ML040620018: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 20: | Line 20: | ||
Tennessee Valley Authority | Tennessee Valley Authority | ||
ATTN: Mr. J. A. Scalice | ATTN: Mr. J. A. Scalice | ||
Chief Nuclear Officer and | |||
Executive Vice President | |||
6A Lookout Place | 6A Lookout Place | ||
1101 Market Street | 1101 Market Street | ||
Chattanooga, TN 37402-2801 | Chattanooga, TN 37402-2801 | ||
SUBJECT: | SUBJECT: | ||
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION - | |||
Dear Mr. Scalice: | SEQUOYAH NUCLEAR PLANT 50-327/2004-301 AND 50-328/2004-301 | ||
Dear Mr. Scalice: | |||
In a telephone conversation on March 1, 2004, between Mr. Scott Poteet, Operator Training | In a telephone conversation on March 1, 2004, between Mr. Scott Poteet, Operator Training | ||
Instructor and Mr. Lee R. Miller, Senior Operations Examiner, arrangements were made for the | Instructor and Mr. Lee R. Miller, Senior Operations Examiner, arrangements were made for the | ||
administration of licensing examinations at the Sequoyah Nuclear Plant during the weeks of | administration of licensing examinations at the Sequoyah Nuclear Plant during the weeks of | ||
June 7 and June 14, 2004 (operating test) and the week of June 14, 2004. (written | June 7 and June 14, 2004 (operating test) and the week of June 14, 2004. (written | ||
examination). The on-site preparatory week is scheduled for the week of May 17, 2004. | examination). The on-site preparatory week is scheduled for the week of May 17, 2004. | ||
As agreed during the telephone conversation, your staff will prepare the examination based on | As agreed during the telephone conversation, your staff will prepare the examination based on | ||
the guidelines in Draft Revision 9 of NUREG-1021, "Operator Licensing Examination Standards | the guidelines in Draft Revision 9 of NUREG-1021, "Operator Licensing Examination Standards | ||
for Power Reactors." The NRC regional office will discuss with your staff any changes that | for Power Reactors." The NRC regional office will discuss with your staff any changes that | ||
might be necessary before the examinations are administered. Your staff will also provide | might be necessary before the examinations are administered. Your staff will also provide | ||
copying services for administering the exam. | copying services for administering the exam. | ||
To meet the above schedule, it will be necessary for your staff to furnish the examination | To meet the above schedule, it will be necessary for your staff to furnish the examination | ||
outlines by March 22, 2004. The written examinations, operating tests, and the supporting | outlines by March 22, 2004. The written examinations, operating tests, and the supporting | ||
reference materials identified in Attachment 2 of ES-201 will be due by April 12, 2004, instead | reference materials identified in Attachment 2 of ES-201 will be due by April 12, 2004, instead | ||
of March 22, 2004 as stated in our letter dated February 17, 2004. Pursuant to | of March 22, 2004 as stated in our letter dated February 17, 2004. Pursuant to | ||
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the | 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the | ||
outlines, examinations, and tests before they are submitted to the NRC for review and approval. | outlines, examinations, and tests before they are submitted to the NRC for review and approval. | ||
All materials shall be complete and ready-to-use. Any delay in receiving the required | All materials shall be complete and ready-to-use. Any delay in receiving the required | ||
examination and reference materials, or the submittal of inadequate or incomplete materials, | examination and reference materials, or the submittal of inadequate or incomplete materials, | ||
may cause the examination to be rescheduled. | may cause the examination to be rescheduled. | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | In order to conduct the requested written examinations and operating tests, it will be necessary | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | for your staff to provide adequate space and accommodations in accordance with ES-402, and | ||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | to make the simulation facility available on the dates noted above. In accordance with ES-302, | ||
your staff should retain the original simulator performance data (e.g., system pressures, | your staff should retain the original simulator performance data (e.g., system pressures, | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | temperatures, and levels) generated during the dynamic operating tests until the examination | ||
| Line 55: | Line 56: | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | To permit timely NRC review and evaluation, your staff should submit preliminary reactor | ||
operator and senior reactor operator license applications (Office of Management and Budget | operator and senior reactor operator license applications (Office of Management and Budget | ||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | ||
TVA | 2 | ||
TVA | |||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the | ||
examination date. If the applications are not received at least 30 days before the examination | examination date. If the applications are not received at least 30 days before the examination | ||
date, a postponement may be necessary. Signed applications certifying that all training has | date, a postponement may be necessary. Signed applications certifying that all training has | ||
been completed should be submitted at least 14 days before the examination date. | been completed should be submitted at least 14 days before the examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | ||
Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The | Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The | ||
public reporting burden for this collection of information is estimated to average 500 hours per | public reporting burden for this collection of information is estimated to average 500 hours per | ||
response, including the time for reviewing instructions, gathering and maintaining the data | response, including the time for reviewing instructions, gathering and maintaining the data | ||
needed, writing the examinations, and completing and reviewing the collection of information. | needed, writing the examinations, and completing and reviewing the collection of information. | ||
Send comments on any aspect of this collection of information, including suggestions for | Send comments on any aspect of this collection of information, including suggestions for | ||
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. | reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. | ||
| Line 78: | Line 80: | ||
enclosures will be available electronically for public inspection in the NRC Public Document | enclosures will be available electronically for public inspection in the NRC Public Document | ||
Room or from the Publicly Available Records (PARS) component of NRCs document system | Room or from the Publicly Available Records (PARS) component of NRCs document system | ||
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading- | ||
rm/adams.html (the Public Electronic Reading Room). | rm/adams.html (the Public Electronic Reading Room). | ||
Thank you for your cooperation in this matter. Mr. George Sanders has been advised of the | Thank you for your cooperation in this matter. Mr. George Sanders has been advised of the | ||
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's | policies and guidelines referenced in this letter. If you have any questions regarding the NRC's | ||
examination procedures and guidelines, please contact Lee R. Miller at (404) 562-4676, | examination procedures and guidelines, please contact Lee R. Miller at (404) 562-4676, | ||
(Internet E-mail: LRM@NRC.GOV), George Hopper at (404) 562-4645, (Internet E-mail: | (Internet E-mail: LRM@NRC.GOV), George Hopper at (404) 562-4645, (Internet E-mail: | ||
GTH1@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV). | GTH1@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV). | ||
Sincerely, | |||
/RA/ | |||
Michael E. Ernstes, Chief | |||
Operator Licensing and | |||
Human Performance Branch | |||
Division of Reactor Safety | |||
Docket Nos. 50-327, 50-328 | Docket Nos. 50-327, 50-328 | ||
License Nos. DPR-77, DPR-79 | License Nos. DPR-77, DPR-79 | ||
cc: (See page 3) | cc: (See page 3) | ||
TVA | 3 | ||
TVA | |||
cc contd: | cc contd: | ||
Karl W. Singer | Karl W. Singer | ||
Senior Vice President | Senior Vice President | ||
Nuclear Operations | Nuclear Operations | ||
Tennessee Valley Authority | Tennessee Valley Authority | ||
Electronic Mail Distribution | Electronic Mail Distribution | ||
James E. Maddox, Vice President | |||
James E. Maddox, Vice President | Engineering and Technical Services | ||
Engineering and Technical Services | Tennessee Valley Authority | ||
Tennessee Valley Authority | |||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Richard T. Purcell | |||
Richard T. Purcell | Site Vice President | ||
Site Vice President | |||
Sequoyah Nuclear Plant | Sequoyah Nuclear Plant | ||
Electronic Mail Distribution | Electronic Mail Distribution | ||
General Counsel | |||
General Counsel | Tennessee Valley Authority | ||
Electronic Mail Distribution | |||
Michael J. Fecht, Acting General Manager | |||
Nuclear Assurance | |||
Tennessee Valley Authority | Tennessee Valley Authority | ||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Mark J. Burzynski, Manager | |||
Nuclear Licensing | |||
Nuclear | |||
Tennessee Valley Authority | Tennessee Valley Authority | ||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Pedro Salas, Manager | Pedro Salas, Manager | ||
| Line 131: | Line 129: | ||
Tennessee Valley Authority | Tennessee Valley Authority | ||
Electronic Mail Distribution | Electronic Mail Distribution | ||
David A. Kulisek, Plant Manager | |||
Sequoyah Nuclear Plant | |||
Tennessee Valley Authority | |||
Electronic Mail Distribution | |||
Lawrence E. Nanney, Director | |||
TN Dept. of Environment & Conservation | |||
Division of Radiological Health | |||
Electronic Mail Distribution | |||
County Executive | |||
Hamilton County Courthouse | |||
Chattanooga, TN 37402-2801 | |||
Ann Harris | |||
341 Swing Loop | |||
Rockwood, TN 37854 | |||
James H. Bassham, Director | |||
Tennessee Emergency Management | |||
Agency | |||
Electronic Mail Distribution | |||
Mr. Roy Goodman | |||
Training Manager | |||
Sequoyah Nuclear Plant | |||
P. O. Box 2000 | |||
Soddy-Daisy, TN 37379-2000 | |||
4 | |||
TVA | |||
Distribution: | |||
R. Anand, NRR | |||
C. Evans (Part 72 Only) | |||
L. Slack, RII EICS | |||
RIDSNRRDIPMLIPB | |||
OFFICE | PUBLIC | ||
SIGNATURE | OFFICE | ||
NAME | RII:DRS | ||
DATE | RII:DRS | ||
E-MAIL COPY? | RII:DRS | ||
PUBLIC DOCUMENT | RII:DRP | ||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA by G. Hopper Acting for/ | |||
/RA/ | |||
NAME | |||
LMiller:pmd | |||
GHopper | |||
MErnstes | |||
SCahill | |||
DATE | |||
3/1/04 | |||
3/1/04 | |||
3/1/04 | |||
3/1/04 | |||
E-MAIL COPY? | |||
YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO YES NO YES | |||
NO | |||
PUBLIC DOCUMENT | |||
YES | |||
NO | |||
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040620018.wpd | |||
}} | }} | ||
Latest revision as of 04:41, 16 January 2025
| ML040620018 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/01/2004 |
| From: | Ernstes M Division of Reactor Safety II |
| To: | Scalice J Tennessee Valley Authority |
| References | |
| 50-327/04-301, 50-328/04-301 | |
| Download: ML040620018 (5) | |
See also: IR 05000327/2004301
Text
March 1, 2004
Tennessee Valley Authority
ATTN: Mr. J. A. Scalice
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION -
SEQUOYAH NUCLEAR PLANT 50-327/2004-301 AND 50-328/2004-301
Dear Mr. Scalice:
In a telephone conversation on March 1, 2004, between Mr. Scott Poteet, Operator Training
Instructor and Mr. Lee R. Miller, Senior Operations Examiner, arrangements were made for the
administration of licensing examinations at the Sequoyah Nuclear Plant during the weeks of
June 7 and June 14, 2004 (operating test) and the week of June 14, 2004. (written
examination). The on-site preparatory week is scheduled for the week of May 17, 2004.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in Draft Revision 9 of NUREG-1021, "Operator Licensing Examination Standards
for Power Reactors." The NRC regional office will discuss with your staff any changes that
might be necessary before the examinations are administered. Your staff will also provide
copying services for administering the exam.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by March 22, 2004. The written examinations, operating tests, and the supporting
reference materials identified in Attachment 2 of ES-201 will be due by April 12, 2004, instead
of March 22, 2004 as stated in our letter dated February 17, 2004. Pursuant to
10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. Any delay in receiving the required
examination and reference materials, or the submittal of inadequate or incomplete materials,
may cause the examination to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
2
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The
public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. George Sanders has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Lee R. Miller at (404) 562-4676,
(Internet E-mail: LRM@NRC.GOV), George Hopper at (404) 562-4645, (Internet E-mail:
GTH1@NRC.GOV), or myself at (404) 562-4638, (Internet E-mail: MEE@NRC.GOV).
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos. 50-327, 50-328
cc: (See page 3)
3
cc contd:
Karl W. Singer
Senior Vice President
Nuclear Operations
Tennessee Valley Authority
Electronic Mail Distribution
James E. Maddox, Vice President
Engineering and Technical Services
Tennessee Valley Authority
Electronic Mail Distribution
Richard T. Purcell
Site Vice President
Sequoyah Nuclear Plant
Electronic Mail Distribution
General Counsel
Tennessee Valley Authority
Electronic Mail Distribution
Michael J. Fecht, Acting General Manager
Nuclear Assurance
Tennessee Valley Authority
Electronic Mail Distribution
Mark J. Burzynski, Manager
Nuclear Licensing
Tennessee Valley Authority
Electronic Mail Distribution
Pedro Salas, Manager
Licensing and Industry Affairs
Sequoyah Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
David A. Kulisek, Plant Manager
Sequoyah Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
Lawrence E. Nanney, Director
TN Dept. of Environment & Conservation
Division of Radiological Health
Electronic Mail Distribution
County Executive
Hamilton County Courthouse
Chattanooga, TN 37402-2801
Ann Harris
341 Swing Loop
Rockwood, TN 37854
James H. Bassham, Director
Tennessee Emergency Management
Agency
Electronic Mail Distribution
Mr. Roy Goodman
Training Manager
Sequoyah Nuclear Plant
P. O. Box 2000
Soddy-Daisy, TN 37379-2000
4
Distribution:
R. Anand, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
RIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA by G. Hopper Acting for/
/RA/
NAME
LMiller:pmd
GHopper
MErnstes
SCahill
DATE
3/1/04
3/1/04
3/1/04
3/1/04
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES NO YES
NO
PUBLIC DOCUMENT
YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040620018.wpd