~,,:UCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUiTE 400 ARLINGTON, TEXAS 76011-4125 EA-11-142 Donna Jacobs, Vice President, Operations Entergy Operations, Inc. | |||
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 | Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 | ||
==Dear Ms. Jacobs:== | ==Dear Ms. Jacobs:== | ||
October 19, 2011 On October 3, 2011, representatives of Entergy Operations, Inc., VVaterford Steam Electric Station, Unit 3, met with NRC personnel in the Region IV office located in Arlington, Texas, to discuss the preliminary White finding identified in NRC Inspection Report 05000382/2011009. The conference was held at the request of the licensee. | |||
On October 3, 2011, representatives of Entergy Operations, Inc., VVaterford Steam Electric Station, Unit 3, met with NRC personnel in the Region IV office located in Arlington, Texas, to discuss the preliminary White finding identified in NRC Inspection Report 05000382/2011009. The conference was held at the request of the licensee. | |||
The licensee presented a summary of the causes for the preliminary White finding and their corrective actions. The licensee provided a discussion of the information in Attachment 2. | The licensee presented a summary of the causes for the preliminary White finding and their corrective actions. The licensee provided a discussion of the information in Attachment 2. | ||
The attendance list and the licensee's presentation are attached to this summary. | The attendance list and the licensee's presentation are attached to this summary. | ||
In accordance with 10 CFR 2390 of the NRC's "Ru!es of Practice," a copy of this letter vvi!! be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the electronic Reading Room page of the NRC's public website at | In accordance with 10 CFR 2390 of the NRC's "Ru!es of Practice," a copy of this letter vvi!! be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the electronic Reading Room page of the NRC's public website at Docket: 50-382 License: NPF-38 | ||
==Enclosures:== | ==Enclosures:== | ||
: 1. Attendance List | : 1. Attendance List | ||
: 2. Licensee Presentation Distribution via ListServ | : 2. Licensee Presentation Distribution via ListServ Sincerely, IRAJ Gregory E. Werner, Chief Plant Support Branch 2 | ||
REGULATORY CONFERENCE ATTENDANCE LICENSEE/FACILITY | REGULATORY CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNiT 3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. | ||
CONFERENCE | 11 :00 a.m. | ||
Entergy | CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 LICENSEE REPRESENTATIVES NAME (PLEASE ORGANIZATION TITLE PRINT) | ||
Donna Jacobs Entergy Vice President Operations Bruce Proctor Entergy Vice President Technical Assistance Daryl Marse Entergy Chemistry Specialist Jeffrey W. Brawley Entergy ALARA Supervisor Billy Steelman Entergy Licensing Manager John Gumnick Entergy R~rli':l+if"\\n PI"'I"'\\+o,...+il"\\n I\\II""r"\\'''\\I''''tl'''\\r I '\\.U\\,AH,..... I"IVI I I | |||
I VI,,\\,,;vlIVI I IVlctl la~C;;1 Casey Alldredge USNRC Health Physicist Jim Drake USNRC Acting Branch Chief, DRP, Branch E Greg Werner USNRC Branch Chief, DRS! PS82 Marlone Davis USNRC Senior. Resident Inspector, Waterford 3 Dean Overland USNRC Resident Inspector, Waterford 3 Elmo Collins USNRC Regional Administrator Anton Vegel USNRC Division Director, DRS II Page _1_ of -L | |||
PREDECISIONAL ENFORCEMENT CONFERENCE ATTENDANCE LICENSEE/FACILITY | PREDECISIONAL ENFORCEMENT CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNIT3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. - 11 :00 a.m. | ||
CONFERENCE | CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 NRC REPRESENTATIVES NAME (PLEASE PRINT) | ||
ORGANIZATION TITLE Dan Bradley USNRC Project Engineer Gwynne Skaggs Ryan USNRC Reactor Inspector Bryan Ford Entergy Senior Manager, Licensing John Mc Cann Entergy Vice President, Nuclear Safety, Emergency Preparedness, and Licensing USNRC Health Physicist Natasha Greene Larry Ricketson USNRC Senior Health Physicist Ray Kellar USNRC Senior Enforcement Specialist Stephen Garry USNRC, Nuclear Senior Health Physicist Reactor Regulation Manual Jimenez USNRC,, Nuclear Health Physicist Reactor Regulation Stephen Vaughn USNRC,, Nuclear Enforcement Coordinator Reactor Regulation Gerald Gulla USNRC, Enforcement Senior Enforcement Specialist I | |||
Page-L of -L | |||
egulatorv Conference October 3, 2011 W ATEltFORD STEAM ELEC'TRIC STATION UNIT 3 NRC R1\DIATION SAFETY INSI>ECTION REPORT | egulatorv Conference October 3, 2011 W ATEltFORD STEAM ELEC'TRIC STATION UNIT 3 NRC R1\\DIATION SAFETY INSI>ECTION REPORT 050010382/2011009; PRE-LIMINAR-Y WHITE FINDING | ||
PRE-LIMINAR-Y WHITE FINDING | |||
Opening RemarKS Waterford 3 Perspective Reactor coolant p'Ull1p vapor seal de staging Waterfor<i 3 has ta.ken ll1itigating actions Waterfor<i 3 has nlade signiiicant ill1prOVenlents in (;urrent pla,nt perforll1ance | Opening RemarKS Waterford 3 Perspective Reactor coolant p'Ull1p vapor seal de staging Waterfor<i 3 has ta.ken ll1itigating actions Waterfor<i 3 has nlade signiiicant ill1prOVenlents in (;urrent pla,nt perforll1ance | ||
: | :2 | ||
Opening Remarks Donna Jacobs - VVaterford | Opening Remarks Donna Jacobs - VVaterford ~~ Vice Pres* | ||
300 250 200 e-O) | |||
~ 150 w | |||
a: | a: | ||
u 100 50 o -1LZli",~,~'~4_,'~~~ | u 100 50 o -1LZli",~,~'~4_,'~~~ | ||
Refuel Outage 3 | Collective Radiation Exposure (CRE) | ||
Refuel Outage 3 | |||
Opening Remarks l?resentation Olltline | Opening Remarks l?resentation Olltline | ||
[] Engineering - Bnlce Proctor Refuel Cc)nditions - Daryl Marse Radiation Protection - Jeff Brawley | [] Engineering - Bnlce Proctor Refuel Cc)nditions - Daryl Marse Radiation Protection - Jeff Brawley | ||
[] Regulatory Perspt~ctive... Billy Steellllan Closing R"elllarks - Donna Jacobs 4 | [] Regulatory Perspt~ctive... Billy Steellllan Closing R"elllarks - Donna Jacobs 4 | ||
vVatertord 3 | vVatertord 3 eSlgn COlllbustion Engilleering 2 I-,oop Design | ||
[] F"our Rea(~tor Coolant PUlllPS Reactor | [] F"our Rea(~tor Coolant PUlllPS Reactor C~oolant F~UlllP Vapc)r Seal Design c* | ||
,) | |||
Engineering Reactor Coolant Pump Vapor Seal Summary September 2005 - Reactor coolant pump vapor seal de staging March 2006 - Operating procedure changes anuary 2007 - Vendor evaluation started September 2008 - Vendor evaluation and testing complete | Engineering Reactor Coolant Pump Vapor Seal Summary September 2005 - Reactor coolant pump vapor seal de staging March 2006 - Operating procedure changes anuary 2007 - Vendor evaluation started September 2008 - Vendor evaluation and testing complete | ||
[] October 2009 - Reactor coolant pum]? seal installed at ANO November 2009 - Refuel 16 installed trough modification April 2011 -. Refuel 17 two reactor coolant pump seal packages replaced 7 | [] | ||
October 2009 - Reactor coolant pum]? seal installed at ANO November 2009 - Refuel 16 installed trough modification April 2011 -. Refuel 17 two reactor coolant pump seal packages replaced 7 | |||
nglneerln | nglneerln 4g R~efuel 16 Modification Trough lTLodification perfonned in Refuel 16 PennanerLtly instaJled engil1eered control Trough lTLodification established at accolTLlTLo,date unE~xpected s()urce terlTLS 8 | ||
W,lterford 3 Refulel 16 I>lann d Activities | W,lterford 3 Refulel 16 I>lann d Activities | ||
[] Pre-outag'e power reductioIl and clean up DIan Reactor c,oolant systetn dose equivalent iodine and react()r coolaIlt systetn degassing I>lan o | [] Pre-outag'e power reductioIl and clean up DIan Reactor c,oolant systetn dose equivalent iodine and react()r coolaIlt systetn degassing I>lan o | ||
()perating~ Experit~nce 9 | Shutdown Cooling PurificatioJQ Cobalt clt~anup ptans | ||
()perating~ Experit~nce 9 | |||
JRadiation Prott~ction Pre-Outage ALARA Planning Reactor coolant pUlTIP Radi,ltion W or~: PeflTIit planning Radiatiol1 W orl( F~erlllit expected conditions Reactor coolant pUlTIP vapor destaging pre-planned c:ontingel1cies 10 | JRadiation Prott~ction Pre-Outage ALARA Planning Reactor coolant pUlTIP Radi,ltion W or~: PeflTIit planning Radiatiol1 W orl( F~erlllit expected conditions Reactor coolant pUlTIP vapor destaging pre-planned c:ontingel1cies 10 | ||
W4aterford 3 Refuel 16 Unplanned Conditions Reactor trip (moisture separator reheater) | W4aterford 3 Refuel 16 Unplanned Conditions Reactor trip (moisture separator reheater) | ||
Fuel pin (iefects Addition,ll cleanu.p Reactor coolant system acid reducing duration 11 | Fuel pin (iefects Addition,ll cleanu.p Reactor coolant system acid reducing duration 11 | ||
]~adiation Prote~ction Unexpected Conditions Response Initiated 1~adiatiol1 Work Permit revisions Analyzed impact lof emergel1t conditions Documented and *briefed Radiation W()rk Permit re1visions Executed ALARA contingel1cy actions 12 | |||
Executed ALARA contingel1cy actions 12 | |||
Wclterford 3 ALARA Improvements Installed trough ITlodificatio:n Replaced two | Wclterford 3 ALARA Improvements Installed trough ITlodificatio:n Replaced two rea(~tor coolarlt pUITlP seal packages Purchase(i additional tungst(~n shieldin.g including tungste11 vests Increased. the aITlc)unt of shielding Added ne:w shieldling applic,ations 13 | ||
Radiation ProtE~ctl0n ALARA Improvement Statistic RF16 | Radiation ProtE~ctl0n ALARA Improvement Statistic RF16 RFI I | ||
()utage Dose | ()utage Dose | ||
~250 Rem | |||
~98 Rem F~ersonnel COfltaminatic)n 128 21 I~vents 14 | |||
Regulatory Perspective IMC 030:8 Reactc~r Oversigllt Process (ROP) | Regulatory Perspective IMC 030:8 Reactc~r Oversigllt Process (ROP) | ||
IMC 060~9 Appendix C Occupational Radiatiol1 Safety :Significan~:;e Detenninati Process 15 | IMC 060~9 Appendix C Occupational Radiatiol1 Safety :Significan~:;e Detenninati Process 15 | ||
Closing Remarks Reactor c,oolant pump vapor seal leakage Waterforci 3 took reasonablt~ actions Waterforci 3 has i:mplementt~d ALARA itnprOvenlents 16 | Closing Remarks Reactor c,oolant pump vapor seal leakage Waterforci 3 took reasonablt~ actions Waterforci 3 has i:mplementt~d ALARA itnprOvenlents 16 }} | ||
Latest revision as of 01:31, 13 January 2025
| ML112920520 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/19/2011 |
| From: | Greg Werner NRC/RGN-IV/DRS/PSB-2 |
| To: | Jacobs D Entergy Operations |
| References | |
| EA-11-142, IR-11-009 | |
| Download: ML112920520 (19) | |
Text
UNITED STATES
~,,:UCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUiTE 400 ARLINGTON, TEXAS 76011-4125 EA-11-142 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
Dear Ms. Jacobs:
October 19, 2011 On October 3, 2011, representatives of Entergy Operations, Inc., VVaterford Steam Electric Station, Unit 3, met with NRC personnel in the Region IV office located in Arlington, Texas, to discuss the preliminary White finding identified in NRC Inspection Report 05000382/2011009. The conference was held at the request of the licensee.
The licensee presented a summary of the causes for the preliminary White finding and their corrective actions. The licensee provided a discussion of the information in Attachment 2.
The attendance list and the licensee's presentation are attached to this summary.
In accordance with 10 CFR 2390 of the NRC's "Ru!es of Practice," a copy of this letter vvi!! be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the electronic Reading Room page of the NRC's public website at Docket: 50-382 License: NPF-38
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation Distribution via ListServ Sincerely, IRAJ Gregory E. Werner, Chief Plant Support Branch 2
REGULATORY CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNiT 3 DATE/TIME OCTOBER 3, 2011/9:00 a.m.
11 :00 a.m.
CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 LICENSEE REPRESENTATIVES NAME (PLEASE ORGANIZATION TITLE PRINT)
Donna Jacobs Entergy Vice President Operations Bruce Proctor Entergy Vice President Technical Assistance Daryl Marse Entergy Chemistry Specialist Jeffrey W. Brawley Entergy ALARA Supervisor Billy Steelman Entergy Licensing Manager John Gumnick Entergy R~rli':l+if"\\n PI"'I"'\\+o,...+il"\\n I\\II""r"\\\\I'tl\\r I '\\.U\\,AH,..... I"IVI I I
I VI,,\\,,;vlIVI I IVlctl la~C;;1 Casey Alldredge USNRC Health Physicist Jim Drake USNRC Acting Branch Chief, DRP, Branch E Greg Werner USNRC Branch Chief, DRS! PS82 Marlone Davis USNRC Senior. Resident Inspector, Waterford 3 Dean Overland USNRC Resident Inspector, Waterford 3 Elmo Collins USNRC Regional Administrator Anton Vegel USNRC Division Director, DRS II Page _1_ of -L
PREDECISIONAL ENFORCEMENT CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNIT3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. - 11 :00 a.m.
CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 NRC REPRESENTATIVES NAME (PLEASE PRINT)
ORGANIZATION TITLE Dan Bradley USNRC Project Engineer Gwynne Skaggs Ryan USNRC Reactor Inspector Bryan Ford Entergy Senior Manager, Licensing John Mc Cann Entergy Vice President, Nuclear Safety, Emergency Preparedness, and Licensing USNRC Health Physicist Natasha Greene Larry Ricketson USNRC Senior Health Physicist Ray Kellar USNRC Senior Enforcement Specialist Stephen Garry USNRC, Nuclear Senior Health Physicist Reactor Regulation Manual Jimenez USNRC,, Nuclear Health Physicist Reactor Regulation Stephen Vaughn USNRC,, Nuclear Enforcement Coordinator Reactor Regulation Gerald Gulla USNRC, Enforcement Senior Enforcement Specialist I
Page-L of -L
egulatorv Conference October 3, 2011 W ATEltFORD STEAM ELEC'TRIC STATION UNIT 3 NRC R1\\DIATION SAFETY INSI>ECTION REPORT 050010382/2011009; PRE-LIMINAR-Y WHITE FINDING
Opening RemarKS Waterford 3 Perspective Reactor coolant p'Ull1p vapor seal de staging Waterfor<i 3 has ta.ken ll1itigating actions Waterforlann d Activities
[] Pre-outag'e power reductioIl and clean up DIan Reactor c,oolant systetn dose equivalent iodine and react()r coolaIlt systetn degassing I>lan o
Shutdown Cooling PurificatioJQ Cobalt clt~anup ptans
()perating~ Experit~nce 9
JRadiation Prott~ction Pre-Outage ALARA Planning Reactor coolant pUlTIP Radi,ltion W or~: PeflTIit planning Radiatiol1 W orl( F~erlllit expected conditions Reactor coolant pUlTIP vapor destaging pre-planned c:ontingel1cies 10
W4aterford 3 Refuel 16 Unplanned Conditions Reactor trip (moisture separator reheater)
Fuel pin (iefects Addition,ll cleanu.p Reactor coolant system acid reducing duration 11
]~adiation Prote~ction Unexpected Conditions Response Initiated 1~adiatiol1 Work Permit revisions Analyzed impact lof emergel1t conditions Documented and *briefed Radiation W()rk Permit re1visions Executed ALARA contingel1cy actions 12
Wclterford 3 ALARA Improvements Installed trough ITlodificatio:n Replaced two rea(~tor coolarlt pUITlP seal packages Purchase(i additional tungst(~n shieldin.g including tungste11 vests Increased. the aITlc)unt of shielding Added ne:w shieldling applic,ations 13
Radiation ProtE~ctl0n ALARA Improvement Statistic RF16 RFI I
()utage Dose
~250 Rem
~98 Rem F~ersonnel COfltaminatic)n 128 21 I~vents 14
Regulatory Perspective IMC 030:8 Reactc~r Oversigllt Process (ROP)
IMC 060~9 Appendix C Occupational Radiatiol1 Safety :Significan~:;e Detenninati Process 15
Closing Remarks Reactor c,oolant pump vapor seal leakage Waterforci 3 took reasonablt~ actions Waterforci 3 has i:mplementt~d ALARA itnprOvenlents 16