ML020250090: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ES-301                         Administrative Topics Outline                   Form ES-301-1 Facility:   Millstone 3                             Date of Examination:   January 7-10, 2002 Examination Level (circle one):       SRO                   Operating Test Number: A-1 Administrative       Describe method of evaluation:
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Topic/Subject       1. ONE Administrative JPM, OR Description       2. TWO Administrative Questions A.1.1         Execute   JPM Determine the effect and response to degrading Intake conditions Procedure   using OP 3215, Response to Intake Structure Degraded Conditions.
Millstone 3 Date of Examination: January 7-10, 2002 Examination Level (circle one):
Steps (GEN 2.1.20) (41.10/43.5/45.12)
SRO Operating Test Number: A-1 Administrative Describe method of evaluation:
A.1.2       Review an   JPM     Review an Estimated Critical Position.
Topic/Subject
Estimated Critical Position (Sys:001,   SRO: 3.9 A4.10)
: 1. ONE Administrative JPM, OR Description
A.2     Tagging and   JPM Given a completed clearance boundary and reference material, Clearance   review, amend and approve the clearance boundary.
: 2. TWO Administrative Questions A.1.1 Execute JPM Determine the effect and response to degrading Intake conditions Procedure using OP 3215, Response to Intake Structure Degraded Conditions.
Procedures (GEN 2.2.13)   (41.10/45.13)
Steps (GEN 2.1.20) (41.10/43.5/45.12)
A.3       Review and   JPM Review and Approve a Radioactive Liquid Waste discharge Approve   permit.
A.1.2 Review an JPM Review an Estimated Critical Position.
Release Permits (GEN 2.3.6) (43.4/45.10)
Estimated Critical Position (Sys:001, SRO: 3.9 A4.10)
A.4           E-Plan   JPM   Emergency Plan Responsibilities as Shift Manager.
A.2 Tagging and JPM Given a completed clearance boundary and reference material, Clearance review, amend and approve the clearance boundary.
Actions (GEN 2.4.44)   (43.5/45.11)
Procedures (GEN 2.2.13)
(41.10/45.13)
A.3 Review and JPM Review and Approve a Radioactive Liquid Waste discharge Approve permit.
Release Permits (GEN 2.3.6)
(43.4/45.10)
A.4 E-Plan JPM Emergency Plan Responsibilities as Shift Manager.
Actions (GEN 2.4.44)
(43.5/45.11)
NUREG-1021, Revision 8
NUREG-1021, Revision 8


Line 33: Line 40:


==Title:==
==Title:==
JPM ID Number:
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
JPM ID Number:        SRO-A1.1                                       Revision:   1 II. Initiated:
SRO-A1.1 Revision:
10/31/01 Date I1l. Reviewed:
1 II. Initiated:
f Ray Martin           I771ZOJ+/-VL                                       11/15/01 Technical Reviewer                                                      Date IV. Approved:
10/31/01 Date I1l.
Cognizant Plant Supervisor (optional)                                   Date
Reviewed:
                                                                            /oý //(6 Nucl dar Training Supervisor                                              Pa 1 of 12
Ray Martin Technical Reviewer I771ZOJ+/-VL IV. Approved:
Cognizant Plant Supervisor (optional)
Nucl dar Training Supervisor 11/15/01 Date Date
/oý //(6 Pa 1 of 12 f


ADMIN JPM SRO-AI.1
ADMIN JPM SRO-AI.1  


==SUMMARY==
==SUMMARY==
Line 49: Line 60:
Made OP 3215, Response to Intake Structure Degraded Conditions, a required material Added OP 3325A, Circulating Water, as a General Reference
Made OP 3215, Response to Intake Structure Degraded Conditions, a required material Added OP 3325A, Circulating Water, as a General Reference


JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3 JPM ID Number:           SRO-AI.1                           Revision:
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 JPM ID Number:
SRO-AI.1 Revision:
Task
Task


==Title:==
==Title:==
System:
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
System:        Intake Structure Time Critical Task:               ) YES     (X)     NO Validated Time (minutes):       5 min Task Number(s):         341-01-107, Response to degrading intake conditions.
Intake Structure Time Critical Task:
Applicable To:          SRO         X         RO                     PEO K/A Number:         GEN.2.1.20, Ability to execute procedure steps           K/A Rating:       4.3/4.2 Method of Testing:         Simulated Performance:                     Actual Performance:         X Location:                  Classroom:      X            Simulator:                 In-Plant::
) YES (X)
Task Standards:             Response to degrading intake conditions Required Materials:         SP 3665.2, Intake Structure Condition Determination, Rev. 7 OP 3215, Response to Intake Structure Degraded Conditions, Rev.
NO Validated Time (minutes):
7 General  
5 min Task Number(s):
Applicable To:
341-01-107, Response to degrading intake conditions.
SRO X
RO PEO K/A Number:
GEN.2.1.20, Ability to execute procedure steps K/A Rating:
Method of Testing:
Location:
Simulated Performance:
Classroom:
X Actual Performance:
Simulator:
In-Plant::
Task Standards:
Required Materials:
General  


==References:==
==References:==
OP 3325A, Circulating Water
Response to degrading intake conditions SP 3665.2, Intake Structure Condition Determination, Rev. 7 OP 3215, Response to Intake Structure Degraded Conditions, Rev.
                                    ***READ TO THE STUDENT***
7 OP 3325A, Circulating Water 2 of 8 4.3/4.2 X
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 8


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:         SRO-AI.1                                               Revision:     1 Simulator Requirements:           NONE Initial Conditions:             You are the Shift Manager and the unit is experiencing degrading conditions at the intake structure. The Shift Technical Advisor (STA) is keeping SP 3665.2, Intake Structure Condition Determination current. The last surveillance was done at 0800 and indicated a plant factor condition of YELLOW, an environmental factor condition of YELLOW.
JPM Number:
Initiating Cues:                The "B" Screen Wash pump has just tripped due to an electrical fault. Maintenance estimates 4 hours to restore the pump to operability.
SRO-AI.1 Revision:
1 Simulator Requirements:
Initial Conditions:
Initiating Cues:
You are the Shift Manager and the unit is experiencing degrading conditions at the intake structure. The Shift Technical Advisor (STA) is keeping SP 3665.2, Intake Structure Condition Determination current. The last surveillance was done at 0800 and indicated a plant factor condition of YELLOW, an environmental factor condition of YELLOW.
The "B" Screen Wash pump has just tripped due to an electrical fault. Maintenance estimates 4 hours to restore the pump to operability.
Wind speed, from Met. Tower data, has increased to a steady 27 mph.
Wind speed, from Met. Tower data, has increased to a steady 27 mph.
The re-calculated surveillance indicated a plant factor condition of RED, an environmental factor condition of RED.
The re-calculated surveillance indicated a plant factor condition of RED, an environmental factor condition of RED.
                                        **** NOTES TO EVALUATOR ****
**** NOTES TO EVALUATOR ****
: 1.     Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 1.
The students performance is graded by an "S"for satisfactory or a "U" for unsatisfactory on each step.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
I-  3.     If necessary, question the student for details of simulated actions/observations I
: 2.
(i.e. "What are you looking at?" or "What are you observing?").
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3 of 8
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 8 NONE I-I


PERFORMANCE INFORMATION JPM Number:   SRO-AI.1                                              Revision:      1 Task
PERFORMANCE INFORMATION JPM Number:
SRO-AI.1 Task


==Title:==
==Title:==
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
Revision:
1 Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
Start Time:
Start Time:
EXAMINER: Give candidate the completed copy of SP 3665.2 & the MB6 sheet.
EXAMINER: Give candidate the completed copy of SP 3665.2 & the MB6 sheet.
STEP        1               Performance Step:     Review SP 3665.2, Intake Structure Condition Determination (0800).
1 2
GRADE                        Standards:            Review SP 3665.2, Intake Structure Condition Determination relative to the description of plant and environmental conditions and understand the current condition.
X X
Grade:                SAT                   UNSAT STEP        2        X      Performance Step:      REVIEW OP 3215 procedure steps and determine which are applicable with the plant factor condition "RED",
Performance Step:
Standards:
Grade:
Performance Step:
Standards:
Review SP 3665.2, Intake Structure Condition Determination (0800).
Review SP 3665.2, Intake Structure Condition Determination relative to the description of plant and environmental conditions and understand the current condition.
SAT UNSAT REVIEW OP 3215 procedure steps and determine which are applicable with the plant factor condition "RED",
OR the environmental factor condition "RED". (step 4.5)
OR the environmental factor condition "RED". (step 4.5)
GRADE                X      Standards:            Evaluate factor conditions and returns to procedure section 4.5 Discuss the following:
Evaluate factor conditions and returns to procedure section 4.5 Discuss the following:  
                                                  "* NOTIFY Intake Structure Coordinator and Operations management of the conditions affecting the Intake Structure
"* NOTIFY Intake Structure Coordinator and Operations management of the conditions affecting the Intake Structure  
                                                  "* RESTORE maximum steam dumps and atmospheric dumps to service
"* RESTORE maximum steam dumps and atmospheric dumps to service  
                                                  "* COMMENCE continuous trash rack cleaning
"* COMMENCE continuous trash rack cleaning  
                                                  "* OPEN trash trough trap door if necessary
"* OPEN trash trough trap door if necessary  
                                                  "* OPEN Plexiglas inspection doors at backside debris trough to monitor debris spray and carryover
"* OPEN Plexiglas inspection doors at backside debris trough to monitor debris spray and carryover  
                                                  "* EVALUATE the condition of the following systems
"* EVALUATE the condition of the following systems  
                                                          - Steam Dump System 4 of 8
- Steam Dump System 4 of 8 STEP GRADE STEP GRADE


PERFORMANCE INFORMATION JPM Number:   SRO-A1.1                                                Revision:    1 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
SRO-A1.1 Revision:
                                                            - Condenser Vacuum Systems
1 Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
                                                            - Screenwash Systems
- Condenser Vacuum Systems  
                                                            - Service Water Systems
- Screenwash Systems  
                                                            - Circulating Water Systems Grade:                 SAT                     UNSAT STEP        3       x       Performance Step:     Monitor conditions in the following systems (step 4.6)
- Service Water Systems  
- Circulating Water Systems Grade:
SAT UNSAT 3
x Performance Step:
Standards:
Grade:
Performance Step:
4 Standards:
Grade:
Monitor conditions in the following systems (step 4.6)
* Steam Dump System
* Steam Dump System
* Condenser Vacuum Systems
* Condenser Vacuum Systems
* Screenwash Systems
* Screenwash Systems Service Water Systems Circulating Water Systems Discusses the need to monitor systems affected by intake challenges SAT UNSAT IF circ pump amps, discharge pressure, and condenser delta T indicate the waterbox is fouling, Refer To OP 3325A, "Circulating Water," and PERFORM backwashes (setp 4.7)
* Service Water Systems
Discusses the need to perform backwashes during intake challenges SAT UNSAT 5
* Circulating Water Systems GRADE                        Standards:            Discusses the need to monitor systems affected by intake challenges Grade:                SAT                     UNSAT STEP        4                Performance Step:      IF circ pump amps, discharge pressure, and condenser delta T indicate the waterbox is fouling, Refer To OP 3325A, "Circulating Water," and PERFORM backwashes (setp 4.7)
x Performance Step:
GRADE                        Standards:            Discusses the need to perform backwashes during intake challenges Grade:                SAT                     UNSAT STEP        5       x       Performance Step:     IF the circulating pumps in the same condenser bay are lost, TRIP the reactor and Go To EOP 35 E-0, "Reactor Trip or Safety Injection" (step 4.9) 5 of 8
IF the circulating pumps in the same condenser bay are lost, TRIP the reactor and Go To EOP 35 E-0, "Reactor Trip or Safety Injection" (step 4.9) 5 of 8 STEP GRADE STEP GRADE STEP


PERFORMANCE INFORMATION JPM Number:   SRO-AI.1                                            Revision:      1 Task
PERFORMANCE INFORMATION JPM Number:
SRO-AI.1 Task


==Title:==
==Title:==
Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
Revision:
GRADE                x      Standards:             Candidate determines that A & B Circ Pumps ARE in the same condenser bay and decides to trip the reactor.
1 Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.
Grade:                SAT                   UNSAT Termination Cue: The Evaluation For This JPM is Complete.
Standards:
Grade:
Candidate determines that A & B Circ Pumps ARE in the same condenser bay and decides to trip the reactor.
SAT Termination Cue: The Evaluation For This JPM is Complete.
Stop Time:
Stop Time:
6 of 8
6 of 8 GRADE x
UNSAT


VERIFICATION OF JPM COMPLETION JPM Number:             SRO-A1.1                                        Revision:          1 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
SRO-A1.1 Revision:
Time Critical Task?                         YES              NO      X Validated Time (minutes):                     5 Actual Time to Complete (minutes):
1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
Validated Time (minutes):
YES NO X
5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 135: Line 201:
7 of 8
7 of 8


STUDENT HANDOUT JPM Number:         SRO-AI.1 Initial Conditions: You are the Shift Manager and the unit is experiencing degrading conditions at the intake structure. The Shift Technical Advisor (STA) is keeping SP 3665.2, Intake Structure Condition Determination current. The last surveillance was done at 0800 and indicated a plant factor condition of YELLOW, an environmental factor condition of YELLOW.
STUDENT HANDOUT JPM Number:
Initiating Cues:    The "B" Screen Wash pump has just tripped due to an electrical fault. Maintenance estimates 4 hours to restore the pump to operability.
Initial Conditions:
Initiating Cues:
SRO-AI.1 You are the Shift Manager and the unit is experiencing degrading conditions at the intake structure. The Shift Technical Advisor (STA) is keeping SP 3665.2, Intake Structure Condition Determination current. The last surveillance was done at 0800 and indicated a plant factor condition of YELLOW, an environmental factor condition of YELLOW.
The "B" Screen Wash pump has just tripped due to an electrical fault. Maintenance estimates 4 hours to restore the pump to operability.
Wind speed, from Met. Tower data, has increased to a steady 27 mph.
Wind speed, from Met. Tower data, has increased to a steady 27 mph.
The re-calculated surveillance indicated a plant factor condition of RED, an environmental factor condition of RED.
The re-calculated surveillance indicated a plant factor condition of RED, an environmental factor condition of RED.
8 of 8
8 of 8


SSurveillanee For.m Generic Inf         =ormation                                                                                               o IPr Rev.-No.
SSurveillanee For.m Generic Inf  
Form Title Intake Structure Condition DeterminationI                                                                       008 Applicable Tech. Spec. Applicability (Tech. Spec.)         Frequency Reference Procedure SP 3665.2                               N/A                         N/AI                                 s This form is being used for the following:
=ormation Rev.-No.
o     Tech Spec Surveillance               C) System Alignment       O     Other:
Form Title IPr o
o       Maintenance Restoration                   Non-Tech S(pc
Intake Structure Condition DeterminationI 008 Reference Procedure Applicable Tech. Spec.
                                                ,, v iln e( M L (Retest)
Applicability (Tech. Spec.)
Stpecific' Information" Awe Number                     Late Date                                 i Schedule Start Date Prerequisites Completed (Initials)         Precautions Noted (Initials)
Frequency SP 3665.2 N/A N/AI s
Performance Modes 1, 2", 3", and 4*
This form is being used for the following:
Test Authorized By                                                           Date                             Partial Surveillance Date / Time                           Yes             No Perlormed By Date I Time                   Acceptance Criteria Accepted By                                                                                                        Satisfied Approved By (Department Head or Designee)                                   Date                         [       Yes         ] No Date                        CR#:
o Tech Spec Surveillance C) System Alignment O Other:
Shift Manager Notified of Failed Test Surveillance Information OA Number                     Cal Due Date Test Equipment Type N/A                                           N/A                             N/A Comments
o Maintenance Restoration Non-Tech S(pc L (Retest) v iln e( M Stpecific' Information" Awe Number Late Date i Schedule Start Date Performance Modes Prerequisites Completed (Initials)
  *With vacuum in condenser SP 3665.2-001 Rev. 008 Page l of 5
Precautions Noted (Initials) 1, 2", 3", and 4*
Test Authorized By Date Partial Surveillance Perlormed By Date / Time Yes No Accepted By Date I Time Acceptance Criteria Satisfied Approved By (Department Head or Designee)
Date
[
Yes  
]
No Shift Manager Notified of Failed Test Date CR#:
Surveillance Information Test Equipment Type OA Number Cal Due Date N/A N/A N/A Comments  
*With vacuum in condenser SP 3665.2-001 Rev. 008 Page l of 5


Intake Structure Condition Determination Each shift: CIRCLE the applicable box In each                         08     08* 20 20*
Intake Structure Condition Determination Each shift: CIRCLE the applicable box In each 08 08* 20 20*
section, then TOTAL.
section, then TOTAL.
Plant Factors
Plant Factors
: 1. Circulating Water Pumps and Screens All bays, circulating pumps, and screens operating properly or are                 0   0 available for operation 1 bay out of service (C, D, E, or F)                                   3     3   3   3 1 bay out of service (A or B)                                         6       6   6   6 2 bays out of service                                                 9       9   9   9 3 bays out of service                                                 25     25   25   25
: 1. Circulating Water Pumps and Screens All bays, circulating pumps, and screens operating properly or are 0
: 2. Screen Wash Pumps Two pumps available                                                     0     0 .0     0 1 pump out of service                                                               8   8 2 pumps out of service                                                 25     25   25   25
0 available for operation 1 bay out of service (C, D, E, or F) 3 3
: 3. Trash Racks
3 3
< 6 inches dp on all racks                                             0     0   0   0
1 bay out of service (A or B) 6 6
> 6 inches dp on one rack                                             1       1   1   1 3      3    3  3
6 6
> 6 inches dp on two racks
2 bays out of service 9
> 6 inches dp on three racks                                             (D       6   6
9 9
> 6 inches dp on four or more racks                                   12     12   12   12
9 3 bays out of service 25 25 25 25
> 10 inches on two or more racks                                     20     20   20 20
: 2. Screen Wash Pumps Two pumps available 0
: 4. Trash Rakes Two rakes available                                                 (0O           0   0 One rake out of service                                                 8     8   8   8 Two rakes out of service                                               25     25   25   25
0  
: 5. Traveling Screens
.0 0
< 6 inches dp, in either automatic or manual Slow 1                   no           0   0
1 pump out of service 8
>6 inches dp with screens in Slow 1                                     6     6   6   6 Screens frequently shifting to Fast 1 (once/hour over 3 hours)         12     12   12 12 Plant Factors Section Total (1. + 2. + 3. + 4. + 5.)                   1At
8 2 pumps out of service 25 25 25 25
* 24 hour look ahead                                                                       I SP 3665.2-001 Rev. 008 P 2 nff S Paore   of 5
: 3. Trash Racks  
< 6 inches dp on all racks 0
0 0
0  
> 6 inches dp on one rack 1
1 1
1  
> 6 inches dp on two racks 3
3 3
3
> 6 inches dp on three racks (D
6 6  
> 6 inches dp on four or more racks 12 12 12 12  
> 10 inches on two or more racks 20 20 20 20
: 4. Trash Rakes Two rakes available (0O 0
0 One rake out of service 8
8 8
8 Two rakes out of service 25 25 25 25
: 5. Traveling Screens  
< 6 inches dp, in either automatic or manual Slow 1 no 0
0  
>6 inches dp with screens in Slow 1 6
6 6
6 Screens frequently shifting to Fast 1 (once/hour over 3 hours) 12 12 12 12 Plant Factors Section Total (1. + 2. + 3. + 4. + 5.)
1 At
* 24 hour look ahead I
SP 3665.2-001 Rev. 008 P 2 nff S Paore of 5


Intake Structure Condition Determination I Each shift: CIRCLE the applicable box in each section, then TOTAL.
Intake Structure Condition Determination I
Environmental Factors 08      08*      20      20*
* 24 hour look ahead SP 3665.2-001 Rev. 008 Page 3 of 5 I
I
I Each shift: CIRCLE the applicable box in 08 08*
: 1. Predicted Height of Next Tide (local tide chart) 0        0      0      0 Next high tide is < 3.0 feet Next high tide is > 3.0 feet but < 3.5 feet                           c*     (         2     2 4        4      4      4 Next high tide is > 3.5 feet
20 20*
: 2. Height of Tide in Last 48 Hours (local tide chart) 0        0      0      0 All high tides < 3.5 feet 2      2 Any high tide > 3.5 feet
each section, then TOTAL.
: 3. Wind Direction (actual from MET tower or other source as noted below) 2 71 or < 119)                                                     1 From 271 to 119 (_
Environmental Factors
02       02         2 From 120 to 270
: 1. Predicted Height of Next Tide (local tide chart)
: 4. Wind Speed (actual from MET tower or other source as noted below) 1         1       1 Sustained speed < 10 mph 2         2       2     2 Sustained speed > 10 mph but < 20 mph 3         3       3     3 Sustained speed >! .>20 mph but < 25 mph                               5*     (,1j     5     5 Sustained speed      25 mph but < 30 mph 7        7      7      7 Sustained speed _>30 mph or gusts > 45 mph alarms, or EDAN)
Next high tide is < 3.0 feet 0
: 5. Historical Wind Speed (PPC (BOP-F11-F1 1), (OFIS, computer priority Sustained wind < 20 mph in last 24 hours or Sustained                                           0 0          0      0 wind > 20 mph for less than any 4-hour period in last 24 hours Sustained wind > 20 mph for any 4-hour period in last 24             (*                 2     2 hours
0 0
: 6. Wind Correction: (3.) x (4.+ 5.)                                       0 1
0 Next high tide is > 3.0 feet but < 3.5 feet c*
* 24 hour look ahead                                                                                I SP 3665.2-001 Rev. 008 Page 3 of 5
(
2 2
Next high tide is > 3.5 feet 4
4 4
4
: 2. Height of Tide in Last 48 Hours (local tide chart)
All high tides < 3.5 feet 0
0 0
0 Any high tide > 3.5 feet 2
2
: 3. Wind Direction (actual from MET tower or other source as noted below)
From 271 to 119 (_ 2 7 1 or < 119) 1 From 120 to 270 02 02 2
: 4. Wind Speed (actual from MET tower or other source as noted below)
Sustained speed < 10 mph 1
1 1
Sustained speed > 10 mph but < 20 mph 2
2 2
2 Sustained speed.> 20 mph but < 25 mph 3
3 3
3 Sustained speed >! 25 mph but < 30 mph 5*
(,1j 5
5 Sustained speed _> 30 mph or gusts > 45 mph 7
7 7
7
: 5.
Historical Wind Speed (PPC (BOP-F11-F1 1), (OFIS, computer priority alarms, or EDAN)
Sustained wind < 20 mph in last 24 hours or Sustained wind > 20 mph for less than any 4-hour period in last 24 0
0 0
0 hours Sustained wind > 20 mph for any 4-hour period in last 24
(*
2 2
hours
: 6. Wind Correction: (3.) x (4.+ 5.)
1 0


Intake Structure Condition Determination Each shift: CIRCLE the applicable box in 7.
Intake Structure Condition Determination Each shift: CIRCLE the applicable box in 08 08*
20 20*
each section, then TOTAL.
each section, then TOTAL.
Predicted Wave Height/Seas (from internet) 08  08*  20    20*
: 7. Predicted Wave Height/Seas (from internet)
I Wave height < 1 foot                                                     1     1   1     1 Wave height > 1 foot but < 3 feet                                       2     2   2     2 Wave height > 3 feet but < 5 feet             ,                                    4     4 Wave height > 5 feet                                                     6     6   6     6
Wave height < 1 foot 1
1 1
1 Wave height > 1 foot but < 3 feet 2
2 2
2 Wave height > 3 feet but < 5 feet 4
4 Wave height > 5 feet 6
6 6
6
: 8. Historical Wave Height/Seas (as seen at Intake Structure)
: 8. Historical Wave Height/Seas (as seen at Intake Structure)
Wave height < 3.5 feet in last 48 hours                                 1     1,1     1 Wave height > 3.5 feet in last 48 hours                                 1         1 2    2
Wave height < 3.5 feet in last 48 hours 1
: 9. Wave Correction Subtotal: (7.) x (8.)                                 1   <'
1,1 1
: 10. Barometric Pressure   ( internet or local on site ifavailable)   _
Wave height > 3.5 feet in last 48 hours 1
Pressure > 29.5" (> 750 mm), steady/rising                               1     1   1     1 Pressure > 29.5" (> 750 mm), falling                                     2     2   2     2 Pressure < 29.5" (< 750 mm), steady/rising                               2     2   2     2 Pressure < 29.5" (   750 mm), falling                               .              4 4_    4
2 1 2
: 11. Season January or July                                                         n         0     0 February or December                                                     2     2   2     2 March, June, August, November or May1 6-31                               4     4   4     4 April, May 1-15, September or October                                   6     6   6     6
: 9. Wave Correction Subtotal: (7.) x (8.)
: 12. Historical Environmental Factor Last environmental factor < 25                                                     0     0 Last environmental factor > 25                                           4     4   4     4 Environmental Factors Section Total (1. + 2. + 6. + 9. + 10. + 11. + 12.)                                               -"
1
: 10. Barometric Pressure ( internet or local on site if available)
Pressure > 29.5" (> 750 mm), steady/rising 1
1 1
1 Pressure > 29.5" (> 750 mm), falling 2
2 2
2 Pressure < 29.5" (< 750 mm), steady/rising 2
2 2
2 Pressure < 29.5" (
750 mm), falling 4_
4 4
: 11. Season January or July n
0 0
February or December 2
2 2
2 March, June, August, November or May1 6-31 4
4 4
4 April, May 1-15, September or October 6
6 6
6
: 12. Historical Environmental Factor Last environmental factor < 25 0
0 Last environmental factor > 25 4
4 4
4 Environmental Factors Section Total (1. + 2. + 6. + 9. + 10. + 11. + 12.)
* 24 hour look ahead I
* 24 hour look ahead I
SP 3665.2-001 Rev. 008 Paee 4 of 5
SP 3665.2-001 Rev. 008 Paee 4 of 5 I


Intake Structure Condition Determination Determination of Factors I              Parameter                 Action Level     08       08*     20   20*         I Plant Factors Section Total               > 3 points     I 1&#xfd;   I%"
Intake Structure Condition Determination
Environmental Factors Section Total     > 17 points     2t6o     2&#xfd; Intake Condition Total                                       0   u*O (Plant + Environmental)
* 24 hour look ahead Note 1 If predicted wind speed is expected to be greater than 20 MPH make notifications per 3215, "Response to Intake Structure Degraded Conditions," step 4.1 Note 2 If any Action Level is exceeded, Refer To OP 3215, "Response to Intake Structure Degraded Conditions," and PERFORM applicable actions.
Predicted   le sustained Sustained weather forcast ( note Ifrom 72 hour wind speed                     speed  >20     .'
SP 3665.2-001 Rev. 008 Page 5 of 5 I
mph SM Review (Note 2)                                                                           I I
Determination of Factors Parameter Action Level 08 08*
* 24 hour look ahead 20 MPH make notifications per Note 1 If predicted wind speed is expected to be greater than step 4.1 3215, "Response to Intake Structure Degraded Conditions,"
20 20*
Note 2 If any Action Level is exceeded, Refer To OP  3215, "Response to Intake Structure Degraded Conditions," and PERFORM applicable actions.
Plant Factors Section Total  
SP 3665.2-001 Rev. 008 Page 5 of 5
> 3 points I 1&#xfd; I %"
Environmental Factors Section Total  
> 17 points 2t6o 2&#xfd; Intake Condition Total 0
u*O (Plant + Environmental)
Predicted le Sustained wind speed from 72 hour sustained weather forcast ( note I speed >20 mph SM Review (Note 2)
I I
I


INTAKE STRUCTURE STATUS PLANT FACTORS               RED ENVIRONMENTAL FACTORS               RED
INTAKE STRUCTURE STATUS PLANT FACTORS ENVIRONMENTAL FACTORS RED RED
                                )
)


JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM


==Title:==
==Title:==
Review Reactivity Calculations - Estimated Critical Conditions JPM ID Number:      SRO-A1.2                                         Revision:       0 II. Initiated:
JPM ID Number:
10/31/01 Steve  Jac w-*
Review Reactivity Calculations - Estimated Critical Conditions SRO-A1.2 Revision:
Developer                                                                  Date Ill. Reviewed:
0 II. Initiated:
                                                                                /1 /i19 /o1 Date Technical Reviewer IV. Approved:
10/31/01 Date Ill.
Date Cognizant Plant Supervisor (optional)
Reviewed:
Nuclef Training Supervisor                                               /De 1 of 7
/1  
/i19 /o1 Date Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuclef Training Supervisor 1 of 7 Date
/De Steve Jac w-*
Developer


JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM


==Title:==
==Title:==
Review Reactivity Calculations - Estimated Critical Conditions JPM ID Number:     SRO-A1.2                                         Revision: 0 I1. Initiated:
Review Reactivity Calculations - Estimated Critical Conditions JPM ID Number:
Steve Jackson                                                         10/31/01 Developer                                                               Date Ill. Reviewed:
SRO-A1.2 Revision:
Technical Reviewer                                                     Date IV. Approved:
0 I1. Initiated:
Cognizant Plant Supervisor (optional)                                   Date Nuclear Training Supervisor                                             Date 1 of 7
Steve Jackson Developer Ill.
Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional) 10/31/01 Date Date Nuclear Training Supervisor Date Date 1 of 7


JOB PERFORMANCE MEASURE GUIDE Facility:     Millstone Unit 3 JPM ID Number:           SRO-A1.2                             Revision:     0 Task
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 JPM ID Number:
SRO-A1.2 Revision:
0 Task


==Title:==
==Title:==
Review Reactivity Calculations - Estimated Critical Conditions System:       Reactor Core Time Critical Task:       (       ) YES   ( X ) NO Validated Time (minutes):         20 min Task Number(s):           341-01-175, Perform a reactivity balance to determine estimated critical Csondition.
Review Reactivity Calculations - Estimated Critical Conditions System:
Applicable To:            SRO         X         RO                     PEO K/A Number:          Sys: 001.A4.10, Determination of an ECP                   K/A Rating:       3.5/3.9 Method of Testin g:       Simulated Performance:                     Actual Performance:       X Location:                  Classroom:     X             Simulator:                 In-Plant::
Reactor Core Time Critical Task:
Task Standards:              Perform a reactivity balance to determine estimated critical condition.
(  
Required Materidals:         OP 3209A, Reactivity Calculations - Estimated Critical Conditions General Referen ces:         MP3 Reactor Engineering Curve and Data Book
) YES
                                    ***READ TO THE STUDENT***
( X ) NO Validated Time (minutes):
20 min Task Number(s):
Applicable To:
K/A Number:
Method of Testin Location:
Task Standards:
Required Materid General Referen C
341-01-175, Perform a reactivity balance to determine estimated critical sondition.
SRO X
RO PEO Sys: 001.A4.10, Determination of an ECP K/A Rating:
g:
Simulated Performance:
Actual Performance:
Classroom:
X Simulator:
In-Plant::
Perform a reactivity balance to determine estimated critical condition.
als:
OP 3209A, Reactivity Calculations - Estimated Critical Conditions ces:
MP3 Reactor Engineering Curve and Data Book 2 of 7 3.5/3.9 X
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 7


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:         SRO-A1.2                                                 Revision:     0 Simulator Requirements:         NONE Initial Conditions:             You are an on-shift Senior Licensed Operator. Your shift is preparing to perform a reactor startup. Reactor Engineering has presented you with two independently performed Estimated Critical Condition (ECC) reactivity calculations for your review.
JPM Number:
Initiating Cues:                Using the two independently performed Estimated Critical Condition (ECC) reactivity calculations review the ECC in accordance with OP 3209A, Reactivity Calculations - Estimated Critical Condition, Section 4.20. Inform the examiner of the results of your comparison and when you are complete.
SRO-A1.2 Revision:
                                  '"NOTES TO EVALUATOR ****
0 Simulator Requirements:
: 1.     Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Initial Conditions:
Initiating Cues:
You are an on-shift Senior Licensed Operator. Your shift is preparing to perform a reactor startup. Reactor Engineering has presented you with two independently performed Estimated Critical Condition (ECC) reactivity calculations for your review.
Using the two independently performed Estimated Critical Condition (ECC) reactivity calculations review the ECC in accordance with OP 3209A, Reactivity Calculations - Estimated Critical Condition, Section 4.20. Inform the examiner of the results of your comparison and when you are complete.
3 of 7 NONE
'"NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 2.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3 of 7
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:     SRO-A1.2                                               Revision:   0
PERFORMANCE INFORMATION JPM Number:
_-,- Task
SRO-A1.2 Revision:
0 Task


==Title:==
==Title:==
Review Reactivity Calculations - Estimated Critical Conditions Start Time:
Review Reactivity Calculations - Estimated Critical Conditions Start Time:
Note to Examiner:       approximate values are acceptable, since visual interpolation between curves on a graph may be employed STEP        1               Performance Step:       Reviews procedure sections.
Note to Examiner:
approximate values are acceptable, since visual interpolation between curves on a graph may be employed 1
Performance Step:
Standards:
Grade:
2 X
Performance Step:
X Standards:
Grade:
Reviews procedure sections.
Determines if second, independent ECC has been performed (step 4.20.1)
Determines if second, independent ECC has been performed (step 4.20.1)
GRADE                        Standards:              Locate and review procedure section.
Locate and review procedure section.
Obtains both ECC reactivity calculations.
Obtains both ECC reactivity calculations.
Grade:                SAT                     UNSAT STEP        2        X      Performance Step:      COMPARE the two independent ECC calculations and RESOLVE the differences (step 4.20.2)
SAT UNSAT COMPARE the two independent ECC calculations and RESOLVE the differences (step 4.20.2)
GRADE              X        Standards:            Compares the two ECCs and discovers the following differences:
Compares the two ECCs and discovers the following differences:  
                                                        "* differences in ECC 2 hour Administrative Time Period
"* differences in ECC 2 hour Administrative Time Period  
                                                        "* differences in boron worth Grade:                SAT                     UNSAT STEP        3      X        Performance Step:     Resolve differences in Estimated Conditions at Criticality between the two ECCs. (steps 4.4.2, 4.4.3)
"* differences in boron worth SAT UNSAT Performance Step:
GRADE              X        Standards:            ECC B is incorrect. Administrative time period must start when T/S time period starts.
Standards:
Grade:
Resolve differences in Estimated Conditions at Criticality between the two ECCs. (steps 4.4.2, 4.4.3)
ECC B is incorrect. Administrative time period must start when T/S time period starts.
Resolve by confirming ECC A Estimated Conditions at Criticality are correct.
Resolve by confirming ECC A Estimated Conditions at Criticality are correct.
Grade:                SAT                     UNSAT 4 of 7
SAT UNSAT 4 of 7 STEP GRADE STEP GRADE STEP 3
X X
GRADE


PERFORMANCE INFORMATION JPM Number:   SRO-A1.2                                               Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
SRO-A1.2 Task


==Title:==
==Title:==
Review Reactivity Calculations - Estimated Critical Conditions STEP        4      X       Performance Step:     Resolve differences in boron worth between the two ECCs. (steps 4.12.1, 4.12.2)
Revision:
GRADE              X        Standards:            ECC B is incorrect. Incorrect boron worth chosen from curve RE-F-02.
0 Review Reactivity Calculations - Estimated Critical Conditions X
Performance Step:
X Standards:
Comment:
Resolve differences in boron worth between the two ECCs. (steps 4.12.1, 4.12.2)
ECC B is incorrect. Incorrect boron worth chosen from curve RE-F-02.
Resolve by confirming ECC A Boron Defect parameters are correct.
Resolve by confirming ECC A Boron Defect parameters are correct.
Comment:              There are no other errors in the ECC.
There are no other errors in the ECC.
It is not required for the candidate to recalculate values that are in close agreement.
It is not required for the candidate to recalculate values that are in close agreement.
Grade:                 SAT                     UNSAT STEP        5       x       Performance Step:     Determine or Prepare the final OPS form 3209A-1. (step 4.20.3)
Grade:
GRADE              x      Standards:              ECC A is correct and should be used as the final OPS form 3209A-1.
SAT UNSAT 5
Grade:                  SAT                     UNSAT Termination Cue: The Evaluation For This JPM is Complete.
x x
Performance Step:
Standards:
Grade:
Determine or Prepare the final OPS form 3209A-1. (step 4.20.3)
ECC A is correct and should be used as the final OPS form 3209A-1.
SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete.
Stop Time:
Stop Time:
5 of 7
5 of 7 STEP 4
GRADE STEP GRADE


VERIFICATION OF JPM COMPLETION JPM Number:             SRO-A1.2                                      Revision:          0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
SRO-A1.2 Revision:
Time Critical Task?                         YES             NO      X Validated Time (minutes):                   20 Actual Time to Complete (minutes):
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
YES Validated Time (minutes):
NO X
20 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 291: Line 536:
6 of 7
6 of 7


STUDENT HANDOUT JPM Number:         SRO-A1.2 Initial Conditions: You are an on-shift Senior Licensed Operator. Your shift is preparing to perform a reactor startup. Reactor Engineering has presented you with two independently performed Estimated Critical Condition (ECC) reactivity calculations for your review.
STUDENT HANDOUT JPM Number:
Initiating Cues:    Using the two independently performed Estimated Critical Condition (ECC) reactivity calculations review the ECC in accordance with OP 3209A, Reactivity Calculations Estimated Critical Condition, Section 4.20. Inform the examiner of the results of your comparison and when you are complete.
Initial Conditions:
Initiating Cues:
SRO-A1.2 You are an on-shift Senior Licensed Operator. Your shift is preparing to perform a reactor startup. Reactor Engineering has presented you with two independently performed Estimated Critical Condition (ECC) reactivity calculations for your review.
Using the two independently performed Estimated Critical Condition (ECC) reactivity calculations review the ECC in accordance with OP 3209A, Reactivity Calculations Estimated Critical Condition, Section 4.20. Inform the examiner of the results of your comparison and when you are complete.
7 of 7
7 of 7


IForm Approval.
I Form Approval I rApproval Date JUL 0 1 1999 A
I                                       A JUL 0 1 1999                         *1Effective Date         JUL 0 6 1999                           I 1999 06eciv rApproval Date C/&#xfd;,,)-        ~JU
*1Effective Date JUL 0 6 1999
  "[urnI                     ColverShedt JGeneric Information Form Title Estimated Critical Conditions Reference Procedure                       Applicable Tech. Spec.
~JU 06eciv 1999
OP 3209A                                          4.1.1.1.1.c                                      AR*
"[urnI ColverShedt JGeneric Information Form Title Estimated Critical Conditions Reference Procedure OP 3209A Applicable Tech. Spec.
AR*
This form is being used for the following:
This form is being used for the following:
3     Tech Spec Surveillance           C) System Alignment               0   Other:
3 Tech Spec Surveillance C) System Alignment 0
0     Maintenance Restoration (Retest)
Other:
Non-Tech Spec Surveillance (PM)
0 Maintenance Restoration Non-Tech Spec (Retest)
Specific InformationI Schedule Date     N/A                                     Applicable Mode                                 Partial           D 2                                 Surveillance Test Authorized By Date                             Baseline Test Prerequisites Completed (Initials)
Surveillance (PM)
Specific InformationI Schedule Date N/A Applicable Mode Partial D
2 Surveillance Test Authorized By Date Baseline Test Prerequisites Completed (Initials)
Precautions Noted (Initials)
Precautions Noted (Initials)
Performed By Date                           Time Accepted By                                               Date                       Time                 Acceptance Criteria Satisfied Approved By (Department Head or Designee)                 Date Shift Manager Notified of Failed Test                     Date                                             D     Yes       D No Surveillance Information Test Equipment Type                                       QA Number             Cal Due Date N/A
Performed By Date Time Accepted By Date Time Acceptance Criteria Satisfied Approved By (Department Head or Designee)
Date Shift Manager Notified of Failed Test Date D Yes D No Surveillance Information Test Equipment Type QA Number Cal Due Date N/A
* This calculation may be performed at any time but must be verified within 4 hours prior to achieving reactor criticality.
* This calculation may be performed at any time but must be verified within 4 hours prior to achieving reactor criticality.
Send completed Form to Reactor Engineering.
Send completed Form to Reactor Engineering.
OPS Form 3209A-1 Rev. 6 Page 1 of 9
OPS Form 3209A-1 Rev. 6 Page 1 of 9 4.1.1.1.1.c C/&#xfd;,,)
I


k Estimated Critical Conditions, I
k Estimated Critical Conditions, Step No.
Step No.                       Name                           Date                   Time 4.2   Performed By:                                   I Reference Critical Data Step No.               Parameter                                 Value Date                                                 o 0 Time                                               06           _5" Power Level                                             1O0                           %
Name Date Time 4.2 Performed By:
Burnup                                            -74o3-5                   MWD/MTU RCS Pressure                                       2 ;         4 ,                 psia Tavg                                                 _578hL LF Tref                                                   5.                             OF Boron Concentration                                     [lq(                       ppm Xenon                                   (-)                   - 7       L.t       pcm Samarium                                 (-)                 ,        5             pcm Control Bank C                                                       3.           steps Control Bank D                                                   -7               steps Estimated Conditions At Criticality Step No.               Parameter                                 Value 4.4.1 Date 4.4.2 Administrative Time Period (2 hours) From:   UO00           To:     /I C0 4.4.3 T/S Time Period (4 hours)           From:   50 300         To:     / 2. o0 4.4.4 Present Burnup                                         8 00                 MWD/MTU 4.4.5 Tavg                                                     557                         OF 4.4.6 RCS Pressure                                             2,15                       psia 4.4.7.b. Xenon                                   (-)                       0               pcm 4.4.8.b. Samarium                               (-)           1300                       pcm 4.4.9.b.                                     Control Bank C @             2 15         Steps or   Desired Critical Rod Height 4.4.10                                       Control Bank D @               /         -0 Steps Boron Concentration Step No.               Parameter                                 Value 4.5   Present Boron Concentration                         /     60 0                     ppm OPS Form 3209A-1 Rev. 6 Page 2 of 9
I Reference Critical Data Step No.
Parameter Value Date o 0 Time 06
_5" Power Level 1O0 Burnup
-74o3-5 MWD/MTU RCS Pressure 2 ;
4,
psia Tavg
_578hL LF Tref
: 5.
OF Boron Concentration
[lq(
ppm Xenon
(-)  
- 7 L.t pcm Samarium
(-)
5 pcm Control Bank C
: 3.
steps Control Bank D  
-7 steps Estimated Conditions At Criticality Step No.
Parameter Value 4.4.1 Date 4.4.2 Administrative Time Period (2 hours) From:
UO00 To:  
/ I C 0 4.4.3 T/S Time Period (4 hours)
From:
50 300 To:  
/ 2. o0 4.4.4 Present Burnup 8 00 MWD/MTU 4.4.5 Tavg 557 OF 4.4.6 RCS Pressure 2,15 psia 4.4.7.b.
Xenon
(-)
0 pcm 4.4.8.b.
Samarium
(-)
1300 pcm 4.4.9.b.
Control Bank C @
2 15 Steps or Desired Critical Rod Height 4.4.10 Control Bank D @  
/  
-0 Steps Boron Concentration Step No.
Parameter Value 4.5 Present Boron Concentration  
/
0 6 0 ppm OPS Form 3209A-1 Rev. 6 Page 2 of 9 I


I D
D Defects Estimated Critical Conditions POWER DEFECT Step No.
Estimated Critical Conditions Defects POWER DEFECT Step No.                           Parameter and/or Calculation                         Value 4.6.1   Power Defect @ Reference Power =                                     (-)Ji._(,_           pcm Defect @ Ref Power 4.6.2   [(-)         5   .5.
Parameter and/or Calculation Value 4.6.1 Power Defect @ Reference Power =
Defect @ Ref Pwr pcm] x   (1 F              U.5 ."pcm Power Defect REFERENCE MODERATOR DEFECT Step No.                           Parameter and/or Calculation                         Value 4.7.2                                                                              pcmn/   F(no sign)
(-)Ji._(,_ pcm Defect @ Ref Power 4.6.2
Magnitude of MTC @ Tref           =                                 Magnitude of MTC @ Tref 4.7.3   Difference Between Tref       and Tavg =                               Tref/Tg A OF (no sign) 4.7.4   ( _F)                 x (_           pcm/&deg;F) =                     _          pcm (no sign)
[(-)
Trcf/Tavg A           MTC @ Tref                             Ref Mod Defect 4.7.5   Sign of Reference Moderator Defect         =                                         (+ or-)
5  
Sign 4.7.1 or   Value and Sign of Reference Moderator Defect 4.7.6 Ref      C) pcm Ref Mod Defect ESTIMATED MODERATOR DEFECT Step No.                           Parameter and/or Calculation                         Value 4.8.2                                                                              pcm/0 F(no sign)
.5.
Magnitude of ITC @ 5570F           =                               Magnitude of ITC @ 557 0 F 4.8.3   Difference Between Estimated Tavg and 557&deg;F =                         _            &deg;F (no sign)
pcm] x (1 U.5."pcm Defect @ Ref Pwr F
Tavg/ 557'*F A 4.8.4   (               OF) x ( _pcm/*F)             =                     _          pcm (no sign)
Power Defect REFERENCE MODERATOR DEFECT Step No.
Tavg/557*F A           ITC @ 557" F                           Est ModDefect 4.8.5   Sign of Estimated Moderator Defect         =                                   _      (+ or-)
Parameter and/or Calculation Value pcmn/
Sign 4.8.1 or     Value and Sign of Estimated Moderator Defect =                       (       Mod Depcm 4.8.6                                                                           Est Mod Defect OPS Form 3209A- 1 Rev. 6
F(no sign) 4.7.2 Magnitude of MTC @ Tref =
Magnitude of MTC @ Tref 4.7.3 Difference Between Tref and Tavg =
Tref/Tg A OF (no sign) 4.7.4
( _F) x ( _
pcm/&deg;F) =
pcm (no sign)
Trcf/Tavg A MTC @ Tref Ref Mod Defect 4.7.5 Sign of Reference Moderator Defect =
(+ or-)
Sign 4.7.1 or Value and Sign of Reference Moderator Defect Ref C) pcm 4.7.6 Ref Mod Defect ESTIMATED MODERATOR DEFECT Step No.
Parameter and/or Calculation Value pcm/0 F(no sign) 4.8.2 Magnitude of ITC @ 5570F =
Magnitude of ITC @ 557 0F 4.8.3 Difference Between Estimated Tavg and 557&deg;F =  
&deg;F (no sign)
Tavg/ 557'* F A 4.8.4
(
OF) x ( _pcm/*F)  
=
pcm (no sign)
Tavg/557*F A ITC @ 557" F Est ModDefect 4.8.5 Sign of Estimated Moderator Defect =
(+ or-)
Sign 4.8.1 or Value and Sign of Estimated Moderator Defect =
(
Mod De pcm 4.8.6 Est Mod Defect OPS Form 3209A-1 Rev. 6 I


Estimated Critical Conditions Defects (Continued)
Estimated Critical Conditions Defects (Continued)
XENON DEFECT Parameter and/or Calculation                                         Value I                          I pcm] - [(-         77 7. ' pcm]                                   ) 16771q pcm I ( Xenon Defect Reference Xe I
XENON DEFECT Parameter and/or Calculation pcm] -
SAMARIUM DEFECT Step No.                           Parameter and/or Calculation                                         Value 4.10     [     13o 0 1-          pcm] - [(-)0.+/-L,.-     S   pcm]   =                           (-)     33,S     pcm Estimated Sm               Reference Sm                                       Samarium Defect ROD WORTH DEFECT Step No.                           Parameter and/or Calculation                                         Value 4.11.2.a.
[(-
or       Integral Rod Worth @ Reference Conditions =                                       (-)         .7   pcm 4.11.3.a.                                                                                           Reference RW 4.11.2.b.
7 7. '
or       Integral Rod Worth @ Estimated Conditions =                                       (-) E     "ie   pcm 4.11.3.b.                                                                                           Estimated RW 4.11.1 or       [(-)I5"/3         pcm] - [(-L               7   pcm] =                           (_) 5o2,3 pcm 4.11.4         Estimated RW               Reference RW                                           RW Defect BORON DEFECT Step                             Parameter and/or Calculation                                           Value No.
7 pcm]
4.12.1   Differential Boron Worth @ Reference Burnup           =                             (-)63         c/ppm Reference BW 4.12.2   Differential Boron Worth @ Present Burnup         =                                       6 ,80 pcm/ppm I                                             Present BW 4.12.3           "[(-
Reference Xe
76.7/.               +
) 16771 q pcm Xenon Defect SAMARIUM DEFECT Step No.
pcm/ppm)+(-         .0       pcm/ppm)] -- 2=                   (-)279 pcm/ppm Reference BW                   Present BW                                             Avg DiffBW 4.12.4   [(     o,00       ppm) - ( I I   '         ppm)]   x [(-) 6.1     pcm/ppm] =         (-) 27-73         pcm Present CB (4.5)         Reference C3(4.3)             Avg Diff BW                   Boron Defect OPS Form 3209A-1 Rev. 6 Page 4 of 9
Parameter and/or Calculation Value 4.10
[
1-13o 0 pcm] - [(-)0.+/-L,.-
S pcm] =
(-)
33,S pcm Estimated Sm Reference Sm Samarium Defect ROD WORTH DEFECT Step No.
Parameter and/or Calculation Value 4.11.2.a.
or Integral Rod Worth @ Reference Conditions =
(-)  
.7 pcm 4.11.3.a.
Reference RW 4.11.2.b.
or Integral Rod Worth @ Estimated Conditions =
(-) E "ie pcm 4.11.3.b.
Estimated RW 4.11.1 or
[(-)I5"/3 pcm] - [(-L 7
pcm] =
(_) 5o2,3 pcm 4.11.4 Estimated RW Reference RW RW Defect BORON DEFECT Step Parameter and/or Calculation Value No.
4.12.1 Differential Boron Worth @ Reference Burnup =
(-)63 c/ppm Reference BW 4.12.2 Differential Boron Worth @ Present Burnup =
6,80 pcm/ppm I
Present BW 4.12.3  
"[(-
76.7/.
pcm/ppm)+(-  
+
.0 pcm/ppm)] -- 2=
(-)279 pcm/ppm Reference BW Present BW Avg DiffBW 4.12.4
[(
o,00 ppm) -
( I I '
ppm)] x [(-) 6.1 pcm/ppm] =
(-) 27-73 pcm Present CB (4.5)
Reference C3 (4.3)
Avg Diff BW Boron Defect OPS Form 3209A-1 Rev. 6 Page 4 of 9 Value I
I I (
I


SEstimated Critical Conditions I
SEstimated Critical Conditions I
Defects (Continued)
Defects (Continued)
VOID DEFECT Step No.                         Parameter and/or Calculation                             Value 4.13.2   Value of Void Correction Factor (Void Defect) =                         (+)...O       .. pcm Void Defect TOTAL REACTIVITY DEFECT Step No.                         Parameter and/or Calculation                             Value Power Defect                   = (+)       5     Spcm (step 4.6.2)
VOID DEFECT Step No.
Ref Mod Defect                 = (           00)   pcm (step 4.7.6)
Parameter and/or Calculation Value 4.13.2 Value of Void Correction Factor (Void Defect) =
Est Mod Defect                 = ( )         2   pcm (step 4.8.6)
(+)...O  
Xe Defect                       = (4) 2 6-7? Yf pcm (step 4.9) 4.14.1 c
.. pcm Void Defect TOTAL REACTIVITY DEFECT Step No.
and   Sm Defect                       = (-)_331.           pcm             (     ota plDefe pcm 4.14.2   (step 4.10)                                                                 Total p Defect RW Defect                       = (- 5-4.3 pcm (step 4.11.4)
Parameter and/or Calculation Value Power Defect  
Boron Defect                   = (-       73 pcm (step 4.12.4)
= (+)
Void Defect                     = (+)         Q       pcm (step 4.13.2)               +
5 Spcm (step 4.6.2)
Combined Total = (-)                   . I pcm =
Ref Mod Defect  
Burnup Correction Step No.                         Parameter and/or Calculation                             Value 4.15.2.a. Critical Boron Concentration @ Reference Burnup =                       Re C71           ppmG Ref Critical CB 4.15.2.b. Critical Boron Concentration @ Present Burnup             =           PrsetCrtia         ppm Present Critical CB 4.15.1     1771           ppm)-( 17L'2-               ppm)   =               (-I)_2_           ppm or       Ref77/
= (
Ciia             -    Preset 17 LkC 4.15.3     Ref Critical CB       -Present   Critical CB                       Burnup Correction OPS Form 3209A-1 Rev. 6 Page 5 of 9
: 0) 0 pcm (step 4.7.6)
Est Mod Defect  
= ( )
2 pcm (step 4.8.6)
Xe Defect  
= (4) 2 6-7? Yf pcm (step 4.9) 4.14.1 c
and Sm Defect  
= (-)_331.
pcm
(
ota plDefe pcm 4.14.2 (step 4.10)
Total p Defect RW Defect  
= (- 5-4.3 pcm (step 4.11.4)
Boron Defect  
= (- 73 pcm (step 4.12.4)
Void Defect  
= (+)
Q pcm (step 4.13.2)  
+
Combined Total = (-)  
. I pcm =
Burnup Correction Step No.
Parameter and/or Calculation Value 4.15.2.a.
Critical Boron Concentration @ Reference Burnup =
Re C71 ppmG Ref Critical CB 4.15.2.b.
Critical Boron Concentration @ Present Burnup =
PrsetCrtia ppm Present Critical CB 4.15.1 1771 ppm)-( 17L'2-ppm) =
(-I)_2_
ppm or Ref77/
Ciia 17 Lk Preset C 4.15.3 Ref Critical CB  
-Present Critical CB Burnup Correction OPS Form 3209A-1 Rev. 6 Page 5 of 9


Estimated Critical Conditions it Critical Boron Concentration Calculation Step No.                               Parameter and/or Calculation                                     Value
Estimated Critical Conditions it Critical Boron Concentration Calculation OPS Form 3209A-1 Rev. 6 Page 6 of 9 Step No.
[(-H) 101_1.1           pcm]--[(-)           (y,80 pcm/ppm]         =         ()         -)50 ppm 4.16.2           Total p Defect                   Present BW                                 Boron Equivalent 4.14.2                             4.12.2                                   of p Defect
Parameter and/or Calculation Value
[(         ;L 9         ppm] + [(-)             1SO           ppm] =             (-)       I           ppm 4.16.3       Burnup Correction                 Boron Equivalent of p Defect                     Corrected Boron 4.15.3                               4.16.2                                   Equivalent 4.16.4     (-)       12-1           ppm] x (-1)=                                           (4)       1.-- I       ppm Corrected Boron Equivalent                                                         Required Boron A
[(-H) 101_1.1 pcm]--[(-) (y,80 pcm/ppm] =
( l           0oo ppm)+[(4)                 I 2.1         ppm] =                           -72) ppm 4.16.5         Present CB                   Required Boron A                                 Calculated CB 4.5                         4.16.4
()  
_          pcm_ 0 F(no sign) 4.16.7.a. Magnitude of ITC @ 557&deg;F =                                                       Magnitude of ITC@ 557"F 7F    (no sign) 4.16.7.b. Difference Between Estimated Tavg and 5570F =
-)50 ppm 4.16.2 Total p Defect Present BW Boron Equivalent 4.14.2 4.12.2 of p Defect
I                                                         Tavg/ 557'F A
[(  
(                   OF) X   (               pcm/&deg;F) =                             _          pcm (no sign) 4.16.7.c.     Tavg/557&deg;F A               ITC @ 557"F                                       Magnitude of 4.16.7.b.                 4.16.7.a.                                         Mod CF Moderator Correction Factor                                                               (+ or-)
;L 9 ppm] + [(-)
4.16.7.d.
1SO ppm] =
4.16.7.e.S Sign of  Sign of Moderator Correction Factor           =                                   Sign 4.16.7.e. Value and Sign of Moderator Correction Factor =                                     (   )______pcm Moderator CF Differential Boron Worth @ for Present Burnup                       =                               cm/ppm 4.16.7.f.                                                        4.12.2                             Diff BW R( )_                   pcm] - [(-)_                         pcm/ppm] =           (   )                 ppm 4.16.7.g.           Mod CF                             Diff BW                                   Boron Equivalent 4.16.7.e.                         4.16.7.f.                                 of Moderator CF 4.16.6.a. Calculated 4.16.5 Boron Concentration = Critical Boron Concentration     =
(-)
(                       pcm) + (                             pcm)   =                     1____
I ppm 4.16.3 Burnup Correction Boron Equivalent of p Defect Corrected Boron 4.15.3 4.16.2 Equivalent 4.16.4
r a       ppm 4.16.1                    4.16.5 or       Boron Equivalent of Mod CF                 Calculated CB 4.16.7.h.           4.16.7.g.                               4.16.5 OPS Form 3209A-1 Rev. 6 Page 6 of 9
(-)
12 -1 ppm] x (-1)=
(4) 1.-- I ppm Corrected Boron Equivalent Required Boron A
( l 0oo ppm)+[(4)
I 2.1 ppm] =  
-72) ppm 4.16.5 Present CB Required Boron A Calculated CB 4.5 4.16.4 pcm_ 0 F(no sign) 4.16.7.a.
Magnitude of ITC @ 557&deg;F =
Magnitude of ITC@ 557"F 4.16.7.b.
Difference Between Estimated Tavg and 5570F =
7F (no sign)
I Tavg/ 557'F A
(
OF) X (
pcm/&deg;F) =
pcm (no sign) 4.16.7.c.
Tavg/557&deg;F A ITC @ 557"F Magnitude of 4.16.7.b.
4.16.7.a.
Mod CF 4.16.7.d.
Sign of Moderator Correction Factor
(+ or-)
4.16.7.e.S Sign of Moderator Correction Factor  
=
Sign 4.16.7.e.
Value and Sign of Moderator Correction Factor =
( )______pcm Moderator CF 4.16.7.f.
Differential Boron Worth @ for Present Burnup =
cm/ppm 4.12.2 Diff BW R( )_
pcm] - [(-)_
pcm/ppm] =
( )
ppm 4.16.7.g.
Mod CF Diff BW Boron Equivalent 4.16.7.e.
4.16.7.f.
of Moderator CF 4.16.6.a.
Calculated Boron Concentration = Critical Boron Concentration =
4.16.5 4.16.1
(
4.16.5 pcm) + (
1____
pcm) =
r a
ppm or Boron Equivalent of Mod CF Calculated CB 4.16.7.h.
4.16.7.g.
4.16.5


mated Critical ConditionsJ I
I Critical Rod Height Calculation mated Critical ConditionsJ Step No.
Critical Rod Height Calculation Step No.                             Parameter and/or Calculation                                     Value
Parameter and/or Calculation Value
[(+)_____             ppm] x [(-)                 pcmwppm] =
[(+)_____
4.17.1         Burnup Correction             Present BW                                                       pcm 4.15.3                       4.12.2                                     p Equivalent of BC
ppm] x [(-)
[(-)_pcm]+[(                     )                 pcm] =
pcmwppm] =
_                                          (   )__             pcm 4.17.2         p Equivalent of BC           Total p Defect                                   Corrected Total 4.17.1                       4.14.2                                           p Defect 4.17.3.a.
4.17.1 Burnup Correction Present BW pcm 4.15.3 4.12.2 p Equivalent of BC
or     Integral Rod Worth @ Reference Conditions                                         N                 cm 4.17.4                                                                                           RW @ Ref
[(-)_pcm]+[(  
[(   )____           pcm] + [(+)         -      pcm]                               _
) _
4.17.5         Corrected p Defect         RW @ Reference                                       N             pcm 4.17.2                       4.17.4                                         Net p Defect 4.17.6.a.                                                                                           _Bank or   Critical Rod Position Corresponding to Net p Defect           =@                               I   Steps 4.17.6.b.                                                                                     Critical Rod Position Rod Withdrawal Limits Step No.                               Parameter and/or Calculation                                     Value 4.18.1.a.
pcm] =
or     Integral Rod Worth @ Estimated Critical Position                                 (+)     5i    3   pcm 4.18.2                                                                                           RW @ ECP 4.18.3   [(+)     5 "3         pcm] - (500pcm)         =f(-4)                                     or        pcm RW @ ECP                                                                 RW for D @ 57 Steps W/D Limit 4.18.4 or     Rod Position Corresponding to the RW for the D @ 57 Steps                       Bank D
( )__
                                                                                                @ 2 ) I Steps 4.18.5   Withdrawal Limit or the Control Bank D Full Out Position                           D @ 57 Steps Withdrawal Limit 4(pcm]-(750pcm)=                                                           (-)     23-7       pcm 4.18.6           RW @ ECP                                                                 RW for C @ 57 Steps W/D Limit 4.18.5 or                                                           Bank 4.18.7   Rod Position Corresponding to the RW for the C @ 57
pcm 4.17.2 p Equivalent of BC Total p Defect Corrected Total 4.17.1 4.14.2 p Defect 4.17.3.a.
: r.                                                                 Steps                @ Steps Withdrawal Limit or the Control Bank D Full Out Position 4.18.8                                                                                     C @ 57 Steps Withdrawal Limit OPS Form 3209A-1 Rev. 6 Page 7 of 9
or Integral Rod Worth @ Reference Conditions N
cm 4.17.4 RW @ Ref
[( )____
pcm] + [(+)
pcm]
4.17.5 Corrected p Defect RW @ Reference N
pcm 4.17.2 4.17.4 Net p Defect 4.17.6.a.
_Bank or Critical Rod Position Corresponding to Net p Defect =@
I Steps 4.17.6.b.
Critical Rod Position Rod Withdrawal Limits Step No.
Parameter and/or Calculation Value 4.18.1.a.
or Integral Rod Worth @ Estimated Critical Position
(+) 5 i 3 pcm 4.18.2 RW @ ECP 4.18.3
[(+)
5 "3 pcm] - (500 pcm)  
=f(-4) o r pcm RW @ ECP RW for D @ 57 Steps W/D Limit 4.18.4 Bank D
or Rod Position Corresponding to the RW for the D @ 57 Steps  
@ 2 ) I Steps 4.18.5 Withdrawal Limit or the Control Bank D Full Out Position D @ 57 Steps Withdrawal Limit 4(pcm]-(750pcm)=
(-)
23-7 pcm 4.18.6 RW @ ECP RW for C @ 57 Steps W/D Limit 4.18.5 or Bank 4.18.7 Rod Position Corresponding to the RW for the C @ 57 Steps Steps r.
Withdrawal Limit or the Control Bank D Full Out Position C @ 57 Steps 4.18.8 Withdrawal Limit OPS Form 3209A-1 Rev. 6 Page 7 of 9


I Conditions(
Estimated Critical Condition4 OPS Form 3209A-1 Rev. 6 Page 8 of 9 Step No.
(Estimated Critical Critical Condition4 Step No.                         Parameter and/or Calculation                                 Value 4.19.1   [(+) _ _"    __ _        (500 pcm) pcm] +RW      @  =ECPRW                                        fo D 1@3
Parameter and/or Calculation Value 4.19.1
(+ for     @ 57 pcm Steps RW @ECP                                                                   Insertion Limit Bank P 4.19.2.a. Rod Position Corresponding to the RW for the D @ 57 Step Insertion Limit     @ 4j           Steps or 4.19.3                                                                                 Rod Position for D @ 57 Steps Limit Bank C 4.19.4   Zero Power Rod Insertion Limit (RIL) =                                       @ 5"1         Steps 0% RIL 4.19.5                                                                               Bank 49     Rod Position Corresponding to the RW for the                               @      q3       Steps or 4.19.6   D @ 57 Step Insertion Limit or the 0% RIL                                     D @ 57 Steps Insertion Limit
[(+)
(+)    oC2 63 pcm 4.19.7   [(+)S     ' 3     pcm] + (750 pcm) =
_ pcm] + (500 pcm) =
RW for C @ 57 Steps RW @ ECP Insertion Limit 4.19.8.a.                                                                             Bank     1?*
(+ fo 1@3 pcm RW ECPRW for D @ 57 Steps RW @ECP Insertion Limit Bank P
or     Rod Position Corresponding to the RW for the C @ 57 Step Insertion Limit   Ba@        -    Steps or                                                                                   @..J~.           tp 4.19.9   -                                                                            Rod Position for C @ 57 Steps iUmit 4.19.6.a.
4.19.2.a.
or                                                                                 Bank__f2_
Rod Position Corresponding to the RW for the D @ 57 Step Insertion Limit  
4.19.10   Rod Position Corresponding to the RW for the
@ 4j Steps or 4.19.3 Rod Position for D @ 57 Steps Limit Bank C 4.19.4 Zero Power Rod Insertion Limit (RIL) =  
                                                                                      @        1 ;L Steps C @ 57 Step Insertion Limit or the 0% RIL or                                                                                  C @ 57 Steps 4.19.11 Insertion Limit OPS Form 3209A-1 Rev. 6 Page 8 of 9
@ 5"1 Steps 0% RIL 4.19.5 Bank 49 Rod Position Corresponding to the RW for the q3 Steps or 4.19.6 D @ 57 Step Insertion Limit or the 0% RIL D @ 57 Steps Insertion Limit 4.19.7
[(+)S  
' 3 pcm] + (750 pcm) =
(+)
oC2 63 pcm RW @ ECP RW for C @ 57 Steps Insertion Limit 4.19.8.a.
Bank 1?*
or Rod Position Corresponding to the RW for the C @ 57 Step Insertion Limit Ba Steps or  
@..J~.
tp 4.19.9 Rod Position for C @ 57 Steps iUmit 4.19.6.a.
or Bank__f2_
4.19.10 Rod Position Corresponding to the RW for the 1 ;L Steps C @ 57 Step Insertion Limit or the 0% RIL C @ 57 Steps or 4.19.11 Insertion Limit I
( Estimated Critical Conditions(


Estimated Critical Conditions" lAeview Step No.                               Name                                   Date       Time 4.20.4       Independent Calculation By:
Estimated Critical Conditions" lAeview Step No.
4.20.6       Licensed Operator Review By:
Name Date Time 4.20.4 Independent Calculation By:
T/S Acceptance Criteria Step No.                               Acceptance Criteria                               Yes     No OP 3202       Predicted Critical Rod Position Greater Than the RIL Step 4.8.1 OP SteP 3202 4.2     Criticality Predicted Within the T/S 4 Hour Time Period Step 4.8.2                                                              (4.4.3)
4.20.6 Licensed Operator Review By:
OP SP 3202 3202. Plant is in MODE 2 @ the RIL AND Reactor NOT Step 4.19.7.b                                                       Critical OP 3202 Step 4.22     Criticality Achieved Within the T/S 4 Hour Time Period (4.4.3)
T/S Acceptance Criteria Step No.
Actual Critical Data Parameter                         Source                       Value Date                                                         X Time Intermediate Range Current                   NMI-NI35B                               amps Intermediate Range Current                   NMI-NI36B                               amps NR Pressure                                 3RCS-PI455A                                 psia NR Pressure                                 3RCS-PI456A                                 psia NR Pressure                                 3RCS-PI457                                 psia NR Pressure                                 3RCS-PI458                                 psia Loop Tavg                                   3RCS-TI412                                 OF Loop Tavg                                   3RCS-TI422                                 OF Loop Tavg                                   3RCS-TI432                                 OF Loop Tavg                                   3RCS-TI442                                 OF Boron Concentration                           Chemistry                               ppm Control Bank C                           Rod Step Counters                           steps Control Bank D                           Rod Step Counters                           steps OPS Form 3209A-1 Rev. 6 Page 9 of 9
Acceptance Criteria Yes No OP 3202 Predicted Critical Rod Position Greater Than the RIL Step 4.8.1 OP 3202 SteP 4.2 Criticality Predicted Within the T/S 4 Hour Time Period (4.4.3)
Step 4.8.2 OP 3202 SP 3202.
Plant is in MODE 2 @ the RIL AND Reactor NOT Critical Step 4.19.7.b OP 3202 Step 4.22 Criticality Achieved Within the T/S 4 Hour Time Period (4.4.3)
Actual Critical Data Parameter Source Value Date X
Time Intermediate Range Current NMI-NI35B amps Intermediate Range Current NMI-NI36B amps NR Pressure 3RCS-PI455A psia NR Pressure 3RCS-PI456A psia NR Pressure 3RCS-PI457 psia NR Pressure 3RCS-PI458 psia Loop Tavg 3RCS-TI412 OF Loop Tavg 3RCS-TI422 OF Loop Tavg 3RCS-TI432 OF Loop Tavg 3RCS-TI442 OF Boron Concentration Chemistry ppm Control Bank C Rod Step Counters steps Control Bank D Rod Step Counters steps OPS Form 3209A-1 Rev. 6 Page 9 of 9


Form Approval         !               (
Form Approval !
j.pproval Date                                                       Effective Date JUL 0 11999                                                     JUL 0 6 1999                         I Form Cover Sheet Generic Information7 Form Title                                                                                                         Rev. No.
j.pproval Date
Estimated Critical Conditions                                                                                         6 Reference Procedure                       Applicable Tech. Spec.                                     Frequency OP 3209A                                             4.1.1.1.1.c                                   AR*
(
JUL 0 11999 Effective Date JUL 0 6 1999 Form Cover Sheet Generic Information 7 Form Title Rev. No.
Estimated Critical Conditions 6
Reference Procedure Applicable Tech. Spec.
Frequency OP 3209A 4.1.1.1.1.c AR*
This form is being used for the following:
This form is being used for the following:
STech Spec Surveillance                 0   System Alignment                 0)Other:
STech Spec Surveillance 0
0     Maintenance Restoration                 Non-Tech Spec (Retest)                               Surveillance (PM)
System Alignment
Specific InfBymDteonim Schedule Date                                           Applicable Mode                                 Partial     fed Sl  Ncen2                                                                                      n Surveillance fTest Authorized By                                                       Date                           Baseline         r TestD    D Prerequisites Completed (Initials)                                       Precautions Noted (Initials)
: 0) Other:
Performed By'                                                             Date                         Time
0 Maintenance Restoration Non-Tech Spec (Retest)
                    - Acepte     By                         ateTime                                       Accepac     Criteria Acceptd                             BySDteisfied Approved By (Department Head or Designee)                 Date Shift Manager Notified of Failed Test                     Date                                           11Ys           F1N Surveillance Information Test Equipment Type                                       CA Number           Cal Due Date N/A
Surveillance (PM)
Specific InfBy mDteonim Schedule Date Applicable Mode Partial fed S l Nce n2 Surveillance n
fTest Authorized By Date Baseline r
Test D D
Prerequisites Completed (Initials)
Precautions Noted (Initials)
Performed By' Date Time  
- Acepte By ateTime Accepac Criteria Acceptd BySDteisfied Approved By (Department Head or Designee)
Date Shift Manager Notified of Failed Test Date 11Ys F1N Surveillance Information Test Equipment Type CA Number Cal Due Date N/A
* This calculation may be performed at any time but must be verified within 4 hours prior to achieving reactor criticality.
* This calculation may be performed at any time but must be verified within 4 hours prior to achieving reactor criticality.
Send completed Form to Reactor Engineering.
Send completed Form to Reactor Engineering.
OPS Form 3209A-1 Rev. 6 Page 1 of 9
OPS Form 3209A-1 Rev. 6 Page 1 of 9 I


Estimated Critical Conditions,
(
(
Estimated Critical Conditions, Step No.                       Name                               Date             Time 4.2   Performed By:                                   I                   106001 Reference Critical Data Step No.               Parameter                                   Value Date                                               /0 [,     I   0 1 Time                                                   Q6      5.
OPS Form 3209A-1 Rev. 6 Page 2 of 9 Step No.
Power Level                                             00                       %
Name Date Time 4.2 Performed By:
Burnup                                            - 6     3,   S       MWD/MTU RCS Pressure                                     Z2--*         . 6             psia 6, 6                   0OF F
I 106001 Reference Critical Data Step No.
Tavg                                              6 Tref                                             5   136. 9                     OF Boron Concentration                                 11 9     1               ppm Xenon                                   (-)       2679.           +           pcm Samarium                                 (-)         6     1, S               pcm Control Bank C                                       Z2 -.                   steps Control Bank D                                       ea 1 -                   steps Estimated Conditions At Criticality Step No.               Parameter                                   Value 4.4.1   Date 4.4.2   Administrative Time Period (2 hours) From " /0 0                To:   Z 4.4.3   T/S Time Period (4 hours)           From: 0       O0           To:   ZoCoC 4.4.4   Present Burnup                               `30 00D                     MWD/MTU 4.4.5   Tavg                                                                               OF 4.4.6   RCS Pressure                                 2-25O                             psia 4.4.7.b. Xenon                                   (-)           O                       pcm 4.4.8.b. Samarium                               (-)       1300                       pcm 4.4.9.b.                                     Control Bank C @               2 I5    Steps or   Desired Critical Rod Height 4.4.10                                       Control Bank D @                 00     Steps Boron Concentration Step No.               Parameter                                   Value 4.5   Present Boron Concentration                         /:1     00               ppm OPS Form 3209A-1 Rev. 6 Page 2 of 9
Parameter Value Date  
/0 [,
I 0 1 Time Q 6
: 5.
Power Level 00 Burnup
- 6 3,
S MWD/MTU RCS Pressure Z2--*  
. 6 psia Tavg 6
0F 6, 6 OF Tref 5
136. 9 OF Boron Concentration 1 1 9 1
ppm Xenon
(-)
2679.  
+
pcm Samarium
(-)
6 1, S pcm Control Bank C Z2 -.
steps Control Bank D ea 1 -
steps Estimated Conditions At Criticality Step No.
Parameter Value 4.4.1 Date 4.4.2 Administrative Time Period (2 hours)
From "
0
/0 To:
Z 4.4.3 T/S Time Period (4 hours)
From: 0 O0 To:
Zo CoC 4.4.4 Present Burnup  
` 30 00D MWD/MTU 4.4.5 Tavg OF 4.4.6 RCS Pressure 2-25O psia 4.4.7.b.
Xenon
(-)
O pcm 4.4.8.b.
Samarium
(-)
1300 pcm 4.4.9.b.
Control Bank C @
2 I 5 Steps or Desired Critical Rod Height 4.4.10 Control Bank D @
00 Steps Boron Concentration Step No.
Parameter Value 4.5 Present Boron Concentration  
/:1 00 ppm


I                                              Estimated Critical Conditionst Defects POWER DEFECT Step No.                                 Parameter and/or Calculation                               Value 4.6.1     Power Defect @ Reference Power                                             (-)__q H I                   pcm Defect @ Ref Power 4.6.2     [(-)_pcm]
Estimated Critical Conditionst POWER DEFECT Step No.
Defect @ Ref Pwr x (-1) =                               (+)     (9* 60 pcm Power Defect REFERENCE MODERATOR DEFECT Step No.                                 Parameter and/or Calculation                               Value 4.7.2     Magnitude of MTC @ T"e                                                   __._pcm/1 F(no sign)
Parameter and/or Calculation Value 4.6.1 Power Defect @ Reference Power H
Magnitude of MTC @ Tref 4.7.3     Difference Between Tref and Tavg         =F                                                   (no sign) 4.7.4     (F)                         (Pcm/&deg;F)___                                                 pcm (no sign)
(-)__q I
                      -Trefffavg A           MTC @ T,,"                                   Ref Mod Defect 4.7.5     Sign of Reference Moderator Defect                                                 Sign-     (+ or 4.7.1 or       Value and Sign of Reference Moderator Defect =                             (   )_     __          pcm 4.7.6                                                                                     Ref Mod Defect ESTIMATED MODERATOR DEFECT C"*_    'L Ntep INO.                               Parameter and/or Calculation                               Value 1                                                                       4            Value 4.8.2                                                                                ._p        cml&deg;  F(no sign)
pcm Defect @ Ref Power 4.6.2
Magnitude of ITC @ 5570F =                                                 Magnitude of ITC @ 557&deg;F 0
[(-)_pcm]
1                                                                        4.ITC@ 557 F 4.8.3      Difference Between Estimated Tavg and 557&deg;F =                               __            OF (no sign)
x (-1) =
Tag/ 557-&deg;F A Tavg/557 0 FA 4.8.4 I
(+)
(                  &deg;OF) x ( _pcm/!F)           =                       4.
(9* 60 pcm Defect @ Ref Pwr Power Defect REFERENCE MODERATOR DEFECT Step No.
Tavg/557&deg;F A
Parameter and/or Calculation Value
_          pcm (no sign)
__._pcm/1 F(no sign) 4.7.2 Magnitude of MTC @ T"e Magnitude of MTC @ Tref 4.7.3 Difference Between Tref and Tavg =F (no sign) 4.7.4 (F)
ITC@ 557"F                                   Est ModDefect Est ModDefect 4.8.5      Sign of Estimated Moderator Defect I                                              =                                               (+ or -)
(Pcm/&deg;F)___
I Sign Sign 4.8.1 or       Value and Sign of Estimated Moderator Defect =                                   ) Mod
pcm (no sign)  
( Est     C Defect   pcm 4.8.6 Est Mod Defect I. _______________________________________
-Trefffavg A MTC @ T,,"
OPS Form 3209A-1 Rev. 6 of 9
Ref Mod Defect 4.7.5 Sign of Reference Moderator Defect Sign-(+ or 4.7.1 or Value and Sign of Reference Moderator Defect =
( )_
pcm 4.7.6 Ref Mod Defect ESTIMATED MODERATOR DEFECT Ntep INO.
4.8.2 4.8.3 4.8.4 4.8.5 I
I Parameter and/or Calculation Value 1
4 Magnitude of ITC @ 5570F =
ITC@ 5570F 1
4.
Difference Between Estimated Tavg and 557&deg;F =
(  
&deg;OF) x ( _pcm/!F)  
=
Tavg/557&deg;F A ITC@ 557"F Sign of Estimated Moderator Defect =
4.8.1 or Value and 4.8.6 Sign of Estimated Moderator Defect =
Tavg/557 0FA 4.
._p cml&deg; F(no sign)
Magnitude of ITC @ 557&deg;F OF (no sign)
Tag/ 557-&deg;F A pcm (no sign)
Est ModDefect Est ModDefect
(+ or -)
Sign
( ) C pcm Est Mod Defect Est Mod Defect I. _______________________________________
OPS Form 3209A-1 Rev. 6 of 9 I
Defects I
C"*_
'L Value Sign


Estimated Critical Conditionsk Defects (Continued)
Estimated Critical Conditionsk Defects (Continued)
XENON DEFECT Step No.                               Parameter and/or Calculation                                       Value 4.9                               pcm] - [(-)_pcm]                                             (-)267*4 pcm Estimated Xe                   Reference Xe                                     Xenon Defect SAMARIUM DEFECT Step No.                                 Parameter and/or Calculation                                     Value 4.10       [(-)--           _pcm]     -  [(-)       -      ppcm] =                         (-)3       7, 5 pcm Estimated Sm                   Reference Sm                                   Samarium Defect ROD WORTH DEFECT Step No.                                 Parameter and/or Calculation                                     Value 4.11.2.a.
XENON DEFECT Step No.
or       Integral Rod Worth @ Reference Conditions =                                         (-)R ifc           pcm 4.11.3.a.                                                                                             Reference RW 4.11.2.b.
Parameter and/or Calculation Value 4.9 pcm] - [(-)_pcm]
or       Integral Rod Worth @ Estimated Conditions =                                         ()     5*   0     pcm 4.11.3.b.                                                                                             Estimated RW 4.11.1 or       [(-)                     ppc[m                             =                       ( )   500         pcm 4.11.4           Estimated RW                   Reference RW                                       RW Defect BORON DEFECT Step                                   Parameter and/or Calculation                                       Value No.
(-)267*4 pcm Estimated Xe Reference Xe Xenon Defect SAMARIUM DEFECT Step No.
4.12.1   Differential Boron Worth @ Reference Burnup                                           (-)   6. Z   pcm/ppm Reference BW 4.12.2   Differential Boron Worth @ Present Burnup               =                                   Pn Z B cm/ppm Present BW 4.12.3                           pcm/ppm) +     (-_pcm/ppm)]                 -- 2 =             (-)L. IJ pc m/ppm Reference BW                         Present BW                                         Avg Diff BW 4.12.4   [(                   ppm) - (                   ppm)] X [(-)           pcm/ppm] =       (-) a     -"t'*' pcm Present CB (4.5)               Reference CB (4.3)           Avg Diff BW                 Boron Defect OPS Form 3209A-1 Rev. 6 Page 4 of 9
Parameter and/or Calculation Value 4.10
[(-)--
_pcm]
[(-)
pcm]
p
=
(-)3 7, 5 pcm Estimated Sm Reference Sm Samarium Defect ROD WORTH DEFECT Step No.
Parameter and/or Calculation Value 4.11.2.a.
or Integral Rod Worth @ Reference Conditions =
(-)R ifc pcm 4.11.3.a.
Reference RW 4.11.2.b.
or Integral Rod Worth @ Estimated Conditions =
()
5* 0 pcm 4.11.3.b.
Estimated RW 4.11.1 or
[(-)
ppc[m  
=
( ) 500 pcm 4.11.4 Estimated RW Reference RW RW Defect BORON DEFECT Step Parameter and/or Calculation Value No.
4.12.1 Differential Boron Worth @ Reference Burnup
(-) 6. Z pcm/ppm Reference BW 4.12.2 Differential Boron Worth @ Present Burnup =
Pn Z B cm/ppm Present BW 4.12.3 pcm/ppm) + (-_pcm/ppm)]  
-- 2 =
(-)L. IJ pc m/ppm Reference BW Present BW Avg Diff BW 4.12.4
[(
ppm) -
(
ppm)] X [(-)
pcm/ppm] =
(-) a  
-"t'*'
pcm Present CB (4.5)
Reference CB (4.3)
Avg Diff BW Boron Defect OPS Form 3209A-1 Rev. 6 Page 4 of 9


Defects (Continued)
Estimated Critical Conditions*
Estimated Critical Conditions*
Defects (Continued)
VOID DEFECT Step No.
VOID DEFECT Step No.                           Parameter and/or Calculation                         Value 4.13.2   Value of Void Correction Factor (Void Defect) =                       (+)           pcm Void Defect TOTAL REACTIVITY DEFECT Step No.                           Parameter and/or Calculation                         Value Power Defect                 =   (+) I 960 pcm (step 4.6.2)
Parameter and/or Calculation Value 4.13.2 Value of Void Correction Factor (Void Defect) =
Ref Mod Defect               =   ()           0   pcm (step 4.7.6)
(+)
Est Mod Defect               =   ( )         0   pcm (step 4.8.6)
pcm Void Defect TOTAL REACTIVITY DEFECT Step No.
Xe Defect                     =   (+)_ 2      'Jpcm (step 4.9) 4.14.1                                                                       (.         5    '1 pcm and     Sm Defect                     = (-). 3 36,Q Spcm                   (     o-) p Defect 4.14.2   (step 4.10)                                                               Total P Defect RWDefect                       = H             0   pcm (step 4.11.4)
Parameter and/or Calculation Value Power Defect  
Boron Defect                   = H z 5 il           pcm (step 4.12.4)
= (+) I 960 pcm (step 4.6.2)
Void Defect                   = (H)             G pcm (step 4.13.2)             +
Ref Mod Defect  
Combined Total = (0.) I           52 21pcm  =
= ()
Burnup Correction Step No.                           Parameter and/or Calculation                         Value 4.15.2.a. Critical Boron Concentration @ Reference Burnup =                                 0     ppm Ref Critical CB 4.15.2.b. Critical Boron Concentration @ Present Burnup =                             'tOto      ppm Present Critical CB 4.15.1 or     (           _      ppm) - (                     ppm) =               (-)     SO       ppm 4.15.3       Ref Critical CB   .       Present Critical CB                     Burnup Correction OPS Form 3209A-1 Rev. 6 Page5 of 9
0 pcm (step 4.7.6)
Est Mod Defect  
= ( )
0 pcm (step 4.8.6)
Xe Defect  
= (+)_2
'Jpcm (step 4.9) 4.14.1 5
(.  
'1 pcm and Sm Defect  
= (-). 3 36,Q Spcm
(
o-) p Defect 4.14.2 (step 4.10)
Total P Defect RWDefect  
= H 0
pcm (step 4.11.4)
Boron Defect  
= H z 5 il pcm (step 4.12.4)
Void Defect  
= (H)
G pcm (step 4.13.2)  
+
Combined Total = (0.) I 5 21 2
pcm =
Burnup Correction Step No.
Parameter and/or Calculation Value 4.15.2.a.
Critical Boron Concentration @ Reference Burnup =
0 ppm Ref Critical CB 4.15.2.b.
Critical Boron Concentration @ Present Burnup =
to
'tO ppm Present Critical CB 4.15.1 or
(
ppm) - (
ppm) =
(-)
SO ppm 4.15.3 Ref Critical CB.
Present Critical CB Burnup Correction OPS Form 3209A-1 Rev. 6 Page5 of 9


Estimated Critical Conditions Cn Critical Boron Concentration Calculation Step No.                                   Parameter and/or Calculation                                     Value
Estimated Critical Conditions Cn Critical Boron Concentration Calculation OPS Form 3209A-1 Rev. 6 Page 6 of 9 Step No.
[(I) Z 52.-                 pcm]     [(-)     6.2 5 pcm/ppmJ =                   (-)__00                 ppm 4.16.2             Total p Defect                   Present BW                                   Boron Equivalent 4.14.2                           4.12.2                                   of p Defect
Parameter and/or Calculation Value
[(). 20                   ppm] + [(--           0(,0         ppm]   =           (-)         1     04
[(I) Z 52. -
(     ppm 4.16.3       Burnup Correction                 Boron Equivalent of p Defect                     Corrected Boron 4.15.3                             4.16.2                                     Equivalent 4.16.4     (-)                         ppm] x (-1) =                                     (+)Required Boron Appm Corrected Boron Equivalent
pcm]
(     I       0O(G       ppm)+[(4)       1-+0           ppm]   =                       V4 O           ppm 4.16.5         Present CB                   Required Boron Aac                                           e 4.5                         4.16.4                                         Calculated CB
[(-) 6.2 5 pcm/ppmJ =
                                                                                                .            pcn/ 0 F(no sign) 4.16.7.a. Magnitude of ITC @557&deg;F                   =                                       Magnitude of ITC@ 557 0 F 4.16.7.b. Difference Between Estimated Tavg and 557 0 F                                            a           &deg;F (no sign)
(-)__00 ppm 4.16.2 Total p Defect Present BW Boron Equivalent 4.14.2 4.12.2 of p Defect
[(). 20 ppm] + [(--
0(,0 ppm] =
(-)
1 04
(
ppm 4.16.3 Burnup Correction Boron Equivalent of p Defect Corrected Boron 4.15.3 4.16.2 Equivalent 4.16.4
(-)
ppm] x (-1) =
(+)
X ppm Corrected Boron Equivalent Required Boron A
(
I 0O(G ppm)+[(4) 1-+0 ppm]  
=
V4 O ppm 4.16.5 Present CB Required Boron Aac e
4.5 4.16.4 Calculated CB pcn/ 0 F(no sign) 4.16.7.a.
Magnitude of ITC @557&deg;F =
Magnitude of ITC@ 557 0F 4.16.7.b.
Difference Between Estimated Tavg and 557 0F a  
&deg;F (no sign)
Tavg/ 557"*F A
Tavg/ 557"*F A
( __                 _OF)     x (             pcm/&deg;F) =                               _          pcm (no sign) 4.16.7.c.       Tavg/557&deg;F A               ITC @ 557&deg;F                                       Magnitude of 4.16.7.b.                   4.16.7.a.                                       Mod CF 4.16.7.d. Sign of Moderator Correction Factor =                                                           Si       (+ or-)
( __
Sign 4.16.7.e. Value and Sign of Moderator Correction Factor                       =                 (   )_pcm Moderator CF 4.16.7.f. Differential Boron Worth @ for Present Burnup                       =             (-)p                 cm/ppm 4.12.2                             Diff BW 4
_OF) x (
[R )_pcm]                         + [(-)                     pcm/ppm] =           (     )__ppm
pcm/&deg;F) =
  .16.7.g.             Mod CF                           Diff BW                                   Boron Equivalent 4.16.7.e.                         4.16.7.f.                                 of Moderator CF 4.16.6.a. Calculated Boron Concentration = Critical Boron Concentration             =
pcm (no sign) 4.16.7.c.
4.16.5 4.16.1   (   __pcm)                         + (                               =                   ( "        0   ppm or       Boron Equivalent of Mod CF                   Calculated CB                               Critical CB 4
Tavg/557&deg;F A ITC @ 557&deg;F Magnitude of 4.16.7.b.
4.16.7.h.             .16.7.g.                             4.16.5 OPS Form 3209A-1 Rev. 6 Page 6 of 9
4.16.7.a.
Mod CF 4.16.7.d.
Sign of Moderator Correction Factor =
Si
(+ or-)
Sign 4.16.7.e.
Value and Sign of Moderator Correction Factor =
( )_pcm Moderator CF 4.16.7.f.
Differential Boron Worth @ for Present Burnup =
(-)p cm/ppm 4.12.2 Diff BW
[R )_pcm]  
+ [(-)
pcm/ppm] =
( )__ppm 4.16.7.g.
Mod CF Diff BW Boron Equivalent 4.16.7.e.
4.16.7.f.
of Moderator CF 4.16.6.a.
Calculated Boron Concentration = Critical Boron Concentration =
4.16.5 4.16.1
(
__pcm)  
+ (
(
=
0 ppm or Boron Equivalent of Mod CF Calculated CB Critical CB 4.16.7.h.
4.16.7.g.
4.16.5


Estimated Critical Conditions.
Estimated Critical Conditions.
C Critical     Rod Height Calculation '
C Critical Rod Height Calculation '
Step No.                                   Parameter and/or Calculation                                   Value ppm] x [(-)_pcm/ppm]                 =
OPS Form 3209A-1 Rev. 6 Paozet 7 of 9 Pare ofI Step No.
4.17.1           Burnup Correction               Present BW                                                       pcm 4.15.3                       4.12.2                                     p Equivalent of BC
Parameter and/or Calculation Value ppm] x [(-)_pcm/ppm]  
[(-)_pcm]                     + R( )               pcmJ 4.17.2             p
=
                                                                          =                        (  )_            pcm Equivalent of BC         Total p Defect                                     Corrected Total 4.17.1                     4.14.2                                           p Defect 4
4.17.1 Burnup Correction Present BW pcm 4.15.3 4.12.2 p Equivalent of BC
    .17.3.a.
[(-)_pcm]  
or       Integral Rod Worth @ Reference Conditions =                                         (+)L         _pcm 4.17.4                                                                                                 RW @ Ref
+ R( )
[( )____               pcm] + [(+)       -      pcm] =
pcmJ  
4.17.5           Corrected p Defect           RW @ Reference                                                     pcm 4.17.2                     4.17.4                                           Net P Defect 4 .17.6.a.
=
Bank or       Critical Rod Position Corresponding to Net p Defect                                   @              Steps 4.17.6.b.                                                                                           Critical Rod Position Rod Withdrawal Limits Step No.                                   Parameter and/or Calculation                                   Value 4.18.1.a.
( )_
or       Integral Rod Worth @ Estimated Critical Position 4.18.2
pcm 4.17.2 p Equivalent of BC Total p Defect Corrected Total 4.17.1 4.14.2 p Defect 4.17.3.a.
                                                                          =                        (+) 5 10 pcm RW @ ECP 4.18.3     [               I       pcm]-   (500 pcm)       =()                                           OD 7 pcm RW @ ECP                                                                     RW for D @ 57 Steps W/D Limit 4.18.4 48       Rod Position Corresponding to the RW for the D @ 57 Steps                         Bank i0
or Integral Rod Worth @ Reference Conditions =
                                                                                                      @ 2 2.0 Steps 4.18.5     Withdrawal Limit or the Control Bank D Full Out Position                   D @ 57 Steps Withdrawal Limit 4.18.6     [(+)       -      . pcm] - (750 pcm)       =                                 (     -) or@- pcm RW @ ECP                                                                     RW for C @ 57 Steps W/D Limit 4.18.5                           or                                                           Bank 0 4.18.7       Rod Position Corresponding to the RW for the C 57 Steps or       Withdrawal Limit or the Control Bank D Full Out@Position                               @ Zi- I      Steps 4.18.8                                                                                             C @ 57 Steps Withdrawal Limit OPS Form 3209A-1 Rev.
(+)L
Paozet 67 of 9 Pare          ofI
_pcm 4.17.4 RW @ Ref
[( )____
pcm] + [(+)
pcm] =
4.17.5 Corrected p Defect RW @ Reference pcm 4.17.2 4.17.4 Net P Defect 4.17.6.a.
Bank or Critical Rod Position Corresponding to Net p Defect Steps 4.17.6.b.
Critical Rod Position Rod Withdrawal Limits Step No.
Parameter and/or Calculation Value 4.18.1.a.
or Integral Rod Worth @ Estimated Critical Position =
(+) 5 10 pcm 4.18.2 RW @ ECP 4.18.3
[
I pcm]-
(500 pcm)  
=()
OD 7 pcm RW @ ECP RW for D @ 57 Steps W/D Limit 4.18.4 Bank i0 48 Rod Position Corresponding to the RW for the D @ 57 Steps  
@ 2 2.0 Steps 4.18.5 Withdrawal Limit or the Control Bank D Full Out Position D @ 57 Steps Withdrawal Limit 4.18.6
[(+)
pcm] -
(750 pcm)  
=
(  
-)
or @-
pcm RW @ ECP RW for C @ 57 Steps W/D Limit 4.18.5 or Bank 0 4.18.7 Rod Position Corresponding to the RW for the C @ 57 Steps
@ Z I i-Steps or Withdrawal Limit or the Control Bank D Full Out Position C @ 57 Steps 4.18.8 Withdrawal Limit


Condition*
- I
          - I                       Estimated Critical
( Estimated Critical Conditionj OPS Form 3209A-1 Rev. 6 Page 8 of 9 Step No.
( SEstimated      Critical Conditionj Step No.                         Parameter and/or Calculation                                   Value 4.19.1     [(+)   510 RW @ ECP pcmj + (500 pcm) =                                         (+)   1010 pcm RW for D @ 57 Steps Insertion Limit 4.19.2.a 0or
Parameter and/or Calculation Value 4.19.1
* Rod Position Corresponding to the RW for the D @ 57 Step Insertion Limit Bank
[(+)
                                                                                          @      0 L-q-     Steps 4.19.3     =Rod                                                                             Position for D @ 57 Steps Limit Bank     C 4.19.4     Zero Power Rod Insertion Limit (RIL) =                                     @ __5 1       Steps 0% RIL 4.19.5                                                                               Bank     0 or       Rod Position Corresponding to the RW for the                             @        +4       Steps 4.19.6     D @ 57 Step Insertion Limit or the 0% RIL                                   D @ 57 Steps Insertion     Limit 4.19.7    4.19__________.pcm]   + (750 pcm) =                                       (+) JZ.O pcm RW @ ECP                                                             RW for C @ 57 Steps Insertion Limit 4.19.8.a.                                                                             Bank     6 or     Rod Position Corresponding to the RW for the C @ 57 Step Insertion Limit     @      13       Steps 4.19.9     =                                                                           Rod Position for C @ 57 Steps Limit 4.19.6.a.
510 pcmj + (500 pcm) =
or                                                                                Bank       D Bn 4.19.10   Rod Position Corresponding to the RW for the or     C @ 57 Step Insertion Limit or the 0% RIL                                 @       13 Steps 4.19.11                                                                                 C @ 57 Steps Insertion Limit OPS Form 3209A-1 Rev. 6 Page 8 of 9
(+)
1010 pcm RW @ ECP RW for D @ 57 Steps Insertion Limit 4.19.2.a Bank 0 0or
* Rod Position Corresponding to the RW for the D @ 57 Step Insertion Limit L-q-Steps 4.19.3  
=Rod Position for D @ 57 Steps Limit Bank C
4.19.4 Zero Power Rod Insertion Limit (RIL) =  
@ __5 1 Steps 0% RIL 4.19.5 Bank 0 or Rod Position Corresponding to the RW for the  
+4 Steps 4.19.6 D @ 57 Step Insertion Limit or the 0% RIL D @ 57 Steps Insertion Limit 4.19__________.pcm] + (750 pcm) =
(+) JZ.O pcm 4.19.7 RW @ ECP RW for C @ 57 Steps Insertion Limit 4.19.8.a.
Bank 6
or Rod Position Corresponding to the RW for the C @ 57 Step Insertion Limit 13 Steps 4.19.9  
=
Rod Position for C @ 57 Steps Limit 4.19.6.a.
Bank D
or Bn 4.19.10 Rod Position Corresponding to the RW for the 13 Steps or C @ 57 Step Insertion Limit or the 0% RIL C @ 57 Steps 4.19.11 Insertion Limit SEstimated Critical Condition*


Estimated Critical ConditionT Igeview Step No.                        Name                      Date        Time 4.20.4    Independent Calculation By:
Estimated Critical ConditionT Igeview T/S Acceptance Criteria Actual Critical Data Parameter Source Value Date Time Intermediate Range Current NMI-NI35B amps Intermediate Range Current NMI-NI36B amps NR Pressure 3RCS-PI455A psia NR Pressure 3RCS-PI456A psia NR Pressure 3RCS-PI457 psia NR Pressure 3RCS-PI458 psia Loop Tavg 3RCS-TI412 OF Loop Tavg 3RCS-TI422 OF Loop Tavg 3RCS-TI432 oF Loop Tavg 3RCS-TI442 OF Boron Concentration Chemistry ppm Control Bank C Rod Step Counters steps Control Bank D Rod Step Counters steps OPS Form 3209A-1 Rev. 6 Step No.
4.20.6    Licensed Operator Review By:
Name Date Time 4.20.4 Independent Calculation By:
T/S Acceptance Criteria Actual Critical Data Parameter                     Source             Value Date Time Intermediate Range Current             NMI-NI35B                     amps Intermediate Range Current             NMI-NI36B                     amps NR Pressure                           3RCS-PI455A                     psia NR Pressure                         3RCS-PI456A                       psia NR Pressure                           3RCS-PI457                     psia NR Pressure                           3RCS-PI458                     psia Loop Tavg                             3RCS-TI412                       OF Loop Tavg                             3RCS-TI422                       OF Loop Tavg                             3RCS-TI432                       oF Loop Tavg                             3RCS-TI442                       OF Boron Concentration                     Chemistry                     ppm Control Bank C                     Rod Step Counters               steps Control Bank D                     Rod Step Counters               steps OPS Form 3209A-1 Rev. 6
4.20.6 Licensed Operator Review By:


JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM


==Title:==
==Title:==
JPM ID Number:
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
JPM ID Number:        SRO-A2                                     Revision: 0 II. Initiated:
SRO-A2 Revision:
Steve Ja&#xa2;                                                           10/31/01 Date Ill. Reviewed:
0 II. Initiated:
                                                                          ,,/1/0 j Technical Reviewer                                                   Date IV. Approved:
Steve Ja&#xa2; 10/31/01 Date Ill.
Cognizant Plant Supervisor (optional)                                 Date Da uK     r Training Supervisor 1 of 8
Reviewed:
Technical Reviewer IV.
Approved:
Cognizant Plant Supervisor (optional) uK r Training Supervisor
,,/1/0 j Date Date Da 1 of 8


Tagging and Clearance 341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements GEN.2.2.13, Knowledge of Tagging and Clearance Procedures
'*READ TO THE STUDENT'*
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Facility:
JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Facility:
JPM ID Number:             SRO-A2                           Revision:   - 0 Task
JPM ID Number:
SRO-A2 Revision:
- 0 Task


==Title:==
==Title:==
System:
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
System:
Time Critical Task:
Tagging and Clearance Time Critical Task:           (   ) YES     ( X ) NO Validated Time (minutes):       10 min Task Number(s):         341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements Applicable To:         SRO         X           RO                     PEO K/A Number:          GEN.2.2.13, Knowledge of Tagging and                      K/A Rating:       3.6/3.8 Clearance Procedures
(  
--- Method of Testing:         Simulated Performance:                     Actual Performance:         X Location:                  Classroom:      X            Simulator:                 In-Plant::
) YES
Task Standards:             Review and approve a tag clearance boundary Required Materials:         Completed work package boundary sheet P&IDs EE One-Line Electrical Drawings OP 3300 series procedures General  
( X ) NO Validated Time (minutes):
10 min Task Number(s):
Applicable To:
SRO X
RO PEO K/A Rating:
3.6/3.8 K/A Number:
--- Method of Testing:
Simulated Performance:
Actual Performance:
X Simulator:
In-Plant::
Location:
Task Standards:
Required Materials:
General  


==References:==
==References:==
WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance
Classroom:
                                        '*READ TO THE STUDENT'*
X Review and approve a tag clearance boundary Completed work package boundary sheet P&IDs EE One-Line Electrical Drawings OP 3300 series procedures WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance 2 of 8
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 8


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:           SRO-A2                                               Revision:   0 Simulator Reauirements:          NONE Initial Conditions:             You are a licensed SRO. A tagout clearance boundary for the shaft mechanical seal replacement for the "B" Reactor Plant Component Cooling Water (CCP) pump has been developed.
JPM Number:
Initiating Cues:                Your task is to review the recommended tagout clearance boundary using available references so that the work package boundary sheet is ready for approval.
SRO-A2 Simulator Reauirements:
                                  "****NOTES TO EVALUATOR ****
Revision:
: 1.     Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
0 NONE Initial Conditions:
The students performance is graded by an "S"for satisfactory or a "U" for unsatisfactory on each step.
Initiating Cues:
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
You are a licensed SRO. A tagout clearance boundary for the shaft mechanical seal replacement for the "B" Reactor Plant Component Cooling Water (CCP) pump has been developed.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
Your task is to review the recommended tagout clearance boundary using available references so that the work package boundary sheet is ready for approval.
3 of 8
3 of 8 NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:     SRO-A2                                           Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
SRO-A2 Task


==Title:==
==Title:==
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
Revision:
0 Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
Start Time:
Start Time:
STEP        1              Performance Step:   Reviews the Work Package Boundary Sheet and selects appropriate reference materials GRADE                      Standards:          Selects:
Performance Step:
Standards:
Grade:
Performance Step:
STEP GRADE STEP GRADE Reviews the Work Package Boundary Sheet and selects appropriate reference materials Selects:
P&ID EM-121A, (CCP), EE Drawing.
P&ID EM-121A, (CCP), EE Drawing.
1M, OP 3330A, Rev. 15-02 Grade:              SAT                   UNSAT STEP        2              Performance Step:    Reviews 3CCP-P1 B-CS, "B" RPCCW Pump Control Switch GRADE                      Standards:          Uses selected references and determines the Pump Control Switch tagging is correct.
1M, OP 3330A, Rev. 15-02 SAT UNSAT Reviews 3CCP-P1 B-CS, "B" RPCCW Pump Control Switch Uses selected references and determines the Pump Control Switch tagging is correct.
Grade:              SAT                   UNSAT STEP        3       x     Performance Step:   Reviews power supply 34D9-2, 3CCP*P1 B breaker racked down and red tagged.
SAT UNSAT 3
GRADE                x      Standards:          Uses selected references and determines power supply 34D9-2 is INCORRECT.
x x
Performance Step:
Standards:
Grade:
Reviews power supply 34D9-2, 3CCP*P1 B breaker racked down and red tagged.
Uses selected references and determines power supply 34D9-2 is INCORRECT.
34D8-2 is the correct breaker (EE Drawing. 1M,).
34D8-2 is the correct breaker (EE Drawing. 1M,).
Tag and tagged position are correct.
Tag and tagged position are correct.
Grade:              SAT                   UNSAT 4 of 8
SAT UNSAT 4 of 8 1
Standards:
Grade:
2 STEP GRADE


PERFORMANCE INFORMATION JPM Number:     SRO-A2                                            Revision:      0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
SRO-A2 Revision:
STEP        4       x     Performance Step:   Reviews 3CCP*V91, RPCCW Pump P1 B Suction Isolation, red tagged closed.
0 Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
GRADE                X      Standards:            Uses selected references and determines that 3CCP*V91 selection, position and tagging is correct.
4 x
Grade:              SAT                     UNSAT STEP        5      x      Performance Step:    Reviews 3CCP*V8, RPCCW Pump P1 B Discharge Isolation, red tagged closed.
Performance Step:
GRADE              x      Standards:          Uses selected references and determines that 3CCP*V8 selection is INCORRECT.
X Standards:
Grade:
5 x
x Performance Step:
Standards:
Grade:
Reviews 3CCP*V91, RPCCW Pump P1 B Suction Isolation, red tagged closed.
Uses selected references and determines that 3CCP*V91 selection, position and tagging is correct.
SAT UNSAT Reviews 3CCP*V8, RPCCW Pump P1 B Discharge Isolation, red tagged closed.
Uses selected references and determines that 3CCP*V8 selection is INCORRECT.
3CCP*V6 is the correct boundary (P&ID EM-121A)
3CCP*V6 is the correct boundary (P&ID EM-121A)
CLOSED position and RED tagging is correct.
CLOSED position and RED tagging is correct.
Grade:              SAT                     UNSAT STEP        6        X     Performance Step:     Reviews 3CCP*V649, RPCCW Pump P1 B Vent valve, red tagged open.
SAT UNSAT X
GRADE                x      Standards:            Uses selected references and determines that 3CCP V649 selection, position and tagging is correct.
Performance Step:
Grade:              SAT                     UNSAT 5 of 8
Standards:
Grade:
Reviews 3CCP*V649, RPCCW Pump P1 B Vent valve, red tagged open.
Uses selected references and determines that 3CCP V649 selection, position and tagging is correct.
SAT UNSAT 5 of 8 STEP GRADE STEP GRADE 6
STEP GRADE x


PERFORMANCE INFORMATION JPM Number:     SRO-A2                                            Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
SRO-A2 Revision:
STEP        7        x      Performance Step:   Reviews 3CCP*V314, RPCCW Pump P1B Drain Valve, red tagged open.
0 Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.
GRADE                x      Standards:          Uses selected references and determines that 3CCP*V314 selection, position and tagging is correct.
Performance Step:
Grade:              SAT                   UNSAT STEP        8              Performance Step:    Amend and approve the clearance boundary GRADE                      Standards:          Makes indicated changes to the clearance boundary, and recommends approval as amended.
Standards:
Grade:              SAT                   UNSAT Termination Cue: The Evaluation For This JPM is Complete.
Grade:
Performance Step:
Standards:
Grade:
Reviews 3CCP*V314, RPCCW Pump P1B Drain Valve, red tagged open.
Uses selected references and determines that 3CCP*V314 selection, position and tagging is correct.
SAT UNSAT Amend and approve the clearance boundary Makes indicated changes to the clearance boundary, and recommends approval as amended.
SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete.
Stop Time:
Stop Time:
6 of 8
6 of 8 STEP 7
x GRADE x
STEP 8
GRADE


VERIFICATION OF JPM COMPLETION JPM Number:           SRO-A2                                        Revision:            0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
SRO-A2 Revision:
Time Critical Task?                         YES              NO      X Validated Time (minutes):                   10 Actual Time to Complete (minutes):
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
Validated Time (minutes):
YES NO X
10 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 568: Line 1,324:
7 of 8
7 of 8


STUDENT HANDOUT JPM Number:         SRO-A2 Initial Conditions: You are a licensed SRO. A tagout clearance boundary for the shaft mechanical seal replacement for the "B" Reactor Plant Component Cooling Water (CCP) pump has been developed.
STUDENT HANDOUT JPM Number:
Initiating Cues:    Your task is to review the recommended tagout clearance boundary using available references so that the work package boundary sheet is ready for approval.
Initial Conditions:
Initiating Cues:
SRO-A2 You are a licensed SRO. A tagout clearance boundary for the shaft mechanical seal replacement for the "B" Reactor Plant Component Cooling Water (CCP) pump has been developed.
Your task is to review the recommended tagout clearance boundary using available references so that the work package boundary sheet is ready for approval.
8 of 8
8 of 8


WORK PACKAGE BOUNDARY SHEET Clearance Number:
WORK PACKAGE BOUNDARY SHEET Clearance Number:
AWO Number:           Clearance Adequate for Personnel Safety:                               Date:
AWO Number:
M30110525             Contact Person / Designee Sign Step   Tag Tagged     Tag   Equipment ID       Equipment   Equipment     Notes     Tag     Tag     Worker Number   Type Position   Serial                   Description   Location             Placed Verified Verified Number 1     YEL                   3CCP-P1 B-CS   B RPCCW PUMP             POWER IS RED CONTROL SWITCH             TAGGED OFF 2   RED RACKED               34D9-2         3CCP*P1B DOWN 3   RED CLOSED               3CCP*V91     RPCCW PUMP P1 B SUCTION ISOLATION 4   RED CLOSED               3CCP*V8     RPCCW PUMP P1B DISCHARGE ISOLATION 5   RED   OPEN               3CCP*V649     RPCCW PUMP P1 B VENT VALVE 6   RED   OPEN               3CCP*V314     RPCCW PUMP P1B DRAIN VALVE
Clearance Adequate for Personnel Safety:
Date:
M30110525 Contact Person / Designee Sign Step Tag Tagged Tag Equipment ID Equipment Equipment Notes Tag Tag Worker Number Type Position Serial Description Location Placed Verified Verified Number 1
YEL 3CCP-P1 B-CS B RPCCW PUMP POWER IS RED CONTROL SWITCH TAGGED OFF 2
RED RACKED 34D9-2 3CCP*P1B DOWN 3
RED CLOSED 3CCP*V91 RPCCW PUMP P1 B SUCTION ISOLATION 4
RED CLOSED 3CCP*V8 RPCCW PUMP P1B DISCHARGE ISOLATION 5
RED OPEN 3CCP*V649 RPCCW PUMP P1 B VENT VALVE 6
RED OPEN 3CCP*V314 RPCCW PUMP P1B DRAIN VALVE


!                                                                                                        (
(
KEY---WORK PACKAGE BOUNDARY SHEET---KEY Clearance Number:
KEY---WORK PACKAGE BOUNDARY SHEET---KEY Clearance Number:
AWO Number:           Clearance Adequate for Personnel Safety:                               Date:
AWO Number:
M30110525             Contact Person ! Designee Sign Step   Tag   Tagged     Tag   Equipment ID       Equipment   Equipment     Notes     Tag     Tag     Worker Number   Type Position   Serial                   Description   Location             Placed Verified Verified Number 1   YEL                     3CCP-PI B-CS   B RPCCW PUMP             POWER IS RED CONTROL SWITCH             TAGGED OFF 2     RED RACKED                 34D8-2         3CCP*P1B DOWN 3     RED CLOSED               3CCP*V91     RPCCW PUMP P1B SUCTION ISOLATION 4     RED CLOSED               3CCP*V6     RPCCW PUMP P1B DISCHARGE ISOLATION 5     RED   OPEN               3CCP*V649     RPCCW PUMP P1 B VENT VALVE 6     RED   OPEN               3CCP*V314     RPCCW PUMP P1B DRAIN VALVE
Clearance Adequate for Personnel Safety:
Date:
M30110525 Contact Person ! Designee Sign Step Tag Tagged Tag Equipment ID Equipment Equipment Notes Tag Tag Worker Number Type Position Serial Description Location Placed Verified Verified Number 1
YEL 3CCP-PI B-CS B RPCCW PUMP POWER IS RED CONTROL SWITCH TAGGED OFF 2
RED RACKED 34D8-2 3CCP*P1B DOWN 3
RED CLOSED 3CCP*V91 RPCCW PUMP P1B SUCTION ISOLATION 4
RED CLOSED 3CCP*V6 RPCCW PUMP P1B DISCHARGE ISOLATION 5
RED OPEN 3CCP*V649 RPCCW PUMP P1 B VENT VALVE 6
RED OPEN 3CCP*V314 RPCCW PUMP P1B DRAIN VALVE


JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM


==Title:==
==Title:==
Review and Approve a Radioactive Liquid Waste Discharge Permit JPM ID Number:         SRO-A3                                 Revision:   0 II. Initiated:
Review and Approve a Radioactive Liquid Waste Discharge Permit JPM ID Number:
Steve Jackso(=         -z-n                                     11/01/01 Developer                                                         Date Reviewed:
SRO-A3 Revision:
Ray Martin     C         o* t .,.                                11/15/01 Technical Reviewer                                                 Date IV. Approved:
0 II. Initiated:
Cognizant Plant Supervisor (optional)                             Date Nu'cfrTraining Supervisor                                         Dat 1 of 7
Steve Jackso(=  
-z-n Developer Reviewed:
Ray Martin C
o* t Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nu'cfrTraining Supervisor Date Dat 1 of 7 11/01/01 Date 11/15/01 Date


JOB PERFORMANCE MEASURE GUIDE Facility:      Millstone Unit 3 JPM ID Number:             SRO-A3                           Revision:     0 Task
JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 JPM ID Number:
SRO-A3 Revision:
Task


==Title:==
==Title:==
Review and Approve a Radioactive Liquid Waste Discharge Permit System:        Radioactive Liquid Waste System Time Critical Task:             ) YES     (X)     NO Validated Time (minutes):
System:
Task Number(s):         068-01-064, Discharge the contents of a Low Level Waste Drain Tank 068-03-001, Adhere to the requirements of the Radwaste Management Program Applicable To:          SRO       X           RO                       PEO K/A Number:         GEN- 2.3.6                             K/A Rating:     2.1/3.1 Method of Testing:         Simulated Performance:         X         Actual Performance:         X Location:                 Classroom:           In-Plant::    X          Simulator:          X Task Standards:             Review and Approve a Radioactive Liquid Waste Discharge Permit Required Materials:         OP 3335D, Radioactive Liquid Waste System Liquid Discharge Permit Screen Print of Rad Monitor LWS70-1 General  
Review and Approve a Radioactive Liquid Waste Discharge Permit Radioactive Liquid Waste System Time Critical Task:
) YES (X)
NO Validated Time (minutes):
Task Number(s):
Applicable To:
068-01-064, Discharge the contents of a Low Level Waste Drain Tank 068-03-001, Adhere to the requirements of the Radwaste Management Program SRO X
RO PEO K/A Number:
GEN-2.3.6 K/A Rating:
Method of Testing:
Simulated Performance:
X Actual Performance:
Location:
Classroom:
Task Standards:
Required Materials:
General  


==References:==
==References:==
None
In-Plant::
                                  ***READ TO THE STUDENT***
X Simulator:
X Review and Approve a Radioactive Liquid Waste Discharge Permit OP 3335D, Radioactive Liquid Waste System Liquid Discharge Permit Screen Print of Rad Monitor LWS70-1 None 2 of 7 Facility:
0 2.1/3.1 X
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 7


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:           SRO-A3                                               Revision:   0 Simulator Reauirements:          None Initial Conditions:             The unit is at 100% power with all systems in normal line-ups.
JPM Number:
SRO-A3 Simulator Reauirements:
Revision:
0 None Initial Conditions:
Initiating Cues:
The unit is at 100% power with all systems in normal line-ups.
The "A" and "B" Service Water pumps and all Circulating Water pumps are running.
The "A" and "B" Service Water pumps and all Circulating Water pumps are running.
Initiating Cues:                The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval.
The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval.
Review and approve the permit and report to the examiner when complete.
Review and approve the permit and report to the examiner when complete.
                                  "*NOTESTO EVALUATOR ****
: 1.      Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S"for satisfactory or a "U" for unsatisfactory on each step.
: 2.      When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.      If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 7
3 of 7
"*NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:       SRO-A3                                      Revision:        0 1
PERFORMANCE INFORMATION JPM Number:
Task
1 Task


==Title:==
==Title:==
SRO-A3 Revision:
Review and Approve a Radioactive Liquid Waste Discharge Permit Start Time:
Review and Approve a Radioactive Liquid Waste Discharge Permit Start Time:
STEP        1       X     Performance Step:     Go to the correct procedure step, OP3335D, Section 4.25.4.j GRADE              X      Standards:            Locates the correct procedure step.
1 X
X 2
X X
X Performance Step:
Standards:
Grade:
Performance Step:
Standards:
Standards:
Comments:
Go to the correct procedure step, OP3335D, Section 4.25.4.j Locates the correct procedure step.
Candidate may review previous steps.
Candidate may review previous steps.
Grade:                SAT                   UNSAT STEP        2      X      Performance Step:    PERFORM Independent Verification of liquid effluent monitor alarm and alert settings. [step 4.25.4.j.1)]
SAT UNSAT PERFORM Independent Verification of liquid effluent monitor alarm and alert settings. [step 4.25.4.j.1)]
GRADE              X      Standards:            Locates liquid effluent monitor alarm and alert settings on Liquid Discharge Permit.
Locates liquid effluent monitor alarm and alert settings on Liquid Discharge Permit.
GRADE              X      Standards:          Locates liquid effluent monitor alarm and alert current settings on RMS Console.
Locates liquid effluent monitor alarm and alert current settings on RMS Console.
Comments:            Since this JPM is done in a classroom setting the RMS Console is not available. When candidate requests information and specifies that he would access the RMS screen for LWS70-1, Liquid Waste discharge process radiation monitor, exercise the cue.
Since this JPM is done in a classroom setting the RMS Console is not available. When candidate requests information and specifies that he would access the RMS screen for LWS70-1, Liquid Waste discharge process radiation monitor, exercise the cue.
GRADE              X     Standards:           Compares permit settings and RMS information and identifies that RMS is incorrect. Recommends changing RMS to match the permit.
X Standards:
4 of 7
Compares permit settings and RMS information and identifies that RMS is incorrect. Recommends changing RMS to match the permit.
4 of 7 0
STEP GRADE STEP GRADE GRADE GRADE


PERFORMANCE INFORMATION JPM Number:       SRO-A3                                      Revision:          0 1
PERFORMANCE INFORMATION JPM Number:
Task
1 Task


==Title:==
==Title:==
SRO-A3 Revision:
Review and Approve a Radioactive Liquid Waste Discharge Permit Initials permit after receiving the cue.
Review and Approve a Radioactive Liquid Waste Discharge Permit Initials permit after receiving the cue.
Grade:               SAT                     UNSAT STEP        3      x      Performance Step:   Refer to CHEM Form 3800P-001 and CHECK "EST Activity this Discharge (Ci) on Liquid Discharge Permit is less than action level specified. [step 4.25.4.j.2)]
Grade:
GRADE              x      Standards:          COMPARE CHEM Form 3800P-001 and CHECK "EST Activity this Discharge (Ci) to Discharge permit "Estimated activity this discharge (Ci)".
SAT UNSAT Performance Step:
Standards:
Grade:
Performance Step:
Standards:
Grade:
Refer to CHEM Form 3800P-001 and CHECK "EST Activity this Discharge (Ci) on Liquid Discharge Permit is less than action level specified. [step 4.25.4.j.2)]
COMPARE CHEM Form 3800P-001 and CHECK "EST Activity this Discharge (Ci) to Discharge permit "Estimated activity this discharge (Ci)".
Determines that values are below the limits. Initials permit.
Determines that values are below the limits. Initials permit.
Grade:              SAT                     UNSAT STEP        4      x      Performance Step:    CHECK required dilution flowrate is met. [step 4.25.4.j.4)]
SAT UNSAT CHECK required dilution flowrate is met. [step 4.25.4.j.4)]
GRADE              x      Standards:          COMPARES permit requirement of 2 SWP and 3 CWP to actual plant condition of 2 SWP and 6 CWP.
COMPARES permit requirement of 2 SWP and 3 CWP to actual plant condition of 2 SWP and 6 CWP.
Determines that dilution flow is met.
Determines that dilution flow is met.
Initials permit.
Initials permit.
Grade:              SAT                     UNSAT Termination Cue: The Evaluation of this JPM is Complete Stop Time:
SAT UNSAT Termination Cue: The Evaluation of this JPM is Complete Stop Time:
5 of 7
5 of 7 0
3 STEP GRADE x
x STEP 4
GRADE x
x


VERIFICATION OF JPM COMPLETION JPM Number:             SRO-A3                                            Revision:        0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
SRO-A3 Revision:
Time Critical Task?                         YES             NO      X Validated Time (minutes):                   10 Actual Time to Complete (minutes):
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
YES Validated Time (minutes):
NO X
10 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 656: Line 1,494:
6 of 7
6 of 7


STUDENT HANDOUT JPM Number:           SRO-A3 Initial Conditions: The unit is at 100% power with all systems in normal line ups. The "A" and "B" Service Water pumps and all Circulating Water pumps are running.
STUDENT HANDOUT JPM Number:
Initiating Cues:    The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval. Review and approve the permit and report to the examiner when complete.
Initial Conditions:
Initiating Cues:
SRO-A3 The unit is at 100% power with all systems in normal line ups. The "A" and "B" Service Water pumps and all Circulating Water pumps are running.
The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval. Review and approve the permit and report to the examiner when complete.
7 of 7
7 of 7


