{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                              REGION IV
REGION IV  
                                          1600 E. LAMAR BLVD.
1600 E. LAMAR BLVD.  
                                        ARLINGTON, TX 76011-4511
ARLINGTON, TX 76011-4511  
                                            March 4, 2014
Lou Cortopassi, Site Vice President
Omaha Public Power District
March 4, 2014  
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
Lou Cortopassi, Site Vice President
SUBJECT:       FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL
Omaha Public Power District  
                OPERATOR LICENSING EXAMINATION 05000285/2014301
Fort Calhoun Station FC-2-4
Dear Mr. Cortopassi:
P.O. Box 550  
On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the
Fort Calhoun, NE 68023-0550  
arrangements for the licensing examination during the week of May 19, 2014 (Accession
Number ML13137A194). Members of the site examination development staff and NRC regional
SUBJECT:  
staff have reviewed this letter recently. The result is that several of the dates associated with
FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL  
examination material submittals needed to be revised. Therefore, this letter serves to document
OPERATOR LICENSING EXAMINATION 05000285/2014301  
the revised dates, as well as the revised assignment of Chief Examiner. These revisions are
based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist,
Dear Mr. Cortopassi:  
Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28
to February 24, 2014.
On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the  
To meet the schedule of starting the examination on May 19, 2014, the operating tests and
arrangements for the licensing examination during the week of May 19, 2014 (Accession  
supporting reference materials identified in Attachment 3 to ES-201 will be due by
Number ML13137A194). Members of the site examination development staff and NRC regional  
March 31, 2014. The written examination and supporting reference materials will be due by
staff have reviewed this letter recently. The result is that several of the dates associated with  
April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
examination material submittals needed to be revised. Therefore, this letter serves to document  
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
the revised dates, as well as the revised assignment of Chief Examiner. These revisions are  
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist,  
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28  
sensitive unclassified, or safeguards information in your response be contained in a separate
to February 24, 2014.  
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
To meet the schedule of starting the examination on May 19, 2014, the operating tests and  
examinations to be rescheduled. In addition, your support for on-site validation of the
supporting reference materials identified in Attachment 3 to ES-201 will be due by
examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the
March 31, 2014. The written examination and supporting reference materials will be due by
examination is Steve Garchow. All other due dates and requests documented in the
April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
May 16, 2013 letter remain the same.
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the  
outlines, examinations, and tests before they are submitted to the NRC for review and approval.  
All materials shall be complete and ready-to-use. We request that any personal, proprietary,  
sensitive unclassified, or safeguards information in your response be contained in a separate  
enclosure and appropriately marked. Any delay in receiving the required examinations and  
reference materials, or the submittal of inadequate or incomplete materials, may cause the  
examinations to be rescheduled. In addition, your support for on-site validation of the  
examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the  
examination is Steve Garchow. All other due dates and requests documented in the
May 16, 2013 letter remain the same.  


L. Cortopassi                                 -2-
L. Cortopassi  
This letter contains information collections that are subject to the Paperwork Reduction Act
- 2 -  
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
This letter contains information collections that are subject to the Paperwork Reduction Act
estimated to average 50 hours per response, including the time for reviewing instructions,
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
gathering and maintaining the data needed, and completing and reviewing the collection of
approval number 3150-0018. The public reporting burden for this collection of information is  
information. Send comments regarding this burden estimate or any other aspect of these
estimated to average 50 hours per response, including the time for reviewing instructions,  
information collections, including suggestions for reducing the burden, to the Records and
gathering and maintaining the data needed, and completing and reviewing the collection of  
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
information. Send comments regarding this burden estimate or any other aspect of these  
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
information collections, including suggestions for reducing the burden, to the Records and  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,  
information collection, unless it displays a currently valid OMB control number.
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an  
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
information collection, unless it displays a currently valid OMB control number.  
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be  
Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies
available electronically for public inspection in the NRCs Public Document Room or from the  
and guidelines referenced in this letter. If you have any questions regarding the NRCs
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access  
examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426,
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room  
or myself at 817-200-1159.
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
                                                Sincerely,
                                                  /RA/
Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies  
                                                Vincent Gaddy, Chief
and guidelines referenced in this letter. If you have any questions regarding the NRCs  
                                                Operations Branch
examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426,
                                                Division of Reactor Safety
or myself at 817-200-1159.  
Docket: 50-285
License: DPR-40
Sincerely,
/RA/  
Vincent Gaddy, Chief  
Operations Branch  
Division of Reactor Safety  
Docket:   50-285  
License: DPR-40  


