{{#Wiki_filter:ECG Section ii Pg 1 o f 5 HOPE CREEK EVENT CLASSIFICATION GUIDE Glossary of Acronyms & Abbreviations Section ii AAAG  Accident Assessment Advisory Group (Delaware)
{{#Wiki_filter:ECG Section ii Pg 1 of5 AAAG AC ADS ALARA APRM A RI ARM ASAP ASM AS ATWS BKGD BKR BNE CACS CAS CCPM CEDE CDE CFR CIS CNTMT CP CPM CR CREF CRIDS CRD css DC DAPA CDE DEI DEMA DEP HOPE CREEK EVENT CLASSIFICATION GUIDE Glossary of Acronyms & Abbreviations Section ii Accident Assessment Advisory Group (Delaware)
AC    Alternating Current ADS  Automatic Depressurization System ALARA As Low As Reasonably Achievable APRM  Average Power Range Monitor A RI  Alternate Rod Insertion ARM  Area Radiation Monitor ASAP  As Soon As Possible ASM  Administrative Support Manager AS    Administrative Supervisor ATWS  Anticipated Transient Without Scram BKGD  Background BKR  Breaker (electrical circuit)
Alternating Current Automatic Depressurization System As Low As Reasonably Achievable Average Power Range Monitor Alternate Rod Insertion Area Radiation Monitor As Soon As Possible Administrative Support Manager Administrative Supervisor Anticipated Transient Without Scram  
BNE  Bureau of Nuclear Engineering (NJDEPE)
CACS  Containment Atmosphere Control System CAS  Central Alarm Station CCPM  Corrected Counts per Minute CEDE  Committed Effective Dose Equivalent CDE  Committed Dose Equivalent              - _ -      -*
4 CFR  Code of Federal Regulations          $
CIS  Containment Isolation System          r-  -    -- --- I -    ~
CNTMT Containment (Bamer)                              . . a -
U  I CP    Control Point                              - -.            I CPM CR Counts Per Minute Control Room I      >I      . - -
* e -
CREF  Control Rmm Emergency Filter System CRIDS Control Room Integrated Display System CRD  Control Rod Drive css  Core Spray System DC    Direct Current DAPA  Drywell Atmosphere Post Accident (Radiation monitor)
CDE  Deep Dose Equivalent DEI  Dose Equivalent Iodine DEMA  Delaware Emergency Management Agency DEP  Department of Environmental Protection (NJ)
HCGS                                                                            Rev. 00


ECG Section ii Pg2of5 DID      - Direct Inward Dial (phone system)
===Background===
DLD      - Drywell Leak Detection DOE        Department of Energy DOT        Department of Transportation DPCC/DCR - Discharge Prevention, Containment, & Countermeasures/
Breaker (electrical circuit)
Discharge Cleanup & Removal Plan DPM        Disintegrations per Minute DRCF      Dose Rate Conversion Factor EACS      ESF Equipment Area Cooling System EAL        Emergency Action Level EAS        Emergency Alert System (Broadcast)
Bureau of Nuclear Engineering (NJDEPE)
EC        Emergency Coordinator ECCS      Emergency Core Cooling Systems ECG        Emergency Classification Guide EDG        Emergency Diesel Generator ED0        Emergency Duty Officer EMRAD      Emergency Radio (NJ)
Containment Atmosphere Control System Central Alarm Station Corrected Counts per Minute Committed Effective Dose Equivalent Committed Dose Equivalent 4
ENC        Emergency News Center ENS        Emergency Notification System (NRC)
Code of Federal Regulations Containment Isolation System r-I -
EOC        Emergency Operations Center (NJ & DE)
~
EOF        Emergency Operations Facility EOP        Emergency Operating Procedure PA        Emergency Preparedness Advisor EPA        Environmental Protection Agency EPC        Emergency Preparedness Coordinator EPIP      Emergency Plan Implementing Procedure EPZ        Emergency Planning Zone EQPT      Equipment ERDS      Emergency Response Data System ERM        Emergency Response Manager ERO        Emergency Response Organization ESF        Engineered Safety Feature ESSX      Electronic Switch System Exchange (Centrex)
Containment (Bamer)
FC        Fuel Clad (Barrier)
U I
FFD        Fitness For Duty FRVS      Filtration, Recirculation, and Ventilation System FTS        Federal Telecommunications System (NRC)
Control Point Counts Per Minute I
GE        General Emergency HCLL      Heat Capacity Level Limit HCGS      Hope Creek Generating Station HCGS                                                             Rev. 00
> I e
Control Room Control Rmm Emergency Filter System Control Room Integrated Display System Control Rod Drive Core Spray System
. a -
I Direct Current Drywell Atmosphere Post Accident (Radiation monitor)
Deep Dose Equivalent Dose Equivalent Iodine Delaware Emergency Management Agency Department of Environmental Protection (NJ)
HCGS Rev. 00  


ECG Section ii P g j of5 HCTL  - Heat Capacity Temperature Limit HEPA    High Efficiency Particulate Absorbers HPCI    High Pressure Coolant Injection HTV    - Hardened Torus Vent HVAC    Heating, Ventilation & Air Conditioning HWCI    Hydrogen Water Chemical Injection HX      Heat Exchanger IAW      In Accordance With IC    - Initiating Condition ICMF  - Initial Contact Message Form IDLH    Immediately Dangerous to Life and Health IRM      Intermediate Range Monitor I/S      In Service KI    - Potassium Iodide KV      Kilovolt LAC      Lower Alloways Creek LCO    - Limiting Condition for Operation LDE    - Lens Dose Equivalent LEL    - Lower Explosive Limit LLD    - Lowest Level Detectable LOCA  - Loss of Coolant Accident LOP    - Loss of Offsite Power LPCI  - Low Pressure Coolant Injection LPZ      Low Population Zone MCR    - Main Control Room MDA    - Minimum Detectable Amount MEA    - Minimum Exclusion Area MEES  - Major Equipment & Electrical Status (Form)
DID DLD DOE DOT DPCC/DCR DPM DRCF EACS EAL EAS EC ECCS ECG EDG ED0 EMRAD ENC ENS EOC EOF EOP PA EPA EPC EPIP EPZ EQPT ERDS ERM ERO ESF ESSX FC FFD FRVS FTS GE HCLL HCGS ECG Section ii P g 2 o f 5 Direct Inward Dial (phone system)
MET    - Meteorological M.O.U. Memorandum of Understanding MRO    - Medical Review Officer MSIV  - Main Steam Isolation Valve MSIVSS - Main Steam Isolation Valve Sealing System MSL    - Main Steam Line NAWAS    National Attack Warning Alert System NCO      Nuclear Control Operator NDAB    Nuclear Department Administration Building (TB2)
Drywell Leak Detection Department of Energy Department of Transportation Discharge Prevention, Containment, & Countermeasures/
NE0      Nuclear Equipment Operator NETS    Nuclear Emergency Telecommunications System HCGS                                                       Rev. 00
Discharge Cleanup & Removal Plan Disintegrations per Minute Dose Rate Conversion Factor ESF Equipment Area Cooling System Emergency Action Level Emergency Alert System (Broadcast)
Emergency Coordinator Emergency Core Cooling Systems Emergency Classification Guide Emergency Diesel Generator Emergency Duty Officer Emergency Radio (NJ)
Emergency News Center Emergency Notification System (NRC)
Emergency Operations Center (NJ & DE)
Emergency Operations Facility Emergency Operating Procedure Emergency Preparedness Advisor Environmental Protection Agency Emergency Preparedness Coordinator Emergency Plan Implementing Procedure Emergency Planning Zone Equipment Emergency Response Data System Emergency Response Manager Emergency Response Organization Engineered Safety Feature Electronic Switch System Exchange (Centrex)
Fuel Clad (Barrier)
Fitness For Duty Filtration, Recirculation, and Ventilation System Federal Telecommunications System (NRC)
General Emergency Heat Capacity Level Limit Hope Creek Generating Station HCGS Rev. 00  


ECG Section ii Pg4of5 NFE    -  Nuclear Fuels Engineer NFPB      Normal Full Power Background NJSP      New Jersey State Police NOAA      National Oceanographic and Atmospheric Administration NPV      North Plant Vent NRC      Nuclear Regulatory Commission NS S  -  Nuclear Shift Supervisor NSSSS    Nuclear Steam Supply Shutoff System NSTA  -  Nuclear Shift Technical Advisor NUMARC -  Nuclear Management and Resources Council NWS    -  National Weather Service OBE    -  Operating Basis Earthquake OCA    -  Owner Controlled Area ODCM  -  Offsite Dose Calculation Manual OEM    -  Office of Emergency Management (NJ)
HCTL HEPA HPCI HTV HVAC HWCI HX IAW IC ICMF IDLH IRM I/S KI KV LAC LCO LDE LEL LLD LOCA LOP LPCI LPZ MCR MDA MEA MEES MET M.O.U.
OHA      Overhead Annunciator OPCON  -  Operating Condition OSB      Operational Status Board (Form) osc      Operations Support Center PAG    -  Protective Action Guideline PAR    -  Protective Action Recommendation PASS      Post Accident Sample System PC    -  Primary Containmen t (Barrier)
MRO MSIV MSIVSS MSL NAWAS NCO NDAB NE0 NETS Heat Capacity Temperature Limit High Efficiency Particulate Absorbers High Pressure Coolant Injection Hardened Torus Vent Heating, Ventilation & Air Conditioning Hydrogen Water Chemical Injection Heat Exchanger In Accordance With Initiating Condition Initial Contact Message Form Immediately Dangerous to Life and Health Intermediate Range Monitor In Service Potassium Iodide Kilovolt Lower Alloways Creek Limiting Condition for Operation Lens Dose Equivalent Lower Explosive Limit Lowest Level Detectable Loss of Coolant Accident Loss of Offsite Power Low Pressure Coolant Injection Low Population Zone Main Control Room Minimum Detectable Amount Minimum Exclusion Area Major Equipment & Electrical Status (Form)
PCIG  -  Primary containment Instrument Gas System PCIS  -  Primary Containment Isolation System PS IG  -  Pounds Square Inch Gauge RAD    -  Radiation RAL    -  Reportable Action Level RC    -  Reactor Coolant RCA    -  Radiologically Controlled Area RCAM  -  Repair and Corrective Action Mission RCIC  -  Reactor Core Isolation Cooling RCS    -  Reactor Coolant System (Bamer)
Meteorological Memorandum of Understanding Medical Review Officer Main Steam Isolation Valve Main Steam Isolation Valve Sealing System Main Steam Line National Attack Warning Alert System Nuclear Control Operator Nuclear Department Administration Building (TB2)
RHR      Residual Heat Removal (Containment Heat Removal)
Nuclear Equipment Operator Nuclear Emergency Telecommunications System ECG Section ii P g j of5 HCGS Rev. 00  
RM        Recovery Manager RMO    -  Recovery Management Organization RMS    - Radiation Monitoring System RPS      Radiation Protection Supervisor
' RPS      Reactor Protection System RPV      Reactor Pressure Vessel RRCS      Redundant Reactivity Control System HCGS                                                             Rev. 00


ECG Section ii Pg5of5 RS M Radiological Support Manager RWCU  Reactor Water Cleanup (System)
NFE NFPB NJSP NOAA NPV NRC NS S NSSSS NSTA NUMARC N W S OBE OCA ODCM OEM OHA OPCON OSB osc PAG PAR PASS PC PCIG PCIS PS IG RAD RAL RC RCA RCAM RCIC RCS RHR RM RMO RMS RPS RPV RRCS RPS ECG Section ii P g 4 o f 5 Nuclear Fuels Engineer Normal Full Power Background New Jersey State Police National Oceanographic and Atmospheric Administration North Plant Vent Nuclear Regulatory Commission Nuclear Shift Supervisor Nuclear Steam Supply Shutoff System Nuclear Shift Technical Advisor Nuclear Management and Resources Council National Weather Service Operating Basis Earthquake Owner Controlled Area Offsite Dose Calculation Manual Office of Emergency Management (NJ)
SACS  Safety Auxiliaries Cooling System SAE  Site Area Emergency SAM  Severe Accident Management SAS  Secondary Alarm Station (Security)
Overhead Annunciator Operating Condition Operational Status Board (Form)
SBO  Station Blackout SCBA  Self Contained Breathing Apparatus SCP  Security Contingency Procedure SDE  Shallow Dose Equivalent SDM  Shutdown Margin SLC  Standby Liquid Control SJAE  Steam Jet Air Ejector SNM  Special Nuclear Material SNSS  Senior Nuclear Shift Supervisor sos  Systems Operations Supervisor (Security)
Operations Support Center Protective Action Guideline Protective Action Recommendation Post Accident Sample System Primary Contain men t (Barrier)
SPDS  Safety Parameter Display System SPV  South Plant Vent SRM  Source Range Monitor SRPT  Shift Radiation Protection Technician SRV  Safety Relief Valve SSCL  Station Status Checklist SSE  Safe Shutdown Earthquake ssws  Station Service Water System SSNM  Strategic Special Nuclear Material TAF  Top of Active Fuel TDR  Technical Document Room TEDE  Total Effective Dose Equivalent TIP  Traversing Incore Probe TLV  Threshold Limit Value T/S  Technical Specifications TSC  Technical Support Center TSS  Technical Support Supervisor TSTL  Technical Support Team Leader TSTM  Technical Support Team Member UE    Unusual Event UFSAR Updated Final Safety .4nalysis Report UHS  Ultimate Heat Sink USCG  United States Coast Guard VDC  Volts Direct Current WB    Whole Body HCGS                                           Rev. 00
Primary containment Instrument Gas System Primary Containment Isolation System Pounds Square Inch Gauge Radiation Reportable Action Level Reactor Coolant Radiologically Controlled Area Repair and Corrective Action Mission Reactor Core Isolation Cooling Reactor Coolant System (Bamer)
: r.  .
Residual Heat Removal (Containment Heat Removal)
F)
Recovery Manager Recovery Management Organization Radiation Monitoring System Radiation Protection Supervisor Reactor Protection System Reactor Pressure Vessel Redundant Reactivity Control System HCGS Rev. 00
          *pl, 3
 
IiCCiS liCG 1.0 Fuel Clad Challenge                                                                                              R W no I or I 1.1 RCS Activity Initiating                                                                         Fuel Clad Degradation Condition                                             ............                        ....  ~    ...                                  . ...._ . .
RS M RWCU SACS SAE SAM SAS SBO SCBA SCP SDE SDM SLC SJAE SNM SNSS sos SPDS SPV SRM SRPT SRV SSCL SSE ssws SSNM TAF TDR TEDE TIP TLV T/S TSC TSS TSTL TSTM UE UFSAR UHS USCG VDC WB Radiological Support Manager Reactor Water Cleanup (System)
                                                                                                              . I----
Safety Auxiliaries Cooling System Site Area Emergency Severe Accident Management Secondary Alarm Station (Security)
OPCON                                                                                                            (  1,2,3,4
Station Blackout Self Contained Breathing Apparatus Security Contingency Procedure Shallow Dose Equivalent Shutdown Margin Standby Liquid Control Steam Jet Air Ejector Special Nuclear Material Senior Nuclear Shift Supervisor Systems Operations Supervisor (Security)
                                                                                                                                  )                                  1,2,3 1
Safety Parameter Display System South Plant Vent Source Range Monitor Shift Radiation Protection Technician Safety Relief Valve Station Status Checklist Safe Shutdown Earthquake Station Service Water System Strategic Special Nuclear Material Top of Active Fuel Technical Document Room Total Effective Dose Equivalent Traversing Incore Probe Threshold Limit Value Technical Specifications Technical Support Center Technical Support Supervisor Technical Support Team Leader Technical Support Team Member Unusual Event Updated Final Safety.4nalysis Report Ultimate Heat Sink United States Coast Guard Volts Direct Current Whole Body ECG Section ii Pg5of5 HCGS Rev. 00  
EAL #                  1.l.l.a                                                                                    I.l.l    .c                                    1.1.2 I                 IF                                                                                        IF I               .    .-      . .
* pl, 3
E     l M    I I        Reactor Coolant                  Valid Offgas Pretreatment                            Valid Main Steam Line E     l R      I        Sample Activity                              Radiation Monitor                          Radiation Monitor I          > 4 pCi/gm                              (9RX62 1 / 9RX622)                        High High Alarm Condition G     I Dose Equivalent                        High Alarm Condition                          ( 2 3 times Normal Full 1-131                          ( 2 2.2E+04 mRem/hr)                              Power Background)
ANY SRV is determined to be Stuck Open Initiating Condition OPCON EAL #
N     I C      I                             .. L              .
I I
Y    I I
M I
I A       I                I     .      .......                ....  -.  .
I R
C      I T     I                                                                                                                                                   ANY SRV I                                                                                                                            AND I                                                                                                                                                  is determined 0 1                                                                                                                                                             to be N    I I
I I
I
E l
                                                                                  /r                                                                          Stuck Open L    I I                                                                    +                            -  -
E l
NOTE:
G I
Refer to Section 3.0, V    I                                                                                    Fission Product Barrier Table E    t                                                                                      prior to Event Classification L    I                                                                                                             ~
N I
S _ _ II I
Y I
Action                                                      Refer to Attachment 1                                                                  Refer to Attachment 2 Required                                                        UNUSUAL EVENT                                                                                    ALERT
I I
A I
T I
0 1 C
I C
I I  


m x s ECO 2.0 RCS Challenge                                                                                      Rev. 00 Pagc I of I 2.1 RCS Leakage Initiating                                                                                      RCS Leakage Condition                          __  - ..
I N
OPCON                  (    1,2, 3    )                        ( --Tz-)  __                              . ._. -        .. ..
I L
('    1, 2, 3      1 EAL ##                    2.1 .l.a                                    2.1 -1.b                                  2.1 .l.c                                2.1.1.d 1                  IF                                          IF                                        IF                                        IF I                       . _-                -              - --         - -     -     -...___                    -  -.. .
I V
E      l  I                                                                                        Reactor Coolant System M      I I      Reactor Coolant System                  Reactor Coolant System                                                                Successful Isolation of a Identified Leakage E      l    Pressure Boundary Leakage                  Unidentified Leakage                                                                  Reactor Recirc Pump R    I                                                                                                      > 25 gpm I            > 10 gpm                                    > 10 gpm                                                                    Dual Seal Failure within averaged over any G      I      (Using I O minute average)               (Using 10 minute average)                                                              10 minutes of recognition 24 hour period I                                     1.-      . ..  . .  ..-.. ....    ..._    .                                              -    - __ - - - . -
I L
N cY II I
I S
I I                                  .-              ._ .. -.
I I
I                                                                                      THEN A      I C      I T      I I
I I
      '    I                                                                                                          - -    - -      - __ - - _.
E t
0 1                                                                                                                            NOTE:
_ _ I Action Required 1.l.l
I N      l                                                                                      . __            Refer to Section 3.0, I                                                                                                    Fission Product Barrier Table I
.a IF Reactor Coolant Sample Activity
L      I                                                                                                      prior to Event Classification
> 4 pCi/gm Dose Equivalent 1-131 I
_ _ _ _ -~                       __  .
: r..
V      I                                                                                                                                                        iI ,
F) 1.0 Fuel Clad Challenge 1.1 RCS Activity Fuel Clad Degradation
i L      I S      I
~
          - .I Action                                                                                Refer to Attachment I Required                                                                              UNUSUAL EVENT
Valid Offgas Pretreatment Radiation Monitor (9RX62 1 / 9RX622)
High Alarm Condition
( 2 2.2E+04 mRem/hr)
L
. I----
(
1,2,3,4 )
I  
.l.l
.c IF Valid Main Steam Line Radiation Monitor High High Alarm Condition
( 2 3 times Normal Full Power Background)
Refer to Attachment 1 UNUSUAL EVENT..
AND
/r NOTE:
Refer to Section 3.0, Fission Product Barrier Table prior to Event Classification  
~  
+
IiCCiS liCG R W no I or I 1,2,3 1
1.1.2 I
Refer to Attachment 2 ALERT


                                                                                                                                                                                                ,'<7
m x s ECO Rev. 00 Pagc I of I 2.0 RCS Challenge 2.1 RCS Leakage RCS Leakage Initiating Condition
                                                                                                                                                                                                    \
( --Tz-)
                -.i                                                                                                                                                                                4 HCGS ECG 4.0 E C Discretion                                                                                  Kcv. 00 Pagc I of 1 4.1---Emergency                    Coordinator Discretion                                                            .
2.1 -1.b IF Reactor Coolant System Unidentified Leakage
                                                          ..               r
> 10 gpm (Using 10 minute average)
                                                                                    - _ _ ~                            _--.-    .-            -.            ,,--
('
Other Conditions Exist Wlirch Otlicr Coiiditions Exist                              Other Conditions Exist                Othcr Conditions Exist Which ' \
1, 2, 3 1
i
(
(
                                                                  ~
1,2, 3
Wliicli In the Judgiiient ol'tlie                    Which hi the Judgment oftlie          hi the Jtidgment of the Emergency        hi the Judgment of the Emergency Ini tiat ing          Ihicrgcncy Coordinator Warrant                        llmcrgeiicy Coordinator Warrant        Coordinator Warrant Declaration                        Warrant Dcxlaration of Condition I )cciiiriitioii ol'ilii IJn\lstial Evcnt .  '            Dtclaratioti ol' an Alert a Site Area Eiiicrgency
)
                                                                                                                              ..                       1
2.1.l
                                                                                                                                                                \-
.a IF Reactor Coolant System Pressure Boundary Leakage
a General Emergency OPCON                            i.        All                                      i        All                                    - ..
> 10 gpm (Using IO minute average)
All
I OPCON 2.1.1.d IF Successful Isolation of a Reactor Recirc Pump Dual Seal Failure within 10 minutes of recognition I
                                                                                                                                                    ')                   (-    __ _---Am EAI, #                              -
2.1.l
4.1.1                                                4.1.2                                     -
.c IF EAL ##
4.1.3                                4.1.4 I
1 I
I                              IF                                                 IF                                          IF                                  IF E    I                                                        I  I                                      I I
M I
hI    I Events are in progress or I
I R
1                                             Events are in progress or I                                                              Events are in progress or            I    Events are in progress or E    I    , have occurred which, in the                                                                      have occurred which, in the              have occurred which, in the I
have occurred which, in the R            judgment of the Emergency                                                                                  judgment of the              judgment of the Emergency I                                                            judgment of the Emergency G      I          Coordinator, indicate a                                                                        Emergency Coordinator,                    Coordinator, indicate an I
I                                                             Coordinator, indicate E          i      I'otcnthl Degradation                                                                                      indicate an                    Actual or imminent I                                                                  EITt iER one of the N      I              of I'lii~lt Safety                                                                          Actual or likely major                      substantial core I                                                                          following:
C      I                                                                                                          failure of plant functions                degradation with the Y      I                                                                Plant safety systems I                                  THEN needed for protection of                    potential for loss of I
(more than one) are or                                  the public                        containment A      I                                                              may be degraded I
C      I                                                              ANY Plant Vital T      I I                                                            Structure is degraded or I      I                                                                                                                                  THEN                              THEN potential I y degraded 0      I N
L I
I I
I I
E l
E l
G I
N I
Y I
I I
I I
I   AND E      I                                                              Increased monitoring of I
A I
V      I Safety Functions E      I                                                                        is warranted I
T I
L i
0 1 I
I I
I I
S
c I
- ____ .-I
C I
                                                                            ._______              THEN 1
I I
1 Action Req u ired Refer to Attachment 1 UNUSUAL EVENT
N l
                        --                -- .. __    _.- -    -        I    Refer to Attachment 2 ALERT
L I
                                                                                          .-__ -  .. -    -  -  -  I    -
V I
Rcfer to Altachincnt 3 SITE AREA EMERGENCY
L I
_ _..I Refer to Attachment 4 :
S I
GENERAL EMERGENCY'
-.I Reactor Coolant System Identified Leakage
> 25 gpm averaged over any 24 hour period I
1.-
THEN NOTE:
Refer to Section 3.0, Fission Product Barrier Table prior to Event Classification
_ _ _ _ -~
i I,
i Action Required Refer to Attachment I UNUSUAL EVENT


IICGS ECG 5.0 Failure to Scram                                                                                                    Rev. 00 Page 1 of 1 5.1 ATWS
-.i E
                                                                                          /    Failure of the Reactor Protection    -- %
hI E
                                                                                                                                                ,,    Failure of the Reactor Protection System (E?) .\,
R G
i                                                       i Failure of tlic Reactor Protection Systcm (RPS)                          System (RPS)to SuccessfullyComplrte                          to Successliilly Complete a Reactor Scram Initiating Condition i      to Successliilly Complete a Reactor Scrim (Automatic or Manual) a Reactor Scram (Automatic and Manual) and Rcactor Power is above -
E N
                                                                                          ,. -___._________.-                  4%
C Y
(Automatic and Manual) and there is indication o l an
                                                                                                                                                \. Estreme Challenee to the Ability to Cool thc Core
                                                                -    .      --                                          ~        --c
                                                                                                                                                                      ..=.-.-- .... .-                  ....
OPCON                                                        ('        I.., 2 \
EAL #            5.1.2.a                                        5.1.2.b                                    5.1.3                                                          -5.1.4 I
I            IF                                                IF E    I  I M    1  I  An Automatic                              ANY Manually I  i                                                    Initiated E    I  I  Reactor Scram R   I I
II Condition exists                          Reactor Scram G
E I
I 1  AND (RPS) from the I  I N    I  I  An Automatic                              Control Room C   I      Reactor Scram                                    IS NOT I  I Y   I  I (RPS) IS NOT                                  successful I                                          ... _ _ --__                        __                ____                  .-
              !  successful 1
A C
A C
T I
0 N
L E
V E
L S
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
r L                            ...   .....        1       AND 1 ALL Reactor Scram attempts from the Control Room (RPS and ARI) DID NOT T    I I                                                                                 REDUCE and MArNTAIN I                                                                                                                                                     EITHER one of the following:
I I
0 N
.-I Ini tiat ing Condition OPCON EAI, #
Action Req u ired Otlicr Coiiditions Exist
~
(
Wliicli In the Judgiiient ol'tlie Ihicrgcncy Coordinator Warrant I )cciiiriitioii ol'ilii IJn\\lstial Evcnt. '
: i.
All 4.1.1 -
IF I
Events are in progress or
, have occurred which, in the judgment of the Emergency I
Coordinator, indicate a i
I'otcnthl Degradation of I'lii~lt Safety THEN 1
Refer to Attachment 1 1
UNUSUAL EVENT 4.0 E C Discretion 4.1 Emergency Coordinator Discretion
-- - - _ _ ~
r Other Conditions Exist Which hi the Judgment oftlie llmcrgeiicy Coordinator Warrant Dtclaratioti ol' an Alert -
i All 4.1.2 IF I
I I
I I
I I     THEN                                   Reactor Power to 5 4%
Events are in progress or have occurred which, in the judgment of the Emergency Coordinator, indicate EITt iER one of the following:
Reactor Water Level CANNOT BE I
Plant safety systems (more than one) are or may be degraded ANY Plant Vital Structure is degraded or potential I y degraded I
I                                                                                                                              AND        MAINTAINED > -190" 1                                                                                                    ..... .-     -.....        .
AND Increased monitoring of Safety Functions is warranted i THEN I __
L    I I
.- __.. - ----I-_
The combination of Suppression Pool E    I I                                                                                                                                          Temperature and RPV Pressure V    I                                                                                                                                          CANNOTBE MAINTAINED E    I I                                                                                                                                          belowthe HCTL Curve L    I I
Refer to Attachment 2 ALERT
S
,' Othcr Conditions Exist Which '\\
...... I 1THEN      ............
hi the Jtidgment of the Emergency Coordinator Warrant Declaration a Site Area Eiiicrgency 1'
r--     -                                                                                                                       ~
i All
Action                    Refer to Attachment 2                                                Refer to Attachment 3                                        Refer to Attachment 4 Required                              ALERT                                                  SITE AREA EMERGENCY                                            GENERAL EMERGENCY
')
_.  -                                                                            __                    ~-      -.
4.1.3 IF I
1 I Events are in progress or have occurred which, in the judgment of the Emergency Coordinator, indicate an Actual or likely major failure of plant functions needed for protection of the public THEN Rcfer to Altachincnt 3 SITE AREA EMERGENCY
..I
,'<7
\\
4 HCGS ECG Kcv. 00 Pagc I of 1
,,-- Other Conditions Exist Wlirch hi the Judgment of the Emergency a General Emergency Warrant Dcxlaration of
\\- __
(---Am 4.1.4 IF Events are in progress or have occurred which, in the judgment of the Emergency Coordinator, indicate an Actual or imminent substantial core degradation with the potential for loss of containment THEN Refer to Attachment 4 GENERAL EMERGENCY'


6.0 Radiological Releases/Occurrences 6.1 Gaseous Effluent Release
IICGS ECG Rev. 00 Page 1 of 1 5.0 Failure to Scram 5.1 ATWS Failure of the Reactor Protection System (E?).\\,
                                  . _ _-    . -- ---      -                  ~
Failure of tlic Reactor Protection Systcm (RPS) to Successliilly Complete a Reactor Scrim (Automatic or Manual)
                                                                                                  ~-       __  ~                                                                _-               - __
/ Failure of the Reactor Protection --
Initiating        Any Unplanned Rclcase of Gaseous Radioactivity to                                                               Any Unplanned Release of Gaseous Radioactivity to Condition Environncnt hat Technical Specifications the hdiological for 60- tiiinutcs or longer i   the Environment that Esceeds 2 limes the IOCFR20. Appcndis B limits for 60 minutes or longer
System (RPS) to Successfully Complrte a Reactor Scram (Automatic and Manual) and Rcactor Power is above 4%
                                                                                                  .-.     ......                  .....        .-__            ...........  ~                  ......     -
~  
OPCON                                                                                                                                                                                  (   ,411 EAL ##                    6.1 .l.a                              6.1.1.b                                          6.1.1 .c                                                            6.1.1 .d Field I      Dose        IF                  Measured        IF                          Sample                IF                                    Alarm                          IF I ,ssessment                            05%!%!!e_.  - --                        %
--c i
                                                                                                ! &s              .                    . . . . . __      ndtcatms E      l M I                                                                                                                                                         Valid High Alarm received from ANY onc of tlic Dosc Assessment                    Dosc Rate measured                            Gaseous effluent release I                                                                                                                                                       following Plant Effluent RMS Chiinncls E      l        ilidiciilcs EITHER                    at lire Prolccrcd                        saniplc analysis for ANY onc one of the following                                                              of the follo\ving indicates it                          FUVS Noble Cas (Grid 1/3, 9RX6XO)
to Successliilly Complete a Reactor Scram (Automatic and Manual) and there is indication o l an
H I                                                     Area Bound;rry I   ;I( tlic MEA or beyond                or beyond EXCEEDS                                    concentration o t                              NPV Nohle Cas (Grid 1/3; 9RX590)
\\. Estreme Challenee to the Ability to Cool thc Core i
G      I           ;ISc;ilcul;ilcd on                    .OS mRem/hr IllC SSCL:                                                                FUVS:                                                    NPV Iodine            (Grid 3, 9RX601) above nornial N      I                                                 biickground                    -
Initiating Condition I
                                                                                                > 1.13E-03 pCi/cc Total Noble Cas                            SPV Noble Gas (Grid 1/3; 9RXSXO)
Action Required i
TEDE -I-D;iy DOSC                                                        -> 2.71E-07 pCi/cc 1-131 cY II            > 2.OE-01 mUem NPV:
I i I I
SPV Iodine            (Grid 3; 9RX605)
I I
I                                                                                                                                                 HTV Nohle Gas (Grid 3,9RX5 16)
I I
Thyroid-CDE Dose                                                          -> 2.43E-04 pCilcc Total Nuhle Cas                        __                -                      - _
I I
I A      I       > 6.NE-Ut mRem                                                            > 5.81E-08 pCi/cc 1-131
.=.-.--....
[ AND based on Plant Vent C      I cfllucnt SiaIiiPlC analysis                                                          SPV:                                                            Tolal Plant Vent release rate EXCEEDS T      I                                                                                                                                                         EITHER ollc or tile roiiowlllgilllllls I and NOT on a default                                                            -
('
                                                                                                  > 2.27E-05 pCi/cc Total Noble Cas I   Noble Gas IO lodine                                                              -
I, 2
                                                                                                  > 5.44 E-09 pCilcc I-13 I                                     4.80Ei-03@/see          Total Noble Cas 0 1        Riitio I
\\
N        I                                                                                                                                             - _1.15EHO pCilscc I-I31(NPV-      I--- -
5.1.2.b IF OPCON EAL #
L SIVONJJ)
E M
I                                                                                                                                        .T-.. ......................      . .J              -
E R
I L      I                                                                                                                                            AND                  -
G E
5:
N C
1- Dose
Y A
                                                                                                                                -  __ Assessment results        NOT available I
C T
                                                                                                                                                          -r-----
I 0
I                                                                           __~_                                                                            -  --
N L
1 AND        ..............
E V
                                                                                                                                                      .. J L      I                                                                  rRelease
E L
                                                                                  ...            is ongoing for 2 60      ..        minutes]
S 5.1.4 5.1.3 5.1.2.a I
S      I                                                                              .-
I I
  . .      .I                                                                                            . __p i G I Act io 11 Required Refer to Attachment I UNUSUAL EVENT
1 I
                                                                                                            .          ...                  1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I IF An Automatic Reactor Scram Condition exists 1 AND ANY Manually Initiated Reactor Scram (RPS) from the Control Room IS NOT successful An Automatic Reactor Scram (RPS) IS NOT successful r
1 ALL Reactor Scram attempts
..... 1 from the Control Room (RPS and ARI) DID NOT AND 1 L
r--
REDUCE and MArNTAIN Reactor Power to 5 4%
EITHER one of the following:
Reactor Water Level CANNOT BE MAINTAINED > -190" The combination of Suppression Pool Temperature and RPV Pressure CANNOTBE MAINTAINED belowthe HCTL Curve I
THEN AND
. I 1 THEN
~......
Refer to Attachment 4 GENERAL EMERGENCY
~-
Refer to Attachment 3 SITE AREA EMERGENCY Refer to Attachment 2 ALERT


liCGS ECti 6.0 Radiological ReIeasedOccurrences                                                                                Rev. 00 Page 2 of 4 6.1 Gaseous Effluent Release
6.0 Radiological Releases/Occurrences 6.1 Gaseous Effluent Release  
                                      -                 -                          - -  - - I _ - -                  -        - - - - .-.- __    -              -
~-
Any Unplanned Release of Gaseous Radioactivity Initiating Condition
_ _ ~
( Eiiviroriiiient that Exceeds 200 Times the Radiological Any Unplanned Release of Gaseous Radioactivity to the Environtnent that Evcecds 200 tinies the IOCFRZO, Appendix B limits for 30 minutes or longer Tccliiiical -Spcctficatrons
~
__        for- -
Any Unplanned Release of Gaseous Radioactivity to Initiating Condition Any Unplanned Rclcase of Gaseous Radioactivity to Environncnt hat the hdiological Technical Specifications for 60
                                          - - _.      intiiutcs 15 __ __ __ or longer,                                                              -            -  __
- tiiinutcs or longer i
OPCON                   (      An    )                  (    All  )
the Environment that Esceeds 2 limes the IOCFR20. Appcndis B limits for 60 minutes or longer  
EAL #                   6.1.2.a                          6.1.2.b                              6.1.2.c Field I       Dose        IF                Measured      IF              Sample              IF I   lgsessrnent                          lEe_Rak-                      -  -
~
E   I
OPCON EAL ##
                                                                          . nalysis                        .    -_
I I
M    I        Dosc Asscssiiient                                                                                                Valid High AIarni rcccived froin ANY oiic of tlic I
E l
Dose Rate measured                Gaseous emucnt rclcase E             iiidiciilcs EITHER                  at the Protected              samplc analysis for ANY one                        following Plant ElTluent RMS Chaniwls:
E l
I n    I I
G I
OIIC of tlic Tollowing at rlic MEA or bcyond Area Boundary                  of the rollowiiig indicates a                FRVS Noble Cas (Grid 1/3; Y R X G 8 0 )
N I
G                                                or beyond EXCEEDS                      concentration of                        NPV Noble Cas (Grid 1/3; YRX590)
Y I
I          iis c;ilcul;ilcd on I                                               5 mRem/hr E                    IllC SSCL:                                              FRVS:                                            NPV Iodine      (Grid 3; YRX601)
I I
I N     1                                                                      2 l.13E-01 pCi/cc Total Noble Cas I      TEDE +Day Dosc                                                  > 2.71E-OS pCi/cc 1-131 C    I
A I
                  -> Z.OE+OI niRem Y     I                                                                       NPV:
T I
I       Thyroid-CDE Dosc I                                                                       > 2.13E-02 pCi/cc Total Noble
I 0 1 M
                                                                                  -                                  Cas A     I       2 6.8E+01 mRem                                                  2'5.81E-06 pCi/cc 1-131 I   b;iscd on Pl;itit Vcnt C    I   cflluciit sample analysis                                          SPV:
I I
T    I and m T o n a dcEiull I                                                                       > 2.27E-03 pCi/cc Total Noble Cas I   I   Noblc Giis IOIodine                                                > 5.11E-07 pCi/cc 1-131 0    I   Rirtio I
H I
N   I                                                                                          I L
I c
E I
I C
I
 
I N
I L
I I
I I
I I    ---
I AND results NOT available V
I I
I I
[- Dose Asscssment E    I I
5 :
Release is ongoing
 
__ 7    AND for 2 30 minutes    1 L   I                                                                                         -                  -
I L
I S
I
I
_- S.. . 1 Act ion                                                                      Refer to Attachment 2 Required                                                                                ALERT
. I Act io 11 Required 6.1.l
.a 6.1.1.b Field Dose IF Measured IF
,ssessment Dosc Assessment ilidiciilcs EITHER one of the following
;I( tlic MEA or beyond
;IS c;ilcul;ilcd on IllC SSCL:
TEDE -I-D;iy DOSC
> 2.OE-01 mUem Thyroid-CDE Dose
> 6.NE-Ut mRem based on Plant Vent cfllucnt SiaIiiPlC analysis and NOT on a default Noble Gas IO lodine Riitio 05% !%!!e_.
Dosc Rate measured at lire Prolccrcd Area Bound;rry or beyond EXCEEDS
.OS mRem/hr above nornial biickground 6.1.1.c Sample IF
!%&s Gaseous effluent release saniplc analysis for ANY onc of the follo\\ving indicates it concentration o t FUVS:
> 1.13E-03 pCi/cc Total Noble Cas
> 2.71E-07 pCi/cc 1-131 NPV:
> 2.43E-04 pCilcc Total Nuhle Cas
> 5.81E-08 pCi/cc 1-131 SPV:
> 2.27E-05 pCi/cc Total Noble Cas
> 5.44 E-09 pCilcc I-13 I
(
,411 6.1.1.d Alarm IF ndtcatms Valid High Alarm received from ANY onc of tlic following Plant Effluent RMS Chiinncls FUVS Noble Cas (Grid 1/3, 9RX6XO)
NPV Nohle Cas (Grid 1/3; 9RX590)
NPV Iodine (Grid 3, 9RX601)
SPV Noble Gas (Grid 1/3; 9RXSXO)
SPV Iodine (Grid 3; 9RX605)
HTV Nohle Gas (Grid 3,9RX5 16)
[ AND Tolal Plant Vent release rate EXCEEDS EITHER ollc or tile roiiowlllg illlllls 4.80Ei-03 @/see Total Noble Cas 1.15EHO pCilscc I-I31(NPV L SIVONJJ) - -
I - - -
.T-........................
AND 1-Dose Assessment results NOT available I
-r-----
_ _ ~ _
J 1 AND rRelease is ongoing for 2 60
.- minutes]
. __ piGI 1
Refer to Attachment I UNUSUAL EVENT
.J


6.0 Radiological Releases/Occurrences                                                                                                                  ttccis ECG 6.1 Gaseous Effluent Release                                                                                                         Hcv. 00 Page 3 o f 4 Initiating          Boundary Dose Rcsulting from an Actual or Imminent Release of Gaseous Radioactivity Exceeds 100 mrcm Total Effcctivc Dose Equivalent (TEDE)
6.0 Radiological ReIeasedOccurrences 6.1 Gaseous Effluent Release Valid High AIarni rcccived froin ANY oiic of tlic following Plant ElTluent RMS Chaniwls:
Condition                                                    or 500 mRcm Thyroid CDE Dose for the actual or projected duration of the release
FRVS Noble Cas (Grid 1/3; YRXG80)
                              ....-__      .- . -  ..                                .~              ........          ___..                                __                          ..                    ..........
NPV Noble Cas (Grid 1/3; YRX590)
OPCON                      (    AN      )                          (-'-Gi---)                                  ('---AT>
NPV Iodine (Grid 3; YRX601) liCGS ECti Rev. 00 Page 2 of 4 I
                                                                                                                      -  -_  -a
Any Unplanned Release of Gaseous Radioactivity to the Environtnent that Evcecds 200 tinies the IOCFRZO, Appendix B limits for 30 minutes or longer Any Unplanned Release of Gaseous Radioactivity
(      All
( Eiiviroriiiient that Exceeds 200 Times the Radiological Tccliiiical Spcctficatrons for 15 intiiutcs or longer, Initiating Condition OPCON EAL #
                                                                                                                                                                                                  . - ./
E M
                                                                                                                                                                                                        ')
E G
EAL ##                    6.1.3.a                                   6.1.3.b                                     6.1.3.c                                                            6.1.3.d Field 1      Dose            IF                  Measured           IF                     Field Survey        IF                         Alarm                                    IF I  ,ssessrnen_t          ___                PSB R&-                 -__                7alYgls_                                    I dications                .
E N
E    I M    I          Dosc Assessment                          Dosc Ratc nicasured                                                                Valid High Alarni rcccivcd from ANY one of [tic I                                                                                                    Analysis of ficld E    I          indicatcs EITHER                              at thc Protectcd                      survcy samples at the                            following Plant Eflucnt RMS Channcls:
C Y
I<    I        onc of tlic following                          Arca Boundary                      Protcctcd Arca Boundery I        ai ilic MEA or bcyond                      or bcyond EXCEEDS                                                                      FRVS Noble Cas (Grid 1/3; 9RX6XO) c    I            iis calculated on                          100 mRein/hr indicatcs EITHER E    I                                                                                                onc of the following.                     NPV Noble Cas (Grid I/B; 9RXS90)
A C
I               thc SSCL                          . _ _   _.            -    -
T I
N    I TEDE -+-DayDOSC                                          LAND
0 N
                                                                                                    ' -> J.36E+02 CCPM                                SPV Noble Cas (Grid 113; 9RX580) c:   I Y
L E
V E
L S
n I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I 1
( An )
6.1.2.a Dose IF lgsessrnent Dosc Asscssiiient OIIC of tlic Tollowing at rlic MEA or bcyond iis c;ilcul;ilcd on IllC SSCL:
iiidiciilcs EITHER TEDE +Day Dosc
> Z.OE+OI niRem Thyroid-CDE Dosc 2 6.8E+01 mRem b;iscd on Pl;itit Vcnt cflluciit sample analysis and m T o n a dcEiull Noblc Giis IO Iodine Rirtio I
(
All )
6.1.2.b 6.1.2.c Field Measured IF Sample IF lEe_Rak-Dose Rate measured at the Protected Area Boundary or beyond EXCEEDS 5 mRem/hr nalysis Gaseous emucnt rclcase samplc analysis for ANY one of the rollowiiig indicates a concentration of FRVS:
2 l.13E-01 pCi/cc Total Noble Cas  
> 2.71E-OS pCi/cc 1-131 NPV:
> 2.13E-02 pCi/cc Total Noble Cas 2'5.81E-06 pCi/cc 1-131 SPV:
> 2.27E-03 pCi/cc Total Noble Cas  
> 5.11E-07 pCi/cc 1-131 I
I AND
[ Dose Asscssment results NOT available
... _- _. 7 AND _-
Release is ongoing for 2 30 minutes 1 Act ion Required Refer to Attachment 2 ALERT
 
E M
E I<
c E
N c:
Y A
C I
I 0
N L
E V
E L
S 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
                  > I,(IE+O2 mRcm
                                                                                                    ' -> 3.85E-07 pCi/cc 1-131                        HTV Noble Gas (Grid 3; 9RX.5 16)
I      Thyroid-CDE Dose                              Release is espccted to I                                                continuc for 1 15 minutes                                    .-. . . . . . . .        __                                      .
A            L S.OEi-02 mRcm C
I I
I I
I I
I I
I briscd on Plant Vcnt effluciit siilliplc analysis arid NOT 011 I ....  -.......
                                                                                                                                                    - - ...        .- .........              ]  AND
                                                                                                                                                                                                            ~          .~    ..
I  a dchult Noblc Gas to                                                                                                                          Total Plant Vciit rclcasc ralc EXCEEDS I      I lodlllc Rilllo                                                                                                                                      7.6E+07 pCi/sec Total Noble Cas 0      I 1
I N      I                                                                                                                                                                                    AND I                                                                                                                                            . -.    .
I L                                                                                                                                                        Dose Asscssnicnt results                          availablc I                                                                                                                                            __ ..            ... __                __
E      I I
I  AND V
E I
I Release            is ongoing for-2.....15_._
minutes I
I 1
I 1
L S
I I
Initiating Condition OPCON EAL ##
6.0 Radiological Releases/Occurrences 6.1 Gaseous Effluent Release ttccis ECG Hcv. 00 Page 3 of4 Boundary Dose Rcsulting from an Actual or Imminent Release of Gaseous Radioactivity Exceeds 100 mrcm Total Effcctivc Dose Equivalent (TEDE) or 500 mRcm Thyroid CDE Dose for the actual or projected duration of the release
.~
(
AN
)
6.1.3.a Dose IF
,ssessrnen_t Dosc Assessment indicatcs EITHER onc of tlic following ai ilic MEA or bcyond iis calculated on thc SSCL TEDE -+-Day DOSC
> I,(IE+O2 mRcm Thyroid-CDE Dose L S.OEi-02 mRcm briscd on Plant Vcnt effluciit siilliplc analysis arid NOT 011 a dchult Noblc Gas to lodlllc Rilllo
(-'-Gi-- -)
6.1.3.b Field Measured IF PSB R&-
Dosc Ratc nicasured at thc Protectcd Arca Boundary or bcyond EXCEEDS 100 mRein/hr L A N D Release is espccted to continuc for 1 15 minutes I.... -
('---AT>
- -_ -a 6.1.3.c Field Survey IF 7alYgls_
Analysis of ficld survcy samples at the Protcctcd Arca Boundery indicatcs EITHER onc of the following.
> J.36E+02 CCPM
> 3.85E-07 pCi/cc 1-131
.- I THEN I
(
All
')
6.1.3.d
. -./
Alarm IF dications Valid High Alarni rcccivcd from ANY one of [tic following Plant Eflucnt RMS Channcls:
FRVS Noble Cas (Grid 1/3; 9RX6XO)
NPV Noble Cas (Grid I/B; 9RXS90)
SPV Noble Cas (Grid 113; 9RX580)
HTV Noble Gas (Grid 3; 9RX.5 16)
]
Total Plant Vciit rclcasc ralc EXCEEDS 7.6E+07 pCi/sec Total Noble Cas 1
Dose Asscssnicnt results availablc AND
~
.~
AND I AND Release is ongoing for 2 15 minutes I 1
J Action Required Refer to Attachment 3 SITE AREA EMERGENCY
 
6.0 Radiological ReleasedOccurrences 6.1 Gaseous Effluent Release IICOS ECG Rev. 00 Page 4 of 4 Boundary Dose Resulting from an Actual or Imminent Release of Gaseous Radioactivity Exceeds 1000 mrem Total Effective Dose Equivalent (TEDE) or 5000 mRem Thyroid CDE Dose for the actual or projected duration of the release
----.-._____I.__..._._
Initiating Condition OPCON EAL ##
1 I
1 I
I I       THEN
M I
                                                                                                                                        . . .  -                                ....          J Action                                                                                  Refer to Attachment 3 Required                                                                          SITE AREA EMERGENCY
I R
I I
E l
E l
G I
N I
Y I
I I
A i
T I
0 1
I I
I c
C t
I


IICOS ECG 6.0 Radiological ReleasedOccurrences                                                                                                                        Rev. 00 Page 4 of 4 6.1 Gaseous Effluent Release Initiating                Boundary Dose Resulting from an Actual or Imminent Release of Gaseous Radioactivity Exceeds 1000 mrem Total Effective Dose Equivalent (TEDE)
I N
Condition                                                            or 5000 mRem Thyroid CDE Dose for the actual or projected duration of the release
I L
                                            .-        .......                                                            ______                  ...                    ..      ----.-._____I.__..._._                  .......
I V
OPCON                          (    All    )                                                                            r L _    -  -  j                                          (-Ai;            -)
I L
EAL ##                        6.1.4.a                                        6.1.4.b                                    6.1.4.c                                                      6.1.4.d Field 1      Dose            IF                        Measured            IF                        Field Survey    IF                      Alarm                                    IF I   issessrnent                ..  --              me Rate          ___-                        -
r S
nak?!??    -    .    - - - --  . idications      .-.-                      .._
E      l M I                   Dosc Asscssincnl                            Dose Rate measured                              Analysis of field                  Valid High Alarm received from ANY otic of tltc I
E      l            iirdicatcs EITHER                              at the Protected                          survey SilIIIples at the                      following Plmt Effluent RMS Channels:
R    I            oiie of the following                            Area Boundary                          Protected Area Boundaiy I       iil  tlrc MEA or bcyond                        or beyond EXCEEDS                                                                  FRVS Noble Gas (Grid 1/3; YRX6XO)
G      I                                                                                                         indicates EITHER
:ISciIlctilittCd 011                          1000 mRem/hr one of tltc following.              NPV Noble Gas (Grid 1/3; 9RX590) the SSCL:                                              -
N c
I
I
              ;    TEDE l-Da\ DOSC
- 1 Action Required
                                                                                    ]-_
(
AND
All
                                                                                                                  >1.36E+03 CCPM                          SPV Noble Cas (Grid 1/3; YRXSXO)
)
Y      I        2 t.OE+03 mRem
6.1.4.a Dose IF issessrnent Dosc Asscssincnl iirdicatcs EITHER oiie of the following iil tlrc MEA or bcyond
                                                                                                                  -> 3.8SE-06 pCi/cc 1-131                HTV Noble Gas (Grid 3; Y R X S 16)
:IS ciIlctilittCd 011 the SSCL:
I                                                        Release is espcctcd to Thyroid-CDE Dosc                                                                                               .._..- .. ._      -
TEDE l-Da\\ DOSC 2 t.OE+03 mRem Thyroid-CDE Dosc 2 S.OE+03 mRem based on Plant Vent effluent s;iarplc ;iiialysis and 011 lodiirc Ralio
1 I                                                    continue for L IS minutes A      i      2 S.OE+03 mRem                               .. __    .....      ..........            I                                                                                            AND based on Plant Vent effluent                                                                                                                                                                     ...............
;I dcfili1lI Noble Gi\\s IO 6.1.4.b Field Measured IF me Rate Dose Rate measured at the Protected Area Boundary or beyond EXCEEDS 1000 mRem/hr
C      t  s;iarplc ;iiialysis and           011
] AND Release is espcctcd to continue for L IS minutes I
                                                                                                                                                                  ..                          .-.I..
r j
T      I I  ;I dcfili1lI Noble Gi\s IO I    lodiirc Ralio                                                                                                                                      7.6Ei-08 pCi/sec Total Noble Cas 0    1                                                                                                                                                           ..........
L _ - -
I N    I I                                                                                                                                          ........           .                         ...__                ..
6.1.4.c Field Survey IF nak?!??
I L        I                                                                                                                                        [           Dose Assessment results
Analysis of field survey SilIIIples at the Protected Area Boundaiy indicates EITHER one of tltc following.  
__                      available.
>1.36E+03 CCPM
                                                                                                                                                                                . -_        .... - L A N -D.............
> 3.8SE-06 pCi/cc 1-131
V      I I Release is ongoing for 2 15 minutes I L      r                              .        ......                __-                                                                                                                .-I
(-Ai;
                                                                                                                                                                                            .. .J S    - 1I
-)
                                                                                                      -_ . _ _ _ ~ -   L ___      THEN Action Required I      Refer to Attachment 4 GENERAL EMERGENCY
6.1.4.d Alarm IF idications Valid High Alarm received from ANY otic of tltc following Plmt Effluent RMS Channels:
FRVS Noble Gas (Grid 1/3; YRX6XO)
NPV Noble Gas (Grid 1/3; 9RX590)
SPV Noble Cas (Grid 1/3; YRXSXO)
HTV Noble Gas (Grid 3; Y R X S 16) 1 AND
.-.I..
7.6Ei-08 pCi/sec Total Noble Cas
[ Dose Assessment results available.  
.... - L A N D I Release is ongoing for 2 15 minutes I  
.-I  
...J L
Refer to Attachment 4 GENERAL EMERGENCY THEN
- _. _ _ _ ~ -
II -


6.0 Radiological ReleasedOccurrences 6.2 Liquid Effluent Release
6.0 Radiological ReleasedOccurrences 6.2 Liquid Effluent Release  
                      ..                                ..              __                                          T--
-~
Initiating                 Any Unplanned Release of Liquid Radioactivity                                                          Any Unplanned Release of Liquid Radioactivity Condition to the lhviroiuneiit that Esceeds 2 Tiiiies the Radiological                                  (\        to the Eiiviroiunent that exceeds 200 'limes Radiological TLxhiical    Specifications for  60 minutes or longer                                                  'I'wluiical Spcciiicatioiis for 15 minutes or longer OPCON                                             ( ,411      )
Valid Cooling Tower Blowdown Effluent Radiation Monitor High Alarm Condition Initiating Condition OPCON EAI, #
EAI, #                                           6.2.1                                                                                                6.2.2 1
E M
1                                                                                -~......
E K
E     1 M    I I          Valid Cooling Tower Blowdown Effluent E     1 I
G E
Radiation Monitor High Alarm Condition K
N c:
I                                                 .    -  .                                    ..I G    I E    I I                                                         ...
Y A c I
N    I c:    I I
0 N
Y    I I
L E
I A    I AND AND c      I I                                                   - - _-                                                                                                      .  .  .  .
V E
    'r    I                                                                                                       I I           Sample analysis of liquid effluent indicates                                                j          Sample analysis of liquid emuent indicates I   I                                                                                                       I I
L S
concentration in excess of 2 times                                                  I               concentration in excess of 200 times 0
'r 1
N      I                     Tec ti 11ical Spec ilica tion lini i ts                                          i                  Technical Specification liniits I                                                                                                       I L
1 1
I I
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I            .... -.        ..........
1
                                                      .I.  .
AND
                                                                                                      ._            I
                                                                                                                                                            -]:."D 1
E      I                                                                                        -1            I                                                                          1 I                Release continues for 2 60 minutes                                                                    Release continues for 2 15 minutes V      I E    I                              after the alarm occurs                                                                              after the alarm occurs L
S I
I I
I I
I 1
Action Required Any Unplanned Release of Liquid Radioactivity to the lhviroiuneiit that Esceeds 2 Tiiiies the Radiological TLxhiical Specifications for 60 minutes or longer
t.
(,411
THEN
)
                                                                                            ...         J        I  - - -- -          -  --
T--
1 L_-
Any Unplanned Release of Liquid Radioactivity to the Eiiviroiunent that exceeds 200 'limes Radiological
THEN J
(
Action                                  Refer to Attachment 1                                                                                Refer to Attachment 2 Required                                  IJNUSUAL EVENT                                                                                              ALERT
'I'wluiical Spcciiicatioiis for 15 minutes or longer
                        . . . . . . . .                       ___          .                     ....... .J
\\
6.2.1 6.2.2 AND - - _-
Sample analysis of liquid effluent indicates concentration in excess of 2 times Tec ti 11 ical Spec ilica tion lini i ts 1 AND
..I
. I.. ______
-1 Release continues for 2 60 minutes after the alarm occurs J
1 THEN
........J
. t.
Refer to Attachment 1 IJNUSUAL EVENT AND I
j Sample analysis of liquid emuent indicates I
I i
Technical Specification liniits concentration in excess of 200 times I I 1
-]:."D I
1 Release continues for 2 15 minutes after the alarm occurs 1 THEN J
I - - - - -
L Refer to Attachment 2 ALERT


HCGS F.CG 6.0 Radiological Releases/Occu rrences                                                                    Rev. 00 Page 1 of 1 6.3 In-Plant Radiation Occurrences 7%                  Release of Radioactive Material or increases in Radiationlevels within the Initiating                                                                               facility that impedes operation of systems required to maintain Condition         (    Unplanned Increase in Plant Radiation
Initiating Condition OPCON EAL #
                                                    .-.    --          -              __ safe operations or to establish or maintain____        __
1 I
Cold Shutdown    .    .  -
E l
OPCON                                                                               ('A117 EAL #                                 6.3.1                                         6.3.2.a                                                    6.3.2.b 1                            IF                                              IF                                                          IF I               .....          ......  - ..
M I
E       l M       I                   Unplanned rise in                            Unplanned Dose Rates                                      Unplanned Dose Rates I
I E
E      l               radiation levels inside the                        > 2000 mRem/hr                                              -> 15 mRem/hr K       I                     Protected Area                            in ANY area of the plant                              in EITHER one of the following 1
l K
G      I                 > 1000 times normal                          which requires ACCESS to                            Main Control Room as indicated by EITHER                            maintain plant safety N     I                    one of the following:                      functions (EXCLUDTNG the                              Security Central Alarm Station (CAS)
I G
C        I     '  Permanent or portable                              Main Control Room and CAS)
I N
Y    I                                                             as indicated by EITHER one of the I         Area Radiation Monitors I                                                                       following:
I Y
A        I     '  General Area Radiological Survey                1 Permanent or portable Area C      t                                          - ___ -
I I
Radiation Monitors T      I                                   THEN I                                                        0 General Area Radiological Survey
I A
      '      I                                                                               -      ..........
I T
I I
0 1 I
0 1 I
N       l I
I I
I L         I V       I L
1 C
S
I C
          .-I I I
t I
r -- --
N l
                                                                                                                              -- i-"
L I
Action Required              I        Refer to Attachment 1 UNUSUAL EVENT                                                           I.....
V I
Refer to Attachment 2 ALERT
L I
                                                                                                                                  ~  _____.____. J
S I
.-I Action Required 6.0 Radiological Releases/Occu rrences 6.3 In-Plant Radiation Occurrences HCGS F.CG Rev. 00 Page 1 of 1 7%
(
Unplanned Increase in Plant Radiation 6.3.1 IF Unplanned rise in radiation levels inside the Protected Area
> 1000 times normal as indicated by EITHER one of the following:
' Permanent or portable Area Radiation Monitors
' General Area Radiological Survey THEN r -- --
Refer to Attachment 1 I
UNUSUAL EVENT Release of Radioactive Material or increases in Radiationlevels within the facility that impedes operation of systems required to maintain
__ safe operations or to establish or maintain ____
Cold Shutdown
('A117 6.3.2.a IF Unplanned Dose Rates
> 2000 mRem/hr in ANY area of the plant which requires ACCESS to maintain plant safety functions (EXCLUDTNG the Main Control Room and CAS) as indicated by EITHER one of the following:
1 Permanent or portable Area 0 General Area Radiological Survey Radiation Monitors 6.3.2.b IF Unplanned Dose Rates
> 15 mRem/hr in EITHER one of the following Main Control Room Security Central Alarm Station (CAS)
-- i-"
J I
~
Refer to Attachment 2 ALERT  


liC0S ECG 6.0 Radiological Releases/Occu r rences                                             Rev. 00 Page I o f 2 6.4 Irradiated Fuel Event Initiating                            Unplanned Increase in Plant Radiation Condition OPCON                        (
Initiating Condition OPCON EAL #
5   .j EAL #                        6.4.1 .a                                   6.4.1.b 1                    IF                                        IF I
1 M
M      I    Uncontrolled water level                      Uncontrolled water level drop in the                               drop in the K    I              Reactor Cavity as                          Spent Fuel Pool I
I K
G    I          indicated by EITHER                            as indicated by E    l          one of the following:                      Valid Fuel Pool Low I
I I
N    I     ' Visual Observation                            Level Alarm Condition C      I                                                                     .. -
G I
I Y     I I
E l
                ' Reactor Water Level Shutdown Range Level II AND I                                                       .        1.      ....
I N
A    I       Indicator 1 BBLI-R605                                                    .I cT I I           _.               _.-                     Visual Obsenation I
I C
1
I Y
      ' 1 0 1 I
I A
i        ..... .. .
I T
THEN
I 0
                                                                          -  I I
1 I
Act ion                                Refer to Attachment I Required                                UNUSUAL EVENT
I I
c I
1 I
Act ion Required 6.0 Radiological Releases/Occu r rences 6.4 Irradiated Fuel Event Unplanned Increase in Plant Radiation
(
5.j 6.4.1.a IF Uncontrolled water level drop in the Reactor Cavity as indicated by EITHER one of the following:
' Visual Observation
' Reactor Water Level Shutdown Range Level Indicator 1 BBLI-R605 i
6.4.1.b IF I
Uncontrolled water level drop in the Spent Fuel Pool as indicated by Valid Fuel Pool Low Level Alarm Condition I
I AND
. I 1.
Visual Obsenation I
1 I
THEN liC0S ECG Rev. 00 Page I of2 I
Refer to Attachment I UNUSUAL EVENT
 
HCGS ECG Rev. 00 Page 2 of 2 Initiating Condition
-~
Major Damage to
(
Irradiated Fuel OPCON EAL ##
1 M
I R
I I
E l
I C
I G
I N
l Y
I A
I T
I 0
1 1
I I
c I
I N
I I
I E
l L
I I
I E
l L
I S
I Action Required 6.4.2.a IF Major Damage to Irradiated Fuel has occurred A AND Valid High Alarm received from ANY one of the following RMS channels: -  
' Refbel Floor Exhaust Channel A (9RX627)
' Refbel Floor Exhaust Channel B (9RX628)
' Refhel Floor Exhaust Channel C (9RX629)
------I-----
6.0 Radiologic,. Releases/Occurrences 6.4 Irradiated Fuel Event Events that have or may result in uncovering Irradiated Fuel outside the Reactor Vessel
( All 6.4.2.b IF Unplanned rise on ANy one of the following Area Rad Monitors or by general area rad survey indicates
> 2000 mRem/hr:
' Spent Fuel Storage Pool Area (9RX707)
' New Fuel Criticality Storage Channel A (9RX6 12)
' New Fuel Criticality Storage Channel B (9RX6 13) 6.4.2.c IF Visual observation of Irradiated Fuel uncovered I
THEN Refer to Attachment 2
---I  


6.0 Radiologic,. Releases/Occurrences                                                        HCGS ECG Rev. 00 6.4 Irradiated Fuel Event                                                            Page 2 of 2
IICGS ECG Kcv. 00 Page I Of2 7.0 Electrical Power 7.1 Loss of AC Power Capabilities
                                -~   ------,
~.
Initiating            Major Damage to                                   Events that have or may result in uncovering Condition      (       Irradiated Fuel                                  Irradiated Fuel outside the Reactor Vessel OPCON                                                          ( All EAL ##                    6.4.2.a                               6.4.2.b                                          6.4.2.c 1
1.0~s olAll Offsitc Power AC power capability to Vital Buses reduced to a Single Power' Shutdown or Refueling for greater
IF                                   IF                                              IF M      I                                               Unplanned rise Major Damage to on ANy one of the                                Visual observation of R      I Irradiated Fuel following                                Irradiated Fuel uncovered I         has occurred G      I                                           Area Rad Monitors or E
_ _ than
N l
~ IS niiriute5
_ _ ~ _ _ _
Loss of All OlTsite Power and All Onsite AC
(
tu vital 13uses for greater ) ( Source for greater than 15 minutes such that any additional single) ( Power to 4. I6 KV Vital Buses during either in Cold )
fiailurc would result in a complete loss of all 4.16 KV Vital Buses
..A '
Initiating Condition tlian 15 minutes OPCON
(
All 1
EAI, #
7.1.1 1
IF I
Unplanned Loss of I
I Service Transformers I
I 1AXS01AND1BX501 to I
i 4.16 KV Vital Buses E
I 1 E
l I
l I
A AND
1 Power from Station R
                      -- __ - __- __    --            by general area rad survey indicates C      I 1
1 E
Valid High Alarm                      -
I i
                                                            > 2000 mRem/hr:
I I
Y      I         received from I
c f
ANY one of the                  ' Spent Fuel Storage Pool I
Y I
A      I             following -                  Area (9RX707) cT I I           RMS channels: -                ' New Fuel Criticality
I AND I
                '  Refbel Floor Exhaust                Storage Channel A
I A
      ' I 0 1           Channel A (9RX627)                  (9RX6 12)
I T
                ' Refbel Floor Exhaust                ' New Fuel Criticality N      I I    Channel B (9RX628)                   Storage Channel B I                                          (9RX6 13)
I C
L    I    '  Refhel Floor Exhaust E      l I    Channel C (9RX629)
I I
      "    I E      l L     I I   ------I-----
I N
S      '                                                        I  THEN Action Refer to Attachment 2 Required
I L
                                                                    -      I        -
I V
I L
r S
I 0 1 I
I 1
-. J Action Required 1
> 15 minutes have elapsed 1 THEN 1
-1 Refer to Attachment 1 UNUSUAL EVENT
(
1, 2, 3 )
7.1 -2.a IF Loss of 4.16 KV Vital Bus Power Sources (Offsite and Onsite) which results in the rvailability of ONLY one 4.16 KV Vital Bus Power Source (Offsite or Onsite)
( 4, 5, Defueled )
7.1.2.b IF 4.16 KV Vital Buses are deenergized L.
I AND
> 15 minutes have elapsed I
THEN Refer to Attachment 2 ALERT


IICGS ECG 7.0 Electrical Power                                                                                        Kcv. 00 Page I Of2 7.1 Loss of AC Power Capabilities 1.0~solAll Offsitc Power AC power capability to Vital Buses reduced to a Single Power'
Initiating Condition OPCON EAL #
                                                                                                                                      ~.          .                                            ,
I M
(        Loss of All OlTsite Power and All Onsite AC Initiating     (    tu vital 13uses for greater  ) ( Source for greater than 15 minutes such that any additional single)          Power to 4. I6 KV Vital Buses during either in Cold            )
I I
Condition                 tlian 15 minutes                        ____
R I
fiailurc would result in a complete
                                                                                -        loss of all 4.16 KV
                                                                                                          -  Vital Buses '
                                                                                                                      ..A Shutdown or Refueling
                                                                                                                                                    -            for greater              __~___
_ _ than IS niiriute5
                                                                                                                                                                                    ~
OPCON                       (      All  1                                    (    1,2,3)
( 4, 5, Defueled )
EAI, #                        7.1.1                                              7.1-2.a                                                                      7.1.2.b 1                      IF                                                IF                                                                            IF E        I 1                                          -                        .-
              ' I   Unplanned Loss of                        Loss of 4.16 KV Vital Bus Power Sources                                                  4.16 KV Vital Buses E      lI  1 Power from Station                            (Offsite and Onsite) which results in the                                              are deenergized R      I 1 '
I Service Transformers                                    rvailability of ONLY                                L.                                    _._      __
E I
E I
I I 1AXS01AND1BX501 i
E l
one 4.16 KV Vital Bus Power Source to                                            (Offsite or Onsite)
G I
I I I  i  4.16 KV Vital Buses c
N I
I f  '
Y I
Y     I                           AND I                       1 I
I I
A     I           > 15 minutes C
A I
T I
T I
0 1 I
C I
C I
I I
I I
have elapsed 1 THEN I     AND
N I
                                                                                                            > 15 minutes have elapsed
L I
    '     I 0 1                                                                                                       -              - .           .
V I
N I I
L I
1 I
I I
THEN L    I V    I L    r S
I S
    -  . J Action Required I
I Action Required 7.0 Electrical Power 7.1 Loss of AC Power Capabilities Loss of All Offsitc Powcr and All Onsite AC Pow& to All Vital AC Buscs during either Power Operation, )
                  -  -            1 Refer to Attachment 1
Startup or Hot Shutdown for grcatcr than 15 niinutcs I
                                                -1 Refer to Attachment 2 UNUSUAL EVENT                                                                                        ALERT
(
i 1,2,3
)
7.1.3 IF ALL 4.16 KV Vital Buses are deenergized I
I I
1
> 15 minutes have elapsed THEN I ICOS ISCG Rev. 00 Page 2 Of 2
'1, 2, 3 7.1.4.a
)
Prolonged Loss of All Offsitc and Onsitc AC Powcr to All Vital AC Buscs AND t
1,2, 3 1
7.1.4.b AND I
I I
Restoration of Power to at least one 4.16 KV Vital Bus within 4 hours is NOT likely 1
THEN I
Loss of any 2 Fission Product Barriers has occurred or is Imminent I
I THEN 4
Refer to Attachment 3 I
I SITE AREA EMERGENCY I
Refer to Attachment 4
~
GENERAL EMERGENCY


I ICOS ISCG 7.0 Electrical Power                                                              Rev. 00 Page 2 Of 2 7.1 Loss of AC Power Capabilities Initiating       Loss of All Offsitc Powcr and All Onsite AC Pow& to Condition I  All Vital AC Buscs during either Power Operation,      )  (
Initiating Condition OPCON AND EAL #
Prolonged Loss of All Offsitc and Onsitc AC Powcr to All Vital AC Buscs                        )
I I
Startup or Hot Shutdown for grcatcr than 15 niinutcs OPCON                                 i 1,2,3    )                                      '1, 2, 3                                    t  1,2, 3 1 EAL #                                   -
M I
7.1.3                                          7.1.4.a                                      7.1.4.b I
I E
IF E      I  I I
l E
M    I                  ALL    4.16 KV Vital Buses E
l R
I l I                    are deenergized R   I                                      - - -  __-  _- - - -. - ..
I G    I N      I C      I Y      I I                                                                                  AND                                          AND A
I I
I I
I I                    I Restoration of Power to                                                          I C      I                                                                                                                      Loss of any 2 T    I                                                                            at least one 0 1 I
I                > 15 minutes have elapsed
                                            .    -  .__ - _-        -- 1        4.16 KV Vital Bus within 4 hours is NOT likely Fission Product Barriers has occurred or is Imminent THEN I                                                                                                        1                                          I I N    I                                                                                      THEN                                        THEN I
I L    I V      I L      I S      I 4      . .-
Action        I              Refer to Attachment 3                                              I        Refer to Attachment 4 Required      I          SITE AREA EMERGENCY                                                    ~    GENERAL EMERGENCY
7.0 Electrical Power 7.2 Loss of DC Power Capabilities Loss of All Vital 125 VDC Power during either Power Initiating Condition Unplanned Loss of All Vital 125 VDC Power during either
( Cold Shutdown or Reheling Mode for greater than 15 minutes
                                                                                        )  iUnplanned
                                                                                            ,  Operation, Startup or Hot Shutdown for greater than 15 Minutes )
OPCON                                ( 4, 5, Deheled )                                                                  (---,      3        )
EAL #                                      7.2.1                                                                              7.2.3 I                                  IF                                                                                IF I
E      l  I I                                                                            I M    I              Unplanned degraded voltage condition for                                          Unplanned degraded voltage condition for I
E      l                        Vital 125 VDC Buses,                                                              Vital 125 VDC Buses, R
G I
G I
I I  i I
N I
such that voltage is < 108 VDC 1  . . . ..      .
C I
such that voltage is < 108 VDC
Y I
__        -.      . .. - .- -  .. - .    .. .. -    I 1
I I
N C
Y     I I
I AND 1 AND I
A I
A I
T I
I 0 1 I
I I
I I
                                  > 15 niinutes have elapsed I I                       > 15 minutes have elapsed C
C I
T    I I                                   1  THEN I
I N
I        ,
l L
0 1 I
I V
N        l I
I L
I L      I V    I L    I Action Required I    .
I 7.0 Electrical Power 7.2 Loss of DC Power Capabilities
Refer to Attachment 1 UNUSUAL EVENT
)
Unplanned Loss of All Vital 125 VDC Power during either
( Cold Shutdown or Reheling Mode for greater than 15 minutes
( 4, 5, Deheled )
7.2.1 IF I
i I
Unplanned degraded voltage condition for such that voltage is < 108 VDC Vital 125 VDC Buses,
> 15 niinutes have elapsed I
1 THEN Action Required Refer to Attachment 1 UNUSUAL EVENT I
)
Unplanned Loss of All Vital 125 VDC Power during either Power
, Operation, Startup or Hot Shutdown for greater than 15 Minutes i
(---,
3
)
7.2.3 IF I
I Unplanned degraded voltage condition for such that voltage is < 108 VDC Vital 125 VDC Buses, 1...
I 1
I 1 AND
> 15 minutes have elapsed I


tiCtiS ECti 8,O System Malfunctions                                                                                                                            Rev. 00 Page I of I 8.1 Loss of Heat Removal Capabililty Loss of Reactor Water Level -'
Initiating Condition OPCON EAL #
Initiating                        Inability to Maintain the Plant                                                                                                        Complete I.oss of Functions Needed that has or will Uncover Fuel in Cold Shutdown                                                                                                              to Achieve Cold Shutdown Conditions Condition                                                                                            ..-- in the.Reactor          Vessel
E
                                                                                                                                                                .~
&I E
                                      -    ~          _      _    -    - __  - .          -.-'                      .                                ....                      ...                                    ........            .
R c E
OPCON                                      (I....4,- 5 ')    ...
N c Y
(          4.-, s    1                                                      1-, 2 , .3 EAL #                                            8.1.2 7
A C
8.1.3.a                                                                8.1.3.b I                                             IF                                                                IF                                                                      IF I                                                                                                   ...........                        ..........                              ......                  ......................
T I
E    I
0 N
    &I    I             Unplanned, Complete Loss of                                                      Reactor Water Level                        Loss of Main Condenser capabilities, as evidenced by I
L E
E    I                 Technical Specification required                                            REACHES -161"                            an inability to remove Decay Heat from the Reactor R      I             systems available to provide                                                  (Top of Active Fuel)                            ___                __ - __ -                                                  .    .        ._
V E
I c      I           Decay Heat Removal functions                                                  ..    . . .
L S
E      I                             ....                  .    .          .......                                                                          __      -        _..
I I
I I.
I I
N c
I I
Y I
I I
I I
I I
I I
I I
I I
I I
I I
I I
1 I
I I
I I
I I
I I
I I
AND
                                                                              -1 AND Loss of Torus capabilities as evidenced by EITHER one of the following:
I                                                                An I  RCS Temperature                                                                                                                          Entry into an Unsafe region of ANY one of the A      I                                                  UNCONTROLLED I      has risen to                                                                                                                        following curves:
C                                                                temperature T
I I
I I
                      > 200&deg;F rise
* Heat Capacity Temperature Limit (HCTL) Curve I      I  (Excluding a <I5 is RAPIDLY
* Heat Capacity Level Limit (HCLL) Curve 0
I I
I I
minutes rise approaching
1 Action Required 8,O System Malfunctions 8.1 Loss of Heat Removal Capabililty Inability to Maintain the Plant in Cold Shutdown
* Pressure Suppression Pressure (PSP) Curve N      1         >200&deg;F 200&deg;F
- ~ _ _ - - __.
* SRV Tailpipe Level Limit Curve I
(I 4, 5
with a I                                                     (with NO heat I     heat removal                                                                                                                          Insufficient SRV capacity to reduce RPV pressure L      I                                                    removal function I  function restored)                                                                                                                                                                                                            __
')
E                                                                  restored)                                                                      -    -    ..                                                     .        .  -
7 8.1.2 IF Unplanned, Complete Loss of systems available to provide Decay Heat Removal functions Technical Specification required I
I                                                 .    .              _____
AND RCS Temperature has risen to
> 200&deg;F (Excluding a <I5 minutes rise
>200&deg;F with a heat removal function restored) -
I............
I.
-1 AND An UNCONTROLLED temperature rise is RAPIDLY approaching 200&deg;F (with NO heat removal function res tored)
I THEN 1
.... ~-
Refer to Attachment 2 ALERT
' Loss of Reactor Water Level -'
that has or will Uncover Fuel in the Reactor Vessel
(
4,s 1
8.1.3.a IF Reactor Water Level (Top of Active Fuel)
REACHES -161" tiCtiS ECti Rev. 00 Page I of I Complete I.oss of Functions Needed to Achieve Cold Shutdown Conditions
.~
1,2,3 8.1.3.b IF Loss of Main Condenser capabilities, as evidenced by an inability to remove Decay Heat from the Reactor Loss of Torus capabilities as evidenced by EITHER one of the following:
Entry into an Unsafe region of ANY one of the following curves:
* Heat Capacity Temperature Limit (HCTL) Curve
* Heat Capacity Level Limit (HCLL) Curve
* Pressure Suppression Pressure (PSP) Curve
* SRV Tailpipe Level Limit Curve Insufficient SRV capacity to reduce RPV pressure Refer to Attachment 3 SITE AREA EMERGENCY
 
8.0 System Malfunctions 8.2 Loss of Overhead Annunciators 1
of Main Control Room Overhead Annunciators Initiating Condition OPCON EAL #
E M
E R c E
N Y
A C
T I
0 N
L E
V E
V E
L
: s. - 1 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I
                              -1  --      - --
I ............                                  I                                                                              -    .
L      I                                                THEN S      I 1
                            ......                        1                  .... ~-....                                                                    -      -
Action                          Refer to Attachment 2                                                                                                    Refer to Attachment 3 Required                                    ALERT                                                                                                  SITE AREA EMERGENCY
8.0 System Malfunctions 8.2 Loss of Overhead Annunciators linplanned Ims of Most or All Control Room Initiating                                                      Annunciators and a Significant Tramlent i s in Progrcls or Compensatory Inability to Monitor a Sigiiilicant 'lruisiait in Condition                                                                                IndiLators are UnaVdlldbk Progress
                                                                  -          - __ __-          - --                -  -                .~. .                          .  -.
OPCON                                                                                                            (  I, 2,3 j
_L_--*
EAL #                                                                  8.2.2.a                                    8.2.2. b                                    0.2.3 1                                                                                                                                                        IF E    I M    I                                                                                                                              Loss of > 75% of Main Control Room I
E    I      1    of Main Control Room                                                                                                          Overhead Annunciators c
R    I I
I Overhead Annunciators                                                                                                                          1  AND E    I I                                                                                                          - - AND A significant transient** is in progress            1 N
    <:    I I
BOT! I of the                                      1  AND I                                                  A significant                                        following.
Y    I                                                                                                                                        13OTH of the following I                                                  t ransieii t*
* CRIDS                                  CRIDS I                                                  is in progress                                                                        SPDS A    I                                                                                                  SPDS I                                                                                                                                        are NOT AVAILABLE C                                                                                                              are NOT T
I I
I I
I I
I I
AVAILABLE r
I AND 1
Main Control Room indications arc NOT 0    I ii\ailiiblc to nioiiitor ANY onc of ttic I
1 I
1 I
I                                                                                  I N    I                                                            t                                                                                      roiiowing I                                                                                              AND I                                                                                                                              RCS Status L      I                                                                              15 minutes have I                                ..- .                                                                                          Rcaclivity Control E
I                              THEN                                      elapsed since the loss                              ECCS V    I of OHAs E    I                                                                                                                              Containment Parameters 1
I I
I I
L                                                                                                  THEN                                                                  -. -
I I
: s. - 1 I
I I
I       .- .______.   . .. .     .. - . . ... .                . .- . __    . .-     - f ._._ . .
I I
HEN
I I
                                                                                                                                                                    .1               -
I I
I Action              Refer to Attachment I                                          Refer to Attachment 2                                          Refer to Attachment 3 Required              UNUSIJAL EVENT                                                            ALERT                                      SITE AREA EMERGENCY
Action Required THEN
                            . ..- ...  .-.                                      ...                      ..-  - -- -  .-            I                   .    ..      .. __    .. .  .
.... I.. -
              ** NOTE: A Significant Transient is based on EC judgment, but includes ias a minimum ANY                                                 of the following:
Refer to Attachment I UNUSIJAL EVENT linplanned Ims of Most or All Control Room Annunciators and a Significant Tramlent is in Progrcls or Compensatory IndiLators are UnaVdlldbk 8.2.2.a A significant t ransieii t*
RX SCRAM, LOAD REJECTION >25% POWER, ECCS INJECTION, THERMAL POWER OSCILLATION > I O % .
* is in progress I t I
(
I, 2,3 j
_L_--*
8.2.2. b AND BOT! I of the following.
CRIDS SPDS are NOT AVAILABLE I
1 AND 15 minutes have elapsed since the loss of OHAs 1 THEN
_ _..- - f._._
Refer to Attachment 2 ALERT Inability to Monitor a Sigiiilicant 'lruisiait in Progress
. ~..
0.2.3 IF Loss of > 75% of Main Control Room Overhead Annunciators 1 AND A significant transient** is in progress 1 1 AND 13OTH of the following CRIDS SPDS are NOT AVAILABLE r AND I
Main Control Room indications arc NOT ii\\ailiiblc to nioiiitor ANY onc of ttic roiiowing RCS Status Rcaclivity Control ECCS Containment Parameters HEN  
.1 I
Refer to Attachment 3 SITE AREA EMERGENCY I  
** NOTE: A Significant Transient is based on EC judgment, but includes ias a minimum ANY of the following:
RX SCRAM, LOAD REJECTION >25% POWER, ECCS INJECTION, THERMAL POWER OSCILLATION > I O %.  


8.0 System Malfunctions 8.3 Loss of Communications Capabililty Initiating       llnplanned Loss of All Onsitr or Offsite CommunicationsCapabilities Condition OPCON             ('._- ..All -___-
Initiating Condition OPCON EAI, ##
                                          )                                        .
I I
8.3.1 .a                                                      8.3.1.b EAI, ##
E l
I                       IF                                                          IF I
I M I R I E
E l I
l C r E
M I           Unplanned loss of                                                Unplanned loss of ALL ONSITE                                                      ALL OFFSITE E t R I communications                                                  conimunications as evidenced by the loss of                                      as evidenced by the loss of
t N
                & of the following                                              &of the following E     l              systems:                                                      syslcnls:
I I
N     I
I I  
* Direct Inward Dial System                                        Direct Inward Dial Systcni C r      (DID)                                                            (DID)
" I A
I C
I T
I I 1 0 1 I
I N
I L
I
I
  " I      ' Station Page Systcni                                            Nuclear Enicrgency I                                                                    Telephone System (NETS)
" I L
I  (Gaitronics)
I I
A    I  ' Station Radio System                                            Esss System (Centres)
E I
C    I                                                                    phone I
T    I I 1 I
0 1 N I    I L I E I "E I I                                                        1 THEN L I S I                                                          t 1
Action                                            Refer to Attachment I Required                                              U N U S U A L EVENT
 
HCGS ECG 8.0 System Malfunctions                                                  Rev. 01 Page I of 1 8.4 Control Room Evacuation Initiating                    M a h Control Room Evacuation                        Main Control Room Evacuation has been Initiated Condition                              has been Initiated                            and Plant Control cannot be established OPCON                                      0                                                      (.-. All    .-_F
                                                                                                                  )
EAL #                                        -0.4.2
------l                                          IF I
E     l M I                     Main Control Room Evacuation I
E      l                            has been initiated R I G      I    '
N      I C I I Y    I I
I A      I C
T                                                                                                      ___-
I                                                                                                    THEN i  t 0            8'  .
N E t V
E I
E I
: 1.       '
S I
L    I      !'
Action Required 1
s      !
8.0 System Malfunctions 8.3 Loss of Communications Capabililty llnplanned Loss of All Onsitr or Offsite Communications Capabilities
Action                              Refer to Attachment 2                                    Refer to Attachment 3 Rea ra ired                                  ALERT                                        SITE AREA EMFRCFNPY
('
                                  ~~~~        -
All
)
8.3.1.a IF Unplanned loss of ALL ONSITE communications as evidenced by the loss of of the following systems:
* Direct Inward Dial System (DID)
' Station Page Systcni (Gaitronics)
' Station Radio System 8.3.1.b IF Unplanned loss of ALL OFFSITE conimunicatio ns as evidenced by the loss of
&of the following syslcnls:
Direct Inward Dial Systcni Nuclear Enicrgency Esss System (Centres)
(DID)
Telephone System (NETS) phone 1 THEN t
Refer to Attachment I UNUSUAL EVENT


IICciS ECCi 8.0 System Malfunctions                                   Rev. 00 Page I of I 8.5 Technical Specifications
8.0 System Malfunctions 8.4 Control Room Evacuation HCGS ECG Rev. 01 Page I of 1 Initiating Condition Mah Control Room Evacuation has been Initiated OPCON -
                      ~
EAL #
Initiating             Inability to Reach Required Operational Condition Condition        ( -_-
------l I
:*            within Technical Specification Limits
M I E
__/.
l E
OPCON                                        ('        1, 2, 3
l G
                                                                    -j EAL #                                                7 8.5.1 I                                              IF I    .        -~                    ____          - . .  .......  - .-
I N
E    l
I Y
                                          ~
I I
M     I                  Plant is NOT brought to the REQUIRED I
I A
E     l                     Operational Condition within the R II G
I I
Technical Specification required time limit E      ;    1    . . . . . .    ........                                      -
R I
N      I THEN cY I I I
C I I C
I A      I C       I T     I I
T I
      '   I 0 1 I
0 N
N  I I
i t
I L      I v    i L      I s   f                            . . . .
8'.
Action Required Refer to Attachment 1 UNUSUAL EVENT I
E t
V I
: 1. '
E L
I s
0 0.4.2 IF Main Control Room Evacuation has been Initiated and Plant Control cannot be established
(
All
)
_F Main Control Room Evacuation has been initiated THEN Action Rea ra ired Refer to Attachment 2 ALERT
~~~~
Refer to Attachment 3 SITE AREA EMFRCFNPY


9.0 Hazards - InternaVExternal                                                                                    HCGS ECG Rev. 01 Page I of I I                                 9.1 Security Threats
Initiating Condition OPCON E A L #
                        -        -      -      I   _
I I
Initiating                      Confinned Security Event                                                                                                Security Event Resulting i n Loss of Security Event in a Plant Which Indicates a Potential Degradation in                                              Security Event in a Plant Vital Area          Ability to Reach and Maintain Cold Condition                  the Level of Safetv of the Plant    ,
M I
Protected Area
I E
                                                                    '--_ .. . .  ~ . ... .  .      -'
l E
OI'CON                                  (Ai-]
l G
k.
I N
All- -
I Y
                                                                                              )
I A
EAL #                                  9.1.I                                     -
I T
9.1.2                                  -
I 0 1 R
9.1.3 1        ~ ....  ..      -
I E
IF          . _ _ ..
c I
IF__      . __ _____                  IF_          I   _          _
C I
I E      I     Con finned security threat directed toward        Confirmed hostile intrusion                Confirmed hostile intrusion or          Security event resulting in the actual M      I   the station as evidenced by ANY    -one of the          or inalicious acts as          malicious acts in Plant Vital Areas that      loss of physical control of EI'I'I4ER I
I I
E      I following:                  evidenced by -      A N Y one of involve actual or likely major failures of              one of the following:
I I
It    I     Credible threat of malicious acts or                        the following:          dant functions needed for the protection        Control Room I                                                                                           of the public as evidenced by any one G      I destructive device within the Protected              Discovery of an                                                                  Remote Shutdown Panel Area resulting in SCP-5 implementation                                                              of the following:
N I
E      I                                                       intruder(s), armed and I
L I
Credible intrusion or assault threat to the        violent, within the                  Discovery of an intruder(s), armed N      I                                                                                            and violent, within the Vital Area THEN Protected Area resulting c      I I
v i
Protected Area resulting in SCP-5 implementat ion                                    in SCP-6 implementation            resulting in SCP-6 implementation Y      I                                                        Hostage held on-site in a            Destructive device discovered in a I    Attempted intrusion or assault to the I    Protected Area resulting in SCP-7 or              non-vital area resulting            Vital Area resulting in SCP-IO A      I                                                        in SCP-8 implementation            implementation I    SCP-1 I implementation C      I                                                        Malicious acts attempted          Malicious act(s) attempted or discovered in a Vital Area Malicious acts attempted or discovered T      I within the Protected Area resulting in            or discovered within a              resulting in SCP-10 implementation AND the malicious I
L I
I      I    SCP-10 implementation                              Vital Area (which is in the        act(s) is of a magnitude that it SPECIFICALLY results 0      I                                                        Protected Area) resulting          in Damage to ANY one of the following:
I I
I    Hostage/Extortion situation that threatens          in SCP-IO implementation N                                                                                                      TWO OR MORE Trains of a Safety System I    normal plant operations resulting in                that does not meet criteria I                                                                                              MORE THAN ONE Safety System SCP-8 implementation                                of 9.1.3 I                                                                                              Any Plant Vital Structure which renders the structure L      I    Destructive Device discovered within the                                        ___        incapable of performing its Design Function E      I    Protected Area resulting in SCP-IO                                                    AND I                                                                            THEN V      I    implementation                                                                            Damaged Safety System(s) or Plant Vital Structure E      I                                                                                              is required for the present Operational Condition I
I s
L      I                                                                                                                          I I
f Action Required 8.0 System Malfunctions 8.5 Technical Specifications
I...-..
~
s      I I
Inability to Reach Required Operational Condition within Technical Specification Limits __/.
(
('
1, 2, 3
-j 8.5.1 IF Plant is NOT brought to the REQUIRED Operational Condition within the Technical Specification required time limit 7
-~
~
1 THEN Refer to Attachment 1 UNUSUAL EVENT I
IICciS ECCi Rev. 00 Page I of I  


9.0 Hazards - InternaVExternal Page I of I 9.2 Fire Initiating                          Fire within the Protected Area Boundary                                          Fire Affecting the Operability of Pl;int Safety Systems i                                                                                                          Required to Establish or Maintain Safe Shutdown Condition                   Not Estinguished within 15 minutcs of Dctection OPCON                      I      All                                            (      All      1                                           (    All    )
9.0 Hazards - InternaVExternal I
EAI, #                        -
9.1 Security Threats
9.2.1                                                  -
---I___-__
9.2.1                                                      -
Security Event in a Plant Vital Area Security Event in a Plant Protected Area Confinned Security Event Which Indicates a Potential Degradation in the Level of Safetv of the Plant Initiating Condition OI'CON EAL #
9.2.2 I                       IF                                                    IF                                                        IF E
1 E
M E
It G
E N
c Y
A C
T I
0 N
L E
V E
L s I
I I
I I
I I
I I
I I
I I
I I
I I
I I I I
I I
I I
I I
I I
I I
I I
M E
R I
I 1
I I
I I
Valid Fire Alami is rcccived iii tlic Main Control Room 1
li  -~--- -
AND Rcport of a fire from personnel at the scciic I    1- 1 Fire within  ANY oiic of tlic followiiig Phiit VitA Slructurcs:
Reactor Building Control/Aus Building G    I                                                      _.-_
E    I              Fire i s \ t i t h i n ANY onc of tlic following Plant Stnicturcs I            (EXCLUDING sni;ill fires Ihiit h a w                    potclitial to aflect              Scrim W;itcr Intake Structurc N    I Safct? S?stemsor Prolectcd Arca Pcrliiiinelit Plant Struclurcs) c    I I
Scn icc/Riid W;istc Building Y            RciicIor Building I
I I j    lurbinc Building 1  AND A
c I
I I
I I
Control/Aus Building                                                                        I       The Fire is of a niiignitudc tlial I SPECIFICALLY rcsiilts iii Ilamage to ANY oiic of llic following.
I (Ai-]
I  I Scnicc Waler Iiit;ikc Stnslirrc I                                                                                                    TWO OR MORE siibsystciiis of a Safety Sjsteni I    I 0    I      Scn icc/R;id Wastc Building                                                                    MORE THAN ONE Safety Systeni I
9.1.I IF Con finned security threat directed toward the station as evidenced by ANY -
N    I      Low Lcvcl Radwastc lntcrini Storage Facility                                                  Any Plant Vila1 Structure which renders thc structiirc incapablc c I
one of the following:
I i                                              ]-AND I
Credible threat of malicious acts or
performing its Design Function L    I                                                   ___.         -       __. 1i                            __
~....
destructive device within the Protected Area resulting in SCP-5 implementation Credible intrusion or assault threat to the Protected Area resulting in SCP-5 implementat ion Attempted intrusion or assault to the Protected Area resulting in SCP-7 or SCP-1 I implementation Malicious acts attempted or discovered within the Protected Area resulting in SCP-10 implementation normal plant operations resulting in SCP-8 implementation Protected Area resulting in SCP-IO implementation Hostage/Extortion situation that threatens Destructive Device discovered within the
. ~.....
<- All )
: k.
9.1.2 IF Confirmed hostile intrusion or inalicious acts as evidenced by -
ANY one of the following:
Discovery of an intruder(s), armed and violent, within the Protected Area resulting in SCP-6 implementation Hostage held on-site in a non-vital area resulting in SCP-8 implementation Malicious acts attempted or discovered within a Vital Area (which is in the Protected Area) resulting in SCP-IO implementation that does not meet criteria of 9.1.3 9.1.3 IF -
_I__
Confirmed hostile intrusion or malicious acts in Plant Vital Areas that involve actual or likely major failures of dant functions needed for the protection of the public as evidenced by any one of the following:
Discovery of an intruder(s), armed and violent, within the Vital Area resulting in SCP-6 implementation Destructive device discovered in a Vital Area resulting in SCP-IO implementation HCGS ECG Rev. 01 Page I of I Security Event Resulting in Loss of Ability to Reach and Maintain Cold Security event resulting in the actual loss of physical control of EI'I'I4ER one of the following:
Control Room Remote Shutdown Panel Malicious act(s) attempted or discovered in a Vital Area resulting in SCP-10 implementation AND the malicious act(s) is of a magnitude that it SPECIFICALLY results in Damage to ANY one of the following:
TWO OR MORE Trains of a Safety System MORE THAN ONE Safety System Any Plant Vital Structure which renders the structure AND incapable of performing its Design Function Damaged Safety System(s) or Plant Vital Structure is required for the present Operational Condition THEN I I...-..
I THEN
 
9.0 Hazards - InternaVExternal Initiating Condition OPCON EAI, #
E M
E R
G E
N c Y
A c I
I 0
N L
E V
E V
I I I               Fire i s NOT estinguished within 15 minutes of I EITHER one of the following.
E L
I I.
S Actioii Required I
I AND I
I I
I   i                                                                                  i                    Daiiiagcd Safcty Syslcin(s) or Pl;iiiI Vital Stnicture E    I I Receipt of a Valid Fire Alariii                                                  I is rcquircd for tlic prcscrit 0pcr;irional Coiidition L
I I
S I
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
Rcport of a lire from tlic scciir:
Fire within the Protected Area Boundary Not Estinguished within 15 minutcs of Dctection i
ti  THEN f
I All 9.2.1 IF -
1 THEN 1
(
Actioii Required                                  1      Refer to Attachment 1 IJNUSUALEVENT                      1 Refer to Attachment 2 ALERT
All 1
9.2.1 IF 9.2 Valid Fire Alami is rcccived iii tlic Main Control Room Rcport of a fire from personnel at the scciic l i
- ~ - - - - I 1-1 AND 1
Fire is \\tithin ANY onc of tlic following Plant Stnicturcs potclitial to aflect Safct? S?stems or Prolectcd Arca Pcrliiiinelit Plant Struclurcs)
(EXCLUDING sni;ill fires Ihiit haw RciicIor Building j
lurbinc Building Control/Aus Building Scnicc Waler Iiit;ikc Stnslirrc Scn icc/R;id Wastc Building Low Lcvcl Radwastc lntcrini Storage Facility I
i 1
I
]-AND i
Fire is NOT estinguished within 15 minutes of I I


tKx;s EC(;
I.
9.0 Hazards - InternaVExternal                                                        Rev 00 Page I of I 9.3 Explosion Explosion Affecting the Operability of Plant Initiating      Natural and Destructive Phenomena Condition    (    Atrecling the Protected Arca                  i          Safcty Systenis Required to Establish or Maintain Safe Shutdown OPCON                          All EAI, #                        -
i I EITHER one of the following.
9.3.1                                                            -9.3.2 I                    IF                                                               IF I
i I
E    l                                        I           !                                                        I M I               Confirmed Explosion                                 Confirmed Explosion within ANY onc of h c I                   \\ it hin                                            foilo\ving Plant Vital Structures:
Receipt of a Valid Fire Alariii Rcport of a lire from tlic scciir:
E     l R     I             thc Protcctcd Arca I                             . -
f i
G     I 1
THEN t
I AND N     I c:    I    Rcpon of visiblc daniagc to Plant equipnicnt or Protected Area Y     I       Pcrniancnt Plant Structurcs I
Refer to Attachment 1 1
1                           - - ._.- ..
1 IJNUSUALEVENT 1
A C
Page I of I Fire Fire Affecting the Operability of Pl;int Safety Systems Required to Establish or Maintain Safe Shutdown
(
All  
)
9.2.2 IF Fire within ANY oiic of tlic followiiig Phiit VitA Slructurcs:
Reactor Building Control/Aus Building Scrim W;itcr Intake Structurc Scn icc/Riid W;istc Building 1 AND The Fire is of a niiignitudc tlial I I
SPECIFICALLY rcsiilts iii Ilamage to ANY oiic of llic following.
TWO OR MORE siibsystciiis of a Safety Sjsteni MORE THAN ONE Safety Systeni Any Plant Vila1 Structure which renders thc structiirc incapablc c performing its Design Function I AND Daiiiagcd Safcty Syslcin(s) or Pl;iiiI Vital Stnicture is rcquircd for tlic prcscrit 0pcr;irional Coiidition 1
THEN Refer to Attachment 2 ALERT
 
Initiating Condition The Explosion is of a niagnitudc that it SPECIFICALLY rcsults i n Damage lo ANY oiic of tlic following I
I OPCON TWO OR MORE subsystcnis of a Safet! Sjstem MORE THAN ONE Saftty Sjstem Any Plant Vital Structurc which renders the structurc incapable of performing its Design Function EAI, #
I I
M I
E l
E l
I I
)
i I
t I.
1 R
I I
G I
N I
Y I
I 1
A i
T i
T i
I i
I 0 1 c:
I C
I I
N I
L I
V I
L I
I I
I E
t s
t Ac tiori Required 9.0 Hazards - InternaVExternal 9.3 Explosion Natural and Destructive Phenomena Atrecling the Protected Arca All
(
9.3.1 IF -
I Confirmed Explosion
\\\\ it hi n thc Protcctcd Arca 1 AND I
Rcpon of visiblc daniagc to Plant equipnicnt or Protected Area Pcrniancnt Plant Structurcs I THEN I
?
Refer to Attachment I UNlJSUAL EVENT i
Explosion Affecting the Operability of Plant Safcty Systenis Required to Establish or Maintain Safe Shutdown 9.3.2 IF Confirmed Explosion within ANY onc of h c foilo\\ving Plant Vital Structures:
I tKx;s EC(;
Rev 00 Page I of I
 
I ni t ;at ing Condition OPCON Action Required 9.0 Hazards - InternaVExternal 9.4 Toxic/Flammable Gases I
Release of Toxic or Flammable Gases Deemed Detrimental to Safe Operation of the Plant
('
All
\\
9.4.1.a IF I
1 Notification by Local, County, or I State Ofticials for the potential need I
i I
I I
I I
I THEN I
I  
The Explosion i s of a niagnitudc that it SPECIFICALLY rcsults i n Damage lo ANY oiic of tlic following TWO OR MORE subsystcnis of a Safet! Sjstem I   '
~
0 1                                                                                                                                     I    )
I 1
I                                                        MORE THAN ONE Saftty Sjstem N    I                                                                                                                                i I                                                        Any Plant Vital Structurc which renders the structurc                I t .
to EVACUATE non-essential personnel due to an Offsite Toxic Gas release I I AND SNSS deems evacuation of non-essential personnel is required i i i -
I                                                                                                                               ,
9.4.1.b IF Uncontrolled Toxic Gas release within the Protected Area in ANY area which does not normally require an atmospheric survey or Respiratoty Protection for entry I
L    I                                                         incapable of performing its Design Function            I .
(
1 V    I E tI L
All
s    t                        I
)
                                  ?
9.4.1.c IF IIC'OS 1:u; Kev 00 Page I Of 2 1
Ac tiori            Refer to Attachment I Required              UNlJSUAL EVENT
llncontrolled Flammable Giis 1
release wit hi n the Protected Area that RESULTS in Flammable Gas concentrations 2SY" of the LEL 1: x c E Ii r) I K G 1
1 AND I
I Routine Plant Operations are IMPEDED based on EITHER one of the following.
Access restrictions caused by the uncontrolled release Personnel injuries have occurred as a result of the release THEN
+
Refer to Attachment 1 UNUSUAL EVENT  


IIC'OS 1:u; 9.0 Hazards - InternaVExternal                                                                    Kev 00 Page I Of 2 9.4 Toxic/Flammable Gases I ni t ;at ing Condition I                      Release of Toxic or Flammable Gases Deemed Detrimental to Safe Operation of the Plant                                1 OPCON                         ('  All    \                                i    ii-                                        (    All        )
Initiating C g n ci i t i on OPCON EAI, #
9.4.1 .a                                    9.4.1.b                                        9.4.1 .c IF                                          IF                                                IF I
1 Notification by Local, County, or I State Ofticials for the potential need Uncontrolled Toxic Gas                    llncontrolled Flammable Giis                  1 I
release within the Protected Area                      release wit hi n the I
to EVACUATE                                in ANY area which                                Protected Area i      non-essential personnel                    does not normally require an                      that RESULTS in due to an                              atmospheric survey                      Flammable Gas concentrations OffsiteToxic Gas release                    or Respiratoty Protection for                          1: xc
__  _ _E Ii r) I K G I
I AND entry I
2SY" of the LEL II                                                                                                                  1 SNSS deems evacuation                                                                                        I
                ~
I I
I I
of non-essential personnel is required 1 AND 1                                                                                 I Routine Plant Operations are IMPEDED based on EITHER one of the following.
E l
Access restrictions caused by the uncontrolled release Personnel injuries have occurred as a result of the release THEN
It1 1
                                                                                                    +
E l
Refer to Attachment 1 Action                                                                                  UNUSUAL EVENT Required
K I
(;
I 1.:
I N
l c
Y I
I I
A I
T I
0 1 I
I I
C I
I


9.0 Hazards - InternaVExternal                                                                         I I C W ECG Hcv 00 Page 2 o f 2 9.4 ToxidFlammable Cases Initiating                          Release of Toxic or Flammable Gases Within a Facility Structure Which Jeopardizes Operation of Systems I
I N
C g nci i t i on                            Required to Maintain Safe Operations or to Establish or Maintain Cold Shutdown Conditions OPCON                                                                                                                                                (    All  \
I L
EAI, #                                              9.4.2.a                                                                                         9.4.2.b I                                      IF                                                                                             IF I                              -  ___ _-
I E
E          l                                                                                            I          Uncontrolled Flammable Cas release within ANY one It1          1 Uncontrolled Toxic Cas release within ANY one I                of the following Plant Structures                                                               of the following Plant Structures E        l K            I    Reactor Building                                                                                  Reactor Building I
l V
(;            I    Turbine Building                                                                                  Turbine Building 1:.          I    (ontrol/Aux Building
I L
                                                                                                              ~
I I
                                                                                                              !          ConrroVAux Building I
I I
N            l                                                                                          i Service Water Intahe Structure                                                       i          Service Water Intake Structure c                  ServicdRad Waste Building
I Action Required 9.0 Hazards - InternaVExternal 9.4 ToxidFlammable Cases Release of Toxic or Flammable Gases Within a Facility Structure Which Jeopardizes Operation of Systems Required to Maintain Safe Operations or to Establish or Maintain Cold Shutdown Conditions I
                                                                                                              ~
9.4.2.a IF Uncontrolled Toxic Cas release within ANY one of the following Plant Structures Reactor Building Turbine Building (ontrol/Aux Building Service Water Intahe Structure ServicdRad Waste Building
I          Service/Rad Waste Building Y          I                                                                                            I I
[ AND Toxic Gas concentrations result in ANY one of the following.
I
An IDLt1 atmosphere Plant personnel report severe adverse health reactions, 1
[ AND
The Threshold Limit Value (TLV) being EXCEEDED including burning eyes, nose, throat, dizziness
__                                                                                        -1 AND A            I            Toxic Gas concentrations result in ANY one of the following.                                                                   ~latnmableGas concentrations EXCEED C            I T          I                                                                                                                            50% of the LEL I
- -I-I. -................  
An IDLt1 atmosphere I                                                                                              !
^___....... -.
Plant personnel report severe adverse health reactions, 0 1 including burning eyes, nose, throat, dizziness i
I
I N            I I  1 The Threshold Limit Value (TLV) being EXCEEDED
~
____      -      I L            I I
i i
                                                  -   -I-E          l I                              ,
~
I. -. . . . . . . . . . . . . . . .
I I
                                                        ...... ^___ . . . . . . .   -.       ......
i I
I   AND I
I I C W ECG Hcv 00 Page 2 o f 2
V          I Plant personnel are unable to perform actions necessary to complete a Safe Shutdown of the plant without appropriate personnel protection equipment L          I 1 .
(
THEN Action                                                                                                Refer to Attachment 2 Required                                                                                                      ALERT
All
\\
9.4.2.b IF Uncontrolled Flammable Cas release within ANY one of the following Plant Structures Reactor Building Turbine Building ConrroVAux Building Service Water Intake Structure Service/Rad Waste Building
- 1 AND
~latnmable Gas concentrations EXCEED 50% of the LEL I AND I
Plant personnel are unable to perform actions necessary to complete a Safe Shutdown of the plant without appropriate personnel protection equipment 1 THEN Refer to Attachment 2 ALERT  


9.0 Hazards - InternaVExternal IlC(iS ECO K C V . 00 Pagc I of I 9.5 Seismic Event initiating                           Natural and Destructive Phenomena                                      Natural and Destructive Phenomena Condition                                 Affecting the Protected Area Atfecting the Plant Vital Area                1 OPCON                                                                 ('  All )                                          (    All    )
9.0 Hazards - InternaVExternal 9.5 Seismic Event I
EAL #                   9.5.1 .a                                      9.5.1.b                                            -
IlC(iS ECO K C V. 00 Pagc I of I initiating Condition OPCON EAL #
9.5.2 I                                                              IF I              IF                                                .-
E      l    I                    1 M I          j Seismic Event felt                        Valid Actuation of the I                                                                              I E      l      ! by personnel                            Seismic Trigger (> 0.01g)
R      I          within the                    has occurred as verified by the 1
G      I      I Protected Area                    SMA-3 Event Indicator (flag)
E      ;                          I                          being WHITE I
N    I                                                  on Panel IO-C-673 in the c        ;                                                Upper Relay Room Y      I                                                                    .
I I
I I
A c
E l
I
E l
                ;                                                                                  1 Valid I
G I
i Actuation of the Seismic Switch   (> 0.lg) has occurred as veritied by E l l 1 IER one
N I
      '1'      I I                                                                                    of the following:
Y I
I        I 0 1                                                                                      AND I                                                                                        Valid actuation of Main Control Room N      I I                                                                                      Overhead Annunciator C6-C4 I
A I
L        I                                                                                      AMBER Alarm light on the Seismic Switch Power Supply Drawer is lit on Panel IO-C-673 V      I                                                                                        in the Upper Relay Room 1,
'1' I
S 1
0 1 M
I 1 THEN t                                                                 t      .
I I
Ke1i.r to Attachnient 24                i              I                Refer to Attachment 2 Act io 11 Required                        I UNUSUAL EVEN'I (Common Site)                    I              I                        ALERI
R I
1 E
c c
I I
I I
I N
I L
I V
I 1,
1 I
I I
S I
Act io 11 Required Natural and Destructive Phenomena Affecting the Protected Area 9.5.1.a IF I
1 j Seismic Event felt by personnel within the I Protected Area I
('
All
)
9.5.1.b IF Valid Actuation of the Seismic Trigger (> 0.01g) has occurred as verified by the SMA-3 Event Indicator (flag) being WHITE on Panel IO-C-673 in the Upper Relay Room t
Ke1i.r to Attachnient 24 i
I UNUSUAL EVEN'I (Common Site) I 1
Natural and Destructive Phenomena Atfecting the Plant Vital Area
(
All
)
9.5.2 I
1 Valid Actuation of the Seismic Switch (> 0.lg) i has occurred as veritied by Ell1 IER one I
of the following:
AND Valid actuation of Main Control Room Overhead Annunciator C6-C4 Power Supply Drawer is lit on Panel IO-C-673 in the Upper Relay Room AMBER Alarm light on the Seismic Switch 1 THEN t
Refer to Attachment 2 ALERI I
I  


9.0 Hazards - Internal/External 9.6 High Winds Initiating Condition             Natural and Destructive Phenomena                                      Natural and Destructive Phenomena i             Affecting the Piotected Area             'i    (                      AtTecting the Plant Vital Area OPC'ON All     \                   (   Ail   I                                           (    All    ')
9.0 Hazards - Internal/External 9.6 High Winds Initiating Condition Natural and Destructive Phenomena OPC'ON
9.6.1.a                         9.6.1.b                                               -
'i
9.6.2 IF                              IF Report of a                Sustained wind speeds Tornado                          > 75 MPH
(
                'l:OUC11ING                    for 15 minutes, DOWN                        measured at within the                ANY elevation of I'l-otected Area                   the Met Tower                    The Wind Speed is of a magnitude that it SPECIFICAL1.Y results in Damage to ANY one of the following:
i Affecting the Piotected Area All  
TWO OR MORE subsystems of a Safety Systeni MORE THAN ONE Safety Systeni Rendering ANY of the following structures incapable of perforniing b
\\
I its Design Function I
(
I t
Ail I
THEN
9.6.1.a IF Report of a Tornado
'l:OUC11ING DOWN within the I'l-otected Area I
1 N
I 9.6.1.b IF Sustained wind speeds  
> 75 MPH for 15 minutes, measured at ANY elevation of the Met Tower I
b I
THEN t
Act ion Required v
Refer to Attachinent 24
' IJNUSIJAL, EVENT (Coninion Site)
Natural and Destructive Phenomena AtTecting the Plant Vital Area
(
All
')
9.6.2 The Wind Speed is of a magnitude that it SPECIFICAL1.Y results in Damage to ANY one of the following:
Rendering ANY of the following structures incapable of perforniing TWO OR MORE subsystems of a Safety Systeni MORE THAN ONE Safety Systeni its Design Function
* Reactor Building
* Reactor Building
* Control/Aux Building N    I 1
* Control/Aux Building
              * *
* Service Water Intake Structure
* Service Water Intake Structure
* Service/RadwasteBuilding I   AND I         Damaged Safety System(s) or Plant Vital Structure
* Service/Radwaste Building I
                                                                            !          is required for the present Operational Condition 4 THEN v
AND I
Refer to Attachinent 24                                                Refer to Attachment 2 Act ion        '  IJNUSIJAL, EVENT (Coninion Site)                                                      A I .ER'I*
Damaged Safety System(s) or Plant Vital Structure is required for the present Operational Condition 4 THEN Refer to Attachment 2 A I.E R'I*  
Required


9.0 Hazards - InternaVExternal 9.7 Flooding Initiating             Internal Flooding in Excess of Sump Handling Capability                 Internal Flooding Affecting the Operabilityof Plant Safety Condition          (
9.0 Hazards - InternaVExternal 9.7 Flooding i
Affecting Safety Related Areas of the Plant              (      Systems Required to Establish or Maintain Safe Shutdown       i OPCON                                                                                                                    (   All      \
Initiating Condition Internal Flooding in Excess of Sump Handling Capability Affecting Safety Related Areas of the Plant Internal Flooding Affecting the Operabilityof Plant Safety Systems Required to Establish or Maintain Safe Shutdown
EAL #                                               -
(
9.7.1                                                                 9.7.2 I                                         IF                                                                    IF I
(
E     l      l                                                                    I I
OPCON EAL #
Visual Observation of Uncontrolled Flooding that confirms                      Visual Observation of Flooding within ANY one            I 1      ,
9.7.1 I
E      l                         ANY one of the following                                            of the following Plant Vital Structures R                                                                                         Reactor Building iI 1     1 I     1    Reactor Building Floor Levels above the Maximum G
IF I
I      '  Normal Floor Level ( > I " ) referenced in EOP 103,                   ControVAux Building E      ;
1 E
Secondary Containment Control                                          Service Water Intake Structure N       I                                                                                                                                                 I Receipt ofa SSWS Pump Room Flooded Alarm
l R
    "    I
1 1
            ;  ,      Greater than 2" of water in ANY area that contains a ServicdRad Waste Building I
I I
              ~i Siifety System(s), not included above
Normal Floor Level ( > I " ) referenced in EOP 103, G
                                                                                    ~
N I
I AND
I Greater than 2" of water in ANY area that contains a I
                                                                                                                                                                ~
Siifety System(s), not included above  
A                                                                             I C       I 1      '
~i I
The Flooding is o f a magnitude that it XCIFICALLY results in Daniage to ANY one of the following
E l
      'I'    I 1    1I                                          I                               Ii  '--
l Visual Observation of Uncontrolled Flooding that confirms ANY one of the following 1
TWO OR MORE subsystems of a Safety System 1   MORE I H A N ONE Safety System I
Reactor Building Floor Levels above the Maximum Secondary Containment Control E
Any of the above listed Plant Vital Structures which renders the structure incapable of performing its Design Function i
Receipt ofa SSWS Pump Room Flooded Alarm A
1 AND Damaged Safety System(s) or Plant Vital Structure is required for I
1
the present Operational Condition                   i I
'I' I
S      I t
C I
I                                                                    I t
I
THEN Action                                  Refer to Attachment I          L i Refer to Attachment 2 Required                                  UN US I1 A L EV EN'I'                                                            A LE 14'1.
(
All
\\
9.7.2 IF Visual Observation of Flooding within ANY one I
I of the following Plant Vital Structures i
Reactor Building ControVAux Building Service Water Intake Structure ServicdRad Waste Building I
I
~
~
I AND The Flooding is ofa magnitude that it XCIFICALLY results in Daniage to ANY one of the following I
I I i
'TWO
-- OR MORE subsystems of a Safety System 1
1 S
I Action Required I t Refer to Attachment I U N US I1 A L EV EN'I' L
1 MORE I H A N ONE Safety System I
Any of the above listed Plant Vital Structures which renders i
the structure incapable of performing its Design Function 1 AND Damaged Safety System(s) or Plant Vital Structure is required for I
I the present Operational Condition i
I THEN t
A LE 14'1.
i Refer to Attachment 2  


9.0 Hazards - InternallExternal HC<IS ECG KW. no Page I of I 9.8 Turbine Failure / Vehicle Crash / Missile Impact lnitiating                           Natural and Destructive Phenomena                                          Natural and Destructive Phenomena Condition j
lnitiating Condition OPCON EAL #
Affecting Certain Structures Within the Protected Area
( Affecting Certain Structures Within the Plant Vital Area      )
OPCON                             All          1                              ( - - Ail  )                                [  All    'I EAL #                           9.8.1 .a                                          9.8.1.b                                      9.8.2 I                        IF                                                IF                                          IF I                  .  . .. ... . - .    . __                  . . - ._-.    - --
E    l    I                                                  1.-  --                                                                                          I bl    I    j    Catastrophic damage to the                              Vehicle Crash /              Vehicle Crash / Missile Impact with or within              I I
E H
G l
I I
I I
I i
E l
j Main Turbine as evidenced by EITHER    one of the following:
bl I
Missile Impact with or within ANY one of the ANY one of the following Plant Vital Structures Reactor Building                                              Ii
E l
                '    Main Turbine casing                              following Plant Structures'    Control/Aux Building                                          II E   l         penetration I                                                          Reactor Building                Service Water Intake Structure                                  I N     I
H I
    <-    ;          Main I'urbine/Generator 1)arnage potentially releasing Turbine Building                ServicdRad Waste Building                                      I Control/Aux Building                                                                            I Y     I I
G I
I     I Lube Oil or t iydrogen Gas to the Turbine Building Service Water Intake                                        1 AND A     I I
E l
Structure                    l h e Vehicle Crash / Missile Impact is of a magnitude            I1
N I
    <:    I                                                           Service/Rad Waste Building      that it SPECIFICALLY results in Damage to ANY I' I                                                                                                                                                               ~
Y I
1                          I I
I I
one of the following I     ,                        i                                                              TWO OK MORE subsystems of' a Safety System 0 1
A I
                                                                                                                                                                        ~
I I'
I         , . ,      '
I 0 1 I
MORE THAN ONE Safety System                                        I N     I I
I I
                  \  I Any of the above Plant Vital Structures which renders I                                                               ._-
I I
L E tI V
N I
E 1,
L I
V I
1, I
1 I
I I
I I
I   THEN the structure incapable of performing its Design Function I AND Safety System(s) or Plant Vital Structure for the present Operational Condition Action
E t
                                                          . 1      ..
E Action Required 9.0 Hazards - InternallExternal 9.8 Turbine Failure / Vehicle Crash / Missile Impact HC<IS ECG KW. no Page I of I
Refer to Attachment I 4THEN Refer to Attachment 2 Required                                          UNUSUAL EVENT                                                                ALERT
)
Natural and Destructive Phenomena Affecting Certain Structures Within the Protected Area Natural and Destructive Phenomena
( Affecting Certain Structures Within the Plant Vital Area j
All 1
9.8.1.a IF I
j Catastrophic damage to the i
j Main Turbine casing Main Turbine as evidenced by EITHER one of the following:
penetration 1)arnage potentially releasing Lube Oil or t iydrogen Gas Main I'urbine/Generator I
to the Turbine Building I I i
\\
I
( - - Ail
)
9.8.1.b IF Vehicle Crash /
Missile Impact with or within ANY one of the following Plant Structures' 1. -
Reactor Building Turbine Building Control/Aux Building Service Water Intake Service/Rad Waste Building Structure I THEN  
. 1 Refer to Attachment I UNUSUAL EVENT
[
All
'I 9.8.2 IF I
I Vehicle Crash / Missile Impact with or within i
Control/Aux Building I I I
I ANY one of the following Plant Vital Structures Reactor Building Service Water Intake Structure ServicdRad Waste Building I
I 1 AND l h e Vehicle Crash / Missile Impact is of a magnitude I 1 that it SPECIFICALLY results in Damage to ANY one of the following
~
TWO OK MORE subsystems of' a Safety System MORE THAN ONE Safety System
~
I Any of the above Plant Vital Structures which renders the structure incapable of performing its Design Function I AND Safety System(s) or Plant Vital Structure for the present Operational Condition 4 THEN Refer to Attachment 2 ALERT  


9.0 Hazards - InternaVExternal 9.9 River Level
Initiating Condition OPCON EAL # -
                                  -  ____      -        -  ~ .- - ---        -    -
1 I
Initiating                         Natural and Destructive Phenomena Condition     (  ...............
E M
AfYecting the Protected Area OPCON                                                               (,        All    )
I I
EAL #                                                                   9.9.1 .b 9.9.1 .a 1
R I
I                         IF                                        IF I1
I E
                                ~
l G
E     :
I N
M    I                                                   River Level < 80.0' I
I Y
E    l                                      . I      I R     I I
I I
G     I N   I                                       ._
I A
cY I I                                                   THEN I
I T
I A    I c     :
I 0 1 c
T      I
I c
      ' 1 0 1 I
1 I
N     l 1
1 I
I L     l E   1 I
N l
V     I                                                                             . \
L l
L     I 1                               -     -     --       .  -     -
E 1
Refer to Attachment 24 Action                          UNUSUAL EVENT (Common Site)
V I
Required
L I
I 1
Action Required 9.0 Hazards - InternaVExternal 9.9 River Level Natural and Destructive Phenomena
~.- - - - - -
(
AfYecting the Protected Area 9.9.1.a IF
~
(,
All
)
9.9.1.b IF River Level < 80.0' I 1
. I I
THEN Refer to Attachment 24 UNUSUAL EVENT (Common Site)  
. \\


I ICGS ECG 11.0 Reportable Action Levels                                                                                                       Ilev. 02 Page I of 2 11.1 Technical Specifications
Initiating C'o nd i I i o n OPC'ON I U L, #
                    ~.     _.. . . . .    .....        .- .....................                            . . . . .      __ .......        .......
I I
                                                                                                / - - -
'I I
Initiating                INI'I'IA'I'ION 01; A N Y 1lNl'l SI l1Jl'l)OWN                           liXCl3il)lN(j ANY 'I'liCI INICAl,                                            ANY IXVIA'I'ION I'KOM T/S OR ItliQUIKlil) IiS '1'1 Ili l'l:Cl INICAI, Sl'liCII~ICh'l'lONS                                     Shl.lI'I'Y I.IMII                                    1,ICLINSII CONI)I'I'ION I'URSUAN'I '1'0 C'ondi I i on                            I IOCIzR5U.72(h)(2)(i)                              ,.'               [ IOCFR50.36(c)(l),'I'S6.7.I.aI                                 IOCI.X50.54(x) I IOCFR50.72(h)( I)]
1' I
                                                                                - ...            \............            ........
It I
OPC'ON                                        ..  ...  ..
1 1
( 1 ,2 ,-3 , 4_, 5 (as applicable in -
(;
TIS)]
I A
c-All-3 IUL, #                                        11.1.I.a                                                            ll.l.l.b                                                           11.I.l.c I
I T
IF                                                                     IF                                                                IF I                                                                                                          -    -        __  -        _  -- ._- __ . _    ....                    . __........ __
I 0
      'I        I I'      I                      Unit shutdown is                                                        Exceeding ANY one                                               Action required because I
I I'
1'      I                            INIIIATEII                                                          of the following                                           no action consistent with 0        I                      to comply with                                          Technical Specification Safety Limits:                                         Technical Specifications I
I 0
It      I              'I'eclinical Speci ticat ions                                                                                                          or license can provide adequate I                                                                                    T/S 2.1.1,'I'lIERMAL POWER,
I I
                                                                      -    -                                                                                            or equivalent protection in an I                                                                                    Low Pressure or Low Flow 1      1                                        THEN                                                                                                                          emergency N I
I I
(;      I
I N
                                                                                                      'us THERM THERMAL POWER, tligh Pressure and High Flow (See NC.NA-AP.ZZ-0005 (Q)
I c
I for guidance on deviation I                                                                                    T/S 2.1.3, REACTOR COOLANT                                               from written procedures)
t I
A        I SYSTEM PRESSURE c      t                                                                                                                                                                                I  THEN T        I                                                                                  T/S 2.1.4, REACTOR VESSEL I
I I
1       ,                                                                                   WATER LEVEL 0        I                                                                                                                           -
1 N
I N        I                                                                                                                     THEN I
I 1,
I 1,      I E      l I
I E
V      I
l V
        " 1 L        l S        I Action               I          Refer to Attachment 14                            I I                                                                                        12     1 i i c q u i i cu        I                  4 i iuiu iicpuii                          I I
I L
l I
I I
I 1
S I
Action i i c q u i i cu 11.0 Reportable Action Levels 11.1 Technical Specifications  
~.
INI'I'IA'I'ION 01; ANY 1lNl'l SI l1Jl'l)OWN ItliQUIKlil) IiS '1'1 Ili l'l:Cl INICAI, Sl'liCII~ICh'l'lONS I IOCIzR5U.72(h)(2)(i) 11.1.I  
.a IF Unit shutdown is INIIIATEII to comply with
'I'eclinical Speci ticat ions THEN I
Refer to Attachment 14 I
4 i iuiu iicpuii I
I I
I
/ - - -
liXCl3il)lN(j ANY 'I'liCI INICAl, Shl.lI'I'Y I.IMII
[ IOCFR50.36(c)(l),'I'S 6.7.I.aI  
\\
(
1, 2,3,4,5 (as applicable in TIS)]
ll.l.l.b IF Exceeding ANY one of the following Technical Specification Safety Limits:
T/S 2.1.1,'I'lIERMAL POWER, Low Pressure or Low Flow  
'us THERM THERMAL POWER, tligh Pressure and High Flow T/S 2.1.3, REACTOR COOLANT SYSTEM PRESSURE T/S 2.1.4, REACTOR VESSEL WATER LEVEL THEN I ICGS ECG Ilev. 02 Page I of 2 ANY IXVIA'I'ION I'KOM T/S OR 1,ICLINSII CONI)I'I'ION I'URSUAN'I '1'0 IOCI.X50.54(x) I IOCFR50.72(h)( I)]
c-All-3 11.I  
.l.c IF Action required because no action consistent with Technical Specifications or license can provide adequate or equivalent protection in an emergency (See NC.NA-AP.ZZ-0005 (Q) for guidance on deviation from written procedures) 12 1
I THEN


11.0 Reportable Action Levels 11.1 Technical Specifications i
11.0 Reportable Action Levels 11.1 Technical Specifications  
                                                                                                  ~               .........                                                                                                                .
~  
Initiating Condi t ion \,.
. i ANY EVENT REQUIRING AN ENGINEERING EVAIAJATION BY TECI INICAL SPECIFICAIIONS OR COMMITMENT VIOLATION OF T H E REQUIREMENTS i
VIOLATION OF T H E R E Q U I R E M E N T S C O N T A I N E D IN THE O P E R A T I N G LICENSE
CONTAINED IN THE OPERATING LICENSE Initiating Co ndi t io n
[JICGS Operating License, Sections 2.FJ
\\,
                                                                                    ...         \            .................
[TIS 3.4.6.1, 3.4.4,3.7.5]  
ANY E V E N T REQUIRING AN ENGINEERING EVAIAJATION BY TECI INICAL SPECIFICAIIONS OR C O M M I T M E N T
---e
_- 3.4.4,3.7.5]
[JICGS Operating License, Sections 2.FJ
[TIS 3.4.6.1,             -.                                                     .-- -
\\
e i
OICON
OICON                                   (--
(--  
                                          \
-All-->  
                                              -All-->
\\
                                                  ..........      ../
.../
(        All          )                                                    All 1I.I.3.a                                                      I 1.I.3.b                                    11.I.3.c                                                          I 1.I.3.d IF                                                              IF                                              IF IF Violation of ANY one of the                                                     Any          of the                    The conductivity,                                                  One or more rcq uircnicnt s contni tied in Scc t ion 2 .C                                       T/S I .cos                            chloride concentration                                                        snubbers ottlic ()pcrating I,icensc l~X(l~1l.                                           li)r JiCS                              or pl1 in the RCS                                                    are tound to be
1 I.I  
:is otlicr\vise proiidcd i n thc                                         ProsSIIre/                              is in excess of its                                                  INOIIRAI31,I IcchnicalSpccitications                                        Ienipcrature                            specified limits per                                                              and o r Ilti~~irotitiicntal           Irotcction Ihn                         (T/S 3.4.6.1 )                                     T/S 3.4.4                                                 have been replaced arc exceeded                              Action Statement C. 1                                                               or restored to an 1      THEN                                there by requiring an Engineering thereby requiring an Engineering Evaluation                                               0I ERA I3 LE stiltus, Eva1uat ion.                                                                                                    an Engineering Evaluation shall be performed per T/S 4.7.54 THEN 1
.3.a IF Violation of ANY one of the rcq uircnicnt s contni tied in Scc t ion 2.C ottlic ()pcrating I,icensc l~X(l~1l.
J I
:is otlicr\\vise proiidcd in thc Icchnical Spccitications o r Ilti~~irotitiicntal Irotcction Ihn I 1.I
1
.3.b 1 THEN IF Any of the T/S I.cos li)r JiCS Pros SII re/
Ienipcrature (T/S 3.4.6.1 )
arc exceeded there by requiring an Engineering Eva1 uat ion.
I
( All
)
11.I
.3.c IF The conductivity, chloride concentration or pl1 in the RCS is in excess of its specified limits per T/S 3.4.4 Action Statement C. 1 thereby requiring an Engineering Evaluation All I 1.I
.3.d IF One or more snubbers are tound to be INOIIRAI31,I and have been replaced or restored to an 0 I ERA I3 LE stilt us, an Engineering Evaluation shall be performed per T/S 4.7.54 1
J THEN 1  


I ICGS ECG 11.0 Reportable Action Levels                                                                                I k v 01 Page I of I 1 I .2 Degraded or Unanalyzed Condition J l c--  I:VEN'I'/CONI~I~I'ION TIIAI COULD IIAVE I'RISVEN'IED CI'RI'AIN SAFETY FUNCI'IONS
I ICGS ECG I k v 01 Page I of I 11.0 Reportable Action Levels 1 I.2 Degraded or Unanalyzed Condition 11.2.1 IF 11s judgcd by tlic OS/KI)O, an cvcnt or condition that rcsults in ANY unc ofthc li)llo\\ving:
I tic condition 01' tlic pliirit. iiicluding its principal salkty barricrs, being scriously dcgradcd; The plant being in an unanalyzed condition that significantly degrades plant safety.
J l
I:VEN'I'/CONI~I~I'ION TIIAI COULD IIAVE I'RISVEN'IED CI'RI'AIN SAFETY FUNCI'IONS
[ 10CI:R50.72 (b)(3)(v)]
[ 10CI:R50.72 (b)(3)(v)]
All 11.2.1                                                                                       1I.2.2.b IF                                                                                            IF Any event or condition that at the time of 11s judgcd by tlic OS/KI)O, an cvcnt or discovery could have prevented the condition that rcsults in ANY unc ofthc fulfillment of the safety function of li)llo\ving:
c--
structures or systems that are needed to I tic condition 01' tlic pliirit. iiicluding its pcrform A N Y one of the following:
All 1 I
principal salkty barricrs, being scriously dcgradcd;
.2.2.b IF Any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to pcrform ANY one of the following:
: 4. Shutdown the reactor and maintain it in The plant being in an unanalyzed a safe shutdown condition condition that significantly degrades plant
: 4. Shutdown the reactor and maintain it in a safe shutdown condition
: 3. Remove residual heat.
: 3. Remove residual heat.
safety.
: 2. Control the release of radioactive material D. Mitigate the consequences of an accident THEN THEN 1
: 2. Control the release of radioactive material
~
____.--                                                                            D. Mitigate the consequences of an THEN                                                                 accident THEN
I n I I  
                                                  .  .  . .  .      1    ~       .. . .    .  .
.... n..-....
I                 n I I .... n ..- ....                 I   I
I I


                      . ,. ,..._. . .                d   , .
d


IICGS ECG 11.0 Reportable Action Levels                                                                                          I k v . 02 Page I o f I 1 1.3 System Actuations
11.0 actuation of the reactor protection system (RPS) when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.
                                                                                                                                                                ~~  ........... _ _ ...      ................    .-    .....
Reportable Action Levels 1 1.3 System Actuations 111 it i at i ng C'ondi tion OI'CON RAL #
                                                                                                                                                                                                                                    --\
It E=
VAI I I ) A C I ~ I A ~ I O N O ~ I I S ~ ~ I ~I XCI        S Y SP II I ~ M 111i t i at i ng C'ondi tion            ..                                  .-  -      _ _ -- - -                                                                              (\.-      I'K1 PI ANN1 I) [ 1OC.I IlW 72(b)(3)(iv)(A)I OI'CON                                      (    - _-
I' 0
All        -    2 1                                                                                                        (-      All -            1 )'
H T
RAL #                                                11.3.1                                                                                                                                11.3.3 I                                          IF                                                                                                                                IF I                                                                      __          -                                                                                                    ._
I N
It      I E=      I                                                                                                                                                  Any event or condition that results in I              Valid ECCS Actuation, Manual or                                                            actuation of the reactor protection     valid actuation of any system listed in I'      I 0        I          Automatic, has or should have occurred                                                        system (RPS) when the reactor is     Technical Basis 1 1.3.3 except when the H
(;
I I  I.....        __...          .. -.      ,              .                        ...
A C
critical except when the actuation results from and is part of a pre-planned actuation results from and is part of a pre-planned sequence during testing or I
T 1
T      I I                                                                                                        sequence during testing or reactor I      I reactor operation.
0 N
N      I        ..... ___  ....                        AND
L E
                                                                - .- .-            ~              __
operation.
I
(;       I                                                                                                                                  rHEN                                                  THEN I        ECCS results, or should have resulted, in I
A       I                    discharge to the vessel C
T I
I I
1       I                                          1    AND I
0       I I
N        I I                Actuation is NOT part of a I          pre-planned sequence during testing or L       I E       I                        reactor operation.
V E
V E
I        - ..                            -
1L THEN L
S I ---
I            4    tiour Kenort                      I
11.0 Reportable Action Levels 11.4 Personnel Safety / Overexposure ONSI'IE FAIAl,l'IY OCFK50.72(b)(2)(xi)]
                .      .            ___                          ..-.    '.__ ...............                    -2
                                                                                                                                . _. 1 OI'CON ItAL, ##
c  -
                                          - A!!..)
1I.4.1 L-..  -!LJ 1I.4.2.a
(-All_)
II.4.2.b I                                  IF                                                            IF                                          IF I                                                                                        _ _ -. __                __ -          __---      --. -
I E:  I j Any fatality has I  1  I ~ I ~ I ~ S O N OVEREXPOSURE N~~I,                or potential    PERSONNEL OVEREXPOSURE or potential for                          occurred within the 1'  I for oscrcsposurc as indicated by              )verexposure within a 24 hour period, as indicated                Owner Controlled A N Y one of the folloiving:
                              --.-                                                        by ANY one of the following:                          Area (OCA)
I ...... .- ....
                        'l*Kl)K exposure >      - 25 Hem                          TEDE exposure > S Rem                                                    THEN I,DE exposure >        - 75 Hem                            1,DE exposure > 15 Rem SI)K exposure        - 250 Item
                                                >                                    SDE exposure > SO Item I
I  D I<elcascof radioactive material inside                      Release of radioactive material inside A    I or outside of a Kestricted Area so that                  or outside of a Restricted Area so that c      ;            had an individual been present for                        had an individual been present for
    'r    I 24 hours the individual could have 24 hours the individual could have
      ' I 0 1                received > 5 times the occupational                      received > 1 times the occupational I            ALI (Annual Limit of Intake) which                        ALI (Annual Limit of Intake) which N      l            would usually equate to 25 Rem                            would usually equate to 5 Rem CEDE.
I I            CEDE. This Does N O 1 apply to areas                      This Does NO'I' apply to areas where L    I                                                                      personnel are              normally stationed E    l            where personnel are NOT normally I          stationed during routine operations.                      during routine operations.
V    I E    ;                                                                  -                                          _ .
L S
L S
A rtinn I<eauired I
I I
I I
I         i kiour Kepon        I 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I
I
                                                                                                    -   - - 1 THEN Refer to Attachment 14 4 iiuu: iicpuii I
( All 1
11.3.1 IF 2
Valid ECCS Actuation, Manual or Automatic, has or should have occurred I.....
I
-.- AND
~
ECCS results, or should have resulted, in discharge to the vessel 1
AND Actuation is NOT part of a pre-planned sequence during testing or reactor operation.
1 THEN L
rHEN IICGS ECG Ikv. 02 Page I of I
~~
--\\
VAI I I ) A C I ~ I A ~ I O N O ~ I I S ~ ~ I ~ S Y S I I ~ M I XCI P I I'K1 PI ANN1 I) [ 1OC.I IlW 72(b)(3)(iv)(A)I
(\\.-
(-
All -
1
')
11.3.3 IF Any event or condition that results in valid actuation of any system listed in Technical Basis 1 1.3.3 except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.
I ---
THEN I
4 tiour Kenort I
 
11.0 Reportable Action Levels 11.4 Personnel Safety / Overexposure
- c - A!!..)
OI'CON ItAL, ##
1 I.4.1 I
IF I
I E:
I j 1'
I I 1 I ~ I ~ I ~ S O N N ~ ~ I,
OVEREXPOSURE or potential I
I A
I c
I
I
'r I
N l
L I
E l
V I
L I
S I
0 1 I
I I
I E
I A rtinn I<eauired D
for oscrcsposurc as indicated by
--.- ANY one of the folloiving:
'l*Kl)K exposure > - 25 Hem I,DE exposure >
- 75 Hem SI)K exposure > - 250 Item I<elcasc of radioactive material inside or outside of a Kestricted Area so that had an individual been present for 24 hours the individual could have received > 5 times the occupational ALI (Annual Limit of Intake) which would usually equate to 25 Rem CEDE. This Does N O 1 apply to areas where personnel are NOT normally stationed during routine operations.
I i kiour Kepon I
-2 1
L-.. -!LJ 1 I
.4.2.a IF PERSONNEL OVEREXPOSURE or potential for
)verexposure within a 24 hour period, as indicated by ANY one of the following:
TEDE exposure > S Rem 1,DE exposure > 15 Rem SDE exposure > SO Item Release of radioactive material inside or outside of a Restricted Area so that had an individual been present for 24 hours the individual could have received > 1 times the occupational ALI (Annual Limit of Intake) which would usually equate to 5 Rem CEDE.
This Does NO'I' apply to areas where personnel are normally stationed during routine operations.
I
- - - 1 THEN 1
- Refer to Attachment 14 I
I 4 iiuu: iicpuii ONSI'IE FAIAl,l'IY OCFK50.72(b)(2)(xi)]
(-All_)
I I.4.2.b IF Any fatality has occurred within the Owner Controlled Area (OCA)
I THEN


11.0 Reportable Action Levels 1 1.4 Personnel Safety / Overexposure
Initiating c'o nd i t i o n O I T O N I<
                                                                                                                          ~          ~.
K 1'
I'I'INIISS lOK INJ'I'Y PROGRAM: FAI.SK I'OSI'I'IVE Initiating                                                                            SIGNIFICANT FITNESS FOR c'o nd i t i on                                                                    (          EVENTS [ IOCFR26.731
0 It
                                                                                                                            'IO AI>MINISIIIAI'IVI.: ERROR (I3L.IND TESl' 13Y IAH)
'I' I
[ IOCI.'R26, AI'I'. A, 2.8(e)(S)]
N
                                                                                                                                                                            .......      -  /
(;
OITON 11.4.2.c                                            11.4.3.a                                            II.4.3.b I                                  IF                                                  IF                                                    IF I
A c T
I<        I K        I    I 'I'ransportation of a radioactively contaminated              Any event that is determined to be    The occurrence of a false positive error on I
I 0
1'        I          o r potentially contaminated individual                  rcportablc by the Medical Review          a blind lab performance test specimen 0        I t'rotii thc siic to ;in ottsitc nicdical tiicility tiw        Ot'ticcr (MKO) or designee IAW            under 1 OCFR26 as determined by the I
N L
It        1                              trcatriicnt                            PSEG 1 iiclear's Fitness for Duty        Medical Review Officer (MRO) IAW
E V
      'I'      I I                                    1                              I'rogram NC.NA-AP.ZZ-O042(Q))          I'SEG Nuclear's Fitness for duty I'rogram I        I                                    ~ THEN                                                                            (NC.NA-AP.ZZ-O042(Q)
E L
N        I I
S I
I                                                                                        AND
I I
(;        I I
I I
I I
I 1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I 11.0 Reportable Action Levels 1 1.4 Personnel Safety / Overexposure 11.4.2.c IF I 'I'ransportation of a radioactively contaminated o r potentially contaminated individual t'rotii thc siic to ;in ottsitc nicdical tiicility tiw trcatriicnt 1
~
THEN 1
1 SIGNIFICANT FITNESS FOR
(
EVENTS [ IOCFR26.731 11.4.3.a IF Any event that is determined to be rcportablc by the Medical Review Ot'ticcr (MKO) or designee IAW PSEG 1 iiclear's Fitness for Duty I'rogram NC.NA-AP.ZZ-O042(Q))
AND
............ -1 The reportable details of the event are made available to the OS by the MRO or designee THEN I'I'INIISS lOK INJ'I'Y PROGRAM: FAI.SK I'OSI'I'IVE  
'IO AI>MINISIIIAI'IVI.: ERROR (I3L.IND TESl' 13Y IAH)  
~
~.
[ IOCI.'R26, AI'I'. A, 2.8(e)(S)]  
/
I I
.4.3.b IF The occurrence of a false positive error on a blind lab performance test specimen under 1 OCFR26 as determined by the Medical Review Officer (MRO) IAW I'SEG Nuclear's Fitness for duty I'rogram (NC.NA-AP.ZZ-O042(Q)
I
I
                                                                                                      -1                                      __ ___         __AND-                      _-__ -
__ ___ I
I A          I                                                                      ............                                                            -      -            .-
__ AND-rTHEN The reportable details of the event are made available to the OS by the MRO or designee T
c T
I                                                                    The reportable details of the event The reportable details of the event are made I
T          I                                                                  are made available to the OS by the             available to the OS by the MRO I                                                                              MRO or designee                                   or designee rTHEN I        I                                                                                                                        __ _ _ -__                              ____ - -
0        I I
N          I                                                                                        THEN I
I L          I E          I I
V          I E          I I
L          I S          I 1      1


11.0 Reportable Action Levels 11.5 Environmental / State Notifications
I1 E
(-. _All
I 0
                                              --j L.
li I
All    1 11.5.2.a                                                           115 2 . b                                              I 1S.2.c I                            IF                                                             IF                                                          IF I                                                            __
I N
I1      I
(;
                .......  -    ..                                            __ .-.. __ - -                  __.  ~        _      _
A C
E        I                                                                  EITf IER one of the following events occur:
T I
Spillldischarge of an industrial chemical or I      I      petroleum product outside of a plant                                                                       i s judged by the OSIEDO, -                  ANY one of Observation of a spill/discharge of an industrial 0        I  structure within the Owner Controlled Area                                                                       he following events has occurred:
0 N
I                                                              chemical or petroleum product from on-site into            Unusually large fish kill li      I  (OCA) that results in EITHER one of the                     the Delaware River or into a storm drain I                       foI lowing :                                                                                     Protected aquatic species impinge on I                                                                                                                                  Circulating or Service Water intake I        Spill / discharge that has passed                     Observation of an oil slick on the Delaware River I      I through the engineered fill and into the                                                                         screens (eg.; sea turtle, sturgeon) as I                                                                from any source N                ground water as confirmed by                                                                                     reported by Site personnel I                                                                                  -  ..
L E
(;      I        licensing                                                                                                         Any occurrence of an unusual or I                                                                                                THEN                    important event that indicates or could Spill / discharge that CANNOT be I                                                                                                                          result in significant environmental A        I        cleaned up within 24 hours and no contact with groundwater is suspected                                                                             impact casually related to plant C        I I                                                                                                                        operation; such as the following:
V E
T        I                                      ~
L S
                                                                                                                                      +    Onsite plant or animal disease I                                                                                                                              outbreaks I        I THEN 0        I                                                                                                                              Mortality or unusual occurrence o I                                                                                                                              any species protected by the N        I                                                                                                                              Endangered Species Act of 1973 I                                    Note:
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
-._I 4 rtinn Reauired 11.0 Reportable Action Levels 11.5 Environmental / State Notifications
(-
All --j 11.5.2.a IF Spillldischarge of an industrial chemical or petroleum product outside of a plant structure within the Owner Controlled Area (OCA) that results in EITHER one of the fo I lowing :
Spill / discharge that has passed through the engineered fill and into the ground water as confirmed by licensing Spill / discharge that CANNOT be cleaned up within 24 hours and no contact with groundwater is suspected r--------
~
THEN 11 5 2. b IF EITf IER one of the following events occur:
__. ~
Observation of a spill/discharge of an industrial chemical or petroleum product from on-site into the Delaware River or into a storm drain Observation of an oil slick on the Delaware River from any source Note:
This event MAY require IMMEDIATE
This event MAY require IMMEDIATE
                                                                                                                                      +    Increase in nuisance organisms or I
( I 5 minute) notifications. DO -
L        I                                    ( I 5 minute) notifications. DO -   NOT                                                   conditions 1--
NOT delay implementation of Attachment 16 1--
E        I delay implementation of Attachment 16                                               +    Excessive bird impactation I                                                                                                                        +    NJPDES Permit violations V        I I                                                                                                                              Excessive Opacity (smoke)
THEN Refer !n.Attachment 16 I
E        I L        I                                                                                                                  -            .        ..
Refer tn.4tt2rhment 16 I
I
I SDiiiiLiiscnarae KeDoninn I
__ S  -._I 4 rtinn Rea uired r--------
I Sniiilijiscnarrze Keuoninrz I
I Refer !n .Attachment 16 SDiiiiLiiscnarae KeDoninn              I I
All 1
I Refer tn .4tt2rhment 16 Sniiilijiscnarrze Keuoninrz I
L.
I
I 1 S.2.c IF i s judged by the OSIEDO, -
[
ANY one of he following events has occurred:
I
Unusually large fish kill Protected aquatic species impinge on Circulating or Service Water intake screens (eg.; sea turtle, sturgeon) as reported by Site personnel Any occurrence of an unusual or important event that indicates or could result in significant environmental impact casually related to plant operation; such as the following:
                                                                                                                                    ---- -.                     ~
+
Refer tn ,4tt2rhmPnt I 5 invironnienrai irotection Pian I ITHEN I
Onsite plant or animal disease outbreaks Mortality or unusual occurrence o any species protected by the Endangered Species Act of 1973 Increase in nuisance organisms or conditions
+
+
Excessive bird impactation
+
NJPDES Permit violations Excessive Opacity (smoke)
ITHEN I
[ ---- -.  
~
Refer tn,4 tt2rhmPnt I 5 I invironnienrai irotection Pian I  


I ICGS ECG 11.0 Reportable Action Levels                         Ilev. 01 Iilge I of I 1 1.6 After-the-Fact                                 ,
Initiating Condition MODE 11.0 Reportable Action Levels 1 1.6 After-the-Fact I ICGS ECG Ilev. 01 Iilge I of I EMERGENCY CONDITIONS DISCOVERED A FTE R-T t 1 E-FACT rAll--7 I I
Initiating          EMERGENCY CONDITIONS DISCOVERED Condition                        A FTE R-T t 1E- FACT MODE                                rAll--7 II.6.1 IF Discovery of events or conditions that had previously occurred (event was NOT ongoing at the time of discovery) which EXCEEDED an Emergency Action Level (EAL) and was NOT declared as an emergency 1     AND More than ONE HOUR has elapsed since the condition occurred I                                                       I 1
.6.1 IF Discovery of events or conditions that had previously occurred (event was NOT ongoing at the time of discovery) which EXCEEDED an Emergency Action Level (EAL) and was NOT declared as an emergency 1
AND More than ONE HOUR has elapsed since the condition occurred I
I 1
I AND I
There are currently NO adverse consequences in progress as a result of the event THEN I
R p f ~ r tn 4 t t d - m m t 1 ?
I I
I I
I I
AND There are currently N O adverse consequences in progress as a result of the event THEN I
I t-iour KeDorr I  
I R p f ~ tn r 4 t t d - m m t 1?    I I
I            I t-iour KeDorr           I


11.O Reportable Action Levels                                                               IlCGS ECG Rev. 04 11.7 Security / Emergency Response Capabilities                                                     Page I of 1 FEGUARDS EVENTS TI1AT ARE DET MAJOR LOSS OF EMERGENCY ASSESSMENT CAPABILITY, OFFSITE RESPONSE T O BE NON-EMERGENCIES, BUT ARE RE CAPABILITY, OR COMMUNICATIONS CAPABILITY [ 10CFRS0.72(b)(3)(xiii)]
11.O Reportable Action Levels 11.7 Security / Emergency Response Capabilities IlCGS ECG Rev. 04 Page I of 1 MAJOR LOSS OF EMERGENCY ASSESSMENT CAPABILITY, OFFSITE RESPONSE CAPABILITY, OR COMMUNICATIONS CAPABILITY [ 10CFRS0.72(b)(3)(xiii)]
TIIENRC WITIllN ONE HOUR [IOCFR OPCON                           (T)                                            ( T I                                      (                    7                      )
FEGUARDS EVENTS TI1AT ARE DET TIIENRC WITIllN ONE HOUR [IOCFR TO BE NON-EMERGENCIES, BUT ARE RE OPCON RAL #
RAL #                             11.7.1.a                                        11.7.1.b                                  11.7.1.c I                                     IF                                                IF                                          IF R    f E   l     Any Non-Emergency safeguards event that is            O S E C determines that an event(s) (excluding a scheduled test or preplanned I
I E
P    I    reportable in accordance with 10CFR73.71 as          maintenance activity) has occurred that would impair the ability to deal with an O     I          determined by Security (SCP-15)                accident or emergency as indicated by the Loss of ANY one of the following:
l R
R      I T     I                               THEN                        Nuclear Emergency I  I Telecommunications System                  Use of the TSC for > 8 hrs N     I G      I                                                          (NETS) for > 1 h r SPV, NPV, or FRVS vent radiation I
f O
I                                                           ENS for > 1 hr in the Control              effluent monitors with no alternate A    I                                                            Room, TSC, and EOF                          method of monitoring for > 72 hrs I
I T
C    I                                                           (NIA if reported by the NRC).
I N
SPDS OR CRlDS for > 8 hrs T I I  I More than 17 Offsite Sirens for >
I I
1 hr                                        More than > 75% OHA's O    f                                                            Use of the EOF for > 8 hrs N    I                                                                                                      Concurrent multiple accident or I                                                                                                      emergency condition indicators I                                                         All Meteorological data (Hope L    I                                                                                                       which in the judgement of the OS Creek AND Salem) for one E
P I
V    I l
R I
I I
G I
I I
I I
parameter for > 8 hrs           I          significantly impairs assessment capabilities E    l                                                            Site access due to Acts of Nature                 Refer to Technical Basis I I .7.1.c for ERD!
A I
LS f I                                                          (snow, flood, etc.)
I C
Action                                                                    Refer to Attachment 25 Required              1 H o u r Report ( C o m m o n Site)
I I
I N
I I
I L
I I
V I
I T
I O
f E
l E
l S
I L
f Action Required (T) 11.7.1.a IF Any Non-Emergency safeguards event that is reportable in accordance with 10CFR73.71 as determined by Security (SCP-15)
THEN 1 Hour Report (Common Site)
( T I (7) 11.7.1.b 1 1.7.1.c IF IF OSEC determines that an event(s) (excluding a scheduled test or preplanned maintenance activity) has occurred that would impair the ability to deal with an accident or emergency as indicated by the Loss of ANY one of the following:
Nuclear Emergency Telecommunications System (NETS) for > 1 hr ENS for > 1 hr in the Control Room, TSC, and EOF More than 17 Offsite Sirens for >
1 hr Use of the EOF for > 8 hrs All Meteorological data (Hope Creek AND Salem) for one parameter for > 8 hrs Site access due to Acts of Nature (snow, flood, etc.)
(NIA if reported by the NRC).
I Refer to Attachment 25 Use of the TSC for > 8 hrs SPV, NPV, or FRVS vent radiation effluent monitors with no alternate method of monitoring for > 72 hrs SPDS OR CRlDS for > 8 hrs Concurrent multiple accident or emergency condition indicators which in the judgement of the OS significantly impairs assessment capabilities More than > 75% OHA's Refer to Technical Basis I I.7.1.c for ERD!  


I ICGS ECG 11.0 Reportable Action Levels                                                                                               Rev. 01 I'age I of I 11.8 Public Interest
OI'C'ON A news release is planned S
[JNIJSIJAI. CONI11 I IONS WAKRAN I IN(; A N E W S 6 N U S U A L - C O N D I T I O N S DIRECTLY AFFECTING l<l~l,l.:ASl< OR N O I IFICA I ION O f GOVI'RNMEN I' AGENCIES [ IOCLK50 72(b)(Z)(ui))
I I
(L-..
Notifications to a Local, State or Federal agency has been or will be made 11.0 Reportable Action Levels 11.8 Public Interest I ICGS ECG Rev. 01 I'age I of I
A L L O W A Y S C R E E K TOWNSf1IP (LACT) [LAC -MOU]
[JNIJSIJAI. CONI11 I IONS WAKRAN I IN(; A NEWS l<l~l,l.:ASl<
OI'C'ON                                    (      A n - )                                                                     (        All      -2 II.8.2.a                                                                             11.8.2.b IF                                                                                   IF II OS/III)( 1 judges that iiii cvcnt o r situation has                               As judged by the OS/EI)O, events which are the occtirrcd IIMI i \ rcliitcd to A N I ' o w of thc l'ollo\~iiig                       responsibility of PSEG Nuclear which have or may result in EITHER one of the following:
OR N O I IFICA I ION O f GOVI'RNMEN I' AGENCIES [ IOCLK50 72(b)(Z)(ui))
I tic Iicalth atid sal'cty oftlic public I                                                                                         Anticipated unusual movement of equipment or I    'I lie health and safcty of onsitc personnel                                       personnel which may significantly affect 1     Protection of the environnicnt                                                     local traffic patterns Onsite events which involve alarms, sirens or other
(
                                                  -I
A n - )
                                                  -  1   . . . . . . . . .
I I.8.2.a IF I
noise which may be heard off-site
I OS/III)( 1 judges that iiii cvcnt or situation has occtirrcd IIMI i \\ rcliitcd to ANI' ow of thc l'ollo\\~iiig I tic Iicalth atid sal'cty oftlic public I  
                .          I AND 1
'I lie health and safcty of onsitc personnel 1
r_  ........ -          1  AND THEN A news release                                  Notifications to a is planned                          Local, State or Federal I                _. -_ __ -. -.          agency has been or will be made I                        -           .- _
Protection of the environnicnt I
I-
-I I AND 1
                                                                            . . I THEN S  II I
1 1
I
AND r _........
I I
I I-_
I-I THEN 6NUSUAL-CONDITIONS DIRECTLY AFFECTING
( ALLOWAYS CREEK TOWNSf1IP (LACT) [LAC -MOU]
L-..
( All -. -2 11.8.2.b IF As judged by the OS/EI)O, events which are the responsibility of PSEG Nuclear which have or may result in EITHER one of the following:
Anticipated unusual movement of equipment or personnel which may significantly affect local traffic patterns Onsite events which involve alarms, sirens or other noise which may be heard off-site THEN  


Il('(iS I . C X i 11.0 Reportable Action Levels                                                                               llev 02 Page I o f 2 11.9 Accidental Criticality / Special Nuclear Material / Rad Material Shipments - Releases
Il('(iS I. C X i llev 02 11.0 Reportable Action Levels Page I o f 2 11.9 Accidental Criticality / Special Nuclear Material / Rad Material Shipments - Releases IJNI'IANNISI) / AC'CIL)I:N'I'AI, CII I'I'ICAI,ITY
                    'IJNI'IANNISI) / AC'CIL)I:N'I'AI, Initiating Condition      i
[ I OCI..R70.52(a)]
                \.,.
i Initiating Condition
CII I'I'ICAI,ITY
\\.,.
[ IOCI..R70.52(a)]
OI'CON ItAL #
OI'CON                                                                                   c        AH
11.9.1.a It E
__ -.      _>                            c-
I' 0
                                                                                                                                          - _--AT_)
It T
_ _ -~
I N
ItAL #                         11.9.1.a                                                       11.9.1.b                                     II.9.1.c I
G A
I IF                                                           IF                                            IF It                        .  - -      _.___.    - .. -...............      - ...        _........
C T
E                      Any unplanned or                ANY one of the following events occur involving                     Lost, stolen or missing I'    II            accidental criticality            Special Nuclear Material (SNM) or Spent Fuel:                       licensed material > 1000 0      I                                                Loss, other than normal operating loss, of SNM                   times the quantity specified I
I 0
It      I                                                Actual or attempted theft or unlawful diversion                   in 10CFR20 Appendix C in T      I                                                of SNM                                                           such circumstances that an I
N L
I      I                                                Shipment of SNM of low strategic                                 exposure could result to N      I                                                significance or Spent Fuel that is lost or                       persons in Unrestricted I
E V
G      I                                                unaccounted for after the estimated time of                       Areas.
E L
I                                                arrival                                                                               - ____- - -
S I
I A      I                                                A lost or unaccounted for shipment of SNM of                                             THEN I                                                low strategic significance or Spent Fuel has C      I T      I                                                been recovered or accounted for I
IF I
0 I      I I
Any unplanned or I
THEN I
I accidental criticality I
N      I 1
I I
I L      I E      I I
I I
V        I E      I I
I I
L      I S      I I
I I
I    - - -          -                                      ,.. ...  -. . . __. .                                  ... __                  __    .....
I I
I I
I I
I I
I I
I 1
I I
I I
I I
I I
I I
I -
c
__ AH 11.9.1.b IF ANY one of the following events occur involving Special Nuclear Material (SNM) or Spent Fuel:
Loss, other than normal operating loss, of SNM Actual or attempted theft or unlawful diversion of SNM Shipment of SNM of low strategic significance or Spent Fuel that is lost or unaccounted for after the estimated time of arrival A lost or unaccounted for shipment of SNM of low strategic significance or Spent Fuel has been recovered or accounted for 1
THEN c-
--AT_)
-~
I I.9.1.c IF Lost, stolen or missing licensed material > 1000 times the quantity specified in 10CFR20 Appendix C in such circumstances that an exposure could result to persons in Unrestricted Areas.
THEN


I ICGS r r c i 11.0 Reportable Action Levels                                               llev 02 I'age 2 of 2 11.9 Accidental Criticality / Special Nuclear Material / Rad Material Shipments - Releases
I ICGS rrci I'age 2 of 2 11.0 Reportable Action Levels llev 02 11.9 Accidental Criticality / Special Nuclear Material / Rad Material Shipments - Releases 1
                                                          . . . .      . .... . . . . 1 c....
c....
All _
All _ 1 I I.9.1.e IF Rcceipt survey indicates that pack agc con t ani i nat iodr ad i at io r levels equal or exceeds ANY one of the following:
II.9.1.e 1
2200 dpm/IOO cm2 200 mWhr on contact 10 mWhr at 3 feet THEN 11.9.2.a IF 4ccidents during the ransportation of radioactive material which are reported to PSE&G as the shipper that involve (or potentially involve) damage to the cargo
11.9.2.a c2!!-1
^____..-_
                                                                                                    ^____..-_
c2!!-1 I I.9.2.b IF Discovery of a Contaminated Area OUTSIDE of the RCA with removable activity due to licensed material
II.9.2.b IF                                       IF                                IF 4ccidents during the              Discovery of a Contaminated Rcceipt survey indicates that                       ransportation of                  Area OUTSIDE of the RCA pack agc cont ani i nat iodrad i at ior              radioactive material              with removable activity due to levels equal or exceeds ANY                         which are reported to PSE&G        licensed material one of the following:
_____7____------  
2200 dpm/IOO cm2 200 mWhr on contact as the shipper that involve (or potentially involve)
,-I--.--.
_____7____------
I AND Location of Area is Plant Structures Size of Contaminated Area is LARGE
I
(>I 00 FT2) 1 AND I
                                                                                                  - I-AND 1   AND damage to the cargo 10 mWhr at 3 feet                                                                  Location of                I     ._
Location of Contaminated Area is such that a contaminated person or material may have left the Protected Area 1-  
Location of
  .- ..................                    .                                                  Area is          Contaminated THEN                                                                      Area is such Plant              that a Structures        contaminated person or
____                material may have left the Size of Protected Contaminated Area Area is 1-LARGE
(>I 00 FT2)


                .i..
. i..
_- ... .~.
_- ~.  


I ICGS ECG 11.0 Reportable Action Levels                                               Rev. 01 Page I of I 11.10 Voluntary Notifications Initiating                  Events/conditions warrant voluntary/courtesy Condition              NRC notification [ 10CFR50.72 - Voluntary Report]
Initiating Condition 11.0 Reportable Action Levels 11.10 Voluntary Notifications I ICGS ECG Rev. 01 Page I of I Events/conditions warrant voluntary/courtesy NRC notification [ 1 OCFR50.72 - Voluntary Report]
i- -Ai-1
i-  
                                                              \.        _-
\\. -Ai -1 11.10.2 IF In the judgement of the OS, i
11.10.2 IF In the judgement of the OS,                         i notitication to the NKC is warranted I
notitication to the NKC is warranted I AND  
L AND i                                                                                    1 1
....... - L 1
L ............
i 1
NO other I3ALs or RALs appear to be applicable
NO other I3ALs or RALs appear to be applicable I
                              -...........         ......  -    .                                  I THEN r
L............
  .4^I...,.n nt:n..
THEN r
D nn..:rnrl
4 nt:n..
D nn..:rnrl  
. ^I...,.n


UNITED STATES NLICLEAR REGULATORY COMMISSICN d
UNITED STATES NLICLEAR REGULATORY COMMISSICN d
WASHINGTON. D.C. 20555-0001 b
WASHINGTON. D.C. 20555-0001 b
PSEG NUCLEAR LLC DOCKET NO. 50-354 HOPE CREEK GENERATING STATION I
PSEG NUCLEAR LLC DOCKET NO. 50-354 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE  
FACILITY OPERATING LICENSE License No. NPF-57
'V PSE&G I
License No. NPF-57
: 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
: 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for a license filed by the Public Service Electric &
A.
The application for a license filed by the Public Service Electric &
Gas Company, acting on behalf of itself and Atlantic City Electric Company (the licensees), complies with the standards and requiremencs of the Atomic Energy Act of 1954, as amended (the Act), and the Ccmmission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made ;
Gas Company, acting on behalf of itself and Atlantic City Electric Company (the licensees), complies with the standards and requiremencs of the Atomic Energy Act of 1954, as amended (the Act), and the Ccmmission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made ;
E. Cons:ruction of the Hope Creek Generating Station (the facility) has Seen subszantially completed in conformity with Construction Pernit Nc. CTPR-120 and :he application, as amended, the provisions of the A=: acd the regulations of the Commission;
E. Cons:ruction of the Hope Creek Generating Station (the facility) has Seen subszantially completed in conformity with Construction Pernit Nc. CTPR-120 and :he application, as amended, the provisions of the A=: acd the regulations of the Commission;  
_ .  ?e facility will operate in c3nformi:y with the application, as
?e facility will operate in c3nformi:y with the application, as ariended, :he provisicns zf Eke Ac:,
'V            ariended, :he provisicns zf Eke Ac:, and the regulations of the Cim.:sslcr, (excep: as exsrr,szed frcm ccmpliance in Section 2.0. below);
and the regulations of the Cim.:sslcr, (excep: as exsrr,szed frcm ccmpliance in Section 2.0. below);  
Z.   -i
-i Z.  
              ,..ere         is reascnable asszrdzze: (i) :ha:         the ac:ivities authorized by L - .
,..ere is reascnable asszrdzze: (i) :ha:
zperating license can be czrciucted withou: endangering the health and safety 3 : the public, a?d ( i i l chat s u c h acEivities will be z=r.5zr=eS in .ccmpliancexizh the C3mmission's regulations set forth in
the ac:ivities authorized by zperating license can be czrciucted withou: endangering the health and safety 3: the public, a?d
              . C C F R Chapter 1 (axcep: as exemp:ed           frcm compliance in Sect;=> 2.D.
( i i l chat such acEivities will be z=r.5zr=eS in.ccmpliance xizh the C3mmission's regulations set forth in 3 -, Y I L -.
3-,YI          ;
. C CFR Chapter 1 (axcep: as exemp:ed frcm compliance in Sect;=> 2.D.
        --  ?255 Ncclear           LLf I s tech:zally qxalified r c engage in the activities       i
i I
                  ,,...b,,,zed<
?255 Ncclear LLf I s tech:zally qxalified r c engage in the activities  
CI      by this licezse iz acccrdance with :ne Cmmissioz's
,,..,,,zed  
                                                  . C reralations set fcr:h ir.            - J  C t i ? Chapter I; F. Tie iicensee has sa=-sfied :he                   applicable provisions of 10 CFR Par:   I
- b.
              -...r, 'Financial Protec::tr.           ReqGrrements and Indemnity Agreements," cf
C I by this licezse iz acccrdance with :ne Cmmissioz's F. Tie iicensee has sa=-sfied :he applicable provisions of 10 CFR Par:  
              . I . .
. C reralations set fcr:h ir. - J Cti? Chapter I;
the Commission's regula:izns; J . The sssuance of this licezse wifl not be inimical to the common 2efense and security o r :c the health and safety of the public; PSE&G L
. I..
CONTROL I
-...r, 'Financial Protec::tr.
COPY # c,/a                                 Amendment No. 35?% 13 5
ReqGrrements and Indemnity Agreements, " cf the Commission's regula:izns; J. The sssuance of this licezse wifl not be inimical to the common 2efense and security o r :c the health and safety of the public; L
 
CONTROL COPY # c,/a I
Amendment No. 35?%
13 5
: 2.
E. After weighing the environmental, economic, technical, and ctner benefits of the facility against environiental m d other coscs an:!
E. After weighing the environmental, economic, technical, and ctner benefits of the facility against environiental m d other coscs an:!
considering available alternatives, the issuance of Facility Operating License No. NPF-57, subject to the conditions,for protection of the environment set forth in ths Environmental Protection Plar. attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been sazisfied; and I. The'receipt,possession, and. use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70.
considering available alternatives, the issuance of Facility Operating License No. NPF-57, subject to the conditions,for protection of the environment set forth in ths Environmental Protection Plar. attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been sazisfied; and I. The'receipt, possession, and. use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70.
: 2. Based on the foregoing findings and approval by the Nuclear Regulatory Commission at a meeting on July 21, 1986, the License for Fuel Loading an2 Low Power Testing, License No. NPF-50, issued on April il, 1986, is superseded by Facility Operating License NPF-57 hereby issued to PSEG Nuclear LLC (the licensee), zc read as follows:                                               1 A. This license applies t3 the Hope Creek Generating Station, a boiling water nuclear reactcr, azZ associated equipment (the facility) owned by PSEG Nuclear LLf. The facility is located on the licensee's site cn the east bank of the "uelaware River in Lower Alloways Creek Township, I
Based on the foregoing findings and approval by the Nuclear Regulatory Commission at a meeting on July 21, 1986, the License for Fuel Loading an2 Low Power Testing, License No. NPF-50, issued on April il, 1986, is superseded by Facility Operating License NPF-57 hereby issued to PSEG Nuclear LLC (the licensee), zc read as follows:
Salem County, New jersey. The facility is located approximately eight rriles sou:hwest cf Salerr.. New Jersey and is described in the PSEG Nc-: -,ear LLC Final Safezj; halysis Repor:, as supplemented u.d amended, ar.d i n the Environmertal ?.e-,ort, as supplemented and amended.
A.
(:I   TSZG Nl;c;zar 11:. ;srs:ar.t               ts Section 1 3 3 of the Act and 10 CFR
This license applies t3 the Hope Creek Generating Station, a boiling water nuclear reactcr, azZ associated equipment (the facility) owned by PSEG Nuclear LLf. The facility is located on the licensee's site cn the east bank of the "uelaware River in Lower Alloways Creek Township, Salem County, New jersey. The facility is located approximately eight rriles sou:hwest cf Salerr.. New Jersey and is described in the PSEG ar.d i n the Environmertal ?.e-,ort, as supplemented and amended.
              ?arz 5 5 , T,S p : s r e s s . ise and opera:o the facility at the abave desig?azed l:caz:cr.           ir. Zaiem Cou'lzy, New jersey, ir. accordance r-..-
Nc-:  
h* mu,-,e~sres
-,ear LLC Final Safezj; halysis Repor:,
                          ---                 .- ,,.L.,Lations
as supplemented u.d amended,
                                                  * * - - -        s s t fcrth ir! this licezse;
(:I TSZG Nl;c;zar 11:.  
::I   PSEG Nuclear LLC. c - r s ~ a r . : E O the Act and 13 CFR Part 7 C , zc receive, p:ssess ar.2 - s e at any time speciai nuclear material as reactor fuel, : z a c = z r 2 a r . z e w:th the limitations for storage and amounts reqxre:! f z r reazfof operation, as described in :he F-na:
;srs:ar.t ts Section 1 3 3 of the Act and 10 CFR  
Safety iinalysis he?::             as Supplemented and amended; Amendment No.     135 I
?arz 5 5, T,S p:sress.
ise and opera:o the facility at the abave desig?azed l:caz:cr.
ir. Zaiem Cou'lzy, New jersey, ir. accordance rh*
-..- u,-,e~sres m - - -  
.-,,.L.,Lations s s t fcrth ir! this licezse;
: : I PSEG Nuclear LLC. c - r s ~ a r. : EO the Act and 13 CFR Part 7 C, zc receive, p:ssess ar.2 -se at any time speciai nuclear material as reactor fuel, :z ac=zr2ar.ze w:th the limitations for storage and amounts reqxre:! f z r reazfof operation, as described in :he F-na:
Safety iinalysis he?:::
as Supplemented and amended; 1
I Amendment No.
135 I  


L             PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; PSEG Nuclear LLC, pursuant to the Act and 10 CF'R Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction, to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
L PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; PSEG Nuclear LLC, pursuant to the Act and 10 CF'R Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction, to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
C.
(1) Maximum Power Level PSEG Nuclear LLC is aurhorized to operate the facility at reactor core power levels not in excess of 3 3 3 9 megawatts thermal (100 percent rated power) ir. accordance with the conditions specified I
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
herein.
(1) Maximum Power Level PSEG Nuclear LLC is aurhorized to operate the facility at reactor core power levels not in excess of 3339 megawatts thermal (100 percent rated power) ir. accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Projzection Plan The Technical Specifications contained in Appendix A , as revised through Amendment No.     , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the license.
I
I PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
( 2 ) Technical Specifications and Environmental Projzection Plan I
(3) Inservice Testinq of Pumps and Valves (Section 3.9.6, SSER No.     4)'
The Technical Specifications contained in Appendix A, as revised through Amendment No.  
This License Condition was satisfied as documented in the letter from W. R. Butler (N3.C) to C. A . McNeill, Jr. (PSE&G) dated December 7 , 1987. Accordingly, this condition has been deleted.
, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the license.
  *The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 13 1     I
( 3 ) Inservice Testinq of Pumps and Valves (Section 3.9.6, SSER No. 4 ) '
This License Condition was satisfied as documented in the letter from W. R. Butler (N3.C) to C. A. McNeill, Jr. (PSE&G) dated December 7, 1987. Accordingly, this condition has been deleted.  
*The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 13 1 I  


c-.                               L, (4) Inservice Inspection (Section 6.6, SER; Sections 5.2.4.3 and 6.6.3, SSER No. 51
c-.
: a. PSE&G shall submit an inservice inspection program in accordance with 10 CFR 50.55a(g)(4) for staff review by October 11, 1986.
L,
: b. Pursuant to 10 CFR 50.55a(a)(3) and for the reasons set forth in Sections 5.2.4.3 and 6.6.3 of SSER No. 5 , the relief identified in the PSE&G submittal dated November 18, 1985, as revised by the submittal dated January 2 0 , 1986, requesting relief from certain requirements of 10 CFR 50.55a(g) for the preservice inspection program, is granted.
( 4 ) Inservice Inspection (Section 6.6, SER; Sections 5.2.4.3 and 6.6.3, SSER No. 51
(5) solid State Loqic Modules PSEG Nuclear LLC shall continue, for the life of the plant, a reliability program to monitor the performance of the Bailey 862 I
: a.
SSLMs installed at Hope Creek Generating Station. This program should obtain reliability data, failure characteristics, and root cause of failure of both safety-related and non-safety-related Bailey 862 SSLMs. The results of the reliability program shall be maintained on-site and made available to the NRC upon request.
PSE&G shall submit an inservice inspection program in accordance with 10 CFR 50.55a(g)(4) for staff review by October 11, 1986.
(6) Fuel Storage and Handlinq (Section 9.1, SSER No. 5 )
: b.
Pursuant to 10 CFR 50.55a(a)(3) and for the reasons set forth in Sections 5.2.4.3 and 6.6.3 of SSER No. 5, the relief identified in the PSE&G submittal dated November 18, 1985, as revised by the submittal dated January 20, 1986, requesting relief from certain requirements of 10 CFR 50.55a(g) for the preservice inspection program, is granted.
(5) solid State Loqic Modules PSEG Nuclear LLC shall continue, for the life of the plant, a I
reliability program to monitor the performance of the Bailey 862 SSLMs installed at Hope Creek Generating Station. This program should obtain reliability data, failure characteristics, and root cause of failure of both safety-related and non-safety-related Bailey 862 SSLMs. The results of the reliability program shall be maintained on-site and made available to the NRC upon request.
( 6 ) Fuel Storage and Handlinq (Section 9.1, SSER No. 5)
: a. No more than a total of three ( 3 ) fuel assemblies shall be out of approved shipping containers or fuel assembly storage racks or the reactor at any one time.
: a. No more than a total of three ( 3 ) fuel assemblies shall be out of approved shipping containers or fuel assembly storage racks or the reactor at any one time.
: b. The above three ( 3 ) fuel assemblies as a group shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array an:! the storage rack array.
: b. The above three ( 3 ) fuel assemblies as a group shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array an:! the storage rack array.
: c. Fresh Fuel assemblies, when stored in their shipping con-tainers, shall be stacked no more than three ( 3 ) containers high ~
: c. Fresh Fuel assemblies, when stored in their shipping con-tainers, shall be stacked no more than three ( 3 ) containers high  
(7) Fire Protection (seccion 9.5.1.8, SSER No. 5;   Section 9.5.1, SSER No. 6r PSEG Nuclear LLC -na?l implement and maintain in effect all provisions of the approved fire prot.ection program as described in I
~
the Final Safety Analysis Report for the facility through Amendment No. 15 and as described in its submittal dated May 13, 1986, and as approved in the SER dated October 1984 (and Supplements 1 through 6) subject to the following provision:
(7) Fire Protection (seccion 9.5.1.8, SSER No. 5; Section 9.5.1, SSER No. 6r I
PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission I
PSEG Nuclear LLC -na?l implement and maintain in effect all provisions of the approved fire prot.ection program as described in the Final Safety Analysis Report for the facility through Amendment No. 15 and as described in its submittal dated May 13, 1986, and as approved in the SER dated October 1984 (and Supplements 1 through 6) subject to the following provision:
only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
PSEG Nuclear LLC may make changes to the approved fire I
Amendment NO. 88,129     I
protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
 
Amendment NO. 88,129 I
Solid Waste process Control Proqram (Section 11.4.2, SER; Section 11.4, SSER No. 4 1 PSEG Nuclear shall obtain NRC approval of the Class B and C solid waste process control program prior to processing Class B and C I
Solid Waste process Control Proqram (Section 11.4.2, SER; Section 11.4, SSER No. 4 1 PSEG Nuclear shall obtain NRC approval of the Class B and C solid waste process control program prior to processing Class B and C solid wastes.
solid wastes.
Emeruency Planninq (Section 13.3, SSER No. 5 )
Emeruency Planninq (Section 13.3, SSER No. 5 )
In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR Section 50.54(s) (2) will apply.
I In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR Section 50.54(s) (2) will apply.
(10) Initial Startup Test Proqram (Section 14, SSER No. 5)
( 1 0 ) Initial Startup Test Proqram (Section 14, SSER No. 5)
Any changes to the Initial Startup Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.
Any changes to the Initial Startup Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.
(11) Partial Feedwater Heatinq (Section 15.1, SER; Section 15.1, SSER No. 5; Section 15.1, SSER No. 6)
(11) Partial Feedwater Heatinq (Section 15.1, SER; Section 15.1, SSER No. 5; Section 15.1, SSER No. 6)
The facility shall not be operated with reduced feedwater temperature for the purpose of extending the normal fuel cycle.
The facility shall not be operated with reduced feedwater temperature for the purpose of extending the normal fuel cycle.
After the first operating cycle, the facility shall not be operated with a feedwater heating capacity that would result in a rated power feedwater temperature less than 400OF unless analyses supporting such operation are submitted by the licensee and approved by the staff.
After the first operating cycle, the facility shall not be operated with a feedwater heating capacity that would result in a rated power feedwater temperature less than 400OF unless analyses supporting such operation are submitted by the licensee and approved by the staff.
(12) Detailed Control R o o m Desiun Review (Section 18.1, SSER No. 5 )
(12) Detailed Control Room Desiun Review (Section 18.1, SSER No. 5 )
: a. PSE&G shall submit for staff review Detailed Control Room Design Review Summary Reports I1 and I11 on a schedule consistent with, and with contents as specified in, its letter of January 9, 1986.
: a. PSE&G shall submit for staff review Detailed Control Room Design Review Summary Reports I1 and I11 on a schedule consistent with, and with contents as specified in, its letter of January 9, 1986.
: b. Prior to exceeding five perzent power, PSE&G shall provide temporary zone markings on safety-related instruments in the control room.
: b. Prior to exceeding five perzent power, PSE&G shall provide temporary zone markings on safety-related instruments in the control room.
Amendment No .I29       I
Amendment No.I29 I  


                                                ,  (13) Safety Parameter DiSDlaY System (Section i8.2, S S E ~NO. 5 )
(13)  
\.-      Prior to the earlier of 9 9 days after restart frcm tne first refueling outage or July 12, 1988, PSE&G snall add the following parameters to the SPDS and have tbam operational:
\\.-
L Safety Parameter DiSDlaY System (Section i8.2, S S E ~
NO. 5)
Prior to the earlier of 9 9 days after restart frcm tne first refueling outage or July 12, 1988, PSE&G snall add the following parameters to the SPDS and have tbam operational:
: a. Primary containment radiation
: a. Primary containment radiation
: b. Primary containment isolation status
: b. Primary containment isolation status
: c. Combustible gas concentration ir, primary contaimenz
: c. Combustible gas concentration ir, primary contaimenz
: d. Source range neutron flux Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 135, are hereby incorporated into this license. PSEG Nuclear LLC shall operate the facility in I
: d. Source range neutron flux Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 135, are hereby incorporated into this license. PSEG Nuclear LLC shall operate the facility in accordance with the Additional Conditions.
accordance with the Additional Conditions.
PSE&G to PSEG Nuclear LLC License Transfer Conditions I
PSE&G to PSEG Nuclear LLC License Transfer Conditions
: a.  
: a.   ?SEG Nuclear LLC shall take a l l necessary steps Eo ensure that the decommissioning trust is maintained in accordance with the applicarian, :he requirements of the Order Approving Transfer of License and Conforming Amendment, dated February 16, 2 9 0 0 , and the relatod Safety Evaluation dated February 16, 2 0 0 G .
?SEG Nuclear LLC shall take a l l necessary steps Eo ensure that the decommissioning trust is maintained in accordance with the applicarian, :he requirements of the Order Approving Transfer of License and Conforming Amendment, dated February 16, 2900, and the relatod Safety Evaluation dated February 16, 200G.
B. The deccmnissiczicg t r x t agreement shall provide thac:
B.
L i)  The u s 1 :f         8ssezs ir! bcrih thi qualified and nan-c p a l i f i e 5 f ~ r . 5shall  ~     be linited tc expenses related to deccnsr.;ssi:2:zg               zfe:: uni: as define2 by the NRC in its rerdLat::zs               and isscancis, and as provided in the units ::zenrs a d any arnendmencs rhereto. Sowever, cpsr,     c:r.p:eti:r.         t: =ec-m.issi;~ing,as defined abcve, the a s s s t s r a y be x e d f s r any purpose auzhcrized by lax.
The i )
_..__.._a __.
2 )
Ip*ves-~--          .- -i -..e sezzr::ies   2~ ather sbligaticna sf 2)
3 )
PSELS c : aft:::azes                 chereof, o r their successors c r assigr.s, sr.all be SrohikLted. In additicn, except f-r invesznents ::e2                 :3 .mrket indexes cr o:her         ncn-nuclear SeC-Cr ...~.-..   - - a. - ,-.-s,
deccmnissiczicg trxt agreement shall provide thac:
                                              .....-I   investments in any entity owning one cr mcre r.;zlear power plants shall be prohibited.
The u s 1 :f 8ssezs ir! bcrih thi qualified and nan-cpalifie5 f ~ r. 5 ~
: 3)  No disbursemenzs or payments from the trust shall be
shall be linited tc expenses related to deccnsr.;ssi:2:zg zf :
                  ,-de     by z2.s ZrLsZee until the trustee has first given
e uni: as define2 by the NRC in its rerdLat::zs and isscancis, and as provided in the units ::zenrs a d any arnendmencs rhereto. Sowever, cpsr, c:r.p:eti:r.
:he PURC 3: days sotice of =he payment. In addition, nc disbursemants c r payments from the trust shall be made if :he zrsszee receives pricr written notice of objeccicz f r c n the Director, Office of Nuclear 2eacEor Regulaticc.
t: =ec-m.issi;~ing, as defined abcve, the a s s s t s ray be x e d f s r any purpose auzhcrized by lax.
Amendment No. < 2 , : 7 , I S 4 , 12:. 135        I
Ip*ves-~--
: 4)     The trust agreement shall not be modified in any material respect without prior written notification to the Director, Office of Nuclear Reactor Regulation.
_..__.._a __.  
: 5)     The trustee, investment advisor, or anyone else directing the investments made in the trust 'shall adhere to a "prudent investor" standard, as specified .
.- -i  
in 18 CFR 35.32(3) of the Federal Energy Regulatory.
-..e sezzr::ies 2~ ather sbligaticna sf PSELS c: aft:::azes chereof, o r their successors c r assigr.s, sr.all be SrohikLted. In additicn, except f-r invesznents ::e2
:3.mrket indexes cr o:her ncn-nuclear SeC-Cr...... ~ - - a -
.-...,-.-s,  
.....-I investments in any entity owning one cr mcre r.;zlear power plants shall be prohibited.
No disbursemenzs or payments from the trust shall be  
,-de by z2.s ZrLsZee until the trustee has first given
:he PURC 3:
days sotice of =he payment. In addition, nc disbursemants cr payments from the trust shall be made if :he zrsszee receives pricr written notice of objeccicz frcn the Director, Office of Nuclear 2eacEor Regulaticc.  
, 12:.
135 I
Amendment No. < 2, : 7, I S 4 4 )
The trust agreement shall not be modified in any material respect without prior written notification to the Director, Office of Nuclear Reactor Regulation.
C.
: 5)
The trustee, investment advisor, or anyone else directing the investments made in the trust 'shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(3) of the Federal Energy Regulatory.
Commission's regulations.
Commission's regulations.
C. PSEG Nuclear LLC shall not take any action that would cause PSEG Power LLC or its parent companies to void, cancel, or diminish the commitment to fund an extended plant shutdown as represented in the application for approval of the transfer of this license from PSE&G to PSEG Nuclear LLC.
PSEG Nuclear LLC shall not take any action that would cause PSEG Power LLC or its parent companies to void, cancel, or diminish the commitment to fund an extended plant shutdown as represented in the application for approval of the transfer of this license from PSE&G to PSEG Nuclear LLC.
D. The facility requires exemptions from certain requirements of 10 CFR Part 5 0 and 10 CFR Part 70. An exemption from the criticality alarm requirements of 10 CFR 70.24 was granted in Special Nuclear Material License No. 1953, dated August 21, 1985. This exemption is described in Section 9.1 of Supplement No. 5 to the SER. This previously granted exemption is continued in this operating license. An exemption from certain requirements of Appendix A to 10 CFR Part 50, is described in Supplement No. 5 to the SER. This exemption is a schedular exemption to the requirements of General Design Criterion 64, permitting delaying functionality of the Turbine Building Circulating Water System-Radiation Monitoring System until 5 percent power for local indication, and until 120-days after fuel load for control room indication (Appendix R of SSER 5). Exemptions from certain requirements of Appendix J to 10 CFR Part 50, are described in Supplement No. 5 to the SER. These include an exemption from the requirement of Appendix J . exempcing main steam isolation valve leak-rate testing at 1.10 Pa (Section 6.2.6 of SSER 5); an exemption from Appendix J , exempting Type C testing on traversing incore probe system shear valves (Section 6.2.6 of SSER 5); an exemption from Appendix J ,
D. The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70. An exemption from the criticality alarm requirements of 10 CFR 70.24 was granted in Special Nuclear Material License No. 1953, dated August 21, 1985. This exemption is described in Section 9.1 of Supplement No. 5 to the SER. This previously granted exemption is continued in this operating license. An exemption from certain requirements of Appendix A to 10 CFR Part 50, is described in Supplement No. 5 to the SER. This exemption is a schedular exemption to the requirements of General Design Criterion 64, permitting delaying functionality of the Turbine Building Circulating Water System-Radiation Monitoring System until 5 percent power for local indication, and until 120-days after fuel load for control room indication (Appendix R of SSER 5). Exemptions from certain requirements of Appendix J to 10 CFR Part 50, are described in Supplement No. 5 to the SER. These include an exemption from the requirement of Appendix J. exempcing main steam isolation valve leak-rate testing at 1.10 Pa (Section 6.2.6 of SSER 5); an exemption from Appendix J, exempting Type C testing on traversing incore probe system shear valves (Section 6.2.6 of SSER 5); an exemption from Appendix J,
exempting Type C testing for instrument lines and lines containing excess flow check valves (Section 6.2.6 of SSER 5); and an exemption from Appendix J , exempting Type C testing of thermal relief valves (Section 6.2.6 of SSER 5). These exemptions are authorized by law, will not present an undue risk to ths public health and safety, and are consistent with the common defense and security. These exemptions are hereby granted. The special circumstances regarding each exemption are identified in &he referenced section of the safety evaluation report a n d the supplements thereto. These exemptions are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
exempting Type C testing for instrument lines and lines containing excess flow check valves (Section 6.2.6 of SSER 5); and an exemption from Appendix J, exempting Type C testing of thermal relief valves (Section 6.2.6 of SSER 5). These exemptions are authorized by law, will not present an undue risk to ths public health and safety, and are consistent with the common defense and security. These exemptions are hereby granted. The special circumstances regarding each exemption are identified in &he referenced section of the safety evaluation report and the supplements thereto. These exemptions are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
Amendment NO. W , 129
Amendment NO. W, 129 E. The licensee shall fully implement and maintain in effect ali provisions of the Commission-a-pprsved physical security, gcard training and qualification, and safewaras contingency plans includlkig amendments made pursuant :s provisions of :he Miscellar,ezGs Amendments and Search Requirements revisions to 10 CFR 7 3. 5 5 (51 PR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 5 0. 5 4 @ ).
 
The plans, which contain Safeguards Infarmation protected under 10 CFR 73.21, are entitled: "Salem-Hope Creek Nuclear Generating Station Security Plan," with revisions submitted thrmgh December 1 7, 2001; 'Salem-Hope Creek Nuclear Generating Staticn Security Training and Qualification Plan,' with revisions submitte,d through December 1 7, 2001; and "Salem-Hope Creek Nuclear Generatizg Station Security Contingency Plan," with revisions submitted thrzxgk June 2, 1998.
E. The licensee shall fully implement and maintain in effect ali provisions of the Commission-a-pprsved physical security, gcard training and qualification, and safewaras contingency plans includlkig amendments made pursuant :s provisions of :he Miscellar,ezGs Amendments and Search Requirements revisions to 10 CFR 7 3 . 5 5 (51 PR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54@).     The plans, which contain Safeguards Infarmation protected under 10 CFR 7 3 . 2 1 , are entitled: "Salem-Hope Creek Nuclear Generating Station Security P l a n , " with revisions submitted thrmgh December 1 7 , 2 0 0 1 ; 'Salem-Hope Creek Nuclear Generating Staticn             '
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
Security Training and Qualification Plan,' with revisions submitte,d through December 1 7 , 2001; and "Salem-Hope Creek Nuclear Generatizg Station Security Contingency Plan," with revisions submitted thrzxgk June 2 , 1 9 9 8 . Changes made in accordance with 10 CFR 7 3 . 5 5 shall be implemented in accordance with the schedule set forth therein.
Except as otherwise przvided in the Technical Specificati-ns 3r Ecvironmental Protect:sn Plan, PSEG Nuclear LLC shall report any viclatims of the recpirements contained in Section 2.C cf this license in the follzwing manner: initial notification shall be made-w:t!?in 24 hours to the hTC Sperations Center via the Ehergency Kscification System w::!?
    -:. Except as otherwise przvided in the Technical Specificati-ns 3r Ecvironmental Protect:sn Plan, PSEG Nuclear LLC shall report any viclatims of the recpirements contained in Section 2.C cf this license in the follzwing manner: initial notification shall be made-w:t!?in 24 hours to the hTC Sperations Center via the Ehergency Kscification System w::!?             written followup within thirty days in acczrdance with the prccedures described in 10 CFR 50.73(b), (c), ard (e).
written followup within thirty days in acczrdance with the prccedures described in 10 CFR 50.73(b), (c), ard (e).
G. Tke licensees shall kave an:! maintain financial prcteczion of such
G.
          ;?
Tke licensees shall kave an:! maintain financial prcteczion of such
e     and in such &T:.-.:S           as ::?e Cm-missisn shall requsre LT.
:;?e and in such &T:.--.:S as ::?e Cm-missisn shall requsre LT.
aczsrdance with Set:::: :-:zf the Azomic Energy Act z f L954. as a-nenied, to cover -. pa&
aczsrdance with Set:::: :-:
                                      -A' .- -- :iak:lity claims.
zf the Azomic Energy Act z f L954. as a-nenied, to cover -.
I PSR THE NL'CLEAR REGULATORY C2FXISSIZX
p a - A - -
                                                  - crlginal signed by H.R: Oentcn   -
& '. - :iak:lity claims.
Harsld R. Zenton, Director Zftice of Nuclear Reactor Regulacion
I PSR THE NL'CLEAR REGULATORY C2FXISSIZX  
-ars :f Zssuance: July 25, 1 9 a 6 Amendment No. B . 1 3 8
- crlginal signed by H.R: Oentcn -
Harsld R. Zenton, Director Zftice of Nuclear Reactor Regulacion  
-ars :f Zssuance: July 25, 1 9 a 6 Amendment No. B. 1 3 8  


3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 SHUTDOWN MARGIN LIMITING CONDITION FOR OPERATION 3.1.1   The SHUTDOWN MARGIN shall be equal to or greater than:
3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 SHUTDOWN MARGIN LIMITING CONDITION FOR OPERATION 3.1.1 The SHUTDOWN MARGIN shall be equal to or greater than:
: a. 0.38% delta k/k with the highest worth rod analytically determined, or
: a.
: b. 0.28% delta Wk with the highest worth rod determined by test.
0.38% delta k/k with the highest worth rod analytically determined, or
APPLICABILITY:   OPERATIONAL CONDITIONS 1, 2, 3, 4 and 5.
: b.
0.28% delta Wk with the highest worth rod determined by test.
APPLICABILITY:
OPERATIONAL CONDITIONS 1, 2, 3, 4 and 5.
ACTION:
ACTION:
With the SHUTDOWN MARGIN less than specified:
With the SHUTDOWN MARGIN less than specified:
: a. In OPERATIONAL CONDITION 1 or 2, reestablish the required SHUTDOWN MARGIN within 6 hours or be in at least HOT SHUTDOWN within the next 12 hours.
: a.
: b. In OPERATIONAL CONDITION 3 or 4, immediately verify all insertable control rods t o be inserted and suspend all activities that could reduce the SHUTDOWN MARGIN. In OPERATIONAL CONDITION 4, establish SECONDARY CONTAINMENT INTEGRITY within 8 hours.
In OPERATIONAL CONDITION 1 or 2, reestablish the required SHUTDOWN MARGIN within 6 hours or be in at least HOT SHUTDOWN within the next 12 hours.
: c. In OPERATIONAL CONDITION 5, suspend CORE ALTERATIONS and other activities that could reduce the SHUTDOWN MARGIN and insert all insertable control rods within 1 hour. Establish SECONDARY CONTAIN-MENT INTEGRITY within 8 hours.
: b.
SURVEILLANCE REQUIREMENTS 4.1.1   The SHUTDOWN MARGIN shall be determined to be equal to o r greater than specified at any tlme during the fuel cycle:
In OPERATIONAL CONDITION 3 or 4, immediately verify all insertable control rods t o be inserted and suspend all activities that could reduce the SHUTDOWN MARGIN. In OPERATIONAL CONDITION 4, establish SECONDARY CONTAINMENT INTEGRITY within 8 hours.
: a. By measurement, p r i o r to or during the first startup after each refuel i ng.
: c.
b.
In OPERATIONAL CONDITION 5, suspend CORE ALTERATIONS and other activities that could reduce the SHUTDOWN MARGIN and insert all insertable control rods within 1 hour.
MENT INTEGRITY within 8 hours.
Establish SECONDARY CONTAIN-SURVEILLANCE REQUIREMENTS 4.1.1 The SHUTDOWN MARGIN shall be determined to be equal to o r greater than specified at any tlme during the fuel cycle:
: a.
By measurement, p r i o r to or during the first startup after each refuel i ng.
By measurement, within 500 MWD/T prior to the core average exposure at which the predicted SHUTDOWN MARGIN, including uncertainties and calculation biases, i s equal to the specified limit.
By measurement, within 500 MWD/T prior to the core average exposure at which the predicted SHUTDOWN MARGIN, including uncertainties and calculation biases, i s equal to the specified limit.
: c. Within 12 hours after detection of a withdrawn control rod that i s himovable, as a result of excessive friction or mechanical inter-ference, or i s untrippable, except that the above required SHUTDOWN MARGIN shall be verified acceptable with an increased allowance f o r the withdrawn worth of the immovable or untrippable control rod.
: b.
HOPE CREEK                               314 1-1
: c.
Within 12 hours after detection of a withdrawn control rod that i s himovable, as a result of excessive friction or mechanical inter-ference, or i s untrippable, except that the above required SHUTDOWN MARGIN shall be verified acceptable with an increased allowance f o r the withdrawn worth of the immovable or untrippable control rod.
HOPE CREEK 314 1-1  


REACTIVITY CONTROL SYSTEMS 3/4.1.2 REACTIVITY ANOMALIES LIMITING CONDITION FOR OPERATION 3.1.2   The reactivity equivalence o f the difference between the actual ROD OENSITY and the predicted ROD DENSITY shall not exceed 1% delta k/k.
REACTIVITY CONTROL SYSTEMS 3/4.1.2 REACTIVITY ANOMALIES LIMITING CONDITION FOR OPERATION 3.1.2 The reactivity equivalence of the difference between the actual ROD OENSITY and the predicted ROD DENSITY shall not exceed 1% delta k/k.
APPLICABILITY:     OPERATIONAL CONDITIONS 1 and 2.
APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.
ACT ION:
ACT ION:
With the reactivity equivalence difference exceeding 1% delta k/k:
With the reactivity equivalence difference exceeding 1% delta k/k:
: a. Within 12 hours perform an analysis to determine and explain the cause of the reactivity difference; operation may continue i f the difference i s explained and corrected.
: a.
: b. Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
Within 12 hours perform an analysis to determine and explain the cause of the reactivity difference; operation may continue i f the difference i s explained and corrected.
: b.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
SURVEILLANCE REQUIREMENTS 4.1.2 The reactivity equivalence of the difference between the actual ROD DENSITY and the predicted ROD DENSITY shall be verified to be less than or equal to 1% delta k/k:
SURVEILLANCE REQUIREMENTS 4.1.2 The reactivity equivalence of the difference between the actual ROD DENSITY and the predicted ROD DENSITY shall be verified to be less than or equal to 1% delta k/k:
: a. During the first startup following CORE ALTERATIONS, and
: a.
: b. A t least once per 31 effective full power days during POWER OPERATION.
: b.
HOPE CREEK                           3/4 1-2
During the first startup following CORE ALTERATIONS, and A t least once per 31 effective full power days during POWER OPERATION.
HOPE CREEK 3/4 1-2  


REACTIVITY CONTROL SYSTEMS 3/4.1.3   CONTROL RODS CONTROL ROD OPERA'BILIN LIMITING CONDITION FOR     OPERATION     .
REACTIVITY CONTROL SYSTEMS 3/4.1.3 CONTROL RODS CONTROL ROD OPERA'BILIN LIMITING CONDITION FOR OPERATION 3.1.3.1 All control rods shall be OPERABLE.
3.1.3.1   All control rods shall be OPERABLE.
APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.
APPLICABILITY:   OPERATIONAL CONDITIONS 1 and 2.
ACTION:
ACTION:
: a. With one control rod inoperable due to being h w v a b l e , as a result o f excessfve friction or mechanical interference, or known to be untrfppable:
: a.
: 1. Within one hour:
With one control rod inoperable due to being hwvable, as a result o f excessfve friction or mechanical interference, or known to be untrfppable:
a) Verify that the inoperable control rod, f f withdrawn, i s separated from all other inoperable control rods by at least two control cells in all dircctfonr.
: 1.
b) Disarm the associated directional control valves** hydraulically by closing the drive water and exhaust water isolation valves.
Within one hour:
Othenise, be in a t least HOT SHUTDMJN within the next 12 hours.
a)
: 2. Restore the inoperable control rod, i f withdrawn, to OPERABLE status within 48 hours or be i n at least HOT SHUTDOWN within the next 12 hours.
Verify that the inoperable control rod, f f withdrawn, i s separated from all other inoperable control rods by at least two control cells in all dircctfonr.
: b. With one or more control rods trippable but inoperable for causes other than addressed in ACTION a, above:
Disarm the associated directional control valves** hydraulically by closing the drive water and exhaust water isolation valves.
: 1. If the inoperable control rod(s) f s withdrawn, within one hour:
b)
a) V e r i f y that the inoperable withdrawn control rod(s) is separated f r w ill other inoprrablc withdrawn control rods by at least two control cells in all directions, and b)  Demonstrate the insertion capability of the lnoperable withdrawn control rod(s) by i n s e t t i n g the control rod(s) at least one notch by drive water pressure within the noma1 operating range*
Othenise, be in at least HOT SHUTDMJN within the next 12 hours.
Restore the inoperable control rod, i f withdrawn, to OPERABLE status within 48 hours or be in at least HOT SHUTDOWN within the next 12 hours.
With one or more control rods trippable but inoperable for causes other than addressed in ACTION a, above:
: 1.
: 2.
: b.
If the inoperable control rod(s) f s withdrawn, within one hour:
a)
Verify that the inoperable withdrawn control rod(s) is separated frw ill other inoprrablc withdrawn control rods by at least two control cells in all directions, and Demonstrate the insertion capability of the lnoperable withdrawn control rod(s) by insetting the control rod(s) at least one notch by drive water pressure within the noma1 operating range*
Othtnfsc, Insert the inoperable withdraw control rod(s) and disarm the associated directional control valves** tither:
Othtnfsc, Insert the inoperable withdraw control rod(s) and disarm the associated directional control valves** tither:
a) Electrfcally, or b)   Hydraulically by closing the drive water and exhaust water isolation v a l v e s .
a)
      *The inoperable control rod may then be wlthdram t o a position no further withdrawn than its posftfon when found to be inoperable.
Electrfcally, or b)
    **May be reamed Intermittently, under administratfve control, t o permit testing associated with restoring the control rod to OPERABLE status.
Hydraulically by closing the drive water and exhaust water isolation valves.
L HOPE CREEK                               3/4 1-3
b)
*The inoperable control rod may then be wlthdram t o a position no further withdrawn than its posftfon when found to be inoperable.  
**May be reamed Intermittently, under administratfve control, t o permit testing associated with restoring the control rod to OPERABLE status.
L HOPE CREEK 3/4 1-3  


                                                                                                                                        -.:y (continuad)
(continuad)
: 2.       If +h. & & a b l m              controx r0at.j           ir                  within ona hour di8um tho aa8ociat.d direction81 control v8lvorn** e i t h o r x a)   E l e c t z f c a l l y , or b)   Rydraulicatly by cloaing the dtlcn watar M d Warrrt w a t o r i r o l i t i o n oalvas.
: 2.
Ofhamism, k in a t laast tfcn s                         " w i t h i n t h o next 12 burr.
If +h. &&ablm controx r0at.j i r within ona hour di8um tho aa8ociat.d direction81 control v8lvorn** eithorx a)
: 3.       Tha provimionm of Spaclflcation 3.0.4                               .T. n o t  8pplicrbh.
Electzfcally, or b)
: e.       With mora thaa 8 c o n t r o l rod8 inoprrrble, bo i n at l o u t BOT" S w i t h i n 12 hour..
Rydraulicatly by cloaing the dtlcn watar M d Warrrt wator i r o l i t i o n oalvas.
: d.       With one rerun di8clurgo roluma rout valve md/or one 8crm d i r c h u g a wlurrv drain valva inopmrablo urd opan, rostorm thm iaoporabla valvo(8) to OPE-                     s t a t u 8 w i t h i n 24 W m or ba in a t loast BOT SHpTDoWn within th. next 12 hour..
Ofhamism, k in a t laast tfcn s" w i t h i n tho next 12 burr.
: e.       with         8CX.m d b t h u g a r o l w               w n t v & l ~ 8 ( # )Bnd/or m y 8 C f m d f ~ c h u p ovoluma d r a i n valva(^)                 otharuira inoprrabla, tomtom tha inoperabh valve(.)                 t o OP-               r t a t u r w i t h i n 8 bourr or k i n at learnt HOT S         " w i t h i n tho aoxt 12                 hour..
: 3.
4.1.3.1.1           T b 8Ctm di8charge                 VO~W       d r a i n and t.nt       Va1V88              k demonatratad OPERABLZ byt
Tha provimionm of Spaclflcation 3.0.4.T. not 8pplicrbh.
: a.       At  h a r t onca pmr 24 hour8 rrrifying aach valre t o b. oprn,* and
: e.
: b.       A t 10&8t     once p r 31 day8 C p l f B p a&&                       Val-     through         but ona cmnplata cycle of f u l l traval.
With mora thaa 8 control rod8 inoprrrble, bo in at l o u t BOT S w i t h i n 12 hour..
4.1.3.1.2           Whin above tha l o w pmr 88tpoint of t h a Rw)(, 8ll withdrawn a o n t r d rod8 not r.qutrad t o hap. +hair dirmctLona1 c o n t r o l valva8 I
: d.
d 1 . M
With one rerun di8clurgo roluma rout valve md/or one 8crm d i r c h u g a wlurrv drain valva inopmrablo urd opan, rostorm thm iaoporabla valvo(8) to OPE-statu8 w i t h i n 24 W m or ba in at loast BOT SHpTDoWn within th. next 12 hour..
    .TheBe       vrlvmm amy ba clomad intermittently for tasting undar adminimtrati-control..
: e.
    *
with 8CX.m d b t h u g a r o l w w n t v & l ~ 8 ( # ) Bnd/or m y 8 C f m d f ~ c h u p o voluma drain valva(^) otharuira inoprrabla, tomtom tha inoperabh valve(.)
* t h y k raarmad         f n t m n n i t t a n t l y , u n d u a b m f n l m t r a t i v a ' c o n t r l , to p d t te8tFng a8rocLated w i t h ramtorfag tha control rod t o OPERABLE r t a t u 8 .
t o OP-r t a t u r within 8 bourr or k in at learnt HOT S" w i t h i n tho aoxt 12 hour..
HOPE CREEK                                                       3/4 1-4                                                 ~ n105 m a d ~ ~ IPO. t
4.1.3.1.1 T b 8Ctm di8charge V O ~ W drain and t.nt V a 1 V 8 8 k
demonatratad OPERABLZ byt
: a.
A t h a r t onca pmr 24 hour8 rrrifying aach valre t o b. oprn,* and
: b.
A t 10&8t once p r 31 day8 C p l f B p a&& Val-through but ona cmnplata cycle of f u l l traval.
I 4.1.3.1.2 withdrawn a o n t r d rod8 not r.qutrad t o hap. +hair dirmctLona1 control valva8 d 1. M Whin above tha l o w pmr 88tpoint of t h a Rw)(, 8ll
.TheBe vrlvmm amy ba clomad intermittently for tasting undar adminimtrati-control..  
*
* t h y k raarmad fntmnnittantly, u n d u abmfnlmtrativa'contrl, to pdt te8tFng a8rocLated w i t h ramtorfag tha control rod t o OPERABLE rtatu8.
HOPE CREEK 3/4 1-4 m a d ~ ~ ~ n t IPO. 105
-.:y


SURVEILIANCE REQUIREPlENTS (Continued) electrically or hydraulically shall be demonstratrd OPERABLE by moving each control rod a t lsrrt one notch:
SURVEILIANCE REQUIREPlENTS (Continued) electrically or hydraulically shall be demonstratrd OPERABLE by moving each control rod at lsrrt one notch:
: a. At least once per 7 a y e , rad
: a.
: b. within 24 hour8 when any control rod is inmovable ae a result of ucesriva f r i c t i o n or mechanical ia+crfcrcnce.
At least once per 7 a y e, rad
4.1.3.1.3   All control to& shall be denmnmtr8tad OPERABLE by performance of Surveillance Requirement8 4.1.3.2, 4 . 1 . 3 . 4 , 4 . 1 . 3 . 5 , 4 . 1 . 3 . 6 urd 4 . 1 . 3 . 7 .
: b.
4.1.3.1.4   The scram dincharge volurna shall be determined ORERABLB by demonrtratiog:
within 24 hour8 when any control rod is inmovable ae a result of ucesriva friction or mechanical ia+crfcrcnce.
: a. The scram discharge volume drain a d vmat valve. 00-                           at h i n t once per 18 month., by verifying that the &ria and vtat valves:
4.1.3.1.3 Surveillance Requirement8 4.1.3.2, 4.1.3.4, 4.1.3.5, 4.1.3.6 urd 4.1.3.7.
: 1. Close within 30 second. after receipt of a 8ignal for control to& t o scram, and
4.1.3.1.4 demonrtratiog:
: 2. Open when the scram signal io reset.
All control to& shall be denmnmtr8tad OPERABLE by performance of The scram dincharge volurna shall be determined ORERABLB by
L' ROPE CREEK                                 3/4 1-5                               Ameadment        N0.80 1
: a.
The scram discharge volume drain a d vmat valve. 00-at h i n t once per 18 month., by verifying that the &ria and vtat valves:
: 1. Close within 30 second. after receipt of a 8ignal for control to& to scram, and 2.
Open when the scram signal io reset.
Ameadment N0.80 1
ROPE CREEK 3/4 1-5 L'


REACTIVITY     CONTROL   SYSTEMS CONTROL ROD MAXIMUM SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.2 The maxjmum scram insertion time o f each control rod from the fully withdrawn position t o notch position 5, based on de-energiration of the scram pilot valve solenoids as time zero, shal? not exceed 7.0 seconds.
REACTIVITY CONTROL SYSTEMS CONTROL ROD MAXIMUM SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.2 The maxjmum scram insertion time o f each control rod from the fully withdrawn position t o notch position 5, based on de-energiration of the scram pilot valve solenoids as time zero, shal? not exceed 7.0 seconds.
APPLICABILITY: OPERATIONAL CONOITXONS 1 and 2.
APPLICABILITY: OPERATIONAL CONOITXONS 1 and 2.
ACTION:
ACTION:
: a. With the maximum scram insertion time of one or more control rods exceeding 7.0 seconds:
: a. -
: 1.     Declare the control rod(s) with the slow insertion time inoperable,                     and
With the maximum scram insertion time of one or more control rods exceeding 7.0 seconds:
: 2.      Perform the Surveillance Requirements o f Specification 4.1.3.2.c at least once per 60 days when operation I s conttnucd with three or more control rods w i t h maximum scram insertion tSmes In excess o f 7.0 seconds.
: 1.
: 2.
Declare the control rod(s) with the slow insertion time inoperable, and Perform the Surveillance Requirements of Specification 4.1.3.2.c at least once per 60 days when operation I s conttnucd with three or more control rods with maximum scram insertion tSmes In excess o f 7.0 seconds.
Otheruire, be i n at least HOT SHUTDOWN within l2 hours.
Otheruire, be i n at least HOT SHUTDOWN within l2 hours.
: b. The   provisions o f S p e c f f i c a t i o n 3.0.4 are not applicable.
The provisions o f Specffication 3.0.4 are not applicable.
'v SURVEILLANCE       REQUIREMENTS 4.1.3.2       The maxfmtnn scram insertion time o f the control rods shall be dernon-strated through aeasurement w i t h reactor coolant pressure greater than or equal to 950 psiq and, durjng s i n g l e control rod scram time tests, the control rod d r i v e pumps isolated from the accumulators:
: b.  
: a.     For a l l control rods prior to THERMAL POWER exceeding 40% of RATED THERCIAL POWER following CORE ALTERATXONS or after a reactor shutdown that 1 s greater thrn 120 days.
'v SURVEILLANCE REQUIREMENTS 4.1.3.2 The maxfmtnn scram insertion time o f the control rods shall be dernon-strated through aeasurement with reactor coolant pressure greater than or equal to 950 psiq and, durjng single control rod scram time tests, the control rod d r i v e pumps isolated from the accumulators:
: b.      For s p d f i c a l l y affected fndividual control rods following maintenance on o r nodificatfon to the control rod or control rod drive rystcn which could affect the scram fnsertion tine o f those tpecffic control rods, and
: a.
: c.      F o r at least 10% o f the control rods,           on a r o t a t i n g basis, at least once per 120 days of POWER OPERATION.
For a l l control rods prior to THERMAL POWER exceeding 40% of RATED THERCIAL POWER following CORE ALTERATXONS or after a reactor shutdown that 1s greater thrn 120 days.
HOPE CREEK                                         3/1 1-6
For s p d f i c a l l y affected fndividual control rods following maintenance on or nodificatfon to the control rod or control rod drive rystcn which could affect the scram fnsertion tine of those tpecffic control rods, and For at least 10% of the control rods, on a rotating basis, at least once per 120 days of POWER OPERATION.
: b.
: c.
HOPE CREEK 3/1 1-6  


REACTIVITY CONTROL SYSTEMS CONTROL ROD AVERAGE SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.3 The average scram insertion time of all OPERABLE control rods from     ,
REACTIVITY CONTROL SYSTEMS CONTROL ROD AVERAGE SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.3 The average scram insertion time of all OPERABLE control rods from the fully withdrawn position, based on de-energization o f the scram pilot.,valve solenoids as time zero, shall not exceed any of the following:
the fully withdrawn position, based on de-energization o f the scram pilot.,valve solenoids as time zero, shall not exceed any of the following:
Position Inserted From Ful ly Withdrawn Average Scram Inser-tion Time (Seconds1 45 0.43 39 0.86 25 1.93 05 3.49 APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.
Position Inserted From         Average Scram Inser-F u l ly Withdrawn          tion Time (Seconds1 45                       0.43 39                       0.86 25                       1.93 05                       3.49 APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.
ACT I ON :
ACT I ON :
With the average scram insertion time exceeding any of the above limits, be in at least HOT SHUTDOWN within 12 hours.
With the average scram insertion time exceeding any of the above limits, be in at least HOT SHUTDOWN within 12 hours.
SURVEILLANCE REQUIREMENTS 4.1.3.3 All control rods s h a l l be demonstrated OPERABLE by scram time testing from the fully withdrawn position as required by Surveillance Requirement 4.1.3.2. .                                  ,  .
SURVEILLANCE REQUIREMENTS 4.1.3.3 All control rods shall be demonstrated OPERABLE by scram time testing from the fully withdrawn position as required by Surveillance Requirement 4.1.3.2..
HOPE CREEK                           314 1-7
HOPE CREEK 314 1-7  


REACTIVITY CONTROL SYSTEMS FOUR CONTROL ROD GROUP SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.4     The average scram insertion time, from the fully withdrawn position, for the three fastest control rods in each group of four control rods arranged i n a two-by-two array, based on deenergization of the scram pilot valve solenoids as time zero, shall not exceed any o f the following:
REACTIVITY CONTROL SYSTEMS FOUR CONTROL ROD GROUP SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.4 The average scram insertion time, from the fully withdrawn position, for the three fastest control rods in each group of four control rods arranged i n a two-by-two array, based on deenergization of the scram pilot valve solenoids as time zero, shall not exceed any o f the following:
Position Inserted From         Average Scram Inser-F u l ly Withdrawn          tion Time (Seconds1 45                          0.45 39                         0.92 25                         2.05 05                         3.70 APPLICABILITY:     OPERATIONAL CONDITIONS 1 and 2.
Position Inserted From Ful ly Withdrawn Average Scram Inser-tion Time (Seconds1 45 39 25 05 APPLICABILITY:
ACTION:
ACTION:
: a. With the average scram insertion times o f control rods exceeding the above 1 imi ts:
OPERATIONAL CONDITIONS 1 and 2.
: 1. Declare the control rods with the slower than average scram insertion times inoperable until an analysis i s performed to determine that required scram reactiviy remains f o r the slow four control rod group, and
0.45 0.92 2.05 3.70
: 2. Perform the Surveillance Requirements of Specification 4.1.3.2.c at least once per 60 days when operation i s continued with an average scram insertion time(s) in excess o f the average scram insertion time l i m i t .
: a.
With the average scram insertion times o f control rods exceeding the above 1 imi ts:
: 1.
Declare the control rods with the slower than average scram insertion times inoperable until an analysis i s performed to determine that required scram reactiviy remains f o r the slow four control rod group, and
: 2.
Perform the Surveillance Requirements of Specification 4.1.3.2.c at least once per 60 days when operation i s continued with an average scram insertion time(s) in excess o f the average scram insertion time l i m i t.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
: b. The provisions o f Specification 3.0.4 are not applicable.
: b.
SURVEILLANCE   REQUIREMENTS 4.1.3.4     All control rods s h a l l be demonstrated OPERABLE by scram time testing from the fully withdrawn position as required by Surveillance Requirement 4.1.3.2.
The provisions o f Specification 3.0.4 are not applicable.
HOPE CREEK                               3/4 1-8
SURVEILLANCE REQUIREMENTS 4.1.3.4 from the fully withdrawn position as required by Surveillance Requirement 4.1.3.2.
All control rods shall be demonstrated OPERABLE by scram time testing HOPE CREEK 3/4 1-8  


REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS L I M I T I N G CONDITION FOR OPERATION  
  /-
/-
L I M I T I N G C O N D I T I O N FOR OPERATION
3.1.3.5 Each Control rod scram accumulator s h a l l be OPERABLE.
'---  3.1.3.5         Each C o n t r o l rod scram a c c u m u l a t o r s h a l l b e OPERABLE.
APPLICABILITY:
APPLICABILITY:                 OPERATIONAL CONDITIONS 1, 2 and 5*.
OPERATIONAL CONDITIONS 1, 2 and 5*.
ACT I ON :
ACT I ON :
    .............................                              NOTE--------------------------------
S e p a r a t e c o n d i t i o n e n t r y i s allowed f o r each c o n t r o l rod NOTE--------------------------------
S e p a r a t e c o n d i t i o n e n t r y i s allowed f o r each c o n t r o l rod
a.
: a.       I n OPERATIONAL C O N D I T I O N S 1 o r 2 :
I n OPERATIONAL CONDITIONS 1 o r 2 :
: 1.         With one c o n t r o l rod s c r a m a c c u m u l a t o r i n o p e r a b l e and r e a c t o r p r e s s u r e 2 900 p s i g , w i t h i n 8 hours,                                     I a)         R e s t o r e t h e i n o p e r a b l e a c c u m u l a t o r t o OPERABLE s t a t u s ,
I
OK b)         Insert t h e a s s o c i a t e d c o n t r o l rod, d e c l a r e t h e a s s o c i a t e d c o n t r o l r o d i n o p e r a b l e and d i s a r m t h e associated control valves e i t h e r electrically o r h y d r a u l i c a l l y by c l o s i n g t h e d r i v e w a t e r and e x h a u s t water i s o l a t i o n valves.
: 1.
O t h e r w i s e , b e i n a t l e a s t HOT SHUTDOWN w i t h t h e n e x t 1 2 hours.
With one c o n t r o l rod scram accumulator i n o p e r a b l e and r e a c t o r p r e s s u r e 2 900 p s i g, w i t h i n 8 hours, a )
7 L.         W i t h two o r more c a n t r o l r o d s c r a m a c c u m u l a t o r s i n o p e r a b l e and r e a c t o r p r e s s u z e 2 9 0 0 p s i g ,
Restore t h e inoperable accumulator t o OPERABLE s t a t u s,
a)         W i t h i n 2 0 r r i n u t e s of d i s c o v e r y o f t h i s condition concurrent with charging water pressure < 940 psig, r e s t o r e charging water header p r e s s u r e t o 2 940 p s i g otherwise p l a c e t h e mode s w i t c h i n t h e shutdown p o s i t i o n * * ,
OK b )
and b)         W i t h i n 3r.e h o c r l n s e r t t h e a s s o c i a t e d c o n t r o l r a d s ,
Insert t h e a s s o c i a t e d c o n t r o l rod, d e c l a r e t h e a s s o c i a t e d c o n t r o l rod i n o p e r a b l e and disarm t h e a s s o c i a t e d c o n t r o l v a l v e s e i t h e r e l e c t r i c a l l y o r h y d r a u l i c a l l y by c l o s i n g t h e d r i v e water and exhaust water i s o l a t i o n v a l v e s.
c e c l a r e :r.e a s s o c i a r e d c o n t r o l r o d s i n o p e r a b l e a z d a ~ s a r :Re   : ~ a s s o c i a t e d c o n t r c l v a l v e s ei:her e l e ,r,-, , z a : l j .
Otherwise, be i n a t l e a s t HOT SHUTDOWN with t h e next 12 hours.
r .           e: h y c r a u l i c a l l y by c l o s i n g t h e c r i v e wa:e:          a?+= e x k a d s z w a t e r i s o l a t i o n v a l v e s .
L.
g t h e r w i s e , b e :r. a t l e a s t HOT SHUTDOWN w i t h i n :he n e x t 12 h o u r s .
7 W i t h two o r more c a n t r o l rod scram accumulators i n o p e r a b l e and r e a c t o r pressuze 2 900 p s i g,
      .~
a )
* i e d s t t z e accunula:cr               ass3z:a:ez             x i t h e a c h withdrawn c o n t r o l
Within 20 r r i n u t e s of d i s c o v e r y of t h i s c o n d i t i o n concurrent with charging water p r e s s u r e < 940 p s i g, r e s t o r e charging water header p r e s s u r e t o 2 940 p s i g otherwise p l a c e t h e mode switch i n t h e shutdown p o s i t i o n * *,
    . .---.      ::    d s p l i c a b l e z 3 c g n c r c ' l : ~ i s renoved p e r S p e c i f i c a t i o n 3 . 9 . 1 0 . 1 o r
and b )
    ~    - ..
W i t h i n 3r.e hocr l n s e r t t h e a s s o c i a t e d c o n t r o l rads, c e c l a r e :r.e a s s o c i a r e d c o n t r o l rods inoperable azd a ~ s a r : ~
3.:
:Re a s s o c i a t e d c o n t r c l valves ei:her wa:e:
            .'_-    a ~ ~ l i c a b il fe    a l l i n o p e r a b l e c o n t r o l rod s c r a m a:::.--larsrs           are associazed x i t h f 3 s l i y i n s e r t e d c o n t r s l rods.
a?+= e x k a d s z water i s o l a t i o n valves.
I 3 / 4 1-9                               Amendment h70.98       I
eler-
,,,,za:lj.
r.
e : h y c r a u l i c a l l y by c l o s i n g t h e c r i v e gtherwise, be :r. a t l e a s t HOT SHUTDOWN w i t h i n :he next 12 hours.  
.~
i e d s t t z e accunula:cr ass3z:a:ez x i t h each withdrawn c o n t r o l d s p l i c a b l e z 3 cgncrc'l : ~ i s renoved p e r S p e c i f i c a t i o n 3. 9. 1 0. 1 o r a ~ ~ l i c a b l e i f a l l inoperable c o n t r o l rod scram
~
3.:. _ -. _.
a:::.--larsrs a r e associazed x i t h f 3 s l i y i n s e r t e d c o n t r s l rods.
3/4 1-9 Amendment h70.98 I
I  


REACTIVITY CONTROL SYSTEMS L I M I T I N G C O N D I T I O N FOR OPERATION ( c o n t i n u e d )
REACTIVITY CONTROL SYSTEMS L I M I T I N G CONDITION FOR OPERATION (continued)
ACTION ( C o n t i n u e d )
ACTION (Continued)
: 3.       With one o r more c o n t r o l r o d scram a c c u m u l a t o r s i n o p e r a b l e and r e a c t o r p r e s s u r e < 990 p s i g ,
: 3.
a)         Immediately upon d i s c o v e r y o f c h a r g i n g w a t e r h e a d e r pressure < 940 psig, v e r i f y a l l control rods a s s o c i a t e d with i n o p e r a b l e accumulators are f u l l y i n s e r t e d o t h e r w i s e p l a c e t h e mode s w i t c h i n t h e shutdown p o s i t i o n * * , and b)         Within one h o u r i n s e r t t h e a s s o c i a t e d c o n t r o l r o d ( s ) ,
With one o r more c o n t r o l rod scram accumulators i n o p e r a b l e and r e a c t o r p r e s s u r e < 990 psig, a )
d e c l a r e t h e a s s o c i a t e d c o n t r o l r o d ( s ) i n o p e r a b l e and disarm t h e associated control valves e i t h e r e l e c t r i c a l l y o r h y d r a u l i c a l l y by c l o s i n g t h e d r i v e water and e x h a u s t water i s o l a t i o n v a l v e s .
Immediately upon discovery of charging water header p r e s s u r e < 940 psig, v e r i f y a l l c o n t r o l rods a s s o c i a t e d with inoperable accumulators are f u l l y i n s e r t e d otherwise p l a c e t h e mode switch i n t h e shutdown position**, and b )
O t h e r w i s e , be i n a t l e a s t HOT SHUTDOWN w i t h i n t h e next 12 hours.
Within one hour insert t h e a s s o c i a t e d c o n t r o l r o d ( s ),
: b.                 I n OPEMTIONAL CONDITION S * :
d e c l a r e t h e a s s o c i a t e d c o n t r o l r o d ( s ) i n o p e r a b l e and disarm t h e a s s o c i a t e d c o n t r o l valves e i t h e r e l e c t r i c a l l y o r h y d r a u l i c a l l y by c l o s i n g t h e d r i v e water and exhaust water i s o l a t i o n valves.
1 A . With one o r more withdrawn c o n t r o l r o d s i n o p e r a b l e , upon d ; SCOI'.: r y i m m e d i a t e l y i n i t i a t e a c t i o n t o f u l l y i n s e r t i n o p e r a b l e withdrawn control rods.
Otherwise, be i n a t least HOT SHUTDOWN within t h e next 1 2 hours.
  -  C.               -...e p r o v i s i o n s o f i                              Specification 3.0.4 are not applicable.
: b.
5.1.3.5                     Each c o n t r o l rod scram a c c u m u l a t o r s h a l l be d e t e r m i n e d OPERABLE:
I n OPEMTIONAL CONDITION S * :
: a.             At    leas: 2 n c e p e r 7 d a y s by v e r i f y i n g t h a t t h e i n d i c a t e d p r e s s u r e 1 s g r e a t e r t h a n o r e q s a l t o 940 p s i g u n l e s s t h e c o n t r o l rod i s Lnsercec! and disarmed o r scrammed.
A.
::.e a c c a x l a r o r ass3tia:ec               1*;:t!: e a c h withdrawn c o n t r o l
1 With one o r more withdrawn c o n t r o l rods inoperable, upon d; SCOI'.: r y immediately i n i t i a t e a c t i o n t o f u l l y i n s e r t inoperable withdrawn c o n t r o l rods.
                      ... I __ -- C;;l:zab:e
C.  
_  _...                                      t o c o r , t z o i TOSS       rer,Dved p e r S p e c i f i c a t i o n 3 . 9 . 1 0 . 1 c z
-... i e provisions of S p e c i f i c a t i o n 3.0.4 are not a p p l i c a b l e.
      .. .'-.        _ . C .
5. 1. 3. 5 Each c o n t r o l rod scram accumulator s h a l l be determined OPERABLE:
                . . _ . -,,--cable
a.
                            ^__..              i f a l l inDpezaSle cz:r.tzzl rod s c r a m d::-.r412:c:s                     a r e asscciateci w i t h f u l l y rnserted c o n t r o l rods.
A t leas:
3 / 4 1-10                             Amendment No. 98
2nce p e r 7 days by v e r i f y i n g t h a t t h e i n d i c a t e d p r e s s u r e 1 s g r e a t e r than o r e q s a l t o 940 p s i g u n l e s s t h e c o n t r o l rod i s Lnsercec! and disarmed o r scrammed.
::.e a c c a x l a r o r ass3tia:ec 1*;:t!: each withdrawn c o n t r o l
_ _.... I _ - C;;l:zab:e t o cor,tzoi TOSS rer,Dved p e r S p e c i f i c a t i o n 3.9.10.1 c z  
. _ _. C.  
.. _. ^__.
-,,--cable i f a l l inDpezaSle cz:r.tzzl rod scram d::-.r412:c:s a r e asscciateci w i t h f u l l y r n s e r t e d c o n t r o l rods.
3 / 4 1-10 Amendment No. 98  


REACTIVITY CONTROL SYSTEMS CONTROL ROD D R I V E COUPLING 3.1.3.6   All Control rods shall be Coupled to their drive mechanisms.
"v REACTIVITY CONTROL SYSTEMS CONTROL ROD D R I V E COUPLING 3.1.3.6 A l l Control rods shall be Coupled to their drive mechanisms.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 5f.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 5 f.
: a. In OPERATIONAL CONDITION 1 and 2 with one control rod not coupled to its associated drive mechanism, within 2 hours:
: a. In OPERATIONAL CONDITION 1 and 2 with one control rod not coupled to its associated drive mechanism, within 2 hours:
: 1. If permitted by the RWM,.insert the control rod to accomplish recoupling and verify recoupling by withdrawing the I
: 1.
control rod, and:
If permitted by the RWM,.insert the control rod to accomplish recoupling and verify recoupling by withdrawing the control rod, and:
a)   Observing any indicated response of the nuclear instrumentation. and b)   Demonstrating that the control rod will not go to the overtravel position.
I a)
: 2. If recoupling is not accomplished on the first attempt or, if not permitted by the RWM. then until permitted by the RWM, declare the control rod inoperable, insert the control rod and disarm the associated directional control valves++ either:
Observing any indicated response of the nuclear b)
I a)   Electrically, or b)   Hydraulically by closing the drive water and exhaust water "v
Demonstrating that the control rod will not go to the instrumentation. and overtravel position.
isolation valves.
2.
If recoupling is not accomplished on the first attempt or, if I
not permitted by the RWM. then until permitted by the RWM, declare the control rod inoperable, insert the control rod and disarm the associated directional control valves++ either:
a)
Electrically, or b)
Hydraulically by closing the drive water and exhaust water isolation valves.
Otherwise. be in at least HOT SHUTDOWN within the next 12 hours.
Otherwise. be in at least HOT SHUTDOWN within the next 12 hours.
: b. :
: b. :n OPERATIONAL CONDITION 5, with a withdrawn control rod not coupled to its associated drive mechanism, within 2 hours either:
n OPERATIONAL CONDITION 5,   with a withdrawn control rod not coupled to its associated drive mechanism, within 2 hours either:
1.
: 1. Insert the control rod to accomplish recoupling and verify recoupling by withdrawing the control rod and demonstrating that the control rod will not go to the overtravel position, or
Insert the control rod to accomplish recoupling and verify recoupling by withdrawing the control rod and demonstrating that the control rod will not go to the overtravel position, or 2.
: 2. If recoupling is not accomplished, insert the control rod and disarm the associated directional control valves** either:
If recoupling is not accomplished, insert the control rod and disarm the associated directional control valves** either:
a)   Electrically, or b)   Hydraulically by closing the drive water and exhaust water isolation valvem.
a)
: c. The prov~sions of Specification 3.0.4 arc not applicable.
Electrically, or b)
    *At  least each withdrawn control rod. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
Hydraulically by closing the drive water and exhaust water isolation valvem.
  **May be rearmed intermittently. under administrative control, to permit testing associated with restoring the control rod to OPERABLE status.
: c. The prov~sions of Specification 3. 0. 4 arc not applicable.
HOPE CfZEEK                           3/4 1-11                   Amendment NO. 105
* A t least each withdrawn control rod.
Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.  
**May be rearmed intermittently. under administrative control, to permit testing associated with restoring the control rod to OPERABLE status.
HOPE CfZEEK 3 / 4 1-11 Amendment NO. 105  


REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.6 Each affected control rod shall be demonstrated to be coupled to its drive mechanism by observing any indicated response o f the nuclear instrumen-tation while withdrawing the control rod t o the fully withdrawn position and then verifying that the control rod drive does not go t o the overtravel p o s it ion:
REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.6 Each affected control rod shall be demonstrated to be coupled to its drive mechanism by observing any indicated response o f the nuclear instrumen-tation while withdrawing the control rod to the fully withdrawn position and then verifying that the control rod drive does not go to the overtravel pos it i on:
: a. Prior to reactor criticality after completing CORE ALTERATIONS t h a t could have affected the c o n t r o l rod drive coupling integrity,
: a.
: b. Anytime the control rod is withdrawn t o the "Full out" position i n subsequent operation, and
Prior to reactor criticality after completing CORE ALTERATIONS t h a t could have affected the control rod drive coupling integrity,
: c. Following maintenance on or modification to the control rod or control rod drive system which could have affected the control r o d drive coupting integrity.
: b.
HOPE     CREEK                           314 1-12
Anytime the control rod is withdrawn to the "Full out" position i n subsequent operation, and
: c.
Following maintenance on or modification to the control rod or control rod drive system which could have affected the control rod drive coupting integrity.
HOPE CREEK 314 1-12  


pEACTIVITY CONTROL SYSTEMS
pEACTIVITY CO NTROL SYSTEMS  
/- '>
/- ' >
CONTROL R OD POSITION INDICATION 3.1.3.7   The control rod poeition indication system shall be OPERABLE.
W CONTROL R OD POSITION INDICATION 3.1.3.7 The control rod poeition indication system shall be OPERABLE.
fiPPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 5 9 .
fiPPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 5 9.
A. In OPERATIONAL CONDITION 1 or 2 with one or more control rod position     .
A.
indicatore inoperable, within 1 hour:
In OPERATIONAL CONDITION 1 or 2 with one or more control rod position indicatore inoperable, within 1 hour:
: 1. Determine the position of the control rod by using an alternate method, or:
: 1.
a) Moving the control rod, by single notch movement, to a position with an OPERABLE position indicator, b ) Returning the control rod, by single notch movement, to its original position, and c) Verifying no control rod drift alarm at least once per 12 houre, or
2.
: 2. Hove the control rod to a position with an OPERABLE position indicator, or
3.
: 3. When T H E W POWER is:
Determine the position of the control rod by using an alternate method, or:
W a ) Within the preset power level of the RW'M, declare the control rod inoperable.
a) Moving the control rod, by single notch movement, to a b) Returning the control rod, by single notch movement, to its c) Verifying no control rod drift alarm at least once per 12 position with an OPERABLE position indicator, original position, and houre, or Hove the control rod to a position with an OPERABLE position indicator, or When T H E W POWER is:
b ) Greater than the preset power level. of the R W , declare the control rod inoperable, insert the control rod and disarm the aeeociated directional control valves** either:
a) Within the preset power level of the RW'M, declare the control rod inoperable.
: 1)   Electrically, or
b ) Greater than the preset power level. of the R W, declare the control rod inoperable, insert the control rod and disarm the aeeociated directional control valves** either:
: 2)   Hydraulically by closing the drive water and exhaust water isolation valves.
: 1)
Electrically, or
: 2)
Hydraulically by closing the drive water and exhaust water isolation valves.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
Otherwise, be in at least HOT SHUTDOWN within the next 12 hours.
: b. In OPERATIONAL CONDITION 5. with a withdrawn control rod poeition indicator inoperable, move the control rod to a position with an OPERABLE pooition indicator or Insert the control rod.
: b.
: c. The ptovieions of Specification 3.0.4     are not applicable.
In OPERATIONAL CONDITION 5. with a withdrawn control rod poeition indicator inoperable, move the control rod to a position with an OPERABLE pooition indicator or Insert the control rod.
      *At least each withdrawn control rod. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
: c.
      **Hay be rearmed intermittently, under administrative control, to permit testing aeeociated with restoring the control rod to OPERABLE status.
The ptovieions of Specification 3.0.4 are not applicable.  
HOPE CREEK                             3 / 4 1-13                   Amendment NO. 105
*At least each withdrawn control rod. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.  
**Hay be rearmed intermittently, under administrative control, to permit testing aeeociated with restoring the control rod to OPERABLE status.
HOPE CREEK 3/4 1-13 Amendment NO. 105  


REACTIVITY CONTROL SYSTEMS                                                     < :<
REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1. 3.7 OPERABLE by veri fying:
--- SURVEILLANCE REQUIREMENTS 4.1.3.7   The control rod position indication system shall be determined OPERABLE by veri fying:
The control rod position indication system shall be determined
: a. At least once per 24 hours that the position o f each control rod is indicated,
: a.
: b. That the indicated control rod position changes during the movement o f the control rod drive when performing Surveillance Requirement 4.1.3.1.2, and
At least once per 24 hours that the position o f each control rod is indicated,
: c. That the control rod position indicator corresponds t o the control rod position indicated by the "Full O u t " position indicator when performing Surveillance Requirement 4 . 1 . 3 . 6 . b .
: b.
HOPE CREEK                           3/4 1-14
That the indicated control rod position changes during the movement o f the control rod drive when performing Surveillance Requirement 4.1.3.1.2, and
: c.
That the control rod position indicator corresponds t o the control rod position indicated by the "Full Out" position indicator when performing Surveillance Requirement 4.1.3.6.b.
HOPE CREEK 3/4 1-14  


I _.
I _.
CONTROL ROD DRIVE wuSTMC SUPPORT 3.1.3.8     The control rod d r i v e -housing support shall be f n place.
CONTROL ROD DRIVE wuSTMC SUPPORT 3.1.3.8 The control rod drive -housing support shall be f n place.
APPLICABILITY:         OPERATIONAL CONOITIONS 1, 2           8nd 3.
APPLICABILITY: OPERATIONAL CONOITIONS 1, 2 8nd 3.
ACT ION:
ACT ION:
W t h the c o n t r o l rod d r f v r houtjng S U Q Q O r t not i n place, be fn at least HCT SHUTDOYN w i t h i n 12 hours and i n COLD SHUTDCYN w i t h i n .;no f o l l m f n C 24 h;,t; SURVEILUNCE       REQUI RfnEHTS 4.1.3.8 Tho contro1 rod d t f v o hourfng support shall be v o r l f l e d t o be in p l a c e by a v f r u r l fnspectfon erfor to S U t t u O ry ttw It has baon dfrrsr.sbltd o r when u4ntrnanc8 has bran perlomod In f)w control rod d t l u o housing sugDott area.
W t h the control rod d r f v r houtjng S U Q Q O r t not i n place, be fn at least HCT SHUTDOYN within 12 hours and i n COLD SHUTDCYN w i t h i n.;no f o l l m f n C 24 h;,t; SURVEILUNCE REQUI RfnEHTS 4.1.3.8 Tho contro1 rod dtfvo hourfng support shall be vorlfled t o be in p l a c e by a vfrurl fnspectfon erfor to S U t t u O ry ttw It has baon dfrrsr.sbltd or when u4ntrnanc8 has bran perlomod In f)w control rod dtluo housing sugDott area.
nOPf CREEK                                   3/4 1-15
nOPf CREEK 3/4 1-15 I
                                                          ..                      . . I


REACTIVITY CONTROL SYSTEMS 2/4.1.4   CONTROL ROD PROGRAM CONTROLS                                                   !. :.:
REACTIVITY CONTROL SYSTEMS 2/4.1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER 3.1.4.1 The Rod worth minimizer (RWM) ehall be OPERABLE.
ROD WORTH MINIMIZER 3.1.4.1   The Rod worth minimizer (RWM) ehall be OPERABLE.
APPLICABILITY:
APPLICABILITY:       OPERATIONAL CONDITIONS 1 and 2*', when THERMAL POWER is less than or equal to 1 0 1 of RATED TRERMAL POWER, m i n i m allowable low power setpoint.                                                                             I ACTION:
OPERATIONAL CONDITIONS 1 and 2*', when THERMAL POWER is less than or equal to 1 0 1 of RATED TRERMAL POWER, m i n i m allowable low power setpoint.
: a. With the RWM inoperable after the first 12 control roda are f u l l y withdrawn, operation may continue provided that control rod movement         I and compliance with the prescribed control rod pattern are verified by a second licensed operator or other technically qualified member of the unit technical staff who i s present at the reactor control console.
I ACTION:
: b. With the RWM inoperable before the first twelve (12) control rods are fully withdrawn, one startup per calendar year may be performed provided that the control rod movement and compliance with the prescribed control rod pattern are verified by a second licensed operator or other technically qualified member of the unit technical staff who is present at the reactor control console.
I
: c. Otherwise, control rod movement may be only by actuating the manual scram or placing the reactor mode switch in the Shutdown position.
: a.
With the RWM inoperable after the first 12 control roda are f u l l y withdrawn, operation may continue provided that control rod movement and compliance with the prescribed control rod pattern are verified by a second licensed operator or other technically qualified member of the unit technical staff who is present at the reactor control console.
: b.
With the RWM inoperable before the first twelve (12) control rods are fully withdrawn, one startup per calendar year may be performed provided that the control rod movement and compliance with the prescribed control rod pattern are verified by a second licensed operator or other technically qualified member of the unit technical staff who is present at the reactor control console.
: c.
Otherwise, control rod movement may be only by actuating the manual scram or placing the reactor mode switch in the Shutdown position.
4.1.4.1 The RWM ehall be demonstrated OPERABLE:
4.1.4.1 The RWM ehall be demonstrated OPERABLE:
: a. In OPERATIONAL CONDITION 2 within 8 hours prior to withdrawal of control rods for the purpose of making the reactor critical, and in O P K R A T I O W CONDITION 1 within 8 hours prior to RWM automatic initiation when reducing THgRMAL POWER, by verifying proper indication of the eclection error of at least one out-of-sequence control rod.
: a.
Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpoec of determining the OPERABILITY of the RWM prior to withdrawal of control rode for the purpose of bringing the reactor to criticality.
In OPERATIONAL CONDITION 2 within 8 hours prior to withdrawal of control rods for the purpose of making the reactor critical, and in OPKRATIOW CONDITION 1 within 8 hours prior to RWM automatic initiation when reducing THgRMAL POWER, by verifying proper indication of the eclection error of at least one out-of-sequence control rod.
Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpoec of determining the OPERABILITY of the RWM prior to withdrawal of control rode for the purpose of bringing the reactor to criticality.  
# See Special Test Exception 3.10.2.
# See Special Test Exception 3.10.2.
ROPB CXZEK                                 3/4 1-16               Amendment No. 1CFj
ROPB CXZEK 3/4 1-16 Amendment No. 1CFj  


REACTIVITY CONTROL SYSTEMS 314.1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER
REACTIVITY CONTROL SYSTEMS 314.1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER
: b.       In OPERATIONAL CONDITION 2 within 8 hours prior to withdrawal of control rods for the purpose of making the reactor critical, by verifying the rod block function by demonstrating inability to
: b.
    . withdraw an out-of-sequence control rod.
In OPERATIONAL CONDITION 2 within 8 hours prior to withdrawal of control rods for the purpose of making the reactor critical, by verifying the rod block function by demonstrating inability to withdraw an out-of-sequence control rod.
C.       In OPERATIONAL CONDITION 1 within one hour after RWM automatic     .
C.
initiation when reducing THERMAL POWER, by verifying the rod block function by demonstrating inability to withdraw an out-of-sequence control rod.
In OPERATIONAL CONDITION 1 within one hour after RWM automatic initiation when reducing THERMAL POWER, by verifying the rod block function by demonstrating inability to withdraw an out-of-sequence control rod.
: d.       By verifying that the control rod patterns and sequence input to the RWM computer are correctly loaded following any loading of the program into the computer.
: d.
HOPE CREEK                           3/4 1-16a               Amendment No. 105
By verifying that the control rod patterns and sequence input to the RWM computer are correctly loaded following any loading of the program into the computer.
HOPE CREEK 3 / 4 1-16a Amendment No. 105  


REACTIVITY CONTROL SYSTEMS The material originally contained in Section 3 / 4 . 1 . 4 . 2 was deleted with the issuance of Amendment No.     . However, to maintain numerical continuity betueen the succeeding sections and existing station procedural references to those Technical Specification eections, 3/4.1.4.2 has been intentionally left blank..
REACTIVITY CONTROL SYSTEMS The material originally contained in Section 3 / 4. 1. 4. 2 was deleted with the issuance of Amendment No.  
HOPS CREEK                           3 1 4 1-17                         Amendment NO. 105
. However, to maintain numerical continuity betueen the succeeding sections and existing station procedural references to those Technical Specification eections, 3/4.1.4.2 has been intentionally left blank..
HOPS CREEK 314 1-17 Amendment NO. 105  


R E A C T I V I T Y CONTROL SYSTEMS ROD BLOCK MONITOR L I M I T I N G C O N D I T I O N FOR O P E R A T I O N 3.1.4.3           Both rod b l o c k monitor (RBM) channels s h a l l be OPERABLE.
R E A C T I V I T Y CONTROL SYSTEMS ROD BLOCK MONITOR L I M I T I N G CONDITION FOR OPERATION 3. 1. 4. 3 Both rod block monitor (RBM) channels s h a l l be OPERABLE.
A P P L I C A B I L I T Y : OPERATIONAL CONDITION 1, when THERMAL POWER i s g r e a t e r t h a n o r equal t o 30% o f RATED THERMAL POWER.
APPLICABILITY:
ACTION:
equal t o 30% o f RATED THERMAL POWER.
: a.       W i t h one RBM channel inoperable:
OPERATIONAL CONDITION 1, when THERMAL POWER i s greater than o r ACTION:
: 1.       V e r i f y t h a t t h e r e a c t o r i s n o t o p e r a t i n g on a LIMITING CONTROL ROD PATTERN, and
: a.
: 2.       Restore t h e inoperable RBM channel t o OPERABLE s t a t u s w i t h i n 24 hours.
With one RBM channel inoperable:
Otherwise, p l a c e t h e i n o p e r a b l e r o d b l o c k monitor channel i n t h e t r i p p e d c o n d i t i o n w i t h i n the n e x t hour.
: 1.
: b.       With b o t h REM channels inoperable, p l a c e a t l e a s t one inoperable rod b l o c k m o n i t o r channel i n t h e t r i p p e d c o n d i t i o n w i t h i n one hour.
V e r i f y t h a t the reactor i s not operating on a LIMITING CONTROL ROD PATTERN, and
SURVEILLANCE REQUIREMENTS 4.1.4.3         Each o f t h e above r e q u i r e d RBM channels s h a l l be demonstrated OPERABLE by performance o f a:
: 2.
a,      CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION a t t h e frequencies and f o r the OPERATIONAL CONOITIONS s p e c i f i e d i n Table 4.3.6-1.
Restore the inoperable RBM channel t o OPERABLE status w i t h i n 24 hours.
: b.       CHANNEL FUNCTIONAL TEST p r i o r t o c o n t r o l rod withdrawal when the r e a c t o r i s o p e r a t i n g on a LIMITING CONTROL ROO PATTERN.
Otherwise, place the inoperable rod block monitor channel i n the tripped condition w i t h i n the next hour.
HOPE CREEK                                                     3/4 1-18
: b.
With both REM channels inoperable, place a t least one inoperable rod block monitor channel i n the tripped condition w i t h i n one hour.
SURVEILLANCE REQUIREMENTS 4.1.4.3 by performance o f a:
Each o f the above required RBM channels shall be demonstrated OPERABLE a,
CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION a t the frequencies and for the OPERATIONAL CONOITIONS specified i n Table 4.3.6-1.
reactor i s operating on a LIMITING CONTROL ROO PATTERN.
: b.
CHANNEL FUNCTIONAL TEST p r i o r t o control rod withdrawal when the HOPE CREEK 3/4 1-18  


REACTIVITY CONTROL SYSTEMS 3/4.1.S   STANDBY LIQUID CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.1.5 The standby lfquid control system consists of two redundant Subsystems and shall be OPERABLE.
REACTIVITY CONTROL SYSTEMS 3/4.1.S STANDBY LIQUID CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.1.5 The standby lfquid control system consists of two redundant Subsystems and shall be OPERABLE.
APPLICABILITY:     OPERATIONAL CONOITTONS 1, 2, and 5*
APPLICABILITY: OPERATIONAL CONOITTONS 1, 2, and 5*
ACTION:
ACTION: -
: a. In OPERATIONAL CONDITION 1 or 2:
: a.
: 1. Ufth one system subsystem inoperable, restore the subsystem to O P E W L E status within 7 days or be In at least HOT SHUTDOWN within the next 12 hours.
In OPERATIONAL CONDITION 1 or 2:
: 2. Yfth both system subsystems inoperable, krtorr at least one subsystea to OPERABLE status within 8 hours or be in a t least HOT SHUTDOWN within the next 12 hours.
: 1.
: b. In OPERATIONAL CONOITION 5*:
Ufth one system subsystem inoperable, restore the subsystem to O P E W L E status within 7 days or be In at least HOT SHUTDOWN within the next 12 hours.
: 1. With one system subsystem inoperable, restore subsystem to OPERABLE status within 30 days or insert all insertable control rods within the next hour.
Yfth both system subsystems inoperable, krtorr at least one subsystea to OPERABLE status within 8 hours or be in a t least HOT SHUTDOWN within the next 12 hours.
: 2. With both standby liquid control system subsystems inoperable, insert a17 insartable control rods within one hour.
With one system subsystem inoperable, restore subsystem to OPERABLE status within 30 days or insert all insertable control rods within the next hour.
SURVEI L U N C E REQUIREUENTS 4.1.5 The standby lfquid control systam shall be demonstrated OPERABLE:
: 2.
: a. At least once-pr). 24 hours by verify'fng that;
: b.
: 1. The t q r a t u n of the s o d f u pentaborate solution in the storage tank f s greater than or equal to 70&deg;F.
In OPERATIONAL CONOITION 5*:
: 2. Tho avaflrble volune o f s o d i u pentaborate solution is within t h e lfmlts o f figure 3.1.5-1.
: 1.
: 3. fh. heat tracing circuit 1s OPERABLE by determining the teaperature o f 'the p     suction pipfng to be greater than or equal to 7OOF.
: 2.
With both standby liquid control system subsystems inoperable, insert a17 insartable control rods within one hour.
SURVEI LUNCE REQUIREUENTS 4.1.5 The standby lfquid control systam shall be demonstrated OPERABLE:
: a.
At least once-pr). 24 hours by verify'fng that;
: 1.
: 2.
: 3.
The t q r a t u n of the s o d f u pentaborate solution in the storage tank f s greater than or equal to 70&deg;F.
Tho avaflrble volune o f s o d i u pentaborate solution is within t h e lfmlts o f figure 3.1.5-1.
fh. heat tracing circuit 1s OPERABLE by determining the teaperature o f the p suction pipfng to be greater than or equal to 7OOF.  
'*with any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
'*with any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
HOPE CREEK                               3/4 1-19
HOPE CREEK 3/4 1-19  


REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
: b. At least once per 31 days by:
: b.
: 1. Verifying the continuity of the explosive charge.
At least once per 31 days by:
: 2. Determining that the available weight of sodium pentaborate is greater than or equal to 5,776 lbs and the concentration of boron i n solution is within the limits of figure 3.1.5-1 by I
: 1.
chemical analysis. *
Verifying the continuity of the explosive charge.
: 3. Verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
I
: c. Demonstrating that, when tested pursuant to Specification 4.0.5, the minimum flow requirement of 41.2 gpm, per pump, at a pressure o f greater than or equal to 1255 psig is met.
: 2.
: d. At least once per 18 months during shutdown by:
Determining that the available weight of sodium pentaborate is greater than or equal to 5,776 lbs and the concentration of boron i n solution is within the limits of figure 3.1.5-1 by chemical analysis.
: 1. Initiating one of the standby liquid control system subsystem, including an explosive valve, and verifying that a flow path from the pumps to the reactor pressure vessel i s available by pumping demineralized water into the reactor vessel and verifying thabthe relief valve does not actuate. The replacement charge for the explosive valve shall be from the same manufactured batch as the one fired or from another batch which has been certified by having one of that batch successfully fired. Both injection subsystems shall be tested in 36 months.
* Verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
: 2.   **Demonstrating that all heat traced piping between the storage tank and the injection pwnps is unblocked and then draining and flushing the piping with demineralized water.
: 3.
: 3. Demonstrating that the storage tank heaters are OPERABLE by verifying the expected temperature rise o f the sodium penta-
: c.
                  ,borate solution in the storage tank after the heaters are antrgiztd.
Demonstrating that, when tested pursuant to Specification 4.0.5, the minimum flow requirement of 41.2 gpm, per pump, at a pressure o f greater than or equal to 1255 psig is met.
    "This test shall also be performed anytime water or boron is added to the solution or when the solution temperature drops below 70&deg;F.
: d.
  **This test shall also be performed whenever both heat tracing circuits have been found to be inoperable and may be perfomed by any series o f sequential, overlapping or total flow path steps such that the entire flow path is included.
At least once per 18 months during shutdown by:
HOPE CREEK                           314 1-20                   Amendment No. 11 I
: 1.
Initiating one of the standby liquid control system subsystem, including an explosive valve, and verifying that a flow path from the pumps to the reactor pressure vessel i s available by pumping demineralized water into the reactor vessel and verifying thabthe relief valve does not actuate.
for the explosive valve shall be from the same manufactured batch as the one fired or from another batch which has been certified by having one of that batch successfully fired.
injection subsystems shall be tested in 36 months.
The replacement charge Both
: 2.  
**Demonstrating that all heat traced piping between the storage tank and the injection pwnps is unblocked and then draining and flushing the piping with demineralized water.
Demonstrating that the storage tank heaters are OPERABLE by verifying the expected temperature rise o f the sodium penta-  
,borate solution in the storage tank after the heaters are antrgiztd.
: 3.
"This test shall also be performed anytime water or boron is added to the solution or when the solution temperature drops below 70&deg;F.
been found to be inoperable and may be perfomed by any series of sequential, overlapping or total flow path steps such that the entire flow path is included.  
**This test shall also be performed whenever both heat tracing circuits have HOPE CREEK 314 1-20 Amendment No. 11 I  


c w
c b
b 314 1-21 Arncndmt N0.11 .
w 314 1-21 Arncndmt N0.11  


3/4.3 INSTRUMENTATION 3/4,3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protection system instrumentation channels shown in Table 3.3.1-1 shall be OPERABLE.
3/4.3 INSTRUMENTATION 3/4,3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protection system instrumentation channels shown in Table 3.3.1-1 shall be OPERABLE.
APPLICABILITY:   As shown in Table 3.3.1-1.
APPLICABILITY: As shown in Table 3.3.1-1.
ACT ION :
ACT ION :
: a. With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system, place the inoperable channel(s1 and/or that trip system in the tripped condi-tion* within twelve hours. The provisions of Specification 3.0.4 are not applicable.
: a.
: b. With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system** in the tripped condition within one hour and take the ACTION required by Table 3.3.1-1.
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system, place the inoperable channel(s1 and/or that trip system in the tripped condi-tion* within twelve hours. The provisions of Specification 3.0.4 are not applicable.
: b.
With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system** in the tripped condition within one hour and take the ACTION required by Table 3.3.1-1.
SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.
SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.
4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.
4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.
4.3.1.3   The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip functional unit shall be demonstrated to be within its limit at least once per 18 months. Neutron detectors are exempt from response time testing. For the Reactor Vessel Steam Dome Pressure - High Functional Unit and the Reactor Vessel Water Level - Low, Level 3 Functional Unit, the sensor is eliminated from response time testing for RPS circuits. Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip system.
4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip functional unit shall be demonstrated to be within its limit at least once per 18 months. Neutron detectors are exempt from response time testing. For the Reactor Vessel Steam Dome Pressure - High Functional Unit and the Reactor Vessel Water Level - Low, Level 3 Functional Unit, the sensor is eliminated from response time testing for RPS circuits. Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip system.
4.3.1.4 The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 2 or 3 from OPERATIONAL CONDITION 1 for the Inter-mediate Range Monitors.
4.3.1.4 The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 2 or 3 from OPERATIONAL CONDITION 1 for the Inter-mediate Range Monitors.  
*An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur. In these cases, the inoperable channel shall be restored to OPERABLE status within 6 hours or the ACTION required by Table 3.3.1-1 for that Trip Function shall be taken.
*An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur. In these cases, the inoperable channel shall be restored to OPERABLE status within 6 hours or the ACTION required by Table 3.3.1-1 for that Trip Function shall be taken.  
**If more channels are inoperable in one trip system than in the other, place the trip system with more inoperable channels in the tripped condition, except when this would cause the Trip Function to occur.
**If more channels are inoperable in one trip system than in the other, place the trip system with more inoperable channels in the tripped condition, except when this would cause the Trip Function to occur.
HOPE CREEK                         3/4 3-1                 Amendment No. 101
HOPE CREEK 3/4 3-1 Amendment No. 101  


TABLE 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION APPLICABLE         MINIMUM OPERATIONAL     OPERABLE CHANNELS FUNCTIONAL UNIT                                    CONDITIONS     PER TRIP SYSTEM (a) ACTION
TABLE 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION APPLICABLE MINIMUM OPERATIONAL OPERABLE CHANNELS CONDITIONS PER TRIP SYSTEM (a)
: 1. Intermediate Range Monitors ( b )..
ACTION FUNCTIONAL UNIT
: a. Neutron Flux - High                           2                 3               1 31 4                                 2 5 (c)                             3
: 1. Intermediate Range Monitors.
: b. Inoperative                                  2                 3               1 3, 4                 2               2 5                  3(d)           3
( b ).
: 2. Average Power Range Monitor (e). .
: a.
: a. Neutron Flux - Upscale, Setdown               2                 2              1 3, 4                                 2 5 (c)                             3
Neutron Flux - High 2
: b. Flow Biased Simulated Thermal Power - Upscale                           1                 2               4
3 1 4 5 (c) 3 1
: c. Fixed Neutron Flux - Upscale                 1                  2               4
2 3
: d. Inoperative                                                      2              1 2
2 3, 4 5
3 1
2 3
: b.
Inoperative 2 3 (d)
(e).
: 2. Average Power Range Monitor.
: a.
Neutron Flux - Upscale, Setdown 2
3, 4 5 (c) 2 1
2 3
: b.
Flow Biased Simulated Thermal Power - Upscale 1
1 2
2 4
4
: c.
Fixed Neutron Flux - Upscale 2
1 2
3
3
: 3. Reactor Vessel Steam Dome Pressure - High                               1, 2 ( f )           2               1
: d.
: 4. Reactor Vessel Water Level - Low, Level 3                                       1, 2                 2                1
Inoperative
: 5. Main Steam Line Isolation Valve     -
: 3. Reactor Vessel Steam Dome Pressure - High 1, 2 ( f )
Closure                                                             4               4 HOPE CREEK                                          3/4 3-2                           Amendment NO. 39 I
2 1
: 4. Reactor Vessel Water Level - Low, Level 3 2
1 1, 2
: 5. Main Steam Line Isolation Valve -
Closure 4
4 3/4 3-2 Amendment NO. 39 I
HOPE CREEK


TABLE 3.3.1-1 (Continued)
TABLE 3.3.1-1 (Continued)
REACTOR PROTECTION SYSTEM INSTRUMENTATION APPLICABLE          MINIMUM OPERATIONAL    OPERABLE CHANNELS FUNCTIONAL UNIT                                   CONDITIONS      PER TRIP SYSTEM (a) ACTION
FUNCTIONAL UNIT 6.
: 6. This item intentionally blank
7.
: 7. Drywell Pressure - High                           1, 2 ( h )            2                1
: 8.
: 8. Scram Discharge Volume Water Level - High
: 9.
: a. Float Switch                                                   2                1 2                3
: 10.
: b. Level Transmitter/Trip Unit                                   2                1 2                3 (k)
: 11.
: 9. Turbine Stop Valve - Closure                                                       6
: 12.
: 10. Turbine Control Valve Fast Closure, Valve Trip System Oil Pressure - Low                                             6
This item intentionally blank Drywell Pressure - High Scram Discharge Volume Water Level - High
: 11. Reactor Mode Switch Shutdown Position                                                       2               1 2                7 2                3
: a. Float Switch REACTOR PROTECTION SYSTEM INSTRUMENTATION
: 12. Manual Scram                                                      2                1 2                8 2                9 HOPE CREEK                                         3/4 3-3                           Amendment No. 53
: b. Level Transmitter/Trip Unit Turbine Stop Valve - Closure Turbine Control Valve Fast Closure, Valve Trip System Oil Pressure - Low Reactor Mode Switch Shutdown Position Manual Scram APPLICABLE MINIMUM OPERATIONAL OPERABLE CHANNELS CONDITIONS PER TRIP SYSTEM (a)
ACTION 1, 2 ( h )
2 2
2 2
2
( k )
2 2
2 2
2 2
1 1
3 1
3 6
6 1
7 3
1 8
9 HOPE CREEK 3/4 3-3 Amendment No. 53  


TABLE 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION ACTION ACTION 1      Be in at least HOT SHUTDOWN within 12 hours.
ACTION 1 ACTION 2 ACTION 3 ACTION 4 ACTION 5 ACTION 6 ACTION I ACTION 8 ACTION 9 TABLE 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION ACTION Be in at least HOT SHUTDOWN within 12 hours.
ACTION 2      Verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown position within one hour.
Verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown position within one hour.
ACTION 3      Suspend all operations involving CORE ALTERATIONS* and insert all insertable control rods within one hour.
Suspend all operations involving CORE ALTERATIONS* and insert all insertable control rods within one hour.
ACTION 4      Be in at least STARTUP within 6 hours.
Be in at least STARTUP within 6 hours.
ACTION 5      This ACTION is deleted ACTION 6      Initiate a reduction in THERMAL POWER within 15 minutes and reduce turbine first stage pressure to less than the automatic bypass setpoint within 2 hours.
This ACTION is deleted Initiate a reduction in THERMAL POWER within 15 minutes and reduce turbine first stage pressure to less than the automatic bypass setpoint within 2 hours.
ACTION I      Verify all insertable control rods to be inserted within one hour.
Verify all insertable control rods to be inserted within one hour.
ACTION 8      Lock the reactor mode switch in the Shutdown position within one hour.
Lock the reactor mode switch in the Shutdown position within one hour.
ACTION 9      Suspend all operations involving CORE ALTERATIONS*,
Suspend all operations involving CORE ALTERATIONS*,
and insert all insertable control rods and lock the reactor mode switch in the SHUTDOWN position within one hour.
and insert all insertable control rods and lock the reactor mode switch in the SHUTDOWN position within one hour.  
*Except replacement of LPRM strings provided SRM instrumentation is OPERABLE per Specification 3 . 9 . 2 .
*Except replacement of LPRM strings provided SRM instrumentation is OPERABLE per Specification 3.9.2.
HOPE CREEK                             3 / 4 3-4           Amendment No. 53
HOPE CREEK 3 / 4 3-4 Amendment No. 53  


TABLE 3.3.1-1 (Continued)
TABLE 3.3.1-1 (Continued)
Line 1,556: Line 2,585:
This function is not required to be OPERABLE when PRIMARY CONTAINMENT INTEGRITY is not required.
This function is not required to be OPERABLE when PRIMARY CONTAINMENT INTEGRITY is not required.
With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
This function shall be automatically bypassed when turbine first stage pressure is 5 159.7 psig equivalent to THERMAL POWER less than 30% of RATED THERMAL POWER. To allow for instrument accuracyl calibration, and I
I I
drift, a setpoint of 2135.1 psig is used.
This function shall be automatically bypassed when turbine first stage pressure is 5 159.7 psig equivalent to THERMAL POWER less than 30% of RATED THERMAL POWER. To allow for instrument accuracyl calibration, and drift, a setpoint of 2135.1 psig is used.
I Also actuates the EOC-RPT system.
Also actuates the EOC-RPT system.
      . I
I
*Not required for control rods removed per Specification 3.9.10.1 or 3.9.10.2.
*Not required for control rods removed per Specification 3.9.10.1 or 3.9.10.2.
L HOPE CREEK                         3/4 3-5                 Amendment No. 35
L HOPE CREEK 3/4 3-5 Amendment No. 35  


Q   29
Q 29 ELECTRICAL POWER SYSTEMS DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, 2 of the 4 channels, one of which shall be channel A or channel.8, of the power distribution system shall be energized with:
  --  ELECTRICAL POWER SYSTEMS DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, 2 o f the 4 channels, one o f which shall be channel A or channel.8, of the power distribution system shall be energized with:
: a.
: a. A. C. power distribution:                                                 . .
A. C. power distribution:
: 1. Channel A, consisting o f :
: 1.
a)   4160 volt A.C. switchgear bus           10A401 b)   480 volt A.C. load centers             108410 108450 c) 480 volt A.C. MCCs                       108212 10B411 108451 108553 d)   208/120 volt A.C. distribution panels 10Y40l(source:1OB411) 10Y411( source: 108451) 10Y501(source:10B553) e)   120 volt A.C. distribution panels       lA3481 1YF401(source:1AJ481) 1AJ482
Channel A, consisting o f :
: 2. Channel B, consisting o f :
a) 4160 volt A.C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels e) 120 volt A.C. distribution panels
a) 4160 volt A.C. switchgear bus             10A402 b)   480 volt A.C. load centers             108420 108460 c)   480 volt A.C. MCCs                     10B222 108421 iOB461 108563 d)   208/120 volt A.C. distribution panels   10Y402(source:10B421) 10Y412(source:10B461) 10Y502( source: 108563) e)   120 volt A.C. distribution panels       185481 lYF402(source:I83481) 185482
: 2.
: 3. Channel C, consisting o f :
Channel B, consisting o f :
a) 4160 volt A . C . switchgear bus         10A403 b)   480 volt A.C. load centers             108430 fOB470 c)   480 volt A.C. MCCs                     108232 108431 108471 108573 d)   208/120 volt A.C. distribution panels   10Y403(source:10B431) 10Y413( source: 10B471) 10Y503(source:10B573)     1 i
a) 4160 volt A.C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels e) 120 volt A.C. distribution panels
4 HOPE CREEK                             3/4 8-21
: 3.
Channel C, consisting o f :
a) 4160 volt A. C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels 10A401 108410 108450 108212 10B411 108451 108553 10Y40l(source:1OB411) 10Y411( source: 108451) 10Y501(source:10B553) lA3481 1YF401(source:1AJ481) 1AJ482 10A402 108420 108460 10B222 108421 iOB461 108563 10Y402(source:10B421) 10Y412(source:10B461) 10Y502( source: 108563) 185481 lYF402(source:I83481) 185482 10A403 108430 fOB470 108232 108431 108471 108573 10Y403(source:10B431) 10Y413( source: 10B471) 10Y503(source:10B573) 1 i 4
HOPE CREEK 3/4 8-21  


ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)                                 i- 4 v
ELECTRICAL POWER SYSTEMS i
e)   120 volt A.C. distribution panels   1CJ481 1YF403(source:1CJ481) 1C5482
LIMITING CONDITION FOR OPERATION (Continued)  
: 4. Channel 0, consisting o f :
- 4 v
a)   4160 volt A.C. switchgear bus       10A404 b)   480 volt A.C. load centers           10B440 108480 c)   480 volt A.C. MCCs                   108242 10B441 106481 106583 d)   208/120 volt A.C. distribution panels 10Y404( source: 108441) 10Y414(source:108481) 10Y504(source:10B583) e)   120 volt A.C. distribution panels     1DJA?1 1YF404(source:1DJ481) 105482
e) 120 volt A.C. distribution panels 1CJ481 1YF403(source:1CJ481) 1C 5482
: b. D. C. power distribution:
: 4.
: 1. Channel A, consisting o f :
Channel 0, consisting o f :
a)   125 volt D.C. switchgear              100410 b)   125 volt D.C. f u s e box            1AD412
a) 4160 volt A.C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels e) 120 volt A.C. distribution panels
'w.            c)   125 volt D.C. distribution panel      1AD417
: b.
: 2. Channel 8, consisting o f :
D. C. power distribution:
a)   125 volt D.C. switchgear             100420 b)   125 volt D.C. fuse box               160412 c)   125 volt D.C. distribution panel     1BD417
: 1.
: 3. Channel C, consisting o f :
Channel A, consisting o f :  
a)   125 volt D.C. switchgear             100430 100436 b)   125 volt D.C. fuse boxes             1CD412 1CD448 c)   125 volt D.C. distribution panel     1CD417
'w.
: 4. Channel 0, consisting o f :
c )
a)   125 volt D.C. switchgear             100440 100446 b)   125 volt D.C. fuse box               100412 100448 c)   125 volt D.C. distribution panel     1DD417 HOPE CREEK                             3/4 8-22
125 volt D.C. distribution panel a) 125 volt D.C. switchgear b) 125 volt D.C. fuse box
: 2.
Channel 8, consisting o f :
a) 125 volt D.C. switchgear b) 125 volt D.C. fuse box c) 125 volt D.C. distribution panel
: 3.
Channel C, consisting of:
a) 125 volt D.C. switchgear b) 125 volt D.C.
fuse boxes c) 125 volt D.C. distribution panel
: 4.
Channel 0, consisting o f :
a) 125 volt D.C. switchgear b) 125 volt D.C. fuse box c) 125 volt D.C. distribution panel 10A404 10B440 108480 108242 10B441 106481 106583 10Y404( source: 108441) 10Y414(source:108481) 10Y504(source:10B583) 1DJA?1 1YF404(source:1DJ481) 105482 100410 1AD412 1AD417 100420 160412 1BD417 100430 100436 1CD412 1CD448 1CD417 100440 100446 100412 100448 1DD417 HOPE CREEK 3/4 8-22  


ELECTRICAL POWER SYSTEMS
ELECTRICAL POWER SYSTEMS  
'..-/
'..-/
LIMITING CONDITION FOR OPERATION (Continued)
LIMITING CONDITION FOR OPERATION (Continued)
APPLICABILITY:   OPERATIONAL CONDITIONS 4, 5 and *.
APPLICABILITY: OPERATIONAL CONDITIONS 4, 5 and *.
ACTION:
ACTION:
: a. With less than two channels o f the above required A.C. distribution system energized, suspend CORE ALTERATIONS, handling of irradiated fuel i n the secondary containment and operations with a potential for draining the reactor vessel.
: a.
: b. With less than two channels of the above required D.C. distribution system energized, suspend CORE ALTERATIONS, handling o f irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.
With less than two channels of the above required A.C. distribution system energized, suspend CORE ALTERATIONS, handling of irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.
: c. The provisions of Specification 3.0.3 are not applicable.
With less than two channels of the above required D.C. distribution system energized, suspend CORE ALTERATIONS, handling o f irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.
SURVEILLANCE REQUIREMENTS 4.8.3.2 At least the above required power distribution system channels shall be determined energized at least once per 7 days by verifying correct breaker/switch alignment and voltage on the busses/MCCs/panels.
The provisions of Specification 3.0.3 are not applicable.
      *When handling irradiated fuel in the secondary containment.
: b.
HOPE CREEK                           3/4 8-23
: c.
SURVEILLANCE REQUIREMENTS 4.8.3.2 At least the above required power distribution system channels shall be determined energized at least once per 7 days by verifying correct breaker/switch alignment and voltage on the busses/MCCs/panels.  
*When handling irradiated fuel in the secondary containment.
HOPE CREEK 3/4 8-23  


/-
/-
3.9 2 A t least 2 source range monitor* (SRM) channels shall be 0PfRAB;E a.n= :nser:ed to the normal operating level with: U
3.9 2 A t least 2 source range monitor* (SRM) channels shall be 0PfRAB;E a.n= :nser:ed to the normal operating level with: U
: a. Annunciation and continuous visual indication i n the contro1,rogm
: a.
: b. One o f the required SRH detectors located in the quadrant where CORE ALTERATIONS are being p e r f o m d and the other required SRH d e t e c t s t located in an adjacent quadrant, and
Annunciation and continuous visual indication i n the contro1,rogm b.
: c. Unless adequate shutdown aargin has betn drmonstratra per Soeci f i c a -
One of the required SRH detectors located in the quadrant where CORE ALTERATIONS are being p e r f o m d and the other required SRH d e t e c t s t located in an adjacent quadrant, and
: c.
Unless adequate shutdown aargin has betn drmonstratra per Soeci f i c a -
tion 3.1.1, the "shorting links" r m v e d from the RPS circuitry prior to and during the time any control rod i s witndrawn.
tion 3.1.1, the "shorting links" r m v e d from the RPS circuitry prior to and during the time any control rod i s witndrawn.
: a. Duriog a SPIRAL UNLOAD, the count rate may drop below 3 cDs when t h e                   .
: a.
nurnbcr o f assemblies remaining i n the core drops to sixteen or l e s s .           i
Duriog a SPIRAL UNLOAD, the count rate may drop below 3 cDs when t h e nurnbcr of assemblies remaining i n the core drops to sixteen or less.
: e. During a       SPIRAL RELOAD, uD t o four fuel arsemblter         nay be loaded i n the four bundle locations imedirtrly surrounding each o f the four S R r s p r i o r t o obtaining 3 cps. U n t i l these issenblies have been lorded, the 3 cps count rate i s not required.
i e.
APPLICABILYY:         OPERATIONAL CONOITION 5.                                                     1 With the rrQuirements o f t h e above r ~ e c ~ f i c r t f onot n satisfied, lmediatrly susptna all operations involving CORE ALTERATlONS and insert all inscrtmle control roar.
During a SPIRAL RELOAD, uD to four fuel arsemblter nay be loaded i n the four bundle locations imedirtrly surrounding each o f the four S R r s p r i o r t o obtaining 3 cps.
  -E!
lorded, the 3 cps count rate i s not required.
SURk    :LANCE     REQuI REMEHTS 4.9.2     Each of the above rrquirrd S R n channels shall be demonstrated OPERABLE by:
U n t i l these issenblies have been A P P L I C A B I L Y Y :
: a. At least onto per U hours:
OPERATIONAL CONOITION 5.
: 1. P e r f o m r n c e of 4 CHANNEL CHECK, m   e use of rpec?al movable detectors during               CORE ALTERATIONS in place     o f the norut SRn nuclear o e u c t o r s i s p e m i s s i b l e 8s long 4s t h e r r rpecirl oatrctors
1 With the rrQuirements of the above r ~ e c ~ f i c r t f o n not satisfied, lmediatrly susptna all operations involving CORE ALTERATlONS and insert all inscrtmle control roar.
    ,are connected to tho n o m 1 SRM circuits.
SURk E! :LANCE REQuI REMEHTS 4. 9. 2 Each of the above rrquirrd SRn channels shall be demonstrated OPERABLE by:
  #Not   requirtd f o r control roar m a v e d por Specfficrtion 3 . 9 . 1 0 . l . r n d 3.9.10.2.
: a.
fnrrr SRM channels rhrll be O P E W L E for crltical shutdown u r g j n d n o n s t r a -
At least onto per U hours:
tions. An S&I detector may b r ratractad provided a channel Indlcrtion o f at least 100 cgr 4 s uintatnea.
: 1.
HOPE CREEK                                     3/4 9-3                           h n a n t NO. 14 [
Perfomrnce of 4 CHANNEL CHECK, m
e use of rpec?al movable detectors during CORE ALTERATIONS in place o f t h e norut SRn nuclear oeuctors i s pemissible 8s long 4s therr rpecirl oatrctors  
#Not requirtd f o r control roar m a v e d por Specfficrtion 3.9.10.l.rnd 3.9.10.2.,
fnrrr SRM channels rhrll be O P E W L E for crltical shutdown u r g j n dnonstra-tions. An S&I detector may br ratractad provided a channel Indlcrtion o f at least 100 cgr 4 s uintatnea.
,are connected to tho n o m 1 SRM circuits.
HOPE CREEK 3/4 9-3 h n a n t NO. 14 [  


RE FUE L I NG 0 PE RAT IONS L-SURVEILLANCE REQUIREMENTS (Continued)
RE F UE L I NG 0 PE RAT IONS L-SURVEILLANCE REQUIREMENTS (Continued)
: 2.       V e r i f y i n g t h e d e t e c t o r s a r e i n s e r t e d t o t h e normal o p e r a t i n g l e v e l , and
: 2.
: 3.       Ouring C O R E ALTERATIONS, v e r i f y i n g t h a t the d e t e c t o r o f an OPERABLE SRM channel i s l o c a t e d i n t h e c o r e quadrant where CORE ALTERATIONS a r e b e i n g performed and another i s l o c a t e d i n an a d j a c e n t quadrant.                                                                        . .
Verifying the detectors a r e inserted t o the normal operating level, and 3.
: b.     Performance o f a CHANNEL FUNCTIONAL TEST:
Ouring CORE ALTERATIONS, v e r i f y i n g t h a t the detector o f an OPERABLE SRM channel i s located i n the core quadrant where CORE ALTERATIONS are being performed and another i s located i n an adjacent quadrant.
: 1.       W i t h i n 24 hours p r i o r t o t h e s t a r t o f CORE ALTERATIONS, and
: b.
: 2.       A t l e a s t once per 7 days.
Performance o f a CHANNEL FUNCTIONAL TEST:
: c.      V e r i f y i n g t h a t the channel c o u n t r a t e i s a t l e a s t 3 c p s .
: 1.
Within 24 hours p r i o r t o the s t a r t o f CORE ALTERATIONS, and
: 2.
A t l e a s t once per 7 days.
I
I
: 1.       P r i o r t o contr.:l       to&   withdrawal,
: c.
: 2.       P r i o r t o and a t l e a s t once per 12 hours d u r i n g CORE ALTERATIONS***,
Verifying t h a t the channel count r a t e i s a t l e a s t 3 cps.
: 1.
P r i o r t o contr.:l to& withdrawal,
: 2.
P r i o r t o and a t least once per 12 hours during CORE ALTERATIONS***,
and
and
: 3.       A t l e a s t once p e r 24 hours***.
: 3.
: d.      Unless adequate               shutdown v a r g i n has been demonstrated p e r S p e c i f i c a t i o n 3.1.1, v e r i f y i n g t h a t t h e RPS c i r c u i t r y " s h o r t i n g links" have been removed, w i t h i n 8 hours prior t o and a t l e a s t once p e r 12 hours d u r i n g t h e t i m e any c o n t r o l r o d i s w i t h d r a w . *
A t l e a s t once per 24 hours***.
* 4 1   .
Unless adequate shutdown vargin has been demonstrated per Specification 3.1.1, v e r i f y i n g t h a t the RPS c i r c u i t r y "shorting links" have been removed, w i t h i n 8 hours prior t o and a t least once per 12 hours during the time any control rod i s w i t h d r a w. *
    "'Not r e q u i r e d for c o n t r o l pods removed p e r S o e c i f i c a t i o n             3.9.10.1 Or 3.9.1: :.
* d.
  *""Except as n o t e d i n S p e c i f i c a t i o n s 3 . 9 . 2 . d and 3 . 9 . 2 . e .
4 1
HOPE CREEK                                                       3/4 9 - 4                             Amendment No. 3 1             I
"'Not required for c o n t r o l pods removed per S o e c i f i c a t i o n 3.9.10.1 Or 3.9.1: :.  
*""Except as noted i n Specifications 3. 9. 2. d and 3. 9. 2. e.
HOPE CREEK 3/4 9-4 Amendment No. 3 1 I  


REFUEL ING 0P ERAT IONS
REFUEL I NG 0 P ERAT I ONS
\.. 314.9.3 CONTROL ROD POSITION LIMITING CONDITION FOR OPERATION 3.9.3     A l l c o n t r o l rods s h a l l be i n s e r t e d .
\\..
* APPLICABILITY:             OPERATIONAL CONDITION 5, d u r i n g CORE ALTERATIONS. **
314.9.3 CONTROL ROD POSITION LIMITING CONDITION FOR OPERATION 3.9.3 A l l control rods shall be inserted.*
APPLICABILITY:
ACT ION:
ACT ION:
With a l l c o n t r o l rods n o t i n s e r t e d , suspend a l l o t h e r CORE ALTERATIONS, except t h a t one c o n t r o l r o d may be withdrawn under c o n t r o l o f t h e r e a c t o r mode s w i t c h Refuel p o s i t i o n one-rod-out i n t e r l o c k .
With a l l control rods not inserted, suspend a l l other CORE ALTERATIONS, except t h a t one control rod may be withdrawn under control o f the reactor mode switch Refuel p o s i t i o n one-rod-out interlock.
SURVEILLANCE REQUIREMENTS 4.9.3 A l l c o n t r o l r o d s s h a l l be v e r i f i e d t o be i n s e r t e d , except as above specified:
OPERATIONAL CONDITION 5, during CORE ALTERATIONS. **
: a.     W i t h i n 2 hours p r i o r t o :
SURVEILLANCE REQUIREMENTS 4.9.3 A l l control rods shall be v e r i f i e d t o be inserted, except as above specified:
: 1.       The s t a r t o f   CORE ALTERATIONS.
: a.
: 2.       The w i t h d r a w a l o f one c o n t r o l r o d under t h e c o n t r o l o f t h e r e a c t o r mode s w i t c h Refuel p o s i t i o n one-rod-out i n t e r l o c k .
Within 2 hours p r i o r t o :
: b.     A t l e a s t once p e r 12 hours
: 1.
    ' Except c o n t r o l        rods removed p e r Speci f i c a t i o n 3.9.10.1         o r 3.9.10.2.
The s t a r t o f CORE ALTERATIONS.
    **See Special T e s t Exception 3.10.3.
: 2.
HOPE CREEK                                               3/4 9-5
The withdrawal of one control rod under the control o f the reactor mode switch Refuel p o s i t i o n one-rod-out interlock.
: b.
A t l e a s t once per 12 hours Except control rods removed per Speci f i c a t i o n 3.9.10.1 o r 3.9.10.2.  
**See Special Test Exception 3.10.3.
HOPE CREEK 3/4 9-5  


  - - - ,-,,?:s-
r -
  .___            :?s?.z.I:?is r- 3 / 4 . 9 . 5 DELETED 3 / 4 9-7 henciment NC ,137
- - -,-,,?:s
:?s?.z.I:?is 3 / 4. 9. 5 DELETED 3 / 4 9 - 7 henciment NC,137  


THIS PAGE INTENTIONALLY DELETED.
THIS PAGE INTENTIONALLY DELETED.
HOPE CREEK             314 9-9           Amendment No. 31
HOPE CREEK 314 9-9 Amendment No. 31  


3 / 4 . 9 . 7 ;ELZ,E3 I
3 / 4. 9. 7 ;ELZ,E3 I  


REFUELING OPERATIONS
REFUELING OPERATIONS  
.v   3/4.9.8 WATER LEVEL       - REACTOR VESSEL LIMITING CONDITION FOR OPERATION 3.9.8 A t least 22 feet 2 inches of water shall be maintained over the top of the reactor pressure vessel flange.
.v 3/4.9.8 WATER LEVEL - REACTOR VESSEL LIMITING CONDITION FOR OPERATION 3.9.8 A t least 22 feet 2 inches of water shall be maintained over the top of the reactor pressure vessel flange.
APPLICABILITY:       During handling of fuel assemblies or control rods within the reactor pressure vessel while in OPERATIONAL CONDITION 5 when the fuel assemblies being handled are irradiated or the fuel assemblies seated within the reactor vessel are irradiated.
APPLICABILITY: During handling of fuel assemblies or control rods within the reactor pressure vessel while in OPERATIONAL CONDITION 5 when the fuel assemblies being handled are irradiated or the fuel assemblies seated within the reactor vessel are irradiated.
ACTION:
ACTION:
With the requirements of the above specification not satisfied, suspend all operations involving handling o f fuel assemblies or control rods within the reactor pressure vessel after placing all fuel assemblies and control rods in a safe condition.
With the requirements of the above specification not satisfied, suspend all operations involving handling o f fuel assemblies or control rods within the reactor pressure vessel after placing all fuel assemblies and control rods in a safe condition.
SURVEILLANCE REQUIREMENTS 4 . 9 . 8 The reactor vessel water level shall be determined to be at least its minimum required depth within 2 hours prior to the start of and at least once p e r 24 h o u r s during handling o f f u e l assemblies o r control rods within the reactor pressure vessel.
SURVEILLANCE REQUIREMENTS 4. 9. 8 The reactor vessel water level shall be determined to be at least its minimum required depth within 2 hours prior to the start of and at least once per 24 hours during handling of fuel assemblies o r control rods within the reactor pressure vessel.
HOPE CREEK                                 3/4 9-11
HOPE CREEK 3/4 9-11  


REFUELiNG OPERATIONS L
R E F U E L i N G OPERATIONS 3 / 4. 9. 9 WATER L E V E L - SPENT F U E L STORAGE POOL L I M I T I N G C O N D I T I O N FOR O P E R A T I G N L
3/4.9.9         WATER L E V E L     - S P E N T F U E L STORAGE POOL L I M I T I N G C O N D I T I O N FOR O P E R A T I G N 3.9.9 A t least 23 feet of water shall be mainta ned over the top o f irradiated fuel assemblies seated in the spent fuel storage pool racks.
3.9.9 A t least 23 feet of water shall be mainta fuel assemblies seated in the spent fuel storage A P P L I C A B I L I T Y :
APPLICABILITY:                Whenever irradiated fuel assembl es are in the spent fuel storage pool.
Whenever irradiated fuel assembl pool.
ACTION:
A C T I O N :
With the requirements of the above specification not satisfied, suspend all movement of fuel assemblies and crane operations with loads in the spent fuel storage pool area after placing the fuel assemblies and crane load in a safe condition. The provisions of Specification 3 . 0 . 3 are not applicable.
With the requirements of the above specification ned over the top o f irradiated pool racks.
SURVEILLANCE REQUIREMENTS 4.9.9         The water level in the spent fuel storage pool shall be determined to L
es are in the spent fuel storage not satisfied, suspend all movement of fuel assemblies and crane operations with loads in the spent fuel storage pool area after placing the fuel assemblies and crane load in a safe condition. The provisions of Specification 3. 0. 3 are not applicable.
be at least at its minimum required depth at least once per 7 days.
S U R V E I L L A N C E REQUIREMENTS 4. 9. 9 The water level in the spent fuel storage pool shall be determined to be at least at its minimum required depth at least once per 7 days.
W HOPE CREEK                                               3/4 9-12
L W
HOPE CREEK 3/4 9-12  


REFUELING OPERATIONS
/ -
/ -
REFUELING OPERATIONS L,
3/4.9.10 CONTROL ROD REMOVAL L,
3/4.9.10 CONTROL ROD REMOVAL SINGLE CONTROL ROO REMOVAL LIMITING CONDITION FOR OPERATION 3.9.10.1 One control rod and/or the associated control rod drive mechanism.
SINGLE CONTROL ROO REMOVAL LIMITING CONDITION FOR OPERATION 3.9.10.1 One control rod and/or the associated control rod drive mechanism.
may be removed from the core and/or reactor pressure vessel provided that at least the following requirements are satisfied until a control rod and associ-ated control rod drive mechanism are reinstalled and the control rod i s fully inserted in the core.
may be removed from the core and/or reactor pressure vessel provided that at least the following requirements are satisfied until a control rod and associ-ated control rod drive mechanism are reinstalled and the control rod is fully inserted in the core.
: a.     The reactor mode switch i s OPERABLE and locked i n the Shutdown position or in the Refuel position per Table 1.2 and Specification 3.9.1.
: a.
: b.      The source range monitors (SRM) are OPERABLE per Specification 3.9.2.
The reactor mode switch is OPERABLE and locked i n the Shutdown position or in the Refuel position per Table 1.2 and Specification 3.9.1.
: c.     The SHUTDOWN MARGIN requirements of Specification 3.1.1 are satisfied, except that the control rod selected to be removed;
The source range monitors (SRM) are OPERABLE per Specification 3.9.2.
: 1.       May be assumed to be the highest worth control rod required to be assumed to be fully withdrawn by the SHUTDOWN MARGIN test, and
b.
: 2.       Need not be assumed t o be immovable or untrippable.
: c.
: d.     A l l other control rods in a five-by-five array centered on the control rod being removed are inserted and electrically or hydraulically disarmed or the four fuel assemblies surrounding the control rod or control rod drive mechanism t o be removed from the core and/or reactor vessel are removed from the core cell.
The SHUTDOWN MARGIN requirements of Specification 3.1.1 are satisfied, except that the control rod selected to be removed;
e       All other control rods are inserted.
: 1.
f . A l l fue.1 loading operations shall be suspended.
May be assumed to be the highest worth control rod required to be assumed to be fully withdrawn by the SHUTDOWN MARGIN test, and 2.
APPLICABILITY:             OPERATIONAL CONDITIONS 4 and 5 .
Need not be assumed t o be immovable or untrippable.
With t h e     tequirements o f the above specification not satisfied, suspend removal of t h e     control rod and/or associated control rod drive mechanism from the core a n d / o r r e a c t o r pressure vessel a n d initiate action to satisfy the above reQui rements.
: d.
HOPE CREEK                                     3/4 9-13
A l l other control rods in a five-by-five array centered on the control rod being removed are inserted and electrically or hydraulically disarmed or the four fuel assemblies surrounding the control rod or control rod drive mechanism t o be removed from the core and/or reactor vessel are removed from the core cell.
e All other control rods are inserted.
f.
A l l fue.1 loading operations shall be suspended.
APPLICABILITY:
OPERATIONAL CONDITIONS 4 and 5.
With t h e tequirements o f the above specification not satisfied, suspend removal o f t h e control rod and/or associated control rod drive mechanism from the core a n d / o r r e a c t o r pressure vessel and initiate action to satisfy the above reQui rements.
HOPE CREEK 3/4 9-13  


REFUELING OPERATIONS L-SURVEILLANCE REQUIREMENTS 4.9.10.1 Within 4 hours prior to the start of removal o f a control rod and/or the associated control rod drive mechanism from the core and/or reactor pressure vessel and at least once per 24 hours thereafter until a control rod and associ-ated control rod drive mechanism are reinstalled and the control rod is inserted in the core, verify that:
REFUELING OPERATIONS L-SURVEILLANCE REQUIREMENTS 4.9.10.1 Within 4 hours prior to the start of removal o f a control rod and/or the associated control rod drive mechanism from the core and/or reactor pressure vessel and at least once per 24 hours thereafter until a control rod and associ-ated control rod drive mechanism are reinstalled and the control rod is inserted in the core, verify that:
: a. The reactor mode switch is OPERABLE per Surveillance Requirement 4.3.1.1 or 4.9.1.2, as applicable, and locked in the Shutdown position or in the Refuel Dosition with the "one rod out" Refuel position interlock OPERABLE pe'r Specification 3.9.1.
: a.
: b. The SRM channels are OPERABLE per Specif cation 3.9.2.
The reactor mode switch is OPERABLE per Surveillance Requirement 4.3.1.1 or 4.9.1.2, as applicable, and locked in the Shutdown position or in the Refuel Dosition with the "one rod out" Refuel position interlock OPERABLE pe'r Specification 3.9.1.
: c. The SHUTDOWN MARGIN requirements of Spec fication 3.1.1 are satisfied per Specification 3.9.10.1.c.
: b.
: d. All other control rods in a five-bv-five array centered on the control rod being removed are inserted and- electrical ly or hydraul ical ly disarmed or the four fuel assemblies surrounding the control rod o r control rod drive mechanism to be removed from the core and/or reactor   .. '
The SRM channels are OPERABLE per Specif
vessel are removed from the core cell.
: c.
: e. A l l other control rods are inserted.
The SHUTDOWN MARGIN requirements of Spec per Specification 3.9.10.1. c.
: f. All fuel loading operations are suspended.
: d.
HOPE CREEK                           3/4 9-14
All other control rods in a five-bv-five cation 3.9.2.
fication 3.1.1 are satisfied array centered on the control rod being removed are inserted and-electrical ly or hydraul ical ly disarmed or the four fuel assemblies surrounding the control rod o r control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.
e.
A l l other control rods are inserted.
f.
All fuel loading operations are suspended.
HOPE CREEK 3/4 9-14  


REFUELING OPERATIONS i
REFUELING OPERATIONS i  
  \-,
\\-,
MULTIPLE CONTROL ROD REMOVAL LIMITING CONDITION FOR OPERATION 3.9.10.2 Any number of control rods and/or control rod drive mechanisms may be removed from the core and/or reactor pressure vessel provided that at least the following requirements are satisfied until all control rods and control rod drive mechanisms are reinstalled and all control rods are inserted in the core.
MULTIPLE CONTROL ROD REMOVAL LIMITING CONDITION FOR OPERATION 3.9.10.2 be removed from the core and/or reactor pressure vessel provided that at least the following requirements are satisfied until all control rods and control rod drive mechanisms are reinstalled and all control rods are inserted in the core.
: a. The reactor mode switch is OPERABLE and locked in the Shutdown position or in the Refuel position per Specification 3.9.1, except that the Refuel position "one-rod-out" interlock may be bypassed, as required, for those control rods and/or control rod drive mechanisms to be removed, after the fuel assemblies have been removed as specified below.
Any number of control rods and/or control rod drive mechanisms may
: b. The source range monitors SRM are OPERABLE per Specification 3.9.2
: a.
: c. The SHUTDOWN MARGIN requirements o f Specification 3.1.1 are satisfied.
The reactor mode switch is OPERABLE and locked in the Shutdown position or in the Refuel position per Specification 3.9.1, except that the Refuel position "one-rod-out" interlock may be bypassed, as required, for those control rods and/or control rod drive mechanisms to be removed, after the fuel assemblies have been removed as specified below.
: d. All other control rods are either inserted or have the surrounding four fuel assemblies removed from the core cell.
: b.
: e. The four fuel assemblies surrounding each control rod o r control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.
The source range monitors SRM are OPERABLE per Specification 3.9.2 c.
: f. All fuel loading operations shall be suspended.
The SHUTDOWN MARGIN requirements o f Specification 3.1.1 are satisfied.
APPLICABILITY:   OPERATIONAL CONDITION 5.
: d.
All other control rods are either inserted or have the surrounding four fuel assemblies removed from the core cell.
: e.
The four fuel assemblies surrounding each control rod or control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.
: f.
All fuel loading operations shall be suspended.
APPLICABILITY: OPERATIONAL CONDITION 5.
ACTION:
ACTION:
With the requirements of the above specification not satisfied, suspend removal o f control rods and/or control rod drive mechanisms from the core and/or reactor pressure vessel and initiate action t o satisfy the above requirements.
With the requirements of the above specification not satisfied, suspend removal o f control rods and/or control rod drive mechanisms from the core and/or reactor pressure vessel and initiate action t o satisfy the above requirements.
HOPE CREEK                           3/4 9-15
HOPE CREEK 3/4 9-15  


REFUELING OPERATIONS
REFUELING OPERATIONS SURVEILLANCE REQUIREMENTS 4.9.10.2.1 Within 4 hours prior to the start of removal of control rods and/or control roa drive mechanisms from the core and/or reactor pressurw vessel and at least once per 24 hours thereafter until all control rods and control rod drive mechanisms are reinstalled and all control rods are inserted in the core, verify that:
-.-- SURVEILLANCE REQUIREMENTS 4.9.10.2.1 Within 4 hours prior to the start of removal of control rods and/or control roa drive mechanisms from the core and/or reactor pressurw vessel and at least once per 24 hours thereafter until all control rods and control rod drive mechanisms are reinstalled and all control rods are inserted in the core, verify that:
: a.
: a. The reactor mode switch is OPERABLE per Surveillance Requirement 4.3.1.1 or 4.9.1.2, as applicable, and locked in the Shutdown position or in the Refuel position per Specification 3.9.1.
The reactor mode switch is OPERABLE per Surveillance Requirement 4.3.1.1 or 4.9.1.2, as applicable, and locked in the Shutdown position or in the Refuel position per Specification 3.9.1.
: b. The SRM channels are OPERABLE per Specification 3.9.2.
: b.
: c. The SHUTDOWN MARGIN requirements o f Specification 3.1.1 are satisfied.
The SRM channels are OPERABLE per Specification 3.9.2.
: d. All other control rods are either inserted or have the surrounding four fuel assemblies removed from the core cell.
: c.
: e. The four fuel assemblies surrounding each control rod and/or control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.
The SHUTDOWN MARGIN requirements o f Specification 3.1.1 are satisfied.
: f. All fuel loading operations are suspended.
: d.
Ll' 4.9.10.2.2 Following replacement o f all control rods and/or control rod drive mechanisms removed in accordance with this specification, perform a functional test of the "one-rod-out" Refuel position interlock, if this function had been bypassed.
All other control rods are either inserted or have the surrounding four fuel assemblies removed from the core cell.
HOPE CREEK                         3/4 9-16
: e.
The four fuel assemblies surrounding each control rod and/or control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.
: f.
All fuel loading operations are suspended.
Ll' 4.9.10.2.2 Following replacement of all control rods and/or control rod drive mechanisms removed in accordance with this specification, perform a functional test of the "one-rod-out" Refuel position interlock, if this function had been bypassed.
HOPE CREEK 3/4 9-16  


REFUELING OPERATIONS 3/4.9. il RESIDUAL FEAT REMOVAL       AND COOLANT CIRCULATIGN HIGH WATER LEVEL
REFUELING OPERATIONS 3/4.9. il RESIDUAL FEAT REMOVAL AND COOLANT CIRCULATIGN HIGH WATER LEVEL LIKITING CONOITION FOR OPERkTI3N 3.9.11.1 (RHR) systerr! shall be OPERABLE and in operation* with:
-LIKITING CONOITION FOR O P E R k T I 3 N                                        --
At least one shutdown cooling mode loop of the residual heat teFova One OPERABLE RHR pump, and
3.9.11.1 At least one shutdown cooling mode loop of the residual heat teFova (RHR) systerr! shall be OPERABLE and in operation* with:
: a.
: a. One OPERABLE RHR pump, and
: b.
: b. One OPERABLE RYR h e a t exchanger.
One OPERABLE RYR heat exchanger.
APPLICABILITY:       OPERATIONAL CONDITION 5, when 1rradiat.d fuel i s in the react: I vessel and the water level is g n i t e r than or equal to 22 f e e t 2 inches abgve the top o f the reactor pressure vessel flange and heat losses to ambient** arc not sufficient to maintain OPERATIONAL CONDITION 5.
APPLICABILITY:
OPERATIONAL CONDITION 5, when 1rradiat.d fuel i s in the react: I vessel and the water level is gniter than or equal to 22 feet 2 inches abgve the top of the reactor pressure vessel flange and heat losses to ambient** arc not sufficient to maintain OPERATIONAL CONDITION 5.
ACTION:
ACTION:
: a.     Yith no RHR shutdown c o o l i n g wde loop OPERABLE, within one hour and at laart once per 24 hours themafter, demonstrate tha operability o f a t least one alternatr nethod capable o f decay heat ruroval. Otherwise, suspend all operatlonr involving an increase in the reactor decay heat load and establish SECONDARY CONTAIWENT IMTEGRITY within 4 hours.
: a.
: b. Yith no RHR shutdown cooling mode I& in operation, rithjn one hour establish reactor coolant circulation by an alternate method and monitor reactor coolant w e r a t u r e at lerrt once per hour.
Yith no RHR shutdown cooling wde loop OPERABLE, within one hour and at laart once per 24 hours themafter, demonstrate tha operability o f at least one alternatr nethod capable o f decay heat ruroval. Otherwise, suspend all operatlonr involving an increase in the reactor decay heat load and establish SECONDARY CONTAIWENT IMTEGRITY within 4 hours.
S U R V E I L W E REQUIREMENTS                                                   -
: b.
4.9.11.1 At lrrrt one shutdown cooling mda loop of the nridurl heat removal s y s k . or rlkmrtcl method shall be verfflrd to bo in op8rition and Circulatincl reactor coolant at least once par 12 hours.
Yith no RHR shutdown cooling mode I&
n The shutdown coollng pupp m y be removed fm operation f o r up       to 2 hours per 8-hour period.
in operation, rithjn one hour establish reactor coolant circulation by an alternate method and monitor reactor coolant w e r a t u r e at lerrt once per hour.
**Ambfent losses .lJSt be such t h a t no incnase i n reactor vessel water temper-ature will occur (even though REFUELING conditions are being maintained).
S U R V E I L W E REQUIREMENTS 4.9.11.1 At lrrrt one shutdown cooling mda loop of the nridurl heat removal sysk. or rlkmrtcl method shall be verfflrd to bo in op8rition and Circulatincl reactor coolant at least once par 12 hours.
HOPE CREEK                                   314 9-17
n The shutdown coollng pupp m y be removed fm operation for up to 2 hours per 8-hour period.  
**Ambfent losses.lJSt be such t h a t no incnase i n reactor vessel water temper-ature will occur (even though REFUELING conditions are being maintained).
HOPE CREEK 314 9-17  


R EFUE L ING 0P ERA T I ON S i-   LOU     WATER LEVEL LIMITING CONEITInN       -----  FOR OPERATION 2.9.lL.Z           Two shutdown coo'iing mode l o o p s o f t h e residua': heat r e m o v a l (RHR) system s h a l l be CPERABLE and a t l e a s t one l o o p s h a l l be i n o p e r a t i o n , " w i t h each l o o p c o n s i s t i n g o f :
R EFUE L I NG 0 P ERA T I ON S i-LOU WATER LEVEL LIMITING CONEITInN FOR OPERATION 2.9.lL.Z Two shutdown coo'iing mode loops of t h e residua': heat removal (RHR) system shall be CPERABLE and a t least one loop shall be i n operation," w i t h each loop consisting o f :
: a.       One OPERABLE 2HR pump, and
: a.
: b.       One     OPERABLE RHR heat exchanger.
One OPERABLE 2HR pump, and
A P P L I C A B I L I T Y : OPERATIONAL CCNDITION 5, when i r r a d i a t e d f u e l i s i n t h e r e a c t o r vessel and t h e water l e v e l is less tnan 22 f e e t 2 inches above t h e t o p o f t h e r e a c t o r pressure vessel f l a n g e and heat losses t o ambient** a r e n o t s u f f i c i e n t t o m a i n t a i n OPERATIONAL CONDITION 5.
: b.
ACT I ON :
One OPERABLE RHR heat exchanger.
: a.         With less than t h e above r e q u i r e d shutdown c o o l i n g mode loops o f t h e RHR s y s t e m OPERABLE, w i t h i n one hour and a t l e a s t once p e r 24 hours t h e r e -
APPLICABILITY:
a f t e r , demonstrate t h e OPERABILITY of a t l e a s t one a l t e r n a t e method CaDable of decay heat removal f o r each i n o p e r a b l e RHR shutdown c o o l i n g
vessel and the water level is less tnan 22 feet 2 inches above the top o f the reactor pressure vessel flange and heat losses t o ambient** are not s u f f i c i e n t t o maintain OPERATIONAL CONDITION 5.
--          moae loop.
OPERATIONAL CCNDITION 5, when i r r a d i a t e d fuel i s i n the reactor ACT I ON :
: b.       With       no RHR shutdown c o o l i n g mode l o o p i n o p e r a t i o n , w i t h i n one hour e s t a b l i s h r e a c t o r c o o l a n t c i r c u l a t i o n by an a l t e r n a t e method and m o n i t o r reactor c o o l a n t temperature a t l e a s t once p e r hou'r.
: a.
I SURVEiLLANCE REQUIREMENTS 4 . 9 . 1 1 . 2 A t l e a s t one shutdown cooling mode l o o p of t h e r e s i d u a l h e a t reinoval system o r a l t e r n a t e method s h a l l be v e r i f i e d t o be i n o p e r a t i o n and CirCU1ating r e a c t o r c o o l a n t a t l e a s t once p e r 12 hours.
With less than the above required shutdown cooling mode loops o f the RHR system OPERABLE, within one hour and a t l e a s t once per 24 hours there-a f t e r, demonstrate the OPERABILITY of a t l e a s t one alternate method CaDable of decay heat removal f o r each inoperable RHR shutdown cooling moae loop.
    "The shutdown c o o l i n g pump may be removed from o p e r a t i o n f o r up t o 2 hours p e r 8-nour p e r i o d .
: b.
  **Ambient losses must be such t h a t no increase i n r e a c t o r vessel water temper-a t u r e will occur (even t h o u g h REFUELING c o n d i t i o n s a r e b e i n g maintained).
With no RHR shutdown cooling mode loop i n operation, within one hour establish reactor coolant c i r c u l a t i o n by an alternate method and monitor reactor coolant temperature a t least once per hou'r.
I SURVEiLLANCE REQUIREMENTS 4.9.11.2 system o r alternate method shall be v e r i f i e d t o be i n operation and CirCU1ating reactor coolant a t least once per 12 hours.
A t l e a s t one shutdown cooling mode loop of the residual heat reinoval "The shutdown cooling pump may be removed from operation for up t o 2 hours per 8-nour period.  
**Ambient losses must be such t h a t no increase i n reactor vessel water temper-ature will occur (even though REFUELING conditions are being maintained).
L.
L.
HOPE CREEK                                                       3 / 4 9-i8       ..      .Amendment   No. - 19             .
HOPE CREEK 3/4 9-i8  
.Amendment No. - 19  


ALL ACTIVE ON-THE-SPOT   CHANGES   MUST BE ATTACHED FOR FIELD USE 20030210 PSEG Internal Use Only                                                       Page 1 of 1 PSEG NUCLEAR FIRE DEPARTMENT NC.FP-AP.22-0025 (0) Rev. 0 PRECAUTIONS AGAINST FIRE Sponsor Organization: Emergency Services REVISION  
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 PSEG Internal Use Only Page 1 of 1 PSEG NUCLEAR FIRE DEPARTMENT NC.FP-AP.22-0025 (0) - Rev. 0 PRECAUTIONS AGAINST FIRE Sponsor Organization: Emergency Services REVISION  


==SUMMARY==
==SUMMARY==
:                  Biennial Review performed Yes           No -   NIA -
Biennial Review performed Yes No -
: 1. This is a new procedure. This change is in support of revision number 6 to administrathre procedure NC.NA-APmZZ-OO25(Q),       Operational Fire Protection Program. (80035483).
NIA -
: 1.
: 2.
: 3.
: 4.
: 5.
This is a new procedure. This change is in support of revision number 6 to administrathre procedure NC.NA-APmZZ-OO25(Q),
Operational Fire Protection Program. (80035483).
NAAP-25 is being revised to focus on high level process concepts, resulting in relocation of some process description detail and the associated forms, tables, and attachments to other lower tier documents.
NAAP-25 is being revised to focus on high level process concepts, resulting in relocation of some process description detail and the associated forms, tables, and attachments to other lower tier documents.
: 2. This revision represents a significant editorial incorporation of the NAAP-25 Hot Work Program into a new stand alone procedure. The NAAP-25 sections utilized to create this procedure were primarily:
This revision represents a significant editorial incorporation of the NAAP-25 Hot Work Program into a new stand alone procedure. The NAAP-25 sections utilized to create this procedure were primarily:
5.5, Control of Ignition Sources Hot Work 0    5.8, Ignitable Metals
0 5.8, Ignitable Metals 5.5, Control of Ignition Sources - Hot Work The associated NAAP-25 Hot Work forms, tables, and attachments have been relocated to this procedure.
: 3. The associated NAAP-25 Hot Work forms, tables, and attachments have been relocated to this procedure.
Added term seismic joints to step 5.3.2.G to better define penetration in a fire barrier (7001 2801)
: 4. Added term seismic joints to step 5.3.2.G to better define penetration in a fire barrier (70012801)
Added new section 5.1 1 Aerosol Products that deals with National Fire Protection Association (NFPA) Code 30B.
: 5. Added new section 5.1 1 Aerosol Products that deals with National Fire Protection Association (NFPA) Code 30B.
IMPLEMENTATION REQUIREMENTS:
IMPLEMENTATION REQUIREMENTS:                                 Effective Date:
Effective Date:
APPROVED:
APPROVED:
Manager Emergency Services
Manager - Emergency Services  
 
PRECAUTIONSAGAINST FIRE TABLE OF CONTENTS SECTION    TITLE                                                                                                PAGE 1.0    PURPOSE ..................................................................................................... 2 2.0    SCOPE .........................................................................................................
2 3.0    RESPONSIBILITIES ......................................................................................      2 4.0    PROCESS DESCRIPTION ............................................................................              3 5.0    PROCEDURE................................................................................................. 4 5.I Response to Fire Emergencies............................................................4 5.2  Fire Prevention Requirements..............................................................5 5.3  Fire Protection Impairment Program.................................................... 8 5.4                                          -
Control of Ignition Sources Hot Work................................................. 8 5.5  Combustible Material Control - General /All Areas ..............................9 5.6                                              -
CombustibleMaterial Control Safety Related Areas ..........................I O 5.7  Transient Combustibles........................................................................4 1 5.8 Transient Combustible Fire Load Limits................................................11 5.9  Fire Department Transient Combustibles Inspections..........................12 5.10 Control of Flammable and Combustible Liquids and Gases.................13 5.21 Aerosol Products..................................................................................15 6.0    RECORDS................................................................................................... ,.,15 7.0    DEFINITIONS ................................................................................................ 16


==8.0     REFERENCES==
PRECAUTIONS AGAINST FIRE TABLE OF CONTENTS SECTION TITLE PAGE 1. 0 PURPOSE.....................................................................................................
17 TABLES TABLE 1 Limited Transient Combustible Areas -Salem Station....................................20 TABLE 2 Common Transient CombustibldEstimatedHeat Content..............................21 FORMS FORM 1 Transient CombustiblePermit........................................................................22 Common                                   Page 1 of 22                                                             Rev 0 .
2 2.0 SCOPE.........................................................................................................
2 3.0 RESPONSIBILITIES......................................................................................
2 4.0 PROCESS DESCRIPTION............................................................................
3 PROCEDURE.................................................................................................
4 5.0 5.I 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.21 Response to Fire Emergencies............................................................ 4 Fire Prevention Requirements.............................................................. 5 Fire Protection Impairment Program.................................................... 8 Control of Ignition Sources - Hot Work................................................. 8 Combustible Material Control - General /All Areas.............................. 9 Combustible Material Control - Safety Related Areas..........................
I O Transient Combustibles........................................................................ 4 1 Transient Combustible Fire Load Limits................................................ 11 Fire Department Transient Combustibles Inspections.......................... 12 Control of Flammable and Combustible Liquids and Gases................. 13 Aerosol Products.................................................................................. 15 6.0 7.0 8.0 RECORDS...................................................................................................
,.,15 DEFINITIONS................................................................................................ 16 REFERENCES..............................................................................................
17 TABLES TABLE 1 TABLE 2 Limited Transient Combustible Areas -Salem Station.................................... 20 Common Transient CombustibldEstimated Heat Content.............................. 21 FORMS FORM 1 Transient Combustible Permit........................................................................ 22 Common Page 1 of 22 Rev. 0  


NC.FP-AP.TZ-0025 (Q) 1.o    PURPOSE 1.I    This procedure is established to secure a reasonable level of safety to life and property from fire hazards incident to the occupancy and maintenance of PSEG Nuclear structures and facilities.
1.o 1.I I
I.2    This procedure provides MINIMUM fire prevention measures and directs the user to procedures, which govern other fire protection processes in greater detail.
.2 2.0 3.0 3.1 3.2 Common NC.FP-AP.TZ-0025 (Q)
2.0    SCOPE This procedure applies to all PSEG Nuclear buildings and facilities located on the owner controlled property.
PURPOSE This procedure is established to secure a reasonable level of safety to life and property from fire hazards incident to the occupancy and maintenance of PSEG Nuclear structures and facilities.
3.0    RESPONSIBILITIES 3.1    All Directors and Managers Ensure their organizations implement the applicable fire prevention requirements within facilities they maintain and in which they conduct work.
This procedure provides MINIMUM fire prevention measures and directs the user to procedures, which govern other fire protection processes in greater detail.
3.2              -
SCOPE This procedure applies to all PSEG Nuclear buildings and facilities located on the owner controlled property.
Manager Emergencv Services e Coordinate and implement the Operational Fire Protection Program requirements for protecting plant, systems, components, and materials.
RESPONSIBILITIES All Directors and Managers Ensure their organizations implement the applicable fire prevention requirements within facilities they maintain and in which they conduct work.
Ensure General Employee Training (GET) discusses required employee actions in the event of fire.
Manager - Emergencv Services e
Ensure walk downs are performed to monitor control of transient combustibles.
e 0
Ensure an inspection program is implemented to verify compliance with applicable regulations.
e e
Ensure Hot Work, Transient Combustible, and Fire Protection Impairment Permits (FPIPs) are properly prepared, authorized, and implemented.
0 e
Maintain daily communication with the Operations Superintendent andlor Control Room Supervisors on the status of Salem and Hope Creek Station FPIPs. [CD-434E].
e e
Ensure ignition source control and monitoring for fire prevention.
e e
Interface with fire insurance inspectors, state and local enforcement agencies Interface with offsite fire departments.
Coordinate and implement the Operational Fire Protection Program requirements for protecting plant, systems, components, and materials.
Define non-FD responsibility for required testing and inspection of fire protection equipment.
Ensure General Employee Training (GET) discusses required employee actions in the event of fire.
Ensure timely and effective preventive and corrective maintenance on fire protection systems and components assigned to the FD.
Ensure walk downs are performed to monitor control of transient combustibles.
Common                                Page 2 of 22                               Rev. 0
Ensure an inspection program is implemented to verify compliance with applicable regulations.
Ensure Hot Work, Transient Combustible, and Fire Protection Impairment Permits (FPIPs) are properly prepared, authorized, and implemented.
Maintain daily communication with the Operations Superintendent andlor Control Room Supervisors on the status of Salem and Hope Creek Station FPIPs. [CD-434E].
Ensure ignition source control and monitoring for fire prevention.
Interface with fire insurance inspectors, state and local enforcement agencies Interface with offsite fire departments.
Define non-FD responsibility for required testing and inspection of fire protection equipment.
Ensure timely and effective preventive and corrective maintenance on fire protection systems and components assigned to the FD.
Page 2 of 22 Rev. 0  


NC.FP-AP.ZZ-0025 (Q) 3.3                       -
NC.FP-AP.ZZ-0025 (Q) 3.3 Job Supervisors - Salem and Hope Creek Stations 0
Job Supervisors Salem and Hope Creek Stations 0   Comply with fire prevention requirements of the Fire Protection Impairment, Hot Work, and Transient Combustible Control processes Ensure work practices support control of ignition sources, flammable liquids and gases, and ignitable metals.
Comply with fire prevention requirements of the Fire Protection Impairment, Hot Work, and Transient Combustible Control processes Ensure work practices support control of ignition sources, flammable liquids and gases, and ignitable metals.
3.4    All Personnel 0   Comply with the requirements af this procedure.
0 Comply with the requirements af this procedure.
0   Ensure appropriate response to fires and fire alarms for the affected area.
0 Ensure appropriate response to fires and fire alarms for the affected area.
Ensure fire prevention requirements are observed.
Ensure fire prevention requirements are observed.
4.0   PROCESS 4.1   This procedure identifies elements of the Operational Fire Protection Program categorized as Fire Prevention and Readiness to Detect and Suppress Fires.
3.4 All Personnel 4.0 PROCESS 4.1 This procedure identifies elements of the Operational Fire Protection Program categorized as Fire Prevention and Readiness to Detect and Suppress Fires.
4.2    This procedure is implemented in full detail by the following supplemental Fire Department administrative procedures.
This procedure is implemented in full detail by the following supplemental Fire Department administrative procedures.
SC.FP.AP.Z&0003(Q), Actions for Inoperable Fire Protection Salem-HC.FP-AP.ZZ-OOW(Q), Actions For Inoperable Fire Protection- Hope Creek NC.FP-AP.ZZ-O005(Q), Fire Protection Surveillance / Periodic Test Program 0   NC.FP-AP.ZZ-O009Q), Fire Protection Training Program 0   NCFP-AP.ZZ-001O(Q}, Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Hot Work Practices NC.FP-AP.P-O020(Q), Compensatory Measure Fire Watch Program 4.3    Users of this procedure are advised to refer to the above departmental procedures for the full detail and administrative controls which these procedures provide.
SC.FP.AP.Z&0003(Q), Actions for Inoperable Fire Protection - Salem HC.FP-AP.ZZ-OOW(Q), Actions For Inoperable Fire Protection-Hope Creek NC.FP-AP.ZZ-O005(Q), Fire Protection Surveillance / Periodic Test Program 0
Common                             Page 3 of 22                               Rev. 0
NC.FP-AP.ZZ-O009Q), Fire Protection Training Program 0
NCFP-AP.ZZ-001 O(Q}, Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Hot Work Practices NC. FP-AP.P-O020(Q), Compensatory Measure Fire Watch Program Users of this procedure are advised to refer to the above departmental procedures for the full detail and administrative controls which these procedures provide.
4.2 4.3 Common Page 3 of 22 Rev. 0  


NC.FP-AP.22-0025 (Q) 5.0    PROCEDURE 5.1    Response to Fire Emergencies 5.1.1  In the event a fire alarm sounds within an office facility, (e.g. Material Center, Nuclear Operations Services Facility (NOSF), PSEG Nuclear Administration Building (TB-21, Hope Creek Administration Suilding, Processing Center, or "B"Clean Facilities Building) evacuate the building in accordance with the established routes.
5.0 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 NC.FP-AP.22-0025 (Q)
A. Accountability should be performed to ensure all personnel are out of the building and at a specified gathering place.
PROCEDURE Response to Fire Emergencies In the event a fire alarm sounds within an office facility, (e.g. Material Center, Nuclear Operations Services Facility (NOSF), PSEG Nuclear Administration Building (TB-21, Hope Creek Administration Suilding, Processing Center, or "B" Clean Facilities Building) evacuate the building in accordance with the established routes.
B. Evacuees should not crowd the entrances and should await further instructions from either the control room or FD personnel.
A. Accountability should be performed to ensure all personnel are out of the B. Evacuees should not crowd the entrances and should await further C. NEVER use the elevator to leave the building.
C. NEVER use the elevator to leave the building.
D. Always ensure fire boundary doors are closed.
D. Always ensure fire boundary doors are closed.
5.1.2  For fire alarms within the Salem and Hope Creek Stations, listen to the instructions via the page system provided.
For fire alarms within the Salem and Hope Creek Stations, listen to the instructions via the page system provided.
5.1.3  Upon discovering a fire, report it using the telephone via 3333, a manual pull box, or page system A. Use page line 1 for Salem U/1, line 2 for Salem U/2 B. Use page line 5 at Hope Creek 5.1.4  When reporting an emergency, callers should provide information such as nature of the emergency, the location, and any equipment involved.
Upon discovering a fire, report it using the telephone via 3333, a manual pull box, or page system A. Use page line 1 for Salem U/1, line 2 for Salem U/2 B. Use page line 5 at Hope Creek When reporting an emergency, callers should provide information such as nature of the emergency, the location, and any equipment involved.
5.1.5  After reporting a fire, employees should fight the fire if its within their training and capabilities.
After reporting a fire, employees should fight the fire if its within their training and capabilities.
A. If not within the training and capabilities of the employes(s), to fight the fire, then the employee(s) should alert others in the area, evacuate to a safe distance and standby to direct FD personnel to the scene.
A. If not within the training and capabilities of the employes(s), to fight the fire, then the employee(s) should alert others in the area, evacuate to a safe distance and standby to direct FD personnel to the scene.
5.1.6  When the Control Room receives a report of a fire they should dispatch appropriate personnel in accordance with the applicable procedures.
When the Control Room receives a report of a fire they should dispatch appropriate personnel in accordance with the applicable procedures.
Common                               Page 4 of 22                                     Rev. 0
building and at a specified gathering place.
instructions from either the control room or FD personnel.
Common Page 4 of 22 Rev. 0  


A L L ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.77-0025 (Q) 5.2       Fire Preventlon Requirements 5.2.q     General The following conditions are prohibited and should be corrected immediately
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.77-0025 (Q) 5.2 Fire Preventlon Requirements 5.2.q General The following conditions are prohibited and should be corrected immediately IAW N.J.A.C. 570-2-10 (New Jersey State Fire Code). These provisions should be applied in all buildings and facilities:
,                        IAW N.J.A.C. 570-2-10(New Jersey State Fire Code). These provisions should be applied in all buildings and facilities:
A. Dangerous conditions which are liable to cause or contribute to the spread B. Conditions that would interfere with the use of any fire protection C. Obstruction of egress pathways such as stairwells, exit doors and D. Accumulation of dust or waste in HVAC systems or grease in kitchen or E, Accumulations of grease on kitchen cooking equipment, or oil, grease or F. Accumulation of rubbish, waste, paper, boxes, or other combustible of fire.
A. Dangerous conditions which are liable to cause or contribute to the spread of fire.
equipment.
B. Conditions that would interfere with the use of any fire protection equipment.
corridors.
C. Obstruction of egress pathways such as stairwells, exit doors and corridors.
other exhaust ducts.
D. Accumulation of dust or waste in HVAC systems or grease in kitchen or other exhaust ducts.
dirt upon, under or around any mechanical equipment.
E, Accumulations of grease on kitchen cooking equipment, or oil, grease or dirt upon, under or around any mechanical equipment.
materials (trash) or excessive storage of any mmbustible materials in an area not designed for that purpose.
F. Accumulation of rubbish, waste, paper, boxes, or other combustible materials (trash) or excessive storage of any mmbustible materials in an area not designed for that purpose.
installed electrical wiring, equipment or appliances.
G. Hazardous conditions arising from defective or improperly used or installed electrical wiring, equipment or appliances.
equipment for handling or use of combustible, explosive or otherwise hazardous materials.
H. Hazardous conditions arising from defective or improperly installed equipment for handling or use of combustible, explosive or otherwise hazardous materials.
: 1.
: 1. Dangerous amounts of combustible, explosive or otherwise hazardous materials.
Dangerous amounts of combustible, explosive or otherwise hazardous materials.
J. All equipment, materials, processes or operations that are in violation of the provisions and intent of this procedure, the MJ State Fire Code and any procedures for safe plant operation.
J. All equipment, materials, processes or operations that are in violation of the provisions and intent of this procedure, the MJ State Fire Code and any procedures for safe plant operation.
K. Fire Protection deficiencies observed should be immediately reported to the FD (Ext. 2800/2803)for evaluation L. Smoking is prohibited in all buildings and areas unless specifically posted.
the FD (Ext. 2800/2803) for evaluation G. Hazardous conditions arising from defective or improperly used or H. Hazardous conditions arising from defective or improperly installed K. Fire Protection deficiencies observed should be immediately reported to L. Smoking is prohibited in all buildings and areas unless specifically posted.
5.2.2    Storage A, AH storage areas should be maintained in a neat and orderly condition.
A, AH storage areas should be maintained in a neat and orderly condition.
: 8. Storage of material should not affect access to or obstruct fire protection systems or fire fighting equipment.
: 8. Storage of material should not affect access to or obstruct fire protection C. Thirty inches (30) of clearance, free of combustible material, shall be D. Materials should not be placed, stored or kept in any portion of an exit, 5.2.2 Storage systems or fire fighting equipment.
C. Thirty inches (30) of clearance, free of combustible material, shall be maintained around energized electrical panels.
maintained around energized electrical panels.
D. Materials should not be placed, stored or kept in any portion of an exit, elevator or at the bottom of a stairway or other means of escape.
elevator or at the bottom of a stairway or other means of escape.
Common                                 Page 5 of 22                               Rev. 0
Common Page 5 of 22 Rev. 0  


NC.FP-AP.22-0025 (Q) 5.2.3  Fire Barriers A, Fire Doors shall be maintained closed at all times (unless provided with an approved hold-open device).
5.2.3 5.2.4 5.2.5 Common NC.FP-AP.22-0025 (Q)
B. Blocking, propping or leaving a fire door open without proper authorization for any time period is 8 violation of our fire protection program and a serious fire safety hazard. [CD474B, CDD753X,CDm764E]
Fire Barriers A, Fire Doors shall be maintained closed at all times (unless provided with an B. Blocking, propping or leaving a fire door open without proper authorization approved hold-open device).
for any time period is 8 violation of our fire protection program and a serious fire safety hazard. [CD474B, CDD753X, CDm764E]
C. It is imperative that ALL PERSONNEL make sure fire doors close behind them. For doors with hold open devices, the door opening and door swing area need to be free of obstructions.
C. It is imperative that ALL PERSONNEL make sure fire doors close behind them. For doors with hold open devices, the door opening and door swing area need to be free of obstructions.
D. All required fire resistance rated assemblies (ceiling tiles, walls, doors, etc.) shall be maintained, repaired, restored or replaced when damaged, altered, or penetrated 5.2.4  Electrlcal A. Extension cords and flexible cords shall not be a substitute for permanent wiring.
etc.) shall be maintained, repaired, restored or replaced when damaged, altered, or penetrated D. All required fire resistance rated assemblies (ceiling tiles, walls, doors, Electrlcal A. Extension cords and flexible cords shall not be a substitute for permanent wiring.
B. Extension cords and flexible cords shall be a minimum of 12/3 gauge and not be affixed to structures; extended through walls, ceilings or floors, or under doors or floor coverings; nor shall such cords be subject to environmentaldamage or physical impact.
B. Extension cords and flexible cords shall be a minimum of 12/3 gauge and not be affixed to structures; extended through walls, ceilings or floors, or under doors or floor coverings; nor shall such cords be subject to environmental damage or physical impact.
C. Multi-plug adaptors, such as cube adaptors, unfused plug strips or any other device not complying with NFPA 70, shall be prohibited.
C. Multi-plug adaptors, such as cube adaptors, unfused plug strips or any other device not complying with NFPA 70, shall be prohibited.
5.2.5  Fire Protection Systems A. Installedfirefighting equipment, with the exception of portable fire extinguishers, may only be utilized for firefighting at the direction of the ,
Fire Protection Systems A. Installed firefighting equipment, with the exception of portable fire extinguishers, may only be utilized for firefighting at the direction of the NFPS.
NFPS.
B. Use of fire protection water for non-fire protection purposes (not within the scope of a T-Mod), is prohibited without permission from the OSICRS of the affected station and the NFPS, along with issuance of a permit for tracking.
B. Use of fire protectionwater for non-fire protection purposes (not within the scope of a T-Mod), is prohibited without permissionfrom the OSICRS of the affected station and the NFPS, along with issuance of a permit for tracking.
C. Actuated detection or suppression systems should not be shut off until authorized by the NFPS or affected station OSKRS. The FD should be notified immediately whenever a portable fire extinguisher is discharged.
C. Actuated detection or suppression systems should not be shut off until authorized by the NFPS or affected station OSKRS. The FD should be notified immediately whenever a portable fire extinguisher is discharged.
D. Fire extinguishers mounted in the stations are for emergency use only.
D. Fire extinguishers mounted in the stations are for emergency use only.
E. Fire extinguisher location changes at Hope Creek are governed by the configuration control program and cannot be made until approved and documented via the design change process. In addition, use of certain type ABC dry chemical extinguishers are prohibited at Hope Creek station.
E. Fire extinguisher location changes at Hope Creek are governed by the configuration control program and cannot be made until approved and documented via the design change process. In addition, use of certain type ABC dry chemical extinguishers are prohibited at Hope Creek station.
Contact the FD for specific information. [CR990312177]
Contact the FD for specific information. [CR990312177]
Common                              Page 6 of 22                                   Rev. 0
Page 6 of 22 Rev. 0  


NC.FP-AP.22-OOPS (Q) 5.2.6 Portable Space Heaters A. Any use of portable space heaters, whether in a safety related or non-safety related application, will require a review and approval by Fire Protection. Additionally, the following provislons also apply to the use of portable space heaters.
NC.FP-AP.22-OOPS (Q) 5.2.6 Portable Space Heaters A. Any use of portable space heaters, whether in a safety related or non-safety related application, will require a review and approval by Fire Protection. Additionally, the following provislons also apply to the use of portable space heaters.
B. Portable space heaters use in office areas of trailers are prohibited.
B. Portable space heaters use in off ice areas of trailers are prohibited.
C. Portable space heaters used to maintain operability of Safety Related structures, systems, or components (SSCs) are installed in accordance with NC.DE-AP.ZZ-O030(Q), Control of Temporary Modifications.[C10403].
C. Portable space heaters used to maintain operability of Safety Related structures, systems, or components (SSCs) are installed in accordance with NC.DE-AP.ZZ-O030(Q), Control of Temporary Modifications.[C10403].
D. In non-safety related areas to support personnel comfort or equipment operation, use of a portable space heaters, will require a review by fire protection with the following restrictions:
D. In non-safety related areas to support personnel comfort or equipment operation, use of a portable space heaters, will require a review by fire protection with the following restrictions:
: 1. The department placing the heater is responsible for placing it in the plant, inspecting it to ensure the unit is in serviceable condition and all safety features are operational.
: 1. The department placing the heater is responsible for placing it in the plant, inspecting it to ensure the unit is in serviceable condition and all safety features are operational.
: 2. The responsible department shall monitor the operation of the heater at all times, E. Portable space heaters should be electrically powered where possible.
: 2.
The responsible department shall monitor the operation of the heater at all times, E. Portable space heaters should be electrically powered where possible.
F. A clear combustible zone of 10' around the heater should be maintained at all times.
F. A clear combustible zone of 10' around the heater should be maintained at all times.
G. Portable heaters should not be placed in high traffic areas or other areas where personnel could come in contact with them.
G. Portable heaters should not be placed in high traffic areas or other areas where personnel could come in contact with them.
H. Fuel fired portable heaters should not be used in a building unless all other alternatives are exhausted.
H. Fuel fired portable heaters should not be used in a building unless all other alternatives are exhausted.
: 1. Fuel fired portable heaters may not be used without adequate ventilation J. Fuel fired portable heaters may not be used in confined spaces.
: 1.
Fuel fired portable heaters may not be used without adequate ventilation J. Fuel fired portable heaters may not be used in confined spaces.
K. Fuel fired portable heaters may not be fueled while in operation L. A portable fire extinguisher must be present while a fuel fired portable heater is in operation.
K. Fuel fired portable heaters may not be fueled while in operation L. A portable fire extinguisher must be present while a fuel fired portable heater is in operation.
Common                               Page 7 of 22                                 Rev. 0
Common Page 7 of 22 Rev. 0  


NC.FP-AP.22-0025 (Q) 5.3    Fire Protection Impairment Prowram 5.3.1 The Fire Department is the fire protection impairment authority, responsible for implementing the Fire Protection Impairment Program in accordance with administrative procedure: ND.FP-APZ-001 O(Q),Fire Protection Impairment Program. [CD434E]
5.3 NC.FP-AP.22-0025 (Q)
5.3.2  Work activities affecting the following fire protection systems, equipment and barriers shall be controlled through the Fire Protection Impairment Program
Fire Protection Impairment Prowram 5.3.1 The Fire Department is the fire protection impairment authority, responsible for implementing the Fire Protection Impairment Program in accordance with administrative procedure: N D.FP-APZ-001 O(Q), Fire Protection Impairment Program. [CD434E]
[CD-I74B, CD438A, CD-531A, CD-643A, CDdb3X, CD=764E,CD-807X, CD-8214:
Work activities affecting the following fire protection systems, equipment and barriers shall be controlled through the Fire Protection Impairment Program 5.3.2
A. Fire water system (Le. pumps, hydrants, piping, hose stations, deluge and sprinkler systems).
[CD-I74B, CD438A, CD-531 A, CD-643A, CDdb3X, CD=764E, CD-807X, CD-8214:
B. Carbon dioxide (CARDOX), Halon, and Foam systems.
A. Fire water system (Le. pumps, hydrants, piping, hose stations, deluge and B. Carbon dioxide (CARDOX), Halon, and Foam systems.
C. Smoke and thermal detection systems.
C. Smoke and thermal detection systems.
D. Fire alarm and associated circuitry.
D. Fire alarm and associated circuitry.
E, Manual pull box alarm stations.
E, Manual pull box alarm stations.
F. Fire doors and fire dampers.
F. Fire doors and fire dampers.
G. Penetrations, including seismic joints, in fire barriers. 1700128011.
G. Penetrations, including seismic joints, in fire barriers. 17001 28011.
H. Marinite boards and structural steel fireproofing.
H. Marinite boards and structural steel fireproofing.
: 1. Fire Wrap on cable tray, conduits, cables, and vent ducts.
: 1.
Fire Wrap on cable tray, conduits, cables, and vent ducts.
J. Radiant energy shields.
J. Radiant energy shields.
K. Appendix "R" 8-hour battery powered emergency lights.
K. Appendix "R" 8-hour battery powered emergency lights.
L. Transient combustibles in non-safety related areaslrooms.
L. Transient com bustibles in non-safety related areaslrooms.
5.3.3  A Fire Protection Impairment Permit (FPIP) is also required when equipment taken out of service affects operability of a fire protection system (Le. tagging a breaker that powers the detection system).
A Fire Protection Impairment Permit (FPIP) is also required when equipment taken out of service affects operability of a fire protection system (Le. tagging a breaker that powers the detection system).
5.4                                   -
sprinkler systems).
Control of fcrnition Sources Hot Work 5.4.1  The FD authorizes Hot Work Permits in accordance with procedure NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work.
5.3.3 5.4 5.4.1 5.4.2 5.4.3 5.4.4 Control of fcrnition Sources - Hot Work The FD authorizes Hot Work Permits in accordance with procedure NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work.
5.4.2  Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered a fire watch required activity.
Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered a fire watch required activity.
5.4.3                              -
A Hot Work Permit (HWP) - Form I of this procedure, shall control all these processes. [CD-226C, CB3OOX, CD-317Y, CD-754X, CD-821 X]
A Hot Work Permit (HWP) Form Iof this procedure, shall control all these processes. [CD-226C, CB3OOX, CD-317Y, CD-754X, CD-821X]
Work involving wire wheeling! needle gun use, or hot iron soldering is NOT considered hot work and a Hot Work Permit is not required.
5.4.4  Work involving wire wheeling! needle gun use, or hot iron soldering is NOT considered hot work and a Hot Work Permit is not required.
A. Precautions identified in this procedure for hot work activities should be applied to ensure a fire safe work area.
A. Precautions identified in this procedure for hot work activities should be applied to ensure a fire safe work area.
B. At the discretion of the NFPS, the use of certain equipment for pre-heating such as Cooper Heat (trade mark) resistance heaters, or similar devices, may be considered Hot Work.
B. At the discretion of the NFPS, the use of certain equipment for pre-heating such as Cooper Heat (trade mark) resistance heaters, or similar devices, may be considered Hot Work.
Common                               Page 8 of 22                                 Rev. 0
Common Page 8 of 22 Rev. 0  


NC.FP-AP.ZZ-0025 (Q) 5.5                                      -
5.5 5.5.1 5.5.2 5.5.3 5.5.4 5.5.5 5.5.6 5.5.7 5.5.8 5.5.9 NC.FP-AP.ZZ-0025 (Q)
Combustible Material Control General / All Areas 5.5.1  Commonly encountered transient cornbustibles and their estimated heat content are identified in Table 2.
Combustible Material Control - General / All Areas Commonly encountered transient corn bustibles and their estimated heat content are identified in Table 2.
5.5.2  Flammable or combustible liquids introduced into any arealroom within the stations shall be limited to daily usage. [CD-755a 5.5.3  Use and storage of flammable liquids for decon within the stations shall be limited to five gallons. [CD-799X]
Flammable or combustible liquids introduced into any arealroom within the stations shall be limited to daily usage. [CD-755a Use and storage of flammable liquids for decon within the stations shall be limited to five gallons. [CD-799X]
5.5.4  Items incidental to Radiation Protection such as catch-bags, step-off-pads, roping, and stanchions are acceptable in limited quantities as determined by the FD. PC and trash drums are evaluated as transient combustibles.
Items incidental to Radiation Protection such as catch-bags, step-off-pads, roping, and stanchions are acceptable in limited quantities as determined by the FD. PC and trash drums are evaluated as transient combustibles.
5.5.5  Accumulations of waste, debris, scrap, rags, and other combustibles resulting from work activities shatl be removed from the work area immediately following job completion or at the end of a 24 hour period, whichever comes first.
Accumulations of waste, debris, scrap, rags, and other combustibles resulting from work activities shatl be removed from the work area immediately following job completion or at the end of a 24 hour period, whichever comes first.
5.5.6  For work in the RCA, combustibles shall be removed given proper considerationfor ALARA or contained in a sealed container until removed.
For work in the RCA, combustibles shall be removed given proper consideration for ALARA or contained in a sealed container until removed.
[CD-426a 5.5.7  Combustible structures, (including trailers, sheds, etc.) are prohibited from being placed inside of or within 30 feet of permanent buildings, unless a Fire Protection Impairment Permit (FPIP) or TCP as appropriate is issued authorizing placement.
[CD-426a Com bustible structures, (including trailers, sheds, etc.) are prohibited from being placed inside of or within 30 feet of permanent buildings, unless a Fire Protection Impairment Permit (FPIP) or TCP as appropriate is issued authorizing placement.
5.5.8  Introductionof combustibles into Combustible Control Zones (CCZ) at Salem is prohibited without a Transient Combustible Permit (TCP), see Form 1, and appropriate compensatory measures. CCZs are used to limit the potential for exposure of sensitive equipment to fire and/or combustion products, to limit the potential for fire propagation through plant equipment hatches, and to reduce overall fire risk. Fixed combustible material may be installed in CCZs with approval from the fire protection designated design authority or the fire department. Transient combustibles are combustible materials that are not part of permanent plant equipment, components or installations. Transient combustibles are intended to pass through or reside in the plant for a brief duration usually associated with, but not limited to, a maintenance or design change work activity (e.g., combustible liquids, wood 8, plastic products, waste materials, scrap, rags, trash bags, electrical extension cords, ctothing hoop rings, or other cornbustible materials resulting from a work activity.)
Introduction of combustibles into Combustible Control Zones (CCZ) at Salem is prohibited without a Transient Combustible Permit (TCP), see Form 1, and appropriate compensatory measures. CCZs are used to limit the potential for exposure of sensitive equipment to fire and/or combustion products, to limit the potential for fire propagation through plant equipment hatches, and to reduce overall fire risk. Fixed combustible material may be installed in CCZs with approval from the fire protection designated design authority or the fire department. Transient combustibles are combustible materials that are not part of permanent plant equipment, components or installations. Transient combustibles are intended to pass through or reside in the plant for a brief duration usually associated with, but not limited to, a maintenance or design change work activity (e.g., combustible liquids, wood 8, plastic products, waste materials, scrap, rags, trash bags, electrical extension cords, ctothing hoop rings, or other corn bustible materials resulting from a work activity.)
5.5.9  Equipment or supplies (such as new fuel) shipped in untreated combustible containers can be unpacked (in preparation for immediate use} in safety-related areas if required for valid operating reasons. However, the combustible shipping materials shall be removed from the area immediately after unpacking, unless stored in metal containers with tight-fitting, self-closing metal covers or equivalent. Such material unless stored in the approved containers, shall NOT be left unattended at any time. [CD426X]
Equipment or supplies (such as new fuel) shipped in untreated combustible containers can be unpacked (in preparation for immediate use} in safety-related areas if required for valid operating reasons. However, the combustible shipping materials shall be removed from the area immediately after unpacking, unless stored in metal containers with tight-fitting, self-closing metal covers or equivalent. Such material unless stored in the approved containers, shall NOT be left unattended at any time. [CD426X]
Common                               Page 9 of 22                                 Rev. 0
Rev. 0 Common Page 9 of 22  


A L L ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.ZZ-0025 (Q) 5.5.10 All wood used for maintenance activities, refueling or modification operations, including wood carts and foreign material exclusion (FME)covers, etc. shall be fire retardant (performance rated Exterior Type per National Fire Protection Association Standard 703).
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.ZZ-0025 (Q) 5.5.10 5.5.1 1 5.5.12 5.5.13 5.514 5.6 5.6.1 5.6.2 5.6.3 5.6.4 5.6.5 Common All wood used for maintenance activities, refueling or modification operations, including wood carts and foreign material exclusion (FME) covers, etc. shall be fire retardant (performance rated Exterior Type per National Fire Protection Association Standard 703).
5.5.11    Combustible material for decoration in any building is prohibited, unless the materials have been made flame retardant with an approved flame retardant material or process and are approved by the NFPS prior to the installation, using the planned FPlP process.
Combustible material for decoration in any building is prohibited, unless the materials have been made flame retardant with an approved flame retardant material or process and are approved by the NFPS prior to the installation, using the planned FPlP process.
5.5.12    Temporary buildings, enclosures, or fixtures within or on buildings should be constructed of noncombustible material. Use of combustible materials may affect compliance with Nuclear Electric Insurance Limited (NEIL) Property Loss Prevention Standards. Permanent items are prohibited unless evaluated and approved in accordance with NC.NA-AP.ZZ-0008 (Q) Configuration Control Program.
Temporary buildings, enclosures, or fixtures within or on buildings should be constructed of noncombustible material. Use of combustible materials may affect compliance with Nuclear Electric Insurance Limited (NEIL) Property Loss Prevention Standards. Permanent items are prohibited unless evaluated and approved in accordance with NC.NA-AP.ZZ-0008 (Q) Configuration Control Program.
5.5.13    Storing combustible or flammable material in stairwells is prohibited.
Storing combustible or flammable material in stairwells is prohibited.
5.514      Combustible or flammable materials in use shall not be stored on or against stations' fire rated barriers, where it will come in contact with such items as:
Combustible or flammable materials in use shall not be stored on or against stations' fire rated barriers, where it will come in contact with such items as:
A. Metal floor hatches, pipes, conduits, cable trays, cable, and HVAC ducts that penetrate fire barriers.
A. Metal floor hatches, pipes, conduits, cable trays, cable, and HVAC ducts that penetrate fire barriers.
B. Penetration seals installed in barriers or embedded sleeves used to form openings in fire barriers.
B. Penetration seals installed in barriers or embedded sleeves used to form openings in fire barriers.
5.6                                          -
Combustible Material Control - Safetv Related Areas Storage of combustibles is safety related areashooms except when approved by Engineering.
Combustible Material Control Safetv Related Areas 5.6.1      Storage of combustibles is         permitted in Salem and Hope Creek Station's safety related areashooms except when approved by Engineering.
When approved, storage of combustibles in safety related areashooms is permitted only in metal containers with tight-fitting, selfclosing metal covers or equivalent.
iCD-31v 5.6.2      When approved, storage of combustibles in safety related areashooms is permitted only in metal containers with tight-fitting, selfclosing metal covers or equivalent.
Storage for Salem's RCA safety related areas is limited to the engineering approved locations andlor the "A" Controlled Facilities Building, while Hope Creek's RCA safety related areas is limited to the engineering approved locations and/or sprinklered areas of the Turbine Building.
5.6.3      Storage for Salem's RCA safety related areas is limited to the engineering approved locations andlor the "A"Controlled Facilities Building, while Hope Creek's RCA safety related areas is limited to the engineering approved locations and/or sprinklered areas of the Turbine Building.
Use of non-fire retardant wood (such as large dunnage, wooden carts, or FME) in any safety-related area/room, regardless of the total British Thermal Units (BTU) content, requires an evaluation by engineering.
5.6.4      Use of non-fire retardant wood (such as large dunnage, wooden carts, or FME) in any safety-related area/room, regardless of the total British Thermal Units (BTU) content, requires an evaluation by engineering.
Daily usage of combustible or flammable materials in safety related areas of Salem and Hope Creek Stations is considered transient combustibles and requires Section 5.7 of this procedure to be completed.
5.6.5      Daily usage of combustible or flammable materials in safety related areas of Salem and Hope Creek Stations is considered transient combustibles and requires Section 5.7 of this procedure to be completed.
permitted in Salem and Hope Creek Station's iCD-31v Page 10 of 22 Rev. 0  
Common                                    Page 10 of 22                               Rev. 0


NC.FP-AP.ZZ-0025 (Q) 5.7   Transient Combustibles 5.7.q All work activities requiring the introduction of transient combustible material into SAFETY RELATED AREAS or ROOMS shall be identified and administratively controlled. [CD1226C, CD-300X, CD463Y, CD-807X, CD-8214 5.7.2  Job Supervisors or designees, for work activities introducing combustible items into safety-related areaslroorns, are responsible for performing a calculation of the transient combustibles BTU content.
NC.FP-AP.ZZ-0025 (Q) 5.7 5.7.q 5.7.2 5.7.3 5.7.4 5.7.5 5.8 5.8.1 5.8.2 5.8.3 5.8.4 5.8.5 Common Transient Combustibles All work activities requiring the introduction of transient combustible material into SAFETY RELATED AREAS or ROOMS shall be identified and administratively controlled. [CD1226C, CD-300X, CD463Y, CD-807X, Job Supervisors or designees, for work activities introducing combustible items into safety-related areaslroorns, are responsible for performing a calculation of the transient combustibles BTU content.
5.7.3  This calculation should be completed during the walk-down phase of the workweek process.
This calculation should be completed during the walk-down phase of the workweek process.
5.7.4  Use Form 1 Transient Combustible Permit (TCP) for performing the calculation.
Use Form 1 Transient Combustible Permit (TCP) for performing the calculation.
5.7.5  The FD will issue an approved TCP for SAFETY RELATED AREAS or ROOMS and specify compensatory measures based on the following:
The FD will issue an approved TCP for SAFETY RELATED AREAS or ROOMS and specify compensatory measures based on the following:
A. Total transient combustibles being utilized in a fire aredroom.
A. Total transient combustibles being utilized in a fire aredroom.
B. Pre-existing quantities of transient combustibles found during roving patrols or the current TCP logs.
B. Pre-existing quantities of transient combustibles found during roving C. Valid hot work activities.
C. Valid hot work activities.
D. Sound Fire Protection Practices.
D. Sound Fire Protection Practices.
E. Presence/operability of installed detection or suppressian equipment in aredroom, 5.8    Transient Combustible Fire Load Limits 5.8.1  Transient combustible fire load limits have been established for safety related areaslrooms within the Salem and Hope Creek Stations and are specified in the Fire Hazards Analysis of each station. [CD=300X,CD839F) 5.8.2  If it is determined the use of combustibles WILL EXCEED established limits, an engineering assessment is required to determine threshold limits and any additional controls BEFORE the combustibles are brought into the safety related areaslrooms.
E. Presence/operability of installed detection or suppressian equipment in Transient Combustible Fire Load Limits Transient combustible fire load limits have been established for safety related areaslrooms within the Salem and Hope Creek Stations and are specified in the Fire Hazards Analysis of each station. [CD=300X, CD839F)
5.8.3  Regardless of whether the transient combustibles do or do not exceed the limits, the FD will issue a TCP and specify compensatory measures.
If it is determined the use of combustibles WILL EXCEED established limits, an engineering assessment is required to determine threshold limits and any additional controls BEFORE the combustibles are brought into the safety related areaslrooms.
5.8.4  Departments introducing the transient cornbustibles are responsiblefor the implementation, control and release of the fire watch compensatory measure.
Regardless of whether the transient combustibles do or do not exceed the limits, the FD will issue a TCP and specify compensatory measures.
5.8.5  Salem Station Transient Combustible Load Limit A. 400,000 BTU per fire area. t842201 B. Table Icontains the areas in both Salem Stations, which have restrictions to the established limits with regards to transient combustibles.
Departments introducing the transient corn bustibles are responsible for the implementation, control and release of the fire watch compensatory measure.
Common                              Page 11 of 22                             Rev. 0
Salem Station Transient Combustible Load Limit A. 400,000 BTU per fire area. t842201 B. Table I contains the areas in both Salem Stations, which have restrictions CD-8214 patrols or the current TCP logs.
: aredroom, to the established limits with regards to transient combustibles.
Page 11 of 22 Rev. 0  


NC.F P-AP.22-0025 (Q) 5.8.6 Hope Creek Station Transient Combustible Load Limit A. 4,480,000 BTU per room. [CD-939F]
NC. F P-AP.22-0025 (Q) 5.8.6 Hope Creek Station Transient Combustible Load Limit A. 4,480,000 BTU per room. [CD-939F]
: 6. Mope Creek rooms have restrictions with regards to transient combustible load limits: [CD463q 1, Room 4326 (CRDRemoval and Repair Area) and Room 4333 (CRD Storage Area): Transient combustibfes are prohibited with the exception of CRD cleaning and rebuilding equipment.
: 6. Mope Creek rooms have restrictions with regards to transient combustible load limits: [CD463q 1, Room 4326 (CRD Removal and Repair Area) and Room 4333 (CRD Storage Area): Transient combustibfes are prohibited with the exception of CRD cleaning and rebuilding equipment.
: 2. Vestibules 5101 5201 and Electrical Raceways 5216 and 5336:
: 2. Vestibules 5101 5201 and Electrical Raceways 521 6 and 5336:
Transient combustibles are prohibited.
Transient combustibles are prohibited.
: 3. Main Control Room and Control Complex Peripheral Rooms:
: 3. Main Control Room and Control Complex Peripheral Rooms:
Transient combustibles are limited to Class "A" materials and small quantities of cleaning supplies incidental to Control Room Complex functions. This area shall not be used for any storage, as storage shall be limited to the peripheral rooms only. This does not include small quantities of items such as a ream of paper or stationary supplies like pens and notepads.
Transient combustibles are limited to Class "A" materials and small quantities of cleaning supplies incidental to Control Room Complex functions. This area shall not be used for any storage, as storage shall be limited to the peripheral rooms only. This does not include small quantities of items such as a ream of paper or stationary supplies like pens and notepads.
5.9   Fire Department (FD) Transient Combustibles Inspections 59.1  The FD performs a survey of transient combustibles in safety-related areas/rooms as part of their daily housekeeping inspections.
5.9 59.1 5.9.2 5.9.3 5.9.4 Fire Department (FD) Transient Combustibles Inspections The FD performs a survey of transient combustibles in safety-related areas/rooms as part of their daily housekeeping inspections.
5.9.2  The FD performs a survey of transient combustibles in non-safety-related areadrooms as part of their weekly housekeeping inspections.
The FD performs a survey of transient combustibles in non-safety-related areadrooms as part of their weekly housekeeping inspections.
5.9.3  Non-compliancesdiscovered will be documented using the notification process. v8106]
Non-compliances discovered will be documented using the notification process. v8106]
5.9.4  For Non-Safety Related Areas Only:
For Non-Safety Related Areas Only:
A. No combustible or flammable material should be stored in any non-safety related area of either Salem or Hope Creek Stations, unless the area contains a fire suppression system, due to insurance restrictions (NEIL Property Loss Prevention Standards). Exceptions to this requirement are based on a FD evaluation with implementation of compensatory measures.
A. No combustible or flammable material should be stored in any non-safety related area of either Salem or Hope Creek Stations, unless the area contains a fire suppression system, due to insurance restrictions (NEIL Property Loss Prevention Standards). Exceptions to this requirement are based on a FD evaluation with implementation of compensatory measures.
B. All wood used for maintenance activities should be fire retardant wood (performance rated Exterior Type per National Fire Protection Association
(performance rated Exterior Type per National Fire Protection Association
[NFPA] Standard 703).
[NFPA] Standard 703).
C. Introductionof combustibles considered to be excessive will be tracked by a Fire Protection Impairment Permit.
C. Introduction of combustibles considered to be excessive will be tracked by a Fire Protection Impairment Permit.
Common                             Page 12 of 22                               Rev.0
B. All wood used for maintenance activities should be fire retardant wood Common Page 12 of 22 Rev. 0  


4 L L ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025   (a) 5.10       Control of Flammable and Cornbustible Liquids and Gases 5.10.1    Storage or dispensing of flammable or combustible liquids shall be in accordance with NFPA Standard 30, the "Flammable and Combustible Liquids Code", unless an authority having jurisdiction (suchas the Nuclear Regulatory Commission (NRC) or the Nuclear Electric Insurance Limited (NEIL) grants exceptions or variances. All questions regarding compliance with NFPA 30 should be directed to the FD. [CD900X, CD-755)(1 5.10.2    Flammable and combustible liquids shall be handled carefully using the following guidelines: [CD=755X]
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (a) 5.10 5.10.1 5.1 0.2 5.10.3 5.40.4 Common Control of Flammable and Cornbusti ble Liquids and Gases Storage or dispensing of flammable or combustible liquids shall be in accordance with NFPA Standard 30, the "Flammable and Combustible Liquids Code", unless an authority having jurisdiction (such as the Nuclear Regulatory Commission (NRC) or the Nuclear Electric Insurance Limited (NEIL) grants exceptions or variances. All questions regarding compliance with NFPA 30 should be directed to the FD. [CD900X, CD-755)(1 Flammable and combustible liquids shall be handled carefully using the following guidelines: [CD=755X]
A. Kept in Factory Mutual (FM) or Underwriters Laboratory (UL) approved safety cans when in use, handled and/or dispensed. The only exception is when liquids remain in their original containers to maintain purity.
A. Kept in Factory Mutual (FM) or Underwriters Laboratory (UL) approved safety cans when in use, handled and/or dispensed. The only exception is when liquids remain in their original containers to maintain purity.
B. Flammable and combustible liquids when NOT in use are stored in FM or UL approved flammable liquid storage cabinets regardless of container.
B. Flammable and combustible liquids when NOT in use are stored in FM or UL approved flammable liquid storage cabinets regardless of container.
C. Proper electrical grounding and bonding are provided when dispensing.
C. Proper electrical grounding and bonding are provided when dispensing.
5.10.3    Portable Fuel Tanks A. Portable fuel tanks, or fuel tanks used for storage, require the following measures:
Portable Fuel Tanks A. Portable fuel tanks, or fuel tanks used for storage, require the following measures:
1, A capacity > 660 gallons requires a permit by the State of N.J.
1, A capacity > 660 gallons requires a permit by the State of N.J.
: 2. Contained within a dike capable of being drained frequently to remove accumulated rainwater or spills.
: 2. Contained within a dike capable of being drained frequently to remove accumulated rainwater or spills.
Line 1,960: Line 3,081:
: 4. Equipped with a lockable, automatic shutoff nozzle.
: 4. Equipped with a lockable, automatic shutoff nozzle.
: 5. Portable ABC type fire extinguisher provided.
: 5. Portable ABC type fire extinguisher provided.
B. If any of the above fire prevention measures are not met, a fire protection impairment permit is required along with possible compensatory measures.
impairment perm it is required along with possible compensatory measures.
5.40.4    Engineering is to assess and approve all permanent or temporary placements of flammable liquid storage cabinets and gas cylinders in safety-related areas of either Salem or Hope Creek. [CD-755X, CD-830A A. Requests for permanent placement of a cabinet in a SAFETY RELATED area made via N I Notification for engineering evaluation and approval.
B. If any of the above fire prevention measures are not met, a fire protection Engineering is to assess and approve all permanent or temporary placements of flammable liquid storage cabinets and gas cylinders in safety-related areas of either Salem or Hope Creek. [CD-755X, CD-830A A. Requests for permanent placement of a cabinet in a SAFETY RELATED area made via NI Notification for engineering evaluation and approval.
B. Requests for temporary placement of a cabinet in a SAFElY RELATED area are made via the Transient Combustible Permit process through the Fire Department.
B. Requests for temporary placement of a cabinet in a SAFElY RELATED area are made via the Transient Combustible Permit process through the Fire Department.
Common                                  Page 13 of 22                                 Rev. 0
Page 13 of 22 Rev. 0  


NCFP-AP.ZZ-0025 (Q) 5.1 0.5 Placement of flammable liquid cabinets in non-safety related areas is in accordance with the following:
NCFP-AP.ZZ-0025 (Q) 5.1 0.5 5.10.6 5.10.7 5.1 0.8 5.10.9 5.1 0.1 0 Common Placement of flammable liquid cabinets in non-safety related areas is in accordance with the following:
A. No more than 3 cabinets should be located in any one fire area.
A. No more than 3 cabinets should be located in any one fire area.
B. In large plant areas (ie Turbine Building) more than 3 cabinets may be installed provided each group of 3 cabinets is separated by at least 100.
B. In large plant areas (ie Turbine Building) more than 3 cabinets may be installed provided each group of 3 cabinets is separated by at least 100.
C. Ifthe area is fully sprinklered, up to 6 cabinets may be installed in a single area without 100' separation.
C. If the area is fully sprinklered, up to 6 cabinets may be installed in a single area without 100' separation.
5.10.6  Flammable liquid cabinets should be maintained in a neat orderly condition with all latches, hardware and hinges properly functioning.
Flammable liquid cabinets should be maintained in a neat orderly condition with all latches, hardware and hinges properly functioning.
5.10.7  The maximum atlowable quantity of Class I, It, and IllA liquids should not exceed 120 gallons per cabinet.
The maximum atlowable quantity of Class I, It, and IllA liquids should not exceed 120 gallons per cabinet.
5.10.8 NO storage of materials other than Class I, ll and MA liquid is permitted in a Flammable liquid cabinet.
NO storage of materials other than Class I, ll and MA liquid is permitted in a Flammable liquid cabinet.
5.10.9  Flammable Gas Cylinders A. Flammable gas cylinders in any safety-related area or room, regardless of the amount, shall NOT be left unattended for > 1 hour. [78111]
Flammable Gas Cylinders A. Flammable gas cylinders in any safety-related area or room, regardless of the amount, shall NOT be left unattended for > 1 hour. [78111]
B. Flammable gas cylinders in any safety-related area or room, regardless of the amount requires a TCP.
B. Flammable gas cylinders in any safety-related area or room, regardless of the amount requires a TCP.
: 1. An exception for the TCP would be when a Hot Work Permit ( H W ) is issued for the gas cylinders on a daily basis.
: 1. An exception for the TCP would be when a Hot Work Permit (HW) is issued for the gas cylinders on a daily basis.
: 2. The requirement to monitor flammable gas cylinders left for longer than one hour in a safety related area or room of the stations remains the same. [CD-830X, TS990325186J 5.10.10 Compressed Gas Cylinders A. Personnel working with compressed gas cylinders shall comply with the precautions as specified in desk guide: NC.PM-DG.77-0001 (Z) Storage and Handling of Compressed Gas Cylinders: [CD-;IS4X, CD-830XI B. Compressed Gas Cylinder Control Tags must be affixed to cylinder(s).
: 2. The requirement to monitor flammable gas cylinders left for longer than one hour in a safety related area or room of the stations remains the same. [CD-830X, TS990325186J Compressed Gas Cylinders A. Personnel working with compressed gas cylinders shall comply with the precautions as specified in desk guide: NC.PM-DG.77-0001 (Z) Storage and Handling of Compressed Gas Cylinders: [CD-;IS4X, CD-830XI B. Compressed Gas Cylinder Control Tags must be affixed to cylinder(s).
These tags should be maintained to match cylinder level (EMPTY, IN-USE, and FULL).
These tags should be maintained to match cylinder level (EMPTY, IN-USE, and FULL).
C. Compressed gas cylinders used for hot work with a valid daily hot work permit issued, are considered "in use". Those not in use will be treated as "storage" and shall         be left unattended for longer than one hour in safety related areas of the stations. [78111J D. Cylinders should contain a job information tag attached for identifying the owners. ~ S S S O S O SSO]
permit issued, are considered "in use". Those not in use will be treated as "storage" and shall safety related areas of the stations. [78111 J owners. ~SSSOSOSI SO]
I E. Cylinders should be kept in an Upright position, secured in specially manufactured holding devices, or to a cart or permanent structure by chain or double wrapped wire (minimum No. 9 gauge), to prevent them from falling or being knocked over.
manufactured holding devices, or to a cart or permanent structure by chain or double wrapped wire (minimum No. 9 gauge), to prevent them from falling or being knocked over.
Common                                Page 14 of 22                               Rev. 0
C. Compressed gas cylinders used for hot work with a valid daily hot work be left unattended for longer than one hour in D. Cylinders should contain a job information tag attached for identifying the E. Cylinders should be kept in an Upright position, secured in specially Page 14 of 22 Rev. 0  


NC.FP-AP.22-0025 (Q)
5.1 1 5.1 1.1 5.1 1.2 5.11.3 5.1 1.4 5.11.5 5.11.6 6.0 6.1 6.2 NC. F P-AP.22-0025 (Q)
F. Open cylinder valves slowly and close valves when work is complete or when personnel leave the area.
F. Open cylinder valves slowly and close valves when work is complete or when personnel leave the area.
G. Keep cylinders capped whenever regulator is removed, while moving a cylinder, or when cylinder is in storage.
G. Keep cylinders capped whenever regulator is removed, while moving a cylinder, or when cylinder is in storage.
H. Promptly return cylinders to the appropriate gas bottle storage areas upon completion of the work.
H. Promptly return cylinders to the appropriate gas bottle storage areas upon completion of the work.
: 1. All storage and issuance of compressed gas cylinders in the gas bottle storage areas should be In accordance with Compressed Gas Association Pamphlet P-1.
: 1.
All storage and issuance of compressed gas cylinders in the gas bottle storage areas should be In accordance with Compressed Gas Association Pamphlet P-1.
J. Warning signs are required in areas where the possibility of hydrogen leakage exists (Re-combiners, Waste Gas Compressors, Decay Tanks, and Turbine Generators) to prevent open flames or other sources of ignition within 35 feet of the hazard. [CD=173B]
J. Warning signs are required in areas where the possibility of hydrogen leakage exists (Re-combiners, Waste Gas Compressors, Decay Tanks, and Turbine Generators) to prevent open flames or other sources of ignition within 35 feet of the hazard. [CD=173B]
5.1 1  Aerosol Products 5.1 1.1 An aerosol is a product that is dlspensed from an aerosol container by a propellant.
Aerosol Products An aerosol is a product that is dlspensed from an aerosol container by a propellant.
5.1 1.2 The definition of aerosol does not apply to the storage or display of containers whose contents are composed entirely of liquid petroleum (LP) gas products.
The definition of aerosol does not apply to the storage or display of containers whose contents are composed entirely of liquid petroleum (LP) gas products.
A. Examples include MAP (methane, acetylene, propane) gas cylinders, propane gas cylinders, and butane gas cylinders.
A. Examples include MAP (methane, acetylene, propane) gas cylinders, B. Uses for these LP-gases might include small hand torches for brazing and An aerosol container is a metat can up to a maximum ske of 33.8 fluid ounces (1 000 ml) or a glass or plastic bottle up to a maximum size of 4 fluid ounces (1 18 ml).
B. Uses for these LP-gases might include small hand torches for brazing and soldering.
Storage and display of aerosols shall be In accordance with NFPA standard 308, Manufacture and Storage of Aerosol Products Code.
5.11.3  An aerosol container is a metat can up to a maximum ske of 33.8 fluid ounces (1000 ml) or a glass or plastic bottle up to a maximum size of 4 fluid ounces (118 ml).
Aerosols introduced into any safety related aredroom within the stations shall be limited to daily usage.
5.1 1.4 Storage and display of aerosols shall be In accordance with NFPA standard 308,Manufacture and Storage of Aerosol Products Code.
Daily usage of aerosols in safety related areas of Salem and Hope Creek Stations is considered transient combustibles and is required to be controlled accordingly.
5.11.5  Aerosols introduced into any safety related aredroom within the stations shall be limited to daily usage.
propane gas cylinders, and butane gas cylinders.
5.11.6  Daily usage of aerosols in safety related areas of Salem and Hope Creek Stations is considered transient combustibles and is required to be controlled accordingly.
soldering.
6.0    Records 6.1    Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.22-0011(Q), Records Management Program (NAP-11). [CD434E]
Records Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.22-0011 (Q), Records Management Program The FD, in accordance with NAP-1 1, shall retain transient combustible permits and logs pertaining to hot work permits and fire protection impairment permits. [CP434EJ (NAP-1 1). [CD434E]
6.2    The FD, in accordance with NAP-11, shall retain transient combustible permits and logs pertaining to hot work permits and fire protection impairment permits. [CP434EJ Common                               Page t5 of 22                               Rev. 0
Common Page t5 of 22 Rev. 0  


NC.FP-AP.22-0025 ( Q )
7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.1 I 7.12 7.13 7.14 7.1 5 Common NC.FP-AP.22-0025 (Q)
7.0    DEFlNITIONS 7.1    Aerosol - A product that is dispensed from an aersol container by a propellant,(NFPA 30B).
DEFl NITIONS Aerosol - A product that is dispensed from an aersol container by a propellant,(NFPA 30B).
7.2    Combustible Control Zone (CCZ) - An area of the plant in which transient combustible material@)is prohibited without a Temporary Combustible Permit (TCP) and appropriate compensatory measures.
Combustible Control Zone (CCZ) - An area of the plant in which transient combustible material@) is prohibited without a Temporary Combustible Permit (TCP) and appropriate compensatory measures.
7.3                          -
Combustible Liquid - A liquid having a flash point at or above 100" F (37.8' C).
Combustible Liquid A liquid having a flash point at or above 100" F (37.8' C).
Combustible Material - Materiat, which in the form it is used and under the conditions anticipated, WILL ignite, burn, support corn bustion, or release flammable vapors when subjected to fire and heat.
7.4                            -
Fines - very small particles in a mixture of various sizes.
Combustible Material Materiat, which in the form it is used and under the conditions anticipated, WILL ignite, burn, support cornbustion, or release flammable vapors when subjected to fire and heat.
Fire Barrier - Those construction elements (walls, floors, and their supports),
7.5            -
Fines very small particles in a mixture of various sizes.
7.6                  -
Fire Barrier Those construction elements (walls, floors, and their supports),
including beams, columns, penetration seals or closures, fire doors and dampers, that are rated by approving laboratories in hours of resistance to fire and used to prevent the spread of fire.
including beams, columns, penetration seals or closures, fire doors and dampers, that are rated by approving laboratories in hours of resistance to fire and used to prevent the spread of fire.
7.7    Fire Retardant Wood - Wood that has been treated with fire retardant chemicals and is performance rated Exterior Type per National Fire Protection Association Standard 703).
Fire Retardant Wood - Wood that has been treated with fire retardant chemicals and is performance rated Exterior Type per National Fire Protection Association Standard 703).
7.8                -
Flre Watch - An individual who has satisfactorily completed fire watch training and is designated by the FD for compensatory measure, hot work, or both fire watch type duties.
Flre Watch An individual who has satisfactorily completed fire watch training and is designated by the FD for compensatory measure, hot work, or both fire watch type duties.
Flammable Liquid - A liquid with a flash point below 100" F and a vapor pressure not exceeding 40 pounds per square inch absolute at 100" F. (Also known as a Class I liquid.)
7.9                        -
Hot Work - Work that involves ignition sources.
Flammable Liquid A liquid with a flash point below 100"F and a vapor pressure not exceeding 40 pounds per square inch absolute at 100" F. (Also known as a Class I liquid.)
ignition Source - Heat or flame from any source capable of igniting combustible or flammable material.
7.10              -
Impairment - Any condition affecting the intended operation of a fire protection system or barrier or posing as a fire hazard within the stations.
Hot Work Work that involves ignition sources.
Liquified Petroleum Gas (LP-Gas1 - Material having a vapor pressure not exceeding that allowed for commercial propane composed predominantly of the following hydrocarbons, either by themselves or as mixtures: propane, propylene, butane (normal butane or isobutene), butylenes (NFPA 58).
7.1 I  ignition Source - Heat or flame from any source capable of igniting combustible or flammable material.
Noncornbustlble Material - Material which, in the form it is used and under the conditions anticipated, will NOT ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.
7.12                -
Permanent - A condition with an indefinite period of time.
Impairment Any condition affecting the intended operation of a fire protection system or barrier or posing as a fire hazard within the stations.
Page 16 of 22 Rev. 0  
7.13                                        -
Liquified Petroleum G a s (LP-Gas1 Material having a vapor pressure not exceeding that allowed for commercial propane composed predominantly of the following hydrocarbons, either by themselves or as mixtures: propane, propylene, butane (normal butane or isobutene), butylenes (NFPA 58).
7.14                              -
Noncornbustlble Material Material which, in the form it is used and under the conditions anticipated, will NOT ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.
7.15  Permanent - A condition with an indefinite period of time.
Common                            Page 16 of 22                                 Rev. 0
 
A L L ACTIVE ON-THE-SPOT    CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (Q) 7.1 6      Safety Related Area - An area that contains systems and components required to shut down the reactor, mitigate the consequences of postulated accidents or maintain the reactor in a safe cold shutdown condition, 7.17      Sealed Container - A metal container sealed by means of a tightly fitting lid or other device so neither liquid nor vapors can escape at room temperature.
7.18                -
Storage The placing of items in a location and leaving them unattended until later use or disposal.
7.19                    -
Temporary planned time duration of no more than 60 days.
7.20                                -
Temporary Buildinas Any temporary structure or supported protective covering where personnel can move freely in and out of the structure.
7.21                                -
Temporary Enclosure Any supported protective covering where personnel cannot move in and out of the structure or where the protection is accomplished by draping the protective cover over the material and/or equipment. This definition also applies to temporary enclosures inside of permanent buildings.
7.22                            -
Temporary Fixture Something securely placed or attached as an appendage or as 8 structural part of a building (Le, door, portable steps, storage rack), constructed of a combustible material. This definition does not apply to furniture permanently installed in Station facilities.
7.23      Transient Combustible - Any combustible material introduced into a Safety-Related aredroom which will be used to complete an assigned task or left unattended for any period of time. It does not include items moved through areas in route to the final destination, unless the items are lef?un-monitored during transit.
 
==0.0        REFERENCES==


8.I       NC. NA4P.ZZ-0025 (a),Operational Fire Protection Program 8.2                            -
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (Q) 7.1 6 7.17 7.18 7.19 7.20 7.21 7.22 7.23 0.0
N.J.A.C. 570-2-10 New Jersey State Fire Code 8.3        Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, Fire -
: 8. I 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8,9 8.1 0 Safety Related Area - An area that contains systems and components required to shut down the reactor, mitigate the consequences of postulated accidents or maintain the reactor in a safe cold shutdown condition, Sealed Container -A metal container sealed by means of a tightly fitting lid or other device so neither liquid nor vapors can escape at room temperature.
Protection System 8.4                                        -
Storage - The placing of items in a location and leaving them unattended until later use or disposal.
Salem Fire Protection Report Fire Hazards Analysis 8.5        HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, Fire   -
Temporary - planned time duration of no more than 60 days.
Protection Program 8.6                                        -
Temporary Buildinas - Any temporary structure or supported protective covering where personnel can move freely in and out of the structure.
HCGS UFSAR, Appendix QA, Appendix R Comparison 8.7        Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July I,     1976 8.8        Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants 8,9        NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance, August 2 977 8.1 0      Occupational Safety and Health Standards Title 29, Chapter XVII, Part 1910.36FR 10466 Common                                 Page 17 of 22                                 Rev. 0
Temporary Enclosure - Any supported protective covering where personnel cannot move in and out of the structure or where the protection is accomplished by draping the protective cover over the material and/or equipment. This definition also applies to temporary enclosures inside of permanent buildings.
Temporary Fixture - Something securely placed or attached as an appendage or as 8 structural part of a building (Le, door, portable steps, storage rack), constructed of a combustible material. This definition does not apply to furniture permanently installed in Station facilities.
Transient Combustible - Any combustible material introduced into a Safety-Related aredroom which will be used to complete an assigned task or left unattended for any period of time. It does not include items moved through areas in route to the final destination, unless the items are lef? un-monitored during transit.
REFERENCES NC. NA4P.ZZ-0025 (a), Operational Fire Protection Program N.J.A.C. 570-2 New Jersey State Fire Code Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System Salem Fire Protection Report - Fire Hazards Analysis HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program HCGS UFSAR, Appendix QA, - Appendix R Comparison Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July I, 1976 Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance, August 2 977 Occupational Safety and Health Standards Title 29, Chapter XVII, Part 191 0.36FR 10466 Common Page 17 of 22 Rev. 0  


ALL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.ZZ-0025 (Q) 8.1 1     10CFR50 Appendix R, Fire Prot. Program for Nuclear Power Facilities Operating Prior to Jan. 1, 1979 8.12      NC.DE-PSZZ-0001(Q), Fire Protection Programmatic Standard 8.13                          -
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.ZZ-0025 (Q) 8.1 1 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.18.1 8.18.2 8.18.3 8.4 8.4 8.18.5 8.18.6 8.18.7 8.18.8 8,18.9 8.18.10 8.1 8.q I 8.18.13 8.18.14 8.1 8.15 8.18.16 8.19 8.19.1 8.19.2 8.19.3 8.19.4 8.1 9.5 8.19.6 8.18.12 8.1 8.1 7 10CFR50 Appendix R, Fire Prot. Program for Nuclear Power Facilities Operating Prior to Jan. 1, 1979 NC.DE-PSZZ-0001 (Q), Fire Protection Programmatic Standard IEEE Standard 634 - 1978 Hope Creek Station Generic Letter 86-10 Submittal, dated May 13, 1986 HC.DE-PS.ZZ-0021 (F), Hope Creek Penetration Seal Program SC.DE-PS.ZZ-O035(Q), Salem Penetration Seal Program National Fire Protection Association Standard 701, Standard Methods for Fire Tests for Flame Propagation of Textiles and Films Cross References NFPA 30 - Flammable Liquids Code, National Fire Protection Association (NFPA)
IEEE Standard 634 1978 8.14      Hope Creek Station Generic Letter 86-10 Submittal, dated May 13, 1986 8.15      HC.DE-PS.ZZ-0021 (F), Hope Creek Penetration Seal Program 8.16      SC.DE-PS.ZZ-O035(Q), Salem Penetration Seal Program 8.17      National Fire Protection Association Standard 701, Standard Methods for Fire Tests for Flame Propagation of Textiles and Films 8.18      Cross References 8.18.1              -
NFPA 30B - Code for the Manufacturer and Storage of Aerosol Products NFPA 58 - Liquefied Petroleum Gas Code NFPA 703 - Standard for Fire Retardant Impregnated Wood and Fire Retardant Coatings for Building Materials Compressed Gas Association Pamphlet P-I, Safe Handling of Compressed Gases in Containers.
NFPA 30 Flammable Liquids Code, National Fire ProtectionAssociation (NFPA) 8.18.2    NFPA 30B - Code for the Manufacturer and Storage of Aerosol Products 8.18.3              -
Property Loss Prevention Standards of Nuclear Generating Stations - Nuclear Services Organization (NSO).
NFPA 58 Liquefied Petroleum Gas Code 8.4 8.4                -
NC.NA-AP.Z&0008(Q), Configuration Control Program NC.NA-AP.ZZ-0011 (a), Records Management Program (NAP-I 1)
NFPA 703 Standard for Fire Retardant Impregnated Wood and Fire Retardant Coatings for Building Materials 8.18.5    Compressed Gas Association Pamphlet P-I , Safe Handling of Compressed Gases in Containers.
MC. DE-AP.Z-O030(Q), Control of Temporary Modifications SC.FP.AP.ZZ-O003(Q), Actions for Inoperable Fire Protection - Salem HC. FP-AP.Z4004(Q), Actions For Inoperable Fire Protection-Hope Creek NC. FP-AP.ZZ-O005(Q), Fire Surveillance and Periodic Test Program NC. Ff-AP.ZZ-0009(Q), Fire Department Training Program NC. FP-AP.ZZ-OOlO(Q), Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work NC. FP-AP.ZZ-Q020(Q), Compensatory Measure Fire Watch Program NC.PM-DG.Z-0001 (Z) Storage and Handling of Compressed Gas Cylinders Commitment Documents: - Hope Creek CD-156A (NRC El Circular 80-09) (See FPAP-12)
8.18.6                                                                      -
CD-1736 (INPO SOER 82-09)
Property Loss Prevention Standards of Nuclear Generating Stations Nuclear Services Organization (NSO).
CD-174B (SOER 82-1OR02,04,07)
8.18.7    NC.NA-AP.Z&0008(Q), Configuration Control Program 8.18.8    NC.NA-AP.ZZ-0011 (a),Records Management Program (NAP-I 1) 8,18.9    MC. DE-AP.Z-O030(Q), Control of Temporary Modifications 8.18.10 SC.FP.AP.ZZ-O003(Q), Actions for Inoperable Fire Protection - Salem 8.18.qI HC.FP-AP.Z4004(Q), Actions For Inoperable Fire Protection- Hope Creek 8.18.12 NC. FP-AP.ZZ-O005(Q), Fire Surveillance and Periodic Test Program 8.18.13 NC. Ff-AP.ZZ-0009(Q), Fire Department Training Program 8.18.14 NC. FP-AP.ZZ-OOlO(Q), Fire Protection Impairment Program 8.1 8.15 NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work 8.18.16 NC.FP-AP.ZZ-Q020(Q), Compensatory Measure Fire Watch Program 8.1 8.1 7 NC.PM-DG.Z-0001 (Z) Storage and Handling of Compressed Gas Cylinders 8.19                                  -
CD-226C (NRC IE Bulletin 75-04A)
Commitment Documents: Hope Creek 8.19.1    CD-156A (NRC El Circular 80-09) (See FPAP-12) 8.19.2    CD-1736 (INPO SOER 82-09) 8.19.3    CD-174B (SOER 82-1OR02,04,07) 8.19.4    CD-226C (NRC IE Bulletin 75-04A) 8.19.5    CD300X (FSAR 8.1.4.14.3.1) 8.19.6    CD317Y (FSAR Q 430.85(B))
CD300X (FSAR 8.1.4.14.3.1)
Common                               Page 18 of 22                             Rev. 0
CD317Y (FSAR Q 430.85( B))
Common Page 18 of 22 Rev. 0  


ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (Q) 8.1 9.7   CD-426X (FSAR 9.1 .I .3.2) 8.19.8    CD-434E (IR 86-062) (LER 86-062) 8.19.9    CD-438A (INPO SER 055-81) 8.19.10  CD-463Y (FSAR Appendix 9A.6.5) 8.19.11  CD-531A (INPO SER 4682) 8.19.12  CD-643A (INPO O&MR 64) 8.19.13  CD-6524(INPO O&MR 73) {See FPAP-12) 8.19.14  CD482D (INPO SER 01-85) (See FPAP-12) 8.19.15  CD-753X (FSAR 9.5.1. I.IO) 8.19.16  CD-754X {FSAR 9.5.1.1.11) 8.19.17  CD-755X (FSAR 9.5.1. I.I3) 8.1 9.1 8 CD-764E (NHO IR 86-274) 8.1 9.1 9 CD-791X (FSAR 9.5.1.2.32) 8.19.20  CD-807X (FSAR Appendix 9A.III.K) 8.19.21  CD-821X (FSAR 9.5.1.5.3) 8.19.22  CD-830X (BTP CMEB 9.5-1 ,~.8.1) 8.19.23  CD-939F (NRC OPEN 354/88-18-F1) 8.20      Closing Documents - Salem 8.20.1    C0403 (NRC-INFO 89-04) 8.20.2    C0549 (SR 272/92-8) (See FPAP-IO) 8.21                              -
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (Q) 8.1 9.7 8.19.8 8.19.9 8.1 9.10 8.19.11 8.19.12 8.19.13 8.19.14 8.19.15 8.19.16 8.19.17 8.1 9.1 8 8.1 9.1 9 8.1 9.20 8.19.21 8.19.22 8.19.23 8.20 8.20.1 8.20.2 8.21 8.21.I 8,21.2 8.21.3 CD-426X (FSAR 9.1.I  
Commitment Documents Engineering 8.21.I 78105 (Appendix A to BTP APSCB 9.5-1, Section 8.2) 8,21.2    78111 (Letter from PSE&G to NRC, 07/26/78) 8.21.3    84220 (Memo from Vargas to PSE&G, 03/23/84)
.3.2)
Common                             Page 19 of 22
CD-434E (IR 86-062) (LER 86-062)
CD-438A (INPO SER 055-81)
CD-463Y (FSAR Appendix 9A.6.5)
CD-643A (INPO O&MR 64)
CD-6524 (INPO O&MR 73) {See FPAP-12)
CD482D (INPO SER 01-85) (See FPAP-12)
CD-531A (INPO SER 4682)
CD-753X (FSAR 9.5.1. I.
IO)
CD-754X {FSAR 9.5.1.1.11)
CD-755X (FSAR 9.5.1. I.I
: 3)
CD-764E (NHO IR 86-274)
CD-791X (FSAR 9.5.1.2.32)
CD-807X (FSAR Appendix 9A.III.K)
CD-821X (FSAR 9.5.1.5.3)
CD-830X (BTP CMEB 9.5-1,~.8.1)
CD-939F (NRC OPEN 354/88-18-F1)
Closing Documents - Salem C0403 (N RC-I N FO 89-04)
C0549 (SR 272/92-8) (See FPAP-IO)
Commitment Documents - Engineering 781 05 (Appendix A to BTP APSCB 9.5-1, Section 8.2) 781 11 (Letter from PSE&G to NRC, 07/26/78) 84220 (Memo from Vargas to PSE&G, 03/23/84)
Common Page 19 of 22  


NC.FP-AP.22-0025 (Q)
NC.FP-AP.22-0025 (Q)
Reference Drawings: 605810,6O5811,605812,605813,605815,605816,& 605817 Common                           Page 20 of 22                       Rev. 0
Reference Drawings: 605810,6O5811,605812,605813,605815,605816, & 605817 Common Page 20 of 22 Rev. 0  


ALL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025   (4)
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (4)
TABLE 2 COMMON TRANSIENT COMBUSTIBLES I ESTIMATED HEAT CONTENT Acetylene                                     20,800 BTUllh MC Size Cyiinder           (4" D x 12'' H) = 36 Ibs B Size Cylinder             (6"Dx 19"H)     = 2ibs R Size Cylinder             (7"Dx 25"f-f) =   3Ibs Common size acetylene cylinders found on site:    S Size Cylinder           (IO"D x 30" H) = 15 Ibs M Size Cylinder           (12"Dx 36" H) = 18 ibs L Size Cylinder           (12"D x 39"H) = 24 Ibs Cable insulation                              12,000 BTUllb Cardboard                                  6,000 BTUllb Charcoal                                  13,000 BTUllb I6,000 STlJllb Clothlcloih pcs
TABLE 2 COMMON TRANSIENT COMBUSTIBLES I ESTIMATED HEAT CONTENT Acetylene Common size acetylene cylinders found on site:
( I PC = ?4 LB or 8,000 STUs)
Cable insulation Cardboard Charcoal Clothlcloih pcs Combustible liquid Dry ion resins Fiberglass ladder (6')
Combustible liquid                            160,000 BTU/gal Dry ion resins                              12,000 BTUAb 32,000BTU/ea Fiberglass ladder (6')
Flammable liquid Paper Plastic Rubber Titanium Wood 20,800 BTUllh MC Size Cyiinder (4" D x 12'' H) = 36 Ibs B Size Cylinder (6"Dx 19"H) =
( I foot = 5,333 BTUs)
2ibs R Size Cylinder (7"Dx 25"f-f) =
Flammable liquid                            90,000 BTUlgaI 8,000 BTUllb or 453,000 BTUlcu. ft.
3Ibs S Size Cylinder (IO" D x 30" H) = 15 Ibs M Size Cylinder (12"Dx 36" H) = 18 ibs L Size Cylinder (12" D x 39" H) = 24 Ibs 12,000 BTUllb 6,000 BTUllb 13,000 BTUllb I
Paper                  (7 case of copier paper = 4 I 6,000 B TUs) 20,000 BTUAb Plastic            ( I sheet of herculite - 50'x 50' = 50,000 BTUs) 10,000BTU/lb Rubber                      (1 - 35'' hose, 50' = 50,000BTUs)
6,000 STlJll b
Titanium                                  8,500 BTUlLB 9,000 BTUllb or 414,000 BTU/cu. ft.
( I PC = ?4 LB or 8,000 STUs) 160,000 BTU/gal 12,000 BTUAb 32,000 BTU/ea
Wood                              -
( I foot = 5,333 BTUs) 90,000 BTUlgaI 8,000 BTUllb or 453,000 BTUlcu. ft.
(f plank 2"x 6 " x IO' = 277,500 BTUs)
(7 case of copier paper = 4 I 6,000 B TUs) 20,000 BTUAb
Common                           Page 21 of 22                                 Rev. 0
( I sheet of herculite - 50'x 50' = 50, 000 BTUs) 10,000 BTU/lb (1 - 35'' hose, 50' = 50,000 BTUs) 8,500 BTUlLB 9,000 BTUllb or 41 4,000 BTU/cu. ft.
(f plank - 2"x 6"x IO' = 277,500 BTUs)
Common Page 21 of 22 Rev. 0  


NC.FP-AP.22-0025 (Q)
NC.FP-AP.22-0025 (Q)
FORM I TRANSIENT COMBUSTIBLE PERMIT II         COM BUSTISLES         I ESTIMATED HEAT CONTENT         I TOTAL BTU's FLAMMABLE LIQUID               90,000 BTUlGALLON COMBUSTIBLE LIQUID or GREASE         160,000BTU/GALLON CHARCOAL                   13,000 BTUPOUND FIBERGLASS LADDER         5,333 BTU/FOOT OF LADDER CABLE INSULATION               12,000 BTUFOUND CARDBOARD                     6,000 BTUlPOUND PAPER I         8,000 BTU/POUND (453,000 BTUlCUBIC FOOT)     I I      CLOTH and CLOTH PCs 16,000 BTU/POUND 1PC = % POUND 20,000 BTUlPOUND 9,000BTUlPound WOOD (414,000 BTU/Cubic Foot)
FORM I TRANSIENT COMBUSTIBLE PERMIT II COM BUSTISLES I ESTIMATED HEAT CONTENT I TOTAL BTU's FLAMMABLE LIQUID 90,000 BTUlGALLON 160,000 BTU/GALLON COMBUSTIBLE LIQUID or GREASE CHARCOAL 13,000 BTUPOUND FIBERGLASS LADDER 5,333 BTU/FOOT OF LADDER CABLE INSULATION 12,000 BTUFOUND CARDBOARD 6,000 BTUlPOUND I
DRY ION RESlNS                 12,000 BTU/Pound TITANIUM                     8,500 BTWPound I           ACETYLENE                     20,300BTUlPound A               OTHER           I       Contact FIRE DEPT.     I Engineering Assessment Needed   0 Yes       No   Approved     Yes   No Completed By                                     Date TCP #                                             Total BTUs
8,000 BTU/POUND I
[       REMOVE ALL TRANSIENT COMBUST18tES UPON JOB COMPLT!ON Common                         Page 22 of 22                           Rev. 0
(453,000 BTUlCUBIC FOOT)
PAPER 16,000 BTU/POUND 1PC = % POUND CLOTH and CLOTH PCs I
20,000 BTUlPOUND 9,000 BTUlPound (414,000 BTU/Cubic Foot)
DRY ION RESlNS 12,000 BTU/Pound TITANIUM 8,500 BTWPound WOOD I
ACETYLENE 20,300 BTUlPound A
OTHER I
Contact FIRE DEPT.
I Engineering Assessment Needed 0 Yes No Approved Yes No Completed By Date TCP #
Total BTUs
[
REMOVE ALL TRANSIENT COMBUST18tES UPON JOB COMPLT!ON Common Page 22 of 22 Rev. 0  


ALL ACTIVE ON-THE-SPOT       CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG Internal Use Only Pacre 1 of 1 I
!        PSEG Internal Use Only                                                             Pacre 1 of 1 I                                     PSEG NUCLEAR FIRE DEPARTMENT I
PSEG NUCLEAR FIRE DEPARTMENT I
NC.FP-AP.ZZ-0012(4) Revision 0 SAFE PERFORMANCE OF HOT WORK Sponsor Organization: Emergency Services - Fire Department I         REVISION  
NC.FP-AP.ZZ-0012(4) - Revision 0 SAFE PERFORMANCE OF HOT WORK Sponsor Organization: Emergency Services - Fire Department I
 
REVISION SUM MARY:
==SUMMARY==
: 1. This is a new procedure. This change is in support of revision number 6 to administrative procedure NC. NA-AP.ZZ-O025(Q), Operational Fire Protection Program. (80035483).
: 1. This is a new procedure. This change is in support of revision number 6 to administrative procedure NC.NA-AP.ZZ-O025(Q), Operational Fire Protection Program. (80035483).
NAAP-25 is being revised to focus on high level process concepts, resulting in relocation of some process description detait and the associated forms, tables, and attachments to other lower tier documents.
NAAP-25 is being revised to focus on high level process concepts, resulting in relocationof some process description detait and the associated forms, tables, and attachments to other lower tier documents.
: 2. This revision represents a significant editorial incorporation of the NAAP-25 Hot Work Program into a new stand alone procedure. The NAAP-25 sections utilized to create this procedure were primarily:
: 2. This revision represents a significant editorial incorporation of the NAAP-25 Hot Work Program into a new stand alone procedure. The NAAP-25 sections utilized to create this procedure were primarily:
0                                     -
0 0
5.5, Control of Ignition Sources Hot Work 0    5.8, ignitable Metals
5.8, ignitable Metals 5.5, Control of Ignition Sources - Hot Work
: 3. The associated NAAP-25 Hot Work forms,tables, and attachments have been relocated to this procedure.
: 3. The associated NAAP-25 Hot Work forms, tables, and attachments have been relocated to this procedure.
: 4. This revision meets the requirements of the biennial review.
: 4. This revision meets the requirements of the biennial review.
IMPLEMENTING REQUIREMENTS                                 Effective On:     I ,/ 2 8 / 03 Manager Emergency Services
IMPLEMENTING REQUIREMENTS Effective On:
I,/ 2 8 / 0 3
Manager - Emergency Services  


I ALL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.22-0012 (a)
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.22-0012 (a)
I                                 SAFE PERFORMANCE OF HOT WORK SECTION TITLE                                                           PAGE 1.Q   Purpose                                                         2 2.0   Scope                                                           2 3.0   Responsibilities                                                 2 4.0   Hot Work Process Overview                                       3 4.1     Hot Work                                                 3 4.2     General                                                 3 4.3     High Risk Hot Work                                       4 4.4     Ignitable Metals                                         4 4.5    Electromagnetic I Radio Frequency Interference          5 4.6     Exceptions                                               5 5.0   Approval Process                                                 5 6.0   Records                                                         7 7.0   References                                                       8 Table I Ignitable Metals - Salem                                         9 Table 2  lgnitable Metals - Hope Creek                                   11 Form 1  Hot Work Permit                                                12 Form 2  Hot Work Authorization Log                                     14 WCLEAR COMMON                         Page 1 of 14                     Rev. 0
I I
SAFE PERFORMANCE OF HOT WORK SECTION TITLE 1.Q Purpose 2.0 Scope 3.0 Responsibilities 4.0 Hot Work Process Overview 4.1 Hot Work 4.2 General 4.3 High Risk Hot Work 4.4 Ignitable Metals 4.5 4.6 Exceptions 5.0 Approval Process Electromagnetic I Radio Frequency Interference 6.0 Records 7.0 References Table I Table 2 Form 1 Hot Work Permit Form 2 Ignitable Metals - Salem lgnitable Metals - Hope Creek Hot Work Authorization Log PAGE 2
2 2
3 3
3 4
4 5
5 5
7 8
9 11 12 14 WCLEAR COMMON Page 1 of 14 Rev. 0  


ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.22-0012     (a) 1.o      PURPOSE Provide a method and instruction for preparing, authorizing, and tracking Hot Work Permits, to control and limit the introduction of potential fire hazards into plant areas. [CD-300)(3 2.0      SCOPE 2.I      This procedure applies to the performance of hot work in the Salem 1 and 2 Stations, the Hope Creek Generating Station, and associated out buildings.
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 1.o 2.0
2.2      Implementation of this procedure provides a log of the areas where hot work has been authorized including High Risk jobs and hot work in approved fab shops.
: 2. I 2.2 2,3 2.4 3.0 3.1 3.1.I 3.1.2 3.1.3 3.1.4 3.1.5 3.2 3.2. I 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 NC.FP-AP.22-0012 (a)
2,3                                                              -
PURPOSE Provide a method and instruction for preparing, authorizing, and tracking Hot Work Permits, to control and limit the introduction of potential fire hazards into plant areas. [CD-300)(3 SCOPE This procedure applies to the performance of hot work in the Salem 1 and 2 Stations, the Hope Creek Generating Station, and associated out buildings.
This procedure ensures that the Emergency Services Fire Department (FD) duty Nuclear Fire Protection Supervisor (NFPS) is aware of all hot work jobs, possible fire hazards and their effect on station safety.
Implementation of this procedure provides a log of the areas where hot work has been authorized including High Risk jobs and hot work in approved fab shops.
2.4      This procedure also allows for the tracking of flammable compressed gas cylinders utilized for hot work.
This procedure ensures that the Emergency Services - Fire Department (FD) duty Nuclear Fire Protection Supervisor (NFPS) is aware of all hot work jobs, possible fire hazards and their effect on station safety.
3.0      RESPONSIBILITIES 3.1      Nuclear Fire Protection Supervisor (NFPS) or designee 3.1.I    Compile information on the hot work permit ( H W ) log prior to authorizing a permit.
This procedure also allows for the tracking of flammable compressed gas cylinders utilized for hot work.
3.1.2    Authorize Hot Work Permit.
RESPONSIBILITIES Nuclear Fire Protection Supervisor (NFPS) or designee Compile information on the hot work permit ( H W ) log prior to authorizing a permit.
3.1.3    Maintain log of authorized hot work perm its.
Authorize Hot Work Permit.
3.1.4    Recognize the extent of hot work jobs in progress during his shift.
Maintain log of authorized hot work perm its.
3.1.5    Inspect and authorize high risk hot work jobs.
Recognize the extent of hot work jobs in progress during his shift.
3.2      Job Supervisor 3.2. I  Ensure their personnel are trained and qualified to perform hot work.
Inspect and authorize high risk hot work jobs.
3.2.2    Prepare their jobsite in accordance with the H W .
Job Supervisor Ensure their personnel are trained and qualified to perform hot work.
3.2.3    Inspect their jobsite prior to requesting a HWP number.
Prepare their jobsite in accordance with the H W.
3.2.4    Maintain their jobsite in accordance with the HWP.
Inspect their jobsite prior to requesting a HWP number.
3.2.5    Ensure precautions are taken regarding work practices that have the potential to generate electromagnetic interference and radio frequency interference 3.2.6    Notify the OS/CRS of the affected station prior to welding in the vicinity of a Radiation Monitor System (RMS) component 0   Spiking of the RMS may result, causing unexpected alarms of the RMS.
Maintain their jobsite in accordance with the HWP.
Ensure precautions are taken regarding work practices that have the potential to generate electromagnetic interference and radio frequency interference Notify the OS/CRS of the affected station prior to welding in the vicinity of a Radiation Monitor System (RMS) component 0
Spiking of the RMS may result, causing unexpected alarms of the RMS.
[TS980622174].
[TS980622174].
3.2.7    Assign qualified firewatch to the hot work job site.
Assign qualified fire watch to the hot work job site.
0   Additional firewatch may be assigned due to sparks or slag streams affecting adjacent fire areas or elevations.
0 Additional firewatch may be assigned due to sparks or slag streams affecting adjacent fire areas or elevations.
NUCLEAR COMMON                             Page 2 of 14                           Rev. 0
NUCLEAR COMMON Page 2 of 14 Rev. 0  


4LL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-AP.22-0012 ( Q )
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-AP.22-0012 (Q) 3.2.8 3.2.9 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.0
3.2.8    Terminate work activities properly to ensure that flammable compressed gas cylinders are not left unattended.
: 4.
3.2.9    Ensure fire watch remains for 30 minutes after hot work is completed.
A 4.1.I 4.1.2 4.1.3 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 Terminate work activities properly to ensure that flammable compressed gas cylinders are not left unattended.
3.3      Hot Work Fire Watchers:
Ensure fire watch remains for 30 minutes after hot work is completed.
3.3.1    Present and observant at all times of the work being performed and the surrounding area.
Hot Work Fire Watchers:
3.3.2    Ensure that the work area is maintained as described on the HWP Inspection at all times while hot work is being performed.
Present and observant at all times of the work being performed and the surrounding area.
3.3.3    Notify the control room immediately of any fire occurring after ensuring the safety of their co-workers.
Ensure that the work area is maintained as described on the HWP Inspection at all times while hot work is being performed.
3.3.4    Extinguish fires within the capabilities of their training after the fire has been reported.
Notify the control room immediately of any fire occurring after ensuring the safety of their co-workers.
3.3.5    Remain at their post fur 30 minutes following the last hot work.
Extinguish fires within the capabilities of their training after the fire has been reported.
4.0      HOT WORK PROCESS OVERVIEW 4.A      Hot Work 4.1.I    Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered Hot Work.
Remain at their post fur 30 minutes following the last hot work.
4.1.2    Hot work is a fire watch required activity.
HOT WORK PROCESS OVERVIEW Hot Work Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered Hot Work.
4.1.3    A Hot Work Permit (HWP)shall control work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering. [CD*226C, CD300X, CD-317YsCD-754X, CD-SZlXJ 4.2      General 4.2.1    Daily Hot Work permits are valid for the one calendar day in which they are issued.
Hot work is a fire watch required activity.
4.2.2    Annual hot work permits, with specific numbers, are issued individually for each approved shop facility on site for compliance with the New Jersey State Uniform Fire Code.
A Hot Work Permit (HWP) shall control work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering. [CD*226C, General Daily Hot Work permits are valid for the one calendar day in which they are issued.
4.2.3    Fire watch are not required in shops where wetding and work involving ignition sources are routinely performed or in yard areas where no flammable or combustible materials are located within 35 feet of the hot work.
Annual hot work permits, with specific numbers, are issued individually for each approved shop facility on site for compliance with the New Jersey State Uniform Fire Code.
4.2.4    Separate Hot Work tracking logs should be established for the Hope Creek and Salem stations.
Fire watch are not required in shops where wetding and work involving ignition sources are routinely performed or in yard areas where no flammable or combustible materials are located within 35 feet of the hot work.
4.2.5    The NFPS should review the logs at the beginning of each operating shift to become familiar with hot work that has been authorized for the shift and what detection zones may be affected.
Separate Hot Work tracking logs should be established for the Hope Creek and Salem stations.
4.2.6    Hot work requires the fire watch to be maintained for 30 minutes after hot work is completed or suspended, to ensure the work area is safe from fire.
The NFPS should review the logs at the beginning of each operating shift to become familiar with hot work that has been authorized for the shift and what detection zones may be affected.
NUCLEAR COMMON                           Page 3 of 34                               Rev. 0
Hot work requires the fire watch to be maintained for 30 minutes after hot work is completed or suspended, to ensure the work area is safe from fire.
CD300X, CD-317Ys CD-754X, CD-SZlXJ NUCLEAR COMMON Page 3 of 34 Rev. 0  


4LL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 4.2.7   Fire watch is responsible for monitoring the work area, including levels below floor grating and floor openings.
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 4.2.7 4.2.8 4.3 Hiqh Risk Hot Work 4.3. I 4.3.2 4.3.3 Fire watch is responsible for monitoring the work area, including levels below floor grating and floor openings.
4.2.8    A portable fire extinguisher, inspected within the previous 30 days, is required for the hot work job.
A portable fire extinguisher, inspected within the previous 30 days, is required for the hot work job.
4.3      Hiqh Risk Hot Work 4.3.I    Hot Work activities will b e defined as H1GH RISK if certain criteria are met.
Hot Work activities will be defined as H1GH RISK if certain criteria are met.
4.3.2    HIGH RISK hot work activities will require additional administrative controls and supervisory oversight, beyond the normal hot work controls.
HIGH RISK hot work activities will require additional administrative controls and supervisory oversight, beyond the normal hot work controls.
4.3.3    The following hot work activities are considered HIGH RISK:
The following hot work activities are considered HIGH RISK:
Work on tanks, vessels or piping that contained, or had contained combustible or flammable chemicals, solvents, gases, etc.
Work on tanks, vessels or piping that contained, or had contained combustible or flammable chemicals, solvents, gases, etc.  
                  + Work in areas identified as having hydrogen as part of equipment or processes.
+ Work in areas identified as having hydrogen as part of equipment or processes.
Use of arc gouging or plasma arc welding which produce copious amounts of heat, with molten slag and sparks.
Use of arc gouging or plasma arc welding which produce copious amounts of heat, with molten slag and sparks.
Work in cable shafts, filter housings, or ventilation ductwork Work in Hope Creek Drywell [CD-682-D].
Work in cable shafts, filter housings, or ventilation ductwork Work in Hope Creek Drywell [CD-682-D].
0   Work on equipment containing combustible (ignitable) metals, which are listed in Table Iand 2 of this procedure 4.4      lgnit ab1e Metals 4.4.1    Ignitable metals utilized at Salem and Hope Creek Stations are identified in Tab!e 1 and Table 2.
0 Work on equipment containing combustible (ignitable) metals, which are listed in Table I and 2 of this procedure lgni t ab1 e Metals Ignitable metals utilized at Salem and Hope Creek Stations are identified in Tab!e 1 and Table 2.
4.4.2    The following precautions apply when working on or in proximity of equipment containing ignitable metals:
The following precautions apply when working on or in proximity of equipment containing ignitable metals:
Metals are considered potentially combustible whenever exposed.
4.4 4.4.1 4.4.2 Metals are considered potentially combustible whenever exposed.
Notify the Fire Department (FD) of work activities involving ignitable metals prior to the exposure of the metal.
Notify the Fire Department (FD) of work activities involving ignitable metals prior to the exposure of the metal.
Class D fire extinguisher (identified by a yellow star with a D, located on the extinguisher body), is readily available.
Class D fire extinguisher (identified by a yellow star with a D, located on the extinguisher body), is readily available.
Line 2,159: Line 3,305:
Metal fines produced from combustible metals, increase the hazard potential because they act like kindling.
Metal fines produced from combustible metals, increase the hazard potential because they act like kindling.
Proper cleanup and removal of accumulations of metal fines, produced in such operations as band saw cutting, are essential for fire prevention and safety.
Proper cleanup and removal of accumulations of metal fines, produced in such operations as band saw cutting, are essential for fire prevention and safety.
NUCLEAR COMMON                           Page 4 of 14                           Rev. 0
NUCLEAR COMMON Page 4 of 14 Rev. 0  


4LL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 4.5      ElectromagneticI Radio Frequency Interference 4.5.1    Plant areas susceptible to electromagnetic interference (EMI) and radio frequency interferenceare listed in NC.NA-AP.ZZ-O005(Q) (NAAP3), Station Operating Practices.
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 4.5 4.5.1 4.5.2 4.5.3 4.6 4.6.1 4.6.2 5.0 5.1 5.2 NC.FP-AP.ZZ-0012 (Q)
4.5.2    Prior to commencing electric arc welding in plant areas susceptible to EM1 or RFI, the job supervisor should ensure work practice precautions and Main Control Room notifications have been addressed in accordance with NAAP-5.
Electromagnetic I Radio Frequency Interference Plant areas susceptible to electromagnetic interference (EMI) and radio frequency interference are listed in NC.NA-AP.ZZ-O005(Q) (NAAP3), Station Operating Practices.
4.5.3  Hot Work Permit (Form 'I)provides the job supervisor with the direction to inspect the work area against the precautions for EMI and RFI.
Prior to commencing electric arc welding in plant areas susceptible to EM1 or RFI, the job supervisor should ensure work practice precautions and Main Control Room notifications have been addressed in accordance with NAAP-5.
4.6      Exceptions 4.6.1    Work involving wire wheeling, needle gun use, or hot iron soldering is N a a fire watch required activity and a HWP is not required. However precautions identified in this procedure for hot work activities should be taken to ensure a fire safe work area.
Hot Work Permit (Form 'I) provides the job supervisor with the direction to inspect the work area against the precautions for EMI and RFI.
4.6.2  Equipment for pre-heating such as Cooper Heat (trade mark) resistance heaters, or similar devices, is not ordinarily considered Hot Work.
Exceptions Work involving wire wheeling, needle gun use, or hot iron soldering is N a a fire watch required activity and a HWP is not required. However precautions identified in this procedure for hot work activities should be taken to ensure a fire safe work area.
e   At the discretion of the NFPS, formal Hot Work administrative controls may be required.
Equipment for pre-heating such as Cooper Heat (trade mark) resistance heaters, or similar devices, is not ordinarily considered Hot Work.
II The job supervisor is not exempt from enforcing the intent of maintaining any work area in good housekeeping condition.
e At the discretion of the NFPS, formal Hot Work administrative controls may be required.
II The job supervisor is not exempt from enforcing the intent of maintaining any work area in good housekeeping condition.
At the discretion of the job supervisor, formal Hot Work administrative controls may be requested. If any uncertainty exists, regarding the nature of the work activity, the job supervisor should review the activity with the NFPS.
At the discretion of the job supervisor, formal Hot Work administrative controls may be requested. If any uncertainty exists, regarding the nature of the work activity, the job supervisor should review the activity with the NFPS.
5.0    APPROVAL PROCESS 5.1    Prior to requesting a HWP, the job supervisor should ensure that all of the inspection criteria on the HWP have been satisfied and the job site inspected.
APPROVAL PROCESS Prior to requesting a HWP, the job supervisor should ensure that all of the inspection criteria on the HWP have been satisfied and the job site inspected.
5.2      FD personnel develop and record the following baseline information fields in the Hot Work Authorization (HWA) Log:
FD personnel develop and record the following baseline information fields in the Hot Work Authorization (HWA) Log:
e   Job location.
e Job location.
Work order number.
Work order number.
a   Type of work (including use of flammable compressed gas cylinders).
a Type of work (including use of flammable compressed gas cylinders).
a   Responsible supervisor and telephone extension.
a Responsible supervisor and telephone extension.
e   Affected detection zones.
e Affected detection zones.
Time and date of authorization.
Time and date of authorization.
NUCLEAR COMMON                           Page 5 of 14                           Rev. 0
NUCLEAR COMMON Page 5 of 14 Rev. 0  


ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 5.3     Evaluate For HIGH RlSK 5.3.1   FD personnel evaluate the hot work activity request against the following HIGH RISK criteria, prior to providing the hot work authorization number:
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.4 5.4.1 Evaluate For HIGH RlSK FD personnel evaluate the hot work activity request against the following HIGH RISK criteria, prior to providing the hot work authorization number:
0   Work on tanks, vessels or piping that contained, or had contained combustible or flammable chemicals, solvents, gases, etc.
0 Work on tanks, vessels or piping that contained, or had contained combustible or flammable chemicals, solvents, gases, etc.
0   Work in areas identified as having hydrogen as part of equipment or processes.
0 Work in areas identified as having hydrogen as part of equipment or processes.
0   Use of arc gouging or plasma arc welding which produce copious amounts of heat, with molten slag and sparks.
0 Use of arc gouging or plasma arc welding which produce copious amounts of heat, with molten slag and sparks.
0   Work in cable shafts, filter housings, or ventilation ductwork 0   Work in Hope Creek Drywell [CD-68Z-D].
0 Work in cable shafts, filter housings, or ventilation ductwork 0 Work in Hope Creek Drywell [CD-68Z-D].
0   Work on equipment containing combustible metals, which are listed in Table Iand 2 of this procedure.
0 Work on equipment containing combustible metals, which are listed in Table I and 2 of this procedure.
5.3.2  IF the job is HIGH RISK, THEN no authorization number will be provided until after the job site is inspected by the Fire Protection Supervisor or his designee.
IF the job is HIGH RISK, THEN no authorization number will be provided until after the job site is inspected by the Fire Protection Supervisor or his designee.
The inspection will determine whether the jobsite complies with the minimum standards set forth on the HWP or whether more stringent requirements need to be implemented.
The inspection will determine whether the jobsite complies with the minimum standards set forth on the HWP or whether more stringent requirements need to be implemented.
A FD field inspection is REQUIRED to be performed prior to issue of a HIGH RISK HWP.
A FD field inspection is REQUIRED to be performed prior to issue of a HIGH RISK HWP.
5.3.3  The NFPS should notify the Operations Superintendent (OS) of High Risk work being conducted.
The NFPS should notify the Operations Superintendent (OS) of High Risk work being conducted.
5.3.4  FD reviews the Impairment Log for any fire protection components in the work area that are inoperable and identifies additional compensatory measures as necessary.
FD reviews the Impairment Log for any fire protection components in the work area that are inoperable and identifies additional compensatory measures as necessary.
5.4    Hot Work Authorization 5.4.1  Hot Work may be authorized by FD after completion of the following:
Hot Work Authorization Hot Work may be authorized by FD after completion of the following:
FD completes baseline information fields in the HWA Log (Form 2)
FD completes baseline information fields in the HWA Log (Form 2)
FD completes a HIGH RISK activity criteria evaluation.
FD completes a HIGH RISK activity criteria evaluation.
e FD completes a work area inspection and signs/dates the field HWP, for activities designated HIGH RISK.
e FD completes a work area inspection and signs/dates the field HWP, for activities designated HIGH RISK.
NUCLEAR ~ O M M O N                       Page 6 of 14                           Rev. 0
NUCLEAR ~ O M M O N Page 6 of 14 Rev. 0  


4LL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (a) 5.4.2  Authorization to perform hot work is indicated by an authorization number.
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 5.4.2 5.4.3 5.4.4 5.5 5.5.1 5.5.2 5.5.3 5.5.4 5.5.5 6.0 6.1 6.2 6.3 NC.FP-AP.ZZ-0012 (a)
Authorization to perform hot work is indicated by an authorization number.
The authorization number is developed using the following format and associated legend:
The authorization number is developed using the following format and associated legend:
Format:
Format:
o X-YY-MM-DD-ZZ Legend:
o X-YY-MM-DD-ZZ Legend:
o X   - Station where work is performed. (S=Salem, M=Hope Creek) o YY - Last 2 digits of current year o MM-Month o DD - Day that work is being performed o ZZ- Sequential number beginning with 01 each day.
o X - Station where work is performed. (S=Salem, M=Hope Creek) o YY - Last 2 digits of current year o MM-Month o DD - Day that work is being performed o ZZ-Sequential number beginning with 01 each day.
5.4.3  FD enters the authorization number for each activity into the HWA Log.
FD enters the authorization number for each activity into the HWA Log.
5.4.4  FD initials the HWA Log and records the time the HWP was issued.
FD initials the HWA Log and records the time the HWP was issued.
5.5    Work Area Hot Work Permit 5.5.1  Upon issuance of a hot work authorization number, the job supervisor should complete the following fields of the HWP:
Work Area Hot Work Permit Upon issuance of a hot work authorization number, the job supervisor should complete the following fields of the HWP:
0   HWPNumber 0   Job Supervisor Name 8   Date 5.5.2  The job supervisor should ensure the HWP is posted in the work area.
0 HWPNumber 0
5.5.3  The job supervisor should ensure that the work area is maintained in accordance with the HWP Work Area Inspection criteria.
Job Supervisor Name 8
5.5.4  IF hot work is discontinued for longer than 8 hrs, THEN re-inspection of the area in accordance with Part 2 of the HWP (Form I)   is required prior to the commencement of work.
Date The job supervisor should ensure the HWP is posted in the work area.
5.5.5  The FD will verify HVVP criteriakonditions on a random basis after issuance of hot work permits.
The job supervisor should ensure that the work area is maintained in accordance with the HWP Work Area Inspection criteria.
6.0    RECORDS 6.1    Hot work authorization logs should be maintained for a minimum of 30 days.
IF hot work is discontinued for longer than 8 hrs, THEN re-inspection of the area in accordance with Part 2 of the HWP (Form I) is required prior to the commencement of work.
6.2    Hot Work Permits and Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.ZZ-0011(Q),Records Management Program (NAP-11). [CD-434E]
The FD will verify HVVP criteriakonditions on a random basis after issuance of hot work permits.
6.3    The FD, in accordance with NAP-1Ishall retain logs pertaining to hot work permits. [CD434E]
RECORDS Hot work authorization logs should be maintained for a minimum of 30 days.
NUCLEAR COMMON                           Page 7 of14                          Rev. 0
Hot Work Permits and Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.ZZ-0011 (Q), Records Management Program (NAP-1 1 ). [CD-434E]
The FD, in accordance with NAP-1 I shall retain logs pertaining to hot work permits. [CD434E]
NUCLEAR COMMON Page 7 of 14 Rev. 0  


4LL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-APZ-0012 (Q)
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-APZ-0012 (Q) 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.1 I 7.12 7.1 3 7.1 4 7.15 7.16 7.16.1 7.16.2 7.16.3 7.16.4 7.16.5 7.16.6 7.16.7 7.16.8 7.


==7.0      REFERENCES==
==16.9 REFERENCES==
NC.NA-AP.ZZ-0055 (Q) Operational Fire Protection Program New Jersey Administrative Code - NJAC 5:70-2 NJ State Fire Code NC. PM-DG.ZZ-0001 (Z) Storage and Handling of Compressed Gas Cylinders Compressed Gas Association Pamphlet P-I Property Loss Prevention Standards of Nuclear Generating Stations, -
Nuclear Electric Insurance Limited (NEIL).NFPA 30 - Flammable Liquids Code, National Fire Protection Association NC.IS-TM.22-0001 (Z) PSEG Nuclear Industrial Health and Safety Manual Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System Salem Fir8 Protection Report - Fire Hazards Analysis HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program HCGS UFSAR, Appendix 9A, - Appendix R Comparison Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 4 I 1976 Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance, August 1977 Occupational Safety and Health Standards Title 29, Chapter XVII, Part 1910.36FR 10466 1 OCFRSO Appendix R, Fire Prot. Program for Nuclear Power Facilities Operating Prior to Jan. 1, 1979 Commitment Documents: - Hope Creek CD-156A (NRC El Circular 80-09)
CD-226C (NRC IE Bulletin 75-04A)
CD300X (FSAR 8.1.4.14.3.1)
CD-317Y (FSAR Q 430.85(8))
CD-434E (IR 86-062)
(LER 86462)
CD-652A (INPO O&MR 73)
CD-682D (INPO SER 01-85)
CD-754X (FSAR 9.5.1.I.I
: 1)
CD-821 X (FSAR 9.5.1.5.3)
NUCLEAR COMMON Page 8 of 14 Rev. 0


7.1      NC.NA-AP.ZZ-0055 (Q) Operational Fire Protection Program 7.2                                        -
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-AP.22-0012 (Q)
New Jersey Administrative Code NJAC 5:70-2-10        - NJ State Fire Code 7.3      NC. PM-DG.ZZ-0001 (Z) Storage and Handling of Compressed Gas Cylinders 7.4      Compressed Gas Association Pamphlet P-I 7.5      Property Loss Prevention Standards of Nuclear Generating Stations, -
TABLE I Ignitable Metals - Salem Page 1 of 2 Location
Nuclear Electric Insurance Limited (NEIL).NFPA 30 Flammable Liquids Code, National Fire Protection Association 7.6      NC.IS-TM.22-0001 (Z) PSEG Nuclear Industrial Health and Safety Manual 7.7      Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, Fire -
* Units I  
Protection System 7.8                                    -
& 2 Turbine Bldg.
Salem Fir8 Protection Report Fire Hazards Analysis 7.9      HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program 7.10    HCGS UFSAR, Appendix 9A, - Appendix R Comparison 7.1 I    Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 4 I 1976 7.12    Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protectionfor Nuclear Power Plants 7.13    NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance, August 1977 7.14    Occupational Safety and Health Standards Title 29, Chapter XVII, Part 1910.36FR 10466 7.15    10CFRSO Appendix R, Fire Prot. Program for Nuclear Power Facilities Operating Prior to Jan. 1, 1979 7.16                                -
Commitment Documents: Hope Creek 7.16.1 CD-156A (NRC El Circular 80-09) 7.16.2 CD-226C (NRC IE Bulletin 75-04A) 7.16.3 CD300X (FSAR 8.1.4.14.3.1) 7.16.4 CD-317Y (FSAR Q 430.85(8))
7.16.5 CD-434E (IR86-062)(LER 86462) 7.16.6 CD-652A (INPO O&MR 73) 7.16.7 CD-682D (INPO SER 01-85) 7.16.8 CD-754X (FSAR 9.5.1 .I.I  1) 7.16.9 CD-821X (FSAR 9.5.1.5.3)
NUCLEAR COMMON                            Page 8 of 14                          Rev. 0
 
ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-AP.22-0012 (Q)
TABLE I Ignitable Metals Salem Page 1 of 2 Location           System@)            Component              Ignitable Metal
* Units I& 2       Turbine Auxiliary Cooling (TAC)
Heat Exchangers Nos. 11,12,21,22 Titanium Tubes Turbine Bldg.
El. 100'
El. 100'
* Units 1 & 2       Component Cooling    Heat Exchangers Nos. 11,21,22 Titanium Tubes Auxiliary Bldg.
* Units 1 & 2 Auxiliary Bldg.
El. 84'
El. 84'
* Unit 1           Component Cooling Heat Exchanger No. 12 Titanium Plates Auxiliary BIdg.
* Unit 1 Auxiliary BIdg.
El. 84'
El. 84'
* Unit I Auxiliary Bldg.
* Unit I Auxiliary Bldg.
Service Water        Diesel Generator Lube Oil Coolers Titanium Tubes & Heads El. 100'                                 & Jacket Water Heat Exchangers
El. 100'
{Nos, IA, I B , I C )
* Unit 2 Auxiliary Bldg.
* Unit 2 Auxiliary Bldg.
Service Water         Diesel Generator Lube Oil Coolers Titanium Tubes & Heads El. 100'                                  & Jacket Water Heat Exchangers (Nos. 2A, 2B, 2C)
El. 100'
* Units 1 8 2      Service Water         Chiller Condensers     Titanium Plates Nozzles & Flanges Inner Piping Pen Area, El. 100'                                                    Water Box Housings Turn Around Heads
* Units 1 8 2 Inner Piping Pen Area, El. 100'
          *Units 1 & 2        Service Water       Service Water           Titanium Service Water                            Pump Upper Motor Tube Coils Intake Structure                          Bearing Coolers NOS.I1-1684 21-23, 25 & 26 NUCLEAR COMMON                       Page 9 of 14                           Rev. 0
*Units 1 & 2 Service Water Intake Structure System@)
Component Turbine Auxiliary Heat Exchangers Cooling (TAC)
Nos. 11,12,21,22 Component Cooling Heat Exchangers Nos. 11,21,22 Component Cooling Heat Exchanger No. 12 Service Water Diesel Generator Lube Oil Coolers  
& Jacket Water Heat Exchangers
{Nos, IA, IB, IC)
Service Water Diesel Generator Lube Oil Coolers
& Jacket Water Heat Exchangers (Nos. 2A, 2B, 2C)
Service Water Chiller Condensers Service Water Service Water Pump Upper Motor Bearing Coolers 25 & 26 NOS. I 1-1 684 21 -23, NUCLEAR COMMON Page 9 of 14 Ignitable Metal Titanium Tubes Titanium Tubes Titanium Plates Titanium Tubes & Heads Titanium Tubes & Heads Titanium Plates Nozzles & Flanges Water Box Housings Turn Around Heads Titanium Tube Coils Rev. 0  


4LL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0042 (Q)
4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0042 (Q)
TABLE 1 Ignitable Metafs Salem Page 2 of 2 Location           System@)            Component          Ignitable Metal
TABLE 1 Ignitable Metafs - Salem Page 2 of 2 Location
* Units 1 4 2 Turbine Bldg.
* Units 1 4 2 Turbine Bldg.
Turbine Auxiliary Cooling (TAC)
El. 100'
Condensate Pump Titanium Tubes Upper Motor Oil El. 100'                                   Finned Coil Coolers
* Units I  
* Units I& 2 Auxiliary Bldg.
& 2 Auxiliary Bldg.
Service Water        Charging Pump Bearing Oil Coolers Titanium Tubes
El. 84'
                                                                          & Tube Sheets El. 84'                                   Nos. 11,12,21,22
* Units 1 & 2 Auxiliary Bldg.
* Units 1 & 2 Auxiliary Bldg.
Service Water        Safety Injection Pump Bearing Oil Titanium Tubes
El. 84'
                                                                          & Tube Sheets El. 84'                                   Coolers Nos. 11, 12,21,22
* Unit I Auxiliary Wdg.
* Unit I           Service Water        ChglSafety lnj.
El. 84'
Pump Titanium Tubes
                                                                          & Tube Sheets Auxiliary Wdg.
El. 84'                                   Speed Increaser Gear Lube Oil Cooler Nos. 11 & 12
* Unit2 Auxiliary 8ldg.
* Unit2 Auxiliary 8ldg.
Service Water         Chg/Safety Inj.
El. 84' System@)
Pump Titanium Tubes 8, Tube Sheets El. 84'                                    Speed Increaser Gear Lube Oil Cooler Nos. 21 & 22
Component Ignitable Metal Turbine Auxiliary Condensate Pump Titanium Tubes Cooling (TAC)
* Circulating Water lntake Structure Circ Water           Circ. Water Pump Motor Coolers Titanium Tubes NUCLEAR COMMON                         Page 10 of 14                         Rev. 0
Upper Motor Oil Finned Coil Coolers Service Water Charging Pump Titanium Tubes
& Tube Sheets Bearing Oil Coolers Nos. 11,12,21,22 Service Water Safety Injection Titanium Tubes
& Tube Sheets Pump Bearing Oil Coolers Nos. 11, 12,21,22 Service Water ChglSafety lnj.
Titanium Tubes Pump
& Tube Sheets Speed Increaser Gear Lube Oil Cooler Nos. 11 & 12 Service Water Chg/Safety Inj.
Titanium Tubes Pump 8, Tube Sheets Speed Increaser Gear Lube Oil Cooler Nos. 21 & 22
* Circulating Water Circ Water lnta ke Structure Circ. Water Pump Titanium Tubes Motor Coolers NUCLEAR COMMON Page 10 of 14 Rev. 0  


ALL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 2003O22 1 NC-FP-AP.ZZ-0012(Q)
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003O22 1 NC-FP-AP.ZZ-0012 (Q)
TABLE 2 Ignitable Metals Hope Creek Equipment           Descrl ption      Imitable Metal      Locations 1A I E-201 SACS Heat Exchangers          Titanium  Reactor Bldg., El. 102' 1ME-201     Tubing                                  Room 4309 2 B I E-201                                         Room 4307 t B2E-201 1A-E-21 7   RACS Heat Exchangers          Titanium  Reactor Bldg., El. 77' 1 B-E-217   Tubing                                  Room 421 1 1A-E-I 08   Main Condensers              Titanium  Turb Bldg., El. 54' - 102' 1B-E-I 08   Tubing                                  Rooms 1310 to 1312 1C-E-108 Rx Fuel Channels           Zirconium4  Reactor Bldg El. 201' Rx Fuel Spacers Rx Fuel Elements           Zirconium-2 Tubing End Plugs Limitorque Actuators         Magnesium  Dryweil Motor Core Rotor NUCLEAR COMMON                       Page I 1 of 14                     Rev. 0
TABLE 2 Ignitable Metals - Hope Creek Equipment 1 A I E-201 1 ME-201 2 B I E-201 t B2E-201 1 A-E-21 7 1 B-E-217 1 A-E-I 08 1 B-E-I 08 1 C-E-108 Descrl ption SACS Heat Exchangers Tubing RACS Heat Exchangers Tubing Main Condensers Tubing Rx Fuel Channels Rx Fuel Spacers Rx Fuel Elements Tubing End Plugs Limitorque Actuators Motor Core Rotor NUCLEAR COMMON Imitable Metal Titanium Titanium Titanium Zirconium4 Zirconium-2 Magnesium Page I 1 of 14 Locations Reactor Bldg., El. 102' Room 4309 Room 4307 Reactor Bldg., El. 77' Room 421 1 Turb Bldg., El. 54' - 102' Rooms 1310 to 1312 Reactor Bldg El. 201' Dryweil Rev. 0  


ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q)
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q)
FORM I HOT WORK PERMIT Page Iof 2 PART 1: GENERAL INFORMATION TYPE OF WORK:................................ W 0 C I3 B t3 G El OFS OXY-ACETYLENE RIG TO BE USED:.... YES                     NO LOCATION:....................................... SGS U l l 0 SGS U/2 0 HCGS 0 YARD LOCATION DESCRIPTION:
FORM I HOT WORK PERMIT Page I of 2 PART 1: GENERAL INFORMATION TYPE OF WORK:................................ W 0 C I3 B t3 G El OFS OXY-ACETYLENE RIG TO BE USED:.... YES NO LOCATION:....................................... SGS Ull 0 SGS U/2 0 HCGS 0 YARD LOCATION DESCRIPTION:
ANNUAL PERMIT:.............................. YES           NO ORDER NUMBER:
ANNUAL PERMIT:.............................. YES NO ORDER NUMBER:
JOB SUPERVISOR (PRINT):
JOB SUPERVISOR (PRINT):  
                  ~
~
PART 2: WORK AREA INSPECTION Burning, cutting, and welding equipment is in good repair.
PART 2: WORK AREA INSPECTION Burning, cutting, and welding equipment is in good repair.
Ignitable metals have been considered (is. titanium).
Ignitable metals have been considered (is. titanium).
Line 2,282: Line 3,444:
Precautions required for protection of filtrationladsorption ventilation systems have been taken (per NAP-9). [CD-652A]
Precautions required for protection of filtrationladsorption ventilation systems have been taken (per NAP-9). [CD-652A]
For electric arc welding, electromagnetic interference (EMI) precautions have been taken. (per NAP-5) [CD-I56A]
For electric arc welding, electromagnetic interference (EMI) precautions have been taken. (per NAP-5) [CD-I56A]
Signature on page 2 indicates inspection was satisfactory and hot work actlvlty may proceed following the acquisition of the DAlLY hot work permit number, NUCLEAR COMMON                                   Page 12 of I 4                   Rev. 0
Signature on page 2 indicates inspection was satisfactory and hot work actlvlty may proceed following the acquisition of the DAlLY hot work permit number, NUCLEAR COMMON Page 12 of I 4 Rev. 0  


NC.FP-AP.22-0012 (Q)
NC.FP-AP.22-0012 (Q)
FORM 3 HOT WORK PERMIT Page 2 of 2 PART 3: FINAL CHECKJOB COMPLETION Wark areas and all adjacent areas have been inspected following job completion and no evidence of fire is present. All equipment has been returned to its proper locatian.
FORM 3 HOT WORK PERMIT Page 2 of 2 PART 3: FINAL CHECKJOB COMPLETION Wark areas and all adjacent areas have been inspected following job completion and no evidence of fire is present. All equipment has been returned to its proper locatian.
VERIFIED BY:
VERIFIED BY:
Job Supervisor                 Date/ Time NUCLEAR COMMON                           Page 13 of 14                       Rev. 0
Job Supervisor Date/ Ti me NUCLEAR COMMON Page 13 of 14 Rev. 0  


FORM 2 HOT WORK AUTHORIZATION LOG KEY: W =Welding                   B = Burning                  STATION:
KEY: W =Welding C = Cutting Hot Work Work Location /
C = Cutting             OFS = Open Flame Soldering Hot Work     Work Location / Type of       Order       Job Supv.     Hi Det. FD Number       Equip Involved   work       Number         Ext         Risk Zone Initials/
Type of Order Job Supv.
Time w, c SGY                                 Yes B, OFS,OA               X-               No w ,c ,G,                                 YeS B,OFS, OA               X-               NO w YC ,G                                 YeS B, OFS, OA               X-               No w IC ,G,                                 Yes 6, OFS, OA               X-               No w ?e,G,                                 YeS B, OFS, OA               X-               NO w, c ,G,                                 Yes B, OFS, OA               X-               No WY c ,G,                                 YeS B, OFS, OA               X-               NO IC ,G,                                Yes B, OFS, OA               X-               NO NUCLEAR COMMON                               Page 14 of 14                           Rev. 0
Hi Det.
Number Equip Involved work Number Ext Risk Zone w, c SGY Yes B, OFS, OA X-No w,c,G, YeS B, OFS, OA X-NO w YC,G YeS B, OFS, OA X-No w IC,G, Yes 6, OFS, OA X-No w ?e,G, YeS B, OFS, OA X-NO w, c,G, Yes B, OFS, OA X-No WY c,G, YeS B, OFS, OA X-NO B, OFS, OA X-NO IC,G, Yes FORM 2 HOT WORK AUTHORIZATION LOG FD Initials/
Time B = Burning STATION:
OFS = Open Flame Soldering NUCLEAR COMMON Page 14 of 14 Rev. 0  


A L L ACTIVE ON-THE-SPOT       CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG lnternal Use Onlv                                                       Page 1 of 2 PSEG NUCLEAR FIRE DEPARTMENT NC.NA-AP.ZL-0025 (Q) Rev. 6 OPERATIONAL FIR PROTECTION PROGRAM Sponsor Organization: Emergency Services REVISION  
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG lnternal Use Onlv Page 1 of 2 PSEG NUCLEAR FIRE DEPARTMENT NC.NA-AP.ZL-0025 (Q) - Rev. 6 OPERATIONAL FIR PROTECTION PROGRAM Sponsor Organization: Emergency Services REVISION  


==SUMMARY==
==SUMMARY==
:                        Biennial Review performed Yes     X   No -.
Biennial Review performed Yes X
: 1.                                                   -
No -.
This is a full revision to NC.NA-AP.ZZ-0025 (Q) Rev. 5. (80035483).
: 1.
: 2. Due to the extensive nature of the revision, change bars have not been used. This revision represents a significant editorial change with regard to content, formatting, process descriptions, and section numbering.
: 2.
: 3. This procedure has been revised to focus on high level process concepts, resulting in relocation of process description detail and associated forms, tables, and attachments to other lower tier administrative procedures.
This is a full revision to NC.NA-AP.ZZ-0025 (Q) - Rev. 5. (80035483).
: 4. These changes are editorial. There is no reduction in program content or control, as a result of this revision.
Due to the extensive nature of the revision, change bars have not been used. This revision represents a significant editorial change with regard to content, formatting, process descriptions, and section numbering.
: 5. This revision relocates all Commitment Document numbers to the departmental administrative procedures implementing those commitments.
This procedure has been revised to focus on high level process concepts, resulting in relocation of process description detail and associated forms, tables, and attachments to other lower tier administrative procedures.
: 6. Revised titles to reflect the current organizational assignments.
These changes are editorial. There is no reduction in program content or control, as a result of this revision.
: 7. Replaced Nuclear Electric Insurance Limited (NEIL) with Nuclear Services Organization (NSO) throughout the procedure.
This revision relocates all Commitment Document numbers to the departmental administrative procedures implementing those commitments.
IMPLEMENTATION REQUIREMENTS:                                   Effective on:   I/z8/03 I. Fire Protection Impairment, Hot Work, and Transient Combustible Permits processed by the Fire Department under Revision 5 as of the issue date, do not have io be changed in the field to meet Revision 6 requirements.
Revised titles to reflect the current organizational assignments.
: 2. Nudear Outlook article and PSEG Nuclear L.L.C. lntranet website announcement describing the revision.
Replaced Nuclear Electric Insurance Limited (NEIL) with Nuclear Services Organization (NSO) throughout the procedure.
: 3. Provide a global electronic Power Point presentation to all PSEG Nuclear personnel.
: 3.
APPROVED:
: 4.
 
: 5.
I A L L ACTIVE ON-THE-SPOT      CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG Internal Use Only NC.NAwAP.ZZ-O025(Q),Revlsion 6 OPERATIONAL FRE PROTECTION PROGRAM Revision Summary (Continued)                                              Page 2 of 2
: 6.
: 8. Revised company name from PSE&G Nuclear Business Unit (NBU) to PSEG Nuclear.
: 7.
: 9. Removed detailed information on the Combustible Control Program. Aft detailed information is now found in NC.FP-AP.ZZ-O025(Q).
IMPLEMENTATION REQUIREMENTS:
I O . Removed detailed information and forms for fire protection impairments. This information is now located in NC.FP-APZZ-0025 (GI) and NC FP-AP.ZZ-0010 (a).
Effective on: I /z8/03 I. Fire Protection Impairment, Hot Work, and Transient Combustible Permits processed by the Fire Department under Revision 5 as of the issue date, do not have io be changed in the field to meet Revision 6 requirements.
1I, Removed detailed infomation and forms for hot work operation and the control of ignition sources, This information is now located in NCFP-APZ-0025 (GI)and NC.FP-AP.ZZ-0O.I2{Q).
Nudear Outlook article and PSEG Nuclear L.L.C. lntranet website announcement describing the revision.
Provide a global electronic Power Point presentation to all PSEG Nuclear personnel.
: 2.
: 3.
APPROVED:  


                                          ~~
I A L L ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG Internal Use Only NC.NAwAP.ZZ-O025(Q), Revlsion 6 OPERATIONAL FRE PROTECTION PROGRAM Revision Summary (Continued)
ALL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP.22-0025(Q)
Page 2 of 2
OPERATIONAL FIRE PROTECTION PROGRAM TABLE OF CONTENTS SECTION      .
: 8.
TITLE                                                                                              .PAGE 1.0        PURPOSE................................................................................................... 2 2.0        SCOPE........................................................................................................2 3.0        RESPONSIBILITIES ...................................................................................        2 4.0        PROCESS DESCRIPTION ......................................................................... 4 5.0        PROCEDURE ............................................................................................. 4 5.1  Response to Fire Emergencies........................................................ 4 5.2  Fire Prevention Requirements.......................................................... 5 5.3                                          -
Revised company name from PSE&G Nuclear Business Unit (NBU) to PSEG Nuclear.
Control of Ignition Sources Hot Work ............................................. 5 5.4  High Risk Hot Work .......................................................................... 6 5.5  Combustible Material Control ...........................................................6 5.6  Control of Flammable and Combustible Liquids and Gases.............6 5.7  Control of Portable Space Heaters...................................................6 5.8  Fire Protection Impairment Pragram.................................................7 5.9  Compensatory Measure Fire Watch Program .................................. 7 5.10 Ignitable Metals ................................................................................ 7 6.0        RECORDS .................................................................................................  -7 7.0        DEFINITIONS ............................................................................................. 8
: 9.
Removed detailed information on the Combustible Control Program. Aft detailed information is now found in NC. FP-AP.ZZ-O025(Q).
I O. Removed detailed information and forms for fire protection impairments. This information is now located in NC.FP-APZZ-0025 (GI) and NC FP-AP.ZZ-0010 (a).
1 I, Removed detailed infomation and forms for hot work operation and the control of ignition sources, This information is now located in NCFP-APZ-0025 (GI) and NC.FP-AP.ZZ-0O.I 2{Q).  


==8.0       REFERENCES==
SECTION 1. 0 2.0 3.0 4.0 5.0
............................................................................................ 9 8.1   General Documents.......................................................................... 9 8.2   Cross References.............................................................................         9 Common                                    Page 1 of 9                                                         Rev.6 2
~~
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP.22-0025( Q)
OPERATIONAL FIRE PROTECTION PROGRAM TABLE OF CONTENTS 2
6.0 7.0 8.0 Common TITLE PAGE PURPOSE................................................................................................... 2 SCOPE........................................................................................................ 2 RESPONSIBILITIES...................................................................................
2 PROCESS DESCRIPTION......................................................................... 4 PROCEDURE............................................................................................. 4 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 Response to Fire Emergencies........................................................ 4 Fire Prevention Requirements.......................................................... 5 Control of Ignition Sources - Hot Work............................................. 5 High Risk Hot Work.......................................................................... 6 Combustible Material Control........................................................... 6 Control of Flammable and Combustible Liquids and Gases............. 6 Control of Portable Space Heaters................................................... 6 Fire Protection Impairment Pragram................................................. 7 Compensatory Measure Fire Watch Program.................................. 7 Ignitable Metals................................................................................ 7 RECORDS.................................................................................................
- 7 DEFINITIONS.............................................................................................
8 REFERENCES............................................................................................ 9 8.1 General Documents.......................................................................... 9 8.2 Cross References.............................................................................
9 Page 1 of 9 Rev. 6  


ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP.ZZ-0025(Q) 1.0     PURPOSE This procedure addresses the Operational Fire Protection Program (OFPP) for PSEG Nuclear.
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC. NA-AP.ZZ-0025( Q) 1.0 2.0
2.0      SCOPE
: 2. I 3.0 3.1 3.2 3.3 3.4 3.5 3.6 PURPOSE This procedure addresses the Operational Fire Protection Program (OFPP) for PSEG Nuclear.
: 2. I    This procedure applies to all organizations and personnel engaged in activities which may affect the Operational Fire Protection Program (OFPP) for PSEG Nuclear.
SCOPE This procedure applies to all organizations and personnel engaged in activities which may affect the Operational Fire Protection Program (OFPP) for PSEG Nuclear.
3.0      RESPONS16IL~l"TIES 3.1      All Personnel Comply with the requirements of this procedure.
RESPONS16IL~l"TIES All Personnel Comply with the requirements of this procedure.
3.2                          -
Job Supervisors - Salem and Hope Creek Stations e Comply with fire prevention requirements of the Fire Protection Impairment, Hot Wotk, and Transient Combustible Control processes Adhere to controls for ignition sources and flammable liquids and gases.
Job Supervisors Salem and Hope Creek Stations e   Comply with fire prevention requirements of the Fire Protection Impairment, Hot Wotk, and Transient Combustible Control processes Adhere to controls for ignition sources and flammable liquids and gases.
All Directors and Nlanaaers Ensure their organizations implement the applicable fire prevention requirements within facilities they maintain and in which they conduct work.
3.3      All Directors and Nlanaaers Ensure their organizations implement the applicable fire prevention requirements within facilities they maintain and in which they conduct work.
Chemistry Manaaer Ensure the performance of the Hope Creek Diesel Driven Fire Pump Fuel Oil Storage Tank sampling surveillance.
3.4      Chemistry Manaaer Ensure the performance of the Hope Creek Diesel Driven Fire Pump Fuel Oil Storage Tank sampling surveillance.
Oeeratlons Department Manaaer - Salem Ensure the performance of the Diesel Driven Fire Pump Fuel Oil Storage Tank sampling surveillance Ensure that personnel within their organization, designated as the Operation's liaison to the Fire Department (FD), are available as required, during fire fighting activities.
3.5      Oeeratlons Department Manaaer Salem   -
Operations Department Manauer - Hope Creek Ensure that personnel within their organization designated as the Operation's iiaison to the FD, are available as required, during fire fighting activities.
Ensure the performance of the Diesel Driven Fire Pump Fuel Oil Storage Tank sampling surveillance Ensure that personnel within their organization, designated as the Operation's liaison to the Fire Department (FD), are available as required, during fire fighting activities.
Common Page 2 of 9 Rev. 6  
3.6                                            -
Operations Department Manauer Hope Creek Ensure that personnel within their organization designated as the Operation's iiaison to the FD, are available as required, during fire fighting activities.
Common                                   Page 2 of 9                                 Rev. 6


ALL ACTIVE ON-THE-SPOT       CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 3.7     Radiation Protection Marlaaer Provide required radiological monitoring when their personnel respond with FD personnel to fires located within the Radiological Controlled Areas (RGAs).
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 3.7 Radiation Protection Marlaaer Provide required radiological monitoring when their personnel respond with FD personnel to fires located within the Radiological Controlled Areas (RGAs).
3.8                                           -
3.8 Work Control Center Personnel - Salem and Hope Creek Operations Notify the FD when a fire protection systemlbarrier is being affected and when it is being returned to service.
Work Control Center Personnel Salem and Hope Creek Operations Notify the FD when a fire protection systemlbarrier is being affected and when it is being returned to service.
3.9 Manaaer - Emernencv Services a
3.9                 -
a a
Manaaer Emernencv Services Ensure General Employee Training (GET) discusses required employee actions in the event of fire.
e a
Ensure a qualified, trained fire department is present on-site in accordance with NC.FP-AP.IZ-O009(Q) Fire Protection Training Program.
0 Ensure General Employee Training (GET) discusses required employee actions in the event of fire.
Ensure a qualified, trained fire department is present on-site in accordance with NC. FP-AP.IZ-O009(Q) Fire Protection Training Program.
Develop and maintain FD surveillance and test procedures.
Develop and maintain FD surveillance and test procedures.
a    Perform walk downs to monitor control of transient combustibles.
Perform walk downs to monitor control of transient combustibles.
a    Authorize Hot Work, Transient Combustible, and Fire Protection Impairment Permits (FPIPs) and ensuring the aggregate impad is considered.
Authorize Hot Work, Transient Combustible, and Fire Protection Impairment Permits (FPIPs) and ensuring the aggregate impad is considered.
Maintain daily communication with the Operations Superintendent and/or Control Room Supervisors on the status of Salem and flope Creek Station FPIPs.
Maintain daily communication with the Operations Superintendent and/or Control Room Supervisors on the status of Salem and flope Creek Station FPIPs.
a    Ignition source control and monitoring for fire prevention.
Ignition source control and monitoring for fire prevention.
e    Fire incident reports and investigations.
Fire incident reports and investigations.
Interface with fire insurance inspectors, state and local enforcement agencies, and with offsite fire departments.
Interface with fire insurance inspectors, state and local enforcement agencies, and with offsite fire departments.
a    Define non-FD responsibility for required testing and inspection of fire protection equipment.
Define non-FD responsibility for required testing and inspection of fire protection equipment.
0    Performance of preventive and corrective maintenance on fire protection systems and components assigned to the FD.
Performance of preventive and corrective maintenance on fire protection systems and components assigned to the FD.
Administration and control of the Fire Watch Program.
Administration and control of the Fire Watch Program.
3.10                     -
3.10 Vlce President - Enaineering 0
Vlce President Enaineering 0   Establish programmatic requirements for implementing design related aspects of the Fire Protection and Fire Barrier PenetrationSeal Programs.
Establish programmatic requirements for implementing design related aspects of the Fire Protection and Fire Barrier Penetration Seal Programs.
0   Development and review of Design Change Packages for controlling configuration of both the Fire Protection and Fire Barrier Penetration Seal Programs.
0 Development and review of Design Change Packages for controlling configuration of both the Fire Protection and Fire Barrier Penetration Seal Programs.
Ensure a member grade Society of Fir8 Protection Engineer (SFPE) person exists within the organization. [CR96041621I]
Ensure a member grade Society of Fir8 Protection Engineer (SFPE) person exists within the organization. [CR96041621 I]
Common                                 Page 3 of 9                               Rev. 6
Common Page 3 of 9 Rev. 6  


ALL ACTIVE ON-THE-SPOT   CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP.Z&002fi(Q) 3.1I                    -
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 3.1 I 4.0
vice President Operations 0 Ensure trained maintenance personnel perform preventive or corrective maintenance of Fire Protection systems in a prompt and effective manner.
: 4. I 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 5.0 5.1 5.1.I NC. NA-AP.Z&002fi(Q) vice President - Operations 0 Ensure trained maintenance personnel perform preventive or corrective maintenance of Fire Protection systems in a prompt and effective manner.
Ensure performance of preventive maintenance surveillancesfor fire protection components at both the Salem and Hope Creek Stations, as agreed upon with the Manager Emergency Services.
Ensure performance of preventive maintenance surveillances for fire protection components at both the Salem and Hope Creek Stations, as agreed upon with the Manager - Emergency Services.
0 Ensure PSEG Nuclear facilities are maintained in compliance with the applicable state fire codes and insurance regulations.
0 Ensure PSEG Nuclear facilities are maintained in compliance with the applicable state fire codes and insurance regulations.
4.0    PROCESS DESCRIPTION
PROCESS DESCRIPTION This procedure identifies elements of the Operational Fire Protection Program categorized as Fire Prevention and Readiness to Detect and Suppress Fires.
: 4. I    This procedure identifies elements of the Operational Fire Protection Program categorized as Fire Prevention and Readiness to Detect and Suppress Fires.
This procedure is implemented in full detail by the following Fire Department administrative procedures:
4.2    This procedure is implemented in full detail by the following Fire Department administrative procedures:
NC.FP.AP.2Z-O025(Q); Precautions Against Fire SC. FP.AP.ZZ-O003(Q), Actions for Inoperabte Fife Protection - Salem HC.FP-AP.ZZ-OOM(Q), Actions For Inoperable Fire Protection-Hope Creek NC.FP-AP.Z2-0005(8), Fire Protection Surveillance / Periodic Test Program NC. FP-AP.2Z-CIOOQQ), Fire Protection Training Program NC.FP-AP.22-001 O(Q), Fire Protection Impairment Program NC.FP-AP.ZZ-OOIZ(Q), Safe Hot Work Practices NC.
4.2.1  NC.FP.AP.2Z-O025(Q); Precautions Against Fire 4.2.2  SC.FP.AP.ZZ-O003(Q), Actions for Inoperabte Fife Protection - Salem 4.2.3  HC.FP-AP.ZZ-OOM(Q), Actions For Inoperable Fire Protection- Hope Creek 4.2.4  NC.FP-AP.Z2-0005(8), Fire Protection Surveillance / Periodic Test Program 4.2.5  NC.FP-AP.2Z-CIOOQQ),Fire Protection Training Program 4.2.6  NC.FP-AP.22-001O(Q),Fire Protection Impairment Program 4.2.7  NC.FP-AP.ZZ-OOIZ(Q), Safe Hot Work Practices 4.2.8  NC.FP-AP.ZZ-OOZO(Q), Compensatory Measure Fire Watch Program 5.0    PROCEDURE 5.1    Response to Fire Emeraencies 5.1.I  Refer to NC.FPdP.ZZ-O025(Q) (FPAP-25) for detailed instructions on response to fire emergencies, Key concepts are reviewed here.
FP-AP.ZZ-OOZO(Q), Compensatory Measure Fire Watch Program PROCEDURE Response to Fire Emeraencies Refer to NC.FPdP.ZZ-O025(Q) (FPAP-25) for detailed instructions on response to fire emergencies, Key concepts are reviewed here.
0 In the event a fire alarm sounds within en office facility, evacuate the building in accordance with the established routes. Accountability should be performed.
0 In the event a fire alarm sounds within en office facility, evacuate the building in accordance with the established routes. Accountability should be performed.
NEVER use the elevator during a fire emergency building evacuation.
NEVER use the elevator during a fire emergency building evacuation.
For fire alarms within the Salem and Hope Creek Stations, listen to the instructions via the page system provided.
For fire alarms within the Salem and Hope Creek Stations, listen to the instructions via the page system provided.
Common                               Page 4 of 9                                 Rev. 6
Common Page 4 of 9 Rev. 6  


5.1.1 (Continued) e Upon discovering a fire, your first duty is to report the fire. The Fire Department wilt respond with personnel and equipment to combat the emergency.
5.1.1 (Continued) e Upon discovering a fire, your first duty is to report the fire. The Fire Department wilt respond with personnel and equipment to combat the emergency.
The communication systems vary between the Salem and Hope Creek stations. Know the differences between the plants. Refer to FPAP-25.
The communication systems vary between the Salem and Hope Creek stations. Know the differences between the plants. Refer to FPAP-25.
After reporting a fire, employees should fight the fire if its within their training and capabilities. If not, they should alert others in the area, evacuate to a safe distance and standby to direct FD personnel to the scene.
After reporting a fire, employees should fight the fire if its within their training and capabilities. If not, they should alert others in the area, evacuate to a safe distance and standby to direct FD personnel to the scene.
5.2   Fire Prevention Reauirements 5.2.1 Refer to NC.FP-AP.ZZ-O025(Q) (FPAP-25) for detailed instructions on fire prevention work practices and requirements.
5.2 Fire Prevention Reauirements 5.2.1 5.2.2 Refer to NC.FP-AP.ZZ-O025(Q) (FPAP-25) for detailed instructions on fire prevention work practices and requirements.
5.2.2 Some key concepts are briefly reviewed here.
Some key concepts are briefly reviewed here.
Fire Doors shall be maintained closed,.except for normal passage, unless provided with an approved permit It is imperative that ALL PERSONNEL make sure fife doors close behind them.
Fire Doors shall be maintained closed,. except for normal passage, unless provided with an approved permit It is imperative that ALL PERSONNEL make sure fife doors close behind them.
Fire Protection deficiencies observed should be immediately reported to the FD (Ext. 2800/2803)for evaluation.
Fire Protection deficiencies observed should be immediately reported to the FD (Ext. 2800/2803) for evaluation.
Restrictions apply to combustible materials introduced into any safety-related aredroom.
Restrictions apply to combustible materials introduced into any safety-related aredroom.
Restrictions apply to locating combustible materials in the vicinity of permanent buiIdings.
Restrictions apply to locating combustible materials in the vicinity of permanent bu i Idings.
Restrictions apply to use of fire protection water for non-fire protection purposes.
Restrictions apply to use of fire protection water for non-fire protection purposes.
Storage of material should not affect access to, or obstruct, fire protection systems or fire fighting equipment.
Storage of material should not affect access to, or obstruct, fire protection systems or fire fighting equipment.
Line 2,388: Line 3,565:
Clearance, free of combustible material, shall be maintained around energized electrical paneis.
Clearance, free of combustible material, shall be maintained around energized electrical paneis.
Extension cords and flexible cords shall not be a substitute for permanent wiring.
Extension cords and flexible cords shall not be a substitute for permanent wiring.
5.3                                 -
5.3 5.3.1 5.3.2 Control of lanition Sources - Hot Work Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered hot work.
Control of lanition Sources Hot Work 5.3.1 Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered hot work.
A Hot Work Permit will be required to control these ignition sources.
5.3.2 A Hot Work Permit will be required to control these ignition sources.
Rev. 6  
Rev. 6


ALL ACTIVE ON-THE-SPOT       CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 5.3.3   Plant work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering is considered a fire watch required activity.
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 5.3.3 5.4 5.4.1 5.4.2 5.4.3 5.5 5.5.t 5.5.2 5.6 5.6.1 5.7 5.7.1 5.7.2 Plant work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering is considered a fire watch required activity.
An exception to this requirement is allowed for work performed in shop areas.
An exception to this requirement is allowed for work performed in shop areas.
0   Hot work permits are required for all hot work activities.
0 Hot work permits are required for all hot work activities.
5.4    Hinh Risk Hot Work 5.4.1  High risk hot work is a PSEG Fire Department term applied to work with well defined and special hazard criteria.
Hinh Risk Hot Work High risk hot work is a PSEG Fire Department term applied to work with well defined and special hazard criteria.
This type of hot work is distinguished from non-high risk hot work.
This type of hot work is distinguished from non-high risk hot work.
High Risk hot work still involves ignition sources, such as welding, cutting, burning, grinding or open flame soldering.
High Risk hot work still involves ignition sources, such as welding, cutting, burning, grinding or open flame soldering.
5.4.2  High risk work involves:
High risk work involves:
0   Vessels and systems that contain, or had contained, combustible or flammable chemicals, solvents, or gases.
0 Vessels and systems that contain, or had contained, combustible or flammable chemicals, solvents, or gases.
0   Work involving ignitable metals.
0 Work involving ignitable metals.
Work involving processes that produce copious amounts of heat with molten slag and sparks. For example, current industrial technology may employ equipment such as plasma arc cutting machines. This technology produces copious amounts of energetic slag and sparks.
Work involving processes that produce copious amounts of heat with molten slag and sparks. For example, current industrial technology may employ equipment such as plasma arc cutting machines. This technology produces copious amounts of energetic slag and sparks.
5.4.3  Special and additional controls apply to high risk hot work These controls are covered under NC.FP-AP.Z7-0012(Q), Safe Hot Work Practices.
Special and additional controls apply to high risk hot work These controls are covered under NC.FP-AP.Z7-0012(Q), Safe Hot Work Practices.
5.5    Combustible Material Control 5.5.t                                -
Combustible Material Control General Use and Controls - All areas:
General Use and Controls All areas:
0 Combustibles Material will be controlled IAW NC.FP-AP.22-0025 (Q).
0   Combustibles Material will be controlled IAW NC.FP-AP.22-0025 (Q).
for Safety Related Areas Only Storage of combustibles is NOT permitted in Salem and Hope Creek Stations safety related areas/rooms except when approved by Engineering.
5.5.2  f o r Safety Related Areas Only Storage of combustibles is NOT permitted in Salem and Hope Creek Stations safety related areas/rooms except when approved by Engineering.
Control of Flammable and Combustible Licluids and Gases Detailed guidance on the handling and control of flammable and combustible liquids and gases is provided in NC.FP-AP.ZZ-O025(Q).
5.6    Control of Flammable and Combustible Licluids and Gases 5.6.1  Detailed guidance on the handling and control of flammable and combustible liquids and gases is provided in NC.FP-AP.ZZ-O025(Q).
Control of Portable Space Heaters The use of portable space heaters is prohibited in safety related areas except as indicated IAW NC. DE-AP.774030 Q). Contro t of Temporary Modifications.
5.7    Control of Portable Space Heaters 5.7.1  The use of portable space heaters is prohibited in safety related areas except as indicated IAW NC.DE-AP.774030 Q). Controt of Temporary Modifications.
Space heaters in non-safety related areas are controlled IAW NC.FP-AP.2Z-0025 (Q).
5.7.2  Space heaters in non- safety related areas are controlled IAW NC.FP-AP.2Z-0025 (Q).
Common Page 6 of 9 Rev. 6  
Common                                 Page 6 of 9                               Rev. 6


ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP.ZZ-0026(Q) 5.8     Fire Protection Impairment Proaram 5.8.1   FD is the fire protection impairment authority.
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC. NA-AP.ZZ-0026(Q) 5.8 5.8.1 5.8.2 5.8.3 5.8.4 5.8.5 5.9 5.9.1 5.4.2 5.10 5.10.1 5.10.2 5.j0.3 6.0 6.1 6.2 6.3 Fire Protection Impairment Proaram FD is the fire protection impairment authority.
5.8.2  lmpairments are formal controls that recognize, evaluate, and administratively approve and track either planned actions or emergent conditions that impact the operability of the fire protection system or a fire protection component.
lmpairments are formal controls that recognize, evaluate, and administratively approve and track either planned actions or emergent conditions that impact the operability of the fire protection system or a fire protection component.
5.8.3 Job supervisors prepare and submit impairment requests for work activities that will place fire protection equipment or system in an inoperable condition.
Job supervisors prepare and submit impairment requests for work activities that will place fire protection equipment or system in an inoperable condition.
5.8.4  Nuclear fire protection supervisors (NFPS) evaluate impairment requests and emergent system and equipment issues to identify the full scope, or aggregate impact, of the issue.
Nuclear fire protection supervisors (NFPS) evaluate impairment requests and emergent system and equipment issues to identify the full scope, or aggregate impact, of the issue.
0 NFPS identifies the appropriate compensatory measures and generates an impairment, accordingly.
0 NFPS identifies the appropriate compensatory measures and generates an impairment, accordingly.
5.8.5  Prior to issuing impairments, the NFPS notifies and reviews the impairment issue with the Operations Superintendent or Control Room Supervisor (OSICRS), of the affected station, and obtains 0SICRS.approval to issue the impairment..
Prior to issuing impairments, the NFPS notifies and reviews the impairment issue with the Operations Superintendent or Control Room Supervisor (OSICRS), of the affected station, and obtains 0SICRS.approval to issue the impairment..
5.9    Compensatorv Measure Fire Watch Proaram 5.9.1  Adequate compensatory measures are required to be implemented to supplement inoperable fire protection systems and equipment 5.4.2  Procedures SC.FP-AP.ZZ-O003(Q) and HC.FP-AP.ZZ-0004(Q) identify those systems and components requiring compensatory actions to be taken when a fire protection system or component is determined to be inoperable.
Compensatorv Measure Fire Watch Proaram Adequate compensatory measures are required to be implemented to supplement inoperable fire protection systems and equipment Procedures SC.FP-AP.ZZ-O003(Q) and HC. FP-AP.ZZ-0004(Q) identify those systems and components requiring compensatory actions to be taken when a fire protection system or component is determined to be inoperable.
5.10    lanitable Metals 5.10.1  The metals titanium, zirconium, and magnesium represent a special combustible material hazard class that warrants extra care and control.
lanitable Metals The metals titanium, zirconium, and magnesium represent a special combustible material hazard class that warrants extra care and control.
5.10.2 These metals are classified as ignitable metals. These are metals that can burn readily, vigorously, and with a significant release of heat.
These metals are classified as ignitable metals. These are metals that can burn readily, vigorously, and with a significant release of heat.
5.j0.3 Controls relative to working on or in the vicinity of ignitable metals are provided in procedure NC.FP-AP.ZZ-0042(Q),Safe Performance of Hot Work.
Controls relative to working on or in the vicinity of ignitable metals are provided in procedure NC.FP-AP.ZZ-004 2(Q), Safe Performance of Hot Work.
6.0    RECORDS 6.1    Hot Work Permits and Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.ZZ-OOl1(a),Records Management Program (NAP-I 1).
RECORDS Hot Work Permits and Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.ZZ-OOl1 (a), Records Management Program (NAP-I 1).
6.2    The FD, in accordance with NAP-I 1 shail retain transient combustible permits and logs pertaining to hot work permits and fire protection impairment permits for a minimum of six months.
The FD, in accordance with NAP-I 1 shail retain transient combustible permits and logs pertaining to hot work permits and fire protection impairment permits for a minimum of six months.
6.3    FPlRs that were used to create FPlPs should be retained with work packages. The FD maintains a hard copy log of all FPlPs generated from FPIRs.
FPlRs that were used to create FPlPs should be retained with work packages. The FD maintains a hard copy log of all FPlPs generated from FPIRs.
Common                                 Page 7 of 9                               Rev. 6
Common Page 7 of 9 Rev. 6  


ALL ACTIVE ON-THE-SPOT     CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 7.0     DEFINITIONS 7.1                           -
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.0 7.9 7.10 7.1 1 7.12 7.13 7.14 DEFINITIONS Combustible Liquid - Liquid having a flash point at or above 100 deg-F (37.e4 C).
Combustible Liquid Liquid having a flash point at or above 100 deg-F (37.e4C).
Combustible Material - Material, which in the form it is used and under the conditions anticipated, WILL ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.
7.2    Combustible Material - Material, which in the form it is used and under the conditions anticipated, WILL ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.
Fire Barrier - Those construction elements (walls, floors, and their supports),
7.3                  -
Fire Barrier Those construction elements (walls, floors, and their supports),
including beams, columns, penetration seals or closures, fire doors and dampers, that are rated by approving laboratories in hours of resistance to fire and used tu prevent the spread of fire.
including beams, columns, penetration seals or closures, fire doors and dampers, that are rated by approving laboratories in hours of resistance to fire and used tu prevent the spread of fire.
7.4                -
Flre Watch - An individual who has satisfactorily completed fire watch training and is designated by the FD for compensatory measure, hot work, or both fire watch type duties.
Flre Watch An individual who has satisfactorily completed fire watch training and is designated by the FD for compensatory measure, hot work, or both fire watch type duties.
Flammable Liauid - A liquid with a flash point below 100 deg-F and a vapor pressure not exceeding 40 pounds per square inch absolute at 100 deg-F.
7.5    Flammable Liauid - A liquid with a flash point below 100 deg-F and a vapor pressure not exceeding 40 pounds per square inch absolute at 100 deg-F.
e Also known as a Class 1 liquid.
e Also known as a Class 1 liquid.
7.6    Hot Work - Work that involves ignition sources.
Hot Work - Work that involves ignition sources.
7.7    lnnition Source - Heat or flame from any source capable of igniting combustible or flammable material.
lnnition Source - Heat or flame from any source capable of igniting combustible or flammable material.
7.0    lmpalrment - Any condition affecting the intended operation of a fire protection system or barrier or posing as a fire hazard within the stations.
lmpalrment - Any condition affecting the intended operation of a fire protection system or barrier or posing as a fire hazard within the stations.
7.9    Noncombustible Material - Material which, in the form it is used and under the conditions anticipated, will NOT ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.
Noncombustible Material - Material which, in the form it is used and under the conditions anticipated, will NOT ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.
7.10                -
Permanent - A condition with an indefinite period of time.
Permanent A condition with an indefinite period of time.
Safetv Related Area - An area that contains systems and components required to shut down the reactor, mitigate the consequences of postulated accidents or maintain the reactor in a safe cold shutdown condition.
7.1 1  Safetv Related Area - An area that contains systems and components required to shut down the reactor, mitigate the consequences of postulated accidents or maintain the reactor in a safe cold shutdown condition.
Storane - The placing of items in a location and leaving them unattended until later use or disposal.
7.12              -
Temporary - planned time duration of no more than 60 days.
Storane The placing of items in a location and leaving them unattended until later use or disposal.
Transient Combustible - Any combustible material introduced into a Safety-Related arealroom which will be used to complete an assigned task or left unattended for any period of time. It does not include items moved through areas in route to the final destination, unless the items are left un-monitored during transit.
7.13  Temporary - planned time duration of no more than 60 days.
Common Page 8 of 9 Rev. 6  
7.14  Transient Combustible - Any combustible material introduced into a Safety-Related arealroom which will be used to complete an assigned task or left unattendedfor any period of time. It does not include items moved through areas in route to the final destination, unless the items are left un-monitored during transit.
Common                               Page 8 of 9                                 Rev. 6
 
ALL ACTIVE ON-THE-SPOT      CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP,ZZ-0025( Q)


==8.0       REFERENCES==
ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC. NA-AP,ZZ-0025( Q) 8.0
: 8. I     General Documents 8.1.1     Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System 8.1.2    Salem Fire Protection Report - Fire Hazards Analysis 8.1.3                                                                          -
: 8. I 8.1.1 8.1.2 8.1.3 8.1.4 8.1.5
HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, Fire Protection Program 8.1.4    HCGS UFSAR, Appendix 9A, - Appendix R Comparison 8.1.5    Appendix A to Branch Technical Position APCSB 9.5-1 , Guidelines for Fire Protectionfor Nuclear Power Plants Docketed Prior to July 1, 1976
: 8. I
: 8. I.6    Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants
.6
: 8. t .7  NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controis and Quality Assurance, August 1977 0.1.8    Occupational Safety and Health Standards Title 29, Chapter XVII, Part 191O.36FR 10466 8.1.9    10CFR50 Appendix R,Fire Rot. Program for Nuclear Power Facilities Operating Prior to Jan. I,1979 8.1.10    NC.DE-PSZ-0001 (QII Fire Protection Programmatic Standard 8.1.11    IEEE Standard 634 - 1978 8.1 . I 2 Hope Creek Station Generic Letter 86-10 Submittal, dated May 13, 1986 8.1.13    HCDE-PS.ZZ-0021(F), Hope Creek Penetration Seal Program 8.1.14    SC.DE-PS.ZZ-O035(Q), Salem Penetration Seal Program 8.1 -15  HC.FP-EO.ZZ-0001 (Z), Control Room Fire Response - HCGS 8.1.16    SC.FP-E0.Z-0001 (Z), Control Room Fire Response - Salem 8.2      Cross  
: 8. t.7 0.1.8 8.1.9 8.1.10 8.1.11 8.1.I2 8.1.13 8.1.14 8.1 -15 8.1.16 8.2 8.2.1 0.2.2 8.2.3 8.2.4 8-25 8.2.6 8.2.7 8.2.8 8.2.9 8.2.10 REFERENCES General Documents Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System Salem Fire Protection Report - Fire Hazards Analysis HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program HCGS UFSAR, Appendix 9A, - Appendix R Comparison Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 1, 1976 Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controis and Quality Assurance, August 1977 Occupational Safety and Health Standards Title 29, Chapter XVII, Part 191 O.36FR 1 0466 1 OCFR50 Appendix R, Fire Rot. Program for Nuclear Power Facilities Operating Prior to Jan. I, 1979 NC.
DE-PSZ-0001 (QII Fire Protection Programmatic Standard IEEE Standard 634 - 1978 Hope Creek Station Generic Letter 86-1 0 Submittal, dated May 13, 1986 HCDE-PS.ZZ-0021 (F), Hope Creek Penetration Seal Program SC.DE-PS.ZZ-O035(Q), Salem Penetration Seal Program HC.FP-EO.ZZ-0001 (Z), Control Room Fire Response - HCGS SC.FP-E0.Z-0001 (Z), Control Room Fire Response - Salem Cross  


==References:==
==References:==
 
NC.NA-AP.Zf-001 I (a),
8.2.1    NC.NA-AP.Zf-001 I   (a), Records Management Program 0.2.2    NC.DE-AP.ZZ-O030(Q), Control of Temporary Modifications 8.2.3    SC.FP.AP.ZZ-0003(Q),Actions for Inoperable Fire Protection - Salem 8.2.4    HC.FP-AP.ZZ-O004(Q), Actions For Inoperable Fire Protection- Hope Creek 8-25      NC. FP-AP.ZZ-0005(Q), Fire Surveillance and Periodic Test Program 8.2.6    NC.FP-AP.ZZ-0009( Q), Fire Department Training Program 8.2.7    NC.FP-APZ-001O(Q), Fire Protection Impairment Program 8.2.8    NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work 8.2.9    NC.FP-AP.U-OOZO(Q), Compensatory Measure Fire Watch Program 8.2.10    NC.FP.AP.ZZ-O025(Q); Precautions Against Fire Common                               Page 9 of 9                               Rev. 6}}
Records Management Program NC.DE-AP.ZZ-O030(Q), Control of Temporary Modifications SC.FP.AP.ZZ-0003(Q), Actions for Inoperable Fire Protection - Salem HC. FP-AP.ZZ-O004(Q), Actions For Inoperable Fire Protection-Hope Creek NC. FP-AP.ZZ-0005(Q), Fire Surveillance and Periodic Test Program NC. FP-AP.ZZ-0009( Q), Fire Department Training Program NC.FP-APZ-001 O(Q), Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work NC. FP-AP.U-OOZO(Q), Compensatory Measure Fire Watch Program NC.FP.AP.ZZ-O025(Q); Precautions Against Fire Common Page 9 of 9 Rev. 6}}

Latest revision as of 06:01, 16 January 2025

Written Exam Reference Material
ML033570032
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/01/2003
From: Alan Blamey
NRC/RGN-I/DRS/OSB
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-354/03-301
Download: ML033570032 (163)


Text

ECG Section ii Pg 1 of5 AAAG AC ADS ALARA APRM A RI ARM ASAP ASM AS ATWS BKGD BKR BNE CACS CAS CCPM CEDE CDE CFR CIS CNTMT CP CPM CR CREF CRIDS CRD css DC DAPA CDE DEI DEMA DEP HOPE CREEK EVENT CLASSIFICATION GUIDE Glossary of Acronyms & Abbreviations Section ii Accident Assessment Advisory Group (Delaware)

Alternating Current Automatic Depressurization System As Low As Reasonably Achievable Average Power Range Monitor Alternate Rod Insertion Area Radiation Monitor As Soon As Possible Administrative Support Manager Administrative Supervisor Anticipated Transient Without Scram

Background

Breaker (electrical circuit)

Bureau of Nuclear Engineering (NJDEPE)

Containment Atmosphere Control System Central Alarm Station Corrected Counts per Minute Committed Effective Dose Equivalent Committed Dose Equivalent 4

Code of Federal Regulations Containment Isolation System r-I -

~

Containment (Bamer)

U I

Control Point Counts Per Minute I

> I e

Control Room Control Rmm Emergency Filter System Control Room Integrated Display System Control Rod Drive Core Spray System

. a -

I Direct Current Drywell Atmosphere Post Accident (Radiation monitor)

Deep Dose Equivalent Dose Equivalent Iodine Delaware Emergency Management Agency Department of Environmental Protection (NJ)

HCGS Rev. 00

DID DLD DOE DOT DPCC/DCR DPM DRCF EACS EAL EAS EC ECCS ECG EDG ED0 EMRAD ENC ENS EOC EOF EOP PA EPA EPC EPIP EPZ EQPT ERDS ERM ERO ESF ESSX FC FFD FRVS FTS GE HCLL HCGS ECG Section ii P g 2 o f 5 Direct Inward Dial (phone system)

Drywell Leak Detection Department of Energy Department of Transportation Discharge Prevention, Containment, & Countermeasures/

Discharge Cleanup & Removal Plan Disintegrations per Minute Dose Rate Conversion Factor ESF Equipment Area Cooling System Emergency Action Level Emergency Alert System (Broadcast)

Emergency Coordinator Emergency Core Cooling Systems Emergency Classification Guide Emergency Diesel Generator Emergency Duty Officer Emergency Radio (NJ)

Emergency News Center Emergency Notification System (NRC)

Emergency Operations Center (NJ & DE)

Emergency Operations Facility Emergency Operating Procedure Emergency Preparedness Advisor Environmental Protection Agency Emergency Preparedness Coordinator Emergency Plan Implementing Procedure Emergency Planning Zone Equipment Emergency Response Data System Emergency Response Manager Emergency Response Organization Engineered Safety Feature Electronic Switch System Exchange (Centrex)

Fuel Clad (Barrier)

Fitness For Duty Filtration, Recirculation, and Ventilation System Federal Telecommunications System (NRC)

General Emergency Heat Capacity Level Limit Hope Creek Generating Station HCGS Rev. 00

HCTL HEPA HPCI HTV HVAC HWCI HX IAW IC ICMF IDLH IRM I/S KI KV LAC LCO LDE LEL LLD LOCA LOP LPCI LPZ MCR MDA MEA MEES MET M.O.U.

MRO MSIV MSIVSS MSL NAWAS NCO NDAB NE0 NETS Heat Capacity Temperature Limit High Efficiency Particulate Absorbers High Pressure Coolant Injection Hardened Torus Vent Heating, Ventilation & Air Conditioning Hydrogen Water Chemical Injection Heat Exchanger In Accordance With Initiating Condition Initial Contact Message Form Immediately Dangerous to Life and Health Intermediate Range Monitor In Service Potassium Iodide Kilovolt Lower Alloways Creek Limiting Condition for Operation Lens Dose Equivalent Lower Explosive Limit Lowest Level Detectable Loss of Coolant Accident Loss of Offsite Power Low Pressure Coolant Injection Low Population Zone Main Control Room Minimum Detectable Amount Minimum Exclusion Area Major Equipment & Electrical Status (Form)

Meteorological Memorandum of Understanding Medical Review Officer Main Steam Isolation Valve Main Steam Isolation Valve Sealing System Main Steam Line National Attack Warning Alert System Nuclear Control Operator Nuclear Department Administration Building (TB2)

Nuclear Equipment Operator Nuclear Emergency Telecommunications System ECG Section ii P g j of5 HCGS Rev. 00

NFE NFPB NJSP NOAA NPV NRC NS S NSSSS NSTA NUMARC N W S OBE OCA ODCM OEM OHA OPCON OSB osc PAG PAR PASS PC PCIG PCIS PS IG RAD RAL RC RCA RCAM RCIC RCS RHR RM RMO RMS RPS RPV RRCS RPS ECG Section ii P g 4 o f 5 Nuclear Fuels Engineer Normal Full Power Background New Jersey State Police National Oceanographic and Atmospheric Administration North Plant Vent Nuclear Regulatory Commission Nuclear Shift Supervisor Nuclear Steam Supply Shutoff System Nuclear Shift Technical Advisor Nuclear Management and Resources Council National Weather Service Operating Basis Earthquake Owner Controlled Area Offsite Dose Calculation Manual Office of Emergency Management (NJ)

Overhead Annunciator Operating Condition Operational Status Board (Form)

Operations Support Center Protective Action Guideline Protective Action Recommendation Post Accident Sample System Primary Contain men t (Barrier)

Primary containment Instrument Gas System Primary Containment Isolation System Pounds Square Inch Gauge Radiation Reportable Action Level Reactor Coolant Radiologically Controlled Area Repair and Corrective Action Mission Reactor Core Isolation Cooling Reactor Coolant System (Bamer)

Residual Heat Removal (Containment Heat Removal)

Recovery Manager Recovery Management Organization Radiation Monitoring System Radiation Protection Supervisor Reactor Protection System Reactor Pressure Vessel Redundant Reactivity Control System HCGS Rev. 00

RS M RWCU SACS SAE SAM SAS SBO SCBA SCP SDE SDM SLC SJAE SNM SNSS sos SPDS SPV SRM SRPT SRV SSCL SSE ssws SSNM TAF TDR TEDE TIP TLV T/S TSC TSS TSTL TSTM UE UFSAR UHS USCG VDC WB Radiological Support Manager Reactor Water Cleanup (System)

Safety Auxiliaries Cooling System Site Area Emergency Severe Accident Management Secondary Alarm Station (Security)

Station Blackout Self Contained Breathing Apparatus Security Contingency Procedure Shallow Dose Equivalent Shutdown Margin Standby Liquid Control Steam Jet Air Ejector Special Nuclear Material Senior Nuclear Shift Supervisor Systems Operations Supervisor (Security)

Safety Parameter Display System South Plant Vent Source Range Monitor Shift Radiation Protection Technician Safety Relief Valve Station Status Checklist Safe Shutdown Earthquake Station Service Water System Strategic Special Nuclear Material Top of Active Fuel Technical Document Room Total Effective Dose Equivalent Traversing Incore Probe Threshold Limit Value Technical Specifications Technical Support Center Technical Support Supervisor Technical Support Team Leader Technical Support Team Member Unusual Event Updated Final Safety.4nalysis Report Ultimate Heat Sink United States Coast Guard Volts Direct Current Whole Body ECG Section ii Pg5of5 HCGS Rev. 00

  • pl, 3

ANY SRV is determined to be Stuck Open Initiating Condition OPCON EAL #

I I

M I

I R

I I

E l

E l

G I

N I

Y I

I I

A I

T I

0 1 C

I C

I I

I N

I L

I V

I L

I S

I I

I I

E t

_ _ I Action Required 1.l.l

.a IF Reactor Coolant Sample Activity

> 4 pCi/gm Dose Equivalent 1-131 I

r..

F) 1.0 Fuel Clad Challenge 1.1 RCS Activity Fuel Clad Degradation

~

Valid Offgas Pretreatment Radiation Monitor (9RX62 1 / 9RX622)

High Alarm Condition

( 2 2.2E+04 mRem/hr)

L

. I----

(

1,2,3,4 )

I

.l.l

.c IF Valid Main Steam Line Radiation Monitor High High Alarm Condition

( 2 3 times Normal Full Power Background)

Refer to Attachment 1 UNUSUAL EVENT..

AND

/r NOTE:

Refer to Section 3.0, Fission Product Barrier Table prior to Event Classification

~

+

IiCCiS liCG R W no I or I 1,2,3 1

1.1.2 I

Refer to Attachment 2 ALERT

m x s ECO Rev. 00 Pagc I of I 2.0 RCS Challenge 2.1 RCS Leakage RCS Leakage Initiating Condition

( --Tz-)

2.1 -1.b IF Reactor Coolant System Unidentified Leakage

> 10 gpm (Using 10 minute average)

('

1, 2, 3 1

(

1,2, 3

)

2.1.l

.a IF Reactor Coolant System Pressure Boundary Leakage

> 10 gpm (Using IO minute average)

I OPCON 2.1.1.d IF Successful Isolation of a Reactor Recirc Pump Dual Seal Failure within 10 minutes of recognition I

2.1.l

.c IF EAL ##

1 I

M I

I R

I I

E l

E l

G I

N I

Y I

I I

A I

T I

0 1 I

I I

c I

C I

I I

N l

L I

V I

L I

S I

-.I Reactor Coolant System Identified Leakage

> 25 gpm averaged over any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period I

1.-

THEN NOTE:

Refer to Section 3.0, Fission Product Barrier Table prior to Event Classification

_ _ _ _ -~

i I,

i Action Required Refer to Attachment I UNUSUAL EVENT

-.i E

hI E

R G

E N

C Y

A C

T I

0 N

L E

V E

L S

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

.-I Ini tiat ing Condition OPCON EAI, #

Action Req u ired Otlicr Coiiditions Exist

~

(

Wliicli In the Judgiiient ol'tlie Ihicrgcncy Coordinator Warrant I )cciiiriitioii ol'ilii IJn\\lstial Evcnt. '

i.

All 4.1.1 -

IF I

Events are in progress or

, have occurred which, in the judgment of the Emergency I

Coordinator, indicate a i

I'otcnthl Degradation of I'lii~lt Safety THEN 1

Refer to Attachment 1 1

UNUSUAL EVENT 4.0 E C Discretion 4.1 Emergency Coordinator Discretion

-- - - _ _ ~

r Other Conditions Exist Which hi the Judgment oftlie llmcrgeiicy Coordinator Warrant Dtclaratioti ol' an Alert -

i All 4.1.2 IF I

I I

Events are in progress or have occurred which, in the judgment of the Emergency Coordinator, indicate EITt iER one of the following:

Plant safety systems (more than one) are or may be degraded ANY Plant Vital Structure is degraded or potential I y degraded I

AND Increased monitoring of Safety Functions is warranted i THEN I __

.- __.. - ----I-_

Refer to Attachment 2 ALERT

,' Othcr Conditions Exist Which '\\

hi the Jtidgment of the Emergency Coordinator Warrant Declaration a Site Area Eiiicrgency 1'

i All

')

4.1.3 IF I

1 I Events are in progress or have occurred which, in the judgment of the Emergency Coordinator, indicate an Actual or likely major failure of plant functions needed for protection of the public THEN Rcfer to Altachincnt 3 SITE AREA EMERGENCY

..I

,'<7

\\

4 HCGS ECG Kcv. 00 Pagc I of 1

,,-- Other Conditions Exist Wlirch hi the Judgment of the Emergency a General Emergency Warrant Dcxlaration of

\\- __

(---Am 4.1.4 IF Events are in progress or have occurred which, in the judgment of the Emergency Coordinator, indicate an Actual or imminent substantial core degradation with the potential for loss of containment THEN Refer to Attachment 4 GENERAL EMERGENCY'

IICGS ECG Rev. 00 Page 1 of 1 5.0 Failure to Scram 5.1 ATWS Failure of the Reactor Protection System (E?).\\,

Failure of tlic Reactor Protection Systcm (RPS) to Successliilly Complete a Reactor Scrim (Automatic or Manual)

/ Failure of the Reactor Protection --

System (RPS) to Successfully Complrte a Reactor Scram (Automatic and Manual) and Rcactor Power is above 4%

~

--c i

to Successliilly Complete a Reactor Scram (Automatic and Manual) and there is indication o l an

\\. Estreme Challenee to the Ability to Cool thc Core i

Initiating Condition I

Action Required i

I i I I

I I

I I

I I

.=.-.--....

('

I, 2

\\

5.1.2.b IF OPCON EAL #

E M

E R

G E

N C

Y A

C T

I 0

N L

E V

E L

S 5.1.4 5.1.3 5.1.2.a I

I I

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

1 I

I I

I I

I I

I IF An Automatic Reactor Scram Condition exists 1 AND ANY Manually Initiated Reactor Scram (RPS) from the Control Room IS NOT successful An Automatic Reactor Scram (RPS) IS NOT successful r

1 ALL Reactor Scram attempts

..... 1 from the Control Room (RPS and ARI) DID NOT AND 1 L

r--

REDUCE and MArNTAIN Reactor Power to 5 4%

EITHER one of the following:

Reactor Water Level CANNOT BE MAINTAINED > -190" The combination of Suppression Pool Temperature and RPV Pressure CANNOTBE MAINTAINED belowthe HCTL Curve I

THEN AND

. I 1 THEN

~......

Refer to Attachment 4 GENERAL EMERGENCY

~-

Refer to Attachment 3 SITE AREA EMERGENCY Refer to Attachment 2 ALERT

6.0 Radiological Releases/Occurrences 6.1 Gaseous Effluent Release

~-

_ _ ~

~

Any Unplanned Release of Gaseous Radioactivity to Initiating Condition Any Unplanned Rclcase of Gaseous Radioactivity to Environncnt hat the hdiological Technical Specifications for 60

- tiiinutcs or longer i

the Environment that Esceeds 2 limes the IOCFR20. Appcndis B limits for 60 minutes or longer

~

OPCON EAL ##

I I

E l

E l

G I

N I

Y I

I I

A I

T I

I 0 1 M

I I

H I

I c

I C

I

I N

I L

I I

I I

5 :

I L

I S

I

. I Act io 11 Required 6.1.l

.a 6.1.1.b Field Dose IF Measured IF

,ssessment Dosc Assessment ilidiciilcs EITHER one of the following

I( tlic MEA or beyond
IS c;ilcul;ilcd on IllC SSCL

TEDE -I-D;iy DOSC

> 2.OE-01 mUem Thyroid-CDE Dose

> 6.NE-Ut mRem based on Plant Vent cfllucnt SiaIiiPlC analysis and NOT on a default Noble Gas IO lodine Riitio 05% !%!!e_.

Dosc Rate measured at lire Prolccrcd Area Bound;rry or beyond EXCEEDS

.OS mRem/hr above nornial biickground 6.1.1.c Sample IF

!%&s Gaseous effluent release saniplc analysis for ANY onc of the follo\\ving indicates it concentration o t FUVS:

> 1.13E-03 pCi/cc Total Noble Cas

> 2.71E-07 pCi/cc 1-131 NPV:

> 2.43E-04 pCilcc Total Nuhle Cas

> 5.81E-08 pCi/cc 1-131 SPV:

> 2.27E-05 pCi/cc Total Noble Cas

> 5.44 E-09 pCilcc I-13 I

(

,411 6.1.1.d Alarm IF ndtcatms Valid High Alarm received from ANY onc of tlic following Plant Effluent RMS Chiinncls FUVS Noble Cas (Grid 1/3, 9RX6XO)

NPV Nohle Cas (Grid 1/3; 9RX590)

NPV Iodine (Grid 3, 9RX601)

SPV Noble Gas (Grid 1/3; 9RXSXO)

SPV Iodine (Grid 3; 9RX605)

HTV Nohle Gas (Grid 3,9RX5 16)

[ AND Tolal Plant Vent release rate EXCEEDS EITHER ollc or tile roiiowlllg illlllls 4.80Ei-03 @/see Total Noble Cas 1.15EHO pCilscc I-I31(NPV L SIVONJJ) - -

I - - -

.T-........................

AND 1-Dose Assessment results NOT available I

-r-----

_ _ ~ _

J 1 AND rRelease is ongoing for 2 60

.- minutes]

. __ piGI 1

Refer to Attachment I UNUSUAL EVENT

.J

6.0 Radiological ReIeasedOccurrences 6.1 Gaseous Effluent Release Valid High AIarni rcccived froin ANY oiic of tlic following Plant ElTluent RMS Chaniwls:

FRVS Noble Cas (Grid 1/3; YRXG80)

NPV Noble Cas (Grid 1/3; YRX590)

NPV Iodine (Grid 3; YRX601) liCGS ECti Rev. 00 Page 2 of 4 I

Any Unplanned Release of Gaseous Radioactivity to the Environtnent that Evcecds 200 tinies the IOCFRZO, Appendix B limits for 30 minutes or longer Any Unplanned Release of Gaseous Radioactivity

( Eiiviroriiiient that Exceeds 200 Times the Radiological Tccliiiical Spcctficatrons for 15 intiiutcs or longer, Initiating Condition OPCON EAL #

E M

E G

E N

C Y

A C

T I

0 N

L E

V E

L S

n I

I I

I I

I I

I I

I I

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 1

( An )

6.1.2.a Dose IF lgsessrnent Dosc Asscssiiient OIIC of tlic Tollowing at rlic MEA or bcyond iis c;ilcul;ilcd on IllC SSCL:

iiidiciilcs EITHER TEDE +Day Dosc

> Z.OE+OI niRem Thyroid-CDE Dosc 2 6.8E+01 mRem b;iscd on Pl;itit Vcnt cflluciit sample analysis and m T o n a dcEiull Noblc Giis IO Iodine Rirtio I

(

All )

6.1.2.b 6.1.2.c Field Measured IF Sample IF lEe_Rak-Dose Rate measured at the Protected Area Boundary or beyond EXCEEDS 5 mRem/hr nalysis Gaseous emucnt rclcase samplc analysis for ANY one of the rollowiiig indicates a concentration of FRVS:

2 l.13E-01 pCi/cc Total Noble Cas

> 2.71E-OS pCi/cc 1-131 NPV:

> 2.13E-02 pCi/cc Total Noble Cas 2'5.81E-06 pCi/cc 1-131 SPV:

> 2.27E-03 pCi/cc Total Noble Cas

> 5.11E-07 pCi/cc 1-131 I

I AND

[ Dose Asscssment results NOT available

... _- _. 7 AND _-

Release is ongoing for 2 30 minutes 1 Act ion Required Refer to Attachment 2 ALERT

E M

E I<

c E

N c:

Y A

C I

I 0

N L

E V

E L

S 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 1

I I

Initiating Condition OPCON EAL ##

6.0 Radiological Releases/Occurrences 6.1 Gaseous Effluent Release ttccis ECG Hcv. 00 Page 3 of4 Boundary Dose Rcsulting from an Actual or Imminent Release of Gaseous Radioactivity Exceeds 100 mrcm Total Effcctivc Dose Equivalent (TEDE) or 500 mRcm Thyroid CDE Dose for the actual or projected duration of the release

.~

(

AN

)

6.1.3.a Dose IF

,ssessrnen_t Dosc Assessment indicatcs EITHER onc of tlic following ai ilic MEA or bcyond iis calculated on thc SSCL TEDE -+-Day DOSC

> I,(IE+O2 mRcm Thyroid-CDE Dose L S.OEi-02 mRcm briscd on Plant Vcnt effluciit siilliplc analysis arid NOT 011 a dchult Noblc Gas to lodlllc Rilllo

(-'-Gi-- -)

6.1.3.b Field Measured IF PSB R&-

Dosc Ratc nicasured at thc Protectcd Arca Boundary or bcyond EXCEEDS 100 mRein/hr L A N D Release is espccted to continuc for 1 15 minutes I.... -

('---AT>

- -_ -a 6.1.3.c Field Survey IF 7alYgls_

Analysis of ficld survcy samples at the Protcctcd Arca Boundery indicatcs EITHER onc of the following.

> J.36E+02 CCPM

> 3.85E-07 pCi/cc 1-131

.- I THEN I

(

All

')

6.1.3.d

. -./

Alarm IF dications Valid High Alarni rcccivcd from ANY one of [tic following Plant Eflucnt RMS Channcls:

FRVS Noble Cas (Grid 1/3; 9RX6XO)

NPV Noble Cas (Grid I/B; 9RXS90)

SPV Noble Cas (Grid 113; 9RX580)

HTV Noble Gas (Grid 3; 9RX.5 16)

]

Total Plant Vciit rclcasc ralc EXCEEDS 7.6E+07 pCi/sec Total Noble Cas 1

Dose Asscssnicnt results availablc AND

~

.~

AND I AND Release is ongoing for 2 15 minutes I 1

J Action Required Refer to Attachment 3 SITE AREA EMERGENCY

6.0 Radiological ReleasedOccurrences 6.1 Gaseous Effluent Release IICOS ECG Rev. 00 Page 4 of 4 Boundary Dose Resulting from an Actual or Imminent Release of Gaseous Radioactivity Exceeds 1000 mrem Total Effective Dose Equivalent (TEDE) or 5000 mRem Thyroid CDE Dose for the actual or projected duration of the release


.-._____I.__..._._

Initiating Condition OPCON EAL ##

1 I

M I

I R

I I

E l

E l

G I

N I

Y I

I I

A i

T I

0 1

I I

I c

C t

I

I N

I L

I V

I L

r S

I

- 1 Action Required

(

All

)

6.1.4.a Dose IF issessrnent Dosc Asscssincnl iirdicatcs EITHER oiie of the following iil tlrc MEA or bcyond

IS ciIlctilittCd 011 the SSCL:

TEDE l-Da\\ DOSC 2 t.OE+03 mRem Thyroid-CDE Dosc 2 S.OE+03 mRem based on Plant Vent effluent s;iarplc ;iiialysis and 011 lodiirc Ralio

I dcfili1lI Noble Gi\\s IO 6.1.4.b Field Measured IF me Rate Dose Rate measured at the Protected Area Boundary or beyond EXCEEDS 1000 mRem/hr

] AND Release is espcctcd to continue for L IS minutes I

r j

L _ - -

6.1.4.c Field Survey IF nak?!??

Analysis of field survey SilIIIples at the Protected Area Boundaiy indicates EITHER one of tltc following.

>1.36E+03 CCPM

> 3.8SE-06 pCi/cc 1-131

(-Ai;

-)

6.1.4.d Alarm IF idications Valid High Alarm received from ANY otic of tltc following Plmt Effluent RMS Channels:

FRVS Noble Gas (Grid 1/3; YRX6XO)

NPV Noble Gas (Grid 1/3; 9RX590)

SPV Noble Cas (Grid 1/3; YRXSXO)

HTV Noble Gas (Grid 3; Y R X S 16) 1 AND

.-.I..

7.6Ei-08 pCi/sec Total Noble Cas

[ Dose Assessment results available.

.... - L A N D I Release is ongoing for 2 15 minutes I

.-I

...J L

Refer to Attachment 4 GENERAL EMERGENCY THEN

- _. _ _ _ ~ -

II -

6.0 Radiological ReleasedOccurrences 6.2 Liquid Effluent Release

-~

Valid Cooling Tower Blowdown Effluent Radiation Monitor High Alarm Condition Initiating Condition OPCON EAI, #

E M

E K

G E

N c:

Y A c I

0 N

L E

V E

L S

'r 1

1 1

I I

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

Action Required Any Unplanned Release of Liquid Radioactivity to the lhviroiuneiit that Esceeds 2 Tiiiies the Radiological TLxhiical Specifications for 60 minutes or longer

(,411

)

T--

Any Unplanned Release of Liquid Radioactivity to the Eiiviroiunent that exceeds 200 'limes Radiological

(

'I'wluiical Spcciiicatioiis for 15 minutes or longer

\\

6.2.1 6.2.2 AND - - _-

Sample analysis of liquid effluent indicates concentration in excess of 2 times Tec ti 11 ical Spec ilica tion lini i ts 1 AND

..I

. I.. ______

-1 Release continues for 2 60 minutes after the alarm occurs J

1 THEN

........J

. t.

Refer to Attachment 1 IJNUSUAL EVENT AND I

j Sample analysis of liquid emuent indicates I

I i

Technical Specification liniits concentration in excess of 200 times I I 1

-]:."D I

1 Release continues for 2 15 minutes after the alarm occurs 1 THEN J

I - - - - -

L Refer to Attachment 2 ALERT

Initiating Condition OPCON EAL #

1 I

E l

M I

I E

l K

I G

I N

I Y

I I

I A

I T

I I

0 1 I

I I

1 C

I C

t I

N l

L I

V I

L I

S I

.-I Action Required 6.0 Radiological Releases/Occu rrences 6.3 In-Plant Radiation Occurrences HCGS F.CG Rev. 00 Page 1 of 1 7%

(

Unplanned Increase in Plant Radiation 6.3.1 IF Unplanned rise in radiation levels inside the Protected Area

> 1000 times normal as indicated by EITHER one of the following:

' Permanent or portable Area Radiation Monitors

' General Area Radiological Survey THEN r -- --

Refer to Attachment 1 I

UNUSUAL EVENT Release of Radioactive Material or increases in Radiationlevels within the facility that impedes operation of systems required to maintain

__ safe operations or to establish or maintain ____

Cold Shutdown

('A117 6.3.2.a IF Unplanned Dose Rates

> 2000 mRem/hr in ANY area of the plant which requires ACCESS to maintain plant safety functions (EXCLUDTNG the Main Control Room and CAS) as indicated by EITHER one of the following:

1 Permanent or portable Area 0 General Area Radiological Survey Radiation Monitors 6.3.2.b IF Unplanned Dose Rates

> 15 mRem/hr in EITHER one of the following Main Control Room Security Central Alarm Station (CAS)

-- i-"

J I

~

Refer to Attachment 2 ALERT

Initiating Condition OPCON EAL #

1 M

I K

I I

G I

E l

I N

I C

I Y

I A

I T

I 0

1 I

I I

c I

1 I

Act ion Required 6.0 Radiological Releases/Occu r rences 6.4 Irradiated Fuel Event Unplanned Increase in Plant Radiation

(

5.j 6.4.1.a IF Uncontrolled water level drop in the Reactor Cavity as indicated by EITHER one of the following:

' Visual Observation

' Reactor Water Level Shutdown Range Level Indicator 1 BBLI-R605 i

6.4.1.b IF I

Uncontrolled water level drop in the Spent Fuel Pool as indicated by Valid Fuel Pool Low Level Alarm Condition I

I AND

. I 1.

Visual Obsenation I

1 I

THEN liC0S ECG Rev. 00 Page I of2 I

Refer to Attachment I UNUSUAL EVENT

HCGS ECG Rev. 00 Page 2 of 2 Initiating Condition

-~

Major Damage to

(

Irradiated Fuel OPCON EAL ##

1 M

I R

I I

E l

I C

I G

I N

l Y

I A

I T

I 0

1 1

I I

c I

I N

I I

I E

l L

I I

I E

l L

I S

I Action Required 6.4.2.a IF Major Damage to Irradiated Fuel has occurred A AND Valid High Alarm received from ANY one of the following RMS channels: -

' Refbel Floor Exhaust Channel A (9RX627)

' Refbel Floor Exhaust Channel B (9RX628)

' Refhel Floor Exhaust Channel C (9RX629)


I-----

6.0 Radiologic,. Releases/Occurrences 6.4 Irradiated Fuel Event Events that have or may result in uncovering Irradiated Fuel outside the Reactor Vessel

( All 6.4.2.b IF Unplanned rise on ANy one of the following Area Rad Monitors or by general area rad survey indicates

> 2000 mRem/hr:

' Spent Fuel Storage Pool Area (9RX707)

' New Fuel Criticality Storage Channel A (9RX6 12)

' New Fuel Criticality Storage Channel B (9RX6 13) 6.4.2.c IF Visual observation of Irradiated Fuel uncovered I

THEN Refer to Attachment 2

---I

IICGS ECG Kcv. 00 Page I Of2 7.0 Electrical Power 7.1 Loss of AC Power Capabilities

~.

1.0~s olAll Offsitc Power AC power capability to Vital Buses reduced to a Single Power' Shutdown or Refueling for greater

_ _ than

~ IS niiriute5

_ _ ~ _ _ _

Loss of All OlTsite Power and All Onsite AC

(

tu vital 13uses for greater ) ( Source for greater than 15 minutes such that any additional single) ( Power to 4. I6 KV Vital Buses during either in Cold )

fiailurc would result in a complete loss of all 4.16 KV Vital Buses

..A '

Initiating Condition tlian 15 minutes OPCON

(

All 1

EAI, #

7.1.1 1

IF I

Unplanned Loss of I

I Service Transformers I

I 1AXS01AND1BX501 to I

i 4.16 KV Vital Buses E

I 1 E

l I

1 Power from Station R

1 E

I i

I I

c f

Y I

I AND I

I A

I T

I C

I I

I N

I L

I V

I L

r S

I 0 1 I

I 1

-. J Action Required 1

> 15 minutes have elapsed 1 THEN 1

-1 Refer to Attachment 1 UNUSUAL EVENT

(

1, 2, 3 )

7.1 -2.a IF Loss of 4.16 KV Vital Bus Power Sources (Offsite and Onsite) which results in the rvailability of ONLY one 4.16 KV Vital Bus Power Source (Offsite or Onsite)

( 4, 5, Defueled )

7.1.2.b IF 4.16 KV Vital Buses are deenergized L.

I AND

> 15 minutes have elapsed I

THEN Refer to Attachment 2 ALERT

Initiating Condition OPCON EAL #

I M

I I

R I

E I

E l

G I

N I

Y I

I I

A I

T I

0 1 I

C I

C I

I I

N I

L I

V I

L I

I I

I S

I Action Required 7.0 Electrical Power 7.1 Loss of AC Power Capabilities Loss of All Offsitc Powcr and All Onsite AC Pow& to All Vital AC Buscs during either Power Operation, )

Startup or Hot Shutdown for grcatcr than 15 niinutcs I

(

i 1,2,3

)

7.1.3 IF ALL 4.16 KV Vital Buses are deenergized I

I I

1

> 15 minutes have elapsed THEN I ICOS ISCG Rev. 00 Page 2 Of 2

'1, 2, 3 7.1.4.a

)

Prolonged Loss of All Offsitc and Onsitc AC Powcr to All Vital AC Buscs AND t

1,2, 3 1

7.1.4.b AND I

I I

Restoration of Power to at least one 4.16 KV Vital Bus within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is NOT likely 1

THEN I

Loss of any 2 Fission Product Barriers has occurred or is Imminent I

I THEN 4

Refer to Attachment 3 I

I SITE AREA EMERGENCY I

Refer to Attachment 4

~

GENERAL EMERGENCY

Initiating Condition OPCON AND EAL #

I I

M I

I E

l E

l R

I I

G I

N I

C I

Y I

I I

A I

T I

I 0 1 I

I I

C I

I N

l L

I V

I L

I 7.0 Electrical Power 7.2 Loss of DC Power Capabilities

)

Unplanned Loss of All Vital 125 VDC Power during either

( Cold Shutdown or Reheling Mode for greater than 15 minutes

( 4, 5, Deheled )

7.2.1 IF I

i I

Unplanned degraded voltage condition for such that voltage is < 108 VDC Vital 125 VDC Buses,

> 15 niinutes have elapsed I

1 THEN Action Required Refer to Attachment 1 UNUSUAL EVENT I

)

Unplanned Loss of All Vital 125 VDC Power during either Power

, Operation, Startup or Hot Shutdown for greater than 15 Minutes i

(---,

3

)

7.2.3 IF I

I Unplanned degraded voltage condition for such that voltage is < 108 VDC Vital 125 VDC Buses, 1...

I 1

I 1 AND

> 15 minutes have elapsed I

Initiating Condition OPCON EAL #

E

&I E

R c E

N c Y

A C

T I

0 N

L E

V E

L S

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

1 I

I I

I I

I I

I I

I I

1 Action Required 8,O System Malfunctions 8.1 Loss of Heat Removal Capabililty Inability to Maintain the Plant in Cold Shutdown

- ~ _ _ - - __.

(I 4, 5

')

7 8.1.2 IF Unplanned, Complete Loss of systems available to provide Decay Heat Removal functions Technical Specification required I

AND RCS Temperature has risen to

> 200°F (Excluding a <I5 minutes rise

>200°F with a heat removal function restored) -

I............

I.

-1 AND An UNCONTROLLED temperature rise is RAPIDLY approaching 200°F (with NO heat removal function res tored)

I THEN 1

.... ~-

Refer to Attachment 2 ALERT

' Loss of Reactor Water Level -'

that has or will Uncover Fuel in the Reactor Vessel

(

4,s 1

8.1.3.a IF Reactor Water Level (Top of Active Fuel)

REACHES -161" tiCtiS ECti Rev. 00 Page I of I Complete I.oss of Functions Needed to Achieve Cold Shutdown Conditions

.~

1,2,3 8.1.3.b IF Loss of Main Condenser capabilities, as evidenced by an inability to remove Decay Heat from the Reactor Loss of Torus capabilities as evidenced by EITHER one of the following:

Entry into an Unsafe region of ANY one of the following curves:

  • Heat Capacity Temperature Limit (HCTL) Curve
  • Heat Capacity Level Limit (HCLL) Curve
  • Pressure Suppression Pressure (PSP) Curve
  • SRV Tailpipe Level Limit Curve Insufficient SRV capacity to reduce RPV pressure Refer to Attachment 3 SITE AREA EMERGENCY

8.0 System Malfunctions 8.2 Loss of Overhead Annunciators 1

of Main Control Room Overhead Annunciators Initiating Condition OPCON EAL #

E M

E R c E

N Y

A C

T I

0 N

L E

V E

L

s. - 1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

1 I

I I

I I

I I

I I

I I

I I

Action Required THEN

.... I.. -

Refer to Attachment I UNUSIJAL EVENT linplanned Ims of Most or All Control Room Annunciators and a Significant Tramlent is in Progrcls or Compensatory IndiLators are UnaVdlldbk 8.2.2.a A significant t ransieii t*

  • is in progress I t I

(

I, 2,3 j

_L_--*

8.2.2. b AND BOT! I of the following.

CRIDS SPDS are NOT AVAILABLE I

1 AND 15 minutes have elapsed since the loss of OHAs 1 THEN

_ _..- - f._._

Refer to Attachment 2 ALERT Inability to Monitor a Sigiiilicant 'lruisiait in Progress

. ~..

0.2.3 IF Loss of > 75% of Main Control Room Overhead Annunciators 1 AND A significant transient** is in progress 1 1 AND 13OTH of the following CRIDS SPDS are NOT AVAILABLE r AND I

Main Control Room indications arc NOT ii\\ailiiblc to nioiiitor ANY onc of ttic roiiowing RCS Status Rcaclivity Control ECCS Containment Parameters HEN

.1 I

Refer to Attachment 3 SITE AREA EMERGENCY I

    • NOTE: A Significant Transient is based on EC judgment, but includes ias a minimum ANY of the following:

RX SCRAM, LOAD REJECTION >25% POWER, ECCS INJECTION, THERMAL POWER OSCILLATION > I O %.

Initiating Condition OPCON EAI, ##

I I

E l

I M I R I E

l C r E

t N

I I

I I

" I A

I C

I T

I I 1 0 1 I

I N

I L

I

" I L

I I

E I

E I

S I

Action Required 1

8.0 System Malfunctions 8.3 Loss of Communications Capabililty llnplanned Loss of All Onsitr or Offsite Communications Capabilities

('

All

)

8.3.1.a IF Unplanned loss of ALL ONSITE communications as evidenced by the loss of of the following systems:

  • Direct Inward Dial System (DID)

' Station Page Systcni (Gaitronics)

' Station Radio System 8.3.1.b IF Unplanned loss of ALL OFFSITE conimunicatio ns as evidenced by the loss of

&of the following syslcnls:

Direct Inward Dial Systcni Nuclear Enicrgency Esss System (Centres)

(DID)

Telephone System (NETS) phone 1 THEN t

Refer to Attachment I UNUSUAL EVENT

8.0 System Malfunctions 8.4 Control Room Evacuation HCGS ECG Rev. 01 Page I of 1 Initiating Condition Mah Control Room Evacuation has been Initiated OPCON -

EAL #


l I

M I E

l E

l G

I N

I Y

I I

I A

I I

R I

C I I C

T I

0 N

i t

8'.

E t

V I

1. '

E L

I s

0 0.4.2 IF Main Control Room Evacuation has been Initiated and Plant Control cannot be established

(

All

)

_F Main Control Room Evacuation has been initiated THEN Action Rea ra ired Refer to Attachment 2 ALERT

~~~~

Refer to Attachment 3 SITE AREA EMFRCFNPY

Initiating Condition OPCON E A L #

I I

M I

I E

l E

l G

I N

I Y

I A

I T

I 0 1 R

I E

c I

C I

I I

I I

N I

L I

v i

L I

I I

I s

f Action Required 8.0 System Malfunctions 8.5 Technical Specifications

~

Inability to Reach Required Operational Condition within Technical Specification Limits __/.

(

('

1, 2, 3

-j 8.5.1 IF Plant is NOT brought to the REQUIRED Operational Condition within the Technical Specification required time limit 7

-~

~

1 THEN Refer to Attachment 1 UNUSUAL EVENT I

IICciS ECCi Rev. 00 Page I of I

9.0 Hazards - InternaVExternal I

9.1 Security Threats

---I___-__

Security Event in a Plant Vital Area Security Event in a Plant Protected Area Confinned Security Event Which Indicates a Potential Degradation in the Level of Safetv of the Plant Initiating Condition OI'CON EAL #

1 E

M E

It G

E N

c Y

A C

T I

0 N

L E

V E

L s I

I I

I I

I I

I I

I I

I I

I I

I I

I I I I

I I

I I

I I

I I

I I

I I

I I

I (Ai-]

9.1.I IF Con finned security threat directed toward the station as evidenced by ANY -

one of the following:

Credible threat of malicious acts or

~....

destructive device within the Protected Area resulting in SCP-5 implementation Credible intrusion or assault threat to the Protected Area resulting in SCP-5 implementat ion Attempted intrusion or assault to the Protected Area resulting in SCP-7 or SCP-1 I implementation Malicious acts attempted or discovered within the Protected Area resulting in SCP-10 implementation normal plant operations resulting in SCP-8 implementation Protected Area resulting in SCP-IO implementation Hostage/Extortion situation that threatens Destructive Device discovered within the

. ~.....

<- All )

k.

9.1.2 IF Confirmed hostile intrusion or inalicious acts as evidenced by -

ANY one of the following:

Discovery of an intruder(s), armed and violent, within the Protected Area resulting in SCP-6 implementation Hostage held on-site in a non-vital area resulting in SCP-8 implementation Malicious acts attempted or discovered within a Vital Area (which is in the Protected Area) resulting in SCP-IO implementation that does not meet criteria of 9.1.3 9.1.3 IF -

_I__

Confirmed hostile intrusion or malicious acts in Plant Vital Areas that involve actual or likely major failures of dant functions needed for the protection of the public as evidenced by any one of the following:

Discovery of an intruder(s), armed and violent, within the Vital Area resulting in SCP-6 implementation Destructive device discovered in a Vital Area resulting in SCP-IO implementation HCGS ECG Rev. 01 Page I of I Security Event Resulting in Loss of Ability to Reach and Maintain Cold Security event resulting in the actual loss of physical control of EI'I'I4ER one of the following:

Control Room Remote Shutdown Panel Malicious act(s) attempted or discovered in a Vital Area resulting in SCP-10 implementation AND the malicious act(s) is of a magnitude that it SPECIFICALLY results in Damage to ANY one of the following:

TWO OR MORE Trains of a Safety System MORE THAN ONE Safety System Any Plant Vital Structure which renders the structure AND incapable of performing its Design Function Damaged Safety System(s) or Plant Vital Structure is required for the present Operational Condition THEN I I...-..

I THEN

9.0 Hazards - InternaVExternal Initiating Condition OPCON EAI, #

E M

E R

G E

N c Y

A c I

I 0

N L

E V

E L

S Actioii Required I

I I

I I

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

Fire within the Protected Area Boundary Not Estinguished within 15 minutcs of Dctection i

I All 9.2.1 IF -

(

All 1

9.2.1 IF 9.2 Valid Fire Alami is rcccived iii tlic Main Control Room Rcport of a fire from personnel at the scciic l i

- ~ - - - - I 1-1 AND 1

Fire is \\tithin ANY onc of tlic following Plant Stnicturcs potclitial to aflect Safct? S?stems or Prolectcd Arca Pcrliiiinelit Plant Struclurcs)

(EXCLUDING sni;ill fires Ihiit haw RciicIor Building j

lurbinc Building Control/Aus Building Scnicc Waler Iiit;ikc Stnslirrc Scn icc/R;id Wastc Building Low Lcvcl Radwastc lntcrini Storage Facility I

i 1

I

]-AND i

Fire is NOT estinguished within 15 minutes of I I

I.

i I EITHER one of the following.

i I

Receipt of a Valid Fire Alariii Rcport of a lire from tlic scciir:

f i

THEN t

Refer to Attachment 1 1

1 IJNUSUALEVENT 1

Page I of I Fire Fire Affecting the Operability of Pl;int Safety Systems Required to Establish or Maintain Safe Shutdown

(

All

)

9.2.2 IF Fire within ANY oiic of tlic followiiig Phiit VitA Slructurcs:

Reactor Building Control/Aus Building Scrim W;itcr Intake Structurc Scn icc/Riid W;istc Building 1 AND The Fire is of a niiignitudc tlial I I

SPECIFICALLY rcsiilts iii Ilamage to ANY oiic of llic following.

TWO OR MORE siibsystciiis of a Safety Sjsteni MORE THAN ONE Safety Systeni Any Plant Vila1 Structure which renders thc structiirc incapablc c performing its Design Function I AND Daiiiagcd Safcty Syslcin(s) or Pl;iiiI Vital Stnicture is rcquircd for tlic prcscrit 0pcr;irional Coiidition 1

THEN Refer to Attachment 2 ALERT

Initiating Condition The Explosion is of a niagnitudc that it SPECIFICALLY rcsults i n Damage lo ANY oiic of tlic following I

I OPCON TWO OR MORE subsystcnis of a Safet! Sjstem MORE THAN ONE Saftty Sjstem Any Plant Vital Structurc which renders the structurc incapable of performing its Design Function EAI, #

I I

M I

E l

E l

I I

)

i I

t I.

1 R

I I

G I

N I

Y I

I 1

A i

T i

I 0 1 c:

I C

I I

N I

L I

V I

L I

I I

I E

t s

t Ac tiori Required 9.0 Hazards - InternaVExternal 9.3 Explosion Natural and Destructive Phenomena Atrecling the Protected Arca All

(

9.3.1 IF -

I Confirmed Explosion

\\\\ it hi n thc Protcctcd Arca 1 AND I

Rcpon of visiblc daniagc to Plant equipnicnt or Protected Area Pcrniancnt Plant Structurcs I THEN I

?

Refer to Attachment I UNlJSUAL EVENT i

Explosion Affecting the Operability of Plant Safcty Systenis Required to Establish or Maintain Safe Shutdown 9.3.2 IF Confirmed Explosion within ANY onc of h c foilo\\ving Plant Vital Structures:

I tKx;s EC(;

Rev 00 Page I of I

I ni t ;at ing Condition OPCON Action Required 9.0 Hazards - InternaVExternal 9.4 Toxic/Flammable Gases I

Release of Toxic or Flammable Gases Deemed Detrimental to Safe Operation of the Plant

('

All

\\

9.4.1.a IF I

1 Notification by Local, County, or I State Ofticials for the potential need I

i I

I I

I

~

I 1

to EVACUATE non-essential personnel due to an Offsite Toxic Gas release I I AND SNSS deems evacuation of non-essential personnel is required i i i -

9.4.1.b IF Uncontrolled Toxic Gas release within the Protected Area in ANY area which does not normally require an atmospheric survey or Respiratoty Protection for entry I

(

All

)

9.4.1.c IF IIC'OS 1:u; Kev 00 Page I Of 2 1

llncontrolled Flammable Giis 1

release wit hi n the Protected Area that RESULTS in Flammable Gas concentrations 2SY" of the LEL 1: x c E Ii r) I K G 1

1 AND I

I Routine Plant Operations are IMPEDED based on EITHER one of the following.

Access restrictions caused by the uncontrolled release Personnel injuries have occurred as a result of the release THEN

+

Refer to Attachment 1 UNUSUAL EVENT

Initiating C g n ci i t i on OPCON EAI, #

I I

E l

It1 1

E l

K I

(;

I 1.:

I N

l c

Y I

I I

A I

T I

0 1 I

I I

C I

I

I N

I L

I E

l V

I L

I I

I I

I Action Required 9.0 Hazards - InternaVExternal 9.4 ToxidFlammable Cases Release of Toxic or Flammable Gases Within a Facility Structure Which Jeopardizes Operation of Systems Required to Maintain Safe Operations or to Establish or Maintain Cold Shutdown Conditions I

9.4.2.a IF Uncontrolled Toxic Cas release within ANY one of the following Plant Structures Reactor Building Turbine Building (ontrol/Aux Building Service Water Intahe Structure ServicdRad Waste Building

[ AND Toxic Gas concentrations result in ANY one of the following.

An IDLt1 atmosphere Plant personnel report severe adverse health reactions, 1

The Threshold Limit Value (TLV) being EXCEEDED including burning eyes, nose, throat, dizziness

- -I-I. -................

^___....... -.

I

~

i i

~

I I

i I

I I C W ECG Hcv 00 Page 2 o f 2

(

All

\\

9.4.2.b IF Uncontrolled Flammable Cas release within ANY one of the following Plant Structures Reactor Building Turbine Building ConrroVAux Building Service Water Intake Structure Service/Rad Waste Building

- 1 AND

~latnmable Gas concentrations EXCEED 50% of the LEL I AND I

Plant personnel are unable to perform actions necessary to complete a Safe Shutdown of the plant without appropriate personnel protection equipment 1 THEN Refer to Attachment 2 ALERT

9.0 Hazards - InternaVExternal 9.5 Seismic Event I

IlC(iS ECO K C V. 00 Pagc I of I initiating Condition OPCON EAL #

I I

E l

E l

G I

N I

Y I

A I

'1' I

0 1 M

I I

R I

1 E

c c

I I

I I

I N

I L

I V

I 1,

1 I

I I

S I

Act io 11 Required Natural and Destructive Phenomena Affecting the Protected Area 9.5.1.a IF I

1 j Seismic Event felt by personnel within the I Protected Area I

('

All

)

9.5.1.b IF Valid Actuation of the Seismic Trigger (> 0.01g) has occurred as verified by the SMA-3 Event Indicator (flag) being WHITE on Panel IO-C-673 in the Upper Relay Room t

Ke1i.r to Attachnient 24 i

I UNUSUAL EVEN'I (Common Site) I 1

Natural and Destructive Phenomena Atfecting the Plant Vital Area

(

All

)

9.5.2 I

1 Valid Actuation of the Seismic Switch (> 0.lg) i has occurred as veritied by Ell1 IER one I

of the following:

AND Valid actuation of Main Control Room Overhead Annunciator C6-C4 Power Supply Drawer is lit on Panel IO-C-673 in the Upper Relay Room AMBER Alarm light on the Seismic Switch 1 THEN t

Refer to Attachment 2 ALERI I

I

9.0 Hazards - Internal/External 9.6 High Winds Initiating Condition Natural and Destructive Phenomena OPC'ON

'i

(

i Affecting the Piotected Area All

\\

(

Ail I

9.6.1.a IF Report of a Tornado

'l:OUC11ING DOWN within the I'l-otected Area I

1 N

I 9.6.1.b IF Sustained wind speeds

> 75 MPH for 15 minutes, measured at ANY elevation of the Met Tower I

b I

THEN t

Act ion Required v

Refer to Attachinent 24

' IJNUSIJAL, EVENT (Coninion Site)

Natural and Destructive Phenomena AtTecting the Plant Vital Area

(

All

')

9.6.2 The Wind Speed is of a magnitude that it SPECIFICAL1.Y results in Damage to ANY one of the following:

Rendering ANY of the following structures incapable of perforniing TWO OR MORE subsystems of a Safety Systeni MORE THAN ONE Safety Systeni its Design Function

  • Reactor Building
  • Control/Aux Building
  • Service/Radwaste Building I

AND I

Damaged Safety System(s) or Plant Vital Structure is required for the present Operational Condition 4 THEN Refer to Attachment 2 A I.E R'I*

9.0 Hazards - InternaVExternal 9.7 Flooding i

Initiating Condition Internal Flooding in Excess of Sump Handling Capability Affecting Safety Related Areas of the Plant Internal Flooding Affecting the Operabilityof Plant Safety Systems Required to Establish or Maintain Safe Shutdown

(

(

OPCON EAL #

9.7.1 I

IF I

1 E

l R

1 1

I I

Normal Floor Level ( > I " ) referenced in EOP 103, G

N I

I Greater than 2" of water in ANY area that contains a I

Siifety System(s), not included above

~i I

E l

l Visual Observation of Uncontrolled Flooding that confirms ANY one of the following 1

Reactor Building Floor Levels above the Maximum Secondary Containment Control E

Receipt ofa SSWS Pump Room Flooded Alarm A

1

'I' I

C I

I

(

All

\\

9.7.2 IF Visual Observation of Flooding within ANY one I

I of the following Plant Vital Structures i

Reactor Building ControVAux Building Service Water Intake Structure ServicdRad Waste Building I

I

~

~

I AND The Flooding is ofa magnitude that it XCIFICALLY results in Daniage to ANY one of the following I

I I i

'TWO

-- OR MORE subsystems of a Safety System 1

1 S

I Action Required I t Refer to Attachment I U N US I1 A L EV EN'I' L

1 MORE I H A N ONE Safety System I

Any of the above listed Plant Vital Structures which renders i

the structure incapable of performing its Design Function 1 AND Damaged Safety System(s) or Plant Vital Structure is required for I

I the present Operational Condition i

I THEN t

A LE 14'1.

i Refer to Attachment 2

lnitiating Condition OPCON EAL #

I I

E l

bl I

E l

H I

G I

E l

N I

Y I

I I

A I

I I'

I 0 1 I

I I

I I

N I

L I

V I

1, I

1 I

I I

E t

E Action Required 9.0 Hazards - InternallExternal 9.8 Turbine Failure / Vehicle Crash / Missile Impact HC<IS ECG KW. no Page I of I

)

Natural and Destructive Phenomena Affecting Certain Structures Within the Protected Area Natural and Destructive Phenomena

( Affecting Certain Structures Within the Plant Vital Area j

All 1

9.8.1.a IF I

j Catastrophic damage to the i

j Main Turbine casing Main Turbine as evidenced by EITHER one of the following:

penetration 1)arnage potentially releasing Lube Oil or t iydrogen Gas Main I'urbine/Generator I

to the Turbine Building I I i

\\

I

( - - Ail

)

9.8.1.b IF Vehicle Crash /

Missile Impact with or within ANY one of the following Plant Structures' 1. -

Reactor Building Turbine Building Control/Aux Building Service Water Intake Service/Rad Waste Building Structure I THEN

. 1 Refer to Attachment I UNUSUAL EVENT

[

All

'I 9.8.2 IF I

I Vehicle Crash / Missile Impact with or within i

Control/Aux Building I I I

I ANY one of the following Plant Vital Structures Reactor Building Service Water Intake Structure ServicdRad Waste Building I

I 1 AND l h e Vehicle Crash / Missile Impact is of a magnitude I 1 that it SPECIFICALLY results in Damage to ANY one of the following

~

TWO OK MORE subsystems of' a Safety System MORE THAN ONE Safety System

~

I Any of the above Plant Vital Structures which renders the structure incapable of performing its Design Function I AND Safety System(s) or Plant Vital Structure for the present Operational Condition 4 THEN Refer to Attachment 2 ALERT

Initiating Condition OPCON EAL # -

1 I

E M

I I

R I

I E

l G

I N

I Y

I I

I A

I T

I 0 1 c

I c

1 I

1 I

N l

L l

E 1

V I

L I

I 1

Action Required 9.0 Hazards - InternaVExternal 9.9 River Level Natural and Destructive Phenomena

~.- - - - - -

(

AfYecting the Protected Area 9.9.1.a IF

~

(,

All

)

9.9.1.b IF River Level < 80.0' I 1

. I I

THEN Refer to Attachment 24 UNUSUAL EVENT (Common Site)

. \\

Initiating C'o nd i I i o n OPC'ON I U L, #

I I

'I I

1' I

It I

1 1

(;

I A

I T

I 0

I I'

I 0

I I

I I

I N

I c

t I

I I

1 N

I 1,

I E

l V

I L

l I

I I

I 1

S I

Action i i c q u i i cu 11.0 Reportable Action Levels 11.1 Technical Specifications

~.

INI'I'IA'I'ION 01; ANY 1lNl'l SI l1Jl'l)OWN ItliQUIKlil) IiS '1'1 Ili l'l:Cl INICAI, Sl'liCII~ICh'l'lONS I IOCIzR5U.72(h)(2)(i) 11.1.I

.a IF Unit shutdown is INIIIATEII to comply with

'I'eclinical Speci ticat ions THEN I

Refer to Attachment 14 I

4 i iuiu iicpuii I

I I

I

/ - - -

liXCl3il)lN(j ANY 'I'liCI INICAl, Shl.lI'I'Y I.IMII

[ IOCFR50.36(c)(l),'I'S 6.7.I.aI

\\

(

1, 2,3,4,5 (as applicable in TIS)]

ll.l.l.b IF Exceeding ANY one of the following Technical Specification Safety Limits:

T/S 2.1.1,'I'lIERMAL POWER, Low Pressure or Low Flow

'us THERM THERMAL POWER, tligh Pressure and High Flow T/S 2.1.3, REACTOR COOLANT SYSTEM PRESSURE T/S 2.1.4, REACTOR VESSEL WATER LEVEL THEN I ICGS ECG Ilev. 02 Page I of 2 ANY IXVIA'I'ION I'KOM T/S OR 1,ICLINSII CONI)I'I'ION I'URSUAN'I '1'0 IOCI.X50.54(x) I IOCFR50.72(h)( I)]

c-All-3 11.I

.l.c IF Action required because no action consistent with Technical Specifications or license can provide adequate or equivalent protection in an emergency (See NC.NA-AP.ZZ-0005 (Q) for guidance on deviation from written procedures) 12 1

I THEN

11.0 Reportable Action Levels 11.1 Technical Specifications

~

. i ANY EVENT REQUIRING AN ENGINEERING EVAIAJATION BY TECI INICAL SPECIFICAIIONS OR COMMITMENT VIOLATION OF T H E REQUIREMENTS i

CONTAINED IN THE OPERATING LICENSE Initiating Co ndi t io n

\\,

[TIS 3.4.6.1, 3.4.4,3.7.5]

---e

[JICGS Operating License, Sections 2.FJ

\\

OICON

(--

-All-->

\\

.../

1 I.I

.3.a IF Violation of ANY one of the rcq uircnicnt s contni tied in Scc t ion 2.C ottlic ()pcrating I,icensc l~X(l~1l.

is otlicr\\vise proiidcd in thc Icchnical Spccitications o r Ilti~~irotitiicntal Irotcction Ihn I 1.I

.3.b 1 THEN IF Any of the T/S I.cos li)r JiCS Pros SII re/

Ienipcrature (T/S 3.4.6.1 )

arc exceeded there by requiring an Engineering Eva1 uat ion.

I

( All

)

11.I

.3.c IF The conductivity, chloride concentration or pl1 in the RCS is in excess of its specified limits per T/S 3.4.4 Action Statement C. 1 thereby requiring an Engineering Evaluation All I 1.I

.3.d IF One or more snubbers are tound to be INOIIRAI31,I and have been replaced or restored to an 0 I ERA I3 LE stilt us, an Engineering Evaluation shall be performed per T/S 4.7.54 1

J THEN 1

I ICGS ECG I k v 01 Page I of I 11.0 Reportable Action Levels 1 I.2 Degraded or Unanalyzed Condition 11.2.1 IF 11s judgcd by tlic OS/KI)O, an cvcnt or condition that rcsults in ANY unc ofthc li)llo\\ving:

I tic condition 01' tlic pliirit. iiicluding its principal salkty barricrs, being scriously dcgradcd; The plant being in an unanalyzed condition that significantly degrades plant safety.

J l

I:VEN'I'/CONI~I~I'ION TIIAI COULD IIAVE I'RISVEN'IED CI'RI'AIN SAFETY FUNCI'IONS

[ 10CI:R50.72 (b)(3)(v)]

c--

All 1 I

.2.2.b IF Any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to pcrform ANY one of the following:

4. Shutdown the reactor and maintain it in a safe shutdown condition
3. Remove residual heat.
2. Control the release of radioactive material D. Mitigate the consequences of an accident THEN THEN 1

~

I n I I

.... n..-....

I I

d

11.0 actuation of the reactor protection system (RPS) when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.

Reportable Action Levels 1 1.3 System Actuations 111 it i at i ng C'ondi tion OI'CON RAL #

It E=

I' 0

H T

I N

(;

A C

T 1

0 N

L E

V E

L S

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

( All 1

11.3.1 IF 2

Valid ECCS Actuation, Manual or Automatic, has or should have occurred I.....

I

-.- AND

~

ECCS results, or should have resulted, in discharge to the vessel 1

AND Actuation is NOT part of a pre-planned sequence during testing or reactor operation.

1 THEN L

rHEN IICGS ECG Ikv. 02 Page I of I

~~

--\\

VAI I I ) A C I ~ I A ~ I O N O ~ I I S ~ ~ I ~ S Y S I I ~ M I XCI P I I'K1 PI ANN1 I) [ 1OC.I IlW 72(b)(3)(iv)(A)I

(\\.-

(-

All -

1

')

11.3.3 IF Any event or condition that results in valid actuation of any system listed in Technical Basis 1 1.3.3 except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation.

I ---

THEN I

4 tiour Kenort I

11.0 Reportable Action Levels 11.4 Personnel Safety / Overexposure

- c - A!!..)

OI'CON ItAL, ##

1 I.4.1 I

IF I

I E:

I j 1'

I I 1 I ~ I ~ I ~ S O N N ~ ~ I,

OVEREXPOSURE or potential I

I A

I c

I

'r I

N l

L I

E l

V I

L I

S I

0 1 I

I I

I E

I A rtinn I<eauired D

for oscrcsposurc as indicated by

--.- ANY one of the folloiving:

'l*Kl)K exposure > - 25 Hem I,DE exposure >

- 75 Hem SI)K exposure > - 250 Item I<elcasc of radioactive material inside or outside of a Kestricted Area so that had an individual been present for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the individual could have received > 5 times the occupational ALI (Annual Limit of Intake) which would usually equate to 25 Rem CEDE. This Does N O 1 apply to areas where personnel are NOT normally stationed during routine operations.

I i kiour Kepon I

-2 1

L-.. -!LJ 1 I

.4.2.a IF PERSONNEL OVEREXPOSURE or potential for

)verexposure within a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, as indicated by ANY one of the following:

TEDE exposure > S Rem 1,DE exposure > 15 Rem SDE exposure > SO Item Release of radioactive material inside or outside of a Restricted Area so that had an individual been present for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the individual could have received > 1 times the occupational ALI (Annual Limit of Intake) which would usually equate to 5 Rem CEDE.

This Does NO'I' apply to areas where personnel are normally stationed during routine operations.

I

- - - 1 THEN 1

- Refer to Attachment 14 I

I 4 iiuu: iicpuii ONSI'IE FAIAl,l'IY OCFK50.72(b)(2)(xi)]

(-All_)

I I.4.2.b IF Any fatality has occurred within the Owner Controlled Area (OCA)

I THEN

Initiating c'o nd i t i o n O I T O N I<

K 1'

0 It

'I' I

N

(;

A c T

I 0

N L

E V

E L

S I

I I

I I

I I

I 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 11.0 Reportable Action Levels 1 1.4 Personnel Safety / Overexposure 11.4.2.c IF I 'I'ransportation of a radioactively contaminated o r potentially contaminated individual t'rotii thc siic to ;in ottsitc nicdical tiicility tiw trcatriicnt 1

~

THEN 1

1 SIGNIFICANT FITNESS FOR

(

EVENTS [ IOCFR26.731 11.4.3.a IF Any event that is determined to be rcportablc by the Medical Review Ot'ticcr (MKO) or designee IAW PSEG 1 iiclear's Fitness for Duty I'rogram NC.NA-AP.ZZ-O042(Q))

AND

............ -1 The reportable details of the event are made available to the OS by the MRO or designee THEN I'I'INIISS lOK INJ'I'Y PROGRAM: FAI.SK I'OSI'I'IVE

'IO AI>MINISIIIAI'IVI.: ERROR (I3L.IND TESl' 13Y IAH)

~

~.

[ IOCI.'R26, AI'I'. A, 2.8(e)(S)]

/

I I

.4.3.b IF The occurrence of a false positive error on a blind lab performance test specimen under 1 OCFR26 as determined by the Medical Review Officer (MRO) IAW I'SEG Nuclear's Fitness for duty I'rogram (NC.NA-AP.ZZ-O042(Q)

I

__ ___ I

__ AND-rTHEN The reportable details of the event are made available to the OS by the MRO or designee T

I1 E

I 0

li I

I N

(;

A C

T I

0 N

L E

V E

L S

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

-._I 4 rtinn Reauired 11.0 Reportable Action Levels 11.5 Environmental / State Notifications

(-

All --j 11.5.2.a IF Spillldischarge of an industrial chemical or petroleum product outside of a plant structure within the Owner Controlled Area (OCA) that results in EITHER one of the fo I lowing :

Spill / discharge that has passed through the engineered fill and into the ground water as confirmed by licensing Spill / discharge that CANNOT be cleaned up within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and no contact with groundwater is suspected r--------

~

THEN 11 5 2. b IF EITf IER one of the following events occur:

__. ~

Observation of a spill/discharge of an industrial chemical or petroleum product from on-site into the Delaware River or into a storm drain Observation of an oil slick on the Delaware River from any source Note:

This event MAY require IMMEDIATE

( I 5 minute) notifications. DO -

NOT delay implementation of Attachment 16 1--

THEN Refer !n.Attachment 16 I

Refer tn.4tt2rhment 16 I

I SDiiiiLiiscnarae KeDoninn I

I Sniiilijiscnarrze Keuoninrz I

All 1

L.

I 1 S.2.c IF i s judged by the OSIEDO, -

ANY one of he following events has occurred:

Unusually large fish kill Protected aquatic species impinge on Circulating or Service Water intake screens (eg.; sea turtle, sturgeon) as reported by Site personnel Any occurrence of an unusual or important event that indicates or could result in significant environmental impact casually related to plant operation; such as the following:

+

Onsite plant or animal disease outbreaks Mortality or unusual occurrence o any species protected by the Endangered Species Act of 1973 Increase in nuisance organisms or conditions

+

+

Excessive bird impactation

+

NJPDES Permit violations Excessive Opacity (smoke)

ITHEN I

[ ---- -.

~

Refer tn,4 tt2rhmPnt I 5 I invironnienrai irotection Pian I

Initiating Condition MODE 11.0 Reportable Action Levels 1 1.6 After-the-Fact I ICGS ECG Ilev. 01 Iilge I of I EMERGENCY CONDITIONS DISCOVERED A FTE R-T t 1 E-FACT rAll--7 I I

.6.1 IF Discovery of events or conditions that had previously occurred (event was NOT ongoing at the time of discovery) which EXCEEDED an Emergency Action Level (EAL) and was NOT declared as an emergency 1

AND More than ONE HOUR has elapsed since the condition occurred I

I 1

I AND I

There are currently NO adverse consequences in progress as a result of the event THEN I

R p f ~ r tn 4 t t d - m m t 1 ?

I I

I I

I t-iour KeDorr I

11.O Reportable Action Levels 11.7 Security / Emergency Response Capabilities IlCGS ECG Rev. 04 Page I of 1 MAJOR LOSS OF EMERGENCY ASSESSMENT CAPABILITY, OFFSITE RESPONSE CAPABILITY, OR COMMUNICATIONS CAPABILITY [ 10CFRS0.72(b)(3)(xiii)]

FEGUARDS EVENTS TI1AT ARE DET TIIENRC WITIllN ONE HOUR [IOCFR TO BE NON-EMERGENCIES, BUT ARE RE OPCON RAL #

I E

l R

f O

I T

I N

I I

P I

R I

I I

G I

I I

A I

I C

I I

I N

I I

I L

I I

V I

I T

I O

f E

l E

l S

I L

f Action Required (T) 11.7.1.a IF Any Non-Emergency safeguards event that is reportable in accordance with 10CFR73.71 as determined by Security (SCP-15)

THEN 1 Hour Report (Common Site)

( T I (7) 11.7.1.b 1 1.7.1.c IF IF OSEC determines that an event(s) (excluding a scheduled test or preplanned maintenance activity) has occurred that would impair the ability to deal with an accident or emergency as indicated by the Loss of ANY one of the following:

Nuclear Emergency Telecommunications System (NETS) for > 1 hr ENS for > 1 hr in the Control Room, TSC, and EOF More than 17 Offsite Sirens for >

1 hr Use of the EOF for > 8 hrs All Meteorological data (Hope Creek AND Salem) for one parameter for > 8 hrs Site access due to Acts of Nature (snow, flood, etc.)

(NIA if reported by the NRC).

I Refer to Attachment 25 Use of the TSC for > 8 hrs SPV, NPV, or FRVS vent radiation effluent monitors with no alternate method of monitoring for > 72 hrs SPDS OR CRlDS for > 8 hrs Concurrent multiple accident or emergency condition indicators which in the judgement of the OS significantly impairs assessment capabilities More than > 75% OHA's Refer to Technical Basis I I.7.1.c for ERD!

OI'C'ON A news release is planned S

I I

Notifications to a Local, State or Federal agency has been or will be made 11.0 Reportable Action Levels 11.8 Public Interest I ICGS ECG Rev. 01 I'age I of I

[JNIJSIJAI. CONI11 I IONS WAKRAN I IN(; A NEWS l<l~l,l.:ASl<

OR N O I IFICA I ION O f GOVI'RNMEN I' AGENCIES [ IOCLK50 72(b)(Z)(ui))

(

A n - )

I I.8.2.a IF I

I OS/III)( 1 judges that iiii cvcnt or situation has occtirrcd IIMI i \\ rcliitcd to ANI' ow of thc l'ollo\\~iiig I tic Iicalth atid sal'cty oftlic public I

'I lie health and safcty of onsitc personnel 1

Protection of the environnicnt I

-I I AND 1

1 1

AND r _........

I I

I I-_

I-I THEN 6NUSUAL-CONDITIONS DIRECTLY AFFECTING

( ALLOWAYS CREEK TOWNSf1IP (LACT) [LAC -MOU]

L-..

( All -. -2 11.8.2.b IF As judged by the OS/EI)O, events which are the responsibility of PSEG Nuclear which have or may result in EITHER one of the following:

Anticipated unusual movement of equipment or personnel which may significantly affect local traffic patterns Onsite events which involve alarms, sirens or other noise which may be heard off-site THEN

Il('(iS I. C X i llev 02 11.0 Reportable Action Levels Page I o f 2 11.9 Accidental Criticality / Special Nuclear Material / Rad Material Shipments - Releases IJNI'IANNISI) / AC'CIL)I:N'I'AI, CII I'I'ICAI,ITY

[ I OCI..R70.52(a)]

i Initiating Condition

\\.,.

OI'CON ItAL #

11.9.1.a It E

I' 0

It T

I N

G A

C T

I 0

N L

E V

E L

S I

IF I

Any unplanned or I

I accidental criticality I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 1

I I

I I

I I

I I

I I

I -

c

__ AH 11.9.1.b IF ANY one of the following events occur involving Special Nuclear Material (SNM) or Spent Fuel:

Loss, other than normal operating loss, of SNM Actual or attempted theft or unlawful diversion of SNM Shipment of SNM of low strategic significance or Spent Fuel that is lost or unaccounted for after the estimated time of arrival A lost or unaccounted for shipment of SNM of low strategic significance or Spent Fuel has been recovered or accounted for 1

THEN c-

--AT_)

-~

I I.9.1.c IF Lost, stolen or missing licensed material > 1000 times the quantity specified in 10CFR20 Appendix C in such circumstances that an exposure could result to persons in Unrestricted Areas.

THEN

I ICGS rrci I'age 2 of 2 11.0 Reportable Action Levels llev 02 11.9 Accidental Criticality / Special Nuclear Material / Rad Material Shipments - Releases 1

c....

All _ 1 I I.9.1.e IF Rcceipt survey indicates that pack agc con t ani i nat iodr ad i at io r levels equal or exceeds ANY one of the following:

2200 dpm/IOO cm2 200 mWhr on contact 10 mWhr at 3 feet THEN 11.9.2.a IF 4ccidents during the ransportation of radioactive material which are reported to PSE&G as the shipper that involve (or potentially involve) damage to the cargo

^____..-_

c2!!-1 I I.9.2.b IF Discovery of a Contaminated Area OUTSIDE of the RCA with removable activity due to licensed material

_____7____------

,-I--.--.

I AND Location of Area is Plant Structures Size of Contaminated Area is LARGE

(>I 00 FT2) 1 AND I

Location of Contaminated Area is such that a contaminated person or material may have left the Protected Area 1-

. i..

_- ~.

Initiating Condition 11.0 Reportable Action Levels 11.10 Voluntary Notifications I ICGS ECG Rev. 01 Page I of I Events/conditions warrant voluntary/courtesy NRC notification [ 1 OCFR50.72 - Voluntary Report]

i-

\\. -Ai -1 11.10.2 IF In the judgement of the OS, i

notitication to the NKC is warranted I AND

....... - L 1

i 1

NO other I3ALs or RALs appear to be applicable I

L............

THEN r

4 nt:n..

D nn..:rnrl

. ^I...,.n

UNITED STATES NLICLEAR REGULATORY COMMISSICN d

WASHINGTON. D.C. 20555-0001 b

PSEG NUCLEAR LLC DOCKET NO. 50-354 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE

'V PSE&G I

License No. NPF-57

1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:

A.

The application for a license filed by the Public Service Electric &

Gas Company, acting on behalf of itself and Atlantic City Electric Company (the licensees), complies with the standards and requiremencs of the Atomic Energy Act of 1954, as amended (the Act), and the Ccmmission's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made ;

E. Cons:ruction of the Hope Creek Generating Station (the facility) has Seen subszantially completed in conformity with Construction Pernit Nc. CTPR-120 and :he application, as amended, the provisions of the A=: acd the regulations of the Commission;

?e facility will operate in c3nformi:y with the application, as ariended, :he provisicns zf Eke Ac:,

and the regulations of the Cim.:sslcr, (excep: as exsrr,szed frcm ccmpliance in Section 2.0. below);

-i Z.

,..ere is reascnable asszrdzze: (i) :ha:

the ac:ivities authorized by zperating license can be czrciucted withou: endangering the health and safety 3: the public, a?d

( i i l chat such acEivities will be z=r.5zr=eS in.ccmpliance xizh the C3mmission's regulations set forth in 3 -, Y I L -.

. C CFR Chapter 1 (axcep: as exemp:ed frcm compliance in Sect;=> 2.D.

i I

?255 Ncclear LLf I s tech:zally qxalified r c engage in the activities

,,..,,,zed

- b.

C I by this licezse iz acccrdance with :ne Cmmissioz's F. Tie iicensee has sa=-sfied :he applicable provisions of 10 CFR Par:

. C reralations set fcr:h ir. - J Cti? Chapter I;

. I..

-...r, 'Financial Protec::tr.

ReqGrrements and Indemnity Agreements, " cf the Commission's regula:izns; J. The sssuance of this licezse wifl not be inimical to the common 2efense and security o r :c the health and safety of the public; L

CONTROL COPY # c,/a I

Amendment No. 35?%

13 5

2.

E. After weighing the environmental, economic, technical, and ctner benefits of the facility against environiental m d other coscs an:!

considering available alternatives, the issuance of Facility Operating License No. NPF-57, subject to the conditions,for protection of the environment set forth in ths Environmental Protection Plar. attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been sazisfied; and I. The'receipt, possession, and. use of source, byproduct and special nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70.

Based on the foregoing findings and approval by the Nuclear Regulatory Commission at a meeting on July 21, 1986, the License for Fuel Loading an2 Low Power Testing, License No. NPF-50, issued on April il, 1986, is superseded by Facility Operating License NPF-57 hereby issued to PSEG Nuclear LLC (the licensee), zc read as follows:

A.

This license applies t3 the Hope Creek Generating Station, a boiling water nuclear reactcr, azZ associated equipment (the facility) owned by PSEG Nuclear LLf. The facility is located on the licensee's site cn the east bank of the "uelaware River in Lower Alloways Creek Township, Salem County, New jersey. The facility is located approximately eight rriles sou:hwest cf Salerr.. New Jersey and is described in the PSEG ar.d i n the Environmertal ?.e-,ort, as supplemented and amended.

Nc-:

-,ear LLC Final Safezj; halysis Repor:,

as supplemented u.d amended,

(:I TSZG Nl;c;zar 11:.

srs
ar.t ts Section 1 3 3 of the Act and 10 CFR

?arz 5 5, T,S p:sress.

ise and opera:o the facility at the abave desig?azed l:caz:cr.

ir. Zaiem Cou'lzy, New jersey, ir. accordance rh*

-..- u,-,e~sres m - - -

.-,,.L.,Lations s s t fcrth ir! this licezse;

: I PSEG Nuclear LLC. c - r s ~ a r. : EO the Act and 13 CFR Part 7 C, zc receive, p:ssess ar.2 -se at any time speciai nuclear material as reactor fuel, :z ac=zr2ar.ze w:th the limitations for storage and amounts reqxre:! f z r reazfof operation, as described in :he F-na:

Safety iinalysis he?:::

as Supplemented and amended; 1

I Amendment No.

135 I

L PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; PSEG Nuclear LLC, pursuant to the Act and 10 CF'R Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction, to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C.

This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PSEG Nuclear LLC is aurhorized to operate the facility at reactor core power levels not in excess of 3339 megawatts thermal (100 percent rated power) ir. accordance with the conditions specified herein.

I

( 2 ) Technical Specifications and Environmental Projzection Plan I

The Technical Specifications contained in Appendix A, as revised through Amendment No.

, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into the license.

PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

( 3 ) Inservice Testinq of Pumps and Valves (Section 3.9.6, SSER No. 4 ) '

This License Condition was satisfied as documented in the letter from W. R. Butler (N3.C) to C. A. McNeill, Jr. (PSE&G) dated December 7, 1987. Accordingly, this condition has been deleted.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 13 1 I

c-.

L,

( 4 ) Inservice Inspection (Section 6.6, SER; Sections 5.2.4.3 and 6.6.3, SSER No. 51

a.

PSE&G shall submit an inservice inspection program in accordance with 10 CFR 50.55a(g)(4) for staff review by October 11, 1986.

b.

Pursuant to 10 CFR 50.55a(a)(3) and for the reasons set forth in Sections 5.2.4.3 and 6.6.3 of SSER No. 5, the relief identified in the PSE&G submittal dated November 18, 1985, as revised by the submittal dated January 20, 1986, requesting relief from certain requirements of 10 CFR 50.55a(g) for the preservice inspection program, is granted.

(5) solid State Loqic Modules PSEG Nuclear LLC shall continue, for the life of the plant, a I

reliability program to monitor the performance of the Bailey 862 SSLMs installed at Hope Creek Generating Station. This program should obtain reliability data, failure characteristics, and root cause of failure of both safety-related and non-safety-related Bailey 862 SSLMs. The results of the reliability program shall be maintained on-site and made available to the NRC upon request.

( 6 ) Fuel Storage and Handlinq (Section 9.1, SSER No. 5)

a. No more than a total of three ( 3 ) fuel assemblies shall be out of approved shipping containers or fuel assembly storage racks or the reactor at any one time.
b. The above three ( 3 ) fuel assemblies as a group shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array an:! the storage rack array.
c. Fresh Fuel assemblies, when stored in their shipping con-tainers, shall be stacked no more than three ( 3 ) containers high

~

(7) Fire Protection (seccion 9.5.1.8, SSER No. 5; Section 9.5.1, SSER No. 6r I

PSEG Nuclear LLC -na?l implement and maintain in effect all provisions of the approved fire prot.ection program as described in the Final Safety Analysis Report for the facility through Amendment No. 15 and as described in its submittal dated May 13, 1986, and as approved in the SER dated October 1984 (and Supplements 1 through 6) subject to the following provision:

PSEG Nuclear LLC may make changes to the approved fire I

protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

Amendment NO. 88,129 I

Solid Waste process Control Proqram (Section 11.4.2, SER; Section 11.4, SSER No. 4 1 PSEG Nuclear shall obtain NRC approval of the Class B and C solid waste process control program prior to processing Class B and C solid wastes.

Emeruency Planninq (Section 13.3, SSER No. 5 )

I In the event that the NRC finds that the lack of progress in completion of the procedures in the Federal Emergency Management Agency's final rule, 44 CFR Part 350, is an indication that a major substantive problem exists in achieving or maintaining an adequate state of emergency preparedness, the provisions of 10 CFR Section 50.54(s) (2) will apply.

( 1 0 ) Initial Startup Test Proqram (Section 14, SSER No. 5)

Any changes to the Initial Startup Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

(11) Partial Feedwater Heatinq (Section 15.1, SER; Section 15.1, SSER No. 5; Section 15.1, SSER No. 6)

The facility shall not be operated with reduced feedwater temperature for the purpose of extending the normal fuel cycle.

After the first operating cycle, the facility shall not be operated with a feedwater heating capacity that would result in a rated power feedwater temperature less than 400OF unless analyses supporting such operation are submitted by the licensee and approved by the staff.

(12) Detailed Control Room Desiun Review (Section 18.1, SSER No. 5 )

a. PSE&G shall submit for staff review Detailed Control Room Design Review Summary Reports I1 and I11 on a schedule consistent with, and with contents as specified in, its letter of January 9, 1986.
b. Prior to exceeding five perzent power, PSE&G shall provide temporary zone markings on safety-related instruments in the control room.

Amendment No.I29 I

(13)

\\.-

L Safety Parameter DiSDlaY System (Section i8.2, S S E ~

NO. 5)

Prior to the earlier of 9 9 days after restart frcm tne first refueling outage or July 12, 1988, PSE&G snall add the following parameters to the SPDS and have tbam operational:

a. Primary containment radiation
b. Primary containment isolation status
c. Combustible gas concentration ir, primary contaimenz
d. Source range neutron flux Additional Conditions The Additional Conditions contained in Appendix C, as revised through Amendment No. 135, are hereby incorporated into this license. PSEG Nuclear LLC shall operate the facility in accordance with the Additional Conditions.

PSE&G to PSEG Nuclear LLC License Transfer Conditions I

a.

?SEG Nuclear LLC shall take a l l necessary steps Eo ensure that the decommissioning trust is maintained in accordance with the applicarian, :he requirements of the Order Approving Transfer of License and Conforming Amendment, dated February 16, 2900, and the relatod Safety Evaluation dated February 16, 200G.

B.

The i )

2 )

3 )

deccmnissiczicg trxt agreement shall provide thac:

The u s 1 :f 8ssezs ir! bcrih thi qualified and nan-cpalifie5 f ~ r. 5 ~

shall be linited tc expenses related to deccnsr.;ssi:2:zg zf :

e uni: as define2 by the NRC in its rerdLat::zs and isscancis, and as provided in the units ::zenrs a d any arnendmencs rhereto. Sowever, cpsr, c:r.p:eti:r.

t: =ec-m.issi;~ing, as defined abcve, the a s s s t s ray be x e d f s r any purpose auzhcrized by lax.

Ip*ves-~--

_..__.._a __.

.- -i

-..e sezzr::ies 2~ ather sbligaticna sf PSELS c: aft:::azes chereof, o r their successors c r assigr.s, sr.all be SrohikLted. In additicn, except f-r invesznents ::e2

3.mrket indexes cr o:her ncn-nuclear SeC-Cr...... ~ - - a -

.-...,-.-s,

.....-I investments in any entity owning one cr mcre r.;zlear power plants shall be prohibited.

No disbursemenzs or payments from the trust shall be

,-de by z2.s ZrLsZee until the trustee has first given

he PURC 3:

days sotice of =he payment. In addition, nc disbursemants cr payments from the trust shall be made if :he zrsszee receives pricr written notice of objeccicz frcn the Director, Office of Nuclear 2eacEor Regulaticc.

, 12:.

135 I

Amendment No. < 2, : 7, I S 4 4 )

The trust agreement shall not be modified in any material respect without prior written notification to the Director, Office of Nuclear Reactor Regulation.

C.

5)

The trustee, investment advisor, or anyone else directing the investments made in the trust 'shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(3) of the Federal Energy Regulatory.

Commission's regulations.

PSEG Nuclear LLC shall not take any action that would cause PSEG Power LLC or its parent companies to void, cancel, or diminish the commitment to fund an extended plant shutdown as represented in the application for approval of the transfer of this license from PSE&G to PSEG Nuclear LLC.

D. The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70. An exemption from the criticality alarm requirements of 10 CFR 70.24 was granted in Special Nuclear Material License No. 1953, dated August 21, 1985. This exemption is described in Section 9.1 of Supplement No. 5 to the SER. This previously granted exemption is continued in this operating license. An exemption from certain requirements of Appendix A to 10 CFR Part 50, is described in Supplement No. 5 to the SER. This exemption is a schedular exemption to the requirements of General Design Criterion 64, permitting delaying functionality of the Turbine Building Circulating Water System-Radiation Monitoring System until 5 percent power for local indication, and until 120-days after fuel load for control room indication (Appendix R of SSER 5). Exemptions from certain requirements of Appendix J to 10 CFR Part 50, are described in Supplement No. 5 to the SER. These include an exemption from the requirement of Appendix J. exempcing main steam isolation valve leak-rate testing at 1.10 Pa (Section 6.2.6 of SSER 5); an exemption from Appendix J, exempting Type C testing on traversing incore probe system shear valves (Section 6.2.6 of SSER 5); an exemption from Appendix J,

exempting Type C testing for instrument lines and lines containing excess flow check valves (Section 6.2.6 of SSER 5); and an exemption from Appendix J, exempting Type C testing of thermal relief valves (Section 6.2.6 of SSER 5). These exemptions are authorized by law, will not present an undue risk to ths public health and safety, and are consistent with the common defense and security. These exemptions are hereby granted. The special circumstances regarding each exemption are identified in &he referenced section of the safety evaluation report and the supplements thereto. These exemptions are granted pursuant to 10 CFR 50.12. With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

Amendment NO. W, 129 E. The licensee shall fully implement and maintain in effect ali provisions of the Commission-a-pprsved physical security, gcard training and qualification, and safewaras contingency plans includlkig amendments made pursuant :s provisions of :he Miscellar,ezGs Amendments and Search Requirements revisions to 10 CFR 7 3. 5 5 (51 PR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 5 0. 5 4 @ ).

The plans, which contain Safeguards Infarmation protected under 10 CFR 73.21, are entitled: "Salem-Hope Creek Nuclear Generating Station Security Plan," with revisions submitted thrmgh December 1 7, 2001; 'Salem-Hope Creek Nuclear Generating Staticn Security Training and Qualification Plan,' with revisions submitte,d through December 1 7, 2001; and "Salem-Hope Creek Nuclear Generatizg Station Security Contingency Plan," with revisions submitted thrzxgk June 2, 1998.

Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.

Except as otherwise przvided in the Technical Specificati-ns 3r Ecvironmental Protect:sn Plan, PSEG Nuclear LLC shall report any viclatims of the recpirements contained in Section 2.C cf this license in the follzwing manner: initial notification shall be made-w:t!?in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the hTC Sperations Center via the Ehergency Kscification System w::!?

written followup within thirty days in acczrdance with the prccedures described in 10 CFR 50.73(b), (c), ard (e).

G.

Tke licensees shall kave an:! maintain financial prcteczion of such

?e and in such &T
.--.:S as ::?e Cm-missisn shall requsre LT.

aczsrdance with Set:::: :-:

zf the Azomic Energy Act z f L954. as a-nenied, to cover -.

p a - A - -

& '. - :iak:lity claims.

I PSR THE NL'CLEAR REGULATORY C2FXISSIZX

- crlginal signed by H.R: Oentcn -

Harsld R. Zenton, Director Zftice of Nuclear Reactor Regulacion

-ars :f Zssuance: July 25, 1 9 a 6 Amendment No. B. 1 3 8

3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 SHUTDOWN MARGIN LIMITING CONDITION FOR OPERATION 3.1.1 The SHUTDOWN MARGIN shall be equal to or greater than:

a.

0.38% delta k/k with the highest worth rod analytically determined, or

b.

0.28% delta Wk with the highest worth rod determined by test.

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, 3, 4 and 5.

ACTION:

With the SHUTDOWN MARGIN less than specified:

a.

In OPERATIONAL CONDITION 1 or 2, reestablish the required SHUTDOWN MARGIN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

In OPERATIONAL CONDITION 3 or 4, immediately verify all insertable control rods t o be inserted and suspend all activities that could reduce the SHUTDOWN MARGIN. In OPERATIONAL CONDITION 4, establish SECONDARY CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

c.

In OPERATIONAL CONDITION 5, suspend CORE ALTERATIONS and other activities that could reduce the SHUTDOWN MARGIN and insert all insertable control rods within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

MENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

Establish SECONDARY CONTAIN-SURVEILLANCE REQUIREMENTS 4.1.1 The SHUTDOWN MARGIN shall be determined to be equal to o r greater than specified at any tlme during the fuel cycle:

a.

By measurement, p r i o r to or during the first startup after each refuel i ng.

By measurement, within 500 MWD/T prior to the core average exposure at which the predicted SHUTDOWN MARGIN, including uncertainties and calculation biases, i s equal to the specified limit.

b.
c.

Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after detection of a withdrawn control rod that i s himovable, as a result of excessive friction or mechanical inter-ference, or i s untrippable, except that the above required SHUTDOWN MARGIN shall be verified acceptable with an increased allowance f o r the withdrawn worth of the immovable or untrippable control rod.

HOPE CREEK 314 1-1

REACTIVITY CONTROL SYSTEMS 3/4.1.2 REACTIVITY ANOMALIES LIMITING CONDITION FOR OPERATION 3.1.2 The reactivity equivalence of the difference between the actual ROD OENSITY and the predicted ROD DENSITY shall not exceed 1% delta k/k.

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

ACT ION:

With the reactivity equivalence difference exceeding 1% delta k/k:

a.

Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> perform an analysis to determine and explain the cause of the reactivity difference; operation may continue i f the difference i s explained and corrected.

b.

Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.2 The reactivity equivalence of the difference between the actual ROD DENSITY and the predicted ROD DENSITY shall be verified to be less than or equal to 1% delta k/k:

a.
b.

During the first startup following CORE ALTERATIONS, and A t least once per 31 effective full power days during POWER OPERATION.

HOPE CREEK 3/4 1-2

REACTIVITY CONTROL SYSTEMS 3/4.1.3 CONTROL RODS CONTROL ROD OPERA'BILIN LIMITING CONDITION FOR OPERATION 3.1.3.1 All control rods shall be OPERABLE.

APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

ACTION:

a.

With one control rod inoperable due to being hwvable, as a result o f excessfve friction or mechanical interference, or known to be untrfppable:

1.

Within one hour:

a)

Verify that the inoperable control rod, f f withdrawn, i s separated from all other inoperable control rods by at least two control cells in all dircctfonr.

Disarm the associated directional control valves** hydraulically by closing the drive water and exhaust water isolation valves.

b)

Othenise, be in at least HOT SHUTDMJN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Restore the inoperable control rod, i f withdrawn, to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

With one or more control rods trippable but inoperable for causes other than addressed in ACTION a, above:

1.
2.
b.

If the inoperable control rod(s) f s withdrawn, within one hour:

a)

Verify that the inoperable withdrawn control rod(s) is separated frw ill other inoprrablc withdrawn control rods by at least two control cells in all directions, and Demonstrate the insertion capability of the lnoperable withdrawn control rod(s) by insetting the control rod(s) at least one notch by drive water pressure within the noma1 operating range*

Othtnfsc, Insert the inoperable withdraw control rod(s) and disarm the associated directional control valves** tither:

a)

Electrfcally, or b)

Hydraulically by closing the drive water and exhaust water isolation valves.

b)

    • May be reamed Intermittently, under administratfve control, t o permit testing associated with restoring the control rod to OPERABLE status.

L HOPE CREEK 3/4 1-3

(continuad)

2.

If +h. &&ablm controx r0at.j i r within ona hour di8um tho aa8ociat.d direction81 control v8lvorn** eithorx a)

Electzfcally, or b)

Rydraulicatly by cloaing the dtlcn watar M d Warrrt wator i r o l i t i o n oalvas.

Ofhamism, k in a t laast tfcn s" w i t h i n tho next 12 burr.

3.

Tha provimionm of Spaclflcation 3.0.4.T. not 8pplicrbh.

e.

With mora thaa 8 control rod8 inoprrrble, bo in at l o u t BOT S w i t h i n 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

d.

With one rerun di8clurgo roluma rout valve md/or one 8crm d i r c h u g a wlurrv drain valva inopmrablo urd opan, rostorm thm iaoporabla valvo(8) to OPE-statu8 w i t h i n 24 W m or ba in at loast BOT SHpTDoWn within th. next 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

e.

with 8CX.m d b t h u g a r o l w w n t v & l ~ 8 ( # ) Bnd/or m y 8 C f m d f ~ c h u p o voluma drain valva(^) otharuira inoprrabla, tomtom tha inoperabh valve(.)

t o OP-r t a t u r within 8 bourr or k in at learnt HOT S" w i t h i n tho aoxt 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />..

4.1.3.1.1 T b 8Ctm di8charge V O ~ W drain and t.nt V a 1 V 8 8 k

demonatratad OPERABLZ byt

a.

A t h a r t onca pmr 24 hour8 rrrifying aach valre t o b. oprn,* and

b.

A t 10&8t once p r 31 day8 C p l f B p a&& Val-through but ona cmnplata cycle of f u l l traval.

I 4.1.3.1.2 withdrawn a o n t r d rod8 not r.qutrad t o hap. +hair dirmctLona1 control valva8 d 1. M Whin above tha l o w pmr 88tpoint of t h a Rw)(, 8ll

.TheBe vrlvmm amy ba clomad intermittently for tasting undar adminimtrati-control..

  • t h y k raarmad fntmnnittantly, u n d u abmfnlmtrativa'contrl, to pdt te8tFng a8rocLated w i t h ramtorfag tha control rod t o OPERABLE rtatu8.

HOPE CREEK 3/4 1-4 m a d ~ ~ ~ n t IPO. 105

-.:y

SURVEILIANCE REQUIREPlENTS (Continued) electrically or hydraulically shall be demonstratrd OPERABLE by moving each control rod at lsrrt one notch:

a.

At least once per 7 a y e, rad

b.

within 24 hour8 when any control rod is inmovable ae a result of ucesriva friction or mechanical ia+crfcrcnce.

4.1.3.1.3 Surveillance Requirement8 4.1.3.2, 4.1.3.4, 4.1.3.5, 4.1.3.6 urd 4.1.3.7.

4.1.3.1.4 demonrtratiog:

All control to& shall be denmnmtr8tad OPERABLE by performance of The scram dincharge volurna shall be determined ORERABLB by

a.

The scram discharge volume drain a d vmat valve. 00-at h i n t once per 18 month., by verifying that the &ria and vtat valves:

1. Close within 30 second. after receipt of a 8ignal for control to& to scram, and 2.

Open when the scram signal io reset.

Ameadment N0.80 1

ROPE CREEK 3/4 1-5 L'

REACTIVITY CONTROL SYSTEMS CONTROL ROD MAXIMUM SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.2 The maxjmum scram insertion time o f each control rod from the fully withdrawn position t o notch position 5, based on de-energiration of the scram pilot valve solenoids as time zero, shal? not exceed 7.0 seconds.

APPLICABILITY: OPERATIONAL CONOITXONS 1 and 2.

ACTION:

a. -

With the maximum scram insertion time of one or more control rods exceeding 7.0 seconds:

1.
2.

Declare the control rod(s) with the slow insertion time inoperable, and Perform the Surveillance Requirements of Specification 4.1.3.2.c at least once per 60 days when operation I s conttnucd with three or more control rods with maximum scram insertion tSmes In excess o f 7.0 seconds.

Otheruire, be i n at least HOT SHUTDOWN within l2 hours.

The provisions o f Specffication 3.0.4 are not applicable.

b.

'v SURVEILLANCE REQUIREMENTS 4.1.3.2 The maxfmtnn scram insertion time o f the control rods shall be dernon-strated through aeasurement with reactor coolant pressure greater than or equal to 950 psiq and, durjng single control rod scram time tests, the control rod d r i v e pumps isolated from the accumulators:

a.

For a l l control rods prior to THERMAL POWER exceeding 40% of RATED THERCIAL POWER following CORE ALTERATXONS or after a reactor shutdown that 1s greater thrn 120 days.

For s p d f i c a l l y affected fndividual control rods following maintenance on or nodificatfon to the control rod or control rod drive rystcn which could affect the scram fnsertion tine of those tpecffic control rods, and For at least 10% of the control rods, on a rotating basis, at least once per 120 days of POWER OPERATION.

b.
c.

HOPE CREEK 3/1 1-6

REACTIVITY CONTROL SYSTEMS CONTROL ROD AVERAGE SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.3 The average scram insertion time of all OPERABLE control rods from the fully withdrawn position, based on de-energization o f the scram pilot.,valve solenoids as time zero, shall not exceed any of the following:

Position Inserted From Ful ly Withdrawn Average Scram Inser-tion Time (Seconds1 45 0.43 39 0.86 25 1.93 05 3.49 APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2.

ACT I ON :

With the average scram insertion time exceeding any of the above limits, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.3 All control rods shall be demonstrated OPERABLE by scram time testing from the fully withdrawn position as required by Surveillance Requirement 4.1.3.2..

HOPE CREEK 314 1-7

REACTIVITY CONTROL SYSTEMS FOUR CONTROL ROD GROUP SCRAM INSERTION TIMES LIMITING CONDITION FOR OPERATION 3.1.3.4 The average scram insertion time, from the fully withdrawn position, for the three fastest control rods in each group of four control rods arranged i n a two-by-two array, based on deenergization of the scram pilot valve solenoids as time zero, shall not exceed any o f the following:

Position Inserted From Ful ly Withdrawn Average Scram Inser-tion Time (Seconds1 45 39 25 05 APPLICABILITY:

ACTION:

OPERATIONAL CONDITIONS 1 and 2.

0.45 0.92 2.05 3.70

a.

With the average scram insertion times o f control rods exceeding the above 1 imi ts:

1.

Declare the control rods with the slower than average scram insertion times inoperable until an analysis i s performed to determine that required scram reactiviy remains f o r the slow four control rod group, and

2.

Perform the Surveillance Requirements of Specification 4.1.3.2.c at least once per 60 days when operation i s continued with an average scram insertion time(s) in excess o f the average scram insertion time l i m i t.

Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

The provisions o f Specification 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.1.3.4 from the fully withdrawn position as required by Surveillance Requirement 4.1.3.2.

All control rods shall be demonstrated OPERABLE by scram time testing HOPE CREEK 3/4 1-8

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS L I M I T I N G CONDITION FOR OPERATION

/-

3.1.3.5 Each Control rod scram accumulator s h a l l be OPERABLE.

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2 and 5*.

ACT I ON :

S e p a r a t e c o n d i t i o n e n t r y i s allowed f o r each c o n t r o l rod NOTE--------------------------------

a.

I n OPERATIONAL CONDITIONS 1 o r 2 :

I

1.

With one c o n t r o l rod scram accumulator i n o p e r a b l e and r e a c t o r p r e s s u r e 2 900 p s i g, w i t h i n 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, a )

Restore t h e inoperable accumulator t o OPERABLE s t a t u s,

OK b )

Insert t h e a s s o c i a t e d c o n t r o l rod, d e c l a r e t h e a s s o c i a t e d c o n t r o l rod i n o p e r a b l e and disarm t h e a s s o c i a t e d c o n t r o l v a l v e s e i t h e r e l e c t r i c a l l y o r h y d r a u l i c a l l y by c l o s i n g t h e d r i v e water and exhaust water i s o l a t i o n v a l v e s.

Otherwise, be i n a t l e a s t HOT SHUTDOWN with t h e next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

L.

7 W i t h two o r more c a n t r o l rod scram accumulators i n o p e r a b l e and r e a c t o r pressuze 2 900 p s i g,

a )

Within 20 r r i n u t e s of d i s c o v e r y of t h i s c o n d i t i o n concurrent with charging water p r e s s u r e < 940 p s i g, r e s t o r e charging water header p r e s s u r e t o 2 940 p s i g otherwise p l a c e t h e mode switch i n t h e shutdown p o s i t i o n * *,

and b )

W i t h i n 3r.e hocr l n s e r t t h e a s s o c i a t e d c o n t r o l rads, c e c l a r e :r.e a s s o c i a r e d c o n t r o l rods inoperable azd a ~ s a r : ~

Re a s s o c i a t e d c o n t r c l valves ei:her wa:e:

a?+= e x k a d s z water i s o l a t i o n valves.

eler-

,,,,za:lj.

r.

e : h y c r a u l i c a l l y by c l o s i n g t h e c r i v e gtherwise, be :r. a t l e a s t HOT SHUTDOWN w i t h i n :he next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

.~

i e d s t t z e accunula:cr ass3z:a:ez x i t h each withdrawn c o n t r o l d s p l i c a b l e z 3 cgncrc'l : ~ i s renoved p e r S p e c i f i c a t i o n 3. 9. 1 0. 1 o r a ~ ~ l i c a b l e i f a l l inoperable c o n t r o l rod scram

~

3.:. _ -. _.

a:::.--larsrs a r e associazed x i t h f 3 s l i y i n s e r t e d c o n t r s l rods.

3/4 1-9 Amendment h70.98 I

I

REACTIVITY CONTROL SYSTEMS L I M I T I N G CONDITION FOR OPERATION (continued)

ACTION (Continued)

3.

With one o r more c o n t r o l rod scram accumulators i n o p e r a b l e and r e a c t o r p r e s s u r e < 990 psig, a )

Immediately upon discovery of charging water header p r e s s u r e < 940 psig, v e r i f y a l l c o n t r o l rods a s s o c i a t e d with inoperable accumulators are f u l l y i n s e r t e d otherwise p l a c e t h e mode switch i n t h e shutdown position**, and b )

Within one hour insert t h e a s s o c i a t e d c o n t r o l r o d ( s ),

d e c l a r e t h e a s s o c i a t e d c o n t r o l r o d ( s ) i n o p e r a b l e and disarm t h e a s s o c i a t e d c o n t r o l valves e i t h e r e l e c t r i c a l l y o r h y d r a u l i c a l l y by c l o s i n g t h e d r i v e water and exhaust water i s o l a t i o n valves.

Otherwise, be i n a t least HOT SHUTDOWN within t h e next 1 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

b.

I n OPEMTIONAL CONDITION S * :

A.

1 With one o r more withdrawn c o n t r o l rods inoperable, upon d; SCOI'.: r y immediately i n i t i a t e a c t i o n t o f u l l y i n s e r t inoperable withdrawn c o n t r o l rods.

C.

-... i e provisions of S p e c i f i c a t i o n 3.0.4 are not a p p l i c a b l e.

5. 1. 3. 5 Each c o n t r o l rod scram accumulator s h a l l be determined OPERABLE:

a.

A t leas:

2nce p e r 7 days by v e r i f y i n g t h a t t h e i n d i c a t e d p r e s s u r e 1 s g r e a t e r than o r e q s a l t o 940 p s i g u n l e s s t h e c o n t r o l rod i s Lnsercec! and disarmed o r scrammed.

.e a c c a x l a r o r ass3tia:ec 1*;:t!: each withdrawn c o n t r o l

_ _.... I _ - C;;l:zab:e t o cor,tzoi TOSS rer,Dved p e r S p e c i f i c a t i o n 3.9.10.1 c z

. _ _. C.

.. _. ^__.

-,,--cable i f a l l inDpezaSle cz:r.tzzl rod scram d::-.r412:c:s a r e asscciateci w i t h f u l l y r n s e r t e d c o n t r o l rods.

3 / 4 1-10 Amendment No. 98

"v REACTIVITY CONTROL SYSTEMS CONTROL ROD D R I V E COUPLING 3.1.3.6 A l l Control rods shall be Coupled to their drive mechanisms.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 5 f.

a. In OPERATIONAL CONDITION 1 and 2 with one control rod not coupled to its associated drive mechanism, within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
1.

If permitted by the RWM,.insert the control rod to accomplish recoupling and verify recoupling by withdrawing the control rod, and:

I a)

Observing any indicated response of the nuclear b)

Demonstrating that the control rod will not go to the instrumentation. and overtravel position.

2.

If recoupling is not accomplished on the first attempt or, if I

not permitted by the RWM. then until permitted by the RWM, declare the control rod inoperable, insert the control rod and disarm the associated directional control valves++ either:

a)

Electrically, or b)

Hydraulically by closing the drive water and exhaust water isolation valves.

Otherwise. be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b. :n OPERATIONAL CONDITION 5, with a withdrawn control rod not coupled to its associated drive mechanism, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> either:

1.

Insert the control rod to accomplish recoupling and verify recoupling by withdrawing the control rod and demonstrating that the control rod will not go to the overtravel position, or 2.

If recoupling is not accomplished, insert the control rod and disarm the associated directional control valves** either:

a)

Electrically, or b)

Hydraulically by closing the drive water and exhaust water isolation valvem.

c. The prov~sions of Specification 3. 0. 4 arc not applicable.

Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

    • May be rearmed intermittently. under administrative control, to permit testing associated with restoring the control rod to OPERABLE status.

HOPE CfZEEK 3 / 4 1-11 Amendment NO. 105

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.3.6 Each affected control rod shall be demonstrated to be coupled to its drive mechanism by observing any indicated response o f the nuclear instrumen-tation while withdrawing the control rod to the fully withdrawn position and then verifying that the control rod drive does not go to the overtravel pos it i on:

a.

Prior to reactor criticality after completing CORE ALTERATIONS t h a t could have affected the control rod drive coupling integrity,

b.

Anytime the control rod is withdrawn to the "Full out" position i n subsequent operation, and

c.

Following maintenance on or modification to the control rod or control rod drive system which could have affected the control rod drive coupting integrity.

HOPE CREEK 314 1-12

pEACTIVITY CO NTROL SYSTEMS

/- ' >

W CONTROL R OD POSITION INDICATION 3.1.3.7 The control rod poeition indication system shall be OPERABLE.

fiPPLICABILITY: OPERATIONAL CONDITIONS 1, 2 and 5 9.

A.

In OPERATIONAL CONDITION 1 or 2 with one or more control rod position indicatore inoperable, within 1 hour:

1.

2.

3.

Determine the position of the control rod by using an alternate method, or:

a) Moving the control rod, by single notch movement, to a b) Returning the control rod, by single notch movement, to its c) Verifying no control rod drift alarm at least once per 12 position with an OPERABLE position indicator, original position, and houre, or Hove the control rod to a position with an OPERABLE position indicator, or When T H E W POWER is:

a) Within the preset power level of the RW'M, declare the control rod inoperable.

b ) Greater than the preset power level. of the R W, declare the control rod inoperable, insert the control rod and disarm the aeeociated directional control valves** either:

1)

Electrically, or

2)

Hydraulically by closing the drive water and exhaust water isolation valves.

Otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

In OPERATIONAL CONDITION 5. with a withdrawn control rod poeition indicator inoperable, move the control rod to a position with an OPERABLE pooition indicator or Insert the control rod.

c.

The ptovieions of Specification 3.0.4 are not applicable.

  • At least each withdrawn control rod. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
    • Hay be rearmed intermittently, under administrative control, to permit testing aeeociated with restoring the control rod to OPERABLE status.

HOPE CREEK 3/4 1-13 Amendment NO. 105

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1. 3.7 OPERABLE by veri fying:

The control rod position indication system shall be determined

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> that the position o f each control rod is indicated,

b.

That the indicated control rod position changes during the movement o f the control rod drive when performing Surveillance Requirement 4.1.3.1.2, and

c.

That the control rod position indicator corresponds t o the control rod position indicated by the "Full Out" position indicator when performing Surveillance Requirement 4.1.3.6.b.

HOPE CREEK 3/4 1-14

I _.

CONTROL ROD DRIVE wuSTMC SUPPORT 3.1.3.8 The control rod drive -housing support shall be f n place.

APPLICABILITY: OPERATIONAL CONOITIONS 1, 2 8nd 3.

ACT ION:

W t h the control rod d r f v r houtjng S U Q Q O r t not i n place, be fn at least HCT SHUTDOYN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and i n COLD SHUTDCYN w i t h i n.;no f o l l m f n C 24 h;,t; SURVEILUNCE REQUI RfnEHTS 4.1.3.8 Tho contro1 rod dtfvo hourfng support shall be vorlfled t o be in p l a c e by a vfrurl fnspectfon erfor to S U t t u O ry ttw It has baon dfrrsr.sbltd or when u4ntrnanc8 has bran perlomod In f)w control rod dtluo housing sugDott area.

nOPf CREEK 3/4 1-15 I

REACTIVITY CONTROL SYSTEMS 2/4.1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER 3.1.4.1 The Rod worth minimizer (RWM) ehall be OPERABLE.

APPLICABILITY:

OPERATIONAL CONDITIONS 1 and 2*', when THERMAL POWER is less than or equal to 1 0 1 of RATED TRERMAL POWER, m i n i m allowable low power setpoint.

I ACTION:

I

a.

With the RWM inoperable after the first 12 control roda are f u l l y withdrawn, operation may continue provided that control rod movement and compliance with the prescribed control rod pattern are verified by a second licensed operator or other technically qualified member of the unit technical staff who is present at the reactor control console.

b.

With the RWM inoperable before the first twelve (12) control rods are fully withdrawn, one startup per calendar year may be performed provided that the control rod movement and compliance with the prescribed control rod pattern are verified by a second licensed operator or other technically qualified member of the unit technical staff who is present at the reactor control console.

c.

Otherwise, control rod movement may be only by actuating the manual scram or placing the reactor mode switch in the Shutdown position.

4.1.4.1 The RWM ehall be demonstrated OPERABLE:

a.

In OPERATIONAL CONDITION 2 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to withdrawal of control rods for the purpose of making the reactor critical, and in OPKRATIOW CONDITION 1 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to RWM automatic initiation when reducing THgRMAL POWER, by verifying proper indication of the eclection error of at least one out-of-sequence control rod.

Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpoec of determining the OPERABILITY of the RWM prior to withdrawal of control rode for the purpose of bringing the reactor to criticality.

  1. See Special Test Exception 3.10.2.

ROPB CXZEK 3/4 1-16 Amendment No. 1CFj

REACTIVITY CONTROL SYSTEMS 314.1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER

b.

In OPERATIONAL CONDITION 2 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to withdrawal of control rods for the purpose of making the reactor critical, by verifying the rod block function by demonstrating inability to withdraw an out-of-sequence control rod.

C.

In OPERATIONAL CONDITION 1 within one hour after RWM automatic initiation when reducing THERMAL POWER, by verifying the rod block function by demonstrating inability to withdraw an out-of-sequence control rod.

d.

By verifying that the control rod patterns and sequence input to the RWM computer are correctly loaded following any loading of the program into the computer.

HOPE CREEK 3 / 4 1-16a Amendment No. 105

REACTIVITY CONTROL SYSTEMS The material originally contained in Section 3 / 4. 1. 4. 2 was deleted with the issuance of Amendment No.

. However, to maintain numerical continuity betueen the succeeding sections and existing station procedural references to those Technical Specification eections, 3/4.1.4.2 has been intentionally left blank..

HOPS CREEK 314 1-17 Amendment NO. 105

R E A C T I V I T Y CONTROL SYSTEMS ROD BLOCK MONITOR L I M I T I N G CONDITION FOR OPERATION 3. 1. 4. 3 Both rod block monitor (RBM) channels s h a l l be OPERABLE.

APPLICABILITY:

equal t o 30% o f RATED THERMAL POWER.

OPERATIONAL CONDITION 1, when THERMAL POWER i s greater than o r ACTION:

a.

With one RBM channel inoperable:

1.

V e r i f y t h a t the reactor i s not operating on a LIMITING CONTROL ROD PATTERN, and

2.

Restore the inoperable RBM channel t o OPERABLE status w i t h i n 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Otherwise, place the inoperable rod block monitor channel i n the tripped condition w i t h i n the next hour.

b.

With both REM channels inoperable, place a t least one inoperable rod block monitor channel i n the tripped condition w i t h i n one hour.

SURVEILLANCE REQUIREMENTS 4.1.4.3 by performance o f a:

Each o f the above required RBM channels shall be demonstrated OPERABLE a,

CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION a t the frequencies and for the OPERATIONAL CONOITIONS specified i n Table 4.3.6-1.

reactor i s operating on a LIMITING CONTROL ROO PATTERN.

b.

CHANNEL FUNCTIONAL TEST p r i o r t o control rod withdrawal when the HOPE CREEK 3/4 1-18

REACTIVITY CONTROL SYSTEMS 3/4.1.S STANDBY LIQUID CONTROL SYSTEM LIMITING CONDITION FOR OPERATION 3.1.5 The standby lfquid control system consists of two redundant Subsystems and shall be OPERABLE.

APPLICABILITY: OPERATIONAL CONOITTONS 1, 2, and 5*

ACTION: -

a.

In OPERATIONAL CONDITION 1 or 2:

1.

Ufth one system subsystem inoperable, restore the subsystem to O P E W L E status within 7 days or be In at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Yfth both system subsystems inoperable, krtorr at least one subsystea to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in a t least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

With one system subsystem inoperable, restore subsystem to OPERABLE status within 30 days or insert all insertable control rods within the next hour.

2.
b.

In OPERATIONAL CONOITION 5*:

1.
2.

With both standby liquid control system subsystems inoperable, insert a17 insartable control rods within one hour.

SURVEI LUNCE REQUIREUENTS 4.1.5 The standby lfquid control systam shall be demonstrated OPERABLE:

a.

At least once-pr). 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verify'fng that;

1.
2.
3.

The t q r a t u n of the s o d f u pentaborate solution in the storage tank f s greater than or equal to 70°F.

Tho avaflrble volune o f s o d i u pentaborate solution is within t h e lfmlts o f figure 3.1.5-1.

fh. heat tracing circuit 1s OPERABLE by determining the teaperature o f the p suction pipfng to be greater than or equal to 7OOF.

'*with any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

HOPE CREEK 3/4 1-19

REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

b.

At least once per 31 days by:

1.

Verifying the continuity of the explosive charge.

I

2.

Determining that the available weight of sodium pentaborate is greater than or equal to 5,776 lbs and the concentration of boron i n solution is within the limits of figure 3.1.5-1 by chemical analysis.

  • Verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
3.
c.

Demonstrating that, when tested pursuant to Specification 4.0.5, the minimum flow requirement of 41.2 gpm, per pump, at a pressure o f greater than or equal to 1255 psig is met.

d.

At least once per 18 months during shutdown by:

1.

Initiating one of the standby liquid control system subsystem, including an explosive valve, and verifying that a flow path from the pumps to the reactor pressure vessel i s available by pumping demineralized water into the reactor vessel and verifying thabthe relief valve does not actuate.

for the explosive valve shall be from the same manufactured batch as the one fired or from another batch which has been certified by having one of that batch successfully fired.

injection subsystems shall be tested in 36 months.

The replacement charge Both

2.
    • Demonstrating that all heat traced piping between the storage tank and the injection pwnps is unblocked and then draining and flushing the piping with demineralized water.

Demonstrating that the storage tank heaters are OPERABLE by verifying the expected temperature rise o f the sodium penta-

,borate solution in the storage tank after the heaters are antrgiztd.

3.

"This test shall also be performed anytime water or boron is added to the solution or when the solution temperature drops below 70°F.

been found to be inoperable and may be perfomed by any series of sequential, overlapping or total flow path steps such that the entire flow path is included.

    • This test shall also be performed whenever both heat tracing circuits have HOPE CREEK 314 1-20 Amendment No. 11 I

c b

w 314 1-21 Arncndmt N0.11

3/4.3 INSTRUMENTATION 3/4,3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1 As a minimum, the reactor protection system instrumentation channels shown in Table 3.3.1-1 shall be OPERABLE.

APPLICABILITY: As shown in Table 3.3.1-1.

ACT ION :

a.

With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system, place the inoperable channel(s1 and/or that trip system in the tripped condi-tion* within twelve hours. The provisions of Specification 3.0.4 are not applicable.

b.

With the number of OPERABLE channels less than required by the Minimum OPERABLE Channels per Trip System requirement for both trip systems, place at least one trip system** in the tripped condition within one hour and take the ACTION required by Table 3.3.1-1.

SURVEILLANCE REQUIREMENTS 4.3.1.1 Each reactor protection system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION operations for the OPERATIONAL CONDITIONS and at the frequencies shown in Table 4.3.1.1-1.

4.3.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months.

4.3.1.3 The REACTOR PROTECTION SYSTEM RESPONSE TIME of each reactor trip functional unit shall be demonstrated to be within its limit at least once per 18 months. Neutron detectors are exempt from response time testing. For the Reactor Vessel Steam Dome Pressure - High Functional Unit and the Reactor Vessel Water Level - Low, Level 3 Functional Unit, the sensor is eliminated from response time testing for RPS circuits. Each test shall include at least one channel per trip system such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip system.

4.3.1.4 The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 2 or 3 from OPERATIONAL CONDITION 1 for the Inter-mediate Range Monitors.

  • An inoperable channel need not be placed in the tripped condition where this would cause the Trip Function to occur. In these cases, the inoperable channel shall be restored to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or the ACTION required by Table 3.3.1-1 for that Trip Function shall be taken.
    • If more channels are inoperable in one trip system than in the other, place the trip system with more inoperable channels in the tripped condition, except when this would cause the Trip Function to occur.

HOPE CREEK 3/4 3-1 Amendment No. 101

TABLE 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION APPLICABLE MINIMUM OPERATIONAL OPERABLE CHANNELS CONDITIONS PER TRIP SYSTEM (a)

ACTION FUNCTIONAL UNIT

1. Intermediate Range Monitors.

( b ).

a.

Neutron Flux - High 2

3 1 4 5 (c) 3 1

2 3

2 3, 4 5

3 1

2 3

b.

Inoperative 2 3 (d)

(e).

2. Average Power Range Monitor.
a.

Neutron Flux - Upscale, Setdown 2

3, 4 5 (c) 2 1

2 3

b.

Flow Biased Simulated Thermal Power - Upscale 1

1 2

2 4

4

c.

Fixed Neutron Flux - Upscale 2

1 2

3

d.

Inoperative

3. Reactor Vessel Steam Dome Pressure - High 1, 2 ( f )

2 1

4. Reactor Vessel Water Level - Low, Level 3 2

1 1, 2

5. Main Steam Line Isolation Valve -

Closure 4

4 3/4 3-2 Amendment NO. 39 I

HOPE CREEK

TABLE 3.3.1-1 (Continued)

FUNCTIONAL UNIT 6.

7.

8.
9.
10.
11.
12.

This item intentionally blank Drywell Pressure - High Scram Discharge Volume Water Level - High

a. Float Switch REACTOR PROTECTION SYSTEM INSTRUMENTATION
b. Level Transmitter/Trip Unit Turbine Stop Valve - Closure Turbine Control Valve Fast Closure, Valve Trip System Oil Pressure - Low Reactor Mode Switch Shutdown Position Manual Scram APPLICABLE MINIMUM OPERATIONAL OPERABLE CHANNELS CONDITIONS PER TRIP SYSTEM (a)

ACTION 1, 2 ( h )

2 2

2 2

2

( k )

2 2

2 2

2 2

1 1

3 1

3 6

6 1

7 3

1 8

9 HOPE CREEK 3/4 3-3 Amendment No. 53

ACTION 1 ACTION 2 ACTION 3 ACTION 4 ACTION 5 ACTION 6 ACTION I ACTION 8 ACTION 9 TABLE 3.3.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION ACTION Be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown position within one hour.

Suspend all operations involving CORE ALTERATIONS* and insert all insertable control rods within one hour.

Be in at least STARTUP within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

This ACTION is deleted Initiate a reduction in THERMAL POWER within 15 minutes and reduce turbine first stage pressure to less than the automatic bypass setpoint within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Verify all insertable control rods to be inserted within one hour.

Lock the reactor mode switch in the Shutdown position within one hour.

Suspend all operations involving CORE ALTERATIONS*,

and insert all insertable control rods and lock the reactor mode switch in the SHUTDOWN position within one hour.

  • Except replacement of LPRM strings provided SRM instrumentation is OPERABLE per Specification 3.9.2.

HOPE CREEK 3 / 4 3-4 Amendment No. 53

TABLE 3.3.1-1 (Continued)

REACTOR PROTECTION SYSTEM INSTRUMENTATION TABLE NOTATIONS A channel may be placed in an inoperable status for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for required surveillance without placing the trip system in the tripped condition provided at least one OPERABLE channel in the same trip system is monitoring that parameter.

This function shall be automatically bypassed when the reactor mode switch is in the Run position.

Unless adequate shutdown margin has been demonstrated per Specification 3.1.1, the "shorting links" shall be removed from the RPS circuitry prior to and during the time any control rod is withdrawn*.

The non-coincident NMS reactor trip function logic is such that all channels go to both trip systems. Therefore, when the "shorting links" are removed, the Minimum OPERABLE Channels Per the Trip System are 4 APRMS, 6 IRMS and 2 SRMS.

This function is not required to be OPERABLE when the reactor pressure vessel head is removed per Specification 3.10.1.

This function shall be automatically bypassed when the reactor mode switch is not in the Run position.

This function is not required to be OPERABLE when PRIMARY CONTAINMENT INTEGRITY is not required.

With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

I I

This function shall be automatically bypassed when turbine first stage pressure is 5 159.7 psig equivalent to THERMAL POWER less than 30% of RATED THERMAL POWER. To allow for instrument accuracyl calibration, and drift, a setpoint of 2135.1 psig is used.

Also actuates the EOC-RPT system.

I

  • Not required for control rods removed per Specification 3.9.10.1 or 3.9.10.2.

L HOPE CREEK 3/4 3-5 Amendment No. 35

Q 29 ELECTRICAL POWER SYSTEMS DISTRIBUTION - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.8.3.2 As a minimum, 2 of the 4 channels, one of which shall be channel A or channel.8, of the power distribution system shall be energized with:

a.

A. C. power distribution:

1.

Channel A, consisting o f :

a) 4160 volt A.C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels e) 120 volt A.C. distribution panels

2.

Channel B, consisting o f :

a) 4160 volt A.C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels e) 120 volt A.C. distribution panels

3.

Channel C, consisting o f :

a) 4160 volt A. C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels 10A401 108410 108450 108212 10B411 108451 108553 10Y40l(source:1OB411) 10Y411( source: 108451) 10Y501(source:10B553) lA3481 1YF401(source:1AJ481) 1AJ482 10A402 108420 108460 10B222 108421 iOB461 108563 10Y402(source:10B421) 10Y412(source:10B461) 10Y502( source: 108563) 185481 lYF402(source:I83481) 185482 10A403 108430 fOB470 108232 108431 108471 108573 10Y403(source:10B431) 10Y413( source: 10B471) 10Y503(source:10B573) 1 i 4

HOPE CREEK 3/4 8-21

ELECTRICAL POWER SYSTEMS i

LIMITING CONDITION FOR OPERATION (Continued)

- 4 v

e) 120 volt A.C. distribution panels 1CJ481 1YF403(source:1CJ481) 1C 5482

4.

Channel 0, consisting o f :

a) 4160 volt A.C. switchgear bus b) 480 volt A.C. load centers c) 480 volt A.C. MCCs d) 208/120 volt A.C. distribution panels e) 120 volt A.C. distribution panels

b.

D. C. power distribution:

1.

Channel A, consisting o f :

'w.

c )

125 volt D.C. distribution panel a) 125 volt D.C. switchgear b) 125 volt D.C. fuse box

2.

Channel 8, consisting o f :

a) 125 volt D.C. switchgear b) 125 volt D.C. fuse box c) 125 volt D.C. distribution panel

3.

Channel C, consisting of:

a) 125 volt D.C. switchgear b) 125 volt D.C.

fuse boxes c) 125 volt D.C. distribution panel

4.

Channel 0, consisting o f :

a) 125 volt D.C. switchgear b) 125 volt D.C. fuse box c) 125 volt D.C. distribution panel 10A404 10B440 108480 108242 10B441 106481 106583 10Y404( source: 108441) 10Y414(source:108481) 10Y504(source:10B583) 1DJA?1 1YF404(source:1DJ481) 105482 100410 1AD412 1AD417 100420 160412 1BD417 100430 100436 1CD412 1CD448 1CD417 100440 100446 100412 100448 1DD417 HOPE CREEK 3/4 8-22

ELECTRICAL POWER SYSTEMS

'..-/

LIMITING CONDITION FOR OPERATION (Continued)

APPLICABILITY: OPERATIONAL CONDITIONS 4, 5 and *.

ACTION:

a.

With less than two channels of the above required A.C. distribution system energized, suspend CORE ALTERATIONS, handling of irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.

With less than two channels of the above required D.C. distribution system energized, suspend CORE ALTERATIONS, handling o f irradiated fuel in the secondary containment and operations with a potential for draining the reactor vessel.

The provisions of Specification 3.0.3 are not applicable.

b.
c.

SURVEILLANCE REQUIREMENTS 4.8.3.2 At least the above required power distribution system channels shall be determined energized at least once per 7 days by verifying correct breaker/switch alignment and voltage on the busses/MCCs/panels.

HOPE CREEK 3/4 8-23

/-

3.9 2 A t least 2 source range monitor* (SRM) channels shall be 0PfRAB;E a.n= :nser:ed to the normal operating level with: U

a.

Annunciation and continuous visual indication i n the contro1,rogm b.

One of the required SRH detectors located in the quadrant where CORE ALTERATIONS are being p e r f o m d and the other required SRH d e t e c t s t located in an adjacent quadrant, and

c.

Unless adequate shutdown aargin has betn drmonstratra per Soeci f i c a -

tion 3.1.1, the "shorting links" r m v e d from the RPS circuitry prior to and during the time any control rod i s witndrawn.

a.

Duriog a SPIRAL UNLOAD, the count rate may drop below 3 cDs when t h e nurnbcr of assemblies remaining i n the core drops to sixteen or less.

i e.

During a SPIRAL RELOAD, uD to four fuel arsemblter nay be loaded i n the four bundle locations imedirtrly surrounding each o f the four S R r s p r i o r t o obtaining 3 cps.

lorded, the 3 cps count rate i s not required.

U n t i l these issenblies have been A P P L I C A B I L Y Y :

OPERATIONAL CONOITION 5.

1 With the rrQuirements of the above r ~ e c ~ f i c r t f o n not satisfied, lmediatrly susptna all operations involving CORE ALTERATlONS and insert all inscrtmle control roar.

SURk E! :LANCE REQuI REMEHTS 4. 9. 2 Each of the above rrquirrd SRn channels shall be demonstrated OPERABLE by:

a.

At least onto per U hours:

1.

Perfomrnce of 4 CHANNEL CHECK, m

e use of rpec?al movable detectors during CORE ALTERATIONS in place o f t h e norut SRn nuclear oeuctors i s pemissible 8s long 4s therr rpecirl oatrctors

  1. Not requirtd f o r control roar m a v e d por Specfficrtion 3.9.10.l.rnd 3.9.10.2.,

fnrrr SRM channels rhrll be O P E W L E for crltical shutdown u r g j n dnonstra-tions. An S&I detector may br ratractad provided a channel Indlcrtion o f at least 100 cgr 4 s uintatnea.

,are connected to tho n o m 1 SRM circuits.

HOPE CREEK 3/4 9-3 h n a n t NO. 14 [

RE F UE L I NG 0 PE RAT IONS L-SURVEILLANCE REQUIREMENTS (Continued)

2.

Verifying the detectors a r e inserted t o the normal operating level, and 3.

Ouring CORE ALTERATIONS, v e r i f y i n g t h a t the detector o f an OPERABLE SRM channel i s located i n the core quadrant where CORE ALTERATIONS are being performed and another i s located i n an adjacent quadrant.

b.

Performance o f a CHANNEL FUNCTIONAL TEST:

1.

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> p r i o r t o the s t a r t o f CORE ALTERATIONS, and

2.

A t l e a s t once per 7 days.

I

c.

Verifying t h a t the channel count r a t e i s a t l e a s t 3 cps.

1.

P r i o r t o contr.:l to& withdrawal,

2.

P r i o r t o and a t least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS***,

and

3.

A t l e a s t once per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s***.

Unless adequate shutdown vargin has been demonstrated per Specification 3.1.1, v e r i f y i n g t h a t the RPS c i r c u i t r y "shorting links" have been removed, w i t h i n 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior t o and a t least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during the time any control rod i s w i t h d r a w. *

  • d.

4 1

"'Not required for c o n t r o l pods removed per S o e c i f i c a t i o n 3.9.10.1 Or 3.9.1: :.

  • ""Except as noted i n Specifications 3. 9. 2. d and 3. 9. 2. e.

HOPE CREEK 3/4 9-4 Amendment No. 3 1 I

REFUEL I NG 0 P ERAT I ONS

\\..

314.9.3 CONTROL ROD POSITION LIMITING CONDITION FOR OPERATION 3.9.3 A l l control rods shall be inserted.*

APPLICABILITY:

ACT ION:

With a l l control rods not inserted, suspend a l l other CORE ALTERATIONS, except t h a t one control rod may be withdrawn under control o f the reactor mode switch Refuel p o s i t i o n one-rod-out interlock.

OPERATIONAL CONDITION 5, during CORE ALTERATIONS. **

SURVEILLANCE REQUIREMENTS 4.9.3 A l l control rods shall be v e r i f i e d t o be inserted, except as above specified:

a.

Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> p r i o r t o :

1.

The s t a r t o f CORE ALTERATIONS.

2.

The withdrawal of one control rod under the control o f the reactor mode switch Refuel p o s i t i o n one-rod-out interlock.

b.

A t l e a s t once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Except control rods removed per Speci f i c a t i o n 3.9.10.1 o r 3.9.10.2.

    • See Special Test Exception 3.10.3.

HOPE CREEK 3/4 9-5

r -

- - -,-,,?:s

?s?.z.I:?is 3 / 4. 9. 5 DELETED 3 / 4 9 - 7 henciment NC,137

THIS PAGE INTENTIONALLY DELETED.

HOPE CREEK 314 9-9 Amendment No. 31

3 / 4. 9. 7 ;ELZ,E3 I

REFUELING OPERATIONS

.v 3/4.9.8 WATER LEVEL - REACTOR VESSEL LIMITING CONDITION FOR OPERATION 3.9.8 A t least 22 feet 2 inches of water shall be maintained over the top of the reactor pressure vessel flange.

APPLICABILITY: During handling of fuel assemblies or control rods within the reactor pressure vessel while in OPERATIONAL CONDITION 5 when the fuel assemblies being handled are irradiated or the fuel assemblies seated within the reactor vessel are irradiated.

ACTION:

With the requirements of the above specification not satisfied, suspend all operations involving handling o f fuel assemblies or control rods within the reactor pressure vessel after placing all fuel assemblies and control rods in a safe condition.

SURVEILLANCE REQUIREMENTS 4. 9. 8 The reactor vessel water level shall be determined to be at least its minimum required depth within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prior to the start of and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during handling of fuel assemblies o r control rods within the reactor pressure vessel.

HOPE CREEK 3/4 9-11

R E F U E L i N G OPERATIONS 3 / 4. 9. 9 WATER L E V E L - SPENT F U E L STORAGE POOL L I M I T I N G C O N D I T I O N FOR O P E R A T I G N L

3.9.9 A t least 23 feet of water shall be mainta fuel assemblies seated in the spent fuel storage A P P L I C A B I L I T Y :

Whenever irradiated fuel assembl pool.

A C T I O N :

With the requirements of the above specification ned over the top o f irradiated pool racks.

es are in the spent fuel storage not satisfied, suspend all movement of fuel assemblies and crane operations with loads in the spent fuel storage pool area after placing the fuel assemblies and crane load in a safe condition. The provisions of Specification 3. 0. 3 are not applicable.

S U R V E I L L A N C E REQUIREMENTS 4. 9. 9 The water level in the spent fuel storage pool shall be determined to be at least at its minimum required depth at least once per 7 days.

L W

HOPE CREEK 3/4 9-12

REFUELING OPERATIONS

/ -

3/4.9.10 CONTROL ROD REMOVAL L,

SINGLE CONTROL ROO REMOVAL LIMITING CONDITION FOR OPERATION 3.9.10.1 One control rod and/or the associated control rod drive mechanism.

may be removed from the core and/or reactor pressure vessel provided that at least the following requirements are satisfied until a control rod and associ-ated control rod drive mechanism are reinstalled and the control rod is fully inserted in the core.

a.

The reactor mode switch is OPERABLE and locked i n the Shutdown position or in the Refuel position per Table 1.2 and Specification 3.9.1.

The source range monitors (SRM) are OPERABLE per Specification 3.9.2.

b.

c.

The SHUTDOWN MARGIN requirements of Specification 3.1.1 are satisfied, except that the control rod selected to be removed;

1.

May be assumed to be the highest worth control rod required to be assumed to be fully withdrawn by the SHUTDOWN MARGIN test, and 2.

Need not be assumed t o be immovable or untrippable.

d.

A l l other control rods in a five-by-five array centered on the control rod being removed are inserted and electrically or hydraulically disarmed or the four fuel assemblies surrounding the control rod or control rod drive mechanism t o be removed from the core and/or reactor vessel are removed from the core cell.

e All other control rods are inserted.

f.

A l l fue.1 loading operations shall be suspended.

APPLICABILITY:

OPERATIONAL CONDITIONS 4 and 5.

With t h e tequirements o f the above specification not satisfied, suspend removal o f t h e control rod and/or associated control rod drive mechanism from the core a n d / o r r e a c t o r pressure vessel and initiate action to satisfy the above reQui rements.

HOPE CREEK 3/4 9-13

REFUELING OPERATIONS L-SURVEILLANCE REQUIREMENTS 4.9.10.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to the start of removal o f a control rod and/or the associated control rod drive mechanism from the core and/or reactor pressure vessel and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter until a control rod and associ-ated control rod drive mechanism are reinstalled and the control rod is inserted in the core, verify that:

a.

The reactor mode switch is OPERABLE per Surveillance Requirement 4.3.1.1 or 4.9.1.2, as applicable, and locked in the Shutdown position or in the Refuel Dosition with the "one rod out" Refuel position interlock OPERABLE pe'r Specification 3.9.1.

b.

The SRM channels are OPERABLE per Specif

c.

The SHUTDOWN MARGIN requirements of Spec per Specification 3.9.10.1. c.

d.

All other control rods in a five-bv-five cation 3.9.2.

fication 3.1.1 are satisfied array centered on the control rod being removed are inserted and-electrical ly or hydraul ical ly disarmed or the four fuel assemblies surrounding the control rod o r control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.

e.

A l l other control rods are inserted.

f.

All fuel loading operations are suspended.

HOPE CREEK 3/4 9-14

REFUELING OPERATIONS i

\\-,

MULTIPLE CONTROL ROD REMOVAL LIMITING CONDITION FOR OPERATION 3.9.10.2 be removed from the core and/or reactor pressure vessel provided that at least the following requirements are satisfied until all control rods and control rod drive mechanisms are reinstalled and all control rods are inserted in the core.

Any number of control rods and/or control rod drive mechanisms may

a.

The reactor mode switch is OPERABLE and locked in the Shutdown position or in the Refuel position per Specification 3.9.1, except that the Refuel position "one-rod-out" interlock may be bypassed, as required, for those control rods and/or control rod drive mechanisms to be removed, after the fuel assemblies have been removed as specified below.

b.

The source range monitors SRM are OPERABLE per Specification 3.9.2 c.

The SHUTDOWN MARGIN requirements o f Specification 3.1.1 are satisfied.

d.

All other control rods are either inserted or have the surrounding four fuel assemblies removed from the core cell.

e.

The four fuel assemblies surrounding each control rod or control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.

f.

All fuel loading operations shall be suspended.

APPLICABILITY: OPERATIONAL CONDITION 5.

ACTION:

With the requirements of the above specification not satisfied, suspend removal o f control rods and/or control rod drive mechanisms from the core and/or reactor pressure vessel and initiate action t o satisfy the above requirements.

HOPE CREEK 3/4 9-15

REFUELING OPERATIONS SURVEILLANCE REQUIREMENTS 4.9.10.2.1 Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to the start of removal of control rods and/or control roa drive mechanisms from the core and/or reactor pressurw vessel and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter until all control rods and control rod drive mechanisms are reinstalled and all control rods are inserted in the core, verify that:

a.

The reactor mode switch is OPERABLE per Surveillance Requirement 4.3.1.1 or 4.9.1.2, as applicable, and locked in the Shutdown position or in the Refuel position per Specification 3.9.1.

b.

The SRM channels are OPERABLE per Specification 3.9.2.

c.

The SHUTDOWN MARGIN requirements o f Specification 3.1.1 are satisfied.

d.

All other control rods are either inserted or have the surrounding four fuel assemblies removed from the core cell.

e.

The four fuel assemblies surrounding each control rod and/or control rod drive mechanism to be removed from the core and/or reactor vessel are removed from the core cell.

f.

All fuel loading operations are suspended.

Ll' 4.9.10.2.2 Following replacement of all control rods and/or control rod drive mechanisms removed in accordance with this specification, perform a functional test of the "one-rod-out" Refuel position interlock, if this function had been bypassed.

HOPE CREEK 3/4 9-16

REFUELING OPERATIONS 3/4.9. il RESIDUAL FEAT REMOVAL AND COOLANT CIRCULATIGN HIGH WATER LEVEL LIKITING CONOITION FOR OPERkTI3N 3.9.11.1 (RHR) systerr! shall be OPERABLE and in operation* with:

At least one shutdown cooling mode loop of the residual heat teFova One OPERABLE RHR pump, and

a.
b.

One OPERABLE RYR heat exchanger.

APPLICABILITY:

OPERATIONAL CONDITION 5, when 1rradiat.d fuel i s in the react: I vessel and the water level is gniter than or equal to 22 feet 2 inches abgve the top of the reactor pressure vessel flange and heat losses to ambient** arc not sufficient to maintain OPERATIONAL CONDITION 5.

ACTION:

a.

Yith no RHR shutdown cooling wde loop OPERABLE, within one hour and at laart once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> themafter, demonstrate tha operability o f at least one alternatr nethod capable o f decay heat ruroval. Otherwise, suspend all operatlonr involving an increase in the reactor decay heat load and establish SECONDARY CONTAIWENT IMTEGRITY within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

b.

Yith no RHR shutdown cooling mode I&

in operation, rithjn one hour establish reactor coolant circulation by an alternate method and monitor reactor coolant w e r a t u r e at lerrt once per hour.

S U R V E I L W E REQUIREMENTS 4.9.11.1 At lrrrt one shutdown cooling mda loop of the nridurl heat removal sysk. or rlkmrtcl method shall be verfflrd to bo in op8rition and Circulatincl reactor coolant at least once par 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

n The shutdown coollng pupp m y be removed fm operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8-hour period.

    • Ambfent losses.lJSt be such t h a t no incnase i n reactor vessel water temper-ature will occur (even though REFUELING conditions are being maintained).

HOPE CREEK 314 9-17

R EFUE L I NG 0 P ERA T I ON S i-LOU WATER LEVEL LIMITING CONEITInN FOR OPERATION 2.9.lL.Z Two shutdown coo'iing mode loops of t h e residua': heat removal (RHR) system shall be CPERABLE and a t least one loop shall be i n operation," w i t h each loop consisting o f :

a.

One OPERABLE 2HR pump, and

b.

One OPERABLE RHR heat exchanger.

APPLICABILITY:

vessel and the water level is less tnan 22 feet 2 inches above the top o f the reactor pressure vessel flange and heat losses t o ambient** are not s u f f i c i e n t t o maintain OPERATIONAL CONDITION 5.

OPERATIONAL CCNDITION 5, when i r r a d i a t e d fuel i s i n the reactor ACT I ON :

a.

With less than the above required shutdown cooling mode loops o f the RHR system OPERABLE, within one hour and a t l e a s t once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> there-a f t e r, demonstrate the OPERABILITY of a t l e a s t one alternate method CaDable of decay heat removal f o r each inoperable RHR shutdown cooling moae loop.

b.

With no RHR shutdown cooling mode loop i n operation, within one hour establish reactor coolant c i r c u l a t i o n by an alternate method and monitor reactor coolant temperature a t least once per hou'r.

I SURVEiLLANCE REQUIREMENTS 4.9.11.2 system o r alternate method shall be v e r i f i e d t o be i n operation and CirCU1ating reactor coolant a t least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

A t l e a s t one shutdown cooling mode loop of the residual heat reinoval "The shutdown cooling pump may be removed from operation for up t o 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8-nour period.

    • Ambient losses must be such t h a t no increase i n reactor vessel water temper-ature will occur (even though REFUELING conditions are being maintained).

L.

HOPE CREEK 3/4 9-i8

.Amendment No. - 19

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 PSEG Internal Use Only Page 1 of 1 PSEG NUCLEAR FIRE DEPARTMENT NC.FP-AP.22-0025 (0) - Rev. 0 PRECAUTIONS AGAINST FIRE Sponsor Organization: Emergency Services REVISION

SUMMARY

Biennial Review performed Yes No -

NIA -

1.
2.
3.
4.
5.

This is a new procedure. This change is in support of revision number 6 to administrathre procedure NC.NA-APmZZ-OO25(Q),

Operational Fire Protection Program. (80035483).

NAAP-25 is being revised to focus on high level process concepts, resulting in relocation of some process description detail and the associated forms, tables, and attachments to other lower tier documents.

This revision represents a significant editorial incorporation of the NAAP-25 Hot Work Program into a new stand alone procedure. The NAAP-25 sections utilized to create this procedure were primarily:

0 5.8, Ignitable Metals 5.5, Control of Ignition Sources - Hot Work The associated NAAP-25 Hot Work forms, tables, and attachments have been relocated to this procedure.

Added term seismic joints to step 5.3.2.G to better define penetration in a fire barrier (7001 2801)

Added new section 5.1 1 Aerosol Products that deals with National Fire Protection Association (NFPA) Code 30B.

IMPLEMENTATION REQUIREMENTS:

Effective Date:

APPROVED:

Manager - Emergency Services

PRECAUTIONS AGAINST FIRE TABLE OF CONTENTS SECTION TITLE PAGE 1. 0 PURPOSE.....................................................................................................

2 2.0 SCOPE.........................................................................................................

2 3.0 RESPONSIBILITIES......................................................................................

2 4.0 PROCESS DESCRIPTION............................................................................

3 PROCEDURE.................................................................................................

4 5.0 5.I 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.21 Response to Fire Emergencies............................................................ 4 Fire Prevention Requirements.............................................................. 5 Fire Protection Impairment Program.................................................... 8 Control of Ignition Sources - Hot Work................................................. 8 Combustible Material Control - General /All Areas.............................. 9 Combustible Material Control - Safety Related Areas..........................

I O Transient Combustibles........................................................................ 4 1 Transient Combustible Fire Load Limits................................................ 11 Fire Department Transient Combustibles Inspections.......................... 12 Control of Flammable and Combustible Liquids and Gases................. 13 Aerosol Products.................................................................................. 15 6.0 7.0 8.0 RECORDS...................................................................................................

,.,15 DEFINITIONS................................................................................................ 16 REFERENCES..............................................................................................

17 TABLES TABLE 1 TABLE 2 Limited Transient Combustible Areas -Salem Station.................................... 20 Common Transient CombustibldEstimated Heat Content.............................. 21 FORMS FORM 1 Transient Combustible Permit........................................................................ 22 Common Page 1 of 22 Rev. 0

1.o 1.I I

.2 2.0 3.0 3.1 3.2 Common NC.FP-AP.TZ-0025 (Q)

PURPOSE This procedure is established to secure a reasonable level of safety to life and property from fire hazards incident to the occupancy and maintenance of PSEG Nuclear structures and facilities.

This procedure provides MINIMUM fire prevention measures and directs the user to procedures, which govern other fire protection processes in greater detail.

SCOPE This procedure applies to all PSEG Nuclear buildings and facilities located on the owner controlled property.

RESPONSIBILITIES All Directors and Managers Ensure their organizations implement the applicable fire prevention requirements within facilities they maintain and in which they conduct work.

Manager - Emergencv Services e

e 0

e e

0 e

e e

e e

Coordinate and implement the Operational Fire Protection Program requirements for protecting plant, systems, components, and materials.

Ensure General Employee Training (GET) discusses required employee actions in the event of fire.

Ensure walk downs are performed to monitor control of transient combustibles.

Ensure an inspection program is implemented to verify compliance with applicable regulations.

Ensure Hot Work, Transient Combustible, and Fire Protection Impairment Permits (FPIPs) are properly prepared, authorized, and implemented.

Maintain daily communication with the Operations Superintendent andlor Control Room Supervisors on the status of Salem and Hope Creek Station FPIPs. [CD-434E].

Ensure ignition source control and monitoring for fire prevention.

Interface with fire insurance inspectors, state and local enforcement agencies Interface with offsite fire departments.

Define non-FD responsibility for required testing and inspection of fire protection equipment.

Ensure timely and effective preventive and corrective maintenance on fire protection systems and components assigned to the FD.

Page 2 of 22 Rev. 0

NC.FP-AP.ZZ-0025 (Q) 3.3 Job Supervisors - Salem and Hope Creek Stations 0

Comply with fire prevention requirements of the Fire Protection Impairment, Hot Work, and Transient Combustible Control processes Ensure work practices support control of ignition sources, flammable liquids and gases, and ignitable metals.

0 Comply with the requirements af this procedure.

0 Ensure appropriate response to fires and fire alarms for the affected area.

Ensure fire prevention requirements are observed.

3.4 All Personnel 4.0 PROCESS 4.1 This procedure identifies elements of the Operational Fire Protection Program categorized as Fire Prevention and Readiness to Detect and Suppress Fires.

This procedure is implemented in full detail by the following supplemental Fire Department administrative procedures.

SC.FP.AP.Z&0003(Q), Actions for Inoperable Fire Protection - Salem HC.FP-AP.ZZ-OOW(Q), Actions For Inoperable Fire Protection-Hope Creek NC.FP-AP.ZZ-O005(Q), Fire Protection Surveillance / Periodic Test Program 0

NC.FP-AP.ZZ-O009Q), Fire Protection Training Program 0

NCFP-AP.ZZ-001 O(Q}, Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Hot Work Practices NC. FP-AP.P-O020(Q), Compensatory Measure Fire Watch Program Users of this procedure are advised to refer to the above departmental procedures for the full detail and administrative controls which these procedures provide.

4.2 4.3 Common Page 3 of 22 Rev. 0

5.0 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 NC.FP-AP.22-0025 (Q)

PROCEDURE Response to Fire Emergencies In the event a fire alarm sounds within an office facility, (e.g. Material Center, Nuclear Operations Services Facility (NOSF), PSEG Nuclear Administration Building (TB-21, Hope Creek Administration Suilding, Processing Center, or "B" Clean Facilities Building) evacuate the building in accordance with the established routes.

A. Accountability should be performed to ensure all personnel are out of the B. Evacuees should not crowd the entrances and should await further C. NEVER use the elevator to leave the building.

D. Always ensure fire boundary doors are closed.

For fire alarms within the Salem and Hope Creek Stations, listen to the instructions via the page system provided.

Upon discovering a fire, report it using the telephone via 3333, a manual pull box, or page system A. Use page line 1 for Salem U/1, line 2 for Salem U/2 B. Use page line 5 at Hope Creek When reporting an emergency, callers should provide information such as nature of the emergency, the location, and any equipment involved.

After reporting a fire, employees should fight the fire if its within their training and capabilities.

A. If not within the training and capabilities of the employes(s), to fight the fire, then the employee(s) should alert others in the area, evacuate to a safe distance and standby to direct FD personnel to the scene.

When the Control Room receives a report of a fire they should dispatch appropriate personnel in accordance with the applicable procedures.

building and at a specified gathering place.

instructions from either the control room or FD personnel.

Common Page 4 of 22 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.77-0025 (Q) 5.2 Fire Preventlon Requirements 5.2.q General The following conditions are prohibited and should be corrected immediately IAW N.J.A.C. 570-2-10 (New Jersey State Fire Code). These provisions should be applied in all buildings and facilities:

A. Dangerous conditions which are liable to cause or contribute to the spread B. Conditions that would interfere with the use of any fire protection C. Obstruction of egress pathways such as stairwells, exit doors and D. Accumulation of dust or waste in HVAC systems or grease in kitchen or E, Accumulations of grease on kitchen cooking equipment, or oil, grease or F. Accumulation of rubbish, waste, paper, boxes, or other combustible of fire.

equipment.

corridors.

other exhaust ducts.

dirt upon, under or around any mechanical equipment.

materials (trash) or excessive storage of any mmbustible materials in an area not designed for that purpose.

installed electrical wiring, equipment or appliances.

equipment for handling or use of combustible, explosive or otherwise hazardous materials.

1.

Dangerous amounts of combustible, explosive or otherwise hazardous materials.

J. All equipment, materials, processes or operations that are in violation of the provisions and intent of this procedure, the MJ State Fire Code and any procedures for safe plant operation.

the FD (Ext. 2800/2803) for evaluation G. Hazardous conditions arising from defective or improperly used or H. Hazardous conditions arising from defective or improperly installed K. Fire Protection deficiencies observed should be immediately reported to L. Smoking is prohibited in all buildings and areas unless specifically posted.

A, AH storage areas should be maintained in a neat and orderly condition.

8. Storage of material should not affect access to or obstruct fire protection C. Thirty inches (30) of clearance, free of combustible material, shall be D. Materials should not be placed, stored or kept in any portion of an exit, 5.2.2 Storage systems or fire fighting equipment.

maintained around energized electrical panels.

elevator or at the bottom of a stairway or other means of escape.

Common Page 5 of 22 Rev. 0

5.2.3 5.2.4 5.2.5 Common NC.FP-AP.22-0025 (Q)

Fire Barriers A, Fire Doors shall be maintained closed at all times (unless provided with an B. Blocking, propping or leaving a fire door open without proper authorization approved hold-open device).

for any time period is 8 violation of our fire protection program and a serious fire safety hazard. [CD474B, CDD753X, CDm764E]

C. It is imperative that ALL PERSONNEL make sure fire doors close behind them. For doors with hold open devices, the door opening and door swing area need to be free of obstructions.

etc.) shall be maintained, repaired, restored or replaced when damaged, altered, or penetrated D. All required fire resistance rated assemblies (ceiling tiles, walls, doors, Electrlcal A. Extension cords and flexible cords shall not be a substitute for permanent wiring.

B. Extension cords and flexible cords shall be a minimum of 12/3 gauge and not be affixed to structures; extended through walls, ceilings or floors, or under doors or floor coverings; nor shall such cords be subject to environmental damage or physical impact.

C. Multi-plug adaptors, such as cube adaptors, unfused plug strips or any other device not complying with NFPA 70, shall be prohibited.

Fire Protection Systems A. Installed firefighting equipment, with the exception of portable fire extinguishers, may only be utilized for firefighting at the direction of the NFPS.

B. Use of fire protection water for non-fire protection purposes (not within the scope of a T-Mod), is prohibited without permission from the OSICRS of the affected station and the NFPS, along with issuance of a permit for tracking.

C. Actuated detection or suppression systems should not be shut off until authorized by the NFPS or affected station OSKRS. The FD should be notified immediately whenever a portable fire extinguisher is discharged.

D. Fire extinguishers mounted in the stations are for emergency use only.

E. Fire extinguisher location changes at Hope Creek are governed by the configuration control program and cannot be made until approved and documented via the design change process. In addition, use of certain type ABC dry chemical extinguishers are prohibited at Hope Creek station.

Contact the FD for specific information. [CR990312177]

Page 6 of 22 Rev. 0

NC.FP-AP.22-OOPS (Q) 5.2.6 Portable Space Heaters A. Any use of portable space heaters, whether in a safety related or non-safety related application, will require a review and approval by Fire Protection. Additionally, the following provislons also apply to the use of portable space heaters.

B. Portable space heaters use in off ice areas of trailers are prohibited.

C. Portable space heaters used to maintain operability of Safety Related structures, systems, or components (SSCs) are installed in accordance with NC.DE-AP.ZZ-O030(Q), Control of Temporary Modifications.[C10403].

D. In non-safety related areas to support personnel comfort or equipment operation, use of a portable space heaters, will require a review by fire protection with the following restrictions:

1. The department placing the heater is responsible for placing it in the plant, inspecting it to ensure the unit is in serviceable condition and all safety features are operational.
2.

The responsible department shall monitor the operation of the heater at all times, E. Portable space heaters should be electrically powered where possible.

F. A clear combustible zone of 10' around the heater should be maintained at all times.

G. Portable heaters should not be placed in high traffic areas or other areas where personnel could come in contact with them.

H. Fuel fired portable heaters should not be used in a building unless all other alternatives are exhausted.

1.

Fuel fired portable heaters may not be used without adequate ventilation J. Fuel fired portable heaters may not be used in confined spaces.

K. Fuel fired portable heaters may not be fueled while in operation L. A portable fire extinguisher must be present while a fuel fired portable heater is in operation.

Common Page 7 of 22 Rev. 0

5.3 NC.FP-AP.22-0025 (Q)

Fire Protection Impairment Prowram 5.3.1 The Fire Department is the fire protection impairment authority, responsible for implementing the Fire Protection Impairment Program in accordance with administrative procedure: N D.FP-APZ-001 O(Q), Fire Protection Impairment Program. [CD434E]

Work activities affecting the following fire protection systems, equipment and barriers shall be controlled through the Fire Protection Impairment Program 5.3.2

[CD-I74B, CD438A, CD-531 A, CD-643A, CDdb3X, CD=764E, CD-807X, CD-8214:

A. Fire water system (Le. pumps, hydrants, piping, hose stations, deluge and B. Carbon dioxide (CARDOX), Halon, and Foam systems.

C. Smoke and thermal detection systems.

D. Fire alarm and associated circuitry.

E, Manual pull box alarm stations.

F. Fire doors and fire dampers.

G. Penetrations, including seismic joints, in fire barriers. 17001 28011.

H. Marinite boards and structural steel fireproofing.

1.

Fire Wrap on cable tray, conduits, cables, and vent ducts.

J. Radiant energy shields.

K. Appendix "R" 8-hour battery powered emergency lights.

L. Transient com bustibles in non-safety related areaslrooms.

A Fire Protection Impairment Permit (FPIP) is also required when equipment taken out of service affects operability of a fire protection system (Le. tagging a breaker that powers the detection system).

sprinkler systems).

5.3.3 5.4 5.4.1 5.4.2 5.4.3 5.4.4 Control of fcrnition Sources - Hot Work The FD authorizes Hot Work Permits in accordance with procedure NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work.

Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered a fire watch required activity.

A Hot Work Permit (HWP) - Form I of this procedure, shall control all these processes. [CD-226C, CB3OOX, CD-317Y, CD-754X, CD-821 X]

Work involving wire wheeling! needle gun use, or hot iron soldering is NOT considered hot work and a Hot Work Permit is not required.

A. Precautions identified in this procedure for hot work activities should be applied to ensure a fire safe work area.

B. At the discretion of the NFPS, the use of certain equipment for pre-heating such as Cooper Heat (trade mark) resistance heaters, or similar devices, may be considered Hot Work.

Common Page 8 of 22 Rev. 0

5.5 5.5.1 5.5.2 5.5.3 5.5.4 5.5.5 5.5.6 5.5.7 5.5.8 5.5.9 NC.FP-AP.ZZ-0025 (Q)

Combustible Material Control - General / All Areas Commonly encountered transient corn bustibles and their estimated heat content are identified in Table 2.

Flammable or combustible liquids introduced into any arealroom within the stations shall be limited to daily usage. [CD-755a Use and storage of flammable liquids for decon within the stations shall be limited to five gallons. [CD-799X]

Items incidental to Radiation Protection such as catch-bags, step-off-pads, roping, and stanchions are acceptable in limited quantities as determined by the FD. PC and trash drums are evaluated as transient combustibles.

Accumulations of waste, debris, scrap, rags, and other combustibles resulting from work activities shatl be removed from the work area immediately following job completion or at the end of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, whichever comes first.

For work in the RCA, combustibles shall be removed given proper consideration for ALARA or contained in a sealed container until removed.

[CD-426a Com bustible structures, (including trailers, sheds, etc.) are prohibited from being placed inside of or within 30 feet of permanent buildings, unless a Fire Protection Impairment Permit (FPIP) or TCP as appropriate is issued authorizing placement.

Introduction of combustibles into Combustible Control Zones (CCZ) at Salem is prohibited without a Transient Combustible Permit (TCP), see Form 1, and appropriate compensatory measures. CCZs are used to limit the potential for exposure of sensitive equipment to fire and/or combustion products, to limit the potential for fire propagation through plant equipment hatches, and to reduce overall fire risk. Fixed combustible material may be installed in CCZs with approval from the fire protection designated design authority or the fire department. Transient combustibles are combustible materials that are not part of permanent plant equipment, components or installations. Transient combustibles are intended to pass through or reside in the plant for a brief duration usually associated with, but not limited to, a maintenance or design change work activity (e.g., combustible liquids, wood 8, plastic products, waste materials, scrap, rags, trash bags, electrical extension cords, ctothing hoop rings, or other corn bustible materials resulting from a work activity.)

Equipment or supplies (such as new fuel) shipped in untreated combustible containers can be unpacked (in preparation for immediate use} in safety-related areas if required for valid operating reasons. However, the combustible shipping materials shall be removed from the area immediately after unpacking, unless stored in metal containers with tight-fitting, self-closing metal covers or equivalent. Such material unless stored in the approved containers, shall NOT be left unattended at any time. [CD426X]

Rev. 0 Common Page 9 of 22

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.ZZ-0025 (Q) 5.5.10 5.5.1 1 5.5.12 5.5.13 5.514 5.6 5.6.1 5.6.2 5.6.3 5.6.4 5.6.5 Common All wood used for maintenance activities, refueling or modification operations, including wood carts and foreign material exclusion (FME) covers, etc. shall be fire retardant (performance rated Exterior Type per National Fire Protection Association Standard 703).

Combustible material for decoration in any building is prohibited, unless the materials have been made flame retardant with an approved flame retardant material or process and are approved by the NFPS prior to the installation, using the planned FPlP process.

Temporary buildings, enclosures, or fixtures within or on buildings should be constructed of noncombustible material. Use of combustible materials may affect compliance with Nuclear Electric Insurance Limited (NEIL) Property Loss Prevention Standards. Permanent items are prohibited unless evaluated and approved in accordance with NC.NA-AP.ZZ-0008 (Q) Configuration Control Program.

Storing combustible or flammable material in stairwells is prohibited.

Combustible or flammable materials in use shall not be stored on or against stations' fire rated barriers, where it will come in contact with such items as:

A. Metal floor hatches, pipes, conduits, cable trays, cable, and HVAC ducts that penetrate fire barriers.

B. Penetration seals installed in barriers or embedded sleeves used to form openings in fire barriers.

Combustible Material Control - Safetv Related Areas Storage of combustibles is safety related areashooms except when approved by Engineering.

When approved, storage of combustibles in safety related areashooms is permitted only in metal containers with tight-fitting, selfclosing metal covers or equivalent.

Storage for Salem's RCA safety related areas is limited to the engineering approved locations andlor the "A" Controlled Facilities Building, while Hope Creek's RCA safety related areas is limited to the engineering approved locations and/or sprinklered areas of the Turbine Building.

Use of non-fire retardant wood (such as large dunnage, wooden carts, or FME) in any safety-related area/room, regardless of the total British Thermal Units (BTU) content, requires an evaluation by engineering.

Daily usage of combustible or flammable materials in safety related areas of Salem and Hope Creek Stations is considered transient combustibles and requires Section 5.7 of this procedure to be completed.

permitted in Salem and Hope Creek Station's iCD-31v Page 10 of 22 Rev. 0

NC.FP-AP.ZZ-0025 (Q) 5.7 5.7.q 5.7.2 5.7.3 5.7.4 5.7.5 5.8 5.8.1 5.8.2 5.8.3 5.8.4 5.8.5 Common Transient Combustibles All work activities requiring the introduction of transient combustible material into SAFETY RELATED AREAS or ROOMS shall be identified and administratively controlled. [CD1226C, CD-300X, CD463Y, CD-807X, Job Supervisors or designees, for work activities introducing combustible items into safety-related areaslroorns, are responsible for performing a calculation of the transient combustibles BTU content.

This calculation should be completed during the walk-down phase of the workweek process.

Use Form 1 Transient Combustible Permit (TCP) for performing the calculation.

The FD will issue an approved TCP for SAFETY RELATED AREAS or ROOMS and specify compensatory measures based on the following:

A. Total transient combustibles being utilized in a fire aredroom.

B. Pre-existing quantities of transient combustibles found during roving C. Valid hot work activities.

D. Sound Fire Protection Practices.

E. Presence/operability of installed detection or suppressian equipment in Transient Combustible Fire Load Limits Transient combustible fire load limits have been established for safety related areaslrooms within the Salem and Hope Creek Stations and are specified in the Fire Hazards Analysis of each station. [CD=300X, CD839F)

If it is determined the use of combustibles WILL EXCEED established limits, an engineering assessment is required to determine threshold limits and any additional controls BEFORE the combustibles are brought into the safety related areaslrooms.

Regardless of whether the transient combustibles do or do not exceed the limits, the FD will issue a TCP and specify compensatory measures.

Departments introducing the transient corn bustibles are responsible for the implementation, control and release of the fire watch compensatory measure.

Salem Station Transient Combustible Load Limit A. 400,000 BTU per fire area. t842201 B. Table I contains the areas in both Salem Stations, which have restrictions CD-8214 patrols or the current TCP logs.

aredroom, to the established limits with regards to transient combustibles.

Page 11 of 22 Rev. 0

NC. F P-AP.22-0025 (Q) 5.8.6 Hope Creek Station Transient Combustible Load Limit A. 4,480,000 BTU per room. [CD-939F]

6. Mope Creek rooms have restrictions with regards to transient combustible load limits: [CD463q 1, Room 4326 (CRD Removal and Repair Area) and Room 4333 (CRD Storage Area): Transient combustibfes are prohibited with the exception of CRD cleaning and rebuilding equipment.
2. Vestibules 5101 5201 and Electrical Raceways 521 6 and 5336:

Transient combustibles are prohibited.

3. Main Control Room and Control Complex Peripheral Rooms:

Transient combustibles are limited to Class "A" materials and small quantities of cleaning supplies incidental to Control Room Complex functions. This area shall not be used for any storage, as storage shall be limited to the peripheral rooms only. This does not include small quantities of items such as a ream of paper or stationary supplies like pens and notepads.

5.9 59.1 5.9.2 5.9.3 5.9.4 Fire Department (FD) Transient Combustibles Inspections The FD performs a survey of transient combustibles in safety-related areas/rooms as part of their daily housekeeping inspections.

The FD performs a survey of transient combustibles in non-safety-related areadrooms as part of their weekly housekeeping inspections.

Non-compliances discovered will be documented using the notification process. v8106]

For Non-Safety Related Areas Only:

A. No combustible or flammable material should be stored in any non-safety related area of either Salem or Hope Creek Stations, unless the area contains a fire suppression system, due to insurance restrictions (NEIL Property Loss Prevention Standards). Exceptions to this requirement are based on a FD evaluation with implementation of compensatory measures.

(performance rated Exterior Type per National Fire Protection Association

[NFPA] Standard 703).

C. Introduction of combustibles considered to be excessive will be tracked by a Fire Protection Impairment Permit.

B. All wood used for maintenance activities should be fire retardant wood Common Page 12 of 22 Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (a) 5.10 5.10.1 5.1 0.2 5.10.3 5.40.4 Common Control of Flammable and Cornbusti ble Liquids and Gases Storage or dispensing of flammable or combustible liquids shall be in accordance with NFPA Standard 30, the "Flammable and Combustible Liquids Code", unless an authority having jurisdiction (such as the Nuclear Regulatory Commission (NRC) or the Nuclear Electric Insurance Limited (NEIL) grants exceptions or variances. All questions regarding compliance with NFPA 30 should be directed to the FD. [CD900X, CD-755)(1 Flammable and combustible liquids shall be handled carefully using the following guidelines: [CD=755X]

A. Kept in Factory Mutual (FM) or Underwriters Laboratory (UL) approved safety cans when in use, handled and/or dispensed. The only exception is when liquids remain in their original containers to maintain purity.

B. Flammable and combustible liquids when NOT in use are stored in FM or UL approved flammable liquid storage cabinets regardless of container.

C. Proper electrical grounding and bonding are provided when dispensing.

Portable Fuel Tanks A. Portable fuel tanks, or fuel tanks used for storage, require the following measures:

1, A capacity > 660 gallons requires a permit by the State of N.J.

2. Contained within a dike capable of being drained frequently to remove accumulated rainwater or spills.
3. Located and arranged that access for fire fighting is not restricted.
4. Equipped with a lockable, automatic shutoff nozzle.
5. Portable ABC type fire extinguisher provided.

impairment perm it is required along with possible compensatory measures.

B. If any of the above fire prevention measures are not met, a fire protection Engineering is to assess and approve all permanent or temporary placements of flammable liquid storage cabinets and gas cylinders in safety-related areas of either Salem or Hope Creek. [CD-755X, CD-830A A. Requests for permanent placement of a cabinet in a SAFETY RELATED area made via NI Notification for engineering evaluation and approval.

B. Requests for temporary placement of a cabinet in a SAFElY RELATED area are made via the Transient Combustible Permit process through the Fire Department.

Page 13 of 22 Rev. 0

NCFP-AP.ZZ-0025 (Q) 5.1 0.5 5.10.6 5.10.7 5.1 0.8 5.10.9 5.1 0.1 0 Common Placement of flammable liquid cabinets in non-safety related areas is in accordance with the following:

A. No more than 3 cabinets should be located in any one fire area.

B. In large plant areas (ie Turbine Building) more than 3 cabinets may be installed provided each group of 3 cabinets is separated by at least 100.

C. If the area is fully sprinklered, up to 6 cabinets may be installed in a single area without 100' separation.

Flammable liquid cabinets should be maintained in a neat orderly condition with all latches, hardware and hinges properly functioning.

The maximum atlowable quantity of Class I, It, and IllA liquids should not exceed 120 gallons per cabinet.

NO storage of materials other than Class I, ll and MA liquid is permitted in a Flammable liquid cabinet.

Flammable Gas Cylinders A. Flammable gas cylinders in any safety-related area or room, regardless of the amount, shall NOT be left unattended for > 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. [78111]

B. Flammable gas cylinders in any safety-related area or room, regardless of the amount requires a TCP.

1. An exception for the TCP would be when a Hot Work Permit (HW) is issued for the gas cylinders on a daily basis.
2. The requirement to monitor flammable gas cylinders left for longer than one hour in a safety related area or room of the stations remains the same. [CD-830X, TS990325186J Compressed Gas Cylinders A. Personnel working with compressed gas cylinders shall comply with the precautions as specified in desk guide: NC.PM-DG.77-0001 (Z) Storage and Handling of Compressed Gas Cylinders: [CD-;IS4X, CD-830XI B. Compressed Gas Cylinder Control Tags must be affixed to cylinder(s).

These tags should be maintained to match cylinder level (EMPTY, IN-USE, and FULL).

permit issued, are considered "in use". Those not in use will be treated as "storage" and shall safety related areas of the stations. [78111 J owners. ~SSSOSOSI SO]

manufactured holding devices, or to a cart or permanent structure by chain or double wrapped wire (minimum No. 9 gauge), to prevent them from falling or being knocked over.

C. Compressed gas cylinders used for hot work with a valid daily hot work be left unattended for longer than one hour in D. Cylinders should contain a job information tag attached for identifying the E. Cylinders should be kept in an Upright position, secured in specially Page 14 of 22 Rev. 0

5.1 1 5.1 1.1 5.1 1.2 5.11.3 5.1 1.4 5.11.5 5.11.6 6.0 6.1 6.2 NC. F P-AP.22-0025 (Q)

F. Open cylinder valves slowly and close valves when work is complete or when personnel leave the area.

G. Keep cylinders capped whenever regulator is removed, while moving a cylinder, or when cylinder is in storage.

H. Promptly return cylinders to the appropriate gas bottle storage areas upon completion of the work.

1.

All storage and issuance of compressed gas cylinders in the gas bottle storage areas should be In accordance with Compressed Gas Association Pamphlet P-1.

J. Warning signs are required in areas where the possibility of hydrogen leakage exists (Re-combiners, Waste Gas Compressors, Decay Tanks, and Turbine Generators) to prevent open flames or other sources of ignition within 35 feet of the hazard. [CD=173B]

Aerosol Products An aerosol is a product that is dlspensed from an aerosol container by a propellant.

The definition of aerosol does not apply to the storage or display of containers whose contents are composed entirely of liquid petroleum (LP) gas products.

A. Examples include MAP (methane, acetylene, propane) gas cylinders, B. Uses for these LP-gases might include small hand torches for brazing and An aerosol container is a metat can up to a maximum ske of 33.8 fluid ounces (1 000 ml) or a glass or plastic bottle up to a maximum size of 4 fluid ounces (1 18 ml).

Storage and display of aerosols shall be In accordance with NFPA standard 308, Manufacture and Storage of Aerosol Products Code.

Aerosols introduced into any safety related aredroom within the stations shall be limited to daily usage.

Daily usage of aerosols in safety related areas of Salem and Hope Creek Stations is considered transient combustibles and is required to be controlled accordingly.

propane gas cylinders, and butane gas cylinders.

soldering.

Records Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.22-0011 (Q), Records Management Program The FD, in accordance with NAP-1 1, shall retain transient combustible permits and logs pertaining to hot work permits and fire protection impairment permits. [CP434EJ (NAP-1 1). [CD434E]

Common Page t5 of 22 Rev. 0

7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.1 I 7.12 7.13 7.14 7.1 5 Common NC.FP-AP.22-0025 (Q)

DEFl NITIONS Aerosol - A product that is dispensed from an aersol container by a propellant,(NFPA 30B).

Combustible Control Zone (CCZ) - An area of the plant in which transient combustible material@) is prohibited without a Temporary Combustible Permit (TCP) and appropriate compensatory measures.

Combustible Liquid - A liquid having a flash point at or above 100" F (37.8' C).

Combustible Material - Materiat, which in the form it is used and under the conditions anticipated, WILL ignite, burn, support corn bustion, or release flammable vapors when subjected to fire and heat.

Fines - very small particles in a mixture of various sizes.

Fire Barrier - Those construction elements (walls, floors, and their supports),

including beams, columns, penetration seals or closures, fire doors and dampers, that are rated by approving laboratories in hours of resistance to fire and used to prevent the spread of fire.

Fire Retardant Wood - Wood that has been treated with fire retardant chemicals and is performance rated Exterior Type per National Fire Protection Association Standard 703).

Flre Watch - An individual who has satisfactorily completed fire watch training and is designated by the FD for compensatory measure, hot work, or both fire watch type duties.

Flammable Liquid - A liquid with a flash point below 100" F and a vapor pressure not exceeding 40 pounds per square inch absolute at 100" F. (Also known as a Class I liquid.)

Hot Work - Work that involves ignition sources.

ignition Source - Heat or flame from any source capable of igniting combustible or flammable material.

Impairment - Any condition affecting the intended operation of a fire protection system or barrier or posing as a fire hazard within the stations.

Liquified Petroleum Gas (LP-Gas1 - Material having a vapor pressure not exceeding that allowed for commercial propane composed predominantly of the following hydrocarbons, either by themselves or as mixtures: propane, propylene, butane (normal butane or isobutene), butylenes (NFPA 58).

Noncornbustlble Material - Material which, in the form it is used and under the conditions anticipated, will NOT ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.

Permanent - A condition with an indefinite period of time.

Page 16 of 22 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (Q) 7.1 6 7.17 7.18 7.19 7.20 7.21 7.22 7.23 0.0

8. I 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8,9 8.1 0 Safety Related Area - An area that contains systems and components required to shut down the reactor, mitigate the consequences of postulated accidents or maintain the reactor in a safe cold shutdown condition, Sealed Container -A metal container sealed by means of a tightly fitting lid or other device so neither liquid nor vapors can escape at room temperature.

Storage - The placing of items in a location and leaving them unattended until later use or disposal.

Temporary - planned time duration of no more than 60 days.

Temporary Buildinas - Any temporary structure or supported protective covering where personnel can move freely in and out of the structure.

Temporary Enclosure - Any supported protective covering where personnel cannot move in and out of the structure or where the protection is accomplished by draping the protective cover over the material and/or equipment. This definition also applies to temporary enclosures inside of permanent buildings.

Temporary Fixture - Something securely placed or attached as an appendage or as 8 structural part of a building (Le, door, portable steps, storage rack), constructed of a combustible material. This definition does not apply to furniture permanently installed in Station facilities.

Transient Combustible - Any combustible material introduced into a Safety-Related aredroom which will be used to complete an assigned task or left unattended for any period of time. It does not include items moved through areas in route to the final destination, unless the items are lef? un-monitored during transit.

REFERENCES NC. NA4P.ZZ-0025 (a), Operational Fire Protection Program N.J.A.C. 570-2 New Jersey State Fire Code Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System Salem Fire Protection Report - Fire Hazards Analysis HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program HCGS UFSAR, Appendix QA, - Appendix R Comparison Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July I, 1976 Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance, August 2 977 Occupational Safety and Health Standards Title 29, Chapter XVII, Part 191 0.36FR 10466 Common Page 17 of 22 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.ZZ-0025 (Q) 8.1 1 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.18.1 8.18.2 8.18.3 8.4 8.4 8.18.5 8.18.6 8.18.7 8.18.8 8,18.9 8.18.10 8.1 8.q I 8.18.13 8.18.14 8.1 8.15 8.18.16 8.19 8.19.1 8.19.2 8.19.3 8.19.4 8.1 9.5 8.19.6 8.18.12 8.1 8.1 7 10CFR50 Appendix R, Fire Prot. Program for Nuclear Power Facilities Operating Prior to Jan. 1, 1979 NC.DE-PSZZ-0001 (Q), Fire Protection Programmatic Standard IEEE Standard 634 - 1978 Hope Creek Station Generic Letter 86-10 Submittal, dated May 13, 1986 HC.DE-PS.ZZ-0021 (F), Hope Creek Penetration Seal Program SC.DE-PS.ZZ-O035(Q), Salem Penetration Seal Program National Fire Protection Association Standard 701, Standard Methods for Fire Tests for Flame Propagation of Textiles and Films Cross References NFPA 30 - Flammable Liquids Code, National Fire Protection Association (NFPA)

NFPA 30B - Code for the Manufacturer and Storage of Aerosol Products NFPA 58 - Liquefied Petroleum Gas Code NFPA 703 - Standard for Fire Retardant Impregnated Wood and Fire Retardant Coatings for Building Materials Compressed Gas Association Pamphlet P-I, Safe Handling of Compressed Gases in Containers.

Property Loss Prevention Standards of Nuclear Generating Stations - Nuclear Services Organization (NSO).

NC.NA-AP.Z&0008(Q), Configuration Control Program NC.NA-AP.ZZ-0011 (a), Records Management Program (NAP-I 1)

MC. DE-AP.Z-O030(Q), Control of Temporary Modifications SC.FP.AP.ZZ-O003(Q), Actions for Inoperable Fire Protection - Salem HC. FP-AP.Z4004(Q), Actions For Inoperable Fire Protection-Hope Creek NC. FP-AP.ZZ-O005(Q), Fire Surveillance and Periodic Test Program NC. Ff-AP.ZZ-0009(Q), Fire Department Training Program NC. FP-AP.ZZ-OOlO(Q), Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work NC. FP-AP.ZZ-Q020(Q), Compensatory Measure Fire Watch Program NC.PM-DG.Z-0001 (Z) Storage and Handling of Compressed Gas Cylinders Commitment Documents: - Hope Creek CD-156A (NRC El Circular 80-09) (See FPAP-12)

CD-1736 (INPO SOER 82-09)

CD-174B (SOER 82-1OR02,04,07)

CD-226C (NRC IE Bulletin 75-04A)

CD300X (FSAR 8.1.4.14.3.1)

CD317Y (FSAR Q 430.85( B))

Common Page 18 of 22 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (Q) 8.1 9.7 8.19.8 8.19.9 8.1 9.10 8.19.11 8.19.12 8.19.13 8.19.14 8.19.15 8.19.16 8.19.17 8.1 9.1 8 8.1 9.1 9 8.1 9.20 8.19.21 8.19.22 8.19.23 8.20 8.20.1 8.20.2 8.21 8.21.I 8,21.2 8.21.3 CD-426X (FSAR 9.1.I

.3.2)

CD-434E (IR 86-062) (LER 86-062)

CD-438A (INPO SER 055-81)

CD-463Y (FSAR Appendix 9A.6.5)

CD-643A (INPO O&MR 64)

CD-6524 (INPO O&MR 73) {See FPAP-12)

CD482D (INPO SER 01-85) (See FPAP-12)

CD-531A (INPO SER 4682)

CD-753X (FSAR 9.5.1. I.

IO)

CD-754X {FSAR 9.5.1.1.11)

CD-755X (FSAR 9.5.1. I.I

3)

CD-764E (NHO IR 86-274)

CD-791X (FSAR 9.5.1.2.32)

CD-807X (FSAR Appendix 9A.III.K)

CD-821X (FSAR 9.5.1.5.3)

CD-830X (BTP CMEB 9.5-1,~.8.1)

CD-939F (NRC OPEN 354/88-18-F1)

Closing Documents - Salem C0403 (N RC-I N FO 89-04)

C0549 (SR 272/92-8) (See FPAP-IO)

Commitment Documents - Engineering 781 05 (Appendix A to BTP APSCB 9.5-1, Section 8.2) 781 11 (Letter from PSE&G to NRC, 07/26/78) 84220 (Memo from Vargas to PSE&G, 03/23/84)

Common Page 19 of 22

NC.FP-AP.22-0025 (Q)

Reference Drawings: 605810,6O5811,605812,605813,605815,605816, & 605817 Common Page 20 of 22 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030210 NC.FP-AP.22-0025 (4)

TABLE 2 COMMON TRANSIENT COMBUSTIBLES I ESTIMATED HEAT CONTENT Acetylene Common size acetylene cylinders found on site:

Cable insulation Cardboard Charcoal Clothlcloih pcs Combustible liquid Dry ion resins Fiberglass ladder (6')

Flammable liquid Paper Plastic Rubber Titanium Wood 20,800 BTUllh MC Size Cyiinder (4" D x 12 H) = 36 Ibs B Size Cylinder (6"Dx 19"H) =

2ibs R Size Cylinder (7"Dx 25"f-f) =

3Ibs S Size Cylinder (IO" D x 30" H) = 15 Ibs M Size Cylinder (12"Dx 36" H) = 18 ibs L Size Cylinder (12" D x 39" H) = 24 Ibs 12,000 BTUllb 6,000 BTUllb 13,000 BTUllb I

6,000 STlJll b

( I PC = ?4 LB or 8,000 STUs) 160,000 BTU/gal 12,000 BTUAb 32,000 BTU/ea

( I foot = 5,333 BTUs) 90,000 BTUlgaI 8,000 BTUllb or 453,000 BTUlcu. ft.

(7 case of copier paper = 4 I 6,000 B TUs) 20,000 BTUAb

( I sheet of herculite - 50'x 50' = 50, 000 BTUs) 10,000 BTU/lb (1 - 35 hose, 50' = 50,000 BTUs) 8,500 BTUlLB 9,000 BTUllb or 41 4,000 BTU/cu. ft.

(f plank - 2"x 6"x IO' = 277,500 BTUs)

Common Page 21 of 22 Rev. 0

NC.FP-AP.22-0025 (Q)

FORM I TRANSIENT COMBUSTIBLE PERMIT II COM BUSTISLES I ESTIMATED HEAT CONTENT I TOTAL BTU's FLAMMABLE LIQUID 90,000 BTUlGALLON 160,000 BTU/GALLON COMBUSTIBLE LIQUID or GREASE CHARCOAL 13,000 BTUPOUND FIBERGLASS LADDER 5,333 BTU/FOOT OF LADDER CABLE INSULATION 12,000 BTUFOUND CARDBOARD 6,000 BTUlPOUND I

8,000 BTU/POUND I

(453,000 BTUlCUBIC FOOT)

PAPER 16,000 BTU/POUND 1PC = % POUND CLOTH and CLOTH PCs I

20,000 BTUlPOUND 9,000 BTUlPound (414,000 BTU/Cubic Foot)

DRY ION RESlNS 12,000 BTU/Pound TITANIUM 8,500 BTWPound WOOD I

ACETYLENE 20,300 BTUlPound A

OTHER I

Contact FIRE DEPT.

I Engineering Assessment Needed 0 Yes No Approved Yes No Completed By Date TCP #

Total BTUs

[

REMOVE ALL TRANSIENT COMBUST18tES UPON JOB COMPLT!ON Common Page 22 of 22 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG Internal Use Only Pacre 1 of 1 I

PSEG NUCLEAR FIRE DEPARTMENT I

NC.FP-AP.ZZ-0012(4) - Revision 0 SAFE PERFORMANCE OF HOT WORK Sponsor Organization: Emergency Services - Fire Department I

REVISION SUM MARY:

1. This is a new procedure. This change is in support of revision number 6 to administrative procedure NC. NA-AP.ZZ-O025(Q), Operational Fire Protection Program. (80035483).

NAAP-25 is being revised to focus on high level process concepts, resulting in relocation of some process description detait and the associated forms, tables, and attachments to other lower tier documents.

2. This revision represents a significant editorial incorporation of the NAAP-25 Hot Work Program into a new stand alone procedure. The NAAP-25 sections utilized to create this procedure were primarily:

0 0

5.8, ignitable Metals 5.5, Control of Ignition Sources - Hot Work

3. The associated NAAP-25 Hot Work forms, tables, and attachments have been relocated to this procedure.
4. This revision meets the requirements of the biennial review.

IMPLEMENTING REQUIREMENTS Effective On:

I,/ 2 8 / 0 3

Manager - Emergency Services

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.22-0012 (a)

I I

SAFE PERFORMANCE OF HOT WORK SECTION TITLE 1.Q Purpose 2.0 Scope 3.0 Responsibilities 4.0 Hot Work Process Overview 4.1 Hot Work 4.2 General 4.3 High Risk Hot Work 4.4 Ignitable Metals 4.5 4.6 Exceptions 5.0 Approval Process Electromagnetic I Radio Frequency Interference 6.0 Records 7.0 References Table I Table 2 Form 1 Hot Work Permit Form 2 Ignitable Metals - Salem lgnitable Metals - Hope Creek Hot Work Authorization Log PAGE 2

2 2

3 3

3 4

4 5

5 5

7 8

9 11 12 14 WCLEAR COMMON Page 1 of 14 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 1.o 2.0

2. I 2.2 2,3 2.4 3.0 3.1 3.1.I 3.1.2 3.1.3 3.1.4 3.1.5 3.2 3.2. I 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 NC.FP-AP.22-0012 (a)

PURPOSE Provide a method and instruction for preparing, authorizing, and tracking Hot Work Permits, to control and limit the introduction of potential fire hazards into plant areas. [CD-300)(3 SCOPE This procedure applies to the performance of hot work in the Salem 1 and 2 Stations, the Hope Creek Generating Station, and associated out buildings.

Implementation of this procedure provides a log of the areas where hot work has been authorized including High Risk jobs and hot work in approved fab shops.

This procedure ensures that the Emergency Services - Fire Department (FD) duty Nuclear Fire Protection Supervisor (NFPS) is aware of all hot work jobs, possible fire hazards and their effect on station safety.

This procedure also allows for the tracking of flammable compressed gas cylinders utilized for hot work.

RESPONSIBILITIES Nuclear Fire Protection Supervisor (NFPS) or designee Compile information on the hot work permit ( H W ) log prior to authorizing a permit.

Authorize Hot Work Permit.

Maintain log of authorized hot work perm its.

Recognize the extent of hot work jobs in progress during his shift.

Inspect and authorize high risk hot work jobs.

Job Supervisor Ensure their personnel are trained and qualified to perform hot work.

Prepare their jobsite in accordance with the H W.

Inspect their jobsite prior to requesting a HWP number.

Maintain their jobsite in accordance with the HWP.

Ensure precautions are taken regarding work practices that have the potential to generate electromagnetic interference and radio frequency interference Notify the OS/CRS of the affected station prior to welding in the vicinity of a Radiation Monitor System (RMS) component 0

Spiking of the RMS may result, causing unexpected alarms of the RMS.

[TS980622174].

Assign qualified fire watch to the hot work job site.

0 Additional firewatch may be assigned due to sparks or slag streams affecting adjacent fire areas or elevations.

NUCLEAR COMMON Page 2 of 14 Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-AP.22-0012 (Q) 3.2.8 3.2.9 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.0

4.

A 4.1.I 4.1.2 4.1.3 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 Terminate work activities properly to ensure that flammable compressed gas cylinders are not left unattended.

Ensure fire watch remains for 30 minutes after hot work is completed.

Hot Work Fire Watchers:

Present and observant at all times of the work being performed and the surrounding area.

Ensure that the work area is maintained as described on the HWP Inspection at all times while hot work is being performed.

Notify the control room immediately of any fire occurring after ensuring the safety of their co-workers.

Extinguish fires within the capabilities of their training after the fire has been reported.

Remain at their post fur 30 minutes following the last hot work.

HOT WORK PROCESS OVERVIEW Hot Work Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered Hot Work.

Hot work is a fire watch required activity.

A Hot Work Permit (HWP) shall control work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering. [CD*226C, General Daily Hot Work permits are valid for the one calendar day in which they are issued.

Annual hot work permits, with specific numbers, are issued individually for each approved shop facility on site for compliance with the New Jersey State Uniform Fire Code.

Fire watch are not required in shops where wetding and work involving ignition sources are routinely performed or in yard areas where no flammable or combustible materials are located within 35 feet of the hot work.

Separate Hot Work tracking logs should be established for the Hope Creek and Salem stations.

The NFPS should review the logs at the beginning of each operating shift to become familiar with hot work that has been authorized for the shift and what detection zones may be affected.

Hot work requires the fire watch to be maintained for 30 minutes after hot work is completed or suspended, to ensure the work area is safe from fire.

CD300X, CD-317Ys CD-754X, CD-SZlXJ NUCLEAR COMMON Page 3 of 34 Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 4.2.7 4.2.8 4.3 Hiqh Risk Hot Work 4.3. I 4.3.2 4.3.3 Fire watch is responsible for monitoring the work area, including levels below floor grating and floor openings.

A portable fire extinguisher, inspected within the previous 30 days, is required for the hot work job.

Hot Work activities will be defined as H1GH RISK if certain criteria are met.

HIGH RISK hot work activities will require additional administrative controls and supervisory oversight, beyond the normal hot work controls.

The following hot work activities are considered HIGH RISK:

Work on tanks, vessels or piping that contained, or had contained combustible or flammable chemicals, solvents, gases, etc.

+ Work in areas identified as having hydrogen as part of equipment or processes.

Use of arc gouging or plasma arc welding which produce copious amounts of heat, with molten slag and sparks.

Work in cable shafts, filter housings, or ventilation ductwork Work in Hope Creek Drywell [CD-682-D].

0 Work on equipment containing combustible (ignitable) metals, which are listed in Table I and 2 of this procedure lgni t ab1 e Metals Ignitable metals utilized at Salem and Hope Creek Stations are identified in Tab!e 1 and Table 2.

The following precautions apply when working on or in proximity of equipment containing ignitable metals:

4.4 4.4.1 4.4.2 Metals are considered potentially combustible whenever exposed.

Notify the Fire Department (FD) of work activities involving ignitable metals prior to the exposure of the metal.

Class D fire extinguisher (identified by a yellow star with a D, located on the extinguisher body), is readily available.

Ignition mechanisms consists of oxy-acetylene or carbon-arc welding, band saw friction cutting, abrasive cutting wheels and grinding operations.

Heat sink effect dissipates ignition source heating when in bulk form.

The ignitable metal hazard increases significantly when shavings, chips, dust, etc., are involved.

Metal fines produced from combustible metals, increase the hazard potential because they act like kindling.

Proper cleanup and removal of accumulations of metal fines, produced in such operations as band saw cutting, are essential for fire prevention and safety.

NUCLEAR COMMON Page 4 of 14 Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 4.5 4.5.1 4.5.2 4.5.3 4.6 4.6.1 4.6.2 5.0 5.1 5.2 NC.FP-AP.ZZ-0012 (Q)

Electromagnetic I Radio Frequency Interference Plant areas susceptible to electromagnetic interference (EMI) and radio frequency interference are listed in NC.NA-AP.ZZ-O005(Q) (NAAP3), Station Operating Practices.

Prior to commencing electric arc welding in plant areas susceptible to EM1 or RFI, the job supervisor should ensure work practice precautions and Main Control Room notifications have been addressed in accordance with NAAP-5.

Hot Work Permit (Form 'I) provides the job supervisor with the direction to inspect the work area against the precautions for EMI and RFI.

Exceptions Work involving wire wheeling, needle gun use, or hot iron soldering is N a a fire watch required activity and a HWP is not required. However precautions identified in this procedure for hot work activities should be taken to ensure a fire safe work area.

Equipment for pre-heating such as Cooper Heat (trade mark) resistance heaters, or similar devices, is not ordinarily considered Hot Work.

e At the discretion of the NFPS, formal Hot Work administrative controls may be required.

II The job supervisor is not exempt from enforcing the intent of maintaining any work area in good housekeeping condition.

At the discretion of the job supervisor, formal Hot Work administrative controls may be requested. If any uncertainty exists, regarding the nature of the work activity, the job supervisor should review the activity with the NFPS.

APPROVAL PROCESS Prior to requesting a HWP, the job supervisor should ensure that all of the inspection criteria on the HWP have been satisfied and the job site inspected.

FD personnel develop and record the following baseline information fields in the Hot Work Authorization (HWA) Log:

e Job location.

Work order number.

a Type of work (including use of flammable compressed gas cylinders).

a Responsible supervisor and telephone extension.

e Affected detection zones.

Time and date of authorization.

NUCLEAR COMMON Page 5 of 14 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q) 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.4 5.4.1 Evaluate For HIGH RlSK FD personnel evaluate the hot work activity request against the following HIGH RISK criteria, prior to providing the hot work authorization number:

0 Work on tanks, vessels or piping that contained, or had contained combustible or flammable chemicals, solvents, gases, etc.

0 Work in areas identified as having hydrogen as part of equipment or processes.

0 Use of arc gouging or plasma arc welding which produce copious amounts of heat, with molten slag and sparks.

0 Work in cable shafts, filter housings, or ventilation ductwork 0 Work in Hope Creek Drywell [CD-68Z-D].

0 Work on equipment containing combustible metals, which are listed in Table I and 2 of this procedure.

IF the job is HIGH RISK, THEN no authorization number will be provided until after the job site is inspected by the Fire Protection Supervisor or his designee.

The inspection will determine whether the jobsite complies with the minimum standards set forth on the HWP or whether more stringent requirements need to be implemented.

A FD field inspection is REQUIRED to be performed prior to issue of a HIGH RISK HWP.

The NFPS should notify the Operations Superintendent (OS) of High Risk work being conducted.

FD reviews the Impairment Log for any fire protection components in the work area that are inoperable and identifies additional compensatory measures as necessary.

Hot Work Authorization Hot Work may be authorized by FD after completion of the following:

FD completes baseline information fields in the HWA Log (Form 2)

FD completes a HIGH RISK activity criteria evaluation.

e FD completes a work area inspection and signs/dates the field HWP, for activities designated HIGH RISK.

NUCLEAR ~ O M M O N Page 6 of 14 Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 5.4.2 5.4.3 5.4.4 5.5 5.5.1 5.5.2 5.5.3 5.5.4 5.5.5 6.0 6.1 6.2 6.3 NC.FP-AP.ZZ-0012 (a)

Authorization to perform hot work is indicated by an authorization number.

The authorization number is developed using the following format and associated legend:

Format:

o X-YY-MM-DD-ZZ Legend:

o X - Station where work is performed. (S=Salem, M=Hope Creek) o YY - Last 2 digits of current year o MM-Month o DD - Day that work is being performed o ZZ-Sequential number beginning with 01 each day.

FD enters the authorization number for each activity into the HWA Log.

FD initials the HWA Log and records the time the HWP was issued.

Work Area Hot Work Permit Upon issuance of a hot work authorization number, the job supervisor should complete the following fields of the HWP:

0 HWPNumber 0

Job Supervisor Name 8

Date The job supervisor should ensure the HWP is posted in the work area.

The job supervisor should ensure that the work area is maintained in accordance with the HWP Work Area Inspection criteria.

IF hot work is discontinued for longer than 8 hrs, THEN re-inspection of the area in accordance with Part 2 of the HWP (Form I) is required prior to the commencement of work.

The FD will verify HVVP criteriakonditions on a random basis after issuance of hot work permits.

RECORDS Hot work authorization logs should be maintained for a minimum of 30 days.

Hot Work Permits and Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.ZZ-0011 (Q), Records Management Program (NAP-1 1 ). [CD-434E]

The FD, in accordance with NAP-1 I shall retain logs pertaining to hot work permits. [CD434E]

NUCLEAR COMMON Page 7 of 14 Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-APZ-0012 (Q) 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.1 I 7.12 7.1 3 7.1 4 7.15 7.16 7.16.1 7.16.2 7.16.3 7.16.4 7.16.5 7.16.6 7.16.7 7.16.8 7.

16.9 REFERENCES

NC.NA-AP.ZZ-0055 (Q) Operational Fire Protection Program New Jersey Administrative Code - NJAC 5:70-2 NJ State Fire Code NC. PM-DG.ZZ-0001 (Z) Storage and Handling of Compressed Gas Cylinders Compressed Gas Association Pamphlet P-I Property Loss Prevention Standards of Nuclear Generating Stations, -

Nuclear Electric Insurance Limited (NEIL).NFPA 30 - Flammable Liquids Code, National Fire Protection Association NC.IS-TM.22-0001 (Z) PSEG Nuclear Industrial Health and Safety Manual Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System Salem Fir8 Protection Report - Fire Hazards Analysis HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program HCGS UFSAR, Appendix 9A, - Appendix R Comparison Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 4 I 1976 Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance, August 1977 Occupational Safety and Health Standards Title 29, Chapter XVII, Part 1910.36FR 10466 1 OCFRSO Appendix R, Fire Prot. Program for Nuclear Power Facilities Operating Prior to Jan. 1, 1979 Commitment Documents: - Hope Creek CD-156A (NRC El Circular 80-09)

CD-226C (NRC IE Bulletin 75-04A)

CD300X (FSAR 8.1.4.14.3.1)

CD-317Y (FSAR Q 430.85(8))

CD-434E (IR 86-062)

(LER 86462)

CD-652A (INPO O&MR 73)

CD-682D (INPO SER 01-85)

CD-754X (FSAR 9.5.1.I.I

1)

CD-821 X (FSAR 9.5.1.5.3)

NUCLEAR COMMON Page 8 of 14 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 20030221 NC.FP-AP.22-0012 (Q)

TABLE I Ignitable Metals - Salem Page 1 of 2 Location

  • Units I

& 2 Turbine Bldg.

El. 100'

  • Units 1 & 2 Auxiliary Bldg.

El. 84'

  • Unit 1 Auxiliary BIdg.

El. 84'

  • Unit I Auxiliary Bldg.

El. 100'

  • Unit 2 Auxiliary Bldg.

El. 100'

  • Units 1 8 2 Inner Piping Pen Area, El. 100'

Component Turbine Auxiliary Heat Exchangers Cooling (TAC)

Nos. 11,12,21,22 Component Cooling Heat Exchangers Nos. 11,21,22 Component Cooling Heat Exchanger No. 12 Service Water Diesel Generator Lube Oil Coolers

& Jacket Water Heat Exchangers

{Nos, IA, IB, IC)

Service Water Diesel Generator Lube Oil Coolers

& Jacket Water Heat Exchangers (Nos. 2A, 2B, 2C)

Service Water Chiller Condensers Service Water Service Water Pump Upper Motor Bearing Coolers 25 & 26 NOS. I 1-1 684 21 -23, NUCLEAR COMMON Page 9 of 14 Ignitable Metal Titanium Tubes Titanium Tubes Titanium Plates Titanium Tubes & Heads Titanium Tubes & Heads Titanium Plates Nozzles & Flanges Water Box Housings Turn Around Heads Titanium Tube Coils Rev. 0

4LL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0042 (Q)

TABLE 1 Ignitable Metafs - Salem Page 2 of 2 Location

  • Units 1 4 2 Turbine Bldg.

El. 100'

  • Units I

& 2 Auxiliary Bldg.

El. 84'

  • Units 1 & 2 Auxiliary Bldg.

El. 84'

  • Unit I Auxiliary Wdg.

El. 84'

  • Unit2 Auxiliary 8ldg.

El. 84' System@)

Component Ignitable Metal Turbine Auxiliary Condensate Pump Titanium Tubes Cooling (TAC)

Upper Motor Oil Finned Coil Coolers Service Water Charging Pump Titanium Tubes

& Tube Sheets Bearing Oil Coolers Nos. 11,12,21,22 Service Water Safety Injection Titanium Tubes

& Tube Sheets Pump Bearing Oil Coolers Nos. 11, 12,21,22 Service Water ChglSafety lnj.

Titanium Tubes Pump

& Tube Sheets Speed Increaser Gear Lube Oil Cooler Nos. 11 & 12 Service Water Chg/Safety Inj.

Titanium Tubes Pump 8, Tube Sheets Speed Increaser Gear Lube Oil Cooler Nos. 21 & 22

  • Circulating Water Circ Water lnta ke Structure Circ. Water Pump Titanium Tubes Motor Coolers NUCLEAR COMMON Page 10 of 14 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003O22 1 NC-FP-AP.ZZ-0012 (Q)

TABLE 2 Ignitable Metals - Hope Creek Equipment 1 A I E-201 1 ME-201 2 B I E-201 t B2E-201 1 A-E-21 7 1 B-E-217 1 A-E-I 08 1 B-E-I 08 1 C-E-108 Descrl ption SACS Heat Exchangers Tubing RACS Heat Exchangers Tubing Main Condensers Tubing Rx Fuel Channels Rx Fuel Spacers Rx Fuel Elements Tubing End Plugs Limitorque Actuators Motor Core Rotor NUCLEAR COMMON Imitable Metal Titanium Titanium Titanium Zirconium4 Zirconium-2 Magnesium Page I 1 of 14 Locations Reactor Bldg., El. 102' Room 4309 Room 4307 Reactor Bldg., El. 77' Room 421 1 Turb Bldg., El. 54' - 102' Rooms 1310 to 1312 Reactor Bldg El. 201' Dryweil Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.FP-AP.ZZ-0012 (Q)

FORM I HOT WORK PERMIT Page I of 2 PART 1: GENERAL INFORMATION TYPE OF WORK:................................ W 0 C I3 B t3 G El OFS OXY-ACETYLENE RIG TO BE USED:.... YES NO LOCATION:....................................... SGS Ull 0 SGS U/2 0 HCGS 0 YARD LOCATION DESCRIPTION:

ANNUAL PERMIT:.............................. YES NO ORDER NUMBER:

JOB SUPERVISOR (PRINT):

~

PART 2: WORK AREA INSPECTION Burning, cutting, and welding equipment is in good repair.

Ignitable metals have been considered (is. titanium).

Floor has been swept clean of loose combustibles within 35 feet.

Watl, floor openings, cable trays and readily ignitable combustibles within a 35 foot radius which may be subjected to ignition sources have been covered.

Combustibles have been moved away from opposite sides of walls or ceilings.

Enclosed space/equipment has been cleaned and purged of combustibles.

[CD-682D]

Fire extinguisher is available {obtain extinguisher from Firehouse/Storeroom).

Fire Watch will be provided during and 30 minutes after work completion to ensure work area is safe from fire danger.

Precautions required for protection of filtrationladsorption ventilation systems have been taken (per NAP-9). [CD-652A]

For electric arc welding, electromagnetic interference (EMI) precautions have been taken. (per NAP-5) [CD-I56A]

Signature on page 2 indicates inspection was satisfactory and hot work actlvlty may proceed following the acquisition of the DAlLY hot work permit number, NUCLEAR COMMON Page 12 of I 4 Rev. 0

NC.FP-AP.22-0012 (Q)

FORM 3 HOT WORK PERMIT Page 2 of 2 PART 3: FINAL CHECKJOB COMPLETION Wark areas and all adjacent areas have been inspected following job completion and no evidence of fire is present. All equipment has been returned to its proper locatian.

VERIFIED BY:

Job Supervisor Date/ Ti me NUCLEAR COMMON Page 13 of 14 Rev. 0

KEY: W =Welding C = Cutting Hot Work Work Location /

Type of Order Job Supv.

Hi Det.

Number Equip Involved work Number Ext Risk Zone w, c SGY Yes B, OFS, OA X-No w,c,G, YeS B, OFS, OA X-NO w YC,G YeS B, OFS, OA X-No w IC,G, Yes 6, OFS, OA X-No w ?e,G, YeS B, OFS, OA X-NO w, c,G, Yes B, OFS, OA X-No WY c,G, YeS B, OFS, OA X-NO B, OFS, OA X-NO IC,G, Yes FORM 2 HOT WORK AUTHORIZATION LOG FD Initials/

Time B = Burning STATION:

OFS = Open Flame Soldering NUCLEAR COMMON Page 14 of 14 Rev. 0

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG lnternal Use Onlv Page 1 of 2 PSEG NUCLEAR FIRE DEPARTMENT NC.NA-AP.ZL-0025 (Q) - Rev. 6 OPERATIONAL FIR PROTECTION PROGRAM Sponsor Organization: Emergency Services REVISION

SUMMARY

Biennial Review performed Yes X

No -.

1.
2.

This is a full revision to NC.NA-AP.ZZ-0025 (Q) - Rev. 5. (80035483).

Due to the extensive nature of the revision, change bars have not been used. This revision represents a significant editorial change with regard to content, formatting, process descriptions, and section numbering.

This procedure has been revised to focus on high level process concepts, resulting in relocation of process description detail and associated forms, tables, and attachments to other lower tier administrative procedures.

These changes are editorial. There is no reduction in program content or control, as a result of this revision.

This revision relocates all Commitment Document numbers to the departmental administrative procedures implementing those commitments.

Revised titles to reflect the current organizational assignments.

Replaced Nuclear Electric Insurance Limited (NEIL) with Nuclear Services Organization (NSO) throughout the procedure.

3.
4.
5.
6.
7.

IMPLEMENTATION REQUIREMENTS:

Effective on: I /z8/03 I. Fire Protection Impairment, Hot Work, and Transient Combustible Permits processed by the Fire Department under Revision 5 as of the issue date, do not have io be changed in the field to meet Revision 6 requirements.

Nudear Outlook article and PSEG Nuclear L.L.C. lntranet website announcement describing the revision.

Provide a global electronic Power Point presentation to all PSEG Nuclear personnel.

2.
3.

APPROVED:

I A L L ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 PSEG Internal Use Only NC.NAwAP.ZZ-O025(Q), Revlsion 6 OPERATIONAL FRE PROTECTION PROGRAM Revision Summary (Continued)

Page 2 of 2

8.

Revised company name from PSE&G Nuclear Business Unit (NBU) to PSEG Nuclear.

9.

Removed detailed information on the Combustible Control Program. Aft detailed information is now found in NC. FP-AP.ZZ-O025(Q).

I O. Removed detailed information and forms for fire protection impairments. This information is now located in NC.FP-APZZ-0025 (GI) and NC FP-AP.ZZ-0010 (a).

1 I, Removed detailed infomation and forms for hot work operation and the control of ignition sources, This information is now located in NCFP-APZ-0025 (GI) and NC.FP-AP.ZZ-0O.I 2{Q).

SECTION 1. 0 2.0 3.0 4.0 5.0

~~

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC.NA-AP.22-0025( Q)

OPERATIONAL FIRE PROTECTION PROGRAM TABLE OF CONTENTS 2

6.0 7.0 8.0 Common TITLE PAGE PURPOSE................................................................................................... 2 SCOPE........................................................................................................ 2 RESPONSIBILITIES...................................................................................

2 PROCESS DESCRIPTION......................................................................... 4 PROCEDURE............................................................................................. 4 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 Response to Fire Emergencies........................................................ 4 Fire Prevention Requirements.......................................................... 5 Control of Ignition Sources - Hot Work............................................. 5 High Risk Hot Work.......................................................................... 6 Combustible Material Control........................................................... 6 Control of Flammable and Combustible Liquids and Gases............. 6 Control of Portable Space Heaters................................................... 6 Fire Protection Impairment Pragram................................................. 7 Compensatory Measure Fire Watch Program.................................. 7 Ignitable Metals................................................................................ 7 RECORDS.................................................................................................

- 7 DEFINITIONS.............................................................................................

8 REFERENCES............................................................................................ 9 8.1 General Documents.......................................................................... 9 8.2 Cross References.............................................................................

9 Page 1 of 9 Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC. NA-AP.ZZ-0025( Q) 1.0 2.0

2. I 3.0 3.1 3.2 3.3 3.4 3.5 3.6 PURPOSE This procedure addresses the Operational Fire Protection Program (OFPP) for PSEG Nuclear.

SCOPE This procedure applies to all organizations and personnel engaged in activities which may affect the Operational Fire Protection Program (OFPP) for PSEG Nuclear.

RESPONS16IL~l"TIES All Personnel Comply with the requirements of this procedure.

Job Supervisors - Salem and Hope Creek Stations e Comply with fire prevention requirements of the Fire Protection Impairment, Hot Wotk, and Transient Combustible Control processes Adhere to controls for ignition sources and flammable liquids and gases.

All Directors and Nlanaaers Ensure their organizations implement the applicable fire prevention requirements within facilities they maintain and in which they conduct work.

Chemistry Manaaer Ensure the performance of the Hope Creek Diesel Driven Fire Pump Fuel Oil Storage Tank sampling surveillance.

Oeeratlons Department Manaaer - Salem Ensure the performance of the Diesel Driven Fire Pump Fuel Oil Storage Tank sampling surveillance Ensure that personnel within their organization, designated as the Operation's liaison to the Fire Department (FD), are available as required, during fire fighting activities.

Operations Department Manauer - Hope Creek Ensure that personnel within their organization designated as the Operation's iiaison to the FD, are available as required, during fire fighting activities.

Common Page 2 of 9 Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 3.7 Radiation Protection Marlaaer Provide required radiological monitoring when their personnel respond with FD personnel to fires located within the Radiological Controlled Areas (RGAs).

3.8 Work Control Center Personnel - Salem and Hope Creek Operations Notify the FD when a fire protection systemlbarrier is being affected and when it is being returned to service.

3.9 Manaaer - Emernencv Services a

a a

e a

0 Ensure General Employee Training (GET) discusses required employee actions in the event of fire.

Ensure a qualified, trained fire department is present on-site in accordance with NC. FP-AP.IZ-O009(Q) Fire Protection Training Program.

Develop and maintain FD surveillance and test procedures.

Perform walk downs to monitor control of transient combustibles.

Authorize Hot Work, Transient Combustible, and Fire Protection Impairment Permits (FPIPs) and ensuring the aggregate impad is considered.

Maintain daily communication with the Operations Superintendent and/or Control Room Supervisors on the status of Salem and flope Creek Station FPIPs.

Ignition source control and monitoring for fire prevention.

Fire incident reports and investigations.

Interface with fire insurance inspectors, state and local enforcement agencies, and with offsite fire departments.

Define non-FD responsibility for required testing and inspection of fire protection equipment.

Performance of preventive and corrective maintenance on fire protection systems and components assigned to the FD.

Administration and control of the Fire Watch Program.

3.10 Vlce President - Enaineering 0

Establish programmatic requirements for implementing design related aspects of the Fire Protection and Fire Barrier Penetration Seal Programs.

0 Development and review of Design Change Packages for controlling configuration of both the Fire Protection and Fire Barrier Penetration Seal Programs.

Ensure a member grade Society of Fir8 Protection Engineer (SFPE) person exists within the organization. [CR96041621 I]

Common Page 3 of 9 Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 3.1 I 4.0

4. I 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 5.0 5.1 5.1.I NC. NA-AP.Z&002fi(Q) vice President - Operations 0 Ensure trained maintenance personnel perform preventive or corrective maintenance of Fire Protection systems in a prompt and effective manner.

Ensure performance of preventive maintenance surveillances for fire protection components at both the Salem and Hope Creek Stations, as agreed upon with the Manager - Emergency Services.

0 Ensure PSEG Nuclear facilities are maintained in compliance with the applicable state fire codes and insurance regulations.

PROCESS DESCRIPTION This procedure identifies elements of the Operational Fire Protection Program categorized as Fire Prevention and Readiness to Detect and Suppress Fires.

This procedure is implemented in full detail by the following Fire Department administrative procedures:

NC.FP.AP.2Z-O025(Q); Precautions Against Fire SC. FP.AP.ZZ-O003(Q), Actions for Inoperabte Fife Protection - Salem HC.FP-AP.ZZ-OOM(Q), Actions For Inoperable Fire Protection-Hope Creek NC.FP-AP.Z2-0005(8), Fire Protection Surveillance / Periodic Test Program NC. FP-AP.2Z-CIOOQQ), Fire Protection Training Program NC.FP-AP.22-001 O(Q), Fire Protection Impairment Program NC.FP-AP.ZZ-OOIZ(Q), Safe Hot Work Practices NC.

FP-AP.ZZ-OOZO(Q), Compensatory Measure Fire Watch Program PROCEDURE Response to Fire Emeraencies Refer to NC.FPdP.ZZ-O025(Q) (FPAP-25) for detailed instructions on response to fire emergencies, Key concepts are reviewed here.

0 In the event a fire alarm sounds within en office facility, evacuate the building in accordance with the established routes. Accountability should be performed.

NEVER use the elevator during a fire emergency building evacuation.

For fire alarms within the Salem and Hope Creek Stations, listen to the instructions via the page system provided.

Common Page 4 of 9 Rev. 6

5.1.1 (Continued) e Upon discovering a fire, your first duty is to report the fire. The Fire Department wilt respond with personnel and equipment to combat the emergency.

The communication systems vary between the Salem and Hope Creek stations. Know the differences between the plants. Refer to FPAP-25.

After reporting a fire, employees should fight the fire if its within their training and capabilities. If not, they should alert others in the area, evacuate to a safe distance and standby to direct FD personnel to the scene.

5.2 Fire Prevention Reauirements 5.2.1 5.2.2 Refer to NC.FP-AP.ZZ-O025(Q) (FPAP-25) for detailed instructions on fire prevention work practices and requirements.

Some key concepts are briefly reviewed here.

Fire Doors shall be maintained closed,. except for normal passage, unless provided with an approved permit It is imperative that ALL PERSONNEL make sure fife doors close behind them.

Fire Protection deficiencies observed should be immediately reported to the FD (Ext. 2800/2803) for evaluation.

Restrictions apply to combustible materials introduced into any safety-related aredroom.

Restrictions apply to locating combustible materials in the vicinity of permanent bu i Idings.

Restrictions apply to use of fire protection water for non-fire protection purposes.

Storage of material should not affect access to, or obstruct, fire protection systems or fire fighting equipment.

Fire extinguishers mounted in the stations are for emergency use only.

Clearance, free of combustible material, shall be maintained around energized electrical paneis.

Extension cords and flexible cords shall not be a substitute for permanent wiring.

5.3 5.3.1 5.3.2 Control of lanition Sources - Hot Work Work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering, is considered hot work.

A Hot Work Permit will be required to control these ignition sources.

Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 5.3.3 5.4 5.4.1 5.4.2 5.4.3 5.5 5.5.t 5.5.2 5.6 5.6.1 5.7 5.7.1 5.7.2 Plant work involving ignition sources, such as welding, cutting, burning, grinding or open flame soldering is considered a fire watch required activity.

An exception to this requirement is allowed for work performed in shop areas.

0 Hot work permits are required for all hot work activities.

Hinh Risk Hot Work High risk hot work is a PSEG Fire Department term applied to work with well defined and special hazard criteria.

This type of hot work is distinguished from non-high risk hot work.

High Risk hot work still involves ignition sources, such as welding, cutting, burning, grinding or open flame soldering.

High risk work involves:

0 Vessels and systems that contain, or had contained, combustible or flammable chemicals, solvents, or gases.

0 Work involving ignitable metals.

Work involving processes that produce copious amounts of heat with molten slag and sparks. For example, current industrial technology may employ equipment such as plasma arc cutting machines. This technology produces copious amounts of energetic slag and sparks.

Special and additional controls apply to high risk hot work These controls are covered under NC.FP-AP.Z7-0012(Q), Safe Hot Work Practices.

Combustible Material Control General Use and Controls - All areas:

0 Combustibles Material will be controlled IAW NC.FP-AP.22-0025 (Q).

for Safety Related Areas Only Storage of combustibles is NOT permitted in Salem and Hope Creek Stations safety related areas/rooms except when approved by Engineering.

Control of Flammable and Combustible Licluids and Gases Detailed guidance on the handling and control of flammable and combustible liquids and gases is provided in NC.FP-AP.ZZ-O025(Q).

Control of Portable Space Heaters The use of portable space heaters is prohibited in safety related areas except as indicated IAW NC. DE-AP.774030 Q). Contro t of Temporary Modifications.

Space heaters in non-safety related areas are controlled IAW NC.FP-AP.2Z-0025 (Q).

Common Page 6 of 9 Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC. NA-AP.ZZ-0026(Q) 5.8 5.8.1 5.8.2 5.8.3 5.8.4 5.8.5 5.9 5.9.1 5.4.2 5.10 5.10.1 5.10.2 5.j0.3 6.0 6.1 6.2 6.3 Fire Protection Impairment Proaram FD is the fire protection impairment authority.

lmpairments are formal controls that recognize, evaluate, and administratively approve and track either planned actions or emergent conditions that impact the operability of the fire protection system or a fire protection component.

Job supervisors prepare and submit impairment requests for work activities that will place fire protection equipment or system in an inoperable condition.

Nuclear fire protection supervisors (NFPS) evaluate impairment requests and emergent system and equipment issues to identify the full scope, or aggregate impact, of the issue.

0 NFPS identifies the appropriate compensatory measures and generates an impairment, accordingly.

Prior to issuing impairments, the NFPS notifies and reviews the impairment issue with the Operations Superintendent or Control Room Supervisor (OSICRS), of the affected station, and obtains 0SICRS.approval to issue the impairment..

Compensatorv Measure Fire Watch Proaram Adequate compensatory measures are required to be implemented to supplement inoperable fire protection systems and equipment Procedures SC.FP-AP.ZZ-O003(Q) and HC. FP-AP.ZZ-0004(Q) identify those systems and components requiring compensatory actions to be taken when a fire protection system or component is determined to be inoperable.

lanitable Metals The metals titanium, zirconium, and magnesium represent a special combustible material hazard class that warrants extra care and control.

These metals are classified as ignitable metals. These are metals that can burn readily, vigorously, and with a significant release of heat.

Controls relative to working on or in the vicinity of ignitable metals are provided in procedure NC.FP-AP.ZZ-004 2(Q), Safe Performance of Hot Work.

RECORDS Hot Work Permits and Transient Combustible Permits shall be retained with the work package in accordance with NC.NA-AP.ZZ-OOl1 (a), Records Management Program (NAP-I 1).

The FD, in accordance with NAP-I 1 shail retain transient combustible permits and logs pertaining to hot work permits and fire protection impairment permits for a minimum of six months.

FPlRs that were used to create FPlPs should be retained with work packages. The FD maintains a hard copy log of all FPlPs generated from FPIRs.

Common Page 7 of 9 Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.0 7.9 7.10 7.1 1 7.12 7.13 7.14 DEFINITIONS Combustible Liquid - Liquid having a flash point at or above 100 deg-F (37.e4 C).

Combustible Material - Material, which in the form it is used and under the conditions anticipated, WILL ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.

Fire Barrier - Those construction elements (walls, floors, and their supports),

including beams, columns, penetration seals or closures, fire doors and dampers, that are rated by approving laboratories in hours of resistance to fire and used tu prevent the spread of fire.

Flre Watch - An individual who has satisfactorily completed fire watch training and is designated by the FD for compensatory measure, hot work, or both fire watch type duties.

Flammable Liauid - A liquid with a flash point below 100 deg-F and a vapor pressure not exceeding 40 pounds per square inch absolute at 100 deg-F.

e Also known as a Class 1 liquid.

Hot Work - Work that involves ignition sources.

lnnition Source - Heat or flame from any source capable of igniting combustible or flammable material.

lmpalrment - Any condition affecting the intended operation of a fire protection system or barrier or posing as a fire hazard within the stations.

Noncombustible Material - Material which, in the form it is used and under the conditions anticipated, will NOT ignite, burn, support combustion, or release flammable vapors when subjected to fire and heat.

Permanent - A condition with an indefinite period of time.

Safetv Related Area - An area that contains systems and components required to shut down the reactor, mitigate the consequences of postulated accidents or maintain the reactor in a safe cold shutdown condition.

Storane - The placing of items in a location and leaving them unattended until later use or disposal.

Temporary - planned time duration of no more than 60 days.

Transient Combustible - Any combustible material introduced into a Safety-Related arealroom which will be used to complete an assigned task or left unattended for any period of time. It does not include items moved through areas in route to the final destination, unless the items are left un-monitored during transit.

Common Page 8 of 9 Rev. 6

ALL ACTIVE ON-THE-SPOT CHANGES MUST BE ATTACHED FOR FIELD USE 2003022 1 NC. NA-AP,ZZ-0025( Q) 8.0

8. I 8.1.1 8.1.2 8.1.3 8.1.4 8.1.5
8. I

.6

8. t.7 0.1.8 8.1.9 8.1.10 8.1.11 8.1.I2 8.1.13 8.1.14 8.1 -15 8.1.16 8.2 8.2.1 0.2.2 8.2.3 8.2.4 8-25 8.2.6 8.2.7 8.2.8 8.2.9 8.2.10 REFERENCES General Documents Salem Updated Final Safety Analysis Report (UFSAR), Section 9.5, - Fire Protection System Salem Fire Protection Report - Fire Hazards Analysis HCGS Updated Final Safety Analysis Report, (UFSAR) Section 9.5.1, - Fire Protection Program HCGS UFSAR, Appendix 9A, - Appendix R Comparison Appendix A to Branch Technical Position APCSB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 1, 1976 Branch Technical Position CMEB 9.5-1, Guidelines for Fire Protection for Nuclear Power Plants NRC Supplemental Guidance, Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controis and Quality Assurance, August 1977 Occupational Safety and Health Standards Title 29, Chapter XVII, Part 191 O.36FR 1 0466 1 OCFR50 Appendix R, Fire Rot. Program for Nuclear Power Facilities Operating Prior to Jan. I, 1979 NC.

DE-PSZ-0001 (QII Fire Protection Programmatic Standard IEEE Standard 634 - 1978 Hope Creek Station Generic Letter 86-1 0 Submittal, dated May 13, 1986 HCDE-PS.ZZ-0021 (F), Hope Creek Penetration Seal Program SC.DE-PS.ZZ-O035(Q), Salem Penetration Seal Program HC.FP-EO.ZZ-0001 (Z), Control Room Fire Response - HCGS SC.FP-E0.Z-0001 (Z), Control Room Fire Response - Salem Cross

References:

NC.NA-AP.Zf-001 I (a),

Records Management Program NC.DE-AP.ZZ-O030(Q), Control of Temporary Modifications SC.FP.AP.ZZ-0003(Q), Actions for Inoperable Fire Protection - Salem HC. FP-AP.ZZ-O004(Q), Actions For Inoperable Fire Protection-Hope Creek NC. FP-AP.ZZ-0005(Q), Fire Surveillance and Periodic Test Program NC. FP-AP.ZZ-0009( Q), Fire Department Training Program NC.FP-APZ-001 O(Q), Fire Protection Impairment Program NC.FP-AP.ZZ-O012(Q), Safe Performance of Hot Work NC. FP-AP.U-OOZO(Q), Compensatory Measure Fire Watch Program NC.FP.AP.ZZ-O025(Q); Precautions Against Fire Common Page 9 of 9 Rev. 6