FORM APPROVED.:           C. J. Schwar2             DATE.: 5/16/97             PORC MTG NO.:     3-97-105 MILLSTONE UNIT #3                        LIQUID DISCHARGE PERMIT NO.                   4463   (2001-69338) ank .............           WTT-A                                   Date/time sampled...:             9-NOV-2001   17:35 Sampled by .....                                                     Date/time on recirc.:             9-NOV-2001   14:00 TSS (ppm) .:                               (tank limit           = 45 ppm)                     pH.:     4.7 Boric acid conc           (ppm) .:       4330.0
FORM APPROVED.:
              <<<   2 circulators             must be in           operation during a discharge               >>>
C.
Independent             samples taken >>> yes no                     (circle one)
J.
Isotope                  Activity                            MPC              Activity/MPC (uCi/ml)                         (uCi/ml)
Schwar2 MILLSTONE UNIT #3 DATE.: 5/16/97 PORC MTG NO.: 3-97-105 LIQUID DISCHARGE PERMIT NO.
CO-58                    3 .522E-07                       1. OOOE-04                3.522E-03 CO-60                    4. 720E-07                       5. 000E-05                9.441E-03 SB-125                    4. 779E-06                       1.000E-04                 4.779E-02 XE-133                    4 240E-07 XE-135                    1. 920E-07 CS-137                    1. 268E-07                        2. 000E-05                6 .342E-03 H-3                      1. 720E-01                        3. 000E-03               5.733E+01 Totals                    6. 346E-06          (@)                                    5. 740E+01 Dissolved gas conc (uCi/ml) = 6.161E-07 (limit = 4.0E-l)
4463 (2001-69338) ank.............
Minimum recirc time using 1 pump is                                                                                     Tech 175.   (min)
WTT-A Date/time sampled...:
Sample saved for composite ....................
9-NOV-2001 17:35 Sampled by.....
Date             Tech Release limit (Ci) ...............................                                     6.700E-03
Date/time on recirc.:
  )tal   activity released to date (Ci) ...........                                   1.613E-03
9-NOV-2001 14:00 TSS (ppm).:
-stimated volume this discharge (gal) .........                                             21000.
(tank limit  
Estimated activity this discharge (Ci) .........                                       5.044E-04     (@)
= 45 ppm) pH.:
Estimated total activity released (Ci) .........                                       2.117E-03     (@)
4.7 Boric acid conc (ppm).:
(W) these values do not include activity due to tritium (1) Reduction         factor .............................                     :      1.742E-02               SM/US init (2) Required dilution flow rate ..............                                           480000.    (gpm) 3 circ water,                 2 service water pump(s)
4330.0  
<<< 2 circulators must be in operation during a discharge >>>
Independent samples taken >>> yes no (circle one)
Activity (uCi/ml) 3.522E-07
: 4. 720E-07
: 4. 779E-06 4 240E-07
: 1. 920E-07
: 1. 268E-07
: 1. 720E-01
: 6. 346E-06
(@)
MPC (uCi/ml)
: 1. OOOE-04
: 5. 000E-05 1.000E-04
: 2. 000E-05
: 3. 000E-03 Activity/MPC 3.522E-03 9.441E-03 4.779E-02 6.342E-03 5.733E+01
: 5. 740E+01 Dissolved gas conc (uCi/ml) =
6.161E-07 (limit = 4.0E-l)
Minimum recirc time using 1 pump is 175.
(min)
Sample saved for composite....................
Date Release limit (Ci)...............................
6.700E-03  
)tal activity released to date (Ci)...........
1.613E-03  
-stimated volume this discharge (gal).........
21000.
Estimated activity this discharge (Ci).........
5.044E-04
(@)
Estimated total activity released (Ci).........
2.117E-03
(@)
(W) these values do not include activity due to tritium (1) Reduction factor.............................
1.742E-02 (2) Required dilution flow rate..............
3 circ water, 2 service water pump(s)
(3) Normal rate limit (flow rate=#l*#2*0.1)..:
(3) Normal rate limit (flow rate=#l*#2*0.1)..:
(4) Liquid effluent monitor alert                                                             150.  (gpm) setting ....           1.500E-04    (uCi/ml)
(4) Liquid effluent monitor alert setting....
(5) Liquid effluent monitor alarm setting ....
(5) Liquid effluent monitor alarm setting....
: 2. OOOE-04    (uCi/ml)
(6) Rad monitor source check completed at....
(6) Rad monitor source check completed at ....
Maximum approved rate........................
Oper Maximum approved rate ........................                                   :
(Authorization required to exceed normal rate limit.)
(Authorization required to exceed normal rate limit.)                                               (gpm)
SM/US init 480000.
Dual verification             of     release         rate     calculation       ---    >>> yes no             (circle one)
(gpm) 150.
-** DISCHARGE         ***
1.500E-04
DILUTION               TANK DATE                  TIME                FLOW RATE             LEVEL                  DISCHARGE        OPERATOR (gpm)                 (gallons)               RATE (gpm)
: 2. OOOE-04 (gpm)
(uCi/ml)
(uCi/ml)
Oper (gpm)
Dual verification of release rate calculation  
>>> yes no (circle one)
-** DISCHARGE DILUTION FLOW RATE (gpm)
TANK LEVEL (gallons)
DISCHARGE RATE (gpm)
OPERATOR Isotope CO-58 CO-60 SB-125 XE-133 XE-135 CS-137 H-3 Totals Tech Tech DATE TIME


(              i                ~I                                                                                                            ,
(UJ/  
a2                ....
' Aplroval Approval Date
(UJ/         ' Aplroval                                   Approval Date                 tffect(ve Date                POC Mtg. No.
(
Unit 3 Liquid Radwaste Discharge Goals Year:                                                 (O&#xa9;ppV Normal at Power Operations                           Refueling and Cold Shutdown Outages                             Annual Action Level                 Monthly Goal                   Action Level                   Monthly Goal                     Goal
POC Mtg. No.
              ;Z a V, 00         gal/month   12.c, ,v9a      gal/month                  gal/month    I.2--)      t000    gal/month 1 -      .30. (ioo      gal
Unit 3 Liquid Radwaste Discharge Goals Year:
_n            galm--o n
Normal at Power Operations Refueling and Cold Shutdown Outages Annual Action Level Monthly Goal Action Level Monthly Goal Goal
                ,.7r*-p3 Ci/month           I / ."7 if-A 'j2 r;/mr~ntb'   S/7r-o3 Ci/month             /    -* if -A -Z  Ci/month                         Ci
;Z a V, 00 gal/month
                    ---------m_-
,.7r*-p3 Ci/month 12.c,,v9 a gal/month I /."7 if-A 'j2 r;/mr~ntb'
                ,q r.-03 Cl/discharge                                        3.  ,6 -03* Ci/discharge Radwaste Coordinator / Date
,q r.-03 Cl/discharge gal/month I.2--)
                                                                            "-T,,  n    Lf,-,, I&#xfd;s, z2-L-0-*,
t000
Motcl     t-3 WTT-(D                                                                                                  1k                           I ,A'I-oi'   3.*-Q3 (Ji l    0' -                                                                        Mtode q-4                    Lw-Pl'              2,q,     -    A,     //,.
_n galm--o n S/7r-o3 Ci/month
t7T gJJhsI            Pe:
: 3.
Chem Form 3800P -1 Rev. 0 Page 1 of 1
,6 -03*
Ci/discharge gal/month 1 -
.30. (ioo gal
/
if -A -Z Ci/month Ci Radwaste Coordinator / Date Motcl t-3 W TT-
 1k
Mtode q-4 Lw-Pl' I,A'I-oi' 3.*-Q3 2, q, A,  
//,.
t7T gJJhsI
Pe:
Chem Form 3800P -1 Rev. 0 Page 1 of 1 a2 tffect(ve Date (D
0' (Ji l
(O&#xa9;ppV m_-
i
~I
"-T,,
n Lf,-,, I &#xfd;s, 2-L z *,


4Z.: 7-0 SWAVIV-0NI 313t;&#xfd;HOt&#xfd;3&#xfd;4
4Z.: 7-0 SWAVIV-0NI 313t;&#xfd;HOt&#xfd;3&#xfd;4
Line 704: Line 1,605:


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager JPM ID Number:     SRO-A4                                     Revision: 0 I1. Initiated:
Emergency Plan Responsibilities as Shift Manager JPM ID Number:
9/28/01 Date III. Reviewed:
SRO-A4 Revision:
Date Technical Reviewer IV. Approved:
0 I1. Initiated:
Date Cognizant Plant Supervisor (optional)
9/28/01 Date III.
Nucr r Training Supervisor                                     /D~te 1 of 12
Reviewed:
Technical Reviewer Date IV. Approved:
Cognizant Plant Supervisor (optional)
Nucr r Training Supervisor Date
/D~te 1 of 12


JOB PERFORMANCE MEASURE GUIDE Facility:      Millstone Unit 3 JPM ID Number:           SRO-A4                             Revision:      0 Task
JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Revision:
JPM ID Number:
SRO-A4 Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager System:        Admin, SERO Time Critical Task:       (X     )YES     (   ) NO Validated Time (minutes):       10 Task Number(s):         301-05-578, Assume command of the SERO Applicable To:          SRO         X         RO                       PEO K/A Number:         GEN.2.4.44                           K/A Rating:         4.0 Method of Testing:         Simulated Performance:                     Actual Performance:        X Location:                 Classroom:      X          Simulator:      X          In-Plant::    X Task Standards:             Assume command of the SERO Required Materials:         MP-26-EPI-FAP01-001, Control Room DSEO, Rev. 000 MP-26-EPI-FAP06, Classification and PARs, Rev. 000 MP-26-EPI-FAP06-005, Control Room PARs, Rev. 000 MP-26-EPI-FAP08, Evacuation and Assembly, Rev. 000 EPUG-08B, Millstone Emergency Preparedness Resource Book General  
System:
Emergency Plan Responsibilities as Shift Manager Admin, SERO Time Critical Task:
(X  
)YES
(
Validated Time (minutes):
10 Task Number(s):
Applicable To:
301-05-578, Assume command of the SERO SRO X
RO K/A Number:
GEN.2.4.44 K/A Rating:
Method of Testing:
Simulated Performance:
Location:
Task Standards:
Required Materials:
General  


==References:==
==References:==
MP-26-EPI-FAP06-001, EAL Tables, Rev. 000
Classroom:
                                    ***READ TO THE STUDENT***
X Simulator:
Actual Performance:
X X
In-Plant::
X Assume command of the SERO MP-26-EPI-FAP01-001, Control Room DSEO, Rev. 000 MP-26-EPI-FAP06, Classification and PARs, Rev. 000 MP-26-EPI-FAP06-005, Control Room PARs, Rev. 000 MP-26-EPI-FAP08, Evacuation and Assembly, Rev. 000 EPUG-08B, Millstone Emergency Preparedness Resource Book MP-26-EPI-FAP06-001, EAL Tables, Rev. 000 2 of 12 Facility:
0
) NO PEO 4.0
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 12


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:           SRO-A4                                                 Revision:    0 Simulator Requirements:           none Initial Conditions:             The Initial Conditions are covered in the Event Description.
JPM Number:
Initiating Cues:               You are the Shift Manager. You have assumed responsibility in the Control Room DSEO (CR-DSEO) role during an Inter-System LOCA event. You are implementing EPI-FAP01-001, Control Room DSEO, and have completed all actions in Section A and are ready to Go To Section E.
SRO-A4 Simulator Requirements:
Initial Conditions:
Revision:
0 none The Initial Conditions are covered in the Event Description.
Initiating Cues:
You are the Shift Manager. You have assumed responsibility in the Control Room DSEO (CR-DSEO) role during an Inter-System LOCA event. You are implementing EPI-FAP01-001, Control Room DSEO, and have completed all actions in Section A and are ready to Go To Section E.
You have classified the event as a General Emergency Alpha (GE-A) based on events in progress and the Incident Report Form (IRF) has been reviewed, approved and transmitted. Your task is to complete all actions in Section E, General Emergency Immediate Actions. Discuss with the examiner any actions that cannot be performed or simulated.
You have classified the event as a General Emergency Alpha (GE-A) based on events in progress and the Incident Report Form (IRF) has been reviewed, approved and transmitted. Your task is to complete all actions in Section E, General Emergency Immediate Actions. Discuss with the examiner any actions that cannot be performed or simulated.
The examiner will act as all persons or agencies with whom you must communicate. Inform the examiner when you have completed the task.
The examiner will act as all persons or agencies with whom you must communicate. Inform the examiner when you have completed the task.
                                  **** NOTES TO EVALUATOR ****
3 of 12
: 1.     Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
**** NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 2.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3 of 12
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:       SRO-A4                                            Revision:      0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager Record Start Time:
SRO-A4 Revision:
STEP        1              Performance Step:       Locate Section E of FAP01-001, and review notes.
0 Emergency Plan Responsibilities as Shift Manager Record Start Time:
GRADE                        Standards:            Reviews notes:
Performance Step:
                                                    "* Consideration of shelter versus evacuation during hazardous events
Standards:
                                                    "* Advisability of not making PA announcements during security events Grade:                SAT                   UNSAT STEP        2                Performance Step:      Notify the unaffected unit control rooms of the event "GRADE                      Standards:            Discusses with examiner contacting MP1 and MP2 control rooms. Includes methods of communicating in discussion.
Grade:
Comments:            Ask candidate how this is accomplished if not volunteered during discussion.
Performance Step:
Grade:                SAT                   UNSAT STEP        3                Performance Step:      Request Security to restrict site access GRADE                        Standards:            Discusses with examiner the following items:
Standards:
* all personnel called on site must process through EOF Comments:            Ask candidate how this is accomplished if not volunteered during discussion.
Comments:
Grade:                SAT                   UNSAT 4 of 12
Grade:
Performance Step:
Standards:
Comments:
Grade:
Locate Section E of FAP01-001, and review notes.
Reviews notes:  
"* Consideration of shelter versus evacuation during hazardous events  
"* Advisability of not making PA announcements during security events SAT UNSAT Notify the unaffected unit control rooms of the event Discusses with examiner contacting MP1 and MP2 control rooms. Includes methods of communicating in discussion.
Ask candidate how this is accomplished if not volunteered during discussion.
SAT UNSAT Request Security to restrict site access Discusses with examiner the following items:
all personnel called on site must process through EOF Ask candidate how this is accomplished if not volunteered during discussion.
SAT UNSAT 4 of 12 STEP 1
GRADE 2
STEP "G RADE STEP 3
GRADE


PERFORMANCE INFORMATION JPM Number:     SRO-A4                                             Revision:  0 Task
PERFORMANCE INFORMATION JPM Number:
SRO-A4 Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager STEP       4             Performance Step:     Make station page.
Revision:
GRADE                      Standards:            Discusses with examiner the following items:
0 Emergency Plan Responsibilities as Shift Manager STEP 4
* how to active the outside speakers
Performance Step:
Standards:
Comments:
Grade:
Performance Step:
UNSAT Review and approve IRF Comments:
6 X
Performance Step:
Standards:
For this JPM IRF has already been approved and transmitted.
Refer to EPI-FAP06-005, Section B:
Control Room PAR Process Flowchart and determine the appropriate PAR Reviews flowchart and diagnoses that 5 mile doses exceed Table 2 values of TEDE> 1 Rem and transitions down to "EVACUATE 5 MILE RADIUS and 10 MILE DOWNWIND, SHELTER REMAINING EPZ." Protective action 5 of 12 Make station page.
Discusses with examiner the following items:
how to active the outside speakers
* the need to expedite evacuation after site page
* the need to expedite evacuation after site page
* the PA message
* the PA message where to log time of announcement Ask candidate how this is accomplished if not volunteered during discussion.  
* where to log time of announcement Comments:              Ask candidate how this is accomplished if not volunteered during discussion.
"* Outside speakers activated at US desk.  
                                                  "* Outside speakers activated at US desk.
"* Expedited evacuation precludes spontaneous evacuation.
                                                  "* Expedited evacuation precludes spontaneous evacuation.
* Message should be clear and brief
* Message should be clear and brief
* Autolog or SERO logsheet FAP1 5 012 acceptable Grade:                SAT                   UNSAT STEP       5             Performance Step:      Review and approve IRF Comments:              For this JPM IRF has already been approved and transmitted.
* Autolog or SERO logsheet FAP1 5 012 acceptable SAT GRADE STEP 5
STEP       6      X      Performance Step:      Refer to EPI-FAP06-005, Section B:
STEP GRADE X
Control Room PAR Process Flowchart and determine the appropriate PAR GRADE             X       Standards:            Reviews flowchart and diagnoses that 5 mile doses exceed Table 2 values of TEDE> 1 Rem and transitions down to "EVACUATE 5 MILE RADIUS and 10 MILE DOWNWIND, SHELTER REMAINING EPZ." Protective action 5 of 12


PERFORMANCE INFORMATION JPM Number:     SRO-A4                                              Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager recommendation Grade:                SAT                     UNSAT STEP        7     X       Performance Step:     If PARs are warranted out to 10 miles:
SRO-A4 Revision:
0 Emergency Plan Responsibilities as Shift Manager recommendation SAT 7
X X
Performance Step:
Standards:
Grade:
If PARs are warranted out to 10 miles:
: 1. Record the current wind direction in degrees (from):
: 1. Record the current wind direction in degrees (from):
: 2. Check the appropriate row on the PAR table GRADE              X      Standards:            Records 2700 Identifies correct zones to evacuate as A and B and F and Groton City &
: 2. Check the appropriate row on the PAR table Records 2700 Identifies correct zones to evacuate as A and B and F and Groton City &
town in E, and shelter ALL other zones Grade:                SAT                   UNSAT Comments:             Evacuate and Shelter recommendations must both be identified STEP        8      X      Performance Step: Contact the DEP Dispatcher in Hartford GRADE              X      Standards:            Obtains telephone number from EPUG-08B and attempts to call Grade:                SAT                     UNSAT Cue:Examiner acts as DEP Dispatcher~
town in E, and shelter ALL other zones SAT UNSAT Comments:
STEP        9     X       Performance Step:     Identify self and read Evacuate and Shelter recommendations GRADE              X      Standards:           Identifies self and state recommended zones to evacuate as A and B and F and Groton City & town in E, and shelter ALL other zones Grade:               SAT                     UNSAT Cue:,*                 Acknowe*ege
Performance Step:
                                                      ..        receipt of PARs....
Standards:
6 of 12
Grade:
Evacuate and Shelter recommendations must both be identified Contact the DEP Dispatcher in Hartford Obtains telephone number from EPUG-08B and attempts to call SAT UNSAT Cue:Examiner acts as DEP Dispatcher~
9 X
Performance Step:
Identify self and read Evacuate and Shelter recommendations Standards:
Identifies self and state recommended zones to evacuate as A and B and F and Groton City & town in E, and shelter ALL other zones Grade:
SAT UNSAT Cue:,
* Acknowe*ege receipt of PARs....
6 of 12 Grade:
STEP GRADE UNSAT STEP 8
GRADE X
X STEP GRADE X


PERFORMANCE INFORMATION JPM Number:       SRO-A4                                             Revision:    0
PERFORMANCE INFORMATION JPM Number:
SRO-A4
--v Task
--v Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager STEP        10     X       Performance Step:     Request the dispatcher inform the DEP Duty Officer that a PAR has been issued GRADE              x      Standards:            Requests the dispatcher inform the DEP Duty Officer that a PAR has been issued Grade:                SAT                     UNSAT Cue:                   Acknowledge receipt f equest STEP        11     X       Performance Step:     Log date and time of notification GRADE              x      Standards:            Uses either Auto-Log, SERO Log Sheet from EPI-FAP15-012 or other means to log date and time of DEP notification Grade:                SAT                   UNSAT STEP        12              Performance Step:      If necessary, refer to and review EPI FAP06, Att. 4, PAR Zone Descriptions GRADE                      Standards:            Refers to EPI-FAP06 for PAR Zone Descriptions Grade:                SAT                   UNSAT STEP        13              Performance Step:      Refer to EPI-FAP08, "Evacuation and Assembly", and conduct evacuation.
Revision:
GRADE                      Standards:            Refers to EPI-FAP08, Section 2.2 Discusses SSS/MOS interaction
0 Emergency Plan Responsibilities as Shift Manager 10 X
* Inform Waterford PD of evacuation
x Performance Step:
* Establish traffic control with Waterford PD and CT State Police Comments:            Ask candidate how this is 7 of 12
Standards:
Grade:
Request the dispatcher inform the DEP Duty Officer that a PAR has been issued Requests the dispatcher inform the DEP Duty Officer that a PAR has been issued SAT UNSAT Cue:
Acknowledge receipt f equest 11 X
x 12 13 Performance Step:
Standards:
Grade:
Performance Step:
Standards:
Grade:
Performance Step:
Standards:
Comments:
Log date and time of notification Uses either Auto-Log, SERO Log Sheet from EPI-FAP15-012 or other means to log date and time of DEP notification SAT UNSAT If necessary, refer to and review EPI FAP06, Att. 4, PAR Zone Descriptions Refers to EPI-FAP06 for PAR Zone Descriptions SAT UNSAT Refer to EPI-FAP08, "Evacuation and Assembly", and conduct evacuation.
Refers to EPI-FAP08, Section 2.2 Discusses SSS/MOS interaction Inform Waterford PD of evacuation Establish traffic control with Waterford PD and CT State Police Ask candidate how this is 7 of 12 STEP GRADE STEP GRADE STEP GRADE STEP GRADE


PERFORMANCE INFORMATION JPM Number:       SRO-A4                                            Revision:  0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager accomplished if not volunteered during discussion.
SRO-A4 Revision:
Grade:                 SAT                    UNSAT STEP        14              Performance Step:     Perform announcement over Site PA GRADE                      Standards:            Discuss site notification
0 Emergency Plan Responsibilities as Shift Manager accomplished if not volunteered during discussion.
* Activate outside speakers
SAT UNSAT Performance Step:
* Sound Evacuation alarm for 30 seconds
Standards:
* Select station public address system
Comments:
* Make announcement
Grade:
* log time of the announcement and contingencies:
Performance Step:
* Security sweeps using bullhorns
Standards:
* HP personnel
Comments:
* O&M radios Comments:            Ask candidate how this is accomplished if not volunteered during discussion.
Grade:
Grade:                SAT                     UNSAT STEP        15              Performance Step:    Discuss SSS/MOS responsibilities to Shift Manager GRADE                      Standards:            "* Security sweeps to cover areas PA does not cover
Perform announcement over Site PA Discuss site notification Activate outside speakers Sound Evacuation alarm for 30 seconds
                                                  "* Verify personnel responding to evacuation order
* Select station public address system Make announcement log time of the announcement and contingencies:
                                                  "* Provide accountability to SM with 30 minutes Comments:            Ask candidate how this is accomplished if not volunteered during discussion.
Security sweeps using bullhorns HP personnel O&M radios Ask candidate how this is accomplished if not volunteered during discussion.
Grade:                SAT                     UNSAT 8 of 12
SAT UNSAT Discuss SSS/MOS responsibilities to Shift Manager  
"* Security sweeps to cover areas PA does not cover  
"* Verify personnel responding to evacuation order  
"* Provide accountability to SM with 30 minutes Ask candidate how this is accomplished if not volunteered during discussion.
SAT UNSAT 8 of 12 STEP Grade:
14 GRADE STEP 15 GRADE


PERFORMANCE INFORMATION JPM Number:       SRO-A4                                             Revision:  0 "1-' Task
PERFORMANCE INFORMATION JPM Number:
SRO-A4 "1-' Task


==Title:==
==Title:==
Emergency Plan Responsibilities as Shift Manager STEP        15               Performance Step:     Refer to EPI-FAP1 5-001, "DSEO/ADTS Briefing Sheet" and complete.
Revision:
GRADE                        Standards:            Obtain sheet Using Unit Status handout, complete to substantially match the DSEO/ADTS Briefing Sheet - Master Grade:                SAT                   UNSAT Termination Cue: The evaluation for this JPM is complete Record Stop Time:
0 Emergency Plan Responsibilities as Shift Manager 15 Performance Step:
9 of 12
Standards:
Grade:
Refer to EPI-FAP1 5-001, "DSEO/ADTS Briefing Sheet" and complete.
Obtain sheet Using Unit Status handout, complete to substantially match the DSEO/ADTS Briefing Sheet - Master SAT UNSAT Termination Cue: The evaluation for this JPM is complete Record Stop Time:
9 of 12 STEP GRADE


VERIFICATION OF JPM COMPLETION JPM Number:           SRO-A4                                              Revision:        0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
SRO-A4 Revision:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES             NO Validated Time (minutes):                     15 Actual Time to Complete (minutes):
Time Critical Task?
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
YES Validated Time (minutes):
NO 15 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 819: Line 1,833:
Score:
Score:
Areas for Improvement:
Areas for Improvement:
10 of 12
10 of 12 0


STUDENT HANDOUT JPM Number:           SRO-A4 Initial Conditions: The Initial Conditions are covered in the Event Description.
STUDENT HANDOUT JPM Number:
Initiating Cues:    You are the Shift Manager. You have assumed responsibility in the Control Room DSEO (CR-DSEO) role during an Inter-System LOCA event. You are implementing EPI-FAP01-001, Control Room DSEO, and have completed all actions in Section A and are ready to Go To Section E You have classified the event as a General Emergency - Alpha (GE-A) based on events in progress and the Incident Report Form (IRF) has been reviewed, approved and transmitted. Your task is to complete all actions in Section E, General Emergency Immediate Actions. Discuss with the examiner any actions that cannot be performed or simulated. The examiner will act as all persons or agencies with whom you must communicate. Inform the examiner when you have completed the task.
Initial Conditions:
Initiating Cues:
SRO-A4 The Initial Conditions are covered in the Event Description.
You are the Shift Manager. You have assumed responsibility in the Control Room DSEO (CR-DSEO) role during an Inter-System LOCA event. You are implementing EPI-FAP01-001, Control Room DSEO, and have completed all actions in Section A and are ready to Go To Section E You have classified the event as a General Emergency - Alpha (GE-A) based on events in progress and the Incident Report Form (IRF) has been reviewed, approved and transmitted. Your task is to complete all actions in Section E, General Emergency Immediate Actions. Discuss with the examiner any actions that cannot be performed or simulated. The examiner will act as all persons or agencies with whom you must communicate. Inform the examiner when you have completed the task.
11 of 12
11 of 12


STUDENT HANDOUT INITIATING CUE:
STUDENT HANDOUT INITIATING CUE:
The plant was at 100% power. At 0530 the reactor was tripped and Safety Injection was actuated due to an Inter-System LOCA. The following conditions exist.
The plant was at 100% power. At 0530 the reactor was tripped and Safety Injection was actuated due to an Inter-System LOCA. The following conditions exist.
CRITICAL PARAMETERS TIME                           INFORMATION                             SOURCE The following parameters exist:                         MB indications RCS pressure                       1900 psia and rising PZR level                         20% and rising CTMT Pressure                       Normal CETCs Subcooling                   40&deg;F CTMT temperature                   1 100 F and stable CTMT radiation histogram           Increasing levels Rx Tripped/SI Actuated             Operating normally Chemistry Tech reports that the Initial Dose Assessment (IDA) calculated offsite dose is 1.1 Rem       Chemistry report TEDE.
CRITICAL PARAMETERS TIME INFORMATION SOURCE The following parameters exist:
Met Tower- All levels of the Met Tower indicate the     PPC indication wind is from the North West (2700) at 4 mph Classification:     NRC: GENERAL EMERGENCY State Posture Code:                 ALPHA EAL Table Designation: OG1.6, Integrated Offsite Dose > 1 Rem TEDE 12 of 12
MB indications RCS pressure 1900 psia and rising PZR level 20% and rising CTMT Pressure Normal CETCs Subcooling 40&deg;F CTMT temperature 1 100 F and stable CTMT radiation histogram Increasing levels Rx Tripped/SI Actuated Operating normally Chemistry Tech reports that the Initial Dose Assessment (IDA) calculated offsite dose is 1.1 Rem Chemistry report TEDE.
Met Tower-All levels of the Met Tower indicate the PPC indication wind is from the North West (2700) at 4 mph Classification:
NRC: GENERAL EMERGENCY State Posture Code:
EAL Table Designation: OG1.6, Integrated Offsite Dose > 1 Rem TEDE 12 of 12 ALPHA


ES-301                         Administrative Topics Outline                     Form ES-301-1 Facility: Millstone 3                               Date of Examination:   January 7-10, 2002 Examination Level (circle one):       RO                   Operating Test Number: A-I Administrative     Describe method of evaluation:
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Millstone 3 Date of Examination:
Topic/Subject       1. ONE Administrative JPM, OR Description       2. TWO Administrative Questions A.1.1       Execute     JPM Complete a Shutdown Safety Assessment Checklist (OP 3260A, Procedure   Conduct of Outages, Section 1.2)
January 7-10, 2002 Examination Level (circle one):
Steps (GEN 2.1.20)   (41.10/43.5/45.12)
RO Operating Test Number: A-I Administrative Describe method of evaluation:
A.1.2   Use the Plant JPM Use the plant process computer to determine current Quadrant Process     Power Tilt Ratio ,analyze results, and recommend actions to Unit Computer     Supervisor. (bundled with SIM JPM #130)
Topic/Subject
(GEN 2.1.19)   (45.12)
: 1. ONE Administrative JPM, OR Description
A.2     Tagging and   JPM Given a maintenance repair recommendation and reference Clearance   material, recommend a clearance boundary.
: 2. TWO Administrative Questions A.1.1 Execute JPM Complete a Shutdown Safety Assessment Checklist (OP 3260A, Procedure Conduct of Outages, Section 1.2)
Procedures (GEN 2.2.13)   (41.10/45.13)
Steps (GEN 2.1.20) (41.10/43.5/45.12)
A.3     Review RWP     JPM Review RWP and Survey Maps concerning a potential entry into a and Survey   contaminated area (RHR Cubicles).
A.1.2 Use the Plant JPM Use the plant process computer to determine current Quadrant Process Power Tilt Ratio,analyze results, and recommend actions to Unit Computer Supervisor. (bundled with SIM JPM #130)
Maps (GEN 2.3.10)   (43.4/45.10)
(GEN 2.1.19)
A.4     RO Respon-     Question #1: Reporting location during an evacuation alarm?
(45.12)
sibility in E Plan (GEN 2.4.39)   Question #2: Where to report in when called in during an emergency event?
A.2 Tagging and JPM Given a maintenance repair recommendation and reference Clearance material, recommend a clearance boundary.
Procedures (GEN 2.2.13) (41.10/45.13)
A.3 Review RWP JPM Review RWP and Survey Maps concerning a potential entry into a and Survey contaminated area (RHR Cubicles).
Maps (GEN 2.3.10)
(43.4/45.10)
A.4 RO Respon-Question #1: Reporting location during an evacuation alarm?
sibility in E Plan (GEN 2.4.39)
Question #2: Where to report in when called in during an emergency event?
(45.11)
(45.11)
NUREG-1021, Revision 8
NUREG-1021, Revision 8
Line 847: Line 1,874:


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Revision:    0 JPM ID Number:       RO-AI .1 II. Initiated:
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST JPM ID Number:
10/25/01 Date Ill. Reviewed:
RO-AI.1 Revision:
                                                            ,/ //itio I Date Technical Reviewer IV. Approved:
0 II. Initiated:
Date Cognizant Plant Supervisor (optional)
10/25/01 Date Ill.
Reviewed:
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Supervisor 1 of 10
Supervisor 1 of 10
,/ //itio I Date Date


JOB PERFORMANCE MEASURE GUIDE Facility:     Millstone Unit 3 JPM ID Number:             RO-AI.1                           Revision:     0 Task
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 JPM ID Number:
RO-AI.1 Revision:
0 Task


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST System:       Conduct of Outages Time Critical Task:       (     ) YES     ( X ) NO Validated Time (minutes):       10 min Task Number(s):         341-01-162, Perform a Shutdown Safety Assessment Checklist Applicable To:          SRO                   RO         X             PEO K/A Number:         GEN.2.1.20, Ability to execute procedure steps           K/A Rating:       4.3/4.2 Method of Testing:         Simulated Performance:                     Actual Performance:        X Location:                 Classroom:      X          Simulator:      X          In-Plant::
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST System:
Task Standards:
Conduct of Outages Time Critical Task:
Required Materials:         OP 3260A, Conduct of Outages Current Equipment Status Worksheet General  
(  
) YES
( X ) NO Validated Time (minutes):
10 min Task Number(s):
Applicable To:
341-01-162, Perform a Shutdown Safety Assessment Checklist SRO RO X
PEO K/A Number:
GEN.2.1.20, Ability to execute procedure steps K/A Rating:
4.3/4.2 Method of Testing:
Simulated Performance:
Location:
Classroom:
Required Materials:
General  


==References:==
==References:==
None
X Actual Performance:
                                    ***READ TO THE STUDENT***
Simulator:
OP 3260A, Conduct of Outages Current Equipment Status Worksheet None 2 of 10 Task Standards:
X X
In-Plant::
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 10


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:         RO-A1.1                                               Revision:     0 Simulator Requirements:         None Initial Conditions:             The unit is shutdown in Mode 5 after a refueling outage.
JPM Number:
Initiating Cues:                Plant conditions have just changed. An electrical fault has rendered the "A" SIH pump inoperable. The Shift Manager has directed you to complete a Shutdown Safety Assessment Checklist. Current equipment and unit are listed on the handout.
RO-A1.1 Revision:
0 Simulator Requirements:
Initial Conditions:
Initiating Cues:
The unit is shutdown in Mode 5 after a refueling outage.
Plant conditions have just changed. An electrical fault has rendered the "A" SIH pump inoperable. The Shift Manager has directed you to complete a Shutdown Safety Assessment Checklist. Current equipment and unit are listed on the handout.
Report to the examiner, as Shift Manager, any conditions that would require compensatory actions.
Report to the examiner, as Shift Manager, any conditions that would require compensatory actions.
                                  "****NOTES TO EVALUATOR ****
3 of 10 None
: 1.     Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
"**** NOTES TO EVALUATOR ****
The students performance is graded by an "S"for satisfactory or a "U" for unsatisfactory on each step.
: 1.
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
3 of 10
: 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:   RO-A1.1                                         Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
RO-A1.1 Task


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Start Time:
Revision:
STEP        1             Performance Step: Obtain materials, locate correct procedure step GRADE                    Standards:        Candidate obtains handout from examiner, copy of OP 3260A, Conduct of Outages, and form 004 the Shutdown Safety Assessment Checklist. Locates section 1.2 of OP 3260A.
0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Start Time:
Grade:            SAT                     UNSAT STEP        2      X      Performance Step:  CIRCLE appropriate Train Designator GRADE              X      Standards:        Candidate circles "A" on Form 004 Grade:            SAT                     UNSAT STEP        3     X     Performance Step: CHECK appropriate boxes for conditions supporting "key safety function" for:
1 2
* RCS Decay Heat Removal GRADE              X      Standards:        Using handout, candidate checks appropriate boxes.
X X
* RHRTrainA
Performance Step:
* All conditions to support natural circulation Comment:          Natural Circulation: Candidate should refer to section 1.3.3 to make this determination.
Standards:
Grade:            SAT                     UNSAT 4 of 10
Grade:
Performance Step:
Standards:
Grade:
Obtain materials, locate correct procedure step Candidate obtains handout from examiner, copy of OP 3260A, Conduct of Outages, and form 004 the Shutdown Safety Assessment Checklist. Locates section 1.2 of OP 3260A.
SAT UNSAT CIRCLE appropriate Train Designator Candidate circles "A" on Form 004 SAT UNSAT 3
X X
Performance Step:
Standards:
Comment:
Grade:
CHECK appropriate boxes for conditions supporting "key safety function" for:
RCS Decay Heat Removal Using handout, candidate checks appropriate boxes.
RHRTrainA All conditions to support natural circulation Natural Circulation: Candidate should refer to section 1.3.3 to make this determination.
SAT UNSAT 4 of 10 STEP GRADE STEP GRADE STEP GRADE


PERFORMANCE INFORMATION JPM Number:   RO-Al .1                                        Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST STEP        4     X       Performance Step: CHECK appropriate boxes for conditions supporting "key safety function" for:
RO-Al.1 Revision:
* SFC Decay Heat Removal GRADE              X      Standards:          Using handout, candidate checks appropriate boxes.
0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST 4
* SFCTrainA
X X
                                              * >23' pool level Comment:          Fuel Offload Required Equipment should not be checked. Only for Mode 6.
Performance Step:
Grade:            SAT                   UNSAT STEP        5     X       Performance Step: CHECK appropriate boxes for conditions supporting "key safety function" for:
Standards:
* Inventory GRADE            X        Standards:        Using handout, candidate checks appropriate boxes.
Comment:
* Train A CHS PP & flow path Comment:          Candidate should also check RWST level >250,000 gallons and V43 tagged. However failure to do so will not effect the Safety Status.
Grade:
Grade:            SAT                   UNSAT STEP        6    X        Performance Step:  CHECK appropriate boxes for conditions supporting "key safety function" for:
CHECK appropriate boxes for conditions supporting "key safety function" for:
* Power Availability GRADE            X        Standards:        Using handout, candidate checks appropriate boxes.
SFC Decay Heat Removal Using handout, candidate checks appropriate boxes.
SA EDG
SFCTrainA  
* RSST
>23' pool level Fuel Offload Required Equipment should not be checked. Only for Mode 6.
* NSST/Main 5 of 10
SAT UNSAT 5
X X
X 6
X Performance Step:
Standards:
Comment:
Grade:
Performance Step:
Standards:
CHECK appropriate boxes for conditions supporting "key safety function" for:
Inventory Using handout, candidate checks appropriate boxes.
Train A CHS PP & flow path Candidate should also check RWST level >250,000 gallons and V43 tagged. However failure to do so will not effect the Safety Status.
SAT UNSAT CHECK appropriate boxes for conditions supporting "key safety function" for:
Power Availability Using handout, candidate checks appropriate boxes.
SA EDG RSST NSST/Main 5 of 10 STEP GRADE STEP GRADE STEP GRADE


PERFORMANCE INFORMATION JPM Number:   RO-AI.1                                        Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST 0   Station Blackout EDG Grade:             SAT                   UNSAT STEP        7     X     Performance Step: CHECK appropriate boxes for conditions supporting "key safety function" for:
RO-AI.1 Revision:
* Reactivity GRADE              X      Standards:        Using handout, candidate checks appropriate boxes.
0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST 0 Station Blackout EDG Grade:
* RCS Boron > required SDM
SAT UNSAT 7
* Inventory Flow Paths (1)
X X
* One SDM Train Operable
X 8
* Dilution paths tagged Comment:          Inventory flow paths: Connected to the RWST and capable of injecting into the RCS. In the current plant status only the "A" CHS pump and line-up meets this criteria.
9 Performance Step:
Grade:            SAT                   UNSAT STEP        8      X      Performance Step: CHECK appropriate boxes for conditions supporting "key safety function" for:
Standards:
0 Containment GRADE              X      Standards:        Using handout, candidate checks appropriate boxes.
Comment:
0 Containment Closure set Grade:            SAT                   UNSAT STEP        9      X      Performance Step:  INITIAL appropriate boxes for conditions supporting "key safety function" for:
Grade:
0 PZR Surge Line Flooding
Performance Step:
'l-.GRADE                X      Standards:        Using handout, candidate initials appropriate boxes.
X Standards:
6 of 10
Grade:
X Performance Step:
X Standards:
CHECK appropriate boxes for conditions supporting "key safety function" for:
Reactivity Using handout, candidate checks appropriate boxes.
RCS Boron > required SDM Inventory Flow Paths (1)
One SDM Train Operable Dilution paths tagged Inventory flow paths: Connected to the RWST and capable of injecting into the RCS. In the current plant status only the "A" CHS pump and line-up meets this criteria.
SAT UNSAT CHECK appropriate boxes for conditions supporting "key safety function" for:
0 Containment Using handout, candidate checks appropriate boxes.
0 Containment Closure set SAT UNSAT INITIAL appropriate boxes for conditions supporting "key safety function" for:
0 PZR Surge Line Flooding Using handout, candidate initials appropriate boxes.
6 of 10 STEP GRADE STEP GRADE STEP
'l-.GRADE


PERFORMANCE INFORMATION JPM Number:     RO-A1.1                                       Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
RO-A1.1 Task


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST
Revision:
* Reactor Core refueled
0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Reactor Core refueled PZR vent path < 6 sq. in.
* PZR vent path < 6 sq. in.
Grade:
Grade:             SAT                   UNSAT STEP        10     X     Performance Step: To obtain each Key Safety Function Total, SUM the points allotted for each credited component or condition supporting the Key Safety Function and ENTER in the box GRADE              X      Standards:        Candidate sums the points for each credited component or condition supporting the Key Safety Function
SAT 10 X
* RCS Decay Heat Removal           2
X 11 X
* SFC Decay Heat Removal           2
X Performance Step:
* Inventory                       I
Standards:
* Power Availability               4
Grade:
* Reactivity                       4
Performance Step:
* Containment                     I Grade:            SAT                   UNSAT STEP        11      X      Performance Step:  Using the Key Safety Function total, CIRCLE the associated color condition.
Standards:
GRADE              X      Standards:        see examiner's copy)
To obtain each Key Safety Function Total, SUM the points allotted for each credited component or condition supporting the Key Safety Function and ENTER in the box Candidate sums the points for each credited component or condition supporting the Key Safety Function RCS Decay Heat Removal 2
Candidate circles the associated color condition for each Key Safety Function
SFC Decay Heat Removal 2
                                              "* RCS Decay Heat Removal Yellow
Inventory I
                                              "* SFC Decay Heat Removal Yellow
Power Availability 4
                                              "* Inventory Orange
Reactivity 4
                                              "* Power Availability Green
Containment I
                                              "* Reactivity Yellow
SAT UNSAT Using the Key Safety Function total, CIRCLE the associated color condition.
                                              "* Containment Green 7 of 10
see examiner's copy)
Candidate circles the associated color condition for each Key Safety Function  
"* RCS Decay Heat Removal Yellow  
"* SFC Decay Heat Removal Yellow  
"* Inventory Orange  
"* Power Availability Green  
"* Reactivity Yellow  
"* Containment Green 7 of 10 UNSAT STEP GRADE STEP GRADE


PERFORMANCE INFORMATION JPM Number:     RO-AI.1                                           Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
RO-AI.1 Task


==Title:==
==Title:==
COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Grade:               SAT                   UNSAT Comment:             If the candidate attempts to continue on in the procedure beyond step 1.2.1.j, prompt him to evaluate the checklist and make recommendations to Shift Manager STEP        12              Performance Step:    Report to the Unit Supervisor any conditions requiring compensatory actions GRADE                      Standards:          Reports that all Key Safety Functions are yellow or green except INVENTORY which is orange and requires compensatory actions.
Revision:
Comment:            No further recommendations are required beyond that some compensatory actions are required.
0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Grade:
Grade:              SAT                     UNSAT Termination Cue: The Evaluation For This JPM is Complete.
SAT UNSAT Comment:
Performance Step:
Standards:
Comment:
Grade:
If the candidate attempts to continue on in the procedure beyond step 1.2.1.j, prompt him to evaluate the checklist and make recommendations to Shift Manager Report to the Unit Supervisor any conditions requiring compensatory actions Reports that all Key Safety Functions are yellow or green except INVENTORY which is orange and requires compensatory actions.
No further recommendations are required beyond that some compensatory actions are required.
SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete.
Stop Time:
Stop Time:
8 of 10
8 of 10 STEP 12 GRADE


VERIFICATION OF JPM COMPLETION JPM Number:           RO-AI.1                                          Revision:          0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
RO-AI.1 Revision:
Time Critical Task?                         YES             NO      X Validated Time (minutes):                     5 Actual Time to Complete (minutes):
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
YES Validated Time (minutes):
NO X
5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 965: Line 2,088:
9 of 10
9 of 10


STUDENT HANDOUT JPM Number:         RO-A1.1 Initial Conditions: The unit is shutdown in Mode 5 after a refueling outage.
STUDENT HANDOUT JPM Number:
Initiating Cues:    Plant conditions have just changed. An electrical fault has rendered the "A" SIH pump inoperable. The Shift Manager has directed you to complete a Shutdown Safety Assessment Checklist. Current equipment and unit are listed on the handout. Report to the examiner, as Shift Manager, any conditions that would require compensatory actions.
Initial Conditions:
Initiating Cues:
RO-A1.1 The unit is shutdown in Mode 5 after a refueling outage.
Plant conditions have just changed. An electrical fault has rendered the "A" SIH pump inoperable. The Shift Manager has directed you to complete a Shutdown Safety Assessment Checklist. Current equipment and unit are listed on the handout. Report to the examiner, as Shift Manager, any conditions that would require compensatory actions.
10 of 10
10 of 10


RO-AI.1 PLANT CONDITION HANDOUT INITIAL CONDITIONS
RO-AI.1 PLANT CONDITION HANDOUT INITIAL CONDITIONS  
"* MODE 5
"* MODE 5  
"* RCS 200 psia
"* RCS 200 psia  
"* PZR LEVEL 60% LEVEL COLD CAL
"* PZR LEVEL 60% LEVEL COLD CAL  
"* "A" TRAIN PROTECTED
"* "A" TRAIN PROTECTED  
"* "B" TRAIN ELECTRICAL OUTAGE; 34D DE-ENERGIZED
"* "B" TRAIN ELECTRICAL OUTAGE; 34D DE-ENERGIZED  
"* "A" + "D" STEAM GENERATOR 50% WITH STEAM RELEASE AND FEEDING CAPABILITY
"* "A" + "D" STEAM GENERATOR 50% WITH STEAM RELEASE AND FEEDING CAPABILITY  
"* "A" TRAIN RHR IN THE COOLDOWN MODE
"* "A" TRAIN RHR IN THE COOLDOWN MODE  
"* "A" TRAIN SFC RUNNING
"* "A" TRAIN SFC RUNNING  
"* SFP NORMAL LEVEL
"* SFP NORMAL LEVEL  
"* "A" CHS IN PTL
"* "A" CHS IN PTL  
"* BOTH OFFSITE SOURCES ARE AVAILABLE
"* BOTH OFFSITE SOURCES ARE AVAILABLE  
"* SBO DIESEL IS AVAILABLE
"* SBO DIESEL IS AVAILABLE  
"* SDM MONITOR OPERABLE
"* SDM MONITOR OPERABLE  
"* CTMT CLOSURE IS SET
"* CTMT CLOSURE IS SET  
"* RCS BORON CONCENTRATION IS > SHUTDOWN MARGIN
"* RCS BORON CONCENTRATION IS > SHUTDOWN MARGIN  
"* DILUTION PATHS TAGGED PER SP3604C.6
"* DILUTION PATHS TAGGED PER SP3604C.6  
"* THE RWST LEVEL IS > 1,000,000 GALLONS
"* THE RWST LEVEL IS > 1,000,000 GALLONS  
"* 3RHS*V43 IS TAGGED AND LOCKED CLOSED AN ELECTRICAL FAULT HAS RENDERED THE "A" SIH PUMP INOPERABLE
"* 3RHS*V43 IS TAGGED AND LOCKED CLOSED AN ELECTRICAL FAULT HAS RENDERED THE "A" SIH PUMP INOPERABLE


Line 992: Line 2,118:


==Title:==
==Title:==
DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS JPM ID Number:       RO-A1.2                           Revision:   0 II. Initiated:
DETERMINE QPTR, ANALYZE RESULTS, RECOMMENDATIONS AND MAKE JPM ID Number:
Steve J,                                                 10/25/01 Developer                                                 Date II1. Reviewed:
RO-A1.2 Revision:
Ray Martin     Cr rrff      .                          11/15/01 Technical Reviewer                                        Date IV. Approved:
0 II. Initiated:
Cognizant Plant Supervisor (optional)                     Date Nuc, Pr Training Supervisor                             'D1     "
Steve J, Developer II1. Reviewed:
1 of 9
Ray Martin Cr rrf f Technical Reviewer 11/15/01 Date IV.
Approved:
Cognizant Plant Supervisor (optional)
Date Nuc, Pr Training Supervisor  
'D1 1 of 9 10/25/01 Date


ADMIN JPM RO-A1.2 NOTE ON SCHEDULING OF JPM This JPM is planned to be performed "within" SIM JPM-1 30, Control Rod Out of Alignment, since it flows naturally from the planned procedure path and JPM-1 30 establishes all of the conditions for ADMIN JPM RO-A1.2, Determine QPTR.
ADMIN JPM RO-A1.2 NOTE ON SCHEDULING OF JPM This JPM is planned to be performed "within" SIM JPM-1 30, Control Rod Out of Alignment, since it flows naturally from the planned procedure path and JPM-1 30 establishes all of the conditions for ADMIN JPM RO-A1.2, Determine QPTR.


JOB PERFORMANCE MEASURE GUIDE Facility:     Millstone Unit 3 JPM ID Number:           RO-A1.2                           Revision:     0 Task
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 JPM ID Number:
RO-A1.2 Revision:
0 Task


==Title:==
==Title:==
DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS System:        Admin, Rod Control Time Critical Task:       (     ) YES     ( X ) NO Validated Time (minutes):       5 min Task Number(s):         341-01-788, Perform a QPTR Applicable To:          SRO                   RO         X            PEO K/A Number:         GEN.2.1.19, Ability to use plant computer to             K/A Rating:        3.0/3.0 obtain and evaluate parametric information on system or component status Method of Testing:         Simulated Performance:                     Actual Performance:         X Location:                 Classroom:                   Simulator:      X          In-Plant::
System:
DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Admin, Rod Control Time Critical Task:
(  
) YES
( X ) NO Validated Time (minutes):
5 min Task Number(s):
Applicable To:
341-01-788, Perform a QPTR SRO RO K/A Number:
GEN.2.1.19, Ability to use plant computer to obtain and evaluate parametric information on system or component status K/A Rating:
Method of Testing:
Simulated Performance:
Actual Performance:
Location:
Classroom:
Simulator:
Task Standards:
Task Standards:
Required Materials:         Plant Process Computer SP 31012, Quadrant Power Tilt Ratio, Rev. 4 Reactor Engineering Curve and Data Book General  
Required Materials:
General  


==References:==
==References:==
MP3 Tech Specs AOP 3552, Malfunction of the Rod Drive System, Rev. 3
Plant Process Computer SP 31012, Quadrant Power Tilt Ratio, Rev. 4 Reactor Engineering Curve and Data Book MP3 Tech Specs AOP 3552, Malfunction of the Rod Drive System, Rev. 3 2 of 9 X
                                  ***READ TO THE STUDENT***
PEO 3.0/3.0 X
X In-Plant::
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 9


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:         RO-AI.1                                                 Revision:   0 Simulator Requirements:         Set-Up for JPM-1 30, Control Rod Out of Alignment; at step 3.b of Attachment A.
JPM Number:
RO-AI.1 Revision:
0 Simulator Requirements:
Initial Conditions:
Initiating Cues:
Set-Up for JPM-1 30, Control Rod Out of Alignment; at step 3.b of Attachment A.
On Plant Process Computer substitute values for the following instruments:
On Plant Process Computer substitute values for the following instruments:
NMP-NM43C and NMP-NM43D                 substitute "0" Initial Conditions:              You are realigning a misaligned rod lAW AOP 3552, Malfunction of the Rod Drive System, Attachment A; Misaligned Rod. You are at step 3.b having just determined that reactor power is greater than 50%.
NMP-NM43C and NMP-NM43D substitute "0" You are realigning a misaligned rod lAW AOP 3552, Malfunction of the Rod Drive System, Attachment A; Misaligned Rod. You are at step 3.b having just determined that reactor power is greater than 50%.
Initiating Cues:                Complete AOP 3552, step 3.b through step 3.d and Determine QPTR.
Complete AOP 3552, step 3.b through step 3.d and Determine QPTR.
                                  **** NOTES TO EVALUATOR ****
: 1.      Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S"for satisfactory or a "U" for unsatisfactory on each step.
: 2.      When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.      If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 9
3 of 9
**** NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:   RO-A1.2                                        Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Start Time:
RO-A1.2 Revision:
STEP        1      X     Performance Step: Candidate uses Plant Process Computer, Tilting Factors, determine QPTR GRADE              X      Standards:        At PPC monitor or Real Time MMI, locates and calls up Tilting Factors Grade:            SAT                   UNSAT STEP        2      X      Performance Step:  Determine Tilting Factors using Plant Process Computer.
0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Start Time:
GRADE              x      Standards:        Candidate determines that 3 of the NI channels are valid information and records that information, but should determine that one channel is NOT providing good QPTR information via the Plant Process Computer.
X Performance Step:
* NI41:       -1.03
X Standards:
* NI42:       -1.03 SNI 43:     FAILED
Grade:
* NI44:       -1.03 Grade:            SAT                   UNSAT Comments:         Candidate should record "good" data and proceed to SP 31012 4 of 9
2 X
Performance Step:
x Standards:
Grade:
Candidate uses Plant Process Computer, Tilting Factors, determine QPTR At PPC monitor or Real Time MMI, locates and calls up Tilting Factors SAT UNSAT Determine Tilting Factors using Plant Process Computer.
Candidate determines that 3 of the NI channels are valid information and records that information, but should determine that one channel is NOT providing good QPTR information via the Plant Process Computer.
NI41:  
-1.03 NI42:  
-1.03 SNI 43:
FAILED NI44:  
-1.03 SAT UNSAT Comments:
Candidate should record "good" data and proceed to SP 31012 4 of 9 1
STEP GRADE STEP GRADE


PERFORMANCE INFORMATION JPM Number:   RO-A1.2                                       Revision:     0 "TaskTitle:  DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS STEP        3             Performance Step: Go To SP31012, QPTR, Step 4.2:
PERFORMANCE INFORMATION JPM Number:
QPTR by measurement GRADE                    Standards:        Locates copy of SP31012 and correct section Grade:            SAT                   UNSAT STEP        4      x      Performance Step: RECORD average percent reactor power from NI cabinet meters NMP NM43F on Attachment 1 (step 4.2.1)
RO-A1.2 "Task
GRADE              X      Standards:        Locates NMP-NM43F and records average percent reactor using Attachment 1 Grade:            SAT                   UNSAT STEP        5      X      Performance Step: RECORD upper and lower detector digital meter reading for NMP-NM43C and NMP-NM43D on Attachment 1.
 
==Title:==
Revision:
0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS 3
4 x
Performance Step:
Standards:
Grade:
Performance Step:
X Standards:
Grade:
5 X
Performance Step:
x Standards:
Grade:
Go To SP31012, QPTR, Step 4.2:
QPTR by measurement Locates copy of SP31012 and correct section SAT UNSAT RECORD average percent reactor power from NI cabinet meters NMP NM43F on Attachment 1 (step 4.2.1)
Locates NMP-NM43F and records average percent reactor using SAT UNSAT RECORD upper and lower detector digital meter reading for NMP-NM43C and NMP-NM43D on Attachment 1.
(step 4.2.3.a.1)
(step 4.2.3.a.1)
GRADE              x      Standards:        Locates NMP-NM43C and NMP NM43D and upper and lower detector digital meter reading using Attachment 1
Locates NMP-NM43C and NMP NM43D and upper and lower detector digital meter reading using Attachment 1
Grade:            SAT                   UNSAT STEP        6      x      Performance Step: RECORD data source in "Remarks" section on Attachment 1 (step 4.2.3.b)
SAT UNSAT Performance Step:
GRADE              x      Standards:        Locates Remarks" section on Attachment 1 and records at least that Channel 43 data came from NMP NM43C and NMP-NM43D, upper and lower detector digital meter.
Standards:
5 of 9
RECORD data source in "Remarks" section on Attachment 1 (step 4.2.3.b)
Locates Remarks" section on and records at least that Channel 43 data came from NMP NM43C and NMP-NM43D, upper and lower detector digital meter.
5 of 9 STEP GRADE STEP GRADE STEP GRADE STEP 6
GRADE x
x


PERFORMANCE INFORMATION JPM Number:   RO-A1.2                                         Revision:  0 "TaskTitle:  DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Grade:            SAT                    UNSAT STEP        7      x      Performance Step: On Attachment 1, RECORD 100% NI upper and lower currents from Attachment 2. (step 4.2.4.a)
PERFORMANCE INFORMATION JPM Number:
GRADE              x      Standards:        Locates current Attachment 2 in Reactor Engineering Curve Book and records 100% NI upper and lower currents on Attachment 1.
RO-A1.2 "Task
Grade:            SAT                    UNSAT STEP        8      X      Performance Step: RECORD data source and date of Attachment 2 entry in "Remarks" section on Attachment 1 (step 4.2.4.b)
GRADE              X      Standards:        Locates Remarks" section on Attachment 1 and records data source and date of Attachment 2 entry.
Grade:            SAT                    UNSAT STEP        9      X      Performance Step: CALCULATE the detector ratio for each detector by dividing each detectors reading by that detectors 100% current and RECORD on Attachment 1. (step 4.2.4.c)
GRADE              x      Standards:        Uses step instructions and calculates detector ratio for AT LEAST channel 43.
Grade:            SAT                    UNSAT 6 of 9


PERFORMANCE INFORMATION JPM Number:     RO-A1.2                                      Revision:      0 Task
==Title:==
Revision:
0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Grade:
SAT UNSAT 7
x x
Performance Step:
Standards:
Grade:
On Attachment 1, RECORD 100% NI upper and lower currents from. (step 4.2.4.a)
Locates current Attachment 2 in Reactor Engineering Curve Book and records 100% NI upper and lower currents on Attachment 1.
SAT UNSAT 8
X 9
x Performance Step:
X Standards:
Grade:
X Performance Step:
Standards:
Grade:
RECORD data source and date of entry in "Remarks" section on Attachment 1 (step 4.2.4.b)
Locates Remarks" section on and records data source and date of Attachment 2 entry.
SAT UNSAT CALCULATE the detector ratio for each detector by dividing each detectors reading by that detectors 100% current and RECORD on. (step 4.2.4.c)
Uses step instructions and calculates detector ratio for AT LEAST channel 43.
SAT UNSAT 6 of 9 STEP GRADE STEP GRADE STEP GRADE
 
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS STEP        10     X     Performance Step: CALCULATE the average upper and lower ratio and RECORD on Attachment 1. (step 4.2.4.d)
RO-A1.2 Revision:
GRADE              X      Standards:        Uses step instructions and calculates average upper and lower detector ratio.
0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS 10 X
Grade:            SAT                     UNSAT STEP       11      X     Performance Step: CALCULATE power tilt for each detector and RECORD in QPTR section of Attachment 1. (step 4.2.4.e)
X 11 X
GRADE              X      Standards:       Uses formulae in step 4.2.4.e and calculates power tilt for AT LEAST channel 43.
X Performance Step:
Grade:           SAT                    UNSAT STEP        12      X      Performance Step: RECORD maximum upper and lower QPTR and associated channel on Attachment 1. (step 4.2.4.f)
Standards:
GRADE              X      Standards:        DETERMINES maximum upper and lower QPTR and associated channel and records on Attachment 1 Grade:            SAT                   UNSAT STEP        13      X      Performance Step: VERIFY maximum QPTR does not exceed 1.02 (step 4.2.6.a)
Grade:
GRADE              X      Standards:       Determines QPTR is >1.02 Grade:            SAT                   UNSAT 7 of 9
Performance Step:
Standards:
Grade:
CALCULATE the average upper and lower ratio and RECORD on. (step 4.2.4.d)
Uses step instructions and calculates average upper and lower detector ratio.
SAT UNSAT STEP GRADE STEP SAT UNSAT 12 X
X 13 X
Performance Step:
Standards:
Grade:
Performance Step:
RECORD maximum upper and lower QPTR and associated channel on. (step 4.2.4.f)
DETERMINES maximum upper and lower QPTR and associated channel and records on Attachment 1 SAT UNSAT VERIFY maximum QPTR does not exceed 1.02 (step 4.2.6.a)
Standards:
Grade:
Determines QPTR is >1.02 SAT 7 of 9 CALCULATE power tilt for each detector and RECORD in QPTR section of Attachment 1. (step 4.2.4.e)
Uses formulae in step 4.2.4.e and calculates power tilt for AT LEAST channel 43.
GRADE STEP GRADE STEP GRADE X
UNSAT


PERFORMANCE INFORMATION JPM Number:     RO-A1.2                                            Revision:    0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS STEP        14       X       Performance Step:   IF QPTR is greater than 1.02 and power is above 50% RTP, NOTIFY Shift Manager that Technical Specification 3/4.2.4, "Quadrant Power Tilt Ratio," action statement applies (step 4.2.6.b)
RO-A1.2 Revision:
GRADE              X        Standards:          Determines QPTR is >1.02 and notifies the examiner acting as Shift Manager that Technical Specification 3/4.2.4, "Quadrant Power Tilt Ratio,"
0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS 14 X
X Performance Step:
Standards:
Grade:
IF QPTR is greater than 1.02 and power is above 50% RTP, NOTIFY Shift Manager that Technical Specification 3/4.2.4, "Quadrant Power Tilt Ratio," action statement applies (step 4.2.6.b)
Determines QPTR is >1.02 and notifies the examiner acting as Shift Manager that Technical Specification 3/4.2.4, "Quadrant Power Tilt Ratio,"
action statement applies.
action statement applies.
Grade:              SAT                     UNSAT Termination Cue: The Evaluation For This JPM is Complete. Return to AOP 3552, Attachment A, Step 3.e, and continue your actions with the Misaligned Rod.
SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete. Return to AOP 3552, Attachment A, Step 3.e, and continue your actions with the Misaligned Rod.
Stop Time:
Stop Time:
8 of 9
8 of 9 STEP GRADE


VERIFICATION OF JPM COMPLETION JPM Number:           RO-A1.2                                        Revision:          0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
RO-A1.2 Revision:
Time Critical Task?                         YES             NO      X Validated Time (minutes):                   -5 Actual Time to Complete (minutes):
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U"for unsatisfactory)
Time Critical Task?
YES Validated Time (minutes):
NO X
-5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 1,087: Line 2,328:
9 of 9
9 of 9


STUDENT HANDOUT JPM Number:         RO-AI.2 Initial Conditions: You are realigning a misaligned rod lAW AOP 3552, Malfunction of the Rod Drive System, Attachment A; Misaligned Rod. You are at step 3.b having just determined that reactor power is greater than 50%.
STUDENT HANDOUT JPM Number:
Initiating Cues:    Complete AOP 3552, step 3.b through step 3.d and Determine QPTR.
Initial Conditions:
Initiating Cues:
RO-AI.2 You are realigning a misaligned rod lAW AOP 3552, Malfunction of the Rod Drive System, Attachment A; Misaligned Rod. You are at step 3.b having just determined that reactor power is greater than 50%.
Complete AOP 3552, step 3.b through step 3.d and Determine QPTR.
10 of 9
10 of 9


Line 1,094: Line 2,338:


==Title:==
==Title:==
JPM ID Number:
Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
JPM ID Number:          RO-A2                                       Revision:   0 II. Initiated:
RO-A2 Revision:
Steve Jacksc                                                         10/31/01 Date III. Reviewed:
0 II. Initiated:
Ray Martin                   a*                                     11/15/01 Technical Reviewer                                                    Date IV. Approved:
Steve Jacksc 10/31/01 Date III.
Cognizant Plant Supervisor (optional)                                 Date Nucle     Training Supervisor                                     &11'Z16 1 of 6
Reviewed:
Ray Martin a*
Technical Reviewer 11/15/01 Date IV.
Approved:
Date Cognizant Plant Supervisor (optional)
Nucle Training Supervisor
&11'Z16 1 of 6


JOB PERFORMANCE MEASURE GUIDE Facility:      Millstone Unit 3 JPM ID Number:             RO-A2                           Revision:      0 Task
JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Revision:
0 JPM ID Number:
RO-A2 Task


==Title:==
==Title:==
Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
System:        Tagging and Clearance Time Critical Task:       (     ) YES     (X)     NO Validated Time (minutes):       10 min Task Number(s):         341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements Applicable To:          SRO                   RO         X           PEO K/A Number:         GEN.2.2.13, Knowledge of Tagging and                     K/A Rating:       3.6/3.8 Clearance Procedures Method of Testing:         Simulated Performance:                     Actual Performance:         X Location:                  Classroom:      X            Simulator:                In-Plant::
Tagging and Clearance Time Critical Task:
Task Standards:               Develop and review a tag clearance Required Materials:         Team Lead recommendation P&IDs, EM-109A EE One-Line diagrams OP 3337, Radioactive Gaseous Waste System General  
(  
) YES (X)
NO Validated Time (minutes):
10 min Task Number(s):
Applicable To:
341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements SRO RO X
PEO K/A Number:
GEN.2.2.13, Knowledge of Tagging and Clearance Procedures K/A Rating:
Method of Testing:
Simulated Performance:
Actual Performance:
Location:
Task Standards:
Required Materials:
General  


==References:==
==References:==
WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance
Classroom:
                                    ***READ TO THE STUDENT***
X Simulator:
In-Plant::
Develop and review a tag clearance Team Lead recommendation P&IDs, EM-109A EE One-Line diagrams OP 3337, Radioactive Gaseous Waste System WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance 2 of 6 Facility:
System:
3.6/3.8 X
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 6


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:           RO-A2                                               Revision:     0 Simulator Requirements:         NONE Initial Conditions:             The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PI B, has seized. Repair efforts are planned and the maintenance Team Lead has made work package recommendations for the clearance boundary.
JPM Number:
Initiating Cues:                Your task is to develop a clearance boundary for this repair activity based on the maintenance Team Lead recommendations..
RO-A2 Revision:
                                  ""NOTES TO EVALUATOR ****
0 Simulator Requirements:
: 1.     Critical steps for this JPM are indicated by an "X"after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Initial Conditions:
The students performance is graded by an "S"for satisfactory or a "U"for unsatisfactory on each step.
Initiating Cues:
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PI B, has seized. Repair efforts are planned and the maintenance Team Lead has made work package recommendations for the clearance boundary.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
Your task is to develop a clearance boundary for this repair activity based on the maintenance Team Lead recommendations..
3 of 6
3 of 6 NONE
""NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:       RO-A2                                            Revision:      0 Task
PERFORMANCE INFORMATION JPM Number:
Task


==Title:==
==Title:==
Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
RO-A2 Revision:
0 Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
Start Time:
Start Time:
Comments:           Electrical and mechanical isolation of the pump can be done in any order STEP        1_      X      Performance Step:  Identifies correct piping isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-P1B GRADE                X      Standards:          Uses P&ID EM-1 09A or OP3337-001 and other appropriate references and identifies the correct boundary:
1_
* Pump Discharge (VO10) CLOSED
X Comments:
* Pump Suction (V006) CLOSED
Performance Step:
* Casing Drain (V107) OPEN
X Standards:
* Discharge Vent (V972) OPEN Grade:              SAT                     UNSAT STEP        2        X      Performance Step:  Identifies correct electrical isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PIB GRADE                X      Standards:          Uses OP3337-004, electrical line-up, or EE-1AC and other appropriate references and identifies the correct boundary:
Grade:
* At MCC 32-3H(2M)           OFF
X Performance Step:
* Pump Control Switch OFF Grade:              SAT                     UNSAT Comments:           Submits completed tagout to examiner as the Shift Manager. Tagout should substantially match the JPM attachment.
2 X
Standards:
Grade:
Electrical and mechanical isolation of the pump can be done in any order Identifies correct piping isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-P1B Uses P&ID EM-1 09A or OP3337-001 and other appropriate references and identifies the correct boundary:
Pump Discharge (VO10) CLOSED Pump Suction (V006) CLOSED Casing Drain (V107) OPEN Discharge Vent (V972) OPEN SAT UNSAT Identifies correct electrical isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PIB Uses OP3337-004, electrical line-up, or EE-1AC and other appropriate references and identifies the correct boundary:
* At MCC 32-3H(2M)
OFF Pump Control Switch OFF SAT UNSAT Comments:
Submits completed tagout to examiner as the Shift Manager. Tagout should substantially match the JPM attachment.
Termination Cue: The Evaluation For This JPM is Complete.
Termination Cue: The Evaluation For This JPM is Complete.
Stop Time:
Stop Time:
4 of 6
4 of 6 STEP GRADE STEP GRADE


VERIFICATION OF JPM COMPLETION JPM Number:             RO-A2                                          Revision:          0 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
RO-A2 Revision:
Time Critical Task?                         YES              NO      X Validated Time (minutes):                   10 Actual Time to Complete (minutes):
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
Validated Time (minutes):
YES NO X
10 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 1,153: Line 2,447:
5 of 6
5 of 6


STUDENT HANDOUT JPM Number:           RO-A2 Initial Conditions: The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PIB, has seized. Repair efforts are planned and the maintenance Team Lead has made work package recommendations for the clearance boundary.
STUDENT HANDOUT JPM Number:
Initiating Cues:    Your task is to develop a clearance boundary for this repair activity based on the maintenance Team Lead recommendations.
Initial Conditions:
6 of 6
Initiating Cues:
 
RO-A2 The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PIB, has seized. Repair efforts are planned and the maintenance Team Lead has made work package recommendations for the clearance boundary.
Attachment 7 Tagout Request (Sheet 1 of 1)
Your task is to develop a clearance boundary for this repair activity based on the maintenance Team Lead recommendations.
6 of 6 Tagout Request (Sheet 1 of 1)
NOTE: When this request is used, all sections should be filled out in detail.
NOTE: When this request is used, all sections should be filled out in detail.
Brief Job
Brief Job


== Description:==
== Description:==
 
Rep/,cce  
Rep/,cce         ,m,://4r               ort       3         5- P14 work Package Number:                       /t3 3         0     0     5 Component to be Isolated( 1 ):                     3     -      - P3 Multiple isolation points or non-component (i.e.: pipe/tube section): Yes Q No [
,m,://4r ort 3
5-P14 work Package Number:  
/t3 3 0
0 5
Component to be Isolated( 1 ):
3  
- P3 Multiple isolation points or non-component (i.e.: pipe/tube section): Yes Q
No [
(If yes, walkdown required by Tagging Authority)
(If yes, walkdown required by Tagging Authority)
Recommended Tags 1 )
Recommended Tags Color Isolation Point PositionM 1 )
Color                                 Isolation Point                                     PositionM (1) For Blue Tags indicate initial position or if initial position is not required enter N/A.
(1) For Blue Tags indicate initial position or if initial position is not required enter N/A.
Amplifying Instructions:
Amplifying Instructions:
Contact Person (for multiple shifts, Contact Person is required for each shift)                   phone:
Contact Person (for multiple shifts, Contact Person is required for each shift) phone:
Approved By:                                                                               D Dat:phone:
Approved By:
Team   e-ader / Planner / Engineering WC 2 Level of Use STOP         THINK             ACT         REVIEW     Rev. 006-02 Information                                                                          68 of 81
Dat:phone:
D Team e-ader / Planner / Engineering Level of Use Information STOP THINK ACT REVIEW WC 2 Rev. 006-02 68 of 81


(                             WORK PA CKA GE'L,OUNDARY SHEET                                   (
(
WORK PA CKA GE'L,OUNDARY SHEET
(
Clearance Number:
Clearance Number:
AWO Number:           Clearance Adequate for Personnel Safety:                       Date:
AWO Number:
IContact Person / Designee SignI Step   Tag Tagged       Tag   Equipment ID     Equipment   Equipment Notes Tag     Tag   Worker Number Type Position   Serial                   Description   Location       Placed Verified Verified Number
Clearance Adequate for Personnel Safety:
Date:
IContact Person / Designee SignI Step Tag Tagged Tag Equipment ID Equipment Equipment Notes Tag Tag Worker Number Type Position Serial Description Location Placed Verified Verified Number


WORK PACKAGE BO(                       ")ARY SHEET                                             1Y   /2001 120:11
WORK PACKAGE BO(  
                                                                                                                                                      .,heet   Of 1 Clearance 3C08 - GWS06-0006 Num ber:                                       11111111111111111111 1111111111111111111 111 AWO Number:                         Clearance Adequate for Personnel Safety:                                                           Date:
")ARY SHEET 1Y  
M30110525                           Contact Person/Designee Sign Step   Tag   Tagged     Tag         Equipment ID         Equipment Description   Equipment Location       Notes   Tag Placed: Tag Verified:   Worker Number Type   Position Serial                                                                                                                     Verified Number 1   IYEL             2461   3GWS-P1B-CS             B DEGASIFIER               _AB     04306       POWER IS RED 06/18/2001   06/18/2001 RECIRCULATION PUMP;       GWS PANEL           TAGGED OFF   07:27       07:27
/2001 20:11  
                                                          ,NTRL SWITCH 2     RED   OFF       2462   32-3H(2M)               ]GWS-P1B DEGASIFIER       3_AB     02406                   06/18/2001   06/18/2001
.,heet 1 Of 1 Clearance 3C08 - GWS06-0006 Num ber:
:ECIRCULATION PUMP       -NORTHWEST                         07:27       07:27 3     RED   CLOSED     6901   3GWS-V010               )EGASIFIER RECIRC PUMP   3_AB     _00406_DEGAS             11/06/2001   11/06/2001 1,                         B) DISCHARGE                                               16:17       16:51 4     RED   CLOSED     6902   3GWS-V006               DEGASIFIER RECIRC PUMP 3_AB       _00406-DEGAS               11/06/2001   11/06/2001
11111111111111111111 1111111111111111111 111 AWO Number:
                                                        'B" SUCTION                                                 16:17       16:51 5     RED   OPEN       6903   3GWS-V107               DEGASIFIER RECIRC PUMP 3_AB       _00406-DEGAS               11/06/2001   11/06/2001 (B) CASING DRAIN                                             16:17       16:51 6     RED   OPEN       6904   3GWS-V972               DEGASIFIER RECIRC PUMP 3_AB       _00406_DEGAS             11/06/2001   11/06/2001 I                       (B) DISCHARGE VENT                                           16:17       16:51
Clearance Adequate for Personnel Safety:
Date:
M30110525 Contact Person/Designee Sign Step Tag Tagged Tag Equipment ID Equipment Description Equipment Location Notes Tag Placed:
Tag Verified:
Worker Number Type Position Serial Verified Number 1
IYEL 2461 3GWS-P1B-CS B DEGASIFIER
_AB 04306 POWER IS RED 06/18/2001 06/18/2001 RECIRCULATION PUMP; GWS PANEL TAGGED OFF 07:27 07:27  
,NTRL SWITCH 2
RED OFF 2462 32-3H(2M)  
]GWS-P1B DEGASIFIER 3_AB 02406 06/18/2001 06/18/2001
:ECIRCULATION PUMP  
-NORTHWEST 07:27 07:27 3
RED CLOSED 6901 3GWS-V010  
)EGASIFIER RECIRC PUMP 3_AB
_00406_DEGAS 11/06/2001 11/06/2001 1,
B) DISCHARGE 16:17 16:51 4
RED CLOSED 6902 3GWS-V006 DEGASIFIER RECIRC PUMP 3_AB
_00406-DEGAS 11/06/2001 11/06/2001  
'B" SUCTION 16:17 16:51 5
RED OPEN 6903 3GWS-V107 DEGASIFIER RECIRC PUMP 3_AB
_00406-DEGAS 11/06/2001 11/06/2001 (B) CASING DRAIN 16:17 16:51 6
RED OPEN 6904 3GWS-V972 DEGASIFIER RECIRC PUMP 3_AB
_00406_DEGAS 11/06/2001 11/06/2001 I
(B) DISCHARGE VENT 16:17 16:51


JOB PERFORMANCE MEASURE APPROVAL WORKSHEET 1&#xfd;. I. JPM
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET 1&#xfd;.
I. JPM


==Title:==
==Title:==
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
JPM ID Number:       RO-A3                                   Revision:     1 I1. Initiated:
JPM ID Number:
11/28/01 Develk                                                           Date Ill. Reviewed:
RO-A3 Revision:
i x/// ./0 /
1 I1. Initiated:
Technical Reviewer                                               Date IV. Approved:
Develk Ill. Reviewed:
Cognizant Plant Supervisor (optional)                           Date 1,A Z Nuc &r Training Supervisor 1 of 8
Technical Reviewer IV. Approved:
Cognizant Plant Supervisor (optional)
Nuc &r Training Supervisor Date 1, A Z 1 of 8 11/28/01 Date i x ///./0 /
Date


ADMIN JPM RO-A3
ADMIN JPM RO-A3  


==SUMMARY==
==SUMMARY==
Line 1,200: Line 2,534:
Added, "and ALARA considerations" to step 4, performance step area and standards
Added, "and ALARA considerations" to step 4, performance step area and standards


JOB PERFORMANCE MEASURE GUIDE Facility:     Millstone Unit 3 JPM ID Number:             RO-A3                             Revision:     1 Task
JOB PERFORMANCE MEASURE GUIDE Facility:
Millstone Unit 3 JPM ID Number:
RO-A3 Revision:
1 Task


==Title:==
==Title:==
System:
Time Critical Task:
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
System:        Rad worker Time Critical Task:        (     ) YES     (X)       NO Validated Time (minutes):       5 min Task Number(s):         119-03-070, Approve entry and/or enter/exit the various radiation areas located within Millstone Station Applicable To:          SRO       X           RO         X           PEO       X K/A Number:         GEN.2.3.10, Ability to perform procedures to             K/A Rating:        2.9/3.3 reduce excessive levels of radiation and guard against personnel exposure Method of Testing:         Simulated Performance:                     Actual Performance:         X Location:                 Classroom:     X            Simulator:                In-Plant::    X Task Standards:             Reviews RWP per RPM 5.2.2 to support the ALARA Program Required Materials:         RWP for A RHR Cubicle (040) and Rad Survey Figure #30 General  
Rad worker
(  
) YES (X)
NO Validated Time (minutes):
5 min Task Number(s):
Applicable To:
119-03-070, Approve entry and/or enter/exit the various radiation areas located within Millstone Station SRO X
RO X
PEO X
K/A Number:
GEN.2.3.10, Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure K/A Rating:
Method of Testing:
Simulated Performance:
Actual Performance:
Location:
Classroom:
Task Standards:
Required Materials:
General  


==References:==
==References:==
Radiation Work Permits and Radiation Survey Maps RPM 5.2.2, Basic Radiation Worker Responsibilities
X Simulator:
                                  ***READ TO THE STUDENT***
In-Plant::
X Reviews RWP per RPM 5.2.2 to support the ALARA Program RWP for A RHR Cubicle (040) and Rad Survey Figure #30 Radiation Work Permits and Radiation Survey Maps RPM 5.2.2, Basic Radiation Worker Responsibilities 2 of 8 2.9/3.3 X
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
2 of 8


JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:           RO-A3                                                 Revision:   1 Simulator Requirements:         NONE Initial Conditions:             You have been directed to vent piping in the A RHR pump cubicle. HP has directed you to use the maintenance RWP 0040, Task 2 for this job. (Give candidate RWP 0040 and survey map #30)
JPM Number:
Initiating Cues:                Review and discuss your preparations for entering this area and what special precautions you would have to observe. Include in your discussion:
RO-A3 Revision:
                                "* ALARA considerations for this task
1 Simulator Requirements:
                                "* Highest contamination level in the cubicle
Initial Conditions:
                                "* Highest radiation level in the cubicle
Initiating Cues:
                                "* Special radiological hazards
You have been directed to vent piping in the A RHR pump cubicle. HP has directed you to use the maintenance RWP 0040, Task 2 for this job. (Give candidate RWP 0040 and survey map #30)
                                "* Longest possible stay time assuming highest general area rad level
Review and discuss your preparations for entering this area and what special precautions you would have to observe. Include in your discussion:  
                                " Personnel protective equipment required in the cubicle The examiner will act as Health Physics for any related questions.
"* ALARA considerations for this task  
                                  **** NOTES TO EVALUATOR ****
"* Highest contamination level in the cubicle  
: 1.     Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
"* Highest radiation level in the cubicle  
The students performance is graded by an "S"for satisfactory or a "U" for unsatisfactory on each step.
"* Special radiological hazards  
: 2.     When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
"* Longest possible stay time assuming highest general area rad level Personnel protective equipment required in the cubicle The examiner will act as Health Physics for any related questions.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
3 of 8 NONE
3 of 8
**** NOTES TO EVALUATOR ****
: 1.
Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
: 2.
When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3.
If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").


PERFORMANCE INFORMATION JPM Number:     RO-A3                                             Revision:    I Task
PERFORMANCE INFORMATION JPM Number:
RO-A3 Task


==Title:==
==Title:==
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Revision:
I Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Start Time:
Start Time:
Ensure candidate has RWP 0040 and survey map #30 STEP        1              Performance Step:   Refers to RWP #40 (A RHR Cubicle)
Ensure candidate has RWP 0040 and survey map #30 Performance Step:
GRADE                      Standards:          Locates Task 2, RHR Cubicle walkdowns and inspections, covered under RWP #40 Grade:              SAT                   UNSAT STEP        2      x      Performance Step:    Locates specific requirements on RWP for at least:
Standards:
* Protective clothing
Grade:
* Dosimetry
Performance Step:
* Dose Limit Alarms
Standards:
* Dose Rate Alarms GRADE              x      Standards:          Reviews RWP for specific requirements including:
Refers to RWP #40 (A RHR Cubicle)
                                              "* Protective clothing
Locates Task 2, RHR Cubicle walkdowns and inspections, covered under RWP #40 SAT UNSAT Locates specific requirements on RWP for at least:
                                                      -for this task fulI-PCs
Protective clothing Dosimetry Dose Limit Alarms Dose Rate Alarms Reviews RWP for specific requirements including:  
                                              "* Dosimetry
"* Protective clothing  
                                                      -TLD & electronic dosimeter
-for this task fulI-PCs  
* Dose Limit & Dose Rate Alarms
"* Dosimetry  
                                              *      -75 mrem & 200 mr/hr Cue:               If candidate does not discuss an individual item:
-TLD & electronic dosimeter Dose Limit & Dose Rate Alarms  
                                              "What are the protective clothing requirements for this area?
-75 mrem & 200 mr/hr 4 of 8 STEP 1
                                              "What are the dosimetry requirements for this area?
GRADE 2
                                              "What are the Dose Limit & Dose Rate Alarms requirements for this area?
STEP GRADE x
4 of 8
x Cue:
If candidate does not discuss an individual item:  
"What are the protective clothing requirements for this area?  
"What are the dosimetry requirements for this area?  
"What are the Dose Limit & Dose Rate Alarms requirements for this area?


PERFORMANCE INFORMATION JPM Number:     RO-A3                                             Revision:    1 Task
PERFORMANCE INFORMATION JPM Number:
RO-A3 Task


==Title:==
==Title:==
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
STEP GRADE Revision:
Cue:                 If candidate asks HP for area protective clothing requirements for this area respond:
1 Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles) 3 X
                                              "What would you expect them to be?
X Cue:
If candidate asks HP for area protective clothing requirements for this area respond:  
"What would you expect them to be?
And then "Full PCs are required in this area for the task you are performing."
And then "Full PCs are required in this area for the task you are performing."
Grade:             SAT                     UNSAT STEP        3      X      Performance Step:   Reviews the survey map for ESF Building 4'- 6" Elev. proposed to be entered GRADE              X      Standards:         Reviews survey map for specific radiation and contamination hazards in the A RHR Cubicle including:
Grade:
                                              "* Smear results
SAT UNSAT Performance Step:
                                                      -Smear results #18, #19, #20
Reviews the survey map for ESF Building 4'- 6" Elev. proposed to be entered Standards:
                                              "* Gamma Surveys
Reviews survey map for specific radiation and contamination hazards in the A RHR Cubicle including:  
                                                      -280 mrem/hr gamma on contact at RHR pump and HX
"* Smear results  
                                                      -40 mrem/hr highest general area gamma
-Smear results #18, #19, #20  
                                              "* Contaminated areas
"* Gamma Surveys  
                                                      -No. 18 highest, 15K
-280 mrem/hr gamma on contact at RHR pump and HX  
                                              "* Hot Spots
-40 mrem/hr highest general area gamma  
                                                      -locates on RHR piping (280 mrem/hour)
"* Contaminated areas  
Grade:             SAT                   UNSAT Cue:               If candidate does not discuss an individual item:
-No. 18 highest, 15K  
                                              "What are the smear results requirements for this area?
"* Hot Spots  
                                              "What are the results of the gamma surveys of this area?
-locates on RHR piping (280 mrem/hour)
                                              "Where are the contaminated areas?"
Grade:
                                              "Where are the hot spots?
SAT UNSAT Cue:
If candidate does not discuss an individual item:  
"What are the smear results requirements for this area?  
"What are the results of the gamma surveys of this area?  
"Where are the contaminated areas?"  
"Where are the hot spots?
5 of 8
5 of 8


PERFORMANCE INFORMATION JPM Number:     RO-A3                                             Revision:      1 Task
PERFORMANCE INFORMATION JPM Number:
RO-A3 Task


==Title:==
==Title:==
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Revision:
STEP        4      x     Performance Step:   Analyze survey map and RWP to determine preparations for entering this area and what special precautions and ALARA considerations they would have to observe.
1 Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles) 4 x
GRADE              x      Standards:          Analyze survey map and RWP to determine the following:
x Performance Step:
                                              "* Highest contamination level in the cubicle
Standards:
                                                              -Pt. 19: 15K
Grade:
                                              "* Highest radiation level in the cubicle
STEP GRADE SAT UNSAT 6 of 8 Analyze survey map and RWP to determine preparations for entering this area and what special precautions and ALARA considerations they would have to observe.
                                                              -80mrem/hr on contact (A RHR Pump)
Analyze survey map and RWP to determine the following:  
                                              "* Special radiological hazards
"* Highest contamination level in the cubicle  
                                                              -Wet/Boron near pump
-Pt. 19: 15K  
                                                              -Hot Spot
"* Highest radiation level in the cubicle  
                                              "* Longest possible stay time assuming highest rad level
-80mrem/hr on contact (A RHR Pump)  
                                                              -Dose Limit Alarm (Stay Time) is 125 mrem
"* Special radiological hazards  
                                                              -Highest general area rad level is 40mrem/hr
-Wet/Boron near pump  
                                                              = about 3.125 hours (figuring in approaching Hot Spots may reduce this time).
-Hot Spot  
                                              "* Personnel protective equipment required in the cubicle
"* Longest possible stay time assuming highest rad level  
                                                              -Full PC's
-Dose Limit Alarm (Stay Time) is 125 mrem  
                                              "* ALARA considerations
-Highest general area rad level is 40mrem/hr  
                                                              -Avoidance of Hot Spot*
= about 3.125 hours (figuring in approaching Hot Spots may reduce this time).  
                                                              -Minimize wait/rest time in higher radiation areas
"* Personnel protective equipment required in the cubicle  
                                                              -Prepare for task (pre stage tools)
-Full PC's  
Grade:              SAT                      UNSAT 6 of 8
"* ALARA considerations  
-Avoidance of Hot Spot*  
-Minimize wait/rest time in higher radiation areas  
-Prepare for task (pre stage tools)


PERFORMANCE INFORMATION JPM Number:     RO-A3                                           Revision:    1 Task
PERFORMANCE INFORMATION JPM Number:
RO-A3 Task


==Title:==
==Title:==
Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Revision:
Comment::           *Definition of Hot Spot: >100 mr AND 5 times highest background/general area Termination Cue: The Evaluation For This JPM is Complete.
1 Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)
Comment::
*Definition of Hot Spot: >100 mr AND 5 times highest background/general area Termination Cue: The Evaluation For This JPM is Complete.
Stop Time:
Stop Time:
7 of 8
7 of 8


VERIFICATION OF JPM COMPLETION JPM Number:             RO-A3                                          Revision:            1 Date Performed:
VERIFICATION OF JPM COMPLETION JPM Number:
Date Performed:
Student:
Student:
Evaluator:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
RO-A3 Revision:
Time Critical Task?                         YES             NO      X Validated Time (minutes):                   -5 Actual Time to Complete (minutes):
1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Result of JPM:                                     ("S" for satisfactory, "U" for unsatisfactory)
Time Critical Task?
YES Validated Time (minutes):
NO X
-5 Actual Time to Complete (minutes):
Result of JPM:
("S" for satisfactory, "U" for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Line 1,321: Line 2,713:
8 of 8
8 of 8


STUDENT HANDOUT JPM Number:           RO-A3 Initial Conditions: You have been directed to vent piping in the A RHR pump cubicle. HP has directed you to use the maintenance RWP 0040, Task 2 for this job.
STUDENT HANDOUT JPM Number:
Initiating Cues:    Review and discuss your preparations for entering this area and what special precautions you would have to observe.
Initial Conditions:
Initiating Cues:
RO-A3 You have been directed to vent piping in the A RHR pump cubicle. HP has directed you to use the maintenance RWP 0040, Task 2 for this job.
Review and discuss your preparations for entering this area and what special precautions you would have to observe.
Include in your discussion:
Include in your discussion:
* ALARA considerations for this task
* ALARA considerations for this task
Line 1,328: Line 2,723:
* Highest radiation level in the cubicle
* Highest radiation level in the cubicle
* Special radiological hazards
* Special radiological hazards
* Longest possible stay time assuming highest general area rad level
* Longest possible stay time assuming highest general area rad level Personnel protective equipment required in the cubicle The examiner will act as Health Physics for any related questions.
* Personnel protective equipment required in the cubicle The examiner will act as Health Physics for any related questions.
9 of 8
9 of 8


                                            - RADIATION SURVEY FIGURE NO. 30                                       UNIT 3 ESF Building 4' 6" Elev.
- RADIATION SURVEY FIGURE NO. 30 ESF Building 4' 6" Elev.
C(OPY                              SMEAR RESULTS No. dpm/100cm 2
SIH*MV8806  
                                                                                                      /- /i ',<"/*
*M ie iz A SIH"V11 M
NorthI CTMT RECIRC COOLERS
e Z
                                                                                                          ~2 40 RHR PUMP SIH*MV8806
  *M ie iz A SIH"V11 RHR PUMP M
e                                                                                         >< *Mezzani Z
z.
z.
25T - neutron(o711) in mrem/hr 100 - gamma(r) at waist level in mrem/hr     100* - gamma(0 contact in mrem/hr
100 - gamma(r) at waist level in mrem/hr  
    "    - contamination survey point          50 mrad - beta(,/) reading in mrad/hr I
- contamination survey point NorthI CTMT RECIRC COOLERS 40 RHR PUMP SMEAR RESULTS No. dpm/100cm 2
/- /i
',<"/*
~2 RHR PUMP
*Mezzani 100* - gamma(0 contact in mrem/hr 50 mrad - beta(,/) reading in mrad/hr 25T - neutron(o711) in mrem/hr C(OPY I
UNIT 3


RADIATION WORK PERMIT                             -     40 Plant Ce         Year RWP Number     Rev. IRWP Start                         IRWP     pe     RWP Category       IsP   Eiraon 3           1       0040       03   i 01-jan-2001                         S                 -POWER           02-jan-2002 RWP DESCRIPTION ESF Building Component & System Modification,           Repair TASK  
RADIATION WORK PERMIT - 40 Plant Ce Year RWP Number Rev.
IRWP Start IRWP pe RWP Category IsP Eiraon 3
1 0040 03 i 01-jan-2001 S  
-POWER 02-jan-2002 RWP DESCRIPTION ESF Building Component & System Modification, Repair TASK  


==SUMMARY==
==SUMMARY==
Job Description 1
3DAS-Pl1 Replace discharge piping.
2 RHR Cubicle-ESF north pipechase preventive and correc 3
RHR Heat Exchanger bolting inspection; remove, instal 4
RHR valve work; 3RHS*HCV607, 3RHS*FCV619 preventive a ALARA INFORMATION I'-RA Review Hours-Estimated Authorized Internal(DAC]- Estimated Authorized External(mRem)-Estimated Authorized 01900 00000 0000 000 001900 001900 SPECIAL INSTRUCTIONS General access to RCAs to perform repairs and Entry on this RWP requires the worker to understand modificiation to ESF Building components, including and comply with the following:
walkdowns, inspections, and necessary support Be knowledgeable of radiological conditions of activities, the work area
** Adhere to the requirements of the RWP
** Notify HP before entering overhead areas
** Monitor electronic dosimeter frequently, especially in high noise areas
** Unless specifically briefed otherwise, if DOSE RATE alarm sounds, move to a lower dose area and notify HP If DOSE alarm sounds, leave the area and notify HP If electronic dosimeter malfunctions, notify HP BEFORE logging out Modesty garments will be worn whenever PCs are worn L
Hea.th Physics Representative Date RWP Term/Rev Date/Time Terminated/Rev by XCOOP


Job              Description 1     3DAS-Pl1 - Replace discharge piping.
RADIATION WORK PERMIT - (40) JOB STEP - 2 OF 4 I[Pant Code Year IRWP Number IRev.
2    RHR Cubicle-ESF north pipechase preventive and correc 3    RHR Heat Exchanger bolting inspection; remove, instal 4    RHR valve work; 3RHS*HCV607,   3RHS*FCV619 preventive a ALARA       INFORMATION I'-RA Review           Hours- Estimated Authorized     Internal(DAC]- Estimated Authorized       External(mRem)-Estimated   Authorized 01900    00000                           0000        000                          001900        001900 SPECIAL INSTRUCTIONS General access to RCAs to perform repairs and                          Entry on this   RWP requires the worker to understand modificiation to ESF Building components, including                    and comply with the following:
IRWP Start IRWP Type IRWP Category iRWP Expiration 3
walkdowns, inspections, and necessary support                                Be knowledgeable of radiological conditions of activities,                                                                  the work area
1 I 0040 03 01-jan-2001 I
                                                                          ** Adhere to the requirements of the RWP
S
                                                                          ** Notify HP before entering overhead areas
~
                                                                          ** Monitor electronic dosimeter frequently, especially in high noise areas
POWER I02-ian-2002 "fResponsible Individual/Extension Department/Company Job Supervisor/Extension Department/Company THOMAS BtW.NS/4326 AD/DNC THOMAS BURNS/4326 AD/DNC Buidin l'orZone ILocation Plant Equipment IRad. Area Type 3ESF 4'"ESF 416' GEN/ONIDENTIFIED AREA MISCELLANEOUSI WRITTEN DESCRIPTION OF JOB (MATERIALS
                                                                          ** Unless specifically      briefed otherwise, if DOSE RATE alarm sounds, move to a lower dose area and notify HP If DOSE alarm sounds, leave the area and notify HP
& METHODS)
                                                                          *,  If electronic dosimeter malfunctions, notify HP BEFORE logging out Modesty garments will be worn whenever PCs are worn L
RHR Cubicle-ESF north pipechase preventive and corrective maintenance to components, walkdowns, inspections, necessary support activities.
Hea.th Physics Representative         Date                                       RWP Term/Rev Date/Time Terminated/Rev   by XCOOP
I I
ALARA INFORMATION oALRA Review Hours-Estimated Authorized Internal(DAC)-
Estimated Authorized External(mRem)-Estimated Authorized NA 00900 00000 00000 00000 000900 000900 System Code Component Code Task
!NRC Task,Alara Zone Location Plant Equipment 3305 MISC REPLACE SP 3CMAI 3720 3000 SURVEY MEASUREMENTS RADIATION (MR/HR)
CONTAMINATION(DPM/100CM2)
AIRBORN'.E (DAC) iRRCubicle 140 -200 5KS -
20K<.
14" Pipe Chase Platform Area 5 -
50
<1K
<.3 SPECIAL INSTRUCTIONS entry to Tech Spec Locked High Radiation Areas
"}'rmitted using this Job Step.
PCs required in contaminated areas.
HP supervision may adjust protective clothing requirements based on any of the followig:
"* TEDE ALARA reviews
"* Heat stress evaluations
"* FME controls Requirements for entry to High Radiation Areas:
* Dose rate meter or alarming dosimeter AND knowledge of area dose rates, OR continuous HP coverage
- Health Physics briefing for High Radiation Areas IDose Limit Alarm(Stay Time)= 0125 mrem Dose Rate Alarm= 0200 mr/hr Elapsed Time Alarm= 0000 min.
REQUIREMENTS Protective clothing:
Lab coat "Cotton liners Surgeon's gloves Health Physics Coverage
* Booties Periodic Coveralls Electronic dosimeter Shoe covers TLD Minimum Margin:
Rubber gloves 0175 mrem Modesty garments alth Physics Representative Date RWP Term/Rev Date/Time Terminated/Rev by  
/
/


RADIATION WORK PERMIT - (40) JOB STEP - 2 OF 4 I[Pant    Code    Year IRWP Number         IRev. IRWP Start                              IRWP Type    IRWP Category      iRWP  Expiration 3            1  I    0040          03    01-jan-2001                          I  S      ~  ,    POWER          I02-ian-2002 "fResponsible Individual/Extension                  Department/Company          Job Supervisor/Extension                Department/Company THOMAS BtW.NS/4326                                      AD/DNC                THOMAS BURNS/4326                                AD/DNC Buidin                    l'orZone        ILocation                                Plant Equipment                      IRad. Area Type 3ESF            4'"ESF                                416'  GEN/ONIDENTIFIED AREA        MISCELLANEOUSI WRITTEN DESCRIPTION OF JOB                  (MATERIALS    & METHODS) walkdowns,  inspections, I
Reactor Operator E-Plan Responsibilities JPM ID Number:
RHR Cubicle-ESF north pipechase preventive and corrective maintenance to components, necessary support activities.                                                                                                                   I ALARA INFORMATION oALRA Review        Hours-  Estimated Authorized        Internal(DAC)-    Estimated Authorized      External(mRem)-Estimated Authorized 00900        00000                            00000          00000                    000900      000900 NA Task              !NRC Task    ,Alara  Zone      Location            Plant Equipment System Code                  Component Code 3305                        MISC                REPLACE              SP        3CMAI            3720                3000 MEASUREMENTS                                  RADIATION    (MR/HR)        CONTAMINATION(DPM/100CM2)    AIRBORN'.E (DAC)
RO-A.4 Revision:
SURVEY iRRCubicle Platform Area 140 5 -
0 I1. Initiated:
                                                                -200 50 5KS - 20K<.
10/05/01 Date I1I.
                                                                                            <1K                      <.3 14"    Pipe Chase SPECIAL INSTRUCTIONS entry to Tech Spec Locked High Radiation Areas
Reviewed:
"}'rmitted using          this  Job Step.
Technical Reviewer IV. Approved:
PCs required in          contaminated    areas.
Cognizant Plant Supervisor (optional)
HP supervision may adjust protective clothing requirements based on any of the followig:
Nucld-Training Supervisor Date Date ln1i6 D5e
  "*  TEDE ALARA reviews
  "*  Heat stress        evaluations
  "*  FME controls Requirements for entry to High Radiation Areas:
* Dose rate meter or alarming dosimeter AND knowledge of area dose rates, OR continuous HP coverage
    - Health Physics briefing for High Radiation Areas IDose Limit Alarm(Stay Time)= 0125 mrem                                                Dose Rate Alarm= 0200 mr/hr Elapsed Time Alarm= 0000 min.
REQUIREMENTS Protective clothing:                                            Lab coat Health Physics Coverage "Cotton  liners                                            Surgeon's  gloves Periodic
* Booties Coveralls                                                  Electronic dosimeter TLD                                                  Minimum Margin:
    - Shoe covers 0175 mrem Rubber gloves Modesty garments alth Physics Representative            Date                                           RWP Term/Rev Date/Time      Terminated/Rev by
/            /
: 1. JPM
: 1. JPM


==Title:==
==Title:==
Reactor Operator E-Plan Responsibilities JPM ID Number:        RO-A.4                            Revision: 0 I1. Initiated:
10/05/01 Date I1I. Reviewed:
Date Technical Reviewer IV. Approved:
Date Cognizant Plant Supervisor (optional) ln1i6 Nucld-    Training Supervisor                                D5e
Questions for Admin RO A.4 Topic: RO responsibilities during an E-Plan GEN. 2.4. 39 K/A: 3.3/3.1 Question 1:
Questions for Admin RO A.4 Topic: RO responsibilities during an E-Plan GEN. 2.4. 39 K/A: 3.3/3.1 Question 1:
You are a qualified Control Operator currently working with the Outage Planning Group. You are eating lunch in the building 475 cafeteria when you hear the evacuation alarm sound. The message following the siren states that an ALERT C-1 has been declared and all non essential personnel evacuate the site via the North Access Point. Where do you go?
You are a qualified Control Operator currently working with the Outage Planning Group. You are eating lunch in the building 475 cafeteria when you hear the evacuation alarm sound. The message following the siren states that an ALERT C-1 has been declared and all non essential personnel evacuate the site via the North Access Point. Where do you go?

Latest revision as of 01:24, 17 January 2025

Final - Operating Section a (RO & SRO)
ML020250090
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/04/2002
From: Wilson M
Dominion Nuclear Connecticut
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
050-423/2001-302 IR-01-302
Download: ML020250090 (122)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility:

Millstone 3 Date of Examination: January 7-10, 2002 Examination Level (circle one):

SRO Operating Test Number: A-1 Administrative Describe method of evaluation:

Topic/Subject

1. ONE Administrative JPM, OR Description
2. TWO Administrative Questions A.1.1 Execute JPM Determine the effect and response to degrading Intake conditions Procedure using OP 3215, Response to Intake Structure Degraded Conditions.

Steps (GEN 2.1.20) (41.10/43.5/45.12)

A.1.2 Review an JPM Review an Estimated Critical Position.

Estimated Critical Position (Sys:001, SRO: 3.9 A4.10)

A.2 Tagging and JPM Given a completed clearance boundary and reference material, Clearance review, amend and approve the clearance boundary.

Procedures (GEN 2.2.13)

(41.10/45.13)

A.3 Review and JPM Review and Approve a Radioactive Liquid Waste discharge Approve permit.

Release Permits (GEN 2.3.6)

(43.4/45.10)

A.4 E-Plan JPM Emergency Plan Responsibilities as Shift Manager.

Actions (GEN 2.4.44)

(43.5/45.11)

NUREG-1021, Revision 8

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

JPM ID Number:

Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.

SRO-A1.1 Revision:

1 II. Initiated:

10/31/01 Date I1l.

Reviewed:

Ray Martin Technical Reviewer I771ZOJ+/-VL IV. Approved:

Cognizant Plant Supervisor (optional)

Nucl dar Training Supervisor 11/15/01 Date Date

/oý //(6 Pa 1 of 12 f

ADMIN JPM SRO-AI.1

SUMMARY

OF CHANGES RE: NRC VALIDATION Removed steps 2-10 as they related to a YELLOW/YELLOW condition.

Moved step 11 to the step 2 position.

Deleted cue at old step 10 as the Circ Water pump trip follows immediately.

Deleted the "Initial" initiating cue Changed validated time to 5 minutes.

Made OP 3215, Response to Intake Structure Degraded Conditions, a required material Added OP 3325A, Circulating Water, as a General Reference

JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 JPM ID Number:

SRO-AI.1 Revision:

Task

Title:

System:

Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.

Intake Structure Time Critical Task:

) YES (X)

NO Validated Time (minutes):

5 min Task Number(s):

Applicable To:

341-01-107, Response to degrading intake conditions.

SRO X

RO PEO K/A Number:

GEN.2.1.20, Ability to execute procedure steps K/A Rating:

Method of Testing:

Location:

Simulated Performance:

Classroom:

X Actual Performance:

Simulator:

In-Plant::

Task Standards:

Required Materials:

General

References:

Response to degrading intake conditions SP 3665.2, Intake Structure Condition Determination, Rev. 7 OP 3215, Response to Intake Structure Degraded Conditions, Rev.

7 OP 3325A, Circulating Water 2 of 8 4.3/4.2 X

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

SRO-AI.1 Revision:

1 Simulator Requirements:

Initial Conditions:

Initiating Cues:

You are the Shift Manager and the unit is experiencing degrading conditions at the intake structure. The Shift Technical Advisor (STA) is keeping SP 3665.2, Intake Structure Condition Determination current. The last surveillance was done at 0800 and indicated a plant factor condition of YELLOW, an environmental factor condition of YELLOW.

The "B" Screen Wash pump has just tripped due to an electrical fault. Maintenance estimates 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to restore the pump to operability.

Wind speed, from Met. Tower data, has increased to a steady 27 mph.

The re-calculated surveillance indicated a plant factor condition of RED, an environmental factor condition of RED.

        • NOTES TO EVALUATOR ****
1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

3 of 8 NONE I-I

PERFORMANCE INFORMATION JPM Number:

SRO-AI.1 Task

Title:

Revision:

1 Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.

Start Time:

EXAMINER: Give candidate the completed copy of SP 3665.2 & the MB6 sheet.

1 2

X X

Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Review SP 3665.2, Intake Structure Condition Determination (0800).

Review SP 3665.2, Intake Structure Condition Determination relative to the description of plant and environmental conditions and understand the current condition.

SAT UNSAT REVIEW OP 3215 procedure steps and determine which are applicable with the plant factor condition "RED",

OR the environmental factor condition "RED". (step 4.5)

Evaluate factor conditions and returns to procedure section 4.5 Discuss the following:

"* NOTIFY Intake Structure Coordinator and Operations management of the conditions affecting the Intake Structure

"* RESTORE maximum steam dumps and atmospheric dumps to service

"* COMMENCE continuous trash rack cleaning

"* OPEN trash trough trap door if necessary

"* OPEN Plexiglas inspection doors at backside debris trough to monitor debris spray and carryover

"* EVALUATE the condition of the following systems

- Steam Dump System 4 of 8 STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

Task

Title:

SRO-A1.1 Revision:

1 Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.

- Condenser Vacuum Systems

- Screenwash Systems

- Service Water Systems

- Circulating Water Systems Grade:

SAT UNSAT 3

x Performance Step:

Standards:

Grade:

Performance Step:

4 Standards:

Grade:

Monitor conditions in the following systems (step 4.6)

  • Steam Dump System
  • Condenser Vacuum Systems
  • Screenwash Systems Service Water Systems Circulating Water Systems Discusses the need to monitor systems affected by intake challenges SAT UNSAT IF circ pump amps, discharge pressure, and condenser delta T indicate the waterbox is fouling, Refer To OP 3325A, "Circulating Water," and PERFORM backwashes (setp 4.7)

Discusses the need to perform backwashes during intake challenges SAT UNSAT 5

x Performance Step:

IF the circulating pumps in the same condenser bay are lost, TRIP the reactor and Go To EOP 35 E-0, "Reactor Trip or Safety Injection" (step 4.9) 5 of 8 STEP GRADE STEP GRADE STEP

PERFORMANCE INFORMATION JPM Number:

SRO-AI.1 Task

Title:

Revision:

1 Determine the effect of changing intake conditions and respond to degrading intake conditions using OP 3215, Response to Intake Structure Degraded Conditions.

Standards:

Grade:

Candidate determines that A & B Circ Pumps ARE in the same condenser bay and decides to trip the reactor.

SAT Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

6 of 8 GRADE x

UNSAT

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

SRO-A1.1 Revision:

1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Validated Time (minutes):

YES NO X

5 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

7 of 8

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

SRO-AI.1 You are the Shift Manager and the unit is experiencing degrading conditions at the intake structure. The Shift Technical Advisor (STA) is keeping SP 3665.2, Intake Structure Condition Determination current. The last surveillance was done at 0800 and indicated a plant factor condition of YELLOW, an environmental factor condition of YELLOW.

The "B" Screen Wash pump has just tripped due to an electrical fault. Maintenance estimates 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to restore the pump to operability.

Wind speed, from Met. Tower data, has increased to a steady 27 mph.

The re-calculated surveillance indicated a plant factor condition of RED, an environmental factor condition of RED.

8 of 8

SSurveillanee For.m Generic Inf

=ormation Rev.-No.

Form Title IPr o

Intake Structure Condition DeterminationI 008 Reference Procedure Applicable Tech. Spec.

Applicability (Tech. Spec.)

Frequency SP 3665.2 N/A N/AI s

This form is being used for the following:

o Tech Spec Surveillance C) System Alignment O Other:

o Maintenance Restoration Non-Tech S(pc L (Retest) v iln e( M Stpecific' Information" Awe Number Late Date i Schedule Start Date Performance Modes Prerequisites Completed (Initials)

Precautions Noted (Initials) 1, 2", 3", and 4*

Test Authorized By Date Partial Surveillance Perlormed By Date / Time Yes No Accepted By Date I Time Acceptance Criteria Satisfied Approved By (Department Head or Designee)

Date

[

Yes

]

No Shift Manager Notified of Failed Test Date CR#:

Surveillance Information Test Equipment Type OA Number Cal Due Date N/A N/A N/A Comments

  • With vacuum in condenser SP 3665.2-001 Rev. 008 Page l of 5

Intake Structure Condition Determination Each shift: CIRCLE the applicable box In each 08 08* 20 20*

section, then TOTAL.

Plant Factors

1. Circulating Water Pumps and Screens All bays, circulating pumps, and screens operating properly or are 0

0 available for operation 1 bay out of service (C, D, E, or F) 3 3

3 3

1 bay out of service (A or B) 6 6

6 6

2 bays out of service 9

9 9

9 3 bays out of service 25 25 25 25

2. Screen Wash Pumps Two pumps available 0

0

.0 0

1 pump out of service 8

8 2 pumps out of service 25 25 25 25

3. Trash Racks

< 6 inches dp on all racks 0

0 0

0

> 6 inches dp on one rack 1

1 1

1

> 6 inches dp on two racks 3

3 3

3

> 6 inches dp on three racks (D

6 6

> 6 inches dp on four or more racks 12 12 12 12

> 10 inches on two or more racks 20 20 20 20

4. Trash Rakes Two rakes available (0O 0

0 One rake out of service 8

8 8

8 Two rakes out of service 25 25 25 25

5. Traveling Screens

< 6 inches dp, in either automatic or manual Slow 1 no 0

0

>6 inches dp with screens in Slow 1 6

6 6

6 Screens frequently shifting to Fast 1 (once/hour over 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />) 12 12 12 12 Plant Factors Section Total (1. + 2. + 3. + 4. + 5.)

1 At

  • 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> look ahead I

SP 3665.2-001 Rev. 008 P 2 nff S Paore of 5

Intake Structure Condition Determination I

  • 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> look ahead SP 3665.2-001 Rev. 008 Page 3 of 5 I

I Each shift: CIRCLE the applicable box in 08 08*

20 20*

each section, then TOTAL.

Environmental Factors

1. Predicted Height of Next Tide (local tide chart)

Next high tide is < 3.0 feet 0

0 0

0 Next high tide is > 3.0 feet but < 3.5 feet c*

(

2 2

Next high tide is > 3.5 feet 4

4 4

4

2. Height of Tide in Last 48 Hours (local tide chart)

All high tides < 3.5 feet 0

0 0

0 Any high tide > 3.5 feet 2

2

3. Wind Direction (actual from MET tower or other source as noted below)

From 271 to 119 (_ 2 7 1 or < 119) 1 From 120 to 270 02 02 2

4. Wind Speed (actual from MET tower or other source as noted below)

Sustained speed < 10 mph 1

1 1

Sustained speed > 10 mph but < 20 mph 2

2 2

2 Sustained speed.> 20 mph but < 25 mph 3

3 3

3 Sustained speed >! 25 mph but < 30 mph 5*

(,1j 5

5 Sustained speed _> 30 mph or gusts > 45 mph 7

7 7

7

5.

Historical Wind Speed (PPC (BOP-F11-F1 1), (OFIS, computer priority alarms, or EDAN)

Sustained wind < 20 mph in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or Sustained wind > 20 mph for less than any 4-hour period in last 24 0

0 0

0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Sustained wind > 20 mph for any 4-hour period in last 24

(*

2 2

hours

6. Wind Correction: (3.) x (4.+ 5.)

1 0

Intake Structure Condition Determination Each shift: CIRCLE the applicable box in 08 08*

20 20*

each section, then TOTAL.

7. Predicted Wave Height/Seas (from internet)

Wave height < 1 foot 1

1 1

1 Wave height > 1 foot but < 3 feet 2

2 2

2 Wave height > 3 feet but < 5 feet 4

4 Wave height > 5 feet 6

6 6

6

8. Historical Wave Height/Seas (as seen at Intake Structure)

Wave height < 3.5 feet in last 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 1

1,1 1

Wave height > 3.5 feet in last 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 1

2 1 2

9. Wave Correction Subtotal: (7.) x (8.)

1

10. Barometric Pressure ( internet or local on site if available)

Pressure > 29.5" (> 750 mm), steady/rising 1

1 1

1 Pressure > 29.5" (> 750 mm), falling 2

2 2

2 Pressure < 29.5" (< 750 mm), steady/rising 2

2 2

2 Pressure < 29.5" (

750 mm), falling 4_

4 4

11. Season January or July n

0 0

February or December 2

2 2

2 March, June, August, November or May1 6-31 4

4 4

4 April, May 1-15, September or October 6

6 6

6

12. Historical Environmental Factor Last environmental factor < 25 0

0 Last environmental factor > 25 4

4 4

4 Environmental Factors Section Total (1. + 2. + 6. + 9. + 10. + 11. + 12.)

  • 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> look ahead I

SP 3665.2-001 Rev. 008 Paee 4 of 5 I

Intake Structure Condition Determination

  • 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> look ahead Note 1 If predicted wind speed is expected to be greater than 20 MPH make notifications per 3215, "Response to Intake Structure Degraded Conditions," step 4.1 Note 2 If any Action Level is exceeded, Refer To OP 3215, "Response to Intake Structure Degraded Conditions," and PERFORM applicable actions.

SP 3665.2-001 Rev. 008 Page 5 of 5 I

Determination of Factors Parameter Action Level 08 08*

20 20*

Plant Factors Section Total

> 3 points I 1ý I %"

Environmental Factors Section Total

> 17 points 2t6o 2ý Intake Condition Total 0

u*O (Plant + Environmental)

Predicted le Sustained wind speed from 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> sustained weather forcast ( note I speed >20 mph SM Review (Note 2)

I I

I

INTAKE STRUCTURE STATUS PLANT FACTORS ENVIRONMENTAL FACTORS RED RED

)

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

JPM ID Number:

Review Reactivity Calculations - Estimated Critical Conditions SRO-A1.2 Revision:

0 II. Initiated:

10/31/01 Date Ill.

Reviewed:

/1

/i19 /o1 Date Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional)

Nuclef Training Supervisor 1 of 7 Date

/De Steve Jac w-*

Developer

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

Review Reactivity Calculations - Estimated Critical Conditions JPM ID Number:

SRO-A1.2 Revision:

0 I1. Initiated:

Steve Jackson Developer Ill.

Reviewed:

Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional) 10/31/01 Date Date Nuclear Training Supervisor Date Date 1 of 7

JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 JPM ID Number:

SRO-A1.2 Revision:

0 Task

Title:

Review Reactivity Calculations - Estimated Critical Conditions System:

Reactor Core Time Critical Task:

(

) YES

( X ) NO Validated Time (minutes):

20 min Task Number(s):

Applicable To:

K/A Number:

Method of Testin Location:

Task Standards:

Required Materid General Referen C

341-01-175, Perform a reactivity balance to determine estimated critical sondition.

SRO X

RO PEO Sys: 001.A4.10, Determination of an ECP K/A Rating:

g:

Simulated Performance:

Actual Performance:

Classroom:

X Simulator:

In-Plant::

Perform a reactivity balance to determine estimated critical condition.

als:

OP 3209A, Reactivity Calculations - Estimated Critical Conditions ces:

MP3 Reactor Engineering Curve and Data Book 2 of 7 3.5/3.9 X

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

SRO-A1.2 Revision:

0 Simulator Requirements:

Initial Conditions:

Initiating Cues:

You are an on-shift Senior Licensed Operator. Your shift is preparing to perform a reactor startup. Reactor Engineering has presented you with two independently performed Estimated Critical Condition (ECC) reactivity calculations for your review.

Using the two independently performed Estimated Critical Condition (ECC) reactivity calculations review the ECC in accordance with OP 3209A, Reactivity Calculations - Estimated Critical Condition, Section 4.20. Inform the examiner of the results of your comparison and when you are complete.

3 of 7 NONE

'"NOTES TO EVALUATOR ****

1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

SRO-A1.2 Revision:

0 Task

Title:

Review Reactivity Calculations - Estimated Critical Conditions Start Time:

Note to Examiner:

approximate values are acceptable, since visual interpolation between curves on a graph may be employed 1

Performance Step:

Standards:

Grade:

2 X

Performance Step:

X Standards:

Grade:

Reviews procedure sections.

Determines if second, independent ECC has been performed (step 4.20.1)

Locate and review procedure section.

Obtains both ECC reactivity calculations.

SAT UNSAT COMPARE the two independent ECC calculations and RESOLVE the differences (step 4.20.2)

Compares the two ECCs and discovers the following differences:

"* differences in ECC 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Administrative Time Period

"* differences in boron worth SAT UNSAT Performance Step:

Standards:

Grade:

Resolve differences in Estimated Conditions at Criticality between the two ECCs. (steps 4.4.2, 4.4.3)

ECC B is incorrect. Administrative time period must start when T/S time period starts.

Resolve by confirming ECC A Estimated Conditions at Criticality are correct.

SAT UNSAT 4 of 7 STEP GRADE STEP GRADE STEP 3

X X

GRADE

PERFORMANCE INFORMATION JPM Number:

SRO-A1.2 Task

Title:

Revision:

0 Review Reactivity Calculations - Estimated Critical Conditions X

Performance Step:

X Standards:

Comment:

Resolve differences in boron worth between the two ECCs. (steps 4.12.1, 4.12.2)

ECC B is incorrect. Incorrect boron worth chosen from curve RE-F-02.

Resolve by confirming ECC A Boron Defect parameters are correct.

There are no other errors in the ECC.

It is not required for the candidate to recalculate values that are in close agreement.

Grade:

SAT UNSAT 5

x x

Performance Step:

Standards:

Grade:

Determine or Prepare the final OPS form 3209A-1. (step 4.20.3)

ECC A is correct and should be used as the final OPS form 3209A-1.

SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

5 of 7 STEP 4

GRADE STEP GRADE

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

SRO-A1.2 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

YES Validated Time (minutes):

NO X

20 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

6 of 7

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

SRO-A1.2 You are an on-shift Senior Licensed Operator. Your shift is preparing to perform a reactor startup. Reactor Engineering has presented you with two independently performed Estimated Critical Condition (ECC) reactivity calculations for your review.

Using the two independently performed Estimated Critical Condition (ECC) reactivity calculations review the ECC in accordance with OP 3209A, Reactivity Calculations Estimated Critical Condition, Section 4.20. Inform the examiner of the results of your comparison and when you are complete.

7 of 7

I Form Approval I rApproval Date JUL 0 1 1999 A

  • 1Effective Date JUL 0 6 1999

~JU 06eciv 1999

"[urnI ColverShedt JGeneric Information Form Title Estimated Critical Conditions Reference Procedure OP 3209A Applicable Tech. Spec.

AR*

This form is being used for the following:

3 Tech Spec Surveillance C) System Alignment 0

Other:

0 Maintenance Restoration Non-Tech Spec (Retest)

Surveillance (PM)

Specific InformationI Schedule Date N/A Applicable Mode Partial D

2 Surveillance Test Authorized By Date Baseline Test Prerequisites Completed (Initials)

Precautions Noted (Initials)

Performed By Date Time Accepted By Date Time Acceptance Criteria Satisfied Approved By (Department Head or Designee)

Date Shift Manager Notified of Failed Test Date D Yes D No Surveillance Information Test Equipment Type QA Number Cal Due Date N/A

  • This calculation may be performed at any time but must be verified within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving reactor criticality.

Send completed Form to Reactor Engineering.

OPS Form 3209A-1 Rev. 6 Page 1 of 9 4.1.1.1.1.c C/ý,,)

I

k Estimated Critical Conditions, Step No.

Name Date Time 4.2 Performed By:

I Reference Critical Data Step No.

Parameter Value Date o 0 Time 06

_5" Power Level 1O0 Burnup

-74o3-5 MWD/MTU RCS Pressure 2 ;

4,

psia Tavg

_578hL LF Tref

5.

OF Boron Concentration

[lq(

ppm Xenon

(-)

- 7 L.t pcm Samarium

(-)

5 pcm Control Bank C

3.

steps Control Bank D

-7 steps Estimated Conditions At Criticality Step No.

Parameter Value 4.4.1 Date 4.4.2 Administrative Time Period (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />) From:

UO00 To:

/ I C 0 4.4.3 T/S Time Period (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

From:

50 300 To:

/ 2. o0 4.4.4 Present Burnup 8 00 MWD/MTU 4.4.5 Tavg 557 OF 4.4.6 RCS Pressure 2,15 psia 4.4.7.b.

Xenon

(-)

0 pcm 4.4.8.b.

Samarium

(-)

1300 pcm 4.4.9.b.

Control Bank C @

2 15 Steps or Desired Critical Rod Height 4.4.10 Control Bank D @

/

-0 Steps Boron Concentration Step No.

Parameter Value 4.5 Present Boron Concentration

/

0 6 0 ppm OPS Form 3209A-1 Rev. 6 Page 2 of 9 I

D Defects Estimated Critical Conditions POWER DEFECT Step No.

Parameter and/or Calculation Value 4.6.1 Power Defect @ Reference Power =

(-)Ji._(,_ pcm Defect @ Ref Power 4.6.2

[(-)

5

.5.

pcm] x (1 U.5."pcm Defect @ Ref Pwr F

Power Defect REFERENCE MODERATOR DEFECT Step No.

Parameter and/or Calculation Value pcmn/

F(no sign) 4.7.2 Magnitude of MTC @ Tref =

Magnitude of MTC @ Tref 4.7.3 Difference Between Tref and Tavg =

Tref/Tg A OF (no sign) 4.7.4

( _F) x ( _

pcm/°F) =

pcm (no sign)

Trcf/Tavg A MTC @ Tref Ref Mod Defect 4.7.5 Sign of Reference Moderator Defect =

(+ or-)

Sign 4.7.1 or Value and Sign of Reference Moderator Defect Ref C) pcm 4.7.6 Ref Mod Defect ESTIMATED MODERATOR DEFECT Step No.

Parameter and/or Calculation Value pcm/0 F(no sign) 4.8.2 Magnitude of ITC @ 5570F =

Magnitude of ITC @ 557 0F 4.8.3 Difference Between Estimated Tavg and 557°F =

°F (no sign)

Tavg/ 557'* F A 4.8.4

(

OF) x ( _pcm/*F)

=

pcm (no sign)

Tavg/557*F A ITC @ 557" F Est ModDefect 4.8.5 Sign of Estimated Moderator Defect =

(+ or-)

Sign 4.8.1 or Value and Sign of Estimated Moderator Defect =

(

Mod De pcm 4.8.6 Est Mod Defect OPS Form 3209A-1 Rev. 6 I

Estimated Critical Conditions Defects (Continued)

XENON DEFECT Parameter and/or Calculation pcm] -

[(-

7 7. '

7 pcm]

Reference Xe

) 16771 q pcm Xenon Defect SAMARIUM DEFECT Step No.

Parameter and/or Calculation Value 4.10

[

1-13o 0 pcm] - [(-)0.+/-L,.-

S pcm] =

(-)

33,S pcm Estimated Sm Reference Sm Samarium Defect ROD WORTH DEFECT Step No.

Parameter and/or Calculation Value 4.11.2.a.

or Integral Rod Worth @ Reference Conditions =

(-)

.7 pcm 4.11.3.a.

Reference RW 4.11.2.b.

or Integral Rod Worth @ Estimated Conditions =

(-) E "ie pcm 4.11.3.b.

Estimated RW 4.11.1 or

[(-)I5"/3 pcm] - [(-L 7

pcm] =

(_) 5o2,3 pcm 4.11.4 Estimated RW Reference RW RW Defect BORON DEFECT Step Parameter and/or Calculation Value No.

4.12.1 Differential Boron Worth @ Reference Burnup =

(-)63 c/ppm Reference BW 4.12.2 Differential Boron Worth @ Present Burnup =

6,80 pcm/ppm I

Present BW 4.12.3

"[(-

76.7/.

pcm/ppm)+(-

+

.0 pcm/ppm)] -- 2=

(-)279 pcm/ppm Reference BW Present BW Avg DiffBW 4.12.4

[(

o,00 ppm) -

( I I '

ppm)] x [(-) 6.1 pcm/ppm] =

(-) 27-73 pcm Present CB (4.5)

Reference C3 (4.3)

Avg Diff BW Boron Defect OPS Form 3209A-1 Rev. 6 Page 4 of 9 Value I

I I (

I

SEstimated Critical Conditions I

Defects (Continued)

VOID DEFECT Step No.

Parameter and/or Calculation Value 4.13.2 Value of Void Correction Factor (Void Defect) =

(+)...O

.. pcm Void Defect TOTAL REACTIVITY DEFECT Step No.

Parameter and/or Calculation Value Power Defect

= (+)

5 Spcm (step 4.6.2)

Ref Mod Defect

= (

0) 0 pcm (step 4.7.6)

Est Mod Defect

= ( )

2 pcm (step 4.8.6)

Xe Defect

= (4) 2 6-7? Yf pcm (step 4.9) 4.14.1 c

and Sm Defect

= (-)_331.

pcm

(

ota plDefe pcm 4.14.2 (step 4.10)

Total p Defect RW Defect

= (- 5-4.3 pcm (step 4.11.4)

Boron Defect

= (- 73 pcm (step 4.12.4)

Void Defect

= (+)

Q pcm (step 4.13.2)

+

Combined Total = (-)

. I pcm =

Burnup Correction Step No.

Parameter and/or Calculation Value 4.15.2.a.

Critical Boron Concentration @ Reference Burnup =

Re C71 ppmG Ref Critical CB 4.15.2.b.

Critical Boron Concentration @ Present Burnup =

PrsetCrtia ppm Present Critical CB 4.15.1 1771 ppm)-( 17L'2-ppm) =

(-I)_2_

ppm or Ref77/

Ciia 17 Lk Preset C 4.15.3 Ref Critical CB

-Present Critical CB Burnup Correction OPS Form 3209A-1 Rev. 6 Page 5 of 9

Estimated Critical Conditions it Critical Boron Concentration Calculation OPS Form 3209A-1 Rev. 6 Page 6 of 9 Step No.

Parameter and/or Calculation Value

[(-H) 101_1.1 pcm]--[(-) (y,80 pcm/ppm] =

()

-)50 ppm 4.16.2 Total p Defect Present BW Boron Equivalent 4.14.2 4.12.2 of p Defect

[(

L 9 ppm] + [(-)

1SO ppm] =

(-)

I ppm 4.16.3 Burnup Correction Boron Equivalent of p Defect Corrected Boron 4.15.3 4.16.2 Equivalent 4.16.4

(-)

12 -1 ppm] x (-1)=

(4) 1.-- I ppm Corrected Boron Equivalent Required Boron A

( l 0oo ppm)+[(4)

I 2.1 ppm] =

-72) ppm 4.16.5 Present CB Required Boron A Calculated CB 4.5 4.16.4 pcm_ 0 F(no sign) 4.16.7.a.

Magnitude of ITC @ 557°F =

Magnitude of ITC@ 557"F 4.16.7.b.

Difference Between Estimated Tavg and 5570F =

7F (no sign)

I Tavg/ 557'F A

(

OF) X (

pcm/°F) =

pcm (no sign) 4.16.7.c.

Tavg/557°F A ITC @ 557"F Magnitude of 4.16.7.b.

4.16.7.a.

Mod CF 4.16.7.d.

Sign of Moderator Correction Factor

(+ or-)

4.16.7.e.S Sign of Moderator Correction Factor

=

Sign 4.16.7.e.

Value and Sign of Moderator Correction Factor =

( )______pcm Moderator CF 4.16.7.f.

Differential Boron Worth @ for Present Burnup =

cm/ppm 4.12.2 Diff BW R( )_

pcm] - [(-)_

pcm/ppm] =

( )

ppm 4.16.7.g.

Mod CF Diff BW Boron Equivalent 4.16.7.e.

4.16.7.f.

of Moderator CF 4.16.6.a.

Calculated Boron Concentration = Critical Boron Concentration =

4.16.5 4.16.1

(

4.16.5 pcm) + (

1____

pcm) =

r a

ppm or Boron Equivalent of Mod CF Calculated CB 4.16.7.h.

4.16.7.g.

4.16.5

I Critical Rod Height Calculation mated Critical ConditionsJ Step No.

Parameter and/or Calculation Value

[(+)_____

ppm] x [(-)

pcmwppm] =

4.17.1 Burnup Correction Present BW pcm 4.15.3 4.12.2 p Equivalent of BC

[(-)_pcm]+[(

) _

pcm] =

( )__

pcm 4.17.2 p Equivalent of BC Total p Defect Corrected Total 4.17.1 4.14.2 p Defect 4.17.3.a.

or Integral Rod Worth @ Reference Conditions N

cm 4.17.4 RW @ Ref

[( )____

pcm] + [(+)

pcm]

4.17.5 Corrected p Defect RW @ Reference N

pcm 4.17.2 4.17.4 Net p Defect 4.17.6.a.

_Bank or Critical Rod Position Corresponding to Net p Defect =@

I Steps 4.17.6.b.

Critical Rod Position Rod Withdrawal Limits Step No.

Parameter and/or Calculation Value 4.18.1.a.

or Integral Rod Worth @ Estimated Critical Position

(+) 5 i 3 pcm 4.18.2 RW @ ECP 4.18.3

[(+)

5 "3 pcm] - (500 pcm)

=f(-4) o r pcm RW @ ECP RW for D @ 57 Steps W/D Limit 4.18.4 Bank D

or Rod Position Corresponding to the RW for the D @ 57 Steps

@ 2 ) I Steps 4.18.5 Withdrawal Limit or the Control Bank D Full Out Position D @ 57 Steps Withdrawal Limit 4(pcm]-(750pcm)=

(-)

23-7 pcm 4.18.6 RW @ ECP RW for C @ 57 Steps W/D Limit 4.18.5 or Bank 4.18.7 Rod Position Corresponding to the RW for the C @ 57 Steps Steps r.

Withdrawal Limit or the Control Bank D Full Out Position C @ 57 Steps 4.18.8 Withdrawal Limit OPS Form 3209A-1 Rev. 6 Page 7 of 9

Estimated Critical Condition4 OPS Form 3209A-1 Rev. 6 Page 8 of 9 Step No.

Parameter and/or Calculation Value 4.19.1

[(+)

_ pcm] + (500 pcm) =

(+ fo 1@3 pcm RW ECPRW for D @ 57 Steps RW @ECP Insertion Limit Bank P

4.19.2.a.

Rod Position Corresponding to the RW for the D @ 57 Step Insertion Limit

@ 4j Steps or 4.19.3 Rod Position for D @ 57 Steps Limit Bank C 4.19.4 Zero Power Rod Insertion Limit (RIL) =

@ 5"1 Steps 0% RIL 4.19.5 Bank 49 Rod Position Corresponding to the RW for the q3 Steps or 4.19.6 D @ 57 Step Insertion Limit or the 0% RIL D @ 57 Steps Insertion Limit 4.19.7

[(+)S

' 3 pcm] + (750 pcm) =

(+)

oC2 63 pcm RW @ ECP RW for C @ 57 Steps Insertion Limit 4.19.8.a.

Bank 1?*

or Rod Position Corresponding to the RW for the C @ 57 Step Insertion Limit Ba Steps or

@..J~.

tp 4.19.9 Rod Position for C @ 57 Steps iUmit 4.19.6.a.

or Bank__f2_

4.19.10 Rod Position Corresponding to the RW for the 1 ;L Steps C @ 57 Step Insertion Limit or the 0% RIL C @ 57 Steps or 4.19.11 Insertion Limit I

( Estimated Critical Conditions(

Estimated Critical Conditions" lAeview Step No.

Name Date Time 4.20.4 Independent Calculation By:

4.20.6 Licensed Operator Review By:

T/S Acceptance Criteria Step No.

Acceptance Criteria Yes No OP 3202 Predicted Critical Rod Position Greater Than the RIL Step 4.8.1 OP 3202 SteP 4.2 Criticality Predicted Within the T/S 4 Hour Time Period (4.4.3)

Step 4.8.2 OP 3202 SP 3202.

Plant is in MODE 2 @ the RIL AND Reactor NOT Critical Step 4.19.7.b OP 3202 Step 4.22 Criticality Achieved Within the T/S 4 Hour Time Period (4.4.3)

Actual Critical Data Parameter Source Value Date X

Time Intermediate Range Current NMI-NI35B amps Intermediate Range Current NMI-NI36B amps NR Pressure 3RCS-PI455A psia NR Pressure 3RCS-PI456A psia NR Pressure 3RCS-PI457 psia NR Pressure 3RCS-PI458 psia Loop Tavg 3RCS-TI412 OF Loop Tavg 3RCS-TI422 OF Loop Tavg 3RCS-TI432 OF Loop Tavg 3RCS-TI442 OF Boron Concentration Chemistry ppm Control Bank C Rod Step Counters steps Control Bank D Rod Step Counters steps OPS Form 3209A-1 Rev. 6 Page 9 of 9

Form Approval !

j.pproval Date

(

JUL 0 11999 Effective Date JUL 0 6 1999 Form Cover Sheet Generic Information 7 Form Title Rev. No.

Estimated Critical Conditions 6

Reference Procedure Applicable Tech. Spec.

Frequency OP 3209A 4.1.1.1.1.c AR*

This form is being used for the following:

STech Spec Surveillance 0

System Alignment

0) Other:

0 Maintenance Restoration Non-Tech Spec (Retest)

Surveillance (PM)

Specific InfBy mDteonim Schedule Date Applicable Mode Partial fed S l Nce n2 Surveillance n

fTest Authorized By Date Baseline r

Test D D

Prerequisites Completed (Initials)

Precautions Noted (Initials)

Performed By' Date Time

- Acepte By ateTime Accepac Criteria Acceptd BySDteisfied Approved By (Department Head or Designee)

Date Shift Manager Notified of Failed Test Date 11Ys F1N Surveillance Information Test Equipment Type CA Number Cal Due Date N/A

  • This calculation may be performed at any time but must be verified within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving reactor criticality.

Send completed Form to Reactor Engineering.

OPS Form 3209A-1 Rev. 6 Page 1 of 9 I

Estimated Critical Conditions,

(

OPS Form 3209A-1 Rev. 6 Page 2 of 9 Step No.

Name Date Time 4.2 Performed By:

I 106001 Reference Critical Data Step No.

Parameter Value Date

/0 [,

I 0 1 Time Q 6

5.

Power Level 00 Burnup

- 6 3,

S MWD/MTU RCS Pressure Z2--*

. 6 psia Tavg 6

0F 6, 6 OF Tref 5

136. 9 OF Boron Concentration 1 1 9 1

ppm Xenon

(-)

2679.

+

pcm Samarium

(-)

6 1, S pcm Control Bank C Z2 -.

steps Control Bank D ea 1 -

steps Estimated Conditions At Criticality Step No.

Parameter Value 4.4.1 Date 4.4.2 Administrative Time Period (2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />)

From "

0

/0 To:

Z 4.4.3 T/S Time Period (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)

From: 0 O0 To:

Zo CoC 4.4.4 Present Burnup

` 30 00D MWD/MTU 4.4.5 Tavg OF 4.4.6 RCS Pressure 2-25O psia 4.4.7.b.

Xenon

(-)

O pcm 4.4.8.b.

Samarium

(-)

1300 pcm 4.4.9.b.

Control Bank C @

2 I 5 Steps or Desired Critical Rod Height 4.4.10 Control Bank D @

00 Steps Boron Concentration Step No.

Parameter Value 4.5 Present Boron Concentration

/:1 00 ppm

Estimated Critical Conditionst POWER DEFECT Step No.

Parameter and/or Calculation Value 4.6.1 Power Defect @ Reference Power H

(-)__q I

pcm Defect @ Ref Power 4.6.2

[(-)_pcm]

x (-1) =

(+)

(9* 60 pcm Defect @ Ref Pwr Power Defect REFERENCE MODERATOR DEFECT Step No.

Parameter and/or Calculation Value

__._pcm/1 F(no sign) 4.7.2 Magnitude of MTC @ T"e Magnitude of MTC @ Tref 4.7.3 Difference Between Tref and Tavg =F (no sign) 4.7.4 (F)

(Pcm/°F)___

pcm (no sign)

-Trefffavg A MTC @ T,,"

Ref Mod Defect 4.7.5 Sign of Reference Moderator Defect Sign-(+ or 4.7.1 or Value and Sign of Reference Moderator Defect =

( )_

pcm 4.7.6 Ref Mod Defect ESTIMATED MODERATOR DEFECT Ntep INO.

4.8.2 4.8.3 4.8.4 4.8.5 I

I Parameter and/or Calculation Value 1

4 Magnitude of ITC @ 5570F =

ITC@ 5570F 1

4.

Difference Between Estimated Tavg and 557°F =

(

°OF) x ( _pcm/!F)

=

Tavg/557°F A ITC@ 557"F Sign of Estimated Moderator Defect =

4.8.1 or Value and 4.8.6 Sign of Estimated Moderator Defect =

Tavg/557 0FA 4.

._p cml° F(no sign)

Magnitude of ITC @ 557°F OF (no sign)

Tag/ 557-°F A pcm (no sign)

Est ModDefect Est ModDefect

(+ or -)

Sign

( ) C pcm Est Mod Defect Est Mod Defect I. _______________________________________

OPS Form 3209A-1 Rev. 6 of 9 I

Defects I

C"*_

'L Value Sign

Estimated Critical Conditionsk Defects (Continued)

XENON DEFECT Step No.

Parameter and/or Calculation Value 4.9 pcm] - [(-)_pcm]

(-)267*4 pcm Estimated Xe Reference Xe Xenon Defect SAMARIUM DEFECT Step No.

Parameter and/or Calculation Value 4.10

[(-)--

_pcm]

[(-)

pcm]

p

=

(-)3 7, 5 pcm Estimated Sm Reference Sm Samarium Defect ROD WORTH DEFECT Step No.

Parameter and/or Calculation Value 4.11.2.a.

or Integral Rod Worth @ Reference Conditions =

(-)R ifc pcm 4.11.3.a.

Reference RW 4.11.2.b.

or Integral Rod Worth @ Estimated Conditions =

()

5* 0 pcm 4.11.3.b.

Estimated RW 4.11.1 or

[(-)

ppc[m

=

( ) 500 pcm 4.11.4 Estimated RW Reference RW RW Defect BORON DEFECT Step Parameter and/or Calculation Value No.

4.12.1 Differential Boron Worth @ Reference Burnup

(-) 6. Z pcm/ppm Reference BW 4.12.2 Differential Boron Worth @ Present Burnup =

Pn Z B cm/ppm Present BW 4.12.3 pcm/ppm) + (-_pcm/ppm)]

-- 2 =

(-)L. IJ pc m/ppm Reference BW Present BW Avg Diff BW 4.12.4

[(

ppm) -

(

ppm)] X [(-)

pcm/ppm] =

(-) a

-"t'*'

pcm Present CB (4.5)

Reference CB (4.3)

Avg Diff BW Boron Defect OPS Form 3209A-1 Rev. 6 Page 4 of 9

Defects (Continued)

Estimated Critical Conditions*

VOID DEFECT Step No.

Parameter and/or Calculation Value 4.13.2 Value of Void Correction Factor (Void Defect) =

(+)

pcm Void Defect TOTAL REACTIVITY DEFECT Step No.

Parameter and/or Calculation Value Power Defect

= (+) I 960 pcm (step 4.6.2)

Ref Mod Defect

= ()

0 pcm (step 4.7.6)

Est Mod Defect

= ( )

0 pcm (step 4.8.6)

Xe Defect

= (+)_2

'Jpcm (step 4.9) 4.14.1 5

(.

'1 pcm and Sm Defect

= (-). 3 36,Q Spcm

(

o-) p Defect 4.14.2 (step 4.10)

Total P Defect RWDefect

= H 0

pcm (step 4.11.4)

Boron Defect

= H z 5 il pcm (step 4.12.4)

Void Defect

= (H)

G pcm (step 4.13.2)

+

Combined Total = (0.) I 5 21 2

pcm =

Burnup Correction Step No.

Parameter and/or Calculation Value 4.15.2.a.

Critical Boron Concentration @ Reference Burnup =

0 ppm Ref Critical CB 4.15.2.b.

Critical Boron Concentration @ Present Burnup =

to

'tO ppm Present Critical CB 4.15.1 or

(

ppm) - (

ppm) =

(-)

SO ppm 4.15.3 Ref Critical CB.

Present Critical CB Burnup Correction OPS Form 3209A-1 Rev. 6 Page5 of 9

Estimated Critical Conditions Cn Critical Boron Concentration Calculation OPS Form 3209A-1 Rev. 6 Page 6 of 9 Step No.

Parameter and/or Calculation Value

[(I) Z 52. -

pcm]

[(-) 6.2 5 pcm/ppmJ =

(-)__00 ppm 4.16.2 Total p Defect Present BW Boron Equivalent 4.14.2 4.12.2 of p Defect

[(). 20 ppm] + [(--

0(,0 ppm] =

(-)

1 04

(

ppm 4.16.3 Burnup Correction Boron Equivalent of p Defect Corrected Boron 4.15.3 4.16.2 Equivalent 4.16.4

(-)

ppm] x (-1) =

(+)

X ppm Corrected Boron Equivalent Required Boron A

(

I 0O(G ppm)+[(4) 1-+0 ppm]

=

V4 O ppm 4.16.5 Present CB Required Boron Aac e

4.5 4.16.4 Calculated CB pcn/ 0 F(no sign) 4.16.7.a.

Magnitude of ITC @557°F =

Magnitude of ITC@ 557 0F 4.16.7.b.

Difference Between Estimated Tavg and 557 0F a

°F (no sign)

Tavg/ 557"*F A

( __

_OF) x (

pcm/°F) =

pcm (no sign) 4.16.7.c.

Tavg/557°F A ITC @ 557°F Magnitude of 4.16.7.b.

4.16.7.a.

Mod CF 4.16.7.d.

Sign of Moderator Correction Factor =

Si

(+ or-)

Sign 4.16.7.e.

Value and Sign of Moderator Correction Factor =

( )_pcm Moderator CF 4.16.7.f.

Differential Boron Worth @ for Present Burnup =

(-)p cm/ppm 4.12.2 Diff BW

[R )_pcm]

+ [(-)

pcm/ppm] =

( )__ppm 4.16.7.g.

Mod CF Diff BW Boron Equivalent 4.16.7.e.

4.16.7.f.

of Moderator CF 4.16.6.a.

Calculated Boron Concentration = Critical Boron Concentration =

4.16.5 4.16.1

(

__pcm)

+ (

(

=

0 ppm or Boron Equivalent of Mod CF Calculated CB Critical CB 4.16.7.h.

4.16.7.g.

4.16.5

Estimated Critical Conditions.

C Critical Rod Height Calculation '

OPS Form 3209A-1 Rev. 6 Paozet 7 of 9 Pare ofI Step No.

Parameter and/or Calculation Value ppm] x [(-)_pcm/ppm]

=

4.17.1 Burnup Correction Present BW pcm 4.15.3 4.12.2 p Equivalent of BC

[(-)_pcm]

+ R( )

pcmJ

=

( )_

pcm 4.17.2 p Equivalent of BC Total p Defect Corrected Total 4.17.1 4.14.2 p Defect 4.17.3.a.

or Integral Rod Worth @ Reference Conditions =

(+)L

_pcm 4.17.4 RW @ Ref

[( )____

pcm] + [(+)

pcm] =

4.17.5 Corrected p Defect RW @ Reference pcm 4.17.2 4.17.4 Net P Defect 4.17.6.a.

Bank or Critical Rod Position Corresponding to Net p Defect Steps 4.17.6.b.

Critical Rod Position Rod Withdrawal Limits Step No.

Parameter and/or Calculation Value 4.18.1.a.

or Integral Rod Worth @ Estimated Critical Position =

(+) 5 10 pcm 4.18.2 RW @ ECP 4.18.3

[

I pcm]-

(500 pcm)

=()

OD 7 pcm RW @ ECP RW for D @ 57 Steps W/D Limit 4.18.4 Bank i0 48 Rod Position Corresponding to the RW for the D @ 57 Steps

@ 2 2.0 Steps 4.18.5 Withdrawal Limit or the Control Bank D Full Out Position D @ 57 Steps Withdrawal Limit 4.18.6

[(+)

pcm] -

(750 pcm)

=

(

-)

or @-

pcm RW @ ECP RW for C @ 57 Steps W/D Limit 4.18.5 or Bank 0 4.18.7 Rod Position Corresponding to the RW for the C @ 57 Steps

@ Z I i-Steps or Withdrawal Limit or the Control Bank D Full Out Position C @ 57 Steps 4.18.8 Withdrawal Limit

- I

( Estimated Critical Conditionj OPS Form 3209A-1 Rev. 6 Page 8 of 9 Step No.

Parameter and/or Calculation Value 4.19.1

[(+)

510 pcmj + (500 pcm) =

(+)

1010 pcm RW @ ECP RW for D @ 57 Steps Insertion Limit 4.19.2.a Bank 0 0or

  • Rod Position Corresponding to the RW for the D @ 57 Step Insertion Limit L-q-Steps 4.19.3

=Rod Position for D @ 57 Steps Limit Bank C

4.19.4 Zero Power Rod Insertion Limit (RIL) =

@ __5 1 Steps 0% RIL 4.19.5 Bank 0 or Rod Position Corresponding to the RW for the

+4 Steps 4.19.6 D @ 57 Step Insertion Limit or the 0% RIL D @ 57 Steps Insertion Limit 4.19__________.pcm] + (750 pcm) =

(+) JZ.O pcm 4.19.7 RW @ ECP RW for C @ 57 Steps Insertion Limit 4.19.8.a.

Bank 6

or Rod Position Corresponding to the RW for the C @ 57 Step Insertion Limit 13 Steps 4.19.9

=

Rod Position for C @ 57 Steps Limit 4.19.6.a.

Bank D

or Bn 4.19.10 Rod Position Corresponding to the RW for the 13 Steps or C @ 57 Step Insertion Limit or the 0% RIL C @ 57 Steps 4.19.11 Insertion Limit SEstimated Critical Condition*

Estimated Critical ConditionT Igeview T/S Acceptance Criteria Actual Critical Data Parameter Source Value Date Time Intermediate Range Current NMI-NI35B amps Intermediate Range Current NMI-NI36B amps NR Pressure 3RCS-PI455A psia NR Pressure 3RCS-PI456A psia NR Pressure 3RCS-PI457 psia NR Pressure 3RCS-PI458 psia Loop Tavg 3RCS-TI412 OF Loop Tavg 3RCS-TI422 OF Loop Tavg 3RCS-TI432 oF Loop Tavg 3RCS-TI442 OF Boron Concentration Chemistry ppm Control Bank C Rod Step Counters steps Control Bank D Rod Step Counters steps OPS Form 3209A-1 Rev. 6 Step No.

Name Date Time 4.20.4 Independent Calculation By:

4.20.6 Licensed Operator Review By:

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

JPM ID Number:

Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.

SRO-A2 Revision:

0 II. Initiated:

Steve Ja¢ 10/31/01 Date Ill.

Reviewed:

Technical Reviewer IV.

Approved:

Cognizant Plant Supervisor (optional) uK r Training Supervisor

,,/1/0 j Date Date Da 1 of 8

Tagging and Clearance 341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements GEN.2.2.13, Knowledge of Tagging and Clearance Procedures

'*READ TO THE STUDENT'*

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Facility:

JPM ID Number:

SRO-A2 Revision:

- 0 Task

Title:

System:

Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.

Time Critical Task:

(

) YES

( X ) NO Validated Time (minutes):

10 min Task Number(s):

Applicable To:

SRO X

RO PEO K/A Rating:

3.6/3.8 K/A Number:

--- Method of Testing:

Simulated Performance:

Actual Performance:

X Simulator:

In-Plant::

Location:

Task Standards:

Required Materials:

General

References:

Classroom:

X Review and approve a tag clearance boundary Completed work package boundary sheet P&IDs EE One-Line Electrical Drawings OP 3300 series procedures WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance 2 of 8

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

SRO-A2 Simulator Reauirements:

Revision:

0 NONE Initial Conditions:

Initiating Cues:

You are a licensed SRO. A tagout clearance boundary for the shaft mechanical seal replacement for the "B" Reactor Plant Component Cooling Water (CCP) pump has been developed.

Your task is to review the recommended tagout clearance boundary using available references so that the work package boundary sheet is ready for approval.

3 of 8 NOTES TO EVALUATOR ****

1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

SRO-A2 Task

Title:

Revision:

0 Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.

Start Time:

Performance Step:

Standards:

Grade:

Performance Step:

STEP GRADE STEP GRADE Reviews the Work Package Boundary Sheet and selects appropriate reference materials Selects:

P&ID EM-121A, (CCP), EE Drawing.

1M, OP 3330A, Rev. 15-02 SAT UNSAT Reviews 3CCP-P1 B-CS, "B" RPCCW Pump Control Switch Uses selected references and determines the Pump Control Switch tagging is correct.

SAT UNSAT 3

x x

Performance Step:

Standards:

Grade:

Reviews power supply 34D9-2, 3CCP*P1 B breaker racked down and red tagged.

Uses selected references and determines power supply 34D9-2 is INCORRECT.

34D8-2 is the correct breaker (EE Drawing. 1M,).

Tag and tagged position are correct.

SAT UNSAT 4 of 8 1

Standards:

Grade:

2 STEP GRADE

PERFORMANCE INFORMATION JPM Number:

Task

Title:

SRO-A2 Revision:

0 Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.

4 x

Performance Step:

X Standards:

Grade:

5 x

x Performance Step:

Standards:

Grade:

Reviews 3CCP*V91, RPCCW Pump P1 B Suction Isolation, red tagged closed.

Uses selected references and determines that 3CCP*V91 selection, position and tagging is correct.

SAT UNSAT Reviews 3CCP*V8, RPCCW Pump P1 B Discharge Isolation, red tagged closed.

Uses selected references and determines that 3CCP*V8 selection is INCORRECT.

3CCP*V6 is the correct boundary (P&ID EM-121A)

CLOSED position and RED tagging is correct.

SAT UNSAT X

Performance Step:

Standards:

Grade:

Reviews 3CCP*V649, RPCCW Pump P1 B Vent valve, red tagged open.

Uses selected references and determines that 3CCP V649 selection, position and tagging is correct.

SAT UNSAT 5 of 8 STEP GRADE STEP GRADE 6

STEP GRADE x

PERFORMANCE INFORMATION JPM Number:

Task

Title:

SRO-A2 Revision:

0 Given a completed clearance boundary and reference material, review, amend and approve the clearance boundary.

Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Grade:

Reviews 3CCP*V314, RPCCW Pump P1B Drain Valve, red tagged open.

Uses selected references and determines that 3CCP*V314 selection, position and tagging is correct.

SAT UNSAT Amend and approve the clearance boundary Makes indicated changes to the clearance boundary, and recommends approval as amended.

SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

6 of 8 STEP 7

x GRADE x

STEP 8

GRADE

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

SRO-A2 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Validated Time (minutes):

YES NO X

10 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Imorovement:

7 of 8

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

SRO-A2 You are a licensed SRO. A tagout clearance boundary for the shaft mechanical seal replacement for the "B" Reactor Plant Component Cooling Water (CCP) pump has been developed.

Your task is to review the recommended tagout clearance boundary using available references so that the work package boundary sheet is ready for approval.

8 of 8

WORK PACKAGE BOUNDARY SHEET Clearance Number:

AWO Number:

Clearance Adequate for Personnel Safety:

Date:

M30110525 Contact Person / Designee Sign Step Tag Tagged Tag Equipment ID Equipment Equipment Notes Tag Tag Worker Number Type Position Serial Description Location Placed Verified Verified Number 1

YEL 3CCP-P1 B-CS B RPCCW PUMP POWER IS RED CONTROL SWITCH TAGGED OFF 2

RED RACKED 34D9-2 3CCP*P1B DOWN 3

RED CLOSED 3CCP*V91 RPCCW PUMP P1 B SUCTION ISOLATION 4

RED CLOSED 3CCP*V8 RPCCW PUMP P1B DISCHARGE ISOLATION 5

RED OPEN 3CCP*V649 RPCCW PUMP P1 B VENT VALVE 6

RED OPEN 3CCP*V314 RPCCW PUMP P1B DRAIN VALVE

(

KEY---WORK PACKAGE BOUNDARY SHEET---KEY Clearance Number:

AWO Number:

Clearance Adequate for Personnel Safety:

Date:

M30110525 Contact Person ! Designee Sign Step Tag Tagged Tag Equipment ID Equipment Equipment Notes Tag Tag Worker Number Type Position Serial Description Location Placed Verified Verified Number 1

YEL 3CCP-PI B-CS B RPCCW PUMP POWER IS RED CONTROL SWITCH TAGGED OFF 2

RED RACKED 34D8-2 3CCP*P1B DOWN 3

RED CLOSED 3CCP*V91 RPCCW PUMP P1B SUCTION ISOLATION 4

RED CLOSED 3CCP*V6 RPCCW PUMP P1B DISCHARGE ISOLATION 5

RED OPEN 3CCP*V649 RPCCW PUMP P1 B VENT VALVE 6

RED OPEN 3CCP*V314 RPCCW PUMP P1B DRAIN VALVE

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

Review and Approve a Radioactive Liquid Waste Discharge Permit JPM ID Number:

SRO-A3 Revision:

0 II. Initiated:

Steve Jackso(=

-z-n Developer Reviewed:

Ray Martin C

o* t Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional)

Nu'cfrTraining Supervisor Date Dat 1 of 7 11/01/01 Date 11/15/01 Date

JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 JPM ID Number:

SRO-A3 Revision:

Task

Title:

System:

Review and Approve a Radioactive Liquid Waste Discharge Permit Radioactive Liquid Waste System Time Critical Task:

) YES (X)

NO Validated Time (minutes):

Task Number(s):

Applicable To:

068-01-064, Discharge the contents of a Low Level Waste Drain Tank 068-03-001, Adhere to the requirements of the Radwaste Management Program SRO X

RO PEO K/A Number:

GEN-2.3.6 K/A Rating:

Method of Testing:

Simulated Performance:

X Actual Performance:

Location:

Classroom:

Task Standards:

Required Materials:

General

References:

In-Plant::

X Simulator:

X Review and Approve a Radioactive Liquid Waste Discharge Permit OP 3335D, Radioactive Liquid Waste System Liquid Discharge Permit Screen Print of Rad Monitor LWS70-1 None 2 of 7 Facility:

0 2.1/3.1 X

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

SRO-A3 Simulator Reauirements:

Revision:

0 None Initial Conditions:

Initiating Cues:

The unit is at 100% power with all systems in normal line-ups.

The "A" and "B" Service Water pumps and all Circulating Water pumps are running.

The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval.

Review and approve the permit and report to the examiner when complete.

3 of 7

"*NOTES TO EVALUATOR ****

1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

1 Task

Title:

SRO-A3 Revision:

Review and Approve a Radioactive Liquid Waste Discharge Permit Start Time:

1 X

X 2

X X

X Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Standards:

Comments:

Go to the correct procedure step, OP3335D, Section 4.25.4.j Locates the correct procedure step.

Candidate may review previous steps.

SAT UNSAT PERFORM Independent Verification of liquid effluent monitor alarm and alert settings. [step 4.25.4.j.1)]

Locates liquid effluent monitor alarm and alert settings on Liquid Discharge Permit.

Locates liquid effluent monitor alarm and alert current settings on RMS Console.

Since this JPM is done in a classroom setting the RMS Console is not available. When candidate requests information and specifies that he would access the RMS screen for LWS70-1, Liquid Waste discharge process radiation monitor, exercise the cue.

X Standards:

Compares permit settings and RMS information and identifies that RMS is incorrect. Recommends changing RMS to match the permit.

4 of 7 0

STEP GRADE STEP GRADE GRADE GRADE

PERFORMANCE INFORMATION JPM Number:

1 Task

Title:

SRO-A3 Revision:

Review and Approve a Radioactive Liquid Waste Discharge Permit Initials permit after receiving the cue.

Grade:

SAT UNSAT Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Grade:

Refer to CHEM Form 3800P-001 and CHECK "EST Activity this Discharge (Ci) on Liquid Discharge Permit is less than action level specified. [step 4.25.4.j.2)]

COMPARE CHEM Form 3800P-001 and CHECK "EST Activity this Discharge (Ci) to Discharge permit "Estimated activity this discharge (Ci)".

Determines that values are below the limits. Initials permit.

SAT UNSAT CHECK required dilution flowrate is met. [step 4.25.4.j.4)]

COMPARES permit requirement of 2 SWP and 3 CWP to actual plant condition of 2 SWP and 6 CWP.

Determines that dilution flow is met.

Initials permit.

SAT UNSAT Termination Cue: The Evaluation of this JPM is Complete Stop Time:

5 of 7 0

3 STEP GRADE x

x STEP 4

GRADE x

x

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

SRO-A3 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

YES Validated Time (minutes):

NO X

10 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

6 of 7

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

SRO-A3 The unit is at 100% power with all systems in normal line ups. The "A" and "B" Service Water pumps and all Circulating Water pumps are running.

The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval. Review and approve the permit and report to the examiner when complete.

7 of 7

FORM APPROVED.:

C.

J.

Schwar2 MILLSTONE UNIT #3 DATE.: 5/16/97 PORC MTG NO.: 3-97-105 LIQUID DISCHARGE PERMIT NO.

4463 (2001-69338) ank.............

WTT-A Date/time sampled...:

9-NOV-2001 17:35 Sampled by.....

Date/time on recirc.:

9-NOV-2001 14:00 TSS (ppm).:

(tank limit

= 45 ppm) pH.:

4.7 Boric acid conc (ppm).:

4330.0

<<< 2 circulators must be in operation during a discharge >>>

Independent samples taken >>> yes no (circle one)

Activity (uCi/ml) 3.522E-07

4. 720E-07
4. 779E-06 4 240E-07
1. 920E-07
1. 268E-07
1. 720E-01
6. 346E-06

(@)

MPC (uCi/ml)

1. OOOE-04
5. 000E-05 1.000E-04
2. 000E-05
3. 000E-03 Activity/MPC 3.522E-03 9.441E-03 4.779E-02 6.342E-03 5.733E+01
5. 740E+01 Dissolved gas conc (uCi/ml) =

6.161E-07 (limit = 4.0E-l)

Minimum recirc time using 1 pump is 175.

(min)

Sample saved for composite....................

Date Release limit (Ci)...............................

6.700E-03

)tal activity released to date (Ci)...........

1.613E-03

-stimated volume this discharge (gal).........

21000.

Estimated activity this discharge (Ci).........

5.044E-04

(@)

Estimated total activity released (Ci).........

2.117E-03

(@)

(W) these values do not include activity due to tritium (1) Reduction factor.............................

1.742E-02 (2) Required dilution flow rate..............

3 circ water, 2 service water pump(s)

(3) Normal rate limit (flow rate=#l*#2*0.1)..:

(4) Liquid effluent monitor alert setting....

(5) Liquid effluent monitor alarm setting....

(6) Rad monitor source check completed at....

Maximum approved rate........................

(Authorization required to exceed normal rate limit.)

SM/US init 480000.

(gpm) 150.

1.500E-04

2. OOOE-04 (gpm)

(uCi/ml)

(uCi/ml)

Oper (gpm)

Dual verification of release rate calculation

>>> yes no (circle one)

-** DISCHARGE DILUTION FLOW RATE (gpm)

TANK LEVEL (gallons)

DISCHARGE RATE (gpm)

OPERATOR Isotope CO-58 CO-60 SB-125 XE-133 XE-135 CS-137 H-3 Totals Tech Tech DATE TIME

(UJ/

' Aplroval Approval Date

(

POC Mtg. No.

Unit 3 Liquid Radwaste Discharge Goals Year:

Normal at Power Operations Refueling and Cold Shutdown Outages Annual Action Level Monthly Goal Action Level Monthly Goal Goal

Z a V, 00 gal/month

,.7r*-p3 Ci/month 12.c,,v9 a gal/month I /."7 if-A 'j2 r;/mr~ntb'

,q r.-03 Cl/discharge gal/month I.2--)

t000

_n galm--o n S/7r-o3 Ci/month

3.

,6 -03*

Ci/discharge gal/month 1 -

.30. (ioo gal

/

if -A -Z Ci/month Ci Radwaste Coordinator / Date Motcl t-3 W TT-

 1k

Mtode q-4 Lw-Pl' I,A'I-oi' 3.*-Q3 2, q, A,

//,.

t7T gJJhsI

Pe:

Chem Form 3800P -1 Rev. 0 Page 1 of 1 a2 tffect(ve Date (D

0' (Ji l

(O©ppV m_-

i

~I

"-T,,

n Lf,-,, I ýs, 2-L z *,

4Z.: 7-0 SWAVIV-0NI 313t;ýHOtý3ý4

3N 1 - A 0

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

Emergency Plan Responsibilities as Shift Manager JPM ID Number:

SRO-A4 Revision:

0 I1. Initiated:

9/28/01 Date III.

Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional)

Nucr r Training Supervisor Date

/D~te 1 of 12

JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Revision:

JPM ID Number:

SRO-A4 Task

Title:

System:

Emergency Plan Responsibilities as Shift Manager Admin, SERO Time Critical Task:

(X

)YES

(

Validated Time (minutes):

10 Task Number(s):

Applicable To:

301-05-578, Assume command of the SERO SRO X

RO K/A Number:

GEN.2.4.44 K/A Rating:

Method of Testing:

Simulated Performance:

Location:

Task Standards:

Required Materials:

General

References:

Classroom:

X Simulator:

Actual Performance:

X X

In-Plant::

X Assume command of the SERO MP-26-EPI-FAP01-001, Control Room DSEO, Rev. 000 MP-26-EPI-FAP06, Classification and PARs, Rev. 000 MP-26-EPI-FAP06-005, Control Room PARs, Rev. 000 MP-26-EPI-FAP08, Evacuation and Assembly, Rev. 000 EPUG-08B, Millstone Emergency Preparedness Resource Book MP-26-EPI-FAP06-001, EAL Tables, Rev. 000 2 of 12 Facility:

0

) NO PEO 4.0

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

SRO-A4 Simulator Requirements:

Initial Conditions:

Revision:

0 none The Initial Conditions are covered in the Event Description.

Initiating Cues:

You are the Shift Manager. You have assumed responsibility in the Control Room DSEO (CR-DSEO) role during an Inter-System LOCA event. You are implementing EPI-FAP01-001, Control Room DSEO, and have completed all actions in Section A and are ready to Go To Section E.

You have classified the event as a General Emergency Alpha (GE-A) based on events in progress and the Incident Report Form (IRF) has been reviewed, approved and transmitted. Your task is to complete all actions in Section E, General Emergency Immediate Actions. Discuss with the examiner any actions that cannot be performed or simulated.

The examiner will act as all persons or agencies with whom you must communicate. Inform the examiner when you have completed the task.

3 of 12

        • NOTES TO EVALUATOR ****
1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

Task

Title:

SRO-A4 Revision:

0 Emergency Plan Responsibilities as Shift Manager Record Start Time:

Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Comments:

Grade:

Performance Step:

Standards:

Comments:

Grade:

Locate Section E of FAP01-001, and review notes.

Reviews notes:

"* Consideration of shelter versus evacuation during hazardous events

"* Advisability of not making PA announcements during security events SAT UNSAT Notify the unaffected unit control rooms of the event Discusses with examiner contacting MP1 and MP2 control rooms. Includes methods of communicating in discussion.

Ask candidate how this is accomplished if not volunteered during discussion.

SAT UNSAT Request Security to restrict site access Discusses with examiner the following items:

all personnel called on site must process through EOF Ask candidate how this is accomplished if not volunteered during discussion.

SAT UNSAT 4 of 12 STEP 1

GRADE 2

STEP "G RADE STEP 3

GRADE

PERFORMANCE INFORMATION JPM Number:

SRO-A4 Task

Title:

Revision:

0 Emergency Plan Responsibilities as Shift Manager STEP 4

Performance Step:

Standards:

Comments:

Grade:

Performance Step:

UNSAT Review and approve IRF Comments:

6 X

Performance Step:

Standards:

For this JPM IRF has already been approved and transmitted.

Refer to EPI-FAP06-005, Section B:

Control Room PAR Process Flowchart and determine the appropriate PAR Reviews flowchart and diagnoses that 5 mile doses exceed Table 2 values of TEDE> 1 Rem and transitions down to "EVACUATE 5 MILE RADIUS and 10 MILE DOWNWIND, SHELTER REMAINING EPZ." Protective action 5 of 12 Make station page.

Discusses with examiner the following items:

how to active the outside speakers

  • the need to expedite evacuation after site page
  • the PA message where to log time of announcement Ask candidate how this is accomplished if not volunteered during discussion.

"* Outside speakers activated at US desk.

"* Expedited evacuation precludes spontaneous evacuation.

  • Message should be clear and brief
  • Autolog or SERO logsheet FAP1 5 012 acceptable SAT GRADE STEP 5

STEP GRADE X

PERFORMANCE INFORMATION JPM Number:

Task

Title:

SRO-A4 Revision:

0 Emergency Plan Responsibilities as Shift Manager recommendation SAT 7

X X

Performance Step:

Standards:

Grade:

If PARs are warranted out to 10 miles:

1. Record the current wind direction in degrees (from):
2. Check the appropriate row on the PAR table Records 2700 Identifies correct zones to evacuate as A and B and F and Groton City &

town in E, and shelter ALL other zones SAT UNSAT Comments:

Performance Step:

Standards:

Grade:

Evacuate and Shelter recommendations must both be identified Contact the DEP Dispatcher in Hartford Obtains telephone number from EPUG-08B and attempts to call SAT UNSAT Cue:Examiner acts as DEP Dispatcher~

9 X

Performance Step:

Identify self and read Evacuate and Shelter recommendations Standards:

Identifies self and state recommended zones to evacuate as A and B and F and Groton City & town in E, and shelter ALL other zones Grade:

SAT UNSAT Cue:,

  • Acknowe*ege receipt of PARs....

6 of 12 Grade:

STEP GRADE UNSAT STEP 8

GRADE X

X STEP GRADE X

PERFORMANCE INFORMATION JPM Number:

SRO-A4

--v Task

Title:

Revision:

0 Emergency Plan Responsibilities as Shift Manager 10 X

x Performance Step:

Standards:

Grade:

Request the dispatcher inform the DEP Duty Officer that a PAR has been issued Requests the dispatcher inform the DEP Duty Officer that a PAR has been issued SAT UNSAT Cue:

Acknowledge receipt f equest 11 X

x 12 13 Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Comments:

Log date and time of notification Uses either Auto-Log, SERO Log Sheet from EPI-FAP15-012 or other means to log date and time of DEP notification SAT UNSAT If necessary, refer to and review EPI FAP06, Att. 4, PAR Zone Descriptions Refers to EPI-FAP06 for PAR Zone Descriptions SAT UNSAT Refer to EPI-FAP08, "Evacuation and Assembly", and conduct evacuation.

Refers to EPI-FAP08, Section 2.2 Discusses SSS/MOS interaction Inform Waterford PD of evacuation Establish traffic control with Waterford PD and CT State Police Ask candidate how this is 7 of 12 STEP GRADE STEP GRADE STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

Task

Title:

SRO-A4 Revision:

0 Emergency Plan Responsibilities as Shift Manager accomplished if not volunteered during discussion.

SAT UNSAT Performance Step:

Standards:

Comments:

Grade:

Performance Step:

Standards:

Comments:

Grade:

Perform announcement over Site PA Discuss site notification Activate outside speakers Sound Evacuation alarm for 30 seconds

  • Select station public address system Make announcement log time of the announcement and contingencies:

Security sweeps using bullhorns HP personnel O&M radios Ask candidate how this is accomplished if not volunteered during discussion.

SAT UNSAT Discuss SSS/MOS responsibilities to Shift Manager

"* Security sweeps to cover areas PA does not cover

"* Verify personnel responding to evacuation order

"* Provide accountability to SM with 30 minutes Ask candidate how this is accomplished if not volunteered during discussion.

SAT UNSAT 8 of 12 STEP Grade:

14 GRADE STEP 15 GRADE

PERFORMANCE INFORMATION JPM Number:

SRO-A4 "1-' Task

Title:

Revision:

0 Emergency Plan Responsibilities as Shift Manager 15 Performance Step:

Standards:

Grade:

Refer to EPI-FAP1 5-001, "DSEO/ADTS Briefing Sheet" and complete.

Obtain sheet Using Unit Status handout, complete to substantially match the DSEO/ADTS Briefing Sheet - Master SAT UNSAT Termination Cue: The evaluation for this JPM is complete Record Stop Time:

9 of 12 STEP GRADE

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

SRO-A4 Revision:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

YES Validated Time (minutes):

NO 15 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

10 of 12 0

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

SRO-A4 The Initial Conditions are covered in the Event Description.

You are the Shift Manager. You have assumed responsibility in the Control Room DSEO (CR-DSEO) role during an Inter-System LOCA event. You are implementing EPI-FAP01-001, Control Room DSEO, and have completed all actions in Section A and are ready to Go To Section E You have classified the event as a General Emergency - Alpha (GE-A) based on events in progress and the Incident Report Form (IRF) has been reviewed, approved and transmitted. Your task is to complete all actions in Section E, General Emergency Immediate Actions. Discuss with the examiner any actions that cannot be performed or simulated. The examiner will act as all persons or agencies with whom you must communicate. Inform the examiner when you have completed the task.

11 of 12

STUDENT HANDOUT INITIATING CUE:

The plant was at 100% power. At 0530 the reactor was tripped and Safety Injection was actuated due to an Inter-System LOCA. The following conditions exist.

CRITICAL PARAMETERS TIME INFORMATION SOURCE The following parameters exist:

MB indications RCS pressure 1900 psia and rising PZR level 20% and rising CTMT Pressure Normal CETCs Subcooling 40°F CTMT temperature 1 100 F and stable CTMT radiation histogram Increasing levels Rx Tripped/SI Actuated Operating normally Chemistry Tech reports that the Initial Dose Assessment (IDA) calculated offsite dose is 1.1 Rem Chemistry report TEDE.

Met Tower-All levels of the Met Tower indicate the PPC indication wind is from the North West (2700) at 4 mph Classification:

NRC: GENERAL EMERGENCY State Posture Code:

EAL Table Designation: OG1.6, Integrated Offsite Dose > 1 Rem TEDE 12 of 12 ALPHA

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Millstone 3 Date of Examination:

January 7-10, 2002 Examination Level (circle one):

RO Operating Test Number: A-I Administrative Describe method of evaluation:

Topic/Subject

1. ONE Administrative JPM, OR Description
2. TWO Administrative Questions A.1.1 Execute JPM Complete a Shutdown Safety Assessment Checklist (OP 3260A, Procedure Conduct of Outages, Section 1.2)

Steps (GEN 2.1.20) (41.10/43.5/45.12)

A.1.2 Use the Plant JPM Use the plant process computer to determine current Quadrant Process Power Tilt Ratio,analyze results, and recommend actions to Unit Computer Supervisor. (bundled with SIM JPM #130)

(GEN 2.1.19)

(45.12)

A.2 Tagging and JPM Given a maintenance repair recommendation and reference Clearance material, recommend a clearance boundary.

Procedures (GEN 2.2.13) (41.10/45.13)

A.3 Review RWP JPM Review RWP and Survey Maps concerning a potential entry into a and Survey contaminated area (RHR Cubicles).

Maps (GEN 2.3.10)

(43.4/45.10)

A.4 RO Respon-Question #1: Reporting location during an evacuation alarm?

sibility in E Plan (GEN 2.4.39)

Question #2: Where to report in when called in during an emergency event?

(45.11)

NUREG-1021, Revision 8

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST JPM ID Number:

RO-AI.1 Revision:

0 II. Initiated:

10/25/01 Date Ill.

Reviewed:

Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional)

Supervisor 1 of 10

,/ //itio I Date Date

JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 JPM ID Number:

RO-AI.1 Revision:

0 Task

Title:

COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST System:

Conduct of Outages Time Critical Task:

(

) YES

( X ) NO Validated Time (minutes):

10 min Task Number(s):

Applicable To:

341-01-162, Perform a Shutdown Safety Assessment Checklist SRO RO X

PEO K/A Number:

GEN.2.1.20, Ability to execute procedure steps K/A Rating:

4.3/4.2 Method of Testing:

Simulated Performance:

Location:

Classroom:

Required Materials:

General

References:

X Actual Performance:

Simulator:

OP 3260A, Conduct of Outages Current Equipment Status Worksheet None 2 of 10 Task Standards:

X X

In-Plant::

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

RO-A1.1 Revision:

0 Simulator Requirements:

Initial Conditions:

Initiating Cues:

The unit is shutdown in Mode 5 after a refueling outage.

Plant conditions have just changed. An electrical fault has rendered the "A" SIH pump inoperable. The Shift Manager has directed you to complete a Shutdown Safety Assessment Checklist. Current equipment and unit are listed on the handout.

Report to the examiner, as Shift Manager, any conditions that would require compensatory actions.

3 of 10 None

"**** NOTES TO EVALUATOR ****

1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

RO-A1.1 Task

Title:

Revision:

0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Start Time:

1 2

X X

Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Grade:

Obtain materials, locate correct procedure step Candidate obtains handout from examiner, copy of OP 3260A, Conduct of Outages, and form 004 the Shutdown Safety Assessment Checklist. Locates section 1.2 of OP 3260A.

SAT UNSAT CIRCLE appropriate Train Designator Candidate circles "A" on Form 004 SAT UNSAT 3

X X

Performance Step:

Standards:

Comment:

Grade:

CHECK appropriate boxes for conditions supporting "key safety function" for:

RCS Decay Heat Removal Using handout, candidate checks appropriate boxes.

RHRTrainA All conditions to support natural circulation Natural Circulation: Candidate should refer to section 1.3.3 to make this determination.

SAT UNSAT 4 of 10 STEP GRADE STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

Task

Title:

RO-Al.1 Revision:

0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST 4

X X

Performance Step:

Standards:

Comment:

Grade:

CHECK appropriate boxes for conditions supporting "key safety function" for:

SFC Decay Heat Removal Using handout, candidate checks appropriate boxes.

SFCTrainA

>23' pool level Fuel Offload Required Equipment should not be checked. Only for Mode 6.

SAT UNSAT 5

X X

X 6

X Performance Step:

Standards:

Comment:

Grade:

Performance Step:

Standards:

CHECK appropriate boxes for conditions supporting "key safety function" for:

Inventory Using handout, candidate checks appropriate boxes.

Train A CHS PP & flow path Candidate should also check RWST level >250,000 gallons and V43 tagged. However failure to do so will not effect the Safety Status.

SAT UNSAT CHECK appropriate boxes for conditions supporting "key safety function" for:

Power Availability Using handout, candidate checks appropriate boxes.

SA EDG RSST NSST/Main 5 of 10 STEP GRADE STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

Task

Title:

RO-AI.1 Revision:

0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST 0 Station Blackout EDG Grade:

SAT UNSAT 7

X X

X 8

9 Performance Step:

Standards:

Comment:

Grade:

Performance Step:

X Standards:

Grade:

X Performance Step:

X Standards:

CHECK appropriate boxes for conditions supporting "key safety function" for:

Reactivity Using handout, candidate checks appropriate boxes.

RCS Boron > required SDM Inventory Flow Paths (1)

One SDM Train Operable Dilution paths tagged Inventory flow paths: Connected to the RWST and capable of injecting into the RCS. In the current plant status only the "A" CHS pump and line-up meets this criteria.

SAT UNSAT CHECK appropriate boxes for conditions supporting "key safety function" for:

0 Containment Using handout, candidate checks appropriate boxes.

0 Containment Closure set SAT UNSAT INITIAL appropriate boxes for conditions supporting "key safety function" for:

0 PZR Surge Line Flooding Using handout, candidate initials appropriate boxes.

6 of 10 STEP GRADE STEP GRADE STEP

'l-.GRADE

PERFORMANCE INFORMATION JPM Number:

RO-A1.1 Task

Title:

Revision:

0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Reactor Core refueled PZR vent path < 6 sq. in.

Grade:

SAT 10 X

X 11 X

X Performance Step:

Standards:

Grade:

Performance Step:

Standards:

To obtain each Key Safety Function Total, SUM the points allotted for each credited component or condition supporting the Key Safety Function and ENTER in the box Candidate sums the points for each credited component or condition supporting the Key Safety Function RCS Decay Heat Removal 2

SFC Decay Heat Removal 2

Inventory I

Power Availability 4

Reactivity 4

Containment I

SAT UNSAT Using the Key Safety Function total, CIRCLE the associated color condition.

see examiner's copy)

Candidate circles the associated color condition for each Key Safety Function

"* RCS Decay Heat Removal Yellow

"* SFC Decay Heat Removal Yellow

"* Inventory Orange

"* Power Availability Green

"* Reactivity Yellow

"* Containment Green 7 of 10 UNSAT STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

RO-AI.1 Task

Title:

Revision:

0 COMPLETE A SHUTDOWN SAFETY ASSESSMENT CHECKLIST Grade:

SAT UNSAT Comment:

Performance Step:

Standards:

Comment:

Grade:

If the candidate attempts to continue on in the procedure beyond step 1.2.1.j, prompt him to evaluate the checklist and make recommendations to Shift Manager Report to the Unit Supervisor any conditions requiring compensatory actions Reports that all Key Safety Functions are yellow or green except INVENTORY which is orange and requires compensatory actions.

No further recommendations are required beyond that some compensatory actions are required.

SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

8 of 10 STEP 12 GRADE

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

RO-AI.1 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

YES Validated Time (minutes):

NO X

5 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for ImDrovement:

9 of 10

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

RO-A1.1 The unit is shutdown in Mode 5 after a refueling outage.

Plant conditions have just changed. An electrical fault has rendered the "A" SIH pump inoperable. The Shift Manager has directed you to complete a Shutdown Safety Assessment Checklist. Current equipment and unit are listed on the handout. Report to the examiner, as Shift Manager, any conditions that would require compensatory actions.

10 of 10

RO-AI.1 PLANT CONDITION HANDOUT INITIAL CONDITIONS

"* MODE 5

"* RCS 200 psia

"* PZR LEVEL 60% LEVEL COLD CAL

"* "A" TRAIN PROTECTED

"* "B" TRAIN ELECTRICAL OUTAGE; 34D DE-ENERGIZED

"* "A" + "D" STEAM GENERATOR 50% WITH STEAM RELEASE AND FEEDING CAPABILITY

"* "A" TRAIN RHR IN THE COOLDOWN MODE

"* "A" TRAIN SFC RUNNING

"* SFP NORMAL LEVEL

"* "A" CHS IN PTL

"* BOTH OFFSITE SOURCES ARE AVAILABLE

"* SBO DIESEL IS AVAILABLE

"* SDM MONITOR OPERABLE

"* CTMT CLOSURE IS SET

"* RCS BORON CONCENTRATION IS > SHUTDOWN MARGIN

"* DILUTION PATHS TAGGED PER SP3604C.6

"* THE RWST LEVEL IS > 1,000,000 GALLONS

"* 3RHS*V43 IS TAGGED AND LOCKED CLOSED AN ELECTRICAL FAULT HAS RENDERED THE "A" SIH PUMP INOPERABLE

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

DETERMINE QPTR, ANALYZE RESULTS, RECOMMENDATIONS AND MAKE JPM ID Number:

RO-A1.2 Revision:

0 II. Initiated:

Steve J, Developer II1. Reviewed:

Ray Martin Cr rrf f Technical Reviewer 11/15/01 Date IV.

Approved:

Cognizant Plant Supervisor (optional)

Date Nuc, Pr Training Supervisor

'D1 1 of 9 10/25/01 Date

ADMIN JPM RO-A1.2 NOTE ON SCHEDULING OF JPM This JPM is planned to be performed "within" SIM JPM-1 30, Control Rod Out of Alignment, since it flows naturally from the planned procedure path and JPM-1 30 establishes all of the conditions for ADMIN JPM RO-A1.2, Determine QPTR.

JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 JPM ID Number:

RO-A1.2 Revision:

0 Task

Title:

System:

DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Admin, Rod Control Time Critical Task:

(

) YES

( X ) NO Validated Time (minutes):

5 min Task Number(s):

Applicable To:

341-01-788, Perform a QPTR SRO RO K/A Number:

GEN.2.1.19, Ability to use plant computer to obtain and evaluate parametric information on system or component status K/A Rating:

Method of Testing:

Simulated Performance:

Actual Performance:

Location:

Classroom:

Simulator:

Task Standards:

Required Materials:

General

References:

Plant Process Computer SP 31012, Quadrant Power Tilt Ratio, Rev. 4 Reactor Engineering Curve and Data Book MP3 Tech Specs AOP 3552, Malfunction of the Rod Drive System, Rev. 3 2 of 9 X

PEO 3.0/3.0 X

X In-Plant::

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

RO-AI.1 Revision:

0 Simulator Requirements:

Initial Conditions:

Initiating Cues:

Set-Up for JPM-1 30, Control Rod Out of Alignment; at step 3.b of Attachment A.

On Plant Process Computer substitute values for the following instruments:

NMP-NM43C and NMP-NM43D substitute "0" You are realigning a misaligned rod lAW AOP 3552, Malfunction of the Rod Drive System, Attachment A; Misaligned Rod. You are at step 3.b having just determined that reactor power is greater than 50%.

Complete AOP 3552, step 3.b through step 3.d and Determine QPTR.

3 of 9

        • NOTES TO EVALUATOR ****
1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

Task

Title:

RO-A1.2 Revision:

0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Start Time:

X Performance Step:

X Standards:

Grade:

2 X

Performance Step:

x Standards:

Grade:

Candidate uses Plant Process Computer, Tilting Factors, determine QPTR At PPC monitor or Real Time MMI, locates and calls up Tilting Factors SAT UNSAT Determine Tilting Factors using Plant Process Computer.

Candidate determines that 3 of the NI channels are valid information and records that information, but should determine that one channel is NOT providing good QPTR information via the Plant Process Computer.

NI41:

-1.03 NI42:

-1.03 SNI 43:

FAILED NI44:

-1.03 SAT UNSAT Comments:

Candidate should record "good" data and proceed to SP 31012 4 of 9 1

STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

RO-A1.2 "Task

Title:

Revision:

0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS 3

4 x

Performance Step:

Standards:

Grade:

Performance Step:

X Standards:

Grade:

5 X

Performance Step:

x Standards:

Grade:

Go To SP31012, QPTR, Step 4.2:

QPTR by measurement Locates copy of SP31012 and correct section SAT UNSAT RECORD average percent reactor power from NI cabinet meters NMP NM43F on Attachment 1 (step 4.2.1)

Locates NMP-NM43F and records average percent reactor using SAT UNSAT RECORD upper and lower detector digital meter reading for NMP-NM43C and NMP-NM43D on Attachment 1.

(step 4.2.3.a.1)

Locates NMP-NM43C and NMP NM43D and upper and lower detector digital meter reading using Attachment 1

SAT UNSAT Performance Step:

Standards:

RECORD data source in "Remarks" section on Attachment 1 (step 4.2.3.b)

Locates Remarks" section on and records at least that Channel 43 data came from NMP NM43C and NMP-NM43D, upper and lower detector digital meter.

5 of 9 STEP GRADE STEP GRADE STEP GRADE STEP 6

GRADE x

x

PERFORMANCE INFORMATION JPM Number:

RO-A1.2 "Task

Title:

Revision:

0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS Grade:

SAT UNSAT 7

x x

Performance Step:

Standards:

Grade:

On Attachment 1, RECORD 100% NI upper and lower currents from. (step 4.2.4.a)

Locates current Attachment 2 in Reactor Engineering Curve Book and records 100% NI upper and lower currents on Attachment 1.

SAT UNSAT 8

X 9

x Performance Step:

X Standards:

Grade:

X Performance Step:

Standards:

Grade:

RECORD data source and date of entry in "Remarks" section on Attachment 1 (step 4.2.4.b)

Locates Remarks" section on and records data source and date of Attachment 2 entry.

SAT UNSAT CALCULATE the detector ratio for each detector by dividing each detectors reading by that detectors 100% current and RECORD on. (step 4.2.4.c)

Uses step instructions and calculates detector ratio for AT LEAST channel 43.

SAT UNSAT 6 of 9 STEP GRADE STEP GRADE STEP GRADE

PERFORMANCE INFORMATION JPM Number:

Task

Title:

RO-A1.2 Revision:

0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS 10 X

X 11 X

X Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Grade:

CALCULATE the average upper and lower ratio and RECORD on. (step 4.2.4.d)

Uses step instructions and calculates average upper and lower detector ratio.

SAT UNSAT STEP GRADE STEP SAT UNSAT 12 X

X 13 X

Performance Step:

Standards:

Grade:

Performance Step:

RECORD maximum upper and lower QPTR and associated channel on. (step 4.2.4.f)

DETERMINES maximum upper and lower QPTR and associated channel and records on Attachment 1 SAT UNSAT VERIFY maximum QPTR does not exceed 1.02 (step 4.2.6.a)

Standards:

Grade:

Determines QPTR is >1.02 SAT 7 of 9 CALCULATE power tilt for each detector and RECORD in QPTR section of Attachment 1. (step 4.2.4.e)

Uses formulae in step 4.2.4.e and calculates power tilt for AT LEAST channel 43.

GRADE STEP GRADE STEP GRADE X

UNSAT

PERFORMANCE INFORMATION JPM Number:

Task

Title:

RO-A1.2 Revision:

0 DETERMINE QPTR, ANALYZE RESULTS, AND MAKE RECOMMENDATIONS 14 X

X Performance Step:

Standards:

Grade:

IF QPTR is greater than 1.02 and power is above 50% RTP, NOTIFY Shift Manager that Technical Specification 3/4.2.4, "Quadrant Power Tilt Ratio," action statement applies (step 4.2.6.b)

Determines QPTR is >1.02 and notifies the examiner acting as Shift Manager that Technical Specification 3/4.2.4, "Quadrant Power Tilt Ratio,"

action statement applies.

SAT UNSAT Termination Cue: The Evaluation For This JPM is Complete. Return to AOP 3552, Attachment A, Step 3.e, and continue your actions with the Misaligned Rod.

Stop Time:

8 of 9 STEP GRADE

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

RO-A1.2 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

YES Validated Time (minutes):

NO X

-5 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

9 of 9

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

RO-AI.2 You are realigning a misaligned rod lAW AOP 3552, Malfunction of the Rod Drive System, Attachment A; Misaligned Rod. You are at step 3.b having just determined that reactor power is greater than 50%.

Complete AOP 3552, step 3.b through step 3.d and Determine QPTR.

10 of 9

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM

Title:

JPM ID Number:

Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

RO-A2 Revision:

0 II. Initiated:

Steve Jacksc 10/31/01 Date III.

Reviewed:

Ray Martin a*

Technical Reviewer 11/15/01 Date IV.

Approved:

Date Cognizant Plant Supervisor (optional)

Nucle Training Supervisor

&11'Z16 1 of 6

JOB PERFORMANCE MEASURE GUIDE Millstone Unit 3 Revision:

0 JPM ID Number:

RO-A2 Task

Title:

Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

Tagging and Clearance Time Critical Task:

(

) YES (X)

NO Validated Time (minutes):

10 min Task Number(s):

Applicable To:

341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements SRO RO X

PEO K/A Number:

GEN.2.2.13, Knowledge of Tagging and Clearance Procedures K/A Rating:

Method of Testing:

Simulated Performance:

Actual Performance:

Location:

Task Standards:

Required Materials:

General

References:

Classroom:

X Simulator:

In-Plant::

Develop and review a tag clearance Team Lead recommendation P&IDs, EM-109A EE One-Line diagrams OP 3337, Radioactive Gaseous Waste System WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance 2 of 6 Facility:

System:

3.6/3.8 X

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

RO-A2 Revision:

0 Simulator Requirements:

Initial Conditions:

Initiating Cues:

The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PI B, has seized. Repair efforts are planned and the maintenance Team Lead has made work package recommendations for the clearance boundary.

Your task is to develop a clearance boundary for this repair activity based on the maintenance Team Lead recommendations..

3 of 6 NONE

""NOTES TO EVALUATOR ****

1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

Task

Title:

RO-A2 Revision:

0 Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

Start Time:

1_

X Comments:

Performance Step:

X Standards:

Grade:

X Performance Step:

2 X

Standards:

Grade:

Electrical and mechanical isolation of the pump can be done in any order Identifies correct piping isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-P1B Uses P&ID EM-1 09A or OP3337-001 and other appropriate references and identifies the correct boundary:

Pump Discharge (VO10) CLOSED Pump Suction (V006) CLOSED Casing Drain (V107) OPEN Discharge Vent (V972) OPEN SAT UNSAT Identifies correct electrical isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PIB Uses OP3337-004, electrical line-up, or EE-1AC and other appropriate references and identifies the correct boundary:

  • At MCC 32-3H(2M)

OFF Pump Control Switch OFF SAT UNSAT Comments:

Submits completed tagout to examiner as the Shift Manager. Tagout should substantially match the JPM attachment.

Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

4 of 6 STEP GRADE STEP GRADE

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

RO-A2 Revision:

0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

Validated Time (minutes):

YES NO X

10 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

5 of 6

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

RO-A2 The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PIB, has seized. Repair efforts are planned and the maintenance Team Lead has made work package recommendations for the clearance boundary.

Your task is to develop a clearance boundary for this repair activity based on the maintenance Team Lead recommendations.

6 of 6 Tagout Request (Sheet 1 of 1)

NOTE: When this request is used, all sections should be filled out in detail.

Brief Job

Description:

Rep/,cce

,m,://4r ort 3

5-P14 work Package Number:

/t3 3 0

0 5

Component to be Isolated( 1 ):

3

- P3 Multiple isolation points or non-component (i.e.: pipe/tube section): Yes Q

No [

(If yes, walkdown required by Tagging Authority)

Recommended Tags Color Isolation Point PositionM 1 )

(1) For Blue Tags indicate initial position or if initial position is not required enter N/A.

Amplifying Instructions:

Contact Person (for multiple shifts, Contact Person is required for each shift) phone:

Approved By:

Dat:phone:

D Team e-ader / Planner / Engineering Level of Use Information STOP THINK ACT REVIEW WC 2 Rev. 006-02 68 of 81

(

WORK PA CKA GE'L,OUNDARY SHEET

(

Clearance Number:

AWO Number:

Clearance Adequate for Personnel Safety:

Date:

IContact Person / Designee SignI Step Tag Tagged Tag Equipment ID Equipment Equipment Notes Tag Tag Worker Number Type Position Serial Description Location Placed Verified Verified Number

WORK PACKAGE BO(

")ARY SHEET 1Y

/2001 20:11

.,heet 1 Of 1 Clearance 3C08 - GWS06-0006 Num ber:

11111111111111111111 1111111111111111111 111 AWO Number:

Clearance Adequate for Personnel Safety:

Date:

M30110525 Contact Person/Designee Sign Step Tag Tagged Tag Equipment ID Equipment Description Equipment Location Notes Tag Placed:

Tag Verified:

Worker Number Type Position Serial Verified Number 1

IYEL 2461 3GWS-P1B-CS B DEGASIFIER

_AB 04306 POWER IS RED 06/18/2001 06/18/2001 RECIRCULATION PUMP; GWS PANEL TAGGED OFF 07:27 07:27

,NTRL SWITCH 2

RED OFF 2462 32-3H(2M)

]GWS-P1B DEGASIFIER 3_AB 02406 06/18/2001 06/18/2001

ECIRCULATION PUMP

-NORTHWEST 07:27 07:27 3

RED CLOSED 6901 3GWS-V010

)EGASIFIER RECIRC PUMP 3_AB

_00406_DEGAS 11/06/2001 11/06/2001 1,

B) DISCHARGE 16:17 16:51 4

RED CLOSED 6902 3GWS-V006 DEGASIFIER RECIRC PUMP 3_AB

_00406-DEGAS 11/06/2001 11/06/2001

'B" SUCTION 16:17 16:51 5

RED OPEN 6903 3GWS-V107 DEGASIFIER RECIRC PUMP 3_AB

_00406-DEGAS 11/06/2001 11/06/2001 (B) CASING DRAIN 16:17 16:51 6

RED OPEN 6904 3GWS-V972 DEGASIFIER RECIRC PUMP 3_AB

_00406_DEGAS 11/06/2001 11/06/2001 I

(B) DISCHARGE VENT 16:17 16:51

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET 1ý.

I. JPM

Title:

Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)

JPM ID Number:

RO-A3 Revision:

1 I1. Initiated:

Develk Ill. Reviewed:

Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional)

Nuc &r Training Supervisor Date 1, A Z 1 of 8 11/28/01 Date i x ///./0 /

Date

ADMIN JPM RO-A3

SUMMARY

OF CHANGES RE: NRC VALIDATION Added, "ALARA considerations for this task" to the initiating cue.

Added, "and ALARA considerations" to step 4, performance step area and standards

JOB PERFORMANCE MEASURE GUIDE Facility:

Millstone Unit 3 JPM ID Number:

RO-A3 Revision:

1 Task

Title:

System:

Time Critical Task:

Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)

Rad worker

(

) YES (X)

NO Validated Time (minutes):

5 min Task Number(s):

Applicable To:

119-03-070, Approve entry and/or enter/exit the various radiation areas located within Millstone Station SRO X

RO X

PEO X

K/A Number:

GEN.2.3.10, Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure K/A Rating:

Method of Testing:

Simulated Performance:

Actual Performance:

Location:

Classroom:

Task Standards:

Required Materials:

General

References:

X Simulator:

In-Plant::

X Reviews RWP per RPM 5.2.2 to support the ALARA Program RWP for A RHR Cubicle (040) and Rad Survey Figure #30 Radiation Work Permits and Radiation Survey Maps RPM 5.2.2, Basic Radiation Worker Responsibilities 2 of 8 2.9/3.3 X

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number:

RO-A3 Revision:

1 Simulator Requirements:

Initial Conditions:

Initiating Cues:

You have been directed to vent piping in the A RHR pump cubicle. HP has directed you to use the maintenance RWP 0040, Task 2 for this job. (Give candidate RWP 0040 and survey map #30)

Review and discuss your preparations for entering this area and what special precautions you would have to observe. Include in your discussion:

"* ALARA considerations for this task

"* Highest contamination level in the cubicle

"* Highest radiation level in the cubicle

"* Special radiological hazards

"* Longest possible stay time assuming highest general area rad level Personnel protective equipment required in the cubicle The examiner will act as Health Physics for any related questions.

3 of 8 NONE

        • NOTES TO EVALUATOR ****
1.

Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.

2.

When the student states what his/her simulated action/observation would be, read the appropriate "Cue".

3.

If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").

PERFORMANCE INFORMATION JPM Number:

RO-A3 Task

Title:

Revision:

I Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)

Start Time:

Ensure candidate has RWP 0040 and survey map #30 Performance Step:

Standards:

Grade:

Performance Step:

Standards:

Refers to RWP #40 (A RHR Cubicle)

Locates Task 2, RHR Cubicle walkdowns and inspections, covered under RWP #40 SAT UNSAT Locates specific requirements on RWP for at least:

Protective clothing Dosimetry Dose Limit Alarms Dose Rate Alarms Reviews RWP for specific requirements including:

"* Protective clothing

-for this task fulI-PCs

"* Dosimetry

-TLD & electronic dosimeter Dose Limit & Dose Rate Alarms

-75 mrem & 200 mr/hr 4 of 8 STEP 1

GRADE 2

STEP GRADE x

x Cue:

If candidate does not discuss an individual item:

"What are the protective clothing requirements for this area?

"What are the dosimetry requirements for this area?

"What are the Dose Limit & Dose Rate Alarms requirements for this area?

PERFORMANCE INFORMATION JPM Number:

RO-A3 Task

Title:

STEP GRADE Revision:

1 Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles) 3 X

X Cue:

If candidate asks HP for area protective clothing requirements for this area respond:

"What would you expect them to be?

And then "Full PCs are required in this area for the task you are performing."

Grade:

SAT UNSAT Performance Step:

Reviews the survey map for ESF Building 4'- 6" Elev. proposed to be entered Standards:

Reviews survey map for specific radiation and contamination hazards in the A RHR Cubicle including:

"* Smear results

-Smear results #18, #19, #20

"* Gamma Surveys

-280 mrem/hr gamma on contact at RHR pump and HX

-40 mrem/hr highest general area gamma

"* Contaminated areas

-No. 18 highest, 15K

"* Hot Spots

-locates on RHR piping (280 mrem/hour)

Grade:

SAT UNSAT Cue:

If candidate does not discuss an individual item:

"What are the smear results requirements for this area?

"What are the results of the gamma surveys of this area?

"Where are the contaminated areas?"

"Where are the hot spots?

5 of 8

PERFORMANCE INFORMATION JPM Number:

RO-A3 Task

Title:

Revision:

1 Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles) 4 x

x Performance Step:

Standards:

Grade:

STEP GRADE SAT UNSAT 6 of 8 Analyze survey map and RWP to determine preparations for entering this area and what special precautions and ALARA considerations they would have to observe.

Analyze survey map and RWP to determine the following:

"* Highest contamination level in the cubicle

-Pt. 19: 15K

"* Highest radiation level in the cubicle

-80mrem/hr on contact (A RHR Pump)

"* Special radiological hazards

-Wet/Boron near pump

-Hot Spot

"* Longest possible stay time assuming highest rad level

-Dose Limit Alarm (Stay Time) is 125 mrem

-Highest general area rad level is 40mrem/hr

= about 3.125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> (figuring in approaching Hot Spots may reduce this time).

"* Personnel protective equipment required in the cubicle

-Full PC's

"* ALARA considerations

-Avoidance of Hot Spot*

-Minimize wait/rest time in higher radiation areas

-Prepare for task (pre stage tools)

PERFORMANCE INFORMATION JPM Number:

RO-A3 Task

Title:

Revision:

1 Review an RWP and Survey Maps concerning a potential entry into a Contaminated Area (RHR Cubicles)

Comment::

  • Definition of Hot Spot: >100 mr AND 5 times highest background/general area Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

7 of 8

VERIFICATION OF JPM COMPLETION JPM Number:

Date Performed:

Student:

Evaluator:

RO-A3 Revision:

1 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task?

YES Validated Time (minutes):

NO X

-5 Actual Time to Complete (minutes):

Result of JPM:

("S" for satisfactory, "U" for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for ImDrovement:

8 of 8

STUDENT HANDOUT JPM Number:

Initial Conditions:

Initiating Cues:

RO-A3 You have been directed to vent piping in the A RHR pump cubicle. HP has directed you to use the maintenance RWP 0040, Task 2 for this job.

Review and discuss your preparations for entering this area and what special precautions you would have to observe.

Include in your discussion:

  • ALARA considerations for this task
  • Highest contamination level in the cubicle
  • Highest radiation level in the cubicle
  • Special radiological hazards
  • Longest possible stay time assuming highest general area rad level Personnel protective equipment required in the cubicle The examiner will act as Health Physics for any related questions.

9 of 8

- RADIATION SURVEY FIGURE NO. 30 ESF Building 4' 6" Elev.

SIH*MV8806

  • M ie iz A SIH"V11 M

e Z

z.

100 - gamma(r) at waist level in mrem/hr

- contamination survey point NorthI CTMT RECIRC COOLERS 40 RHR PUMP SMEAR RESULTS No. dpm/100cm 2

/- /i

',<"/*

~2 RHR PUMP

  • Mezzani 100* - gamma(0 contact in mrem/hr 50 mrad - beta(,/) reading in mrad/hr 25T - neutron(o711) in mrem/hr C(OPY I

UNIT 3

RADIATION WORK PERMIT - 40 Plant Ce Year RWP Number Rev.

IRWP Start IRWP pe RWP Category IsP Eiraon 3

1 0040 03 i 01-jan-2001 S

-POWER 02-jan-2002 RWP DESCRIPTION ESF Building Component & System Modification, Repair TASK

SUMMARY

Job Description 1

3DAS-Pl1 Replace discharge piping.

2 RHR Cubicle-ESF north pipechase preventive and correc 3

RHR Heat Exchanger bolting inspection; remove, instal 4

RHR valve work; 3RHS*HCV607, 3RHS*FCV619 preventive a ALARA INFORMATION I'-RA Review Hours-Estimated Authorized Internal(DAC]- Estimated Authorized External(mRem)-Estimated Authorized 01900 00000 0000 000 001900 001900 SPECIAL INSTRUCTIONS General access to RCAs to perform repairs and Entry on this RWP requires the worker to understand modificiation to ESF Building components, including and comply with the following:

walkdowns, inspections, and necessary support Be knowledgeable of radiological conditions of activities, the work area

    • Adhere to the requirements of the RWP
    • Notify HP before entering overhead areas
    • Monitor electronic dosimeter frequently, especially in high noise areas
    • Unless specifically briefed otherwise, if DOSE RATE alarm sounds, move to a lower dose area and notify HP If DOSE alarm sounds, leave the area and notify HP If electronic dosimeter malfunctions, notify HP BEFORE logging out Modesty garments will be worn whenever PCs are worn L

Hea.th Physics Representative Date RWP Term/Rev Date/Time Terminated/Rev by XCOOP

RADIATION WORK PERMIT - (40) JOB STEP - 2 OF 4 I[Pant Code Year IRWP Number IRev.

IRWP Start IRWP Type IRWP Category iRWP Expiration 3

1 I 0040 03 01-jan-2001 I

S

~

POWER I02-ian-2002 "fResponsible Individual/Extension Department/Company Job Supervisor/Extension Department/Company THOMAS BtW.NS/4326 AD/DNC THOMAS BURNS/4326 AD/DNC Buidin l'orZone ILocation Plant Equipment IRad. Area Type 3ESF 4'"ESF 416' GEN/ONIDENTIFIED AREA MISCELLANEOUSI WRITTEN DESCRIPTION OF JOB (MATERIALS

& METHODS)

RHR Cubicle-ESF north pipechase preventive and corrective maintenance to components, walkdowns, inspections, necessary support activities.

I I

ALARA INFORMATION oALRA Review Hours-Estimated Authorized Internal(DAC)-

Estimated Authorized External(mRem)-Estimated Authorized NA 00900 00000 00000 00000 000900 000900 System Code Component Code Task

!NRC Task,Alara Zone Location Plant Equipment 3305 MISC REPLACE SP 3CMAI 3720 3000 SURVEY MEASUREMENTS RADIATION (MR/HR)

CONTAMINATION(DPM/100CM2)

AIRBORN'.E (DAC) iRRCubicle 140 -200 5KS -

20K<.

14" Pipe Chase Platform Area 5 -

50

<1K

<.3 SPECIAL INSTRUCTIONS entry to Tech Spec Locked High Radiation Areas

"}'rmitted using this Job Step.

PCs required in contaminated areas.

HP supervision may adjust protective clothing requirements based on any of the followig:

"* TEDE ALARA reviews

"* Heat stress evaluations

"* FME controls Requirements for entry to High Radiation Areas:

  • Dose rate meter or alarming dosimeter AND knowledge of area dose rates, OR continuous HP coverage

- Health Physics briefing for High Radiation Areas IDose Limit Alarm(Stay Time)= 0125 mrem Dose Rate Alarm= 0200 mr/hr Elapsed Time Alarm= 0000 min.

REQUIREMENTS Protective clothing:

Lab coat "Cotton liners Surgeon's gloves Health Physics Coverage

  • Booties Periodic Coveralls Electronic dosimeter Shoe covers TLD Minimum Margin:

Rubber gloves 0175 mrem Modesty garments alth Physics Representative Date RWP Term/Rev Date/Time Terminated/Rev by

/

/

Reactor Operator E-Plan Responsibilities JPM ID Number:

RO-A.4 Revision:

0 I1. Initiated:

10/05/01 Date I1I.

Reviewed:

Technical Reviewer IV. Approved:

Cognizant Plant Supervisor (optional)

Nucld-Training Supervisor Date Date ln1i6 D5e

1. JPM

Title:

Questions for Admin RO A.4 Topic: RO responsibilities during an E-Plan GEN. 2.4. 39 K/A: 3.3/3.1 Question 1:

You are a qualified Control Operator currently working with the Outage Planning Group. You are eating lunch in the building 475 cafeteria when you hear the evacuation alarm sound. The message following the siren states that an ALERT C-1 has been declared and all non essential personnel evacuate the site via the North Access Point. Where do you go?

Question 2:

You are a qualified Control Operator currently working with the Outage Planning Group. You receive a call at home from the Manager of Resources. He states that a SERO activation has occurred, site access has been restricted and you are requested to report to provide shift relief coverage. Where do you report and to whom do you report?

ANSWER KEY Questions for Admin RO A.4 Topic: RO responsibilities during an E-Plan GEN. 2.4. 39 K/A: 3.3/3.1 Question 1:

You are a qualified Control Operator currently working with the Outage Planning Group. You are eating lunch in the building 475 cafeteria when you hear the evacuation alarm sound. The message following the siren states that an ALERT C-1 has been declared and all non essential personnel evacuate the site via the North Access Point. Where do you go?

Answer: In accordance with EPI-FAP08, Evacuation and Assembly, non on-duty/on-call SERO personnel within the protected are will report to the OSC Assembly Area in the Bldg. 475 Cafeteria.

Question 2:

You are a qualified Control Operator currently working with the Outage Planning Group. You receive a call at home from the Manager of Resources. He states that a SERO activation has occurred, site access has been restricted and you are requested to report to provide shift relief coverage. Where do you report and to whom do you report?

Answer: Since site access has been restricted, the qualified Control Operator should report to the EOF and the Manager of Resources. The Manager of Resources then will contact the requesting party and arrange access to the site for the individual.