ML023520029: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Kewaunee Nuclear Power | {{#Wiki_filter:NMC CommItted to Nuclear Excellene~ | ||
Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920 388 2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 920 755.2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-106 December 6, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen: | |||
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant forNovember 2002 is enclosed in accordance with Technical Specification 6.9.a.3. | Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant forNovember 2002 is enclosed in accordance with Technical Specification 6.9.a.3. | ||
Sincerely, Thomas Coutu | Sincerely, 6Z Thomas Coutu Site Vice President MLA Enclosure cc - | ||
US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning | |||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
UNIT NAME | UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD | ||
: 1. | |||
2. | |||
50-305 KEWAUNEE DECEMBER 4,2002 MARY ANDERSON (920) 388-8453 NOVEMBER, 2002 DESIGN ELECTRICAL RATING (MWE-NET) | |||
: 3. NUMBER OF HOURS REACTOR WAS CRITICAL | MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 535 511 MONTH! | ||
: 4. NUMBER OF HOURS GENERATOR WAS ON LINE | YEAR-TO-DATE | ||
: 5. UNIT RESERVE SHUTDOWN HOURS | : 3. | ||
: 6. NET ELECTRICAL ENERGY (MWVH) | NUMBER OF HOURS REACTOR WAS CRITICAL | ||
: 4. | |||
NUMBER OF HOURS GENERATOR WAS ON LINE | |||
: 5. | |||
UNIT RESERVE SHUTDOWN HOURS | |||
: 6. | |||
NET ELECTRICAL ENERGY (MWVH) 720.0 720.0 0.0 380890 7784.8 7770.7 0.0 4077891 CUMULATIVE 212750.7 210549.3 10.0 105251388 Notes: Unit continues to operate at 100% | |||
power. | |||
UNIT SHUTDOWNS DOCKET NO. | UNIT SHUTDOWNS DOCKET NO. | ||
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee December 4, 2002 Mary Anderson (920) 388-8453 November, 2002 (1) | |||
F: Forced S: Scheduled (2) | |||
Reason: | |||
E - Operator Training & License Examination | A - Equipment Failure (Explain) | ||
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain) | |||
H - Other (Explain) | H - Other (Explain) | ||
(3) | |||
Method: | |||
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain) | |||
Continuation | |||
==SUMMARY== | ==SUMMARY== | ||
The unit continues to operate at 100% steady state power}} | The unit continues to operate at 100% steady state power METHOD OF NO. | ||
DATE Type DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours) | |||
DOWN REACTOR3 No shutdowns or power reductions in November}} | |||
Latest revision as of 13:39, 16 January 2025
| ML023520029 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 12/06/2002 |
| From: | Coutu T Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-02-106 | |
| Download: ML023520029 (3) | |
Text
NMC CommItted to Nuclear Excellene~
Kewaunee Nuclear Power Plant N490 Highway 42 Kewaunee, WI 54216-9511 920 388 2560 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241 920 755.2321 Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-106 December 6, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:
Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant forNovember 2002 is enclosed in accordance with Technical Specification 6.9.a.3.
Sincerely, 6Z Thomas Coutu Site Vice President MLA Enclosure cc -
US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD
- 1.
2.
50-305 KEWAUNEE DECEMBER 4,2002 MARY ANDERSON (920) 388-8453 NOVEMBER, 2002 DESIGN ELECTRICAL RATING (MWE-NET)
MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 535 511 MONTH!
YEAR-TO-DATE
- 3.
NUMBER OF HOURS REACTOR WAS CRITICAL
- 4.
NUMBER OF HOURS GENERATOR WAS ON LINE
- 5.
UNIT RESERVE SHUTDOWN HOURS
- 6.
NET ELECTRICAL ENERGY (MWVH) 720.0 720.0 0.0 380890 7784.8 7770.7 0.0 4077891 CUMULATIVE 212750.7 210549.3 10.0 105251388 Notes: Unit continues to operate at 100%
power.
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-305 Kewaunee December 4, 2002 Mary Anderson (920) 388-8453 November, 2002 (1)
F: Forced S: Scheduled (2)
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
Method:
1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Other (Explain)
Continuation
SUMMARY
The unit continues to operate at 100% steady state power METHOD OF NO.
DATE Type DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours)
DOWN REACTOR3 No shutdowns or power reductions in November