ML100640080: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 12: | Line 12: | ||
| document type = E-Mail | | document type = E-Mail | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Acceptance Review | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:From: | {{#Wiki_filter:From: | ||
Martin, Robert Sent: | |||
Friday, March 05, 2010 9:02 AM To: | |||
internet: njstring@southernco.com Cc: | |||
Boyle, Patrick | |||
==Subject:== | ==Subject:== | ||
Acceptance for Review of 2/02/10 Vogtle Application By letter dated February 2, 2010, (ML100340033), SNC submitted a request to revise the Technical Specifications (TS), Appendix A to Facility Operating License Numbers NPF-68 and NPF-81 for the Vogtle Electric Generating Plant Units 1 and 2, respectively. The changes would add Surveillance Requirement (SR) 3.3.1.15 to VEGP TS Table 3.3.1-1, Reactor Trip System Instrumentation, Function 3, Power Range Neutron Flux High Positive Rate. SR 3.3.1.15 requires verification that the RTS RESPONSE TIME is within limits every 18 months on a STAGGERED TEST BASIS. Function 3 is the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. This change is being proposed based on a reanalysis of the Rod Cluster Control Assembly Bank Withdrawal at Power event. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. | Acceptance for Review of 2/02/10 Vogtle Application By {{letter dated|date=February 2, 2010|text=letter dated February 2, 2010}}, (ML100340033), SNC submitted a request to revise the Technical Specifications (TS), Appendix A to Facility Operating License Numbers NPF-68 and NPF-81 for the Vogtle Electric Generating Plant Units 1 and 2, respectively. The changes would add Surveillance Requirement (SR) 3.3.1.15 to VEGP TS Table 3.3.1-1, Reactor Trip System Instrumentation, Function 3, Power Range Neutron Flux High Positive Rate. SR 3.3.1.15 requires verification that the RTS RESPONSE TIME is within limits every 18 months on a STAGGERED TEST BASIS. Function 3 is the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. This change is being proposed based on a reanalysis of the Rod Cluster Control Assembly Bank Withdrawal at Power event. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. | ||
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the SNCs request in terms of regulatory requirements and the protection of public health and safety and the environment. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the SNCs request in terms of regulatory requirements and the protection of public health and safety and the environment. | ||
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | ||
Bob Martin LPL2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No(s): 50-424, 50-425 E-mail Properties Mail Envelope Properties () | Bob Martin LPL2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No(s): 50-424, 50-425 E-mail Properties Mail Envelope Properties () | ||
==Subject:== | ==Subject:== | ||
Acceptance for Review of 2/02/10 Vogtle Application Sent Date: | Acceptance for Review of 2/02/10 Vogtle Application Sent Date: 3/5/2010 8:55:34 AM Received Date: 3/5/2010 9:01:00 AM From: Martin, Robert Created By: Robert.Martin@nrc.gov | ||
Recipients: | Recipients: | ||
| Line 31: | Line 37: | ||
Tracking Status: None Patrick.Boyle@nrc.gov (Boyle, Patrick) | Tracking Status: None Patrick.Boyle@nrc.gov (Boyle, Patrick) | ||
Tracking Status: None Post Office: | Tracking Status: None Post Office: | ||
Files | Files Size Date & Time MESSAGE 9492 3/5/2010 Options Expiration Date: | ||
Priority: | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} | ||
Latest revision as of 06:15, 14 January 2025
| ML100640080 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/05/2010 |
| From: | Martin R Plant Licensing Branch II |
| To: | Southern Nuclear Operating Co |
| Martin, R E, NRR/DORL/LPLII-1, 301-415-1 | |
| References | |
| Download: ML100640080 (1) | |
Text
From:
Martin, Robert Sent:
Friday, March 05, 2010 9:02 AM To:
internet: njstring@southernco.com Cc:
Boyle, Patrick
Subject:
Acceptance for Review of 2/02/10 Vogtle Application By letter dated February 2, 2010, (ML100340033), SNC submitted a request to revise the Technical Specifications (TS), Appendix A to Facility Operating License Numbers NPF-68 and NPF-81 for the Vogtle Electric Generating Plant Units 1 and 2, respectively. The changes would add Surveillance Requirement (SR) 3.3.1.15 to VEGP TS Table 3.3.1-1, Reactor Trip System Instrumentation, Function 3, Power Range Neutron Flux High Positive Rate. SR 3.3.1.15 requires verification that the RTS RESPONSE TIME is within limits every 18 months on a STAGGERED TEST BASIS. Function 3 is the Power Range Neutron Flux High Positive Rate Trip (PFRT) function. This change is being proposed based on a reanalysis of the Rod Cluster Control Assembly Bank Withdrawal at Power event. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the SNCs request in terms of regulatory requirements and the protection of public health and safety and the environment.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Bob Martin LPL2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No(s): 50-424, 50-425 E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance for Review of 2/02/10 Vogtle Application Sent Date: 3/5/2010 8:55:34 AM Received Date: 3/5/2010 9:01:00 AM From: Martin, Robert Created By: Robert.Martin@nrc.gov
Recipients:
NJSTRING@southernco.com (internet: njstring@southernco.com)
Tracking Status: None Patrick.Boyle@nrc.gov (Boyle, Patrick)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 9492 3/5/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: