A fire is reported in the Turbine Lube Oil Tank Room. The fire warrants the declaration of a NOTIFICATION OF UNUSUAL EVENT (EPP-201 Chart 9). | A fire is reported in the Turbine Lube Oil Tank Room. The fire warrants the declaration of a NOTIFICATION OF UNUSUAL EVENT (EPP-201 Chart 9). | ||
A 65-gpm reactor coolant system (RCS) leak occurs inside containment. An ALERT should be declared due to RCS leakage > 50 gpm based on EPP-201 Chart 2. Actions commensurate with an ALERT should begin. Operations crew may isolate letdown or may begin a reactor shutdown. If letdown is isolated, LCV-459 closes and LCV-460 partially closes leaving a 20-gpm leak. | A 65-gpm reactor coolant system (RCS) leak occurs inside containment. An ALERT should be declared due to RCS leakage > 50 gpm based on EPP-201 Chart 2. Actions commensurate with an ALERT should begin. Operations crew may isolate letdown or may begin a reactor shutdown. If letdown is isolated, LCV-459 closes and LCV-460 partially closes leaving a 20-gpm leak. | ||
A large break loss of coolant accident occurs. A SITE AREA EMERGENCY is warranted due to the LOCA leak and indications of failed fuel based on EPP-201, Chart 2. Expect the ERO to take actions warranted by procedure for a SITE AREA EMERGENCY. Site evacuation will not be demonstrated. | A large break loss of coolant accident occurs. A SITE AREA EMERGENCY is warranted due to the LOCA leak and indications of failed fuel based on EPP-201, Chart 2. Expect the ERO to take actions warranted by procedure for a SITE AREA EMERGENCY. Site evacuation will not be demonstrated. | ||
A person in the vicinity of the equipment hatch observes and reports steam coming from the equipment hatch. A GENERAL EMERGENCY is warranted per EPP-201, Chart 2. Expect the ERO to take actions warranted by procedure for a GE and to make the initial protective action recommendation based on plant conditions to be evacuate zone 2A and down wind sectors to 5 miles and shelter downwind sector between 5 and 10 miles. | A person in the vicinity of the equipment hatch observes and reports steam coming from the equipment hatch. A GENERAL EMERGENCY is warranted per EPP-201, Chart 2. Expect the ERO to take actions warranted by procedure for a GE and to make the initial protective action recommendation based on plant conditions to be evacuate zone 2A and down wind sectors to 5 miles and shelter downwind sector between 5 and 10 miles. | ||
Terminate the exercise around 1230, 94 | Terminate the exercise around 1230, 94 | ||
I-0 b | |||
m Y | |||
8 c | |||
.I Y | |||
95 | u 2 | ||
cr, w | |||
95 | |||
I-E 0 | |||
z 5 - | |||
m m | |||
z 5-97 | m a m | ||
97 | |||
v1 W | v1 W | ||
s | 2 s W | ||
W | |||
2 2 | 2 2 | ||
t? | 2 t? | ||
E 0 | E 0 | ||
0 | E 3 | ||
? | |||
0 0 | |||
m 3 | |||
1 99}} | |||
Latest revision as of 19:47, 14 January 2025
| ML073321272 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/07/2007 |
| From: | US Dept of Homeland Security, Federal Emergency Management Agency |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML073320782 | List: |
| References | |
| Download: ML073321272 (6) | |
Text
APPENDIX 4 EXERCISE SCENARIO AND TIMELINE This scenario is for Comanche Peak Steam Electric Station Unit 1. The scenario consists of a fire in the Turbine Lube Oil Tank Room. Then a Loss of Coolant Accident in the Reactor Containment, followed by failed fuel. Pressure increases in Containment, followed by a leaking Equipment Hatch seal. The main event is a large break LOCA with a failure of the containment resulting in a release of radioactive material to the environment.
The exercise is scheduled to begin at 7:30 am., Wednesday, August 29, 2007.
METEOROLOGICAL CONDITIONS Temperature is 85 degrees with wind out of 250*, at 10 mph. Temperature will increase to about 95 degrees by the end of the exercise..
EVENT
SUMMARY
A fire is reported in the Turbine Lube Oil Tank Room. The fire warrants the declaration of a NOTIFICATION OF UNUSUAL EVENT (EPP-201 Chart 9).
A 65-gpm reactor coolant system (RCS) leak occurs inside containment. An ALERT should be declared due to RCS leakage > 50 gpm based on EPP-201 Chart 2. Actions commensurate with an ALERT should begin. Operations crew may isolate letdown or may begin a reactor shutdown. If letdown is isolated, LCV-459 closes and LCV-460 partially closes leaving a 20-gpm leak.
A large break loss of coolant accident occurs. A SITE AREA EMERGENCY is warranted due to the LOCA leak and indications of failed fuel based on EPP-201, Chart 2. Expect the ERO to take actions warranted by procedure for a SITE AREA EMERGENCY. Site evacuation will not be demonstrated.
A person in the vicinity of the equipment hatch observes and reports steam coming from the equipment hatch. A GENERAL EMERGENCY is warranted per EPP-201, Chart 2. Expect the ERO to take actions warranted by procedure for a GE and to make the initial protective action recommendation based on plant conditions to be evacuate zone 2A and down wind sectors to 5 miles and shelter downwind sector between 5 and 10 miles.
Terminate the exercise around 1230, 94