{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:October 19, 2010
                                  NUC LE AR RE G UL AT O RY C O M M I S S I O N
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
                                          AR LI N GTON , TEXAS 76011-4125
                                              October 19, 2010
Michael Perito  
Michael Perito
Vice President, Operations  
Vice President, Operations
Entergy Operations, Inc.  
Entergy Operations, Inc.
River Bend Station  
River Bend Station
5485 US Highway 61N  
5485 US Highway 61N
St. Francisville, LA 70775  
St. Francisville, LA 70775
Subject: RIVER BEND STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION
          REPORT 05000458/2011002) AND REQUEST FOR INFORMATION
Subject: RIVER BEND STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION
Dear Mr. Perito:
REPORT 05000458/2011002) AND REQUEST FOR INFORMATION  
From January 21 through January 27, 2011, reactor inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at
Dear Mr. Perito:  
River Bend Station, using NRC Inspection Procedure 71111.08. Experience has shown that this
inspection is a resource intensive inspection both for the NRC inspectors and your staff. In
From January 21 through January 27, 2011, reactor inspectors from the Nuclear Regulatory  
order to minimize the impact to your onsite resources and to ensure a productive inspection, we
Commissions (NRC) Region IV office will perform the baseline inservice inspection at  
have enclosed a request for documents needed for this inspection. These documents have
River Bend Station, using NRC Inspection Procedure 71111.08. Experience has shown that this  
been divided into two groups. The first group (Section A of the enclosure) identified information
inspection is a resource intensive inspection both for the NRC inspectors and your staff. In  
to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
order to minimize the impact to your onsite resources and to ensure a productive inspection, we  
The second group (Section B of the enclosure) identifies the information the inspectors will need
have enclosed a request for documents needed for this inspection. These documents have  
upon arrival at the site. It is important that all of these documents are up-to-date and complete
been divided into two groups. The first group (Section A of the enclosure) identified information  
in order to minimize the number of additional documents requested during the preparation
to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
and/or the onsite portions of the inspection.
The second group (Section B of the enclosure) identifies the information the inspectors will need  
We have discussed the schedule for these inspection activities with your staff and understand
upon arrival at the site. It is important that all of these documents are up-to-date and complete  
that our regulatory contact for this inspection will be Ms. Kristi Huffstatler of your licensing
in order to minimize the number of additional documents requested during the preparation  
organization. Our inspection dates are subject to change based on your updated schedule of
and/or the onsite portions of the inspection.  
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector Jim Drake at (817) 276-6558 (James.Drake@nrc.gov).
We have discussed the schedule for these inspection activities with your staff and understand  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
that our regulatory contact for this inspection will be Ms. Kristi Huffstatler of your licensing  
enclosure will be available electronically for public inspection in the NRC Public Document
organization. Our inspection dates are subject to change based on your updated schedule of  
Room or from the Publicly Available Records (PARS) component of NRCs document
outage activities. If there are any questions about this inspection or the material requested,  
please contact the lead inspector Jim Drake at (817) 276-6558 (James.Drake@nrc.gov).  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
enclosure will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of NRCs document  
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON  I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125


Entergy Operations, Inc.                     -2-
Entergy Operations, Inc.  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
- 2 -  
rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
                                                /RA/ James Drake for
rm/adams.html (the Public Electronic Reading Room).  
                                                Gregory Werner, Chief
                                                Plant Support Branch 2
                                                Division of Reactor Safety
Sincerely,  
Docket: 50-458
License: NPF-47
Enclosure:
Inservice Inspection Document Request
/RA/ James Drake for  
cc w/enclosure:
Senior Vice President and COO
Entergy Operations, Inc
P. O. Box 31995
Gregory Werner, Chief  
Jackson, MS 39286-1995
Vice President, Oversight
Plant Support Branch 2  
Entergy Operations, Inc.
P. O. Box 31995
Division of Reactor Safety  
Jackson, MS 39286-1995
Senior Manager, Nuclear Safety & Licensing
Docket:   50-458  
Entergy Nuclear Operations
License: NPF-47  
P. O. Box 31995
Jackson, MS 39286-1995
Enclosure:  
Manager, Licensing
Inservice Inspection Document Request  
Entergy Operations, Inc.
5485 US Highway 61N
cc w/enclosure:  
St. Francisville, LA 70775
Senior Vice President and COO  
Attorney General
Entergy Operations, Inc  
State of Louisiana
P. O. Box 31995  
P. O. Box 94005
Jackson, MS 39286-1995  
Baton Rouge, LA 70804-9005
Ms. H. Anne Plettinger
Vice President, Oversight  
3456 Villa Rose Drive
Entergy Operations, Inc.  
Baton Rouge, LA 70806
P. O. Box 31995  
Jackson, MS 39286-1995  
Senior Manager, Nuclear Safety & Licensing  
Entergy Nuclear Operations  
P. O. Box 31995  
Jackson, MS 39286-1995  
Manager, Licensing  
Entergy Operations, Inc.  
5485 US Highway 61N  
St. Francisville, LA 70775  
Attorney General  
State of Louisiana  
P. O. Box 94005  
Baton Rouge, LA 70804-9005  
Ms. H. Anne Plettinger  
3456 Villa Rose Drive  
Baton Rouge, LA 70806  


Entergy Operations, Inc.                     -3-
Entergy Operations, Inc.  
President of West Feliciana
- 3 -  
Police Jury
P. O. Box 1921
President of West Feliciana
St. Francisville, LA 70775
Police Jury  
Mr. Brian Almon
P. O. Box 1921  
Public Utility Commission
St. Francisville, LA 70775  
William B. Travis Building
P. O. Box 13326
Mr. Brian Almon  
Austin, TX 78701-3326
Public Utility Commission  
Mr. Jim Calloway
William B. Travis Building  
Public Utility
P. O. Box 13326  
Commission of Texas
Austin, TX 78701-3326  
1701 N. Congress Avenue
Austin, TX 78711-3326
Mr. Jim Calloway  
Louisiana Department of Environmental Quality
Public Utility  
Radiological Emergency Planning and
Commission of Texas  
Response Division
1701 N. Congress Avenue  
P. O. Box 4312
Austin, TX 78711-3326  
Baton Rouge, LA 70821-4312
Joseph A. Aluise
Louisiana Department of Environmental Quality  
Associate General Counsel - Nuclear
Radiological Emergency Planning and  
Entergy Services, Inc.
  Response Division  
639 Loyola Avenue
P. O. Box 4312  
New Orleans, LA 70113
Baton Rouge, LA 70821-4312  
Chief, Technological Hazards
  Branch
Joseph A. Aluise  
FEMA Region VI
Associate General Counsel - Nuclear  
800 N. Loop 288
Entergy Services, Inc.  
Denton, TX 76209-3606
639 Loyola Avenue  
New Orleans, LA 70113  
Chief, Technological Hazards  
  Branch  
FEMA Region VI  
800 N. Loop 288  
Denton, TX 76209-3606  


Entergy Operations, Inc.                       -4-
Entergy Operations, Inc.  
Electronic distribution by RIV:
- 4 -  
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Electronic distribution by RIV:  
DRP Deputy Director (Anton.Vegel@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)  
DRS Director (Roy.Caniano@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)  
DRS Deputy Director (Troy.Pruett@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)  
Senior Resident Inspector (Grant.Larkin@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)  
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)  
RBS Administrative Assistant (Lisa.Day@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)  
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)  
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)  
Project Manager (Alan.Wang@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)  
Acting Regional Counsel (David.Roth@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
OEMail Resource
Regional Counsel (Karla.Fuller@nrc.gov)  
OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)
Acting Regional Counsel (David.Roth@nrc.gov)  
SUNSI Review Completed: ___Y___             ADAMS: 7 Yes         No   Initials: _JFD_
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
7 Publicly Available       Non-Publicly Available   Sensitive     7 Non-Sensitive
OEMail Resource  
SRI:PSB2             C:PSB2
OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)  
JDrake               GWerner
/RA/                 /RA/ JFD for
10/19/10             10/19/10
OFFICIAL RECORD COPY T=Telephone                 E=E-mail   F=Fax
SUNSI Review Completed: ___Y___  
ADAMS: 7 Yes  
  No       Initials: _JFD_
7   Publicly Available         Non-Publicly Available         Sensitive  
7   Non-Sensitive  
SRI:PSB2  
C:PSB2  
JDrake  
GWerner  
/RA/  
/RA/ JFD for  
10/19/10  
10/19/10  
OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  


                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:           January 21 through January 27, 2011
Inspection Procedures:     IP 71111.08 Inservice Inspection (ISI) Activities
Inspectors:                 Jim Drake, Senior Reactor Inspector (Lead Inspector - ISI)
- 1 -
A.     Information Requested for the In-Office Preparation Week
Enclosure
      The following information should be sent to the Region IV office in hard copy or
INSERVICE INSPECTION DOCUMENT REQUEST  
      electronic format (ims.certrec.com preferred), in care of Jim Drake, by November 12,
      2010, to facilitate the selection of specific items that will be reviewed during the onsite
      inspection week. The inspector will select specific items from the information requested
Inspection Dates:  
      below and then request from your staff additional documents needed during the onsite
January 21 through January 27, 2011  
      inspection week (Section B of this enclosure). We ask that the specific items selected
      from the lists be available and ready for review on the first day of inspection. *Please
Inspection Procedures:  
      provide requested documentation electronically if possible. If requested documents are
IP 71111.08 Inservice Inspection (ISI) Activities  
      large and only hard copy formats are available, please inform the inspector(s), and
      provide subject documentation during the first day of the onsite inspection. If you have
Inspectors:  
      any questions regarding this information request, please call the inspector as soon as
Jim Drake, Senior Reactor Inspector (Lead Inspector - ISI)  
      possible.
A.1   ISI/Welding Programs and Schedule Information
      a)     A detailed schedule (including preliminary dates) of:
A.  
              i)       Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
Information Requested for the In-Office Preparation Week  
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
The following information should be sent to the Region IV office in hard copy or  
                        upcoming outage.
electronic format (ims.certrec.com preferred), in care of Jim Drake, by November 12,  
                        Provide a status summary of the NDE inspection activities vs. the
2010, to facilitate the selection of specific items that will be reviewed during the onsite  
                        required inspection period percentages for this Interval by category per
inspection week. The inspector will select specific items from the information requested  
                        ASME Section XI, IWX-2400 (Do not provide separately if other
below and then request from your staff additional documents needed during the onsite  
                        documentation requested contains this information)
inspection week (Section B of this enclosure). We ask that the specific items selected  
              ii)     Welding activities that are scheduled to be completed during the
from the lists be available and ready for review on the first day of inspection. *Please  
                        upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
provide requested documentation electronically if possible. If requested documents are  
                        components (SSCs))
large and only hard copy formats are available, please inform the inspector(s), and  
      b)     A copy of ASME Section XI Code Relief Requests and associated NRC Safety
provide subject documentation during the first day of the onsite inspection. If you have  
              Evaluations applicable to the examinations identified above.
any questions regarding this information request, please call the inspector as soon as  
      c)     A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
possible.  
              Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
                                            -1-                                        Enclosure
A.1  
ISI/Welding Programs and Schedule Information  
a)  
A detailed schedule (including preliminary dates) of:  
i)
Nondestructive examinations (NDEs) planned for Class 1 & 2 systems  
and containment, performed as part of your ASME Section XI, Risk  
Informed (if applicable), and augmented ISI programs during the  
upcoming outage.  
Provide a status summary of the NDE inspection activities vs. the  
required inspection period percentages for this Interval by category per  
ASME Section XI, IWX-2400 (Do not provide separately if other  
documentation requested contains this information)  
ii)  
Welding activities that are scheduled to be completed during the  
upcoming outage (ASME Class 1, 2, or 3 structures, systems, or  
components (SSCs))  
b)  
A copy of ASME Section XI Code Relief Requests and associated NRC Safety  
Evaluations applicable to the examinations identified above.
c)  
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,  
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code  


          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. The list of NDE
          reports should include a brief description of the SSC where the relevant condition
- 2 -
          was identified.
Enclosure
    d)     A list with a brief description (e.g., system, material, pipe size, weld number, and
Class 1 & 2 systems since the beginning of the last refueling outage. This should  
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
include the previous Section XI pressure test(s) conducted during start up and  
          fabricated due to component repair/replacement activities since the beginning of
any evaluations associated with the results of the pressure tests. The list of NDE  
          the last refueling outage, or are planned to be fabricated this refueling outage.
reports should include a brief description of the SSC where the relevant condition  
    e)     If reactor vessel weld examinations required by the ASME Code are scheduled to
was identified.  
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
d)  
          reference numbers for applicable procedures that will be used to conduct these
A list with a brief description (e.g., system, material, pipe size, weld number, and  
          examinations.
NDE performed) of the welds in Code Class 1 and 2 systems which have been  
    f)     Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
fabricated due to component repair/replacement activities since the beginning of  
          Section XI of the ASME Code that have been identified since the beginning of the
the last refueling outage, or are planned to be fabricated this refueling outage.  
          last refueling outage.
    g)     A list of any temporary non-code repairs in service (e.g., pinhole leaks).
e)  
    h)     Please provide copies of the most recent self assessments for the ISI, Welding,
If reactor vessel weld examinations required by the ASME Code are scheduled to  
          and Alloy 600 Programs.
occur during the upcoming outage, provide a detailed description of the welds to  
A.2 Additional information related to all ISI activities
be examined and the extent of the planned examination. Please also provide  
    a)     A list with a brief description of ISI inspection related issues (e.g., condition
reference numbers for applicable procedures that will be used to conduct these  
          reports) entered into your corrective action program since the beginning of the
examinations.  
          last refueling outage (for the applicable unit). For example, a list based upon
          data base searches using key words related to piping such as: ISI, ASME Code,
f)  
          Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion or errors in
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of  
          piping/NDE examinations.
Section XI of the ASME Code that have been identified since the beginning of the  
    b)     Please provide names and phone numbers for the following program leads:
last refueling outage.  
          ISI contacts (Examination, planning)
          Containment Exams
g)
          Snubbers and Supports
A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
          Repair and Replacement Program Manager
          Licensing Contact
h)  
          Site Welding Engineer
Please provide copies of the most recent self assessments for the ISI, Welding,  
B. Information to be provided onsite to the inspector(s) at the entrance meeting (January
and Alloy 600 Programs.
    21, 2011):
B.1 ISI / Welding Programs and Schedule Information
A.2  
                                          -2-                                        Enclosure
Additional information related to all ISI activities  
a)
A list with a brief description of ISI inspection related issues (e.g., condition  
reports) entered into your corrective action program since the beginning of the  
last refueling outage (for the applicable unit). For example, a list based upon  
data base searches using key words related to piping such as: ISI, ASME Code,  
Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion or errors in  
piping/NDE examinations.  
b)
Please provide names and phone numbers for the following program leads:  
ISI contacts (Examination, planning)  
Containment Exams  
Snubbers and Supports  
Repair and Replacement Program Manager  
Licensing Contact  
Site Welding Engineer  
B.  
Information to be provided onsite to the inspector(s) at the entrance meeting (January  
21, 2011):  
B.1  
ISI / Welding Programs and Schedule Information  


a) Updated schedules for ISI/NDE activities, planned welding activities, and
  schedule showing contingency repair plans, if available.
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists
  provided from section A of this enclosure, please provide copies of the following
- 3 -
  documentation for each subject weld:
Enclosure
  i)       Weld data sheet (traveler)
  ii)     Weld configuration and system location
a)  
  iii)     Applicable Code Edition and Addenda for weldment
Updated schedules for ISI/NDE activities, planned welding activities, and  
  iv)     Applicable Code Edition and Addenda for welding procedures
schedule showing contingency repair plans, if available.  
  v)       Applicable weld procedures (WPS) used to fabricate the welds
  vi)     Copies of procedure qualification records (PQRs) supporting the WPS
b)  
            from B.1.b.v
For ASME Code Class 1 and 2 welds selected by the inspector from the lists  
  vii)     Copies of mechanical test reports identified in the PQRs above
provided from section A of this enclosure, please provide copies of the following  
  viii)   Copies of the nonconformance reports for the selected welds (If
documentation for each subject weld:  
            applicable)
  ix)     Radiographs of the selected welds and access to equipment to allow
i)  
            viewing radiographs (If RT was performed)
Weld data sheet (traveler)  
  x)       Copies of the preservice examination records for the selected welds.
ii)  
  xi)     Copies of welder performance qualifications records applicable to the
Weld configuration and system location  
            selected welds, including documentation that welder maintained
iii)  
            proficiency in the applicable welding processes specified in the WPS (at
Applicable Code Edition and Addenda for weldment  
            least six months prior to the date of subject work)
iv)  
  xii)     Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
Applicable Code Edition and Addenda for welding procedures  
c) For the ISI related corrective action issues selected by the inspector(s) from
v)  
  section A of this enclosure, provide a copy of the corrective actions and
Applicable weld procedures (WPS) used to fabricate the welds  
  supporting documentation.
vi)  
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems
Copies of procedure qualification records (PQRs) supporting the WPS  
  selected by the inspector from section A above, provide a copy of the
from B.1.b.v  
  examination records, examiner qualification records, and associated corrective
vii)  
  action documents.
Copies of mechanical test reports identified in the PQRs above  
e) A copy of (or ready access to) most current revision of the ISI Program Manual
viii)  
  and Plan for the current Interval.
Copies of the nonconformance reports for the selected welds (If  
f) For the NDEs selected by the inspector from section A of this enclosure, provide
applicable)  
  copy of the NDE procedures used to perform the examinations (including
ix)  
  calibration and flaw characterization/sizing procedures). For ultrasonic
Radiographs of the selected welds and access to equipment to allow  
  examination procedures qualified in accordance with ASME Code, Section XI,
viewing radiographs (If RT was performed)  
  Appendix VIII, provide documentation supporting the procedure qualification
x)  
  (e.g., the EPRI performance demonstration qualification summary sheets). Also,
Copies of the preservice examination records for the selected welds.  
  include qualification documentation of the specific equipment to be used (e.g.,
xi)  
  ultrasonic unit, cables, and transducers including serial numbers) and NDE
Copies of welder performance qualifications records applicable to the  
  personnel qualification records.
selected welds, including documentation that welder maintained  
                                -3-                                      Enclosure
proficiency in the applicable welding processes specified in the WPS (at  
least six months prior to the date of subject work)  
xii)  
Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
c)  
For the ISI related corrective action issues selected by the inspector(s) from  
section A of this enclosure, provide a copy of the corrective actions and  
supporting documentation.  
d)  
For the NDE reports with relevant conditions on Code Class 1 & 2 systems  
selected by the inspector from section A above, provide a copy of the  
examination records, examiner qualification records, and associated corrective  
action documents.  
e)  
A copy of (or ready access to) most current revision of the ISI Program Manual  
and Plan for the current Interval.
f)  
For the NDEs selected by the inspector from section A of this enclosure, provide  
copy of the NDE procedures used to perform the examinations (including  
calibration and flaw characterization/sizing procedures). For ultrasonic  
examination procedures qualified in accordance with ASME Code, Section XI,  
Appendix VIII, provide documentation supporting the procedure qualification  
(e.g., the EPRI performance demonstration qualification summary sheets). Also,  
include qualification documentation of the specific equipment to be used (e.g.,  
ultrasonic unit, cables, and transducers including serial numbers) and NDE  
personnel qualification records.  


B.2     Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
              available):
- 4 -
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
Enclosure
                      inservice inspection program and the repair/replacement program.
              ii)     Any other applicable EPRI and industry standards referenced in the plant
B.2  
                      procedures for welding and NDE activities.
Codes and Standards  
Inspector Contact Information:
Jim Drake
a)  
Senior Reactor Inspector
Ready access to (i.e., copies provided to the inspector(s) for use during the  
817-276-6558
inspection at the onsite inspection location, or room number and location where  
James.Drake@nrc.gov
available):  
Mailing Address:
US NRC Region IV
i)
Attn: Jim Drake
Applicable Editions of the ASME Code (Sections V, IX and XI) for the  
612 E. Lamar Blvd, Suite 400
inservice inspection program and the repair/replacement program.
ii)
Any other applicable EPRI and industry standards referenced in the plant  
procedures for welding and NDE activities.  
Inspector Contact Information:  
Jim Drake  
Senior Reactor Inspector  
817-276-6558  
James.Drake@nrc.gov
Mailing Address:  
US NRC Region IV  
Attn: Jim Drake  
612 E. Lamar Blvd, Suite 400  
Arlington, TX 76011
Arlington, TX 76011
                                            -4-                                      Enclosure
}}
}}

Latest revision as of 02:27, 14 January 2025

Notification of Inspection (NRC Inspection Report 05000458/2011002) and Request for Information
ML102920735
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/19/2010
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Mike Perito
Entergy Operations
References
IR-11-002
Download: ML102920735 (8)


See also: IR 05000458/2011002

Text

October 19, 2010

Michael Perito

Vice President, Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Subject: RIVER BEND STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION

REPORT 05000458/2011002) AND REQUEST FOR INFORMATION

Dear Mr. Perito:

From January 21 through January 27, 2011, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at

River Bend Station, using NRC Inspection Procedure 71111.08. Experience has shown that this

inspection is a resource intensive inspection both for the NRC inspectors and your staff. In

order to minimize the impact to your onsite resources and to ensure a productive inspection, we

have enclosed a request for documents needed for this inspection. These documents have

been divided into two groups. The first group (Section A of the enclosure) identified information

to be provided prior to the inspection to ensure that the inspectors are adequately prepared.

The second group (Section B of the enclosure) identifies the information the inspectors will need

upon arrival at the site. It is important that all of these documents are up-to-date and complete

in order to minimize the number of additional documents requested during the preparation

and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Kristi Huffstatler of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Jim Drake at (817) 276-6558 (James.Drake@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Entergy Operations, Inc.

- 2 -

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ James Drake for

Gregory Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket: 50-458

License: NPF-47

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Senior Vice President and COO

Entergy Operations, Inc

P. O. Box 31995

Jackson, MS 39286-1995

Vice President, Oversight

Entergy Operations, Inc.

P. O. Box 31995

Jackson, MS 39286-1995

Senior Manager, Nuclear Safety & Licensing

Entergy Nuclear Operations

P. O. Box 31995

Jackson, MS 39286-1995

Manager, Licensing

Entergy Operations, Inc.

5485 US Highway 61N

St. Francisville, LA 70775

Attorney General

State of Louisiana

P. O. Box 94005

Baton Rouge, LA 70804-9005

Ms. H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, LA 70806

Entergy Operations, Inc.

- 3 -

President of West Feliciana

Police Jury

P. O. Box 1921

St. Francisville, LA 70775

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P. O. Box 13326

Austin, TX 78701-3326

Mr. Jim Calloway

Public Utility

Commission of Texas

1701 N. Congress Avenue

Austin, TX 78711-3326

Louisiana Department of Environmental Quality

Radiological Emergency Planning and

Response Division

P. O. Box 4312

Baton Rouge, LA 70821-4312

Joseph A. Aluise

Associate General Counsel - Nuclear

Entergy Services, Inc.

639 Loyola Avenue

New Orleans, LA 70113

Chief, Technological Hazards

Branch

FEMA Region VI

800 N. Loop 288

Denton, TX 76209-3606

Entergy Operations, Inc.

- 4 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Acting Regional Counsel (David.Roth@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)

SUNSI Review Completed: ___Y___

ADAMS: 7 Yes

No Initials: _JFD_

7 Publicly Available Non-Publicly Available Sensitive

7 Non-Sensitive

SRI:PSB2

C:PSB2

JDrake

GWerner

/RA/

/RA/ JFD for

10/19/10

10/19/10

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

January 21 through January 27, 2011

Inspection Procedures:

IP 71111.08 Inservice Inspection (ISI) Activities

Inspectors:

Jim Drake, Senior Reactor Inspector (Lead Inspector - ISI)

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Jim Drake, by November 12,

2010, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (Section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspector(s), and

provide subject documentation during the first day of the onsite inspection. If you have

any questions regarding this information request, please call the inspector as soon as

possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

- 2 -

Enclosure

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. The list of NDE

reports should include a brief description of the SSC where the relevant condition

was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2

Additional information related to all ISI activities

a)

A list with a brief description of ISI inspection related issues (e.g., condition

reports) entered into your corrective action program since the beginning of the

last refueling outage (for the applicable unit). For example, a list based upon

data base searches using key words related to piping such as: ISI, ASME Code,

Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion or errors in

piping/NDE examinations.

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

B.

Information to be provided onsite to the inspector(s) at the entrance meeting (January

21, 2011):

B.1

ISI / Welding Programs and Schedule Information

- 3 -

Enclosure

a)

Updated schedules for ISI/NDE activities, planned welding activities, and

schedule showing contingency repair plans, if available.

b)

For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x)

Copies of the preservice examination records for the selected welds.

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

- 4 -

Enclosure

B.2

Codes and Standards

a)

Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii)

Any other applicable EPRI and industry standards referenced in the plant

procedures for welding and NDE activities.

Inspector Contact Information:

Jim Drake

Senior Reactor Inspector

817-276-6558

James.Drake@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Jim Drake

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011