from the parts above.

b.

In addition, the following guidance should be used in issuing press releases:

Speculation, Dose Projections and Protective Action Recommendations should not be included in press releases.

52

TMI - Unit 1 Emergency Plan ilementina Document Number 11-.27 Operations Facility 18 EXHIBIT 13 Page 2 of 4 Press Releases SHALL have the concurrence of the Emergency Support Director. Press Releases, should have engineering, radiological and as appropriate Safeguards review.

a.

Exceptions to this are limited to releases that are media advisories or releases that only contain 'boiler plate' information (e.g., level of emergency without any specific details or that the Joint Information Center is now activated).

i.

The ED/ESD should be made aware of these advisories.

b.

Original initialed copies are retained for records.

Press releases should be reviewed promptly to support timely (< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) issuance.

Press releases should avoid undefined technical terms and abbreviations (e.g., plant names, trip, etc.)

a.

Press releases should be written to be as simple as possible.

i.

Where possible, descriptions should be used instead of technical terms. For example, "back up power source" should be used in place of "diesel generators".

b.

Additional list of Technical terms and alternate words.

Technical Terms Suggqested Descriptions Accountability The process of accounting for all plant personnel Auxiliary Building Building housing support equipment for the Reactor RMG22 A monitor which detects radiation levels RMG23 inside the Reactor Building Contaminated Has loose radioactive material on it, him, her.

Contamination Loose radioactive material Containment Building Building which houses the Reactor or Reactor Containment Building Cladding A metal tube containing the nuclear fuel Control Rod A device which when inserted in a reactor stops the generation of power Critical Sustained Chain Reaction 53

TMI - Unit 1 Emergency Plan Implementing Document Emergency Operations Facility Number I

EPIP-TMI-.27 Revislon No.

18 EXHIBIT 13 Technical Terms Diesel Generator Fission Products Fission Products Barriers Fuel Cladding Failure Fuel Pool Grid Hot Well Loss of Off Site Power Noble Gas Penetration Plume Poison PORV Primary System Protected Area Radionuclides Reactor Building Reactor Building Purge Reactor Trip Page 3 of 4 Suggested Descriptions Emergency Power Unit or Back Up Power Source Radioactive materials made from operating the Reactor Barriers designed to contain the radioactive materials made from operating the Reactor.

Damage to the metal tubes containing the nuclear fuel.

Underwater Storage Area for Nuclear Fuel Electrical Distribution System Tank that collects condensed steam The plant has lost its connection to the Electrical Distribution system Radioactive Gas Opening through the wall Radioactivity released in the air or water A material which reduces power in the reactor Pressure Relief Valve The system that circulates water through the Reactor to remove heat Security Barrier around the plant Radioactive material Building which houses the reactor or reactor containment building A means of exchanging air inside the Reactor Building with outside air Automatic or Manual Shutdown of the Reactor 54

TMI - Unit 1 Emergency Plan Implementing Document

"--mergency Operations Facility EXHIBIT 13 Technical Terms Reuter Stokes SCRAM Secondary System Steam Generator Subcritical Half Life Number EPIP-TMI-.27 Revision No.

18 Page 4 of 4 Suggested Descriptions Off Site electronic Radiation Monitors Immediate or Fast Shutdown of the Reactor Non Nuclear Steam System Heat Exchanger where steam is made No self sustaining chain reaction Time it takes for half of the radioactive material to decay away 55

'tie

TMI - Unit 1 Emergency Plan Implementing Document

"'-e-mergency Operations Facility Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 14 Site Access Policy for Media During Emergencies Page 1 of 2 1.0 Providing site access to media personnel during a plant emergency or in the recovery from a plant emergency is in the best interest of the company and the public. However, media access to the site must not impair the response to the emergency.

2.0 Responsibility for approving site access rests with the Emergency Support Director, or, if the EOF is not activated, with the Emergency Director. Refer to Section 5 of this exhibit for responsibilities.

3.0 For purposes of media access to the site during an emergency, the same industrial safety and security standards and requirements that apply to non-essential employees will be applied to the media.

4.0 Communications Dept. Responsibilities

a.

Requests for media access will be made to the ESD or ED by the Public Information Duty Representative or the Communications Emergency Team Leader.

b.

Communications will provide the ED/ESD with the number of media to gain site access, areas to be accessed and length of time the media will be there. (Communications will decide the number of media gaining access based on conditions at the time of the emergency. An attempt will be made to gain access for, at a minimum, one representative each from radio, television and print media.)

c.

Communications will provide media transportation on and off site.

d.

Communications will have each member of the media sign a Media Access Briefing Form, indicating they were bdefed about the risks as they were known at the time by Company Management.

If media access does not involve entry into a posted radiologically controlled area:

a.

The Communications staff will conduct the sign in and badging of media at TMI.

i.

b.

C.

Communications will notify the Security Coordinator prior to proceeding with Site Access.

Communications will supervise and escort the media while on site.

Communications will conduct a briefing explaining the radiological and industrial conditions and dsks on site.

56 NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 fle Revision No.

Emergency Operations Facility 18 EXHIBIT 14 Page 2 of 2 If media access involves entry into a posted radiologically controlled area:

a.

Media will be processed at the EOF, as appropriate, receiving dosimetry, training, bioassay, waivers and briefings based on established procedural requirements.

Communications will notify the Security Coordinator prior to proceeding with Site Access.

b.

Communications in conjunction with Radiological Controls will supervise and escort the media while in posted radiologically controlled areas.

5.0 ED/ESD Responsibilities

a.

The ED/ESD will consult with the RAC/Group Leader R&EC, and media will be granted access if the projected dose will not exceed the 500 millirem annual limit including external and internal exposure.

For Security driven events, media access to the Site must also be approved by the Local Law Enforcement Agency/Security.

b.

Approve media access to the site if requirements are met.

57

TMI - Unit 1 Emergency Plan Implementing Document le Emergency Operations Facility EXHIBIT 15 Technical Support Rep Checklist

1.

ACTIVATION Initials 1.0 Activate the Tech Support Rep position.

Number EPIP-TMI-.27 Revision No.

18 Page 1 of 2

a.

Start the Technical Support Representative Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".

b.

Assign a communicator to communicate on the Technical Functions Line with the communicator in the Technical Support Center (TSC).

Instruct the communicator to log telephone conversations in accordance with EPIP-TMI-.05, "Communications and Record Keeping".

c.

Verify that the CRT to the Plant Process computer is being activated in accordance with Exhibit 15A instructions.

d.

Verify that the projection information System is activated.

Use instructions posted at the projection unit.

e.

Report your status as activated when asked by the Emergency Preparedness Representative II.

Tech Support Rep Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

a.

Contact the TSC to determine the following:

Operational status of the plant Mitigating activities

i.

Completed ii.

Underway iii.

Planned Release information

i.

Pathway ii.

Duration 58

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

"*-mergency Operations Facility 18 EXHIBIT 15 Page 2 of 2

b.

Provide the ESD with a summary of the plant status, as obtained from the TSC.

c.

Act as the Point-of-Contact for the BRP Engineering Representative.

0 Keep the BRP Representative informed of plant status and mitigating activities.

d.

Attend ESD Conferences and be prepared to discuss technical issues Core Conditions Barrier status

i.

RCS ii.

Clad iii.

Containment Mitigating activities

i.

In progress ii.

Being evaluated What could make the situation worse?

e.

Commence Accident assessment functions by:

Monitoring plant parameters Conducting trend analysis of key parameters Display information on Status Boards

i.

Update information on a routine basis

f.

Review and concur on draft Press Releases Use Exhibit 13, if required.

If Press Release is acceptable from a technical point of view, endorse it by initialing the document for ESD approval.

g.

If problems are encountered with communications equipment contact the EOF Communications Coordinator for resolution.

h.

Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date Tech Support Rep.

59

Number TMI-Unit I Emergency Plan Implementing Document EPIP-TMI-.27

.le Revision No.

Emergency Operations Facility 18 EXHIBIT 15A Page 1 of 2 EOF Plant Process Computer Access Instructions

1.

To put computer on line, verify system is energized or energize by turning on the computer and monitor.

a.

If the computer and monitor are energized but there is nothing displayed on the monitor, adjust the contrast knob as needed.

NOTE This is for the dedicated line access.

2.

Simultaneously press the following keys ("Shift" and "On Line/Off').

a.

This may not work on the first attempt - try again.

b.

If the system does not come on line, access the PPC using the modem instructions in Step 9.

3.

If PPC access is granted, the words "Off Line" at the bottom right hand comer of the screen will disappear.

4.

Press the key marked "GROUP" or any other function key to access the PPC.

5.

Enter the number of the area you wish to access, and press "Execute".

6.

From any menu screen, select the display number to be printed and then press the print button (other functions are per users guide).

7.

To automatically print the first 10 displays in the EOF area, push the EOF print button.

8.

To quit, 8.1 Clear the screen, press "cancel" twice.

8.2 Simultaneously press the following keys ("Shift" and "On Line/Off Line").

8.3 Reduce contrast to eliminate monitor display.

60

Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 15A Page 2 of 2 Modem Access (Backup)

9.

If the direct access fails, proceed as follows:

9.1 Press the "C" (cell) button.

9.2 Press the "Go" button.

NOTE The modem will automatically dial the following two numbers:

9-717-948-9114 9-717-948-9115 9.3 When the numbers are dialed and connected, proceed with Step 4.

10.

If PPC access is not successful or problems are encountered with the computer, call 9-717-948 8606 for assistance.

11.

To quit, proceed as follows:

11.1 On Aydin Keyboard press CANCEL twice.

11.2 On Aydin Keyboard press and hold down the SHIFT key (either RIGHT or LEFT) and press the On/Off Line key or xmit page key.

NOTE An OFFLINE message may briefly appear in the lower right hand corner.

11.3 On modem press the following buttons.

11.3.1 "DISC" 11.3.2 "GO", the modem will display "DISCONNECTED".

61

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

'tlie Revision No.

4Emergency Operations Facility 18 EXHIBIT 16 Page 1 of 5 TMI/NRC Emergency Response Interface Criteria This is a synopsis of the NRC emergency response process as it applies to TMI.

Upon arrival of the NRC, the ED/ESD should:

Verify who is the senior NRC person in charge Ask the senior NRC person to inform the ED/ESD when the position of Director Site Operations is assumed and whether the responsibility to issue directives is included.

Request that the NRC keep TMI Management informed of all substantive information exchanges between the NRC and the state.

Request the NRC provide all DIRECTIVES in writing.

In essence, directives from the NRC must come from the NRC Director (typically, the NRC Chairman) or from the NRC Director of Site Operations (typically, the NRC Regional Administrator). Such advice or directive can only be communicated to the Emergency Director (the Emergency Support Director once the EOF is activated). If a directive order is issued by the NRC Director or Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive.

rhile NRC advice may be challenged by the ED or ESD, directives must be complied with.

With respect to protective action recommendations for the public, the NRC may either endorse the TMI's recommendation or opt to recommend a different one. The ED/ESD is encouraged to include the NRC and State representatives in the protective action recommendation discussions in order to arrive at a mutually agreeable recommendation. In the event that the NRC opts to recommend a different PAR, they will attempt to resolve their differences with the utility prior to recommendations to the State. Their recommendation, like the utility recommendation, will be considered by the State in the development of a Governor directive.

SYNOPSIS - NRC EMERGENCY RESPONSE Revision 2 to NUREG 0728, supplemented by NUREG-0845 and NUREG-1471, describes the manner in which the NRC will respond to an incident and provides criteria for making preplanned response decisions. They provide procedural guidance, describe the functions related to NRC emergency response and define procedures for responding to the following NRC modes of operation.

1.

Normal Mode

2.

Standby mode

3.

Initial Activation

4.

Expanded Activation

5.

Deactivation 62

TMI - Unit 1 Emergency Plan Number

"*Emergency Operations Facility 18 EXHIBIT 16 Page 2 of 5 Each mode defines the scope of NRC activities related to a particular level of emergency response in ascending order of degree of involvement to deactivation. The various modes are characterized as follows:

1.

Normal mode - Normal activities designed to maintain readiness.

2.

Standby mode - Regional Office activates the Incident Response Center (IRC) with an appropriate staff and NRC Headquarters Operations Center is staffed by a Standby Team.

3.

Initial Activation - NRC Operations Center is staffed by a response team, the Regional IRC is fully activated and a Site Team is dispatched under the leadership of the Regional Administrator, normally designated as Director of Site Operations (DSO).

4.

Expanded Activation - Focus of NRC response operations is shifted to the site. DSO is designated primary spokesman for the NRC and may be empowered with directive authority by the Chairman of the Nuclear Regulatory Commission.

5.

Deactivation - Follow-up activities (e.g., reviews, investigation and recovery operations).

The particular mode assumed by the NRC will be dependent upon Licensee event classification and "independent NRC perception of relative severity of uncertainty of accident conditions".

"IRC functions defined in NUREG 0728 which impact directly on the Licensee are:

1.

Evaluate Incident and Plant Status NRC personnel at the site, the Regional Office and the Headquarters will acquire the necessary data to develop and maintain a complete and accurate overview of the evolution and status of the event.

This will involve data gathering via ERDS, ENS, HPN, and other FTS 2000 telephones as well as direct communications with the Licensee at the ERF's.

2.

Evaluate Licensee Actions NRC personnel will evaluate Licensee actions to mitigate the consequences of the incident and provide recommendations conceming protective actions for the public.

3.

Project Incident Consequences and Plant Status Based on information and evaluations discussed above, the NRC will develop an independent projection of the likely further course of events.

63

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 dle Revision No.

Emergency Operations Facility 18 EXHIBIT 16 Page 3 of 5

4.

Advise, Assist or Direct Licensee The NRC may offer advice or assistance to the Licensee during an emergency, or may respond to Licensee requests for advice of assistance. This may involve diagnosis of critical problems, development of proposed remedial courses of action, and proposals to implement additional precautionary measures. The NRC is also prepared to direct that certain actions be taken if, after thorough discussion with the Emergency Director (the Emergency Support Director once the EOF is activated) it is decided that such direction is required. In the event that such action is taken by the NRC Director or the NRC Director of Site Operations, the ED/ESD should request written confirmation which spells out the specific nature of the directive. Directives will be communicated directly to the ED/ESD from the NRC Director (NRC Chairman) or from the NRC Director of Site Operations (DSO), typically the Regional Administrator, once appointed and empowered to do so.

Several important concepts govern the NRC in providing advice, assistance, or direction. They are:

a.

The Licensee is at all times responsible for mitigating the consequences of the incident.

b.

Although the NRC could issue formal orders to the Licensee to take certain measures and to monitor implementation, "... licensee continues to make other key operational decisions and to operate and manage the facility...".

c.

The NRC must have a single voice when advising or directing the Licensee.

d.

The ED/ESD has the option to accept or challenge NRC advice.

At no time will advice or direction come from both the Director and the DSO and the Licensee will always be kept apprised of who is empowered to exercise authority as the NRC spokesman. All other NRC personnel in contact with Licensee personnel are responsible to make clear that discussions should not be construed as advice or direction but rather as a sharing or gathering of information.

5.

Inform Public and Monitor Public Information During emergency situations, the NRC will formulate its own press releases based on information gathered from the Licensee and from NRC personnel. Procedures exist to ensure that press releases are approved by one person. That person may be the Regional Administrator, NRC Chairman, or DSO depending on the current NRC mode of operations. NRC draft press releases will normally be shared with the Licensee; however, this does not imply a request for approval by the Licensee. The intent is to identify issues needing clarification prior to release to avoid confusing or misleading the public.

64

Number TMI - Unit I Emergency Plan Implementing Document EPIP-TMI-.27

-'tle Revision No.

"--mergency Operations Facility 18 EXHIBIT 16 Page 4 of 5

6.

Recommend Protective Actions for the Public The NRC responsibility during an emergency, as during normal operations, is to ensure that protection of public health and safety is adequate. One aspect of this responsibility is to provide protective action recommendations or advice to offsite authorities. This may take the form of an NRC endorsement of a Licensee protective action recommendation or the NRC may opt to recommend additional protective actions. The NRC is not normally involved in the process of recommending protective actions, however they may get involved if a major problem is identified with the protective actions recommended by the licensee or protective actions undertaken by the state or local govemment. Additionally NRC involvement may be requested by state or local officials.

7.

Review, Investigate and Document Response Actions The scope of this task is not preplanned by the NRC; however, it is apparent that this may require a great deal of interaction between the Licensee and the NRC after-the-fact.

SYNOPSIS - REGION I SUPPLEMENT The Region I Incident Response Supplement to NUREG 0845 restates many of the concepts of NUREG 0845 in greater detail as they apply specifically to Region I.

,ction I - Concept of Operations delineates general duties and responsibilities and describes the NRC modes of

.,_--jeration. Relative to the authority of the DSO, it states:

"The Director of Site Operations (DSO) supervises/manages all NRC personnel and operations at the site, is the NRC spokesperson, represents the NRC in interactions with other agencies and carries out the authority delegated by the Director of the NRC Executive Team (Chairman).

Delegated authority will include one or more of the following:

(a) authority to recommend actions to the Licensee, (b) authority to direct the Licensee to take specified actions, and (c) authority to recommend actions offsite, including protective measures for the public.

The Chairman of the NRC, by memo dated 4/22/80, indicated the Chairman may delegate authority to the Regional Administrator as DSO, upon transfer of control of NRC actions and resources to the site, to issue orders to a Licensee during an emergency. It is intended that this authority be used as a last resort to mitigate the emergency conditions only if, in the judgement of the NRC, the Licensee has shown it is incapable of controlling the emergency. This authority is valid only in an emergency when the Regional Administrator (or other senior NRC official) is the DSO and specific authorities have been transferred to him by the Chairman or designated alternate".

Sections II and III contain detailed procedures specific to Region I and present no new concepts of interest to the Licensee.

The attachment to the synopsis is provided for your information. This attachment depicts the Site Team Organization and is an extract of the NUREG-1471. It defines the number of NRC personnel expected to operate in each facility and shows the lines of communications the NRC expects to use.

65

(

EXHIBIT 16 V*.F*J,.F.P,l*

Dfsd boedeed born nd*c.ate Ibm~.1.d Cudtks POr"n~ie. CtI"o positon conmllute the n**nm dnff necnay to p6Mom Vh. cdical NRC repons functimon proaredV to desg (on of a Clredar of SM. Opeatkwon (050).

Loc*an of al positions Is dvWen by Oie SWW

'$nssea Emergency Resos Omwlalin. The fcM Nsta with these Positm represat lieF I bcalons.

Note 1: Either the PMCL Communicator or the PHN Communicator will be a critical position, not both.

Note 2: Either the ENS Communicator or the RSCL Communicator will be a critical position, not both.

Note 3: Safeguards/Security Assistant Coordinator is part of the Initial Site Team only in safeguards/security type events.

5' Open~if ow) to Is

!L I

66

(

EPIP-TMI-.27 Revision 18 Page 5 of 5

(

TMI - Unit 1 Emergency Plan Imolementina Document le Emergency Operations Facility 4

Number EPIP-TMI-.27 Revision No.

18 Page 1 of 4 EXHIBIT 17 EXHIBIT 17 Group Leader - Radiological and Environmental Controls Checklist ACTUATION Initials 1.0 Activate the Group Leader - Radiological and Environmental Controls position.

a.

Start the Group Leader R & EC log in accordance with EPIP-TMI-.05, Communications and Record Keepin-q.

b.

Turn on the Group Leader R & EC computer to access the Emergency Information Network (e.g., RAC information, or dose projections).

c.

Contact the RAC to obtain a status of the situation.

Use list below as a guide, it is not all-inclusive.

Release path(s)

Release duration In plant radiological conditions Samples requested

d.

Contact the Environmental Assessment Coordinator (EAC) to obtain a status of the situation.

Use list below as a guide, it is not all-inclusive.

Field team status Weather forecast Reuter Stokes

e.

Inform the Emergency Preparedness Representative that the Group Leader R & EC position is activated.

II.

OPERATION 2.0 Perform the following:

a.

Review dose projection information 67 NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e

Revision No.

Emergency Operations Facility 18 EXHIBIT 17 Page 2 of 4

b.

Review field monitoring information

c.

Perform dose assessment Compare dose projections against field monitoring data.

Determine if the dose projections are accurate (i.e., Field monitoring team data within a factor of 10 and less than the dose projection).

Compare dose projections and field monitoring team data to EPA PAG's.

Review weather forecast data for impact on the dose assessment process.

d.

Keep the ESD informed on the following:

All radiological issues.

All environmental issues.

All industrial health issues.

All safety issues.

e.

IMMEDIATELY inform the ESD if, after thorough dose assessment, you conclude that EPA Protective Action Guidelines (PAG's) will be exceeded anywhere offsite including OUTSIDE the 10 mile EPZ.

f.

Report any telephone problems to the EOF Communications Coordinator.

g.

Direct Access Control personnel to set up the EOF frisking station.

If appropriate, require personnel to frisk prior to entering the EOF.

If personnel require decontamination, refer to procedure 661 0-ADM-4330.02, Personnel Contamination Monitoring and Decontamination.

h.

Review DRAFT press releases developed for ESD approval to insure accuracy in the radiological information.

Use Exhibit 13 for guidance to ensure the releases do not contain the following:

a.

Technical jargon

b.

Acronyms

c.

Dose Projections

d.

Protective Action Recommendations Correct the press release, as required.

Endorse the correct release for ESD approval by initialing.

68

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Revision No.

"'-ýmergency Operations Facility 18 EXHIBIT 17 Page 3 of 4 Periodically brief the following on current radiological and environmental conditions.

ESD NRC State representative (BRP)

a.

Notify the State (BRP representative) if valid offsite dose projections are > 25 REM thyroid dose.

b.

Inform the State (BRP representative) of any problems with the automated dose projection code.

0 Insure the level of conservatism in the calculation is presented.

Consider the following if, the Training Center is used as the Near-Site JIC and / or the Remote Assembly Area (RAA)

Evacuation of these facilities should NOT occur prior to evacuation of the general public.

Evacuation orders, for the general public, do NOT automatically apply to the RAA.

Relocation of the RAA should be considered if, the projected dose at the facility reaches 4 REM (TEDE) or 40 REM (CDE).

0 If relocated, the RAA and the JIC should be re-established at the EOF.

0 If warranted, provide radiological protection instructions to the RAA Team Leaders.

k.

As necessary, assist the Access Center Coordinator in the completion of the TMI Access Authorization Checklist for NRC personnel requiring access to the site.

If additional dosimetry issue support is needed, request the Group Leader - Admin Support call out a Radiological Support Technician.

Forward the following to the Emergency Preparedness Representative Completed Group Leader R & EC checklist Completed Group Leader R & EC log 69

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

"-Ile Revision No.

"-Emergency Operations Facility 18 EXHIBIT 17 Page 4 of 4 2.1 Attend ESD conferences.

a.

Discuss dose assessment information Dose projections

i.

Insure the level of conservatism in the calculation is presented.

Field monitoring team results Sample results

b.

Provide information concerning Protective Action Recommendations (PAR)

Appropriate PAR in accordance with Exhibit 8 When EPA PAG's are exceeded outside 5 mile radius When the EPA PAG's are exceeded outside 10 mile EPZ iL Dose projections covering the 10 to 30 mile radius can be found on the Emergency Information Network.

ii.

Recommend protective actions outside the 10 mile EPZ as follows:

a.

Expand the evacuation area in 5 mile increments

b.

Utilize a 360 degree approach

c.

Expand the area such that EPA PAG's are not expected to be exceeded outside the recommended radius (e.g., If PAG's are expected to be reached at 17 mile radius, the PAR would include the 20 mile radius).

c.

Inform the NRC representative of any problems.with the automated dose projection code.

Insure the level of conservatism in the calculation is presented.

Name Time:

Date 70 Group Leader - Radiological & Environmental Controls

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

-;fle Revision No.

",--ýmergency Operations Facility 18 EXHIBIT 18 Page 1 of 2 Environmental Assessment Coordinator Checklist 1.0 Activate the Environmental Assessment Coordinator Position.

a.

Start an EAC log in accordance with EPIP-TMI-.05, "Communications and Record Keeping.

b.

Ensure that the Met/Dose Coordinator position is activated.

c.

Ensure the Emergency Information Network (EIN) Computer is activated.

d.

Establish communications with the RAC.

e.

Report the EAC and Met/Dose Coordinator positions as activated when asked by the Emergency Preparedness Representative.

2.0 Operations NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

a.

Keep the Group Leader R & EC and the RAC informed on the status of the following:

Field Team measurements Reuter Stokes readings Meteorological data Plume Travel NOTE The items listed under "a" above are met if EIN is active and displaying proper data.

Weather forecasts Environmental Monitoring sample results (if available)

Other pertinent information 71

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e

Revision No.

Emergency Operations Facility 18 EXHIBIT 18 Page 2 of 2

b.

Interpret field team data.

Ensure field team data is entered in the EIN (Onsite/Offsite Teams).

Compare field team data to projections.

Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.

c.

Evaluate Reuter Stokes information.

Compare Reuter Stoke information to field team data.

Report results of comparison to the Group Leader R & EC and, as appropriate, to the RAC.

d.

Ensure weather forecast information is provided to the Group Leader R & EC and to the RAC.

NOTE Be especially sensitive to changes in dispersion at dusk and dawn.

e.

If problems are encountered with the telephones, contact the EOF Communications Coordinator.

f.

As additional personnel are available assign them to the following positions, as needed to help fulfill EAC responsibilities.

Field Team Coordinator Dose Projection Computer Operator Radio Communicator RAC Communicator

g.

Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date 72 Environmental Assessment Coordinator

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

Emergency Operations Facility 18 EXHIBIT 18A Page 1 of 3 Met/Dose Coordinator 1.0 Activate the Met/Dose Coordinator position.

a.

Start a log in accordance with EPIP-TMI-.05, "Communications and Record Keeping"

b.

Energize the following, if not already done.

EACC Computers EACC Printers EACC radio

i.

Perform radio check

c.

Deploy Field Monitoring Teams Make team assignments.

If EOF access control has been established, inform the access center coordinator that there will be more than one access area open while field monitoring teams are being dispatched.

S*

Instruct the field monitoring teams to ensure that there is no unauthorized entry.

i.

Instruct the teams to secure the door upon their departure.

ii.

Instruct them to inform you upon departure.

Instruct the team to perform field monitoring per EPIP-TMI-.10, "Onsite/Offsite Radiological/Environmental Monitoring".

d.

Access the Emergency Information Network (EIN).

If the LAN connection is unavailable the EIN data will not be available and functions of the Reuter/Stokes, Midas, and the meteorology will have to be obtained by alternate means.

e.

Obtain present meteorological parameters.

f.

Report to the EAC that the Met/Dose Coordinator position is activated.

73

TMI - Unit I Emergency Plan Implementing Document le Emergency Operations Facility EPIP-TMI-.27 Revision No.

18 EXHIBIT 18A 2.0 Operations NOTE The following steps are not presented in the exact sequence to be performed. It is likely that some steps will have to be of the sequence listed and that some steps will be performei concurrently. Steps that are not applicable for the present s be skipped. Other steps may need to be repeated. This exl referred to periodically to ensure that necessary actions are

a.

Obtain a current weather forecast by any of the following means:

From a meteorologist, if available

i.

ii.

Page 2 of 3 Obtain a weather forecast if the meteorologist can provide one over the telephone.

Ask the meteorologist to report to the EACC.

From National Weather Service information found on the LAN or the Internet.

From the National Weather Service directly using the telephone numbers found in EPIP-TMI-.06.

b.

Direct the Field Monitoring Efforts When the EAC and MET/Dose Coordinator positions are activated and the field monitoring teams are operational, inform the RAC that the EACC is ready to assume responsibility for radiological and environmental monitoring.

ii.

Request the RAC inform the ED assistant that the EACC is operational.

Provide the following message to Field Monitoring Teams.

Use MIDAS plume plots and meteorological data to properly position the teams for monitoring duties while keeping their doses ALARA.

i.

Provide redundant tracking of field team accumulated doses, after field teams reports accumulate 500 mRem of thyroid dose.

74 Number I.

that they are erformed out d

ituation may hibit should be not missed.

ATTENTION FIELD MONITORING PERSONNEL. THE ENVIRONMENTAL ASSESSMENT COMMAND CENTER IS ACTIVATED AND WILL ASSUME RESPONSIBILITY FOR ALL RADIOLOGICAL AND ENVIRONMENTAL MONITORING AS OF

. ALL TEAMS RESPOND BY CONFIRMING THIS MESSAGE.

(Time)

EPIP-TMI-.27 18

Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 le Revision No.

"-l~mergency Operations Facility 18 EXHIBIT 18A Page 3 of 3 Direct the Field Teams to perform monitoring activities such as but not limited to:

i.

Scan to find plume center line ii.

Perform dose rate surveys iii.

Obtain air samples Interpret field team data.

i.

Ensure field team data is entered in the EIN.

ii.

Compare field team data to that projected by MIDAS and the RAC dose codes.

iii.

Report results of comparison to the EAC and, as appropriate, to the RAC.

c.

Based on the forecast data meteorological parameters used by the dose projection system are reasonable.

d.

Edit the MIDAS plume plots as necessary.

e.

Keep the EAC informed of changes in the meteorology.

Verify that the meteorological information appears to be accurate (e.g., the data is not remaining exactly the same over an extended time [30 - 45 minutes], it seems consistent with forecast information).

f.

Using weather forecasts, obtained in Step 2.1, relay the expected trend in dispersion factors and wind direction.

NOTE Be especially sensitive to changes in dispersion at dusk and dawn.

g.

Enter data on the EIN As time permits, enter field team data (Onsite & Offsite)

L Field team data is collected using Exhibit 18B.

Evaluate the data for consistency.

h.

Forward the completed checklist and all other pertinent documentation to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date Met/Dose Coordinator 75

le

"'-ýmergency Operations Facility TMI - Unit I Emergency Plan Implementing Document Number EPIP-TMI-.27 Revision No.

18 Air Sampler Time Sample Type Net CPM Run Time Flow Time Iodine Particulate Smear 1

t Noble Gas 76 EXHIBIT 18B Page 1 of 1 Field Team Designation:

Date:

Open Window E520 Location Time (mR/hr)

Average Closed Window E520 (mR/hr) or Frisker (cpm)

Air Sampler Time Sample Type Net CPM Run Time Flow Time Iodine Particulate Smear Noble Gas Field Team Designation:

Date:

Open Window E520 1 Location Time (mR/hr)

Average Closed Window E520 (mR/hr) or Frisker (cpm)

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

le Revision No.

Emergency Operations Facility 18 EXHIBIT 19 Page 1 of 1 RAC Line Communicator

1.

ACTIVATION 1.0 Activate the RAC Line Communicator Position.

a.

Turn on the Group Leader Radiological and Environment Controls computer and access the Emergency Information Network, if not already completed.

b.

Establish communications with the RAC by manning the Radiological Line.

0 Dial "22" on the ML-8000 System.

c.

Establish a Telephone Communications Logsheet in accordance with EPIP-TMI-.05, "Communications and Record Keeping".

d.

Report your status as activated when asked by the Emergency Preparedness Representative.

I1.

RAC LINE COMMUNICATOR OPERATIONAL CHECKLIST 2.0 Assist the Group Leader Radiological and Environmental Controls as necessary.

a.

Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date RAC Line Communicator 77

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 tie Revision No.

Emergency Operations Facility 18 EXHIBIT 20 Page 1 of 3 Group Leader Admin Support I.

ACTIVATION Initial 1.0 Activate the Group Leader Admin Support Function

a.

Begin the Group Leader - Administrative Support Log in accordance with EPIP-TMI-.05, "Communications and Record Keeping".

b.

Report your status as activated to the Emergency Preparedness Representative.

II.

GROUP LEADER - ADMIN SUPPORT OPERATIONAL CHECKLIST NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

2.0 Implement EOF Access Control in accordance with Exhibit 6.

a.

If an individual is not available to implement Exhibit 6, proceed as follows:

Insure the door is locked.

Display a sign stating "Ring doorbell for facility access".

2.1 Determine, as necessary, where the following services can be performed or obtained.

a.

General Administration Word processing Typing pool Reproduction

b.

Transportation Helicopter services (Refer to EPIP-TMI-.06)

Vans Buses Automobiles Shuttle service 78

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 Fe Revision No.

Emergency Operations Facility 18 EXHIBIT 20 Page 2 of 3

c.

Personnel Administration and Accommodations Personnel processing i)

Registration ii)

Indoctrination iii)

Training iv)

Security badging Lodging Food

d.

Outside Plant Support Trailer setup Janitorial Service Telephones

e.

If problems are encountered with the telephones, contact the EOF Communications Coordinator.

f.

Process personnel requiring site access by implementing Exhibit 7, "TMI Access Authorization".

Ensure a Radiological Support Technician is called out to activate the dosimetry issue function at the EOF.

g.

Assume the duties as the TMI Point of Contact for INPO.

h.

Using Exhibit 21, develop a watch-bill for the Emergency Support Organization that will support the emergency on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> / day basis.

Determine from the ESD when he wants the first shift change to occur.

The time should be far enough in the future to give backup duty roster members time enough to get some rest before filling the second shift.

Use a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift rotation.

Determine from each watch station the person that is presently filling that duty roster position.

List the person in the first shift position on Exhibit 21.

Determine alternate duty roster members.

i.

Identify backup duty roster members already at the EOF.

79

Number TMI-Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 de Revision No.

Emergency Operations Facility 18 EXHIBIT 20 Page 3 of 3 ii.

Using the Emergency Support Organization Duty Roster and telephone listings from the glass case next to the nametag bulletin board, call other duty roster members to determine their availability.

Fill in the second shift using the available backup duty roster members.

Pass out copies of each group's watch-bill to that group.

Have the ESD announce when the shift rotation will occur.

Call out additional personnel as required.

2.2 Contact the Emergency Director Assistant to obtain the status of Protected Area Accountability and Site Evacuation.

a.

Inform the ESD of the status.

b.

If informed by the Emergency Assembly Area Coordinator that the EOF will be used as the Remote Assembly Area.

Prepare the EOF to receive site evacuees in accordance with Exhibit 22.

2.3 Attend ESD conferences and be prepared to discuss information concerning the following:

NRC Incident Response Team Status of Accountability Status of Site Evacuation i)

Monitoring status ii)

Decontamination status Other Agencies Logistical information 2.4 Forward the completed checklist and all logs to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date Group Leader - Admin Support 80

e Emergency Operations Facility r

Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 21 Emergency Shift Schedule Start hours Start hours End hours End hours List duty roster positions for your group including phone talkers/communicators being used.

Position # -

Name -

Name Home Phone Number Work Phone Number Beeper Number Position # -

Name -

Name Home Phone Number Work Phone Number Beeper Number

)sition # -

Home Phone Number Work Phone Number Beeper Number Name -

t I. Name -

i I

t

+

Position # -

Name -

Name Home Phone Number Work Phone Number Beeper Number Position # -

Name -

Name Home Phone Number Work Phone Number Beeper Number Position # -

Name -

Name Home Phone Number Work Phone Number Beeper Number Position # -

Name -

Name Home Phone Number Work Phone Number Beeper Number U _______________________________

I _______________________________

81 DATE:

GROUP:

Shift I Shift 2 Page 1 of I TMI - Unit 1 Emergency Plan Implementing Document I

18

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27 e

Revision No.

Emergency Operations Facility 18 EXHIBIT 22 Page 1 of 2 EOF Set Up for Personnel Monitoring and Decon NOTE These steps may be performed concurrently.

1.0 Obtain the signs from the decon locker and post them as follows (see Exhibit 9 of EPIP-TMI-.36):

Post a magnetic "TMI Site Evacuees Enter Here" sign on the outside of the door to the sample storage area.

Post a "Clean Personnel Exit - No Entry" sign outside the small roll-up door to the sample storage area.

0 Post 2 "TMI Site Evacuees Use Garage Entrance" signs on orange safety cones and place them at the EOF gate.

Post a magnetic "Clean Personnel Exit - No Entry" sign outside the door at the front of the EOF near the NRC Conference Room.

0 Set up a frisking area in the sample storage areas as indicated on Exhibit 9 of EPIP-TMI-.36.

"1---,.0 Erect radiological barriers as shown on Exhibit 9 of EPIP-TMI-.36.

4.0 Take the following personnel decon supplies from the decon locker to the men's room.

Paper towels Waterless hand cleaner Wash basin Bath soap Shampoo Scrub Brushes Nail Clippers Barber scissors Nasal swabs Disposable PC's Masking tape Poly bags Frisker Step off pad Procedure 661 0-ADM-4330.02 82

7 EPIP-TMI-.27 Revision 18 EXHIBIT 22 Page 2 of 2 83

(

RADIOLOGICAL BARRIER FRISKING AREAS SOFF UMITS,, DO NOT USE C

TMI - Unit 1 Emergency Plan Implementina Document 4

Number EPIP-TMI-.27 Revision No.

18 EXHIBIT 23 EOF Communications Coordinator Page 1 of 2 I.

ACTIVATION 1.0 Activate the EOF Communications Coordinator position.

a.

Synchronize the EOF clock, Admin Room clock and the ESD conference room clock with the Control Room clock.

Dial 8070 (2070 for drills) and ask the ED Assistant for the Control Room clock time.

b.

Activate the Rayland Public Address System Depress the black power button.

Ensure the red power indicator light is solid red.

Test the PA system by depressing the red signal button located on the = microphone. An alert tone should be heard. (Note: If the red power light or PA test does not work, verify the unit is plugged in.)

Gc.

Report your status as activated when asked by the Emergency Preparedness Representative.

EOF Communications Coordinator Operational Checklist.

2.0 Maintain an EOF Status Board with the following information, as a minimum, using the overhead projector in the front of the room.

Time when EOF is activated Emergency Classification Level Major changes in plant status

a.

Call in additional personnel if requested to do so by the Emergency Preparedness Representative.

Obtain the positions that need to be filled from the Emergency Preparedness Representative.

Use the Emergency Support Organization Duty Roster and telephone listings from the notebook at the communications table.

84 Emergency Operations Facility NOTE The following steps are not presented in the exact sequence that they are to be performed. It is likely that some steps will have to be performed out of the sequence listed and that some steps will be performed concurrently. Steps that are not applicable for the present situation may be skipped. Other steps may need to be repeated. This exhibit should be referred to periodically to ensure that necessary actions are not missed.

