{{#Wiki_filter:OFFICIAL USE ONLY | {{#Wiki_filter:OFFICIAL USE ONLY | ||
Enclosure Contains Sensitive Unclassified | |||
Non-Safeguards Information. Upon | |||
separation, this page is decontrolled. | |||
OFFICIAL USE ONLY | |||
June 13, 2006 | |||
Mr. L. William Pearce | Mr. L. William Pearce | ||
Vice President | Vice President | ||
| Line 24: | Line 28: | ||
Perry Nuclear Power Plant | Perry Nuclear Power Plant | ||
10 Center Road, A290 | 10 Center Road, A290 | ||
Perry, OH 44081 | Perry, OH 44081 | ||
SUBJECT: | SUBJECT: | ||
PERRY NUCLEAR POWER PLANT | |||
NRC SECURITY BASELINE INSPECTION REPORT 05000440/2006018(DRS) | |||
Dear Mr. Pearce: | Dear Mr. Pearce: | ||
On May 19, 2006, the US Nuclear Regulatory Commission (NRC) completed a security | On May 19, 2006, the US Nuclear Regulatory Commission (NRC) completed a security | ||
baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of | baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of | ||
the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The | the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The | ||
enclosed inspection report documents the inspection results, which were discussed on May 19, | enclosed inspection report documents the inspection results, which were discussed on May 19, | ||
2006, with you and other members of your staff. | 2006, with you and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and | The inspection examined activities conducted under your license as they relate to security and | ||
compliance with the Commissions rules and regulations and with the conditions of your license. | compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspector reviewed selected procedures and records, observed activities, and interviewed | The inspector reviewed selected procedures and records, observed activities, and interviewed | ||
personnel. | personnel. | ||
| Line 40: | Line 45: | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | ||
available electronically for public inspection in the NRC Public Document Room or from the | available electronically for public inspection in the NRC Public Document Room or from the | ||
Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS | Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS | ||
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public | is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public | ||
EXEMPT FROM PUBLIC DISCLOSURE | |||
May be exempt from public release under the Freedom of | |||
Information Act (5 U.S.C. 552) | |||
Exemption number: 5 | |||
Nuclear Regulatory Commission review required before public | |||
release. | |||
Joseph Maynen, RIII/DRS/PSB | |||
Name and organization of person making determination. | |||
Date of determination: 05/25/06 | |||
OFFICIAL USE ONLY | |||
L. Pearce | OFFICIAL USE ONLY | ||
Electronic Reading Room). However, because of the security-related concerns contained in the | Enclosure Contains Sensitive Unclassified | ||
Non-Safeguards Information. Upon | |||
separation, this page is decontrolled. | |||
L. Pearce | |||
-2- | |||
Electronic Reading Room). However, because of the security-related concerns contained in the | |||
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be | enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be | ||
available for public inspection. | available for public inspection. | ||
Should you have any questions concerning this inspection, we will be pleased to discuss them | Should you have any questions concerning this inspection, we will be pleased to discuss them | ||
with you. | with you. | ||
Sincerely, | |||
/RA by T. Madeda acting for/ | |||
Kenneth Riemer, Chief | |||
Plant Support Branch | |||
Division of Reactor Safety | |||
Docket No. 50-440 | Docket No. 50-440 | ||
License No. NPF-58 | License No. NPF-58 | ||
Enclosure: | Enclosure: | ||
