{{#Wiki_filter:UNITE D S TATE S
{{#Wiki_filter:January 22, 2014  
                                    NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                      R E G IO N I V
                                                  1600 EAST LAMAR BLVD
Mr. Edward D. Halpin  
                                            AR L I NGTON , TEXAS 7 601 1- 4511
Senior Vice President and  
                                              January 22, 2014
   Chief Nuclear Officer  
Mr. Edward D. Halpin
Pacific Gas and Electric Company  
Senior Vice President and
Diablo Canyon Power Plant  
   Chief Nuclear Officer
P.O. Box 56, Mail Code 104/6  
Pacific Gas and Electric Company
Avila Beach, CA 93424  
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
SUBJECT:  
Avila Beach, CA 93424
DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -  
SUBJECT:         DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING  
                NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000275/2014301; 05000323/2014301
                EXAMINATION 05000275/2014301; 05000323/2014301
Dear Mr. Halpin:
Dear Mr. Halpin:  
In a telephone conversation on October 31, 2013, between Messrs. Ron Fortier, NRC
Examination Lead, and Chris Steely, Chief Examiner, arrangements were made for the
In a telephone conversation on October 31, 2013, between Messrs. Ron Fortier, NRC  
administration of licensing examinations at Diablo Canyon Nuclear Power Plant, Units 1 and 2,
Examination Lead, and Chris Steely, Chief Examiner, arrangements were made for the  
during the week of August 11, 2014.
administration of licensing examinations at Diablo Canyon Nuclear Power Plant, Units 1 and 2,  
As agreed during the telephone conversation, your staff will prepare the examinations based on
during the week of August 11, 2014.  
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
As agreed during the telephone conversation, your staff will prepare the examinations based on  
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power  
discuss with your staff any changes that might be necessary before the examinations are
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for  
administered.
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will  
To meet the above schedule, it will be necessary for your staff to furnish the examination
discuss with your staff any changes that might be necessary before the examinations are  
outlines by May 23, 2014. The written examinations, operating tests, and supporting reference
administered.
materials identified in Attachment 3 to ES-201 will be due by June 20, 2014. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
To meet the above schedule, it will be necessary for your staff to furnish the examination  
authorized representative of the facility licensee shall approve the outlines, examinations, and
outlines by May 23, 2014. The written examinations, operating tests, and supporting reference  
tests before they are submitted to the NRC for review and approval. All materials shall be
materials identified in Attachment 3 to ES-201 will be due by June 20, 2014. Pursuant to  
complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an  
safeguards information in your response be contained in a separate enclosure and appropriately
authorized representative of the facility licensee shall approve the outlines, examinations, and  
marked. Any delay in receiving the required examinations and reference materials, or the
tests before they are submitted to the NRC for review and approval. All materials shall be  
submittal of inadequate or incomplete materials, may cause the examinations to be
complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or  
rescheduled. In addition, your support for on-site validation of the examinations is required
safeguards information in your response be contained in a separate enclosure and appropriately  
during the week of July 14, 2014.
marked. Any delay in receiving the required examinations and reference materials, or the  
In order to conduct the requested written examinations and operating tests, it will be necessary
submittal of inadequate or incomplete materials, may cause the examinations to be  
for your staff to provide adequate space and accommodations in accordance with ES-402 and
rescheduled. In addition, your support for on-site validation of the examinations is required  
during the week of July 14, 2014.  
In order to conduct the requested written examinations and operating tests, it will be necessary  
for your staff to provide adequate space and accommodations in accordance with ES-402 and  
UNITED STATES
NUCLEAR REGULATORY COMMI SSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511


E. Halpin                                   -2-
E. Halpin  
to make the simulation facility available on the dates noted above. In accordance with ES-302,
- 2 -  
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
to make the simulation facility available on the dates noted above. In accordance with ES-302,  
results are final.
your staff should retain the original simulator performance data (e.g., system pressures,  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
temperatures, and levels) generated during the dynamic operating tests until the examination  
effect while the written examinations and operating tests are being administered.
results are final.  
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in  
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
effect while the written examinations and operating tests are being administered.  
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
To permit timely NRC review and evaluation, your staff should submit preliminary operator and  
date, a postponement may be necessary. Signed applications certifying that all training has
senior operator license applications (Office of Management and Budget (OMB) approval  
been completed should be submitted at least 14 days before the first examination date.
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver  
This letter contains information collections that are subject to the Paperwork Reduction Act of
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
examination date. If the applications are not received at least 30 days before the examination  
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
date, a postponement may be necessary. Signed applications certifying that all training has  
this collection of information is estimated to average 50 hours per response, including the time
been completed should be submitted at least 14 days before the first examination date.  
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
This letter contains information collections that are subject to the Paperwork Reduction Act of  
other aspect of these information collections, including suggestions for reducing the burden, to
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for  
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
this collection of information is estimated to average 50 hours per response, including the time  
INFOCOLLECTS@NRC.GOV.
for reviewing instructions, gathering and maintaining the data needed, and completing and  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
reviewing the collection of information. Send comments regarding this burden estimate or any  
information collection, unless it displays a currently valid OMB control number.
other aspect of these information collections, including suggestions for reducing the burden, to  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory  
available electronically for public inspection in the NRCs Public Document Room or from the
Commission, Washington, DC 20555-0001, or by Internet electronic mail to  
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
INFOCOLLECTS@NRC.GOV.
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and
information collection, unless it displays a currently valid OMB control number.  
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
available electronically for public inspection in the NRCs Public Document Room or from the  
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access  
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room  
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and  
guidelines referenced in this letter. If you have any questions regarding the NRCs examination  
procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-
procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-
1159.
1159.  
                                                Sincerely,
                                                /RA/
                                                Vincent Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Dockets: 50-275; 50-323
Licenses: DPR-80; DPR-82
Sincerely,
/RA/  
Vincent Gaddy, Chief  
Operations Branch  
Division of Reactor Safety  
Dockets:   50-275; 50-323  
Licenses: DPR-80; DPR-82  




ML14023A876
  ML14023A876  
SUNSI Rev Compl.  Yes  No ADAMS         Yes  No     Reviewer Initials   CDS
SUNSI Rev Compl.  
Publicly Avail   Yes  No Sensitive     Yes  No     Sens. Type Initials CDS
  Yes  No  
SOE:OB           C:OB
ADAMS  
CSteely           VGaddy
Yes  No  
/RA/             /RA/
Reviewer Initials  
1/22/14           1/22/14
CDS  
Publicly Avail  
Yes  No  
Sensitive  
Yes  No  
Sens. Type Initials  
CDS  
SOE:OB  
C:OB  
CSteely  
VGaddy  
/RA/  
/RA/  
1/22/14  
1/22/14
}}
}}

Latest revision as of 23:49, 10 January 2025

Notification of NRC Initial Operator Licensing Examination 05000275/2014301; 05000323/2014301
ML14023A876
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/22/2014
From: Vincent Gaddy
Division of Reactor Safety IV
To: Halpin E
Pacific Gas & Electric Co
References
IR-14-301
Download: ML14023A876 (3)


See also: IR 05000275/2014301

Text

January 22, 2014

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000275/2014301; 05000323/2014301

Dear Mr. Halpin:

In a telephone conversation on October 31, 2013, between Messrs. Ron Fortier, NRC

Examination Lead, and Chris Steely, Chief Examiner, arrangements were made for the

administration of licensing examinations at Diablo Canyon Nuclear Power Plant, Units 1 and 2,

during the week of August 11, 2014.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by May 23, 2014. The written examinations, operating tests, and supporting reference

materials identified in Attachment 3 to ES-201 will be due by June 20, 2014. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examinations and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. In addition, your support for on-site validation of the examinations is required

during the week of July 14, 2014.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and

UNITED STATES

NUCLEAR REGULATORY COMMI SSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

E. Halpin

- 2 -

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Fortier has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Steely at 817-200-1432, or myself at 817-200-

1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

ML14023A876

SUNSI Rev Compl.

Yes No

ADAMS

Yes No

Reviewer Initials

CDS

Publicly Avail

Yes No

Sensitive

Yes No

Sens. Type Initials

CDS

SOE:OB

C:OB

CSteely

VGaddy

/RA/

/RA/

1/22/14

1/22/14