==Dear Mr. Bezilla:==
==Dear Mr. Bezilla:==
On August 6, 2002, the NRC staff completed its mid-cycle plant performance assessment of Beaver Valley Power Station, Units 1 and 2 (Beaver Valley). In accordance with NRC Inspection Manual Chapter 0305 Operating Reactor Assessment Program, the mid-cycle review involved the participation of all technical divisions in evaluating the performance of your Beaver Valley facility for the first half of the current assessment cycle, January 1 -
On August 6, 2002, the NRC staff completed its mid-cycle plant performance assessment of Beaver Valley Power Station, Units 1 and 2 (Beaver Valley). In accordance with NRC Inspection Manual Chapter 0305 Operating Reactor Assessment Program, the mid-cycle review involved the participation of all technical divisions in evaluating the performance of your Beaver Valley facility for the first half of the current assessment cycle, January 1 -
December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
Line 29: Line 28:
The last six months of the inspection plan is tentative and may be revised at the end-of-cycle review.
The last six months of the inspection plan is tentative and may be revised at the end-of-cycle review.


Mr. Mark Bezilla                                 2 In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
Mr. Mark Bezilla 2
In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room).
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. John Rogge at (610) 337-5146 with any questions you may have regarding this letter or the inspection plan.
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. John Rogge at (610) 337-5146 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                              /RA/
/RA/
A. Randolph Blough, Director Division of Reactor Projects Docket Nos. 50-334, 50-412 Licensee Nos. DPR-66, NPF-73
A. Randolph Blough, Director Division of Reactor Projects Docket Nos. 50-334, 50-412 Licensee Nos. DPR-66, NPF-73


Line 40: Line 40:
J. Lash, Plant General Manager F. von Ahn, Director, Plant Engineering T. Cosgrove, Director, Work Management R. Donnellon, Director, Plant Maintenance M. Pearson, Director, Services and Projects L. Freeland, Manager, Nuclear Regulatory Affairs & Corrective Actions M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety Commonwealth of Pennsylvania State of Ohio State of West Virginia
J. Lash, Plant General Manager F. von Ahn, Director, Plant Engineering T. Cosgrove, Director, Work Management R. Donnellon, Director, Plant Maintenance M. Pearson, Director, Services and Projects L. Freeland, Manager, Nuclear Regulatory Affairs & Corrective Actions M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety Commonwealth of Pennsylvania State of Ohio State of West Virginia


Mr. Mark Bezilla                                               3 Distribution w/encl:
Mr. Mark Bezilla 3
Distribution w/encl:
Region I Docket Room (with concurrences)
Region I Docket Room (with concurrences)
D. Kern, DRP - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA J. Rogge, DRP S. Barr, DRP DRS Director, Region I P. Kaufman, DRS J. McFadden, DRS G. Smith, DRS D. Silk, DRS B. Platchek, DRP H. Nieh, OEDO S. Richards, NRR (RIDSNRRDIPMLPDI)
D. Kern, DRP - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA J. Rogge, DRP S. Barr, DRP DRS Director, Region I P. Kaufman, DRS J. McFadden, DRS G. Smith, DRS D. Silk, DRS B. Platchek, DRP H. Nieh, OEDO S. Richards, NRR (RIDSNRRDIPMLPDI)
D. Collins, PM, NRR R. Clark, Backup PM, NRR RidsNrrDipmlipb DOCUMENT NAME: S:\ROP 3 Mid-cycle\Branch 7\BVMIDCYC.WPD After declaring this document An Official Agency Record it will be released to the Public.
D. Collins, PM, NRR R. Clark, Backup PM, NRR RidsNrrDipmlipb DOCUMENT NAME: S:\\ROP 3 Mid-cycle\\Branch 7\\BVMIDCYC.WPD After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE               RI/DRP                       RI/DRP                     RI/DRP NAME           D Kern /JFR                   J Rogge                   A R Blough for/                          /JFR/                      /ARB/
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME D Kern /JFR for/
DATE           08/21/02                     08/21/02                   08/23/02                     08/         /02         08/       /02 OFFICIAL RECORD COPY
J Rogge
/JFR/
A R Blough
/ARB/
DATE 08/21/02 08/21/02 08/23/02 08/ /02 08/ /02 OFFICIAL RECORD COPY


