{{#Wiki_filter:Dominion Resources Services, Inc.
{{#Wiki_filter:j"Dominion Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 j"Dominion January 7, 2014 U. S. Nuclear Regulatory Commission                                 Serial No. 13-643 Attention: Document Control Desk                                   NLOS /ETS One White Flint North                                               Docket No. 50-338 11555 Rockville Pike                                                License No. NPF-4 Rockville, MD 20852-2738 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 January 7, 2014 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.
NLOS /ETS Docket No.
License No.
13-643 50-338 NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNIT I CYCLE 24 CORE OPERATING LIMITS REPORT. REVISION 2 Pursuant to North Anna Technical Specification 5.6.5.d, attached is a copy of the Dominion Core Operating Limits Report for North Anna Unit 1 Cycle 24 Pattern BUS, Revision 2.
NORTH ANNA POWER STATION UNIT I CYCLE 24 CORE OPERATING LIMITS REPORT. REVISION 2 Pursuant to North Anna Technical Specification 5.6.5.d, attached is a copy of the Dominion Core Operating Limits Report for North Anna Unit 1 Cycle 24 Pattern BUS, Revision 2.
If you have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.
If you have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.
Line 27: Line 30:
Commitments made in this letter: None
Commitments made in this letter: None


Serial No. 13-643 Docket No. 50-338 COLR, North Anna 1 Cycle 24, BUS R2 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. J. E. Reasor, Jr.
Serial No. 13-643 Docket No. 50-338 COLR, North Anna 1 Cycle 24, BUS R2 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. J. E. Reasor, Jr.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738
Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738
Line 34: Line 38:


Serial No. 13-643 Docket No. 50-338 N 1 C24 CORE OPERATING LIMITS REPORT INTRODUCTION The Core Operating Limits Report (COLR) for North Anna Unit 1 Cycle 24 has been prepared in accordance with North Anna Technical Specification 5.6.5. The technical specifications affected by this report are listed below:
Serial No. 13-643 Docket No. 50-338 N 1 C24 CORE OPERATING LIMITS REPORT INTRODUCTION The Core Operating Limits Report (COLR) for North Anna Unit 1 Cycle 24 has been prepared in accordance with North Anna Technical Specification 5.6.5. The technical specifications affected by this report are listed below:
TS 2.1.1       Reactor Core Safety Limits TS 3.1.1       Shutdown Margin (SDM)
TS 2.1.1 Reactor Core Safety Limits TS 3.1.1 Shutdown Margin (SDM)
TS 3.1.3       Moderator Temperature Coefficient (MTC)
TS 3.1.3 Moderator Temperature Coefficient (MTC)
TS 3.1.4       Rod Group Alignment Limits TS 3.1.5       Shutdown Bank Insertion Limit TS 3.1.6       Control Bank Insertion Limits TS 3.1.9       PHYSICS TESTS Exceptions - Mode 2 TS 3.2.1       Heat Flux Hot Channel Factor TS 3.2.2       Nuclear Enthalpy Rise Hot Channel Factor (F NA)
TS 3.1.4 Rod Group Alignment Limits TS 3.1.5 Shutdown Bank Insertion Limit TS 3.1.6 Control Bank Insertion Limits TS 3.1.9 PHYSICS TESTS Exceptions - Mode 2 TS 3.2.1 Heat Flux Hot Channel Factor TS 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (F NA)
TS 3.2.3       Axial Flux Difference (AFD)
TS 3.2.3 Axial Flux Difference (AFD)
TS 3.3.1       Reactor Trip System (RTS) Instrumentation TS 3.4.1       RCS Pressure, Temperature, and Flow DNB Limits TS 3.5.6       Boron Injection Tank (BIT)
TS 3.3.1 Reactor Trip System (RTS) Instrumentation TS 3.4.1 RCS Pressure, Temperature, and Flow DNB Limits TS 3.5.6 Boron Injection Tank (BIT)
TS 3.9.1       Boron Concentration In addition, a technical requirement (TR) in the NAPS Technical Requirements Manual (TRM) refers to the COLR:
TS 3.9.1 Boron Concentration In addition, a technical requirement (TR) in the NAPS Technical Requirements Manual (TRM) refers to the COLR:
TR 3.1.1       Boration Flow Paths - Operating The analytical methods used to determine the core operating limits are those previously approved by the NRC and discussed in the documents listed in the References Section.
TR 3.1.1 Boration Flow Paths - Operating The analytical methods used to determine the core operating limits are those previously approved by the NRC and discussed in the documents listed in the References Section.
Cycle-specific values are presented in bold. Text in italics is provided for information only.
Cycle-specific values are presented in bold. Text in italics is provided for information only.
Page 1 of 22
Page 1 of 22
Line 48: Line 52:
Methodology for:
Methodology for:
TS 3.1.1 - Shutdown Margin, TS 3.1.3 - Moderator Temperature Coefficient, TS.3.1.4 - Rod Group Alignment Limits TS 3.1.5 - Shutdown Bank Insertion Limit, TS 3.1.6 - Control Bank Insertion Limits, TS 3.1.9 - Physics Tests Exceptions - Mode 2, TS 3.2.1 - Heat Flux Hot Channel Factor, TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor TS 3.5.6 - Boron Injection Tank (BIT) and TS 3.9.1 - Boron Concentration
TS 3.1.1 - Shutdown Margin, TS 3.1.3 - Moderator Temperature Coefficient, TS.3.1.4 - Rod Group Alignment Limits TS 3.1.5 - Shutdown Bank Insertion Limit, TS 3.1.6 - Control Bank Insertion Limits, TS 3.1.9 - Physics Tests Exceptions - Mode 2, TS 3.2.1 - Heat Flux Hot Channel Factor, TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor TS 3.5.6 - Boron Injection Tank (BIT) and TS 3.9.1 - Boron Concentration
: 2. Plant-specific adaptation of WCAP- 16009-P-A, "Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM),"
: 2. Plant-specific adaptation of WCAP-16009-P-A, "Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM),"
as approved by NRC Safety Evaluation Report dated February 29, 2012.
as approved by NRC Safety Evaluation Report dated February 29, 2012.
Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor
Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor
Line 67: Line 71:
Methodology for:
Methodology for:
TS 3.2.1 - Heat Flux Hot Channel Factor and TS 3.2.3 - Axial Flux Difference
TS 3.2.1 - Heat Flux Hot Channel Factor and TS 3.2.3 - Axial Flux Difference
: 8. WCAP-8745-P-A, Design Bases for the Thermal Overpower AT and Thermal Overtemperature AT Trip Functions, September 1986.
: 8.
WCAP-8745-P-A, Design Bases for the Thermal Overpower AT and Thermal Overtemperature AT Trip Functions, September 1986.
Methodology for:
Methodology for:
TS 2.1.1 - Reactor Core Safety Limits and TS 3.3.1 - Reactor Trip System Instrumentation
TS 2.1.1 - Reactor Core Safety Limits and TS 3.3.1 - Reactor Trip System Instrumentation
Line 82: Line 87:


Serial No. 13-643 Docket No. 50-338
Serial No. 13-643 Docket No. 50-338
: 13. BAW- 10168P-A, Rev. 3, "RSG LOCA - BWNT Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants," December 1996. Volume II only (SBLOCA models).
: 13. BAW-10168P-A, Rev. 3, "RSG LOCA - BWNT Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants," December 1996. Volume II only (SBLOCA models).
Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor
Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor
: 14. DOM-NAF-2, Rev. 0.2- P-A, "Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code," including Appendix A, "Qualification of the F-ANP BWU CHF Correlations in the Dominion VIPRE-D Computer Code," and Appendix C, "Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code,"
: 14. DOM-NAF-2, Rev. 0.2-P-A, "Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code," including Appendix A, "Qualification of the F-ANP BWU CHF Correlations in the Dominion VIPRE-D Computer Code," and Appendix C, "Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code,"
August 2010.
August 2010.
Methodology for:
Methodology for:
TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor and TS 3.4.1 - RCS Pressure, Temperature and Flow DNB Limits
TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor and TS 3.4.1 - RCS Pressure, Temperature and Flow DNB Limits
: 15. WCAP- 12610-P-A and CENPD-404.-P-A, Addendum 1-A, "Optimized ZIRLOTM,'' July 2006.
: 15. WCAP-12610-P-A and CENPD-404.-P-A, Addendum 1 -A, "Optimized ZIRLOTM,'' July 2006.
Methodology for:
Methodology for:
TS 2.1.1 - Reactor Core Safety Limits and TS 3.2.1 - Heat Flux Hot Channel Factor Note:   In some instances, the North Anna COLR lists multiple methodologies that are used to verify a single Technical Specification parameter. This is due to the transition from AREVA fuel to Westinghouse fuel which requires the use of different vendor proprietary methodologies to verify the two fuiel products meet the applicable regulatory limits.
TS 2.1.1 - Reactor Core Safety Limits and TS 3.2.1 - Heat Flux Hot Channel Factor Note:
In some instances, the North Anna COLR lists multiple methodologies that are used to verify a single Technical Specification parameter. This is due to the transition from AREVA fuel to Westinghouse fuel which requires the use of different vendor proprietary methodologies to verify the two fuiel products meet the applicable regulatory limits.
Page 4 of 22
Page 4 of 22


Line 98: Line 104:
Page 5 of 22
Page 5 of 22


Serial No. 13-643 Docket No. 50-338 COLR Figure 2.1-1 NORTH ANNA REACTOR CORE SAFETY LIMITS 665 660 655 650 645 640 635 630 4-625 E 620 ba 615 (U
Serial No. 13-643 Docket No. 50-338 COLR Figure 2.1-1 NORTH ANNA REACTOR CORE SAFETY LIMITS 4-E ba (U
w, 610 605 600 595 590 585 580 575 570 0 10 20   30 40     50     60   70   80 90 100    110      120 Percent of RATED THERMAL POWER Page 6 of 22
w, 665 660 655 650 645 640 635 630 625 620 615 610 605 600 595 590 585 580 575 570 0
10 20 30 40 50 60 70 80 Percent of RATED THERMAL POWER 90 100 110 120 Page 6 of 22


Serial No. 13-643 Docket No. 50-338 3.1   REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)
Serial No. 13-643 Docket No. 50-338 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)
LCO   3.1.1   SDM shall be__ 1.77 % Ak/k.
LCO 3.1.1 SDM shall be__ 1.77 % Ak/k.
3.1.3 Moderator Temperature Coefficient (MTC)
3.1.3 Moderator Temperature Coefficient (MTC)
LCO   3.1.3   The MTC shall be maintained within the limits specified below. The upper limit of MTC is +0.6 x 10-4 Ak/k/IF, when < 70% RTP, and 0.0 Ak/k/OF when > 70%
LCO 3.1.3 The MTC shall be maintained within the limits specified below. The upper limit of MTC is +0.6 x 10-4 Ak/k/IF, when < 70% RTP, and 0.0 Ak/k/OF when > 70%
RTP.
RTP.
The BOC/ARO-MTC shall be _ +0.6 x 10-4 Ak/k/F (upper limit), when < 70%
The BOC/ARO-MTC shall be _ +0.6 x 10-4 Ak/k/F (upper limit), when < 70%
Line 111: Line 118:
The MTC surveillance limits are:
The MTC surveillance limits are:
The 300 ppm/ARO/RTP-MTC should be less negative than or equal to
The 300 ppm/ARO/RTP-MTC should be less negative than or equal to
              -4.0 x 104 Ak/k/ 0 F [Note 2].
-4.0 x 104 Ak/k/0 F [Note 2].
The 60 ppm/ARO/RTP-MTC should be less negative than or equal to
The 60 ppm/ARO/RTP-MTC should be less negative than or equal to
            -4.7 x 104 AkWk/&deg;F [Note 3].
-4.7 x 104 AkWk/&deg;F [Note 3].
SR 3.1.3.2   Verify MTC is within -5.0 x 10-4 Ak'k/&deg;F (lower limit).
SR 3.1.3.2 Verify MTC is within -5.0 x 10-4 Ak'k/&deg;F (lower limit).
Note 2: If the MTC is more negative than -4.0 x 10-4 Ak/k/&deg;F, SR 3.1.3.2 shall be repeated once per 14 EFPD during the remainder of the fuel cycle.
Note 2: If the MTC is more negative than -4.0 x 10-4 Ak/k/&deg;F, SR 3.1.3.2 shall be repeated once per 14 EFPD during the remainder of the fuel cycle.
Note 3: SR 3.1.3.2 need not be repeated if the MTC measured at the equivalent of equilibrium RTP-ARO boron concentration of _ 60 ppm is less negative than -4.7 x 10-4 Ak/k/]F.
Note 3: SR 3.1.3.2 need not be repeated if the MTC measured at the equivalent of equilibrium RTP-ARO boron concentration of _ 60 ppm is less negative than -4.7 x 10-4 Ak/k/]F.
3.1.4 Rod Group Alignment Limits Required Action A. 1.1     Verify SDM to be > 1.77 % Ak/k.
3.1.4 Rod Group Alignment Limits Required Action A. 1.1 Verify SDM to be > 1.77 % Ak/k.
Required Action B. 1.1     Verify SDM to be _>1.77 % Ak/k.
Required Action B. 1.1 Verify SDM to be _> 1.77 % Ak/k.
Required Action D. 1.1     Verify SDM to be > 1.77 % Ak/k.
Required Action D. 1.1 Verify SDM to be > 1.77 % Ak/k.
Page 7 of 22
Page 7 of 22


Serial No. 13-643 Docket No. 50-338 3.1.5 Shutdown Bank Insertion Limits LCO   3.1.5   Each shutdown bank shall be withdrawn to at least 225 steps.
Serial No. 13-643 Docket No. 50-338 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be withdrawn to at least 225 steps.
Required Action A. 1.1     Verify SDM to be > 1.77 % Ak/k.
Required Action A. 1.1 Verify SDM to be > 1.77 % Ak/k.
Required Action B.1         Verify SDM to be > 1.77 % Ak/k.
Required Action B.1 Verify SDM to be > 1.77 % Ak/k.
SR 3.1.5.1     Verify each shutdown bank is withdrawn to at least 225 steps.
SR 3.1.5.1 Verify each shutdown bank is withdrawn to at least 225 steps.
3.1.6 Control Bank Insertion Limits LCO   3.1.6 Control banks shall be limited in physical insertion as shown in COLR Figure 3.1-1. Sequence of withdrawal shall be A, B, C and D, in that order; and the overlap limit during withdrawal shall be 97 steps.
3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be limited in physical insertion as shown in COLR Figure 3.1-1. Sequence of withdrawal shall be A, B, C and D, in that order; and the overlap limit during withdrawal shall be 97 steps.
Required Action A. 1.1     Verify SDM to be > 1.77 % Ak/k.
Required Action A. 1.1 Verify SDM to be > 1.77 % Ak/k.
Required Action B. 1.1     Verify SDM to be > 1.77 % Ak/k.
Required Action B. 1.1 Verify SDM to be > 1.77 % Ak/k.
Required Action C. 1       Verify SDM to be > 1.77 % Ak/k.
Required Action C. 1 Verify SDM to be > 1.77 % Ak/k.
SR 3.1.6.1     Verify estimated critical control bank position is within the insertion limits specified in COLR Figure 3.1-1.
SR 3.1.6.1 Verify estimated critical control bank position is within the insertion limits specified in COLR Figure 3.1-1.
SR 3.1.6.2     Verify each control bank is within the insertion limits specified in COLR Figure 3.1-1.
SR 3.1.6.2 Verify each control bank is within the insertion limits specified in COLR Figure 3.1-1.
SR 3.1.6.3     Verify each control bank not fully withdrawn from the core is within the sequence and overlap limits specified in LCO 3.1.6 above.
SR 3.1.6.3 Verify each control bank not fully withdrawn from the core is within the sequence and overlap limits specified in LCO 3.1.6 above.
3.1.9 PHYSICS TESTS Exceptions - MODE 2 LCO 3.1.9.b         SDM is _ 1.77 % Ak/k.
3.1.9 PHYSICS TESTS Exceptions - MODE 2 LCO 3.1.9.b SDM is _ 1.77 % Ak/k.
SR 3.1.9.4   Verify SDM to be __1.77 % Ak/k.
SR 3.1.9.4 Verify SDM to be __ 1.77 % Ak/k.
Page 8 of 22
Page 8 of 22


Serial No. 13-643 Docket No. 50-338 COLR Figure 3.1-1 North Anna 1 Cycle 24 Control Rod Bank Insertion Limits 230 220 210 200 190 180 170 160 0.
Serial No. 13-643 Docket No. 50-338 COLR Figure 3.1-1 North Anna 1 Cycle 24 Control Rod Bank Insertion Limits 0.
150 1,In 140
1, 4.
: 4. 130 0  120 0
In 0
W-0.
0W-0.
0~ 110 100 90 80 70 60 50 40 30 20 10 0
0~
0.0 0.1 0.2   0.3     0.4     0.5     0.6   0.7 0.8   0.9       1.0 Fraction of Rated Thermal Power Page 9 of 22
230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power Page 9 of 22


Serial No. 13-643 Docket No. 50-338 3.2     POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))
Serial No. 13-643 Docket No. 50-338 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))
LCO     3.2.1   FQ(Z), as approximated by FQM(Z), shall be within the limits specified below.
LCO 3.2.1 FQ(Z), as approximated by FQM(Z), shall be within the limits specified below.
CFQ = 2.32 The Measured Heat Flux Hot Channel Factor, FQM(Z), shall be limited by the following relationships:
CFQ = 2.32 The Measured Heat Flux Hot Channel Factor, FQM(Z), shall be limited by the following relationships:
CFQ K(Z)
CFQ K(Z)
P N(Z))         for e>0.5 P N(Z)
P N(Z))
for e>0.5 P
N(Z)
CFQ K(Z)
CFQ K(Z)
F0 (Z)Q0.5-      N( Z)     for P0.5 THERMAL POWER where:       P = RATED THERMAL POWER ; and K(Z) is provided in COLR Figure 3.2-1 N(Z) is a cycle-specific non-equilibrium multiplier on FQ (Z) to account for power distribution transients during normal operation, provided in COLR Table 3.2-1.
F0 (Z) -
The discussion in the Bases Section B 3.2.1 for this LCO requires the application of a cycle dependent non-equilibriummultiplier, N(Z), to the CFQ limit. N(Z) accountsfor power distribution transients encountered during normal operation. As function N(Z) is dependent on the predicted equilibrium FQ(Z) and is sensitive to the axialpower distribution, it is typically generatedfrom the actual EOC burnup distributionthat can only be obtained after the shutdown of the previous cycle.
for P0.5 Q0.5 N( Z)
The cycle-specific N(Z) function is presentedin COLR Table 3.2-1.
THERMAL POWER where:
P = RATED THERMAL POWER ; and K(Z) is provided in COLR Figure 3.2-1 N(Z) is a cycle-specific non-equilibrium multiplier on FQ (Z) to account for power distribution transients during normal operation, provided in COLR Table 3.2-1.
The discussion in the Bases Section B 3.2.1 for this LCO requires the application of a cycle dependent non-equilibrium multiplier, N(Z), to the CFQ limit. N(Z) accounts for power distribution transients encountered during normal operation. As function N(Z) is dependent on the predicted equilibrium FQ(Z) and is sensitive to the axial power distribution, it is typically generated from the actual EOC burnup distribution that can only be obtained after the shutdown of the previous cycle.
The cycle-specific N(Z) function is presented in COLR Table 3.2-1.
Page 10 of 22
Page 10 of 22


Serial No. 13-643 Docket No. 50-338 COLR Table 3.2-1 N1C24 Normal Operation N(Z)
Serial No. 13-643 Docket No. 50-338 COLR Table 3.2-1 N1C24 Normal Operation N(Z)
NODE   HEIGHT     0 to 1000 1000 to 3000  3000 to 5000 5000 to 7000  7000 to 9000 (FEET)   MWD/MTU      MWD/MTU      MWDIMTU      MWD/MTU        MWD/MTU 10     10.2       1.128      1.139        1.143        1.144        1.121 11      10.0       1.128      1.147        1.148        1.148          1.128 12      9.8       1.133      1.155        1.154        1.152          1.137 13      9.6       1.140      1.161        1.161        1.156          1.148 14      9.4       1.143      1.166        1.165        1.156          1.153 15      9.2       1.144      1.168        1.168        1.158          1.157 16      9.0       1.150      1.173        1.173        1.170        1.170 17      8.8      1.155      1.176        1.176        1.181          1.181 18      8.6      1.158      1.177        1.176        1.186          1.186 19      8.4      1.159      1.175        1.176        1.185          1.185 20      8.2        1.162      1.173        1.176        1.186        1.185 21      8.0        1.162      1.169        1.175        1.185        1.184 22      7.8        1.162      1.164        1.175        1.185        1.183 23      7.6      1.160      1.160        1.174        1.180          1.184 24      7.4      1.157      1.157        1.171        1.173          1.187 25      7.2      1.152      1.152        1.167        1.167          1.189 26      7.0      1.147       1.147        1.163        1.163          1.189 27      6.8      1.145      1.145        1.161        1.162          1.190 28      6.6        1.143      1.143        1.158        1.162          1.188 29      6.4      1.134      1.135         1.150        1.158          1.185 30      6.2        1.123      1.123        1.137        1.152          1.178 31      6.0        1.118      1.116        1.131        1.149          1.175 32      5.8      1.113      1.108        1.121        1.142          1.167 33      5.6      1.100      1.091        1.098        1.126          1.148 34      5.4      1.092      1.079        1.081        1.112          1.131 35      5.2      1.092      1.077        1.077         1.107          1.122 36      5.0      1.096      1.080        1.079        1.109          1.120 37      4.8        1.099      1.082        1.079        1.111          1.121 38      4.6        1.101      1.086        1.082        1.114          1.123 39      4.4        1.102      1.091        1.087        1.115          1.121 40      4.2        1.102      1.097        1.091        1.115          1.120 41      4.0        1.104      1.104        1.096        1.115          1.120 42      3.8        1.113      1.112        1.104        1.113        1.116 43      3.6        1.127      1.121        1.114       1.115         1.115 44      3.4        1.137      1.128        1.122        1.124         1.123 45      3.2        1.146      1.135        1.129        1.137          1.137 46      3.0        1.157      1.144        1.135        1.147          1.147 47      2.8        1.170       1.154        1.142        1.155          1.155 48      2.6        1.182      1.163        1.153        1.158          1.159 49      2.4        1.193      1.172        1.164        1.166          1.167 50      2.2        1.203      1.180        1.174        1.183          1.183 51      2.0        1.213      1.187        1.183        1.195          1.195 52      1.8        1.222      1.195        1.192        1.197          1.197 These decks are generated for normal operation flux maps that are typically taken at full power ARO. Additional N(z) decks may be generated, if necessary, consistent with the methodology described in the RPDC topical (Reference 7). EOR is defined as Hot Full Power End of Reactivity.
NODE HEIGHT (FEET) 10 10.2 11 10.0 12 9.8 13 9.6 14 9.4 15 9.2 16 9.0 17 8.8 18 8.6 19 8.4 20 8.2 21 8.0 22 7.8 23 7.6 24 7.4 25 7.2 26 7.0 27 6.8 28 6.6 29 6.4 30 6.2 31 6.0 32 5.8 33 5.6 34 5.4 35 5.2 36 5.0 37 4.8 38 4.6 39 4.4 40 4.2 41 4.0 42 3.8 43 3.6 44 3.4 45 3.2 46 3.0 47 2.8 48 2.6 49 2.4 50 2.2 51 2.0 52 1.8 0 to 1000 MWD/MTU 1.128 1.128 1.133 1.140 1.143 1.144 1.150 1.155 1.158 1.159 1.162 1.162 1.162 1.160 1.157 1.152 1.147 1.145 1.143 1.134 1.123 1.118 1.113 1.100 1.092 1.092 1.096 1.099 1.101 1.102 1.102 1.104 1.113 1.127 1.137 1.146 1.157 1.170 1.182 1.193 1.203 1.213 1.222 1000 to 3000 MWD/MTU 1.139 1.147 1.155 1.161 1.166 1.168 1.173 1.176 1.177 1.175 1.173 1.169 1.164 1.160 1.157 1.152 1.147 1.145 1.143 1.135 1.123 1.116 1.108 1.091 1.079 1.077 1.080 1.082 1.086 1.091 1.097 1.104 1.112 1.121 1.128 1.135 1.144 1.154 1.163 1.172 1.180 1.187 1.195 3000 to 5000 MWDIMTU 1.143 1.148 1.154 1.161 1.165 1.168 1.173 1.176 1.176 1.176 1.176 1.175 1.175 1.174 1.171 1.167 1.163 1.161 1.158 1.150 1.137 1.131 1.121 1.098 1.081 1.077 1.079 1.079 1.082 1.087 1.091 1.096 1.104 1.114 1.122 1.129 1.135 1.142 1.153 1.164 1.174 1.183 1.192 5000 to 7000 MWD/MTU 1.144 1.148 1.152 1.156 1.156 1.158 1.170 1.181 1.186 1.185 1.186 1.185 1.185 1.180 1.173 1.167 1.163 1.162 1.162 1.158 1.152 1.149 1.142 1.126 1.112 1.107 1.109 1.111 1.114 1.115 1.115 1.115 1.113 1.115 1.124 1.137 1.147 1.155 1.158 1.166 1.183 1.195 1.197 7000 to 9000 MWD/MTU 1.121 1.128 1.137 1.148 1.153 1.157 1.170 1.181 1.186 1.185 1.185 1.184 1.183 1.184 1.187 1.189 1.189 1.190 1.188 1.185 1.178 1.175 1.167 1.148 1.131 1.122 1.120 1.121 1.123 1.121 1.120 1.120 1.116 1.115 1.123 1.137 1.147 1.155 1.159 1.167 1.183 1.195 1.197 These decks are generated for normal operation flux maps that are typically taken at full power ARO. Additional N(z) decks may be generated, if necessary, consistent with the methodology described in the RPDC topical (Reference 7). EOR is defined as Hot Full Power End of Reactivity.
Page 11 of 22
Page 11 of 22


Serial No. 13-643 Docket No. 50-338 COLR Table 3.2-1 (continued)
Serial No. 13-643 Docket No. 50-338 COLR Table 3.2-1 (continued)
N1C24 Normal Operation N(Z)
N1C24 Normal Operation N(Z)
NODE   HEIGHT 9000 to 11000 11000 to 13000 13000 to 15000 15000 to 17000  17000 to EOR (FEET)     MWDIMTU      MWD/MTU        MWD/MTU      MWD/MTU        MWDIMTU 10     10.2     1.119        1.120          1.112        1.119          1.119 11      10.0     1.118        1.118          1.111        1.119          1.119 12      9.8     1.123        1.121          1.108        1.118          1.118 13      9.6     1.133        1.127          1.109        1.117          1.117 14      9.4     1.138        1.128          1.111        1.112          1.112 15      9.2       1.143        1.132          1.120        1.113          1.113 16      9.0       1.156        1.144          1.139        1.123           1.123 17      8.8      1.168        1.158          1.159        1.138          1.139 18      8.6      1.173        1.164          1.165        1.146          1.148 19      8.4      1.175        1.170          1.170        1.157          1.160 20      8.2      1.180        1.182          1.182        1.175          1.179 21      8.0      1.182        1.189          1.189        1.188          1.194 22      7.8      1.182        1.192          1.192        1.193          1.200 23      7.6      1.183        1.193          1.193        1.200          1.207 24      7.4      1.187        1.197          1.197        1.211          1.218 25      7.2      1.189        1.198          1.198        1.217          1.226 26      7.0      1.189        1.198         1.198         1.219          1.228 27      6.8      1.190        1.197         1.197        1.221          1.231 28      6.6      1.188        1.195          1.195        1.222          1.231 29      6.4      1.185        1.196          1.196        1.222          1.232 30      6.2      1.178        1.197          1.197        1.219          1.229 31      6.0      1.175        1.198          1.198        1.218          1.229 32      5.8      1.167        1.194          1.194        1.211          1.223 33      5.6      1.147        1.184          1.184        1.196          1.209 34      5.4      1.132        1.173          1.173        1.181          1.194 35      5.2      1.130        1.168         1.168        1.174          1.188 36      5.0      1.131        1.159          1.163        1.169          1.182 37      4.8      1.130        1.145          1.155        1.161          1.172 38      4.6      1.127        1.131          1.145        1.154          1.164 39      4.4      1.123         1.122          1.134        1.148          1.159 40      4.2      1.119        1.123          1.130        1.144          1.154 41      4.0      1.119        1.133          1.134        1.140          1.148 42      3.8      1.118        1.142          1.141        1.134          1.135 43      3.6      1.122        1.150          1.150        1.128           1.124 44      3.4      1.130         1.156          1.156        1.122          1.122 45      3.2      1.144        1.161          1.161        1.122          1.133 46      3.0      1.156        1.163          1.165        1.130          1.145 47      2.8      1.168        1.168          1.167        1.145          1.160 48      2.6      1.176        1.174          1.169        1.153          1.170 49      2.4      1.185        1.185          1.170        1.163          1.181 50      2.2      1.199        1.199          1.170        1.175          1.196 51      2.0      1.208        1.208          1.171        1.186          1.209 52      1.8      1.209        1.209          1.173        1.194          1.220 These decks are generated for normal operation flux maps that are typically taken at full power ARO. Additional N(z) decks may be generated, if necessary, consistent with the methodology described in the RPDC topical (Reference 7). EOR is defined as Hot Full Power End of Reactivity.
NODE HEIGHT (FEET) 10 10.2 11 10.0 12 9.8 13 9.6 14 9.4 15 9.2 16 9.0 17 8.8 18 8.6 19 8.4 20 8.2 21 8.0 22 7.8 23 7.6 24 7.4 25 7.2 26 7.0 27 6.8 28 6.6 29 6.4 30 6.2 31 6.0 32 5.8 33 5.6 34 5.4 35 5.2 36 5.0 37 4.8 38 4.6 39 4.4 40 4.2 41 4.0 42 3.8 43 3.6 44 3.4 45 3.2 46 3.0 47 2.8 48 2.6 49 2.4 50 2.2 51 2.0 52 1.8 9000 to 11000 MWDIMTU 1.119 1.118 1.123 1.133 1.138 1.143 1.156 1.168 1.173 1.175 1.180 1.182 1.182 1.183 1.187 1.189 1.189 1.190 1.188 1.185 1.178 1.175 1.167 1.147 1.132 1.130 1.131 1.130 1.127 1.123 1.119 1.119 1.118 1.122 1.130 1.144 1.156 1.168 1.176 1.185 1.199 1.208 1.209 11000 to 13000 MWD/MTU 1.120 1.118 1.121 1.127 1.128 1.132 1.144 1.158 1.164 1.170 1.182 1.189 1.192 1.193 1.197 1.198 1.198 1.197 1.195 1.196 1.197 1.198 1.194 1.184 1.173 1.168 1.159 1.145 1.131 1.122 1.123 1.133 1.142 1.150 1.156 1.161 1.163 1.168 1.174 1.185 1.199 1.208 1.209 13000 to 15000 MWD/MTU 1.112 1.111 1.108 1.109 1.111 1.120 1.139 1.159 1.165 1.170 1.182 1.189 1.192 1.193 1.197 1.198 1.198 1.197 1.195 1.196 1.197 1.198 1.194 1.184 1.173 1.168 1.163 1.155 1.145 1.134 1.130 1.134 1.141 1.150 1.156 1.161 1.165 1.167 1.169 1.170 1.170 1.171 1.173 15000 to 17000 MWD/MTU 1.119 1.119 1.118 1.117 1.112 1.113 1.123 1.138 1.146 1.157 1.175 1.188 1.193 1.200 1.211 1.217 1.219 1.221 1.222 1.222 1.219 1.218 1.211 1.196 1.181 1.174 1.169 1.161 1.154 1.148 1.144 1.140 1.134 1.128 1.122 1.122 1.130 1.145 1.153 1.163 1.175 1.186 1.194 17000 to EOR MWDIMTU 1.119 1.119 1.118 1.117 1.112 1.113 1.123 1.139 1.148 1.160 1.179 1.194 1.200 1.207 1.218 1.226 1.228 1.231 1.231 1.232 1.229 1.229 1.223 1.209 1.194 1.188 1.182 1.172 1.164 1.159 1.154 1.148 1.135 1.124 1.122 1.133 1.145 1.160 1.170 1.181 1.196 1.209 1.220 These decks are generated for normal operation flux maps that are typically taken at full power ARO. Additional N(z) decks may be generated, if necessary, consistent with the methodology described in the RPDC topical (Reference 7). EOR is defined as Hot Full Power End of Reactivity.
Page 12 of 22
Page 12 of 22


Serial No. 13-643 Docket No. 50-338 COLR Figure 3.2-1 K(Z) - Normalized FQ as a Function of Core Height 1.2 1.1 6,1.0 1.0 0.9 (12 .925) 0.8 N
Serial No. 13-643 Docket No. 50-338 1.2 1.1 1.0 0.9 0.8 N
0   0.7 M.'
0 0.7 M.'
N
N
-- I 40.6 0
-- I 40.6 0Z
Z N
- 0.5 N
  - 0.5 0.4 0.3 0.2 0.1 0.0 0 1 2     3   4     5     6       7   8     9   10   11   12     13 CORE HEIGHT (FT)
0.4 0.3 0.2 0.1 0.0 COLR Figure 3.2-1 K(Z) - Normalized FQ as a Function of Core Height 6,1.0 (12.925) 0 1
2 3
4 5
6 7
8 9
10 11 12 13 CORE HEIGHT (FT)
Page 13 of 22
Page 13 of 22


Serial No. 13-643 Docket No. 50-338 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FNAH)
Serial No. 13-643 Docket No. 50-338 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FNAH)
LCO   3.2.2 FNAH shall be within the limits specified below.
LCO 3.2.2 FNAH shall be within the limits specified below.
FNA   _<1.587(1 + 0.3(1 - P)}
FNA
THERMAL POWER where: P     RA TED THERMAL POWER SR 3.2.2.1   Verify FNAH is within limits specified above.
_< 1.587(1 + 0.3(1 - P)}
THERMAL POWER where: P RA TED THERMAL POWER SR 3.2.2.1 Verify FNAH is within limits specified above.
3.2.3 AXIAL FLUX DIFFERENCE (AFD)
3.2.3 AXIAL FLUX DIFFERENCE (AFD)
LCO   3.2.3 The AFD in % flux difference units shall be maintained within the limits specified in the applicable COLR Figure (3.2-2-A or 3.2-2-B).
LCO 3.2.3 The AFD in % flux difference units shall be maintained within the limits specified in the applicable COLR Figure (3.2-2-A or 3.2-2-B).
Page 14 of 22
Page 14 of 22


Serial No. 13-643 Docket No. 50-338 COLR Figure 3.2-2-A Applicable Burnup: BOC* to 5000 MWD/MTU North Anna 1 Cycle 24 Axial Flux Difference Limits 120 110 100 90 0   80 C-ra, 70 60 0    50 40 30 20 10 0
Serial No. 13-643 Docket No. 50-338 COLR Figure 3.2-2-A Applicable Burnup: BOC* to 5000 MWD/MTU North Anna 1 Cycle 24 Axial Flux Difference Limits 120 110 100 0
            -30       -20         -10           0         10         20             30 Percent Flux Difference (Delta-I)
C-ra, 0
90 80 70 60 50 40 30 20 10 0
-30  
-20  
-10 0
10 20 Percent Flux Difference (Delta-I) 30
*Figure 3.2.-2-A was implemented at a core bumup of approximately 2000 MWD/MTU.
*Figure 3.2.-2-A was implemented at a core bumup of approximately 2000 MWD/MTU.
Page 15 of 22
Page 15 of 22


Serial No. 13-643 Docket No. 50-338 COLR Figure 3.2-2-B Applicable Burnup: 5000 MWD/MTU to EOC North Anna 1 Cycle 24 Axial Flux Difference Limits 120 110
Serial No. 13-643 Docket No. 50-338 COLR Figure 3.2-2-B Applicable Burnup: 5000 MWD/MTU to EOC North Anna 1 Cycle 24 Axial Flux Difference Limits 120 110 100 0
(-12,100)             (+6,10))
E-0 90 80 70 60 50 40 30 20 10 0
100    Unacceptabl/
(-12,100)
eUnateiont                                 Unacceptable Operation 90 0                          Acc ptable Operation 80 E-70 60 50 0
(+6,10))
(-27,50)                                 (+20,50) 40 30 20 10 0
Unacceptabl/
      -30         -20       -10           0       10     20             30 Percent Flux Difference (Delta-I)
eUnateiont Unacceptable Operation Acc ptable Operation
(-27,50)
(+20,50)
-30
-20
-10 0
10 20 30 Percent Flux Difference (Delta-I)
Page 16 of 22
Page 16 of 22


Serial No. 13-643 Docket No. 50-338 3.3.1 Reactor Trip System (RTS) Instrumentation TS Table 3.3.1-1 Note 1: Overtemperature AT The Overtemperature AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span, with the numerical values of the parameters as specified below.
Serial No. 13-643 Docket No. 50-338 3.3.1 Reactor Trip System (RTS) Instrumentation TS Table 3.3.1-1 Note 1: Overtemperature AT The Overtemperature AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span, with the numerical values of the parameters as specified below.
AT<~C {K          +~
AT<~C  
K)[TT,]+K3             (P-p,)_fl(A)}
+~
where: AT       is measured RCS AT, OF AT 0    is the indicated AT at RTP, OF S        is the Laplace transform operator, sec1 T        is the measured RCS average temperature, OF T'      is the nominal Tavg at RTP, < 586.8 OF P        is the measured pressurizer pressure, psig 1
{K K)[TT,]+K3 (P-p,)_fl(A)}
P        is the nominal RCS operating pressure, _>2235 psig Ki < 1.2715                   K 2 >- 0.02174 /OF             K3 ->0.001145 /psig r/, r2 = time constants utilized in the lead-lag controllerfor Tavg Ti ! 23.75 sec                         T2 - 4.4 sec (1 + rls)/(J + r2s) = function generated by the lead-lag controllerfor Tag dynamic compensation f1 (AI) > 0.0291 {- 13.0 - (Cit - qb)}     when (qt - qb) < -13.0% RTP 0                                  when -13.0% RTP < (qt - qb) - +7.0% RTP 0.0251 {(qt - qb) - 7.0}          when (qt- qb) > +7.0% RTP Where qt and qb are percent RTP in the upper and lower halves of the core, respectively, and qt + qb is the total THERMAL POWER in percent RTP.
where: AT AT 0 S
T T'
P P
1 is measured RCS AT, OF is the indicated AT at RTP, OF is the Laplace transform operator, sec1 is the measured RCS average temperature, OF is the nominal Tavg at RTP, < 586.8 OF is the measured pressurizer pressure, psig is the nominal RCS operating pressure, _> 2235 psig Ki < 1.2715 K 2 >- 0.02174 /OF K3 -> 0.001145 /psig r/, r2 = time constants utilized in the lead-lag controller for Tavg Ti ! 23.75 sec T2 - 4.4 sec (1 + rls)/(J + r2s) = function generated by the lead-lag controller for Tag dynamic compensation f1 (AI) > 0.0291 {- 13.0 - (Cit - qb)}
0 0.0251 {(qt - qb) - 7.0}
when (qt - qb) < -13.0% RTP when -13.0% RTP < (qt - qb) - +7.0% RTP when (qt-qb) > +7.0% RTP Where qt and qb are percent RTP in the upper and lower halves of the core, respectively, and qt + qb is the total THERMAL POWER in percent RTP.
Page 17 of 22
Page 17 of 22


Serial No. 13-643 Docket No. 50-338 TS Table 3.3.1-1 Note 2: Overpower AT The Overpower AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span, with the numerical values of the parameters as specified below.
Serial No. 13-643 Docket No. 50-338 TS Table 3.3.1-1 Note 2: Overpower AT The Overpower AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span, with the numerical values of the parameters as specified below.
AT<ATo {K 4a-K 5 [ V3S[]T-K 6 [T-T']-f 2 (AI)}
AT<ATo {K 4a-K 5 [ V3S[]T-K 6[T-T']-f 2 (AI)}
where: AT         is measured RCS AT, &deg;F.
where: AT ATo T
ATo      is the indicated AT at RTP, OF.
T' is measured RCS AT, &deg;F.
is the indicated AT at RTP, OF.
is the Laplace transform operator, secl.
is the Laplace transform operator, secl.
T        is the measured RCS average temperature, OF.
is the measured RCS average temperature, OF.
T'      is the nominal Tavg at RTP, <586.8 OF.
is the nominal Tavg at RTP, <586.8 OF.
K4 :5 1.0865 K5 >0.0198 /OF for increasing Tavg             K6 >0.00162 /OF when T > T' 0 /OF        for decreasing Tavg            0 /OF      when T < T' r3= time constant utilized in the rate lag controllerfor Tag T3 &#x17d; 9.5 sec r3s/(1 + r3s) = function generated by the rate lag controllerfor T*,g dynamic compensation f2 (AI) = 0, for all Al.
K4 :5 1.0865 K5 >0.0198 /OF for increasing Tavg 0 /OF for decreasing Tavg K6 >0.00162 0 /OF
/OF when T > T' when T < T' r3= time constant utilized in the rate lag controller for Tag T3 &#x17d; 9.5 sec r3s/(1 + r3s) = function generated by the rate lag controller for T*,g dynamic compensation f2(AI) = 0, for all Al.
Page 18 of 22
Page 18 of 22


Serial No. 13-643 Docket No. 50-338 3.4   REACTOR COOLANT SYSTEM (RCS) 3.4,1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO   3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:
Serial No. 13-643 Docket No. 50-338 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4,1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:
: a. Pressurizer pressure is greater than or equal to 2205 psig;
: a. Pressurizer pressure is greater than or equal to 2205 psig;
: b. RCS average temperature is less than or equal to 591 OF; and
: b. RCS average temperature is less than or equal to 591 OF; and
: c. RCS total flow rate is greater than or equal to 295,000 gpm.
: c. RCS total flow rate is greater than or equal to 295,000 gpm.
SR 3.4.1.1   Verify pressurizer pressure is greater than or equal to 2205 psig.
SR 3.4.1.1 Verify pressurizer pressure is greater than or equal to 2205 psig.
SR 3.4.1.2   Verify RCS average temperature is less than or equal to 591 OF.
SR 3.4.1.2 Verify RCS average temperature is less than or equal to 591 OF.
SR 3.4.1.3   Verify RCS total flow rate is greater than or equal to 295,000 gpm.
SR 3.4.1.3 Verify RCS total flow rate is greater than or equal to 295,000 gpm.
SR 3.4.1.4                             NOTE-------------------------
SR 3.4.1.4 NOTE-------------------------
Not required to be performed until 30 days after > 90% RTP.
Not required to be performed until 30 days after > 90% RTP.
Verify by precision heat balance that RCS total flow rate is _>295,000 gpm.
Verify by precision heat balance that RCS total flow rate is _> 295,000 gpm.
Page 19 of 22
Page 19 of 22


Serial No. 13-643 Docket No. 50-338 3.5   EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.6 Boron Injection Tank (BIT)
Serial No. 13-643 Docket No. 50-338 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.6 Boron Injection Tank (BIT)
Required Action B.2     Borate to a SDM _>1.77 % Ak/k at 200 OF.
Required Action B.2 Borate to a SDM _> 1.77 % Ak/k at 200 OF.
Page 20 of 22
Page 20 of 22


Serial No. 13-643 Docket No. 50-338 3.9   REFUELING OPERATIONS 3.9.1 Boron Concentration LCO   3.9.1 Boron concentrations of the Reactor Coolant System (RCS), the refueling canal, and the refueling cavity shall be maintained > 2600 ppm.
Serial No. 13-643 Docket No. 50-338 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of the Reactor Coolant System (RCS), the refueling canal, and the refueling cavity shall be maintained > 2600 ppm.
SR 3.9.1.1   Verify boron concentration is within the limit specified above.
SR 3.9.1.1 Verify boron concentration is within the limit specified above.
Page 21 of 22
Page 21 of 22


Serial No. 13-643 Docket No. 50-338 NAPS TECHNICAL REQUIREMENTS MANUAL TRM 3.1     REACTIVITY CONTROL SYSTEMS TR 3.1.1     Boration Flow Paths - Operating Required Action D.2     Borate to a SHUTDOWN MARGIN >_1.77 % Ak/k at 200 IF, after xenon decay.
Serial No. 13-643 Docket No. 50-338 NAPS TECHNICAL REQUIREMENTS MANUAL TRM 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.1 Boration Flow Paths - Operating Required Action D.2 Borate to a SHUTDOWN MARGIN >_ 1.77 % Ak/k at 200 IF, after xenon decay.
Page 22 of 22}}
Page 22 of 22}}

Latest revision as of 23:55, 10 January 2025

Cycle 24 Core Operating Limits Report, Revision 2
ML14014A100
Person / Time
Site: North Anna Dominion icon.png
Issue date: 01/07/2014
From: Huber T
Dominion, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
13-643
Download: ML14014A100 (25)


Text

j"Dominion Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 January 7, 2014 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.

NLOS /ETS Docket No.

License No.13-643 50-338 NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

NORTH ANNA POWER STATION UNIT I CYCLE 24 CORE OPERATING LIMITS REPORT. REVISION 2 Pursuant to North Anna Technical Specification 5.6.5.d, attached is a copy of the Dominion Core Operating Limits Report for North Anna Unit 1 Cycle 24 Pattern BUS, Revision 2.

If you have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.

Sincerely, T. R. Huber, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

for Virginia Electric and Power Company

Attachment:

1. Core Operating Limits Report for North Anna Unit 1 Cycle 24 - Pattern BUS, Revision 2.

Commitments made in this letter: None

Serial No.13-643 Docket No. 50-338 COLR, North Anna 1 Cycle 24, BUS R2 Page 2 of 2 cc:

U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. J. E. Reasor, Jr.

Old Dominion Electric Cooperative Innsbrook Corporate Center 4201 Dominion Blvd.

Suite 300 Glen Allen, Virginia 23060 NRC Senior Resident Inspector North Anna Power Station Dr. V. Sreenivas NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, Maryland 20852-2738

Serial No.13-643 Docket No. 50-338 ATTACHMENT I CORE OPERATING LIMITS REPORT FOR NORTH ANNA UNIT 1 CYCLE 24 PATTERN BUS, REVISION 2 NORTH ANNA POWER STATION VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)

Serial No.13-643 Docket No. 50-338 N 1 C24 CORE OPERATING LIMITS REPORT INTRODUCTION The Core Operating Limits Report (COLR) for North Anna Unit 1 Cycle 24 has been prepared in accordance with North Anna Technical Specification 5.6.5. The technical specifications affected by this report are listed below:

TS 2.1.1 Reactor Core Safety Limits TS 3.1.1 Shutdown Margin (SDM)

TS 3.1.3 Moderator Temperature Coefficient (MTC)

TS 3.1.4 Rod Group Alignment Limits TS 3.1.5 Shutdown Bank Insertion Limit TS 3.1.6 Control Bank Insertion Limits TS 3.1.9 PHYSICS TESTS Exceptions - Mode 2 TS 3.2.1 Heat Flux Hot Channel Factor TS 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (F NA)

TS 3.2.3 Axial Flux Difference (AFD)

TS 3.3.1 Reactor Trip System (RTS) Instrumentation TS 3.4.1 RCS Pressure, Temperature, and Flow DNB Limits TS 3.5.6 Boron Injection Tank (BIT)

TS 3.9.1 Boron Concentration In addition, a technical requirement (TR) in the NAPS Technical Requirements Manual (TRM) refers to the COLR:

TR 3.1.1 Boration Flow Paths - Operating The analytical methods used to determine the core operating limits are those previously approved by the NRC and discussed in the documents listed in the References Section.

Cycle-specific values are presented in bold. Text in italics is provided for information only.

Page 1 of 22

Serial No.13-643 Docket No. 50-338 REFERENCES

1. VEP-FRD-42, Rev. 2.1-A, "Reload Nuclear Design Methodology," August 2003.

Methodology for:

TS 3.1.1 - Shutdown Margin, TS 3.1.3 - Moderator Temperature Coefficient, TS.3.1.4 - Rod Group Alignment Limits TS 3.1.5 - Shutdown Bank Insertion Limit, TS 3.1.6 - Control Bank Insertion Limits, TS 3.1.9 - Physics Tests Exceptions - Mode 2, TS 3.2.1 - Heat Flux Hot Channel Factor, TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor TS 3.5.6 - Boron Injection Tank (BIT) and TS 3.9.1 - Boron Concentration

2. Plant-specific adaptation of WCAP-16009-P-A, "Realistic Large Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM),"

as approved by NRC Safety Evaluation Report dated February 29, 2012.

Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor

3. WCAP-10054-P-A, "Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code," August 1985.

Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor

4. WCAP-10079-P-A, "NOTRUMP, A Nodal Transient Small Break and General Network Code," August 1985.

Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor

5. WCAP-12610-P-A, "VANTAGE+ FUEL ASSEMBLY - REFERENCE CORE REPORT,"

April 1995.

Methodology for:

TS 2.1.1 - Reactor Core Safety Limits TS 3.2.1 - Heat Flux Hot Channel Factor

6. VEP-NE-2, Rev. 0-A, Statistical DNBR Evaluation Methodology, June 1987.

Methodology for:

TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor and TS 3.4.1 - RCS Pressure, Temperature and Flow DNB Limits Page 2 of 22

Serial No.13-643 Docket No. 50-338

7. VEP-NE-1, Rev. 0.1-A, Relaxed Power Distribution Control Methodology and Associated FQ Surveillance Technical Specifications, August 2003.

Methodology for:

TS 3.2.1 - Heat Flux Hot Channel Factor and TS 3.2.3 - Axial Flux Difference

8.

WCAP-8745-P-A, Design Bases for the Thermal Overpower AT and Thermal Overtemperature AT Trip Functions, September 1986.

Methodology for:

TS 2.1.1 - Reactor Core Safety Limits and TS 3.3.1 - Reactor Trip System Instrumentation

9. WCAP-14483-A, Generic Methodology for Expanded Core Operating Limits Report, January 1999.

Methodology for:

TS 2.1.1 - Reactor Core Safety Limits, TS 3.1.1 - Shutdown Margin, TS 3.1.4 - Rod Group Alignment Limits TS 3.1.9 - Physics Tests Exceptions - Mode 2 TS 3.3.1 - Reactor Trip System Instrumentation, TS 3.4.1 - RCS Pressure, Temperature, and Flow DNB Limits TS 3.5.6 - Boron Injection Tank (BIT) and TS 3.9.1 - Boron Concentration

10. BAW-10227P-A, Rev. 0, "Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel," February 2000.

Methodology for:

TS 2.1.1 - Reactor Core Safety Limits and TS 3.2.1 - Heat Flux Hot Channel Factor

11. EMF-2103 (P) (A), Rev. 0, "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," April 2003.

Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor

12. EMF-96-029 (P) (A), Rev. 0, "Reactor Analysis System for PWRs," January 1997.

Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor Page 3 of 22

Serial No.13-643 Docket No. 50-338

13. BAW-10168P-A, Rev. 3, "RSG LOCA - BWNT Loss-of-Coolant Accident Evaluation Model for Recirculating Steam Generator Plants," December 1996. Volume II only (SBLOCA models).

Methodology for: TS 3.2.1 - Heat Flux Hot Channel Factor

14. DOM-NAF-2, Rev. 0.2-P-A, "Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code," including Appendix A, "Qualification of the F-ANP BWU CHF Correlations in the Dominion VIPRE-D Computer Code," and Appendix C, "Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code,"

August 2010.

Methodology for:

TS 3.2.2 - Nuclear Enthalpy Rise Hot Channel Factor and TS 3.4.1 - RCS Pressure, Temperature and Flow DNB Limits

15. WCAP-12610-P-A and CENPD-404.-P-A, Addendum 1 -A, "Optimized ZIRLOTM, July 2006.

Methodology for:

TS 2.1.1 - Reactor Core Safety Limits and TS 3.2.1 - Heat Flux Hot Channel Factor Note:

In some instances, the North Anna COLR lists multiple methodologies that are used to verify a single Technical Specification parameter. This is due to the transition from AREVA fuel to Westinghouse fuel which requires the use of different vendor proprietary methodologies to verify the two fuiel products meet the applicable regulatory limits.

Page 4 of 22

Serial No.13-643 Docket No. 50-338 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs In MODES 1 and 2, the combination of THERMAL POWER, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in COLR Figure 2.1-1; and the following SLs shall not be exceeded.

2.1.1.1 The departure from nucleate boiling ratio (DNBR) shall be maintained greater than or equal to the 95/95 DNBR criterion for the DNB correlations and methodologies specified in the References Section.

2.1.1.2 The peak fuel centerline temperature shall be maintained < 5080'F, decreasing by 58'F per 10,000 MWD/MTU of burnup, for Westinghouse fuel and < 5173°F, decreasing by 65'F per 10,000 MWD/MTU of burnup, for AREVA fuel.

Page 5 of 22

Serial No.13-643 Docket No. 50-338 COLR Figure 2.1-1 NORTH ANNA REACTOR CORE SAFETY LIMITS 4-E ba (U

w, 665 660 655 650 645 640 635 630 625 620 615 610 605 600 595 590 585 580 575 570 0

10 20 30 40 50 60 70 80 Percent of RATED THERMAL POWER 90 100 110 120 Page 6 of 22

Serial No.13-643 Docket No. 50-338 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)

LCO 3.1.1 SDM shall be__ 1.77 % Ak/k.

3.1.3 Moderator Temperature Coefficient (MTC)

LCO 3.1.3 The MTC shall be maintained within the limits specified below. The upper limit of MTC is +0.6 x 10-4 Ak/k/IF, when < 70% RTP, and 0.0 Ak/k/OF when > 70%

RTP.

The BOC/ARO-MTC shall be _ +0.6 x 10-4 Ak/k/F (upper limit), when < 70%

RTP, and _0.0 Ak/k/0 F when > 70% RTP.

The EOC/ARO/RTP-MTC shall be less negative than -5.0 x 10-4 Ak/k/OF (lower limit).

The MTC surveillance limits are:

The 300 ppm/ARO/RTP-MTC should be less negative than or equal to

-4.0 x 104 Ak/k/0 F [Note 2].

The 60 ppm/ARO/RTP-MTC should be less negative than or equal to

-4.7 x 104 AkWk/°F [Note 3].

SR 3.1.3.2 Verify MTC is within -5.0 x 10-4 Ak'k/°F (lower limit).

Note 2: If the MTC is more negative than -4.0 x 10-4 Ak/k/°F, SR 3.1.3.2 shall be repeated once per 14 EFPD during the remainder of the fuel cycle.

Note 3: SR 3.1.3.2 need not be repeated if the MTC measured at the equivalent of equilibrium RTP-ARO boron concentration of _ 60 ppm is less negative than -4.7 x 10-4 Ak/k/]F.

3.1.4 Rod Group Alignment Limits Required Action A. 1.1 Verify SDM to be > 1.77 % Ak/k.

Required Action B. 1.1 Verify SDM to be _> 1.77 % Ak/k.

Required Action D. 1.1 Verify SDM to be > 1.77 % Ak/k.

Page 7 of 22

Serial No.13-643 Docket No. 50-338 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be withdrawn to at least 225 steps.

Required Action A. 1.1 Verify SDM to be > 1.77 % Ak/k.

Required Action B.1 Verify SDM to be > 1.77 % Ak/k.

SR 3.1.5.1 Verify each shutdown bank is withdrawn to at least 225 steps.

3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be limited in physical insertion as shown in COLR Figure 3.1-1. Sequence of withdrawal shall be A, B, C and D, in that order; and the overlap limit during withdrawal shall be 97 steps.

Required Action A. 1.1 Verify SDM to be > 1.77 % Ak/k.

Required Action B. 1.1 Verify SDM to be > 1.77 % Ak/k.

Required Action C. 1 Verify SDM to be > 1.77 % Ak/k.

SR 3.1.6.1 Verify estimated critical control bank position is within the insertion limits specified in COLR Figure 3.1-1.

SR 3.1.6.2 Verify each control bank is within the insertion limits specified in COLR Figure 3.1-1.

SR 3.1.6.3 Verify each control bank not fully withdrawn from the core is within the sequence and overlap limits specified in LCO 3.1.6 above.

3.1.9 PHYSICS TESTS Exceptions - MODE 2 LCO 3.1.9.b SDM is _ 1.77 % Ak/k.

SR 3.1.9.4 Verify SDM to be __ 1.77 % Ak/k.

Page 8 of 22

Serial No.13-643 Docket No. 50-338 COLR Figure 3.1-1 North Anna 1 Cycle 24 Control Rod Bank Insertion Limits 0.

1, 4.

In 0

0W-0.

0~

230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Fraction of Rated Thermal Power Page 9 of 22

Serial No.13-643 Docket No. 50-338 3.2 POWER DISTRIBUTION LIMITS 3.2.1 Heat Flux Hot Channel Factor (FQ(Z))

LCO 3.2.1 FQ(Z), as approximated by FQM(Z), shall be within the limits specified below.

CFQ = 2.32 The Measured Heat Flux Hot Channel Factor, FQM(Z), shall be limited by the following relationships:

CFQ K(Z)

P N(Z))

for e>0.5 P

N(Z)

CFQ K(Z)

F0 (Z) -

for P0.5 Q0.5 N( Z)

THERMAL POWER where:

P = RATED THERMAL POWER ; and K(Z) is provided in COLR Figure 3.2-1 N(Z) is a cycle-specific non-equilibrium multiplier on FQ (Z) to account for power distribution transients during normal operation, provided in COLR Table 3.2-1.

The discussion in the Bases Section B 3.2.1 for this LCO requires the application of a cycle dependent non-equilibrium multiplier, N(Z), to the CFQ limit. N(Z) accounts for power distribution transients encountered during normal operation. As function N(Z) is dependent on the predicted equilibrium FQ(Z) and is sensitive to the axial power distribution, it is typically generated from the actual EOC burnup distribution that can only be obtained after the shutdown of the previous cycle.

The cycle-specific N(Z) function is presented in COLR Table 3.2-1.

Page 10 of 22

Serial No.13-643 Docket No. 50-338 COLR Table 3.2-1 N1C24 Normal Operation N(Z)

NODE HEIGHT (FEET) 10 10.2 11 10.0 12 9.8 13 9.6 14 9.4 15 9.2 16 9.0 17 8.8 18 8.6 19 8.4 20 8.2 21 8.0 22 7.8 23 7.6 24 7.4 25 7.2 26 7.0 27 6.8 28 6.6 29 6.4 30 6.2 31 6.0 32 5.8 33 5.6 34 5.4 35 5.2 36 5.0 37 4.8 38 4.6 39 4.4 40 4.2 41 4.0 42 3.8 43 3.6 44 3.4 45 3.2 46 3.0 47 2.8 48 2.6 49 2.4 50 2.2 51 2.0 52 1.8 0 to 1000 MWD/MTU 1.128 1.128 1.133 1.140 1.143 1.144 1.150 1.155 1.158 1.159 1.162 1.162 1.162 1.160 1.157 1.152 1.147 1.145 1.143 1.134 1.123 1.118 1.113 1.100 1.092 1.092 1.096 1.099 1.101 1.102 1.102 1.104 1.113 1.127 1.137 1.146 1.157 1.170 1.182 1.193 1.203 1.213 1.222 1000 to 3000 MWD/MTU 1.139 1.147 1.155 1.161 1.166 1.168 1.173 1.176 1.177 1.175 1.173 1.169 1.164 1.160 1.157 1.152 1.147 1.145 1.143 1.135 1.123 1.116 1.108 1.091 1.079 1.077 1.080 1.082 1.086 1.091 1.097 1.104 1.112 1.121 1.128 1.135 1.144 1.154 1.163 1.172 1.180 1.187 1.195 3000 to 5000 MWDIMTU 1.143 1.148 1.154 1.161 1.165 1.168 1.173 1.176 1.176 1.176 1.176 1.175 1.175 1.174 1.171 1.167 1.163 1.161 1.158 1.150 1.137 1.131 1.121 1.098 1.081 1.077 1.079 1.079 1.082 1.087 1.091 1.096 1.104 1.114 1.122 1.129 1.135 1.142 1.153 1.164 1.174 1.183 1.192 5000 to 7000 MWD/MTU 1.144 1.148 1.152 1.156 1.156 1.158 1.170 1.181 1.186 1.185 1.186 1.185 1.185 1.180 1.173 1.167 1.163 1.162 1.162 1.158 1.152 1.149 1.142 1.126 1.112 1.107 1.109 1.111 1.114 1.115 1.115 1.115 1.113 1.115 1.124 1.137 1.147 1.155 1.158 1.166 1.183 1.195 1.197 7000 to 9000 MWD/MTU 1.121 1.128 1.137 1.148 1.153 1.157 1.170 1.181 1.186 1.185 1.185 1.184 1.183 1.184 1.187 1.189 1.189 1.190 1.188 1.185 1.178 1.175 1.167 1.148 1.131 1.122 1.120 1.121 1.123 1.121 1.120 1.120 1.116 1.115 1.123 1.137 1.147 1.155 1.159 1.167 1.183 1.195 1.197 These decks are generated for normal operation flux maps that are typically taken at full power ARO. Additional N(z) decks may be generated, if necessary, consistent with the methodology described in the RPDC topical (Reference 7). EOR is defined as Hot Full Power End of Reactivity.

Page 11 of 22

Serial No.13-643 Docket No. 50-338 COLR Table 3.2-1 (continued)

N1C24 Normal Operation N(Z)

NODE HEIGHT (FEET) 10 10.2 11 10.0 12 9.8 13 9.6 14 9.4 15 9.2 16 9.0 17 8.8 18 8.6 19 8.4 20 8.2 21 8.0 22 7.8 23 7.6 24 7.4 25 7.2 26 7.0 27 6.8 28 6.6 29 6.4 30 6.2 31 6.0 32 5.8 33 5.6 34 5.4 35 5.2 36 5.0 37 4.8 38 4.6 39 4.4 40 4.2 41 4.0 42 3.8 43 3.6 44 3.4 45 3.2 46 3.0 47 2.8 48 2.6 49 2.4 50 2.2 51 2.0 52 1.8 9000 to 11000 MWDIMTU 1.119 1.118 1.123 1.133 1.138 1.143 1.156 1.168 1.173 1.175 1.180 1.182 1.182 1.183 1.187 1.189 1.189 1.190 1.188 1.185 1.178 1.175 1.167 1.147 1.132 1.130 1.131 1.130 1.127 1.123 1.119 1.119 1.118 1.122 1.130 1.144 1.156 1.168 1.176 1.185 1.199 1.208 1.209 11000 to 13000 MWD/MTU 1.120 1.118 1.121 1.127 1.128 1.132 1.144 1.158 1.164 1.170 1.182 1.189 1.192 1.193 1.197 1.198 1.198 1.197 1.195 1.196 1.197 1.198 1.194 1.184 1.173 1.168 1.159 1.145 1.131 1.122 1.123 1.133 1.142 1.150 1.156 1.161 1.163 1.168 1.174 1.185 1.199 1.208 1.209 13000 to 15000 MWD/MTU 1.112 1.111 1.108 1.109 1.111 1.120 1.139 1.159 1.165 1.170 1.182 1.189 1.192 1.193 1.197 1.198 1.198 1.197 1.195 1.196 1.197 1.198 1.194 1.184 1.173 1.168 1.163 1.155 1.145 1.134 1.130 1.134 1.141 1.150 1.156 1.161 1.165 1.167 1.169 1.170 1.170 1.171 1.173 15000 to 17000 MWD/MTU 1.119 1.119 1.118 1.117 1.112 1.113 1.123 1.138 1.146 1.157 1.175 1.188 1.193 1.200 1.211 1.217 1.219 1.221 1.222 1.222 1.219 1.218 1.211 1.196 1.181 1.174 1.169 1.161 1.154 1.148 1.144 1.140 1.134 1.128 1.122 1.122 1.130 1.145 1.153 1.163 1.175 1.186 1.194 17000 to EOR MWDIMTU 1.119 1.119 1.118 1.117 1.112 1.113 1.123 1.139 1.148 1.160 1.179 1.194 1.200 1.207 1.218 1.226 1.228 1.231 1.231 1.232 1.229 1.229 1.223 1.209 1.194 1.188 1.182 1.172 1.164 1.159 1.154 1.148 1.135 1.124 1.122 1.133 1.145 1.160 1.170 1.181 1.196 1.209 1.220 These decks are generated for normal operation flux maps that are typically taken at full power ARO. Additional N(z) decks may be generated, if necessary, consistent with the methodology described in the RPDC topical (Reference 7). EOR is defined as Hot Full Power End of Reactivity.

Page 12 of 22

Serial No.13-643 Docket No. 50-338 1.2 1.1 1.0 0.9 0.8 N

0 0.7 M.'

N

-- I 40.6 0Z

- 0.5 N

0.4 0.3 0.2 0.1 0.0 COLR Figure 3.2-1 K(Z) - Normalized FQ as a Function of Core Height 6,1.0 (12.925) 0 1

2 3

4 5

6 7

8 9

10 11 12 13 CORE HEIGHT (FT)

Page 13 of 22

Serial No.13-643 Docket No. 50-338 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (FNAH)

LCO 3.2.2 FNAH shall be within the limits specified below.

FNA

_< 1.587(1 + 0.3(1 - P)}

THERMAL POWER where: P RA TED THERMAL POWER SR 3.2.2.1 Verify FNAH is within limits specified above.

3.2.3 AXIAL FLUX DIFFERENCE (AFD)

LCO 3.2.3 The AFD in % flux difference units shall be maintained within the limits specified in the applicable COLR Figure (3.2-2-A or 3.2-2-B).

Page 14 of 22

Serial No.13-643 Docket No. 50-338 COLR Figure 3.2-2-A Applicable Burnup: BOC* to 5000 MWD/MTU North Anna 1 Cycle 24 Axial Flux Difference Limits 120 110 100 0

C-ra, 0

90 80 70 60 50 40 30 20 10 0

-30

-20

-10 0

10 20 Percent Flux Difference (Delta-I) 30

  • Figure 3.2.-2-A was implemented at a core bumup of approximately 2000 MWD/MTU.

Page 15 of 22

Serial No.13-643 Docket No. 50-338 COLR Figure 3.2-2-B Applicable Burnup: 5000 MWD/MTU to EOC North Anna 1 Cycle 24 Axial Flux Difference Limits 120 110 100 0

E-0 90 80 70 60 50 40 30 20 10 0

(-12,100)

(+6,10))

Unacceptabl/

eUnateiont Unacceptable Operation Acc ptable Operation

(-27,50)

(+20,50)

-30

-20

-10 0

10 20 30 Percent Flux Difference (Delta-I)

Page 16 of 22

Serial No.13-643 Docket No. 50-338 3.3.1 Reactor Trip System (RTS) Instrumentation TS Table 3.3.1-1 Note 1: Overtemperature AT The Overtemperature AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span, with the numerical values of the parameters as specified below.

AT<~C

+~

{K K)[TT,]+K3 (P-p,)_fl(A)}

where: AT AT 0 S

T T'

P P

1 is measured RCS AT, OF is the indicated AT at RTP, OF is the Laplace transform operator, sec1 is the measured RCS average temperature, OF is the nominal Tavg at RTP, < 586.8 OF is the measured pressurizer pressure, psig is the nominal RCS operating pressure, _> 2235 psig Ki < 1.2715 K 2 >- 0.02174 /OF K3 -> 0.001145 /psig r/, r2 = time constants utilized in the lead-lag controller for Tavg Ti ! 23.75 sec T2 - 4.4 sec (1 + rls)/(J + r2s) = function generated by the lead-lag controller for Tag dynamic compensation f1 (AI) > 0.0291 {- 13.0 - (Cit - qb)}

0 0.0251 {(qt - qb) - 7.0}

when (qt - qb) < -13.0% RTP when -13.0% RTP < (qt - qb) - +7.0% RTP when (qt-qb) > +7.0% RTP Where qt and qb are percent RTP in the upper and lower halves of the core, respectively, and qt + qb is the total THERMAL POWER in percent RTP.

Page 17 of 22

Serial No.13-643 Docket No. 50-338 TS Table 3.3.1-1 Note 2: Overpower AT The Overpower AT Function Allowable Value shall not exceed the following nominal trip setpoint by more than 2% of AT span, with the numerical values of the parameters as specified below.

AT<ATo {K 4a-K 5 [ V3S[]T-K 6[T-T']-f 2 (AI)}

where: AT ATo T

T' is measured RCS AT, °F.

is the indicated AT at RTP, OF.

is the Laplace transform operator, secl.

is the measured RCS average temperature, OF.

is the nominal Tavg at RTP, <586.8 OF.

K4 :5 1.0865 K5 >0.0198 /OF for increasing Tavg 0 /OF for decreasing Tavg K6 >0.00162 0 /OF

/OF when T > T' when T < T' r3= time constant utilized in the rate lag controller for Tag T3 Ž 9.5 sec r3s/(1 + r3s) = function generated by the rate lag controller for T*,g dynamic compensation f2(AI) = 0, for all Al.

Page 18 of 22

Serial No.13-643 Docket No. 50-338 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4,1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.4.1 RCS DNB parameters for pressurizer pressure, RCS average temperature, and RCS total flow rate shall be within the limits specified below:

a. Pressurizer pressure is greater than or equal to 2205 psig;
b. RCS average temperature is less than or equal to 591 OF; and
c. RCS total flow rate is greater than or equal to 295,000 gpm.

SR 3.4.1.1 Verify pressurizer pressure is greater than or equal to 2205 psig.

SR 3.4.1.2 Verify RCS average temperature is less than or equal to 591 OF.

SR 3.4.1.3 Verify RCS total flow rate is greater than or equal to 295,000 gpm.

SR 3.4.1.4 NOTE-------------------------

Not required to be performed until 30 days after > 90% RTP.

Verify by precision heat balance that RCS total flow rate is _> 295,000 gpm.

Page 19 of 22

Serial No.13-643 Docket No. 50-338 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.6 Boron Injection Tank (BIT)

Required Action B.2 Borate to a SDM _> 1.77 % Ak/k at 200 OF.

Page 20 of 22

Serial No.13-643 Docket No. 50-338 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of the Reactor Coolant System (RCS), the refueling canal, and the refueling cavity shall be maintained > 2600 ppm.

SR 3.9.1.1 Verify boron concentration is within the limit specified above.

Page 21 of 22

Serial No.13-643 Docket No. 50-338 NAPS TECHNICAL REQUIREMENTS MANUAL TRM 3.1 REACTIVITY CONTROL SYSTEMS TR 3.1.1 Boration Flow Paths - Operating Required Action D.2 Borate to a SHUTDOWN MARGIN >_ 1.77 % Ak/k at 200 IF, after xenon decay.

Page 22 of 22