Perry Nuclear Power Plant
Perry Nuclear Power Plant
10 Center Road, A290
10 Center Road, A290
Perry, OH 44081
Perry, OH 44081
SUBJECT:       ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC
SUBJECT:
                INSPECTION REPORT 05000440/2006007
ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC
INSPECTION REPORT 05000440/2006007
Dear Mr. Pearce:
Dear Mr. Pearce:
This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC
This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC
Inspection Report 05000440/2006007. We have reviewed your response and have no further
Inspection Report 05000440/2006007. We have reviewed your response and have no further
questions at this time. Your corrective actions to address the issues discussed in your letter
questions at this time. Your corrective actions to address the issues discussed in your letter
may be reviewed during a future inspection.
may be reviewed during a future inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
will be available electronically for public inspection in the NRC Public Document Room or from
will be available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
the Publicly Available Records (PARS) component of NRC's document system (ADAMS),  
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Electronic Reading Room).
                                                Sincerely,
Sincerely,
                                                /RA by G. Wright Acting for/
/RA by G. Wright Acting for/
                                                Eric R. Duncan, Chief
Eric R. Duncan, Chief
                                                Branch 6
Branch 6
                                                Division of Reactor Project
Division of Reactor Project
Docket No. 50-440
Docket No. 50-440
License No. NPF-58
License No. NPF-58
Line 47: Line 48:
See next page
See next page


                                                                      May 16, 2006
May 16, 2006
CAL 3-05-001
CAL 3-05-001
Mr. L. William Pearce
Mr. L. William Pearce
Line 54: Line 55:
Perry Nuclear Power Plant
Perry Nuclear Power Plant
10 Center Road, A290
10 Center Road, A290
Perry, OH 44081
Perry, OH 44081
SUBJECT:                 ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC
SUBJECT:
                          INSPECTION REPORT 05000440/2006007
ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC
INSPECTION REPORT 05000440/2006007
Dear Mr. Pearce:
Dear Mr. Pearce:
This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC
This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC
Inspection Report 05000440/2006007. We have reviewed your response and have no further
Inspection Report 05000440/2006007. We have reviewed your response and have no further
questions at this time. Your corrective actions to address the issues discussed in your letter
questions at this time. Your corrective actions to address the issues discussed in your letter
may be reviewed during a future inspection.
may be reviewed during a future inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
will be available electronically for public inspection in the NRC Public Document Room or from
will be available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
the Publicly Available Records (PARS) component of NRC's document system (ADAMS),  
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Electronic Reading Room).
                                                                            Sincerely,
Sincerely,
                                                                            /RA by G. Wright Acting for/
/RA by G. Wright Acting for/
                                                                            Eric R. Duncan, Chief
Eric R. Duncan, Chief
                                                                            Branch 6
Branch 6
                                                                            Division of Reactor Project
Division of Reactor Project
Docket No. 50-440
Docket No. 50-440
License No. NPF-58
License No. NPF-58
DISTRIBUTION:
DISTRIBUTION:
See next page
See next page
DOCUMENT NAME: E:\Filenet\ML061370209.wpd
DOCUMENT NAME: E:\\Filenet\\ML061370209.wpd
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure   "E" = Copy with attachment/enclosure   "N" = No copy
OFFICE             RIII                                 RIII                     C
OFFICE
NAME               GWright for                          CWeil for
RIII
                    EDuncan/trt                         KOBrien
RIII
DATE               5/16/06                             05/16/06
C
                                                          OFFICIAL RECORD COPY
NAME
GWright for
EDuncan/trt
CWeil for
KOBrien
DATE
5/16/06
05/16/06
OFFICIAL RECORD COPY


L. W. Pearce                                 -2-
L. W. Pearce
cc:   G. Leidich, President - FENOC
-2-
      J. Hagan, Chief Operating Officer, FENOC
cc:
      D. Pace, Senior Vice President Engineering and Services, FENOC
G. Leidich, President - FENOC
      Director, Site Operations
J. Hagan, Chief Operating Officer, FENOC
      Director, Regulatory Affairs
D. Pace, Senior Vice President Engineering and Services, FENOC
      M. Wayland, Director, Maintenance Department
Director, Site Operations
      Manager, Regulatory Compliance
Director, Regulatory Affairs
      G. Halnon, Director, Performance Improvement
M. Wayland, Director, Maintenance Department
      J. Shaw, Director, Engineering Department
Manager, Regulatory Compliance
      D. Jenkins, Attorney, FirstEnergy
G. Halnon, Director, Performance Improvement
      Public Utilities Commission of Ohio
J. Shaw, Director, Engineering Department
      Ohio State Liaison Officer
D. Jenkins, Attorney, FirstEnergy
      R. Owen, Ohio Department of Health
Public Utilities Commission of Ohio
Ohio State Liaison Officer
R. Owen, Ohio Department of Health


L. W. Pearce                                 -3-
L. W. Pearce
-3-
ADAMS Distribution:
ADAMS Distribution:
DXC1
DXC1
Line 111: Line 124:
LSL (electronic IRs only)
LSL (electronic IRs only)
C. Pederson, DRS (hard copy - IRs only)
C. Pederson, DRS (hard copy - IRs only)
DRPIII
DRPIII  
DRSIII
DRSIII
PLB1
PLB1

Latest revision as of 08:55, 15 January 2025

Acknowledgement of Licensee Response to Inspection Report 05000440/2006007
ML061370209
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/16/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To: Pearce L
FirstEnergy Nuclear Operating Co
References
CAL 3-05-001, IR-06-007
Download: ML061370209 (4)


See also: IR 05000440/2006007

Text

May 16, 2006

CAL 3-05-001

Mr. L. William Pearce

Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

10 Center Road, A290

Perry, OH 44081

SUBJECT:

ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC

INSPECTION REPORT 05000440/2006007

Dear Mr. Pearce:

This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC

Inspection Report 05000440/2006007. We have reviewed your response and have no further

questions at this time. Your corrective actions to address the issues discussed in your letter

may be reviewed during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

will be available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA by G. Wright Acting for/

Eric R. Duncan, Chief

Branch 6

Division of Reactor Project

Docket No. 50-440

License No. NPF-58

DISTRIBUTION:

See next page

May 16, 2006

CAL 3-05-001

Mr. L. William Pearce

Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

10 Center Road, A290

Perry, OH 44081

SUBJECT:

ACKNOWLEDGEMENT OF RECEIPT OF PERRY RESPONSE TO NRC

INSPECTION REPORT 05000440/2006007

Dear Mr. Pearce:

This acknowledges receipt of your letter dated May 9, 2006, which responded to NRC

Inspection Report 05000440/2006007. We have reviewed your response and have no further

questions at this time. Your corrective actions to address the issues discussed in your letter

may be reviewed during a future inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter

will be available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA by G. Wright Acting for/

Eric R. Duncan, Chief

Branch 6

Division of Reactor Project

Docket No. 50-440

License No. NPF-58

DISTRIBUTION:

See next page

DOCUMENT NAME: E:\\Filenet\\ML061370209.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

RIII

C

NAME

GWright for

EDuncan/trt

CWeil for

KOBrien

DATE

5/16/06

05/16/06

OFFICIAL RECORD COPY

L. W. Pearce

-2-

cc:

G. Leidich, President - FENOC

J. Hagan, Chief Operating Officer, FENOC

D. Pace, Senior Vice President Engineering and Services, FENOC

Director, Site Operations

Director, Regulatory Affairs

M. Wayland, Director, Maintenance Department

Manager, Regulatory Compliance

G. Halnon, Director, Performance Improvement

J. Shaw, Director, Engineering Department

D. Jenkins, Attorney, FirstEnergy

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

L. W. Pearce

-3-

ADAMS Distribution:

DXC1

KNJ

SJC4

RidsNrrDirsIrib

GEG

KGO

RJP

CAA1

LSL (electronic IRs only)

C. Pederson, DRS (hard copy - IRs only)

DRPIII

DRSIII

PLB1

JRK1

ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)