ML070450092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 22: Line 22:


==SUMMARY==
==SUMMARY==
  - MEETING CATEGORY 1 - MEETING BETWEEN NRC AND TVA- SEQUOYAH NUCLEAR PLANT, DOCKET NOS.
  - MEETING CATEGORY 1 - MEETING BETWEEN NRC AND TVA-SEQUOYAH NUCLEAR PLANT, DOCKET NOS.
50-327 AND 50-328
50-327 AND 50-328


==Dear Mr. Singer:==
==Dear Mr. Singer:==
This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia, on February 13, 2007, at 1:00 PM. The purpose of the meeting was to discuss Sequoyah Nuclear Plants overall plant performance, learning initiatives, outage performance, equipment reliability, upcoming projects, and Institute of Nuclear Power Operations (INPO) evaluation results. Enclosed are a list of attendees and the presentation handout used by your staff.
This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia, on February 13, 2007, at 1:00 PM. The purpose of the meeting was to discuss Sequoyah Nuclear Plants overall plant performance, learning initiatives, outage performance, equipment reliability, upcoming projects, and Institute of Nuclear Power Operations (INPO) evaluation results. Enclosed are a list of attendees and the presentation handout used by your staff.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 562-4550.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 562-4550.
Sincerely,
Sincerely,
                                                /RA/
/RA/
Malcolm T. Widmann, Chief Reactor Projects Branch 6 Division of Reactor Projects
Malcolm T. Widmann, Chief Reactor Projects Branch 6 Division of Reactor Projects


Line 39: Line 38:


_Package ML070450089 Memo ML070450092__
_Package ML070450089 Memo ML070450092__
OFFICE           RII:DRP       RII:DRP SIGNATURE         TXN /RA/       MTW /RA/
OFFICE RII:DRP RII:DRP SIGNATURE TXN /RA/
NAME             TNazario       MWidmann DATE                 02/13/2007     02/14/2007 E-MAIL COPY?         YES     NO   YES       NO   YES     NO     YES   NO     YES   NO   YES   NO   YES NO
MTW /RA/
NAME TNazario MWidmann DATE 02/13/2007 02/14/2007 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO  


2 cc w/encls.:                         Robert H. Bryan, Jr., General Manager Ashok S. Bhatnagar                   Licensing and Industry Affairs Senior Vice President               Sequoyah Nuclear Plant Nuclear Operations                   Tennessee Valley Authority Tennessee Valley Authority          4X Blue Ridge Electronic Mail Distribution         1101 Market Street Chattanooga, TN 37402-2801 Preston D. Swafford Senior Vice President               David A. Kulisek, Plant Manager Nuclear Support                     Sequoyah Nuclear Plant Tennessee Valley Authority          Tennessee Valley Authority Electronic Mail Distribution        Electronic Mail Distribution Larry S. Bryant, Vice President     Lawrence E. Nanney, Director Nuclear Engineering &               TN Dept. of Environment & Conservation Technical Services                   Division of Radiological Health Tennessee Valley Authority           Electronic Mail Distribution Electronic Mail Distribution County Mayor Randy Douet                         Hamilton County Courthouse Site Vice President                 Chattanooga, TN 37402-2801 Sequoyah Nuclear Plant Electronic Mail Distribution         Ann Harris 341 Swing Loop General Counsel                     Rockwood, TN 37854 Tennessee Valley Authority Electronic Mail Distribution         James H. Bassham, Director Tennessee Emergency Management John C. Fornicola, General Manager   Agency Nuclear Assurance                   Electronic Mail Distribution Tennessee Valley Authority Electronic Mail Distribution         Distribution w/encl: (See page 3)
2 cc w/encls.:
Glenn W. Morris, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801
Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Senior Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Vice President Nuclear Engineering &
Technical Services Tennessee Valley Authority Electronic Mail Distribution Randy Douet Site Vice President Sequoyah Nuclear Plant Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Glenn W. Morris, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Robert H. Bryan, Jr., General Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 David A. Kulisek, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Ann Harris 341 Swing Loop Rockwood, TN 37854 James H. Bassham, Director Tennessee Emergency Management Agency Electronic Mail Distribution Distribution w/encl: (See page 3)


3 Meeting Summary to Karl W. Singer from Malcolm Widmann dated February 14, 2007.
3 Meeting Summary to Karl W. Singer from Malcolm Widmann dated February 14, 2007.
Line 51: Line 53:


==SUMMARY==
==SUMMARY==
  - MEETING CATEGORY 1 - MEETING BETWEEN NRC AND TVA- SEQUOYAH NUCLEAR PLANT, DOCKET NOS.
  - MEETING CATEGORY 1 - MEETING BETWEEN NRC AND TVA-SEQUOYAH NUCLEAR PLANT, DOCKET NOS.
50-327 AND 50-328 Distribution w/encl:
50-327 AND 50-328 Distribution w/encl:
B. Pascarelli, NRR B. Moroney, NRR C. Evans L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC
B. Pascarelli, NRR B. Moroney, NRR C. Evans L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC List of Attendees MEETING BETWEEN NRC AND TVA-SEQUOYAH NUCLEAR PLANT Nuclear Regulatory Commission (NRC)
 