L. Cortopassi                               -3-
L. Cortopassi  
Electronic distribution by RIV:
- 3 -  
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
Electronic distribution by RIV:  
DRP Director (Kriss.Kennedy@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)  
DRP Deputy Director (Troy.Pruett@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)  
Acting Deputy Director (Geoffrey.Miller@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)  
Acting DRS Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)  
Senior Resident Inspector (John.Kirkland@nrc.gov)
Acting Deputy Director (Geoffrey.Miller@nrc.gov)  
Resident Inspector (Jacob.Wingebach@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)  
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)  
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)  
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)  
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)  
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)  
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)  
NRR Project Manager (Lynnea.Wilkins@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)  
NRR Project Manager (Joseph.Sebrosky@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)  
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
NRR Project Manager (Lynnea.Wilkins@nrc.gov)  
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
NRR Project Manager (Joseph.Sebrosky@nrc.gov)  
TSB Technical Assistant (Loretta.Williams@nrc.gov)
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)  
RIV Regional Counsel (Karla.Fuller@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
TSB Technical Assistant (Loretta.Williams@nrc.gov)  
OEMail Resource
RIV Regional Counsel (Karla.Fuller@nrc.gov)  
OEWEB Resource (Sue.Bogle@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)
OEMail Resource  
RIV RSLO (Bill.Maier@nrc.gov)
OEWEB Resource (Sue.Bogle@nrc.gov)  
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)  
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)  
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)  
MC 0350 Panel Member (Michael.Markley@nrc.gov)
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)  
R:\Reactors\_FCS\2014lFCS2014301CNL LT.pdf
MC 0350 Panel Member (Michael.Balazik@nrc.gov)  
ADAMS: No           Yes         SUNSI Review Complete   Reviewer Initials: VG
MC 0350 Panel Member (Michael.Markley@nrc.gov)  
                                    Publicly Available       Non-Sensitive
                                    Non-publicly Available   Sensitive
OE:OB                 C:OB
SHedger               VGaddy
/RA/                 /RA/
3/4/14               3/4/14
R:\\Reactors\\_FCS\\2014lFCS2014301CNL LT.pdf  
OFFICIAL RECORD COPY T=Telephone                   E=E-mail F=Fax
ADAMS:   No       Yes  
SUNSI Review Complete  
Reviewer Initials: VG  
  Publicly Available  
  Non-Sensitive  
  Non-publicly Available  
  Sensitive  
OE:OB  
C:OB  
SHedger  
VGaddy  
/RA/  
/RA/  
3/4/14  
3/4/14  
OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax
}}
}}

Latest revision as of 22:54, 10 January 2025

IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator
ML14063A624
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/04/2014
From: Vincent Gaddy
Operations Branch IV
To: Cortopassi L
Omaha Public Power District
Gaddy V
References
50-285/14-301
Download: ML14063A624 (3)


See also: IR 05000285/2014301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

March 4, 2014

Lou Cortopassi, Site Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000285/2014301

Dear Mr. Cortopassi:

On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the

arrangements for the licensing examination during the week of May 19, 2014 (Accession

Number ML13137A194). Members of the site examination development staff and NRC regional

staff have reviewed this letter recently. The result is that several of the dates associated with

examination material submittals needed to be revised. Therefore, this letter serves to document

the revised dates, as well as the revised assignment of Chief Examiner. These revisions are

based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist,

Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28

to February 24, 2014.

To meet the schedule of starting the examination on May 19, 2014, the operating tests and

supporting reference materials identified in Attachment 3 to ES-201 will be due by

March 31, 2014. The written examination and supporting reference materials will be due by

April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the

examination is Steve Garchow. All other due dates and requests documented in the

May 16, 2013 letter remain the same.

L. Cortopassi

- 2 -

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426,

or myself at 817-200-1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-285

License: DPR-40

L. Cortopassi

- 3 -

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting Deputy Director (Geoffrey.Miller@nrc.gov)

Acting DRS Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Janise.Schwee@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Lynnea.Wilkins@nrc.gov)

NRR Project Manager (Joseph.Sebrosky@nrc.gov)

RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

TSB Technical Assistant (Loretta.Williams@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

OEWEB Resource (Sue.Bogle@nrc.gov)

RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)

MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)

MC 0350 Panel Member (Michael.Balazik@nrc.gov)

MC 0350 Panel Member (Michael.Markley@nrc.gov)

R:\\Reactors\\_FCS\\2014lFCS2014301CNL LT.pdf

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: VG

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

OE:OB

C:OB

SHedger

VGaddy

/RA/

/RA/

3/4/14

3/4/14

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax