{{#Wiki_filter:Committed to Nuclear Excellence,                                                     Palisades Nuclear Plant Operated by Nuclear Management Company, LLC October 9, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk
{{#Wiki_filter:Committed to Nuclear Excellence, Palisades Nuclear Plant Operated by Nuclear Management Company, LLC October 9, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk  
-Washington,_DC-20555-0001---.-.
-Washington,_DC-20555-0001---.-.
DOCKET 50-255 - LICENSE DPR PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September 2002.
DOCKET 50-255 - LICENSE DPR PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September 2002.
If you have any questions, please contact Mr. Scott Hawn at (269) 764-3179.
If you have any questions, please contact Mr. Scott Hawn at (269) 764-3179.
Laurie A. Lahti Manager, Licensing CC       Regional Administrator, USNRC, Region Ill NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor
Laurie A. Lahti Manager, Licensing CC Regional Administrator, USNRC, Region Ill NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor  
        -RDWhale,-'Michigan-Public-ServicE&Commission .
-RDWhale,-'Michigan-Public-ServicE&Commission Records Center, INPO SMMclntyre, P-26-204 Attachment "27780 Blue Star Memonal Highway ; Covert, MI 49043 Telephone: 616 764.2000
Records Center, INPO SMMclntyre, P-26-204 Attachment
                *                  "27780 Blue Star Memonal Highway ; Covert, MI 49043 Telephone: 616 764.2000


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR SEPTEMBER 2002 The plant operated at essentially full power (at greater than 99%) until September 21, when power was reduced to approximately 89% for repairs to Heater Drain Pump, P-1 OB. The plant was returned to essentially full power on the same day after repairs were completed. The plant remained at essentially full power until September 27, when power was reduced to approximately 25% to allow an oil addition to Primary Coolant Pump, P-50D. Power was increased following the oil addition, and the plant was returned to essentially full power on September 29. The plant completed the month at essentially full power.
OF OPERATING EXPERIENCE FOR SEPTEMBER 2002 The plant operated at essentially full power (at greater than 99%) until September 21, when power was reduced to approximately 89% for repairs to Heater Drain Pump, P-1 OB. The plant was returned to essentially full power on the same day after repairs were completed. The plant remained at essentially full power until September 27, when power was reduced to approximately 25% to allow an oil addition to Primary Coolant Pump, P-50D. Power was increased following the oil addition, and the plant was returned to essentially full power on September 29. The plant completed the month at essentially full power.


OPERATING DATA REPORT DOCKET NO         50-255 DATE (Mo-Da-Yr)   10-05-02 COMPLETED BY: HAReyner TELEPHONE (269) 764-2057 OPERATING STATUS:                                                                                   NOTES:
OPERATING DATA REPORT DOCKET NO 50-255 DATE (Mo-Da-Yr) 10-05-02 COMPLETED BY: HAReyner TELEPHONE (269) 764-2057 OPERATING STATUS:
: 1. UNIT NAME                                                     Palisades 2 REPORTING PERIOD (YrMoDa-YrMoDa):                               020901-020930 3 LICENSED THERMAL POWER (Mwt)                                   2530 4 NAMEPLATE RATING (GROSS Mwe)                                   811.7 5 DESIGN ELECTRICAL RATING (NET Mwe)                             805 6 MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe)                         770
NOTES:
: 7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) -                        730
: 1. UNIT NAME Palisades 2 REPORTING PERIOD (YrMoDa-YrMoDa):
... __ 8._IF.CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS           3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS._
020901-020930 3 LICENSED THERMAL POWER (Mwt) 2530 4 NAMEPLATE RATING (GROSS Mwe) 811.7 5 DESIGN ELECTRICAL RATING (NET Mwe) 805 6 MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770
: 7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) 730 8._IF.CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS._
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe)'
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe)'
10 REASONS FOR RESTRICTIONS, IFANY:
10 REASONS FOR RESTRICTIONS, IF ANY:
This Month       Yr-to-Date           Cumulative
This Month Yr-to-Date Cumulative
: 11. HOURS IN REPORTING PERIOD                                               720.0         6551 0             2698460
: 11.
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                   720.0         61594               167386 1 13   REACTOR RESERVE SHUTDOWN HOURS                                           -                -
HOURS IN REPORTING PERIOD 720.0 6551 0 2698460
14   HOURS GENERATOR ON-LINE                                                 720.0         60656               1618561
: 12.
: 15. UNIT RESERVE SHUTDOWN HOURS                                               -              -
NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 61594 167386 1 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 720.0 60656 1618561
16   GROSS THERMAL ENERGY GENERATED (MWH)                               1776903       15035608             366160185
: 15.
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                               572776       4933301             116692329 18   NET ELECTRICAL ENERGY GENERATED (MWH)                                 545479       4703876             110397691 19   UNIT SERVICE FACTOR                                                   1000%           926%                   600%
UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 1776903 15035608 366160185
: 20. UNIT AVAILABILITY FACTOR                                             100.0%           92.6%                 60.0%
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 572776 4933301 116692329 18 NET ELECTRICAL ENERGY GENERATED (MWH) 545479 4703876 110397691 19 UNIT SERVICE FACTOR 1000%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                 1038%           984%                   590%
926%
22   UNIT CAPACITY FACTOR (USING DER NET)                                   94.1%           892%                   508%
600%
23   UNIT FORCED OUTAGE RATE                                                 00%             7.4%                 255%
: 20.
UNIT AVAILABILITY FACTOR 100.0%
92.6%
60.0%
: 21.
UNIT CAPACITY FACTOR (USING MDC NET) 1038%
984%
590%
22 UNIT CAPACITY FACTOR (USING DER NET) 94.1%
892%
508%
23 UNIT FORCED OUTAGE RATE 00%
7.4%
255%
Based on condenser backpressure Weighted Average (635 MWe used as MDC Net prior to October 1985)
Based on condenser backpressure Weighted Average (635 MWe used as MDC Net prior to October 1985)


C' I- I REPORT MONTH September 2002                                                                                               DOCKET NO        50-255 UNIT NAME    Palisades DATE(MoIDafYr)  10/05/02 COMPLETED BY    HAReyner TELEPHONE    269-764-2057 UNIT SHUTDOWNS No. Date     Type                     Duration Reason'        Method of              Cause / Corrective 2
REPORT MONTH September 2002 UNIT SHUTDOWNS No.
(YrMoDa) F: Forced               (Hours)                   Shutting Down          Actions Comments S: Scheduled NO SHUTDOWNS THIS MONTH
Date Type Duration (YrMoDa)
: 1.                                2.
F: Forced (Hours)
Reason                           Method:
S: Scheduled NO SHUTDOWNS THIS MONTH
A-Equipment Failure (Explain)     1-Manual B-Maintenance or Test             2-Manual Trip/Scram C-Refueling                       3-Automatic Trip/Scram D-Regulatory Restriction         4-Other (Explain)
: 1.
E-Operator Training & License Examination F-Administrative G-Operational Error (Expla n)
Reason A-Equipment Failure (Explain)
H-Other (Explain)}}
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Expla n)
H-Other (Explain)
Reason' Method of Shutting Down 2
C' I-I Cause / Corrective Actions Comments
: 2.
Method:
1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)
DOCKET NO 50-255 UNIT NAME Palisades DATE(MoIDafYr) 10/05/02 COMPLETED BY HAReyner TELEPHONE 269-764-2057}}

Latest revision as of 15:21, 16 January 2025

September 2002 Monthly Operating Report for Palisades
ML022980510
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/09/2002
From: Lahti L
Consumers Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML022980510 (4)


Text

Committed to Nuclear Excellence, Palisades Nuclear Plant Operated by Nuclear Management Company, LLC October 9, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk

-Washington,_DC-20555-0001---.-.

DOCKET 50-255 - LICENSE DPR PALISADES NUCLEAR PLANT LICENSEE REPORT OF MONTHLY OPERATING DATA Attached are the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September 2002.

If you have any questions, please contact Mr. Scott Hawn at (269) 764-3179.

Laurie A. Lahti Manager, Licensing CC Regional Administrator, USNRC, Region Ill NRC Resident Inspector, Palisades LBrandon, Michigan Department of Environmental Quality RJAben, Michigan Department of Labor

-RDWhale,-'Michigan-Public-ServicE&Commission Records Center, INPO SMMclntyre, P-26-204 Attachment "27780 Blue Star Memonal Highway ; Covert, MI 49043 Telephone: 616 764.2000

SUMMARY

OF OPERATING EXPERIENCE FOR SEPTEMBER 2002 The plant operated at essentially full power (at greater than 99%) until September 21, when power was reduced to approximately 89% for repairs to Heater Drain Pump, P-1 OB. The plant was returned to essentially full power on the same day after repairs were completed. The plant remained at essentially full power until September 27, when power was reduced to approximately 25% to allow an oil addition to Primary Coolant Pump, P-50D. Power was increased following the oil addition, and the plant was returned to essentially full power on September 29. The plant completed the month at essentially full power.

OPERATING DATA REPORT DOCKET NO 50-255 DATE (Mo-Da-Yr) 10-05-02 COMPLETED BY: HAReyner TELEPHONE (269) 764-2057 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades 2 REPORTING PERIOD (YrMoDa-YrMoDa):

020901-020930 3 LICENSED THERMAL POWER (Mwt) 2530 4 NAMEPLATE RATING (GROSS Mwe) 811.7 5 DESIGN ELECTRICAL RATING (NET Mwe) 805 6 MAXIMUM DEPENDABLE CAPACITY (GROSS Mwe) 770

7. MAXIMUM DEPENDABLE CAPACITY (NET Mwe) 730 8._IF.CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS._
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe)'

10 REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11.

HOURS IN REPORTING PERIOD 720.0 6551 0 2698460

12.

NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 61594 167386 1 13 REACTOR RESERVE SHUTDOWN HOURS 14 HOURS GENERATOR ON-LINE 720.0 60656 1618561

15.

UNIT RESERVE SHUTDOWN HOURS 16 GROSS THERMAL ENERGY GENERATED (MWH) 1776903 15035608 366160185

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 572776 4933301 116692329 18 NET ELECTRICAL ENERGY GENERATED (MWH) 545479 4703876 110397691 19 UNIT SERVICE FACTOR 1000%

926%

600%

20.

UNIT AVAILABILITY FACTOR 100.0%

92.6%

60.0%

21.

UNIT CAPACITY FACTOR (USING MDC NET) 1038%

984%

590%

22 UNIT CAPACITY FACTOR (USING DER NET) 94.1%

892%

508%

23 UNIT FORCED OUTAGE RATE 00%

7.4%

255%

Based on condenser backpressure Weighted Average (635 MWe used as MDC Net prior to October 1985)

REPORT MONTH September 2002 UNIT SHUTDOWNS No.

Date Type Duration (YrMoDa)

F: Forced (Hours)

S: Scheduled NO SHUTDOWNS THIS MONTH

1.

Reason A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Expla n)

H-Other (Explain)

Reason' Method of Shutting Down 2

C' I-I Cause / Corrective Actions Comments

2.

Method:

1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Other (Explain)

DOCKET NO 50-255 UNIT NAME Palisades DATE(MoIDafYr) 10/05/02 COMPLETED BY HAReyner TELEPHONE 269-764-2057