C. Casto, Director, Division of Reactor Projects (DRP), RII S. Freeman, Senior Reactor Inspector, DRP, RII J. Shea, Director, Division of Reactor Safety, RII W. Travers, Regional Administrator, RII M. Widmann, Chief, Reactor Projects Branch 6, DRP, RII Sequoyah R. Douet, Sequoyah Site Vice President B. Dungan, Sequoyah Outage and Scheduling Manager K. Jones, Sequoyah Engineering Manager D. Kulisek, Sequoyah Plant Manager G. Morris, Sequoyah Licensing and Industry Affairs Manager M. Palmer, Sequoyah Operation Manager Other NRC Attendees T. Nazario, Project Engineer, DRP, RII S. Sandall, Project Engineer, DRP, RII}}
List of Attendees MEETING BETWEEN NRC AND TVA- SEQUOYAH NUCLEAR PLANT Nuclear Regulatory Commission (NRC)
C. Casto, Director, Division of Reactor Projects (DRP), RII S. Freeman, Senior Reactor Inspector, DRP, RII J. Shea, Director, Division of Reactor Safety, RII W. Travers, Regional Administrator, RII M. Widmann, Chief, Reactor Projects Branch 6, DRP, RII Sequoyah R. Douet, Sequoyah Site Vice President B. Dungan, Sequoyah Outage and Scheduling Manager K. Jones, Sequoyah Engineering Manager D. Kulisek, Sequoyah Plant Manager G. Morris, Sequoyah Licensing and Industry Affairs Manager M. Palmer, Sequoyah Operation Manager Other NRC Attendees T. Nazario, Project Engineer, DRP, RII S. Sandall, Project Engineer, DRP, RII Enclosure 1}}

Latest revision as of 03:14, 15 January 2025

Meeting Summary Memo Betweem NRC and TVA - Sequoyah Nuclear Plant
ML070450092
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/14/2007
From: Widmann M
Division of Nuclear Materials Safety II
To: Singer K
Tennessee Valley Authority
Shared Package
ML070450089 List:
References
Download: ML070450092 (5)


Text

February 14, 2007 Tennessee Valley Authority ATTN: Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- MEETING CATEGORY 1 - MEETING BETWEEN NRC AND TVA-SEQUOYAH NUCLEAR PLANT, DOCKET NOS.

50-327 AND 50-328

Dear Mr. Singer:

This refers to the meeting conducted at your staffs request at the Region II Office in Atlanta, Georgia, on February 13, 2007, at 1:00 PM. The purpose of the meeting was to discuss Sequoyah Nuclear Plants overall plant performance, learning initiatives, outage performance, equipment reliability, upcoming projects, and Institute of Nuclear Power Operations (INPO) evaluation results. Enclosed are a list of attendees and the presentation handout used by your staff.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact me at (404) 562-4550.

Sincerely,

/RA/

Malcolm T. Widmann, Chief Reactor Projects Branch 6 Division of Reactor Projects

Enclosures:

1. List of Attendees
2. Handout - Sequoyah Nuclear Plant - Plant Performance Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 cc w/encls: (See page 2)

_Package ML070450089 Memo ML070450092__

OFFICE RII:DRP RII:DRP SIGNATURE TXN /RA/

MTW /RA/

NAME TNazario MWidmann DATE 02/13/2007 02/14/2007 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

2 cc w/encls.:

Ashok S. Bhatnagar Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution Preston D. Swafford Senior Vice President Nuclear Support Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Vice President Nuclear Engineering &

Technical Services Tennessee Valley Authority Electronic Mail Distribution Randy Douet Site Vice President Sequoyah Nuclear Plant Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Glenn W. Morris, Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Robert H. Bryan, Jr., General Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 David A. Kulisek, Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution County Mayor Hamilton County Courthouse Chattanooga, TN 37402-2801 Ann Harris 341 Swing Loop Rockwood, TN 37854 James H. Bassham, Director Tennessee Emergency Management Agency Electronic Mail Distribution Distribution w/encl: (See page 3)

3 Meeting Summary to Karl W. Singer from Malcolm Widmann dated February 14, 2007.

SUBJECT:

PUBLIC MEETING

SUMMARY

- MEETING CATEGORY 1 - MEETING BETWEEN NRC AND TVA-SEQUOYAH NUCLEAR PLANT, DOCKET NOS.

50-327 AND 50-328 Distribution w/encl:

B. Pascarelli, NRR B. Moroney, NRR C. Evans L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC List of Attendees MEETING BETWEEN NRC AND TVA-SEQUOYAH NUCLEAR PLANT Nuclear Regulatory Commission (NRC)

C. Casto, Director, Division of Reactor Projects (DRP), RII S. Freeman, Senior Reactor Inspector, DRP, RII J. Shea, Director, Division of Reactor Safety, RII W. Travers, Regional Administrator, RII M. Widmann, Chief, Reactor Projects Branch 6, DRP, RII Sequoyah R. Douet, Sequoyah Site Vice President B. Dungan, Sequoyah Outage and Scheduling Manager K. Jones, Sequoyah Engineering Manager D. Kulisek, Sequoyah Plant Manager G. Morris, Sequoyah Licensing and Industry Affairs Manager M. Palmer, Sequoyah Operation Manager Other NRC Attendees T. Nazario, Project Engineer, DRP, RII S. Sandall, Project Engineer, DRP, RII