ML042300433: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 1: | Line 1: | ||
# | {{Adams | ||
| number = ML042300433 | |||
| issue date = 08/10/2004 | |||
| title = July 2004 Monthly Operating Report for Fermi 2 | |||
| author name = Peterson N | |||
| author affiliation = Detroit Edison | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000341 | |||
| license number = NPF-043 | |||
| contact person = | |||
| case reference number = GL-97-002, NRC-04-0057 | |||
| document type = Letter, License-Monthly Operating Report | |||
| page count = 2 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:Fermi 2 6400 North Dixie Hly., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 August 10, 2004 NRC-04-0057 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555 | |||
==Reference:== | |||
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF43 | |||
==Subject:== | |||
Monthly Operating Status Report for July 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for July 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4. | |||
Should you have any questions or require additional information, please contact me at (734) 586-4258. | |||
Sincerely, o~rman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr. | |||
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr. | |||
NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company | |||
OPERATING DATA REPORT DOCKET NO. | |||
UNIT NAME DATE COMPLETED BY TELEPHONE 50-341 Fermi 2 August 10, 2004 Kevin Burke (734) 586-5148 g | |||
REPORTING PERIOD: July 2004 | |||
: 1. | |||
Design Electrical Rating (MWe-Net) 1.150.00 | |||
: 2. | |||
Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month | |||
: 3. | |||
Number of Hours the Reactor Was Critical | |||
: 4. | |||
Number of Hours Generator On-line | |||
: 5. | |||
Reserve Shutdown Hours | |||
: 6. | |||
Net Electrical Energy Generated (MWH) 744 744 0.00 798.842 Year-to-Date 5.111 5.111 0.00 5.615.447 Cumulative 113.007 109.120 0.00 110,239.015 UNIT SHUTDOWNS | |||
==SUMMARY== | |||
: The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On July 16, 2004 at 0106 hours, commenced planned power reduction from 100% to 95% for Hydraulic Control Unit maintenance. At 0157 hours, plant was returned to full power. On July 17, 2004 at 0259 hours, commenced planned power reduction from 100% to 63% for control rod pattern adjustment, testing and maintenance. Plant was returned to full power on July 18, 2004 at 0842 hours. On July 18, 2004 at 2122 hours, commenced planned power reduction from 100% to 83% to set final control rod pattern. Plant was returned to full power on July 19, 2004 at 0047 hours. | |||
(1) Reason: | |||
A Equipment Failure (Explain) | |||
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training and License Examination F Administration G Operational Error (Explain) | |||
H Other (Explain) | |||
* (2) Method: | |||
I Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain) r}} | |||
Latest revision as of 01:48, 16 January 2025
| ML042300433 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 08/10/2004 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC-04-0057 | |
| Download: ML042300433 (2) | |
Text
Fermi 2 6400 North Dixie Hly., Newport, Ml 48166 Detroit Edison Generic Letter 97-02 August 10, 2004 NRC-04-0057 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF43
Subject:
Monthly Operating Status Report for July 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for July 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, o~rman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region m A DTE Energy Company
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-341 Fermi 2 August 10, 2004 Kevin Burke (734) 586-5148 g
REPORTING PERIOD: July 2004
- 1.
Design Electrical Rating (MWe-Net) 1.150.00
- 2.
Maximum Dependable Capacity (Mwe-Net) 1,089.00 This Month
- 3.
Number of Hours the Reactor Was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWH) 744 744 0.00 798.842 Year-to-Date 5.111 5.111 0.00 5.615.447 Cumulative 113.007 109.120 0.00 110,239.015 UNIT SHUTDOWNS
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On July 16, 2004 at 0106 hours0.00123 days <br />0.0294 hours <br />1.752645e-4 weeks <br />4.0333e-5 months <br />, commenced planned power reduction from 100% to 95% for Hydraulic Control Unit maintenance. At 0157 hours0.00182 days <br />0.0436 hours <br />2.595899e-4 weeks <br />5.97385e-5 months <br />, plant was returned to full power. On July 17, 2004 at 0259 hours0.003 days <br />0.0719 hours <br />4.282407e-4 weeks <br />9.85495e-5 months <br />, commenced planned power reduction from 100% to 63% for control rod pattern adjustment, testing and maintenance. Plant was returned to full power on July 18, 2004 at 0842 hours0.00975 days <br />0.234 hours <br />0.00139 weeks <br />3.20381e-4 months <br />. On July 18, 2004 at 2122 hours0.0246 days <br />0.589 hours <br />0.00351 weeks <br />8.07421e-4 months <br />, commenced planned power reduction from 100% to 83% to set final control rod pattern. Plant was returned to full power on July 19, 2004 at 0047 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br />.
(1) Reason:
A Equipment Failure (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training and License Examination F Administration G Operational Error (Explain)
H Other (Explain)
- (2) Method:
I Manual 2 Manual Trip/Scram 3 Automatic Trip/Scram 4 Continuation 5 Other (Explain) r