ML040060198: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. -J, | {{#Wiki_filter:. -J, From: | ||
From: | To: | ||
Date: | |||
==Subject:== | ==Subject:== | ||
holtec para F--, q ( | Frank Jacobs/4..V. | ||
S5 Paul Narbut 5/22/03 1:36PM holtec para F--, q ( | |||
Contrary to the above, design measures were not adequate to ensure compatibility of materials. | Contrary to the above, design measures were not adequate to ensure compatibility of materials. | ||
During dry runs and spent fuel cask loading at Columbia Generating Station, significant amounts of hydrogen were generated indicating significant aluminum-water reaction. The prepassivation of the Boral plates had been done at nominal water depth, whereas the Boral plates were subjected to substantially greater water depth during cask loading in the spent fuel pool. The prepassivation process had not been qualified under the most adverse conditions, i.e., the water depth associated with cask loading.}} | During dry runs and spent fuel cask loading at Columbia Generating Station, significant amounts of hydrogen were generated indicating significant aluminum-water reaction. The prepassivation of the Boral plates had been done at nominal water depth, whereas the Boral plates were subjected to substantially greater water depth during cask loading in the spent fuel pool. The prepassivation process had not been qualified under the most adverse conditions, i.e., the water depth associated with cask loading.}} | ||
Latest revision as of 05:51, 16 January 2025
| ML040060198 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 05/22/2003 |
| From: | Jacobs F NRC/NMSS/SFPO |
| To: | Narbut P Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML040060080 | List: |
| References | |
| FOIA/PA-2003-0395 | |
| Download: ML040060198 (2) | |
Text
. -J, From:
To:
Date:
Subject:
Frank Jacobs/4..V.
S5 Paul Narbut 5/22/03 1:36PM holtec para F--, q (
Contrary to the above, design measures were not adequate to ensure compatibility of materials.
During dry runs and spent fuel cask loading at Columbia Generating Station, significant amounts of hydrogen were generated indicating significant aluminum-water reaction. The prepassivation of the Boral plates had been done at nominal water depth, whereas the Boral plates were subjected to substantially greater water depth during cask loading in the spent fuel pool. The prepassivation process had not been qualified under the most adverse conditions, i.e., the water depth associated with cask loading.