{{#Wiki_filter:WATTS BAR TABLE OF CONTENTS Section                               Title             Page 16.0                       TECHNICAL SPECIFICATIONS 16.1     PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-1 16.2     PROPOSED FINAL TECHNICAL SPECIFICATIONS       16.2-1 16.3     RELOCATED SPECIFICATIONS                     16.3-1 16.3.1         DISCUSSION                             16.3-1 16.3.2         DOCUMENT CONTROL                       16.3-1 16.3.3         CHANGES TO THE RELOCATED SPECIFICATIONS 16.3-1 Table of Contents                                          16-i
{{#Wiki_filter:Table of Contents 16-i WATTS BAR TABLE OF CONTENTS Section Title Page 16.0 TECHNICAL SPECIFICATIONS 16.1 PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-1 16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS 16.2-1 16.3 RELOCATED SPECIFICATIONS 16.3-1 16.3.1 DISCUSSION 16.3-1 16.3.2 DOCUMENT CONTROL 16.3-1 16.3.3 CHANGES TO THE RELOCATED SPECIFICATIONS 16.3-1


WATTS BAR TABLE OF CONTENTS Section                     Title             Page THIS PAGE INTENTIONALLY BLANK Table of Contents                                16-ii
Table of Contents 16-ii WATTS BAR TABLE OF CONTENTS Section Title Page THIS PAGE INTENTIONALLY BLANK


WATTS BAR LIST OF TABLES Section                 Title THIS PAGE INTENTIONALLY BLANK List of Tables                              16-iii
List of Tables 16-iii WATTS BAR LIST OF TABLES Section Title THIS PAGE INTENTIONALLY BLANK


WATTS BAR LIST OF TABLES Section           Title THIS PAGE INTENTIONALLY BLANK 16-iv                                  List of Tables
16-iv List of Tables WATTS BAR LIST OF TABLES Section Title THIS PAGE INTENTIONALLY BLANK


WATTS BAR LIST OF FIGURES Section                 Title THIS PAGE INTENTIONALLY BLANK List of Figures                              16-v
List of Figures 16-v WATTS BAR LIST OF FIGURES Section Title THIS PAGE INTENTIONALLY BLANK


WATTS BAR LIST OF FIGURES Section                 Title THIS PAGE INTENTIONALLY BLANK List of Figures                              16-vi
List of Figures 16-vi WATTS BAR LIST OF FIGURES Section Title THIS PAGE INTENTIONALLY BLANK


WATTS BAR                                         WBNP-102 16.0 TECHNICAL SPECIFICATIONS 16.1 PROPOSED TECHNICAL SPECIFICATIONS (NOT USED)
PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-1 WATTS BAR WBNP-102 16.0 TECHNICAL SPECIFICATIONS 16.1 PROPOSED TECHNICAL SPECIFICATIONS (NOT USED)
PROPOSED TECHNICAL SPECIFICATIONS (NOT USED)        16.1-1


WATTS BAR                                                        WBNP-102 THIS PAGE INTENTIONALLY BLANK PROPOSED TECHNICAL SPECIFICATIONS (NOT USED)                       16.1-2
PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-2 WATTS BAR WBNP-102 THIS PAGE INTENTIONALLY BLANK


WATTS BAR                                                                                 WBNP-102 16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS This Section describes Watts Bars plan for implementation of the Restructured Standard Technical Specifications (RSTS) based on the Westinghouse Owners Group MERITS Program and NUREG-1431 in lieu of the previous Standard Technical Specification (STS) in NUREG-0452.
PROPOSED FINAL TECHNICAL SPECIFICATIONS 16.2-1 WATTS BAR WBNP-102 16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS This Section describes Watts Bars plan for implementation of the Restructured Standard Technical Specifications (RSTS) based on the Westinghouse Owners Group MERITS Program and NUREG-1431 in lieu of the previous Standard Technical Specification (STS) in NUREG-0452.
The RSTS (NUREG-1431) is structured for the broadest possible use on Westinghouse plants. Accordingly, the document contains specifications which may not be applicable to all plants. Optional specifications are provided for those features and systems which may be included in individual plant designs but are not generic in their scope of application. Alternate specifications are provided in a limited number of cases to cover situations where alternate specification requirements are necessary on a generic basis because of design differences. The values of parameters and variables which may vary because of plant design appear as either blanks or bracketed numbers throughout the RSTS for illustration purposes only.
The RSTS (NUREG-1431) is structured for the broadest possible use on Westinghouse plants. Accordingly, the document contains specifications which may not be applicable to all plants. Optional specifications are provided for those features and systems which may be included in individual plant designs but are not generic in their scope of application. Alternate specifications are provided in a limited number of cases to cover situations where alternate specification requirements are necessary on a generic basis because of design differences. The values of parameters and variables which may vary because of plant design appear as either blanks or bracketed numbers throughout the RSTS for illustration purposes only.
During Technical Specification development for Watts Bar, specifications were removed as justified or added as required. The actual plant specific value for each parameter and variable was provided during the development process. A Proof and Review edition of the Watts Bar Technical Specifications was issued by NRC for review within NRC and Watts Bar. After resolution of the comments from this process, a Final Draft Technical Specification will be issued by NRC with a request for certification.
During Technical Specification development for Watts Bar, specifications were removed as justified or added as required. The actual plant specific value for each parameter and variable was provided during the development process. A Proof and Review edition of the Watts Bar Technical Specifications was issued by NRC for review within NRC and Watts Bar. After resolution of the comments from this process, a Final Draft Technical Specification will be issued by NRC with a request for certification.
Watts Bar must certify the Technical Specifications prior to requesting an operating license. The Certified Technical Specification will be issued by the NRC as Appendix "A" of the Operating License.
Watts Bar must certify the Technical Specifications prior to requesting an operating license. The Certified Technical Specification will be issued by the NRC as Appendix "A" of the Operating License.
Prior to issuance of the Final Draft Technical Specification, Watts Bar may maintain a controlled copy of the proposed Technical Specifications, based on the NRC approved changes from the Proof and Review version, for use in procedure development and training.
Prior to issuance of the Final Draft Technical Specification, Watts Bar may maintain a controlled copy of the proposed Technical Specifications, based on the NRC approved changes from the Proof and Review version, for use in procedure development and training.
PROPOSED FINAL TECHNICAL SPECIFICATIONS                                                        16.2-1


WATTS BAR                                                       WBNP-102 THIS PAGE INTENTIONALLY BLANK PROPOSED FINAL TECHNICAL SPECIFICATIONS                            16.2-2
PROPOSED FINAL TECHNICAL SPECIFICATIONS 16.2-2 WATTS BAR WBNP-102 THIS PAGE INTENTIONALLY BLANK


WATTS BAR                                                                                 WBNP-102 16.3 RELOCATED SPECIFICATIONS 16.3.1 Discussion As part of the implementation of the improved Technical Specifications program, Watts Bar has relocated certain information from the previous Standard Technical Specifications (NUREG-0452) to separate controlled documents based on the Commission's Policy Statement for improvement of Technical Specifications for nuclear power plants.[1,2] The majority of relocated information is now contained in a separate document called the Technical Requirements Manual (TRM). Other information has been relocated into site procedures or other Technical Specification required programs such as the Offsite Dose Calculation Manual (ODCM), Fire Protection Report (FPR), and the Process Control Program (PCP) as permitted by generic guidance. These documents become effective upon receipt of the operating license. The following is a description of the administrative program for control and amending the relocated specification material. The requirements for changing the ODCM are specified in the Technical Specifications.
RELOCATED SPECIFICATIONS 16.3-1 WATTS BAR WBNP-102 16.3 RELOCATED SPECIFICATIONS 16.3.1 Discussion As part of the implementation of the improved Technical Specifications program, Watts Bar has relocated certain information from the previous Standard Technical Specifications (NUREG-0452) to separate controlled documents based on the Commission's Policy Statement for improvement of Technical Specifications for nuclear power plants.[1,2] The majority of relocated information is now contained in a separate document called the Technical Requirements Manual (TRM). Other information has been relocated into site procedures or other Technical Specification required programs such as the Offsite Dose Calculation Manual (ODCM), Fire Protection Report (FPR), and the Process Control Program (PCP) as permitted by generic guidance. These documents become effective upon receipt of the operating license. The following is a description of the administrative program for control and amending the relocated specification material. The requirements for changing the ODCM are specified in the Technical Specifications.
16.3.2 Document Control Overall control of the relocated material documents is in accordance with the procedures for control of documents. Changes to the TRM, ODCM, and FPR are issued on a replacement page basis to controlled document holders following approval of the change in accordance with TVA procedures.
16.3.2 Document Control Overall control of the relocated material documents is in accordance with the procedures for control of documents. Changes to the TRM, ODCM, and FPR are issued on a replacement page basis to controlled document holders following approval of the change in accordance with TVA procedures.
16.3.3 Changes to the Relocated Specifications Activities at Watts Bar have the potential to affect the relocated specifications. These include design modifications, procedure changes, other licensing document changes, etc. Changes to the relocated material are controlled by procedures to ensure that appropriate reviews and approvals are obtained. The relocated material contained in the TRM may subsequently be relocated into other procedures and the TRM eliminated. Changes to the requirements of the relocated material are evaluated in accordance with 10CFR50.59.
16.3.3 Changes to the Relocated Specifications Activities at Watts Bar have the potential to affect the relocated specifications. These include design modifications, procedure changes, other licensing document changes, etc. Changes to the relocated material are controlled by procedures to ensure that appropriate reviews and approvals are obtained. The relocated material contained in the TRM may subsequently be relocated into other procedures and the TRM eliminated. Changes to the requirements of the relocated material are evaluated in accordance with 10CFR50.59.
Changes to the TRM are reported as required by TRM Section 5.0, Administrative Controls.
Changes to the TRM are reported as required by TRM Section 5.0, Administrative Controls.
REFERENCES (1)   "Interim Policy Statement on Technical Specification Improvements on Nuclear Power Reactors," Nuclear Regulatory Commission, 52 FR 3788, February 6, 1987.
REFERENCES (1)
(2)   "Watts Bar Unit 1 Technical Specifications Criteria Application Report,"
"Interim Policy Statement on Technical Specification Improvements on Nuclear Power Reactors," Nuclear Regulatory Commission, 52 FR 3788, February 6, 1987.
(2)
"Watts Bar Unit 1 Technical Specifications Criteria Application Report,"
WCAP-13470, August 1, 1992.
WCAP-13470, August 1, 1992.
RELOCATED SPECIFICATIONS                                                                      16.3-1


WATTS BAR                                           WBNP-102 THIS PAGE INTENTIONALLY BLANK 16.3-2                                RELOCATED SPECIFICATIONS}}
16.3-2 RELOCATED SPECIFICATIONS WATTS BAR WBNP-102 THIS PAGE INTENTIONALLY BLANK}}

Latest revision as of 04:53, 13 January 2025

Amendment 102 to Final Safety Analysis Report (Fsar), Section, 16, Technical Specifications (Redacted)
ML11221A295
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/17/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML11221A295 (12)


Text

Table of Contents 16-i WATTS BAR TABLE OF CONTENTS Section Title Page 16.0 TECHNICAL SPECIFICATIONS 16.1 PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-1 16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS 16.2-1 16.3 RELOCATED SPECIFICATIONS 16.3-1 16.3.1 DISCUSSION 16.3-1 16.3.2 DOCUMENT CONTROL 16.3-1 16.3.3 CHANGES TO THE RELOCATED SPECIFICATIONS 16.3-1

Table of Contents 16-ii WATTS BAR TABLE OF CONTENTS Section Title Page THIS PAGE INTENTIONALLY BLANK

List of Tables 16-iii WATTS BAR LIST OF TABLES Section Title THIS PAGE INTENTIONALLY BLANK

16-iv List of Tables WATTS BAR LIST OF TABLES Section Title THIS PAGE INTENTIONALLY BLANK

List of Figures 16-v WATTS BAR LIST OF FIGURES Section Title THIS PAGE INTENTIONALLY BLANK

List of Figures 16-vi WATTS BAR LIST OF FIGURES Section Title THIS PAGE INTENTIONALLY BLANK

PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-1 WATTS BAR WBNP-102 16.0 TECHNICAL SPECIFICATIONS 16.1 PROPOSED TECHNICAL SPECIFICATIONS (NOT USED)

PROPOSED TECHNICAL SPECIFICATIONS (NOT USED) 16.1-2 WATTS BAR WBNP-102 THIS PAGE INTENTIONALLY BLANK

PROPOSED FINAL TECHNICAL SPECIFICATIONS 16.2-1 WATTS BAR WBNP-102 16.2 PROPOSED FINAL TECHNICAL SPECIFICATIONS This Section describes Watts Bars plan for implementation of the Restructured Standard Technical Specifications (RSTS) based on the Westinghouse Owners Group MERITS Program and NUREG-1431 in lieu of the previous Standard Technical Specification (STS) in NUREG-0452.

The RSTS (NUREG-1431) is structured for the broadest possible use on Westinghouse plants. Accordingly, the document contains specifications which may not be applicable to all plants. Optional specifications are provided for those features and systems which may be included in individual plant designs but are not generic in their scope of application. Alternate specifications are provided in a limited number of cases to cover situations where alternate specification requirements are necessary on a generic basis because of design differences. The values of parameters and variables which may vary because of plant design appear as either blanks or bracketed numbers throughout the RSTS for illustration purposes only.

During Technical Specification development for Watts Bar, specifications were removed as justified or added as required. The actual plant specific value for each parameter and variable was provided during the development process. A Proof and Review edition of the Watts Bar Technical Specifications was issued by NRC for review within NRC and Watts Bar. After resolution of the comments from this process, a Final Draft Technical Specification will be issued by NRC with a request for certification.

Watts Bar must certify the Technical Specifications prior to requesting an operating license. The Certified Technical Specification will be issued by the NRC as Appendix "A" of the Operating License.

Prior to issuance of the Final Draft Technical Specification, Watts Bar may maintain a controlled copy of the proposed Technical Specifications, based on the NRC approved changes from the Proof and Review version, for use in procedure development and training.

PROPOSED FINAL TECHNICAL SPECIFICATIONS 16.2-2 WATTS BAR WBNP-102 THIS PAGE INTENTIONALLY BLANK

RELOCATED SPECIFICATIONS 16.3-1 WATTS BAR WBNP-102 16.3 RELOCATED SPECIFICATIONS 16.3.1 Discussion As part of the implementation of the improved Technical Specifications program, Watts Bar has relocated certain information from the previous Standard Technical Specifications (NUREG-0452) to separate controlled documents based on the Commission's Policy Statement for improvement of Technical Specifications for nuclear power plants.[1,2] The majority of relocated information is now contained in a separate document called the Technical Requirements Manual (TRM). Other information has been relocated into site procedures or other Technical Specification required programs such as the Offsite Dose Calculation Manual (ODCM), Fire Protection Report (FPR), and the Process Control Program (PCP) as permitted by generic guidance. These documents become effective upon receipt of the operating license. The following is a description of the administrative program for control and amending the relocated specification material. The requirements for changing the ODCM are specified in the Technical Specifications.

16.3.2 Document Control Overall control of the relocated material documents is in accordance with the procedures for control of documents. Changes to the TRM, ODCM, and FPR are issued on a replacement page basis to controlled document holders following approval of the change in accordance with TVA procedures.

16.3.3 Changes to the Relocated Specifications Activities at Watts Bar have the potential to affect the relocated specifications. These include design modifications, procedure changes, other licensing document changes, etc. Changes to the relocated material are controlled by procedures to ensure that appropriate reviews and approvals are obtained. The relocated material contained in the TRM may subsequently be relocated into other procedures and the TRM eliminated. Changes to the requirements of the relocated material are evaluated in accordance with 10CFR50.59.

Changes to the TRM are reported as required by TRM Section 5.0, Administrative Controls.

REFERENCES (1)

"Interim Policy Statement on Technical Specification Improvements on Nuclear Power Reactors," Nuclear Regulatory Commission, 52 FR 3788, February 6, 1987.

(2)

"Watts Bar Unit 1 Technical Specifications Criteria Application Report,"

WCAP-13470, August 1, 1992.

16.3-2 RELOCATED SPECIFICATIONS WATTS BAR WBNP-102 THIS PAGE INTENTIONALLY BLANK