NL-08-1672, Updated Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Southern Nuclear Operating Company, Inc. | {{#Wiki_filter:Southern Nuclear Operating Company, Inc. | ||
Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\ | Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\\ | ||
October 27, 2008 | October 27, 2008 COMPANY Energy to Serve Your World SM Docket Nos.: 50-348 NL-08-1672 50-364 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Updated Response to Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen: | ||
On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-16, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2008-16 requested that addressees voluntarily submit estimates regarding operator licensing examinations. | On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-16, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2008-16 requested that addressees voluntarily submit estimates regarding operator licensing examinations. | ||
In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides an update of the requested information for the Joseph M. Farley Nuclear Plant (FNP). The enclosed NRC Form 536 supersedes the operator exam information included in the RIS 2008-16 response letter submitted August 7, 2008. | In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides an update of the requested information for the Joseph M. Farley Nuclear Plant (FNP). The enclosed NRC Form 536 supersedes the operator exam information included in the RIS 2008-16 response letter submitted August 7, 2008. | ||
The provided estimates are not commitments and may change. If you have any questions, please advise. | The provided estimates are not commitments and may change. If you have any questions, please advise. | ||
Sincerely, m4~~ | Sincerely, m4~~ | ||
M. J. Ajluni Manager, Nuclear Licensing MJAlDWD/daj | M. J. Ajluni Manager, Nuclear Licensing MJAlDWD/daj | ||
==Enclosure:== | ==Enclosure:== | ||
NRC Form 536 Operator Licensing Examination Data for FNP | NRC Form 536 Operator Licensing Examination Data for FNP | ||
: u. S. Nuclear Regulatory Commission NL-08-1672 Page 2 cc: | : u. S. Nuclear Regulatory Commission NL-08-1672 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; LC# 14853 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. K. D. Feintuch, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley | ||
Joseph M. Farley Nuclear Plant Updated Response to Regulatory Issue Summary 2008*16 Preparation and Scheduling of Operator Licensing Examinations Enclosure NRC Form 536 Operator Licensing Examination Data for FNP | Joseph M. Farley Nuclear Plant Updated Response to Regulatory Issue Summary 2008*16 Preparation and Scheduling of Operator Licensing Examinations Enclosure NRC Form 536 Operator Licensing Examination Data for FNP | ||
NRC FORM 536 | NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 08/31/2008 (8-2005) | ||
Estimated burden rr res~nse to comply with this voluntary information collection request: | |||
FACILITY | hour. | ||
his information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments r(frdin3 burden estimate to the Records and FOIA/Privacy Services Branch | |||
-5F5), U. S. | |||
Nuclear R~ulatory Commission, Washington, DC 20555-0001 or b~ inter!1et EXAMINATION DATA email to i ocollects@nrc~v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, N B-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. | |||
FACILITY NRC REGION Joseph M. Farley Nuclear Plant Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cy 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 | |||
1 1 | |||
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR Exam 1: | |||
6 6 | |||
6 OPERATORS Exam 2: | |||
6 NUMBER OF SENIOR REACTOR Exam 1: | |||
8 8 | |||
8 OPERATORS-INSTANT Exam 2: | |||
8 NUMBER OF SENIOR REACTOR Exam 1: | |||
1 1 | |||
1 OPERATORS-UPGRADE Exam 2: | |||
1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES 03/01/2010 10/31/2011 10/29/2012 PRIMARY DATE 11/01/2010 03/08/2010 11/07/2011 11/05/2012 ALTERNATE DATE 11/08/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2009 CY 2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 14 14 NUMBER OF CANDIDATES NRC FORM 536 (8-2005)}} | |||
Latest revision as of 14:36, 14 January 2025
| ML083020163 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/27/2008 |
| From: | Ajluni M Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-08-1672, RIS-08-016 | |
| Download: ML083020163 (4) | |
Text
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN'\\
October 27, 2008 COMPANY Energy to Serve Your World SM Docket Nos.: 50-348 NL-08-1672 50-364 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Updated Response to Regulatory Issue Summary 2008-16 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On June 27,2008, the NRC issued Regulatory Issue Summary (RIS) 2008-16, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2008-16 requested that addressees voluntarily submit estimates regarding operator licensing examinations.
In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides an update of the requested information for the Joseph M. Farley Nuclear Plant (FNP). The enclosed NRC Form 536 supersedes the operator exam information included in the RIS 2008-16 response letter submitted August 7, 2008.
The provided estimates are not commitments and may change. If you have any questions, please advise.
Sincerely, m4~~
M. J. Ajluni Manager, Nuclear Licensing MJAlDWD/daj
Enclosure:
NRC Form 536 Operator Licensing Examination Data for FNP
- u. S. Nuclear Regulatory Commission NL-08-1672 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; LC# 14853 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. K. D. Feintuch, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley
Joseph M. Farley Nuclear Plant Updated Response to Regulatory Issue Summary 2008*16 Preparation and Scheduling of Operator Licensing Examinations Enclosure NRC Form 536 Operator Licensing Examination Data for FNP
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO 3150-0131 EXPIRES 08/31/2008 (8-2005)
Estimated burden rr res~nse to comply with this voluntary information collection request:
hour.
his information collection is used to plan budgets OPERATOR LICENSING and resources for operator examinations. Send comments r(frdin3 burden estimate to the Records and FOIA/Privacy Services Branch
-5F5), U. S.
Nuclear R~ulatory Commission, Washington, DC 20555-0001 or b~ inter!1et EXAMINATION DATA email to i ocollects@nrc~v, and to the Desk Officer, Office of In ormation and Regulatory Affairs, N B-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Joseph M. Farley Nuclear Plant Units 1 & 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER cy 2009 CY 2010 CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 2
1 1
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 2009 CY 2010 CY 2011 CY 2012 NUMBER OF REACTOR Exam 1:
6 6
6 OPERATORS Exam 2:
6 NUMBER OF SENIOR REACTOR Exam 1:
8 8
8 OPERATORS-INSTANT Exam 2:
8 NUMBER OF SENIOR REACTOR Exam 1:
1 1
1 OPERATORS-UPGRADE Exam 2:
1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES 03/01/2010 10/31/2011 10/29/2012 PRIMARY DATE 11/01/2010 03/08/2010 11/07/2011 11/05/2012 ALTERNATE DATE 11/08/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2009 CY 2010 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 14 14 NUMBER OF CANDIDATES NRC FORM 536 (8-2005)