Number TMI - Unit 1 Emergency Plan Implementing Document EPIP-TMI-.27

  • le Revision No.

'-l6mergency Operations Facility 18 EXHIBIT 23 Page 2 of 2

b.

If the ESD informs you that he has assumed the responsibility for "approving and directing official notifications to off-site agencies", perform the following:

Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC) to receive a turnover.

Use EPIP-TMI-.06, Additional Assistance and Notification to obtain phone numbers.

Make notifications to offsite agencies in accordance with Exhibit 24, Offsite Notifications, using the message designated and approved by the ESD.

c.

Coordinate the procurement of outside resources (e.g., Technical assistance, manpower, equipment, etc.) with the Group Leader Admin Support.

If requested to procure an outside resource, contact the Group Leader Admin Support for assistance.

d.

If problems are encountered with the Emergency Telephones Contact the ECC Communications Coordinator in the Shift Manager's Office (ECC).

i.

Use EPIP-TMI-.06, Additional Assistance and Notification, to obtain phone numbers.

Provide the name of the telephone circuit and a brief description of the problem.

2.1 Forward the completed checklist and any other documentation to the Emergency Preparedness Representative at the end of the event.

Name Time:

Date EOF Communications Coordinator 85

EXHIBIT 24 Off Site Notification Checklist EPIP-TMI-.27 Revision 18 Page 1 of 4 Initial in the box following the action for the level of emergency declared, unless a check is requested.

UNUSUAL SITE AREA GENERAL CLOSE OUT ACTION EVENT ALERT EMERGENCY EMERGENCY EMERGENCY Obtain an Emergency Report Form, Part 1 and 2, from the Emergency

-Support Director Perform 15 minute notifications Confirm Dial tone on Notification line Dial "91" As the agencies answer, state, "This is Three Mile Island Nuclear Station. Stand by for an emergency message."

Ask if each agency is on the line.

PEMA PEMA PEMA PEMA PEMA

[PEMA, are you on the line? Dauphin County?, etc.]

Dauphin Dauphin Dauphin Dauphin Dauphin Check when on line Cumberland Cumberland Cumberland Cumberland Cumberland Lancaster Lancaster Lancaster Lancaster Lancaster Lebanon Lebanon Lebanon Lebanon Lebanon York York York York York Cancel the ring tone by flashing the hook switch twice.

If one or more agencies do not answer promptly, get another person, such as the EP Representative, to perform a parallel notification using any telephone with an out side connection.

Direct this person to log the Name/Dispatcher Number of the person contacted and the Time the notification was completed.

State, "Please stay on the line after the following message to provide a name or dispatcher number and to confirm receipt."_

Read Emergency Report Form, Part I RECORD TIME Notification completed 86

(

(

(EPIP-TMI-.27 Revision 18 EXHIBIT 24 Page 2 of 4 87

(

....... U N U S U A L S IT E A R EA G E N E RA L C LO S E O U T ACT.....I....

EVENT ALERT EMERGENCY EMERGENCY EMERGENCY Request receipt confirmation.

(NAME or DISPATCHER number)

PEMA Dauphin Cumberland Lancaster Lebanon York.

Flash the hook switch until a dial tone is heard before hanging up.

If not already notified in parallel by another person, Notify remaining agencies that did not receive the information by pre-set conference call.

Log receipt confirmation by recording name/dispatcher number and time.

PEMA Time Dauphin Time Cumberland Time Lancaster Time Lebanon Time York.

Time

(

(

EPIP-TMI-.27 Revision 18 EXHIBIT 24 Page 3 of 4 UNUSUAL

" IrKIT I-,

114GIiil t:[lll IMM1*,,Ot:llLl IMU.-UMIUIL Ill5PUGLtUl Call Wayne Schmidt Site Telephone 9-948-1165 Or Ext.

8253 Home Telephone 9-687-8627

(

SITE AREA I GENERAL CLOSE OUT r"CRJar-at*_rklP/

EBAMr"Dfr-KItV MRr-I Mr CIKt--r" N 11P Read Emergency Report Form, Part 2 Record Time contacted If unable to contact the Senior Resident Inspector Call the Senior Resident Inspector pager by dialing 9-1-800-398-7853 After hearing three beeps, dial the call back number you want the inspector to call.

When the inspector calls back, read Emergency Report Form, Part 2.

If the Senior Resident Inspector does not call back within 15 minutes, page the Resident Inspector, by dialing 9-1-800-398-8135 After hearing three beeps, dial the call back number you want the inspector to call.

When the inspector calls back, read Emergency Report Form, Part 2.

If the Resident Inspector does not call back within 15 minutes, record the time as

'NOT CONTACTED' Contact the York Haven Power Station Dial 9-848-7277 or 9-266-3654 Read Emergency Report Form, Part 2 Record the following for the person contacted Name Time 88

6 EPIP-TMI-.27 Revision 18 EXHIBIT 24 Page 4 of 4 UNUSUAL ALERT I SITE AREA I GENERAL FIVFNT

F=MFRCrI.F=rY I:FMFRAPINr.Y CLOSE OUT PftAP ** ::nPrny Record the following for the person contacted Name Time Contact ANI at 1(860) 561-3433 Read Emergency Report Form, Part 2 Provide call back number (717)

(Insert number)

Point of Contact is Emergency Support Director Assistant Inform the Emergency Support Director Assistant when all contacts have I been completed.

I EVENT TERMINATION notifications NRC Inspector, contacted above.

Name Time York Haven Power Station, contacted above.

Name Time System Dispatcher, contacted above.

Name Time

(

Forward this CHECKLIST and ALL associated documentation to the Emergency Preparedness Representative 89