{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
NUCLEAR REGULATORY COMMISSION
                                                  R E GI ON I V
R E GI ON I V
                                      612 EAST LAMAR BLVD , SU I TE 400
612 EAST LAMAR BLVD, SUITE 400
                                        AR LI N GTON , TEXAS 76011-4125
ARLINGTON, TEXAS 76011-4125
                                        September 29, 2009
September 29, 2009  
Joseph Kowalewski, Vice President, Operations
Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3
17265 River Road
Killona, LA 70057-3093
Joseph Kowalewski, Vice President, Operations  
SUBJECT:       WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
Entergy Operations, Inc.  
                INSPECTION (NRC INSPECTION REPORT 05000382/2009005) AND
Waterford Steam Electric Station, Unit 3  
                REQUEST FOR INFORMATION
17265 River Road  
Dear Mr. Kowalewski:
Killona, LA 70057-3093  
From November 2-13, 2009, reactor inspectors from the U. S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at the
Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.08, "Inservice
SUBJECT:  
Inspection Activities," and Temporary Instruction 2515/172, "Reactor Coolant System Dissimilar
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF  
Metal Butt Welds." Experience has shown that this inspection is a resource intensive inspection
INSPECTION (NRC INSPECTION REPORT 05000382/2009005) AND  
both for the NRC inspectors and your staff. In order to minimize the impact to your onsite
REQUEST FOR INFORMATION  
resources and to ensure a productive inspection, we have enclosed a request for documents
needed for this inspection. These documents have been divided into two groups. The first
Dear Mr. Kowalewski:  
group (Section A of the enclosure) identified information to be provided prior to the inspection to
ensure that the inspectors are adequately prepared. The second group (Section B of the
From November 2-13, 2009, reactor inspectors from the U. S. Nuclear Regulatory  
enclosure) identifies the information the inspectors will need upon arrival at the site. It is
Commissions (NRC) Region IV office will perform the baseline inservice inspection at the  
important that all of these documents are up to date and complete in order to minimize the
Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.08, "Inservice  
number of additional documents requested during the preparation and/or the onsite portions of
Inspection Activities," and Temporary Instruction 2515/172, "Reactor Coolant System Dissimilar  
the inspection.
Metal Butt Welds." Experience has shown that this inspection is a resource intensive inspection  
We have discussed the schedule and information required for these inspection activities with
both for the NRC inspectors and your staff. In order to minimize the impact to your onsite  
your staff and understand that our regulatory contact for this inspection will be Mr. Jim Pollock of
resources and to ensure a productive inspection, we have enclosed a request for documents  
your licensing organization. Our inspection dates are subject to change based on your updated
needed for this inspection. These documents have been divided into two groups. The first  
schedule of outage activities. If there are any questions about this inspection or the material
group (Section A of the enclosure) identified information to be provided prior to the inspection to  
requested, please contact the lead inspector Ramon Azua at (817) 319-4376
ensure that the inspectors are adequately prepared. The second group (Section B of the  
(ray.azua@nrc.gov) or Michael Bloodgood at (817) 276-6544 (michael.bloodgood@nrc.gov).
enclosure) identifies the information the inspectors will need upon arrival at the site. It is  
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
important that all of these documents are up to date and complete in order to minimize the  
enclosure will be available electronically for public inspection in the NRC Public Document
number of additional documents requested during the preparation and/or the onsite portions of  
Room or from the Publicly Available Records (PARS) component of NRCs document
the inspection.  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
We have discussed the schedule and information required for these inspection activities with  
your staff and understand that our regulatory contact for this inspection will be Mr. Jim Pollock of  
your licensing organization. Our inspection dates are subject to change based on your updated  
schedule of outage activities. If there are any questions about this inspection or the material  
requested, please contact the lead inspector Ramon Azua at (817) 319-4376  
(ray.azua@nrc.gov) or Michael Bloodgood at (817) 276-6544 (michael.bloodgood@nrc.gov).  
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its  
enclosure will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of NRCs document  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).  


Entergy Operations, Inc.               -2-
Entergy Operations, Inc.  
                                          Sincerely,
- 2 -  
                                            /RA/
                                          Ray Kellar, P.E., Chief
                                          Engineering Branch 1
                                          Division of Reactor Safety
Sincerely,  
Docket: 50-382
License: NPF-38
Enclosure:
/RA/  
Inservice Inspection Document Request
Senior Vice President
Entergy Nuclear Operations
P. O. Box 31995
Ray Kellar, P.E., Chief  
Jackson, MS 39286-1995
Senior Vice President and
Engineering Branch 1  
   Chief Operating Officer
Entergy Operations, Inc.
Division of Reactor Safety  
P. O. Box 31995
Jackson, MS 39286-1995
Docket:   50-382  
Vice President, Operations Support
License: NPF-38  
Entergy Services, Inc.
P. O. Box 31995
Enclosure:  
Jackson, MS 39286-1995
Inservice Inspection Document Request  
Senior Manager, Nuclear Safety
  and Licensing
Senior Vice President
Entergy Services, Inc.
Entergy Nuclear Operations  
P. O. Box 31995
P. O. Box 31995  
Jackson, MS 39286-1995
Jackson, MS 39286-1995  
Site Vice President
Waterford Steam Electric Station, Unit 3
Senior Vice President and
Entergy Operations, Inc.
   Chief Operating Officer  
17265 River Road
Entergy Operations, Inc.  
Killona, LA 70057-0751
P. O. Box 31995  
Director
Jackson, MS 39286-1995  
Nuclear Safety Assurance
Entergy Operations, Inc.
Vice President, Operations Support  
17265 River Road
Entergy Services, Inc.  
Killona, LA 70057-0751
P. O. Box 31995  
Jackson, MS 39286-1995  
Senior Manager, Nuclear Safety  
  and Licensing  
Entergy Services, Inc.  
P. O. Box 31995  
Jackson, MS 39286-1995  
Site Vice President  
Waterford Steam Electric Station, Unit 3  
Entergy Operations, Inc.  
17265 River Road  
Killona, LA 70057-0751  
Director  
Nuclear Safety Assurance  
Entergy Operations, Inc.  
17265 River Road  
Killona, LA 70057-0751  


Entergy Operations, Inc.             -3-
Entergy Operations, Inc.  
General Manager, Plant Operations
- 3 -  
Waterford 3 SES
Entergy Operations, Inc.
General Manager, Plant Operations  
17265 River Road
Waterford 3 SES  
Killona, LA 70057-0751
Entergy Operations, Inc.  
Manager, Licensing
17265 River Road  
Entergy Operations, Inc.
Killona, LA 70057-0751  
17265 River Road
Killona, LA 70057-3093
Manager, Licensing  
Chairman
Entergy Operations, Inc.  
Louisiana Public Service Commission
17265 River Road  
P. O. Box 91154
Killona, LA 70057-3093  
Baton Rouge, LA 70821-9154
Parish President Council
Chairman  
St. Charles Parish
Louisiana Public Service Commission  
P. O. Box 302
P. O. Box 91154  
Hahnville, LA 70057
Baton Rouge, LA 70821-9154  
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc.
Parish President Council  
440 Hamilton Avenue
St. Charles Parish  
White Plains, NY 10601
P. O. Box 302  
Louisiana Department of Environmental
Hahnville, LA 70057  
Quality, Radiological Emergency Planning
and Response Division
Director, Nuclear Safety & Licensing  
P. O. Box 4312
Entergy, Operations, Inc.  
Baton Rouge, LA 70821-4312
440 Hamilton Avenue  
Chief, Technological Hazards
White Plains, NY 10601  
  Branch
FEMA Region VI
Louisiana Department of Environmental
800 North Loop 288
  Quality, Radiological Emergency Planning  
Federal Regional Center
  and Response Division  
Denton, TX 76209
P. O. Box 4312  
Baton Rouge, LA 70821-4312  
Chief, Technological Hazards
  Branch  
FEMA Region VI  
800 North Loop 288  
Federal Regional Center  
Denton, TX 76209  


Entergy Operations, Inc.               -4-
Entergy Operations, Inc.  
Electronic distribution by RIV:
- 4 -  
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
Electronic distribution by RIV:  
DRP Deputy Director (Anton.Vegel@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)  
DRS Director (Roy.Caniano@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)  
DRS Deputy Director (Troy.Pruett@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)  
Senior Resident Inspector (Mark.Haire@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)  
Resident Inspector (Dean.Overland@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)  
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)  
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
Senior Resident Inspector (Mark.Haire@nrc.gov)  
WAT Site Secretary (Linda.Dufrene@nrc.gov)
Resident Inspector (Dean.Overland@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)  
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
WAT Site Secretary (Linda.Dufrene@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)  
OEMail Resource
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Inspection Reports/MidCycle and EOC Letters to the following:
Regional Counsel (Karla.Fuller@nrc.gov)  
ROPreports
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
DRS STA (Dale.Powers@nrc.gov)
OEMail Resource  
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
SUNSI Review Completed: ___Y___             ADAMS: 7 Yes         No   Initials: _RVA
Inspection Reports/MidCycle and EOC Letters to the following:  
7 Publicly Available       Non-Publicly Available   Sensitive     7 Non-Sensitive
ROPreports  
R:\REACTORS\W3 ISI RFI - RVA                                         ML09270921
DRS STA (Dale.Powers@nrc.gov)  
SPE:DRP/PBE           RI:DRS/EB1       C:DRS/EB1
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)  
RVAzua               MRBloodgood       RLKellar
/RA/                 /RA/             /RA/
09/29/09             09/29/09         09/29/09
OFFICIAL RECORD COPY T=Telephone                 E=E-mail   F=Fax
SUNSI Review Completed: ___Y___  
ADAMS: 7 Yes  
  No       Initials: _RVA  
7   Publicly Available         Non-Publicly Available         Sensitive  
7   Non-Sensitive  
R:\\REACTORS\\W3 ISI RFI - RVA  
ML09270921  
SPE:DRP/PBE  
RI:DRS/EB1  
C:DRS/EB1  
RVAzua  
MRBloodgood  
RLKellar  
/RA/  
/RA/
/RA/  
09/29/09  
09/29/09  
09/29/09  
OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  


                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:           November 2-13, 2009
Inspection Procedures:     IP 71111.08 "Inservice Inspection (ISI) Activities"
                            TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
- 1 -
Inspectors:                 Ramon Azua, Senior Project Engineer (Lead Inspector - ISI)
Enclosure
                            Michael Bloodgood, Reactor Inspector
INSERVICE INSPECTION DOCUMENT REQUEST  
A.     Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of Ramon Azua, by October 26,
Inspection Dates:  
      2009, to facilitate the selection of specific items that will be reviewed during the onsite
November 2-13, 2009  
      inspection week. The inspector will select specific items from the information requested
      below and then request from your staff additional documents needed during the onsite
Inspection Procedures:  
      inspection week (Section B of this enclosure). We ask that the specific items selected
IP 71111.08 "Inservice Inspection (ISI) Activities"  
      from the lists be available and ready for review on the first day of inspection. *Please
TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"  
      provide requested documentation electronically if possible. If requested documents are
      large and only hard copy formats are available, please inform the inspector(s), and
Inspectors:  
      provide subject documentation during the first day of the onsite inspection. If you have
Ramon Azua, Senior Project Engineer (Lead Inspector - ISI)  
      any questions regarding this information request, please call the inspector as soon as
Michael Bloodgood, Reactor Inspector  
      possible.
A.1   ISI/Welding Programs and Schedule Information
A.  
      a)     A detailed schedule (including preliminary dates) of:
Information Requested for the In-Office Preparation Week  
              i)       Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
The following information should be sent to the Region IV office in hard copy or  
                        Informed (if applicable), and augmented ISI programs during the
electronic format (ims.certrec.com preferred), in care of Ramon Azua, by October 26,  
                        upcoming outage.
2009, to facilitate the selection of specific items that will be reviewed during the onsite  
                        Provide a status summary of the NDE inspection activities vs. the
inspection week. The inspector will select specific items from the information requested  
                        required inspection period percentages for this Interval by category per
below and then request from your staff additional documents needed during the onsite  
                        ASME Section XI, IWX-2400 (Do not provide separately if other
inspection week (Section B of this enclosure). We ask that the specific items selected  
                        documentation requested contains this information)
from the lists be available and ready for review on the first day of inspection. *Please  
              ii)     Reactor pressure vessel head (RPVH) examinations planned for the
provide requested documentation electronically if possible. If requested documents are  
                        upcoming outage.
large and only hard copy formats are available, please inform the inspector(s), and  
              iii)     Examinations planned for Alloy 82/182/600 components that are not
provide subject documentation during the first day of the onsite inspection. If you have  
                        included in the Section XI scope. (If applicable)
any questions regarding this information request, please call the inspector as soon as  
              iv)     Examinations planned as part of your Boric Acid Corrosion Control
possible.  
                        Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                            -1-                                        Enclosure
A.1  
ISI/Welding Programs and Schedule Information  
a)  
A detailed schedule (including preliminary dates) of:  
i)
Nondestructive examinations (NDEs) planned for Class 1 & 2 systems  
and containment, performed as part of your ASME Section XI, Risk  
Informed (if applicable), and augmented ISI programs during the  
upcoming outage.  
Provide a status summary of the NDE inspection activities vs. the  
required inspection period percentages for this Interval by category per  
ASME Section XI, IWX-2400 (Do not provide separately if other  
documentation requested contains this information)  
ii)
Reactor pressure vessel head (RPVH) examinations planned for the  
upcoming outage.  
iii)  
Examinations planned for Alloy 82/182/600 components that are not  
included in the Section XI scope. (If applicable)  
iv)  
Examinations planned as part of your Boric Acid Corrosion Control  
Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)  


          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs)).
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
- 2 -
          Evaluations applicable to the examinations identified above.
Enclosure
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
v)  
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
Welding activities that are scheduled to be completed during the  
          include the previous Section XI pressure test(s) conducted during start up and
upcoming outage (ASME Class 1, 2, or 3 structures, systems, or  
          any evaluations associated with the results of the pressure tests. Also, include in
components (SSCs)).  
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
b)  
          include a brief description of the SSC where the relevant condition was identified.
A copy of ASME Section XI Code Relief Requests and associated NRC Safety  
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
Evaluations applicable to the examinations identified above.
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
c)  
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,  
          occur during the upcoming outage, provide a detailed description of the welds to
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code  
          be examined and the extent of the planned examination. Please also provide
Class 1 & 2 systems since the beginning of the last refueling outage. This should  
          reference numbers for applicable procedures that will be used to conduct these
include the previous Section XI pressure test(s) conducted during start up and  
          examinations.
any evaluations associated with the results of the pressure tests. Also, include in  
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
the list the NDE reports with relevant conditions in the RPVH penetration nozzles  
          Section XI of the ASME Code that have been identified since the beginning of the
which have been accepted for continued service. The list of NDE reports should  
          last refueling outage.
include a brief description of the SSC where the relevant condition was identified.  
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
d)  
          and Alloy 600 Programs.
A list with a brief description (e.g., system, material, pipe size, weld number, and  
A.2 Reactor Pressure Vessel Head (RPVH)
NDE performed) of the welds in Code Class 1 and 2 systems which have been  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
fabricated due to component repair/replacement activities since the beginning of  
          identifies the types of NDE methods to be used on each specific part of the
the last refueling outage, or are planned to be fabricated this refueling outage.  
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
          and NRC Order EA-03-009 or ASME Code Case N-729-1. Also, include
e)  
          examination scope expansion criteria and planned expansion sample sizes if
If reactor vessel weld examinations required by the ASME Code are scheduled to  
          relevant conditions are identified. (If applicable)
occur during the upcoming outage, provide a detailed description of the welds to  
    b)   A list of the standards and/or requirements that will be used to evaluate
be examined and the extent of the planned examination. Please also provide  
          indications identified during NDE of the reactor vessel head (e.g., the specific
reference numbers for applicable procedures that will be used to conduct these  
                                        -2-                                        Enclosure
examinations.  
f)  
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of  
Section XI of the ASME Code that have been identified since the beginning of the  
last refueling outage.  
g)
A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
h)  
Please provide copies of the most recent self assessments for the ISI, Welding,  
and Alloy 600 Programs.
A.2  
Reactor Pressure Vessel Head (RPVH)  
a)
Provide the detailed scope of the planned NDE of the reactor vessel head which  
identifies the types of NDE methods to be used on each specific part of the  
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02  
and NRC Order EA-03-009 or ASME Code Case N-729-1. Also, include  
examination scope expansion criteria and planned expansion sample sizes if  
relevant conditions are identified. (If applicable)  
b)
A list of the standards and/or requirements that will be used to evaluate  
indications identified during NDE of the reactor vessel head (e.g., the specific  


          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
A.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Copy of the procedures that govern the scope, equipment and implementation of
- 3 -
          the inspections required to identify boric acid leakage and the procedures for
Enclosure
          boric acid leakage/corrosion evaluation.
industry or procedural standards which will be used to evaluate potential leakage  
    b)     Please provide a list of leaks (including Code class of the components) that have
and/or flaw indications).  
          been identified since the last refueling outage and associated corrective action
          documentation. If during the last cycle, the Unit was shutdown, please provide
A.3  
          documentation of containment walkdown inspections performed as part of the
Boric Acid Corrosion Control Program (BACCP)  
          BACCP.
    c)     Please provide a copy of the most recent self-assessment performed for the
a)
          BACCP.
Copy of the procedures that govern the scope, equipment and implementation of  
A.4 Steam Generator Tube (SGT) Inspections
the inspections required to identify boric acid leakage and the procedures for  
    a)     A detailed schedule of:
boric acid leakage/corrosion evaluation.  
          i)     SGT inspection, data analyses, and repair activities for the upcoming
                  outage. (If occurring)
b)  
          ii)     SG secondary side inspection activities for the upcoming outage. (If
Please provide a list of leaks (including Code class of the components) that have  
                  occurring)
been identified since the last refueling outage and associated corrective action  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
documentation. If during the last cycle, the Unit was shutdown, please provide  
          include a copy of the Operational Assessment from last outage and a copy of the
documentation of containment walkdown inspections performed as part of the  
          following documents as they become available:
BACCP.  
          i)     Degradation Assessment
          ii)     Condition Monitoring Assessment
c)  
    c)     If you are planning on modifying your Technical Specifications such that they are
Please provide a copy of the most recent self-assessment performed for the  
          consistent with TSTF-449, please provide copies of your correspondence with
BACCP.  
          the NRC regarding deviations from the STS.
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
A.4  
          testing of the SGs during the upcoming outage.
Steam Generator Tube (SGT) Inspections  
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
a)  
          copy of EPRI Appendix H ETSS Qualification Records.
A detailed schedule of:  
                                        -3-                                      Enclosure
i)
SGT inspection, data analyses, and repair activities for the upcoming  
outage. (If occurring)  
ii)
SG secondary side inspection activities for the upcoming outage. (If  
occurring)  
b)  
Please provide a copy of your SG ISI Inspection Program and Plan. Please  
include a copy of the Operational Assessment from last outage and a copy of the  
following documents as they become available:
i)  
Degradation Assessment  
ii)  
Condition Monitoring Assessment  
c)  
If you are planning on modifying your Technical Specifications such that they are  
consistent with TSTF-449, please provide copies of your correspondence with  
the NRC regarding deviations from the STS.  
d)  
Copy of SG history documentation given to vendors performing eddy current (ET)  
testing of the SGs during the upcoming outage.  
e)  
Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy  
Current Technique Specification Sheets (ETSS). Additionally, please provide a  
copy of EPRI Appendix H ETSS Qualification Records.  


    f)     Identify and quantify any SGT leakage experienced during the previous operating
          cycle. Also provide documentation identifying which SG was leaking and
          corrective actions completed or planned for this condition (If applicable).
    g)     Provide past history of the condition and issues pertaining to the secondary side
- 4 -
          of the steam generators (including items such as loose parts, fouling, top of tube
Enclosure
          sheet condition, crud removal amounts, etc.)
f)  
    h)     Please provide copies of your most recent self assessments of the SG
Identify and quantify any SGT leakage experienced during the previous operating  
          monitoring, loose parts monitoring, and secondary side water chemistry control
cycle. Also provide documentation identifying which SG was leaking and  
          programs.
corrective actions completed or planned for this condition (If applicable).  
    i)     Please also indicate where the primary, secondary, and resolution analyses are
          scheduled to take place.
g)
    j)     Please provide a summary of the scope of the SGT examinations, including
Provide past history of the condition and issues pertaining to the secondary side  
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
of the steam generators (including items such as loose parts, fouling, top of tube  
          percentage of tubes to be examined. *Do not provide these documents
sheet condition, crud removal amounts, etc.)  
          separately if already included in other information requested.
A.5 Materials Reliability (MRP-139) Program Activities
h)  
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
Please provide copies of your most recent self assessments of the SG  
          Metal Butt Welds (DMBWs) have been completed by September 30, 2009.
monitoring, loose parts monitoring, and secondary side water chemistry control  
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
programs.  
          have been included in the inspection program and that the schedules for the
          baseline inspections are consistent with the baseline schedules in MRP-139.
i)  
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
Please also indicate where the primary, secondary, and resolution analyses are  
          the upcoming refueling outage. If none are scheduled, then data from previous
scheduled to take place.  
          examinations should be available for review.
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
j)  
          outage. If no welding will be performed then records of previous welding on
Please provide a summary of the scope of the SGT examinations, including  
          DMBWs and postweld NDE documentation.
examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the  
    e)     A list and schedule of any stress improvement (SI) activities planned for the
percentage of tubes to be examined. *Do not provide these documents  
          upcoming refueling outage. If none are scheduled then have qualification reports
separately if already included in other information requested.
          for any SIs previously performed.
    f)     Documentation and description of how the baseline and inservice inspection
A.5  
          specifications in MRP-139 are satisfied at your facility.
Materials Reliability (MRP-139) Program Activities  
    g)     A list of weld locations controlled by MRP-139 which includes the MRP-139 weld
          category, pre-mitigation volumetric examination date, type of mitigation or stress
a)  
          improvement, post mitigation volumetric examination date, and plans for future
A list of, with verification, that the baseline inspections of all applicable Dissimilar  
          MRP-139 required examinations.
Metal Butt Welds (DMBWs) have been completed by September 30, 2009.  
                                          -4-                                        Enclosure
b)  
Verification that baseline inspection of hot leg and cold leg temperature DMBWs  
have been included in the inspection program and that the schedules for the  
baseline inspections are consistent with the baseline schedules in MRP-139.  
c)  
A list and schedule (examination dates) of all DMBW examinations planned for  
the upcoming refueling outage. If none are scheduled, then data from previous  
examinations should be available for review.  
d)  
A list and schedule for any welding to be performed on DMBWs in the upcoming  
outage. If no welding will be performed then records of previous welding on  
DMBWs and postweld NDE documentation.  
e)  
A list and schedule of any stress improvement (SI) activities planned for the  
upcoming refueling outage. If none are scheduled then have qualification reports  
for any SIs previously performed.  
f)  
Documentation and description of how the baseline and inservice inspection  
specifications in MRP-139 are satisfied at your facility.  
g)  
A list of weld locations controlled by MRP-139 which includes the MRP-139 weld  
category, pre-mitigation volumetric examination date, type of mitigation or stress  
improvement, post mitigation volumetric examination date, and plans for future  
MRP-139 required examinations.  


A.6 Additional information related to all ISI activities
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
          (e.g., condition reports) entered into your corrective action program since the
          beginning of the last refueling outage. For example, a list based upon data base
- 5 -
          searches using key words related to piping or SG tube degradation such as: ISI,
Enclosure
          ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,
          boric acid, or errors in piping/SGT examinations.
A.6  
    b)     Please provide names and phone numbers for the following program leads:
Additional information related to all ISI activities  
          ISI contacts (Examination, planning)
          Containment Exams
a)
          RPVH Exams
A list with a brief description of ISI, BACCP, and SGT inspection related issues  
          Snubbers and Supports
(e.g., condition reports) entered into your corrective action program since the  
          Repair and Replacement Program Manager
beginning of the last refueling outage. For example, a list based upon data base  
          Licensing Contact
searches using key words related to piping or SG tube degradation such as: ISI,  
          Site Welding Engineer
ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,  
          Boric Acid Corrosion Control Program
boric acid, or errors in piping/SGT examinations.  
          SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting (November
b)
    2, 2009):
Please provide names and phone numbers for the following program leads:  
B.1 ISI / Welding Programs and Schedule Information
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
ISI contacts (Examination, planning)  
          welding activities, and schedule showing contingency repair plans, if available.
Containment Exams  
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
RPVH Exams  
          provided from section A of this enclosure, please provide copies of the following
Snubbers and Supports  
          documentation for each subject weld:
Repair and Replacement Program Manager  
          i)       Weld data sheet (traveler)
Licensing Contact  
          ii)     Weld configuration and system location
Site Welding Engineer  
          iii)     Applicable Code Edition and Addenda for weldment
Boric Acid Corrosion Control Program  
          iv)     Applicable Code Edition and Addenda for welding procedures
SG Inspection Activities (site lead and vendor contact)  
          v)       Applicable weld procedures (WPS) used to fabricate the welds
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
B.  
                    from B.1.b.v
Information to be provided onsite to the inspector(s) at the entrance meeting (November  
          vii)     Copies of mechanical test reports identified in the PQRs above
2, 2009):  
          viii)   Copies of the nonconformance reports for the selected welds (If
                    applicable)
B.1  
          ix)     Radiographs of the selected welds and access to equipment to allow
ISI / Welding Programs and Schedule Information  
                    viewing radiographs (If RT was performed)
          x)       Copies of the preservice examination records for the selected welds.
a)  
                                          -5-                                      Enclosure
Updated schedules for ISI/NDE activities, including SGT inspections, planned  
welding activities, and schedule showing contingency repair plans, if available.  
b)  
For ASME Code Class 1 and 2 welds selected by the inspector from the lists  
provided from section A of this enclosure, please provide copies of the following  
documentation for each subject weld:  
i)  
Weld data sheet (traveler)  
ii)  
Weld configuration and system location  
iii)  
Applicable Code Edition and Addenda for weldment  
iv)  
Applicable Code Edition and Addenda for welding procedures  
v)  
Applicable weld procedures (WPS) used to fabricate the welds  
vi)  
Copies of procedure qualification records (PQRs) supporting the WPS  
from B.1.b.v  
vii)  
Copies of mechanical test reports identified in the PQRs above  
viii)  
Copies of the nonconformance reports for the selected welds (If  
applicable)  
ix)  
Radiographs of the selected welds and access to equipment to allow  
viewing radiographs (If RT was performed)  
x)  
Copies of the preservice examination records for the selected welds.  


          xi)     Copies of welder performance qualifications records applicable to the
                    selected welds, including documentation that welder maintained
                    proficiency in the applicable welding processes specified in the WPS (at
                    least six months prior to the date of subject work)
- 6 -
          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
Enclosure
    c)     For the ISI related corrective action issues selected by the inspector(s) from
xi)  
          section A of this enclosure, provide a copy of the corrective actions and
Copies of welder performance qualifications records applicable to the  
          supporting documentation.
selected welds, including documentation that welder maintained  
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
proficiency in the applicable welding processes specified in the WPS (at  
          selected by the inspector from section A above, provide a copy of the
least six months prior to the date of subject work)  
          examination records, examiner qualification records, and associated corrective
xii)  
          action documents.
Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
          and Plan for the current Interval.
c)  
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
For the ISI related corrective action issues selected by the inspector(s) from  
          copy of the NDE procedures used to perform the examinations (including
section A of this enclosure, provide a copy of the corrective actions and  
          calibration and flaw characterization/sizing procedures). For ultrasonic
supporting documentation.  
          examination procedures qualified in accordance with ASME Code, Section XI,
          Appendix VIII, provide documentation supporting the procedure qualification
d)  
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
For the NDE reports with relevant conditions on Code Class 1 & 2 systems  
          include qualification documentation of the specific equipment to be used (e.g.,
selected by the inspector from section A above, provide a copy of the  
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
examination records, examiner qualification records, and associated corrective  
          personnel qualification records.
action documents.  
B.2 Reactor Pressure Vessel Head (RPVH)
    a)     Provide the NDE personnel qualification records for the examiners who will
e)  
          perform examinations of the RPVH.
A copy of (or ready access to) most current revision of the ISI Program Manual  
    b)     Provide drawings showing the following: (If a visual examination is planned for
and Plan for the current Interval.
          the upcoming refueling outage)
          i)       RPVH and CRDM nozzle configurations
f)  
          ii)     RPVH insulation configuration
For the NDEs selected by the inspector from section A of this enclosure, provide  
    The drawings listed above should include fabrication drawings for the nozzle attachment
copy of the NDE procedures used to perform the examinations (including  
    welds as applicable.
calibration and flaw characterization/sizing procedures). For ultrasonic  
    c)     Copy of NDE reports from the last RPVH examination.
examination procedures qualified in accordance with ASME Code, Section XI,  
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
Appendix VIII, provide documentation supporting the procedure qualification  
          examination of the upper head will meet the 95 percent minimum coverage
(e.g., the EPRI performance demonstration qualification summary sheets). Also,  
          required by NRC Order EA-03-009 or ASME Code Case N-729-1 (If a visual
include qualification documentation of the specific equipment to be used (e.g.,  
          examination is planned for the upcoming refueling outage).
ultrasonic unit, cables, and transducers including serial numbers) and NDE  
                                        -6-                                      Enclosure
personnel qualification records.  
B.2  
Reactor Pressure Vessel Head (RPVH)  
a)  
Provide the NDE personnel qualification records for the examiners who will  
perform examinations of the RPVH.
b)  
Provide drawings showing the following: (If a visual examination is planned for  
the upcoming refueling outage)  
i)  
RPVH and CRDM nozzle configurations
ii)  
RPVH insulation configuration
The drawings listed above should include fabrication drawings for the nozzle attachment  
welds as applicable.
c)  
Copy of NDE reports from the last RPVH examination.  
d)  
Copy of evaluation or calculation demonstrating that the scope of the visual  
examination of the upper head will meet the 95 percent minimum coverage  
required by NRC Order EA-03-009 or ASME Code Case N-729-1 (If a visual  
examination is planned for the upcoming refueling outage).  


    e)     Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
- 7 -
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
Enclosure
          for the RPVH susceptibility ranking.
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
e)  
          capability of the NDE equipment used for the RPVH examinations. Also, identify
Provide a copy of the procedures that will be used to identify the source of any  
          any changes in equipment configurations used for the RPVH examinations which
boric acid deposits identified on the RPVH. If no explicit procedures exist which  
          differ from that used in the vendor qualification report(s).
govern this activity, provide a description of the process to be followed including  
B.3 Boric Acid Corrosion Control Program (BACCP)
personnel responsibilities and expectations.
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
f)
          documentation, and overall status of planned boric acid inspections.
Provide a copy of the updated calculation of effective degradation years (EDY)  
    b)     Please provide any engineering evaluations completed for boric acid leaks
for the RPVH susceptibility ranking.  
          identified since the end of the last refueling outage. Please include a status of
          corrective actions to repair and/or clean these boric acid leaks. Please identify
g)
          specifically which known leaks, if any, have remained in service or will remain in
Provide copy of the vendor qualification report(s) that demonstrates the detection  
          service as active leaks.
capability of the NDE equipment used for the RPVH examinations. Also, identify  
B.4 Steam Generator Tube (SGT) Inspections
any changes in equipment configurations used for the RPVH examinations which  
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
differ from that used in the vendor qualification report(s).  
          associated justification for any revisions.
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
B.3  
          in the SGs.
Boric Acid Corrosion Control Program (BACCP)  
    c)     Please provide a copy of the ET procedures used to perform the SGT
          inspections (specifically calibration and flaw characterization/sizing procedures,
a)  
          etc.). Also include documentation for the specific equipment to be used.
Please provide boric acid walkdown inspection results, an updated list of boric  
    d)     Please provide copies of your responses to NRC and industry operating
acid leaks identified so far this outage, associated corrective action  
          experience communications such as Generic Letters, Information Notices, etc.
documentation, and overall status of planned boric acid inspections.  
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
b)  
          assessment.
Please provide any engineering evaluations completed for boric acid leaks  
    e)     List of corrective action documents generated by the vendor and/or site with
identified since the end of the last refueling outage. Please include a status of  
          respect to SG inspection activities.
corrective actions to repair and/or clean these boric acid leaks. Please identify  
                                        -7-                                        Enclosure
specifically which known leaks, if any, have remained in service or will remain in  
service as active leaks.
B.4  
Steam Generator Tube (SGT) Inspections  
a)  
Copies of the Examination Technique Specification Sheets (ETSS) and  
associated justification for any revisions.  
b)  
Copy of the guidance to be followed if a loose part or foreign material is identified  
in the SGs.  
c)  
Please provide a copy of the ET procedures used to perform the SGT  
inspections (specifically calibration and flaw characterization/sizing procedures,  
etc.). Also include documentation for the specific equipment to be used.  
d)  
Please provide copies of your responses to NRC and industry operating  
experience communications such as Generic Letters, Information Notices, etc.  
(as applicable to SGT inspections) *Do not provide these documents separately if  
already included in other information requested such as the degradation  
assessment.  
e)  
List of corrective action documents generated by the vendor and/or site with  
respect to SG inspection activities.  


B.5     Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
              available):
- 8 -
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
Enclosure
                      inservice inspection program and the repair/replacement program.
B.5  
              ii)     EPRI and industry standards referenced in the procedures used to
Codes and Standards  
                      perform the SGT eddy current examination.
Inspector Contact Information:
a)  
Ramon Azua                     Michael Bloodgood
Ready access to (i.e., copies provided to the inspector(s) for use during the  
Senior Project Engineer       Reactor Inspector
inspection at the onsite inspection location, or room number and location where  
817-319-4376                   817-276-6544
available):  
ray.azua@nrc.gov               michael.bloodgood@nrc.gov
Mailing Address:
i)
US NRC Region IV
Applicable Editions of the ASME Code (Sections V, IX and XI) for the  
Attn: Ramon Azua
inservice inspection program and the repair/replacement program.
612 E. Lamar Blvd, Suite 400
ii)
EPRI and industry standards referenced in the procedures used to  
perform the SGT eddy current examination.  
Inspector Contact Information:  
Ramon Azua
Michael Bloodgood  
Senior Project Engineer  
Reactor Inspector  
817-319-4376
817-276-6544
ray.azua@nrc.gov  
michael.bloodgood@nrc.gov  
Mailing Address:  
US NRC Region IV  
Attn: Ramon Azua  
612 E. Lamar Blvd, Suite 400  
Arlington, TX 76011
Arlington, TX 76011
                                            -8-                                      Enclosure
}}
}}

Latest revision as of 09:10, 14 January 2025

Notification of Inspection (NRC Inspection Report 05000382/2009005) and Request for Information
ML092720921
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/29/2009
From: Ray Kellar
Region 4 Engineering Branch 1
To: Kowalewski J
Entergy Operations
References
IR-09-005
Download: ML092720921 (12)


See also: IR 05000382/2009005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

September 29, 2009

Joseph Kowalewski, Vice President, Operations

Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3

17265 River Road

Killona, LA 70057-3093

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

INSPECTION (NRC INSPECTION REPORT 05000382/2009005) AND

REQUEST FOR INFORMATION

Dear Mr. Kowalewski:

From November 2-13, 2009, reactor inspectors from the U. S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at the

Waterford Steam Electric Station, Unit 3, using NRC Inspection Procedure 71111.08, "Inservice

Inspection Activities," and Temporary Instruction 2515/172, "Reactor Coolant System Dissimilar

Metal Butt Welds." Experience has shown that this inspection is a resource intensive inspection

both for the NRC inspectors and your staff. In order to minimize the impact to your onsite

resources and to ensure a productive inspection, we have enclosed a request for documents

needed for this inspection. These documents have been divided into two groups. The first

group (Section A of the enclosure) identified information to be provided prior to the inspection to

ensure that the inspectors are adequately prepared. The second group (Section B of the

enclosure) identifies the information the inspectors will need upon arrival at the site. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule and information required for these inspection activities with

your staff and understand that our regulatory contact for this inspection will be Mr. Jim Pollock of

your licensing organization. Our inspection dates are subject to change based on your updated

schedule of outage activities. If there are any questions about this inspection or the material

requested, please contact the lead inspector Ramon Azua at (817) 319-4376

(ray.azua@nrc.gov) or Michael Bloodgood at (817) 276-6544 (michael.bloodgood@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Entergy Operations, Inc.

- 2 -

Sincerely,

/RA/

Ray Kellar, P.E., Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosure:

Inservice Inspection Document Request

Senior Vice President

Entergy Nuclear Operations

P. O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Vice President, Operations Support

Entergy Services, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Site Vice President

Waterford Steam Electric Station, Unit 3

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Director

Nuclear Safety Assurance

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Entergy Operations, Inc.

- 3 -

General Manager, Plant Operations

Waterford 3 SES

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

Manager, Licensing

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-3093

Chairman

Louisiana Public Service Commission

P. O. Box 91154

Baton Rouge, LA 70821-9154

Parish President Council

St. Charles Parish

P. O. Box 302

Hahnville, LA 70057

Director, Nuclear Safety & Licensing

Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601

Louisiana Department of Environmental

Quality, Radiological Emergency Planning

and Response Division

P. O. Box 4312

Baton Rouge, LA 70821-4312

Chief, Technological Hazards

Branch

FEMA Region VI

800 North Loop 288

Federal Regional Center

Denton, TX 76209

Entergy Operations, Inc.

- 4 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Mark.Haire@nrc.gov)

Resident Inspector (Dean.Overland@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

WAT Site Secretary (Linda.Dufrene@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

DRS STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

SUNSI Review Completed: ___Y___

ADAMS: 7 Yes

No Initials: _RVA

7 Publicly Available Non-Publicly Available Sensitive

7 Non-Sensitive

R:\\REACTORS\\W3 ISI RFI - RVA

ML09270921

SPE:DRP/PBE

RI:DRS/EB1

C:DRS/EB1

RVAzua

MRBloodgood

RLKellar

/RA/

/RA/

/RA/

09/29/09

09/29/09

09/29/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

November 2-13, 2009

Inspection Procedures:

IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors:

Ramon Azua, Senior Project Engineer (Lead Inspector - ISI)

Michael Bloodgood, Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Ramon Azua, by October 26,

2009, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii)

Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii)

Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

iv)

Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

- 2 -

Enclosure

v)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009 or ASME Code Case N-729-1. Also, include

examination scope expansion criteria and planned expansion sample sizes if

relevant conditions are identified. (If applicable)

b)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

- 3 -

Enclosure

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3

Boric Acid Corrosion Control Program (BACCP)

a)

Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b)

Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c)

Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii)

SG secondary side inspection activities for the upcoming outage. (If

occurring)

b)

Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d)

Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

- 4 -

Enclosure

f)

Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g)

Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h)

Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i)

Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j)

Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5

Materials Reliability (MRP-139) Program Activities

a)

A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by September 30, 2009.

b)

Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e)

A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f)

Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

g)

A list of weld locations controlled by MRP-139 which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

improvement, post mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

- 5 -

Enclosure

A.6

Additional information related to all ISI activities

a)

A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage. For example, a list based upon data base

searches using key words related to piping or SG tube degradation such as: ISI,

ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,

boric acid, or errors in piping/SGT examinations.

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B.

Information to be provided onsite to the inspector(s) at the entrance meeting (November

2, 2009):

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x)

Copies of the preservice examination records for the selected welds.

- 6 -

Enclosure

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b)

Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c)

Copy of NDE reports from the last RPVH examination.

d)

Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009 or ASME Code Case N-729-1 (If a visual

examination is planned for the upcoming refueling outage).

- 7 -

Enclosure

e)

Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f)

Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g)

Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3

Boric Acid Corrosion Control Program (BACCP)

a)

Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b)

Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4

Steam Generator Tube (SGT) Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c)

Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d)

Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e)

List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

- 8 -

Enclosure

B.5

Codes and Standards

a)

Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

Ramon Azua

Michael Bloodgood

Senior Project Engineer

Reactor Inspector

817-319-4376

817-276-6544

ray.azua@nrc.gov

michael.bloodgood@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Ramon Azua

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011