{{#Wiki_filter:AC Sources -- Operating 3.8.1 SURVEILLANCE REQUiR__MENTS SURVEILLANCE                                       FREQUENCY SR 3.8.1.1     Verify correct breaker alignment and                                   7 days indicated power availability for each offsite circuit.-
{{#Wiki_filter:AC Sources -- Operating 3.8.1 SURVEILLANCE REQUiR__MENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each offsite circuit.-
SR 3.8.1.2   ------------------- NOTES -------------------
SR 3.8.1.2  
: 1.                 All EDG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
------------------- NOTES -------------------
: 2.                 A modified EDG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
: 1.
Verify each EDG starts and achieves steady                             31 days state voltage 2 3873 V and - 4580 V and frequency 2 58.8 Hz and : 61.2 Hz.
All EDG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
SR 3.8.1.3   .....                  -    -............ NOTES .................---
: 2.
: 1.                 EDG loadings may include gradual loading as recommended by the manufacturer.
A modified EDG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
: 2.                 Momentary transients below the load limit do not invalidate this test.
Verify each EDG starts and achieves steady 31 days state voltage 2 3873 V and - 4580 V and frequency 2 58.8 Hz and : 61.2 Hz.
: 3.                 This Surveillance shall be conducted on only one EDG at a time.
SR 3.8.1.3  
Verify each EDG is synchronized and loaded                             31 days and operates for a 60 minutes at a load 2 2500 kW.
-............ NOTES.................---
: 1.
EDG loadings may include gradual loading as recommended by the manufacturer.
: 2.
Momentary transients below the load limit do not invalidate this test.
: 3.
This Surveillance shall be conducted on only one EDG at a time.
Verify each EDG is synchronized and loaded 31 days and operates for a 60 minutes at a load 2 2500 kW.
(continued)
(continued)
FERMI - UNIT 2                                                 3.8-3                 . Amendment No. X# 178
FERMI - UNIT 2 3.8-3 Amendment No. X# 178


AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS           (continued)
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                               FREQUENCY SR 3.8.1.4     Verify each day tank contains Z:210 gal of               31 days fuel oil.
SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains Z:210 gal of 31 days fuel oil.
SR 3.8.1.5     Check for and remove accumulated water from             31 days each day tank.
SR 3.8.1.5 Check for and remove accumulated water from 31 days each day tank.
SR 3.8.1.6     Verify each fuel oil transfer system                     31 days operates to automatically transfer fuel oil from storage tanks to the day tanks.
SR 3.8.1.6 Verify each fuel oil transfer system 31 days operates to automatically transfer fuel oil from storage tanks to the day tanks.
SR 3.8.1.7   ...................          NOTE ....................
SR 3.8.1.7 NOTE....................
All EDG starts-may be preceded by an engine-prelube period and followed by a warmup period prior to loading.
All EDG starts-may be preceded by an engine-prelube period and followed by a warmup period prior to loading.
Verify each EDG starts from standby                     184 days condition and achieves:
Verify each EDG starts from standby 184 days condition and achieves:
: a.       In : 10 seconds. voltage > 3873 V and                             I frequency > 58.8 Hz; and
: a.
: b.       Steady state voltage a 3873 V and
In : 10 seconds. voltage > 3873 V and frequency > 58.8 Hz; and
: b.
Steady state voltage a 3873 V and
:9 4580 V and frequency k 58.8 Hz and
:9 4580 V and frequency k 58.8 Hz and
:5 61.2 Hz.
:5 61.2 Hz.
SR 3.8.1.8     Verify each EDG rejects a load greater than             18 months or equal to its associated single largest post-accident load, and following load rejection, the frequency is :9 66.75 Hz.
SR 3.8.1.8 Verify each EDG rejects a load greater than 18 months or equal to its associated single largest post-accident load, and following load rejection, the frequency is :9 66.75 Hz.
(continued)
(continued)
FERMI -UNIT 2                               3.8-4                     Amendment No. X# 178
I FERMI -UNIT 2
3.8-4 Amendment No. X# 178


AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS           (continued)
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                           I   FREQUENCY SR 3.8.1.9     Verify each EDG does not trip and voltage               18 months is maintained < 5267 V during and following a load rejection of 2 2850 kW.
SURVEILLANCE I FREQUENCY SR 3.8.1.9 Verify each EDG does not trip and voltage 18 months is maintained < 5267 V during and following a load rejection of 2 2850 kW.
SR 3.8.1.10 ...................           NOTE ....................
SR 3.8.1.10...................
NOTE....................
All EDG starts may be preceded by an engine prelube period.
All EDG starts may be preceded by an engine prelube period.
Verify on simulated loss of offsite power               18 months
Verify on simulated loss of offsite power 18 months
                ,signal:
,signal:
: a.       De-energization of emergency buses:
: a.
              ....b,.. Load shedding. from emergency buses:.
De-energization of emergency buses:
....b,..
Load shedding. from emergency buses:.
and
and
: c.     EDG auto-starts and:
: c.
EDG auto-starts and:
: 1. energizes permanently connected loads in : 10 seconds.
: 1. energizes permanently connected loads in : 10 seconds.
: 2.     energizes auto-connected shutdown loads through load sequencer,-
: 2.
: 3.     maintains steady state voltage
energizes auto-connected shutdown loads through load sequencer,-
                                > 3873 V and
: 3.
maintains steady state voltage
> 3873 V and
* 4580 V,
* 4580 V,
: 4.     maintains steady state frequency
: 4.
maintains steady state frequency
: 58.8 Hz and
: 58.8 Hz and
* 61.2 Hz, and
* 61.2 Hz, and
: 5.     supplies permanently connected and auto-connected shutdown loads for
: 5.
                                > 5 minutes.
supplies permanently connected and auto-connected shutdown loads for
> 5 minutes.
(continued)
(continued)
FERMI -UNIT 2                               3.8-5               Amendment No. M4, 1#178
FERMI -UNIT 2
3.8-5 Amendment No. M4, 1#178


AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS                       (continued)
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
                                          ,11DI/rTL
,11DI/rTL AIIAuCE FREQUENCY"
                                          .. ~l*l IL.,.IJ*tLlt AIIAuCE                                  FREQUENCY" SR 3.8.1.11   .................... NOTE&- ...............
..~l* l IL.,.IJ*tLlt SR 3.8.1.11 NOTE&-
All EDG starts may be preceded by an engine prelube period.
All EDG starts may be preceded by an engine prelube period.
                .... .......................                              &deg;. o...............
&deg;.
Verify on an actual or simulated Emergency                                         18 months Core Cooling System (ECCS) initiation signal each EDG auto-starts and:
o...............
: a.       In 5 10 seconds after auto-start and during tests, achieves voltage L 3873 V and frequency>&#xfd; 58.8 Hz:                                                             I I
Verify on an actual or simulated Emergency 18 months Core Cooling System (ECCS) initiation signal each EDG auto-starts and:
: b.     Achieves steady state voltage k 3873 V and : 4580 V. and frequency 2 58.8 Hz and
: a.
In 5 10 seconds after auto-start and during tests, achieves voltage L 3873 V and frequency>&#xfd; 58.8 Hz:
: b.
Achieves steady state voltage k 3873 V and : 4580 V. and frequency 2 58.8 Hz and
* 61.2 Hz; and
* 61.2 Hz; and
: c.     Operates for 2 5 minutes.
: c.
SR 3.8.1.12   Verify each EDG's automatic trips are                                               18 months bypassed on an actual or simulated emergency start signal except:
Operates for 2 5 minutes.
: a.     Engine overspeed:
SR 3.8.1.12 Verify each EDG's automatic trips are 18 months bypassed on an actual or simulated emergency start signal except:
: b.     Generator differential current;
: a.
: c.     Low lube oil pressure;
Engine overspeed:
: d.     Crankcase overpressure; and
: b.
: e.     Failure to start.
Generator differential current;
: c.
Low lube oil pressure;
: d.
Crankcase overpressure; and
: e.
Failure to start.
(continued)
(continued)
FERMI - UNIT 2                                                       3.8-6                         Amendment No. %#K*' 178
II FERMI - UNIT 2 3.8-6 Amendment No. %#K*' 178


AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS           (continued)
AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
S4RVILLANCE                                   FREQUENCY SR 3.8.1.13     ..................        NOTE ---------------------
S4RVILLANCE FREQUENCY SR 3.8.1.13 NOTE ---------------------
Momentary transients outside the load range do not invalidate this test.
Momentary transients outside the load range do not invalidate this test.
Verify each EDG operates for - 24 hours:                   18 months
Verify each EDG operates for - 24 hours:
: a.       For all but the final k 2 hours loaded k 2500 kW and : 2600 kW: and
18 months
: b.       For the final > 2 hours of the test loaded 2 2800 kW and ! 2900 kW.
: a.
SR 3.8.1.14 -------.--------- NOTES -------------------
For all but the final k 2 hours loaded k 2500 kW and : 2600 kW: and
: 1. This Surveillance shall be performed within 5 minutes of shutting down the EDG after the EDG has operated k 2 hours loaded > 2500 kW or until operating temperatures have stabilized.
: b.
For the final > 2 hours of the test loaded 2 2800 kW and ! 2900 kW.
SR 3.8.1.14 -------.---------
NOTES -------------------
: 1.
This Surveillance shall be performed within 5 minutes of shutting down the EDG after the EDG has operated k 2 hours loaded > 2500 kW or until operating temperatures have stabilized.
Momentary transients below the load limit do not invalidate this test.
Momentary transients below the load limit do not invalidate this test.
: 2.       All EDG starts may be preceded by an engine prelube period.
: 2.
Verify each EDG starts and achieves:                       18 months
All EDG starts may be preceded by an engine prelube period.
: a.       In :T 10 seconds, voltage k 3873 V and                               I frequency > 58.8 Hz; and
Verify each EDG starts and achieves:
: b.       Steady state voltage 2 3873 V and
18 months
: a.
In :T 10 seconds, voltage k 3873 V and frequency > 58.8 Hz; and
: b.
Steady state voltage 2 3873 V and
: 4580 V and frequency > 58.8 Hz and
: 4580 V and frequency > 58.8 Hz and
* 61.2 Hz.
* 61.2 Hz.
(continued)
(continued)
FERMI -UNIT 2                               3.8-7                       Amendment No. 4     178
I FERMI -UNIT 2
3.8-7 Amendment No. 4 178


AC Sources -- Operating 3.8.1 A
AC Sources -- Operating 3.8.1 A
SURVEILLANCE REQUIREMENTS                                 (continued)
SURVEILLANCE REQUIREMENTS (continued)
SJRVEILLA.NCE                                             FREQUENCY SR 3.8.1.17 ------------------- NOTE ....................
SJRVEILLA.NCE FREQUENCY SR 3.8.1.17 ------------------- NOTE....................
All EDG starts may be preceded by an engine prelube period.
All EDG starts may be preceded by an engine prelube period.
Verify, on simulated loss of offsite power                                                   18 months signal in conjunction with an actual or simulated ECCS initiation signal:
Verify, on simulated loss of offsite power 18 months signal in conjunction with an actual or simulated ECCS initiation signal:
: a.                     De-energization of emergency buses;
: a.
: b.                     Load shedding from emergency buses; and
De-energization of emergency buses;
: c.                   EDG auto-starts and:
: b.
: 1.         -     energizes permanently connected loads in _<10 seconds.
Load shedding from emergency buses; and
: 2.                 energizes auto-connected emergency loads through load sequencer,
: c.
: 3.                 achieves steady state voltage k 3873 V and _-4580 V.
EDG auto-starts and:
: 4.                 achieves steady state frequency k 58.8 Hz and < 61.2 Hz. and
: 1. -
: 5.                 supplies permanently connected and auto-connected emergency loads for k 5 minutes.
energizes permanently connected loads in _<
SR 3.8.1.18   ................... NOTE -------------------
10 seconds.
: 2.
energizes auto-connected emergency loads through load sequencer,
: 3.
achieves steady state voltage k 3873 V and _-
4580 V.
: 4.
achieves steady state frequency k 58.8 Hz and < 61.2 Hz. and
: 5.
supplies permanently connected and auto-connected emergency loads for k 5 minutes.
SR 3.8.1.18 NOTE -------------------
All EDG starts may be preceded by an engine prelube period.
All EDG starts may be preceded by an engine prelube period.
                  &deg;.....                  ................              ... ..... .........      .....
&deg;.....
Verify, when started simultaneously each                                                     10 years EDG achieves, in : 10 seconds. frequency k 58.8 Hz.
Verify, when started simultaneously each 10 years EDG achieves, in : 10 seconds. frequency k 58.8 Hz.
FERMI -UNIT 2                                                     3.8-9                                   Amendment No. W 178}}
FERMI -UNIT 2
3.8-9 Amendment No. W 178}}

Latest revision as of 17:36, 14 January 2025

Issuance of Amendment Technical Specification Change to Emergency Diesel Generator Surveillance Requirements
ML080790026
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/17/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Milano P, NRR/DORL/LPLA, 415-1457
Shared Package
ML080290283 List:
References
TAC MD4930
Download: ML080790026 (6)


Text

AC Sources -- Operating 3.8.1 SURVEILLANCE REQUiR__MENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and 7 days indicated power availability for each offsite circuit.-

SR 3.8.1.2


NOTES -------------------

1.

All EDG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.

2.

A modified EDG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.

Verify each EDG starts and achieves steady 31 days state voltage 2 3873 V and - 4580 V and frequency 2 58.8 Hz and : 61.2 Hz.

SR 3.8.1.3

-............ NOTES.................---

1.

EDG loadings may include gradual loading as recommended by the manufacturer.

2.

Momentary transients below the load limit do not invalidate this test.

3.

This Surveillance shall be conducted on only one EDG at a time.

Verify each EDG is synchronized and loaded 31 days and operates for a 60 minutes at a load 2 2500 kW.

(continued)

FERMI - UNIT 2 3.8-3 Amendment No. X# 178

AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.4 Verify each day tank contains Z:210 gal of 31 days fuel oil.

SR 3.8.1.5 Check for and remove accumulated water from 31 days each day tank.

SR 3.8.1.6 Verify each fuel oil transfer system 31 days operates to automatically transfer fuel oil from storage tanks to the day tanks.

SR 3.8.1.7 NOTE....................

All EDG starts-may be preceded by an engine-prelube period and followed by a warmup period prior to loading.

Verify each EDG starts from standby 184 days condition and achieves:

a.

In : 10 seconds. voltage > 3873 V and frequency > 58.8 Hz; and

b.

Steady state voltage a 3873 V and

9 4580 V and frequency k 58.8 Hz and
5 61.2 Hz.

SR 3.8.1.8 Verify each EDG rejects a load greater than 18 months or equal to its associated single largest post-accident load, and following load rejection, the frequency is :9 66.75 Hz.

(continued)

I FERMI -UNIT 2

3.8-4 Amendment No. X# 178

AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE I FREQUENCY SR 3.8.1.9 Verify each EDG does not trip and voltage 18 months is maintained < 5267 V during and following a load rejection of 2 2850 kW.

SR 3.8.1.10...................

NOTE....................

All EDG starts may be preceded by an engine prelube period.

Verify on simulated loss of offsite power 18 months

,signal:

a.

De-energization of emergency buses:

....b,..

Load shedding. from emergency buses:.

and

c.

EDG auto-starts and:

1. energizes permanently connected loads in : 10 seconds.
2.

energizes auto-connected shutdown loads through load sequencer,-

3.

maintains steady state voltage

> 3873 V and

  • 4580 V,
4.

maintains steady state frequency

58.8 Hz and
  • 61.2 Hz, and
5.

supplies permanently connected and auto-connected shutdown loads for

> 5 minutes.

(continued)

FERMI -UNIT 2

3.8-5 Amendment No. M4, 1#178

AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

,11DI/rTL AIIAuCE FREQUENCY"

..~l* l IL.,.IJ*tLlt SR 3.8.1.11 NOTE&-

All EDG starts may be preceded by an engine prelube period.

°.

o...............

Verify on an actual or simulated Emergency 18 months Core Cooling System (ECCS) initiation signal each EDG auto-starts and:

a.

In 5 10 seconds after auto-start and during tests, achieves voltage L 3873 V and frequency>ý 58.8 Hz:

b.

Achieves steady state voltage k 3873 V and : 4580 V. and frequency 2 58.8 Hz and

  • 61.2 Hz; and
c.

Operates for 2 5 minutes.

SR 3.8.1.12 Verify each EDG's automatic trips are 18 months bypassed on an actual or simulated emergency start signal except:

a.

Engine overspeed:

b.

Generator differential current;

c.

Low lube oil pressure;

d.

Crankcase overpressure; and

e.

Failure to start.

(continued)

II FERMI - UNIT 2 3.8-6 Amendment No. %#K*' 178

AC Sources -- Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

S4RVILLANCE FREQUENCY SR 3.8.1.13 NOTE ---------------------

Momentary transients outside the load range do not invalidate this test.

Verify each EDG operates for - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

18 months

a.

For all but the final k 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded k 2500 kW and : 2600 kW: and

b.

For the final > 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of the test loaded 2 2800 kW and ! 2900 kW.

SR 3.8.1.14 -------.---------

NOTES -------------------

1.

This Surveillance shall be performed within 5 minutes of shutting down the EDG after the EDG has operated k 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded > 2500 kW or until operating temperatures have stabilized.

Momentary transients below the load limit do not invalidate this test.

2.

All EDG starts may be preceded by an engine prelube period.

Verify each EDG starts and achieves:

18 months

a.

In :T 10 seconds, voltage k 3873 V and frequency > 58.8 Hz; and

b.

Steady state voltage 2 3873 V and

4580 V and frequency > 58.8 Hz and
  • 61.2 Hz.

(continued)

I FERMI -UNIT 2

3.8-7 Amendment No. 4 178

AC Sources -- Operating 3.8.1 A

SURVEILLANCE REQUIREMENTS (continued)

SJRVEILLA.NCE FREQUENCY SR 3.8.1.17 ------------------- NOTE....................

All EDG starts may be preceded by an engine prelube period.

Verify, on simulated loss of offsite power 18 months signal in conjunction with an actual or simulated ECCS initiation signal:

a.

De-energization of emergency buses;

b.

Load shedding from emergency buses; and

c.

EDG auto-starts and:

1. -

energizes permanently connected loads in _<

10 seconds.

2.

energizes auto-connected emergency loads through load sequencer,

3.

achieves steady state voltage k 3873 V and _-

4580 V.

4.

achieves steady state frequency k 58.8 Hz and < 61.2 Hz. and

5.

supplies permanently connected and auto-connected emergency loads for k 5 minutes.

SR 3.8.1.18 NOTE -------------------

All EDG starts may be preceded by an engine prelube period.

°.....

Verify, when started simultaneously each 10 years EDG achieves, in : 10 seconds. frequency k 58.8 Hz.

FERMI -UNIT 2

3.8-9 Amendment No. W 178