ML020920663: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: or indirectly any control over (i) the facility, (ii) power or energy produced by the facility, or (iii) the licensee of the facility. Further, any rights acquired under this authorization may be exercised only in compliance with and subject to the requirements and restrictions of this operating license, the Atomic Energy Act of 1954, as amended, and the NRC's regulations. For purposes of this condition, the limitations of 10 CFR 50.81, as now in effect and as they may be subsequently amended, are fully applicable to the equity investors and any successors in interest to the equity investors, as long as the license for the facility remains in effect. | ||
(b) | (b) | ||
Entergy Louisiana, Inc. (or its designee) to notify the NRC in writing prior to any change in (i) the terms or conditions of any lease agreements executed as part of the above authorized financial transactions, (ii) any facility operating agreement involving a licensee that is in effect now or will be in effect in the future, or (iii) the existing property insurance coverages for the facility, that would materially alter the representations and conditions, set forth in the staffs Safety Evaluation enclosed to the NRC {{letter dated|date=September 18, 1989|text=letter dated September 18, 1989}}. In addition, Entergy Louisiana, Inc. or its designee is required to notify the NRC of any action by equity investors or successors in interest to Entergy Louisiana, Inc. that may have an effect on the operation of the facility. | |||
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: | ||
: 1. | : 1. | ||
: 2. | Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3441 megawatts thermal (100% power) in accordance with the conditions specified herein. | ||
AMENDMENT NO. 134, 169, 170,171, | : 2. | ||
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 182, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. | |||
AMENDMENT NO. 134, 169, 170,171, 183 | |||
DEFINITIONS RATED THERMAL POWER 1.24 RATED THERMAL POWER shall be a total reactor core heat transfer rate to the reactor coolant of 3441 MWt. | DEFINITIONS RATED THERMAL POWER 1.24 RATED THERMAL POWER shall be a total reactor core heat transfer rate to the reactor coolant of 3441 MWt. | ||
| Line 29: | Line 32: | ||
REPORTABLE EVENT 1.26 A REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50. | REPORTABLE EVENT 1.26 A REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50. | ||
SHIELD BUILDING INTEGRITY 1.27 SHIELD BUILDING INTEGRITY shall exist when: | SHIELD BUILDING INTEGRITY 1.27 SHIELD BUILDING INTEGRITY shall exist when: | ||
: a. | : a. | ||
: b. | Each door in each access opening is closed except when the access opening is being used for normal transit entry and exit, then at least one door shall be | ||
: c. | : closed, | ||
: b. | |||
The shield building filtration system is in compliance with the requirements of Specification 3.6.6.1, and | |||
: c. | |||
The sealing mechanism associated with each penetration (e.g., welds, bellows, or O-rings) is OPERABLE. | |||
SHUTDOWN MARGIN 1.28 SHUTDOWN MARGIN shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all control element assemblies are fully inserted except for the single assembly of highest reactivity worth which is assumed to be fully withdrawn. | SHUTDOWN MARGIN 1.28 SHUTDOWN MARGIN shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all control element assemblies are fully inserted except for the single assembly of highest reactivity worth which is assumed to be fully withdrawn. | ||
AMENDMENT NO. 175,182,183 WATERFORD - UNIT 3 1-6}} | |||
Latest revision as of 19:16, 16 January 2025
| ML020920663 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 03/29/2002 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB2971 | |
| Download: ML020920663 (2) | |
Text
or indirectly any control over (i) the facility, (ii) power or energy produced by the facility, or (iii) the licensee of the facility. Further, any rights acquired under this authorization may be exercised only in compliance with and subject to the requirements and restrictions of this operating license, the Atomic Energy Act of 1954, as amended, and the NRC's regulations. For purposes of this condition, the limitations of 10 CFR 50.81, as now in effect and as they may be subsequently amended, are fully applicable to the equity investors and any successors in interest to the equity investors, as long as the license for the facility remains in effect.
(b)
Entergy Louisiana, Inc. (or its designee) to notify the NRC in writing prior to any change in (i) the terms or conditions of any lease agreements executed as part of the above authorized financial transactions, (ii) any facility operating agreement involving a licensee that is in effect now or will be in effect in the future, or (iii) the existing property insurance coverages for the facility, that would materially alter the representations and conditions, set forth in the staffs Safety Evaluation enclosed to the NRC letter dated September 18, 1989. In addition, Entergy Louisiana, Inc. or its designee is required to notify the NRC of any action by equity investors or successors in interest to Entergy Louisiana, Inc. that may have an effect on the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
- 1.
Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3441 megawatts thermal (100% power) in accordance with the conditions specified herein.
- 2.
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 182, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
AMENDMENT NO. 134, 169, 170,171, 183
DEFINITIONS RATED THERMAL POWER 1.24 RATED THERMAL POWER shall be a total reactor core heat transfer rate to the reactor coolant of 3441 MWt.
REACTOR TRIP SYSTEM RESPONSE TIME 1.25 The REACTOR TRIP SYSTEM RESPONSE TIME shall be the time interval from when the monitored parameter exceeds its trip setpoint at the channel sensor until electrical power is interrupted to the CEA drive mechanism. The response time may be measured by any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.
REPORTABLE EVENT 1.26 A REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50.
SHIELD BUILDING INTEGRITY 1.27 SHIELD BUILDING INTEGRITY shall exist when:
- a.
Each door in each access opening is closed except when the access opening is being used for normal transit entry and exit, then at least one door shall be
- closed,
- b.
The shield building filtration system is in compliance with the requirements of Specification 3.6.6.1, and
- c.
The sealing mechanism associated with each penetration (e.g., welds, bellows, or O-rings) is OPERABLE.
SHUTDOWN MARGIN 1.28 SHUTDOWN MARGIN shall be the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all control element assemblies are fully inserted except for the single assembly of highest reactivity worth which is assumed to be fully withdrawn.
AMENDMENT NO. 175,182,183 WATERFORD - UNIT 3 1-6