{{#Wiki_filter:Withdrawn NRC Regulatory Issue Summary 2001-17, Preparation and Scheduling of Operator Licensing Examinations, dated August 22, 2001, has been withdrawn.
{{#Wiki_filter:Withdrawn  


ADAMS Accession Number: ML012110294 See Federal Register notice 81 FR 31969, dated May 20, 2016
NRC Regulatory Issue Summary 2001-17, Preparation and Scheduling of Operator Licensing Examinations, dated August 22, 2001, has been withdrawn.
 
ADAMS Accession Number: ML012110294  
 
See Federal Register notice 81 FR 31969, dated May 20, 2016  


OMB Clearance no.: 3150-0131 UNITED STATES
OMB Clearance no.: 3150-0131 UNITED STATES
                              NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION
                        OFFICE OF NUCLEAR REACTOR REGULATION
OFFICE OF NUCLEAR REACTOR REGULATION
                                  WASHINGTON, D.C. 20555-0001 August 22, 2001 NRC REGULATORY ISSUE SUMMARY 2001-17 PREPARATION AND SCHEDULING OF
WASHINGTON, D.C. 20555-0001 August 22, 2001 NRC REGULATORY ISSUE SUMMARY 2001-17 PREPARATION AND SCHEDULING OF  
                      OPERATOR LICENSING EXAMINATIONS
OPERATOR LICENSING EXAMINATIONS


==ADDRESSEES==
==ADDRESSEES==
Line 30: Line 34:
==INTENT==
==INTENT==
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)
The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)
to inform addressees of the NRC staffs need for updated information on projected site-specific operator licensing examination schedules and estimated numbers of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations (GFEs).
to inform addressees of the NRC staffs need for updated information on projected site-specific operator licensing examination schedules and estimated numbers of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations (GFEs).  
This information will help the NRC to more effectively plan the use of its resources. This RIS
This information will help the NRC to more effectively plan the use of its resources. This RIS
requires no specific action or written response on the part of addressees. Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.
requires no specific action or written response on the part of addressees. Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.


==BACKGROUND==
==BACKGROUND==
On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending
On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending
10 CFR Part 55, Operators Licenses, to allow nuclear power facility licensees to prepare, proctor, and grade their own written examinations and prepare the operating tests. However, facility licensees that elect not to prepare their own examinations and operating tests must request in writing pursuant to 10 CFR 55.40(c) that the examination and operating tests be prepared by the NRC.
10 CFR Part 55, Operators Licenses, to allow nuclear power facility licensees to prepare, proctor, and grade their own written examinations and prepare the operating tests. However, facility licensees that elect not to prepare their own examinations and operating tests must request in writing pursuant to 10 CFR 55.40(c) that the examination and operating tests be prepared by the NRC.


Regulatory Information Summary (RIS) 2000-14, Preparation and Scheduling of Operator Licensing Examinations, issued September 6, 2000, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and to estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2001 through 2004. This RIS supercedes RIS 2000-14, and its objective is to update the schedule estimates for CYs 2002 through 2005.
Regulatory Information Summary (RIS) 2000-14, Preparation and Scheduling of Operator Licensing Examinations, issued September 6, 2000, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and to estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2001 through 2004. This RIS supercedes RIS 2000-14, and its objective is to update the schedule estimates for CYs 2002 through 2005.


==SUMMARY OF ISSUE==
==SUMMARY OF ISSUE==
Facility-developed and NRC-developed examinations require significantly different resource commitments on the part of the NRC. Experience has shown that the NRC can review, approve, administer, and document a facility-prepared examination in approximately half the time that it takes to prepare the examination itself. This fact coupled with year-to-year fluctuations in the total number of examinations complicate the NRCs budgeting and scheduling activities. Consequently, the NRC has found it necessary to obtain updated data on power reactor facility licensees initial operator licensing examination needs, including estimates of the number of applicants to be examined and the facility licensees intentions regarding preparation of the examinations.
Facility-developed and NRC-developed examinations require significantly different resource commitments on the part of the NRC. Experience has shown that the NRC can review, approve, administer, and document a facility-prepared examination in approximately half the time that it takes to prepare the examination itself. This fact coupled with year-to-year fluctuations in the total number of examinations complicate the NRCs budgeting and scheduling activities. Consequently, the NRC has found it necessary to obtain updated data on power reactor facility licensees initial operator licensing examination needs, including estimates of the number of applicants to be examined and the facility licensees intentions regarding preparation of the examinations.


The NRC expects to solicit annually the voluntary reporting of updated information concerning operator licensing examinations through its generic communications program. This information will help the NRC budget and schedule its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.
The NRC expects to solicit annually the voluntary reporting of updated information concerning operator licensing examinations through its generic communications program. This information will help the NRC budget and schedule its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.


NEEDED INFORMATION
NEEDED INFORMATION
The plant-specific information that is needed by the NRC for resource planning purposes is identified in Attachment 1:
The plant-specific information that is needed by the NRC for resource planning purposes is identified in Attachment 1:
    A. Proposed Examination Preparation Schedule:
A. Proposed Examination Preparation Schedule:
    Estimate the number of examinations you intend to prepare and estimate the number of examinations you will request the NRC to prepare during CYs 2002 through 2005. For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, written examination(s), and operating test(s),
Estimate the number of examinations you intend to prepare and estimate the number of examinations you will request the NRC to prepare during CYs 2002 through 2005. For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, written examination(s), and operating test(s),
    unless otherwise specified (shared examination development is permitted and should be coordinated with the appropriate NRC regional office).
unless otherwise specified (shared examination development is permitted and should be coordinated with the appropriate NRC regional office).  
    B. Initial Operator License Examinations:
B. Initial Operator License Examinations:
    For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examination. If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2005.
For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examination. If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2005.


C. Proposed Generic Fundamentals Examination Schedule:
C. Proposed Generic Fundamentals Examination Schedule:  
    Estimate the number of applicants who plan to take the GFE in CYs 2002 and 2003.
Estimate the number of applicants who plan to take the GFE in CYs 2002 and 2003.


==VOLUNTARY RESPONSE==
==VOLUNTARY RESPONSE==


==Addressees==
==Addressees==
that choose to submit the information identified in NRC Form 536 are asked to do so within 30 days of receipt of this RIS. Your response should be directed to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D C 20555-0001, and a copy of the response should be sent to the applicable regional office.
that choose to submit the information identified in NRC Form 536 are asked to do so within 30 days of receipt of this RIS. Your response should be directed to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D C 20555-0001, and a copy of the response should be sent to the applicable regional office.


==BACKFIT DISCUSSION==
==BACKFIT DISCUSSION==
This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the guidance contained in this RIS is strictly voluntary. Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysis.
This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the guidance contained in this RIS is strictly voluntary. Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysis.


===FEDERAL REGISTER NOTIFICATION===
===FEDERAL REGISTER NOTIFICATION===
Line 68: Line 72:


===PAPERWORK REDUCTION ACT STATEMENT===
===PAPERWORK REDUCTION ACT STATEMENT===
This RIS contains a voluntary information collection that is subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). This voluntary information collection is covered by Office of Management and Budget (OMB) clearance number 3150-0131, which expires on July 31,
This RIS contains a voluntary information collection that is subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). This voluntary information collection is covered by Office of Management and Budget (OMB) clearance number 3150-0131, which expires on July 31,
2002. The public reporting burden for this voluntary information collection (NRC Form 536) is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to bjs1@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0131), Office of Management and Budget, Washington, D C 20503.
2002. The public reporting burden for this voluntary information collection (NRC Form 536) is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to bjs1@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0131), Office of Management and Budget, Washington, D C 20503.


===PUBLIC PROTECTION NOTIFICATION===
===PUBLIC PROTECTION NOTIFICATION===
Line 76: Line 80:


/RA Frank P. Gillespie Acting for/
/RA Frank P. Gillespie Acting for/
                                    David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contacts:   David C. Trimble, NRR               Richard J. Conte, RI
David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contacts:
                      301-415-2942                       610-337-5183 E-mail: dct@nrc.gov                 E-mail: rjc@nrc.gov Michael E. Ernstes, RII             David E. Hills, RIII
David C. Trimble, NRR
                      404-562-4638                       630-829-9733 E-mail: mee@nrc.gov                 E-mail: deh@nrc.gov Antony T. Gody, RIV
Richard J. Conte, RI
                      817-860-8159 E-mail: atg@nrc.gov Attachments:
301-415-2942
1. NRC Form 536, Operator Licensing Examination Data
610-337-5183 E-mail: dct@nrc.gov E-mail: rjc@nrc.gov Michael E. Ernstes, RII
2. List of Recently Issued NRC Regulatory Issue Summaries
David E. Hills, RIII
404-562-4638
630-829-9733 E-mail: mee@nrc.gov E-mail: deh@nrc.gov Antony T. Gody, RIV
817-860-8159 E-mail: atg@nrc.gov Attachments:
1. NRC Form 536, Operator Licensing Examination Data
2. List of Recently Issued NRC Regulatory Issue Summaries


Attachment 1  If you have any questions about this matter, please contact one of the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation project manager.
Attachment 1  If you have any questions about this matter, please contact one of the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation project manager.


/RA Frank P. Gillespie Acting for/
/RA Frank P. Gillespie Acting for/
                                                                  David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contacts:         David C. Trimble, NRR                     Richard J. Conte, RI
David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contacts:
                                        301-415-2942                               610-337-5183 E-mail: dct@nrc.gov                       E-mail: rjc@nrc.gov Michael E. Ernstes, RII                   David E. Hills, RIII
David C. Trimble, NRR
                                        404-562-4638                               630-829-9733 E-mail: mee@nrc.gov                       E-mail: deh@nrc.gov Antony T. Gody, RIV
Richard J. Conte, RI
                                        817-860-8159 E-mail: atg@nrc.gov Attachments:
301-415-2942
            1. NRC Form 536, Operator Licensing Examination Data
610-337-5183 E-mail: dct@nrc.gov E-mail: rjc@nrc.gov Michael E. Ernstes, RII
            2. List of Recently Issued NRC Regulatory Issue Summaries Distribution:
David E. Hills, RIII
            PUBLIC
404-562-4638
            RIS File Accession No.:                                                                 Template No.: NRR-052 To receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copy OFFICE         IOLB:DIPM             IOLB:DIPM             TECH ED           IOLB:DIPM               C:IOLB:DIPM           D:DIPM
630-829-9733 E-mail: mee@nrc.gov E-mail: deh@nrc.gov Antony T. Gody, RIV
NAME           GUsova*               EBarnhill*           PKleene*         DTrimble*               GTracy*               BBoger*
817-860-8159 E-mail: atg@nrc.gov Attachments:
DATE           07/16/01             07/16/01             07/05/01         07/26/01               07/26/01             07/27/01 OGC                         REXB:DRIP                     C:REXB:DRIP                   D:DRIP
1. NRC Form 536, Operator Licensing Examination Data
MYoung*                     JShapaker*                     EImbro*                       DMatthews
2. List of Recently Issued NRC Regulatory Issue Summaries Distribution:
07/31/01                   08/06/01                       08/17/01                       08/22/01 OFFICIAL RECORD COPY
PUBLIC
RIS File Accession No.:
Template No.: NRR-052 To receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copy OFFICE
IOLB:DIPM
IOLB:DIPM
TECH ED
IOLB:DIPM
C:IOLB:DIPM
D:DIPM
NAME
GUsova*
EBarnhill*
PKleene*
DTrimble*
GTracy*
BBoger*
DATE
07/16/01
07/16/01
07/05/01
07/26/01
07/26/01
07/27/01 OGC  
REXB:DRIP
C:REXB:DRIP
D:DRIP
MYoung*
JShapaker*
EImbro*
DMatthews
07/31/01
08/06/01
08/17/01
08/22/01 OFFICIAL RECORD COPY


Attachment 2 LIST OF RECENTLY ISSUED
______________________________________________________________________________________
                                NRC REGULATORY ISSUE SUMMARIES
OL = Operating License CP = Construction Permit Attachment 2 LIST OF RECENTLY ISSUED
NRC REGULATORY ISSUE SUMMARIES
_____________________________________________________________________________________
_____________________________________________________________________________________
Regulatory Issue                                     Date of Summary No.                 Subject               Issuance               Issued to
Regulatory Issue Date of Summary No.
 