Page 1 of 2                                                                                    Beaver Valley 08/22/2002    14:41:13                                                                Inspection / Activity Plan Report 22 06/30/2002 - 09/30/2003 Unit                                                                                                                                No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                    Title                                              on Site       Start      End            Type 7112202       - PUB RAD SAFETY - RADWASTE                                                                                       1 1, 2            IP 7112202            Radioactive Material Processing and Transportation                                                          07/08/2002 07/12/2002 Baseline Inspections 7111112B       - MAINTENANCE RULE                                                                                                 1 1, 2            IP 7111112B            Maintenance Effectiveness                                                                                  07/08/2002 07/12/2002 Baseline Inspections 7111121        - SSDI                                                                                                            6 1, 2             IP 7111121             Safety System Design and Performance Capability                                                            08/12/2002 08/16/2002 Baseline Inspections 1, 2            IP 7111121            Safety System Design and Performance Capability                                                             08/26/2002 08/30/2002 Baseline Inspections 71121         - OCC RAD SAFETY                                                                                                   1 1, 2            IP 7112101            Access Control to Radiologically Significant Areas                                                         08/19/2002 08/23/2002 Baseline Inspections 1, 2            IP 7112102            ALARA Planning and Controls                                                                                 08/19/2002 08/23/2002 Baseline Inspections 1, 2            IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                               08/19/2002 08/23/2002 Baseline Inspections 1, 2             IP 71151              Performance Indicator Verification                                                                          08/19/2002  08/23/2002 Baseline Inspections 9/30+EXM       - U1 OPERATOR INITIAL LICENSING EXAMS                                                                             3 1                    U01438            BEAVER VALLEY 1 O/L INITIAL EXAMS 9/30-10/11/2002                                                           09/02/2002 09/06/2002 Not Applicable 1                    U01438            BEAVER VALLEY 1 O/L INITIAL EXAMS 9/30-10/11/2002                                                           09/30/2002 10/11/2002 Not Applicable 71121          - OCC RAD SAFETY                                                                                                  1 1, 2            IP 7112101            Access Control to Radiologically Significant Areas                                                         10/28/2002 11/01/2002 Baseline Inspections 1, 2            IP 7112102            ALARA Planning and Controls                                                                                 10/28/2002 11/01/2002 Baseline Inspections 1, 2            IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                               10/28/2002 11/01/2002 Baseline Inspections 1, 2             IP 71151              Performance Indicator Verification                                                                          10/28/2002  11/01/2002 Baseline Inspections 7111111B       - L.O.REQUALIFICATION PROGRAM                                                                                     2 1, 2            IP 7111111B            Licensed Operator Requalification                                                                          10/28/2002 11/01/2002 Baseline Inspections 12/16EXM       - U2 OPERATOR LICENSING INITIAL EXAMS                                                                             3 2                U01439            BEAVER VALLEY 2 O/L INITIAL EXAMS 5/13-22/2002                                                             11/18/2002 11/22/2002 Not Applicable 2                U01439            BEAVER VALLEY 2 O/L INITIAL EXAMS 5/13-22/2002                                                             12/16/2002  12/20/2002 Not Applicable 71130          - SECURITY                                                                                                        1 1, 2            IP 7113001            Access Authorization Program (Behavior Observation Only)                                                   01/21/2003 01/24/2003 Baseline Inspections 1, 2            IP 7113002            Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)             01/21/2003 01/24/2003 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                                  1 1, 2            IP 7112101            Access Control to Radiologically Significant Areas                                                         02/03/2003 02/07/2003 Baseline Inspections 1, 2            IP 7112102            ALARA Planning and Controls                                                                                 02/03/2003 02/07/2003 Baseline Inspections 1, 2            IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                               02/03/2003 02/07/2003 Baseline Inspections 1, 2             IP 71151              Performance Indicator Verification                                                                          02/03/2003  02/07/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
Beaver Valley Inspection / Activity Plan 06/30/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/22/2002 14:41:13 Report 22 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 07/08/2002 07/12/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 1
7111112B
- MAINTENANCE RULE Baseline Inspections 07/08/2002 07/12/2002 Maintenance Effectiveness IP 7111112B 1, 2 6
7111121
- SSDI Baseline Inspections 08/12/2002 08/16/2002 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 08/26/2002 08/30/2002 Safety System Design and Performance Capability IP 7111121 1, 2 1
71121
- OCC RAD SAFETY Baseline Inspections 08/19/2002 08/23/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/19/2002 08/23/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 08/19/2002 08/23/2002 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 08/19/2002 08/23/2002 Performance Indicator Verification IP 71151 1, 2 3
9/30+EXM
- U1 OPERATOR INITIAL LICENSING EXAMS Not Applicable 09/02/2002 09/06/2002 BEAVER VALLEY 1 O/L INITIAL EXAMS 9/30-10/11/2002 U01438 1
Not Applicable 09/30/2002 10/11/2002 BEAVER VALLEY 1 O/L INITIAL EXAMS 9/30-10/11/2002 U01438 1
1 71121
- OCC RAD SAFETY Baseline Inspections 10/28/2002 11/01/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/28/2002 11/01/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/28/2002 11/01/2002 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 10/28/2002 11/01/2002 Performance Indicator Verification IP 71151 1, 2 2
7111111B
- L.O.REQUALIFICATION PROGRAM Baseline Inspections 10/28/2002 11/01/2002 Licensed Operator Requalification IP 7111111B 1, 2 3
12/16EXM
- U2 OPERATOR LICENSING INITIAL EXAMS Not Applicable 11/18/2002 11/22/2002 BEAVER VALLEY 2 O/L INITIAL EXAMS 5/13-22/2002 U01439 2
Not Applicable 12/16/2002 12/20/2002 BEAVER VALLEY 2 O/L INITIAL EXAMS 5/13-22/2002 U01439 2
1 71130
- SECURITY Baseline Inspections 01/21/2003 01/24/2003 Access Authorization Program (Behavior Observation Only)
IP 7113001 1, 2 Baseline Inspections 01/21/2003 01/24/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
IP 7113002 1, 2 1
71121
- OCC RAD SAFETY Baseline Inspections 02/03/2003 02/07/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 02/03/2003 02/07/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 02/03/2003 02/07/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 02/03/2003 02/07/2003 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                                    Beaver Valley 08/22/2002    14:41:13                                                                Inspection / Activity Plan Report 22 06/30/2002 - 09/30/2003 Unit                                                                                                                              No. of Staff     Planned Dates          Inspection Number      Inspection Activity                                                    Title                                            on Site       Start      End            Type 95001         - 95001 PHAD FOLLOW UP                                                                                           1 1, 2            IP 95001              Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area                       02/24/2003  02/28/2003 Supplemental Program 7111108       - INSERVICE INSPECTION                                                                                           1 1, 2            IP 7111108            Inservice Inspection Activities                                                                          03/10/2003 03/15/2003 Baseline Inspections 71121         - OCC RAD SAFETY                                                                                                 1 1, 2            IP 7112101            Access Control to Radiologically Significant Areas                                                       03/17/2003 03/21/2003 Baseline Inspections 1, 2            IP 7112102            ALARA Planning and Controls                                                                               03/17/2003 03/21/2003 Baseline Inspections 1, 2            IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                             03/17/2003 03/21/2003 Baseline Inspections 1, 2             IP 71151              Performance Indicator Verification                                                                        03/17/2003  03/21/2003 Baseline Inspections 7111107B       - HEAT SINK                                                                                                     1 1, 2            IP 7111107B            Heat Sink Performance                                                                                    04/07/2003 04/11/2003 Baseline Inspections 71122.01       - RETS                                                                                                           