ML032661026: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML032661026 | |||
| issue date = 09/11/2003 | |||
| title = August 2003 Monthly Operating Report Turkey Point Units 3 and 4 | |||
| author name = Jones T | |||
| author affiliation = Florida Power & Light Co | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000250, 05000251 | |||
| license number = DPR-031, DPR-041 | |||
| contact person = | |||
| case reference number = GL-97-002, L-2003-229 | |||
| document type = Letter, License-Monthly Operating Report | |||
| page count = 3 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:FPL SEP 1 1 L-2003-229 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: | |||
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operatina Report - Auaust 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4. | |||
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC. | |||
an FPL Group company I | |||
DOCKET NO.: | |||
UNIT: | |||
DATE: | |||
COMPLETED BY: | |||
TELEPHONE: | |||
50-250 Turkey Point Unit 3 09102/2003 Linda Tudor (305) 246-6408 Reporting Period August. 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 | |||
______^._i__ | |||
Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5064.8 199604.2 No. of hours enerator was on line (service hours) 744.0 5022.8 197231 Unit reserve shutdown hours 0 | |||
0 121.8 Net Electrical Energy (MWH) 508328 3409008 128768085 UNIT SHUTDOWNS No. | |||
Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) | |||
(1) | |||
Shutting S=Scheduled Down (2) | |||
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) | |||
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain) | |||
H -Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain) | |||
Summary Of Monthly Operating Experience UNIT 3 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 15 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 3 RETURNED TO 100% POWER ON AUGUST 17 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003. | |||
DOCKET NO.: | |||
UNIT: | |||
DATE: | |||
COMPLETED BY: | |||
TELEPHONE: | |||
50-251 Turkey Point Unit 4 09/02/03 Linda Tudor (305) 246-6408 Reporting Period August. 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5831 197193.7 No. of hours generator was on line (service hours) 744.0 5831 192776.2 Unit reserve shutdown hours 0 | |||
0 577.2 Net Electrical Energy (MWH) 503572 4065256 127024346 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2-Manual Trip/Scram C -Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain) | |||
F - Administrative G - Operational Error (Explain) | |||
H - Other Summary Of Monthly Operating Experience UNIT 4 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 1 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 4 RETURNED TO 100% POWER ON AUGUST 4 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.}} | |||
Latest revision as of 07:43, 16 January 2025
| ML032661026 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/11/2003 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2003-229 | |
| Download: ML032661026 (3) | |
Text
FPL SEP 1 1 L-2003-229 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operatina Report - Auaust 2003 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the August 2003 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company I
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 09102/2003 Linda Tudor (305) 246-6408 Reporting Period August. 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
______^._i__
Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5064.8 199604.2 No. of hours enerator was on line (service hours) 744.0 5022.8 197231 Unit reserve shutdown hours 0
0 121.8 Net Electrical Energy (MWH) 508328 3409008 128768085 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G -Operational Error (Explain)
H -Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience UNIT 3 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 15 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 3 RETURNED TO 100% POWER ON AUGUST 17 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 09/02/03 Linda Tudor (305) 246-6408 Reporting Period August. 2003 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 744.0 5831 197193.7 No. of hours generator was on line (service hours) 744.0 5831 192776.2 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 503572 4065256 127024346 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2-Manual Trip/Scram C -Refueling 3 -Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summary Of Monthly Operating Experience UNIT 4 OPERATED AT ESSENTIALLY 100% POWER FOR THE MONTH OF AUGUST 2003, EXCEPT FOR A UNIT REDUCTION OF POWER ON AUGUST 1 FOR TURBINE PLANT COOLING WATER HEAT EXCHANGER CLEANING. UNIT 4 RETURNED TO 100% POWER ON AUGUST 4 AND REMAINED AT ESSENTIALLY 100% POWER FOR THE REMAINDER OF THE MONTH OF AUGUST 2003.