ML061780291: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SJamis;Noce,- FW: Scan from' a Xerox WorkCentre Pro         ..                                                          Page 1 From:               "Croulet, Donald" <dcroule@entergy.com>
{{#Wiki_filter:SJamis;Noce,- FW: Scan from' a Xerox WorkCentre Pro Page 1 From:  
To:                 "'James Noggle"' <JDN@nrc.gov>
"Croulet, Donald" <dcroule@entergy.com>
Date:               2/16/06 9:40AM
To:  
"'James Noggle"' <JDN@nrc.gov>
Date:
2/16/06 9:40AM


==Subject:==
==Subject:==
FW: Scan from a Xerox WorkCentre Pro Jim, Attached is the installation drawing for specific monitoring wells. Please note Detail 3 for monitoring well MW-36. The well cover being at 12 foot elevation and drilled to a depth of -42 foot elevation. Therefore, the status sheet showing sample drawn at 53 foot would be at the -41 foot elevation. This well is a multiple well with three sampling points: 26 foot (-14 foot elevation), 41 foot (-29 foot elevation), and 53 foot (-41 foot elevation). It is my understanding these locations are outside the discharge canal but at the top, side, and bottom in the vertical plane. I hope this helps.
FW: Scan from a Xerox WorkCentre Pro
          ----- Original Message -----
: Jim, Attached is the installation drawing for specific monitoring wells. Please note Detail 3 for monitoring well MW-36. The well cover being at 12 foot elevation and drilled to a depth of -42 foot elevation. Therefore, the status sheet showing sample drawn at 53 foot would be at the -41 foot elevation. This well is a multiple well with three sampling points: 26 foot (-14 foot elevation), 41 foot (-29 foot elevation), and 53 foot (-41 foot elevation). It is my understanding these locations are outside the discharge canal but at the top, side, and bottom in the vertical plane. I hope this helps.
----- Original Message -----
From: ipc-gsbpr2l5@entergy.com [mailto:ipc-gsbpr2l5@ entergy.com]
From: ipc-gsbpr2l5@entergy.com [mailto:ipc-gsbpr2l5@ entergy.com]
Sent: Thursday, February 16, 2006 1:36 AM To: Croulet, Donald
Sent: Thursday, February 16, 2006 1:36 AM To: Croulet, Donald
Line 31: Line 35:


i
i
        @CXO.L tSUt ILL^`
@CXO.L IL tSUt L^`
:1.)
DEAI 2
RW!
In 5
NOTES
NOTES
: 1. FOR *ONWORING   WELLLOCATIONS SEE 0Dw. 400937 (DRN-CS-059*5) 27272]
: 1. FOR *ONWORING WELL LOCATIONS SEE 0Dw. 400937 (DRN-CS-059*5) 27272]
:1.)
DOEAIL I
DEAI 2  RW!
REFERENCE DRAWINGS 400937 - IP2 GROUND WATER S*MPLING SOT[ MENOTCRIO WELL LCCAT!CNS DETAIL 3 rra voI~o*
In            -        5 DOEAIL I REFERENCE DRAWINGS DETAIL3  400937 - IP2 GROUND   WATERS*MPLING rra voI~o* IL.           SOT[MENOTCRIO  WELLLCCAT!CNS INSTALLATION
IL.
                                                                      'S-.......o-'Sfl   s.--. ""
INSTALLATION
                                                                        ,-=l-         o
'S-.......o-'Sfl s.--.  
_            -,. I to5 WO G&#xfd;R       0 WATER     &#xfd;SM ING IP2 GROUND           ER SAMPLING MONITOR_ Wt) DETAILS DETAIL 4                                                                       . TRUCTURAL-}}
,-=l-o I
to5 WO G&#xfd;R 0 WATER  
&#xfd;SM ING IP2 GROUND ER SAMPLING MONITOR_ Wt) DETAILS TRUCTURAL-DETAIL 4}}

Latest revision as of 08:16, 15 January 2025

E-mail from D. Croulet of Entergy to J. Noggle of USNRC, Regarding Scan from a Xerox Workcentre Pro
ML061780291
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/16/2006
From: Croulet D
Entergy Corp
To: Noggle J
NRC/RGN-I/DRS/PSB2
References
FOIA/PA-2006-0140
Download: ML061780291 (2)


Text

SJamis;Noce,- FW: Scan from' a Xerox WorkCentre Pro Page 1 From:

"Croulet, Donald" <dcroule@entergy.com>

To:

"'James Noggle"' <JDN@nrc.gov>

Date:

2/16/06 9:40AM

Subject:

FW: Scan from a Xerox WorkCentre Pro

Jim, Attached is the installation drawing for specific monitoring wells. Please note Detail 3 for monitoring well MW-36. The well cover being at 12 foot elevation and drilled to a depth of -42 foot elevation. Therefore, the status sheet showing sample drawn at 53 foot would be at the -41 foot elevation. This well is a multiple well with three sampling points: 26 foot (-14 foot elevation), 41 foot (-29 foot elevation), and 53 foot (-41 foot elevation). It is my understanding these locations are outside the discharge canal but at the top, side, and bottom in the vertical plane. I hope this helps.

Original Message -----

From: ipc-gsbpr2l5@entergy.com entergy.com

Sent: Thursday, February 16, 2006 1:36 AM To: Croulet, Donald

Subject:

Scan from a Xerox WorkCentre Pro Please open the attached document. It was scanned and sent to you using a Xerox WorkCentre Pro.

Number of Images: 1 Attachment File Type: PDF For more information on Xerox products and solutions, please visit http://www.xerox.com

i

@CXO.L IL tSUt L^`

1.)

DEAI 2

RW!

In 5

NOTES

1. FOR *ONWORING WELL LOCATIONS SEE 0Dw. 400937 (DRN-CS-059*5) 27272]

DOEAIL I

REFERENCE DRAWINGS 400937 - IP2 GROUND WATER S*MPLING SOT[ MENOTCRIO WELL LCCAT!CNS DETAIL 3 rra voI~o*

IL.

INSTALLATION

'S-.......o-'Sfl s.--.

,-=l-o I

to5 WO GýR 0 WATER

ýSM ING IP2 GROUND ER SAMPLING MONITOR_ Wt) DETAILS TRUCTURAL-DETAIL 4