| title = Summary of June 27, 2007, Public Meeting Regarding Fenoc'S Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event
| title = Summary of June 27, 2007, Public Meeting Regarding FENOCs Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event
| author name = Wengert T
| author name = Wengert T
| author affiliation = NRC/NRR/ADRO/DORL/LPLA
| author affiliation = NRC/NRR/ADRO/DORL/LPLA
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:August 7, 2007 LICENSEE:       FirstEnergy Nuclear Operating Company (FENOC)
{{#Wiki_filter:August 7, 2007 LICENSEE:
FACILITIES: Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1
FirstEnergy Nuclear Operating Company (FENOC)
FACILITIES:
Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF JUNE 27, 2007, PUBLIC MEETING REGARDING FENOCS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT On June 27, 2007, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) senior staff and representatives of FirstEnergy Nuclear Operating Company (FENOC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss FENOCs June 13, 2007, response to the NRCs May 14, 2007, Demand for Information (DFI) concerning FENOCs re-analysis of the time line and root causes for the 2002 Davis-Besse reactor pressure vessel head degradation event.
OF JUNE 27, 2007, PUBLIC MEETING REGARDING FENOCS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT On June 27, 2007, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) senior staff and representatives of FirstEnergy Nuclear Operating Company (FENOC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss FENOCs June 13, 2007, response to the NRCs May 14, 2007, Demand for Information (DFI) concerning FENOCs re-analysis of the time line and root causes for the 2002 Davis-Besse reactor pressure vessel head degradation event.
Line 29: Line 30:
ML071240254, ML071340333, ML071340325, ML071640480, and ML071710346.
ML071240254, ML071340333, ML071340325, ML071640480, and ML071710346.
The NRC senior staff opened the meeting by stating the purposes of the meeting, as follows:
The NRC senior staff opened the meeting by stating the purposes of the meeting, as follows:
(1)     To discuss FENOCs response to the NRCs May 14, 2007, Demand For Information (DFI). Specifically, to understand the timing of FENOCs review of the Exponent Report, and the factors FENOC considered when determining if the conclusions of the report should be communicated to the NRC.
(1)
(2)     To understand what lessons FENOC learned when they were preparing the response to the DFI, and what actions FENOC has taken and plans to take to address these lessons learned.
To discuss FENOCs response to the NRCs May 14, 2007, Demand For Information (DFI). Specifically, to understand the timing of FENOCs review of the Exponent Report, and the factors FENOC considered when determining if the conclusions of the report should be communicated to the NRC.
 
(2)
(3)     To understand FENOCs position regarding a second contracted report that was prepared for FENOC entitled, Report on Reactor Pressure Vessel Wastage at the Davis-Besse Nuclear Power Plant, dated December 2006 (Mattson Report).
To understand what lessons FENOC learned when they were preparing the response to the DFI, and what actions FENOC has taken and plans to take to address these lessons learned.
(3)
To understand FENOCs position regarding a second contracted report that was prepared for FENOC entitled, Report on Reactor Pressure Vessel Wastage at the Davis-Besse Nuclear Power Plant, dated December 2006 (Mattson Report).
The NRC also provided some background on the events that led to the NRCs issuance of the DFI and the public meeting. A summary of the background is contained in the DFI document found in ADAMS under Accession No. ML071340333.
The NRC also provided some background on the events that led to the NRCs issuance of the DFI and the public meeting. A summary of the background is contained in the DFI document found in ADAMS under Accession No. ML071340333.
The licensees presentation to the NRC senior staff addressed the three elements of the NRCs May 14, 2007, DFI. The presentation included a description of the time line of events from when FENOC received the Exponent and Mattson Reports in December 2006, to FENOCs June 13, 2007, DFI response; FENOCs initial consideration of the Exponent Report; FENOCs consideration of the NRCs April 2, 2007, request for information, and their May 2, 2007, response; a summary of FENOCs analysis of the Exponent and Mattson Reports, and the differences noted between the Exponent Report and the root cause reports; and identification of commitments FENOC intends to make to address the issues raised during their review of the Exponent and Mattson Reports.
The licensees presentation to the NRC senior staff addressed the three elements of the NRCs May 14, 2007, DFI. The presentation included a description of the time line of events from when FENOC received the Exponent and Mattson Reports in December 2006, to FENOCs June 13, 2007, DFI response; FENOCs initial consideration of the Exponent Report; FENOCs consideration of the NRCs April 2, 2007, request for information, and their May 2, 2007, response; a summary of FENOCs analysis of the Exponent and Mattson Reports, and the differences noted between the Exponent Report and the root cause reports; and identification of commitments FENOC intends to make to address the issues raised during their review of the Exponent and Mattson Reports.
Line 42: Line 45:
One Public Meeting Feedback form was received following the meeting, which consisted of the following:
One Public Meeting Feedback form was received following the meeting, which consisted of the following:
As indicated on the June 13th meeting notice, meeting categories are defined in a document dated May 28, 2002, in the Federal Register. Why doesnt it also refer to an ADAMS document, like the May 21, 2002, Policy Statement (Accession No. ML021350492) such that a person can stay within the NRC document system instead of having to refer to an outside document system, in order to find the information about the meeting categories?
As indicated on the June 13th meeting notice, meeting categories are defined in a document dated May 28, 2002, in the Federal Register. Why doesnt it also refer to an ADAMS document, like the May 21, 2002, Policy Statement (Accession No. ML021350492) such that a person can stay within the NRC document system instead of having to refer to an outside document system, in order to find the information about the meeting categories?
This comment has been forwarded to the NRR Senior Communications Analyst for action.
This comment has been forwarded to the NRR Senior Communications Analyst for action.
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.  
                                              /RA/
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Docket Nos. 50-334, 50-412, 50-346, and 50-440
Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Docket Nos. 50-334, 50-412, 50-346, and 50-440


==Enclosures:==
==Enclosures:==
: 1. List of Principal Meeting Participants
: 1. List of Principal Meeting Participants
: 2. List of Attendees cc w/encls: See next page
: 2. List of Attendees cc w/encls: See next page This comment has been forwarded to the NRR Senior Communications Analyst for action.
 
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.  
This comment has been forwarded to the NRR Senior Communications Analyst for action.
/RA/
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.
                                                /RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Docket Nos. 50-334, 50-412, 50-346, and 50-440
Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Docket Nos. 50-334, 50-412, 50-346, and 50-440


Line 60: Line 60:
: 1. List of Principal Meeting Participants
: 1. List of Principal Meeting Participants
: 2. List of Attendees cc w/encls: See next page DISTRIBUTION:
: 2. List of Attendees cc w/encls: See next page DISTRIBUTION:
PUBLIC                                         C. Carpenter,OE LPL3-2 R/F                                     W. Kane, OEDO RidsNrrDorlLpl3-2                               J. Caldwell, RIII RidsNrrPMTWengert                               S. Collins, RI RidsNrrLAEWhitt                                 L. Chandler, OGC RidsOgcRp                                       J. Dyer, NRR RidsAcrsAcnwMailCenter                         RidsNrrDorlLPL1-1 R. Jasinski, NRR                               J. Lamb, EDO Region I RidsNrrAdro                                     T. Bloomer, EDO Region III RidsNrrDorl                                     RidsRgn1MailCenter RidsEdoMailCenter                               RidsRgn3MailCenter RidsNrrDci                                     RidsNrrAdes LPL1-1 R/F Package Accession No. ML072070184 Summary Accession No. ML072070145 Meeting Notice Accession No. ML071710346 Licensees Slides Accession No. ML071790596 NRC Assessment of Exponent Report Accession No. ML071240254 NRC DFI Accession No. ML071340333 NRC DFI Letter Accession No. ML071340325 FENOC Response to DFI Accession No. ML071640480 NRC-001 OFFICE       LPL3-2/PM     LPL3-2/LA       DCI/CPNB         OE/D       LPL3-2/BC NAME         TWengert       EWhitt           TChan           CCarpenter RGibbs DATE         8/7/07         8/7/07           8 / 2 /07       8 /1 /07   8/7/07 OFFICIAL RECORD COPY
PUBLIC C. Carpenter,OE LPL3-2 R/F W. Kane, OEDO RidsNrrDorlLpl3-2 J. Caldwell, RIII RidsNrrPMTWengert S. Collins, RI RidsNrrLAEWhitt L. Chandler, OGC RidsOgcRp J. Dyer, NRR RidsAcrsAcnwMailCenter RidsNrrDorlLPL1-1 R. Jasinski, NRR J. Lamb, EDO Region I RidsNrrAdro T. Bloomer, EDO Region III RidsNrrDorl RidsRgn1MailCenter RidsEdoMailCenter RidsRgn3MailCenter RidsNrrDci RidsNrrAdes LPL1-1 R/F Package Accession No. ML072070184 Summary Accession No. ML072070145 Meeting Notice Accession No. ML071710346 Licensees Slides Accession No. ML071790596 NRC Assessment of Exponent Report Accession No. ML071240254 NRC DFI Accession No. ML071340333 NRC DFI Letter Accession No. ML071340325 FENOC Response to DFI Accession No. ML071640480 NRC-001 OFFICE LPL3-2/PM LPL3-2/LA DCI/CPNB OE/D LPL3-2/BC NAME TWengert EWhitt TChan CCarpenter RGibbs DATE 8/7/07 8/7/07 8 / 2 /07 8 /1 /07 8/7/07 OFFICIAL RECORD COPY
 
LIST OF PRINCIPAL MEETING PARTICIPANTS PUBLIC MEETING REGARDING FIRSTENERGY NUCLEAR OPERATING COMPANYS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT JUNE 27, 2007 9:00 AM - 12:30 PM Nuclear Regulatory Commission C. Carpenter, Director, Office of Enforcement W. Kane, Deputy Executive Director, Office of the Executive Director for Operations J. Caldwell, Regional Administrator, Region III S. Collins, Regional Administrator, Region I J. Dyer, Director, Office of Nuclear Reactor Regulation L. Chandler, Associate General Counsel, Office of the General Counsel FirstEnergy Nuclear Operating Company G. Leidich, FirstEnergy Senior Vice President - Operations J. Hagan, President and Chief Nuclear Officer D. Pace, Senior Vice President, Fleet Engineering G. Halnon, Director, Fleet Regulatory Affairs C. Price, Director, Performance Improvement, Davis-Besse J. Powers, Director, Fleet Engineering Enclosure 1
 
LIST OF ATTENDEES PUBLIC MEETING REGARDING FIRSTENERGY NUCLEAR OPERATING COMPANYS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT JUNE 27, 2007 9:00 AM - 12:30 PM NAME                                AFFILIATION
: 1. A. Rueangvivatanakij            NEI
: 2. D. Johnson                      NEI
: 3. J. Rinckel                      FENOC
: 4. R. Reffner                      FENOC
: 5. T. Schneider                    FirstEnergy
: 6. E. Anderson                      FENOC
: 7. S. Sands                        NRC/NRR/DORL/LPL3-2
: 8. D. Pace                          FENOC
: 9. J. Gutierrez                    FENOC
: 10. J. Lieberman                    Talisman
: 11. G. Halnon                      FENOC
: 12. T. Matthews                    MLB
: 13. J. Schmutz                      ML&B
: 14. D. Jenkins                      FENOC
: 15. S. Eaton                        The Plain Dealer
: 16. J. Powers                      FENOC
: 17. A. Ireland                      NRC/RES
: 18. J. Kaizer                      NRC/ACRS
: 19. R. Anzalone                    NRC/DSS/SNPB
: 20. W. Jessup                      NRC/NRR
: 21. C. Carpenter                    NRC/RES
: 22. G. Caputo                      NRC/OI
: 23. J. Fitzgerald                  NRC/OI
: 24. G. Gulla                        NRC/NRO
: 25. B. Garde                        Clifford and Garde
: 26. S. Shepherd                    Clifford and Garde
: 27. T. Kellum                      NRC/DIRS
: 28. T. Houghton                    NEI
: 29. K. Klump                        NRC/DIRS
: 30. A. Zogrates                    NRC/NRR/DE Enclosure 2


LIST OF ATTENDEES (CONTINUED)
LIST OF PRINCIPAL MEETING PARTICIPANTS PUBLIC MEETING REGARDING FIRSTENERGY NUCLEAR OPERATING COMPANYS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT JUNE 27, 2007 9:00 AM - 12:30 PM Nuclear Regulatory Commission C. Carpenter, Director, Office of Enforcement W. Kane, Deputy Executive Director, Office of the Executive Director for Operations J. Caldwell, Regional Administrator, Region III S. Collins, Regional Administrator, Region I J. Dyer, Director, Office of Nuclear Reactor Regulation L. Chandler, Associate General Counsel, Office of the General Counsel FirstEnergy Nuclear Operating Company G. Leidich, FirstEnergy Senior Vice President - Operations J. Hagan, President and Chief Nuclear Officer D. Pace, Senior Vice President, Fleet Engineering G. Halnon, Director, Fleet Regulatory Affairs C. Price, Director, Performance Improvement, Davis-Besse J. Powers, Director, Fleet Engineering
NAME                          AFFILIATION
: 31. T. Hedigan                NRC/NRR/DIRS
: 32. A. Turlin                NRC/NRO/DE
: 33. J. Davis                  NRC/NRR/DLR
: 34. A. Valentin              NRC/RES
: 35. B. Cullen                NRC/RES
: 36. M. Srinivasan            NRC/RES
: 37. K. Hall                  FirstEnergy
: 38. P. Pettey                Williams & Jensen
: 39. D. McIntyre              NRC/OPA
: 40. J. Cai                    NRC/OE
: 41. A. Powell                NRC/OCA
: 42. T. Steingass              NRC/NRR
: 43. L. Regner                NRC/NRR
: 44. M. Cash                  NRC/OIG
: 45. R. Laufer                NRC/OEDO
: 46. H. Nieh                  NRC/NRR
: 47. D. Solorio                NRC/OE
: 48. K. Cyr                    NRC/OGC
: 49. J. Beall                  NRC
: 50. D. Starkey                NRC/OE
: 51. C. Gratton                NRC/DORL
: 52. E. Duncan                NRC/RIII
: 53. B. Burgess                NRC/RIII
: 54. T. Wengert                NRC/DORL
: 55. D. Horner                Platts/McGraw-Hill
: 56. M. Fahey                  NRC/OI
: 57. S. Hackworth              NRC/OI
: 58. R. Haemer                Pillsbury Winthrop Shaw Pittman
: 59. D. Zaslowsky              Baker & McKenzie
: 60. J. Grobe                  NRC
: 61. B. Bateman                NRC
: 62. J. Collins                NRC
: 63. D. Persinko              NRC
: 64. M. Evans                  NRC/NRR/DCI
: 65. S. Lee                    NRC/OCM
: 66. T. Mensah                NRC/NRR/PSPB
: 67. T. Hibschman              NRC
: 68. P. Gunter                NIRS
: 69. T. Henry                  The Blade
: 70. U. Shoop                  NRC


LIST OF ATTENDEES (CONTINUED)
LIST OF ATTENDEES PUBLIC MEETING REGARDING FIRSTENERGY NUCLEAR OPERATING COMPANYS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT JUNE 27, 2007 9:00 AM - 12:30 PM NAME AFFILIATION
NAME                         AFFILIATION
: 1. A. Rueangvivatanakij NEI
: 71. D. Terao                 NRC
: 2. D. Johnson NEI
: 72. T. Campbell               NRC
: 3. J. Rinckel FENOC
: 73. R. Anderson*             FENOC
: 4. R. Reffner FENOC
: 74. S. Arndt*                 Ottawa County Commissioner
: 5. T. Schneider FirstEnergy
: 75. B. Beach*                 Consultant
: 6. E. Anderson FENOC
: 76. M. Beiting*               FirstEnergy Corp.
: 7. S. Sands NRC/NRR/DORL/LPL3-2
: 77. D. Ferraro*               Member of the public
: 8. D. Pace FENOC
: 78. S. Focht*                 ANI
: 9. J. Gutierrez FENOC
: 79. J. Funk*                 The Plain Dealer
: 10. J. Lieberman Talisman
: 80. J. Goebel*               Indian Point
: 11. G. Halnon FENOC
: 81. J. Greer*                 Ottawa County Emergency Mngt.
: 12. T. Matthews MLB
: 82. T. Griesbach*             Structural Integrity
: 13. J. Schmutz ML&B
: 83. T. Gurdziel*             Private Investor
: 14. D. Jenkins FENOC
: 84. H. Hegrat*               FENOC
: 15. S. Eaton The Plain Dealer
: 85. S. Helmer*               OH Department of Health
: 16. J. Powers FENOC
: 86. R. Janati*               PA Department of Protection
: 17. A. Ireland NRC/RES
: 87. M. Kaplan*               Congresswoman Marcy Kaptur
: 18. J. Kaizer NRC/ACRS
: 88. S. Langan*               NRC
: 19. R. Anzalone NRC/DSS/SNPB
: 89. Y. Leidorf*               Executive Assistant
: 20. W. Jessup NRC/NRR
: 90. M. Leisure*               FENOC
: 21. C. Carpenter NRC/RES
: 91. J. Mangels*               The Plain Dealer
: 22. G. Caputo NRC/OI
: 92. K. Meade*                 FirstEnergy
: 23. J. Fitzgerald NRC/OI
: 93. R. Miller*               House of Rep.
: 24. G. Gulla NRC/NRO
: 94. J. Nelson*               DTE
: 25. B. Garde Clifford and Garde
: 95. K. Nesser*               FirstEnergy
: 26. S. Shepherd Clifford and Garde
: 96. C. OClaire*             OH Emergency Management
: 27. T. Kellum NRC/DIRS
: 97. J. Penny*                 Law Firm Killiam & Gephart
: 28. T. Houghton NEI
: 98. H. Robinson*             Gordon & Ermer
: 29. K. Klump NRC/DIRS
: 99. J. Rogers*               FENOC 100. J. Rutkowski*           NRC 101. K. Schaefer*             WKSU 102. J. Schultz*             FENOC 103. L. Strauss*             FENOC 104. R. Strauss*             FirstEnergy 105. J. Sturdavant*           FirstEnergy 106. K. Turosky*             FirstEnergy Corp.
: 30. A. Zogrates NRC/NRR/DE LIST OF ATTENDEES (CONTINUED)
107. S. West*                 NRC Region 3 108. M. Wilk*                 NRC 109. J. Young*               FirstEnergy
NAME AFFILIATION
: 31. T. Hedigan NRC/NRR/DIRS
: 32. A. Turlin NRC/NRO/DE
: 33. J. Davis NRC/NRR/DLR
: 34. A. Valentin NRC/RES
: 35. B. Cullen NRC/RES
: 36. M. Srinivasan NRC/RES
: 37. K. Hall FirstEnergy
: 38. P. Pettey Williams & Jensen
: 39. D. McIntyre NRC/OPA
: 40. J. Cai NRC/OE
: 41. A. Powell NRC/OCA
: 42. T. Steingass NRC/NRR
: 43. L. Regner NRC/NRR
: 44. M. Cash NRC/OIG
: 45. R. Laufer NRC/OEDO
: 46. H. Nieh NRC/NRR
: 47. D. Solorio NRC/OE
: 48. K. Cyr NRC/OGC
: 49. J. Beall NRC
: 50. D. Starkey NRC/OE
: 51. C. Gratton NRC/DORL
: 52. E. Duncan NRC/RIII
: 53. B. Burgess NRC/RIII
: 54. T. Wengert NRC/DORL
: 55. D. Horner Platts/McGraw-Hill
: 56. M. Fahey NRC/OI
: 57. S. Hackworth NRC/OI
: 58. R. Haemer Pillsbury Winthrop Shaw Pittman
: 59. D. Zaslowsky Baker & McKenzie
: 60. J. Grobe NRC
: 61. B. Bateman NRC
: 62. J. Collins NRC
: 63. D. Persinko NRC
: 64. M. Evans NRC/NRR/DCI
: 65. S. Lee NRC/OCM
: 66. T. Mensah NRC/NRR/PSPB
: 67. T. Hibschman NRC
: 68. P. Gunter NIRS
: 69. T. Henry The Blade
: 70. U. Shoop NRC LIST OF ATTENDEES (CONTINUED)
NAME AFFILIATION
: 71. D. Terao NRC
: 72. T. Campbell NRC
: 73. R. Anderson*
FENOC
: 74. S. Arndt*
Ottawa County Commissioner
: 75. B. Beach*
Consultant
: 76. M. Beiting*
FirstEnergy Corp.
: 77. D. Ferraro*
Member of the public
: 78. S. Focht*
ANI
: 79. J. Funk*
The Plain Dealer
: 80. J. Goebel*
Indian Point
: 81. J. Greer*
Ottawa County Emergency Mngt.
: 82. T. Griesbach*
Structural Integrity
: 83. T. Gurdziel*
Private Investor
: 84. H. Hegrat*
FENOC
: 85. S. Helmer*
OH Department of Health
: 86. R. Janati*
PA Department of Protection
: 87. M. Kaplan*
Congresswoman Marcy Kaptur
: 88. S. Langan*
NRC
: 89. Y. Leidorf*
Executive Assistant
: 90. M. Leisure*
FENOC
: 91. J. Mangels*
The Plain Dealer
: 92. K. Meade*
FirstEnergy
: 93. R. Miller*
House of Rep.
: 94. J. Nelson*
DTE
: 95. K. Nesser*
FirstEnergy
: 96. C. OClaire*
OH Emergency Management
: 97. J. Penny*
Law Firm Killiam & Gephart
: 98. H. Robinson*
Gordon & Ermer
: 99. J. Rogers*
FENOC 100. J. Rutkowski*
NRC 101. K. Schaefer*
WKSU 102. J. Schultz*
FENOC 103. L. Strauss*
FENOC 104. R. Strauss*
FirstEnergy 105. J. Sturdavant*
FirstEnergy 106. K. Turosky*
FirstEnergy Corp.
107. S. West*
NRC Region 3 108. M. Wilk*
NRC 109. J. Young*
FirstEnergy
* participated via teleconference
* participated via teleconference


Davis-Besse Nuclear Power Station, Unit 1 cc:
Davis-Besse Nuclear Power Station, Unit 1 cc:
Manager, Site Regulatory Compliance       Attorney General FirstEnergy Nuclear Operating Company     Office of Attorney General Davis-Besse Nuclear Power Station         30 East Broad Street Mail Stop A-DB-3065                       Columbus, OH 43216 5501 North State Route 2 Oak Harbor, OH 43449-9760                 President, Board of County Commissioners of Ottawa County Director, Ohio Department of Commerce     Port Clinton, OH 43252 Division of Industrial Compliance Bureau of Operations & Maintenance         President, Board of County 6606 Tussing Road                         Commissioners of Lucas County P.O. Box 4009                             One Government Center, Suite 800 Reynoldsburg, OH 43068-9009               Toledo, OH 43604-6506 Regional Administrator, Region III         The Honorable Dennis J. Kucinich U.S. Nuclear Regulatory Commission         United States House of Representatives Suite 210                                 Washington, D.C. 20515 2443 Warrenville Road Lisle, IL 60532-4352                       The Honorable Dennis J. Kucinich United States House of Representatives Resident Inspector                         14400 Detroit Avenue U.S. Nuclear Regulatory Commission         Lakewood, OH 44107 5503 North State Route 2 Oak Harbor, OH 43449-9760                 Joseph J. Hagan President and Chief Nuclear Officer Stephen Helmer                            FirstEnergy Nuclear Operating Company Supervisor, Technical Support Section      Mail Stop A-GO-14 Bureau of Radiation Protection            76 South Main Street Ohio Department of Health                  Akron, OH 44308 35 East Chestnut Street, 7th Floor Columbus, OH 43215                        David W. Jenkins, Attorney FirstEnergy Corporation Carol OClaire, Chief, Radiological Branch Mail Stop A-GO-15 Ohio Emergency Management Agency          76 South Main Street 2855 West Dublin Granville Road            Akron, OH 44308 Columbus, OH 43235-2206 Danny L. Pace Zack A. Clayton                            Senior Vice President, Fleet Engineering DERR                                      FirstEnergy Nuclear Operating Company Ohio Environmental Protection Agency      Mail Stop A-GO-14 P.O. Box 1049                              76 South Main Street Columbus, OH 43266-0149                    Akron, OH 44308 State of Ohio                              Manager, Fleet Licensing Public Utilities Commission                FirstEnergy Nuclear Operating Company 180 East Broad Street                      Mail Stop A-GO-2 Columbus, OH 43266-0573                    76 South Main Street Akron, OH 44308
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Stephen Helmer Supervisor, Technical Support Section Bureau of Radiation Protection Ohio Department of Health 35 East Chestnut Street, 7th Floor Columbus, OH 43215 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Office of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308


Davis-Besse Nuclear Power Station, Unit 1 Perry Nuclear Power Plant, Unit No. 1 cc:                                      cc:
Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory Affairs       Resident Inspector's Office FirstEnergy Nuclear Operating Company     U.S. Nuclear Regulatory Commission Mail Stop A-GO-2                         P.O. Box 331 76 South Main Street                     Perry, OH 44081-0331 Akron, OH 44308 Sue Hiatt Jeannie M. Rinckel                       OCRE Interim Representative Vice President, Fleet Oversight           8275 Munson FirstEnergy Nuclear Operating Company     Mentor, OH 44060 Mail Stop A-GO-14 76 South Main Street                     Manager, Site Regulatory Compliance Akron, OH 44308                           FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Richard Anderson                          Mail Stop A-PY-A200 Vice President, Nuclear Support          P.O. Box 97, 10 Center Road FirstEnergy Nuclear Operating Company    Perry, OH 44081-0097 Mail Stop A-GO-14 76 South Main Street                      Mayor, Village of North Perry Akron, OH 44308                          North Perry Village Hall 4449 Lockwood Road Mark B. Bezilla                          North Perry Village, OH 44081 Site Vice President FirstEnergy Nuclear Operating Company    Donna Owens, Director Davis-Besse Nuclear Power Station        Ohio Department of Commerce Mail Stop A-DB-3080                      Division of Industrial Compliance 5501 North State, Route 2                Bureau of Operations & Maintenance Oak Harbor, OH 43449-9760                6606 Tussing Road P.O. Box 4009 James H. Lash                            Reynoldsburg, OH 43068-9009 Senior Vice President of Operations and Chief Operating Officer                Mayor, Village of Perry FirstEnergy Nuclear Operating Company    P.O. Box 100 Mail Stop A-GO-14                        Perry, OH 44081-0100 76 South Main Street Akron, OH 44308                          Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Perry Nuclear Power Plant, Unit No. 1 cc:
Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081


Perry Nuclear Power Plant, Unit No. 1 Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Perry Nuclear Power Plant, Unit No. 1 cc:
cc:
Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Daniel Z. Fisher Transportation Department            Manager, Site Regulatory Compliance Public Utilities Commission          FirstEnergy Nuclear Operating Company 180 East Broad Street                Beaver Valley Power Station Columbus, OH 43215-3793              Mail Stop A-BV-A P.O. Box 4, Route 168 Barry S. Allen                        Shippingport, PA 15077 Site Vice President FirstEnergy Nuclear Operating Company Commissioner James R. Lewis Perry Nuclear Power Plant            West Virginia Division of Labor Mail Stop A-PY-A290                  749-B, Building No. 6 P.O. Box 97, 10 Center Road          Capitol Complex Perry, OH 44081-0097                  Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
Harrisburg, PA 17110-9364 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406


Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077}}
Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077}}

Latest revision as of 22:46, 14 January 2025

Summary of June 27, 2007, Public Meeting Regarding FENOCs Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event
ML072070145
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 08/07/2007
From: Thomas Wengert
NRC/NRR/ADRO/DORL/LPLA
To:
Wengert, Thomas J, NRR/DORL, 415-4037
Shared Package
ML072070184 List:
References
FOIA/PA-2007-0299
Download: ML072070145 (12)


Text

August 7, 2007 LICENSEE:

FirstEnergy Nuclear Operating Company (FENOC)

FACILITIES:

Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1

SUBJECT:

SUMMARY

OF JUNE 27, 2007, PUBLIC MEETING REGARDING FENOCS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT On June 27, 2007, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) senior staff and representatives of FirstEnergy Nuclear Operating Company (FENOC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss FENOCs June 13, 2007, response to the NRCs May 14, 2007, Demand for Information (DFI) concerning FENOCs re-analysis of the time line and root causes for the 2002 Davis-Besse reactor pressure vessel head degradation event.

The NRC staff issued the May 14, 2007, DFI to determine whether further enforcement action was necessary to provide reasonable assurance that FENOC would continue to operate its licensed facilities in accordance with the terms of its license and the Commissions regulations.

The DFI required FENOC to provide detailed information regarding the process used to evaluate the report developed by Exponent Failure Analysis Associates and Altran Solutions Corporation (Exponent Report), a detailed discussion of the differences between the operational data underpinning FENOCs earlier root cause reports and the assumptions underpinning the Exponent Report, and a position on whether FENOC endorsed the conclusions of a second contractor report prepared in connection with an associated insurance claim.

A list of principal meeting participants is provided as Enclosure 1. A list of meeting attendees is provided as Enclosure 2. The licensees presentation can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML071790596. The NRCs meeting handout materials can be found in ADAMS under Accession Nos.

ML071240254, ML071340333, ML071340325, ML071640480, and ML071710346.

The NRC senior staff opened the meeting by stating the purposes of the meeting, as follows:

(1)

To discuss FENOCs response to the NRCs May 14, 2007, Demand For Information (DFI). Specifically, to understand the timing of FENOCs review of the Exponent Report, and the factors FENOC considered when determining if the conclusions of the report should be communicated to the NRC.

(2)

To understand what lessons FENOC learned when they were preparing the response to the DFI, and what actions FENOC has taken and plans to take to address these lessons learned.

(3)

To understand FENOCs position regarding a second contracted report that was prepared for FENOC entitled, Report on Reactor Pressure Vessel Wastage at the Davis-Besse Nuclear Power Plant, dated December 2006 (Mattson Report).

The NRC also provided some background on the events that led to the NRCs issuance of the DFI and the public meeting. A summary of the background is contained in the DFI document found in ADAMS under Accession No. ML071340333.

The licensees presentation to the NRC senior staff addressed the three elements of the NRCs May 14, 2007, DFI. The presentation included a description of the time line of events from when FENOC received the Exponent and Mattson Reports in December 2006, to FENOCs June 13, 2007, DFI response; FENOCs initial consideration of the Exponent Report; FENOCs consideration of the NRCs April 2, 2007, request for information, and their May 2, 2007, response; a summary of FENOCs analysis of the Exponent and Mattson Reports, and the differences noted between the Exponent Report and the root cause reports; and identification of commitments FENOC intends to make to address the issues raised during their review of the Exponent and Mattson Reports.

The licensee acknowledged that their initial review of the Exponent Report lacked sensitivity to the regulatory interest and that their commercial and nuclear processes did not sufficiently interface during their review of the report.

At various times during the presentation, the NRC staff queried the licensee about aspects of the DFI response and the content of their presentation. The NRC acknowledged the licensees commitments to develop a process to review reports prepared for commercial matters, to provide operational experience to industry, to improve their NRC correspondence procedure, to assess their Regulatory Communications policy, and to develop lessons learned from their May 2, 2007, response to the NRC. The NRC staff is considering further regulatory actions with regard to these commitments.

Several members of the public were in attendance and others participated via teleconference.

Some members of the public asked questions of the NRC staff after the conclusion of the business portion of the meeting.

One member of the public asked the NRC what the next steps in the process would be. The NRC responded that FENOC needs to make the changes they have described, and that the NRC will need to determine if the corrective actions identified are necessary and sufficient.

One Public Meeting Feedback form was received following the meeting, which consisted of the following:

As indicated on the June 13th meeting notice, meeting categories are defined in a document dated May 28, 2002, in the Federal Register. Why doesnt it also refer to an ADAMS document, like the May 21, 2002, Policy Statement (Accession No. ML021350492) such that a person can stay within the NRC document system instead of having to refer to an outside document system, in order to find the information about the meeting categories?

This comment has been forwarded to the NRR Senior Communications Analyst for action.

Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Docket Nos. 50-334, 50-412, 50-346, and 50-440

Enclosures:

1. List of Principal Meeting Participants
2. List of Attendees cc w/encls: See next page This comment has been forwarded to the NRR Senior Communications Analyst for action.

Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Docket Nos. 50-334, 50-412, 50-346, and 50-440

Enclosure:

1. List of Principal Meeting Participants
2. List of Attendees cc w/encls: See next page DISTRIBUTION:

PUBLIC C. Carpenter,OE LPL3-2 R/F W. Kane, OEDO RidsNrrDorlLpl3-2 J. Caldwell, RIII RidsNrrPMTWengert S. Collins, RI RidsNrrLAEWhitt L. Chandler, OGC RidsOgcRp J. Dyer, NRR RidsAcrsAcnwMailCenter RidsNrrDorlLPL1-1 R. Jasinski, NRR J. Lamb, EDO Region I RidsNrrAdro T. Bloomer, EDO Region III RidsNrrDorl RidsRgn1MailCenter RidsEdoMailCenter RidsRgn3MailCenter RidsNrrDci RidsNrrAdes LPL1-1 R/F Package Accession No. ML072070184 Summary Accession No. ML072070145 Meeting Notice Accession No. ML071710346 Licensees Slides Accession No. ML071790596 NRC Assessment of Exponent Report Accession No. ML071240254 NRC DFI Accession No. ML071340333 NRC DFI Letter Accession No. ML071340325 FENOC Response to DFI Accession No. ML071640480 NRC-001 OFFICE LPL3-2/PM LPL3-2/LA DCI/CPNB OE/D LPL3-2/BC NAME TWengert EWhitt TChan CCarpenter RGibbs DATE 8/7/07 8/7/07 8 / 2 /07 8 /1 /07 8/7/07 OFFICIAL RECORD COPY

LIST OF PRINCIPAL MEETING PARTICIPANTS PUBLIC MEETING REGARDING FIRSTENERGY NUCLEAR OPERATING COMPANYS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT JUNE 27, 2007 9:00 AM - 12:30 PM Nuclear Regulatory Commission C. Carpenter, Director, Office of Enforcement W. Kane, Deputy Executive Director, Office of the Executive Director for Operations J. Caldwell, Regional Administrator, Region III S. Collins, Regional Administrator, Region I J. Dyer, Director, Office of Nuclear Reactor Regulation L. Chandler, Associate General Counsel, Office of the General Counsel FirstEnergy Nuclear Operating Company G. Leidich, FirstEnergy Senior Vice President - Operations J. Hagan, President and Chief Nuclear Officer D. Pace, Senior Vice President, Fleet Engineering G. Halnon, Director, Fleet Regulatory Affairs C. Price, Director, Performance Improvement, Davis-Besse J. Powers, Director, Fleet Engineering

LIST OF ATTENDEES PUBLIC MEETING REGARDING FIRSTENERGY NUCLEAR OPERATING COMPANYS RE-ANALYSIS OF THE TIME LINE AND ROOT CAUSES FOR THE 2002 DAVIS-BESSE REACTOR PRESSURE VESSEL HEAD DEGRADATION EVENT JUNE 27, 2007 9:00 AM - 12:30 PM NAME AFFILIATION

1. A. Rueangvivatanakij NEI
2. D. Johnson NEI
3. J. Rinckel FENOC
4. R. Reffner FENOC
5. T. Schneider FirstEnergy
6. E. Anderson FENOC
7. S. Sands NRC/NRR/DORL/LPL3-2
8. D. Pace FENOC
9. J. Gutierrez FENOC
10. J. Lieberman Talisman
11. G. Halnon FENOC
12. T. Matthews MLB
13. J. Schmutz ML&B
14. D. Jenkins FENOC
15. S. Eaton The Plain Dealer
16. J. Powers FENOC
17. A. Ireland NRC/RES
18. J. Kaizer NRC/ACRS
19. R. Anzalone NRC/DSS/SNPB
20. W. Jessup NRC/NRR
21. C. Carpenter NRC/RES
22. G. Caputo NRC/OI
23. J. Fitzgerald NRC/OI
24. G. Gulla NRC/NRO
25. B. Garde Clifford and Garde
26. S. Shepherd Clifford and Garde
27. T. Kellum NRC/DIRS
28. T. Houghton NEI
29. K. Klump NRC/DIRS
30. A. Zogrates NRC/NRR/DE LIST OF ATTENDEES (CONTINUED)

NAME AFFILIATION

31. T. Hedigan NRC/NRR/DIRS
32. A. Turlin NRC/NRO/DE
33. J. Davis NRC/NRR/DLR
34. A. Valentin NRC/RES
35. B. Cullen NRC/RES
36. M. Srinivasan NRC/RES
37. K. Hall FirstEnergy
38. P. Pettey Williams & Jensen
39. D. McIntyre NRC/OPA
40. J. Cai NRC/OE
41. A. Powell NRC/OCA
42. T. Steingass NRC/NRR
43. L. Regner NRC/NRR
44. M. Cash NRC/OIG
45. R. Laufer NRC/OEDO
46. H. Nieh NRC/NRR
47. D. Solorio NRC/OE
48. K. Cyr NRC/OGC
49. J. Beall NRC
50. D. Starkey NRC/OE
51. C. Gratton NRC/DORL
52. E. Duncan NRC/RIII
53. B. Burgess NRC/RIII
54. T. Wengert NRC/DORL
55. D. Horner Platts/McGraw-Hill
56. M. Fahey NRC/OI
57. S. Hackworth NRC/OI
58. R. Haemer Pillsbury Winthrop Shaw Pittman
59. D. Zaslowsky Baker & McKenzie
60. J. Grobe NRC
61. B. Bateman NRC
62. J. Collins NRC
63. D. Persinko NRC
64. M. Evans NRC/NRR/DCI
65. S. Lee NRC/OCM
66. T. Mensah NRC/NRR/PSPB
67. T. Hibschman NRC
68. P. Gunter NIRS
69. T. Henry The Blade
70. U. Shoop NRC LIST OF ATTENDEES (CONTINUED)

NAME AFFILIATION

71. D. Terao NRC
72. T. Campbell NRC
73. R. Anderson*

FENOC

74. S. Arndt*

Ottawa County Commissioner

75. B. Beach*

Consultant

76. M. Beiting*

FirstEnergy Corp.

77. D. Ferraro*

Member of the public

78. S. Focht*

ANI

79. J. Funk*

The Plain Dealer

80. J. Goebel*

Indian Point

81. J. Greer*

Ottawa County Emergency Mngt.

82. T. Griesbach*

Structural Integrity

83. T. Gurdziel*

Private Investor

84. H. Hegrat*

FENOC

85. S. Helmer*

OH Department of Health

86. R. Janati*

PA Department of Protection

87. M. Kaplan*

Congresswoman Marcy Kaptur

88. S. Langan*

NRC

89. Y. Leidorf*

Executive Assistant

90. M. Leisure*

FENOC

91. J. Mangels*

The Plain Dealer

92. K. Meade*

FirstEnergy

93. R. Miller*

House of Rep.

94. J. Nelson*

DTE

95. K. Nesser*

FirstEnergy

96. C. OClaire*

OH Emergency Management

97. J. Penny*

Law Firm Killiam & Gephart

98. H. Robinson*

Gordon & Ermer

99. J. Rogers*

FENOC 100. J. Rutkowski*

NRC 101. K. Schaefer*

WKSU 102. J. Schultz*

FENOC 103. L. Strauss*

FENOC 104. R. Strauss*

FirstEnergy 105. J. Sturdavant*

FirstEnergy 106. K. Turosky*

FirstEnergy Corp.

107. S. West*

NRC Region 3 108. M. Wilk*

NRC 109. J. Young*

FirstEnergy

  • participated via teleconference

Davis-Besse Nuclear Power Station, Unit 1 cc:

Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3065 5501 North State Route 2 Oak Harbor, OH 43449-9760 Director, Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4352 Resident Inspector U.S. Nuclear Regulatory Commission 5503 North State Route 2 Oak Harbor, OH 43449-9760 Stephen Helmer Supervisor, Technical Support Section Bureau of Radiation Protection Ohio Department of Health 35 East Chestnut Street, 7th Floor Columbus, OH 43215 Carol OClaire, Chief, Radiological Branch Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235-2206 Zack A. Clayton DERR Ohio Environmental Protection Agency P.O. Box 1049 Columbus, OH 43266-0149 State of Ohio Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Attorney General Office of Attorney General 30 East Broad Street Columbus, OH 43216 President, Board of County Commissioners of Ottawa County Port Clinton, OH 43252 President, Board of County Commissioners of Lucas County One Government Center, Suite 800 Toledo, OH 43604-6506 The Honorable Dennis J. Kucinich United States House of Representatives Washington, D.C. 20515 The Honorable Dennis J. Kucinich United States House of Representatives 14400 Detroit Avenue Lakewood, OH 44107 Joseph J. Hagan President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-15 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308

Davis-Besse Nuclear Power Station, Unit 1 cc:

Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State, Route 2 Oak Harbor, OH 43449-9760 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Perry Nuclear Power Plant, Unit No. 1 cc:

Resident Inspector's Office U.S. Nuclear Regulatory Commission P.O. Box 331 Perry, OH 44081-0331 Sue Hiatt OCRE Interim Representative 8275 Munson Mentor, OH 44060 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A200 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Mayor, Village of North Perry North Perry Village Hall 4449 Lockwood Road North Perry Village, OH 44081 Donna Owens, Director Ohio Department of Commerce Division of Industrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P.O. Box 4009 Reynoldsburg, OH 43068-9009 Mayor, Village of Perry P.O. Box 100 Perry, OH 44081-0100 Chairman Perry Township Board of Trustees 3750 Center Road, Box 65 Perry, OH 44081

Perry Nuclear Power Plant, Unit No. 1 cc:

Daniel Z. Fisher Transportation Department Public Utilities Commission 180 East Broad Street Columbus, OH 43215-3793 Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 15077 James H. Lash Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077