ML042100049: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 21: Line 21:
NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations Gentlemen:
NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations Gentlemen:
Nine Mile Point Nuclear Station, LLC has gathered the information requested by RIS 2004-10 and has documented the information on the attached NRC Forms 536 (5-2003). If you have any questions, please contact Mr. Michael C. Jaquin at (315) 349-1508.
Nine Mile Point Nuclear Station, LLC has gathered the information requested by RIS 2004-10 and has documented the information on the attached NRC Forms 536 (5-2003). If you have any questions, please contact Mr. Michael C. Jaquin at (315) 349-1508.
Mana       Taning TAE/MCJfkcm Attachments cc:     Mr. H.J. Miller, NRC Regional Administrator Region I Mr. G.K. Hunegs, NRC Senior Resident Inspector Mr. P.S. Tam, Senior Project Manager, NRR (2 copies)
Mana Taning TAE/MCJfkcm Attachments cc:
                                                                                              ~AoQ
Mr. H.J. Miller, NRC Regional Administrator Region I Mr. G.K. Hunegs, NRC Senior Resident Inspector Mr. P.S. Tam, Senior Project Manager, NRR (2 copies)
~AoQ


NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION       APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 07/31/2005 (5-2003)                                                             Estimated burden per response to comply with this voluntary information collection request: 1 hour. This Information collection Is used to plan budgets and resources for operator' examinations. Send commenits regarding burden OPERATOR       LICENSING OPERTOR ICENINGCommission,          estimate to the Records Management Branch (T-6 E6), U.S. Nuerear Regulatory Washington. DC 20555-0001. or by Internet e-mail to EXAMINATION DATA                               lnfocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503. If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the informatlon collection.
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 (5-2003)
FACILITY                                                                                                             NRC REGION Nine Mile Point Unit 1                                                                                                 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                         CY2005               Cy2006                         cy200 7                        Cy2008 ESTIMATED NUMBER OF LICENSEE-PREPARED           RO: 1, SRO: 1                       0               RO: 1, SRO: 1                                   0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                     0                           0                               0                               0 EXAMINATIONS                                                 000 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY2005               Cy 2X 6                         Cy2X7                           Cy2X8 NUMBER OF REACTOR OPERATORS                                   .                                                                              6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                     o                       6                               0                               6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                       o                     0                               0                               0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                     o                     0                               0                               0 PROPOSED DATES PRIMARY DATE                                     05/29/2006                                                 08/25/2008 ALTERNATE DATE                                     06/26/2006                                                 09/22/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005                                                     CY 2007 PROPOSED                       ____          ________  ____                                ____
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This Information collection Is used to plan budgets and resources for operator' examinations. Send commenits regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6), U.S. Nuerear Regulatory OPERTOR ICENINGCommission, Washington. DC 20555-0001. or by Internet e-mail to EXAMINATION DATA lnfocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503.
NUMBER           MARCH           JUNE     SEPTEMBER DECEMBER             MARCH               JUNE           SEPTEMBERDECEMBER ESTIMATED CANIDAES_                           0           12__                                         __12                               ___
If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the informatlon collection.
NRC FORM 536 (5-2003)                                                                                                   PRINTED ON RECYCLED PAPER
FACILITY NRC REGION Nine Mile Point Unit 1 1
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2005 Cy2006 cy2007 Cy2008 ESTIMATED NUMBER OF LICENSEE-PREPARED RO: 1, SRO: 1 0
RO: 1, SRO: 1 0
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
0 EXAMINATIONS 000 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2005 Cy 2X 6 Cy2X7 Cy2X8 NUMBER OF REACTOR OPERATORS 6
NUMBER OF SENIOR REACTOR OPERATORS - INSTANT o
6 0
6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE o
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED o
0 0
0 PROPOSED DATES PRIMARY DATE 05/29/2006 08/25/2008 ALTERNATE DATE 06/26/2006 09/22/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2007 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBERDECEMBER ESTIMATED CANIDAES_
0 12__
__12 NRC FORM 536 (5-2003)
PRINTED ON RECYCLED PAPER


x   A NRC FORM 536                 U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                           EXPIRES: 07/31/2005 (5-2003)                                                         Estimated burden per response to comply with this voluntary Information collection request: 1 hour. This information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden rOPERATO OPErATOR        LICENSING LICENSING                   estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. or by Internet e-mail to EXAMINATION DATA                           infocollectstnrc.gov, and to the Desk Officer. Office of Information and R ublatory Affairs, NEOB-10202, (3150-0131), Office of Management and get. Washington, DC 20503. If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
x A
FACILITY                                                                                                         NRC REGION Nine Mile Point Unit22 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                       CY2005             CY2006                        cy 2 007                         cy 200 8 ESTIMATED NUMBER OF                               R                                                             RO-1 SRO:1 LICENSEE-PREPARED           0                     RO:1,SRO:1                 0                                     .,
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 (5-2003)
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                         0                               U                             0 EXAMINATIONS                                             000 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY 2005           CY 2 _                          Cy23y278 NUMBER OF REACTOR OPERATORS                           5                   0                               6                               0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT                     4                   0                               6                               0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                       2                   0                               0                               0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                     0                   0                               0                               0 PROPOSED DATES PRIMARY DATE             05/02/2005                                       06/25/2007 ALTERNATE DATE           06/06/2005                                       07/23/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED                             CY 2006                                                   CY 2008 NUMBER           MARCH           JUNE     SEPTEMBER DECEMBER           MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER CANDIDATES OF 0             0         12               0                   0                 0                       12_
Estimated burden per response to comply with this voluntary Information collection request: 1 hour. This information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden rOPERATO LICENSING estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory OPErATOR LICENSING Commission, Washington, DC 20555-0001. or by Internet e-mail to EXAMINATION DATA infocollectstnrc.gov, and to the Desk Officer. Office of Information and R ublatory Affairs, NEOB-10202, (3150-0131), Office of Management and get. Washington, DC 20503.
NRC FORM 538(5-2003)                                                                                               PRINTED ON RECYCLED PAPER}}
If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACILITY NRC REGION Nine Mile Point Unit2 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2005 C Y2006 cy 2 007 cy 200 8 ESTIMATED NUMBER OF R
RO-1 SRO:1 LICENSEE-PREPARED 0
RO:1,SRO:1 0
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 U
0 EXAMINATIONS 000 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2 Cy23y278 NUMBER OF REACTOR OPERATORS 5
0 6
0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4
0 6
0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2
0 0
0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0
0 0
0 PROPOSED DATES PRIMARY DATE 05/02/2005 06/25/2007 ALTERNATE DATE 06/06/2005 07/23/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2006 CY 2008 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0
0 12 0
0 0
12_
NRC FORM 538 (5-2003)
PRINTED ON RECYCLED PAPER}}

Latest revision as of 02:09, 16 January 2025

NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations
ML042100049
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 07/23/2004
From: Evans T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP-97989, RIS-04-010
Download: ML042100049 (3)


Text

P.O. Box 63 Lycoming, NY 13093 Constellation Energy-Nine Mile Point Nuclear Station NMP-97989 July 23, 2004 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

NRC Regulatory Issue Summary (RIS) 2004-10, Preparation and Scheduling of Operator Licensing Examinations Gentlemen:

Nine Mile Point Nuclear Station, LLC has gathered the information requested by RIS 2004-10 and has documented the information on the attached NRC Forms 536 (5-2003). If you have any questions, please contact Mr. Michael C. Jaquin at (315) 349-1508.

Mana Taning TAE/MCJfkcm Attachments cc:

Mr. H.J. Miller, NRC Regional Administrator Region I Mr. G.K. Hunegs, NRC Senior Resident Inspector Mr. P.S. Tam, Senior Project Manager, NRR (2 copies)

~AoQ

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 (5-2003)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator' examinations. Send commenits regarding burden OPERATOR LICENSING estimate to the Records Management Branch (T-6 E6), U.S. Nuerear Regulatory OPERTOR ICENINGCommission, Washington. DC 20555-0001. or by Internet e-mail to EXAMINATION DATA lnfocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management and Budget, Washington, DC 20503.

If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the informatlon collection.

FACILITY NRC REGION Nine Mile Point Unit 1 1

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2005 Cy2006 cy2007 Cy2008 ESTIMATED NUMBER OF LICENSEE-PREPARED RO: 1, SRO: 1 0

RO: 1, SRO: 1 0

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS 000 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2005 Cy 2X 6 Cy2X7 Cy2X8 NUMBER OF REACTOR OPERATORS 6

NUMBER OF SENIOR REACTOR OPERATORS - INSTANT o

6 0

6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE o

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED o

0 0

0 PROPOSED DATES PRIMARY DATE 05/29/2006 08/25/2008 ALTERNATE DATE 06/26/2006 09/22/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2005 CY 2007 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBERDECEMBER ESTIMATED CANIDAES_

0 12__

__12 NRC FORM 536 (5-2003)

PRINTED ON RECYCLED PAPER

x A

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 07/31/2005 (5-2003)

Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden rOPERATO LICENSING estimate to the Records Management Branch (T-6 E6), U.S. Nuclear Regulatory OPErATOR LICENSING Commission, Washington, DC 20555-0001. or by Internet e-mail to EXAMINATION DATA infocollectstnrc.gov, and to the Desk Officer. Office of Information and R ublatory Affairs, NEOB-10202, (3150-0131), Office of Management and get. Washington, DC 20503.

If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY NRC REGION Nine Mile Point Unit2 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2005 C Y2006 cy 2 007 cy 200 8 ESTIMATED NUMBER OF R

RO-1 SRO:1 LICENSEE-PREPARED 0

RO:1,SRO:1 0

EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 U

0 EXAMINATIONS 000 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2005 CY 2 Cy23y278 NUMBER OF REACTOR OPERATORS 5

0 6

0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4

0 6

0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2

0 0

0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0

0 0

0 PROPOSED DATES PRIMARY DATE 05/02/2005 06/25/2007 ALTERNATE DATE 06/06/2005 07/23/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2006 CY 2008 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 0

0 12 0

0 0

12_

NRC FORM 538 (5-2003)

PRINTED ON RECYCLED PAPER