ML091820102: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:From:                       Sanders, Carleen Sent:                       Wednesday, July 01, 2009 9:00 AM To:                         Chernoff, Harold; Karwoski, Kenneth
{{#Wiki_filter:From:
Sanders, Carleen Sent:
Wednesday, July 01, 2009 9:00 AM To:
Chernoff, Harold; Karwoski, Kenneth  


==Subject:==
==Subject:==
FW: Clarification Needed on MPS2 SG Tube Inspection Report DNC staff, via a phone call on 06/30/2009, provided the necessary clarifying information to the questions below. The description in the original report was an error, and the information in the RAI response is correct. Also, R38C81 and R40C81, the tubes plugged based on their RAI response, were also stabilized.
FW: Clarification Needed on MPS2 SG Tube Inspection Report DNC staff, via a phone call on 06/30/2009, provided the necessary clarifying information to the questions below. The description in the original report was an error, and the information in the RAI response is correct. Also, R38C81 and R40C81, the tubes plugged based on their RAI response, were also stabilized.
Carleen Sanders 301-415-1603 From: Sanders, Carleen Sent: Friday, June 26, 2009 2:23 PM To: 'William.D.Bartron@dom.com'
Carleen Sanders 301-415-1603 From: Sanders, Carleen Sent: Friday, June 26, 2009 2:23 PM To: 'William.D.Bartron@dom.com'  


==Subject:==
==Subject:==
Line 30: Line 33:
Does this mean that R38C81 and R40C81, the tubes plugged based on their RAI response, were also stabilized?
Does this mean that R38C81 and R40C81, the tubes plugged based on their RAI response, were also stabilized?
Please let me know when we can have a call.
Please let me know when we can have a call.
Thank you, Carleen Sanders 301-415-1603 E-mail Properties Mail Envelope Properties ()
Thank you, Carleen Sanders 301-415-1603 E-mail Properties Mail Envelope Properties ()  


==Subject:==
==Subject:==
FW: Clarification Needed on MPS2 SG Tube Inspection Report
FW: Clarification Needed on MPS2 SG Tube Inspection Report  


Sent Date:     7/1/2009 8:57:42 AM Received Date:       7/1/2009 8:59:00 AM From:           Sanders, Carleen Created By:       Carleen.Sanders@nrc.gov Recipients:
Sent Date: 7/1/2009 8:57:42 AM Received Date: 7/1/2009 8:59:00 AM From: Sanders, Carleen Created By: Carleen.Sanders@nrc.gov Recipients:
Harold.Chernoff@nrc.gov (Chernoff, Harold)
Harold.Chernoff@nrc.gov (Chernoff, Harold)
Tracking Status: None Kenneth.Karwoski@nrc.gov (Karwoski, Kenneth)
Tracking Status: None Kenneth.Karwoski@nrc.gov (Karwoski, Kenneth)
Tracking Status: None Post Office:
Tracking Status: None Post Office:
Files         Size     Date & Time MESSAGE         11339       7/1/2009 Options Expiration Date:
Files Size Date & Time MESSAGE 11339 7/1/2009 Options Expiration Date:
Priority:               olImportanceNormal ReplyRequested:       False Return Notification:     False Sensitivity:     olNormal Recipients received:}}
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}}

Latest revision as of 11:10, 14 January 2025

Clarification Needed on MPS2 SG Tube Inspection Report
ML091820102
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/01/2009
From: Sanders C
Plant Licensing Branch 1
To: Chernoff H, Karwoski K
NRC/NRR/DCI, Division of Operating Reactor Licensing
References
FOIA/PA-2011-0115
Download: ML091820102 (2)


Text

From:

Sanders, Carleen Sent:

Wednesday, July 01, 2009 9:00 AM To:

Chernoff, Harold; Karwoski, Kenneth

Subject:

FW: Clarification Needed on MPS2 SG Tube Inspection Report DNC staff, via a phone call on 06/30/2009, provided the necessary clarifying information to the questions below. The description in the original report was an error, and the information in the RAI response is correct. Also, R38C81 and R40C81, the tubes plugged based on their RAI response, were also stabilized.

Carleen Sanders 301-415-1603 From: Sanders, Carleen Sent: Friday, June 26, 2009 2:23 PM To: 'William.D.Bartron@dom.com'

Subject:

Clarification Needed on MPS2 SG Tube Inspection Report Bill -

The technical reviewer on MPS2 SG tube inspection report needs some clarifications on your RAI response dated 05/20/2009 as noted below. Note, these are not new RAIs, we would just like to discuss these issues:

1. In RAI # 3 the reviewer assumed that the tube in R118C41 was plugged since their original report (10/24/08) indicates that one tube was plugged for an 11% through-wall indication from a part above the top of the tubesheet. The only indication that matches this description in table 3 of the original report is the tube in R118C41. In the RAI response you state that R38C81 and R40C81 were the tubes plugged in SG2, not R118C41.

Is the description in the original report an error and is the correct information in the RAI response?

2. The original report indicates that the 2 tubes in SG 2 that were plugged were also stabilized.

Does this mean that R38C81 and R40C81, the tubes plugged based on their RAI response, were also stabilized?

Please let me know when we can have a call.

Thank you, Carleen Sanders 301-415-1603 E-mail Properties Mail Envelope Properties ()

Subject:

FW: Clarification Needed on MPS2 SG Tube Inspection Report

Sent Date: 7/1/2009 8:57:42 AM Received Date: 7/1/2009 8:59:00 AM From: Sanders, Carleen Created By: Carleen.Sanders@nrc.gov Recipients:

Harold.Chernoff@nrc.gov (Chernoff, Harold)

Tracking Status: None Kenneth.Karwoski@nrc.gov (Karwoski, Kenneth)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11339 7/1/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: