ML092600674: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2009 Mr. Raymond J. Dean Manager Training Constellation Energy Group Nine Mile Point Nuclear Station, Units 1 & 2 450 Lake Road Oswego, NY 13126 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2009 Mr. Raymond J. Dean Manager Training Constellation Energy Group Nine Mile Point Nuclear Station, Units 1 & 2 450 Lake Road Oswego, NY 13126 | ||
==Subject:== | ==Subject:== | ||
NRC Operator Licensing Initial Exam Results Nine Mile Point Nuclear Station, Unit 2 (Cover letter publicly available; enclosures withheld from public.) | NRC Operator Licensing Initial Exam Results Nine Mile Point Nuclear Station, Unit 2 (Cover letter publicly available; enclosures withheld from public.) | ||
==Dear Mr. Dean:== | ==Dear Mr. Dean:== | ||
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on August 31, 2009, and the walk-through (overall) and/or simulator operating tests administered the week of August 24, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. | The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on August 31, 2009, and the walk-through (overall) and/or simulator operating tests administered the week of August 24, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly. | ||
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, five individuals who took the examination passed. This information is considered "proprietary" in accordance with 10 CFR 2.390, and it supplements the information contained in the related examination report for your facility, which will be issued shortly. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses. | As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, five individuals who took the examination passed. This information is considered "proprietary" in accordance with 10 CFR 2.390, and it supplements the information contained in the related examination report for your facility, which will be issued shortly. | ||
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). | |||
is a copy of the licenses. | |||
R. J. Dean | R. J. Dean Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-410 License No. NPF-69 | Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-410 License No. NPF-69 | ||
==Enclosures:== | ==Enclosures:== | ||
| Line 38: | Line 39: | ||
: 2. ES-303-1 and 303-2, Individual Examination Results | : 2. ES-303-1 and 303-2, Individual Examination Results | ||
: 3. Licenses cc w/licenses: | : 3. Licenses cc w/licenses: | ||
Mr. Sam Belcher, Vice President | Mr. Sam Belcher, Vice President | ||
R. J. Dean | R. J. Dean Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-410 License No. NPF-69 | Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-410 License No. NPF-69 | ||
==Enclosures:== | ==Enclosures:== | ||
| Line 50: | Line 51: | ||
: 3. Licenses cc w/licenses: | : 3. Licenses cc w/licenses: | ||
Mr. Sam Belcher, Vice President Distribution: w/o enclosures: | Mr. Sam Belcher, Vice President Distribution: w/o enclosures: | ||
Master Exam File SUNSI Review Complete: | Master Exam File SUNSI Review Complete: SLH (Reviewer=s Initials) | ||
ADAMS PKG NO.: ML083020158 | ADAMS PKG NO.: ML083020158 ADAMS ACC. NO.; ML092600674 DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Exam 09-NMP2 Aug 09 (U01698)\\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will not be released to the Public. | ||
OFFICE | OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB TFish/TF SLHansell/SLH DATE 09/ 14/09 09/ 14 /09 09/ 15/09 OFFICIAL RECORD COPY}} | ||
Latest revision as of 09:20, 14 January 2025
| ML092600674 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 09/15/2009 |
| From: | Hansell S Operations Branch I |
| To: | Dean R Constellation Energy Group |
| Hansell S | |
| Shared Package | |
| ML083020158 | List: |
| References | |
| TAC U01698 | |
| Download: ML092600674 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2009 Mr. Raymond J. Dean Manager Training Constellation Energy Group Nine Mile Point Nuclear Station, Units 1 & 2 450 Lake Road Oswego, NY 13126
Subject:
NRC Operator Licensing Initial Exam Results Nine Mile Point Nuclear Station, Unit 2 (Cover letter publicly available; enclosures withheld from public.)
Dear Mr. Dean:
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on August 31, 2009, and the walk-through (overall) and/or simulator operating tests administered the week of August 24, 2009 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors. This information is considered proprietary in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, five individuals who took the examination passed. This information is considered "proprietary" in accordance with 10 CFR 2.390, and it supplements the information contained in the related examination report for your facility, which will be issued shortly.
contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398).
is a copy of the licenses.
R. J. Dean Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-410 License No. NPF-69
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. Sam Belcher, Vice President
R. J. Dean Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
/RA/
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 050-410 License No. NPF-69
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. Licenses cc w/licenses:
Mr. Sam Belcher, Vice President Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete: SLH (Reviewer=s Initials)
ADAMS PKG NO.: ML083020158 ADAMS ACC. NO.; ML092600674 DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\Exam 09-NMP2 Aug 09 (U01698)\\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will not be released to the Public.
OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB TFish/TF SLHansell/SLH DATE 09/ 14/09 09/ 14 /09 09/ 15/09 OFFICIAL RECORD COPY