{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                                          June 29, 2007
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
June 29, 2007
EA-07-147
EA-07-147
Richard M. Rosenblum
Richard M. Rosenblum
Line 26: Line 27:
San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station
P.O. Box 128
P.O. Box 128
San Clemente, CA 92674-0128
San Clemente, CA 92674-0128
SUBJECT:       SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
SUBJECT:
                SECURITY IN-OFFICE INSPECTION REPORT 05000361/2007404;
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -
                5000362/2007404; OFFICE OF INVESTIGATION REPORT 4-2006-039; AND
SECURITY IN-OFFICE INSPECTION REPORT 05000361/2007404;
                NOTICE OF VIOLATION
5000362/2007404; OFFICE OF INVESTIGATION REPORT 4-2006-039; AND
NOTICE OF VIOLATION  
Dear Mr. Rosenblum:
Dear Mr. Rosenblum:
This refers to the in-office inspection conducted to review the results of NRC's Office of
This refers to the in-office inspection conducted to review the results of NRC's Office of
Investigation Report 4-206-0039 regarding your San Onofre Nuclear Generating Station.
Investigation Report 4-206-0039 regarding your San Onofre Nuclear Generating Station.  
Specifically, the purpose of the inspection and investigation was to review the circumstances
Specifically, the purpose of the inspection and investigation was to review the circumstances
related to a security event that occurred between March 18 and 27, 2006. The enclosed report
related to a security event that occurred between March 18 and 27, 2006. The enclosed report
presents the results of this inspection, which were discussed on June 18, 2007, with B. Katz,
presents the results of this inspection, which were discussed on June 18, 2007, with B. Katz,
Vice President, Nuclear Oversight and Regulatory Affairs, and other members of your staff.
Vice President, Nuclear Oversight and Regulatory Affairs, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and
The inspection examined activities conducted under your license as they relate to security and
compliance with the Commission's rules and regulations and with the conditions of your license.
compliance with the Commission's rules and regulations and with the conditions of your license.  
Based on the results of the inspection and investigation, the NRC has determined that two
Based on the results of the inspection and investigation, the NRC has determined that two
violations of NRC requirements were identified. The NRC has also concluded that the findings
violations of NRC requirements were identified. The NRC has also concluded that the findings
were both NRC identified. The violations were evaluated in accordance with the NRC
were both NRC identified. The violations were evaluated in accordance with the NRC
Enforcement Policy, which can be found on the NRC's Web site at www.nrc.gov, select About
Enforcement Policy, which can be found on the NRC's Web site at www.nrc.gov, select About
NRC, then How we regulate, and Enforcement. The first violation is being cited in the
NRC, then How we regulate, and Enforcement. The first violation is being cited in the
enclosed Notice of Violation (Notice). The security significance of this violation would normally
enclosed Notice of Violation (Notice). The security significance of this violation would normally
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Southern California Edison Co.
Southern California Edison Co.                    -2-
-2-
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
be minor; however, the violation was categorized at Severity Level IV because willfulness was
be minor; however, the violation was categorized at Severity Level IV because willfulness was
involved. In addition, this violation is being cited in the Notice because willfulness was involved
involved. In addition, this violation is being cited in the Notice because willfulness was involved
on the part of a licensee official and it was not licensee-identified (See Section VI.A.1.d of the
on the part of a licensee official and it was not licensee-identified (See Section VI.A.1.d of the
NRC Enforcement Policy).
NRC Enforcement Policy).
The second violation has been categorized at Severity Level IV because it could not be
The second violation has been categorized at Severity Level IV because it could not be
evaluated under the significance determination process. The second violation involved your
evaluated under the significance determination process. The second violation involved your
staffs failure to provide accurate information related to the circumstances involved with the first
staffs failure to provide accurate information related to the circumstances involved with the first
violation. The NRC is treating this second violation as a noncited violation consistent with
violation. The NRC is treating this second violation as a noncited violation consistent with
Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of
Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of
the violation and because it was entered into your corrective action program. If you contest this
the violation and because it was entered into your corrective action program. If you contest this
noncited violation, you should provide a response within 30 days of the date of this inspection
noncited violation, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document
report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document
Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region
Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region
IV; the Director, Office of Enforcement, US Nuclear Regulatory Commission, Washington, DC
IV; the Director, Office of Enforcement, US Nuclear Regulatory Commission, Washington, DC
20555-0001; and the NRC Resident Inspector at the San Onofre Nuclear Generating Station.
20555-0001; and the NRC Resident Inspector at the San Onofre Nuclear Generating Station.  
You are required to respond to the Notice in this letter and should follow the instructions
You are required to respond to the Notice in this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. The NRC will use your
specified in the enclosed Notice when preparing your response. The NRC will use your
response, in part, to determine whether further enforcement action is necessary to ensure
response, in part, to determine whether further enforcement action is necessary to ensure
compliance with regulatory requirements.
compliance with regulatory requirements.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public document Room or from the
available electronically for public inspection in the NRC Public document Room or from the
Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS
Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room). However, because of the security-related concerns contained in the
Electronic Reading Room). However, because of the security-related concerns contained in the
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be
enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be
available for public inspection.
available for public inspection.
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Southern California Edison Co.
Southern California Edison Co.                  -3-
-3-
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
In accordance with 10 CFR 2390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
In accordance with 10 CFR 2390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response, if any. This practice will ensure that your response will not be made available
response, if any. This practice will ensure that your response will not be made available
electronically for public inspection in the NRC Public document Room or from the NRC's
electronically for public inspection in the NRC Public document Room or from the NRC's
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
document system, ADAMS. If Safeguards Information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark
your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow
your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow
the instructions for withholding in 10 CFR 2.390(b)(1).
the instructions for withholding in 10 CFR 2.390(b)(1).
                                              Sincerely,
Sincerely,  
                                                      /RA/
/RA/
                                              Michael P. Shannon, Chief
Michael P. Shannon, Chief
                                              Plant Support Branch
Plant Support Branch
                                              Division of Reactor Safety
Division of Reactor Safety
Docket Nos.: 50-361, 50-362
Docket Nos.: 50-361, 50-362
License Nos.: NPF-10, NPF-15
License Nos.: NPF-10, NPF-15
Enclosure:
Enclosure:
NRC Inspection Report 05000361 and
NRC Inspection Report 05000361 and  
   05000362/2007404
   05000362/2007404  
   w/Attachment: Supplemental Information
   w/Attachment: Supplemental Information  
cc w/o enclosure:
cc w/o enclosure:
Ray W. Waldo
Ray W. Waldo
Line 103: Line 107:
San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station
P.O. Box 128
P.O. Box 128
San Clemente, CA 92674-0128
San Clemente, CA 92674-0128
James T. Reilly
James T. Reilly
Southern California Edison Company
Southern California Edison Company
San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station
P.O. Box 128
P.O. Box 128
San Clemente, CA 92674-0128
San Clemente, CA 92674-0128
        OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Southern California Edison Co.
Southern California Edison Co.        -4-
-4-
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Daniel P. Breig
Daniel P. Breig
Southern California Edison Company
Southern California Edison Company
San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station
P.O. Box 128
P.O. Box 128
San Clemente, CA 92674-0128
San Clemente, CA 92674-0128
A. Edward Scherer
A. Edward Scherer
Southern California Edison Company
Southern California Edison Company
San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station
P.O. Box 128
P.O. Box 128
San Clemente, CA 92674-0128
San Clemente, CA 92674-0128
Brian Katz
Brian Katz
Southern California Edison Company
Southern California Edison Company
San Onofre Nuclear Generating Station
San Onofre Nuclear Generating Station
P.O. Box 128
P.O. Box 128
San Clemente, CA 92674-0128
San Clemente, CA 92674-0128
      OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
}}
}}

Latest revision as of 23:04, 14 January 2025

Security In-Office Inspection Report 05000361-07-404; 5000362-07-404; Office of Investigation Report 4-2006-039; and Notice of Violation
ML071800532
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/29/2007
From: Shannon M
Plant Support Branch Region IV
To: Rosenblum R
Southern California Edison Co
References
4-2006-039, IR-07-404
Download: ML071800532 (4)


See also: IR 05000361/2007404

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

June 29, 2007

EA-07-147

Richard M. Rosenblum

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 -

SECURITY IN-OFFICE INSPECTION REPORT 05000361/2007404;

5000362/2007404; OFFICE OF INVESTIGATION REPORT 4-2006-039; AND

NOTICE OF VIOLATION

Dear Mr. Rosenblum:

This refers to the in-office inspection conducted to review the results of NRC's Office of

Investigation Report 4-206-0039 regarding your San Onofre Nuclear Generating Station.

Specifically, the purpose of the inspection and investigation was to review the circumstances

related to a security event that occurred between March 18 and 27, 2006. The enclosed report

presents the results of this inspection, which were discussed on June 18, 2007, with B. Katz,

Vice President, Nuclear Oversight and Regulatory Affairs, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and

compliance with the Commission's rules and regulations and with the conditions of your license.

Based on the results of the inspection and investigation, the NRC has determined that two

violations of NRC requirements were identified. The NRC has also concluded that the findings

were both NRC identified. The violations were evaluated in accordance with the NRC

Enforcement Policy, which can be found on the NRC's Web site at www.nrc.gov, select About

NRC, then How we regulate, and Enforcement. The first violation is being cited in the

enclosed Notice of Violation (Notice). The security significance of this violation would normally

Southern California Edison Co.

-2-

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

be minor; however, the violation was categorized at Severity Level IV because willfulness was

involved. In addition, this violation is being cited in the Notice because willfulness was involved

on the part of a licensee official and it was not licensee-identified (See Section VI.A.1.d of the

NRC Enforcement Policy).

The second violation has been categorized at Severity Level IV because it could not be

evaluated under the significance determination process. The second violation involved your

staffs failure to provide accurate information related to the circumstances involved with the first

violation. The NRC is treating this second violation as a noncited violation consistent with

Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of

the violation and because it was entered into your corrective action program. If you contest this

noncited violation, you should provide a response within 30 days of the date of this inspection

report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document

Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region

IV; the Director, Office of Enforcement, US Nuclear Regulatory Commission, Washington, DC

20555-0001; and the NRC Resident Inspector at the San Onofre Nuclear Generating Station.

You are required to respond to the Notice in this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. The NRC will use your

response, in part, to determine whether further enforcement action is necessary to ensure

compliance with regulatory requirements.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public document Room or from the

Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS

is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room). However, because of the security-related concerns contained in the

enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be

available for public inspection.

Southern California Edison Co.

-3-

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

In accordance with 10 CFR 2390(b)(1)(ii), the NRC is waiving the affidavit requirements for your

response, if any. This practice will ensure that your response will not be made available

electronically for public inspection in the NRC Public document Room or from the NRC's

document system, ADAMS. If Safeguards Information is necessary to provide an acceptable

response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow

the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 50-361, 50-362

License Nos.: NPF-10, NPF-15

Enclosure:

NRC Inspection Report 05000361 and

05000362/2007404

w/Attachment: Supplemental Information

cc w/o enclosure:

Ray W. Waldo

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

James T. Reilly

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Southern California Edison Co.

-4-

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Daniel P. Breig

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

A. Edward Scherer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Brian Katz

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128