Subject Issuance Issued to
_____ _______________________________________________________________________________
_____ _______________________________________________________________________________
2001-16         Update of Evacuation Time           08/01/2001 All holders of operating licenses Estimates                                      for nuclear power plants
2001-16 Update of Evacuation Time Estimates
2001-15         Peformance of DC-Powered           08/01/2001 All holders of operating licenses Motor-Operated Valve Actuators                for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel
08/01/2001 All holders of operating licenses for nuclear power plants
2001-14         Position on Reportability           07/19/2001 All holders of boiling-water reactor Requirements for Reactor Core                  (BWR) operating licenses Isolation Cooling System Failure
2001-15 Peformance of DC-Powered Motor-Operated Valve Actuators
2001-13         10 CFR Part 40 Exemptions for       07/20/2001 All holders of licenses authorized Uranium Contained in Aircraft                  to manufacture aircraft Counterweights                                counterweights containing uranium, and organizations and end users who may possess such counterweights
08/01/2001 All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel
2001-12         Nonconservatism in Pressurized     05/18/2001 All holders of operating licenses Water Reactor Spent Fuel Storage              for pressurized water reactors Pool Reactivity Equivalencing Calculations
2001-14 Position on Reportability Requirements for Reactor Core Isolation Cooling System Failure
2001-11         Voluntary Submission of             05/11/2001 All holders of operating licenses Performance Indicator Data                    for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel
07/19/2001 All holders of boiling-water reactor (BWR) operating licenses
______________________________________________________________________________________
2001-13
OL = Operating License CP = Construction Permit
10 CFR Part 40 Exemptions for Uranium Contained in Aircraft Counterweights
07/20/2001 All holders of licenses authorized to manufacture aircraft counterweights containing uranium, and organizations and end users who may possess such counterweights
2001-12 Nonconservatism in Pressurized Water Reactor Spent Fuel Storage Pool Reactivity Equivalencing Calculations
05/18/2001 All holders of operating licenses for pressurized water reactors
2001-11 Voluntary Submission of Performance Indicator Data
05/11/2001 All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Latest revision as of 01:51, 17 January 2025

Withdrawn NRC Regulatory Issue Summary 2001-017: Preparation and Scheduling of Operator Licensing Exams
ML012110294
Person / Time
Issue date: 08/22/2001
From: Matthews D
Division of Regulatory Improvement Programs
To:
References
TAC MB2295 RIS-01-017
Download: ML012110294 (9)


Withdrawn

NRC Regulatory Issue Summary 2001-17, Preparation and Scheduling of Operator Licensing Examinations, dated August 22, 2001, has been withdrawn.

ADAMS Accession Number: ML012110294

See Federal Register notice 81 FR 31969, dated May 20, 2016

OMB Clearance no.: 3150-0131 UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001 August 22, 2001 NRC REGULATORY ISSUE SUMMARY 2001-17 PREPARATION AND SCHEDULING OF

OPERATOR LICENSING EXAMINATIONS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)

to inform addressees of the NRC staffs need for updated information on projected site-specific operator licensing examination schedules and estimated numbers of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations (GFEs).

This information will help the NRC to more effectively plan the use of its resources. This RIS

requires no specific action or written response on the part of addressees. Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.

BACKGROUND

On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending

10 CFR Part 55, Operators Licenses, to allow nuclear power facility licensees to prepare, proctor, and grade their own written examinations and prepare the operating tests. However, facility licensees that elect not to prepare their own examinations and operating tests must request in writing pursuant to 10 CFR 55.40(c) that the examination and operating tests be prepared by the NRC.

Regulatory Information Summary (RIS) 2000-14, Preparation and Scheduling of Operator Licensing Examinations, issued September 6, 2000, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and to estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2001 through 2004. This RIS supercedes RIS 2000-14, and its objective is to update the schedule estimates for CYs 2002 through 2005.

SUMMARY OF ISSUE

Facility-developed and NRC-developed examinations require significantly different resource commitments on the part of the NRC. Experience has shown that the NRC can review, approve, administer, and document a facility-prepared examination in approximately half the time that it takes to prepare the examination itself. This fact coupled with year-to-year fluctuations in the total number of examinations complicate the NRCs budgeting and scheduling activities. Consequently, the NRC has found it necessary to obtain updated data on power reactor facility licensees initial operator licensing examination needs, including estimates of the number of applicants to be examined and the facility licensees intentions regarding preparation of the examinations.

The NRC expects to solicit annually the voluntary reporting of updated information concerning operator licensing examinations through its generic communications program. This information will help the NRC budget and schedule its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.

NEEDED INFORMATION

The plant-specific information that is needed by the NRC for resource planning purposes is identified in Attachment 1:

A. Proposed Examination Preparation Schedule:

Estimate the number of examinations you intend to prepare and estimate the number of examinations you will request the NRC to prepare during CYs 2002 through 2005. For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, written examination(s), and operating test(s),

unless otherwise specified (shared examination development is permitted and should be coordinated with the appropriate NRC regional office).

B. Initial Operator License Examinations:

For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examination. If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2005.

C. Proposed Generic Fundamentals Examination Schedule:

Estimate the number of applicants who plan to take the GFE in CYs 2002 and 2003.

VOLUNTARY RESPONSE

Addressees

that choose to submit the information identified in NRC Form 536 are asked to do so within 30 days of receipt of this RIS. Your response should be directed to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D C 20555-0001, and a copy of the response should be sent to the applicable regional office.

BACKFIT DISCUSSION

This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the guidance contained in this RIS is strictly voluntary. Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the Federal Register because it pertains to an administrative aspect of the regulatory process that involves the voluntary submission of information on the part of addressees.

PAPERWORK REDUCTION ACT STATEMENT

This RIS contains a voluntary information collection that is subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). This voluntary information collection is covered by Office of Management and Budget (OMB) clearance number 3150-0131, which expires on July 31,

2002. The public reporting burden for this voluntary information collection (NRC Form 536) is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection. Send comments regarding this burden estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to bjs1@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0131), Office of Management and Budget, Washington, D C 20503.

PUBLIC PROTECTION NOTIFICATION

If a means used to impose an information collection does not display a currently valid OMB

clearance number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. If you have any questions about this matter, please contact one of the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation project manager.

/RA Frank P. Gillespie Acting for/

David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contacts:

David C. Trimble, NRR

Richard J. Conte, RI

301-415-2942

610-337-5183 E-mail: dct@nrc.gov E-mail: rjc@nrc.gov Michael E. Ernstes, RII

David E. Hills, RIII

404-562-4638

630-829-9733 E-mail: mee@nrc.gov E-mail: deh@nrc.gov Antony T. Gody, RIV

817-860-8159 E-mail: atg@nrc.gov Attachments:

1. NRC Form 536, Operator Licensing Examination Data

2. List of Recently Issued NRC Regulatory Issue Summaries

Attachment 1 If you have any questions about this matter, please contact one of the technical contacts listed below or the appropriate Office of Nuclear Reactor Regulation project manager.

/RA Frank P. Gillespie Acting for/

David B. Matthews, Director Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Technical contacts:

David C. Trimble, NRR

Richard J. Conte, RI

301-415-2942

610-337-5183 E-mail: dct@nrc.gov E-mail: rjc@nrc.gov Michael E. Ernstes, RII

David E. Hills, RIII

404-562-4638

630-829-9733 E-mail: mee@nrc.gov E-mail: deh@nrc.gov Antony T. Gody, RIV

817-860-8159 E-mail: atg@nrc.gov Attachments:

1. NRC Form 536, Operator Licensing Examination Data

2. List of Recently Issued NRC Regulatory Issue Summaries Distribution:

PUBLIC

RIS File Accession No.:

Template No.: NRR-052 To receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copy OFFICE

IOLB:DIPM

IOLB:DIPM

TECH ED

IOLB:DIPM

C:IOLB:DIPM

D:DIPM

NAME

GUsova*

EBarnhill*

PKleene*

DTrimble*

GTracy*

BBoger*

DATE

07/16/01

07/16/01

07/05/01

07/26/01

07/26/01

07/27/01 OGC

REXB:DRIP

C:REXB:DRIP

D:DRIP

MYoung*

JShapaker*

EImbro*

DMatthews

07/31/01

08/06/01

08/17/01

08/22/01 OFFICIAL RECORD COPY

______________________________________________________________________________________

OL = Operating License CP = Construction Permit Attachment 2 LIST OF RECENTLY ISSUED

NRC REGULATORY ISSUE SUMMARIES

_____________________________________________________________________________________

Regulatory Issue Date of Summary No.

Subject Issuance Issued to

_____ _______________________________________________________________________________

2001-16 Update of Evacuation Time Estimates

08/01/2001 All holders of operating licenses for nuclear power plants

2001-15 Peformance of DC-Powered Motor-Operated Valve Actuators

08/01/2001 All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel

2001-14 Position on Reportability Requirements for Reactor Core Isolation Cooling System Failure

07/19/2001 All holders of boiling-water reactor (BWR) operating licenses

2001-13

10 CFR Part 40 Exemptions for Uranium Contained in Aircraft Counterweights

07/20/2001 All holders of licenses authorized to manufacture aircraft counterweights containing uranium, and organizations and end users who may possess such counterweights

2001-12 Nonconservatism in Pressurized Water Reactor Spent Fuel Storage Pool Reactivity Equivalencing Calculations

05/18/2001 All holders of operating licenses for pressurized water reactors

2001-11 Voluntary Submission of Performance Indicator Data

05/11/2001 All holders of operating licenses for nuclear power reactors, except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel