{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:August 18, 2010
                                    NUC LE AR RE G ULATO RY C O M M I S S I O N
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
                                            AR LI N GTON , TEXAS 76011-4125
                                                August 18, 2010
Mr. Ross T. Ridenoure  
Mr. Ross T. Ridenoure
Senior Vice President and
Senior Vice President and
   Chief Nuclear Officer  
   Chief Nuclear Officer
Southern California Edison Company  
Southern California Edison Company
San Onofre Nuclear Generating Station  
San Onofre Nuclear Generating Station
P.O. Box 128  
P.O. Box 128
San Clemente, CA 92674-0128  
San Clemente, CA 92674-0128
SUBJECT:       SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 - NOTIFICATION
SUBJECT:  
                OF INSPECTION (NRC INSPECTION REPORT 05000362005) AND REQUEST
SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 - NOTIFICATION  
                FOR INFORMATION
OF INSPECTION (NRC INSPECTION REPORT 05000362005) AND REQUEST  
Dear Mr.Ridenoure:
FOR INFORMATION  
From November 29 to December 10, 2010, reactor inspectors from the U.S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at San
Dear Mr.Ridenoure:  
Onofre Nuclear Generating Station Unit 3, using NRC Inspection Procedure 71111.08,
Inservice Inspection Activities, and TI 2515/172, Reactor Coolant System Dissimilar Metal
From November 29 to December 10, 2010, reactor inspectors from the U.S. Nuclear Regulatory  
Butt Welds. Experience has shown that this inspection is a resource intensive inspection both
Commissions (NRC) Region IV office will perform the baseline inservice inspection at San  
for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources
Onofre Nuclear Generating Station Unit 3, using NRC Inspection Procedure 71111.08,  
and to ensure a productive inspection, we have enclosed a request for documents needed for
Inservice Inspection Activities, and TI 2515/172, Reactor Coolant System Dissimilar Metal  
this inspection. These documents have been divided into two groups. The first group, due by
Butt Welds. Experience has shown that this inspection is a resource intensive inspection both  
September 1, 2010, (Section A of the enclosure) identifies information to be provided prior to the
for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources  
inspection to ensure that the inspectors are adequately prepared. The second group (Section B
and to ensure a productive inspection, we have enclosed a request for documents needed for  
of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is
this inspection. These documents have been divided into two groups. The first group, due by  
important that all of these documents are up to date and complete in order to minimize the
September 1, 2010, (Section A of the enclosure) identifies information to be provided prior to the  
number of additional documents requested during the preparation and/or the onsite portions of
inspection to ensure that the inspectors are adequately prepared. The second group (Section B  
the inspection.
of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is  
We have discussed the schedule for these inspection activities with your staff and understand
important that all of these documents are up to date and complete in order to minimize the  
that our regulatory contact for this inspection will be Mr. Dave Axeline of your licensing
number of additional documents requested during the preparation and/or the onsite portions of  
organization. Our inspection dates are subject to change based on your updated schedule of
the inspection.  
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Jim Drake, at (817) 276-6558 or (James.Drake@nrc.gov).
We have discussed the schedule for these inspection activities with your staff and understand  
This letter does not contain new or amended information collection requirements subject to the
that our regulatory contact for this inspection will be Mr. Dave Axeline of your licensing  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
organization. Our inspection dates are subject to change based on your updated schedule of  
requirements were approved by the Office of Management and Budget, Control
outage activities. If there are any questions about this inspection or the material requested,  
please contact the lead inspector Jim Drake, at (817) 276-6558 or (James.Drake@nrc.gov).  
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON  I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125


Southern California Edison Company             -2-
Southern California Edison Company  
Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to
- 2 -  
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to  
number.
respond to, a request for information or an information collection requirement unless the  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
requesting document displays a currently valid Office of Management and Budget control  
enclosure will be available electronically for public inspection in the NRC Public Document
number.  
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
rm/adams.html (the Public Electronic Reading Room).
enclosure will be available electronically for public inspection in the NRC Public Document  
                                                  Sincerely,
Room or from the Publicly Available Records (PARS) component of NRCs document system  
                                                    /RA/
(ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
                                                  Gregory E. Werner, Chief
rm/adams.html (the Public Electronic Reading Room).  
                                                  Plant Support Branch 2
                                                  Division of Reactor Safety
Docket: 50-362
Sincerely,  
License: NPF-15
Enclosure:
Inservice Inspection Document Request
  /RA/  
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
Gregory E. Werner, Chief  
San Diego, CA 92101
Gary L. Nolff
Plant Support Branch 2  
Assistant Director-Resources
City of Riverside
Division of Reactor Safety  
3900 Main Street
Riverside, CA 92522
Docket:   50-362  
Mark L. Parsons
License: NPF-15  
Deputy City Attorney
City of Riverside
Enclosure:  
3900 Main Street
Inservice Inspection Document Request  
Riverside, CA 92522
Gary H. Yamamoto, P.E., Chief
Chairman, Board of Supervisors  
Division of Drinking Water and
County of San Diego  
   Environmental Management
1600 Pacific Highway, Room 335  
1616 Capitol Avenue, MS 7400
San Diego, CA 92101  
P.O. Box 997377
Sacramento, CA 95899-7377
Gary L. Nolff  
Assistant Director-Resources  
City of Riverside  
3900 Main Street  
Riverside, CA 92522  
Mark L. Parsons  
Deputy City Attorney  
City of Riverside  
3900 Main Street  
Riverside, CA 92522  
Gary H. Yamamoto, P.E., Chief  
Division of Drinking Water and
   Environmental Management
1616 Capitol Avenue, MS 7400  
P.O. Box 997377  
Sacramento, CA 95899-7377  


Southern California Edison Company   -3-
Southern California Edison Company  
Michael L. DeMarco
- 3 -  
San Onofre Liaison
San Diego Gas & Electric Company
Michael L. DeMarco  
8315 Century Park Ct. CP21C
San Onofre Liaison  
San Diego, CA 92123-1548
San Diego Gas & Electric Company  
Director, Radiological Health Branch
8315 Century Park Ct. CP21C  
State Department of Health Services
San Diego, CA 92123-1548  
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
Director, Radiological Health Branch  
The Mayor of the City of San Clemente
State Department of Health Services  
100 Avenida Presidio
P.O. Box 997414 (MS 7610)  
San Clemente, CA 92672
Sacramento, CA 95899-7414  
James D. Boyd, Commissioner
California Energy Commission
The Mayor of the City of San Clemente  
1516 Ninth Street (MS 34)
100 Avenida Presidio  
Sacramento, CA 95814
San Clemente, CA 92672  
Douglas K. Porter, Esquire
Southern California Edison Company
James D. Boyd, Commissioner  
2244 Walnut Grove Avenue
California Energy Commission  
Rosemead, CA 91770
1516 Ninth Street (MS 34)  
Albert R. Hochevar
Sacramento, CA 95814  
Southern California Edison Company
San Onofre Nuclear Generating Station
Douglas K. Porter, Esquire  
P.O. Box 128
Southern California Edison Company  
San Clemente, CA 92674-0128
2244 Walnut Grove Avenue  
Steve Hsu
Rosemead, CA 91770  
Department of Health Services
Radiologic Health Branch
Albert R. Hochevar  
MS 7610, P.O. Box 997414
Southern California Edison Company  
Sacramento, CA 95899-7414
San Onofre Nuclear Generating Station  
R. St. Onge
P.O. Box 128  
Southern California Edison Company
San Clemente, CA 92674-0128  
San Onofre Nuclear Generating Station
P.O. Box 128
Steve Hsu  
San Clemente, CA 92674-0128
Department of Health Services  
Chief, Technological Hazards Branch
Radiologic Health Branch  
FEMA Region IX
MS 7610, P.O. Box 997414  
1111 Broadway, Suite 1200
Sacramento, CA 95899-7414  
Oakland, CA 94607-4052
R. St. Onge  
Southern California Edison Company  
San Onofre Nuclear Generating Station  
P.O. Box 128  
San Clemente, CA 92674-0128  
Chief, Technological Hazards Branch  
FEMA Region IX  
1111 Broadway, Suite 1200  
Oakland, CA 94607-4052  


Southern California Edison Company         -4-
Southern California Edison Company  
Institute of Nuclear Power Operations (INPO)
- 4 -  
Records Center
700 Galleria Parkway SE, Suite 100
Institute of Nuclear Power Operations (INPO)
Atlanta, GA 30339
Records Center  
700 Galleria Parkway SE, Suite 100  
Atlanta, GA 30339  


Southern California Edison Company           -5-
Southern California Edison Company  
Electronic distribution by RIV:
- 5 -  
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
Electronic distribution by RIV:  
Acting DRP Director (Tony.Vegel@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)  
Acting DRP Deputy Director (Troy.Pruett@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)  
DRS Director (Roy.Caniano@nrc.gov)
Acting DRP Director (Tony.Vegel@nrc.gov)  
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting DRP Deputy Director (Troy.Pruett@nrc.gov)  
Senior Resident Inspector (Greg.Warnick@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)  
Resident Inspector (John.Reynoso@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)  
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
Senior Resident Inspector (Greg.Warnick@nrc.gov)  
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)  
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)  
Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)  
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)  
Project Manager (Randy.Hall@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
OEMail Resource
Regional Counsel (Karla.Fuller@nrc.gov)  
Inspection Reports/MidCycle and EOC Letters to the following:
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
ROPreports
OEMail Resource  
Only inspection reports to the following:
DRS/TSB STA (Dale.Powers@nrc.gov)
Inspection Reports/MidCycle and EOC Letters to the following:  
OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)
ROPreports  
SUNSI Review Completed: ___Y___             ADAMS: 7 Yes        No  Initials: ___JFD_
7 Publicly Available       Non-Publicly Available   Sensitive     7 Non-Sensitive
Only inspection reports to the following:  
R:_Reactors/_SONGS/2010/2010005-LTR-JFD.docx                   ML
DRS/TSB STA (Dale.Powers@nrc.gov)  
RI:EB1               C:PSB2
OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)  
JDrake               GWerner
8/16/2010             8/18/2010
OFFICIAL RECORD COPY T=Telephone                         E=E-mail                 F=Fax
SUNSI Review Completed: ___Y___  
ADAMS: 7 Yes  
  No       Initials: ___JFD_
7   Publicly Available         Non-Publicly Available         Sensitive  
7   Non-Sensitive  
R:_Reactors/_SONGS/2010/2010005-LTR-JFD.docx                     ML
RI:EB1  
C:PSB2  
JDrake  
GWerner  
8/16/2010  
8/18/2010  
OFFICIAL RECORD COPY T=Telephone        
 
E=E-mail  
        F=Fax  


                      INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:         November 29 through December 10, 2010
Inspection Procedures:     IP 71111.08 Inservice Inspection (ISI) Activities
                          TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds
- 1 -
Inspectors:               J. Drake, Senior Reactor Inspector (Lead Inspector - ISI)
Enclosure
                          S. Makor, Reactor Inspector
INSERVICE INSPECTION DOCUMENT REQUEST  
                          A. Fairbanks, Reactor Inspector
A.     Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
Inspection Dates:  
      electronic format (ims.certrec.com preferred), in care of Jim Drake, by
November 29 through December 10, 2010  
      September 1, 2010, to facilitate the selection of specific items that will be reviewed
      during the onsite inspection week. The inspectors will select specific items from the
Inspection Procedures:  
      information requested below and then request from your staff additional documents
IP 71111.08 Inservice Inspection (ISI) Activities  
      needed during the onsite inspection week (Section B of this enclosure). We ask that the
TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds  
      specific items selected from the lists be available and ready for review on the first day of
      inspection. *Please provide requested documentation electronically if possible. If
Inspectors:  
      requested documents are large and only hard copy formats are available, please inform
J. Drake, Senior Reactor Inspector (Lead Inspector - ISI)  
      the inspectors, and provide subject documentation during the first day of the onsite
S. Makor, Reactor Inspector  
      inspection. If you have any questions regarding this information request, please call the
A. Fairbanks, Reactor Inspector  
      inspector as soon as possible.
A.1   ISI/Welding Programs and Schedule Information
      a)     A detailed schedule (including preliminary dates) of:
              i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                      and containment, performed as part of your ASME, Section XI, Risk
A.  
                      Informed (if applicable), and augmented ISI programs during the
Information Requested for the In-Office Preparation Week  
                      upcoming outage.
                      Provide a status summary of the NDE inspection activities vs. the
The following information should be sent to the Region IV office in hard copy or  
                      required inspection period percentages for this interval by category per
electronic format (ims.certrec.com preferred), in care of Jim Drake, by  
                      ASME, Section XI, IWX-2400 (Do not provide separately if other
September 1, 2010, to facilitate the selection of specific items that will be reviewed  
                      documentation requested contains this information).
during the onsite inspection week. The inspectors will select specific items from the  
              ii)     Reactor pressure vessel head examinations planned for the upcoming
information requested below and then request from your staff additional documents  
                      outage.
needed during the onsite inspection week (Section B of this enclosure). We ask that the  
              iii)   Examinations planned for Alloy 82/182/600 components that are not
specific items selected from the lists be available and ready for review on the first day of  
                      included in the Section XI scope (if applicable).
inspection. *Please provide requested documentation electronically if possible. If  
                                            -1-                                          Enclosure
requested documents are large and only hard copy formats are available, please inform  
the inspectors, and provide subject documentation during the first day of the onsite  
inspection. If you have any questions regarding this information request, please call the  
inspector as soon as possible.  
A.1  
ISI/Welding Programs and Schedule Information  
a)  
A detailed schedule (including preliminary dates) of:  
i)
Nondestructive examinations (NDEs) planned for Class 1 & 2 systems  
and containment, performed as part of your ASME, Section XI, Risk  
Informed (if applicable), and augmented ISI programs during the  
upcoming outage.  
Provide a status summary of the NDE inspection activities vs. the  
required inspection period percentages for this interval by category per  
ASME, Section XI, IWX-2400 (Do not provide separately if other  
documentation requested contains this information).  
ii)
Reactor pressure vessel head examinations planned for the upcoming  
outage.  
iii)  
Examinations planned for Alloy 82/182/600 components that are not  
included in the Section XI scope (if applicable).  


          iv)     Examinations planned as part of your Boric Acid Corrosion Control
                  Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME, Class 1, 2, or 3 structures, systems, or
- 2 -
                  components (SSCs)).
Enclosure
    b)   A copy of ASME, Section XI, Code Relief Requests and associated NRC Safety
iv)  
          Evaluations applicable to the examinations identified above.
Examinations planned as part of your Boric Acid Corrosion Control  
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).  
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 and 2 systems since the beginning of the last refueling outage. This
v)  
          should include the previous Section XI pressure test(s) conducted during start up
Welding activities that are scheduled to be completed during the  
          and any evaluations associated with the results of the pressure tests. Also,
upcoming outage (ASME, Class 1, 2, or 3 structures, systems, or  
          include in the list the NDE reports with relevant conditions in the reactor pressure
components (SSCs)).  
          vessel head penetration nozzles that have been accepted for continued service.
          The list of NDE reports should include a brief description of the SSC where the
b)  
          relevant condition was identified.
A copy of ASME, Section XI, Code Relief Requests and associated NRC Safety  
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
Evaluations applicable to the examinations identified above.
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated this refueling outage.
c)  
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,  
          occur during the upcoming outage, provide a detailed description of the welds to
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code  
          be examined and the extent of the planned examination. Also provide reference
Class 1 and 2 systems since the beginning of the last refueling outage. This  
          numbers for applicable procedures that will be used to conduct these
should include the previous Section XI pressure test(s) conducted during start up  
          examinations.
and any evaluations associated with the results of the pressure tests. Also,  
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
include in the list the NDE reports with relevant conditions in the reactor pressure  
          Section XI of the ASME Code that have been identified since the beginning of the
vessel head penetration nozzles that have been accepted for continued service.
          last refueling outage.
The list of NDE reports should include a brief description of the SSC where the  
    g)   A list of any temporary noncode repairs in service (e.g., pinhole leaks).
relevant condition was identified.  
    h)   Please provide copies of the most recent self-assessments for the ISI, Welding,
          and Alloy 600 programs.
d)  
A.2 Reactor Pressure Vessel Head
A list with a brief description (e.g., system, material, pipe size, weld number, and  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
NDE performed) of the welds in Code Class 1 and 2 systems which have been  
          identifies the types of NDE methods to be used on each specific part of the
fabricated due to component repair/replacement activities since the beginning of  
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
the last refueling outage, or are planned to be fabricated this refueling outage.  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
          and planned expansion sample sizes if relevant conditions are identified (if
e)  
          applicable).
If reactor vessel weld examinations required by the ASME Code are scheduled to  
                                        -2-                                        Enclosure
occur during the upcoming outage, provide a detailed description of the welds to  
be examined and the extent of the planned examination. Also provide reference  
numbers for applicable procedures that will be used to conduct these  
examinations.  
f)  
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of  
Section XI of the ASME Code that have been identified since the beginning of the  
last refueling outage.  
g)
A list of any temporary noncode repairs in service (e.g., pinhole leaks).  
h)  
Please provide copies of the most recent self-assessments for the ISI, Welding,  
and Alloy 600 programs.
A.2  
Reactor Pressure Vessel Head
a)
Provide the detailed scope of the planned NDE of the reactor vessel head which  
identifies the types of NDE methods to be used on each specific part of the  
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02  
and NRC Order EA-03-009. Also, include examination scope expansion criteria  
and planned expansion sample sizes if relevant conditions are identified (if  
applicable).  


    b)     A list of the standards and/or requirements that will be used to evaluate
          indications identified during NDE of the reactor vessel head (e.g., the specific
          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
- 3 -
A.3 Boric Acid Corrosion Control Program
Enclosure
    a)     Copy of the procedures that govern the scope, equipment, and implementation of
          the inspections required to identify boric acid leakage, and the procedures for
b)
          boric acid leakage/corrosion evaluation.
A list of the standards and/or requirements that will be used to evaluate  
    b)     Provide a list of leaks (including Code class of the components) that have been
indications identified during NDE of the reactor vessel head (e.g., the specific  
          identified since the last refueling outage and associated corrective action
industry or procedural standards which will be used to evaluate potential leakage  
          documentation. If during the last cycle, the unit was shutdown, provide
and/or flaw indications).  
          documentation of containment walkdown inspections performed as part of the
          Boric Acid Corrosion Control Program.
A.3  
    c)     Provide a copy of the most recent self-assessment performed for the Boric Acid
Boric Acid Corrosion Control Program  
          Corrosion Control Program.
A.4 Steam Generator Tube (SGT) Inspections
a)
    a)     A detailed schedule of:
Copy of the procedures that govern the scope, equipment, and implementation of  
          i)       SGT inspection, data analyses, and repair activities for the upcoming
the inspections required to identify boric acid leakage, and the procedures for  
                    outage (if occurring).
boric acid leakage/corrosion evaluation.  
          ii)     Steam Generator (SG) secondary side inspection activities for the
                    upcoming outage (if occurring).
b)  
    b)     Provide a copy of your SG ISI Inspection Program and Plan. Please include a
Provide a list of leaks (including Code class of the components) that have been  
          copy of the Operational Assessment from last outage and a copy of the following
identified since the last refueling outage and associated corrective action  
          documents as they become available:
documentation. If during the last cycle, the unit was shutdown, provide  
          i)       Degradation Assessment
documentation of containment walkdown inspections performed as part of the  
          ii)     Condition Monitoring Assessment
Boric Acid Corrosion Control Program.  
    c)     If you are planning on modifying your technical specifications such that they are
          consistent with Technical Specification Task Force-449, provide copies of your
c)  
          correspondence with the NRC regarding deviations from the standard technical
Provide a copy of the most recent self-assessment performed for the Boric Acid  
          specifications.
Corrosion Control Program.  
    d)     Copy of SG history documentation given to vendors performing Eddy Current
          (ET) testing of the SGs during the upcoming outage.
A.4  
                                        -3-                                      Enclosure
Steam Generator Tube (SGT) Inspections  
a)  
A detailed schedule of:  
i)
SGT inspection, data analyses, and repair activities for the upcoming  
outage (if occurring).  
ii)
Steam Generator (SG) secondary side inspection activities for the  
upcoming outage (if occurring).  
b)  
Provide a copy of your SG ISI Inspection Program and Plan. Please include a  
copy of the Operational Assessment from last outage and a copy of the following  
documents as they become available:
i)  
Degradation Assessment  
ii)  
Condition Monitoring Assessment  
c)  
If you are planning on modifying your technical specifications such that they are  
consistent with Technical Specification Task Force-449, provide copies of your  
correspondence with the NRC regarding deviations from the standard technical  
specifications.  
d)  
Copy of SG history documentation given to vendors performing Eddy Current  
(ET) testing of the SGs during the upcoming outage.  


    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
          Current Technique Specification Sheets (ETSS). Additionally, provide a copy of
          EPRI, Appendix H, ETSS Qualification Records.
    f)     Identify and quantify any SGT leakage experienced during the previous operating
- 4 -
          cycle. Also provide documentation identifying which SG was leaking and
Enclosure
          corrective actions completed or planned for this condition (If applicable).
e)  
    g)     Provide past history of the condition and issues pertaining to the secondary side
Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy  
          of the SG (including items such as loose parts, fouling, top of tube sheet
Current Technique Specification Sheets (ETSS). Additionally, provide a copy of  
          condition, crud removal amounts, etc.).
EPRI, Appendix H, ETSS Qualification Records.  
    h)     Provide copies of your most recent self-assessments of the SG monitoring, loose
          parts monitoring, and secondary side water chemistry control programs.
f)  
    i)     Indicate where the primary, secondary, and resolution analyses are scheduled to
Identify and quantify any SGT leakage experienced during the previous operating  
          take place.
cycle. Also provide documentation identifying which SG was leaking and  
    j)     Provide a summary of the scope of the SGT examinations, including examination
corrective actions completed or planned for this condition (If applicable).  
          methods such as bobbin, rotating pancake, or plus point, and the percentage of
          tubes to be examined. *Do not provide these documents separately if already
g)
          included in other information requested.
Provide past history of the condition and issues pertaining to the secondary side  
A.5 Materials Reliability Program (MRP-139) Activities
of the SG (including items such as loose parts, fouling, top of tube sheet  
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
condition, crud removal amounts, etc.).  
          Metal Butt Welds (DMBWs) have been completed by July 31 2010.
    b)     Verification that baseline inspection of hot-leg and cold-leg temperature DMBWs
h)  
          have been included in the inspection program and that the schedules for the
Provide copies of your most recent self-assessments of the SG monitoring, loose  
          baseline inspections are consistent with the baseline schedules in MRP-139.
parts monitoring, and secondary side water chemistry control programs.  
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
          the upcoming refueling outage. If none are scheduled, then data from previous
i)  
          examinations should be available for review.
Indicate where the primary, secondary, and resolution analyses are scheduled to  
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
take place.  
          outage. If no welding will be performed then records of previous welding on
          DMBWs and post-weld NDE documentation.
j)  
    e)     A list and schedule of any stress improvement activities planned for the
Provide a summary of the scope of the SGT examinations, including examination  
          upcoming refueling outage. If none are scheduled then have qualification reports
methods such as bobbin, rotating pancake, or plus point, and the percentage of  
          for any stress improvements previously performed.
tubes to be examined. *Do not provide these documents separately if already  
    f)     Documentation and description of how the baseline and ISI specifications in
included in other information requested.
          MRP-139 are satisfied at your facility.
                                          -4-                                        Enclosure
A.5  
Materials Reliability Program (MRP-139) Activities  
a)  
A list of, with verification, that the baseline inspections of all applicable Dissimilar  
Metal Butt Welds (DMBWs) have been completed by July 31 2010.  
b)  
Verification that baseline inspection of hot-leg and cold-leg temperature DMBWs  
have been included in the inspection program and that the schedules for the  
baseline inspections are consistent with the baseline schedules in MRP-139.  
c)  
A list and schedule (examination dates) of all DMBW examinations planned for  
the upcoming refueling outage. If none are scheduled, then data from previous  
examinations should be available for review.  
d)  
A list and schedule for any welding to be performed on DMBWs in the upcoming  
outage. If no welding will be performed then records of previous welding on  
DMBWs and post-weld NDE documentation.  
e)  
A list and schedule of any stress improvement activities planned for the  
upcoming refueling outage. If none are scheduled then have qualification reports  
for any stress improvements previously performed.  
f)  
Documentation and description of how the baseline and ISI specifications in  
MRP-139 are satisfied at your facility.  


    g)     A list of weld locations controlled by MRP-139, which includes the MRP-139 weld
          category, pre-mitigation volumetric examination date, type of mitigation or stress
          improvement, post-mitigation volumetric examination date, and plans for future
          MRP-139 required examinations.
- 5 -
A.6 Additional information related to all ISI activities
Enclosure
    a)     A list with a brief description of ISI, Boric Acid Corrosion Control Program, and
g)  
          SGT inspection related issues (e.g., condition reports) entered into your
A list of weld locations controlled by MRP-139, which includes the MRP-139 weld  
          corrective action program since the beginning of the last refueling outage (for
category, pre-mitigation volumetric examination date, type of mitigation or stress  
          Unit 2). For example, a list based upon data base searches using key words
improvement, post-mitigation volumetric examination date, and plans for future  
          related to piping or SG tube degradation such as: ISI, ASME Code, Section XI,
MRP-139 required examinations.  
          NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in
          piping/SGT examinations.
A.6  
    b)     Provide names and phone numbers for the following program leads:
Additional information related to all ISI activities  
          ISI contacts (examination, planning)
          Containment Examinations
a)
          RPVH Examinations
A list with a brief description of ISI, Boric Acid Corrosion Control Program, and  
          Snubbers and Supports
SGT inspection related issues (e.g., condition reports) entered into your  
          Repair and Replacement Program Manager
corrective action program since the beginning of the last refueling outage (for  
          Licensing Contact
Unit 2). For example, a list based upon data base searches using key words  
          Site Welding Engineer
related to piping or SG tube degradation such as: ISI, ASME Code, Section XI,  
          Boric Acid Corrosion Control Program
NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in  
          SG Inspection Activities (site lead and vendor contact)
piping/SGT examinations.  
B. Information to be provided onsite to the inspector(s) at the entrance meeting
    (November 29, 2010).
b)
B.1 ISI / Welding Programs and Schedule Information
Provide names and phone numbers for the following program leads:  
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
          welding activities, and schedule showing contingency repair plans, if available.
ISI contacts (examination, planning)  
    b)     For ASME, Code Class 1 and 2 welds selected by the inspector from the lists
Containment Examinations  
          provided from Section A of this enclosure, provide copies of the following
RPVH Examinations  
          documentation for each subject weld:
Snubbers and Supports  
          i)       Weld data sheet (traveler)
Repair and Replacement Program Manager  
          ii)     Weld configuration and system location
Licensing Contact  
          iii)     Applicable Code edition and addenda for weldment
Site Welding Engineer  
          iv)     Applicable Code edition and addenda for welding procedures
Boric Acid Corrosion Control Program  
          v)       Applicable weld procedures used to fabricate the welds
SG Inspection Activities (site lead and vendor contact)  
                                          -5-                                      Enclosure
B.  
Information to be provided onsite to the inspector(s) at the entrance meeting  
(November 29, 2010).  
B.1  
ISI / Welding Programs and Schedule Information  
a)  
Updated schedules for ISI/NDE activities, including SGT inspections, planned  
welding activities, and schedule showing contingency repair plans, if available.  
b)  
For ASME, Code Class 1 and 2 welds selected by the inspector from the lists  
provided from Section A of this enclosure, provide copies of the following  
documentation for each subject weld:  
i)  
Weld data sheet (traveler)  
ii)  
Weld configuration and system location  
iii)  
Applicable Code edition and addenda for weldment  
iv)  
Applicable Code edition and addenda for welding procedures  
v)  
Applicable weld procedures used to fabricate the welds  


          vi)     Copies of procedure qualification records supporting the weld procedures
                  from B.1.b.v
          vii)     Copies of mechanical test reports identified in the procedure qualification
                  records above
- 6 -
          viii)   Copies of the nonconformance reports for the selected welds (If
Enclosure
                  applicable)
          ix)     Radiographs of the selected welds and access to equipment to allow
vi)  
                  viewing radiographs (If RT was performed)
Copies of procedure qualification records supporting the weld procedures  
          x)       Copies of the preservice examination records for the selected welds
from B.1.b.v  
          xi)     Copies of welder performance qualifications records applicable to the
vii)  
                  selected welds, including documentation that welder maintained
Copies of mechanical test reports identified in the procedure qualification  
                  proficiency in the applicable welding processes specified in the weld
records above  
                  procedures (at least 6 months prior to the date of subject work)
          xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
viii)  
    c)   For the ISI related corrective action issues selected by the inspector(s) from
Copies of the nonconformance reports for the selected welds (If  
          Section A of this enclosure, provide a copy of the corrective actions and
applicable)  
          supporting documentation.
    d)   For the NDE reports with relevant conditions on Code Class 1 & 2 systems
ix)  
          selected by the inspectors from Section A above, provide a copy of the
Radiographs of the selected welds and access to equipment to allow  
          examination records, examiner qualification records, and associated corrective
viewing radiographs (If RT was performed)  
          action documents.
    e)   A copy of (or ready access to) most current revision of the ISI Program Manual
x)  
          and Plan for the current Interval.
Copies of the preservice examination records for the selected welds  
    f)   For the NDEs selected by the inspectors from Section A of this enclosure,
          provide copy of the NDE procedures used to perform the examinations (including
xi)  
          calibration and flaw characterization/sizing procedures). For ultrasonic
Copies of welder performance qualifications records applicable to the  
          examination procedures qualified in accordance with ASME Code, Section XI,
selected welds, including documentation that welder maintained  
          Appendix VIII, provide documentation supporting the procedure qualification
proficiency in the applicable welding processes specified in the weld  
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
procedures (at least 6 months prior to the date of subject work)  
          include qualification documentation of the specific equipment to be used
          (e.g.,. ultrasonic unit, cables, and transducers including serial numbers) and NDE
xii)  
          personnel qualification records.
Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
B.2 Reactor Pressure Vessel Head (RPVH)
    a)   Provide the NDE personnel qualification records for the examiners who will
c)  
          perform examinations of the reactor pressure vessel head
For the ISI related corrective action issues selected by the inspector(s) from  
                                        -6-                                      Enclosure
Section A of this enclosure, provide a copy of the corrective actions and  
supporting documentation.  
d)  
For the NDE reports with relevant conditions on Code Class 1 & 2 systems  
selected by the inspectors from Section A above, provide a copy of the  
examination records, examiner qualification records, and associated corrective  
action documents.  
e)  
A copy of (or ready access to) most current revision of the ISI Program Manual  
and Plan for the current Interval.
f)  
For the NDEs selected by the inspectors from Section A of this enclosure,  
provide copy of the NDE procedures used to perform the examinations (including  
calibration and flaw characterization/sizing procedures). For ultrasonic  
examination procedures qualified in accordance with ASME Code, Section XI,  
Appendix VIII, provide documentation supporting the procedure qualification  
(e.g., the EPRI performance demonstration qualification summary sheets). Also,  
include qualification documentation of the specific equipment to be used  
(e.g.,. ultrasonic unit, cables, and transducers including serial numbers) and NDE  
personnel qualification records.  
B.2  
Reactor Pressure Vessel Head (RPVH)
a)  
Provide the NDE personnel qualification records for the examiners who will  
perform examinations of the reactor pressure vessel head


    b)     Provide drawings showing the following: (If a visual examination is planned for
          the upcoming refueling outage).
          i)       RPVH and CRDM nozzle configurations
          ii)     RPVH insulation configuration
- 7 -
    The drawings listed above should include fabrication drawings for the nozzle attachment
Enclosure
    welds as applicable.
b)  
    c)     Copy of NDE reports from the last RPVH examination.
Provide drawings showing the following: (If a visual examination is planned for  
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
the upcoming refueling outage).  
          examination of the upper head will meet the 95 percent minimum coverage
          required by NRC Order EA-03-009 (If a visual examination is planned for the
i)  
          upcoming refueling outage).
RPVH and CRDM nozzle configurations
    e)     Provide a copy of the procedures that will be used to identify the source of any
ii)  
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
RPVH insulation configuration
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
The drawings listed above should include fabrication drawings for the nozzle attachment  
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
welds as applicable.
          for the RPVH susceptibility ranking.
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
c)  
          capability of the NDE equipment used for the RPVH examinations. Also, identify
Copy of NDE reports from the last RPVH examination.  
          any changes in equipment configurations used for the RPVH examinations which
          differ from that used in the vendor qualification report(s).
d)  
B.3 Boric Acid Corrosion Control Program
Copy of evaluation or calculation demonstrating that the scope of the visual  
    a)     Provide boric acid walkdown inspection results, an updated list of boric acid leaks
examination of the upper head will meet the 95 percent minimum coverage  
          identified so far this outage, associated corrective action documentation, and
required by NRC Order EA-03-009 (If a visual examination is planned for the  
          overall status of planned boric acid inspections.
upcoming refueling outage).  
    b)     Provide any engineering evaluations completed for boric acid leaks identified
          since the end of the last refueling outage. Please include a status of corrective
e)  
          actions to repair and/or clean these boric acid leaks. Please identify specifically
Provide a copy of the procedures that will be used to identify the source of any  
          which known leaks, if any, have remained in service or will remain in service as
boric acid deposits identified on the RPVH. If no explicit procedures exist which  
          active leaks.
govern this activity, provide a description of the process to be followed including  
B.4 SGT Inspections
personnel responsibilities and expectations.
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
f)
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
Provide a copy of the updated calculation of effective degradation years (EDY)  
          in the SGs.
for the RPVH susceptibility ranking.  
                                        -7-                                        Enclosure
g)
Provide copy of the vendor qualification report(s) that demonstrates the detection  
capability of the NDE equipment used for the RPVH examinations. Also, identify  
any changes in equipment configurations used for the RPVH examinations which  
differ from that used in the vendor qualification report(s).  
B.3  
Boric Acid Corrosion Control Program
a)  
Provide boric acid walkdown inspection results, an updated list of boric acid leaks  
identified so far this outage, associated corrective action documentation, and  
overall status of planned boric acid inspections.  
b)  
Provide any engineering evaluations completed for boric acid leaks identified  
since the end of the last refueling outage. Please include a status of corrective  
actions to repair and/or clean these boric acid leaks. Please identify specifically  
which known leaks, if any, have remained in service or will remain in service as  
active leaks.
B.4  
SGT Inspections  
a)  
Copies of the Examination Technique Specification Sheets (ETSS) and  
associated justification for any revisions.  
b)  
Copy of the guidance to be followed if a loose part or foreign material is identified  
in the SGs.  


        c)     Provide a copy of the ET procedures used to perform the SGT inspections
              (specifically calibration and flaw characterization/sizing procedures, etc.). Also
              include documentation for the specific equipment to be used.
        d)     Provide copies of your responses to NRC and industry operating experience
- 8 -
              communications such as Generic Letters, Information Notices, etc. (as applicable
Enclosure
              to SGT inspections) *Do not provide these documents separately if already
              included in other information requested such as the degradation assessment.
c)  
        e)     List of corrective action documents generated by the vendor and/or site with
Provide a copy of the ET procedures used to perform the SGT inspections  
              respect to SG inspection activities.
(specifically calibration and flaw characterization/sizing procedures, etc.). Also  
B.5     Codes and Standards
include documentation for the specific equipment to be used.  
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
d)  
              available):
Provide copies of your responses to NRC and industry operating experience  
              i)       Applicable Editions of the ASME Code, Sections V, IX and XI for the ISI
communications such as Generic Letters, Information Notices, etc. (as applicable  
                        program and the repair/replacement program.
to SGT inspections) *Do not provide these documents separately if already  
              ii)     EPRI and industry standards referenced in the procedures used to
included in other information requested such as the degradation assessment.  
                        perform the SGT Eddy Current examination.
Inspector Contact Information:
e)  
Jim Drake                         Abin Fairbanks                   Shiattin Makor
List of corrective action documents generated by the vendor and/or site with  
Senior Reactor Inspector           Reactor Inspector                 Reactor Inspector
respect to SG inspection activities.  
817-276-6558                       817-860-8158                     817-276-6507
James.Drake@nrc.gov               Abin.Fairbanks@nrc.gov           Shiattin.Makor@nrc.gov
Mailing Address:
B.5  
US NRC Region IV
Codes and Standards  
Attn: Jim Drake
612 E. Lamar Blvd, Suite 400
a)  
Ready access to (i.e., copies provided to the inspector(s) for use during the  
inspection at the onsite inspection location, or room number and location where  
available):  
i)
Applicable Editions of the ASME Code, Sections V, IX and XI for the ISI  
program and the repair/replacement program.
ii)
EPRI and industry standards referenced in the procedures used to  
perform the SGT Eddy Current examination.  
Inspector Contact Information:  
Jim Drake  
Abin Fairbanks  
Shiattin Makor
Senior Reactor Inspector  
Reactor Inspector  
Reactor Inspector  
817-276-6558  
817-860-8158  
817-276-6507  
James.Drake@nrc.gov  
Abin.Fairbanks@nrc.gov  
Shiattin.Makor@nrc.gov  
Mailing Address:  
US NRC Region IV  
Attn: Jim Drake  
612 E. Lamar Blvd, Suite 400  
Arlington, TX 76011
Arlington, TX 76011
                                            -8-                                        Enclosure
}}
}}

Latest revision as of 03:18, 14 January 2025

Notification of Inspection (NRC Inspection Report 05000362005) and Request for Information
ML102300672
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/18/2010
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Ridenoure R
Southern California Edison Co
References
Download: ML102300672 (13)


See also: IR 05000036/2020005

Text

August 18, 2010

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT:

SAN ONOFRE NUCLEAR GENERATING STATION UNIT 3 - NOTIFICATION

OF INSPECTION (NRC INSPECTION REPORT 05000362005) AND REQUEST

FOR INFORMATION

Dear Mr.Ridenoure:

From November 29 to December 10, 2010, reactor inspectors from the U.S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at San

Onofre Nuclear Generating Station Unit 3, using NRC Inspection Procedure 71111.08,

Inservice Inspection Activities, and TI 2515/172, Reactor Coolant System Dissimilar Metal

Butt Welds. Experience has shown that this inspection is a resource intensive inspection both

for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources

and to ensure a productive inspection, we have enclosed a request for documents needed for

this inspection. These documents have been divided into two groups. The first group, due by

September 1, 2010, (Section A of the enclosure) identifies information to be provided prior to the

inspection to ensure that the inspectors are adequately prepared. The second group (Section B

of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dave Axeline of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Jim Drake, at (817) 276-6558 or (James.Drake@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Southern California Edison Company

- 2 -

Number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Gregory E. Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket: 50-362

License: NPF-15

Enclosure:

Inservice Inspection Document Request

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Assistant Director-Resources

City of Riverside

3900 Main Street

Riverside, CA 92522

Mark L. Parsons

Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Gary H. Yamamoto, P.E., Chief

Division of Drinking Water and

Environmental Management

1616 Capitol Avenue, MS 7400

P.O. Box 997377

Sacramento, CA 95899-7377

Southern California Edison Company

- 3 -

Michael L. DeMarco

San Onofre Liaison

San Diego Gas & Electric Company

8315 Century Park Ct. CP21C

San Diego, CA 92123-1548

Director, Radiological Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

The Mayor of the City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Douglas K. Porter, Esquire

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Steve Hsu

Department of Health Services

Radiologic Health Branch

MS 7610, P.O. Box 997414

Sacramento, CA 95899-7414

R. St. Onge

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Chief, Technological Hazards Branch

FEMA Region IX

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Southern California Edison Company

- 4 -

Institute of Nuclear Power Operations (INPO)

Records Center

700 Galleria Parkway SE, Suite 100

Atlanta, GA 30339

Southern California Edison Company

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

Acting DRP Director (Tony.Vegel@nrc.gov)

Acting DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

Acting DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)

Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Inspection Reports/MidCycle and EOC Letters to the following:

ROPreports

Only inspection reports to the following:

DRS/TSB STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Margie.Kotzalas@nrc.gov)

SUNSI Review Completed: ___Y___

ADAMS: 7 Yes

No Initials: ___JFD_

7 Publicly Available Non-Publicly Available Sensitive

7 Non-Sensitive

R:_Reactors/_SONGS/2010/2010005-LTR-JFD.docx ML

RI:EB1

C:PSB2

JDrake

GWerner

8/16/2010

8/18/2010

OFFICIAL RECORD COPY T=Telephone

E=E-mail

F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

November 29 through December 10, 2010

Inspection Procedures:

IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt Welds

Inspectors:

J. Drake, Senior Reactor Inspector (Lead Inspector - ISI)

S. Makor, Reactor Inspector

A. Fairbanks, Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Jim Drake, by

September 1, 2010, to facilitate the selection of specific items that will be reviewed

during the onsite inspection week. The inspectors will select specific items from the

information requested below and then request from your staff additional documents

needed during the onsite inspection week (Section B of this enclosure). We ask that the

specific items selected from the lists be available and ready for review on the first day of

inspection. *Please provide requested documentation electronically if possible. If

requested documents are large and only hard copy formats are available, please inform

the inspectors, and provide subject documentation during the first day of the onsite

inspection. If you have any questions regarding this information request, please call the

inspector as soon as possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME,Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this interval by category per

ASME,Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information).

ii)

Reactor pressure vessel head examinations planned for the upcoming

outage.

iii)

Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (if applicable).

- 2 -

Enclosure

iv)

Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

v)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME, Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b)

A copy of ASME,Section XI, Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 and 2 systems since the beginning of the last refueling outage. This

should include the previousSection XI pressure test(s) conducted during start up

and any evaluations associated with the results of the pressure tests. Also,

include in the list the NDE reports with relevant conditions in the reactor pressure

vessel head penetration nozzles that have been accepted for continued service.

The list of NDE reports should include a brief description of the SSC where the

relevant condition was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Also provide reference

numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary noncode repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self-assessments for the ISI, Welding,

and Alloy 600 programs.

A.2

Reactor Pressure Vessel Head

a)

Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified (if

applicable).

- 3 -

Enclosure

b)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3

Boric Acid Corrosion Control Program

a)

Copy of the procedures that govern the scope, equipment, and implementation of

the inspections required to identify boric acid leakage, and the procedures for

boric acid leakage/corrosion evaluation.

b)

Provide a list of leaks (including Code class of the components) that have been

identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the unit was shutdown, provide

documentation of containment walkdown inspections performed as part of the

Boric Acid Corrosion Control Program.

c)

Provide a copy of the most recent self-assessment performed for the Boric Acid

Corrosion Control Program.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming

outage (if occurring).

ii)

Steam Generator (SG) secondary side inspection activities for the

upcoming outage (if occurring).

b)

Provide a copy of your SG ISI Inspection Program and Plan. Please include a

copy of the Operational Assessment from last outage and a copy of the following

documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your technical specifications such that they are

consistent with Technical Specification Task Force-449, provide copies of your

correspondence with the NRC regarding deviations from the standard technical

specifications.

d)

Copy of SG history documentation given to vendors performing Eddy Current

(ET) testing of the SGs during the upcoming outage.

- 4 -

Enclosure

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, provide a copy of

EPRI, Appendix H, ETSS Qualification Records.

f)

Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g)

Provide past history of the condition and issues pertaining to the secondary side

of the SG (including items such as loose parts, fouling, top of tube sheet

condition, crud removal amounts, etc.).

h)

Provide copies of your most recent self-assessments of the SG monitoring, loose

parts monitoring, and secondary side water chemistry control programs.

i)

Indicate where the primary, secondary, and resolution analyses are scheduled to

take place.

j)

Provide a summary of the scope of the SGT examinations, including examination

methods such as bobbin, rotating pancake, or plus point, and the percentage of

tubes to be examined. *Do not provide these documents separately if already

included in other information requested.

A.5

Materials Reliability Program (MRP-139) Activities

a)

A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by July 31 2010.

b)

Verification that baseline inspection of hot-leg and cold-leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and post-weld NDE documentation.

e)

A list and schedule of any stress improvement activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any stress improvements previously performed.

f)

Documentation and description of how the baseline and ISI specifications in

MRP-139 are satisfied at your facility.

- 5 -

Enclosure

g)

A list of weld locations controlled by MRP-139, which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

improvement, post-mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

A.6

Additional information related to all ISI activities

a)

A list with a brief description of ISI, Boric Acid Corrosion Control Program, and

SGT inspection related issues (e.g., condition reports) entered into your

corrective action program since the beginning of the last refueling outage (for

Unit 2). For example, a list based upon data base searches using key words

related to piping or SG tube degradation such as: ISI, ASME Code,Section XI,

NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in

piping/SGT examinations.

b)

Provide names and phone numbers for the following program leads:

ISI contacts (examination, planning)

Containment Examinations

RPVH Examinations

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B.

Information to be provided onsite to the inspector(s) at the entrance meeting

(November 29, 2010).

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME, Code Class 1 and 2 welds selected by the inspector from the lists

provided from Section A of this enclosure, provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code edition and addenda for weldment

iv)

Applicable Code edition and addenda for welding procedures

v)

Applicable weld procedures used to fabricate the welds

- 6 -

Enclosure

vi)

Copies of procedure qualification records supporting the weld procedures

from B.1.b.v

vii)

Copies of mechanical test reports identified in the procedure qualification

records above

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x)

Copies of the preservice examination records for the selected welds

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the weld

procedures (at least 6 months prior to the date of subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspector(s) from

Section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspectors from Section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspectors from Section A of this enclosure,

provide copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used

(e.g.,. ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the NDE personnel qualification records for the examiners who will

perform examinations of the reactor pressure vessel head

- 7 -

Enclosure

b)

Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage).

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c)

Copy of NDE reports from the last RPVH examination.

d)

Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009 (If a visual examination is planned for the

upcoming refueling outage).

e)

Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f)

Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g)

Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3

Boric Acid Corrosion Control Program

a)

Provide boric acid walkdown inspection results, an updated list of boric acid leaks

identified so far this outage, associated corrective action documentation, and

overall status of planned boric acid inspections.

b)

Provide any engineering evaluations completed for boric acid leaks identified

since the end of the last refueling outage. Please include a status of corrective

actions to repair and/or clean these boric acid leaks. Please identify specifically

which known leaks, if any, have remained in service or will remain in service as

active leaks.

B.4

SGT Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

- 8 -

Enclosure

c)

Provide a copy of the ET procedures used to perform the SGT inspections

(specifically calibration and flaw characterization/sizing procedures, etc.). Also

include documentation for the specific equipment to be used.

d)

Provide copies of your responses to NRC and industry operating experience

communications such as Generic Letters, Information Notices, etc. (as applicable

to SGT inspections) *Do not provide these documents separately if already

included in other information requested such as the degradation assessment.

e)

List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5

Codes and Standards

a)

Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code, Sections V, IX and XI for the ISI

program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to

perform the SGT Eddy Current examination.

Inspector Contact Information:

Jim Drake

Abin Fairbanks

Shiattin Makor

Senior Reactor Inspector

Reactor Inspector

Reactor Inspector

817-276-6558

817-860-8158

817-276-6507

James.Drake@nrc.gov

Abin.Fairbanks@nrc.gov

Shiattin.Makor@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Jim Drake

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011