ML072270635: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 39: Line 39:
Part II - Experiments No new experiments were performed during the year. The experiments performed in this reporting period were as follows:
Part II - Experiments No new experiments were performed during the year. The experiments performed in this reporting period were as follows:
Experiment No.
Experiment No.
114         Neutron radiography performed in the radiography facilities.
114 Neutron radiography performed in the radiography facilities.


SECTION II ARRR MONTHLY OPERATING  
SECTION II ARRR MONTHLY OPERATING  


==SUMMARY==
==SUMMARY==
Date Operating kilowatt-Hours hours 7-06 131 17,645 8-06 159 22,375 9-06 134 18,011 10-06 160 21,603 11-06 131 17,646 12-06 133 17,993 1-07 141 18,922 2-07 174 23,433 3-07 166 22,347 4-07 185 24,969 5-07 148 21,191 6-07 172 27,367 Accumulated kW-h 12,977,375 12,999,750 13,017,761 13,039,364 13,057,010 13,075,003 13,093,925 13,117,358 13,139,705 13,164,674 13,184,951 13,212,318 Experiments & Unscheduled Irradiations 0
0 0
0 0
0 0
0 0
0 0
0 Shutdowns 1
5 2
4 5
3 1
2 1
12 1
1 Totals 1834 253,502 13,212,318 0
38


Date  Operating kilowatt- Accumulated Experiments & Unscheduled Hours      hours      kW-h      Irradiations Shutdowns 7-06    131    17,645    12,977,375        0          1 8-06    159    22,375    12,999,750        0          5 9-06    134    18,011    13,017,761        0          2 10-06    160    21,603    13,039,364        0          4 11-06    131    17,646    13,057,010        0          5 12-06    133    17,993    13,075,003        0          3 1-07    141    18,922    13,093,925        0          1 2-07    174    23,433    13,117,358        0          2 3-07    166      22,347    13,139,705        0          1 4-07    185      24,969    13,164,674        0          12 5-07    148      21,191    13,184,951        0          1 6-07    172    27,367    13,212,318        0          1 Totals  1834    253,502    13,212,318        0          38
ARRR UNSCHEDULED POWER REDUCTIONS TYPE OF SCRAM CHANNEL AFFECTED No.
 
DATE AUTO MAN Spurious Op. Erroi CAL 1 2 3 4 Earthquak H20 Comments 1
ARRR UNSCHEDULED POWER REDUCTIONS TYPE OF SCRAM                       CHANNEL AFFECTED No. DATE AUTO MAN Spurious Op. Erroi CAL 1 2 3 4 Earthquak H20                 Comments 1 7/19/2006   X       X                 X XX X                     Momentary Building Power Loss 2 8/24/2006   X       X                 X X X X                             no visible alarm 3 8/25/2006   X       XX                   X X X                             no visible alarm 4 8/25/2006   X       X                 X X X X       _no                     visible alarm 5 8/27/2006   X       X                 X X X X                             no visible alarm 6 8/30/2006   X       X               -  XX X     _                        Channel 3/4 Low 7   9/1/2006   x       X                 X X XX                              no visible alarm 8 9/28/2006   X       X                   X X XX                             no visible alarm 9 10/27/2006 X       X                 X X X X                         Channel 2 Period Fast 10 10/29/2006 X       X                 X X X X                             no visible alarm 11 10/30/2006 X      X        X        X XXX        _no                    visible alarm 12  10/31/2006  X      X                  X X X X                            no visible alarm 13  11/1/2006  X      x              -  xxxx      _  ___no                    visible alarm 14  11/1/2006  X    _ X                  X X X X                            no visible alarm 15 15 16 11/1/2006 11/1/2006 11/1/2006 X
7/19/2006 X
X X
X X X X X Momentary Building Power Loss 2
8/24/2006 X
X X X X X no visible alarm 3
8/25/2006 X
XX X X X no visible alarm 4
8/25/2006 X
X X X X X X
_no visible alarm 5
8/27/2006 X
X X X X X no visible alarm 6
8/30/2006 X
X X X X Channel 3/4 Low 7
9/1/2006 x
X X X X X no visible alarm 8
9/28/2006 X
X X X XX no visible alarm 9
10/27/2006 X
X X X X X Channel 2 Period Fast 10 10/29/2006 X
X X X X X no visible alarm 11 10/30/2006 X
X X
X X
                                        -  X X 5~X___
X X X X
X X X! Xc X X; X X no visible alarm no visible alarm 17 11/29/2006 X       X                 X X X X                           no visible alarm 18 12/1/2006 X       X                 X X X X                           no visible alarm 19 12/14/2006 X       X                 X X X X                         no visible alarm
_no visible alarm 12 10/31/2006 X
* 20 12/29/2006 X       X                 X X X X                       Channel 2 Period Fast 21   1/4/2007   X       X                 X X XX    _        _            Channel 4 90% Voltage 22   2/7/2007   X                 X         X X XX                        Channel 4 90% Voltage 23   2/9/2007   X       X                 X X X X                   I     Channel 4 90% Voltage 24 3/13/2007   X       X                 X X X X                         Channel 4 90% Voltage 25   4/4/2007   X       X                 X X X X                             no visible alarm 26   4/5/2007   X   I   X                   XXXX  XChannel                             4 Low 27   4/6/2007   X       X                 X X X X                             no visible alarm 28   4/9/2007   X               X         XXIX X XChannel                       4 Low - switching 29 4/10/2007   X       X                 X X XX                            no visible alarm
X X X X X no visible alarm 13 11/1/2006 X
* 30 4/10/2007   X       X                 X X XX                            no visible alarm
x x x x x _
* 31 4/11/2007   X       X                 X X X X                             no visible alarm 32 4/11/2007   X       X                 X X XX                              no visible alarm 33 4/12/2007   X       X                 X X XX                              no visible alarm 34 4/13/2007   X       X                 X X X X                             no visible alarm 35 4/13/2007   X       X                 XX X X                             no visible alarm 36 4/30/2007   X       X                 X X X X                             no visible alarm 37 5/15/2007   X       X                 X X X X                         Channel 2 Period Fast 38   6/4/2007   X       X                 X X X X                       Channel 4 High - transient 39 _
___no visible alarm 14 11/1/2006 X
X X X X X no visible alarm 15 11/1/2006 X
X X X X X no visible alarm 15 11/1/2006 X
X X! Xc 5~X___
no visible alarm 16 11/1/2006 X
X X X; X X no visible alarm 17 11/29/2006 X
X X X X X no visible alarm 18 12/1/2006 X
X X X X X no visible alarm 19 12/14/2006 X
X X X X X no visible alarm
* 20 12/29/2006 X
X X X X X Channel 2 Period Fast 21 1/4/2007 X
X X X X X Channel 4 90% Voltage 22 2/7/2007 X
X X X X X Channel 4 90% Voltage 23 2/9/2007 X
X X X X X I
Channel 4 90% Voltage 24 3/13/2007 X
X X X X X Channel 4 90% Voltage 25 4/4/2007 X
X X X X X no visible alarm 26 4/5/2007 X
I X
X XXX XChannel 4 Low 27 4/6/2007 X
X X X X X no visible alarm 28 4/9/2007 X
X X XIX X
XChannel 4 Low - switching 29 4/10/2007 X
X X X X X no visible alarm
* 30 4/10/2007 X
X X X X X no visible alarm
* 31 4/11/2007 X
X X X X X no visible alarm 32 4/11/2007 X
X X X X X no visible alarm 33 4/12/2007 X
X X X X X no visible alarm 34 4/13/2007 X
X X X X X no visible alarm 35 4/13/2007 X
X XX X X no visible alarm 36 4/30/2007 X
X X X X X no visible alarm 37 5/15/2007 X
X X X X X Channel 2 Period Fast 38 6/4/2007 X
X X X X X Channel 4 High - transient 39 _
401
401
* Concurrent with shutter operation}}
* Concurrent with shutter operation}}

Latest revision as of 22:21, 14 January 2025

Annual Report 2007
ML072270635
Person / Time
Site: Aerotest
Issue date: 07/27/2007
From: Meren A
Aerotest
To:
NRC/OE
References
Download: ML072270635 (6)


Text

AEROTEST OPERATIONS, INC.

3455 FOSTORIA WAY - SAN RAMON, CA 94583 * (925) 866-1212

  • FAX (925) 866-1716 27 July 2007 Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Annual Summary of Changes, Tests, and Experiments at Aerotest Radiography and Research Reactor (ARRR), Docket no. 50-228, for the period of 1 July 2006 to 30 June 2007.

Gentlemen:

The enclosed report summarizes the ARRR operations from July 1, 2006 through June 30, 2007. This submittal complies with the requirements set forth in 10 CFR 50.59, "Authorization of Changes, Tests, and Experiments." Summary forms of monthly operations and unscheduled power reductions are included.

No new or unusual problems have been noted during the year and reactor operations have remained stable with respect to safety and reliability.

Sincerely, Alfredo W. Meren Reactor Supervisor Aerotest Operations, Inc.

ANNUAL

SUMMARY

OF CHANGES, TESTS AND EXPERIMENTS PERFORMED AT THE AEROTEST RADIOGRAPHY AND RESEARCH REACTOR (ARRR)

DOCKET NO. 50-228 BY CHRISTOPHER E. BAUMAN APPROVED BY RAY R. TSUKIMURA PRESIDENT AEROTEST OPERATIONS, INC.

SECTION I Part I - Changes

1. Updated Procedures and Safety Analysis Report have previously been submitted to Nuclear Regulatory Commission as part of facility's relicensing application package. No changes have yet been implemented.
2. Alfredo W. Meren assumed the position of Reactor Supervisor for Christopher E.

Bauman who will stay on as Senior Reactor Operator and Manager of Research and Development.

Part II - Experiments No new experiments were performed during the year. The experiments performed in this reporting period were as follows:

Experiment No.

114 Neutron radiography performed in the radiography facilities.

SECTION II ARRR MONTHLY OPERATING

SUMMARY

Date Operating kilowatt-Hours hours 7-06 131 17,645 8-06 159 22,375 9-06 134 18,011 10-06 160 21,603 11-06 131 17,646 12-06 133 17,993 1-07 141 18,922 2-07 174 23,433 3-07 166 22,347 4-07 185 24,969 5-07 148 21,191 6-07 172 27,367 Accumulated kW-h 12,977,375 12,999,750 13,017,761 13,039,364 13,057,010 13,075,003 13,093,925 13,117,358 13,139,705 13,164,674 13,184,951 13,212,318 Experiments & Unscheduled Irradiations 0

0 0

0 0

0 0

0 0

0 0

0 Shutdowns 1

5 2

4 5

3 1

2 1

12 1

1 Totals 1834 253,502 13,212,318 0

38

ARRR UNSCHEDULED POWER REDUCTIONS TYPE OF SCRAM CHANNEL AFFECTED No.

DATE AUTO MAN Spurious Op. Erroi CAL 1 2 3 4 Earthquak H20 Comments 1

7/19/2006 X

X X X X X Momentary Building Power Loss 2

8/24/2006 X

X X X X X no visible alarm 3

8/25/2006 X

XX X X X no visible alarm 4

8/25/2006 X

X X X X X X

_no visible alarm 5

8/27/2006 X

X X X X X no visible alarm 6

8/30/2006 X

X X X X Channel 3/4 Low 7

9/1/2006 x

X X X X X no visible alarm 8

9/28/2006 X

X X X XX no visible alarm 9

10/27/2006 X

X X X X X Channel 2 Period Fast 10 10/29/2006 X

X X X X X no visible alarm 11 10/30/2006 X

X X

X X X X

_no visible alarm 12 10/31/2006 X

X X X X X no visible alarm 13 11/1/2006 X

x x x x x _

___no visible alarm 14 11/1/2006 X

X X X X X no visible alarm 15 11/1/2006 X

X X X X X no visible alarm 15 11/1/2006 X

X X! Xc 5~X___

no visible alarm 16 11/1/2006 X

X X X; X X no visible alarm 17 11/29/2006 X

X X X X X no visible alarm 18 12/1/2006 X

X X X X X no visible alarm 19 12/14/2006 X

X X X X X no visible alarm

  • 20 12/29/2006 X

X X X X X Channel 2 Period Fast 21 1/4/2007 X

X X X X X Channel 4 90% Voltage 22 2/7/2007 X

X X X X X Channel 4 90% Voltage 23 2/9/2007 X

X X X X X I

Channel 4 90% Voltage 24 3/13/2007 X

X X X X X Channel 4 90% Voltage 25 4/4/2007 X

X X X X X no visible alarm 26 4/5/2007 X

I X

X XXX XChannel 4 Low 27 4/6/2007 X

X X X X X no visible alarm 28 4/9/2007 X

X X XIX X

XChannel 4 Low - switching 29 4/10/2007 X

X X X X X no visible alarm

  • 30 4/10/2007 X

X X X X X no visible alarm

  • 31 4/11/2007 X

X X X X X no visible alarm 32 4/11/2007 X

X X X X X no visible alarm 33 4/12/2007 X

X X X X X no visible alarm 34 4/13/2007 X

X X X X X no visible alarm 35 4/13/2007 X

X XX X X no visible alarm 36 4/30/2007 X

X X X X X no visible alarm 37 5/15/2007 X

X X X X X Channel 2 Period Fast 38 6/4/2007 X

X X X X X Channel 4 High - transient 39 _

401

  • Concurrent with shutter operation