| number = ML102460251
| issue date = 09/03/2010
| title = Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report
| author name = Hansell S
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000277, 05000278, 05000352, 05000353
| license number = DPR-044, DPR-056, NPF-039, NPF-085
| contact person =
| document report number = 50-277/10-301, 50-278/10-301, 50-352/10-301, 50-353/10-301
| package number = ML092470056
| document type = Letter, License-Operator Examination Report
| page count = 9
}}
See also: [[see also::IR 05000352/2010301]]
 
=Text=
{{#Wiki_filter:UNITED STATES
                              NUCLEAR REGULATORY COMMISSION
                                                REGION I
                                          475 ALLENDALE ROAD
                                      KING OF PRUSSIA, PA 19406-1415
                                          September 3, 2010
  Mr. Michael J. Pacilio
. Senior Vice President, Exelon Generation Company, LLC
  President and Chief Nuclear Officer, Exelon Nuclear
  4300 Winfield Rd.
  Warrenville, IL 60555
  SUBJECT:        LIMERICK GENERATING STATION UNITS 1 AND 2 AND
                  PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3
                  LIMITED SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT
                  NOS. 05000352/2010301, 05000353/2010301, 05000277/2010301, AND
                  05000278/2010301
  Dear Mr. Pacilio:
  During the weeks of July 19, 2010, and July 26, 2010, the U.S. Nuclear Regulatory Commission
  (NRC) completed an examination at Limerick Generating Station Units 1 and 2, and Peach
  Bottom Atomic Power Station Units 2 and 3. The enclosed report documents the examination
  conclusions, which were discussed on August 26, 2010, with Mr. Corey Goff of your staff.
  The examination included the evaluation of six applicants for senior operator licenses limited to
  fuel handling. The written and operating examinations were developed using NUREG-1021,
  "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
  The license examiners determined that all six applicants satisfied the requirements of
  10 CFR Part 55, and the appropriate licenses were issued on August 26, 2010. No findings of
  significance were identified during this examination.
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
  enclosure will be available electronically for public inspection in the NRC Public Document
  Room or from the Publicly Available Records (PARS) component of NRC's document system
  (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
  rm/adams.html (the Public Electronic Reading Room).
                                                  Samuel L. Hansell, Jr., Chief
                                                  Operations Branch
                                                  Division of Reactor Safety
  Enclosure: NRC Examination Report 05000352/2010301, 05000353/2010301,
                05000277/2010301,05000278/2010301
  cc w/enclosure:
  Distribution via ListServ
  R. B. Dickinson, Limerick Director of Training
  A. Wasong, Peach Bottom Director of Training
 
                                                            September 3, 2010
            Mr. Michael J. Pacilio
            Senior Vice President, Exelon Generation Company, LLC
            President and Chief Nuclear Officer, Exelon Nuclear
            4300 Winfield Rd.
            Warrenville, IL 60555
            SUBJECT:          LIMERICK GENERATING STATION UNITS 1 AND 2 AND
                              PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3
                              LIMITED SENIOR REACTOR OPERATOR INITIAL EXAMINATION REPORT
                              NOS. 05000352/2010301,05000353/2010301,05000277/2010301, AND
                              05000278/2010301
            Dear Mr. Pacilio:
            During the weeks of July 19, 2010, and July 26, 2010, the U.S. Nuclear Regulatory Commission
            (NRC) completed an examination at Limerick Generating Station Units 1 and 2, and Peach
            Bottom Atomic Power Station Units 2 and 3. The enclosed report documents the examination
            conclusions, which were discussed on August 26, 2010, with Mr. Corey Goff of your staff.
            The examination included the evaluation of six applicants for senior operator licenses limited to
            fuel handling. The written and operating examinations were developed using NUREG-1 021,
            "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
            The license examiners determined that all six applicants satisfied the requirements of
            10 CFR Part 55, and the appropriate licenses were issued on August 26, 2010. No findings of
            significance were identified during this examination.
            In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
            enclosure will be available electronically for public inspection in the NRC Public Document
            Room or from the Publicly Available Records (PARS) component of NRC's document system
            (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
            rm/adams.html (the Public Electronic Reading Room).
                                                                    Sincerely,
                                                                                IRA!
                                                                    Samuel L. Hansell, Jr., Chief
                                                                    Operations Branch
                                                                    Division of Reactor Safety
              Enclosure: NRC Examination Report 05000352/2010301, 05000353/2010301,
                            05000277/2010301, 05000278/2010301
              cc w/enclosure:
              Distribution via ListServ .
              R. B. Dickinson, Limerick Director of Training
              A. Wasong, Peach Bottom Director of Training
SUNSI Review Complete: SLH              (Reviewer's Initials)
DOCUMENT NAME: Y:\Division\DRS\Operations Branch\DANTONIO\Exam 10-LGS-PB LSRO July 10(U01796-U01795)\UM_PB EXAM REPORT.docx
ADAMS PKG. NO.: ML092470056                              ADAMS ACCESSION NO.: ML 102460251
After declaring this document "An Official Agency Record" it willfwill not be released to the Public.
To receive a copy of this document, indicate in the box: "c" =Copy without attachment/enclosure "E" =COpy with attachment/enclosure "N" =No COP}
OFFICE
NAME
                      RIIDRS/OB
                      CBixierlSLH
                                        I      RI/DRS/OB
                                                JD'Antonio/SLH
                                                                  I      RIIDRS/OB
                                                                        SHansell
                                                                                            I                        J
DATE                9/3/10                    9/3/10                  9/3/10
                                                              OFFICIAL RECORD COpy
 
M. Pacilio                                    2
Distribution w/encl:
M. Dapas, Acting RA (R10RAMAIL Resource)
D. Lew, Acting DRA (R10RAMAIL Resource)
J. Clifford, DRP (R1 DRPMAIL Resource)
D. Collins, DRP (R1 DRPMAIL Resource)
D. Roberts, DRS (R1 DRSMaii Resource)
P. Wilson, DRS (R1DRSMaii Resource)
P. Krohn, DRP
A. Rosebrook, DRP
E. Torres, DRP
J. Bream, DRP
E. DiPaolo, DRP, SRI
N. Sieller, DRP, RI
N. Esch, DRP, OA
F. Bower, DRP, SRI
A. Ziedonis, DRP, RI
S. Schmitt, DRP, OA
L. Trocine, RI, OEDO
D. Bearde, DRS
RidsNrrPMLimerick Resource
RidsNrrPMPeachBottom Resource
ROPreportsResource@nrc.gov
Joseph D'Antonio, Chief Examiner, DRS
DRS Master Exam File (C. Bixler) (w/concurrences)
DRS File
 
                          EXAMINATION REPORT
              U;S. NUCLEAR REGULATORY COMMISSION
                                  REGION I
Dockets:    05000352,05000353,05000277,05000278
Licenses:    NPF-39, NPF-85, DPR-44, DPR-56
Report :    05000352/2010301, 05000353/2010301, 05000277/2010301,
            05000278/2010301
Licensee:    Exelon Generating Company
Facility:    Limerick Generating Station and Peach Bottom Atomic Power Station
Location:    Sanatoga, PA
            Delta, PA
Dates:      July 21 - July 29,2010 (Operating Test Administration)
            July 27,2010 (Written Exam Administration)
            August 10, 2010 (End of Grading Period)
Examiners:  Joseph D'Antonio, Chief Examiner, Senior Operations Engineer
            John Caruso, Senior Operations Engineer
            Samuel Hansell, Branch Chief
Approved By: Samuel L. Hansell, Jr., Chief
            Operations Branch
            Division of Reactor Safety
                                                                            Enclosure
 
                                    SUMMARY OF FINDINGS
ER 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301;
July 21-29,2010; Limerick Generating Station Units 1 and 2 and Peach Bottom Atomic Power
Station Units 2 and 3; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of six applicants for senior operator licenses limited
to fuel handling at Limerick Generating Station Units 1 and 2 and Peach Bottom Atomic Power
Station Units 2 and 3. The facility licensee developed the examinations using NUREG-1021 ,
"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
The written examination was administered by the facility on July 27,2010. NRC examiners
administered the operating tests during the weeks of July 19 and July 26, 2010. The license
examiners determined that all six applicants satisfied the requirements of 10 CFR Part 55, and
the appropriate licenses have been issued.
A.      NRC-Identified and Self-Revealing Findings
        No findings of significance were identified.
B.      Licensee-Identified Violations
        None.
                                                  ii                                  Enclosure
 
                                        REPORT DETAILS
4.    OTHER ACTIVITIES (OA)
40A5 Other Activities (Initial Operator License Examination)
.1    License Applications
    a. Scope
      The examiners reviewed all six license applications submitted by the licensee to ensure
      the applications reflected that each applicant satisfied relevant license eligibility
      requirements. The applications were submitted on NRC Form 398, "Personal
      Qualification Statement," and NRC Form 396, "Certification of Medical Examination by
      Facility Licensee." The examiners also audited all of the license applications in detail to
      confirm that they accurately reflected the subject applicant's qualifications. This audit
      focused on the applicant's experience, on-the-job training, and control manipulations.
    b. Findings
      No findings of significance were identified .
.2    Operator Knowledge and Performance
    a. Examination Scope
      On July 27, 2010, the licensee proctored the administration of the written examinations
      to all six applicants. The licensee staff graded the written examinations, analyzed the
      results, and presented their analysis to the NRC on August 10, 2010.
      The NRC examination team administered the operating examination to all six applicants
      during the weeks of July 19 and July 26, 2010. The six applicants seeking a senior
        operator license limited to fuel handling participated in a facilities walkthrough test
        consisting of ten system tasks, and an administrative test consisting of five
        administrative tasks.
    b.  Findings
      All six of the applicants passed the operating test and written examination. For the
        written examinations, the applicants' average score was 85 percent and ranged from
        82 to 92 percent. The text of the examination questions and the licensee's examination
        analysis may be accessed in the ADAMS system under the accession numbers noted in
        the attachment.
        Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze
        the validity of any written examination questions that were missed by half or more of the
        applicants. The licensee conducted this performance analysis for those questions that
        met these criteria and submitted the analysis to the chief examiner. The licensee made
        no recommendations for changes to the examination.
                                                                                            Enclosure
 
                                                2
.3    Initial Licensing Examination Development
    a. Examination Scope
      The facility licensee developed the examinations in accordance with NUREG-1021 ,
      Revision 9, Supplement 1. All licensee facility training and operations staff involved in
      examination preparation and validation were listed on a security agreement. The facility
      licensee submitted both the written and operating examination outlines on
      April 30, 2010. The chief examiner reviewed the outlines against the requirements of
      NUREG-1 021, Revision 9, Supplement 1, and provided comments to the licensee. The
      facility licensee submitted the draft examination package on May 27, 2010. The chief
      examiner reviewed the draft examination package against the requirements of
      NUREG-1 021, Revision 9, Supplement 1, and provided comments to the licensee on
      the examination on June 14, 2010. The NRC conducted an onsite validation of
      the operating examinations and provided further comments during the week of
      June 14, 2010. The licensee satisfactorily completed comment resolution prior to
      administration of the examination.
    b. Findings
      The NRC approved the initial examination outline and advised the licensee to proceed
      with the operating examination development.
      The examiners determined that the written and operating examinations initially
      submitted by the licensee were within the range of acceptability expected for a proposed
      examination.
      No findings of significance were identified .
.4    Examination Security
    a. Examination Scope
      The examiners reviewed examination security for examination development and during
      both the onsite preparation week and examination administration week for compliance
      with NUREG-1021 requirements. Plans for security and applicant control were
        reviewed and discussed with licensee personnel.
    b.  Findings
        No findings of Significance were identified.
                                                                                        Enclosure
 
                                            3
40A6 Meetings, Including Exit
    The chief examiner presented the examination results to Mr. Corey Goff, Operations
    Training Manager at Limerick Generating Station, in a telephone exit on
    August 26, 2010. The licensee acknowledged the comments provided.
    The licensee did not identify any information or materials used during the examination
    as proprietary.
AITACHMENT: SUPPLEMENTAL INFORMATION
                                                                                    Enclosure
 
                                            A-1
                              SUPPLEMENTAL INFORMATION
                                  KEY POINTS OF CONTACT
Licensee Personnel
R. B. Dickinson, Limerick Director of Training
A. Wasong, Peach Bottom Director of Training
NRC Personnel
Joseph M. D'Antonio, Chief Examiner
                        ITEMS OPENED, CLOSED, AND DISCUSSED
NONE
                            ADAMS DOCUMENTS REFERENCED
Accession No. ML 102420248 - FINAL-Written Exam
Accession No. ML 102420261 - FINAL-Operating Exam
                                                            Attachment
}}

Latest revision as of 03:05, 14 January 2025