PLA-6499, Description of Changes to Revision 5 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan, PLA-6499: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION William H. Spence President PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 610.774.3683 Fax 610.774.5019 WHspence@pplweb.com ppI APR 0 2 ?OQR U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION DECRIPTION OF CHANGES TO REVISION 5 TO THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN AND SECURITY AND CONTINGENCY PLAN FOR SUSQUEHANNA :STEAM ELECTRIC STATION                                             Docket Nos. 50-387 PLA-6499                                                                                  and 50-388
{{#Wiki_filter:SAFEGUARDS INFORMATION p pI William H. Spence President PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 610.774.3683 Fax 610.774.5019 WHspence@pplweb.com APR 0 2 ?OQR U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION DECRIPTION OF CHANGES TO REVISION 5 TO THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN AND SECURITY AND CONTINGENCY PLAN FOR SUSQUEHANNA :STEAM ELECTRIC STATION PLA-6499 Docket Nos. 50-387 and 50-388


==Reference:==
==Reference:==
: 1) PLA-6477, Mr. William H. Spence (PPL)to Document Control Desk (USNRC),
: 1) PLA-6477, Mr. William H. Spence (PPL) to Document Control Desk (USNRC),
                  "Revision 5 to the Physical Security Plan, Training and QualificationPlan, Safeguards Contingency Plan and Security and Contingency Plan" dated February6, 2009.
"Revision 5 to the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan" dated February 6, 2009.
Revision 5 to the PPL Susquehanna, LLC (Susquehanna Steam Electric Station) Physical Security Plan was submitted in Reference 1. As a supplement to the plan itself, attached are descriptions of the changes that are contained in Revision 5.
Revision 5 to the PPL Susquehanna, LLC (Susquehanna Steam Electric Station) Physical Security Plan was submitted in Reference 1. As a supplement to the plan itself, attached are descriptions of the changes that are contained in Revision 5.
Pursuant to 10 CFR 50.54(p), PPL Susquehanna, LLC has determined that the changes do not decrease the safeguards effectiveness of the plan and may therefore be made without prior NRC approval.
Pursuant to 10 CFR 50.54(p), PPL Susquehanna, LLC has determined that the changes do not decrease the safeguards effectiveness of the plan and may therefore be made without prior NRC approval.
Should you have any questions or require additional information, please contact Mr. Michael R. Sleigh, Manager - Nuclear Security, at (570) 542-3200.
Should you have any questions or require additional information, please contact Mr. Michael R. Sleigh, Manager - Nuclear Security, at (570) 542-3200.
NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION                                                         2ýod 001-
SAFEGUARDS INFORMATION 2ýod 001-


SAFEGUARDS INFORMATION Document Control Desk PLA-6499 I declare under penalty of perjury that the foregoing is true and correct.
SAFEGUARDS INFORMATION Document Control Desk PLA-6499 I declare under penalty of perjury that the foregoing is true and correct.
Executed on:   04     .
Executed on: 04 W. H. Spence Attachment cc:
W. H. Spence Attachment cc:   Mr. S. J. Collins, NRC Regional Administrator Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector, w/o attachment Mr. B. K. Vaidya, NRC Project Manager NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
Mr. S. J. Collins, NRC Regional Administrator Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector, w/o attachment Mr. B. K. Vaidya, NRC Project Manager NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION


SAFEGUARDS INFORMATION Document Control Desk PLA-6499 bcc: C. E. Manges, Jr.               NUCSA4, w/o attachment P. A. Horn (SRC)               NUCSB2, w/o attachment M. H. Crowthers                GENPL4, w/o attachment M. R. Sleigh                    NUCNG, w/o attachment R. E. Smith                    NUCSA4, w/o attachment T. G. Wales (DBD)              GENPL5, w/o attachment NRA Files                      GENPL4, w/o attachment DCS                            GENPL4, w/o attachment NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION Document Control Desk PLA-6499 bcc:
C. E. Manges, Jr.
P. A. Horn (SRC)
M. H. Crowthers M. R. Sleigh R. E. Smith T. G. Wales (DBD)
NRA Files DCS NUCSA4, w/o attachment NUCSB2, w/o attachment GENPL4, w/o attachment NUCNG, w/o attachment NUCSA4, w/o attachment GENPL5, w/o attachment GENPL4, w/o attachment GENPL4, w/o attachment NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."
SAFEGUARDS INFORMATION}}
SAFEGUARDS INFORMATION}}

Latest revision as of 12:24, 14 January 2025

Description of Changes to Revision 5 to Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan, PLA-6499
ML091050465
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/02/2009
From: Spence W
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6499
Download: ML091050465 (3)


Text

SAFEGUARDS INFORMATION p pI William H. Spence President PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 610.774.3683 Fax 610.774.5019 WHspence@pplweb.com APR 0 2 ?OQR U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION DECRIPTION OF CHANGES TO REVISION 5 TO THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, SAFEGUARDS CONTINGENCY PLAN AND SECURITY AND CONTINGENCY PLAN FOR SUSQUEHANNA :STEAM ELECTRIC STATION PLA-6499 Docket Nos. 50-387 and 50-388

Reference:

1) PLA-6477, Mr. William H. Spence (PPL) to Document Control Desk (USNRC),

"Revision 5 to the Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Security and Contingency Plan" dated February 6, 2009.

Revision 5 to the PPL Susquehanna, LLC (Susquehanna Steam Electric Station) Physical Security Plan was submitted in Reference 1. As a supplement to the plan itself, attached are descriptions of the changes that are contained in Revision 5.

Pursuant to 10 CFR 50.54(p), PPL Susquehanna, LLC has determined that the changes do not decrease the safeguards effectiveness of the plan and may therefore be made without prior NRC approval.

Should you have any questions or require additional information, please contact Mr. Michael R. Sleigh, Manager - Nuclear Security, at (570) 542-3200.

NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION 2ýod 001-

SAFEGUARDS INFORMATION Document Control Desk PLA-6499 I declare under penalty of perjury that the foregoing is true and correct.

Executed on: 04 W. H. Spence Attachment cc:

Mr. S. J. Collins, NRC Regional Administrator Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector, w/o attachment Mr. B. K. Vaidya, NRC Project Manager NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION Document Control Desk PLA-6499 bcc:

C. E. Manges, Jr.

P. A. Horn (SRC)

M. H. Crowthers M. R. Sleigh R. E. Smith T. G. Wales (DBD)

NRA Files DCS NUCSA4, w/o attachment NUCSB2, w/o attachment GENPL4, w/o attachment NUCNG, w/o attachment NUCSA4, w/o attachment GENPL5, w/o attachment GENPL4, w/o attachment GENPL4, w/o attachment NOTE: THE ATTACHMENT TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENT, THIS LETTER IS "DECONTROLLED."

SAFEGUARDS INFORMATION