ML080250315: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 21: Line 21:
d/b/a Duke Energy Carolinas, LLC
d/b/a Duke Energy Carolinas, LLC
ATTN: Mr. Bruce H. Hamilton
ATTN: Mr. Bruce H. Hamilton
        Vice President
Vice President
        McGuire Nuclear Station
McGuire Nuclear Station
12700 Hagers Ferry Road
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
Huntersville, NC 28078-8985
SUBJECT:         REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION
SUBJECT:
                MCGUIRE NUCLEAR STATION- 05000369/2008301 AND 05000370/2008301
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION  
MCGUIRE NUCLEAR STATION- 05000369/2008301 AND 05000370/2008301  
Dear Mr. Hamilton:
Dear Mr. Hamilton:
In a meeting on January 22, 2008, between Mr. Steve Helms, Operations Training Supervisor,
In a meeting on January 22, 2008, between Mr. Steve Helms, Operations Training Supervisor,
and Mr. Ronald F. Aiello, Senior Operations Engineer, arrangements were made for the
and Mr. Ronald F. Aiello, Senior Operations Engineer, arrangements were made for the
administration of licensing examinations at McGuire Nuclear Station Units 1 and 2. The
administration of licensing examinations at McGuire Nuclear Station Units 1 and 2. The
operating test is scheduled for the weeks of May 12 and 19, 2008. The written examination is
operating test is scheduled for the weeks of May 12 and 19, 2008. The written examination is
scheduled to be administered on May 23, 2008. The on-site preparatory week is scheduled for
scheduled to be administered on May 23, 2008. The on-site preparatory week is scheduled for
the week of April 21, 2008.
the week of April 21, 2008.
As agreed during the meeting, your staff will prepare both the written examination and the
As agreed during the meeting, your staff will prepare both the written examination and the
operating tests based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing
operating tests based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors." The NRC regional office will discuss with your
Examination Standards for Power Reactors." The NRC regional office will discuss with your
staff any changes that might be necessary before the examinations are administered. Your
staff any changes that might be necessary before the examinations are administered. Your
staff has agreed to make all of the copies of the examination materials prior to administration.
staff has agreed to make all of the copies of the examination materials prior to administration.
To meet the above schedule, it will be necessary for your staff to furnish the written
To meet the above schedule, it will be necessary for your staff to furnish the written
examinations and operating test outlines by Feb 11, 2008. The written examination and
examinations and operating test outlines by Feb 11, 2008. The written examination and
operating tests will be due by March 17, 2008. Pursuant to 10 CFR 55.40(b)(3), an authorized
operating tests will be due by March 17, 2008. Pursuant to 10 CFR 55.40(b)(3), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval. All materials shall be complete and
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use. Any delay in receiving the required examination and reference materials, or the
ready-to-use. Any delay in receiving the required examination and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.
rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
temperatures, and levels) generated during the dynamic operating tests until the examination
Line 56: Line 57:
effect while the written examinations and operating tests are being administered.
effect while the written examinations and operating tests are being administered.


DPC                                               2
DPC
2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2008. The public reporting burden for this collection of information is estimated to average 500
2008. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
Line 80: Line 82:
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public
is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Helms has been advised of the policies and
Thank you for your cooperation in this matter. Mr. Helms has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E-
procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E-
mail: RFA@NRC.GOV), or me at (404) 562-4550, (Internet E-mail: MTW@NRC.GOV).
mail: RFA@NRC.GOV), or me at (404) 562-4550, (Internet E-mail: MTW@NRC.GOV).
                                                Sincerely,
Sincerely,
                                                /RA/
/RA/
                                                Malcolm T. Widmann, Chief
Malcolm T. Widmann, Chief
                                                Operator Licensing Branch
Operator Licensing Branch
                                                Division of Reactor Safety
Division of Reactor Safety
Docket Nos.: 50-369, 50-370
Docket Nos.: 50-369, 50-370
License Nos.: NPF-9, NPF-17
License Nos.: NPF-9, NPF-17
cc: See Page 3
cc: See Page 3


DPC                                 3
DPC
3
cc w/encl:
cc w/encl:
C. J. Thomas
C. J. Thomas
Line 105: Line 108:
R. L. Gill, Jr., Manager
R. L. Gill, Jr., Manager
Nuclear Regulatory Issues
Nuclear Regulatory Issues
  and Industry Affairs
  and Industry Affairs
Duke Power Company LLC
Duke Power Company LLC
d/b/a Duke Energy Carolinas, LLC
d/b/a Duke Energy Carolinas, LLC
526 S. Church Street
526 S. Church Street
Charlotte, NC 28201-0006
Charlotte, NC 28201-0006
Lisa F. Vaughn
Lisa F. Vaughn
Associate General Counsel
Associate General Counsel
and Managing Attorney
  and Managing Attorney
Duke Energy Corporation
Duke Energy Corporation
526 South Church Street-EC07H
526 South Church Street-EC07H
Charlotte, NC 28202
Charlotte, NC 28202
Kathyrn B. Nolan
Kathyrn B. Nolan
Senior Counsel
Senior Counsel
Line 127: Line 130:
Protection Section
Protection Section
N. C. Department of Environmental
N. C. Department of Environmental
Health & Natural Resources
  Health & Natural Resources
Electronic Mail Distribution
Electronic Mail Distribution
County Manager of Mecklenburg County
County Manager of Mecklenburg County
720 East Fourth Street
720 East Fourth Street
Charlotte, NC 28202
Charlotte, NC 28202




  ML080250315_________
  ML080250315_________
OFFICE             RII:DRS       RII:DRS       RII:DRP
OFFICE
SIGNATURE           /RA/           /RA/         /RA/
RII:DRS
NAME               RAiello       MWidmann     MErnstes
RII:DRS
DATE                   01/24/2008     01/24/2008   01/24/2008
RII:DRP
E-MAIL COPY?         YES      NO  YES       NO YES       NO   YES     NO   YES   NO
SIGNATURE
/RA/
/RA/
/RA/
NAME
RAiello
MWidmann
MErnstes
DATE
01/24/2008
01/24/2008
01/24/2008
E-MAIL COPY?
    YES
NO     YES
NO     YES
NO     YES
NO     YES
NO
}}
}}

Latest revision as of 18:32, 14 January 2025

Reactor and Senior Reactor Operator Initial Examination McGuire Nuclear Station - 05000369/2008301 and 05000370/2008301
ML080250315
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/24/2008
From: Widmann M
Operations Branch I
To: Brandi Hamilton
Duke Energy Carolinas, Duke Power Co
References
05000369/2008301, 05000370/2008301
Download: ML080250315 (4)


See also: IR 05000369/2008301

Text

January 24, 2008

Duke Power Company LLC

d/b/a Duke Energy Carolinas, LLC

ATTN: Mr. Bruce H. Hamilton

Vice President

McGuire Nuclear Station

12700 Hagers Ferry Road

Huntersville, NC 28078-8985

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION

MCGUIRE NUCLEAR STATION- 05000369/2008301 AND 05000370/2008301

Dear Mr. Hamilton:

In a meeting on January 22, 2008, between Mr. Steve Helms, Operations Training Supervisor,

and Mr. Ronald F. Aiello, Senior Operations Engineer, arrangements were made for the

administration of licensing examinations at McGuire Nuclear Station Units 1 and 2. The

operating test is scheduled for the weeks of May 12 and 19, 2008. The written examination is

scheduled to be administered on May 23, 2008. The on-site preparatory week is scheduled for

the week of April 21, 2008.

As agreed during the meeting, your staff will prepare both the written examination and the

operating tests based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." The NRC regional office will discuss with your

staff any changes that might be necessary before the examinations are administered. Your

staff has agreed to make all of the copies of the examination materials prior to administration.

To meet the above schedule, it will be necessary for your staff to furnish the written

examinations and operating test outlines by Feb 11, 2008. The written examination and

operating tests will be due by March 17, 2008. Pursuant to 10 CFR 55.40(b)(3), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use. Any delay in receiving the required examination and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

DPC

2

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,

2008. The public reporting burden for this collection of information is estimated to average 500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and

Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Helms has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E-

mail: RFA@NRC.GOV), or me at (404) 562-4550, (Internet E-mail: MTW@NRC.GOV).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operator Licensing Branch

Division of Reactor Safety

Docket Nos.: 50-369, 50-370

License Nos.: NPF-9, NPF-17

cc: See Page 3

DPC

3

cc w/encl:

C. J. Thomas

Regulatory Compliance Manager (MNS)

Duke Power Company LLC

d/b/a Duke Energy Carolinas, LLC

Electronic Mail Distribution

R. L. Gill, Jr., Manager

Nuclear Regulatory Issues

and Industry Affairs

Duke Power Company LLC

d/b/a Duke Energy Carolinas, LLC

526 S. Church Street

Charlotte, NC 28201-0006

Lisa F. Vaughn

Associate General Counsel

and Managing Attorney

Duke Energy Corporation

526 South Church Street-EC07H

Charlotte, NC 28202

Kathyrn B. Nolan

Senior Counsel

Duke Energy Corporation

526 South Church Street-EC 07H

Charlotte, NC 28202

David A. Repka

Winston & Strawn LLP

Electronic Mail Distribution

Beverly Hall, Chief, Radiation

Protection Section

N. C. Department of Environmental

Health & Natural Resources

Electronic Mail Distribution

County Manager of Mecklenburg County

720 East Fourth Street

Charlotte, NC 28202

ML080250315_________

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

RAiello

MWidmann

MErnstes

DATE

01/24/2008

01/24/2008

01/24/2008

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO