{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E. LAMAR BLVD. | |||
ARLINGTON, TX 76011-4511 | |||
Lou Cortopassi, Site Vice President | |||
Omaha Public Power District | March 4, 2014 | ||
Fort Calhoun Station FC-2-4 | |||
P.O. Box 550 | |||
Fort Calhoun, NE 68023-0550 | Lou Cortopassi, Site Vice President | ||
SUBJECT: | Omaha Public Power District | ||
Fort Calhoun Station FC-2-4 | |||
Dear Mr. Cortopassi: | P.O. Box 550 | ||
On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the | Fort Calhoun, NE 68023-0550 | ||
arrangements for the licensing examination during the week of May 19, 2014 (Accession | |||
Number ML13137A194). Members of the site examination development staff and NRC regional | SUBJECT: | ||
staff have reviewed this letter recently. The result is that several of the dates associated with | FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL | ||
examination material submittals needed to be revised. Therefore, this letter serves to document | OPERATOR LICENSING EXAMINATION 05000285/2014301 | ||
the revised dates, as well as the revised assignment of Chief Examiner. These revisions are | |||
based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist, | Dear Mr. Cortopassi: | ||
Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28 | |||
to February 24, 2014. | On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the | ||
To meet the schedule of starting the examination on May 19, 2014, the operating tests and | arrangements for the licensing examination during the week of May 19, 2014 (Accession | ||
supporting reference materials identified in Attachment 3 to ES-201 will be due by | Number ML13137A194). Members of the site examination development staff and NRC regional | ||
March 31, 2014. The written examination and supporting reference materials will be due by | staff have reviewed this letter recently. The result is that several of the dates associated with | ||
April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations | examination material submittals needed to be revised. Therefore, this letter serves to document | ||
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | the revised dates, as well as the revised assignment of Chief Examiner. These revisions are | ||
outlines, examinations, and tests before they are submitted to the NRC for review and approval. | based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist, | ||
All materials shall be complete and ready-to-use. We request that any personal, proprietary, | Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28 | ||
sensitive unclassified, or safeguards information in your response be contained in a separate | to February 24, 2014. | ||
enclosure and appropriately marked. Any delay in receiving the required examinations and | |||
reference materials, or the submittal of inadequate or incomplete materials, may cause the | To meet the schedule of starting the examination on May 19, 2014, the operating tests and | ||
examinations to be rescheduled. In addition, your support for on-site validation of the | supporting reference materials identified in Attachment 3 to ES-201 will be due by | ||
examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the | March 31, 2014. The written examination and supporting reference materials will be due by | ||
examination is Steve Garchow. All other due dates and requests documented in the | April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations | ||
May 16, 2013 letter remain the same. | (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | ||
outlines, examinations, and tests before they are submitted to the NRC for review and approval. | |||
All materials shall be complete and ready-to-use. We request that any personal, proprietary, | |||
sensitive unclassified, or safeguards information in your response be contained in a separate | |||
enclosure and appropriately marked. Any delay in receiving the required examinations and | |||
reference materials, or the submittal of inadequate or incomplete materials, may cause the | |||
examinations to be rescheduled. In addition, your support for on-site validation of the | |||
examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the | |||
examination is Steve Garchow. All other due dates and requests documented in the | |||
May 16, 2013 letter remain the same. | |||
L. Cortopassi | L. Cortopassi | ||
This letter contains information collections that are subject to the Paperwork Reduction Act | - 2 - | ||
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018. The public reporting burden for this collection of information is | This letter contains information collections that are subject to the Paperwork Reduction Act | ||
estimated to average 50 hours per response, including the time for reviewing instructions, | of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
gathering and maintaining the data needed, and completing and reviewing the collection of | approval number 3150-0018. The public reporting burden for this collection of information is | ||
information. Send comments regarding this burden estimate or any other aspect of these | estimated to average 50 hours per response, including the time for reviewing instructions, | ||
information collections, including suggestions for reducing the burden, to the Records and | gathering and maintaining the data needed, and completing and reviewing the collection of | ||
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, | information. Send comments regarding this burden estimate or any other aspect of these | ||
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. | information collections, including suggestions for reducing the burden, to the Records and | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, | ||
information collection, unless it displays a currently valid OMB control number. | DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | ||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | information collection, unless it displays a currently valid OMB control number. | ||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | ||
Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies | available electronically for public inspection in the NRCs Public Document Room or from the | ||
and guidelines referenced in this letter. If you have any questions regarding the NRCs | Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | ||
examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, | and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | ||
or myself at 817-200-1159. | page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies | |||
and guidelines referenced in this letter. If you have any questions regarding the NRCs | |||
examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, | |||
or myself at 817-200-1159. | |||
Docket: 50-285 | |||
License: DPR-40 | |||
Sincerely, | |||
/RA/ | |||
Vincent Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket: 50-285 | |||
License: DPR-40 | |||
L. Cortopassi | L. Cortopassi | ||
Electronic distribution by RIV: | - 3 - | ||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Steven.Reynolds@nrc.gov) | Electronic distribution by RIV: | ||
DRP Director (Kriss.Kennedy@nrc.gov) | Regional Administrator (Marc.Dapas@nrc.gov) | ||
DRP Deputy Director (Troy.Pruett@nrc.gov) | Deputy Regional Administrator (Steven.Reynolds@nrc.gov) | ||
Acting Deputy Director (Geoffrey.Miller@nrc.gov) | DRP Director (Kriss.Kennedy@nrc.gov) | ||
Acting DRS Director (Jeff.Clark@nrc.gov) | DRP Deputy Director (Troy.Pruett@nrc.gov) | ||
Senior Resident Inspector (John.Kirkland@nrc.gov) | Acting Deputy Director (Geoffrey.Miller@nrc.gov) | ||
Resident Inspector (Jacob.Wingebach@nrc.gov) | Acting DRS Director (Jeff.Clark@nrc.gov) | ||
Branch Chief, DRP/F (Michael.Hay@nrc.gov) | Senior Resident Inspector (John.Kirkland@nrc.gov) | ||
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov) | Resident Inspector (Jacob.Wingebach@nrc.gov) | ||
Project Engineer, DRP/F (Chris.Smith@nrc.gov) | Branch Chief, DRP/F (Michael.Hay@nrc.gov) | ||
FCS Administrative Assistant (Janise.Schwee@nrc.gov) | Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov) | ||
RIV Public Affairs Officer (Victor.Dricks@nrc.gov) | Project Engineer, DRP/F (Chris.Smith@nrc.gov) | ||
RIV Public Affairs Officer (Lara.Uselding@nrc.gov) | FCS Administrative Assistant (Janise.Schwee@nrc.gov) | ||
NRR Project Manager (Lynnea.Wilkins@nrc.gov) | RIV Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
NRR Project Manager (Joseph.Sebrosky@nrc.gov) | RIV Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | NRR Project Manager (Lynnea.Wilkins@nrc.gov) | ||
RIV RITS Coordinator (Marisa.Herrera@nrc.gov) | NRR Project Manager (Joseph.Sebrosky@nrc.gov) | ||
TSB Technical Assistant (Loretta.Williams@nrc.gov) | RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | ||
RIV Regional Counsel (Karla.Fuller@nrc.gov) | RIV RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | TSB Technical Assistant (Loretta.Williams@nrc.gov) | ||
OEMail Resource | RIV Regional Counsel (Karla.Fuller@nrc.gov) | ||
OEWEB Resource (Sue.Bogle@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov) | OEMail Resource | ||
RIV RSLO (Bill.Maier@nrc.gov) | OEWEB Resource (Sue.Bogle@nrc.gov) | ||
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov) | RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov) | ||
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov) | RIV RSLO (Bill.Maier@nrc.gov) | ||
MC 0350 Panel Member (Michael.Balazik@nrc.gov) | MC 0350 Panel Chairman (Anton.Vegel@nrc.gov) | ||
MC 0350 Panel Member (Michael.Markley@nrc.gov) | MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov) | ||
R:\Reactors\_FCS\2014lFCS2014301CNL LT.pdf | MC 0350 Panel Member (Michael.Balazik@nrc.gov) | ||
ADAMS: | MC 0350 Panel Member (Michael.Markley@nrc.gov) | ||
OE:OB | |||
SHedger | |||
/RA/ | |||
3/4/14 | R:\\Reactors\\_FCS\\2014lFCS2014301CNL LT.pdf | ||
OFFICIAL RECORD COPY T=Telephone | ADAMS: No Yes | ||
SUNSI Review Complete | |||
Reviewer Initials: VG | |||
Publicly Available | |||
Non-Sensitive | |||
Non-publicly Available | |||
Sensitive | |||
OE:OB | |||
C:OB | |||
SHedger | |||
VGaddy | |||
/RA/ | |||
/RA/ | |||
3/4/14 | |||
3/4/14 | |||
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
}} | }} | ||
Latest revision as of 22:54, 10 January 2025
| ML14063A624 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 03/04/2014 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Cortopassi L Omaha Public Power District |
| Gaddy V | |
| References | |
| 50-285/14-301 | |
| Download: ML14063A624 (3) | |
See also: IR 05000285/2014301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
March 4, 2014
Lou Cortopassi, Site Vice President
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000285/2014301
Dear Mr. Cortopassi:
On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the
arrangements for the licensing examination during the week of May 19, 2014 (Accession
Number ML13137A194). Members of the site examination development staff and NRC regional
staff have reviewed this letter recently. The result is that several of the dates associated with
examination material submittals needed to be revised. Therefore, this letter serves to document
the revised dates, as well as the revised assignment of Chief Examiner. These revisions are
based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist,
Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28
to February 24, 2014.
To meet the schedule of starting the examination on May 19, 2014, the operating tests and
supporting reference materials identified in Attachment 3 to ES-201 will be due by
March 31, 2014. The written examination and supporting reference materials will be due by
April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the
examination is Steve Garchow. All other due dates and requests documented in the
May 16, 2013 letter remain the same.
L. Cortopassi
- 2 -
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426,
or myself at 817-200-1159.
Sincerely,
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket: 50-285
License: DPR-40
L. Cortopassi
- 3 -
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting Deputy Director (Geoffrey.Miller@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Lynnea.Wilkins@nrc.gov)
NRR Project Manager (Joseph.Sebrosky@nrc.gov)
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
TSB Technical Assistant (Loretta.Williams@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEWEB Resource (Sue.Bogle@nrc.gov)
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
MC 0350 Panel Member (Michael.Markley@nrc.gov)
R:\\Reactors\\_FCS\\2014lFCS2014301CNL LT.pdf
ADAMS: No Yes
SUNSI Review Complete
Reviewer Initials: VG
Publicly Available
Non-Sensitive
Non-publicly Available
Sensitive
OE:OB
C:OB
SHedger
VGaddy
/RA/
/RA/
3/4/14
3/4/14
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax