d/b/a Duke Energy Carolinas, LLC | d/b/a Duke Energy Carolinas, LLC | ||
ATTN: Mr. Bruce H. Hamilton | ATTN: Mr. Bruce H. Hamilton | ||
Vice President | |||
McGuire Nuclear Station | |||
12700 Hagers Ferry Road | 12700 Hagers Ferry Road | ||
Huntersville, NC 28078-8985 | Huntersville, NC 28078-8985 | ||
SUBJECT: | SUBJECT: | ||
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION | |||
MCGUIRE NUCLEAR STATION- 05000369/2008301 AND 05000370/2008301 | |||
Dear Mr. Hamilton: | Dear Mr. Hamilton: | ||
In a meeting on January 22, 2008, between Mr. Steve Helms, Operations Training Supervisor, | In a meeting on January 22, 2008, between Mr. Steve Helms, Operations Training Supervisor, | ||
and Mr. Ronald F. Aiello, Senior Operations Engineer, arrangements were made for the | and Mr. Ronald F. Aiello, Senior Operations Engineer, arrangements were made for the | ||
administration of licensing examinations at McGuire Nuclear Station Units 1 and 2. The | administration of licensing examinations at McGuire Nuclear Station Units 1 and 2. The | ||
operating test is scheduled for the weeks of May 12 and 19, 2008. The written examination is | operating test is scheduled for the weeks of May 12 and 19, 2008. The written examination is | ||
scheduled to be administered on May 23, 2008. The on-site preparatory week is scheduled for | scheduled to be administered on May 23, 2008. The on-site preparatory week is scheduled for | ||
the week of April 21, 2008. | the week of April 21, 2008. | ||
As agreed during the meeting, your staff will prepare both the written examination and the | As agreed during the meeting, your staff will prepare both the written examination and the | ||
operating tests based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing | operating tests based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing | ||
Examination Standards for Power Reactors." The NRC regional office will discuss with your | Examination Standards for Power Reactors." The NRC regional office will discuss with your | ||
staff any changes that might be necessary before the examinations are administered. Your | staff any changes that might be necessary before the examinations are administered. Your | ||
staff has agreed to make all of the copies of the examination materials prior to administration. | staff has agreed to make all of the copies of the examination materials prior to administration. | ||
To meet the above schedule, it will be necessary for your staff to furnish the written | To meet the above schedule, it will be necessary for your staff to furnish the written | ||
examinations and operating test outlines by Feb 11, 2008. The written examination and | examinations and operating test outlines by Feb 11, 2008. The written examination and | ||
operating tests will be due by March 17, 2008. Pursuant to 10 CFR 55.40(b)(3), an authorized | operating tests will be due by March 17, 2008. Pursuant to 10 CFR 55.40(b)(3), an authorized | ||
representative of the facility licensee shall approve the outlines, examinations, and tests before | representative of the facility licensee shall approve the outlines, examinations, and tests before | ||
they are submitted to the NRC for review and approval. All materials shall be complete and | they are submitted to the NRC for review and approval. All materials shall be complete and | ||
ready-to-use. Any delay in receiving the required examination and reference materials, or the | ready-to-use. Any delay in receiving the required examination and reference materials, or the | ||
submittal of inadequate or incomplete materials, may cause the examinations to be | submittal of inadequate or incomplete materials, may cause the examinations to be | ||
rescheduled. | rescheduled. | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | In order to conduct the requested written examinations and operating tests, it will be necessary | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | for your staff to provide adequate space and accommodations in accordance with ES-402, and | ||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | to make the simulation facility available on the dates noted above. In accordance with ES-302, | ||
your staff should retain the original simulator performance data (e.g., system pressures, | your staff should retain the original simulator performance data (e.g., system pressures, | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | temperatures, and levels) generated during the dynamic operating tests until the examination | ||
| Line 56: | Line 57: | ||
effect while the written examinations and operating tests are being administered. | effect while the written examinations and operating tests are being administered. | ||
DPC | DPC | ||
2 | |||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | To permit timely NRC review and evaluation, your staff should submit preliminary reactor | ||
operator and senior reactor operator license applications (Office of Management and Budget | operator and senior reactor operator license applications (Office of Management and Budget | ||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | ||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | ||
examination date. If the applications are not received at least 30 days before the examination | examination date. If the applications are not received at least 30 days before the examination | ||
date, a postponement may be necessary. Signed applications certifying that all training has | date, a postponement may be necessary. Signed applications certifying that all training has | ||
been completed should be submitted at least 14 days before the first examination date. | been completed should be submitted at least 14 days before the first examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of | ||
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, | Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, | ||
2008. The public reporting burden for this collection of information is estimated to average 500 | 2008. The public reporting burden for this collection of information is estimated to average 500 | ||
hours per response, including the time for reviewing instructions, gathering and maintaining the | hours per response, including the time for reviewing instructions, gathering and maintaining the | ||
data needed, writing the examinations, and completing and reviewing the collection of | data needed, writing the examinations, and completing and reviewing the collection of | ||
information. Send comments on any aspect of this collection of information, including | information. Send comments on any aspect of this collection of information, including | ||
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 | suggestions for reducing the burden, to the Information and Records Management Branch (T-6 | ||
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet | F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet | ||
| Line 80: | Line 82: | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | ||
available electronically for public inspection in the NRC Public Document Room or from the | available electronically for public inspection in the NRC Public Document Room or from the | ||
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS | Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS | ||
is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public | is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public | ||
Electronic Reading Room). | Electronic Reading Room). | ||
Thank you for your cooperation in this matter. Mr. Helms has been advised of the policies and | Thank you for your cooperation in this matter. Mr. Helms has been advised of the policies and | ||
guidelines referenced in this letter. If you have any questions regarding the NRC's examination | guidelines referenced in this letter. If you have any questions regarding the NRC's examination | ||
procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E- | procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E- | ||
mail: RFA@NRC.GOV), or me at (404) 562-4550, (Internet E-mail: MTW@NRC.GOV). | mail: RFA@NRC.GOV), or me at (404) 562-4550, (Internet E-mail: MTW@NRC.GOV). | ||
Sincerely, | |||
/RA/ | |||
Malcolm T. Widmann, Chief | |||
Operator Licensing Branch | |||
Division of Reactor Safety | |||
Docket Nos.: 50-369, 50-370 | Docket Nos.: 50-369, 50-370 | ||
License Nos.: NPF-9, NPF-17 | License Nos.: NPF-9, NPF-17 | ||
cc: See Page 3 | cc: See Page 3 | ||
DPC | DPC | ||
3 | |||
cc w/encl: | cc w/encl: | ||
C. J. Thomas | C. J. Thomas | ||
| Line 105: | Line 108: | ||
R. L. Gill, Jr., Manager | R. L. Gill, Jr., Manager | ||
Nuclear Regulatory Issues | Nuclear Regulatory Issues | ||
and Industry Affairs | |||
Duke Power Company LLC | Duke Power Company LLC | ||
d/b/a Duke Energy Carolinas, LLC | d/b/a Duke Energy Carolinas, LLC | ||
526 S. Church Street | 526 S. Church Street | ||
Charlotte, NC 28201-0006 | Charlotte, NC 28201-0006 | ||
Lisa F. Vaughn | Lisa F. Vaughn | ||
Associate General Counsel | Associate General Counsel | ||
and Managing Attorney | |||
Duke Energy Corporation | Duke Energy Corporation | ||
526 South Church Street-EC07H | 526 South Church Street-EC07H | ||
Charlotte, NC 28202 | Charlotte, NC 28202 | ||
Kathyrn B. Nolan | Kathyrn B. Nolan | ||
Senior Counsel | Senior Counsel | ||
| Line 127: | Line 130: | ||
Protection Section | Protection Section | ||
N. C. Department of Environmental | N. C. Department of Environmental | ||
Health & Natural Resources | |||
Electronic Mail Distribution | Electronic Mail Distribution | ||
County Manager of Mecklenburg County | County Manager of Mecklenburg County | ||
720 East Fourth Street | 720 East Fourth Street | ||
Charlotte, NC 28202 | Charlotte, NC 28202 | ||
ML080250315_________ | ML080250315_________ | ||
OFFICE | |||
RII:DRS | |||
RII:DRS | |||
RII:DRP | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
NAME | |||
RAiello | |||
MWidmann | |||
MErnstes | |||
DATE | |||
01/24/2008 | |||
01/24/2008 | |||
01/24/2008 | |||
E-MAIL COPY? | |||
YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO YES | |||
NO | |||
}} | }} | ||
Latest revision as of 18:32, 14 January 2025
| ML080250315 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/24/2008 |
| From: | Widmann M Operations Branch I |
| To: | Brandi Hamilton Duke Energy Carolinas, Duke Power Co |
| References | |
| 05000369/2008301, 05000370/2008301 | |
| Download: ML080250315 (4) | |
See also: IR 05000369/2008301
Text
January 24, 2008
Duke Power Company LLC
d/b/a Duke Energy Carolinas, LLC
ATTN: Mr. Bruce H. Hamilton
Vice President
McGuire Nuclear Station
12700 Hagers Ferry Road
Huntersville, NC 28078-8985
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATION
MCGUIRE NUCLEAR STATION- 05000369/2008301 AND 05000370/2008301
Dear Mr. Hamilton:
In a meeting on January 22, 2008, between Mr. Steve Helms, Operations Training Supervisor,
and Mr. Ronald F. Aiello, Senior Operations Engineer, arrangements were made for the
administration of licensing examinations at McGuire Nuclear Station Units 1 and 2. The
operating test is scheduled for the weeks of May 12 and 19, 2008. The written examination is
scheduled to be administered on May 23, 2008. The on-site preparatory week is scheduled for
the week of April 21, 2008.
As agreed during the meeting, your staff will prepare both the written examination and the
operating tests based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors." The NRC regional office will discuss with your
staff any changes that might be necessary before the examinations are administered. Your
staff has agreed to make all of the copies of the examination materials prior to administration.
To meet the above schedule, it will be necessary for your staff to furnish the written
examinations and operating test outlines by Feb 11, 2008. The written examination and
operating tests will be due by March 17, 2008. Pursuant to 10 CFR 55.40(b)(3), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use. Any delay in receiving the required examination and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2008. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS
is accessible from the NRC Web site at http://www.nrc.gov/readingrm/adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Helms has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Ronald F. Aiello at (404) 562-4641, (Internet E-
mail: RFA@NRC.GOV), or me at (404) 562-4550, (Internet E-mail: MTW@NRC.GOV).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operator Licensing Branch
Division of Reactor Safety
Docket Nos.: 50-369, 50-370
cc: See Page 3
3
cc w/encl:
C. J. Thomas
Regulatory Compliance Manager (MNS)
Duke Power Company LLC
d/b/a Duke Energy Carolinas, LLC
Electronic Mail Distribution
R. L. Gill, Jr., Manager
Nuclear Regulatory Issues
and Industry Affairs
Duke Power Company LLC
d/b/a Duke Energy Carolinas, LLC
526 S. Church Street
Charlotte, NC 28201-0006
Lisa F. Vaughn
Associate General Counsel
and Managing Attorney
Duke Energy Corporation
526 South Church Street-EC07H
Charlotte, NC 28202
Kathyrn B. Nolan
Senior Counsel
Duke Energy Corporation
526 South Church Street-EC 07H
Charlotte, NC 28202
David A. Repka
Winston & Strawn LLP
Electronic Mail Distribution
Beverly Hall, Chief, Radiation
Protection Section
N. C. Department of Environmental
Health & Natural Resources
Electronic Mail Distribution
County Manager of Mecklenburg County
720 East Fourth Street
Charlotte, NC 28202
ML080250315_________
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME
RAiello
MWidmann
MErnstes
DATE
01/24/2008
01/24/2008
01/24/2008
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO