ML061360169: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML061360169
| number = ML061360169
| issue date = 05/15/2006
| issue date = 05/15/2006
| title = Notice of Meeting with Firstenergy Nuclear Operating Company Nrc'S Results of the Confirmatory Action Letter Followup Inspections of the Emergency Preparedness and Human Performance Areas
| title = Notice of Meeting with Firstenergy Nuclear Operating Company NRCs Results of the Confirmatory Action Letter Followup Inspections of the Emergency Preparedness and Human Performance Areas
| author name = Duncan E
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRP/RPB6
| author affiliation = NRC/RGN-III/DRP/RPB6
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:May 15, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:             FirstEnergy Nuclear Operating Company Name of Facility:             Perry Nuclear Power Plant, Unit 1 Docket No:                     50-440 Date and Time of Meeting:     Tuesday, July 11, 2006, 3:00 p.m. (EDT)
{{#Wiki_filter:May 15, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:
Location of Meeting:           Renaissance Quail Hollow Resort Barberry Room 11080 Concord-Hambden Road Painesville, Ohio 44077 Purpose of Meeting:           Public Meeting to Discuss the Results of the NRCs Confirmatory Action Letter Followup Inspections of the Emergency Preparedness and Human Performance areas.
FirstEnergy Nuclear Operating Company Name of Facility:
Category:                     This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.
Perry Nuclear Power Plant, Unit 1 Docket No:
50-440 Date and Time of Meeting:
Tuesday, July 11, 2006, 3:00 p.m. (EDT)
Location of Meeting:
Renaissance Quail Hollow Resort Barberry Room 11080 Concord-Hambden Road Painesville, Ohio 44077 Purpose of Meeting:
Public Meeting to Discuss the Results of the NRCs Confirmatory Action Letter Followup Inspections of the Emergency Preparedness and Human Performance areas.
Category:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.
NRC Attendees:
NRC Attendees:
M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects S. Campbell, Project Manager, Office of Nuclear Reactor Regulation M. Franke, Senior Resident Inspector, Perry M. Wilk, Resident Inspector, Perry Others as Designated Licensee Attendees:
M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects S. Campbell, Project Manager, Office of Nuclear Reactor Regulation M. Franke, Senior Resident Inspector, Perry M. Wilk, Resident Inspector, Perry Others as Designated Licensee Attendees:
L. Pearce, Vice President, Perry F. von Ahn, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry J. Shaw, Director, Engineering, Perry G. Halnon, Director, Performance Improvement Initiative, Perry Others as designated
L. Pearce, Vice President, Perry F. von Ahn, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry J. Shaw, Director, Engineering, Perry G. Halnon, Director, Performance Improvement Initiative, Perry Others as designated


Notice of Significant                           Licensee Meeting Notes:
Notice of Significant Licensee Meeting Notes:
(1)   Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by July 9, 2006.
(1)
(2)   the NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by July 9, 2006.
(2) the NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Approved by: /RA/
Approved by: /RA/
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects


Notice of Significant                           Licensee Meeting Distribution:
Notice of Significant Licensee Meeting Distribution:
J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Banerjee (MXB), Project Manager, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)
J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Banerjee (MXB), Project Manager, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)
J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP}}
J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP}}

Latest revision as of 08:57, 15 January 2025

Notice of Meeting with Firstenergy Nuclear Operating Company NRCs Results of the Confirmatory Action Letter Followup Inspections of the Emergency Preparedness and Human Performance Areas
ML061360169
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/15/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML061360169 (3)


Text

May 15, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:

FirstEnergy Nuclear Operating Company Name of Facility:

Perry Nuclear Power Plant, Unit 1 Docket No:

50-440 Date and Time of Meeting:

Tuesday, July 11, 2006, 3:00 p.m. (EDT)

Location of Meeting:

Renaissance Quail Hollow Resort Barberry Room 11080 Concord-Hambden Road Painesville, Ohio 44077 Purpose of Meeting:

Public Meeting to Discuss the Results of the NRCs Confirmatory Action Letter Followup Inspections of the Emergency Preparedness and Human Performance areas.

Category:

This is a Category 1 Meeting. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees:

M. Satorius, Director, Division of Reactor Projects E. Duncan, Chief, Branch 6, Division of Reactor Projects S. Campbell, Project Manager, Office of Nuclear Reactor Regulation M. Franke, Senior Resident Inspector, Perry M. Wilk, Resident Inspector, Perry Others as Designated Licensee Attendees:

L. Pearce, Vice President, Perry F. von Ahn, Director, Site Operations, Perry A. Cayia, Director, Performance Improvement, Perry J. Shaw, Director, Engineering, Perry G. Halnon, Director, Performance Improvement Initiative, Perry Others as designated

Notice of Significant Licensee Meeting Notes:

(1)

Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Eric Duncan at (630) 829-9628 by July 9, 2006.

(2) the NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Approved by: /RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Banerjee (MXB), Project Manager, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Perry DRS Branch Chiefs (JFL, DEH, KXR, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP