{{#Wiki_filter:DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM ADMIN 1         =   SRO ONLY TITLE VERIFY FUEL MOVEMENT SHEET AUTHOR                     MEDIA NUMBER           TIME Error! Reference source not 2012-301 ADMIN- 1   30 Minutes found.
{{#Wiki_filter:DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM ADMIN 1 = SRO ONLY TITLE VERIFY FUEL MOVEMENT SHEET AUTHOR MEDIA NUMBER TIME Error! Reference source not 2012-301 ADMIN-1 30 Minutes found.
RECOMMENDED BY             APPROVED BY           DATE N/R SOUTHERN COMPANY A
RECOMMENDED BY APPROVED BY DATE N/R SOUTHERNA COMPANY


SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:       OPERATIONS TRAINING             Media Number: 2012-301 ADMIN-1 Rev.                                                                  Authors Date                      Reason for Revision                           Supvs No.                                                                    Initials  Initials 00    03/17/09 Initial development                                      FNF 01            Revision for use on 2012-30 1 NRC Exam. After NRC       ARB Exam, Media Number will be changed to LR-JP-45.33A.
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2012-301 ADMIN-1 Initial development Reason for Revision Revision for use on 2012-30 1 NRC Exam. After NRC Exam, Media Number will be changed to LR-JP-45.33A.
Authors Initials FNF ARB Supvs Initials Rev.
No.
Date 00 03/17/09 01


2012-301 ADMIN-1 Page 1 of 6 UNIT 1 (X) UNIT 2 (X)
2012-301 ADMIN-1 Page 1 of 6 UNIT 1 (X)
TASK TITLE:           VERIFY FUEL MOVEMENT SHEET JPM NUMBER:           2012-301 ADMIN-1 TASK STANDARD:         Verify proper fuel movements.
UNIT 2 (X)
TASK NUMBER:           045.033 OBJECTIVE NUMBER: 045 .033.0 PLANT HATCH JTA IMPORTANCE RATING:
TASK TITLE:
RO   Not Available SRO Not Available K/A CATALOG NUMBER: G2.1.35 K/A CATALOG JTA IMPORTANCE RATING:
VERIFY FUEL MOVEMENT SHEET JPM NUMBER:
RO 2.2 SRO 3.9 OPERATOR APPLICABILITY:       Senior Reactor Operator GENERAL  
2012-301 ADMIN-1 TASK STANDARD:
Verify proper fuel movements.
TASK NUMBER:
045.033 OBJECTIVE NUMBER:
045.033.0 PLANT HATCH JTA IMPORTANCE RATING:
RO Not Available SRO Not Available K/A CATALOG NUMBER: G2.1.35 K/A CATALOG JTA IMPORTANCE RATING:
RO 2.2 SRO 3.9 OPERATOR APPLICABILITY:
Senior Reactor Operator GENERAL  


==REFERENCES:==
==REFERENCES:==
Refuel Floor 34FH-OPS-001-0 (current version) 42FH-ERP-014-0 (current version)
Refuel Floor 34FH-OPS-001-0 (current version) 42FH-ERP-014-0 (current version)
REQUIRED MATERIALS:       Refuel Floor Fuel Movement Sheets 34FH-OPS-001-0 (current version) 42FH-ERP-0 14-0 (current version)
REQUIRED MATERIALS:
APPROXIMATE COMPLETION TIME:             30 Minutes SIMULATOR SETUP:     N/A
Refuel Floor Fuel Movement Sheets 34FH-OPS-001-0 (current version) 42FH-ERP-0 14-0 (current version)
APPROXIMATE COMPLETION TIME:
30 Minutes SIMULATOR SETUP:
N/A


EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is in a refueling outage.
1.
: 2. You are the oncoming Refuel Floor SRO.
Unit 2 is in a refueling outage.
: 3. The off-going Refuel Floor SRO asks you to verify Page 1 of the attached Fuel Movement Sheet.
2.
: 4. The fuel movement sheet, Core Map and pictures of the core cells are available.
You are the oncoming Refuel Floor SRO.
3.
The off-going Refuel Floor SRO asks you to verify Page 1 of the attached Fuel Movement Sheet.
4.
The fuel movement sheet, Core Map and pictures of the core cells are available.
INITIATING CUES:
INITIATING CUES:
Verify the in-core placement of all components listed on Page 1 of the attached Fuel Movement Sheet.
Verify the in-core placement of all components listed on Page 1 of the attached Fuel Movement Sheet.


2012-301 ADMIN-1 Page 3 of 6 STEP             PERFORMANCE STEP                                     STANDARD I
2012-301 ADMIN-1 Page 3 of 6 STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
(COMMENTS)
For INITIAL Operator Programs:
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                               THEN IJ Human performance tools, safety, PPE met (1), AND         D Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS       LI For continuing trg, critical steps (if used) completed correctly FAIL       LI Above standards not met                                     LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  
IF THEN IJ Human performance tools, safety, PPE met (1), AND D
Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  


==Reference:==
==Reference:==
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
START TIME:________
START TIME:________
PROMPT:         Hand the operator the fuel movement sheet, Core Map and pictures of the core cells.
PROMPT:
PROMPT:          IF the operator has problems reading the bundle serial numbers, THEN provide the serial numbers to the operator.
PROMPT:
PROMPT:          IF the operator asks about Spent Fuel Pool verification, THEN tell the operator he is only responsible for in-core verifications.
PROMPT:
: 1. Obtains the correct procedures.                     Obtains and reviews 42FH-ERP-014-0, Fuel Movement and 34FH-OPS-00 1-0, Fuel Movement Operation.
Hand the operator the fuel movement sheet, Core Map and pictures of the core cells.
(** Indicates critical step)
IF the operator has problems reading the bundle serial numbers, THEN provide the serial numbers to the operator.
IF the operator asks about Spent Fuel Pool verification, THEN tell the operator he is only responsible for in-core verifications.
1.
Obtains the correct procedures.
Obtains and reviews 42FH-ERP-014-0, Fuel Movement and 34FH-OPS-001-0, Fuel Movement Operation.
(** Indicates critical step)


2012-301 ADMIN-1 Page 4 of 6 STEP           PERFORMANCE STEP                           STANDARD I (COMMENTS)     - I
2012-301 ADMIN-1 Page 4 of 6 STEP PERFORMANCE STEP STANDARD I
: 2. Verify correct loading of Control Cell Operator determines Control Cell 38-37.                                 38-37 bundles are the correct bundles and in the correct orientation:
(COMMENTS)
- I 2.
Verify correct loading of Control Cell Operator determines Control Cell 38-37.
38-37 bundles are the correct bundles and in the correct orientation:
* JLV675
* JLV675
* JLV682
* JLV682
* JLK8O4
* JLK8O4
* JLK817
* JLK817
    **3 Determine INCORRECT loading of           Operator determines Control Cell Control Cell 14-37.                   14-37 bundles are the correct bundles but in the INCORRECT orientation:
**3 Determine INCORRECT loading of Operator determines Control Cell Control Cell 14-37.
14-37 bundles are the correct bundles but in the INCORRECT orientation:
e JLV678
e JLV678
* JLV67O NOTE: Bundles JLV678 and JLV67O are 180° out.
* JLV67O NOTE: Bundles JLV678 and JLV67O are 180° out.
: 4. Verify correct loading of Control Cell Operator determines Control Cell 14-37.                                 14-37 bundles are the correct bundles and in the correct orientation:
4.
Verify correct loading of Control Cell Operator determines Control Cell 14-37.
14-37 bundles are the correct bundles and in the correct orientation:
* JLK8O5
* JLK8O5
* JLK812
* JLK812
    **5* Determine INCORRECT loading of         Operator determines Control Cell Control Cell 38-17.                   38-17 bundle is the INCORRECT bundle but in the correct orientation:
**5*
Determine INCORRECT loading of Operator determines Control Cell Control Cell 38-17.
38-17 bundle is the INCORRECT bundle but in the correct orientation:
* JLV668 NOTE: Wrong bundle loaded. The correct bundle is JLV698
* JLV668 NOTE: Wrong bundle loaded. The correct bundle is JLV698
( Indicates critical step)
( Indicates critical step)


2012-301 ADMIN-1 Page 5 of 6 STEP I                                                                                   SAT!UNSAT 1
2012-301 ADMIN-1 Page 5 of 6 STEP I
    #    I       PERFORMANCE STEP                             STANDARD (COMMENTS)       I
I SAT!UNSAT 1
: 6. Verify correct loading of Control Cell     Operator determines Control Cell 38-17.                                   14-37 bundles are the correct bundles and in the correct orientation:
I PERFORMANCE STEP STANDARD (COMMENTS)
                                                        . JLV674
I 6.
Verify correct loading of Control Cell Operator determines Control Cell 38-17.
14-37 bundles are the correct bundles and in the correct orientation:
. JLV674
* JLK8O7
* JLK8O7
* JLK82O
* JLK82O
    **7 Determine INCORRECT loading of             Operator determines Control Cell Control Cell 14-17.                       14-17 Double Blade Guide is in the INCORRECT orientation.
**7 Determine INCORRECT loading of Operator determines Control Cell Control Cell 14-17.
END TIME:_______
14-17 Double Blade Guide is in the INCORRECT orientation.
NOTE:      The terminating cue shall be given to the Operator when:
NOTE:
The terminating cue shall be given to the Operator when:
 
After JPM step #7 is complete.
After JPM step #7 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
TERMINATING CUE:
EVALUATOR         PICK UP the Initiating Cue sheet.
We will stop here.
EVALUATOR PICK UP the Initiating Cue sheet.
END TIME:_______
( Indicates critical step)
( Indicates critical step)


UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is in a refueling outage.
1.
: 2. You are the oncoming Refuel Floor SRO.
Unit 2 is in a refueling outage.
: 3. The off-going Refuel Floor SRO asks you to verify Page 1 of the attached Fuel Movement Sheet.
2.
: 4. The fuel movement sheet, Core Map and pictures of the core cells are available.
You are the oncoming Refuel Floor SRO.
3.
The off-going Refuel Floor SRO asks you to verify Page 1 of the attached Fuel Movement Sheet.
4.
The fuel movement sheet, Core Map and pictures of the core cells are available.
INITIATING CUES:
INITIATING CUES:
Verify the in-core placement of all components listed on Page 1 of the attached Fuel Movement Sheet.
Verify the in-core placement of all components listed on Page 1 of the attached Fuel Movement Sheet.


DRAFT Southern Nuclear E, I Hatch Nuclear Plant Operations Training JPM ADMIN 2 ALL TITLE CORRECT RWL INDICATORS FOR HIGH DRY WELL TEMPERATURES AUTHOR                 MEDIA NUMBER               TIME ANTHONY BALL           2012-301 ADMIN-2         11.0 Minutes RECOMMENDED BY         APPROVED BY                 DATE N/R SOUTHERN COMPANY A
DRAFT Southern Nuclear E, I Hatch Nuclear Plant Operations Training JPM ADMIN 2 ALL TITLE CORRECT RWL INDICATORS FOR HIGH DRYWELL TEMPERATURES AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 ADMIN-2 11.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERNA COMPANY


SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                               Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code: OPERATIONS TRAINING           Media Number: 2012-301 ADMIN-2 Rev. No. Date                 Reason for Revision               Authors     Supvs Initials   Initials 00               Modified from LR-JP-25 101 for use on 2012-301     ARB NRC Exam.
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2012-301 ADMIN-2 Rev. No.
Date Reason for Revision Authors Supvs Initials Initials 00 Modified from LR-JP-25 101 for use on 2012-301 ARB NRC Exam.


2012-301 ADMIN-2 Page 1 of 9 UNIT 1     (X)    UNIT 2  (X)
2012-301 ADMIN-2 Page 1 of 9 TASK TITLE:
TASK TITLE:        CORRECT RWL INDICATORS FOR HIGH DRYWELL TEMPERATURES JPM NUMBER:       2012-301 ADMIN-2 TASK STANDARD:      The task shall be completed when the operator has determined the corrected RWL for the specified instrumentation per 34AB-B2 1-002.
UNIT 1 (X)
TASK NUMBER:       201.099 OBJECTIVE NUMBER: 201 .099.B PLANT HATCH JTA IMPORTANCE RATING:
CORRECT RWL INDICATORS FOR HIGH DRYWELL TEMPERATURES UNIT 2 (X)
RO   4.57 SRO 3.83 STA 4.00 K/A CATALOG NUMBER: G2.1.35 K/A CATALOG JTA IMPORTANCE RATING:
JPM NUMBER:
RO   3.90 SRO 4.20 OPERATOR APPLICABILITY: Nuclear Plant Operator (NPO)
TASK STANDARD:
2012-301 ADMIN-2 The task shall be completed when the operator has determined the corrected RWL for the specified instrumentation per 34AB-B2 1-002.
TASK NUMBER:
OBJECTIVE NUMBER:
201.099 201.099.B PLANT HATCH JTA IMPORTANCE RATING:
RO 4.57 SRO 3.83 STA 4.00 K/A CATALOG NUMBER: G2.1.35 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.90 SRO 4.20 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO)
Shift Technical Advisor (STA)
Shift Technical Advisor (STA)
GENERAL  
GENERAL  


==REFERENCES:==
==REFERENCES:==
Unit 1                           Unit 2 34AB-B2 1-002-i                 34AB-B2 1-002-2 (current version)               (current version)
Unit 1 Unit 2 34AB-B2 1-002-i 34AB-B2 1-002-2 (current version)
REQUIRED MATERIALS:      Unit 1                          Unit 2 34AB-B21 -002-1                 34AB-B2 1-002-2 (current version)               (current version)
(current version) 34AB-B21 -002-1 (current version) 34AB-B2 1-002-2 (current version)
APPROXIMATE COMPLETION TIME:           11.0 Minutes SIMULATOR SETUP:   N/A
REQUIRED MATERIALS:
Unit 1 Unit 2 APPROXIMATE COMPLETION TIME:
11.0 Minutes SIMULATOR SETUP:
N/A


EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
Line 120: Line 178:
Determine which of these RWL indications are valid and report the corrected RWL for all valid RWL instrumentation.
Determine which of these RWL indications are valid and report the corrected RWL for all valid RWL instrumentation.


2012-301 ADMIN-2 Page 3 of 9 STEP             PERFORMANCE STEP                                     STANDARD I   (COMMENTS)
2012-301 ADMIN-2 Page 3 of 9 STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
For INITIAL Operator Programs:
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                 THEN U   Human performance tools, safety, PPE met (1), AND         U   Mark the JPM as a PASS U   For initial trg all steps completed correctly OR PASS       U   For continuing trg, critical steps (if used) completed correctly FAIL       U   Above standards not met                                   U   Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expect ations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be selfcorrected provided the action would not have resulted in significant actual or potential consequences.  
IF THEN U
Human performance tools, safety, PPE met (1), AND U
Mark the JPM as a PASS U
For initial trg all steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly FAIL U
Above standards not met U
Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be selfcorrected provided the action would not have resulted in significant actual or potential consequences.  


==Reference:==
==Reference:==
NMP-TR-1 11, On-TheJob Training and Task Performance Evaluation.
NMP-TR-1 11, On-TheJob Training and Task Performance Evaluation.
START TIME:________
START TIME:________
: 1. Operator identifies the procedure                   Operator has identified the correct needed to perform the task,                       procedure as 34AB-B21-002-1.
1.
Operator identifies the procedure Operator has identified the correct needed to perform the task, procedure as 34AB-B21-002-1.
NOTE: If the operator (STA) indicates that SPDS would be checked, give the operator Supplement 1.
NOTE: If the operator (STA) indicates that SPDS would be checked, give the operator Supplement 1.
PROMPT:         IF the operator addresses Drywell temperature indications, INDICATE for the operator that temperature is greater than 150°F (Use Supplement I if SPDS is addressed).
PROMPT:
: 2. Determine if RWL corrections are                   Using SPDS (or Drywell temp required.                                         indications) the operator DETERMINES:
IF the operator addresses Drywell temperature indications, INDICATE for the operator that temperature is greater than 150°F (Use Supplement I if SPDS is addressed).
2.
Determine if RWL corrections are Using SPDS (or Drywell temp required.
indications) the operator DETERMINES:
Drywell temperature is greater than 150°F.
Drywell temperature is greater than 150°F.
RWL corrections ARE required.
RWL corrections ARE required.
: 3. Review Caution 1 and Caution 2 on                   The operator has REVIEWED Attachment I of 34AB-B21-002-1.                   Caution 1 and Caution 2 on Attachment 1 of 34AB-B21-002-l.
3.
Review Caution 1 and Caution 2 on The operator has REVIEWED Attachment I of 34AB-B21-002-1.
Caution 1 and Caution 2 on of 34AB-B21-002-l.
(*
(*
* Indicates critical step)
* Indicates critical step)


2012-301 ADMIN-2 Page 4 of 9 STEP I
2012-301 ADMIN-2 Page 4 of 9 STEP PERFORMANCE STEP STANDARD I
 
(COMMENTSH PROMPT:
PERFORMANCE STEP                               STANDARD (COMMENTSH PROMPT:         IF the operator addresses instrument behavior, as the board operator, INFORM the operator that NO erratic behavior for the specified instruments has been observed.
IF the operator addresses instrument behavior, as the board operator, INFORM the operator that NO erratic behavior for the specified instruments has been observed.
: 4. Confirm there is no indication of         The operator has VERIFIED, by erratic instrument behavior,               observation or by addressing the panel operator, that the following RWL instruments show NO erratic instrument behavior:
4.
Confirm there is no indication of The operator has VERIFIED, by erratic instrument behavior, observation or by addressing the panel operator, that the following RWL instruments show NO erratic instrument behavior:
1B21-R604A 1B21-R604B 1B21-R623A (Wide Range) 1B21-R623B (Wide Range) 1B21-R623A (Fuel Zone)
1B21-R604A 1B21-R604B 1B21-R623A (Wide Range) 1B21-R623B (Wide Range) 1B21-R623A (Fuel Zone)
PROMPT:         WHEN the operator indicates use of the Diagnostic screen of SPDS, GIVE the operator Supplement 2.
PROMPT:
: 5. Determine highest temperature for           At SPDS panel, the operator has RTD Group I and 2 (Maximum Run             DETERMINED the following Temperature).                             Maximum Run Temperatures:
WHEN the operator indicates use of the Diagnostic screen of SPDS, GIVE the operator Supplement 2.
RTD Group I   - 260°F RTD Group 2 257°F PROMPT:         IF the operator addresses temperature indications on Panels P654 and P657; indications can be SIMULATED using the values from Supplement 2.
5.
Indicates critical step)
Determine highest temperature for At SPDS panel, the operator has RTD Group I and 2 (Maximum Run DETERMINED the following Temperature).
Maximum Run Temperatures:
RTD Group I
- 260°F RTD Group 2 - 257°F PROMPT:
IF the operator addresses temperature indications on Panels P654 and P657; indications can be SIMULATED using the values from Supplement 2.
* Indicates critical step)


2012-301 ADMIN-2 Page 5 of 9 STEP           PERFORMANCE STEP                             STANDARD I   (COMMENTS)     1
2012-301 ADMIN-2 Page 5 of 9 STEP PERFORMANCE STEP STANDARD I
      **6. Determine if the RWL instrument may The operator has DETERMINED be used by comparing the Minimum         the following RWL instruments Indicated Level for the associated       are VALID:
(COMMENTS)1
**6.
Determine if the RWL instrument may The operator has DETERMINED be used by comparing the Minimum the following RWL instruments Indicated Level for the associated are VALID:
Maximum Run Temperature.
Maximum Run Temperature.
1B2l-R604A 1B21-R604B 1B21-R623A (Wide Range)
1B2l-R604A 1B21-R604B 1B21-R623A (Wide Range)
I B21-R623B (Wide Range) 1B21-R623A (Fuel Zone) 1B21-R623B (Fuel Zone)
I B21-R623B (Wide Range) 1B21-R623A (Fuel Zone) 1B21-R623B (Fuel Zone)
      **7 Determine corrected Fuel Zone Level       Using Attachment 3 of (1B21-R623A).                           34AB-B2 1-002-1, the operator has DETERMINED Corrected Level for 1B21-R623A (fuel zone) is -137 inches (accept +/-1 inch).
**7 Determine corrected Fuel Zone Level Using Attachment 3 of (1B21-R623A).
PROMPT:         IF the Operator informs you that the Wide Range Instruments are not the preferred RWL Instruments for the current RWL, ACKNOWLEDGE and INFORM the Operator to continue with the RWL corrections.
34AB-B2 1-002-1, the operator has DETERMINED Corrected Level for 1B21-R623A (fuel zone) is -137 inches (accept +/-1 inch).
      **8. Determine Drywell Temperature             Using Attachment 4 of Correction Factor for instruments       34AB-B21-002-1, the operator 1B21-R604A and 1B21-R623A               has DETERMINED the (Wide Range).                           Correction Factor is 8 inches (accept +/-1 inch) for instruments 1B21-R604A and 1B21-R623A (Wide Range).
PROMPT:
      **9* Determine Drywell Temperature             Using Attachment 4 of Correction Factor for instruments       34AB-B21-002-1, the operator 1B21-R604B and 1B21-R623B               has DETERMINED the (Wide Range).                           Correction Factor is 8 inches (accept +/-1 inch) for instruments 1B21-R604B and 1B21-R623B (Wide Range).
IF the Operator informs you that the Wide Range Instruments are not the preferred RWL Instruments for the current RWL, ACKNOWLEDGE and INFORM the Operator to continue with the RWL corrections.
**8.
Determine Drywell Temperature Using Attachment 4 of Correction Factor for instruments 34AB-B21-002-1, the operator 1B21-R604A and 1B21-R623A has DETERMINED the (Wide Range).
Correction Factor is 8 inches (accept +/-1 inch) for instruments 1B21-R604A and 1B21-R623A (Wide Range).
**9*
Determine Drywell Temperature Using Attachment 4 of Correction Factor for instruments 34AB-B21-002-1, the operator 1B21-R604B and 1B21-R623B has DETERMINED the (Wide Range).
Correction Factor is 8 inches (accept +/-1 inch) for instruments 1B21-R604B and 1B21-R623B (Wide Range).
(** Indicates critical step)
(** Indicates critical step)


2012-301 ADMIN-2 Page 6 of 9 STEP I         PERFORMANCE STEP                                                      SAT/UNSAT
2012-301 ADMIN-2 Page 6 of 9 STEP I
    #  j                                         I            STANDARD (COMMENTS)       1
 
    **IO. Determine corrected RWL for the           The operator has DETERMINED following Wide Range instruments:         the corrected level for the 1 B21 -R604A                             following Wide Range instruments:
SAT/UNSAT PERFORMANCE STEP I
1B21-R623A (Wide Range) 1B21-R604A is -133 inches (+/-1) 1B21 -R60413 1B21-R623A (Wide Range) is 1B21-R623B (Wide Range)                   -133 inches (+/-1) 1B21-R604B is -135 inches (+/-1) 1B21-R623B (Wide Range) is
STANDARD j
                                                    -135 inches (+/-1)
(COMMENTS) 1
**IO.
Determine corrected RWL for the The operator has DETERMINED following Wide Range instruments:
the corrected level for the following Wide Range 1 B21 -R604A instruments:
1B21-R623A (Wide Range) 1B21-R604A is -133 inches (+/-1) 1B21 -R60413 1B21-R623A (Wide Range) is 1B21-R623B (Wide Range)
-133 inches (+/-1) 1B21-R604B is -135 inches (+/-1) 1B21-R623B (Wide Range) is
-135 inches (+/-1)
NOTE: Acceptance +/-1 inch for each corrected level.
NOTE: Acceptance +/-1 inch for each corrected level.
END TIME:
END TIME:
NOTE:     The terminating cue shall be given to the Operator when:
NOTE:
The terminating cue shall be given to the Operator when:
 
After JPM step #10 is complete.
After JPM step #10 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
TERMINATING CUE:
EVALUATOR       PICK UP the Initiating Cue sheet.
We will stop here.
EVALUATOR PICK UP the Initiating Cue sheet.
( Indicates critical step)
( Indicates critical step)


Page 7 of 9 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
Page 7 of 9 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. The Reactor has scrammed and the board operator has reported the following UNCOMPENSATED Reactor Water Levels:
1.
The Reactor has scrammed and the board operator has reported the following UNCOMPENSATED Reactor Water Levels:
1B21-R604A and 1B21-R623A (Wide Range) is -125 inches.
1B21-R604A and 1B21-R623A (Wide Range) is -125 inches.
1B21-R604B and 1B21-R623B (Wide Range) is -127 inches.
1B21-R604B and 1B21-R623B (Wide Range) is -127 inches.
Line 183: Line 280:
Determine which of these RWL indications are valid and report the corrected RWL for all valid RWL instrumentation.
Determine which of these RWL indications are valid and report the corrected RWL for all valid RWL instrumentation.


fl 0
SRM I
MODE: RUN                         VENT HNP1  I      I  jtCilcc POWER 125                                 HNP2  I      I  iCiJcc 100W         %                    STACK              jiCi/cc 75.
I0UTI cPS SECONDARY HNP1I___
SRM                            ISOLATION 50*
HNP2I I
25       I     I0UTI                      PRIMARY cPS 0-                                  nIALL         2A 2B IALL      2C2D2E N                              I SEC 180                            IALL SECONDARY HNP1I___
MODE: RUN 0
PSIG 90                  270    y3,{IJ HNP2I      I 0
POWER 125 100W 75.
50*
25 0-fl jtCilcc iCiJcc jiCi/cc VENT HNP1 I
I HNP2 I
I STACK N
180 ISOLATION PRIMARY nIALL IALL 90 I
2A 2B 2C2D2E SEC IALL 270 PSIG y3,{IJ 0
SUPPLEMENT 1
SUPPLEMENT 1


_l__ .
_l__
DRYWELL TEMPERATURE DIAGNOSTIC VOLUMETRIC AVG. TEMP  12201 DEG. F NOO1A             NOD 1K N002 N003 NOO4 NOO7                    NOO1J NOD1B                    NOD1M NOO1L                    N008 NOO5 SUPPLEMENT 2
DRYWELL TEMPERATURE NOO4 NOO7 NOD1B NOO1L NOO5 DIAGNOSTIC VOLUMETRIC 12201 DEG. F AVG.
TEMP NOO1J NOD1M N008 NOO1A NOD 1K N002 N003 SUPPLEMENT 2


DRAFT Southern Nuclear K I. Hatch Nuclear Plant Operations Training JPM ADMIN 3 RO ONLY TITLE Determine if plant conditions allow a Quick Restart of a Recirculation Pump.
DRAFT Southern Nuclear K I. Hatch Nuclear Plant Operations Training JPM ADMIN 3 RO ONLY SOUTHERN COMPANY TITLE Anthony Ball Determine if plant conditions allow a Quick Restart of a Recirculation Pump.
AUTHOR                           MEDIA NUMBER                     TIME Anthony Ball                      2012-301 ADMIN-3                 15 Minutes RECOMMENDED BY                   APPROVED BY                     DATE NR SOUTHERN COMPANY
AUTHOR MEDIA NUMBER TIME 2012-301 ADMIN-3 15 Minutes RECOMMENDED BY APPROVED BY DATE NR


SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                               Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:     OPERATIONS TRAINING             Media Number: 2012-301 ADMIN-3 Rev. No. Date                   Reason for Revision               Authors     Supvs I                                                   Initials     Initials 00                 Modified from LR-JP-25050 & will become new       ARB LR-JP-25053 after NRC Exam.
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number:
2012-301 ADMIN-3 Rev. No.
Date Reason for Revision Authors Supvs I
Initials Initials 00 Modified from LR-JP-25050 & will become new LR-JP-25053 after NRC Exam.
ARB


2012-301 ADMTN-3 Page 2 of 10 UNIT 1     (X)   UNIT 2     ()
2012-301 ADMTN-3 Page 2 of 10 UNIT 1 (X)
TASK TITLE:         Determine if plant conditions allow a Quick Restart of a Recirculation Pump.
UNIT 2
3PM NUMBER:         2012-301 ADMIN-3 TASK STANDARD:       The task shall be complete when it has been determined that the requirements of 34S0-B31-001-1, Reactor Recirculation System have NOT been met to start a Reactor Recirculation pump.
()
TASK NUMBER:         004.002 OBJECTIVE NUMBER:   004.002.A K/A CATALOG NUMBER: Generic 2.1 .20/Generic 2.1.32 K/A CATALOG JTA IMPORTANCE RATING:
TASK TITLE:
RO   4.3/3.4 SRO 4.2/3.8 OPERATOR APPLICABILITY:     Nuclear Plant Operator (NPO)/Senior Reactor Operator (SRO)
Determine if plant conditions allow a Quick Restart of a Recirculation Pump.
3PM NUMBER:
2012-301 ADMIN-3 TASK STANDARD:
The task shall be complete when it has been determined that the requirements of 34S0-B31-001-1, Reactor Recirculation System have NOT been met to start a Reactor Recirculation pump.
TASK NUMBER:
004.002 OBJECTIVE NUMBER:
004.002.A K/A CATALOG NUMBER: Generic 2.1.20/Generic 2.1.32 K/A CATALOG JTA IMPORTANCE RATING:
RO 4.3/3.4 SRO 4.2/3.8 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO)/Senior Reactor Operator (SRO)
* GENERAL  
* GENERAL  


==REFERENCES:==
==REFERENCES:==
Unit 1 34S0-B3 1 -OPS-00 1-1 (Current Version)
Unit 1 34S0-B3 1 -OPS-00 1-1 (Current Version)
REQUIRED MATERIALS:     Unit 1 3400-OPS-001-1 (Current Revision)
REQUIRED MATERIALS:
APPROXIMATE COMPLETION TIME:           15 Minutes SIMULATOR SETUP:   N/A, Used for NRC Adrnin JPM (classroom setting)
Unit 1 3400-OPS-001-1 (Current Revision)
APPROXIMATE COMPLETION TIME:
15 Minutes SIMULATOR SETUP:
N/A, Used for NRC Adrnin JPM (classroom setting)


2012-301 ADMIN-3 Page 3 of 10 EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
2012-301 ADMIN-3 Page 3 of 10 EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. 10 minutes ago, the Unit 1 reactor scrammed from 100% power.
1.
: 2. Both Reactor Recirculation pumps tripped during the scram transient.
10 minutes ago, the Unit 1 reactor scrammed from 100% power.
: 3. Reactor water level went as low as 10 inches and has been restored to
2.
              +37 inches using Reactor Feedwater Pumps.
Both Reactor Recirculation pumps tripped during the scram transient.
: 4. HPCI and RCIC were not required during the transient and have remained in standby.
3.
: 5. RWCU is in service.
Reactor water level went as low as 10 inches and has been restored to
: 6. The Shift Supervisor has given direction to perform a Quick Restart of the 1B Reactor Recirculation pump to prevent thermal stratification.
+37 inches using Reactor Feedwater Pumps.
: 7. An operator has entered 34S0-B31-001-1, Reactor Recirculation System and completed steps 7.1.4.2.1 through 7.1.4.2.5 (Recirc Pump B Quick Re-start).
4.
: 8. Data collection began 4 minutes ago and the operator has completed gathering plant data for use with step 7.1.4.2.6 of 34S0-B31-001-l.
HPCI and RCIC were not required during the transient and have remained in standby.
5.
RWCU is in service.
6.
The Shift Supervisor has given direction to perform a Quick Restart of the 1B Reactor Recirculation pump to prevent thermal stratification.
7.
An operator has entered 34S0-B31-001-1, Reactor Recirculation System and completed steps 7.1.4.2.1 through 7.1.4.2.5 (Recirc Pump B Quick Re-start).
8.
Data collection began 4 minutes ago and the operator has completed gathering plant data for use with step 7.1.4.2.6 of 34S0-B31-001-l.
INITIATING CUES:
INITIATING CUES:
Determine if plant conditions meet the procedural requirements for Quick starting the 1B Reactor Recirculation pump per step 7.1.4.2.6 of 34S0-B3 1-001 -1, Reactor Recirculation System.
Determine if plant conditions meet the procedural requirements for Quick starting the 1B Reactor Recirculation pump per step 7.1.4.2.6 of 34S0-B3 1-001 -1, Reactor Recirculation System.


2012-301 ADMIN-3 Page4of 10 STEP             PERFORMANCE STEP                                     STANDARD I   (COMMENTS)
2012-301 ADMIN-3 Page4of 10 STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
 
For INITIAL Operator Programs:
For INITIAL Operator Programs:
For OJTIO.JE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For OJTIO.JE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                                 THEN U   Human performance tools, safety, PPE met (1), AND           U Mark the JPM as a PASS U   For initial trg aN steps completed correctly OR PASS       U   For continuing trg, critical steps (if used) completed correctly FAIL       Li Above standards not met                                     U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  
IF THEN U
Human performance tools, safety, PPE met (1), AND U
Mark the JPM as a PASS U
For initial trg aN steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met U
Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  


==Reference:==
==Reference:==
Line 234: Line 369:
NOTE: 34S0-B31-OO1-1, Attachment 6 serves as an answer key for this JPM. It is NOT to be provided to the student.
NOTE: 34S0-B31-OO1-1, Attachment 6 serves as an answer key for this JPM. It is NOT to be provided to the student.
NOTE: At this time, provide the operator with Attachment 1 (Plant Data page) and a copy of 34S0-B31-001-1.
NOTE: At this time, provide the operator with Attachment 1 (Plant Data page) and a copy of 34S0-B31-001-1.
PROMPT:         IF addressed by the operator, INFORM the operator that the ASD is NOT in local control.
PROMPT:
: 1. Operator refers to step 7.1.4.2.6 and is           Step 7.1.4.2.6 directed to Attachment 6 of 34SO-B31-001-1.
IF addressed by the operator, INFORM the operator that the ASD is NOT in local control.
: 2. Operator selects B Recirc Pump.                 Places a check mark next to B Recirc. Att. 6 Step 1.0
1.
: 3. The operator enters the current time.               Records current time.
Operator refers to step 7.1.4.2.6 and is Step 7.1.4.2.6 directed to Attachment 6 of 34SO-B31-001-1.
2.
Operator selects B Recirc Pump.
Places a check mark next to B Recirc. Att. 6 Step 1.0 3.
The operator enters the current time.
Records current time.
Att. 6 Step 2.0
Att. 6 Step 2.0
      **4, The operator determines RPV                         Tsat = 521° F (+/-2° F) saturation temperature.                           Att. 6 Step 2.0 (A)
**4, The operator determines RPV Tsat = 521° F (+/-2° F) saturation temperature.
( Indicates critical step)
Att. 6 Step 2.0 (A)
(
Indicates critical step)


2012-301 ADMIN-3 Page 5 of 10 STEP
2012-301 ADMIN-3 Page 5 of 10 STEP PERFORMANCE STEP STANDARD I
 
(COMMENTS) 1 NOTE: Data is NOT required to be filled in for the 1 A Recirc Pump in the following step.
PERFORMANCE STEP                               STANDARD I   (COMMENTS)       1 NOTE: Data is NOT required to be filled in for the 1 A Recirc Pump in the following step.
5.
: 5. The Operator enters suction                 Recirc 1A: 470° F temperature for Recirculation Pumps.       Recirc 1B: 475° F (Att. 6 Step 2.0 (A) & (B))
The Operator enters suction Recirc 1A: 470° F temperature for Recirculation Pumps.
: 6. The operator enters the bottom head         Bottom head temperature: 365° F temperature.                               (Att. 6 Step 2.0 (D))
Recirc 1B: 475° F (Att. 6 Step 2.0 (A) & (B))
: 7. The operator calculates the At between At = (5210 F 475° F) = 46° F the IB ioop and the RPV.                 (+/-2° F) (Att. 6 Step 1.2.1)
6.
      **8. The operator determines the At               At of 46&deg; F (+/-2&deg; F) is < 50&deg; F between the 1B loop and the RPV           (Att. 6 Step 3.1)
The operator enters the bottom head Bottom head temperature: 365&deg; F temperature.
(Att. 6 Step 2.0 (D))
7.
The operator calculates the At between At = (5210 F
- 475&deg; F) = 46&deg; F the IB ioop and the RPV.
(+/-2&deg; F) (Att. 6 Step 1.2.1)
**8.
The operator determines the At At of 46&deg; F (+/-2&deg; F) is < 50&deg; F between the 1B loop and the RPV (Att. 6 Step 3.1)
IS acceptable.
IS acceptable.
NOTE: The student should NOT use step 4.2 to perform the following confirmation of plant conditions due to the NOTE that precedes step 4.0 (RWCU is in service). If the operator does refer to step 4.2, the check will NOT be acceptable due to Feedwater temperature < 300&deg; F.
NOTE: The student should NOT use step 4.2 to perform the following confirmation of plant conditions due to the NOTE that precedes step 4.0 (RWCU is in service). If the operator does refer to step 4.2, the check will NOT be acceptable due to Feedwater temperature < 300&deg; F.
      **9* The operator calculates the At between At = (521&deg; F 365&deg; F) = 156&deg; F bottom head and steam dome.                 (+/-2&deg; F) (Att. 6 Step 4.1)
**9*
    **1O. The operator determines that the At         At of 142&deg; F (+/-2&deg; F) is < 145&deg; F between bottom head and steam dome (Att. 6 Step 4.1)
The operator calculates the At between At = (521&deg; F - 365&deg; F) = 156&deg; F bottom head and steam dome.
(+/-2&deg; F) (Att. 6 Step 4.1)
**1O.
The operator determines that the At At of 142&deg; F (+/-2&deg; F) is < 145&deg; F between bottom head and steam dome (Att. 6 Step 4.1)
IS acceptable.
IS acceptable.
: 11. The operator reports to the Shift           Plant conditions ARE acceptable Supervisor,                                 for starting the 1B Reactor Recirculation pump.
11.
The operator reports to the Shift Plant conditions ARE acceptable Supervisor, for starting the 1B Reactor Recirculation pump.
NOTE: Step 4.2 is NOT required to be performed (it is an alternate method). If the student chooses to perform step 4.2, the conditions will NOT allow the start of the Recirc Pump (FW temp <300 F). The following information is expected to be determined by the student (see Attachment for details):
NOTE: Step 4.2 is NOT required to be performed (it is an alternate method). If the student chooses to perform step 4.2, the conditions will NOT allow the start of the Recirc Pump (FW temp <300 F). The following information is expected to be determined by the student (see Attachment for details):
(a)   is met (>40% of rated flow prior to the RPT).
(a) is met (>40% of rated flow prior to the RPT).
(b)   is met (HPCI and RCIC have not injected since the RPT)
(b) is met (HPCI and RCIC have not injected since the RPT)
(c)   is NOT met (FW temp is not >300 F since the RPT) is met (<30 minutes since trip) and start time (calculated time to start is required to be 30 minutes from the RPT time)
(c) is NOT met (FW temp is not >300 F since the RPT) is met (<30 minutes since trip) and start time (calculated time to start is required to be 30 minutes from the RPT time)
* Indicates critical step)
* Indicates critical step)


2012-301 ADMIN-3 Page 6 of 10 STEP PROMPT:
2012-301 ADMIN-3 Page 6 of 10 STEP PERFORMANCE STEP STANDARD I
PERFORMANCE STEP                               STANDARD I   (COMMENTS)
(COMMENTS)
PROMPT:
IF addressed by the operator, as the STA, INFORM the operator that power/flow map conditions are acceptable for starting the Recirc Pump.
IF addressed by the operator, as the STA, INFORM the operator that power/flow map conditions are acceptable for starting the Recirc Pump.
PROMPT:         IF addressed by the operator, as the Shift Supervisor, INFORM the operator that another operator will verify his calculations.
PROMPT:
IF addressed by the operator, as the Shift Supervisor, INFORM the operator that another operator will verify his calculations.
END TIME:________
END TIME:________
NOTE:       The terminating cue shall be given to the operator when:
NOTE:
The terminating cue shall be given to the operator when:
 
After JPM step #11 is complete.
After JPM step #11 is complete.
With no reasonable progress, the operator exceeds double the allotted time.
With no reasonable progress, the operator exceeds double the allotted time.
Operator states the task is complete.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
TERMINATING CUE:
EVALUATOR         PICK UP the Initiating Cue sheet.
We will stop here.
EVALUATOR PICK UP the Initiating Cue sheet.
( Indicates critical step)
( Indicates critical step)


ti rj-i j.       j. jj]- j 103 UI LUO DOCUMENT TITLE:                                                 DOCUMENT NUMBER:             VERSION No:
ti rj-i j.
REACTOR RECIRCULATION SYSTEM                               34S0-B31-001-1               41.1 ATTACHMENT                                               Attachment Page TITLE:     RECJRC PUMP QUICK RE-START LIMIT CHECKS                                             2 of 4 E9UIEI NOTE: This attachment may be performed in Modes 1, 2, AND 3.
: j. jj]- j 103 UI LUO DOCUMENT TITLE:
[
DOCUMENT NUMBER:
1 1.0     Recirc Loop and RPV Limit Checks:                           EVALUATOR USE ONLY (KEY)
VERSION No:
Pre-startup checks for (v):               A recirc         DO NOT give to candidate B recirc 2.0     Record the foHowing data: Time           CURRENT TIME                     APPLICANTS INITIALS Parameter                         Location                     Value (A)      RPV Saturation Temp.              SPDS MISC RPV Heatup/
REACTOR RECIRCULATION SYSTEM 34S0-B31-001-1 41.1 ATTACHMENT Attachment Page TITLE:
Cooldown OR Steam Tables                               (A) 521&deg;F (+/-2&deg;F) 1B31-R650 OR Equivalent, (B)    A Recirc Suction Temp            average of process computer                            (B) points B034, B035                  470&deg;F 1B3 l-R650 OR Equivalent, (C)    B Recirc Suction Temp            average of process computer                            (C) points B036, B037                475&deg;F (D)    *Vessel Bottom Head Drain              *1B21R606 Pt 3 OR 1G31-N601 Pt5                    *379&deg;F          (D)
RECJRC PUMP QUICK RE-START LIMIT CHECKS 2 of 4 E9UIEI
The Bottom Head Drain temperature (D) may still be used even IF RWCU is NOT in service.
[NOTE:
This attachment may be performed in Modes 1, 2, AND 3.
1 1.0 Recirc Loop and RPV Limit Checks:
Pre-startup checks for (v):
A recirc B recirc 2.0 Record the foHowing data: Time CURRENT TIME APPLICANTS INITIALS Parameter Location Value SPDS MISC RPV Heatup/
Cooldown OR Steam Tables
* The Bottom Head Drain temperature (D) may still be used even IF RWCU is NOT in service.
(See Limitation 5.2.14). IF Bottom Head Drain temperature is NOT available, (i.e., inoperable),
(See Limitation 5.2.14). IF Bottom Head Drain temperature is NOT available, (i.e., inoperable),
THEN use the alternate method of confirming the Bottom Head to Coolant z\T in step 4.0.
THEN use the alternate method of confirming the Bottom Head to Coolant z\\T in step 4.0.
Critical 3.0      FOR the Recirc loop to be started, confirm the AT between the reactor coolant temperature in the loop AND the RPV coolant temperature is 50&deg;F by performing step3.1 OR 3.2 below:
FOR the Recirc loop to be started, confirm the AT between the reactor coolant temperature in the loop AND the RPV coolant temperature is 50&deg;F by performing step3.1 OR 3.2 below:
3.1       IF both recirc loops are idle; Loop A AT = 1(A) (B) =
3.1 IF both recirc loops are idle; Loop A AT = 1(A)
(acceptable   50&deg;F)                       NA OR Loop B AT = 1(A) (C) I =
- (B)
                                      -          46&deg;F (+/-2&deg;F) (acceptable     50&deg;F)                 INITIALS Qi   *..................e..............e..........
=
3.2         IF only one recirc loop is idle, THEN loop AT = 1(B) (C) I =
(acceptable 50&deg;F)
(acceptable 50&deg;F)                 NA OPS-1321 Ver. N/A                               G16.030 rrn     
OR Loop B AT = 1(A)
- (C) I
=
46&deg;F (+/-2&deg;F) (acceptable 50&deg;F)
INITIALS
..................................... Qi *..................e..............e..........
3.2 IF only one recirc loop is idle, THEN loop AT = 1(B)
- (C) I
=
(acceptable 50&deg;F)
NA OPS-1321 Ver. N/A EVALUATOR USE ONLY (KEY)
DO NOT give to candidate RPV Saturation Temp.
(A)
(B)
(C)
(D) 521&deg;F (+/-2&deg;F)
(A) 1B31-R650 OR Equivalent, A Recirc Suction Temp average of process computer 470&deg;F (B) points B034, B035 1B3 l-R650 OR Equivalent, B Recirc Suction Temp average of process computer 475&deg;F (C) points B036, B037
*1B21R606 Pt 3 OR
*Vessel Bottom Head Drain (D) 1G31-N601 Pt5
*379&deg;F Critical 3.0 NA rrn
 
G16.030


SNC PLANT E. I. HATCH I                                                                       Pg 184 of 208 DOCUMENT TITLE:                                                 DOCUMENT NUMBER:               VERSION No:
SNC PLANT E. I. HATCH I Confirm the iT between the bottom head coolant temperature AND the reactor pressure vessel (RPV) coolant temperature is 145&deg;F by performing step 4.1 OR 4.2 below:
REACTOR RECWCULATION SYSThM                               34S0-B31-001-1                   41.1
z\\T = 1(A)
(                                       ATfACHMENT 6                                           Attachment Page iLE:     RECIRC PUMP QUICK RE-START LIMIT CHECKS                                               4 of 4 F NOTE:
- (D)
= 142&deg; F (+/-2&deg;F) (acceptable 145&deg;F)
Pg 184 of 208
**************************************.B *.............................................
4.2 Per Tech Spec BASES B.3.4.9, confirm ALL of the following:
(a)
One Q!E more loop drive flows were > 40% (18,000 gpm) of rated flow prior to the RPT, AND NA TRUE (b)
HPCI and RCIC Systems have NOT injected since the RPT, AND NA TRUE (c)
Feedwater temperature has remained > 300&deg;F since the RPT, AND NOT CORRECT (d)
Time between the RPT AND restart is <30 minutes.
These are calculated by the student, based on JPM start time. The time will vary.
Record Recirc RPT trip time:
(Ti)
Recirc start is required prior to:
(Ti) + 30 minutes =
IF only ONE Recirc pump is idle, THEN confirm the operating pump loop flow is <22,500 gpm.
NA Critical 6.0 Confirm the:
(1)
Power/flow condition is acceptable for restart per the STA/Rx Engineering.
INITIALS OR (2)
IF the OPRM System is inoperable, the reactor is 10% below the 61% Load Line of Attachment 1, OPRM System INOP Power vs. Flow map in 34AB-C51-001-1, in order to avoid inadvertent entry into the RPI.
INITIALS DOCUMENT TITLE:
DOCUMENT NUMBER:
VERSION No:
REACTOR RECWCULATION SYSThM 34S0-B31-001-1 41.1
(
ATfACHMENT 6 Attachment Page iLE:
RECIRC PUMP QUICK RE-START LIMIT CHECKS 4 of 4 F
IF a direct indication is NOT available for Vessel Bottom Head Drain temp (D),
IF a direct indication is NOT available for Vessel Bottom Head Drain temp (D),
NOTE:
THEN within 30 minutes of an RPT, the bottom head to coolant zT ( 145&deg;F) may be confirmed per the alternate method in step 4.2.
THEN within 30 minutes of an RPT, the bottom head to coolant zT ( 145&deg;F) may be confirmed per the alternate method in step 4.2.
Critical 4.0     Confirm the iT between the bottom head coolant temperature AND the reactor pressure vessel (RPV) coolant temperature is 145&deg;F by performing step 4.1 OR 4.2 below:
Critical 4.0 4.1 INITIALS Critical 5.0 EVALUATOR USE ONLY (KE
4.1        z\T =  1(A) (D) = 142&deg; F (+/-2&deg;F) (acceptable 145&deg;F)
)
INITIALS
DO NOT give to candidate INITIALS OPS-1321 Ver. N/A G16.030 MGR-0009 Ver. 5
        ************************************** .B *.............................................
4.2        Per Tech Spec BASES B.3.4.9, confirm ALL of the following:
(a)    One Q!E more loop drive flows were    > 40% (18,000 gpm) of rated flow prior to the RPT, AND                                                          NA TRUE (b)    HPCI and RCIC Systems have NOT injected since the RPT, AND                    NA TRUE (c)    Feedwater temperature has remained > 300&deg;F since the RPT, AND          NOT CORRECT (d) Time between the RPT AND restart is <30 minutes.
These are calculated by the student, based on JPM start time. The time will vary.
Record Recirc RPT trip time:                          (Ti)
Recirc start is required prior to:
30 minutes EVALUATOR USE ONLY (Ti) +              =                                                          INITIALS (KE )
Critical DO NOT give to candidate 5.0    IF only ONE Recirc pump is idle, THEN confirm the operating pump loop flow is <22,500 gpm.                                          NA Critical 6.0    Confirm the:
(1)      Power/flow condition is acceptable for restart per the STA/Rx Engineering.        INITIALS OR (2)      IF the OPRM System is inoperable, the reactor is 10% below the 61% Load Line of Attachment 1, OPRM System INOP Power vs. Flow map in 34AB-C51-001-1, in order to avoid inadvertent entry into the RPI.                                INITIALS OPS-1321 Ver. N/A                                 G16.030 MGR-0009 Ver. 5


SNC PLANT E. I. HATCH I Pg 185 of 208 DOCUMENT TITLE:                                          DOCUMENT NUMBER:
SNC PLANT E. I. HATCH I 7.0 Independently verify the data recorded above is ACCEPTABLE prior to proceeding with the recirc pump start.
REACTOR RECIRCULATION SYSTEM                                            VERSION No:
Critical Pg 185 of 208 (VERIFIED)
34S0-B31-001-1            41.1 ATFACHMENT                                    Attachment Page iLE:    RECIRC PUMP QUICK RE-START LIMIT CHECKS 4 of 4 7.0     Independently verify the data recorded above is ACCEPTAB LE prior to proceeding with the recirc pump start.
INITIALS 8.0 Confirm the steps 1.0 thru 7.0 above, was performed within the ast 15 minutes.
(VERIFIED) INITIALS Critical 8.0     Confirm the steps 1.0 thru 7.0 above, was performed within the ast 15 minutes.
9.0 Record Recirc pump start time:
INITIALS 9.0     Record Recirc pump start time:
OPS-1321 Ver. N/A G16.030 INITIALS INITIALS DOCUMENT TITLE:
INITIALS EVALUATOR USE ONLY (KEY)
DOCUMENT NUMBER:
DO NOT give to candidate OPS-1321 Ver. N/A                            G16.030 MGR-0009 Ver. 5
VERSION No:
REACTOR RECIRCULATION SYSTEM 34S0-B31-001-1 41.1 ATFACHMENT Attachment Page iLE:
RECIRC PUMP QUICK RE-START LIMIT CHECKS 4 of 4 EVALUATOR USE ONLY (KEY)
DO NOT give to candidate MGR-0009 Ver. 5


Page 10 of 11 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
Page 10 of 11 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. 10 minutes ago, the Unit 1 reactor scrammed from 100% power.
1.
: 2. Both Reactor Recirculation pumps tripped during the scram transient.
10 minutes ago, the Unit 1 reactor scrammed from 100% power.
: 3. Reactor water level went as low as 10 inches and has been restored to
2.
              +37 inches using Reactor Feedwater Pumps.
Both Reactor Recirculation pumps tripped during the scram transient.
: 4. HPCI and RCIC were not required during the transient and have remain ed in standby.
3.
: 5. RWCU is in service.
Reactor water level went as low as 10 inches and has been restored to
: 6. The Shift Supervisor has given direction to perform a Quick Restart of the 1B Reactor Recirculation pump to prevent thermal stratification.
+37 inches using Reactor Feedwater Pumps.
: 7. An operator has entered 34S0-B31-001-1, Reactor Recirculation System and completed steps 7.1.3.1 through 7.1.3.9 (Recirc Pump A(B)
4.
HPCI and RCIC were not required during the transient and have remained in standby.
5.
RWCU is in service.
6.
The Shift Supervisor has given direction to perform a Quick Restart of the 1B Reactor Recirculation pump to prevent thermal stratification.
7.
An operator has entered 34S0-B31-001-1, Reactor Recirculation System and completed steps 7.1.3.1 through 7.1.3.9 (Recirc Pump A(B)
Quick Restart).
Quick Restart).
: 8. Data collection began 4 minutes ago and the operator has completed gathering plant data for use with step 7.1.3.10 of 34S0-B31-00l-l.
8.
Data collection began 4 minutes ago and the operator has completed gathering plant data for use with step 7.1.3.10 of 34S0-B31-00l-l.
INITIATING CUES:
INITIATING CUES:
Determine if plant conditions meet the procedural requirements for starting the 1B Reactor Recirculation pump per step 7.1.4.2.6 of 34S0-B3 1-001-1, Reactor Recirculation System.
Determine if plant conditions meet the procedural requirements for starting the 1B Reactor Recirculation pump per step 7.1.4.2.6 of 34S0-B3 1-001-1, Reactor Recirculation System.


Page ii of ii PROVIDE TO APPLICANT 1
Page ii of ii PROVIDE TO APPLICANT 1 Plant Data Reactor pressure: 805 psig A Recirc Suction Temp (1B31-R650): 4700 F B Recirc Suction Temp (1B31-R650):
Plant Data
4750 Vessel Bottom Head Drain (1B21-R606 Pt 3): 379&deg; F Reactor Feedwater temperature:
* Reactor pressure: 805 psig
295&deg; F
* A Recirc Suction Temp (1B31-R650): 4700 F
* B Recirc Suction Temp (1B31-R650): 4750
* Vessel Bottom Head Drain (1B21-R606 Pt 3): 379&deg; F
* Reactor Feedwater temperature: 295&deg; F


DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM ADMIN 4             ALL TITLE REVIEW OF HPCI PUMP OPERABILITY SURVEILLANCE AUTHOR                 MEDIA NUMBER           TIME Anthony Ball           2012-301 ADMIN-4     15 Minutes RECOMMENDED BY         APPROVED BY           DATE SOUTHERN COMPANY A
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM ADMIN 4 ALL TITLE REVIEW OF HPCI PUMP OPERABILITY SURVEILLANCE AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 ADMIN-4 15 Minutes RECOMMENDED BY APPROVED BY DATE SOUTHERNA COMPANY


SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                 Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:         OPERATIONS TRAINING           Media Number: 2012-301 ADMIN-4 Rev. No. Date   1i                              ..
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
Reason for Revision           Authors Supvs I                                                   Initials     Initials 00                 initial development.                             ARB
OPERATIONS TRAINING Media Number: 2012-301 ADMIN-4 1
Authors Supvs Rev. No.
Date i
Reason for Revision I
Initials Initials 00 initial development.
ARB


2012-301 ADMIN-4 Page 1 of 12 UNIT 1   ( )   UNIT 2(X)
2012-301 ADMIN-4 Page 1 of 12 UNIT 1 (
TASK TITLE:       REVIEW OF HPCI PUMP OPERABILITY SURVEILLANCE JPM NUMBER:         2012-301 ADMTN-4 TASK STANDARD:     The task shall be complete when the operator reviews the completed surveillance procedure, 34SV-E41-002-2, and determines HPCI is inoperable and one PSW valve must be retested or declared inoperable and the other is inoperable.
)
TASK NUMBER:       300.011 OBJECTIVE NUMBER:   300.011 .0 K/A CATALOG NUMBER:     Generic 2.2.12 K/A CATALOG JTA IMPORTANCE RATING:
UNIT 2(X)
RO   3.7 SRO   4.1 OPERATOR APPLICABILITY:       Nuclear Plant Operator (NPO) / Senior Reactor Operator (SRO)
TASK TITLE:
REVIEW OF HPCI PUMP OPERABILITY SURVEILLANCE JPM NUMBER:
2012-301 ADMTN-4 TASK STANDARD:
The task shall be complete when the operator reviews the completed surveillance procedure, 34SV-E41-002-2, and determines HPCI is inoperable and one PSW valve must be retested or declared inoperable and the other is inoperable.
TASK NUMBER:
300.011 OBJECTIVE NUMBER:
300.011.0 K/A CATALOG NUMBER:
Generic 2.2.12 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.7 SRO 4.1 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO) / Senior Reactor Operator (SRO)
GENERAL  
GENERAL  


==REFERENCES:==
==REFERENCES:==
Unit 2 34SV-E41 -002-2 (current version)
Unit 2 34SV-E41 -002-2 (current version)
REQUIRED MATERIALS:     Unit 2 Completed surveillance package: 34S V-E41-002-2.
REQUIRED MATERIALS:
APPROXIMATE COMPLETION TIME:             15 Minutes SIMULATOR SETUP:   N/A
Unit 2 Completed surveillance package: 34SV-E41-002-2.
APPROXIMATE COMPLETION TIME:
15 Minutes SIMULATOR SETUP:
N/A


EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is at 100% power.
1.
: 2. A HPCI Pump Quarterly 1ST Data Test (1ST) has just been completed for the HPCJ pump JAW 34SV-E41M02-2, HPCI Pump Operability.
Unit 2 is at 100% power.
2.
A HPCI Pump Quarterly 1ST Data Test (1ST) has just been completed for the HPCJ pump JAW 34SV-E41M02-2, HPCI Pump Operability.
INITIATING CUES:
INITIATING CUES:
Review Attachment 1 of 34SV-E41-002-2, HPCI Pump Operability.
Review Attachment 1 of 34SV-E41-002-2, HPCI Pump Operability.
Line 363: Line 595:
Page 2 of 12
Page 2 of 12


2012-301 ADMIN-4 Page 3 of 12 STEP             PERFORMANCE STEP                                     STANDARD I
2012-301 ADMIN-4 Page 3 of 12 STEP PERFORMANCE STEP STANDARD I
(COMMENTS)
(COMMENTS)
For INITIAL Operator Programs:
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
IF                                               THEN U   Human performance tools, safety, PPE met (1), AND         U Mark the JPM as a PASS U   For initial trg all steps completed correctly OR PASS       U   For continuing trg, critical steps (if used) completed correctly FAIL       U Above standards not met                                     U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  
IF THEN U
Human performance tools, safety, PPE met (1), AND U
Mark the JPM as a PASS U
For initial trg all steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly FAIL U
Above standards not met U
Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  


==Reference:==
==Reference:==
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
START TIME:
START TIME:
PROMPT:         AT this time, GIVE the operator a complete copy of 34SV-E41 -002-2, HPCI Pump Operability.
PROMPT:
PROMPT:         AT this time, GIVE the operator Attachment 2 of this JPM (Data has been filled in for this JPM).
AT this time, GIVE the operator a complete copy of 34SV-E41 -002-2, HPCI Pump Operability.
PROMPT:         IF the operator addresses the 1ST Book, INFORM the operator that a supervisor has verified the reference data.
PROMPT:
: 1. The operator evaluates parameters on               On Attach. I of 34SV-E41-002-2, Attachment 1 and finds Turbine Speed               the operator EVALUATES Nr is acceptable.                                 Turbine Speed Nr data is SATISFACTORY. 3900 rpm (Acceptable Range:
AT this time, GIVE the operator Attachment 2 of this JPM (Data has been filled in for this JPM).
PROMPT:
IF the operator addresses the 1ST Book, INFORM the operator that a supervisor has verified the reference data.
1.
The operator evaluates parameters on On Attach. I of 34SV-E41-002-2, and finds Turbine Speed the operator EVALUATES Nr is acceptable.
Turbine Speed Nr data is SATISFACTORY. 3900 rpm (Acceptable Range:
3861 (0.99) to 3939 (1.01) rpm)
3861 (0.99) to 3939 (1.01) rpm)
( Indicates critical step)
( Indicates critical step)


2012-301 ADMIN-4 Page 4 of 12 STEP           PERFORMANCE STEP                               STANDARD I   (COMMENTS)
2012-301 ADMIN-4 Page 4 of 12 STEP PERFORMANCE STEP STANDARD I
: 2. The operator evaluates parameters on         On Attach. 1 of 34SV-E41-002-2, Attachment I and finds Inlet Pressure       the operator EVALUATES Inlet (Stopped) (P) is acceptable.
(COMMENTS) 2.
1                              Pressure (Stopped) (P) data is 1
The operator evaluates parameters on On Attach. 1 of 34SV-E41-002-2, Attachment I and finds Inlet Pressure the operator EVALUATES Inlet (Stopped) (P
SATISFACTORY. 34 psig Acceptable Range: >7 psig.
: 1) is acceptable.
: 3. The operator evaluates parameters on       On Attach. I of 34SV-E41-002-2, Attachment 1 and finds Inlet Pressure       the operator EVALUATES Inlet (Running) (P) is acceptable.
Pressure (Stopped) (P
1                              Pressure (Running) (P) data is 1
: 1) data is SATISFACTORY. 34 psig Acceptable Range: >7 psig.
SATISFACTORY. 31 psig Acceptable Range: >7 psig.
3.
      **4   The operator evaluates parameters on       At step 7.8.2.1.1 of 34S V-E41-Attachment I and finds Outlet               002-2, the operator Pressure (Running) P  0 is NOT             EVALUATES Outlet Pressure acceptable.                                 data IS NOT SATISFACTORY.
The operator evaluates parameters on On Attach. I of 34SV-E41-002-2, and finds Inlet Pressure the operator EVALUATES Inlet (Running) (P
: 1) is acceptable.
Pressure (Running) (P
: 1) data is SATISFACTORY. 31 psig Acceptable Range: >7 psig.
**4 The operator evaluates parameters on At step 7.8.2.1.1 of 34SV-E41-Attachment I and finds Outlet 002-2, the operator Pressure (Running) P0 is NOT EVALUATES Outlet Pressure acceptable.
data IS NOT SATISFACTORY.
1072 psig is not in theAcceptable Range of> 1135 psig.
1072 psig is not in theAcceptable Range of> 1135 psig.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that Outlet Pressure (Running) P  0 is NOT acceptable and HPCI has failed the surveillance. This action IS acceptable.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that Outlet Pressure (Running) P0 is NOT acceptable and HPCI has failed the surveillance. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.
It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.
PROMPT:         IF the operator addresses the out of spec. item(s), DIRECT the operator to finish the data package review.
PROMPT:
IF the operator addresses the out of spec. item(s), DIRECT the operator to finish the data package review.
(** Indicates critical step)
(** Indicates critical step)


2012-301 ADMIN-4 Page 5 of 12 STEP I
2012-301 ADMIN-4 Page 5 of 12 STEP PERFORMANCE STEP STANDARD I
 
(COMMENTS)
PERFORMANCE STEP                                 STANDARD (COMMENTS)
**5 The operator evaluates parameters on On Attach. 1 of 34SV-E41-002-2, and finds Differential the operator EVALUATES Pressure (2) dPr is NOT acceptable.
    **5 The operator evaluates parameters on             On Attach. 1 of 34SV-E41-002-2, Attachment 1 and finds Differential           the operator EVALUATES Pressure (2) dPr is NOT acceptable.           Differential Pressure (2) dP data IS NOT SATISFACTORY.
Differential Pressure (2) dP data IS NOT SATISFACTORY.
0.88 dPr is not in theAcceptable Range of 0.90 to 1.10 dPr.
0.88 dPr is not in theAcceptable Range of 0.90 to 1.10 dPr.
NOTE: Ratio Differential Pressure (2) dPr is equal to the Test Value dPr divided by the Reference Value dP . 1041/1183 = 0.88.
NOTE: Ratio Differential Pressure (2) dPr is equal to the Test Value dPr divided by the Reference Value dP
1 At this time, the operator may elect to inform the Shift Supervisor that Differential Pressure (2) dPr is NOT acceptable and HPCI must be declared inoperable. This action IS acceptable.
: 1. 1041/1183 = 0.88.
At this time, the operator may elect to inform the Shift Supervisor that Differential Pressure (2) dPr is NOT acceptable and HPCI must be declared inoperable. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.
It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.
PROMPT:       IF the operator addresses the out of spec. item(s), DIRECT the operator to finish the data package review.
PROMPT:
: 6. The operator evaluates parameters on         On Attach. I of 34SV-E41-002-2, Attachment 1 and finds Flowrate (4)           the operator EVALUATES
IF the operator addresses the out of spec. item(s), DIRECT the operator to finish the data package review.
          ) is acceptable.
6.
T (Q                                            Flowrate (4) (Qr) data (4250 gpm) is SATISFACTORY.
The operator evaluates parameters on On Attach. I of 34SV-E41-002-2, and finds Flowrate (4) the operator EVALUATES (Q
T) is acceptable.
Flowrate (4) (Qr) data (4250 gpm) is SATISFACTORY.
Acceptable value is 4250 gpm.
Acceptable value is 4250 gpm.
    **7 The operator evaluates the stroke time         On Attach. I of 34S V-E41-002-2, data for the cooling water valve             the operator evaluates the stroke 2P41-F035A.                                   time data for 2P41-F035A and determines that the valve data is NOT SATISFACTORY.
**7 The operator evaluates the stroke time On Attach. I of 34SV-E41-002-2, data for the cooling water valve the operator evaluates the stroke 2P41-F035A.
time data for 2P41-F035A and determines that the valve data is NOT SATISFACTORY.
4.75 seconds has exceeded the Calculated Allowable Time range of 1.5 to 4.5 seconds.
4.75 seconds has exceeded the Calculated Allowable Time range of 1.5 to 4.5 seconds.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that 2P41-F035A has exceeded the Calculated Allowable Time range of 1.5 to 4.5 seconds and must be immediately retested or declared inoperable.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that 2P41-F035A has exceeded the Calculated Allowable Time range of 1.5 to 4.5 seconds and must be immediately retested or declared inoperable.
Line 414: Line 667:
* Indicates critical step)
* Indicates critical step)


2012-301 ADMIN-4 Page 6 of 12 STEP I                                              I                                                        I
2012-301 ADMIN-4 Page 6 of 12 STEP I
      #    I      PERFORMANCE STEP I
PERFORMANCE STEP I
STANDARD I   SAT/UNSAT (COMMENTS)       I PROMPT:         IF the operator addresses the out of spec. item(s). DIRECT the operator to finish the data package review.
STANDARD I
      **8. The operator evaluates the stroke time         On Attach. 1 of 34SV-E41-002-2, data for the cooling water valve             the operator evaluates the stroke 2P41-F035B.                                 time data for 2P41-F035B and determines that the valve data is NOT SATISFACTORY.
SAT/UNSAT I
I I
(COMMENTS)
I PROMPT:
IF the operator addresses the out of spec. item(s). DIRECT the operator to finish the data package review.
**8.
The operator evaluates the stroke time On Attach. 1 of 34SV-E41-002-2, data for the cooling water valve the operator evaluates the stroke 2P41-F035B.
time data for 2P41-F035B and determines that the valve data is NOT SATISFACTORY.
5.2 seconds has exceeded the MAXIMUM Time Limit of 5.0 seconds.
5.2 seconds has exceeded the MAXIMUM Time Limit of 5.0 seconds.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that 2P41-F035B has exceeded the MAXIMUM Time Limit of 5.0 seconds and must be declared inoperable immediately. This action IS acceptable.
NOTE: At this time, the operator may elect to inform the Shift Supervisor that 2P41-F035B has exceeded the MAXIMUM Time Limit of 5.0 seconds and must be declared inoperable immediately. This action IS acceptable.
It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.
It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.
PROMPT:         WHEN the operator addresses the Out of Spec readings, INFORM the operator to make recommendations based on the findings.
PROMPT:
WHEN the operator addresses the Out of Spec readings, INFORM the operator to make recommendations based on the findings.
(*
(*
* Indicates critical step)
* Indicates critical step)


2012-301 ADMTN-4 Page 7 of 12 STEP           PERFORMANCE STEP                               STANDARD I   (COMMENTS)
2012-301 ADMTN-4 Page 7 of 12 STEP PERFORMANCE STEP STANDARD I
The operator determines the               The operator determines the procedural requirements.                 following procedural requirements:
(COMMENTS)
The operator determines the The operator determines the procedural requirements.
following procedural requirements:
* HPCI pump is inoperable due to dPr <0.90 per steps 7.8.2.2 & 7.7.3.1
* HPCI pump is inoperable due to dPr <0.90 per steps 7.8.2.2 & 7.7.3.1
* HPCT pump is inoperable due to Outlet Pressure (Running) P0 <1135 psig per steps 7.8.2.1.1 & 7.7.2.
* HPCT pump is inoperable due to Outlet Pressure (Running) P0 <1135 psig per steps 7.8.2.1.1 & 7.7.2.
o 2P41-F035A has exceeded the Calculated Allowable Time (1.5 to 4.5) per step 7.8.4.2 and must be immediately retested OR declared inoperable per step 7.7.7.2.
o 2P41-F035A has exceeded the Calculated Allowable Time (1.5 to 4.5) per step 7.8.4.2 and must be immediately retested OR declared inoperable per step 7.7.7.2.
* 2P41-F035B has exceeded the Maximum Time Limit of 5.0 seconds per step 7.8.4.1 and must be declared inoperable per step 7.7.7.1.
* 2P41-F035B has exceeded the Maximum Time Limit of 5.0 seconds per step 7.8.4.1 and must be declared inoperable per step 7.7.7.1.
NOTE:         If the operator addresses writing a Condition Report (CR) based on this surveillance, inform the operator that another operator will write the CR.
NOTE:
If the operator addresses writing a Condition Report (CR) based on this surveillance, inform the operator that another operator will write the CR.
END TIME:
END TIME:
NOTE:     The terminating cue shall be given to the Operator when:
NOTE:
The terminating cue shall be given to the Operator when:
 
After JPM step #9 is complete.
After JPM step #9 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
TERMINATING CUE:
EVALUATOR         PICK UP the Initiating Cue sheet.
We will stop here.
EVALUATOR PICK UP the Initiating Cue sheet.
( Indicates critical step)
( Indicates critical step)


ATTACHMENT 1
ATTACHMENT 1
                                                        **   KEY **
** KEY **
DO NOT give this to applicant SNC PLANT E. I. HATCH                                                                         Pg 45 of 66 DOCUMENT TITLE:                                           I DOCUMENT NUMBER:                     Version No:
DO NOT give this to applicant SNC PLANT E. I. HATCH
HPCI PUMP OPERABILITY                     j       34SV-E41-002-2                   30.25 ATTACHMENT 1                                           Affachment Page TITLE: HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA                                         1 of 2 Reference Data Changes:
 
Is reference data being changed?       ( ) Yes   (v) No IF YES, list justification for so doing:
Pg 45 of 66 DOCUMENT TITLE:
I DOCUMENT NUMBER:
Version No:
HPCI PUMP OPERABILITY j
34SV-E41-002-2 30.25 ATTACHMENT 1
Affachment Page TITLE:
HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 1 of 2 Reference Data Changes:
Is reference data being changed?
(
) Yes (v) No IF YES, list justification for so doing:
(2E41 -Cool)
(2E41 -Cool)
DATE REF                                             REQD INSTRU MPL       REFERENCE                                     ACCEPT. ALERT                 RATIO PARAMETER                                       VALUE       TEST VALUE                             ACTION NO.           VALUE                                       RANGE     RANGE                   (3)
DATE REF REQD INSTRU MPL REFERENCE ACCEPT.
TAKEN                                             RANGE (1)
ALERT RATIO PARAMETER VALUE TEST VALUE ACTION NO.
Turbine                                                                     0.99 to 2E41-R610         3900       01/18/2010       3900                     N/A         N/A       N/A Speed (Nr)                                                                   1.01 RPM Inlet Pressure 2E41-R606           34       01/18/2010         34           7PSIG     N/A     <7PSIG       N/A Stopped) (P)
VALUE RANGE RANGE (3)
Inlet Pressure (Running)     2E41-R606           32       01/18/2010         31         7 PSIG     N/A     <7 PSIG     N/A (P)
TAKEN RANGE (1)
Outlet Pressure 2E41-R601         1215       01/18/2010       1072             N/A     N/A         N/A       N/A (Running)                                                    
Turbine 0.99 to 2E41-R610 3900 01/18/2010 3900 N/A N/A N/A Speed (Nr) 1.01 RPM Inlet Pressure 2E41-R606 34 01/18/2010 34 7PSIG N/A
      )
<7PSIG N/A Stopped) (P)
0 (P
 
Differential                                                                                       <0.90 dPr Pressure (2)       N/A             1183                                         0.90 to 01/18/2010       1041                     N/A       or>1.10 (DPr)                                                                      1.10 dPr dPr Flowrate (4)       2E41-R612         4250         N/A           4250             N/A     N/A         N/A       1.0 (Qr)
Inlet Pressure (Running) 2E41-R606 32 01/18/2010 31 7 PSIG N/A
(1)     Pump declared inoperable according to 31G0-INS-001-0.
<7 PSIG N/A (P)
(2)     Differential pressure must be calculated as: dP       Outlet Pressure (pump running) Inlet Pressure (Pump running)
Outlet Pressure 2E41-R601 1215 01/18/2010 1072 N/A N/A N/A N/A (Running)
(3)     Ratio = Test Value divided by Reference Value (4)     Test value must equal reference value. Ratio for flowrate must equal 1.0.
 
(P 0)
Differential
<0.90 dPr 0.90 to Pressure (2)
N/A 1183 01/18/2010 1041 N/A or>1.10 1.10 dPr (DPr) dPr Flowrate (4) 2E41-R612 4250 N/A 4250 N/A N/A N/A 1.0 (Qr)
(1)
Pump declared inoperable according to 31G0-INS-001-0.
(2)
Differential pressure must be calculated as: dP Outlet Pressure (pump running)
- Inlet Pressure (Pump running)
(3)
Ratio = Test Value divided by Reference Value (4)
Test value must equal reference value. Ratio for flowrate must equal 1.0.
Page 8 of 12
Page 8 of 12


SNC PLANT E. I. HATCH I
Pg 46 of 66 DOCUMENT TITLE:
DOCUMENT NUMBER:
Version No:
HPCI PUMP OPERABILITY 34SV-E41-002-2 30.25 ATTACHMENT 1
Attachment Page TITLE:
HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 2 of 2 NOTE*
WHEN calculating OR recording valve stroke times, round off to the nearest tenth second.
COLUMN 2 COLUMN 4 COLUMN 5 COLUMN 3 CALCULATED REFERENCE OPERATING MAXIMUM TIME ALLOWABLE TIME TIME LIMIT TIMED COLUMN 1 TIME (SEC)
BY:
MPL (TYPE)
(SEC)
(SEC)
INIT OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE MIN/MAX MIN/MAX 2P41-F035A 3.0 N/A 1.5 4.5 N/A N/A 4.75 N/A
<5 N/A SMH AOV 2P41-F035B 2.5 N/A 1.25 3.75 N/A N/A 5.2 N/A
<5 N/A SMH AOV IF operating time is less than 1 second, record 1 second as operating time.
VERIFY STROKE TIMES ACCEPTABLE:
DATE:
ATTACHMENT 1
ATTACHMENT 1
                                                **   KEY **
** KEY **
DO NOT give this to applicant SNC PLANT E. I. HATCH I                                                            Pg 46 of 66 DOCUMENT TITLE:                                        DOCUMENT NUMBER:            Version No:
DO NOT give this to applicant Page 9 of 12
HPCI PUMP OPERABILITY                          34SV-E41-002-2              30.25 ATTACHMENT 1                                    Attachment Page TITLE: HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA                            2 of 2 NOTE*    WHEN calculating OR recording valve stroke times, round off to the nearest tenth second.
COLUMN 2                                            COLUMN 4    COLUMN 5 COLUMN 3 CALCULATED REFERENCE                                          OPERATING  MAXIMUM TIME ALLOWABLE TIME COLUMN 1          TIME                                              TIME        LIMIT        TIMED (SEC)
MPL (TYPE)        (SEC)                                                          (SEC)          BY:
OPEN                                                          INIT OPEN                                  CLOSE CLOSE                                    OPEN    CLOSE OPEN    CLOSE MIN/MAX            MIN/MAX 2P41-F035A AOV        3.0      N/A    1.5    4.5      N/A    N/A    4.75      N/A  <5        N/A    SMH 2P41-F035B AOV        2.5      N/A  1.25    3.75      N/A  N/A      5.2      N/A  <5        N/A    SMH IF operating time is less than 1 second, record 1 second as operating time.
VERIFY STROKE TIMES ACCEPTABLE:                                                            DATE:
Page 9 of 12


ATTACHMENT 2 SNC PLANT E. I. HATCH I                 PROVIDE TO APPLICANT Pg 45 of 66 DOCUMENT TITLE:
ATTACHMENT 2 SNC PLANT E. I. HATCH I
HPCI PUMP OPERABILITY I     DOCUMENT NUMBER:                 Version No:
PROVIDE TO APPLICANT Pg 45 of 66 DOCUMENT TITLE:
I         34SV-E41-002-2                   30.25 ATTACHMENT j_                                           Attachment Page TITLE: HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA                                             1 of 2 Reference Data Changes:
I DOCUMENT NUMBER:
Is reference data being changed?       ( ) Yes (   vi) No IF YES, list justification for so doing:
Version No:
HPCI PUMP OPERABILITY I
34SV-E41-002-2 30.25 ATTACHMENT j_
Attachment Page TITLE:
HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 1 of 2 Reference Data Changes:
Is reference data being changed?
(
) Yes
( vi) No IF YES, list justification for so doing:
(2E41 -Cool)
(2E41 -Cool)
DATE REF                                               REQD INSTRU MPL     REFERENCE                                       ACCEPT. ALERT               RATIO PARAMETER                                       VALUE         TEST VALUE                             ACTION NO.           VALUE                                         RANGE     RANGE                 (3)
DATE REF REQD INSTRU MPL REFERENCE ACCEPT.
TAKEN                                               RANGE (1)
ALERT RATIO PARAMETER VALUE TEST VALUE ACTION NO.
Turbine                                                                         0.99 to 2E41-R610         3900       01/18/2010         3900                     N/A         N/A     N/A Speed (Nr)                                                                   1.01 RPM Inlet Pressure 2E41-R606           34       01/18/2010           34         7PSIG       N/A     <7PSIG     N/A (Stopped) (P)
VALUE RANGE RANGE (3)
Inlet Pressure (Running)       2E41-R606           32       01/18/2010           31           7 PSIG     N/A     <7 PSIG     N/A (Pt)
TAKEN RANGE (1)
Outlet Pressure 2E41-R601         1215     01/18/2010         1072             N/A     N/A         N/A     N/A (Running)                        
Turbine 0.99 to 2E41-R610 3900 01/18/2010 3900 N/A N/A N/A Speed (Nr)
      )
 
0 (P
1.01 RPM Inlet Pressure 2E41-R606 34 01/18/2010 34 7PSIG N/A
Differential                                                                                         <0.90 dPr Pressure (2)       N/A             1183                                         0.90 to 01/18/2010         1041                     N/A       or>1.10 1.10 dPr (DPr)                                                                                               dPr Flowrate (4)       2E41-R612         4250         N/A             4250             N/A     N/A         N/A       1.0 (Qr)
<7PSIG N/A (Stopped) (P)
(1)     Pump declared inoperable according to 3100-INS-O01-0.
 
(2)     Differential pressure must be calculated as: dP     = Outlet Pressure (pump running) - Inlet Pressure (Pump running)
Inlet Pressure (Running) 2E41-R606 32 01/18/2010 31 7 PSIG N/A
(3)     Ratio = Test Value divided by Reference Value (4)     Test value must equal reference value. Ratio for flowrate must equal 1.0.
<7 PSIG N/A (Pt)
Outlet Pressure 2E41-R601 1215 01/18/2010 1072 N/A N/A N/A N/A (Running)
 
(P 0)
Differential
<0.90 dPr 0.90 to Pressure (2)
N/A 1183 01/18/2010 1041 N/A or>1.10 1.10 dPr (DPr) dPr Flowrate (4) 2E41-R612 4250 N/A 4250 N/A N/A N/A 1.0 (Qr)
(1)
Pump declared inoperable according to 3100-INS-O01-0.
(2)
Differential pressure must be calculated as: dP = Outlet Pressure (pump running)
- Inlet Pressure (Pump running)
(3)
Ratio = Test Value divided by Reference Value (4)
Test value must equal reference value. Ratio for flowrate must equal 1.0.
Page 10 of 12
Page 10 of 12


ATTACHMENT 2 PROVIDE TO APPLICANT SNC PLANT E. I. HALcI-U PQ 46 of 66 DOCUMENT TITLE:                                      DOCUMENT NUMBER:                Version No:
NOTES WHEN calculating Q recording valve stroke times, round off to the nearest tenth second.
HPCI PUMP OPERABILITY                        34SV-E41-002-2                  30.25 ATTACHMENT 1                                        Attachment Page TITLE:  HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA                            2 of 2 NOTES WHEN calculating     Q recording valve stroke times,   round off to the nearest tenth second.
COLUMN 1 MPL (TYPE) 2P41-F035A AOV COLUMN 2 REFERENCE TIME (SEC OPEN 3.0 CLOSE N/A COLUMN 3 CALCULATED ALLOWABLE TIME (SEC)
COLUMN 2                                         COLUMN 4 COLUMN 3 CALCULATED                             COLUMN 5 REFERENCE                                        OPERATING ALLOWABLE TIME                               MAXIMUM TIME COLUMN 1          TIME                                              TIME                          TIMED (SEC)                                     LIMIT MPL (TYPE)        (SEC                                              (SEC                            BY:
OPEN MIN/MAX 4.5 1.5 CLOSE MIN/MAX N/A N/A COLUMN 4 OPERATING TIME (SEC OPEN 4.75 CLOSE N/A COLUMN 5 MAXIMUM TIME LIMIT (SEC OPEN
(SEC OPEN             CLOSE                                          INIT OPEN    CLOSE                                  OPEN    CLOSE MIN/MAX           MIN/MAX                        OPEN    CLOSE 2P41-F035A 3.0      N/A    1.5     4.5      N/A   N/A   4.75     N/A       <5 AOV                                                                                    N/A    SMH 2P41 -F035B 2.5      N/A    1.25    3.75      N/A    N/A    5.2      N/A AOV                                                                            <5       N/A   SMH j[ operating time is less than 1 second, record 1 second as operating time.
<5 CLOSE N/A TIMED BY:
INIT SMH j[ operating time is less than 1 second, record 1 second as operating time.
VERIFY STROKE TIMES ACCEPTABLE:
VERIFY STROKE TIMES ACCEPTABLE:
DATE:
DATE:
Page 11 of 12
SNC PLANT E. I. HALcI-U ATTACHMENT 2 PROVIDE TO APPLICANT DOCUMENT TITLE:
DOCUMENT NUMBER:
Version No:
HPCI PUMP OPERABILITY 34SV-E41-002-2 30.25 ATTACHMENT 1
Attachment Page TITLE:
HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 2 of 2 PQ 46 of 66 2P41 -F035B 2.5 N/A 1.25 3.75 N/A N/A 5.2 N/A
<5 N/A SMH AOV Page 11 of 12


UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is at 100% power.
1.
: 2. An In-Service Test (1ST) has just been completed for the HPCI pump JAW 34SV-E41-002-2, HPCI Pump Operability.
Unit 2 is at 100% power.
2.
An In-Service Test (1ST) has just been completed for the HPCI pump JAW 34SV-E41-002-2, HPCI Pump Operability.
INITIATING CUES:
INITIATING CUES:
Review Attachment I of 34SV-E41 -002-2, HPCI Pump Operability.
Review Attachment I of 34SV-E41 -002-2, HPCI Pump Operability.
Line 505: Line 838:
Page 12 of 12
Page 12 of 12


DRAFT Southern Nuclear E. I, Hatch Nuclear Plant Operations Training JPM Admin 5 ALL TITLE RADIATION EXPOSURE CALCULATION AND REQUIRED AUTHORIZATION AUTHOR                   MEDIA NUMBER                 TIME Anthony Ball             2012-301 ADMIN-5           15 Minutes RECOMMENDED BY           APPROVED BY                 DATE SOUTHERN COMPANY
DRAFT Southern Nuclear E. I, Hatch Nuclear Plant Operations Training JPM Admin 5 ALL SOUTHERN COMPANY TITLE RADIATION EXPOSURE CALCULATION AND REQUIRED AUTHORIZATION AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 ADMIN-5 15 Minutes RECOMMENDED BY APPROVED BY DATE


SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                 Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:       OPERATIONS TRAINING             Media Number: 2012-301 ADMIN-5 Rev. No. Date   1I                Reason for Revision               Authors Initials Supvs Initials 01                 Revision for HLT7 NRC Exam. After NRC Exam,       ARB Media Number will be changed to LRJP-10020-01.
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
OPERATIONS TRAINING Media Number: 2012-301 ADMIN-5 Rev. No.
Date 1
Reason for Revision Authors Supvs I
Initials Initials 01 Revision for HLT7 NRC Exam. After NRC Exam, ARB Media Number will be changed to LRJP-10020-01.


2012-301 ADMIN-5 Page 1 of 5 UNIT 1     ( )     UNIT 2   (X)
2012-301 ADMIN-5 Page 1 of 5 UNIT 1
TASK TITLE:         Radiation Exposure Calculation and Required Authorization.
(
JPM NUMBER:         2012-301 ADMIN-5 TASK STANDARD:     The task shall be complete when it has been determined the job cannot be performed without exceeding annual administrative radiation exposure limits, and determining the level of approval to exceed the annual administrative radiation exposure limit.
)
TASK NUMBER:       N/A OBJECTIVE NUMBER: LT30008.01 K/A CATALOG NUMBER: Generic 2.3.4 K/A CATALOG JTA IMPORTANCE RATING:
UNIT 2 (X)
RO   3.2 SRO 3.7 OPERATOR APPLICABILITY:     Nuclear Plant Operator (NPO) / Senior Reactor Operator (SRO)
TASK TITLE:
Radiation Exposure Calculation and Required Authorization.
JPM NUMBER:
2012-301 ADMIN-5 TASK STANDARD:
The task shall be complete when it has been determined the job cannot be performed without exceeding annual administrative radiation exposure limits, and determining the level of approval to exceed the annual administrative radiation exposure limit.
TASK NUMBER:
N/A OBJECTIVE NUMBER:
LT30008.01 K/A CATALOG NUMBER: Generic 2.3.4 K/A CATALOG JTA IMPORTANCE RATING:
RO 3.2 SRO 3.7 OPERATOR APPLICABILITY:
Nuclear Plant Operator (NPO) / Senior Reactor Operator (SRO)
GENERAL  
GENERAL  


==REFERENCES:==
==REFERENCES:==
Unit 2 6OACHPX-001-0 (current version)
Unit 2 6OACHPX-001-0 (current version)
REQUIRED MATERIALS:     Unit 2 6OAC-HPX-001-0 (current version)
REQUIRED MATERIALS:
APPROXIMATE COMPLETION TIME:           15 Minutes SIMULATOR SETUP:   N/A
Unit 2 6OAC-HPX-001-0 (current version)
APPROXIMATE COMPLETION TIME:
15 Minutes SIMULATOR SETUP:
N/A


EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. You are a radiation worker at Hatch and have been assigned to perform a job in the Unit 2 Clean Up Phase Separator (CUPS) room.
1.
: 2. Gamma radiation is the only type of radiation of concern for this particular job (no airborne, Beta or Alpha).
You are a radiation worker at Hatch and have been assigned to perform a job in the Unit 2 Clean Up Phase Separator (CUPS) room.
: 3. Your job inside the CUPS room, will take 1 hour.
2.
: 4. Your total exposure (TEDE) for the year so far has been confirmed to be 1400 mrem.
Gamma radiation is the only type of radiation of concern for this particular job (no airborne, Beta or Alpha).
: 5. One of the radiation fields you will work in for 20 minutes is 4500 mremlhour (Gamma radiation).
3.
: 6. The other radiation field that you will work in for 40 minutes is 1200 mremlhour (Gamma radiation).
Your job inside the CUPS room, will take 1 hour.
: 7. The dose in the travel path to the CUPS room is 1800 mremlhr.
4.
: 8. Travel time through the 1800 mrem/hr field to the CUPS area is 6 minutes EACH WAY.
Your total exposure (TEDE) for the year so far has been confirmed to be 1400 mrem.
5.
One of the radiation fields you will work in for 20 minutes is 4500 mremlhour (Gamma radiation).
6.
The other radiation field that you will work in for 40 minutes is 1200 mremlhour (Gamma radiation).
7.
The dose in the travel path to the CUPS room is 1800 mremlhr.
8.
Travel time through the 1800 mrem/hr field to the CUPS area is 6 minutes EACH WAY.
INITIATING CUES:
INITIATING CUES:
Calculate the Total exposure you will receive for the job.
Calculate the Total exposure you will receive for the job.
Line 535: Line 892:
Considering your current exposure (1400 mrem) and that which will be received from this job, determine who must authorize the exposure, if anyone, lAW 6OAC-HPX-001-0.
Considering your current exposure (1400 mrem) and that which will be received from this job, determine who must authorize the exposure, if anyone, lAW 6OAC-HPX-001-0.


2012-301 ADMIN-5 Page 3 of 5 STEP
2012-301 ADMIN-5 Page 3 of 5 STEP I
      #    I       PERFORMANCE STEP                                     STANDARD I    SAT/UNSAT (COMMENTS)
SAT/UNSAT I
For INITIAL Operator Programs:
PERFORMANCE STEP STANDARD (COMMENTS)
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
IF THEN U
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
Human performance tools, safety, PPE met (1), AND U
IF                                               THEN U   Human performance tools, safety, PPE met (1), AND         U Mark the JPM as a PASS U   For initial trg all steps completed correctly OR PASS       U   For continuing trg, critical steps (if used) completed correctly FAIL      IU  Above standards not met                                    U Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have liffle or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  
Mark the JPM as a PASS U
For initial trg all steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly U
Mark the JPM as a FAIL FAIL IU Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have liffle or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  


==Reference:==
==Reference:==
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.
START TIME:_______
START TIME:_______
NOTE: If the applicant addresses 8.1 .2.1 which states: Prior to an individuals first work assignment in which the individual is likely to receive in excess of 2% of the limits in 8.1.1, the individual MUST submit a signed statement indicating the amount of occupational radiation exposure received during the current calendar year from sources of radiation possessed by other licensees. INFORM the applicant that this form has been signed.
NOTE: If the applicant addresses 8.1.2.1 which states: Prior to an individuals first work assignment in which the individual is likely to receive in excess of 2% of the limits in 8.1.1, the individual MUST submit a signed statement indicating the amount of occupational radiation exposure received during the current calendar year from sources of radiation possessed by other licensees. INFORM the applicant that this form has been signed.
      **1. The applicant calculates exposure in                 (4,500 mremlhr) X 20 mm       =
**1.
the 4,500 mremlhour field.                           60 mm 1500 mrem.
The applicant calculates exposure in (4,500 mremlhr) X 20 mm
      **2    The applicant calculates exposure in             (1200 mremlhr) X 40 mm the 1200 mrem/hour field.                            60 mm 800 mrem
=
      **3 The applicant calculates the dose                     (1800 mremlhr) X 6 mm   x 2 trips received from travel time.                           60 mm
the 4,500 mremlhour field.
                                                                      = 360 mrem.
60 mm 1500 mrem.
The applicant calculates exposure in the 1200 mrem/hour field.
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
**2 (1200 mremlhr) X 40 mm 60 mm 800 mrem
**3 The applicant calculates the dose (1800 mremlhr) X 6 mm x 2 trips received from travel time.
60 mm
= 360 mrem.


2012-301 ADMIN-5 Page 4 of 5 STEP I PERFORMANCE STEP
2012-301 ADMIN-5 Page 4 of 5 STEP I
  **4 I                                                       STANDARD I    SAT/UNSAT (COMMENTS)       1 The applicant calculates total               1400 exposure:
I SAT/UNSAT I
1500 800 360 4060 mrem Total
PERFORMANCE STEP STANDARD (COMMENTS) 1
  **5 The applicant determines that the       The Hatch Administrative limits Hatch Annual Administrative               are 2,000 and 4000 mremlyear.
**4 The applicant calculates total exposure:
Radiation Exposure limit will be         (6OAC-HPX-001-0 step 8.2.1) exceeded while performing the work.
1400 1500 800 360 4060 mrem Total
**5 The applicant determines that the The Hatch Administrative limits Hatch Annual Administrative are 2,000 and 4000 mremlyear.
Radiation Exposure limit will be (6OAC-HPX-001-0 step 8.2.1) exceeded while performing the work.
NOTE: The applicant may address being on the Margin List when within 400 mrem of the administrative exposure limit. It is not necessary for the applicant to discuss the requirements of the margin list for this JPM.
NOTE: The applicant may address being on the Margin List when within 400 mrem of the administrative exposure limit. It is not necessary for the applicant to discuss the requirements of the margin list for this JPM.
PROMPT:       IF the applicant addresses the margin list, STATE that the Health Physic s
PROMPT:
department is taking appropriate actions for Margin List requirements based on expected exposures for this job.
IF the applicant addresses the margin list, STATE that the Health Physics department is taking appropriate actions for Margin List requirements based on expected exposures for this job.
**6. The applicant determines the               With available exposure authorization requirements to exceed     confirmed, authorization must be the Annual Administrative limits,         written approvals from an HP Supervisor and from the Plant Manager. (Step 8.2.2)
**6.
END TIME:_______
The applicant determines the With available exposure authorization requirements to exceed confirmed, authorization must be the Annual Administrative limits, written approvals from an HP Supervisor and from the Plant Manager. (Step 8.2.2)
NOTE:    The terminating cue shall be given to the Operator when:
NOTE:
The terminating cue shall be given to the Operator when:
 
After JPM step #6 is complete.
After JPM step #6 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
TERMINATING CUE:
EVALUATOR         PICK UP the Initiating Cue sheet.
We will stop here.
END TIME:_______
EVALUATOR PICK UP the Initiating Cue sheet.


Page 5 of 5 UNIT 2 READ TO THE APPLICANT INITIAL CONDITIONS:
Page 5 of 5 UNIT 2 READ TO THE APPLICANT INITIAL CONDITIONS:
: 1. You are a radiation worker at Hatch and have been assigned to perform a job in the Unit 2 Clean Up Phase Separator (CUPS) room.
1.
: 2. Gamma radiation is the only type of radiation of concern for this particular job (no airborne, beta or alpha).
You are a radiation worker at Hatch and have been assigned to perform a job in the Unit 2 Clean Up Phase Separator (CUPS) room.
: 3. Your job inside the CUPS room, will take 1 hour.
2.
: 4. Your total exposure (TEDE) for the year so far has been confirmed to be 1400 mrem.
Gamma radiation is the only type of radiation of concern for this particular job (no airborne, beta or alpha).
: 5. One of the radiation fields you will work in for 20 minutes is 4500 mremlhour (gamma radiation).
3.
: 6. The other radiation field that you will work in for 40 minutes is 1200 mremlhour (gamma radiation).
Your job inside the CUPS room, will take 1 hour.
: 7. The dose in the travel path to the CUPS room is 1800 mremlhr.
4.
: 8. Travel time through the 1800 mremlhr field to the CUPS area is 6 minutes each way.
Your total exposure (TEDE) for the year so far has been confirmed to be 1400 mrem.
5.
One of the radiation fields you will work in for 20 minutes is 4500 mremlhour (gamma radiation).
6.
The other radiation field that you will work in for 40 minutes is 1200 mremlhour (gamma radiation).
7.
The dose in the travel path to the CUPS room is 1800 mremlhr.
8.
Travel time through the 1800 mremlhr field to the CUPS area is 6 minutes each way.
INITIATING CUES:
INITIATING CUES:
Calculate the total exposure you will receive for the job.
Calculate the total exposure you will receive for the job.
Line 583: Line 967:
Considering your current exposure (1400 mrem) and that which will be received from this job, determine who must authorize the exposure, if anyone, JAW 6OAC-HPX-001-0.
Considering your current exposure (1400 mrem) and that which will be received from this job, determine who must authorize the exposure, if anyone, JAW 6OAC-HPX-001-0.


DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM Admin 6 SRO ONLY TITLE EMERGENCY CLASSIFICATION AND NOTIFICATION (NEW EALS)
DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM Admin 6 SRO ONLY SOUTHERN COMPANY TITLE EMERGENCY CLASSIFICATION AND NOTIFICATION (NEW EALS)
AUTHOR                 MEDIA NUMBER         TIME CRITICAL Anthony Ball           2012-301 ADMIN-6       15.0/15.0 Minutes RECOMMENDED BY         APPROVED BY                 DATE N/R SOUTH ERN COMPANY
AUTHOR MEDIA NUMBER TIME CRITICAL Anthony Ball 2012-301 ADMIN-6 15.0/15.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R


SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH                                                                       Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:             OPERATIONS TRAINING             Media Number: 2012-301 ADMIN-6 Rev. No. Ji. Date   Ji                    Reason for Revision             Authors Initials Supvs Initials 00         04/30/07   Initial development                                   CME         RAB 01        1 1/04/10 Added Task and HU Pass/Fail criteria. Updated             EU         CME Southern_Company_logo.
SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:
02       01/12/11 Updated references to NMP-EP-1 10 and                     MCK         DNM NMP-EP-1 11 03                     General revision for use on NRC Exam 2012-301.
OPERATIONS TRAINING Media Number: 2012-301 ADMIN-6 01 Rev. No. J Date J
After NRC Exam, Media Number will be changed to       ARB LR-J P-2506 1-03.
Reason for Revision Authors Supvs i.
i Initials Initials 00 04/30/07 Initial development CME RAB 1 1/04/10 Added Task and HU Pass/Fail criteria. Updated EU CME Southern_Company_logo.
02 01/12/11 Updated references to NMP-EP-1 10 and MCK DNM NMP-EP-1 11 03 General revision for use on NRC Exam 2012-301.
ARB After NRC Exam, Media Number will be changed to LR-JP-2506 1-03.


2012-301 ADMIN-6 Page 1 of 7 UNIT 1     (X)     UNIT 2   (X)
2012-301 ADMIN-6 Page 1 of 7 UNIT 1 (X)
TASK TITLE:       Emergency Classification and Notification (NEW EALS)
UNIT 2 (X)
JPM NUMBER:       2012-301 ADMIN-6 TASK STANDARD:     The task shall be completed when the event has been classified per NMP-EP-1 10, the ENN form NMP-EP-1 11 Figure 1 has been completed, and offsite notifications have been directed.
TASK TITLE:
TASK NUMBER:       200.052 OBJECTIVE NUMBER: 200.052.A PLANT HATCH JTA IMPORTANCE RATING:
Emergency Classification and Notification (NEW EALS)
RO 4.67 SRO 4.04 K/A CATALOG NUMBER: Generic 2.4.4 1 K/A CATALOG JTA IMPORTANCE RATING:
JPM NUMBER:
RO 2.9 SRO 4.6 OPERATOR APPLICABILITY:     Senior Reactor Operator (SRO)
2012-301 ADMIN-6 TASK STANDARD:
The task shall be completed when the event has been classified per NMP-EP-1 10, the ENN form NMP-EP-1 11 Figure 1 has been completed, and offsite notifications have been directed.
TASK NUMBER:
200.052 OBJECTIVE NUMBER:
200.052.A PLANT HATCH JTA IMPORTANCE RATING:
RO 4.67 SRO 4.04 K/A CATALOG NUMBER: Generic 2.4.4 1 K/A CATALOG JTA IMPORTANCE RATING:
RO 2.9 SRO 4.6 OPERATOR APPLICABILITY:
Senior Reactor Operator (SRO)
* GENERAL  
* GENERAL  


==REFERENCES:==
==REFERENCES:==
Unit 1 & 2 NMP-EP-1 10 (current version)
Unit 1 & 2 NMP-EP-1 10 (current version)
NMP-EP- 1 1 1 (current version)
NMP-EP-1 1 1 (current version)
F REQUIRED MATERIALS:     Unit 1 & 2 NMP-EP-1 10 (current version)
F REQUIRED MATERIALS:
NMP-EP- 111 FIGURE 1 (current version)
Unit 1 & 2 NMP-EP-1 10 (current version)
APPROXIMATE COMPLETION TIME:           15.0/15.0 Minutes SIMULATOR SETUP:   N/A
NMP-EP-111 FIGURE 1 (current version)
APPROXIMATE COMPLETION TIME:
15.0/15.0 Minutes SIMULATOR SETUP:
N/A


EVALUATOR COPY UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
EVALUATOR COPY UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is in a LOSP due to a failure of the 2D and 2C SUTs.
1.
: 2. The Reactor scrammed and All rods fully inserted on the scram signal.
Unit 2 is in a LOSP due to a failure of the 2D and 2C SUTs.
: 3. For the last 15 minutes, Only Emergency Diesel 2A has been runnin g and is supplying power to 2E 4160 VAC bus.
2.
: 4. Emergency Diesel Generators lB and 2C start attempts have not been successful.
The Reactor scrammed and All rods fully inserted on the scram signal.
: 5. All other Unit 2 parameters are normal.
3.
: 6. The following Unit 1 conditions exists:
For the last 15 minutes, Only Emergency Diesel 2A has been running and is supplying power to 2E 4160 VAC bus.
4.
Emergency Diesel Generators lB and 2C start attempts have not been successful.
5.
All other Unit 2 parameters are normal.
6.
The following Unit 1 conditions exists:
100% power All parameters normal INITIATING CUES:
100% power All parameters normal INITIATING CUES:
Determine the emergency classification that should be declared.
Determine the emergency classification that should be declared.
Line 618: Line 1,021:
Current time is:
Current time is:


2012-301 ADMIN-6 Page 3 of 7 STEP I PERFORMANCE STEP
2012-301 ADMIN-6 Page 3 of 7 STEP I
        #    I                                                              STANDARD I
I PERFORMANCE STEP STANDARD (COMMENTS) 1 I
SAT/UNSAT (COMMENTS)       1 For INITIAL Operator Programs:
SAT/UNSAT IF THEN U
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfa ctory Performance.
Human performance tools, safety, PPE met (1), AND U
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.
Mark the JPM as a PASS U
IF                                                   THEN U   Human performance tools, safety, PPE met (1), AND U   Mark the JPM as a PASS U   For initial trg all steps completed correctly OR PASS       U   For continuing trg, critical steps (if used) completed correctly FAIL      U   Above standards not met                                      U  Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential conseq uence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential conseq uences.  
For initial trg all steps completed correctly OR PASS U
For continuing trg, critical steps (if used) completed correctly U
Mark the JPM as a FAIL FAIL U
Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.  


==Reference:==
==Reference:==
Line 631: Line 1,037:
When the classification is made, a second clock starts. The ENN form and direction to make the NOTIFICATIONS MUST BE COMPLETED WITH 15 MINUTES of that clock start.
When the classification is made, a second clock starts. The ENN form and direction to make the NOTIFICATIONS MUST BE COMPLETED WITH 15 MINUTES of that clock start.
1st START TIME:_______
1st START TIME:_______
: 1. Operator identifies the procedure                   Operator has identified the correct needed to perform the task,                       procedure as NMP-EP-1 10.
1.
      **2. Operator classified event per                         Operator has CLASSIFIED the NMP-EP-1 10.                                       event as an ALERT EMERGENCY.
Operator identifies the procedure Operator has identified the correct needed to perform the task, procedure as NMP-EP-1 10.
NOTE: The expected classification is an ALERT based on IC# SA5, Single power source to the ESF busses and an additional failure will result in a
**2.
station blackout. If follow-up questioning reveals that a classification was declared and based on another IC #, the classification should be evaluated for validity.
Operator classified event per Operator has CLASSIFIED the NMP-EP-1 10.
event as an ALERT EMERGENCY.
NOTE: The expected classification is an ALERT based on IC# SA5, Single power source to the ESF busses and an additional failure will result in a station blackout. If follow-up questioning reveals that a classification was declared and based on another IC #, the classification should be evaluated for validity.
1st END TIME:________
1st END TIME:________
( Indicates critical step)
( Indicates critical step)
For INITIAL Operator Programs:
For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.
For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.


201 2-301 ADMIN-6 Page 4 of 7 STEP           PERFORMANCE STEP                                                          SAT/UNSAT STANDARD (COMMENTS)
STEP NOTE: To successfully complete the ENN form, ALL STEPS HIGHLIGHTED IN YELLOW must be properly completed.
NOTE: The classification IS MADE when the operator STATES OR WRITES the classification. This starts the second clock.
201 2-301 ADMIN-6 Page 4 of 7 SAT/UNSAT (COMMENTS)
PROMPT:        WHEN the operator enquires about meteorological conditions, GIVE the operator the MIDAS Information Sheet.
2&deg; START TIME:________
      **3 Operator properly completes the ENN            Operator has properly form per NMP-EP-l 11.                      COMPLETED NMP-EP-1 11 FIGURE 1, Southern Nuclear Emergency Notification form.
NOTE: To successfully complete the ENN form, ALL STEPS HIGHLIGHTED IN YELLOW must be properly completed.
To be properly completed, the ENN form must have all the required steps completed with correct information. APPLICABLE HIGHLIGHTED steps must contain sufficient information to describe the event.
To be properly completed, the ENN form must have all the required steps completed with correct information. APPLICABLE HIGHLIGHTED steps must contain sufficient information to describe the event.
      **4 Operator directs an operator to make           Operator has DIRECTED the the ENN notifications                       Nuclear Plant Operator to make the required ENN notifications.
**4 Operator directs an operator to make Operator has DIRECTED the the ENN notifications Nuclear Plant Operator to make the required ENN notifications.
2 END TIME:_______
NOTE:
NOTE:      The terminating cue shall be given to the Operator when:
The terminating cue shall be given to the Operator when:
 
After 3PM step #4 is complete.
After 3PM step #4 is complete.
With no reasonable progress, the Operator exceeds double the allotted time.
With no reasonable progress, the Operator exceeds double the allotted time.
Operator states the task is complete.
Operator states the task is complete.
TERMINATING CUE: We will stop here.
TERMINATING CUE: We will stop here.
EVALUATOR         PICK UP the Initiating Cue sheet.
EVALUATOR PICK UP the Initiating Cue sheet.
2 END TIME:_______
PERFORMANCE STEP STANDARD NOTE: The classification IS MADE when the operator STATES OR WRITES the classification. This starts the second clock.
PROMPT:
WHEN the operator enquires about meteorological conditions, GIVE the operator the MIDAS Information Sheet.
2&deg; START TIME:________
**3 Operator properly completes the ENN Operator has properly form per NMP-EP-l 11.
COMPLETED NMP-EP-1 11 FIGURE 1, Southern Nuclear Emergency Notification form.
(** Indicates critical step)
(** Indicates critical step)


ATTACHMENT 1 ** KEY ** DO NOT GIVE TO APPLI CANT Southern Nuclear Operating Company Emergency          I                                                                            NMP-EP-1 11 JTHERNjZS.
ATTACHMENT 1 ** KEY ** DO NOT GIVE TO APPLICANT
COMPANY Implementing                              Emergency Notifications                                    Version 6.0 Procedure          I                                                                            Page 36 of 48 Figure 1      Emergency Notification Form (page 1 of 2) 1.NDRILL              I1ACTUALEVENT                                                                                  MESSAGE#____
(*Ma not be available for Initial Precipitation i;1 DECLARATION
: 2. INITIAL                FOLLOW-UP            NOTIFICATION: TIME                  DATE      _L__I_ AUTHENTICATION              #_____
: 11. A?FECTED UNIT(S):
: 3. SITE:                                                                                          Confirmation Phone 4/
: 12. UNIT STATUS:
: 4. EMERGENCY CLASSIFICATION:                ( UNUSUAL EVENT            ALERT            SITE AREA EMERGENCY                GENERAL EMERGENCY EASED ONBAL#________                    EAL DESCRIPTION:______________________________________
(Unaffected Unit(s) Status Not Required for Initial Notifications)
5, PROTECTIVE ACTION RECOMMENDATIONS:
j NONE I EVACUATE Advise Remainder of EPZ to Monitor Local Radio/TV Stations/Tone Alert Radios for Additional Information and Consider the use of El (potassium iodide) in accordance with State plans and policy.
OTHER
: 6. EMERGENCYRELEASE:                  None                  Is Occurring                    Has Occurred
: 7. RELEASE SIGNIFICANCE:                  Not  applicable j                          Within  normal operating      Above normal operating            Under limits                          limits                          evaluation
: 8. EVENT PROGNOSIS:                    j Improving            [} Stable                          Degrading
: 9. METEOROLOGICAL DATA:                Wind Direction from                                    Wind Speed          mph*
(*Ma not be available for Initial Precipitation                                         Stability Class*
i;1 DECLARATION             ] TERMINATION                      Time                      Date _.__/        /
: 11. A?FECTED UNIT(S):             IJ1I
: 12. UNIT STATUS:                                           UI          Power
                                                              .._%                  Shutdown at Time                  Date      /    I (Unaffected Unit(s) Status Not Required for Initial Notifications)                               U2 __% Power              Shutdown at Time                  Date ._J.j___
: 13. REMARKS:_________________
: 13. REMARKS:_________________
Above normal operating limits Degrading Wind Speed mph*
FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)
EMERGENCY RELEASE DATA NOT REQUIRED IF LINE 6 A IS SELECTED.
EMERGENCY RELEASE DATA NOT REQUIRED IF LINE 6 A IS SELECTED.
: 14. RELEASE CHARACTERIZATION:                     TYPE:     Elevated       Mixed     Ground           UNITS:     Ci     Ci/sec   .tCi/sec MAGNITUDE: Noble Gases:__________ lodines:___________ Particulates:__________ Other:
: 14. RELEASE CHARACTERIZATION:
FORM:     [ Airborne                 Start Time                 Date _/_       /._Stop Time               Date J_L_
TYPE:
fLiquid                     Start Time                 Date .._/_   _j_.Stop Time                 Date J_J_.
Elevated Mixed Ground UNITS:
: 15. PROJECTION PARAMETERS:                 Projection period:            Hours              Estimated Release Duration Projection performed:                Time              Date                                Accident Type:
Ci Ci/sec
: 16. PROJECTED DOSE:
.tCi/sec MAGNITUDE:
DISTANCE                               TEDE (rnrem)                  Adult Thyroid CDE (mrem)
Noble Gases:__________ lodines:___________ Particulates:__________ Other:
Site boundary 2 Miles 5 Miles 10 Miles
FORM: [ Airborne Start Time Date _/_
: 17. APPROVED BY:                                                  Title                                        Time______
/._Stop Time Date J_L_
NOTIFIED                                      RECEIVED BY:
fLiquid Start Time Date.._/_ _j_.Stop Time Date J_J_.
BY:                                                Time (To be completed by receiving organization)
: 15. PROJECTION PARAMETERS:
Page 5 of 7
Projection performed:
16.
PROJECTED DOSE:
: 17. APPROVED BY:
NOTIFIED BY:
Projection period:
Time Date DISTANCE Site boundary 2 Miles 5 Miles 10 Miles RECEIVED BY:
Time (To be completed by receiving organization)
Southern Nuclear Operating Company Emergency I
NMP-EP-1 11 JTHERNjZS.
Implementing I
Emergency Notifications Version 6.0 COMPANY Procedure Page 36 of 48 Figure 1 Emergency Notification Form (page 1 of 2) 1.NDRILL I1ACTUALEVENT MESSAGE#____
: 2. INITIAL FOLLOW-UP NOTIFICATION: TIME DATE
_L__I_ AUTHENTICATION #_____
: 3. SITE:
Confirmation Phone 4/
: 4. EMERGENCY CLASSIFICATION:
( UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY EASED ONBAL#________
EAL DESCRIPTION:______________________________________
5, PROTECTIVE ACTION RECOMMENDATIONS:
j NONE I EVACUATE Advise Remainder ofEPZ to Monitor Local Radio/TV Stations/Tone Alert Radios for Additional Information and Consider the use ofEl (potassiumiodide) in accordance with State plans and policy.
OTHER
: 6. EMERGENCYRELEASE:
None Is Occurring Has Occurred
: 7. RELEASE SIGNIFICANCE:
: 8. EVENT PROGNOSIS:
: 9. METEOROLOGICAL DATA:
j Not applicable Within normal operating limits j Improving
[} Stable Wind Direction from g
] TERMINATION IJ1I Under evaluation Stability Class*
Time Date _.__/
/
UI.._% Power U2 __% Power Shutdown at Time Date
/
I Shutdown at Time Date._J.j___
Hours Estimated Release Duration
_________Hours Accident Type:
TEDE (rnrem)
Adult Thyroid CDE (mrem)
Time______
Title Page 5 of 7


MIDAS iNFORMATION METEOROLOGICAL 1 OM WIND SPD     1 OOM WIND SPD         1 OM WIND DIR 1 OOM WIND DIR 1Y33-R601         1Y33-R603             1Y33-R601     1Y33-R603 5.0               5.0                   130           I30 AMBIENT TEMP       DELTA T               DELTA T         RAINFALL (F) 1 OM       60-10                 100-10       15 MIN. AVG 54           -1.6                   -2.9             .000 RADIOLOGICAL MAIN STACK                       U 1 RX. BLDG. VENT         U2 RX. BLDG. VENT NORMAL RANGE       KAMAN         NORMAL RANGE KAMAN       NORMAL RANGE         KAMAN 1D1J-K600A     1D11-R631         1D11-K619A 1D11-R631     2D11-K636A     2D11-R631 2.OOEO1                         5,04E01                 4.OOEO1 1D11-K600B                       1D11-K619B               2D11-K636B 2.OOEO1                                                 4.OOEO1 STABILITY CLASS D
MIDAS iNFORMATION METEOROLOGICAL 1 OM WIND SPD 1 OOM WIND SPD 1 OM WIND DIR 1 OOM WIND DIR 1Y33-R601 1Y33-R603 1Y33-R601 1Y33-R603 5.0 5.0 130 I30 AMBIENT TEMP DELTA T DELTA T RAINFALL (F) 1 OM 60-10 100-10 15 MIN. AVG 54
-1.6
-2.9
.000 RADIOLOGICAL MAIN STACK U 1 RX. BLDG. VENT U2 RX. BLDG. VENT NORMAL RANGE KAMAN NORMAL RANGE KAMAN NORMAL RANGE KAMAN 1D1J-K600A 1D11-R631 1D11-K619A 1D11-R631 2D11-K636A 2D11-R631 2.OOEO1 5,04E01 4.OOEO1 1D11-K600B 1D11-K619B 2D11-K636B 2.OOEO1 4.OOEO1 STABILITY CLASS D


UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:
: 1. Unit 2 is in a LOSP due to a failure of the 2D and 2C SUTs.
1.
: 2. The Reactor scrammed and All rods fully inserted on the scram signal.
Unit 2 is in a LOSP due to a failure of the 2D and 2C SUTs.
: 3. For the last 15 minutes, Only Emergency Diesel 2A has been running and is supplying power to 2E 4160 VAC bus.
2.
: 4. Emergency Diesel Generators lB and 2C start attempts have not been successful.
The Reactor scrammed and All rods fully inserted on the scram signal.
: 5. All other Unit 2 parameters are normal.
3.
: 6. The following Unit 1 conditions exists:
For the last 15 minutes, Only Emergency Diesel 2A has been running and is supplying power to 2E 4160 VAC bus.
4.
Emergency Diesel Generators lB and 2C start attempts have not been successful.
5.
All other Unit 2 parameters are normal.
6.
The following Unit 1 conditions exists:
100% power All parameters normal INITIATING CUES:
100% power All parameters normal INITIATING CUES:
Determine the emergency classification that should be declared.
Determine the emergency classification that should be declared.

Latest revision as of 20:18, 11 January 2025

Initial Exam 2012-301 Draft Administrative JPMs
ML12342A086
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/06/2012
From:
NRC/RGN-II
To:
Southern Co
References
Download: ML12342A086 (61)


Text

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM ADMIN 1 = SRO ONLY TITLE VERIFY FUEL MOVEMENT SHEET AUTHOR MEDIA NUMBER TIME Error! Reference source not 2012-301 ADMIN-1 30 Minutes found.

RECOMMENDED BY APPROVED BY DATE N/R SOUTHERNA COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2012-301 ADMIN-1 Initial development Reason for Revision Revision for use on 2012-30 1 NRC Exam. After NRC Exam, Media Number will be changed to LR-JP-45.33A.

Authors Initials FNF ARB Supvs Initials Rev.

No.

Date 00 03/17/09 01

2012-301 ADMIN-1 Page 1 of 6 UNIT 1 (X)

UNIT 2 (X)

TASK TITLE:

VERIFY FUEL MOVEMENT SHEET JPM NUMBER:

2012-301 ADMIN-1 TASK STANDARD:

Verify proper fuel movements.

TASK NUMBER:

045.033 OBJECTIVE NUMBER:

045.033.0 PLANT HATCH JTA IMPORTANCE RATING:

RO Not Available SRO Not Available K/A CATALOG NUMBER: G2.1.35 K/A CATALOG JTA IMPORTANCE RATING:

RO 2.2 SRO 3.9 OPERATOR APPLICABILITY:

Senior Reactor Operator GENERAL

REFERENCES:

Refuel Floor 34FH-OPS-001-0 (current version) 42FH-ERP-014-0 (current version)

REQUIRED MATERIALS:

Refuel Floor Fuel Movement Sheets 34FH-OPS-001-0 (current version) 42FH-ERP-0 14-0 (current version)

APPROXIMATE COMPLETION TIME:

30 Minutes SIMULATOR SETUP:

N/A

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is in a refueling outage.

2.

You are the oncoming Refuel Floor SRO.

3.

The off-going Refuel Floor SRO asks you to verify Page 1 of the attached Fuel Movement Sheet.

4.

The fuel movement sheet, Core Map and pictures of the core cells are available.

INITIATING CUES:

Verify the in-core placement of all components listed on Page 1 of the attached Fuel Movement Sheet.

2012-301 ADMIN-1 Page 3 of 6 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN IJ Human performance tools, safety, PPE met (1), AND D

Mark the JPM as a PASS LI For initial trg all steps completed correctly OR PASS LI For continuing trg, critical steps (if used) completed correctly FAIL LI Above standards not met LI Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.

START TIME:________

PROMPT:

PROMPT:

PROMPT:

Hand the operator the fuel movement sheet, Core Map and pictures of the core cells.

IF the operator has problems reading the bundle serial numbers, THEN provide the serial numbers to the operator.

IF the operator asks about Spent Fuel Pool verification, THEN tell the operator he is only responsible for in-core verifications.

1.

Obtains the correct procedures.

Obtains and reviews 42FH-ERP-014-0, Fuel Movement and 34FH-OPS-001-0, Fuel Movement Operation.

(** Indicates critical step)

2012-301 ADMIN-1 Page 4 of 6 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

- I 2.

Verify correct loading of Control Cell Operator determines Control Cell 38-37.

38-37 bundles are the correct bundles and in the correct orientation:

  • JLV675
  • JLV682
  • JLK8O4
  • JLK817
    • 3 Determine INCORRECT loading of Operator determines Control Cell Control Cell 14-37.

14-37 bundles are the correct bundles but in the INCORRECT orientation:

e JLV678

  • JLV67O NOTE: Bundles JLV678 and JLV67O are 180° out.

4.

Verify correct loading of Control Cell Operator determines Control Cell 14-37.

14-37 bundles are the correct bundles and in the correct orientation:

  • JLK8O5
  • JLK812
    • 5*

Determine INCORRECT loading of Operator determines Control Cell Control Cell 38-17.

38-17 bundle is the INCORRECT bundle but in the correct orientation:

  • JLV668 NOTE: Wrong bundle loaded. The correct bundle is JLV698

( Indicates critical step)

2012-301 ADMIN-1 Page 5 of 6 STEP I

I SAT!UNSAT 1

I PERFORMANCE STEP STANDARD (COMMENTS)

I 6.

Verify correct loading of Control Cell Operator determines Control Cell 38-17.

14-37 bundles are the correct bundles and in the correct orientation:

. JLV674

  • JLK8O7
  • JLK82O
    • 7 Determine INCORRECT loading of Operator determines Control Cell Control Cell 14-17.

14-17 Double Blade Guide is in the INCORRECT orientation.

NOTE:

The terminating cue shall be given to the Operator when:

After JPM step #7 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

END TIME:_______

( Indicates critical step)

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is in a refueling outage.

2.

You are the oncoming Refuel Floor SRO.

3.

The off-going Refuel Floor SRO asks you to verify Page 1 of the attached Fuel Movement Sheet.

4.

The fuel movement sheet, Core Map and pictures of the core cells are available.

INITIATING CUES:

Verify the in-core placement of all components listed on Page 1 of the attached Fuel Movement Sheet.

DRAFT Southern Nuclear E, I Hatch Nuclear Plant Operations Training JPM ADMIN 2 ALL TITLE CORRECT RWL INDICATORS FOR HIGH DRYWELL TEMPERATURES AUTHOR MEDIA NUMBER TIME ANTHONY BALL 2012-301 ADMIN-2 11.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R SOUTHERNA COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number: 2012-301 ADMIN-2 Rev. No.

Date Reason for Revision Authors Supvs Initials Initials 00 Modified from LR-JP-25 101 for use on 2012-301 ARB NRC Exam.

2012-301 ADMIN-2 Page 1 of 9 TASK TITLE:

UNIT 1 (X)

CORRECT RWL INDICATORS FOR HIGH DRYWELL TEMPERATURES UNIT 2 (X)

JPM NUMBER:

TASK STANDARD:

2012-301 ADMIN-2 The task shall be completed when the operator has determined the corrected RWL for the specified instrumentation per 34AB-B2 1-002.

TASK NUMBER:

OBJECTIVE NUMBER:

201.099 201.099.B PLANT HATCH JTA IMPORTANCE RATING:

RO 4.57 SRO 3.83 STA 4.00 K/A CATALOG NUMBER: G2.1.35 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.90 SRO 4.20 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)

Shift Technical Advisor (STA)

GENERAL

REFERENCES:

Unit 1 Unit 2 34AB-B2 1-002-i 34AB-B2 1-002-2 (current version)

(current version) 34AB-B21 -002-1 (current version) 34AB-B2 1-002-2 (current version)

REQUIRED MATERIALS:

Unit 1 Unit 2 APPROXIMATE COMPLETION TIME:

11.0 Minutes SIMULATOR SETUP:

N/A

EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

The Reactor has scrammed and the board operator has reported the following UNCOMPENSATED Reactor Water Levels:

1B21-R604A and 1B21-R623A (Wide Range) is -125 inches.

1B21-R604B and 1B21-R623B (Wide Range) is -127 inches.

1B21-R623A (Fuel Zone) is -170 inches.

INITIATING CUES:

Determine which of these RWL indications are valid and report the corrected RWL for all valid RWL instrumentation.

2012-301 ADMIN-2 Page 3 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly FAIL U

Above standards not met U

Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be selfcorrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-TheJob Training and Task Performance Evaluation.

START TIME:________

1.

Operator identifies the procedure Operator has identified the correct needed to perform the task, procedure as 34AB-B21-002-1.

NOTE: If the operator (STA) indicates that SPDS would be checked, give the operator Supplement 1.

PROMPT:

IF the operator addresses Drywell temperature indications, INDICATE for the operator that temperature is greater than 150°F (Use Supplement I if SPDS is addressed).

2.

Determine if RWL corrections are Using SPDS (or Drywell temp required.

indications) the operator DETERMINES:

Drywell temperature is greater than 150°F.

RWL corrections ARE required.

3.

Review Caution 1 and Caution 2 on The operator has REVIEWED Attachment I of 34AB-B21-002-1.

Caution 1 and Caution 2 on of 34AB-B21-002-l.

(*

  • Indicates critical step)

2012-301 ADMIN-2 Page 4 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTSH PROMPT:

IF the operator addresses instrument behavior, as the board operator, INFORM the operator that NO erratic behavior for the specified instruments has been observed.

4.

Confirm there is no indication of The operator has VERIFIED, by erratic instrument behavior, observation or by addressing the panel operator, that the following RWL instruments show NO erratic instrument behavior:

1B21-R604A 1B21-R604B 1B21-R623A (Wide Range) 1B21-R623B (Wide Range) 1B21-R623A (Fuel Zone)

PROMPT:

WHEN the operator indicates use of the Diagnostic screen of SPDS, GIVE the operator Supplement 2.

5.

Determine highest temperature for At SPDS panel, the operator has RTD Group I and 2 (Maximum Run DETERMINED the following Temperature).

Maximum Run Temperatures:

RTD Group I

- 260°F RTD Group 2 - 257°F PROMPT:

IF the operator addresses temperature indications on Panels P654 and P657; indications can be SIMULATED using the values from Supplement 2.

  • Indicates critical step)

2012-301 ADMIN-2 Page 5 of 9 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)1

    • 6.

Determine if the RWL instrument may The operator has DETERMINED be used by comparing the Minimum the following RWL instruments Indicated Level for the associated are VALID:

Maximum Run Temperature.

1B2l-R604A 1B21-R604B 1B21-R623A (Wide Range)

I B21-R623B (Wide Range) 1B21-R623A (Fuel Zone) 1B21-R623B (Fuel Zone)

    • 7 Determine corrected Fuel Zone Level Using Attachment 3 of (1B21-R623A).

34AB-B2 1-002-1, the operator has DETERMINED Corrected Level for 1B21-R623A (fuel zone) is -137 inches (accept +/-1 inch).

PROMPT:

IF the Operator informs you that the Wide Range Instruments are not the preferred RWL Instruments for the current RWL, ACKNOWLEDGE and INFORM the Operator to continue with the RWL corrections.

    • 8.

Determine Drywell Temperature Using Attachment 4 of Correction Factor for instruments 34AB-B21-002-1, the operator 1B21-R604A and 1B21-R623A has DETERMINED the (Wide Range).

Correction Factor is 8 inches (accept +/-1 inch) for instruments 1B21-R604A and 1B21-R623A (Wide Range).

    • 9*

Determine Drywell Temperature Using Attachment 4 of Correction Factor for instruments 34AB-B21-002-1, the operator 1B21-R604B and 1B21-R623B has DETERMINED the (Wide Range).

Correction Factor is 8 inches (accept +/-1 inch) for instruments 1B21-R604B and 1B21-R623B (Wide Range).

(** Indicates critical step)

2012-301 ADMIN-2 Page 6 of 9 STEP I

SAT/UNSAT PERFORMANCE STEP I

STANDARD j

(COMMENTS) 1

    • IO.

Determine corrected RWL for the The operator has DETERMINED following Wide Range instruments:

the corrected level for the following Wide Range 1 B21 -R604A instruments:

1B21-R623A (Wide Range) 1B21-R604A is -133 inches (+/-1) 1B21 -R60413 1B21-R623A (Wide Range) is 1B21-R623B (Wide Range)

-133 inches (+/-1) 1B21-R604B is -135 inches (+/-1) 1B21-R623B (Wide Range) is

-135 inches (+/-1)

NOTE: Acceptance +/-1 inch for each corrected level.

END TIME:

NOTE:

The terminating cue shall be given to the Operator when:

After JPM step #10 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

( Indicates critical step)

Page 7 of 9 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

The Reactor has scrammed and the board operator has reported the following UNCOMPENSATED Reactor Water Levels:

1B21-R604A and 1B21-R623A (Wide Range) is -125 inches.

1B21-R604B and 1B21-R623B (Wide Range) is -127 inches.

1B21-R623A (Fuel Zone) is -170 inches.

INITIATING CUES:

Determine which of these RWL indications are valid and report the corrected RWL for all valid RWL instrumentation.

SRM I

I0UTI cPS SECONDARY HNP1I___

HNP2I I

MODE: RUN 0

POWER 125 100W 75.

50*

25 0-fl jtCilcc iCiJcc jiCi/cc VENT HNP1 I

I HNP2 I

I STACK N

180 ISOLATION PRIMARY nIALL IALL 90 I

2A 2B 2C2D2E SEC IALL 270 PSIG y3,{IJ 0

SUPPLEMENT 1

_l__

DRYWELL TEMPERATURE NOO4 NOO7 NOD1B NOO1L NOO5 DIAGNOSTIC VOLUMETRIC 12201 DEG. F AVG.

TEMP NOO1J NOD1M N008 NOO1A NOD 1K N002 N003 SUPPLEMENT 2

DRAFT Southern Nuclear K I. Hatch Nuclear Plant Operations Training JPM ADMIN 3 RO ONLY SOUTHERN COMPANY TITLE Anthony Ball Determine if plant conditions allow a Quick Restart of a Recirculation Pump.

AUTHOR MEDIA NUMBER TIME 2012-301 ADMIN-3 15 Minutes RECOMMENDED BY APPROVED BY DATE NR

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number:

2012-301 ADMIN-3 Rev. No.

Date Reason for Revision Authors Supvs I

Initials Initials 00 Modified from LR-JP-25050 & will become new LR-JP-25053 after NRC Exam.

ARB

2012-301 ADMTN-3 Page 2 of 10 UNIT 1 (X)

UNIT 2

()

TASK TITLE:

Determine if plant conditions allow a Quick Restart of a Recirculation Pump.

3PM NUMBER:

2012-301 ADMIN-3 TASK STANDARD:

The task shall be complete when it has been determined that the requirements of 34S0-B31-001-1, Reactor Recirculation System have NOT been met to start a Reactor Recirculation pump.

TASK NUMBER:

004.002 OBJECTIVE NUMBER:

004.002.A K/A CATALOG NUMBER: Generic 2.1.20/Generic 2.1.32 K/A CATALOG JTA IMPORTANCE RATING:

RO 4.3/3.4 SRO 4.2/3.8 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO)/Senior Reactor Operator (SRO)

  • GENERAL

REFERENCES:

Unit 1 34S0-B3 1 -OPS-00 1-1 (Current Version)

REQUIRED MATERIALS:

Unit 1 3400-OPS-001-1 (Current Revision)

APPROXIMATE COMPLETION TIME:

15 Minutes SIMULATOR SETUP:

N/A, Used for NRC Adrnin JPM (classroom setting)

2012-301 ADMIN-3 Page 3 of 10 EVALUATOR COPY UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

10 minutes ago, the Unit 1 reactor scrammed from 100% power.

2.

Both Reactor Recirculation pumps tripped during the scram transient.

3.

Reactor water level went as low as 10 inches and has been restored to

+37 inches using Reactor Feedwater Pumps.

4.

HPCI and RCIC were not required during the transient and have remained in standby.

5.

RWCU is in service.

6.

The Shift Supervisor has given direction to perform a Quick Restart of the 1B Reactor Recirculation pump to prevent thermal stratification.

7.

An operator has entered 34S0-B31-001-1, Reactor Recirculation System and completed steps 7.1.4.2.1 through 7.1.4.2.5 (Recirc Pump B Quick Re-start).

8.

Data collection began 4 minutes ago and the operator has completed gathering plant data for use with step 7.1.4.2.6 of 34S0-B31-001-l.

INITIATING CUES:

Determine if plant conditions meet the procedural requirements for Quick starting the 1B Reactor Recirculation pump per step 7.1.4.2.6 of 34S0-B3 1-001 -1, Reactor Recirculation System.

2012-301 ADMIN-3 Page4of 10 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJTIO.JE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg aN steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly FAIL Li Above standards not met U

Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.

START TIME:________

NOTE: 34S0-B31-OO1-1, Attachment 6 serves as an answer key for this JPM. It is NOT to be provided to the student.

NOTE: At this time, provide the operator with Attachment 1 (Plant Data page) and a copy of 34S0-B31-001-1.

PROMPT:

IF addressed by the operator, INFORM the operator that the ASD is NOT in local control.

1.

Operator refers to step 7.1.4.2.6 and is Step 7.1.4.2.6 directed to Attachment 6 of 34SO-B31-001-1.

2.

Operator selects B Recirc Pump.

Places a check mark next to B Recirc. Att. 6 Step 1.0 3.

The operator enters the current time.

Records current time.

Att. 6 Step 2.0

    • 4, The operator determines RPV Tsat = 521° F (+/-2° F) saturation temperature.

Att. 6 Step 2.0 (A)

(

Indicates critical step)

2012-301 ADMIN-3 Page 5 of 10 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 1 NOTE: Data is NOT required to be filled in for the 1 A Recirc Pump in the following step.

5.

The Operator enters suction Recirc 1A: 470° F temperature for Recirculation Pumps.

Recirc 1B: 475° F (Att. 6 Step 2.0 (A) & (B))

6.

The operator enters the bottom head Bottom head temperature: 365° F temperature.

(Att. 6 Step 2.0 (D))

7.

The operator calculates the At between At = (5210 F

- 475° F) = 46° F the IB ioop and the RPV.

(+/-2° F) (Att. 6 Step 1.2.1)

    • 8.

The operator determines the At At of 46° F (+/-2° F) is < 50° F between the 1B loop and the RPV (Att. 6 Step 3.1)

IS acceptable.

NOTE: The student should NOT use step 4.2 to perform the following confirmation of plant conditions due to the NOTE that precedes step 4.0 (RWCU is in service). If the operator does refer to step 4.2, the check will NOT be acceptable due to Feedwater temperature < 300° F.

    • 9*

The operator calculates the At between At = (521° F - 365° F) = 156° F bottom head and steam dome.

(+/-2° F) (Att. 6 Step 4.1)

    • 1O.

The operator determines that the At At of 142° F (+/-2° F) is < 145° F between bottom head and steam dome (Att. 6 Step 4.1)

IS acceptable.

11.

The operator reports to the Shift Plant conditions ARE acceptable Supervisor, for starting the 1B Reactor Recirculation pump.

NOTE: Step 4.2 is NOT required to be performed (it is an alternate method). If the student chooses to perform step 4.2, the conditions will NOT allow the start of the Recirc Pump (FW temp <300 F). The following information is expected to be determined by the student (see Attachment for details):

(a) is met (>40% of rated flow prior to the RPT).

(b) is met (HPCI and RCIC have not injected since the RPT)

(c) is NOT met (FW temp is not >300 F since the RPT) is met (<30 minutes since trip) and start time (calculated time to start is required to be 30 minutes from the RPT time)

  • Indicates critical step)

2012-301 ADMIN-3 Page 6 of 10 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

PROMPT:

IF addressed by the operator, as the STA, INFORM the operator that power/flow map conditions are acceptable for starting the Recirc Pump.

PROMPT:

IF addressed by the operator, as the Shift Supervisor, INFORM the operator that another operator will verify his calculations.

END TIME:________

NOTE:

The terminating cue shall be given to the operator when:

After JPM step #11 is complete.

With no reasonable progress, the operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

( Indicates critical step)

ti rj-i j.

j. jj]- j 103 UI LUO DOCUMENT TITLE:

DOCUMENT NUMBER:

VERSION No:

REACTOR RECIRCULATION SYSTEM 34S0-B31-001-1 41.1 ATTACHMENT Attachment Page TITLE:

RECJRC PUMP QUICK RE-START LIMIT CHECKS 2 of 4 E9UIEI

[NOTE:

This attachment may be performed in Modes 1, 2, AND 3.

1 1.0 Recirc Loop and RPV Limit Checks:

Pre-startup checks for (v):

A recirc B recirc 2.0 Record the foHowing data: Time CURRENT TIME APPLICANTS INITIALS Parameter Location Value SPDS MISC RPV Heatup/

Cooldown OR Steam Tables

  • The Bottom Head Drain temperature (D) may still be used even IF RWCU is NOT in service.

(See Limitation 5.2.14). IF Bottom Head Drain temperature is NOT available, (i.e., inoperable),

THEN use the alternate method of confirming the Bottom Head to Coolant z\\T in step 4.0.

FOR the Recirc loop to be started, confirm the AT between the reactor coolant temperature in the loop AND the RPV coolant temperature is 50°F by performing step3.1 OR 3.2 below:

3.1 IF both recirc loops are idle; Loop A AT = 1(A)

- (B)

=

(acceptable 50°F)

OR Loop B AT = 1(A)

- (C) I

=

46°F (+/-2°F) (acceptable 50°F)

INITIALS

..................................... Qi *..................e..............e..........

3.2 IF only one recirc loop is idle, THEN loop AT = 1(B)

- (C) I

=

(acceptable 50°F)

NA OPS-1321 Ver. N/A EVALUATOR USE ONLY (KEY)

DO NOT give to candidate RPV Saturation Temp.

(A)

(B)

(C)

(D) 521°F (+/-2°F)

(A) 1B31-R650 OR Equivalent, A Recirc Suction Temp average of process computer 470°F (B) points B034, B035 1B3 l-R650 OR Equivalent, B Recirc Suction Temp average of process computer 475°F (C) points B036, B037

  • 1B21R606 Pt 3 OR
  • 379°F Critical 3.0 NA rrn

G16.030

SNC PLANT E. I. HATCH I Confirm the iT between the bottom head coolant temperature AND the reactor pressure vessel (RPV) coolant temperature is 145°F by performing step 4.1 OR 4.2 below:

z\\T = 1(A)

- (D)

= 142° F (+/-2°F) (acceptable 145°F)

Pg 184 of 208

                                                                            • .B *.............................................

4.2 Per Tech Spec BASES B.3.4.9, confirm ALL of the following:

(a)

One Q!E more loop drive flows were > 40% (18,000 gpm) of rated flow prior to the RPT, AND NA TRUE (b)

HPCI and RCIC Systems have NOT injected since the RPT, AND NA TRUE (c)

Feedwater temperature has remained > 300°F since the RPT, AND NOT CORRECT (d)

Time between the RPT AND restart is <30 minutes.

These are calculated by the student, based on JPM start time. The time will vary.

Record Recirc RPT trip time:

(Ti)

Recirc start is required prior to:

(Ti) + 30 minutes =

IF only ONE Recirc pump is idle, THEN confirm the operating pump loop flow is <22,500 gpm.

NA Critical 6.0 Confirm the:

(1)

Power/flow condition is acceptable for restart per the STA/Rx Engineering.

INITIALS OR (2)

IF the OPRM System is inoperable, the reactor is 10% below the 61% Load Line of Attachment 1, OPRM System INOP Power vs. Flow map in 34AB-C51-001-1, in order to avoid inadvertent entry into the RPI.

INITIALS DOCUMENT TITLE:

DOCUMENT NUMBER:

VERSION No:

REACTOR RECWCULATION SYSThM 34S0-B31-001-1 41.1

(

ATfACHMENT 6 Attachment Page iLE:

RECIRC PUMP QUICK RE-START LIMIT CHECKS 4 of 4 F

IF a direct indication is NOT available for Vessel Bottom Head Drain temp (D),

NOTE:

THEN within 30 minutes of an RPT, the bottom head to coolant zT ( 145°F) may be confirmed per the alternate method in step 4.2.

Critical 4.0 4.1 INITIALS Critical 5.0 EVALUATOR USE ONLY (KE

)

DO NOT give to candidate INITIALS OPS-1321 Ver. N/A G16.030 MGR-0009 Ver. 5

SNC PLANT E. I. HATCH I 7.0 Independently verify the data recorded above is ACCEPTABLE prior to proceeding with the recirc pump start.

Critical Pg 185 of 208 (VERIFIED)

INITIALS 8.0 Confirm the steps 1.0 thru 7.0 above, was performed within the ast 15 minutes.

9.0 Record Recirc pump start time:

OPS-1321 Ver. N/A G16.030 INITIALS INITIALS DOCUMENT TITLE:

DOCUMENT NUMBER:

VERSION No:

REACTOR RECIRCULATION SYSTEM 34S0-B31-001-1 41.1 ATFACHMENT Attachment Page iLE:

RECIRC PUMP QUICK RE-START LIMIT CHECKS 4 of 4 EVALUATOR USE ONLY (KEY)

DO NOT give to candidate MGR-0009 Ver. 5

Page 10 of 11 UNIT 1 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

10 minutes ago, the Unit 1 reactor scrammed from 100% power.

2.

Both Reactor Recirculation pumps tripped during the scram transient.

3.

Reactor water level went as low as 10 inches and has been restored to

+37 inches using Reactor Feedwater Pumps.

4.

HPCI and RCIC were not required during the transient and have remained in standby.

5.

RWCU is in service.

6.

The Shift Supervisor has given direction to perform a Quick Restart of the 1B Reactor Recirculation pump to prevent thermal stratification.

7.

An operator has entered 34S0-B31-001-1, Reactor Recirculation System and completed steps 7.1.3.1 through 7.1.3.9 (Recirc Pump A(B)

Quick Restart).

8.

Data collection began 4 minutes ago and the operator has completed gathering plant data for use with step 7.1.3.10 of 34S0-B31-00l-l.

INITIATING CUES:

Determine if plant conditions meet the procedural requirements for starting the 1B Reactor Recirculation pump per step 7.1.4.2.6 of 34S0-B3 1-001-1, Reactor Recirculation System.

Page ii of ii PROVIDE TO APPLICANT 1 Plant Data Reactor pressure: 805 psig A Recirc Suction Temp (1B31-R650): 4700 F B Recirc Suction Temp (1B31-R650):

4750 Vessel Bottom Head Drain (1B21-R606 Pt 3): 379° F Reactor Feedwater temperature:

295° F

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM ADMIN 4 ALL TITLE REVIEW OF HPCI PUMP OPERABILITY SURVEILLANCE AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 ADMIN-4 15 Minutes RECOMMENDED BY APPROVED BY DATE SOUTHERNA COMPANY

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number: 2012-301 ADMIN-4 1

Authors Supvs Rev. No.

Date i

Reason for Revision I

Initials Initials 00 initial development.

ARB

2012-301 ADMIN-4 Page 1 of 12 UNIT 1 (

)

UNIT 2(X)

TASK TITLE:

REVIEW OF HPCI PUMP OPERABILITY SURVEILLANCE JPM NUMBER:

2012-301 ADMTN-4 TASK STANDARD:

The task shall be complete when the operator reviews the completed surveillance procedure, 34SV-E41-002-2, and determines HPCI is inoperable and one PSW valve must be retested or declared inoperable and the other is inoperable.

TASK NUMBER:

300.011 OBJECTIVE NUMBER:

300.011.0 K/A CATALOG NUMBER:

Generic 2.2.12 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.7 SRO 4.1 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO) / Senior Reactor Operator (SRO)

GENERAL

REFERENCES:

Unit 2 34SV-E41 -002-2 (current version)

REQUIRED MATERIALS:

Unit 2 Completed surveillance package: 34SV-E41-002-2.

APPROXIMATE COMPLETION TIME:

15 Minutes SIMULATOR SETUP:

N/A

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is at 100% power.

2.

A HPCI Pump Quarterly 1ST Data Test (1ST) has just been completed for the HPCJ pump JAW 34SV-E41M02-2, HPCI Pump Operability.

INITIATING CUES:

Review Attachment 1 of 34SV-E41-002-2, HPCI Pump Operability.

Complete any calculations required by the surveillance data sheets.

Inform the Shift Supervisor of your results and any recommendations or procedural requirements based on the results.

Page 2 of 12

2012-301 ADMIN-4 Page 3 of 12 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly FAIL U

Above standards not met U

Mark the JPM as a FAIL (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.

START TIME:

PROMPT:

AT this time, GIVE the operator a complete copy of 34SV-E41 -002-2, HPCI Pump Operability.

PROMPT:

AT this time, GIVE the operator Attachment 2 of this JPM (Data has been filled in for this JPM).

PROMPT:

IF the operator addresses the 1ST Book, INFORM the operator that a supervisor has verified the reference data.

1.

The operator evaluates parameters on On Attach. I of 34SV-E41-002-2, and finds Turbine Speed the operator EVALUATES Nr is acceptable.

Turbine Speed Nr data is SATISFACTORY. 3900 rpm (Acceptable Range:

3861 (0.99) to 3939 (1.01) rpm)

( Indicates critical step)

2012-301 ADMIN-4 Page 4 of 12 STEP PERFORMANCE STEP STANDARD I

(COMMENTS) 2.

The operator evaluates parameters on On Attach. 1 of 34SV-E41-002-2, Attachment I and finds Inlet Pressure the operator EVALUATES Inlet (Stopped) (P

1) is acceptable.

Pressure (Stopped) (P

1) data is SATISFACTORY. 34 psig Acceptable Range: >7 psig.

3.

The operator evaluates parameters on On Attach. I of 34SV-E41-002-2, and finds Inlet Pressure the operator EVALUATES Inlet (Running) (P

1) is acceptable.

Pressure (Running) (P

1) data is SATISFACTORY. 31 psig Acceptable Range: >7 psig.
    • 4 The operator evaluates parameters on At step 7.8.2.1.1 of 34SV-E41-Attachment I and finds Outlet 002-2, the operator Pressure (Running) P0 is NOT EVALUATES Outlet Pressure acceptable.

data IS NOT SATISFACTORY.

1072 psig is not in theAcceptable Range of> 1135 psig.

NOTE: At this time, the operator may elect to inform the Shift Supervisor that Outlet Pressure (Running) P0 is NOT acceptable and HPCI has failed the surveillance. This action IS acceptable.

It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.

PROMPT:

IF the operator addresses the out of spec. item(s), DIRECT the operator to finish the data package review.

(** Indicates critical step)

2012-301 ADMIN-4 Page 5 of 12 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

    • 5 The operator evaluates parameters on On Attach. 1 of 34SV-E41-002-2, and finds Differential the operator EVALUATES Pressure (2) dPr is NOT acceptable.

Differential Pressure (2) dP data IS NOT SATISFACTORY.

0.88 dPr is not in theAcceptable Range of 0.90 to 1.10 dPr.

NOTE: Ratio Differential Pressure (2) dPr is equal to the Test Value dPr divided by the Reference Value dP

1. 1041/1183 = 0.88.

At this time, the operator may elect to inform the Shift Supervisor that Differential Pressure (2) dPr is NOT acceptable and HPCI must be declared inoperable. This action IS acceptable.

It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.

PROMPT:

IF the operator addresses the out of spec. item(s), DIRECT the operator to finish the data package review.

6.

The operator evaluates parameters on On Attach. I of 34SV-E41-002-2, and finds Flowrate (4) the operator EVALUATES (Q

T) is acceptable.

Flowrate (4) (Qr) data (4250 gpm) is SATISFACTORY.

Acceptable value is 4250 gpm.

time data for 2P41-F035A and determines that the valve data is NOT SATISFACTORY.

4.75 seconds has exceeded the Calculated Allowable Time range of 1.5 to 4.5 seconds.

NOTE: At this time, the operator may elect to inform the Shift Supervisor that 2P41-F035A has exceeded the Calculated Allowable Time range of 1.5 to 4.5 seconds and must be immediately retested or declared inoperable.

This action IS acceptable.

It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.

  • Indicates critical step)

2012-301 ADMIN-4 Page 6 of 12 STEP I

PERFORMANCE STEP I

STANDARD I

SAT/UNSAT I

I I

(COMMENTS)

I PROMPT:

IF the operator addresses the out of spec. item(s). DIRECT the operator to finish the data package review.

    • 8.

The operator evaluates the stroke time On Attach. 1 of 34SV-E41-002-2, data for the cooling water valve the operator evaluates the stroke 2P41-F035B.

time data for 2P41-F035B and determines that the valve data is NOT SATISFACTORY.

5.2 seconds has exceeded the MAXIMUM Time Limit of 5.0 seconds.

NOTE: At this time, the operator may elect to inform the Shift Supervisor that 2P41-F035B has exceeded the MAXIMUM Time Limit of 5.0 seconds and must be declared inoperable immediately. This action IS acceptable.

It IS also acceptable for the operator to complete the review before bringing this to the supervisors attention.

PROMPT:

WHEN the operator addresses the Out of Spec readings, INFORM the operator to make recommendations based on the findings.

(*

  • Indicates critical step)

2012-301 ADMTN-4 Page 7 of 12 STEP PERFORMANCE STEP STANDARD I

(COMMENTS)

The operator determines the The operator determines the procedural requirements.

following procedural requirements:

  • HPCT pump is inoperable due to Outlet Pressure (Running) P0 <1135 psig per steps 7.8.2.1.1 & 7.7.2.

o 2P41-F035A has exceeded the Calculated Allowable Time (1.5 to 4.5) per step 7.8.4.2 and must be immediately retested OR declared inoperable per step 7.7.7.2.

  • 2P41-F035B has exceeded the Maximum Time Limit of 5.0 seconds per step 7.8.4.1 and must be declared inoperable per step 7.7.7.1.

NOTE:

If the operator addresses writing a Condition Report (CR) based on this surveillance, inform the operator that another operator will write the CR.

END TIME:

NOTE:

The terminating cue shall be given to the Operator when:

After JPM step #9 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

( Indicates critical step)

ATTACHMENT 1

    • KEY **

DO NOT give this to applicant SNC PLANT E. I. HATCH

Pg 45 of 66 DOCUMENT TITLE:

I DOCUMENT NUMBER:

Version No:

HPCI PUMP OPERABILITY j

34SV-E41-002-2 30.25 ATTACHMENT 1

Affachment Page TITLE:

HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 1 of 2 Reference Data Changes:

Is reference data being changed?

(

) Yes (v) No IF YES, list justification for so doing:

(2E41 -Cool)

DATE REF REQD INSTRU MPL REFERENCE ACCEPT.

ALERT RATIO PARAMETER VALUE TEST VALUE ACTION NO.

VALUE RANGE RANGE (3)

TAKEN RANGE (1)

Turbine 0.99 to 2E41-R610 3900 01/18/2010 3900 N/A N/A N/A Speed (Nr) 1.01 RPM Inlet Pressure 2E41-R606 34 01/18/2010 34 7PSIG N/A

<7PSIG N/A Stopped) (P)

Inlet Pressure (Running) 2E41-R606 32 01/18/2010 31 7 PSIG N/A

<7 PSIG N/A (P)

Outlet Pressure 2E41-R601 1215 01/18/2010 1072 N/A N/A N/A N/A (Running)

(P 0)

Differential

<0.90 dPr 0.90 to Pressure (2)

N/A 1183 01/18/2010 1041 N/A or>1.10 1.10 dPr (DPr) dPr Flowrate (4) 2E41-R612 4250 N/A 4250 N/A N/A N/A 1.0 (Qr)

(1)

Pump declared inoperable according to 31G0-INS-001-0.

(2)

Differential pressure must be calculated as: dP Outlet Pressure (pump running)

- Inlet Pressure (Pump running)

(3)

Ratio = Test Value divided by Reference Value (4)

Test value must equal reference value. Ratio for flowrate must equal 1.0.

Page 8 of 12

SNC PLANT E. I. HATCH I

Pg 46 of 66 DOCUMENT TITLE:

DOCUMENT NUMBER:

Version No:

HPCI PUMP OPERABILITY 34SV-E41-002-2 30.25 ATTACHMENT 1

Attachment Page TITLE:

HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 2 of 2 NOTE*

WHEN calculating OR recording valve stroke times, round off to the nearest tenth second.

COLUMN 2 COLUMN 4 COLUMN 5 COLUMN 3 CALCULATED REFERENCE OPERATING MAXIMUM TIME ALLOWABLE TIME TIME LIMIT TIMED COLUMN 1 TIME (SEC)

BY:

MPL (TYPE)

(SEC)

(SEC)

INIT OPEN CLOSE OPEN CLOSE OPEN CLOSE OPEN CLOSE MIN/MAX MIN/MAX 2P41-F035A 3.0 N/A 1.5 4.5 N/A N/A 4.75 N/A

<5 N/A SMH AOV 2P41-F035B 2.5 N/A 1.25 3.75 N/A N/A 5.2 N/A

<5 N/A SMH AOV IF operating time is less than 1 second, record 1 second as operating time.

VERIFY STROKE TIMES ACCEPTABLE:

DATE:

ATTACHMENT 1

    • KEY **

DO NOT give this to applicant Page 9 of 12

ATTACHMENT 2 SNC PLANT E. I. HATCH I

PROVIDE TO APPLICANT Pg 45 of 66 DOCUMENT TITLE:

I DOCUMENT NUMBER:

Version No:

HPCI PUMP OPERABILITY I

34SV-E41-002-2 30.25 ATTACHMENT j_

Attachment Page TITLE:

HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 1 of 2 Reference Data Changes:

Is reference data being changed?

(

) Yes

( vi) No IF YES, list justification for so doing:

(2E41 -Cool)

DATE REF REQD INSTRU MPL REFERENCE ACCEPT.

ALERT RATIO PARAMETER VALUE TEST VALUE ACTION NO.

VALUE RANGE RANGE (3)

TAKEN RANGE (1)

Turbine 0.99 to 2E41-R610 3900 01/18/2010 3900 N/A N/A N/A Speed (Nr)

1.01 RPM Inlet Pressure 2E41-R606 34 01/18/2010 34 7PSIG N/A

<7PSIG N/A (Stopped) (P)

Inlet Pressure (Running) 2E41-R606 32 01/18/2010 31 7 PSIG N/A

<7 PSIG N/A (Pt)

Outlet Pressure 2E41-R601 1215 01/18/2010 1072 N/A N/A N/A N/A (Running)

(P 0)

Differential

<0.90 dPr 0.90 to Pressure (2)

N/A 1183 01/18/2010 1041 N/A or>1.10 1.10 dPr (DPr) dPr Flowrate (4) 2E41-R612 4250 N/A 4250 N/A N/A N/A 1.0 (Qr)

(1)

Pump declared inoperable according to 3100-INS-O01-0.

(2)

Differential pressure must be calculated as: dP = Outlet Pressure (pump running)

- Inlet Pressure (Pump running)

(3)

Ratio = Test Value divided by Reference Value (4)

Test value must equal reference value. Ratio for flowrate must equal 1.0.

Page 10 of 12

NOTES WHEN calculating Q recording valve stroke times, round off to the nearest tenth second.

COLUMN 1 MPL (TYPE) 2P41-F035A AOV COLUMN 2 REFERENCE TIME (SEC OPEN 3.0 CLOSE N/A COLUMN 3 CALCULATED ALLOWABLE TIME (SEC)

OPEN MIN/MAX 4.5 1.5 CLOSE MIN/MAX N/A N/A COLUMN 4 OPERATING TIME (SEC OPEN 4.75 CLOSE N/A COLUMN 5 MAXIMUM TIME LIMIT (SEC OPEN

<5 CLOSE N/A TIMED BY:

INIT SMH j[ operating time is less than 1 second, record 1 second as operating time.

VERIFY STROKE TIMES ACCEPTABLE:

DATE:

SNC PLANT E. I. HALcI-U ATTACHMENT 2 PROVIDE TO APPLICANT DOCUMENT TITLE:

DOCUMENT NUMBER:

Version No:

HPCI PUMP OPERABILITY 34SV-E41-002-2 30.25 ATTACHMENT 1

Attachment Page TITLE:

HPCI PUMP QUARTERLY 1ST DATA AND ACCEPTANCE CRITERIA 2 of 2 PQ 46 of 66 2P41 -F035B 2.5 N/A 1.25 3.75 N/A N/A 5.2 N/A

<5 N/A SMH AOV Page 11 of 12

UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is at 100% power.

2.

An In-Service Test (1ST) has just been completed for the HPCI pump JAW 34SV-E41-002-2, HPCI Pump Operability.

INITIATING CUES:

Review Attachment I of 34SV-E41 -002-2, HPCI Pump Operability.

Complete any calculations required by the surveillance data sheets.

Inform the Shift Supervisor of your results and any recommendations or procedural requirements based on the results.

Page 12 of 12

DRAFT Southern Nuclear E. I, Hatch Nuclear Plant Operations Training JPM Admin 5 ALL SOUTHERN COMPANY TITLE RADIATION EXPOSURE CALCULATION AND REQUIRED AUTHORIZATION AUTHOR MEDIA NUMBER TIME Anthony Ball 2012-301 ADMIN-5 15 Minutes RECOMMENDED BY APPROVED BY DATE

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of I FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number: 2012-301 ADMIN-5 Rev. No.

Date 1

Reason for Revision Authors Supvs I

Initials Initials 01 Revision for HLT7 NRC Exam. After NRC Exam, ARB Media Number will be changed to LRJP-10020-01.

2012-301 ADMIN-5 Page 1 of 5 UNIT 1

(

)

UNIT 2 (X)

TASK TITLE:

Radiation Exposure Calculation and Required Authorization.

JPM NUMBER:

2012-301 ADMIN-5 TASK STANDARD:

The task shall be complete when it has been determined the job cannot be performed without exceeding annual administrative radiation exposure limits, and determining the level of approval to exceed the annual administrative radiation exposure limit.

TASK NUMBER:

N/A OBJECTIVE NUMBER:

LT30008.01 K/A CATALOG NUMBER: Generic 2.3.4 K/A CATALOG JTA IMPORTANCE RATING:

RO 3.2 SRO 3.7 OPERATOR APPLICABILITY:

Nuclear Plant Operator (NPO) / Senior Reactor Operator (SRO)

GENERAL

REFERENCES:

Unit 2 6OACHPX-001-0 (current version)

REQUIRED MATERIALS:

Unit 2 6OAC-HPX-001-0 (current version)

APPROXIMATE COMPLETION TIME:

15 Minutes SIMULATOR SETUP:

N/A

EVALUATOR COPY UNIT 2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

You are a radiation worker at Hatch and have been assigned to perform a job in the Unit 2 Clean Up Phase Separator (CUPS) room.

2.

Gamma radiation is the only type of radiation of concern for this particular job (no airborne, Beta or Alpha).

3.

Your job inside the CUPS room, will take 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

4.

Your total exposure (TEDE) for the year so far has been confirmed to be 1400 mrem.

5.

One of the radiation fields you will work in for 20 minutes is 4500 mremlhour (Gamma radiation).

6.

The other radiation field that you will work in for 40 minutes is 1200 mremlhour (Gamma radiation).

7.

The dose in the travel path to the CUPS room is 1800 mremlhr.

8.

Travel time through the 1800 mrem/hr field to the CUPS area is 6 minutes EACH WAY.

INITIATING CUES:

Calculate the Total exposure you will receive for the job.

Determine if any Administrative Radiation Exposure Limits will be exceeded.

Considering your current exposure (1400 mrem) and that which will be received from this job, determine who must authorize the exposure, if anyone, lAW 6OAC-HPX-001-0.

2012-301 ADMIN-5 Page 3 of 5 STEP I

SAT/UNSAT I

PERFORMANCE STEP STANDARD (COMMENTS)

IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly U

Mark the JPM as a FAIL FAIL IU Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have liffle or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.

START TIME:_______

NOTE: If the applicant addresses 8.1.2.1 which states: Prior to an individuals first work assignment in which the individual is likely to receive in excess of 2% of the limits in 8.1.1, the individual MUST submit a signed statement indicating the amount of occupational radiation exposure received during the current calendar year from sources of radiation possessed by other licensees. INFORM the applicant that this form has been signed.

    • 1.

The applicant calculates exposure in (4,500 mremlhr) X 20 mm

=

the 4,500 mremlhour field.

60 mm 1500 mrem.

The applicant calculates exposure in the 1200 mrem/hour field.

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

    • 2 (1200 mremlhr) X 40 mm 60 mm 800 mrem
    • 3 The applicant calculates the dose (1800 mremlhr) X 6 mm x 2 trips received from travel time.

60 mm

= 360 mrem.

2012-301 ADMIN-5 Page 4 of 5 STEP I

I SAT/UNSAT I

PERFORMANCE STEP STANDARD (COMMENTS) 1

    • 4 The applicant calculates total exposure:

1400 1500 800 360 4060 mrem Total

    • 5 The applicant determines that the The Hatch Administrative limits Hatch Annual Administrative are 2,000 and 4000 mremlyear.

Radiation Exposure limit will be (6OAC-HPX-001-0 step 8.2.1) exceeded while performing the work.

NOTE: The applicant may address being on the Margin List when within 400 mrem of the administrative exposure limit. It is not necessary for the applicant to discuss the requirements of the margin list for this JPM.

PROMPT:

IF the applicant addresses the margin list, STATE that the Health Physics department is taking appropriate actions for Margin List requirements based on expected exposures for this job.

    • 6.

The applicant determines the With available exposure authorization requirements to exceed confirmed, authorization must be the Annual Administrative limits, written approvals from an HP Supervisor and from the Plant Manager. (Step 8.2.2)

NOTE:

The terminating cue shall be given to the Operator when:

After JPM step #6 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE:

We will stop here.

END TIME:_______

EVALUATOR PICK UP the Initiating Cue sheet.

Page 5 of 5 UNIT 2 READ TO THE APPLICANT INITIAL CONDITIONS:

1.

You are a radiation worker at Hatch and have been assigned to perform a job in the Unit 2 Clean Up Phase Separator (CUPS) room.

2.

Gamma radiation is the only type of radiation of concern for this particular job (no airborne, beta or alpha).

3.

Your job inside the CUPS room, will take 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

4.

Your total exposure (TEDE) for the year so far has been confirmed to be 1400 mrem.

5.

One of the radiation fields you will work in for 20 minutes is 4500 mremlhour (gamma radiation).

6.

The other radiation field that you will work in for 40 minutes is 1200 mremlhour (gamma radiation).

7.

The dose in the travel path to the CUPS room is 1800 mremlhr.

8.

Travel time through the 1800 mremlhr field to the CUPS area is 6 minutes each way.

INITIATING CUES:

Calculate the total exposure you will receive for the job.

Determine if any administrative radiation exposure limits will be exceeded.

Considering your current exposure (1400 mrem) and that which will be received from this job, determine who must authorize the exposure, if anyone, JAW 6OAC-HPX-001-0.

DRAFT Southern Nuclear E. I. Hatch Nuclear Plant Operations Training JPM Admin 6 SRO ONLY SOUTHERN COMPANY TITLE EMERGENCY CLASSIFICATION AND NOTIFICATION (NEW EALS)

AUTHOR MEDIA NUMBER TIME CRITICAL Anthony Ball 2012-301 ADMIN-6 15.0/15.0 Minutes RECOMMENDED BY APPROVED BY DATE N/R

SOUTHERN NUCLEAR OPERATING COMPANY PLANT E. I. HATCH Page 1 of 1 FORM TITLE: TRAINING MATERIAL REVISION SHEET Program/Course Code:

OPERATIONS TRAINING Media Number: 2012-301 ADMIN-6 01 Rev. No. J Date J

Reason for Revision Authors Supvs i.

i Initials Initials 00 04/30/07 Initial development CME RAB 1 1/04/10 Added Task and HU Pass/Fail criteria. Updated EU CME Southern_Company_logo.

02 01/12/11 Updated references to NMP-EP-1 10 and MCK DNM NMP-EP-1 11 03 General revision for use on NRC Exam 2012-301.

ARB After NRC Exam, Media Number will be changed to LR-JP-2506 1-03.

2012-301 ADMIN-6 Page 1 of 7 UNIT 1 (X)

UNIT 2 (X)

TASK TITLE:

Emergency Classification and Notification (NEW EALS)

JPM NUMBER:

2012-301 ADMIN-6 TASK STANDARD:

The task shall be completed when the event has been classified per NMP-EP-1 10, the ENN form NMP-EP-1 11 Figure 1 has been completed, and offsite notifications have been directed.

TASK NUMBER:

200.052 OBJECTIVE NUMBER:

200.052.A PLANT HATCH JTA IMPORTANCE RATING:

RO 4.67 SRO 4.04 K/A CATALOG NUMBER: Generic 2.4.4 1 K/A CATALOG JTA IMPORTANCE RATING:

RO 2.9 SRO 4.6 OPERATOR APPLICABILITY:

Senior Reactor Operator (SRO)

  • GENERAL

REFERENCES:

Unit 1 & 2 NMP-EP-1 10 (current version)

NMP-EP-1 1 1 (current version)

F REQUIRED MATERIALS:

Unit 1 & 2 NMP-EP-1 10 (current version)

NMP-EP-111 FIGURE 1 (current version)

APPROXIMATE COMPLETION TIME:

15.0/15.0 Minutes SIMULATOR SETUP:

N/A

EVALUATOR COPY UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is in a LOSP due to a failure of the 2D and 2C SUTs.

2.

The Reactor scrammed and All rods fully inserted on the scram signal.

3.

For the last 15 minutes, Only Emergency Diesel 2A has been running and is supplying power to 2E 4160 VAC bus.

4.

Emergency Diesel Generators lB and 2C start attempts have not been successful.

5.

All other Unit 2 parameters are normal.

6.

The following Unit 1 conditions exists:

100% power All parameters normal INITIATING CUES:

Determine the emergency classification that should be declared.

Complete the ENN form NMP-EP-1 11 Figure 1 for offsite notifications.

Direct the operator to make the proper offsite notifications.

Current time is:

2012-301 ADMIN-6 Page 3 of 7 STEP I

I PERFORMANCE STEP STANDARD (COMMENTS) 1 I

SAT/UNSAT IF THEN U

Human performance tools, safety, PPE met (1), AND U

Mark the JPM as a PASS U

For initial trg all steps completed correctly OR PASS U

For continuing trg, critical steps (if used) completed correctly U

Mark the JPM as a FAIL FAIL U

Above standards not met (1) The standard for human performance tools, safety, PPE, and other pertinent expectations is considered met provided any deviations are minor and have little or no actual or potential consequence. Errors may be self-corrected provided the action would not have resulted in significant actual or potential consequences.

Reference:

NMP-TR-1 11, On-The-Job Training and Task Performance Evaluation.

NOTE: For the completion of this JPM, there is TWO SEPARATE CLOCKS.

The CLASSIFICATION must be made within 15 minutes of the initial prompt.

When the classification is made, a second clock starts. The ENN form and direction to make the NOTIFICATIONS MUST BE COMPLETED WITH 15 MINUTES of that clock start.

1st START TIME:_______

1.

Operator identifies the procedure Operator has identified the correct needed to perform the task, procedure as NMP-EP-1 10.

    • 2.

Operator classified event per Operator has CLASSIFIED the NMP-EP-1 10.

event as an ALERT EMERGENCY.

NOTE: The expected classification is an ALERT based on IC# SA5, Single power source to the ESF busses and an additional failure will result in a station blackout. If follow-up questioning reveals that a classification was declared and based on another IC #, the classification should be evaluated for validity.

1st END TIME:________

( Indicates critical step)

For INITIAL Operator Programs:

For OJT/OJE; ALL PROCEDURE STEPS must be completed for Satisfactory Performance.

For License Examinations; ALL CRITICAL STEPS must be completed for Satisfactory Performance.

STEP NOTE: To successfully complete the ENN form, ALL STEPS HIGHLIGHTED IN YELLOW must be properly completed.

201 2-301 ADMIN-6 Page 4 of 7 SAT/UNSAT (COMMENTS)

To be properly completed, the ENN form must have all the required steps completed with correct information. APPLICABLE HIGHLIGHTED steps must contain sufficient information to describe the event.

    • 4 Operator directs an operator to make Operator has DIRECTED the the ENN notifications Nuclear Plant Operator to make the required ENN notifications.

NOTE:

The terminating cue shall be given to the Operator when:

After 3PM step #4 is complete.

With no reasonable progress, the Operator exceeds double the allotted time.

Operator states the task is complete.

TERMINATING CUE: We will stop here.

EVALUATOR PICK UP the Initiating Cue sheet.

2 END TIME:_______

PERFORMANCE STEP STANDARD NOTE: The classification IS MADE when the operator STATES OR WRITES the classification. This starts the second clock.

PROMPT:

WHEN the operator enquires about meteorological conditions, GIVE the operator the MIDAS Information Sheet.

2° START TIME:________

    • 3 Operator properly completes the ENN Operator has properly form per NMP-EP-l 11.

COMPLETED NMP-EP-1 11 FIGURE 1, Southern Nuclear Emergency Notification form.

(** Indicates critical step)

ATTACHMENT 1 ** KEY ** DO NOT GIVE TO APPLICANT

(*Ma not be available for Initial Precipitation i;1 DECLARATION

11. A?FECTED UNIT(S):
12. UNIT STATUS:

(Unaffected Unit(s) Status Not Required for Initial Notifications)

13. REMARKS:_________________

Above normal operating limits Degrading Wind Speed mph*

FOLLOW-UP INFORMATION (Lines 14 through 16 Not Required for Initial Notifications)

EMERGENCY RELEASE DATA NOT REQUIRED IF LINE 6 A IS SELECTED.

14. RELEASE CHARACTERIZATION:

TYPE:

Elevated Mixed Ground UNITS:

Ci Ci/sec

.tCi/sec MAGNITUDE:

Noble Gases:__________ lodines:___________ Particulates:__________ Other:

FORM: [ Airborne Start Time Date _/_

/._Stop Time Date J_L_

fLiquid Start Time Date.._/_ _j_.Stop Time Date J_J_.

15. PROJECTION PARAMETERS:

Projection performed:

16.

PROJECTED DOSE:

17. APPROVED BY:

NOTIFIED BY:

Projection period:

Time Date DISTANCE Site boundary 2 Miles 5 Miles 10 Miles RECEIVED BY:

Time (To be completed by receiving organization)

Southern Nuclear Operating Company Emergency I

NMP-EP-1 11 JTHERNjZS.

Implementing I

Emergency Notifications Version 6.0 COMPANY Procedure Page 36 of 48 Figure 1 Emergency Notification Form (page 1 of 2) 1.NDRILL I1ACTUALEVENT MESSAGE#____

2. INITIAL FOLLOW-UP NOTIFICATION: TIME DATE

_L__I_ AUTHENTICATION #_____

3. SITE:

Confirmation Phone 4/

4. EMERGENCY CLASSIFICATION:

( UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY EASED ONBAL#________

EAL DESCRIPTION:______________________________________

5, PROTECTIVE ACTION RECOMMENDATIONS:

j NONE I EVACUATE Advise Remainder ofEPZ to Monitor Local Radio/TV Stations/Tone Alert Radios for Additional Information and Consider the use ofEl (potassiumiodide) in accordance with State plans and policy.

OTHER

6. EMERGENCYRELEASE:

None Is Occurring Has Occurred

7. RELEASE SIGNIFICANCE:
8. EVENT PROGNOSIS:
9. METEOROLOGICAL DATA:

j Not applicable Within normal operating limits j Improving

[} Stable Wind Direction from g

] TERMINATION IJ1I Under evaluation Stability Class*

Time Date _.__/

/

UI.._% Power U2 __% Power Shutdown at Time Date

/

I Shutdown at Time Date._J.j___

Hours Estimated Release Duration

_________Hours Accident Type:

TEDE (rnrem)

Adult Thyroid CDE (mrem)

Time______

Title Page 5 of 7

MIDAS iNFORMATION METEOROLOGICAL 1 OM WIND SPD 1 OOM WIND SPD 1 OM WIND DIR 1 OOM WIND DIR 1Y33-R601 1Y33-R603 1Y33-R601 1Y33-R603 5.0 5.0 130 I30 AMBIENT TEMP DELTA T DELTA T RAINFALL (F) 1 OM 60-10 100-10 15 MIN. AVG 54

-1.6

-2.9

.000 RADIOLOGICAL MAIN STACK U 1 RX. BLDG. VENT U2 RX. BLDG. VENT NORMAL RANGE KAMAN NORMAL RANGE KAMAN NORMAL RANGE KAMAN 1D1J-K600A 1D11-R631 1D11-K619A 1D11-R631 2D11-K636A 2D11-R631 2.OOEO1 5,04E01 4.OOEO1 1D11-K600B 1D11-K619B 2D11-K636B 2.OOEO1 4.OOEO1 STABILITY CLASS D

UNIT1&2 READ TO THE OPERATOR INITIAL CONDITIONS:

1.

Unit 2 is in a LOSP due to a failure of the 2D and 2C SUTs.

2.

The Reactor scrammed and All rods fully inserted on the scram signal.

3.

For the last 15 minutes, Only Emergency Diesel 2A has been running and is supplying power to 2E 4160 VAC bus.

4.

Emergency Diesel Generators lB and 2C start attempts have not been successful.

5.

All other Unit 2 parameters are normal.

6.

The following Unit 1 conditions exists:

100% power All parameters normal INITIATING CUES:

Determine the emergency classification that should be declared.

Complete the ENN form NMP-EP-1 11 Figure 1 for offsite notifications.

Direct the operator to make the proper offsite notifications.

Current time is:

Page 7 of 7