ML051330332: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 19: Line 19:


Agenda
Agenda
! Introduction
! Introduction  
! Review of Reactor Oversight Process
! Review of Reactor Oversight Process
! National Summary of Plant Performance
! National Summary of Plant Performance
Line 26: Line 26:
! NRC Closing Remarks
! NRC Closing Remarks
! Break
! Break
! NRC available to address public questions
! NRC available to address public questions  


NRC Representatives
NRC Representatives
! Mark Satorius, Director, Division Reactor Projects
! Mark Satorius, Director, Division Reactor Projects  
    - (630) 829-9600
- (630) 829-9600
! Steve Reynolds, Deputy Division Director, DRP
! Steve Reynolds, Deputy Division Director, DRP
    - (630) 829-9601
- (630) 829-9601
! Deirdre Spaulding, Project Manager, NRR
! Deirdre Spaulding, Project Manager, NRR
    - (301) 415-2928
- (301) 415-2928
! George Wilson, Senior Resident Inspector
! George Wilson, Senior Resident Inspector
    - (319) 851-5111
- (319) 851-5111
! Randal Baker, Resident Inspector
! Randal Baker, Resident Inspector
    - (319) 851-5111
- (319) 851-5111
! Charles Zoia, Senior Project Engineer
! Charles Zoia, Senior Project Engineer
    - (630) 829-9863
- (630) 829-9863
! Bruce Burgess, Branch Chief
! Bruce Burgess, Branch Chief
    - (630) 829-9629
- (630) 829-9629


Region III Organization James L. Caldwell Regional Administrator Geoffrey E. Grant Deputy Regional Administrator Mark A. Satorius                          Cynthia D. Pederson Director Division of Reactor Projects        Director Division of Reactor Safety Steven A. Reynolds                            Roy J. Caniano Deputy Director                             Deputy Director Bruce L. Burgess                            Regional Specialists Branch Chief DAEC                Project Engineers Resident Inspectors          Charles Zoia George Wilson (SRI)         Gregory Gibbs Randal Baker (RI)
Region III Organization Regional Specialists Director Division of Reactor Safety Roy J. Caniano Deputy Director Cynthia D. Pederson Charles Zoia Gregory Gibbs Project Engineers George Wilson (SRI)
Randal Baker (RI)
DAEC Resident Inspectors Branch Chief Bruce L. Burgess Director Division of Reactor Projects Steven A. Reynolds Deputy Director Mark A. Satorius Regional Administrator Geoffrey E. Grant Deputy Regional Administrator James L. Caldwell


NRC Performance Goals
NRC Performance Goals
Line 53: Line 55:
! Management: Ensure excellence in agency management to carry out the NRCs strategic objective
! Management: Ensure excellence in agency management to carry out the NRCs strategic objective


Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results                                 Results Significance                    Significance Threshold                        Threshold Action Matrix Regulatory Response
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas


Examples of Baseline Inspections
Examples of Baseline Inspections
! Equipment Alignment         ~92 hrs/yr
! Equipment Alignment  
! Triennial Fire Protection   ~200 hrs every 3 yrs
~92 hrs/yr  
! Operator Response           ~125 hrs/yr
! Triennial Fire Protection  
! Emergency Preparedness     ~80 hrs/yr
~200 hrs every 3 yrs
! Rad Release Controls       ~100 hrs every 2 yrs
! Operator Response  
~125 hrs/yr
! Emergency Preparedness
~80 hrs/yr
! Rad Release Controls  
~100 hrs every 2 yrs
! Worker Radiation Protection ~100 hrs/yr
! Worker Radiation Protection ~100 hrs/yr
! Corrective Action Program ~200 hrs every 2 yrs
! Corrective Action Program ~200 hrs every 2 yrs
! Corrective Action Case Reviews ~60 hrs/yr
! Corrective Action Case Reviews ~60 hrs/yr


Significance Threshold Performance Indicators Green:     Only Baseline Inspection White:     May increase NRC oversight Yellow:     Requires more NRC oversight Red:       Requires more NRC oversight Inspection Findings Green:     Very Low safety issue White:     Low to moderate safety issue Yellow:   Substantial safety issue Red:       High safety issue
Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very Low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue


Action Matrix Concept Licensee    Regulatory  Degraded    Multiple/Rep. Unacceptable Response    Response    Cornerstone Degraded      Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee
 
===Response===
Regulatory
 
===Response===
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance


Purpose of Todays Meeting
Purpose of Todays Meeting
! A public forum for discussion of the licensees performance
! A public forum for discussion of the licensees performance
! NRC will address the licensee performance issues identified in the annual assessment letter
! NRC will address the licensee performance issues identified in the annual assessment letter
! Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
! Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance  


National Summary of Plant Performance Status at End of CY 2004 Licensee Response                           78 Regulatory Response                         21 Degraded Cornerstone                         0 Multiple/Repetitive Degraded Cornerstone     3 Unacceptable                                 0 Total Units      102
National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0
*Davis-Besse is in IMC 0350 process
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
*Davis-Besse is in IMC 0350 process Total Units 102


National Summary
National Summary
! Performance Indicator Results (at end of CY 2004)
! Performance Indicator Results (at end of CY 2004)
  < Green     1834
< Green 1834
  < White     6
< White 6
  < Yellow     0
< Yellow 0
  < Red       0
< Red 0
! Total Inspection Findings (CY 2004)
! Total Inspection Findings (CY 2004)
  < Green     778
< Green 778
  < White     11
< White 11
  < Yellow   0
< Yellow 0
  < Red       0
< Red 0


DAEC Assessment Results (Jan 1 - Dec 31, 2004)
DAEC Assessment Results (Jan 1 - Dec 31, 2004)
Line 96: Line 120:
! No greater than Green Findings were identified in 2004.
! No greater than Green Findings were identified in 2004.
! No greater than Green Performance Indicators were identified in 2004.
! No greater than Green Performance Indicators were identified in 2004.
! No Substantive Cross-Cutting Issues were identified in 2004.
! No Substantive Cross-Cutting Issues were identified in 2004.  


DAEC Inspection Activities (Jan 1 - Dec 31, 2004)
DAEC Inspection Activities (Jan 1 - Dec 31, 2004)
! There were approximately 4536 hours of inspection related activities performed at the DAEC during 2004.
! There were approximately 4536 hours of inspection related activities performed at the DAEC during 2004.  
! The inspections were performed by the Resident Inspectors and Regional Based Inspectors. The Regional Based Inspectors included specialists in Security, Emergency Preparedness, and Radiation Protection.
! The inspections were performed by the Resident Inspectors and Regional Based Inspectors. The Regional Based Inspectors included specialists in Security, Emergency Preparedness, and Radiation Protection.  
! There were 13 Green Inspection Findings identified during 2004.
! There were 13 Green Inspection Findings identified during 2004.  
! There were 2 planned Forced Outages during 2004.
! There were 2 planned Forced Outages during 2004.


Line 107: Line 131:
! Major team inspections performed in 2004, included a Safety System Design & Performance Capability Inspection, an Emergency Preparedness Inspection, and Security Inspections.
! Major team inspections performed in 2004, included a Safety System Design & Performance Capability Inspection, an Emergency Preparedness Inspection, and Security Inspections.


DAEC Annual Assessment Summary January 1- December 31, 2004
DAEC Annual Assessment Summary January 1-December 31, 2004
! NMC operated DAEC in a manner that preserved public health and safety.
! NMC operated DAEC in a manner that preserved public health and safety.
! All cornerstone objectives were met with no greater than Green Findings identified.
! All cornerstone objectives were met with no greater than Green Findings identified.
! NRC plans baseline inspections at DAEC for the remainder of the assessment period.
! NRC plans baseline inspections at DAEC for the remainder of the assessment period.  


Licensee Response and Remarks Mark Peifer DAEC Site Vice President Nuclear Management Company
Licensee Response and Remarks Mark Peifer DAEC Site Vice President Nuclear Management Company
Line 116: Line 140:
Contacting the NRC
Contacting the NRC
! Report an emergency
! Report an emergency
  < (301) 816-5100 (call collect)
< (301) 816-5100 (call collect)
! Report a safety concern:
! Report a safety concern:  
  < (800) 695-7403
< (800) 695-7403  
  < Allegation@nrc.gov
< Allegation@nrc.gov
! General information or questions
! General information or questions
  < www.nrc.gov
< www.nrc.gov
  < Select What We Do for Public Affairs
< Select What We Do for Public Affairs


Reference Sources
Reference Sources
! Reactor Oversight Process
! Reactor Oversight Process
  < http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
< http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
! Public Electronic Reading Room
! Public Electronic Reading Room
  < http://www.nrc.gov/reading-rm.html
< http://www.nrc.gov/reading-rm.html
! Public Document Room
! Public Document Room
  < 1-800-397-4209 (Toll Free)}}
< 1-800-397-4209 (Toll Free)}}

Latest revision as of 18:55, 15 January 2025

Public Meeting Slides Duane Arnold End-of-Cycle Plant Performance Assessment
ML051330332
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/09/2005
From:
NRC/RGN-III
To:
References
Download: ML051330332 (20)


Text

Duane Arnold Energy Center (DAEC)

Annual Assessment Meeting Reactor Oversight Program - CY 2004 Nuclear Regulatory Commission - Region III Lisle, Illnois

Agenda

! Introduction

! Review of Reactor Oversight Process

! National Summary of Plant Performance

! Discussion of Plant Performance Results

! Licensee Response and Remarks

! NRC Closing Remarks

! Break

! NRC available to address public questions

NRC Representatives

! Mark Satorius, Director, Division Reactor Projects

- (630) 829-9600

! Steve Reynolds, Deputy Division Director, DRP

- (630) 829-9601

! Deirdre Spaulding, Project Manager, NRR

- (301) 415-2928

! George Wilson, Senior Resident Inspector

- (319) 851-5111

! Randal Baker, Resident Inspector

- (319) 851-5111

! Charles Zoia, Senior Project Engineer

- (630) 829-9863

! Bruce Burgess, Branch Chief

- (630) 829-9629

Region III Organization Regional Specialists Director Division of Reactor Safety Roy J. Caniano Deputy Director Cynthia D. Pederson Charles Zoia Gregory Gibbs Project Engineers George Wilson (SRI)

Randal Baker (RI)

DAEC Resident Inspectors Branch Chief Bruce L. Burgess Director Division of Reactor Projects Steven A. Reynolds Deputy Director Mark A. Satorius Regional Administrator Geoffrey E. Grant Deputy Regional Administrator James L. Caldwell

NRC Performance Goals

! Safety:Ensure protection of the public health and safety and the environment

! Security: Enhance the secure use and management of radioactive matrerials

! Openness: Ensure openness in our regulatory process

! Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely

! Management: Ensure excellence in agency management to carry out the NRCs strategic objective

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

! Equipment Alignment

~92 hrs/yr

! Triennial Fire Protection

~200 hrs every 3 yrs

! Operator Response

~125 hrs/yr

! Emergency Preparedness

~80 hrs/yr

! Rad Release Controls

~100 hrs every 2 yrs

! Worker Radiation Protection ~100 hrs/yr

! Corrective Action Program ~200 hrs every 2 yrs

! Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance

Purpose of Todays Meeting

! A public forum for discussion of the licensees performance

! NRC will address the licensee performance issues identified in the annual assessment letter

! Licensee will respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

  • Davis-Besse is in IMC 0350 process Total Units 102

National Summary

! Performance Indicator Results (at end of CY 2004)

< Green 1834

< White 6

< Yellow 0

< Red 0

! Total Inspection Findings (CY 2004)

< Green 778

< White 11

< Yellow 0

< Red 0

DAEC Assessment Results (Jan 1 - Dec 31, 2004)

! Licensee Response Column of the Action Matrix.

! No Supplemental Inspections were performed in 2004.

Safety Significant Findings or PIs

! No greater than Green Findings were identified in 2004.

! No greater than Green Performance Indicators were identified in 2004.

! No Substantive Cross-Cutting Issues were identified in 2004.

DAEC Inspection Activities (Jan 1 - Dec 31, 2004)

! There were approximately 4536 hours0.0525 days <br />1.26 hours <br />0.0075 weeks <br />0.00173 months <br /> of inspection related activities performed at the DAEC during 2004.

! The inspections were performed by the Resident Inspectors and Regional Based Inspectors. The Regional Based Inspectors included specialists in Security, Emergency Preparedness, and Radiation Protection.

! There were 13 Green Inspection Findings identified during 2004.

! There were 2 planned Forced Outages during 2004.

DAEC Inspection Activities (Jan 1 - Dec 31, 2004)

! Major team inspections performed in 2004, included a Safety System Design & Performance Capability Inspection, an Emergency Preparedness Inspection, and Security Inspections.

DAEC Annual Assessment Summary January 1-December 31, 2004

! NMC operated DAEC in a manner that preserved public health and safety.

! All cornerstone objectives were met with no greater than Green Findings identified.

! NRC plans baseline inspections at DAEC for the remainder of the assessment period.

Licensee Response and Remarks Mark Peifer DAEC Site Vice President Nuclear Management Company

Contacting the NRC

! Report an emergency

< (301) 816-5100 (call collect)

! Report a safety concern:

< (800) 695-7403

< Allegation@nrc.gov

! General information or questions

< www.nrc.gov

< Select What We Do for Public Affairs

Reference Sources

! Reactor Oversight Process

< http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

! Public Electronic Reading Room

< http://www.nrc.gov/reading-rm.html

! Public Document Room

< 1-800-397-4209 (Toll Free)