IR 05000336/2008001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:rch 3, 2008
{{#Wiki_filter:March 3, 2008


==SUBJECT:==
==SUBJECT:==
Line 40: Line 40:


Sincerely,
Sincerely,
/RA/
/RA/  
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 Enclosure: Millstone Units 2 and 3 Inspection/Activity Plan cc w/encl:
 
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects  
 
Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49  
 
Enclosure: Millstone Units 2 and 3 Inspection/Activity Plan  
 
cc w/encl:
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.


R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secy, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq Institute of Nuclear Power
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secy, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq Institute of Nuclear Power  
 
Millstone Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2008 09:20:50 Report 22
 
71152B
- PI&R Baseline Inspections Identification and Resolution of Problems 02/11/2008 02/15/2008 2, 3 71152B IP Baseline Inspections Identification and Resolution of Problems 02/25/2008 02/29/2008 2, 3 71152B IP
 
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections Access Control to Radiologically Significant Areas 02/11/2008 02/15/2008 2, 3 7112101 IP
 
EP
- EP EXERCISE EVALUATION EP Baseline Inspection Exercise Evaluation 03/17/2008 03/21/2008 2, 3 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/17/2008 03/21/2008 2, 3 7111404 IP Baseline Inspections Drill/Exercise Performance 03/17/2008 03/21/2008 2, 3 71151-EP01 IP Baseline Inspections ERO Drill Participation 03/17/2008 03/21/2008 2, 3 71151-EP02 IP Baseline Inspections Alert & Notification System 03/17/2008 03/21/2008 2, 3 71151-EP03 IP
 
7111108P
- U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/07/2008 04/11/2008
 
7111108P IP
 
TI-172
- U2 RCS DISSIMILIAR METAL WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/07/2008 04/11/2008
 
2515/172 IP
 
7111108P
- U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/21/2008 04/25/2008
 
7111108P IP
 
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 05/05/2008 05/09/2008 2, 3 7112102 IP
 
7111111B
- L.O. REQUAL.PROG.(FOCUS U2)+P/F RVW Baseline Inspections Licensed Operator Requalification Program 09/08/2008 09/12/2008 2, 3 7111111B IP
 
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 07/14/2008 07/18/2008 2, 3 7112202 IP
 
TI 171
- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/25/2008 08/29/2008 2, 3 2515/171 IP
 
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 09/08/2008 09/12/2008 2, 3 7112102 IP
 
1/19EXAM
- U2 INITIAL OPERATOR LICENSING EXAMS Not Applicable FY-09 - U2 MILLSTONE INITIAL OL EXAM 12/15/2008 12/19/2008
 
U01634 Not Applicable FY-09 - U2 MILLSTONE INITIAL OL EXAM 01/19/2009 01/30/2009
 
U01634
 
7111108P
- U3 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/13/2008 10/17/2008
 
7111108P IP
 
TI-172
- TI-172 RCS DISSIMILIAR METAL WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 10/13/2008 10/17/2008


Page 1 of 2      Millstone 02/28/2008 09:20:50    Inspection / Activity Plan Report 22 01/01/2008 - 06/30/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type 71152B - PI&R      5 2, 3 IP 71152B Identification and Resolution of Problems    02/11/2008 02/15/2008 Baseline Inspections 2, 3 IP 71152B Identification and Resolution of Problems    02/25/2008 02/29/2008 Baseline Inspections 7112101 - OCC RAD SAFETY - ACCESS      1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas    02/11/2008 02/15/2008 Baseline Inspections EP - EP EXERCISE EVALUATION      4 2, 3 IP 7111401 Exercise Evaluation      03/17/2008 03/21/2008 EP Baseline Inspection 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes    03/17/2008 03/21/2008 EP Baseline Inspection 2, 3 IP 71151-EP01 Drill/Exercise Performance    03/17/2008 03/21/2008 Baseline Inspections 2, 3 IP 71151-EP02 ERO Drill Participation      03/17/2008 03/21/2008 Baseline Inspections 2, 3 IP 71151-EP03 Alert & Notification System    03/17/2008 03/21/2008 Baseline Inspections 7111108P - U2 INSERVICE INSPECTION      1 2 IP 7111108P Inservice Inspection Activities - PWR    04/07/2008 04/11/2008 Baseline Inspections TI-172 - U2 RCS DISSIMILIAR METAL WELDS    1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds    04/07/2008 04/11/2008 Generic Safety Inspectio 7111108P - U2 INSERVICE INSPECTION      1 2 IP 7111108P Inservice Inspection Activities - PWR    04/21/2008 04/25/2008 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA      1 2, 3 IP 7112102 ALARA Planning and Controls    05/05/2008 05/09/2008 Baseline Inspections 7111111B - L.O. REQUAL.PROG.(FOCUS U2)+P/F RVW    3 2, 3 IP 7111111B Licensed Operator Requalification Program    09/08/2008 09/12/2008 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE      1 2, 3 IP 7112202 Radioactive Material Processing and Transportation    07/14/2008 07/18/2008 Baseline Inspections TI 171 - TI 171      4 2, 3 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/25/2008 08/29/2008 Generic Safety Inspectio 7112102 - OCC RAD SAFETY - ALARA      1 2, 3 IP 7112102 ALARA Planning and Controls    09/08/2008 09/12/2008 Baseline Inspections 1/19EXAM - U2 INITIAL OPERATOR LICENSING EXAMS    4 2 U01634 FY-09 - U2 MILLSTONE INITIAL OL EXAM    12/15/2008 12/19/2008 Not Applicable 2 U01634 FY-09 - U2 MILLSTONE INITIAL OL EXAM    01/19/2009 01/30/2009 Not Applicable 7111108P - U3 INSERVICE INSPECTION      1 3 IP 7111108P Inservice Inspection Activities - PWR    10/13/2008 10/17/2008 Baseline Inspections TI-172 - TI-172 RCS DISSIMILIAR METAL WELDS    1 3 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds    10/13/2008 10/17/2008 Generic Safety Inspectio This report does not include INPO and OUTAGE activities.
2515/172 IP This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2      Millstone 02/28/2008 09:20:50    Inspection / Activity Plan Report 22 01/01/2008 - 06/30/2009 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type 7111108P - U3 INSERVICE INSPECTION     1 3 IP 7111108P Inservice Inspection Activities - PWR   10/20/2008 10/24/2008 Baseline Inspections 71121.02 - OCC RAD SAFETY     1 2 IP 7112102 ALARA Planning and Controls   10/20/2008 10/24/2008 Baseline Inspections TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION   4 2 IP 7111105T Fire Protection [Triennial]   11/17/2008 11/21/2008 Baseline Inspections 2 IP 7111105T Fire Protection [Triennial]   12/01/2008 12/05/2008 Baseline Inspections 7112103 - OCC RAD SAFETY - INSTRUMENTS     1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 Baseline Inspections 7111121 - CDBI      6 2, 3 IP 7111121 Component Design Bases Inspection   01/12/2009 01/16/2009 Baseline Inspections 2, 3 IP 7111121 Component Design Bases Inspection   01/26/2009 02/06/2009 Baseline Inspections 71121 - OCC RAD SAFETY     1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas   02/23/2009 02/27/2009 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls   02/23/2009 02/27/2009 Baseline Inspections 71122.01 - PUB RAD SAFETY - RETS     1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/08/2009 06/12/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
Millstone Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2008 09:20:50 Report 22
 
7111108P
- U3 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/20/2008 10/24/2008
 
7111108P IP
 
71121.02
- OCC RAD SAFETY Baseline Inspections ALARA Planning and Controls 10/20/2008 10/24/2008
 
7112102 IP
 
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]
11/17/2008 11/21/2008
 
7111105T IP Baseline Inspections Fire Protection [Triennial]
12/01/2008 12/05/2008
 
7111105T IP
 
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 2, 3 7112103 IP
 
7111121
- CDBI Baseline Inspections Component Design Bases Inspection 01/12/2009 01/16/2009 2, 3 7111121 IP Baseline Inspections Component Design Bases Inspection 01/26/2009 02/06/2009 2, 3 7111121 IP
 
71121
- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 02/23/2009 02/27/2009 2, 3 7112101 IP Baseline Inspections ALARA Planning and Controls 02/23/2009 02/27/2009 2, 3 7112102 IP
 
71122.01
- PUB RAD SAFETY - RETS Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/08/2009 06/12/2009 2, 3 7112201 IP This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures. If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
This report shows only on-site and announced inspection procedures. If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.
Line 58: Line 152:
Sincerely,
Sincerely,
/RA/
/RA/
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 Enclosure: Millstone Units 2 and 3 Inspection/Activity Plan cc w/encl:
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects  
 
Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49  
 
Enclosure: Millstone Units 2 and 3 Inspection/Activity Plan  
 
cc w/encl:
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.


R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secy, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq Institute of Nuclear Power DISTRIBUTION see next page SUNSI Review Complete: RJP (Reviewer=s Initials)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secy, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq Institute of Nuclear Power  
DOCUMENT NAME: S:\ROP-8 EOC Review\Branch 5\2007 EOC Millstone Assessment Letter_rev0.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
 
DISTRIBUTION see next page SUNSI Review Complete: RJP (Reviewer=s Initials)
DOCUMENT NAME: S:\\ROP-8 EOC Review\\Branch 5\\2007 EOC Millstone Assessment Letter_rev0.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
 
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy
 
OFFICE
 
RI/DRP
 
RI/DRP
 
RI/DRP
 
NAME
 
NSieller/ BSN FOR
 
SShaffer/ RJP FOR
 
RPowell/RJP DATE


To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP  RI/DRP  RI/DRP NAME NSieller/ BSN FOR SShaffer/ RJP FOR RPowell/RJP DATE 02/28/08 02/28/08 02/28/08 OFFICAL RECORD COPY Distribution w/encl: J. Trapp, DRS S. Collins, RA J. Rogge, DRS M. Dapas, DRA S. Hansell, DRS G. West, RI OEDO (Acting) J. White, DRS R. Powell, DRP L. Doerflein, DRS B. Norris, DRP R. Conte, DRS M. Kowal, NRR L. Scholl, DRS J. Kim, PM, NRR P. Frechette, DRS J. Boska, NRR D. Silk, DRS J. Lubinski, NRR D. Screnci, PAO S. Shaffer, Resident Inspector N. Sheehan, PAO J. Benjamin, Resident Inspector R. Barkley, ORA Region I Docket Room (w/concurrences) D. Holody, ORA RidsNrrDirslpab@nrc.gov  J. Thompson, NRR (JWT1@nrc.gov)
02/28/08 02/28/08 02/28/08 OFFICAL RECORD COPY Distribution w/encl:
ROPreports@nrc.gov
S. Collins, RA M. Dapas, DRA G. West, RI OEDO (Acting)
R. Powell, DRP B. Norris, DRP M. Kowal, NRR J. Kim, PM, NRR J. Boska, NRR J. Lubinski, NRR S. Shaffer, Resident Inspector J. Benjamin, Resident Inspector Region I Docket Room (w/concurrences)
RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov J. Trapp, DRS J. Rogge, DRS S. Hansell, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)
}}
}}

Latest revision as of 17:53, 14 January 2025

IR 05000336-08-001, and IR 05000423-08-001, Millstone Power Station - Annual Assessment Letter
ML080630630
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/03/2008
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: Christian D
Dominion Resources Services
References
IR-08-001
Download: ML080630630 (6)


Text

March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - MILLSTONE POWER STATION (REPORTS 05000336/2008001 AND 05000423/2008001)

Dear Mr. Christian:

On February 14, 2008, the U.S. Nuclear Regulatory Commission (NRC) staff completed its performance review of the Millstone Power Station (Millstone). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Overall, Millstone Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter for Millstone Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green)

and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects

Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49

Enclosure: Millstone Units 2 and 3 Inspection/Activity Plan

cc w/encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secy, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq Institute of Nuclear Power

Millstone Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 02/28/2008 09:20:50 Report 22

71152B

- PI&R Baseline Inspections Identification and Resolution of Problems 02/11/2008 02/15/2008 2, 3 71152B IP Baseline Inspections Identification and Resolution of Problems 02/25/2008 02/29/2008 2, 3 71152B IP

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections Access Control to Radiologically Significant Areas 02/11/2008 02/15/2008 2, 3 7112101 IP

EP

- EP EXERCISE EVALUATION EP Baseline Inspection Exercise Evaluation 03/17/2008 03/21/2008 2, 3 7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/17/2008 03/21/2008 2, 3 7111404 IP Baseline Inspections Drill/Exercise Performance 03/17/2008 03/21/2008 2, 3 71151-EP01 IP Baseline Inspections ERO Drill Participation 03/17/2008 03/21/2008 2, 3 71151-EP02 IP Baseline Inspections Alert & Notification System 03/17/2008 03/21/2008 2, 3 71151-EP03 IP

7111108P

- U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/07/2008 04/11/2008

7111108P IP

TI-172

- U2 RCS DISSIMILIAR METAL WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/07/2008 04/11/2008

2515/172 IP

7111108P

- U2 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/21/2008 04/25/2008

7111108P IP

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 05/05/2008 05/09/2008 2, 3 7112102 IP

7111111B

- L.O. REQUAL.PROG.(FOCUS U2)+P/F RVW Baseline Inspections Licensed Operator Requalification Program 09/08/2008 09/12/2008 2, 3 7111111B IP

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections Radioactive Material Processing and Transportation 07/14/2008 07/18/2008 2, 3 7112202 IP

TI 171

- TI 171 Generic Safety Inspectio Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 08/25/2008 08/29/2008 2, 3 2515/171 IP

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections ALARA Planning and Controls 09/08/2008 09/12/2008 2, 3 7112102 IP

1/19EXAM

- U2 INITIAL OPERATOR LICENSING EXAMS Not Applicable FY-09 - U2 MILLSTONE INITIAL OL EXAM 12/15/2008 12/19/2008

U01634 Not Applicable FY-09 - U2 MILLSTONE INITIAL OL EXAM 01/19/2009 01/30/2009

U01634

7111108P

- U3 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/13/2008 10/17/2008

7111108P IP

TI-172

- TI-172 RCS DISSIMILIAR METAL WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 10/13/2008 10/17/2008

2515/172 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Millstone Inspection / Activity Plan 01/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 02/28/2008 09:20:50 Report 22

7111108P

- U3 INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/20/2008 10/24/2008

7111108P IP

71121.02

- OCC RAD SAFETY Baseline Inspections ALARA Planning and Controls 10/20/2008 10/24/2008

7112102 IP

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]

11/17/2008 11/21/2008

7111105T IP Baseline Inspections Fire Protection [Triennial]

12/01/2008 12/05/2008

7111105T IP

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 12/01/2008 12/05/2008 2, 3 7112103 IP

7111121

- CDBI Baseline Inspections Component Design Bases Inspection 01/12/2009 01/16/2009 2, 3 7111121 IP Baseline Inspections Component Design Bases Inspection 01/26/2009 02/06/2009 2, 3 7111121 IP

71121

- OCC RAD SAFETY Baseline Inspections Access Control to Radiologically Significant Areas 02/23/2009 02/27/2009 2, 3 7112101 IP Baseline Inspections ALARA Planning and Controls 02/23/2009 02/27/2009 2, 3 7112102 IP

71122.01

- PUB RAD SAFETY - RETS Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/08/2009 06/12/2009 2, 3 7112201 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-6967 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects

Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49

Enclosure: Millstone Units 2 and 3 Inspection/Activity Plan

cc w/encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support D. W. Dodson, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control G. Proios, Suffolk County Planning Dept.

R. Shadis, New England Coalition Staff G. Winslow, Citizens Regulatory Commission (CRC)

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York M. Balboni, Deputy Secy, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq Institute of Nuclear Power

DISTRIBUTION see next page SUNSI Review Complete: RJP (Reviewer=s Initials)

DOCUMENT NAME: S:\\ROP-8 EOC Review\\Branch 5\\2007 EOC Millstone Assessment Letter_rev0.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RI/DRP

RI/DRP

RI/DRP

NAME

NSieller/ BSN FOR

SShaffer/ RJP FOR

RPowell/RJP DATE

02/28/08 02/28/08 02/28/08 OFFICAL RECORD COPY Distribution w/encl:

S. Collins, RA M. Dapas, DRA G. West, RI OEDO (Acting)

R. Powell, DRP B. Norris, DRP M. Kowal, NRR J. Kim, PM, NRR J. Boska, NRR J. Lubinski, NRR S. Shaffer, Resident Inspector J. Benjamin, Resident Inspector Region I Docket Room (w/concurrences)

RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov J. Trapp, DRS J. Rogge, DRS S. Hansell, DRS J. White, DRS L. Doerflein, DRS R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)