ML112590415: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 September 16, 2011
{{#Wiki_filter:September 16, 2011  


==SUBJECT:==
==SUBJECT:==
REGULATORY CONFERENCE WITH WATERFORD STEAM ELECTRIC STATION, UNIT 3 FACILITY:   Waterford Steam Electric Station, Unit 3 DOCKET:       50-382 EA:         11-142 DATE & TIME: Monday, October 3, 2011 9 a.m. - 11 a.m. (CDT)
REGULATORY CONFERENCE WITH WATERFORD STEAM ELECTRIC STATION, UNIT 3 FACILITY:
LOCATION:   U.S. Nuclear Regulatory Commission, Region IV Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4005 PURPOSE:     The purpose of this meeting is to discuss the significance, cause, and corrective action associated with a preliminary finding with low-to-moderate safety significance (White). This finding involves the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure of workers during Refueling Outage 16. The preliminary finding is discussed in NRC Inspection Report 05000382/2011009 (ADAMS ML112360693).
Waterford Steam Electric Station, Unit 3 DOCKET:
CATEGORY 1: This meeting is a Category 1 meeting, meaning the public is invited to observe and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
50-382 EA:
11-142 DATE & TIME:
Monday, October 3, 2011 9 a.m. - 11 a.m. (CDT)
LOCATION:
U.S. Nuclear Regulatory Commission, Region IV Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4005 PURPOSE:
The purpose of this meeting is to discuss the significance, cause, and corrective action associated with a preliminary finding with low-to-moderate safety significance (White). This finding involves the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure of workers during Refueling Outage 16. The preliminary finding is discussed in NRC Inspection Report 05000382/2011009 (ADAMS ML112360693).
CATEGORY 1:
This meeting is a Category 1 meeting, meaning the public is invited to observe and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodations will be made on a case-by-case basis.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodations will be made on a case-by-case basis.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125


Waterford Steam Electric Station, Unit 3             2 A telecommunications bridge will be available for the public.
Waterford Steam Electric Station, Unit 3 2
A telecommunications bridge will be available for the public.
Interested parties should call 1-800-952-9677 to participate in this meeting and ask to be joined to the bridge.
Interested parties should call 1-800-952-9677 to participate in this meeting and ask to be joined to the bridge.
PARTICIPANTS:           NRC Elmo Collins, Regional Administrator Anton Vegel, Director, Division of Reactor Safety (DRS)
PARTICIPANTS:
NRC Elmo Collins, Regional Administrator Anton Vegel, Director, Division of Reactor Safety (DRS)
Thomas Blount, Deputy Director, DRS Kriss Kennedy, Director, Division of Reactor Projects (DRP)
Thomas Blount, Deputy Director, DRS Kriss Kennedy, Director, Division of Reactor Projects (DRP)
Gregory Werner, Chief, Plant Support Branch 2, DRS James Drake, Acting Chief, Branch E, DRP Marlone Davis, Senior Resident Inspector, Waterford 3 Dean Overland, Resident Inspector, Waterford 3 S. Garry, Senior Health Physicist, Nuclear Reactor Regulation/Division of Inspection and Regional Support (DIRS)
Gregory Werner, Chief, Plant Support Branch 2, DRS James Drake, Acting Chief, Branch E, DRP Marlone Davis, Senior Resident Inspector, Waterford 3 Dean Overland, Resident Inspector, Waterford 3 S. Garry, Senior Health Physicist, Nuclear Reactor Regulation/Division of Inspection and Regional Support (DIRS)
Natasha Green PhD., Health Physicist, Plant Support Branch 2, DRS Larry Ricketson, Senior Health Physicist, Plant Support Branch 2, DRS Ray Kellar, Senior Enforcement Specialist LICENSEE Joseph Kowalewski, Vice President Bryan Ford, Senior Licensing Manager William Steelman, Licensing Manager Jeff Brawley, ALARA Supervisor Brian Lanka, System Engineering Manager John Hornsby, Chemistry Manager To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Natasha Green PhD., Health Physicist, Plant Support Branch 2, DRS Larry Ricketson, Senior Health Physicist, Plant Support Branch 2, DRS Ray Kellar, Senior Enforcement Specialist LICENSEE Joseph Kowalewski, Vice President Bryan Ford, Senior Licensing Manager William Steelman, Licensing Manager Jeff Brawley, ALARA Supervisor Brian Lanka, System Engineering Manager John Hornsby, Chemistry Manager To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
MEETING CONTACT: Gregory E. Werner, NRC, RIV 817 860-8156 Greg.Werner@nrc.gov  
MEETING CONTACT: Gregory E. Werner, NRC, RIV 817 860-8156 Greg.Werner@nrc.gov


==Enclosure:==
==Enclosure:==
Agenda Distribution via ListServ cc w/enclosure:
Agenda Distribution via ListServ cc w/enclosure:
Institute of Nuclear Power Operations (INPO)
Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339  


Waterford Steam Electric Station, Unit 3       3 E-Mail To:
Waterford Steam Electric Station, Unit 3 3
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, Regional Administrator Art Howell, Deputy Regional Administrator Kriss Kennedy, Director, DRP Anton Vegel, Director, DRS Troy Pruett, Deputy Director, DRP Thomas Blount, Deputy Director, DRS Gregory Werner, Branch Chief, DRS/PSB2 Sue Bogle, OEWEB Resource Nathan Sanfilippo, Coordinator, OEDO OEMAIL, D/OE John McHale, ETA: OEDO Kaly Kalyanam, Project Manager, NRR James Drake, Acting Branch Chief, PB/E Ray Azua, Senior Project Engineer, PB/E Marlone Davis, Senior Resident Inspector Dean Overland, Resident Inspector Victor Dricks, Public Affairs Officer Lara Uselding, Public Affairs Officer Bill Maier, Regional State Liaison Officer Karla Fuller, Regional Counsel Heather Gepford, Branch Chief, ACES Christi Maier, Senior Enforcement Specialist, ACES Ray Kellar, Senior Enforcement Specialist, ACES Lisa Quayle, Administrative Assistant, RA Anita Tannenbaum, Administrative Assistant, DRA Vivian Mehrhoff, Administrative Assistant, DRS Rustin Lusk, Administrative Assistant, DRP Earnestine Clay, Branch Chief, DRMA Stacey Munroe, Support Services Assistant, DRMA Harold McKelvey, Branch Chief, IRMB Trevor Fleischmann, Meeting Support/Service Cherry Pemberton, Receptionist, DRMA Melody Foreman, Receptionist, DRMA Ann Mattila, Security Advisor R:\_REACTORS\_WAT\2011\W3 REG CONF MN 10-3-11                 ADAMS ML112590415 SUNSI Rev Compl. Yes No             ADAMS     Yes No   Reviewer Initials   GEW Publicly Avail           Yes No Sensitive     Yes No   Sens. Type Initials GEW RIV/SHP:DRS/PSB2 PAO                     RSLO               C:DRS/PSB2 LTRicketson             VLDricks         WAMaier           GEWerner
E-Mail To:
/RA/                   /RA/             /RA/               /RA/
NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, Regional Administrator Art Howell, Deputy Regional Administrator Kriss Kennedy, Director, DRP Anton Vegel, Director, DRS Troy Pruett, Deputy Director, DRP Thomas Blount, Deputy Director, DRS Gregory Werner, Branch Chief, DRS/PSB2 Sue Bogle, OEWEB Resource Nathan Sanfilippo, Coordinator, OEDO OEMAIL, D/OE John McHale, ETA: OEDO Kaly Kalyanam, Project Manager, NRR James Drake, Acting Branch Chief, PB/E Ray Azua, Senior Project Engineer, PB/E Marlone Davis, Senior Resident Inspector Dean Overland, Resident Inspector Victor Dricks, Public Affairs Officer Lara Uselding, Public Affairs Officer Bill Maier, Regional State Liaison Officer Karla Fuller, Regional Counsel Heather Gepford, Branch Chief, ACES Christi Maier, Senior Enforcement Specialist, ACES Ray Kellar, Senior Enforcement Specialist, ACES Lisa Quayle, Administrative Assistant, RA Anita Tannenbaum, Administrative Assistant, DRA Vivian Mehrhoff, Administrative Assistant, DRS Rustin Lusk, Administrative Assistant, DRP Earnestine Clay, Branch Chief, DRMA Stacey Munroe, Support Services Assistant, DRMA Harold McKelvey, Branch Chief, IRMB Trevor Fleischmann, Meeting Support/Service Cherry Pemberton, Receptionist, DRMA Melody Foreman, Receptionist, DRMA Ann Mattila, Security Advisor R:\\_REACTORS\\_WAT\\2011\\W3 REG CONF MN 10-3-11 ADAMS ML112590415 SUNSI Rev Compl.
9/13/11                 9/14/11           9/15/11           9/16/2011
Yes No ADAMS Yes No Reviewer Initials GEW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GEW RIV/SHP:DRS/PSB2 PAO RSLO C:DRS/PSB2 LTRicketson VLDricks WAMaier GEWerner  
/RA/  
/RA/  
/RA/  
/RA/
9/13/11 9/14/11 9/15/11 9/16/2011  


Waterford Steam Electric Station, Unit 3 4 OFFICIAL RECORD COPY                       T=Telephone E=E-mail F=Fax
Waterford Steam Electric Station, Unit 3 4
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax  


PROPOSED AGENDA Public Meeting Meeting with Waterford 3, Entergy Operations, Inc to discuss the significance, causes, and corrective actions associated with a preliminary finding with low-to-moderate safety significance (White). This finding involved the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure during Refueling Outage 16.
Enclosure PROPOSED AGENDA Public Meeting Meeting with Waterford 3, Entergy Operations, Inc to discuss the significance, causes, and corrective actions associated with a preliminary finding with low-to-moderate safety significance (White). This finding involved the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure during Refueling Outage 16.
Date                                           Time Monday, October 3, 2011                         9:00 a.m. - 11:00 a.m.
Date Time Monday, October 3, 2011 9:00 a.m. - 11:00 a.m.
Topic                                       Participants Opening Remarks by NRC                                           Anton Vegel Introduction of NRC Personnel                                     NRC-All Introduction of Licensee Personnel                 Waterford 3, Entergy Operations, Inc Regional Administrator Remarks                                   Elmo Collins Licensee Opening Remarks                           Waterford 3, Entergy Operations, Inc.
Topic Participants Opening Remarks by NRC Anton Vegel Introduction of NRC Personnel NRC-All Introduction of Licensee Personnel Waterford 3, Entergy Operations, Inc Regional Administrator Remarks Elmo Collins Licensee Opening Remarks Waterford 3, Entergy Operations, Inc.
Discussion of Potential Finding by NRC                 NRC - Larry Ricketson and/or Gregory Werner Licensee Presentation                             Waterford 3, Entergy Operations, Inc.
Discussion of Potential Finding by NRC NRC - Larry Ricketson and/or Gregory Werner Licensee Presentation Waterford 3, Entergy Operations, Inc.
NRC Caucus - closed session in                                   NRC - All Executive Conference Room Additional Discussion                           NRC and Waterford 3, Entergy Operations, Inc.
NRC Caucus - closed session in Executive Conference Room NRC - All Additional Discussion NRC and Waterford 3, Entergy Operations, Inc.
Closing Remarks                                                 Anton Vegel Public Questions to NRC                                       Public and NRC Enclosure}}
Closing Remarks Anton Vegel Public Questions to NRC Public and NRC}}

Latest revision as of 02:02, 13 January 2025

Regulatory Conference with Waterford Steam Electric Station, Unit 3, to Discuss the Significance, Cause, and Corrective Action Associated with a Preliminary Finding with Low-to-moderate Safety Significance (White)
ML112590415
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/16/2011
From:
NRC Region 4
To:
References
EA-11-142
Download: ML112590415 (5)


Text

September 16, 2011

SUBJECT:

REGULATORY CONFERENCE WITH WATERFORD STEAM ELECTRIC STATION, UNIT 3 FACILITY:

Waterford Steam Electric Station, Unit 3 DOCKET:

50-382 EA:

11-142 DATE & TIME:

Monday, October 3, 2011 9 a.m. - 11 a.m. (CDT)

LOCATION:

U.S. Nuclear Regulatory Commission, Region IV Training Conference Room 612 E. Lamar Boulevard, Suite 400 Arlington, TX 76011-4005 PURPOSE:

The purpose of this meeting is to discuss the significance, cause, and corrective action associated with a preliminary finding with low-to-moderate safety significance (White). This finding involves the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure of workers during Refueling Outage 16. The preliminary finding is discussed in NRC Inspection Report 05000382/2011009 (ADAMS ML112360693).

CATEGORY 1:

This meeting is a Category 1 meeting, meaning the public is invited to observe and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodations will be made on a case-by-case basis.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125

Waterford Steam Electric Station, Unit 3 2

A telecommunications bridge will be available for the public.

Interested parties should call 1-800-952-9677 to participate in this meeting and ask to be joined to the bridge.

PARTICIPANTS:

NRC Elmo Collins, Regional Administrator Anton Vegel, Director, Division of Reactor Safety (DRS)

Thomas Blount, Deputy Director, DRS Kriss Kennedy, Director, Division of Reactor Projects (DRP)

Gregory Werner, Chief, Plant Support Branch 2, DRS James Drake, Acting Chief, Branch E, DRP Marlone Davis, Senior Resident Inspector, Waterford 3 Dean Overland, Resident Inspector, Waterford 3 S. Garry, Senior Health Physicist, Nuclear Reactor Regulation/Division of Inspection and Regional Support (DIRS)

Natasha Green PhD., Health Physicist, Plant Support Branch 2, DRS Larry Ricketson, Senior Health Physicist, Plant Support Branch 2, DRS Ray Kellar, Senior Enforcement Specialist LICENSEE Joseph Kowalewski, Vice President Bryan Ford, Senior Licensing Manager William Steelman, Licensing Manager Jeff Brawley, ALARA Supervisor Brian Lanka, System Engineering Manager John Hornsby, Chemistry Manager To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

MEETING CONTACT: Gregory E. Werner, NRC, RIV 817 860-8156 Greg.Werner@nrc.gov

Enclosure:

Agenda Distribution via ListServ cc w/enclosure:

Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Waterford Steam Electric Station, Unit 3 3

E-Mail To:

NRC Attendees PMNS Resource, Mtg Announcement Coordinator Elmo Collins, Regional Administrator Art Howell, Deputy Regional Administrator Kriss Kennedy, Director, DRP Anton Vegel, Director, DRS Troy Pruett, Deputy Director, DRP Thomas Blount, Deputy Director, DRS Gregory Werner, Branch Chief, DRS/PSB2 Sue Bogle, OEWEB Resource Nathan Sanfilippo, Coordinator, OEDO OEMAIL, D/OE John McHale, ETA: OEDO Kaly Kalyanam, Project Manager, NRR James Drake, Acting Branch Chief, PB/E Ray Azua, Senior Project Engineer, PB/E Marlone Davis, Senior Resident Inspector Dean Overland, Resident Inspector Victor Dricks, Public Affairs Officer Lara Uselding, Public Affairs Officer Bill Maier, Regional State Liaison Officer Karla Fuller, Regional Counsel Heather Gepford, Branch Chief, ACES Christi Maier, Senior Enforcement Specialist, ACES Ray Kellar, Senior Enforcement Specialist, ACES Lisa Quayle, Administrative Assistant, RA Anita Tannenbaum, Administrative Assistant, DRA Vivian Mehrhoff, Administrative Assistant, DRS Rustin Lusk, Administrative Assistant, DRP Earnestine Clay, Branch Chief, DRMA Stacey Munroe, Support Services Assistant, DRMA Harold McKelvey, Branch Chief, IRMB Trevor Fleischmann, Meeting Support/Service Cherry Pemberton, Receptionist, DRMA Melody Foreman, Receptionist, DRMA Ann Mattila, Security Advisor R:\\_REACTORS\\_WAT\\2011\\W3 REG CONF MN 10-3-11 ADAMS ML112590415 SUNSI Rev Compl.

Yes No ADAMS Yes No Reviewer Initials GEW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials GEW RIV/SHP:DRS/PSB2 PAO RSLO C:DRS/PSB2 LTRicketson VLDricks WAMaier GEWerner

/RA/

/RA/

/RA/

/RA/

9/13/11 9/14/11 9/15/11 9/16/2011

Waterford Steam Electric Station, Unit 3 4

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Enclosure PROPOSED AGENDA Public Meeting Meeting with Waterford 3, Entergy Operations, Inc to discuss the significance, causes, and corrective actions associated with a preliminary finding with low-to-moderate safety significance (White). This finding involved the failure to use effective engineering controls as part of pre-job planning to reduce contamination and subsequent exposure during Refueling Outage 16.

Date Time Monday, October 3, 2011 9:00 a.m. - 11:00 a.m.

Topic Participants Opening Remarks by NRC Anton Vegel Introduction of NRC Personnel NRC-All Introduction of Licensee Personnel Waterford 3, Entergy Operations, Inc Regional Administrator Remarks Elmo Collins Licensee Opening Remarks Waterford 3, Entergy Operations, Inc.

Discussion of Potential Finding by NRC NRC - Larry Ricketson and/or Gregory Werner Licensee Presentation Waterford 3, Entergy Operations, Inc.

NRC Caucus - closed session in Executive Conference Room NRC - All Additional Discussion NRC and Waterford 3, Entergy Operations, Inc.

Closing Remarks Anton Vegel Public Questions to NRC Public and NRC