Inspection Report 05000440/2006018(DRS) | |||
cc w/encl: | w/Attachment: Supplemental Information | ||
cc w/encl: | |||
B. Westreich (NSIR/DNS) | |||
NSIR/DNS/RSS/Licensing Assistant | |||
Ohio State Liaison Officer | |||
OFFICIAL USE ONLY | |||
L. Pearce | OFFICIAL USE ONLY | ||
Electronic Reading Room). However, because of the security-related concerns contained in the | Enclosure Contains Sensitive Unclassified | ||
Non-Safeguards Information. Upon | |||
separation, this page is decontrolled. | |||
L. Pearce | |||
-2- | |||
Electronic Reading Room). However, because of the security-related concerns contained in the | |||
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be | enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be | ||
available for public inspection. | available for public inspection. | ||
Should you have any questions concerning this inspection, we will be pleased to discuss them | Should you have any questions concerning this inspection, we will be pleased to discuss them | ||
with you. | with you. | ||
Sincerely, | |||
/RA by T. Madeda acting for/ | |||
Kenneth Riemer, Chief | |||
Plant Support Branch | |||
Division of Reactor Safety | |||
Docket No. 50-440 | Docket No. 50-440 | ||
License No. NPF-58 | License No. NPF-58 | ||
Enclosure: | Enclosure: | ||
Inspection Report 05000440/2006018(DRS) | |||
cc w/encl: | w/Attachment: Supplemental Information | ||
cc w/encl: | |||
B. Westreich (NSIR/DNS) | |||
NSIR/DNS/RSS/Licensing Assistant | |||
Ohio State Liaison Officer | |||
DOCUMENT NAME: E:\\Filenet\\ML061660295.wpd | |||
DOCUMENT NAME: E:\Filenet\ML061660295.wpd | G Publicly Available | ||
G Publicly Available | G Non-Publicly Available | ||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | G Sensitive | ||
G Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII | |||
RIII | |||
RIII | |||
NAME | |||
JMaynen:co | |||
EDuncan | |||
KRiemer | |||
DATE | |||
06/06/06 | |||
06/13/06 | |||
06/13/06 | |||
OFFICIAL RECORD COPY | |||
OFFICIAL USE ONLY | |||
L. Pearce | OFFICIAL USE ONLY | ||
cc w/o encl: G. Leidich, President - FENOC | Enclosure Contains Sensitive Unclassified | ||
Non-Safeguards Information. Upon | |||
separation, this page is decontrolled. | |||
L. Pearce | |||
-3- | |||
cc w/o encl: | |||
G. Leidich, President - FENOC | |||
J. Hagan, Chief Operating Officer, FENOC | |||
D. Pace, Senior Vice President Engineering and Services, FENOC | |||
Director, Site Operations | |||
Director, Regulatory Affairs | |||
M. Wayland, Director, Maintenance Department | |||
Manager, Regulatory Compliance | |||
G. Halnon, Director, Performance Improvement | |||
J. Shaw, Director, Engineering Department | |||
D. Jenkins, Attorney, FirstEnergy | |||
Public Utilities Commission of Ohio | |||
R. Owen, Ohio Department of Health | |||
OFFICIAL USE ONLY | |||
L. Pearce | OFFICIAL USE ONLY | ||
Enclosure Contains Sensitive Unclassified | |||
Non-Safeguards Information. Upon | |||
separation, this page is decontrolled. | |||
L. Pearce | |||
-4- | |||
ADAMS Distribution: | ADAMS Distribution: | ||
DXC1 | DXC1 | ||
| Line 140: | Line 167: | ||
LSL (electronic IRs only) | LSL (electronic IRs only) | ||
C. Pederson, DRS (hard copy - IRs only) | C. Pederson, DRS (hard copy - IRs only) | ||
DRPIII | DRPIII | ||
DRSIII | DRSIII | ||
PLB1 | PLB1 | ||
JRK1 | JRK1 | ||
ROPreports@nrc.gov | ROPreports@nrc.gov | ||
}} | }} | ||
Latest revision as of 08:28, 15 January 2025
| ML061660295 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/13/2006 |
| From: | Kenneth Riemer Plant Support Branch II |
| To: | Pearce L FirstEnergy Nuclear Operating Co |
| References | |
| IR-06-018 | |
| Download: ML061660295 (5) | |
See also: IR 05000440/2006018
Text
OFFICIAL USE ONLY
Enclosure Contains Sensitive Unclassified
Non-Safeguards Information. Upon
separation, this page is decontrolled.
OFFICIAL USE ONLY
June 13, 2006
Mr. L. William Pearce
Vice President
FirstEnergy Nuclear Operating Company
Perry Nuclear Power Plant
10 Center Road, A290
Perry, OH 44081
SUBJECT:
PERRY NUCLEAR POWER PLANT
NRC SECURITY BASELINE INSPECTION REPORT 05000440/2006018(DRS)
Dear Mr. Pearce:
On May 19, 2006, the US Nuclear Regulatory Commission (NRC) completed a security
baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of
the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The
enclosed inspection report documents the inspection results, which were discussed on May 19,
2006, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed
personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
EXEMPT FROM PUBLIC DISCLOSURE
May be exempt from public release under the Freedom of
Information Act (5 U.S.C. 552)
Exemption number: 5
Nuclear Regulatory Commission review required before public
release.
Joseph Maynen, RIII/DRS/PSB
Name and organization of person making determination.
Date of determination: 05/25/06
OFFICIAL USE ONLY
OFFICIAL USE ONLY
Enclosure Contains Sensitive Unclassified
Non-Safeguards Information. Upon
separation, this page is decontrolled.
L. Pearce
-2-
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be
available for public inspection.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
/RA by T. Madeda acting for/
Kenneth Riemer, Chief
Plant Support Branch
Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure:
Inspection Report 05000440/2006018(DRS)
w/Attachment: Supplemental Information
cc w/encl:
B. Westreich (NSIR/DNS)
NSIR/DNS/RSS/Licensing Assistant
Ohio State Liaison Officer
OFFICIAL USE ONLY
OFFICIAL USE ONLY
Enclosure Contains Sensitive Unclassified
Non-Safeguards Information. Upon
separation, this page is decontrolled.
L. Pearce
-2-
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be
available for public inspection.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
/RA by T. Madeda acting for/
Kenneth Riemer, Chief
Plant Support Branch
Division of Reactor Safety
Docket No. 50-440
License No. NPF-58
Enclosure:
Inspection Report 05000440/2006018(DRS)
w/Attachment: Supplemental Information
cc w/encl:
B. Westreich (NSIR/DNS)
NSIR/DNS/RSS/Licensing Assistant
Ohio State Liaison Officer
DOCUMENT NAME: E:\\Filenet\\ML061660295.wpd
G Publicly Available
G Non-Publicly Available
G Sensitive
G Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII
RIII
RIII
NAME
JMaynen:co
EDuncan
KRiemer
DATE
06/06/06
06/13/06
06/13/06
OFFICIAL RECORD COPY
OFFICIAL USE ONLY
OFFICIAL USE ONLY
Enclosure Contains Sensitive Unclassified
Non-Safeguards Information. Upon
separation, this page is decontrolled.
L. Pearce
-3-
cc w/o encl:
G. Leidich, President - FENOC
J. Hagan, Chief Operating Officer, FENOC
D. Pace, Senior Vice President Engineering and Services, FENOC
Director, Site Operations
Director, Regulatory Affairs
M. Wayland, Director, Maintenance Department
Manager, Regulatory Compliance
G. Halnon, Director, Performance Improvement
J. Shaw, Director, Engineering Department
D. Jenkins, Attorney, FirstEnergy
Public Utilities Commission of Ohio
R. Owen, Ohio Department of Health
OFFICIAL USE ONLY
OFFICIAL USE ONLY
Enclosure Contains Sensitive Unclassified
Non-Safeguards Information. Upon
separation, this page is decontrolled.
L. Pearce
-4-
ADAMS Distribution:
DXC1
SJC4
RidsNrrDirsIrib
GEG
KGO
RJP
CAA1
LSL (electronic IRs only)
C. Pederson, DRS (hard copy - IRs only)
DRPIII
DRSIII
PLB1
JRK1