{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December     14, 2009 Vice President, Operations Entergy Operations, Inc.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775  


==SUBJECT:==
==SUBJECT:==
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
 
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By {{letter dated|date=November 30, 2009|text=letter dated November 30, 2009}} (ADAMS Accession No. ML093380291),
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
Sincerely, G\J-bM VJ~
Sincerely, G\\J-bM VJ~
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458  


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 165, TS page 3.8-10
: 1. Amendment No. 165, TS page 3.8-10
: 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv
: 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv  


ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165
ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165  


AC Sources-Operating 3.8.1 SURVEILLANCE                                           FREQUENCY SR 3.8.1.12 -----------------------------NOTES---------------------------
3.8.1 AC Sources-Operating SURVEILLANCE SR 3.8.1.12  
: 1.     All DG starts may be preceded by an engine prelube period.
-----------------------------NOTES---------------------------
: 2.     This Surveillance shall not be performed in MODE 1 or 2. (Not applicable to DG 1C)
: 1.
All DG starts may be preceded by an engine prelube period.
: 2.
This Surveillance shall not be performed in MODE 1 or 2. (Not applicable to DG 1C)
However. credit may be taken for unplanned events that satisfy this SR.
However. credit may be taken for unplanned events that satisfy this SR.
Verify on an actual or simulated Emergency Core                   18 months Cooling System (ECCS) initiation signal each DG auto-starts from standby condition and:
Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each DG auto-starts from standby condition and:
: a.       For DG 1C during the auto-start maintains voltage s; 5400 V and frequency s; 66.75 Hz;
: a.
: b.       In s; 10 seconds for DG 1A and DG 1Band s; 13 seconds for DG 1C after auto-start and during tests, achieves voltage     ~ 3740 V and frequency ~ 58.8 Hz.
For DG 1C during the auto-start maintains voltage s; 5400 V and frequency s; 66.75 Hz;
: c.     Achieves steady state voltage     ~ 3740 V and s; 4580 V and frequency ~ 58.8 Hz and s; 61.2 Hz; and
: b.
: d.     Operates for     ~ 5 minutes.
In s; 10 seconds for DG 1A and DG 1Band s; 13 seconds for DG 1C after auto-start and during tests, achieves voltage ~ 3740 V and frequency ~ 58.8 Hz.
(continued)
: c.
RIVER BEND                                   3.8-10           Amendment No. 81 121 133,165
Achieves steady state voltage ~ 3740 V and s; 4580 V and frequency ~ 58.8 Hz and s; 61.2 Hz; and
: d.
Operates for ~ 5 minutes.
FREQUENCY 18 months (continued)
RIVER BEND 3.8-10 Amendment No. 81 121 133,165  


ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166
ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166  


Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5        CORE OPERATING LIMITS REPORT (COLR) (continued)
5.6 5.6.5 Reporting Requirements 5.6 Reporting Requirements CORE OPERATING LIMITS REPORT (COLR) (continued)
: 24)   NEDE-24011-P-A, uGeneral Electric Standard Application for Reactor Fuel (GESTAR-II)".
: 24)
: 25)   NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel.
NEDE-24011-P-A, uGeneral Electric Standard Application for Reactor Fuel (GESTAR-II)".
: c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
: 25)
: d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel.
RIVER BEND                                   5.0-19     Amendment No. 81 9699 100 105 106
: c.
                                                                                  ~, 166
The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
: d.
The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
RIVER BEND 5.0-19 Amendment No. 81 9699 100 105 106  
~, 166  


December 14, 2009 Vice President, Operations Entergy Operations, Inc.
December 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT:       RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT:
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
 
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By {{letter dated|date=November 30, 2009|text=letter dated November 30, 2009}} (ADAMS Accession No. ML093380291),
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
Sincerely, IRA!
Sincerely, IRA!
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458  


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 165, TS page 3.8-10
: 1. Amendment No. 165, TS page 3.8-10
: 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION:
: 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC                             RidsNrrDirsltsb Resource             RidsNrrLAJBurkhardt Resource LPLIV rtf                           RidsNrrDssSnpb Resource               RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource       RidsNrrDssSrxb Resource               RidsOgcRp Resource RidsNrrDeEeeb Resource             RidsNrrDorlLpl4 Resource             RidsRgn4MailCenter Resource ADAMS Accession No ML093360581 OFFICE     NRR/LPL4/PM             NRR/LPL4/LA             NRR/LPL4/BC             NRR/LPL4/PM NAME       ABWang                 JBurkhardt             MMarkley               ABWang DATE       12/09/09               12/7109                 12/14/09               12/14/09 OFFICIAL AGENCY RECORD}}
PUBLIC RidsNrrDirsltsb Resource RidsNrrLAJBurkhardt Resource LPLIV rtf RidsNrrDssSnpb Resource RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDssSrxb Resource RidsOgcRp Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource ADAMS Accession No ML093360581 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME ABWang JBurkhardt MMarkley ABWang DATE 12/09/09 12/7109 12/14/09 12/14/09 OFFICIAL AGENCY RECORD}}

Latest revision as of 07:59, 14 January 2025

Correction of Errors in Amendment Nos. 165 and 166
ML093360581
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/14/2009
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME0157, TAC ME0406
Download: ML093360581 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 14, 2009 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)

Dear Sir or Madam:

By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),

Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.

Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.

This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.

Sincerely, G\\J-bM VJ~

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosures:

1. Amendment No. 165, TS page 3.8-10
2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv

ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165

3.8.1 AC Sources-Operating SURVEILLANCE SR 3.8.1.12


NOTES---------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not be performed in MODE 1 or 2. (Not applicable to DG 1C)

However. credit may be taken for unplanned events that satisfy this SR.

Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each DG auto-starts from standby condition and:

a.

For DG 1C during the auto-start maintains voltage s; 5400 V and frequency s; 66.75 Hz;

b.

In s; 10 seconds for DG 1A and DG 1Band s; 13 seconds for DG 1C after auto-start and during tests, achieves voltage ~ 3740 V and frequency ~ 58.8 Hz.

c.

Achieves steady state voltage ~ 3740 V and s; 4580 V and frequency ~ 58.8 Hz and s; 61.2 Hz; and

d.

Operates for ~ 5 minutes.

FREQUENCY 18 months (continued)

RIVER BEND 3.8-10 Amendment No. 81 121 133,165

ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166

5.6 5.6.5 Reporting Requirements 5.6 Reporting Requirements CORE OPERATING LIMITS REPORT (COLR) (continued)

24)

NEDE-24011-P-A, uGeneral Electric Standard Application for Reactor Fuel (GESTAR-II)".

25)

NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel.

c.

The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.

d.

The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

RIVER BEND 5.0-19 Amendment No. 81 9699 100 105 106

~, 166

December 14, 2009 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT:

RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)

Dear Sir or Madam:

By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),

Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.

Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.

This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.

Sincerely, IRA!

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosures:

1. Amendment No. 165, TS page 3.8-10
2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDirsltsb Resource RidsNrrLAJBurkhardt Resource LPLIV rtf RidsNrrDssSnpb Resource RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDssSrxb Resource RidsOgcRp Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource ADAMS Accession No ML093360581 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME ABWang JBurkhardt MMarkley ABWang DATE 12/09/09 12/7109 12/14/09 12/14/09 OFFICIAL AGENCY RECORD