1 1, 2            IP 7112201            Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                                  05/05/2003 05/09/2003 Baseline Inspections 7111117B       - PERMANENT PLANT MODS                                                                                           5 1, 2            IP 7111102            Evaluation of Changes, Tests, or Experiments                                                              06/16/2003 06/20/2003 Baseline Inspections 1, 2             IP 7111117B            Permanent Plant Modifications                                                                            06/16/2003 06/20/2003 Baseline Inspections 71152B         - PROBLEM IDENTIFICATION AND RESOLUTION                                                                         4 1, 2            IP 71152B              Identification and Resolution of Problems                                                                07/07/2003 07/11/2003 Baseline Inspections 1, 2            IP 71152B              Identification and Resolution of Problems                                                                 07/21/2003 07/25/2003 Baseline Inspections 71114         - EP PRG RVW & EP PI VERFICATION                                                                                 1 1, 2            IP 7111402            Alert and Notification System Testing                                                                     07/27/2003 08/01/2003 Baseline Inspections 1, 2            IP 7111403            Emergency Response Organization Augmentation Testing                                                     07/27/2003 08/01/2003 Baseline Inspections 1, 2            IP 7111404            Emergency Action Level and Emergency Plan Changes                                                         07/27/2003 08/01/2003 Baseline Inspections 1, 2            IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies                                         07/27/2003 08/01/2003 Baseline Inspections 1, 2             IP 71151              Performance Indicator Verification                                                                        07/27/2003 08/01/2003 Baseline Inspections 71121          - OCC RAD SAFETY                                                                                                1 1, 2            IP 7112101            Access Control to Radiologically Significant Areas                                                       09/08/2003 09/12/2003 Baseline Inspections 1, 2            IP 7112102            ALARA Planning and Controls                                                                               09/08/2003 09/12/2003 Baseline Inspections 1, 2            IP 7112103            Radiation Monitoring Instrumentation and Protective Equipment                                             09/08/2003 09/12/2003 Baseline Inspections 1, 2             IP 71151              Performance Indicator Verification                                                                        09/08/2003 09/12/2003 Baseline Inspections 71130.03      - SECURITY                                                                                                      2 1, 2            IP 7113003            Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)           09/08/2003  09/12/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
Beaver Valley Inspection / Activity Plan 06/30/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/22/2002 14:41:13 Report 22 1
95001
- 95001 PHAD FOLLOW UP Supplemental Program 02/24/2003 02/28/2003 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area IP 95001 1, 2 1
7111108
- INSERVICE INSPECTION Baseline Inspections 03/10/2003 03/15/2003 Inservice Inspection Activities IP 7111108 1, 2 1
71121
- OCC RAD SAFETY Baseline Inspections 03/17/2003 03/21/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/17/2003 03/21/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Performance Indicator Verification IP 71151 1, 2 1
7111107B
- HEAT SINK Baseline Inspections 04/07/2003 04/11/2003 Heat Sink Performance IP 7111107B 1, 2 1
71122.01
- RETS Baseline Inspections 05/05/2003 05/09/2003 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 5
7111117B
- PERMANENT PLANT MODS Baseline Inspections 06/16/2003 06/20/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/16/2003 06/20/2003 Permanent Plant Modifications IP 7111117B 1, 2 4
71152B
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 07/07/2003 07/11/2003 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 07/21/2003 07/25/2003 Identification and Resolution of Problems IP 71152B 1, 2 1
71114
- EP PRG RVW & EP PI VERFICATION Baseline Inspections 07/27/2003 08/01/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Performance Indicator Verification IP 71151 1, 2 1
71121
- OCC RAD SAFETY Baseline Inspections 09/08/2003 09/12/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/08/2003 09/12/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/08/2003 09/12/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 09/08/2003 09/12/2003 Performance Indicator Verification IP 71151 1, 2 2
71130.03
- SECURITY Baseline Inspections 09/08/2003 09/12/2003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)
IP 7113003 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 16:11, 16 January 2025

2002 Beaver Valley Mid-Cycle Performance Review and Inspection Plan
ML022380048
Person / Time
Site: Beaver Valley
Issue date: 08/23/2002
From: Blough A
NRC Region 1
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML022380048 (5)


Text

August 23, 2002 Mr. Mark Bezilla Vice President First Energy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN BEAVER VALLEY POWER STATION

Dear Mr. Bezilla:

On August 6, 2002, the NRC staff completed its mid-cycle plant performance assessment of Beaver Valley Power Station, Units 1 and 2 (Beaver Valley). In accordance with NRC Inspection Manual Chapter 0305 Operating Reactor Assessment Program, the mid-cycle review involved the participation of all technical divisions in evaluating the performance of your Beaver Valley facility for the first half of the current assessment cycle, January 1 -

December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.

Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix based on one White inspection finding, having low to moderate safety significance, which effected the Emergency Preparedness cornerstone. Specifically, personal home alerting devices (PHADs), which comprise a small portion of the public alert and notification system (ANS) for Beaver Valley Power Station, were not adequately tested and maintained to fulfill their design function of alerting the public within the Emergency Planning Zone. During a Regulatory Conference held on May 15, 2002, the corrective actions including interim measures, installation and testing of additional ANS sirens, submittal of a revised ANS design report to eliminate reliance on PHADs, and a planned self assessment of your ANS were discussed. In addition to the reactor oversight program baseline inspections, the NRC intends to perform a supplemental inspection in February 2003 to provide assurance that the root causes and contributing causes of safety significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence of the White inspection finding.

The enclosed inspection plan details the inspections scheduled through September 30, 2003.

The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The last six months of the inspection plan is tentative and may be revised at the end-of-cycle review.

Mr. Mark Bezilla 2

In addition, the NRC is in the process of finalizing a Temporary Instruction (TI) that will be used to review implementation of the Interim Compensatory Measures required by the Agencys Security Order to all commercial nuclear power plants dated February 25, 2002. Schedules have not yet been finalized, but it is anticipated that these inspections will begin within the next calendar quarter. Once finalized, the details will be communicated by separate correspondence.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. John Rogge at (610) 337-5146 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

A. Randolph Blough, Director Division of Reactor Projects Docket Nos. 50-334, 50-412 Licensee Nos. DPR-66, NPF-73

Enclosure:

Beaver Valley Power Station, Units 1 and 2 Inspection/Activity Plan cc w/encl:

J. Lash, Plant General Manager F. von Ahn, Director, Plant Engineering T. Cosgrove, Director, Work Management R. Donnellon, Director, Plant Maintenance M. Pearson, Director, Services and Projects L. Freeland, Manager, Nuclear Regulatory Affairs & Corrective Actions M. Clancy, Mayor, Shippingport, PA R. Janati, Chief, Division of Nuclear Safety Commonwealth of Pennsylvania State of Ohio State of West Virginia

Mr. Mark Bezilla 3

Distribution w/encl:

Region I Docket Room (with concurrences)

D. Kern, DRP - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA J. Rogge, DRP S. Barr, DRP DRS Director, Region I P. Kaufman, DRS J. McFadden, DRS G. Smith, DRS D. Silk, DRS B. Platchek, DRP H. Nieh, OEDO S. Richards, NRR (RIDSNRRDIPMLPDI)

D. Collins, PM, NRR R. Clark, Backup PM, NRR RidsNrrDipmlipb DOCUMENT NAME: S:\\ROP 3 Mid-cycle\\Branch 7\\BVMIDCYC.WPD After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME D Kern /JFR for/

J Rogge

/JFR/

A R Blough

/ARB/

DATE 08/21/02 08/21/02 08/23/02 08/ /02 08/ /02 OFFICIAL RECORD COPY

Beaver Valley Inspection / Activity Plan 06/30/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/22/2002 14:41:13 Report 22 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 07/08/2002 07/12/2002 Radioactive Material Processing and Transportation IP 7112202 1, 2 1

7111112B

- MAINTENANCE RULE Baseline Inspections 07/08/2002 07/12/2002 Maintenance Effectiveness IP 7111112B 1, 2 6

7111121

- SSDI Baseline Inspections 08/12/2002 08/16/2002 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 08/26/2002 08/30/2002 Safety System Design and Performance Capability IP 7111121 1, 2 1

71121

- OCC RAD SAFETY Baseline Inspections 08/19/2002 08/23/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 08/19/2002 08/23/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 08/19/2002 08/23/2002 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 08/19/2002 08/23/2002 Performance Indicator Verification IP 71151 1, 2 3

9/30+EXM

- U1 OPERATOR INITIAL LICENSING EXAMS Not Applicable 09/02/2002 09/06/2002 BEAVER VALLEY 1 O/L INITIAL EXAMS 9/30-10/11/2002 U01438 1

Not Applicable 09/30/2002 10/11/2002 BEAVER VALLEY 1 O/L INITIAL EXAMS 9/30-10/11/2002 U01438 1

1 71121

- OCC RAD SAFETY Baseline Inspections 10/28/2002 11/01/2002 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/28/2002 11/01/2002 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/28/2002 11/01/2002 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 10/28/2002 11/01/2002 Performance Indicator Verification IP 71151 1, 2 2

7111111B

- L.O.REQUALIFICATION PROGRAM Baseline Inspections 10/28/2002 11/01/2002 Licensed Operator Requalification IP 7111111B 1, 2 3

12/16EXM

- U2 OPERATOR LICENSING INITIAL EXAMS Not Applicable 11/18/2002 11/22/2002 BEAVER VALLEY 2 O/L INITIAL EXAMS 5/13-22/2002 U01439 2

Not Applicable 12/16/2002 12/20/2002 BEAVER VALLEY 2 O/L INITIAL EXAMS 5/13-22/2002 U01439 2

1 71130

- SECURITY Baseline Inspections 01/21/2003 01/24/2003 Access Authorization Program (Behavior Observation Only)

IP 7113001 1, 2 Baseline Inspections 01/21/2003 01/24/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)

IP 7113002 1, 2 1

71121

- OCC RAD SAFETY Baseline Inspections 02/03/2003 02/07/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 02/03/2003 02/07/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 02/03/2003 02/07/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 02/03/2003 02/07/2003 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Beaver Valley Inspection / Activity Plan 06/30/2002 - 09/30/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/22/2002 14:41:13 Report 22 1

95001

- 95001 PHAD FOLLOW UP Supplemental Program 02/24/2003 02/28/2003 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area IP 95001 1, 2 1

7111108

- INSERVICE INSPECTION Baseline Inspections 03/10/2003 03/15/2003 Inservice Inspection Activities IP 7111108 1, 2 1

71121

- OCC RAD SAFETY Baseline Inspections 03/17/2003 03/21/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 03/17/2003 03/21/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 03/17/2003 03/21/2003 Performance Indicator Verification IP 71151 1, 2 1

7111107B

- HEAT SINK Baseline Inspections 04/07/2003 04/11/2003 Heat Sink Performance IP 7111107B 1, 2 1

71122.01

- RETS Baseline Inspections 05/05/2003 05/09/2003 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 5

7111117B

- PERMANENT PLANT MODS Baseline Inspections 06/16/2003 06/20/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/16/2003 06/20/2003 Permanent Plant Modifications IP 7111117B 1, 2 4

71152B

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 07/07/2003 07/11/2003 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 07/21/2003 07/25/2003 Identification and Resolution of Problems IP 71152B 1, 2 1

71114

- EP PRG RVW & EP PI VERFICATION Baseline Inspections 07/27/2003 08/01/2003 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 07/27/2003 08/01/2003 Performance Indicator Verification IP 71151 1, 2 1

71121

- OCC RAD SAFETY Baseline Inspections 09/08/2003 09/12/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/08/2003 09/12/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/08/2003 09/12/2003 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 09/08/2003 09/12/2003 Performance Indicator Verification IP 71151 1, 2 2

71130.03

- SECURITY Baseline Inspections 09/08/2003 09/12/2003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)

IP 7113003 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.